JP6785069B2 - Feeder circuit failure point identification system for electric railways and feeder circuit failure point identification method for electric railways - Google Patents
Feeder circuit failure point identification system for electric railways and feeder circuit failure point identification method for electric railways Download PDFInfo
- Publication number
- JP6785069B2 JP6785069B2 JP2016110941A JP2016110941A JP6785069B2 JP 6785069 B2 JP6785069 B2 JP 6785069B2 JP 2016110941 A JP2016110941 A JP 2016110941A JP 2016110941 A JP2016110941 A JP 2016110941A JP 6785069 B2 JP6785069 B2 JP 6785069B2
- Authority
- JP
- Japan
- Prior art keywords
- current
- substation
- fault
- failure
- circuit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title description 10
- 230000000630 rising effect Effects 0.000 claims description 26
- 239000000284 extract Substances 0.000 claims description 5
- 238000010586 diagram Methods 0.000 description 8
- 238000000605 extraction Methods 0.000 description 6
- 238000012545 processing Methods 0.000 description 5
- 230000005540 biological transmission Effects 0.000 description 4
- 238000005520 cutting process Methods 0.000 description 4
- 238000012937 correction Methods 0.000 description 3
- 238000001514 detection method Methods 0.000 description 3
- 230000004807 localization Effects 0.000 description 3
- 238000005259 measurement Methods 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical group [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 238000006243 chemical reaction Methods 0.000 description 2
- 230000010365 information processing Effects 0.000 description 2
- 239000000470 constituent Substances 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 238000004070 electrodeposition Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 230000035945 sensitivity Effects 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
- Y04S10/52—Outage or fault management, e.g. fault detection or location
Landscapes
- Emergency Protection Circuit Devices (AREA)
- Locating Faults (AREA)
Description
本発明は電鉄用き電回路故障点標定システムおよび電鉄用き電回路故障点標定方法に関するものであり、より詳細には、並列回路を構成する区間および/またはタイポストを有する区間を構成する複数回線の電車線において故障点を標定することができる電鉄用き電回路故障点標定システムおよび電鉄用き電回路故障点標定方法に関する。 The present invention relates to a feeder circuit failure point locating system for electric railways and a feeder circuit failure point locating method for electric railways, and more specifically, a plurality of sections constituting a parallel circuit and / or a section having a tie post. The present invention relates to a feeder circuit failure point locating system for electric railways and a feeder circuit failure point locating method for electric railways, which can identify a failure point in a train line.
従来より2つの変電所から給電されている電車線において短絡故障が発生した場合、各変電所から故障点までの距離は、各変電所における高速度遮断器が開局するまでの一定時間に各変電所のき電線に流れた電流値の配分比から求められることが知られている。 When a short-circuit failure occurs in a train line that has been supplied with power from two substations, the distance from each substation to the failure point is the fixed time until the high-speed circuit breaker at each substation opens. It is known that it can be obtained from the distribution ratio of the current value flowing through the electric wire.
図6は本出願人が鋭意研究を重ねて発明した特許文献1(特開2002−40087号公報)に示される電鉄用き電回路故障点標定システムおよび電鉄用き電回路故障点標定方法の例を示す図である。図6に示すように、従来の電鉄用き電回路故障点標定システム90では単一の電車線91の両端部から電力を供給する各変電所92のそれぞれに電圧測定部92Vと電流測定部92Iと、これらの測定値を入力して現在時刻と対応づけて記憶する情報処理装置92Cとを備え、かつ、各情報処理装置92Cに接続されて現在時刻と電流電圧の測定値を送信する遠方制御装置93(被制御所用)およびこれらに接続されて測定値を分析する遠方制御装置94(制御所用)を備えるものである。なお95は電源、96は高速度遮断器、99は電車である。
FIG. 6 shows an example of the feeder circuit failure point locating system for electric railways and the feeder circuit failure point locating method for electric railways shown in Patent Document 1 (Japanese Unexamined Patent Publication No. 2002-4807) invented by the applicant through repeated diligent research. It is a figure which shows. As shown in FIG. 6, in the conventional electric railway circuit failure
また、遠方制御装置94は各変電所92A,92Bにおける高速度遮断器96が開極する前であって故障時点以降の所定時間帯における検出電流値の平均値から、故障点の標定を行なうものである。
Further, the
しかしながら、従来の手法はいずれも変電所から1本の電車線で接続された単線区間を対象としたものであるのに対し、近年は2本以上の並列回線となる複線区間や複々線区間が多くなっており、とりわけ、変電所間の距離が長い場合には上り下りを構成する電車線の約中間部分において電圧降下を抑えるためのタイポストを設けることがある。これらの複線区間においては電流の流れが複雑化するため、従来の電鉄用き電回路故障点標定システムでは故障点の標定を正しく行うことができないという問題がある。 However, while all the conventional methods target single-track sections connected by a single train line from a substation, in recent years there have been many double-track sections and double-track sections with two or more parallel lines. In particular, when the distance between substations is long, a tie post may be provided in the middle part of the train line that constitutes the up and down to suppress the voltage drop. Since the current flow is complicated in these double-track sections, there is a problem that the conventional feeder circuit failure point determination system for electric railways cannot correctly identify the failure point.
図7は2本の並列回路となる電車線91A,91Bを有する場合の各部に流れる電流を示す図である。図7において、96A,96Bは各電車線91A,91Bに設けた高速度遮断器、97A,97Bは電流検出器、98は電車線91A,91Bの間に電圧降下の救済を目的として電車線91Aと電車線91Bを接続するタイポストである。また、La,Lbは両側の変電所92A,92Bの内部インダクタンス、Ra,Rbは変電所92A,92Bの内部抵抗、Laf,Ltf,Lbtは電車線91A,91Bの各部の線路インダクタンス、Raf,Rtf,Rbtは電車線91A,91Bの各部の線路抵抗、Ltpはタイポスト98の内部インダクタンス、Rtpはタイポスト98の内部抵抗である。
FIG. 7 is a diagram showing a current flowing through each part when the
前記構成の複線区間の電車線91BのポイントBpで短絡故障が発生したとすると、電車線91A,91Bの左右両側から電流が短絡故障発生地点(以下、故障点という)Bpに故障電流として流れるだけでなく、電車線91Aの左右両側からもタイポスト98を介して故障点Bpに故障電流Ip1,Ip2が流れる。このとき、電車線91Bのタイポスト98から故障点Bpまでの区間には故障電流Ip1のみならず、故障電流Ip2に電車線91Bの図示右側から故障点Bpに流れる電流が加えられた電流Ip3が流れて複雑な電流経路を形成するため、短絡故障が発生した電車線91Bに設けた電流検出器97Bによって測定した電流を用いる従来の電鉄用き電回路故障点標定では標定点に誤差が生じていた。
If a short-circuit failure occurs at the point Bp of the
同様に、タイポスト98を設けない場合であっても、並列回路の任意の箇所にインピーダンスを持った回路が構成されているので、複線区間の電車線91A,91Bの何れかに短絡故障が発生するとほかの電車線91B,91Aからの回り込み電流が流れて、短絡故障が発生した電車線に設けた電流検出器によって測定した電流を用いる従来の電鉄用き電回路故障点標定では標定点に誤差が生じていた。
Similarly, even if the
また、前記故障点の標定において、電車線91A,91Bの線路定数は1kmあたりの線路インダクタンスが例えば1.1mH、線路抵抗が0.2Ωであるとして標定演算を行なっており、また、変電所92A,92B内における内部インダクタンスLa,Lbおよび内部抵抗Ra,Rbについても線路の長さや形状から想定される値を経験によって手動入力して標定演算を行っていたが、変電所92A,92Bの構成によってはこれらの値La,Lb,Ra,Rbに違いがあるため、電車線91A,91Bに流れ込む電流に(故障点が中間点であっても)不平衡が生じることもある。したがって、標定演算を正確に行うためには変電所92A,92B内の各部の特性をより正確に設定して故障点の標定精度を上げることが望ましい。
Further, in the determination of the failure point, the line constants of the
本発明は上述の事柄を考慮に入れてなされたものであり、その目的は、2つの変電所の間に電圧降下の救済を目的としたタイポストが設置されている場合を含み、複数の電車線を形成する区間において故障点標定をより正確に行うことができる、実用的な電鉄用き電回路故障点標定システムおよび電鉄用き電回路故障点標定方法を提供することにある。 The present invention has been made in consideration of the above-mentioned matters, and an object thereof includes a case where a tie post for the purpose of relieving a voltage drop is installed between two substations, and a plurality of trains. It is an object of the present invention to provide a practical feeder circuit failure point locating system for electric railways and a feeder circuit failure point locating method for electric railways, which can perform failure point identification more accurately in a section forming a line.
前記課題を解決するため、第1発明は、並列回路を構成する区間および/またはタイポストを有する区間を構成する複数回線の電車線の両側から給電する2つの変電所のそれぞれに、変電所から関連する全ての電車線に流れる故障電流の合計を測定する電流測定部と、故障電流を検出する時点からこの故障電流を遮断する動作までの間における所定時間幅の故障電流の立上り平均を求める故障電流算出部とを備え、かつ、少なくとも何れかの変電所にこれらの故障電流算出部によって求められる両変電所からの故障電流の立上り平均の比を用いて故障点を標定する故障点標定部を備え、かつ、前記電流測定部は変電所から電車線の各回線に流れる電流をそれぞれ測定する複数の電流検出器と、これらの電流検出器が測定した電流の合計値を算出する加算器とを備えることを特徴とする電鉄用き電回路故障点標定システム(請求項1)を提供する。 In order to solve the above problems, the first invention provides to each of two substations that supply power from both sides of a plurality of lines forming a section forming a parallel circuit and / or a section having a tie post from the substation. A current measuring unit that measures the total of the fault currents flowing through all the related train lines, and a fault that obtains the rising average of the fault current in a predetermined time width from the time when the fault current is detected to the operation of cutting off this fault current. It is equipped with a current calculation unit, and at least one of the substations is provided with a failure point estimation unit that defines the failure point using the ratio of the rising averages of the failure currents from both substations obtained by these failure current calculation units. In addition , the current measuring unit includes a plurality of current detectors that measure the current flowing from the substation to each line of the train line, and an adder that calculates the total value of the currents measured by these current detectors. providing feeding circuit circuit fault point location system for railway (claim 1), characterized in Rukoto provided.
すなわち、複数回線の電車線の両側から給電する両変電所において、電流測定部が変電所から関連する全ての電車線に流れる合計電流を測定し、故障電流算出部が故障電流を検出する時点からこの故障電流を遮断する動作までの間における所定時間幅の立上り平均を求め、故障点標定部は二つの変電所における前記故障電流の立上り平均の比を用いて故障点を標定することができる。 That is, from the time when the current measuring unit measures the total current flowing from the substation to all the related train lines and the fault current calculation unit detects the fault current in both substations that supply power from both sides of the train lines of multiple lines. The rising average of the predetermined time width until the operation of cutting off the fault current is obtained, and the fault point locating unit can determine the fault point by using the ratio of the rising averages of the fault currents at the two substations.
図8は図7に示す回路の等価回路を示す図である。図8はタイポストを有する複線区間の電車線において、故障点Bpと各電車線と両変電所92A,92Bの接続部の間の回路をΔ−Y変換によって得られる等価回路を示す図である。図8に示すように、タイポストを有する複線区間の電車線が故障点Bpにおいて地絡した状態の等価回路を順次Δ−Y変換することによって求めると、故障点Bpに対してインダクタンスLbと抵抗Rbを介して接続された接続点Pに、抵抗Raf/2とインダクタンスLaf/2、および、抵抗(Rbf+Rtp)/2とインダクタンス(Lbf+Ltp)/2を介して各変電所92A,92Bに接続されている状態と等価となる。
FIG. 8 is a diagram showing an equivalent circuit of the circuit shown in FIG. 7. FIG. 8 is a diagram showing an equivalent circuit obtained by Δ-Y conversion of a circuit between a failure point Bp, each train line, and a connection portion between both
なお、前記故障点Bpと接続点Pの間のインダクタンスLzの大きさは、下記の式(1)のように求められる。
Lz=Laf(Ltf+Ltp・Lbt/(2Lbt+Ltp))/2(Laf+Ltf+Ltp・Lbt/(2Lbt+Ltp)) … 式(1)
The magnitude of the inductance Lz between the failure point Bp and the connection point P is obtained by the following equation (1).
Lz = Laf (Ltf + Ltp ・ Lbt / (2Lbt + Ltp)) / 2 (Laf + Ltf + Ltp ・ Lbt / (2Lbt + Ltp))… Equation (1)
同様に前記故障点Bpと接続点Pの間の抵抗Rzの大きさは、下記の式(2)のように求められる。なお、電車線に介在させた高速度遮断器および電流検出器は回路の等価回路の計算に必要な電気的特性を備えるものではないので、等価回路ではその記載を省略して簡略化を図っている。
Rz=Raf(Rtf+Rtp・Rbt/(2Rbt+Rtp))/2(Raf+Rtf+Rtp・Rbt/(2Rbt+Rtp)) … 式(2)
Similarly, the magnitude of the resistance Rz between the failure point Bp and the connection point P is obtained by the following equation (2). Since the high-speed circuit breaker and current detector interposed in the train line do not have the electrical characteristics necessary for calculating the equivalent circuit of the circuit, the description is omitted in the equivalent circuit for simplification. There is.
Rz = Raf (Rtf + Rtp ・ Rbt / (2Rbt + Rtp)) / 2 (Raf + Rtf + Rtp ・ Rbt / (2Rbt + Rtp))… Equation (2)
前記等価回路から明らかなように、両変電所92A、92Bから全ての電車線に流れる合計電流Ia、Ibの大きさは変電所92A,92B内の抵抗Ra,Rb、インダクタンスLa,Lbに加えて接続点Pまでの抵抗Raf/2,(Rbt+Rtf)/2とインダクタンスLaf/2,(Lbt+Ltf)/2の比の影響を受け、これらの定数Raf,Rbt,Rtf、Laf,Lbt,Ltfはいずれも、距離に比例する分布定数回路を形成するものである。
As is clear from the equivalent circuit, the magnitudes of the total currents Ia and Ib flowing from both
電流測定部が変電所92A,92Bから関連する全ての電車線に流れる合計電流Ia,Ibを測定し、故障電流算出部によって故障電流を検出する時点をトリガとして故障電流が流れ始めた時点からこの故障電流を遮断する動作までの間における所定時間幅の合計電流Ia,Ibの大きさの積分値からこの間の立上り平均電流ΔIa,ΔIbを求めることにより、短絡故障によって両変電所92A,92Bから流れる故障電流の大きさの比から接続点Pの標定に用いる立上り平均電流ΔIa,ΔIbの比をより正確に求めることができる。
The current measuring unit measures the total currents Ia and Ib flowing from the
なお、故障電流を検出する時点とは例えば各電車線に設けた高速度遮断器の短絡故障信号をトリガとして求められる故障電流が流れ始めた時点であり、故障電流を遮断する動作とは高速度遮断器が電車線を変電所92A,92Bから遮断開始するまでの間の短い時間を示すものであり、故障電流によって急激に増加する合計電流Ia,Ibの立ち上がり時における電流変化を安定して測定するのに必要十分な所定時間幅の間の合計電流Ia,Ibを積算してその平均値を出すことにより、故障電流の立ち上がり時の乱れを省いて安定した立上り平均電流ΔIa,ΔIbを得ることにより、より正確な標定を可能とすることを示すものである。
The time when the failure current is detected is, for example, the time when the failure current required by the short-circuit failure signal of the high-speed circuit breaker provided in each train line starts to flow, and the operation of cutting off the failure current is the high speed. The circuit breaker indicates a short time from the
前記各電車線に流れる故障電流の合計電流の時間tにおける瞬時値の大きさをIa(t),Ib(t)とすると、故障電流の立ち上がり時点での電流変化は、下記の式(3),式(4)に示すように電源95の電圧Ea,Ebと各部のインダクタンスLa,Laf,Lb,Lbt,Ltfの関係式で表わすことができる。
dIa(t)/dt=Ea/(La+(Laf/2)) … 式(3)
dIb(t)/dt=Eb/(Lb+((Lbt+Ltf)/2)) … 式(4)
Assuming that the magnitudes of the instantaneous values of the total current flowing through each train line at time t are Ia (t) and Ib (t), the current change at the rising point of the fault current is calculated by the following equation (3). , As shown in the equation (4), it can be expressed by the relational expression between the voltages Ea and Eb of the
dIa (t) / dt = Ea / (La + (Laf / 2)) ... Equation (3)
dIb (t) / dt = Eb / (Lb + ((Lbt + Ltf) / 2)) ... Equation (4)
したがって、少なくとも何れかの変電所に設けた故障点標定部を用いて、故障電流の立上り平均電流ΔIa,ΔIbの大きさdIa(t)/dt,dIb(t)/dtの比を用いて故障点を標定することにより、抵抗Raf/2,(Rbt+Rtf)/2とインダクタンスLaf/2,(Lbt+Ltf)/2の接続点Pの位置を標定できる。つまり、故障時の合計電流Ia,Ibの立上り平均電流ΔIa,ΔIbの大きさの比から両変電所内の内部インダクタンスLa,Lbおよび内部抵抗Ra,Rbの影響を減算することによって、両変電所から接続点Pまでの距離Daf,Dbfを正確に標定でき、ひいては故障点Bpの位置を標定できる。このとき合計電流Ia,Ibの立上り平均電流ΔIa,ΔIbの大きさの比を用いて演算が行われるので、故障点Bpから接続点Pの間に発生する抵抗RzおよびインダクタンスLzの大きさは演算の過程で必要なくなるため無視することができる。 Therefore, a failure is made using the ratio of the magnitudes dIa (t) / dt and dIb (t) / dt of the rising average currents ΔIa and ΔIb of the failure current using the failure point indicator provided at at least one of the substations. By defining the points, the positions of the connection points P of the resistors Raf / 2, (Rbt + Rtf) / 2 and the inductance Raf / 2, (Lbt + Ltf) / 2 can be defined. That is, by subtracting the influences of the internal inductances La and Lb and the internal resistances Ra and Rb in both substations from the ratio of the magnitudes of the rising average currents ΔIa and ΔIb of the total currents Ia and Ib at the time of failure, from both substations. The distances Daf and Dbf to the connection point P can be accurately defined, and the position of the failure point Bp can be defined. At this time, since the calculation is performed using the ratio of the magnitudes of the rising average currents ΔIa and ΔIb of the total currents Ia and Ib, the magnitudes of the resistance Rz and the inductance Lz generated between the failure point Bp and the connection point P are calculated. It can be ignored because it is no longer needed in the process of.
なお、故障点標定部は2つの変電所の何れか一方または両方に設けることが考えられる。しかしながら、両変電所に遠方制御装置の子機を設け、各遠方制御装置の子機と通信可能に構成された遠方制御装置の親機を設ける場合には、この遠方制御装置の親機に故障点標定部を設けてもよい。 It is conceivable that the failure point determination unit is provided at one or both of the two substations. However, if both substations are provided with a slave unit of a distant control device and a master unit of a distant control device configured to be able to communicate with the slave unit of each distant control device, the master unit of this distant control device fails. A point control unit may be provided.
前記複数回線の電車線にタイポストが設けられていない単なる並列回路を形成している場合においては、前記タイポストの線路インダクタンスLtpおよび線路抵抗Rtpの定数を無限大とすることにより、タイポストを設けた場合の等価回路とすることができる。 In the case where a simple parallel circuit in which the tie post is not provided is formed in the train line of the plurality of lines, the tie post is formed by setting the constants of the line inductance Ltp and the line resistance Rtp of the tie post to infinity. It can be an equivalent circuit when it is provided.
図9は並列回線を構成し、タイポストを備えない場合の2回線の電車線を設けた場合を示す図であり、図10はこれら2回線の電車線を1回線の等価回路に変換した図を示す図である。これらの図9,図10において図7,図8と同じ部分には同じ符号を付している。 FIG. 9 is a diagram showing a case where a parallel line is configured and two train lines are provided when a tie post is not provided, and FIG. 10 is a diagram obtained by converting these two train lines into an equivalent circuit of one line. It is a figure which shows. In these FIGS. 9 and 10, the same parts as those in FIGS. 7 and 8 are designated by the same reference numerals.
図9に示す等価回路において変電所92Bから故障点Bpまでの線路抵抗を符号Rbf、線路インダクタンスを符号Lbfで表わすとき、図10のように等価回路では変電所92A,92Bから合流点Pまでの線路抵抗Raf/2,Rbf/2および線路インダクタンスLaf/2,Lbf/2は2回線の電車線91A,91Bにおける線路抵抗Raf,Rbfおよび線路インダクタンスLaf,Lbfを回線数の2で割ったものと等価であることが分かる。なお、合流点Pから故障点までの線路抵抗Ry、線路インダクタンスLyは何れも、変電所から供給される電流の比には影響を与えることがない部分である。
In the equivalent circuit shown in FIG. 9, when the line resistance from the
なお、前記故障点Bpと接続点Pの間の線路インダクタンスLyの大きさは、前記式(1)における線路インダクタンスLtpを無限大することにより、下記の式(5)のように求められる。
Ly=(Laf・Lbf)/2(Laf+Lbf) … 式(5)
The magnitude of the line inductance Ly between the failure point Bp and the connection point P can be obtained as shown in the following equation (5) by making the line inductance Ltp in the equation (1) infinite.
Ly = (Laf · Lbf) / 2 (Laf + Lbf) ... Equation (5)
同様に前記故障点Bpと接続点Pの間の線路抵抗Ryの大きさは、前記式(2)における線路抵抗Rtpを無限大することにより、下記の式(6)のように求められる。
Ry=(Raf・Rbf)/2(Raf+Rbf) … 式(6)
Similarly, the magnitude of the line resistance Ry between the failure point Bp and the connection point P can be obtained as in the following equation (6) by making the line resistance Rtp in the equation (2) infinite.
Ry = (Raf · Rbf) / 2 (Raf + Rbf) ... Equation (6)
同様に、電車線の回線数がN列の並列回路である場合には、等価回路では変電所92A,92Bから合流点Pまでの線路抵抗Raf/N,Rbf/Nおよび線路インダクタンスLaf/N,Lbf/NはN回線の電車線91A,91Bにおける線路抵抗Raf,Rbfおよび線路インダクタンスLaf,Lbfを回線数のNで割ったものと等価である。
Similarly, when the number of train lines is an N-row parallel circuit, in the equivalent circuit, the line resistance Raf / N, Rbf / N and the line inductance Laf / N from the
また、電車線の回線数がN列の並列回路である場合の等価回路において、故障点Bpと接続点Pの間の線路インダクタンスは(N−1)(Laf・Lbf)/N(Laf+Lbf)、線路抵抗は(N−1)(Raf・Rbf)/N(Raf+Rbf)である。 Further, in the equivalent circuit when the number of train lines is an N-column parallel circuit, the line inductance between the failure point Bp and the connection point P is (N-1) (Laf · Lbf) / N (Laf + Lbf). The line resistance is (N-1) (Raf · Rbf) / N (Raf + Rbf).
すなわち、タイポストの有無に関係なく、並列回路の電車線を構成する区間においては、複数ある回線の全ての電車線91A,91Bに流れる故障電流の合計を求めることにより、この合計電流の大きさの比を用いて、回線数に応じた標定式を使用し、回線数に応じた補正を行って故障点を正確に標定できることを示している。
That is, regardless of the presence or absence of the tie post, in the section constituting the train line of the parallel circuit, the magnitude of this total current is calculated by calculating the total of the fault currents flowing through all the
また、前記電流測定部は変電所から電車線の各回線に流れる電流をそれぞれ測定する複数の電流検出器と、これらの電流検出器が測定した電流の合計値を算出する加算器とを備えることにより、各電車線に通常設けられる電流検出器を利用してその測定値を用いて合計電流を求めることができるので、構成の簡略化を図り、それだけ、製造コストを削減できる。 Moreover, the current measuring unit that includes a plurality of current detectors for measuring the current flowing from the substation to each line of catenary, respectively, and an adder that these current detector calculates the total value of the measured current As a result , the total current can be obtained by using the measured value of the current detector normally provided in each train line, so that the configuration can be simplified and the manufacturing cost can be reduced accordingly.
前記故障電流算出部は両変電所において同期信号を受信する同期信号受信部と、この同期信号を用いて求められる同期時間と共に故障電流の大きさを記録する故障電流記録部とを備え、少なくとも、一方の変電所には他方の変電所において記録した同期時間および故障電流情報を受信する受信部、他方の変電所には前記同期時間および故障電流情報を一方の変電所に送信する送信部を備えると共に、前記故障点標定部は、前記受信部を介して受信する同期時間および故障電流の情報と、自変電所内で記録した同期時間および故障電流の情報の比から故障点の標定を行なうものである場合(請求項2)には、前記同期信号受信部が同期信号を受信することにより離れた地点に配置される変電所において時間的な同期を図ることができる。同期信号受信部は例えば原子時計によって標準時刻を計測しているGPS受信機、標準電波によって標準時刻への校正を定期的に行う電波時計などを用いることができる。 The failure current calculation unit includes a synchronization signal receiving unit that receives a synchronization signal at both substations, and a failure current recording unit that records the magnitude of the failure current together with the synchronization time obtained by using the synchronization signal. One substation is provided with a receiving unit that receives synchronization time and failure current information recorded at the other substation, and the other substation is provided with a transmitting unit that transmits the synchronization time and failure current information to one substation. At the same time, the failure point locating unit defines the failure point from the ratio of the synchronization time and failure current information received via the receiving unit to the synchronization time and failure current information recorded in the substation. In some cases (claim 2 ), the synchronization signal receiving unit receives the synchronization signal, so that time synchronization can be achieved at a substation located at a distant point. As the synchronization signal receiver, for example, a GPS receiver that measures the standard time with an atomic clock, a radio clock that periodically calibrates to the standard time with a standard radio wave, or the like can be used.
故障電流記録部は前記同期信号を用いて求められる同期時間と故障電流の大きさを記録するので、離れた地点に配置された両変電所において故障電流の記録が行われ、同じ時刻に生じた故障電流を正確に求めることができるので、両変電所から各電車線に流れる故障電流の合計電流を同時刻においてその比を求めることができる。 Since the fault current recording unit records the synchronization time and the magnitude of the fault current obtained by using the synchronization signal, the fault current is recorded at both substations located at distant points and occurs at the same time. Since the fault current can be accurately obtained, the ratio of the total fault current flowing from both substations to each train line can be obtained at the same time.
変電所から電車線に供給される電圧を測定する電圧測定部と、変電所から定常的に電車線に供給される直流電圧、直流電流のリップルを前記電圧と電流の測定値から分離抽出するリップル抽出部と、変電所から既知距離の電車線に接続させて人工的に短絡故障を発生させる短絡回路を接続したときに電圧と電流のリップルに発生する位相差から変電所内の直流き電回路におけるインダクタンス値を算出する定常インダクタンス算出部とを備え、前記故障点標定部は定常インダクタンス算出部が算出したインダクタンス値を用いて故障点標定の補正を行なうものである場合(請求項3,4)には、電圧測定部によって測定された電圧と前記電流測定部によって測定された合計電流を用いてリップル抽出部が直流電圧と直流電流のリップルを抽出することができる。また、短絡回路が電車線の既知距離の故障点において人工的に短絡故障を発生させたときにおけるリップルを用いて、定常インダクタンス算出部が電圧と電流のリップルに発生する位相差から変電所内の直流き電回路におけるインダクタンス値を算出する。 A voltage measuring unit that measures the voltage supplied from the substation to the train line, and a ripple that separates and extracts the ripples of the DC voltage and DC current that are constantly supplied from the substation to the train line from the measured values of the voltage and current. In the DC current circuit in the substation from the phase difference generated in the ripple of voltage and current when the extraction unit and the short circuit that artificially causes a short circuit failure by connecting to the train line at a known distance from the substation are connected. In the case where a steady inductance calculation unit for calculating an inductance value is provided, and the failure point determination unit corrects the failure point designation using the inductance value calculated by the steady inductance calculation unit (claims 3 and 4) . Can be used by the ripple extraction unit to extract ripples of DC voltage and DC current using the voltage measured by the voltage measuring unit and the total current measured by the current measuring unit. In addition, using the ripple when the short-circuit circuit artificially causes a short-circuit failure at a failure point at a known distance of the train line, the steady inductance calculation unit uses the phase difference generated in the ripple of voltage and current to direct current in the substation. Calculate the inductance value in the short circuit.
前記求められたインダクタンス値によって前記故障点標定部による故障点標定の補正を行なうことにより、より正確な故障点標定を行なうことができる。例えば、この補正には変電所内の線路抵抗および線路インダクタンスを含めた内部抵抗および内部インダクタンスを求めることが含まれる。これによって従来は経験に基づいて入力していた各部の電気的特性を正確に求めることができるので、規模や構成の異なる変電所間においても正確な故障点の標定を行なえる。 By correcting the failure point determination by the failure point identification unit based on the obtained inductance value, more accurate failure point identification can be performed. For example, this correction includes finding the internal resistance and internal inductance including the line resistance and line inductance in the substation. This interrupts the conventional can be obtained accurately the electrical characteristics of the components that were entered on the basis of experience, Ru performed orientation exact point of failure even between different substations the scale and configuration.
以下、図1〜図4を用いて、本発明の第1実施形態にかかる電鉄用き電回路故障点標定システムおよび電鉄用き電回路故障点標定方法を説明する。 Hereinafter, with reference to FIGS. 1 to 4, a feeder circuit failure point determination system for electric railways and a feeder circuit failure point determination method for electric railways according to the first embodiment of the present invention will be described.
図1に示す電鉄用き電回路故障点評定システム1は、図7に示すタイポスト2Tを有する区間を構成する2回線の電車線2A,2Bの両側から給電する2つの変電所3A,3Bを構成する鉄道用き電回路において、本発明の第1実施形態を説明する図であり、電気的な特性は図7において説明したものと同様である。
The feeder circuit failure point assessment system 1 for electric railways shown in FIG. 1 connects two
図1に示すように、本実施形態の電鉄用き電回路故障点標定システム1は、変電所3A,3Bのそれぞれに、変電所3A,3Bから全ての電車線2A,2Bに流れる合計電流を測定する電流測定部4と、故障電流を検出する時点からこの故障電流を遮断する動作までの間における所定時間幅の故障電流の立上り平均を求める故障電流算出部5とを備え、かつ、変電所3Aには、これらの故障電流算出部によって求められる両変電所からの故障電流の立上り平均の比を用いて故障点を標定する故障点標定部6を備える。
As shown in FIG. 1, the electric railway circuit failure point locating system 1 of the present embodiment applies the total current flowing from the
また、前記電流測定部4は変電所から電車線の各回線に流れる電流をそれぞれ測定する複数の電流検出器7A,7Bと、これらの電流検出器7A,7Bが測定した電流の合計値を算出する加算器8とを備える。前記故障電流算出部5は両変電所において同期信号を受信する同期信号受信部9と、この同期信号を用いて求められる同期時間と共に故障電流の大きさを記録する故障電流記録部10とに接続され、少なくとも、一方の変電所には他方の変電所において記録した同期時間および故障電流情報を受信する受信部11、他方の変電所には前記同期時間および故障電流情報を一方の変電所に送信する送信部12を備える。
Further, the
さらに、変電所3A,3Bから供給される電圧Ea,Ebを測定する電圧測定部13と、変電所3A,3Bから定常的に電車線2A,2Bに供給される直流電圧、直流電流のリップルを前記電圧と電流の測定値から分離抽出するリップル抽出部14と、変電所3A,3Bから既知距離の電車線2A,2Bに接続させて人工的に短絡故障を発生させる短絡回路を接続したときに電圧と電流のリップルに発生する位相差から変電所3A,3B内の直流き電回路におけるインダクタンス値La,Lbを算出する定常インダクタンス算出部15とを備える。
Further, the
16A〜16Dは短絡故障の発生時に前記各電車線2A,2Bへの給電をできるだけ高速に遮断できるように構成された高速度遮断器、17A〜17Dは前記電流検出器7A,7Bに接続されて高速度遮断器16A〜16Dを用いた電力供給の遮断を行わせる遮断制御部である。
16A to 16D are high-speed circuit breakers configured to cut off the power supply to the
また、20A,20Bは前記変電所3A,3Bに設けた電鉄用き電回路故障点標定装置であり、21はこれら電鉄用き電回路故障点標定装置20A,20Bにおいて各物理量の測定値を入力する入力部、22は電鉄用き電回路故障点評定装置20A(20B)の演算処理部である。本実施形態では前記故障電流算出部5,故障点標定部6,加算器8,リップル抽出部14,定常インダクタンス算出部15を演算処理部22によって実行可能なプログラム(ソフトウェア)によって形成している例を示している。
Further, 20A and 20B are electric railway feeder circuit failure point locating devices provided in the
前記電車線2A,2Bは上りと下りの路線にそれぞれ配置されており、そのほぼ中間部分にタイポスト2Tを形成することにより、変電所3A,3B間の距離Daf+Dbfが離れている場合にも、線路抵抗Raf,Rtf,Rbtによる電圧降下の影響を可能な限り抑えられるように構成している。
The train lines 2A and 2B are arranged on the up and down lines, respectively, and by forming a
変電所3A、3B内の電源Ea,Ebは詳細には交流電源からの電力を電車線2A,2Bに供給する電圧に調整する変圧器と、交流電源を直流電源に変換するブリッジ回路とを備えるものであり、かつ、電源Ea,Ebと電車線2A,2Bの間には、内部抵抗Ra,Rbおよび内部インダクタンスLa,Lbの直列回路が介在するため電圧降下を生じさせる。前記電圧測定部13はこの電車線2A,2Bに供給される電圧Ea,Ebの変動を測定するためのものである。
The power supplies Ea and Eb in the
前記電流測定部4は電車線2A,2Bの給電部には既に形成されているホール素子からなる電流検出器7A,7Bと加算器8とを備え、各電流検出器7A,7Bによって測定された電流(Iaa,IabまたはIba,Ibb)の測定値を加算することにより、既存の電流検出器7A,7Bを用いて変電所3A(3B)から全ての電車線2A,2Bに流れる合計電流Ia(Ib)を求めることができるので好ましい。また、前記入力部21には電流および電圧の測定値のみならず、前記遮断制御部17A,17Bが電流検出器7A,7Bの出力を監視して検知する短絡故障発生検知信号がそれぞれ入力される。
The
上述のように本実施形態では既存の電流検出器7A,7Bを有効に活用して加算器8と組合わせて全ての電車線2A,2Bに流れる合計電流を測定可能としているが、この構成に変えて電源Ea(Eb)から電車線2A,2Bの分岐点までの間に一つの電流検出器を設けて、これを全電車線2A,2Bに供給する合計電流の測定部としてもよいことはいうまでもない。
As described above, in the present embodiment, the existing
前記故障電流算出部5は何れか一方の遮断制御部17A〜17Dから短絡故障の発生検知信号が入力された時点から前記高速度遮断器16A〜16Dが故障電流を遮断するまでの間の短い所定期間内において故障電流の合計電流の大きさから故障電流の立上り平均ΔIa,ΔIbを算出するプログラムを演算処理部22が実行して実現するものであり、加算する対象となるのは故障電流記録部10内に収められた自変電所3A(3B)故障電流Iaの測定値(故障電流情報)であり、これを基に故障電流の立上り平均ΔIaを求めるが、前記受信部11および送信部12を介して他方の変電所3B(3A)から受信した故障電流Ibの測定値も、同じ時点の時間幅内において故障電流の立上り平均ΔIbを算出する。なお、本実施形態のように故障電流算出部5をソフトウェアによって形成することにより、装置構成の簡素化を図ると共に柔軟な対応が可能となる。
The fault
前記故障点標定部6は故障電流算出部5によって求められた合計電流の大きさを用いて故障点Bpを標定する演算処理を行うプログラムを演算処理部22が実行して実現するものである。
The failure
本実施形態における前記同期信号受信部9はGPS受信機であり、9AはGPS衛星からの電磁波を受信するアンテナである。また、同期信号受信部9は1秒ごとに同期信号を出力し、前記故障電流記録部10は前記同期信号を基準として少なくとも1秒間の合計電流Ia,Ibを記録することにより、同期信号を用いて求められる同期時間と共に故障電流の大きさを記録する。
The synchronization
本実施形態では一方の変電所3Aにおいては記録した同期時間および故障電流情報を受信する受信部11を備え、他方の変電所3Bには故障電流記録部10に記録させた同期時間および故障電流情報を送信する送信部12を備えることにより、他方の変電所3Bによって記録した同期時間および故障電流情報を一方の変電所3Aに転送し、この変電所3Aの故障電流記録部10において両変電所3A、3Bにおいて測定した故障電流の合計を用いて一方の変電所3Aの故障点標定部6において故障点Bpの標定を行うことができる。
In the present embodiment, one
なお、故障点標定においてはインダクタンスだけを用いて演算を行なうことにより、定常的に流れる負荷の影響をできるだけ排除して故障点標定を行なうことができる。 In the failure point determination, the failure point determination can be performed by eliminating the influence of the constantly flowing load as much as possible by performing the calculation using only the inductance.
図2は前記電鉄用き電回路故障点標定システムにおける変電所の内部パラメータの設定方法を示す図である。図2において、R0は一方の電車線2Bの地点P0において人工的に短絡故障を発生させる短絡回路を構成する短絡抵抗であり、Ra0は変電所3Aから人工的な短絡地点P0までの線路抵抗、La0は線路インピーダンス、Rt0は地点P0からタイポストまでの線路抵抗、Lt0は線路インピーダンス、D1,D2は地点P0から変電所3A,3Bまでの距離である。
FIG. 2 is a diagram showing a method of setting internal parameters of a substation in the feeder circuit failure point determination system for electric railways. In FIG. 2, R0 is a short-circuit resistor constituting a short-circuit circuit that artificially causes a short-circuit failure at a point P0 of one
今、変電所3Aの内部パラメータLaを求める場合を考えると、短絡抵抗R0を設けない電車線2Aおよび短絡抵抗R0から変電所3Bの間に設けた遮断制御部17A,17C,17Dを用いて高速度遮断器16A,16C,16Dを遮断させた上で、短絡抵抗R0による短絡を行なう。
Considering the case where the internal parameter La of the
図3は前記短絡回路を接続した状態の等価回路を示す図である。既知の地点P0において人工的に短絡故障を発生させるときの等価回路において接続点P’は、変電所3Aの電源Eaから内部抵抗Ra、内部インダクタンスLa、線路抵抗Raf、線路インダクタンスLafの直列負荷を介して接続され、地点P0に対して線路抵抗R0を介して接続される。
FIG. 3 is a diagram showing an equivalent circuit in a state where the short circuit is connected. In the equivalent circuit when an artificial short-circuit failure occurs at a known point P0, the connection point P'is a series load of internal resistance Ra, internal inductance La, line resistance Raf, and line inductance Laf from the power supply Ea of the
上記等価回路において、地点P’までの距離D1が既知であるから、これらの線路間の線路抵抗Raf、線路インダクタンスLafの大きさも既知となる。また、電鉄用き電回路における直流電源Eaは交流電源に整流器を接続して得られるものであるから、負荷が大きくなればなるほど大きな整流に伴う高調波成分が含まれ、地絡故障に伴って大電流が流れれば流れるほど大きなリップル(交流成分)が発生する。 In the above equivalent circuit, since the distance D1 to the point P'is known, the magnitudes of the line resistance Raf and the line inductance Laf between these lines are also known. Further, since the DC power supply Ea in the feeder circuit for electric railways is obtained by connecting a rectifier to an AC power supply, the larger the load, the larger the harmonic component associated with the rectification is contained, and the ground fault occurs. The larger the current, the larger the ripple (alternating current component) generated.
そして、前記リップル抽出部14は電圧測定部13によって測定された直流電圧、電流測定部4によって測定される直流電流に表れるリップルを抽出し、この電流リップルと電圧リップルの間には、人工的な故障回路を流れる回路上の内部インダクタンスLaと地点P’までの距離D1によって定まる線路インダクタンスLafによる影響を受けた位相差が発生する。
Then, the
次いで、前記定常インダクタンス算出部15がリップルに発生する位相差から人工的に短絡故障を発生させたときの全インダクタンスを計算し、これから既知距離の線路インダクタンスLafの大きさを減算して、変電所3A内の直流き電回路における定常的なインダクタンス値を算出することができる。すなわち、これが内部インダクタンスLaである。
Next, the steady
同様に、前記遮断制御部17A,17B,17Cを用いて高速度遮断器16A,16B,16Cを遮断させた状態で短絡抵抗R0による短絡を行なうことにより、変電所3Bの内部パラメータLbを求めることができる。
Similarly, the internal parameter Lb of the
したがって、この人工的な故障回路を接続したときに流れる電流と電圧に生じる位相差から、変電所3A,3Bの内部インダクタンスLa,Lbを測定値に基づいて正確に求めることができる。これらの変電所3A,3B内の内部インダクタンスLa,Lbを実際の地絡故障が発生した時の補正演算に用いることにより、たとえ変電所3A,3B内部の電気的な特性が大きく異なるような構成の電鉄用き電回路であっても、より正確な故障点の標定を行うことができる。
Therefore, the internal inductances La and Lb of the
次に、図4を用いて前記構成の電鉄用き電回路故障点標定システムにおける電鉄用き電回路故障点標定方法を説明する。本図において変電所3A,3Bの動作を並べて示しており、時間的な経過を揃えるようにして示す。
Next, a method for locating the feeder circuit failure point for electric railway in the feeder circuit failure point locating system for electric railway having the above configuration will be described with reference to FIG. In this figure, the operations of the
図4に示すように、まず、電流測定部4によって複数の電車線2A,2Bの両側から給電する2つの両変電所3A,3Bのそれぞれにおいて、変電所3A,3Bから全ての電車線2A、2Bに流れる電流を測定する。(ステップSa1,Sb1)
As shown in FIG. 4, first, in each of the two
次に、前記測定した電流の大きさを同期時間(すなわち同期信号の立ち上がりからのカウント数)と共に故障電流記録部10に記録する。(ステップSa2,Sb2)
Next, the magnitude of the measured current is recorded in the fault
同時に前記遮断制御部17A,17Bの何れか一方が電流検出器14を監視して急激な電流増加が発生したときに生成する地絡故障発生検知信号の入力を待機し、故障発生まで前記ステップSa1,Sa2、Sb1,Sb2を繰り返す。(ステップSa3,Sab3)
At the same time, one of the
前記故障が発生すると短い所定時間の間、さらに加えて同期時間と電流を測定して故障電流記録部10に記録する(ステップSa4,Sb4)。この短い所定時間とは、前記高速度遮断器16A,16Bが電車線を電源から遮断するまでの時間より短い所定長さの時間である。
When the failure occurs, the synchronization time and the current are further measured and recorded in the failure
次いで、他方の変電所3B側においては、故障電流記録部10に記録させた同期時間と故障電流の記録を送信部12を介して専用回線に送信し(ステップSb5)、一方の変電所3Aでは専用回線から受信部11を介して同期時間と故障電流の記録を受信し、これらを故障電流記録部10に記録する。(ステップSa5)
Next, on the
変電所3Aにおいては、前記故障電流算出部5は故障電流記録部10に記録させた両変電所3A,3Bから全ての電車線2A,2Bに流れる故障電流Ia,Ibを、互いに同期する時間であることを確保した状態で故障電流の立ち上がり時点から所定時間幅の間加算することにより、変電所3A,3Bの両側における故障電流Ia,Ibの立ち上がり時の平均値ΔIa、ΔIbを算出する。(ステップSa6)
In the
そして、前記故障点標定部6は前記故障電流の立ち上がり時の平均値ΔIa,ΔIbの比と、定常インダクタンス算出部15によって既に算出したインダクタンス値を用いて故障点標定を行なう。(ステップSa7)なお、このとき、変電所3Aから見た故障点までの距離Dafは下記の式(9)によって求めることができる。
Daf=ΔIb(Da+Daf+Dbf+Db)/(ΔIa+ΔIb)-Da … 式(9)
Then, the failure
Daf = ΔIb (Da + Daf + Dbf + Db) / (ΔIa + ΔIb) -Da… Equation (9)
なお、Daは変電所3Aの内部インダクタンス等価距離、Dbは変電所3Bの内部インダクタンス等価距離であり、下記の式(10),式(11)に示すように表わされる。
なお、Llineは線路定数のインダクタンス値である。
Da=La/(Lline/2) … 式(10)
Db=Lb/(Lline/2) … 式(11)
Da is the internal inductance equivalent distance of the
Lline is the inductance value of the line constant.
Da = La / (Lline / 2) ... Equation (10)
Db = Lb / (Lline / 2) ... Equation (11)
前記式(9)から式(12)に示すようにΔIa,ΔIbを用いることにより、その比から故障点Bpの標定を行なうことができる。
Daf=ΔIb(Dbf+Db)−Da … 式(12)
By using ΔIa and ΔIb as shown in the equations (9) to (12), the failure point Bp can be determined from the ratio.
Daf = ΔIb (Dbf + Db) -Da ... Equation (12)
本実施形態に示すように、一方の変電所3A側に他方の変電所3Bにおける測定値を転送して故障点の標定をおこなうことが可能であるが本発明はこの構成に限定されるものではなく、両変電所3A,3Bにおいて互いに測定値を交換して電車線2A、2Bの両側から行なってもよく、その場合には、前記ステップSa5,Sb5において互いに同期時間と故障電流の記録を送受信し、変電所3B側においてもステップSa6,Sa7と同様の故障電流の算出および故障点の標定を行なうことができる。
As shown in the present embodiment, it is possible to transfer the measured values at the
また、本実施形態においてはタイポスト2Tを有する2本の電車線2A,2Bにおいて説明しているが、本発明はこの構成に限られるものではなく、タイポストを設けない複線区間であっても同様に故障点の標定を行なうことができる。加えて、同期時間受信部はGPS受信機に限られるものではなく、標準電波によって標準時刻への校正を定期的に行う電波時計を用いてもよい。
Further, in the present embodiment, the two
同様に上述の実施形態では、電車線2A…が2本である場合について説明しているが、当然ながら3本以上の複数線の電車線2A…を用いる場合にも同様に故障点Bpの標定を行なうことができる。
Similarly, in the above-described embodiment, the case where there are two
図5は本発明の第2実施形態にかかる電鉄用き電回路故障点標定システム30を説明する図である。図5に示す例では、両変電所3A,3Bにそれぞれ遠方制御装置31の子機31A,31Bと、これらの子機31A,31Bと通信可能に構成された遠方制御装置の31の親機31Cを設けることにより、親機31Cからの同期信号で各変電所3A,3Bの時刻同期を行なうようにした点と、親機31C側に故障点標定部6’を設けて、前記同期信号を用いて各変電所3A,3Bにおいて測定され、子機31A,31Bから親機31Cに転送される故障電流Ia,Ibの立ち上がり時の平均値ΔIa、ΔIbを用い、親機31C側において故障点標定部6’が故障点Bpの標定行なう点において、第1実施形態と異なっている。
FIG. 5 is a diagram illustrating a feeder circuit failure
本実施形態のように遠方制御装置31を設けることにより、地絡故障の監視などの業務を集中管理にて行なうことができると共に、各変電所3A,3BにおけるGPSまたは電波時計の電磁波の受信感度を考えること無く設置できる利点がある。なお、同期は各変電所3A,3BにおいてGPSまたは電波時計を用いて行い、標定演算を遠方制御装置31の親機31Cにおいて行なうようにしてもよいことはいうまでもない。
By providing the
1 電鉄用き電回路故障点標定システム
2A,2B 電車線
2T タイポスト
3A,3B 変電所
4 電流測定部
5 故障電流算出部
6 故障点標定部
7A,7B 電流検出器
8 加算器
9 同期信号受信部
10 故障電流記録部
11 受信部
12 送信部
13 電圧測定部
14 リップル抽出部
15 定常インダクタンス算出部
Bp 故障点
Ia,Ib 合計電流
ΔIa,ΔIb 故障電流の立上り平均
1 Electric railway circuit failure
Claims (4)
変電所から関連する全ての電車線に流れる故障電流の合計を測定する電流測定部と、
故障電流を検出する時点からこの故障電流を遮断する動作までの間における所定時間幅の故障電流の立上り平均を求める故障電流算出部とを備え、かつ、
これらの故障電流算出部によって求められる両変電所からの故障電流の立上り平均の比を用いて故障点を標定する故障点標定部を備え、かつ、前記電流測定部は変電所から電車線の各回線に流れる電流をそれぞれ測定する複数の電流検出器と、これらの電流検出器が測定した電流の合計値を算出する加算器とを備えることを特徴とする電鉄用き電回路故障点標定システム。 To each of the two substations that supply power from both sides of the multiple train lines that make up the section that makes up the parallel circuit and / or the section that has the tie post,
A current measuring unit that measures the total fault current flowing from the substation to all related train lines,
It is equipped with a fault current calculation unit that obtains the rising average of the fault current in a predetermined time width from the time when the fault current is detected to the operation of shutting off the fault current.
It is equipped with a failure point locating section that uses the ratio of the rising averages of the failure currents from both substations obtained by these failure current calculation sections to determine the failure point , and the current measuring section is for each of the train lines from the substation. a plurality of current detectors and, these current detectors railway feeding circuit circuit fault point location system according to claim Rukoto an adder for calculating the sum of the current measured for measuring the current flowing in the line, respectively ..
変電所から定常的に電車線に供給される直流電圧、直流電流のリップルを前記電圧と電流の測定値から分離抽出するリップル抽出部と、
変電所から既知距離の電車線に接続させて人工的に短絡故障を発生させる短絡回路を接続したときに電圧と電流のリップルに発生する位相差から変電所内の直流き電回路におけるインダクタンス値を算出する定常インダクタンス算出部とを備え、
前記故障点標定部は定常インダクタンス算出部が算出したインダクタンス値を用いて故障点標定の補正を行なうものである請求項1または請求項2に記載の電鉄用き電回路故障点標定システム。 A voltage measuring unit that measures the voltage supplied from the substation to the train line,
A ripple extractor that separates and extracts the ripple of DC voltage and DC current constantly supplied from the substation to the train line from the measured values of the voltage and current, and
Calculate the inductance value in the DC electric circuit in the substation from the phase difference generated in the ripple of voltage and current when a short circuit that artificially causes a short circuit failure by connecting to a train line at a known distance from the substation is connected. Equipped with a steady-state inductance calculation unit
The feeder circuit failure point locating system for an electric railway according to claim 1 or 2 , wherein the failure point locating unit corrects the failure point locating using an inductance value calculated by a steady-state inductance calculation unit.
変電所から関連する全ての電車線に流れる故障電流の合計を測定する電流測定部と、A current measuring unit that measures the total fault current flowing from the substation to all related train lines,
故障電流を検出する時点からこの故障電流を遮断する動作までの間における所定時間幅の故障電流の立上り平均を求める故障電流算出部とを備え、かつ、It is equipped with a fault current calculation unit that obtains the rising average of the fault current in a predetermined time width from the time when the fault current is detected to the operation of shutting off the fault current.
これらの故障電流算出部によって求められる両変電所からの故障電流の立上り平均の比を用いて故障点を標定する故障点標定部を備え、かつ、It is equipped with a fault point locating unit that defines the fault point using the ratio of the rising averages of the fault currents from both substations obtained by these fault current calculation units.
変電所から電車線に供給される電圧を測定する電圧測定部と、 A voltage measuring unit that measures the voltage supplied from the substation to the train line,
変電所から定常的に電車線に供給される直流電圧、直流電流のリップルを前記電圧と電流の測定値から分離抽出するリップル抽出部と、 A ripple extractor that separates and extracts the ripple of DC voltage and DC current constantly supplied from the substation to the train line from the measured values of the voltage and current, and
変電所から既知距離の電車線に接続させて人工的に短絡故障を発生させる短絡回路を接続したときに電圧と電流のリップルに発生する位相差から変電所内の直流き電回路におけるインダクタンス値を算出する定常インダクタンス算出部とを備え、 Calculate the inductance value in the DC electric circuit in the substation from the phase difference generated in the ripple of voltage and current when a short circuit that artificially causes a short circuit failure by connecting to a train line at a known distance from the substation is connected. Equipped with a steady inductance calculation unit
前記故障点標定部は定常インダクタンス算出部が算出したインダクタンス値を用いて故障点標定の補正を行なうものであることを特徴とする電鉄用き電回路故障点標定システム。A feeder circuit failure point locating system for electric railways, wherein the failure point locating unit corrects the failure point locating using an inductance value calculated by a steady-state inductance calculation unit.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2016110941A JP6785069B2 (en) | 2016-06-02 | 2016-06-02 | Feeder circuit failure point identification system for electric railways and feeder circuit failure point identification method for electric railways |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2016110941A JP6785069B2 (en) | 2016-06-02 | 2016-06-02 | Feeder circuit failure point identification system for electric railways and feeder circuit failure point identification method for electric railways |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2017215293A JP2017215293A (en) | 2017-12-07 |
| JP6785069B2 true JP6785069B2 (en) | 2020-11-18 |
Family
ID=60575518
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2016110941A Active JP6785069B2 (en) | 2016-06-02 | 2016-06-02 | Feeder circuit failure point identification system for electric railways and feeder circuit failure point identification method for electric railways |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP6785069B2 (en) |
Families Citing this family (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109950883B (en) * | 2019-04-30 | 2024-10-29 | 广东电网有限责任公司 | Protection and measurement control device and protection and measurement control method for distribution network automation switch |
| CN111579925B (en) * | 2020-05-21 | 2021-10-08 | 西南交通大学 | A method for locating the ground fault of the positive rail of the fourth rail return traction power supply system |
| CN112231623B (en) * | 2020-10-13 | 2022-12-02 | 广州市扬新技术研究有限责任公司 | Contact network parameter calculation method of rail transit traction power supply system |
| CN113325272B (en) * | 2021-08-03 | 2021-10-29 | 中国铁路设计集团有限公司 | A method for identifying fault zones in hub areas based on power flow analysis |
| CN115575767B (en) * | 2022-10-31 | 2024-02-13 | 西南交通大学 | A fault locating system and method for double-line traction network with bilateral direct power supply |
Family Cites Families (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5144568B1 (en) * | 1970-03-03 | 1976-11-29 | ||
| JPS5312058B2 (en) * | 1972-10-06 | 1978-04-26 | ||
| JPS58117467A (en) * | 1982-01-05 | 1983-07-13 | Japanese National Railways<Jnr> | Fault point identification system for dc line |
| JPH073450B2 (en) * | 1984-02-22 | 1995-01-18 | 財団法人鉄道総合技術研究所 | Fault location method for DC electric railway feeder circuit |
| JPS61196712A (en) * | 1985-02-23 | 1986-08-30 | 永楽電気株式会社 | Fault-point location for electric railway feeding circuit |
| JPH04309874A (en) * | 1991-04-05 | 1992-11-02 | Tsuda Denki Keiki Kk | Finding of trouble point of dc electric train feeder circuit |
| JP3157691B2 (en) * | 1994-11-25 | 2001-04-16 | 東海旅客鉄道株式会社 | Feeding equipment protection device |
| SE507043C2 (en) * | 1996-08-29 | 1998-03-16 | Asea Brown Boveri | Measurement procedure at line error locator on HVDC lines |
| JP3293759B2 (en) * | 1997-05-19 | 2002-06-17 | 西日本旅客鉄道株式会社 | Fault Location Method and Fault Location System for DC Railway Feeding Circuit |
| JP6091960B2 (en) * | 2013-03-29 | 2017-03-08 | 東日本旅客鉄道株式会社 | Fault location system and fault location method for DC railway feed circuit |
| JP6600511B2 (en) * | 2015-09-01 | 2019-10-30 | 東日本旅客鉄道株式会社 | Fault location system and fault location method for DC railway feed circuit |
-
2016
- 2016-06-02 JP JP2016110941A patent/JP6785069B2/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| JP2017215293A (en) | 2017-12-07 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP6785069B2 (en) | Feeder circuit failure point identification system for electric railways and feeder circuit failure point identification method for electric railways | |
| EP2829887B1 (en) | Method and device for estimating angle of zero-sequence voltage in single-phase earth fault | |
| US7283915B2 (en) | Method and device of fault location | |
| US20180348267A1 (en) | Measuring and mitigating channel delay in remote data acquisition | |
| CN102472780A (en) | Method and device for monitoring grid status | |
| EP3369150B1 (en) | Method and system for protection in a mixed line | |
| EP3482472B1 (en) | A method and system for locating a fault in a mixed power transmission line | |
| US20120130656A1 (en) | Data alignment in large scale electrical system applications | |
| CZ305209B6 (en) | Method of determining probability of unsymmetrical failure occurrence points in electrical networks and monitoring system intended for carrying out the method | |
| WO1998029752A1 (en) | System for locating faults and estimating fault resistance in distribution networks with tapped loads | |
| KR102378031B1 (en) | Current Differential Relay and Sampling Synchronization Method | |
| JP7077224B2 (en) | Improvements to the power system or related | |
| CN103777113A (en) | Method for locating short circuit in an overhead power transmission line by unsynchronized measurements at both ends thereof | |
| EP1342095B1 (en) | Fault location method and device | |
| CN101183782A (en) | Power station relay mode and PCM current differential relay mode | |
| EP3629437A1 (en) | Method and device for controlling at least one circuit breaker of a power system | |
| CN109742741B (en) | A relay protection data synchronization method for active distribution network | |
| JP2018531575A6 (en) | Improvement of power system or related | |
| JP2016142659A (en) | Failure point locating method and failure point locating system | |
| EP3563163B1 (en) | Travelling wave based method for locating a fault in a transmission line and device therefor | |
| CN111929491B (en) | Transmission line sampling synchronization method and system based on Tellegen's similar power theorem | |
| JP4733987B2 (en) | FAILURE LOCATION METHOD, DEVICE, PROGRAM, AND COMPUTER-READABLE RECORDING MEDIUM | |
| SE1550489A1 (en) | Method and arrangement for locating short circuits in energy supply systems | |
| JP2007076607A (en) | Fault point sample quantity measuring device for AC feeding circuit | |
| JP3844757B2 (en) | Feeder fault location system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20190318 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20200109 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20200204 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20200401 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20201005 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20201026 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 6785069 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |