Train control system, train control method and on-board equipment of train Download PDFInfo
- Publication number
- JP6802091B2 JP6802091B2 JP2017042396A JP2017042396A JP6802091B2 JP 6802091 B2 JP6802091 B2 JP 6802091B2 JP 2017042396 A JP2017042396 A JP 2017042396A JP 2017042396 A JP2017042396 A JP 2017042396A JP 6802091 B2 JP6802091 B2 JP 6802091B2
- Authority
- JP
- Japan
- Prior art keywords
- train
- speed
- current
- station
- time
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60L—PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- B60L15/00—Methods, circuits, or devices for controlling the traction-motor speed of electrically-propelled vehicles
- B60L15/40—Adaptation of control equipment on vehicle for remote actuation from a stationary place
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Power Engineering (AREA)
- Transportation (AREA)
- Electric Propulsion And Braking For Vehicles (AREA)
- Train Traffic Observation, Control, And Security (AREA)
Description
本発明は、先行列車の遅延により、その後ろを走行する後続列車に対して発生する遅延波及を抑制する列車制御システム、列車制御方法および列車の車上装置に関し、先行列車の出発時刻の遅れの予測が困難な状況において、後続列車の駅間停止を抑制することでエネルギー増大を防止するものである。 The present invention relates to a train control system, a train control method, and an on-board device of a train that suppresses the delay spread that occurs to a succeeding train traveling behind the delay of the preceding train, and that the departure time of the preceding train is delayed. In situations where it is difficult to predict, the increase in energy is prevented by suppressing the stoppage of the following train between stations.
鉄道システムにおいて、同一走行路を走行する列車は、列車同士が衝突しないように信号によって制御されていることから、信号を考慮して設計されているダイヤの通りに列車が走行をしている場合には、信号によって後続列車にブレーキがかかる状況はあまり発生しない。 In a railway system, trains traveling on the same track are controlled by signals so that the trains do not collide with each other. Therefore, when the trains are traveling according to the timetable designed in consideration of the signals. There are not many situations where the signal brakes the following train.
しかしながら、ある列車が遅延しダイヤ上の余裕を無くした場合には、その後ろを走行する後続列車に対して、先行列車との衝突を回避するためにブレーキがかかる現象が頻繁に起こり得る。特に、都市部のように高密度に列車が走行している場合には、その更に後ろを走行している後続列車に対してもこの現象が波及することになる。これによって、加減速の増大による消費エネルギーの増加を招くとともに、更に遅延が波及する事態を招くことになる。 However, when a certain train is delayed and the margin on the timetable is exhausted, the phenomenon that the following train traveling behind the train is braked in order to avoid a collision with the preceding train may frequently occur. In particular, when trains are traveling at high density as in urban areas, this phenomenon will spread to subsequent trains traveling further behind. As a result, the energy consumption increases due to the increase in acceleration / deceleration, and the delay further spreads.
このような事態を解決するための技術として、特許文献1には、地上装置と、地上装置が管理する領域内のすべての列車上にある車上装置とをネットワークにより結んだ地上車上連携システムにおいて、地上装置は、各列車上にある車上装置から列車走行情報を入手し、内部にある処理装置によって該当する後続列車に対する目標情報を作成し、この目標情報を各列車上にある車上装置に送付することにより、当該車上装置は、送付された目標情報に従い走行する方法が記述されている。 As a technique for solving such a situation, Patent Document 1 describes a ground-based on-board cooperation system in which a ground-based device and on-board devices on all trains in the area managed by the ground-based device are connected by a network. In the above, the ground device obtains train running information from the on-board device on each train, creates target information for the corresponding following train by the internal processing device, and uses this target information on the on-board on each train. By sending to the device, the method of traveling the on-board device according to the sent target information is described.
しかしながら、特許文献1に記述されている方法は、列車が到着した時刻情報を基に処理をするため、混雑に伴う乗降時間の増加や駆け込み乗車などにより出発時刻に遅延が発生するなど、乗客の動態に依存する出発時刻の遅延に対してまで対応を図ることは、不可能である。このような状況下では、後続列車が先行列車に過剰に接近することとなり、信号によって後続列車にブレーキがかかり駅中間で停車することになる。さらに、その後続列車も同じように過剰に接近することになるため、連鎖的に駅中間で停車することになる。 However, since the method described in Patent Document 1 processes based on the time information when the train arrives, the departure time may be delayed due to an increase in boarding / alighting time due to congestion or a rush boarding. It is impossible to deal with the delay of departure time, which depends on the dynamics. Under such circumstances, the following train will come too close to the preceding train, and the signal will brake the following train and stop in the middle of the station. Furthermore, the following trains will also approach excessively, so they will stop in the middle of the station in a chain reaction.
このように、先行列車の出発の遅れがその後ろを走行する後続列車に影響を与え、さらに後続する列車へと波及することが起こる。その結果として、平常運転時と比較して消費エネルギーが増大するとともに、列車遅延の波及を招くことになる。 In this way, the delay in the departure of the preceding train affects the following train traveling behind it, and further spreads to the following train. As a result, energy consumption increases as compared with normal operation, and train delays spread.
本発明に係る列車制御システムは、上記課題を解決するために、地上側が備える最短解放時刻計算部と、列車の車上側または地上側が備える目標速度算出部と、車上側が備える走行制御装置とを有し、最短解放時刻計算部は、駅の手前に設定される駅進入限界位置で定まるブレーキパターンが消失するに至る最も早い時刻である最短解放時刻を、現在時刻、駅に到着する列車の時間間隔を示す時隔データおよび目標駅までの間に列車より前に停車している列車数に基づいて計算し、目標速度算出部は、駅進入限界位置、列車の現在位置、前記列車の減速度および最短解放時刻と現在時刻との差分値から列車の目標速度を算出し、走行制御装置は、目標走行パターンから列車の現在位置および現在速度に基づいて第1の走行指令を求め、列車の前方を走行する先行列車によって定まる自列車進入限界位置、列車の現在位置および列車の減速度に基づいて算出したブレーキパターン速度と目標速度とから小さい方の速度を追従目標速度として列車の速度を当該追従目標速度に近づける第2の走行指令を求め、第1の走行指令および第2の走行指令から小さい方を列車の走行指令として決定することを特徴とする。
In order to solve the above problems, the train control system according to the present invention includes a shortest release time calculation unit provided on the ground side, a target speed calculation unit provided on the upper side or the ground side of the train, and a traveling control device provided on the upper side of the vehicle. The shortest release time calculation unit has the shortest release time, which is the earliest time until the brake pattern determined at the station approach limit position set in front of the station disappears, as the current time, the time of the train arriving at the station. calculated based on the number of trains that are stopped before the train between the time interval data and the target station when showing the spacing, the target speed calculating unit, the station enters a limit position location, current position of the train, the train The target speed of the train is calculated from the deceleration and the difference between the shortest release time and the current time, and the travel control device obtains the first travel command based on the current position and current speed of the train from the target travel pattern. The speed of the train with the smaller speed as the follow-up target speed from the brake pattern speed and target speed calculated based on the own train approach limit position determined by the preceding train running in front of the train, the current position of the train, and the deceleration of the train. Is obtained as a second travel command that approaches the tracking target speed, and the smaller of the first travel command and the second travel command is determined as the train travel command .
本発明によれば、列車の駅間停止を最小限に抑制して回避することが可能となり、平常運転時と比較して消費エネルギーの増大を防ぐとともに、列車遅延の増大や波及を防ぐことが可能となる。 According to the present invention, it is possible to minimize and avoid stoppages between train stations, prevent an increase in energy consumption as compared with normal operation, and prevent an increase in train delay and spillover. It will be possible.
本発明を実施するための形態として、実施例1〜3について、図面を用いて以下に説明する。 Examples 1 to 3 as a mode for carrying out the present invention will be described below with reference to the drawings.
図1は、本発明の実施例1に係るシステム構成の一例およびデータフローを示す図である。
地上装置101は、管轄する路線の情報を管理し、管轄する路線を走行する列車102A、102B、102C、…(以下、全てを総称して「列車102」とする)に対して情報を送信する。列車102(102A、102B、102C、…)は、送信された情報を基に自列車を制御する。
FIG. 1 is a diagram showing an example of a system configuration and a data flow according to a first embodiment of the present invention.
The ground device 101 manages information on the line under its jurisdiction, and transmits information to trains 102A, 102B, 102C, ... (Hereinafter, all of them are collectively referred to as "train 102") traveling on the line under its jurisdiction. .. The train 102 (102A, 102B, 102C, ...) Controls its own train based on the transmitted information.
また、地上装置101は、管轄する路線を走行する列車の発着状況を管理する発着状況管理装置103、各駅の時隔データ(列車到着の時間間隔を示すデータ)を管理する時隔データベース104、管轄する路線のダイヤを記録しておくダイヤデータベース105、発着状況管理装置103と時隔データベース104とダイヤデータベース105とからの各情報を入力とする最短解放時刻計算装置106および列車102(102A、102B、102C、…)に情報を送信する地上側送信装置107から構成される。 Further, the ground device 101 has a departure / arrival status management device 103 that manages the arrival / departure status of trains traveling on the line under its jurisdiction, a time interval database 104 that manages time interval data (data indicating the time interval of train arrival) at each station, and jurisdiction. The diamond database 105 that records the timetable of the route to be used, the shortest release time calculation device 106 that inputs each information from the departure / arrival status management device 103, the time interval database 104, and the timetable database 105, and the train 102 (102A, 102B, It is composed of a ground-side transmitter 107 that transmits information to 102C, ...).
ここで、最短解放時刻計算装置106は、発着状況管理装置103、時隔データベース104およびダイヤデータベース105からの各入力情報を基にして、各列車102A、102B、102C、…が進入しようとする駅への進入防止を図るブレーキパターンの最短解放時刻151A、151B、151C、…(以下、全てを総称して「最短解放時刻151」とする)および各列車の駅進入限界位置152A、152B、152C、…(以下、全てを総称して「駅進入限界位置152」とする)を計算する。ここで、この最短解放時刻とは、上記ブレーキパターンが消失するとした場合に、この消失することに至る最も早い時刻を示している。 Here, the shortest release time calculation device 106 is a station where each train 102A, 102B, 102C, ... Is about to enter based on each input information from the departure / arrival status management device 103, the time interval database 104, and the timetable database 105. The shortest release times 151A, 151B, 151C, ... (Hereinafter, all of them are collectively referred to as "shortest release time 151") and the station entry limit positions 152A, 152B, 152C of each train to prevent entry into. … (Hereinafter, all of them are collectively referred to as “station approach limit position 152”). Here, the shortest release time indicates the earliest time until the brake pattern disappears when the brake pattern disappears.
地上側送信装置107は、最短解放時刻151(151A、151B、151C、…)および駅進入限界位置152(152A、152B、152C、…)の各情報を列車102(102A、102B、102C、…)に送信する。 The ground-side transmitter 107 transmits each information of the shortest release time 151 (151A, 151B, 151C, ...) And the station approach limit position 152 (152A, 152B, 152C, ...) To the train 102 (102A, 102B, 102C, ...). Send to.
列車102(図1の下図、参照)は、地上装置101から情報を受信する車上側受信装置108、列車の加減速特性を記録するデータベース109、現在の列車速度154および現在の列車位置155を計測する速度計測装置110および列車の走行方法を決定する自動列車走行装置111から構成される。 The train 102 (see the lower figure of FIG. 1) measures the vehicle upper receiving device 108 that receives information from the ground device 101, the database 109 that records the acceleration / deceleration characteristics of the train, the current train speed 154, and the current train position 155. It is composed of a speed measuring device 110 and an automatic train running device 111 that determines a running method of the train.
ここで、車上側受信装置108は、地上装置101から最短解放時刻151および駅進入限界位置152を受信するとともに、信号装置(図示せず)から自列車の前方を走行する先行列車との関係で定まる自列車進入限界位置153を受信する。 Here, the vehicle upper receiving device 108 receives the shortest release time 151 and the station approach limit position 152 from the ground device 101, and in relation to the preceding train traveling in front of the own train from the signal device (not shown). Receives the determined own train approach limit position 153.
速度計測装置110は、現在の列車速度154および現在の列車速度154を積分することで得られる現在の列車位置155を計測する。速度計測装置110としては、速度発電機やGPSなどを用いてもよい。 The speed measuring device 110 measures the current train position 155 obtained by integrating the current train speed 154 and the current train speed 154. As the speed measuring device 110, a speed generator, GPS, or the like may be used.
自動列車走行装置111は、最短解放時刻151、駅進入限界位置152、自列車進入限界位置153、現在の列車速度154、現在の列車位置155およびデータベース109に記録された加減速特性156を基にして、列車の走行方法を決定する。自動列車走行装置111が決定した走行方法に従って、列車102は自動運転を行う。 The automatic train traveling device 111 is based on the shortest release time 151, the station approach limit position 152, the own train approach limit position 153, the current train speed 154, the current train position 155, and the acceleration / deceleration characteristic 156 recorded in the database 109. To decide how to run the train. The train 102 automatically operates according to the traveling method determined by the automatic train traveling device 111.
図2は、最短解放時刻計算装置106が実行する処理のフローチャートを示す図である。以下、このフローチャートに沿って処理内容を説明する。なお、以下の各ステップでは、最短解放時刻計算装置106を「計算装置106」と簡略して記す。 FIG. 2 is a diagram showing a flowchart of processing executed by the shortest release time calculation device 106. Hereinafter, the processing contents will be described according to this flowchart. In each of the following steps, the shortest release time calculation device 106 is abbreviated as "calculation device 106".
ステップ201で、計算装置106は、管轄する路線上に存在する列車のリストを抽出し、ステップ202に進む。このリストの抽出に際し、ダイヤデータベース105を参酌して、発着状況管理装置101により発着状況に応じた適宜の補正を加える。 In step 201, the computing device 106 extracts a list of trains existing on the line under its jurisdiction and proceeds to step 202. When extracting this list, the timetable database 105 is taken into consideration, and the departure / arrival status management device 101 makes appropriate corrections according to the arrival / departure status.
ステップ202で、計算装置106は、ステップ201で抽出した列車のリストの中から駅間に存在する1列車を抽出し、ステップ203に進む。 In step 202, the calculation device 106 extracts one train existing between the stations from the list of trains extracted in step 201, and proceeds to step 203.
ステップ203で、計算装置106は、ステップ202で抽出した列車が向かっている駅までの間に、自列車より前に停車している列車数Nを算出し(抽出した列車が向かっている駅に停車している列車も含む)、ステップ204に進む。この算出には、ダイヤデータベース105および発着状況管理装置101を用いる。 In step 203, the calculation device 106 calculates the number N of trains stopped before the own train before the station where the train extracted in step 202 is heading (to the station where the extracted train is heading). Proceed to step 204 (including stopped trains). A diamond database 105 and a departure / arrival status management device 101 are used for this calculation.
ステップ204で、計算装置106は、ステップ202で抽出した列車が向かっている駅に停車している他列車が出発遅延しているか否かをチェックする。他列車が停車しかつ出発遅延している場合(Y)には、ステップ205に進む。他方、他列車が停車していない、あるいは他列車が停車していても出発遅延していない場合(N)には、ステップ206に進む。 In step 204, the calculation device 106 checks whether or not the departure of another train stopped at the station to which the train extracted in step 202 is heading is delayed. If another train is stopped and the departure is delayed (Y), the process proceeds to step 205. On the other hand, if the other train is not stopped, or if the departure is not delayed even if the other train is stopped, the process proceeds to step 206.
ステップ205で、計算装置106は、ステップ203で抽出した列車数Nを基に、以下の計算式により最短解放時刻を算出し、ステップ207に進む。ここで、時隔のデータは、時隔データベース104により得る。
最短解放時刻=現在時刻+時隔×列車数N
In step 205, the calculation device 106 calculates the shortest release time by the following formula based on the number of trains N extracted in step 203, and proceeds to step 207. Here, the time interval data is obtained from the time interval database 104.
Shortest release time = current time + time interval x number of trains N
ステップ206で、計算装置106は、抽出した列車が向かっている駅に到着するまでに、最短解放時刻が一度でも出されている場合には、その中で最も直近に出された最短解放時刻を指令し、ステップ207に進む。一度も出されていない場合には、最短解放時刻を指定しない。 In step 206, if the shortest release time has been issued even once by the time the extracted train arrives at the station to which the extracted train is heading, the calculation device 106 sets the most recent shortest release time among them. Command and proceed to step 207. If it has never been issued, do not specify the shortest release time.
ステップ207で、計算装置106は、管轄する路線上に存在する列車のリストから現在の列車を削除し、ステップ208に進む。 At step 207, the calculator 106 removes the current train from the list of trains existing on the line under its jurisdiction and proceeds to step 208.
ステップ208で、計算装置106は、管轄する路線上に存在する列車のリストにまだ列車が存在するか否かをチェックし、存在する(Y)場合にはステップ202に戻り、存在しない(N)場合には処理を終了する。 In step 208, the computing device 106 checks whether the train still exists in the list of trains existing on the line under its jurisdiction, and if it exists (Y), returns to step 202 and does not exist (N). If so, end the process.
図3は、車上装置102が搭載する自動列車走行装置111の内部構成の一例を示す図である。
自動列車走行装置111は、目標速度351を算出する目標速度算出装置301、目標走行パターン352を格納する走行パターンデータベース302および走行指令353を決定する走行決定装置303から構成される。
FIG. 3 is a diagram showing an example of the internal configuration of the automatic train traveling device 111 mounted on the on-board device 102.
The automatic train traveling device 111 includes a target speed calculating device 301 for calculating the target speed 351, a traveling pattern database 302 for storing the target traveling pattern 352, and a traveling determining device 303 for determining the traveling command 353.
目標速度算出装置301は、最短解放時刻151、駅進入限界位置152、現在の列車位置155および加減速特性156を基にして、自列車の目標速度351を算出する。
走行パターンデータベース302は、(位置、速度)の集合で構成される自列車の目標走行パターン352を記憶している。その際には、走行パターンデータベース302には、あらかじめ作成した走行パターンおよび走行中に作成した走行パターンの少なくとも一方を格納する。
The target speed calculation device 301 calculates the target speed 351 of the own train based on the shortest release time 151, the station approach limit position 152, the current train position 155, and the acceleration / deceleration characteristic 156.
The travel pattern database 302 stores the target travel pattern 352 of the own train composed of a set of (position, speed). At that time, at least one of the traveling pattern created in advance and the traveling pattern created during traveling is stored in the traveling pattern database 302.
走行決定装置303は、自列車進入限界位置153、現在の列車速度154、現在の列車位置155、加減速特性156、目標速度351および自列車の目標走行パターン352を基にして、自列車の走行指令353を決定する。 The travel determination device 303 travels the own train based on the own train approach limit position 153, the current train speed 154, the current train position 155, the acceleration / deceleration characteristic 156, the target speed 351 and the target travel pattern 352 of the own train. Directive 353 is determined.
図4は、自動列車走行装置111に設ける目標速度算出装置301が実行する処理のフローチャートを示す図である。以下に、このフローチャートに沿って処理内容を説明する。なお、以下の各ステップでは、目標速度算出装置301を「算出装置301」と簡略して記す。 FIG. 4 is a diagram showing a flowchart of processing executed by the target speed calculation device 301 provided in the automatic train traveling device 111. The processing contents will be described below according to this flowchart. In each of the following steps, the target speed calculation device 301 is abbreviated as "calculation device 301".
ステップ401で、算出装置301は、最短解放時刻151(T_Release)があるかどうかをチェックし、それがある(Y)場合にはステップ402に進み、それがない(N)場合には、ステップ405に進む。 In step 401, the calculation device 301 checks whether there is a minimum release time 151 (T_Release), proceeds to step 402 if it exists (Y), and proceeds to step 405 if it does not exist (N). Proceed to.
ステップ402で、算出装置301は、駅進入限界位置152(X_LMA)を取得し、ステップ403に進む。 In step 402, the calculation device 301 acquires the station approach limit position 152 (X_LMA) and proceeds to step 403.
ステップ403で、算出装置301は、加減速特性156を基にして列車の減速度(β[m/s/s])を取得し、ステップ404に進む。 In step 403, the calculation device 301 acquires the deceleration (β [m / s / s]) of the train based on the acceleration / deceleration characteristic 156, and proceeds to step 404.
ステップ404で、算出装置301は、列車の現在位置155(X[m])、ステップ402で取得した駅進入限界位置152(X_LMA[m])、ステップ403で取得した列車の減速度(β[m/s/s])および最短解放時刻151(T_Release)と現在時刻Tとの差分値(ΔT[s])から、以下の式を用いて目標速度351(V[km/h])を算出し、処理を終了する。
V={−ΔT+(ΔT2+2/β×|X_LMA−X|)1/2}×β×3.6
In step 404, the calculation device 301 uses the current position of the train 155 (X [m]), the station approach limit position 152 (X_LMA [m]) acquired in step 402, and the deceleration of the train acquired in step 403 (β []. From the m / s / s]) and the difference value (ΔT [s]) between the shortest release time 151 (T_Release) and the current time T, the target velocity 351 (V [km / h]) is calculated using the following formula. And end the process.
V = {-ΔT + (ΔT 2 + 2 / β × | X_LMA-X |) 1/2 } × β × 3.6
他方、ステップ405で、算出装置301は、列車の最高速度を目標速度351に設定し、処理を終了する。 On the other hand, in step 405, the calculation device 301 sets the maximum speed of the train to the target speed 351 and ends the process.
図5は、自動列車走行装置111に設ける走行決定装置303の内部構成の一例を示す図である。
走行決定装置303は、第1の走行指令551を決定する走行追従制御部501、信号速度552を算出する信号速度算出部502、第2の走行指令554を決定する目標速度制御部504および比較処理部503並びに505から構成される。
FIG. 5 is a diagram showing an example of the internal configuration of the travel determination device 303 provided in the automatic train travel device 111.
The travel determination device 303 includes a travel follow-up control unit 501 that determines the first travel command 551, a signal speed calculation unit 502 that calculates the signal speed 552, a target speed control unit 504 that determines the second travel command 554, and comparison processing. It is composed of parts 503 and 505.
走行追従制御部501は、現在の列車速度154、現在の列車位置155および目標走行パターン352を基にして、現在の列車速度154および現在の列車位置155を目標走行パターン352に近づけるように、第1の走行指令551を決定する。 The travel tracking control unit 501 is based on the current train speed 154, the current train position 155, and the target travel pattern 352, so as to bring the current train speed 154 and the current train position 155 closer to the target travel pattern 352. The running command 551 of 1 is determined.
信号速度算出部502は、自列車進入限界位置153、現在の列車位置155および加減速特性156を基にして、現在の列車位置における自列車のブレーキパターン速度に相当する信号速度552を算出する。 The signal speed calculation unit 502 calculates a signal speed 552 corresponding to the brake pattern speed of the own train at the current train position based on the own train approach limit position 153, the current train position 155, and the acceleration / deceleration characteristic 156.
比較処理部503は、信号速度552と目標速度351の小さい方の数値を追従目標速度553として出力する。
目標速度制御部504は、現在の列車速度154を追従目標速度553に近づけるように、第2の走行指令554を決定する。
The comparison processing unit 503 outputs the smaller numerical value of the signal speed 552 and the target speed 351 as the tracking target speed 553.
The target speed control unit 504 determines the second travel command 554 so that the current train speed 154 approaches the follow-up target speed 553.
比較処理部505は、第1の走行指令551と第2の走行指令554の小さい方の指令値を自列車の走行指令353として出力する。 The comparison processing unit 505 outputs the smaller command values of the first running command 551 and the second running command 554 as the running command 353 of the own train.
なお、走行追従制御部501からの第1の走行指令551の決定方法および目標速度制御機能504からの第2の走行指令554の決定方法は、公知の手法を用いてもよく、例えば、目標速度と現在速度の偏差による比例制御などを用いればよい。 As a method for determining the first travel command 551 from the travel tracking control unit 501 and a method for determining the second travel command 554 from the target speed control function 504, known methods may be used, for example, the target speed. And proportional control based on the deviation of the current speed may be used.
また、信号速度算出部502の信号速度552の算出方法には、信号速度552をV_ATP[km/h]、自列車進入限界位置153をY_LMA[m]、現在の列車位置155をX[m]、加減速特性156で定まる列車の減速度をβ[m/s/s]とした場合に、以下の式を用いる。
V_ATP=(2×β×|Y_LMA−X|)1/2×3.6
Further, in the calculation method of the signal speed 552 of the signal speed calculation unit 502, the signal speed 552 is V_ATP [km / h], the own train approach limit position 153 is Y_LMA [m], and the current train position 155 is X [m]. , When the deceleration of the train determined by the acceleration / deceleration characteristic 156 is β [m / s / s], the following equation is used.
V_ATP = (2 x β x | Y_LMA-X |) 1/2 x 3.6
図6は、本発明に係る列車制御を実施した場合の効果を示す図である。
時刻T0の時点で、駅Bに列車1が停車し、駅Aから駅Bに向かって列車2、その後を列車3が走行している状態を想定する。この後、列車1が駅Bで出発遅延した際に、本発明に係る制御を適用した場合に得られる効果を説明する。
FIG. 6 is a diagram showing the effect when the train control according to the present invention is carried out.
It is assumed that train 1 is stopped at station B at time T0, train 2 is running from station A to station B, and then train 3 is running. After that, when the departure of train 1 is delayed at station B, the effect obtained when the control according to the present invention is applied will be described.
図6において、左側の図(以下、「図6左図」という)は、横軸を速度、縦軸を位置とし、列車3に対して、本発明に係る制御を適用した場合の走行の軌跡(速度変化)を示している。右側の図(以下、「図6右図」という)は、横軸を時刻、縦軸を位置とし、列車1、列車2および列車3それぞれの時々刻々の位置を示している。 In FIG. 6, the left side view (hereinafter referred to as “FIG. 6 left view”) shows a traveling locus when the control according to the present invention is applied to the train 3 with the horizontal axis as the speed and the vertical axis as the position. (Speed change) is shown. In the figure on the right side (hereinafter referred to as "the right figure of FIG. 6"), the horizontal axis is the time and the vertical axis is the position, and the positions of train 1, train 2, and train 3 are shown every moment.
以下では、図2および図4に示す処理フロー並びに図5に示す構成による走行指令を決定する制御態様に沿って、図6右図を中心にして効果を説明する。 In the following, the effects will be described with reference to the right figure of FIG. 6 according to the processing flow shown in FIGS. 2 and 4 and the control mode for determining the traveling command according to the configuration shown in FIG.
(1)時刻T0まで
時刻T0までは、列車1に出発遅延がない状態である。このため、時刻T0までは、列車2および列車3に対して、図2に示す最短解放時刻計算装置106の処理フローでは、いずれもステップ201→202→203→204(N)→206→207→208と処理は進み、最短解放時刻は指定されない(ステップ206では、直近に出された最短解放時刻がないため、指定されない)。なお、ステップ203で抽出されるNは、列車2に対してはN=1、列車3に対してはN=2となる。
(1) Until time T0 Until time T0, train 1 has no departure delay. Therefore, until time T0, for trains 2 and 3, in the processing flow of the shortest release time calculation device 106 shown in FIG. 2, steps 201 → 202 → 203 → 204 (N) → 206 → 207 → The process proceeds to 208, and the shortest release time is not specified (in step 206, the shortest release time is not specified because there is no latest release time). The N extracted in step 203 is N = 1 for train 2 and N = 2 for train 3.
また、図4に示す目標速度算出装置301の処理フローでは、列車2および列車3に対して、いずれもステップ401(N)→405と処理は進み、目標速度は列車最高速度の設定となる。 Further, in the processing flow of the target speed calculation device 301 shown in FIG. 4, the processing proceeds from step 401 (N) to 405 for both trains 2 and 3, and the target speed is set to the maximum train speed.
さらに、図5に示す制御態様を実施することにより、列車2および列車3の走行指令が確定する。列車2(走行パターンを図示せず)については、図6右図に示す時刻−位置の軌跡から、時刻T0の時点で向かっている駅の進入限界位置近くまで到達している。しかし、時刻T0の時点では駅の進入限界位置から発生するブレーキパターンに抵触することなく、かつ先行する列車1に出発遅延が発生していないことから、駅Bへの停車に向けて走行する。列車2に後続する列車3は、目標速度に向けて加速する。 Further, by implementing the control mode shown in FIG. 5, the running commands of the trains 2 and 3 are determined. Train 2 (running pattern not shown) has reached the vicinity of the approach limit position of the station heading at time T0 from the locus of time-position shown in the right figure of FIG. However, at the time of time T0, the train travels toward the stop at the station B because it does not conflict with the brake pattern generated from the approach limit position of the station and the departure delay does not occur in the preceding train 1. The train 3 following the train 2 accelerates toward the target speed.
(2)時刻T1
時刻T1の時点で、列車1には出発遅延が発生する。この時、列車2および列車3に対して、図2に示す最短解放時刻計算装置106の処理フローでは、いずれもステップ201→202→203→204(Y)→205→207→208と進み、それぞれの最短開放時刻TO21およびTO31が算出される。なお、ステップ203で抽出されるNは、列車2に対してはN=1、列車3に対してはN=2となる。
(2) Time T1
At time T1, train 1 has a departure delay. At this time, for trains 2 and 3, in the processing flow of the shortest release time calculation device 106 shown in FIG. 2, steps 201 → 202 → 203 → 204 (Y) → 205 → 207 → 208, respectively, respectively. The shortest opening times TO21 and TO31 are calculated. The N extracted in step 203 is N = 1 for train 2 and N = 2 for train 3.
また、図4に示す目標速度算出装置301の処理フローでは、列車2および列車3に対して、いずれもステップ401(Y)→402→403→404と進み、それぞれの目標速度VO21およびVO31が算出される。 Further, in the processing flow of the target speed calculation device 301 shown in FIG. 4, steps 401 (Y) → 402 → 403 → 404 are performed for both trains 2 and 3, and the target speeds VO21 and VO31 are calculated respectively. Will be done.
この目標速度VO21およびVO31に従って、列車2および列車3は、図5に示す制御態様を行う。列車2(走行パターンを図示せず)については、図6右図に示す時刻−位置の軌跡から、時刻T1の時点で、向かっている駅の進入限界位置から発生するブレーキパターンPT3に抵触することになり、制動状態となる。 According to the target speeds VO21 and VO31, the train 2 and the train 3 perform the control mode shown in FIG. For train 2 (running pattern not shown), the time-position locus shown on the right of FIG. 6 conflicts with the brake pattern PT3 generated from the approach limit position of the station to which the train is heading at time T1. And the braking state is set.
一方、列車3については、向かっている駅の進入限界および先行する列車2によって定まる自列車の進入限界P1で定まるブレーキパターンPT1までは距離があることから、目標速度VO31に応じて制御することになる。なお、目標速度VO31が現在速度よりも大きいため、列車3は加速状態(図6左図)となる。 On the other hand, for train 3, since there is a distance to the approach limit of the station heading and the brake pattern PT1 determined by the approach limit P1 of the own train determined by the preceding train 2, it is decided to control according to the target speed VO31. Become. Since the target speed VO31 is larger than the current speed, the train 3 is in an accelerated state (Fig. 6, left figure).
(3)時刻T1〜T2
時刻T1からT2へ進むと、列車2は駅進入限界位置に停車することになる。目標速度VO21は、列車2が進入限界位置に到達したため0となる。このため、制動の指令が出されたままとなる。以下、列車2については、時刻T4までは同じ挙動となるため、時刻T4までは触れない。
(3) Times T1 to T2
From time T1 to T2, train 2 will stop at the station entry limit position. The target speed VO21 becomes 0 because the train 2 has reached the approach limit position. Therefore, the braking command remains issued. Hereinafter, train 2 will behave in the same way until time T4, and will not be touched until time T4.
一方、列車3の目標速度VO31は、現在速度に近づく方向ではあるが、現在速度よりも高い値となっている。また、先行する列車2によって定まる自列車の進入限界P2で定まるブレーキパターンPT2までは距離があることから、目標速度VO31に応じて制御することになる。このため、列車3は引き続き加速する(図6左図)。 On the other hand, the target speed VO31 of the train 3 is in the direction of approaching the current speed, but is higher than the current speed. Further, since there is a distance to the brake pattern PT2 determined by the approach limit P2 of the own train determined by the preceding train 2, the control is performed according to the target speed VO31. Therefore, train 3 continues to accelerate (Fig. 6, left figure).
(4)時刻T2
時刻T2の時点で、列車3は、X2の位置に到達し、速度V2となる。列車3に対して、図2に示す最短解放時刻計算装置106の処理フローでは、ステップ201→202→203→204(Y)→205→207→208と進み、最短開放時刻TO32が算出される。なお、ステップ203で抽出されるNは、列車2に対してはN=1、列車3に対してはN=2となる。
(4) Time T2
At time T2, train 3 reaches the position of X2 and reaches speed V2. For the train 3, in the processing flow of the shortest release time calculation device 106 shown in FIG. 2, steps 201 → 202 → 203 → 204 (Y) → 205 → 207 → 208 are performed, and the shortest release time TO32 is calculated. The N extracted in step 203 is N = 1 for train 2 and N = 2 for train 3.
また、図4に示す目標速度算出装置301の処理フローでは、ステップ401(Y)→402→403→404と進み、目標速度VO32が算出される。また、先行する列車2によって定まる自列車の進入限界P2で定まるブレーキパターンPT2までは距離があることから、目標速度VO32に応じて制御することになる。この目標速度VO32が、現在の速度V2と一致するため、列車3は現在の速度V2を保つように動作する。 Further, in the processing flow of the target speed calculation device 301 shown in FIG. 4, the target speed VO32 is calculated by proceeding in the order of step 401 (Y) → 402 → 403 → 404. Further, since there is a distance to the brake pattern PT2 determined by the approach limit P2 of the own train determined by the preceding train 2, the control is performed according to the target speed VO32. Since the target speed VO32 matches the current speed V2, the train 3 operates so as to maintain the current speed V2.
(5)時刻T3
時刻T3の時点で、列車3は、X3の位置に到達し、速度V3となる。列車3に対して、図2に示す最短解放時刻計算装置106の処理フローでは、ステップ201→202→203→204(Y)→205→207→208と進み、最短開放時刻TO33が算出される。なお、ステップ203で抽出されるNは、列車2に対してはN=1、列車3に対してはN=2となる。
(5) Time T3
At time T3, train 3 reaches the position of X3 and reaches speed V3. For train 3, in the processing flow of the shortest release time calculation device 106 shown in FIG. 2, steps 201 → 202 → 203 → 204 (Y) → 205 → 207 → 208 are performed, and the shortest release time TO33 is calculated. The N extracted in step 203 is N = 1 for train 2 and N = 2 for train 3.
また、図4に示す目標速度算出装置301の処理フローでは、ステップ401(Y)→402→403→404と進み、目標速度VO33が算出される。また、先行する列車2によって定まる自列車の進入限界P2で定まるブレーキパターンPT2までは距離があることから、目標速度VO33に応じて制御することになる。目標速度VO33は、現在速度V3よりも低いため、列車3は目標速度VO33となるように減速する(図6左図)。 Further, in the processing flow of the target speed calculation device 301 shown in FIG. 4, the target speed VO33 is calculated by proceeding in the order of step 401 (Y) → 402 → 403 → 404. Further, since there is a distance to the brake pattern PT2 determined by the approach limit P2 of the own train determined by the preceding train 2, the control is performed according to the target speed VO33. Since the target speed VO33 is lower than the current speed V3, the train 3 decelerates so as to reach the target speed VO33 (Fig. 6, left figure).
(6)時刻T3〜T4
時刻T3からT4へと進むに従い、列車3の目標速度VO33は、現在の速度よりも低くなる値が算出される。また、先行する列車2によって定まる自列車の進入限界P2で定まるブレーキパターンPT2までは依然距離があることから、目標速度VO33に応じて制御することになる。すなわち、列車3は目標速度VO33になるように減速する(図6左図)。
(6) Times T3 to T4
As the time progresses from T3 to T4, the target speed VO33 of the train 3 is calculated to be lower than the current speed. Further, since there is still a distance to the brake pattern PT2 determined by the approach limit P2 of the own train determined by the preceding train 2, the control is performed according to the target speed VO33. That is, the train 3 decelerates so as to reach the target speed VO33 (Fig. 6, left figure).
(7)時刻T4
時刻T4になると、駅Bに停車していた列車1が出発する。列車2および列車3に対して、図2に示す最短解放時刻計算装置106の処理フローでは、いずれもステップ201→202→203→204(Y)→205→207→208と進み、それぞれの最短開放時刻TO24およびTO34が算出される。なお、ステップ203で抽出されるNは、列車2に対してはN=1、列車3に対してはN=2となる。
(7) Time T4
At time T4, train 1 stopped at station B departs. For trains 2 and 3, in the processing flow of the shortest release time calculation device 106 shown in FIG. 2, steps 201 → 202 → 203 → 204 (Y) → 205 → 207 → 208 are all performed, and the shortest release of each is performed. Times TO24 and TO34 are calculated. The N extracted in step 203 is N = 1 for train 2 and N = 2 for train 3.
また、図4に示す目標速度算出装置301の処理フローでは、列車2および列車3に対していずれもステップ401(Y)→402→403→404と進み、目標速度VO24およびVO34が算出される。この目標速度VO24およびVO34に従って、列車2および列車3は走行制御を行う。但し、列車2に対する目標速度VO24はまだ0であるため、列車2は停車状態を維持する。 Further, in the processing flow of the target speed calculation device 301 shown in FIG. 4, steps 401 (Y) → 402 → 403 → 404 are performed for both train 2 and train 3, and the target speeds VO24 and VO34 are calculated. Trains 2 and 3 control travel according to the target speeds VO24 and VO34. However, since the target speed VO24 with respect to the train 2 is still 0, the train 2 maintains the stopped state.
一方、列車3は、X4の位置に到達しているものの、先行する列車2によって定まる自列車の進入限界P2で定まるブレーキパターンPT2までは依然距離があることから、目標速度VO34に応じて制御することになる。列車3は、現在の速度がV4となっているが、目標速度VO34は現在の速度V4よりも低いため、目標速度VO34となるように減速する(図6左図)。 On the other hand, although the train 3 has reached the position of X4, it is controlled according to the target speed VO34 because there is still a distance to the brake pattern PT2 determined by the approach limit P2 of the own train determined by the preceding train 2. It will be. The current speed of train 3 is V4, but since the target speed VO34 is lower than the current speed V4, the train 3 is decelerated so as to reach the target speed VO34 (Fig. 6, left figure).
(8)時刻T5
時刻T5は、列車1が駅Bから出発し終えた時刻である。列車2および列車3に対して、図2に示す最短解放時刻計算装置106の処理フローでは、いずれもステップ201→202→203→204(Y)→206→207→208と進み、それぞれの最短開放時刻は、この直近に出力されていたTO24およびTO34が算出される。なお、ステップ203で抽出されるNは、列車2に対してはN=0、列車3に対してはN=1となる。
(8) Time T5
Time T5 is the time when train 1 finishes departing from station B. For trains 2 and 3, in the processing flow of the shortest release time calculation device 106 shown in FIG. 2, steps 201 → 202 → 203 → 204 (Y) → 206 → 207 → 208 are all performed, and the shortest release of each is performed. For the time, TO24 and TO34 that were output most recently are calculated. The N extracted in step 203 is N = 0 for train 2 and N = 1 for train 3.
また、図4に示す目標速度算出装置301の処理フローでは、列車2および列車3に対していずれもステップ401(Y)→402→403→404と進み、最短開放時刻のTO24およびTO34並びにそれぞれの駅進入限界位置も変化していないことから、目標速度VO24およびVO34が算出される。この目標速度VO24およびVO34に従って、列車2および列車3は走行制御を行う。但し、列車2に対する目標速度VO24はまだ0であるため、列車2は停車状態を維持する。 Further, in the processing flow of the target speed calculation device 301 shown in FIG. 4, steps 401 (Y) → 402 → 403 → 404 are performed for both train 2 and train 3, and TO24 and TO34 with the shortest opening time and their respective Since the station approach limit position has not changed, the target speeds VO24 and VO34 are calculated. Trains 2 and 3 control travel according to the target speeds VO24 and VO34. However, since the target speed VO24 with respect to the train 2 is still 0, the train 2 maintains the stopped state.
一方、列車3は、X5の位置に到達しているものの、先行する列車2によって定まる自列車の進入限界P2で定まるブレーキパターンPT2までは依然距離があることから、目標速度VO34に応じて制御することになる。列車3は、現在の速度V5(=目標速度VO34)となっているため、目標速度VO34を維持するように走行する(図6左図)。 On the other hand, although the train 3 has reached the position of X5, it is controlled according to the target speed VO34 because there is still a distance to the brake pattern PT2 determined by the approach limit P2 of the own train determined by the preceding train 2. It will be. Since the train 3 has the current speed V5 (= target speed VO34), the train 3 travels so as to maintain the target speed VO34 (Fig. 6, left figure).
(9)時刻T5〜T6
時刻T5からT6へと進んでいる間、列車2および列車3の目標速度は、それぞれの最短開放時刻および駅進入限界位置が変動しないことから、それぞれの目標速度は、時刻T5で算出したVO24(=0)およびVO34から変動しない。すなわち、列車2は停車状態を維持する。
(9) Times T5 to T6
While traveling from time T5 to T6, the target speeds of trains 2 and 3 do not change at the shortest opening time and the station approach limit position, so each target speed is VO24 calculated at time T5 ( = 0) and does not change from VO34. That is, the train 2 maintains the stopped state.
また、列車3は、X5からX6の位置に移動するが、先行する列車2によって定まる自列車の進入限界P2で定まるブレーキパターンPT2までは依然距離があることから、目標速度VO34に応じて制御することになる。すなわち、列車3は、速度V5(=目標速度VO34)となっているため、目標速度VO34を維持するように走行する(図6左図)。 Further, the train 3 moves from the position of X5 to the position of X6, but since there is still a distance to the brake pattern PT2 determined by the approach limit P2 of the own train determined by the preceding train 2, it is controlled according to the target speed VO34. It will be. That is, since the train 3 has a speed V5 (= target speed VO34), the train 3 travels so as to maintain the target speed VO34 (FIG. 6, left figure).
(10)時刻T6
時刻T6は、列車1による駅進入防止が解除された時刻である。列車2および列車3に対して、図2に示す最短解放時刻計算装置106の処理フローでは、いずれもステップ201→202→203→204(Y)→206→207→208と進み、それぞれの最短開放時刻は、この直近に出力されていたTO24およびTO34が算出される。なお、ステップ203で抽出されるNは、列車2に対してはN=0、列車3に対してはN=1となる。
(10) Time T6
Time T6 is the time when the station entry prevention by train 1 is released. For trains 2 and 3, in the processing flow of the shortest release time calculation device 106 shown in FIG. 2, steps 201 → 202 → 203 → 204 (Y) → 206 → 207 → 208 are all performed, and the shortest release of each is performed. For the time, TO24 and TO34 that were output most recently are calculated. The N extracted in step 203 is N = 0 for train 2 and N = 1 for train 3.
また、図4に示す目標速度算出装置301の処理フローでは、列車2および列車3に対していずれもステップ401(Y)→402→403→404と進み、列車2については最短開放時刻がTO24であるところ、駅Bまで進入可能となったため、0を超える目標速度VO26が算出され、列車2は再加速を始め駅Bに向かう。後続する列車3については、最短開放時刻がTO34であり駅進入限界位置は変化しないため、目標速度はVO34のまま変化しない。 Further, in the processing flow of the target speed calculation device 301 shown in FIG. 4, steps 401 (Y) → 402 → 403 → 404 are performed for both train 2 and train 3, and the shortest opening time for train 2 is TO24. At some point, since it became possible to enter station B, a target speed VO26 exceeding 0 was calculated, and train 2 started re-acceleration and headed for station B. For the following train 3, the shortest opening time is TO34 and the station approach limit position does not change, so the target speed remains unchanged at VO34.
また、列車3は、X6の位置に到達しているものの、先行する列車2によって定まる自列車の進入限界P2で定まるブレーキパターンPT2までは依然距離があることから、目標速度VO34に応じて制御することになる。すなわち、列車3は、速度V5(=目標速度VO34)となっているため、目標速度VO34を維持するように走行する(図6左図)。 Further, although the train 3 has reached the position of X6, since there is still a distance to the brake pattern PT2 determined by the approach limit P2 of the own train determined by the preceding train 2, the train 3 is controlled according to the target speed VO34. It will be. That is, since the train 3 has a speed V5 (= target speed VO34), the train 3 travels so as to maintain the target speed VO34 (FIG. 6, left figure).
(11)時刻T6〜T7
時刻T6からT7へと進んでいる間、列車2および列車3に対して、図2に示す最短解放時刻計算装置106の処理フローでは、いずれもステップ201→202→203→204(Y)→206→207→208と進む。その結果、列車2および列車3の最短開放時刻は、この直近に出力されていたTO24およびTO34が算出される。なお、ステップ203で抽出されるNは、列車2に対してはN=0、列車3に対してはN=1となる。
(11) Times T6 to T7
In the processing flow of the shortest release time calculation device 106 shown in FIG. 2 for trains 2 and 3 while proceeding from time T6 to T7, steps 201 → 202 → 203 → 204 (Y) → 206. → 207 → 208. As a result, TO24 and TO34, which have been output most recently, are calculated as the shortest opening times of trains 2 and 3. The N extracted in step 203 is N = 0 for train 2 and N = 1 for train 3.
また、図4に示す目標速度算出装置301の処理フローでは、列車2および列車3に対して、いずれもステップ401(Y)→402→403→404と進む。列車2については、最短開放時刻がTO24であるところ、駅進入限界位置が駅Bに変化しているため、0を超える目標速度VO27が算出されるとともに、駅Bに近づいているため停車に向けた制御を行う。列車3については、最短開放時刻がTO34であり、進入限界は変化しないため、目標速度はVO34のまま変化しない。 Further, in the processing flow of the target speed calculation device 301 shown in FIG. 4, steps 401 (Y) → 402 → 403 → 404 are performed for both train 2 and train 3. For train 2, where the shortest opening time is TO24, the station approach limit position has changed to station B, so the target speed VO27 that exceeds 0 is calculated, and because it is approaching station B, it is heading for a stop. Control. For train 3, the shortest opening time is TO34, and the approach limit does not change, so the target speed remains unchanged at VO34.
さらに、列車3は、位置がX6からX7に移動するものの、走行中の先行する列車2によって定まる自列車の進入限界P2で定まるブレーキパターンPT2まで、また、先行する列車2が駅Bに停車後は駅進入限界位置で定まるブレーキパターンPT3までは、距離があることから、目標速度VO34に応じて制御することになる。すなわち、列車3は、速度V5(=目標速度VO34)となっているため、目標速度VO34を維持するように走行する(図6左図)。 Further, although the position of the train 3 moves from X6 to X7, it reaches the brake pattern PT2 determined by the approach limit P2 of the own train determined by the preceding train 2 running, and after the preceding train 2 stops at the station B. Since there is a distance to the brake pattern PT3, which is determined at the station approach limit position, it is controlled according to the target speed VO34. That is, since the train 3 has a speed V5 (= target speed VO34), the train 3 travels so as to maintain the target speed VO34 (FIG. 6, left figure).
(12)時刻T7
時刻T7は、列車2が出発する時刻である。列車3に対して、図2に示す最短解放時刻計算装置106の処理フローでは、ステップ201→202→203→204(Y)→206→207→208と進み、最短開放時刻は直近で出力されたTO34が算出される。なお、ステップ203で抽出されるNは、列車3に対してN=0となる。
(12) Time T7
Time T7 is the time when train 2 departs. For train 3, in the processing flow of the shortest release time calculation device 106 shown in FIG. 2, steps 201 → 202 → 203 → 204 (Y) → 206 → 207 → 208, and the shortest release time was output most recently. TO34 is calculated. The N extracted in step 203 is N = 0 for the train 3.
また、図4に示す目標速度算出装置301の処理フローでは、列車3に対してステップ401(Y)→402→403→404と進み、最短開放時刻がTO34であり進入限界は変化しないため、目標速度はVO34のまま変化しない。 Further, in the processing flow of the target speed calculation device 301 shown in FIG. 4, the process proceeds in steps 401 (Y) → 402 → 403 → 404 for the train 3, and the shortest opening time is TO34 and the approach limit does not change. The speed remains VO34 and does not change.
一方、列車3は、X7の位置に到達するものの、先行する列車2によって定まる自列車の進入限界が駅進入限界位置と同値であり、駅進入限界位置で定まるブレーキパターンPT3までは距離があることから、目標速度VO34に応じて制御することになる。すなわち、列車3は、速度V5(=目標速度VO34)となっているため、目標速度VO34を維持するように走行する(図6左図)。 On the other hand, although the train 3 reaches the position of X7, the approach limit of its own train determined by the preceding train 2 is the same as the station approach limit position, and there is a distance to the brake pattern PT3 determined by the station approach limit position. Therefore, it will be controlled according to the target speed VO34. That is, since the train 3 has a speed V5 (= target speed VO34), the train 3 travels so as to maintain the target speed VO34 (FIG. 6, left figure).
(13)時刻T8
時刻T8は、列車3に対して先行する列車2による駅進入防止が解除された時刻である。列車3に対して、図2に示す最短解放時刻計算装置106の処理フローでは、ステップ201→202→203→204(Y)→206→207→208と進み、その結果、最短開放時刻は、この直近に出力されていたTO34が算出される。なお、ステップ203で抽出されるNは、列車3に対してはN=0となる。
(13) Time T8
The time T8 is the time when the station entry prevention by the train 2 preceding the train 3 is released. For train 3, in the processing flow of the shortest release time calculation device 106 shown in FIG. 2, steps 201 → 202 → 203 → 204 (Y) → 206 → 207 → 208, and as a result, the shortest release time is this. The most recently output TO34 is calculated. The N extracted in step 203 is N = 0 for train 3.
また、図4に示す目標速度算出装置301の処理フローでは、ステップ401(Y)→402→403→404と進み、最短開放時刻はTO34であるところ、駅Bまで進入可能となったため、これまでの目標速度VO34を超える目標速度VO38が算出される。このため、列車3は再加速を始め、駅Bに向かう。なお、この時点で、列車3はちょうど駅進入限界位置に到達し、無駄な制動をかけることなく走行できていることが理解できる。 Further, in the processing flow of the target speed calculation device 301 shown in FIG. 4, the process proceeds in the order of step 401 (Y) → 402 → 403 → 404, and the shortest opening time is TO34, but it is possible to enter the station B. The target speed VO38 that exceeds the target speed VO34 of is calculated. Therefore, train 3 starts re-acceleration and heads for station B. At this point, it can be understood that the train 3 has just reached the station entry limit position and can run without applying unnecessary braking.
時刻T8以降となれば、列車3は、駅Bに向かって、図6左図に示すような速度パターンによって運行を行う。 After the time T8, the train 3 operates toward the station B according to the speed pattern shown in the left figure of FIG.
以上のとおり、本発明に係る制御を実施することにより、先行列車の出発遅延で起こる後続列車の駅間停止を最小限に抑制することが可能となり、消費エネルギーの増大を防ぐことができる。また、進入限界が解除される時点に当該進入限界に到達するように制御することで、遅延の増大や波及を防ぐことが可能となる。 As described above, by implementing the control according to the present invention, it is possible to minimize the stoppage between stations of the following train caused by the departure delay of the preceding train, and it is possible to prevent an increase in energy consumption. Further, by controlling the approach limit to be reached at the time when the approach limit is released, it is possible to prevent an increase in delay and spread.
図7は、本発明の実施例2に係るシステム構成の一例およびデータフローを示す図である。実施例2では、図7に示すとおり、図1に示す列車102および自動列車走行装置111を、それぞれ列車701および列車走行装置702に置き換えたシステム構成になっている。なお、図1と同じ番号の構成要素については実施例1と同じ内容であるため、以下ではその説明を省略する。 FIG. 7 is a diagram showing an example of a system configuration and a data flow according to a second embodiment of the present invention. In the second embodiment, as shown in FIG. 7, the system configuration is such that the train 102 and the automatic train traveling device 111 shown in FIG. 1 are replaced with the train 701 and the train traveling device 702, respectively. Since the components having the same numbers as those in FIG. 1 have the same contents as those in the first embodiment, the description thereof will be omitted below.
図7の下図に示す列車701は、車上側受信装置108、列車の加減速特性を記録するデータベース109、現在の列車速度および速度位置に関する計測装置110および走行方法を決定する列車走行装置702とから構成される。 The train 701 shown in the lower figure of FIG. 7 is composed of the vehicle upper receiving device 108, the database 109 for recording the acceleration / deceleration characteristics of the train, the measuring device 110 for the current train speed and speed position, and the train running device 702 for determining the running method. It is composed.
車上側受信装置108は、地上装置101から、最短解放時刻151および駅進入限界位置152を受信するとともに、信号装置(図示せず)から自列車の前方を走行している列車との関係で定まる自列車進入限界位置153を受信する。 The vehicle upper receiving device 108 receives the shortest release time 151 and the station approach limit position 152 from the ground device 101, and is determined by the relationship with the train traveling in front of the own train from the signal device (not shown). Receives own train approach limit position 153.
速度計測装置110は、現在の列車速度154および現在の列車速度154を積分することで得られる現在の列車位置155を計測する。 The speed measuring device 110 measures the current train position 155 obtained by integrating the current train speed 154 and the current train speed 154.
列車走行装置702は、最短解放時刻151、駅進入限界位置152、自列車進入限界位置153、現在の列車速度154、現在の列車位置155および加減速特性156を基にして、走行方法を決定する。 The train traveling device 702 determines the traveling method based on the shortest release time 151, the station approach limit position 152, the own train approach limit position 153, the current train speed 154, the current train position 155, and the acceleration / deceleration characteristic 156. ..
図8は、列車走行装置702の構成の一例を示す図である。列車走行装置702は、図3に示す実施例1の自動列車走行装置111から、走行パターンデータベース302を除くとともに、走行決定装置303を運転支援装置801に置き換えた構成であり、それ以外(目標速度算出装置301)には変更はない。 FIG. 8 is a diagram showing an example of the configuration of the train traveling device 702. The train traveling device 702 has a configuration in which the traveling pattern database 302 is removed from the automatic train traveling device 111 of the first embodiment shown in FIG. 3, and the traveling determination device 303 is replaced with the driving support device 801. Other than that (target speed). There is no change in the calculation device 301).
運転支援装置801は、最短解放時刻151、自列車進入限界位置153、現在の列車速度154、現在の列車位置155および目標速度351を基にして、運転支援情報を決定する。運転支援装置801は、表示部を有する構成としてもよい。
図9は、運転支援装置801によって表示される運転支援画面の一構成例を示す図である。
The driving support device 801 determines the driving support information based on the shortest release time 151, the own train approach limit position 153, the current train speed 154, the current train position 155, and the target speed 351. The driving support device 801 may be configured to have a display unit.
FIG. 9 is a diagram showing a configuration example of a driving support screen displayed by the driving support device 801.
図示のように、画面の左上部分に、現在時刻、最短解放時刻151、最短解放時刻151と現在時刻との差分である残時間を表示し、画面左側部分に、速度計を表示し、この速度計上に目標速度351および現在の列車速度154を表示する。また、画面右側部分に、横軸を時刻、縦軸を位置とした運転履歴情報および運転目標情報を表示する。これらの情報に関しては、現在の列車位置155と現在時刻を組み合わせることで運転履歴情報を、また、最短解放時刻151と自列車進入限界位置153を組み合わせることで運転目標情報を、それぞれ生成することが可能である。 As shown in the figure, the current time, the shortest release time 151, the remaining time which is the difference between the shortest release time 151 and the current time is displayed in the upper left part of the screen, and the speedometer is displayed in the left part of the screen. The target speed 351 and the current train speed 154 are displayed in the accounting. Further, on the right side of the screen, operation history information and operation target information with the horizontal axis as the time and the vertical axis as the position are displayed. Regarding this information, the operation history information can be generated by combining the current train position 155 and the current time, and the operation target information can be generated by combining the shortest release time 151 and the own train approach limit position 153. It is possible.
以上のとおり、運転支援装置801が生成する運転支援情報に基づいて運転士が運転することによって、先の図6に示すような列車制御を行うことが可能となる。その結果、実施例2によっても、前述した実施例1と同様の効果を奏することができる。 As described above, the train control as shown in FIG. 6 can be performed by the driver driving based on the driving support information generated by the driving support device 801. As a result, even in Example 2, the same effect as in Example 1 described above can be obtained.
図10は、本発明の実施例3に係るシステム構成の一例およびデータフローを示す図である。先の実施例1と異なる点は、実施例1の列車102の自動列車走行装置111が有する目標速度算出装置301の機能を、実施例3の地上装置1001側に持たせるために、地上装置1001が、実施例1の地上装置101が備える構成に加えて、列車データベース1003、列車位置管理装置1004および目標速度算出装置1005を設けた点である。ただし、実施例3も先の実施例1と同様に、管轄する路線の情報を管理する地上装置1001から、管轄する路線を走行する列車1002A、1002B、1002C、…(以下、全てを総称して「列車1002」とする)に対して情報を送信し、列車1002(1002A、1002B、1002C、…)は、送信された情報を基に自らを制御する形態である。 FIG. 10 is a diagram showing an example of a system configuration and a data flow according to a third embodiment of the present invention. The difference from the previous embodiment 1 is that the ground device 1001 has the function of the target speed calculation device 301 possessed by the automatic train traveling device 111 of the train 102 of the first embodiment on the ground device 1001 side of the third embodiment. However, in addition to the configuration provided in the ground device 101 of the first embodiment, the train database 1003, the train position management device 1004, and the target speed calculation device 1005 are provided. However, in the third embodiment as in the first embodiment, the trains 1002A, 1002B, 1002C, ... Information is transmitted to the "train 1002"), and the train 1002 (1002A, 1002B, 1002C, ...) Controls itself based on the transmitted information.
地上装置1001が、実施例1の地上装置101から追加した構成要素について、以下に説明する。
列車データベース1003は、管轄する路線を走行する列車に関する加減速特性を記録格納している。
The components added by the ground device 1001 from the ground device 101 of the first embodiment will be described below.
The train database 1003 records and stores acceleration / deceleration characteristics of trains traveling on the line under its jurisdiction.
列車位置管理装置1004は、管轄する路線を走行する列車に関する列車位置1051をリアルタイムで管理する。 The train position management device 1004 manages the train position 1051 related to the train traveling on the line under its jurisdiction in real time.
目標速度算出装置1005は、最短解放時刻151、駅進入限界位置152、ダイヤデータベース105からの情報、列車データベース1003に記録された列車の加減速特性および列車位置管理装置1004からの列車位置1051に基づいて、列車1002(1002A、1002B、1002C、…)の目標速度1052A、1052B、1052C、…(以下、全てを総称して「目標速度1052」とする)を計算する。目標速度算出装置1005からの目標速度1052(1052A、1052B、1052C、…)は、地上側送信装置1006から列車1002(1002A、1002B、1002C、…)に送信される。 The target speed calculation device 1005 is based on the shortest release time 151, the station approach limit position 152, the information from the timetable database 105, the acceleration / deceleration characteristics of the train recorded in the train database 1003, and the train position 1051 from the train position management device 1004. Then, the target speeds 1052A, 1052B, 1052C, ... (Hereinafter, all of them are collectively referred to as "target speed 1052") of trains 1002 (1002A, 1002B, 1002C, ...) Are calculated. The target speed 1052 (1052A, 1052B, 1052C, ...) From the target speed calculation device 1005 is transmitted from the ground side transmission device 1006 to the train 1002 (1002A, 1002B, 1002C, ...).
一方、図10の下図に示す列車1002は、前述のとおり実施例1の目標速度算出装置301を有さない。車上側受信装置108は、地上装置1001から目標速度1052を受信するとともに、信号装置(図示せず)から自列車の前方を走行している列車との関係で定まる自列車進入限界位置153を受信する。 On the other hand, the train 1002 shown in the lower figure of FIG. 10 does not have the target speed calculation device 301 of the first embodiment as described above. The vehicle upper receiving device 108 receives the target speed 1052 from the ground device 1001 and also receives the own train approach limit position 153 determined in relation to the train traveling in front of the own train from the signal device (not shown). To do.
列車の加減速特性を記録するデータベース109、現在の列車速度154および現在の列車速度154を積分することで得られる現在の列車位置155を計測する速度計測装置110および(位置、速度)の集合で構成される自列車の目標走行パターン352を記憶する走行パターンデータベース302に関しては、実施例1と同様である。 A database 109 that records the acceleration / deceleration characteristics of a train, a speed measuring device 110 that measures the current train position 155 obtained by integrating the current train speed 154 and the current train speed 154, and a set of (position, speed). The traveling pattern database 302 for storing the target traveling pattern 352 of the own train is the same as that in the first embodiment.
走行決定装置1007は、目標走行パターン352、目標速度1052、自列車進入限界位置153、現在の列車速度154、現在の列車位置155および加減速特性156を基にして、走行方法を決定する。 The travel determination device 1007 determines the travel method based on the target travel pattern 352, the target speed 1052, the own train approach limit position 153, the current train speed 154, the current train position 155, and the acceleration / deceleration characteristic 156.
列車1002は、走行決定装置1007が決定した走行方法に従って、自動運転により運転を行う。 The train 1002 is automatically operated according to the traveling method determined by the traveling determination device 1007.
ここで、地上装置1001に設けた目標速度計算機能1005は、図4に示す目標速度算出装置301の処理フローと同じであり、ステップ404で使用する列車の現在位置155(X[m])を列車位置管理装置1004からの列車位置1051に変更すればよい。 Here, the target speed calculation function 1005 provided in the ground device 1001 is the same as the processing flow of the target speed calculation device 301 shown in FIG. 4, and the current position 155 (X [m]) of the train used in step 404 is set. The train position may be changed from the train position management device 1004 to the train position 1051.
一方、列車1002が有する走行決定装置1007の内部構成は、図5に示す走行決定装置303の目標速度351を、地上装置1001から受信する目標速度1052に変更することとなる。また、自動列車走行装置1007を、実施例2に係る運転支援装置801で代用してもよい。 On the other hand, the internal configuration of the travel determination device 1007 included in the train 1002 changes the target speed 351 of the travel determination device 303 shown in FIG. 5 to the target speed 1052 received from the ground device 1001. Further, the automatic train traveling device 1007 may be replaced by the driving support device 801 according to the second embodiment.
以上のとおり、実施例3においても、先の図6に示すような列車制御を行うことが可能となる。その結果、実施例3によっても、前述した実施例1および実施例2と同様の効果を奏することができる。 As described above, also in the third embodiment, the train control as shown in FIG. 6 can be performed. As a result, even in Example 3, the same effects as those in Example 1 and Example 2 described above can be obtained.
101:地上装置、102,102A,102B,102C:列車、
103:発着状況管理装置、104:時隔データベース、105:ダイヤデータベース、
106:最短解放時刻計算装置、107:地上側送信装置、108:車上側受信装置、
109:列車の加減速特性を記録するデータベース、110:速度計測装置、
111:列車走行装置、151:最短解放時刻、152:駅進入限界位置、
153:自列車進入限界位置、154:現在の列車速度、155:現在の列車位置、
156:加減速特性、301:目標速度算出装置、302:走行パターンデータベース、
303:走行決定装置、351:目標速度、352:自列車の目標走行パターン、
353:自列車の走行指令、501:走行追従制御部、502:信号速度算出部、
503,505:比較処理部、504:目標速度制御部、
551:第1の走行指令、552:信号速度、553:追従目標速度、554:第2の走行指令、
701,701A,701B,701C:列車、702:列車走行装置、801:運転支援装置、
1001:地上装置、1002,1002A,1002B,1002C:列車、
1003:列車データベース、1004:列車位置管理装置、1005:目標速度算出装置、1006:地上側送信装置、1007:走行決定装置、
1051:列車位置、1052,1052A,1052B,1052C:目標速度、
101: Ground equipment, 102, 102A, 102B, 102C: Train,
103: Arrival / departure status management device, 104: Time interval database, 105: Diamond database,
106: Shortest release time calculation device, 107: Ground side transmitter, 108: Vehicle upper receiver,
109: Database that records the acceleration / deceleration characteristics of trains, 110: Speed measuring device,
111: Train running device, 151: Shortest release time, 152: Station approach limit position,
153: Own train approach limit position, 154: Current train speed, 155: Current train position,
156: Acceleration / deceleration characteristics, 301: Target speed calculation device, 302: Driving pattern database,
303: Travel determination device, 351: Target speed, 352: Target travel pattern of own train,
353: Travel command of own train, 501: Travel tracking control unit, 502: Signal speed calculation unit,
503, 505: Comparison processing unit, 504: Target speed control unit,
551: First running command, 552: Signal speed, 535: Follow-up target speed, 554: Second running command,
701, 701A, 701B, 701C: Train, 702: Train running device, 801: Driving support device,
1001: Ground equipment, 1002, 1002A, 1002B, 1002C: Train,
1003: Train database, 1004: Train position management device, 1005: Target speed calculation device, 1006: Ground side transmitter, 1007: Travel determination device,
1051: Train position, 1052, 1052A, 1052B, 1052C: Target speed,
Claims (4)
列車の車上側または前記地上側が備える目標速度算出部と、
前記車上側が備える走行制御装置と
を有し、
前記最短解放時刻計算部は、駅の手前に設定される駅進入限界位置で定まるブレーキパターンが消失するに至る最も早い時刻である最短解放時刻を、現在時刻、駅に到着する列車の時間間隔を示す時隔データおよび目標駅までの間に前記列車より前に停車している列車数に基づいて計算し、
前記目標速度算出部は、前記駅進入限界位置、前記列車の現在位置、前記列車の減速度および前記最短解放時刻と現在時刻との差分値から前記列車の目標速度を算出し、
前記走行制御装置は、目標走行パターン、前記列車の現在位置および前記列車の現在速度に基づいて当該現在位置および当該現在速度を当該目標走行パターンに近づけるための第1の走行指令を求め、前記列車の前方を走行する先行列車によって定まる自列車進入限界位置、前記列車の現在位置および前記列車の減速度に基づいて算出したブレーキパターン速度と前記目標速度とから小さい方の速度を追従目標速度として前記列車の現在速度を当該追従目標速度に近づけるための第2の走行指令を求め、前記第1の走行指令および前記第2の走行指令から指令値の小さい方を前記列車の走行指令として決定する
ことを特徴とする列車制御システム。 The shortest release time calculation unit provided on the ground side,
The target speed calculation unit provided on the upper side of the train or the ground side of the train,
It has a travel control device provided on the upper side of the vehicle.
The shortest release time calculation unit sets the shortest release time, which is the earliest time until the brake pattern determined at the station approach limit position set in front of the station disappears, the current time, and the time interval of the train arriving at the station. Calculated based on the time interval data shown and the number of trains stopped before the train to the target station.
The target speed calculation unit calculates the target speed of the train from the station approach limit position, the current position of the train, the deceleration of the train, and the difference between the shortest release time and the current time.
The travel control device obtains a first travel command for bringing the current position and the current speed closer to the target travel pattern based on the target travel pattern , the current position of the train, and the current speed of the train, and the train. The smaller speed from the brake pattern speed calculated based on the own train approach limit position determined by the preceding train traveling in front of the train, the current position of the train, and the deceleration of the train and the target speed as the follow-up target speed. Obtaining a second running command for bringing the current speed of the train closer to the following target speed, and determining the smaller command value from the first running command and the second running command as the running command of the train. A train control system featuring.
列車の車上側または前記地上側が備える目標速度算出部と、
前記車上側が備える運転支援装置と
を有し、
前記最短解放時刻計算部は、駅の手前に設定される駅進入限界位置で定まるブレーキパターンが消失するに至る最も早い時刻である最短解放時刻を、現在時刻、駅に到着する列車の時間間隔を示す時隔データおよび目標駅までの間に前記列車より前に停車している列車数に基づいて計算し、
前記目標速度算出部は、前記駅進入限界位置、前記列車の現在位置、前記列車の減速度および前記最短解放時刻と現在時刻との差分から前記列車の目標速度を算出し、
前記運転支援装置は、前記列車の前記目標速度、現在速度および前記最短解放時刻並びに現在時刻を表示する表示部を有する
ことを特徴とする列車制御システム。 The shortest release time calculation unit provided on the ground side,
The target speed calculation unit provided on the upper side of the train or the ground side of the train,
It has a driving support device provided on the upper side of the vehicle.
The shortest release time calculation unit sets the shortest release time, which is the earliest time until the brake pattern determined at the station approach limit position set in front of the station disappears, the current time, and the time interval of the train arriving at the station. Calculated based on the time interval data shown and the number of trains stopped before the train to the target station.
The target speed calculation unit calculates the target speed of the train from the station approach limit position, the current position of the train, the deceleration of the train, and the difference between the shortest release time and the current time.
The driving support device is a train control system including a display unit that displays the target speed, the current speed, the shortest release time, and the current time of the train.
駅の手前に設定される駅進入限界位置で定まるブレーキパターンが消失するに至る最も早い時刻である最短解放時刻を、現在時刻、駅に到着する列車の時間間隔を示す時隔データおよび目標駅までの間に前記列車より前に停車している列車数に基づいて計算し、
前記駅進入限界位置、前記列車の現在位置、前記列車の減速度および前記最短解放時刻と現在時刻との差分値から前記列車の目標速度を算出し、
目標走行パターン、前記列車の現在位置および前記列車の現在速度に基づいて当該現在位置および当該現在速度を当該目標走行パターンに近づけるための第1の走行指令を求め、
前記列車の前方を走行する先行列車によって定まる自列車進入限界位置、前記列車の現在位置および前記列車の減速度に基づいてブレーキパターン速度を算出し、前記ブレーキパターン速度と前記目標速度とから小さい方の速度を追従目標速度として前記列車の現在速度を当該追従目標速度に近づけるための第2の走行指令を求め、
前記第1の走行指令および前記第2の走行指令から指令値の小さい方を前記列車の走行指令として決定する
ことを特徴とする列車制御方法。 A train control method that controls the speed of a train
The shortest release time, which is the earliest time until the brake pattern determined at the station approach limit position set in front of the station disappears, is set to the current time, time interval data showing the time interval of the train arriving at the station, and the target station. Calculated based on the number of trains stopped before the train during
The target speed of the train is calculated from the station approach limit position, the current position of the train, the deceleration of the train, and the difference value between the shortest release time and the current time.
A first travel command for bringing the current position and the current speed closer to the target travel pattern is obtained based on the target travel pattern , the current position of the train, and the current speed of the train .
The brake pattern speed is calculated based on the own train approach limit position determined by the preceding train traveling in front of the train, the current position of the train, and the deceleration of the train, and the smaller of the brake pattern speed and the target speed. The second running command for bringing the current speed of the train closer to the following target speed is obtained by using the speed of
A train control method characterized in that the smaller command value from the first running command and the second running command is determined as the running command of the train.
受信部と、
目標速度算出部と、
走行決定部または運転支援部と
を備え、
前記受信部は、地上装置が、現在時刻、駅に到着する列車の時間間隔を示す時隔データおよび目標駅までの間に自列車より前に停車している列車数に基づいて計算した、駅の手前に設定される駅進入限界位置で定まるブレーキパターンが消失するに至る最も早い時刻である最短解放時刻を、当該地上装置から受信し、
前記目標速度算出部は、自列車の、前記駅進入限界位置、現在位置、減速度および前記最短解放時刻から、自列車の目標速度を算出し、
前記走行決定部は、目標走行パターン、自列車の現在位置および自列車の現在速度に基づいて当該現在位置および当該現在速度を当該目標走行パターンに近づけるための第1の走行指令を求め、自列車の前方を走行する先行列車によって定まる自列車進入限界位置、自列車の現在位置および自列車の減速度に基づいて算出したブレーキパターン速度と前記目標速度とから小さい方の速度を追従目標速度として自列車の現在速度を当該追従目標速度に近づけるための第2の走行指令を求め、前記第1の走行指令および前記第2の走行指令から指令値の小さい方を自列車の走行指令として決定し、
前記運転支援部は、自列車の前記目標速度、現在速度および前記最短解放時刻並びに現在時刻を表示する表示部を有する
ことを特徴とする列車の車上装置。
It ’s a train on-board device,
Receiver and
Target speed calculation unit and
Equipped with a driving decision unit or a driving support unit
The receiver calculates the station based on the current time, the time interval data indicating the time interval of the train arriving at the station, and the number of trains stopped before the own train before the target station. The shortest release time, which is the earliest time until the brake pattern determined at the station approach limit position set in front of the station disappears, is received from the ground device.
The target speed calculation unit calculates the target speed of the own train from the station approach limit position, the current position, the deceleration, and the shortest release time of the own train.
The travel determination unit requests a first travel command for bringing the current position and the current speed closer to the target travel pattern based on the target travel pattern , the current position of the own train, and the current speed of the own train, and the own train. The smaller speed from the brake pattern speed calculated based on the own train approach limit position determined by the preceding train traveling in front of the train, the current position of the train, and the deceleration of the train and the target speed is used as the tracking target speed. A second running command for bringing the current speed of the train closer to the following target speed is obtained, and the smaller command value from the first running command and the second running command is determined as the running command of the own train.
The driving support unit is a train on-board device including a display unit that displays the target speed, the current speed, the shortest release time, and the current time of the own train.
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2017042396A JP6802091B2 (en) | 2017-03-07 | 2017-03-07 | Train control system, train control method and on-board equipment of train |
| PCT/JP2017/040345 WO2018163508A1 (en) | 2017-03-07 | 2017-11-09 | Train control system, train control method, and train on-board device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2017042396A JP6802091B2 (en) | 2017-03-07 | 2017-03-07 | Train control system, train control method and on-board equipment of train |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| JP2018144676A JP2018144676A (en) | 2018-09-20 |
| JP2018144676A5 JP2018144676A5 (en) | 2019-12-12 |
| JP6802091B2 true JP6802091B2 (en) | 2020-12-16 |
Family
ID=63448435
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2017042396A Active JP6802091B2 (en) | 2017-03-07 | 2017-03-07 | Train control system, train control method and on-board equipment of train |
Country Status (2)
| Country | Link |
|---|---|
| JP (1) | JP6802091B2 (en) |
| WO (1) | WO2018163508A1 (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP7413177B2 (en) * | 2020-07-21 | 2024-01-15 | 株式会社東芝 | Driving curve creation device, driving support device, and driving control device |
| JP7781699B2 (en) * | 2022-04-11 | 2025-12-08 | 株式会社日立製作所 | Train Control System |
Family Cites Families (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3198170B2 (en) * | 1991-10-25 | 2001-08-13 | 株式会社東芝 | Optimal running pattern calculation device and calculation system |
| JP3392916B2 (en) * | 1993-07-30 | 2003-03-31 | 日本信号株式会社 | Digital transmission type automatic train controller |
| JP6072314B2 (en) * | 2014-02-07 | 2017-02-01 | 三菱電機株式会社 | Train travel management device |
| JP6613073B2 (en) * | 2015-08-05 | 2019-11-27 | 株式会社東芝 | Train control system |
-
2017
- 2017-03-07 JP JP2017042396A patent/JP6802091B2/en active Active
- 2017-11-09 WO PCT/JP2017/040345 patent/WO2018163508A1/en not_active Ceased
Also Published As
| Publication number | Publication date |
|---|---|
| JP2018144676A (en) | 2018-09-20 |
| WO2018163508A1 (en) | 2018-09-13 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102046446B (en) | Method for vehicle platooning in an automated vehicle system | |
| JP6604846B2 (en) | Mining equipment operation management system | |
| JP6096596B2 (en) | Operation management device, operation management method, vehicle, vehicle traffic system and program | |
| CN106935056B (en) | Intelligent crossroad cooperative control method based on critical gap theory | |
| JP7120097B2 (en) | Parking lot management device | |
| WO2013179790A1 (en) | Train control device | |
| JP2014233988A5 (en) | ||
| JP6802091B2 (en) | Train control system, train control method and on-board equipment of train | |
| KR100283828B1 (en) | Train operation management system | |
| WO2015146587A1 (en) | Device and method for controlling train | |
| JPH0976914A (en) | Train running operation control method and device | |
| CN106536269B (en) | train control device | |
| JP2010241225A (en) | Train group operation management system | |
| JP2011045226A (en) | Train control system | |
| JP2019089449A (en) | Device, method and program for train travel control | |
| JP2006006030A (en) | Driving pattern creation device, vehicle speed control device, and vehicle driving support device. | |
| JP3525481B2 (en) | Train control device | |
| JP2018034610A (en) | Travel control system and travel control device | |
| EP3192717A1 (en) | Operation control system | |
| CN110626391A (en) | Information prediction method of passenger information system | |
| WO2018008337A1 (en) | Running pattern creation device and running pattern creation method | |
| JP7466494B2 (en) | Train control system and train control device | |
| JP2017204197A (en) | Driving support method and driving support system | |
| JP6613073B2 (en) | Train control system | |
| JP6789885B2 (en) | On-board control device and train control system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20191101 |
|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20191101 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20200721 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20200908 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20201124 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20201126 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 6802091 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |