JP6904937B2 - How to repair the reinforced concrete vertical wall of the tunnel guard passage - Google Patents
[go: Go Back, main page]

JP6904937B2 - How to repair the reinforced concrete vertical wall of the tunnel guard passage - Google Patents

How to repair the reinforced concrete vertical wall of the tunnel guard passage Download PDF

Info

Publication number
JP6904937B2
JP6904937B2 JP2018190952A JP2018190952A JP6904937B2 JP 6904937 B2 JP6904937 B2 JP 6904937B2 JP 2018190952 A JP2018190952 A JP 2018190952A JP 2018190952 A JP2018190952 A JP 2018190952A JP 6904937 B2 JP6904937 B2 JP 6904937B2
Authority
JP
Japan
Prior art keywords
ufc
panel
vertical wall
reinforced concrete
formwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2018190952A
Other languages
Japanese (ja)
Other versions
JP2020060012A (en
Inventor
健利 山内
健利 山内
一成 大田
一成 大田
祐輔 石井
祐輔 石井
石田 征男
征男 石田
哲二 安藤
哲二 安藤
亮太 鎌田
亮太 鎌田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taiheiyo Cement Corp
Taiheiyo Materials Corp
Original Assignee
Taiheiyo Cement Corp
Taiheiyo Materials Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taiheiyo Cement Corp, Taiheiyo Materials Corp filed Critical Taiheiyo Cement Corp
Priority to JP2018190952A priority Critical patent/JP6904937B2/en
Publication of JP2020060012A publication Critical patent/JP2020060012A/en
Application granted granted Critical
Publication of JP6904937B2 publication Critical patent/JP6904937B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

本発明は、トンネル監視員通路の鉄筋コンクリート製縦壁の補修方法に関する。 The present invention relates to a method for repairing a reinforced concrete vertical wall of a tunnel observer passage.

トンネル監視員通路の鉄筋コンクリート製縦壁は、トンネル内を通行する種々の車両の排気ガス等による劣悪な環境下に晒されているため、劣化が速く進行する傾向がある。また、凍結防止剤に含まれる塩分を含んだ水が、車両の走行に伴って跳ね上げられることによる塩害により、鉄筋コンクリート製縦壁の劣化が更に進行しやすくなる。このような劣化が進行すると、路面上にコンクリート破片等が落下して重大な交通事故を引き起こすおそれがあり、事故を未然に防止するためには、劣化した鉄筋コンクリート製縦壁を速やかに補修する必要がある。 The reinforced concrete vertical wall of the tunnel guard passage is exposed to a bad environment due to the exhaust gas of various vehicles passing through the tunnel, and therefore tends to deteriorate rapidly. In addition, the deterioration of the reinforced concrete vertical wall is more likely to progress due to salt damage caused by the salt-containing water contained in the antifreezing agent being splashed up as the vehicle travels. If such deterioration progresses, concrete debris may fall on the road surface and cause a serious traffic accident. In order to prevent accidents, it is necessary to promptly repair the deteriorated reinforced concrete vertical wall. There is.

従来、劣化した鉄筋コンクリート製縦壁の補修方法としては、例えば、下地壁面の深部に打設したアンカーにロッドを固定し、該ロッドにタイルパネルを貫通させ、下地壁面から所定の間隔を保ちながらタイルパネルを固定した後、タイルパネルと下地壁面との空間部に特定性状を有するモルタルスラリーを充填し硬化させて軽量気泡コンクリート層を形成する方法(特許文献1)、タイル貼り壁面の損傷部位又は脆弱部位を剥離除去し、壁面に取り付けたアンカーボルトで不陸を調整しつつ該壁面から所定の間隔を空けて型枠兼用タイルパネルを取り付けた後、モルタル充填時のタイルパネルの膨出を防止しつつ、タイルパネルと壁面との間に流動性モルタルを充填する方法(特許文献2)等が提案されている。 Conventionally, as a method of repairing a deteriorated vertical wall made of reinforced concrete, for example, a rod is fixed to an anchor placed deep in the base wall surface, a tile panel is penetrated through the rod, and tiles are maintained at a predetermined distance from the base wall surface. After fixing the panel, a method of filling the space between the tile panel and the underlying wall surface with a mortar slurry having specific properties and hardening it to form a lightweight cellular concrete layer (Patent Document 1), a damaged part or fragility of the tiled wall surface. After peeling off the part and adjusting the unevenness with the anchor bolt attached to the wall surface and attaching the tile panel that also serves as a mold at a predetermined distance from the wall surface, the tile panel is prevented from swelling when filling with mortar. At the same time, a method of filling a fluid mortar between the tile panel and the wall surface (Patent Document 2) and the like have been proposed.

特開2014−148825号公報Japanese Unexamined Patent Publication No. 2014-148825 特許第5761701号明細書Japanese Patent No. 5761701

しかしながら、従来の補修方法においては、縦壁側面にアンカーを打設してパネルを固定する必要があり、また縦壁の劣化部を剥離除去する際には、劣化部のみならず、健全部も除去する必要があるため、補修作業に多大な労力と時間を要することが大きな課題であった。
本発明の課題は、労力の軽減、施工期間の短縮が可能なトンネル監視員通路の鉄筋コンクリート製縦壁の補修方法を提供することにある。
However, in the conventional repair method, it is necessary to place an anchor on the side surface of the vertical wall to fix the panel, and when the deteriorated part of the vertical wall is peeled off and removed, not only the deteriorated part but also the sound part is affected. Since it is necessary to remove it, it is a big problem that the repair work requires a lot of labor and time.
An object of the present invention is to provide a method for repairing a reinforced concrete vertical wall of a tunnel observer passage, which can reduce labor and shorten the construction period.

本発明者らは種々検討した結果、鉄筋コンクリート製縦壁天端部のコンクリートを除去し、次いで縦壁側面のかぶりをはつり、次いで型枠を兼ねた特定のパネルをはつり面に所定の間隔を空けて配置し、そしてパネルとはつり面との間隙に特定のモルタルを注入することで、多大な労力を要することなく、短い施工期間でトンネル監視員通路の鉄筋コンクリート製縦壁を補修できることを見出した。 As a result of various studies, the present inventors removed the concrete at the top of the vertical wall made of reinforced concrete, then chipped the side surface of the vertical wall, and then placed a specific panel that also served as a formwork on the suspended surface at a predetermined interval. It was found that the reinforced concrete vertical wall of the tunnel guard passage can be repaired in a short construction period without much labor by injecting a specific mortar into the gap between the panel and the hanging surface.

すなわち、本発明は、トンネル監視員通路の鉄筋コンクリート製縦壁の補修方法であって、
鉄筋コンクリート製縦壁天端部のコンクリートを除去する第1の工程と、
鉄筋コンクリート製縦壁側面のかぶりをはつる第2の工程と、
複数枚の型枠兼用UFCパネルを、はつり面から所定間隔を空けて互いに隣り合うように配置する第3の工程と、
型枠兼用UFCパネルと、はつり面との間隙に防錆剤含有無収縮モルタルを注入する第4の工程
を含む、補修方法を提供するものである。
That is, the present invention is a method for repairing a vertical wall made of reinforced concrete in a tunnel observer passage.
The first step of removing the concrete at the top of the vertical wall made of reinforced concrete,
The second process of hanging the cover on the side of the vertical wall made of reinforced concrete,
A third step of arranging a plurality of UFC panels for both formwork so as to be adjacent to each other at a predetermined interval from the fishing surface.
It provides a repair method including a fourth step of injecting a rust preventive-containing non-shrink mortar into a gap between a formwork-combined UFC panel and a chipping surface.

本発明によれば、トンネル監視員通路の鉄筋コンクリート製縦壁を、多大な労力を要することなく、短い施工期間で補修することができる。 According to the present invention, the reinforced concrete vertical wall of the tunnel observer passage can be repaired in a short construction period without requiring a great deal of labor.

本発明の補修方法が適用されるトンネルの一例を示す模式図である。It is a schematic diagram which shows an example of the tunnel to which the repair method of this invention is applied. 図1のトンネル監視員通路の鉄筋コンクリート製縦壁部分を示す図である。It is a figure which shows the reinforced concrete vertical wall part of the tunnel guard passage of FIG. 本発明の補修方法の一例を模式的に示す図である。It is a figure which shows an example of the repair method of this invention schematically. 型枠兼用UFCパネルの一例を示す図である。It is a figure which shows an example of the UFC panel which also serves as a formwork.

以下、添付図面を参照しながら本発明の好適な実施形態を詳細に説明する。なお、図面の説明において同一の要素には同一の符号を付し、重複する説明を省略する。また、図示の便宜上、図面の寸法比率は説明のものと必ずしも一致しない。 Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings. In the description of the drawings, the same elements are designated by the same reference numerals, and duplicate description will be omitted. Also, for convenience of illustration, the dimensional ratios in the drawings do not always match those described.

図1は、本発明の補修方法が適用されるトンネルの一例を示す模式図である。図2(a)は、トンネル監視員通路の鉄筋コンクリート製縦壁部分を示す図であり、図2(b)は車道側から見た鉄筋コンクリート製縦壁部分を示す。 FIG. 1 is a schematic view showing an example of a tunnel to which the repair method of the present invention is applied. FIG. 2A is a diagram showing a reinforced concrete vertical wall portion of the tunnel observer passage, and FIG. 2B is a diagram showing a reinforced concrete vertical wall portion seen from the roadway side.

監視員通路1は、図1に示されるように、トンネル内の車道3の一端側においてトンネルの上下方向に沿って立設された鉄筋コンクリート製縦壁2と、該縦壁2の上端から横方向に延設された通路部1aとを備えている。なお、本明細書において「鉄筋コンクリート製縦壁天端部」とは、図2(a)に示されるように、鉄筋コンクリート製縦壁2の底面から最も離れた端の部分2aをいい、また「鉄筋コンクリート製縦壁側面」とは、図2(a)に示されるように、車道3側に面した垂直面2bをいう。 As shown in FIG. 1, the observer passage 1 includes a reinforced concrete vertical wall 2 erected along the vertical direction of the tunnel on one end side of the roadway 3 in the tunnel, and a horizontal direction from the upper end of the vertical wall 2. It is provided with a passage portion 1a extended to. In the present specification, the “top end of the reinforced concrete vertical wall” refers to the end portion 2a of the reinforced concrete vertical wall 2 farthest from the bottom surface, as shown in FIG. 2 (a), and also “reinforced concrete”. As shown in FIG. 2A, the “side surface of the vertical wall” means the vertical surface 2b facing the roadway 3 side.

鉄筋コンクリート製縦壁2の上面には、図2(b)に示されているように、所定間隔で離隔した複数の手摺の支柱4aが設置されている。各支柱4aは、図2(c)に示されるように、あと施工アンカー4cにより固定され、鉄筋コンクリート製縦壁2の上面から上方へと立設されている。また、隣接する支柱4aの上端同士は、手摺棒4bで架設されており、支柱4a及び手摺棒4bによって、手摺4が形成されている。 As shown in FIG. 2B, a plurality of handrail columns 4a separated from each other at predetermined intervals are installed on the upper surface of the reinforced concrete vertical wall 2. As shown in FIG. 2C, each support column 4a is fixed by post-installed anchors 4c and is erected upward from the upper surface of the reinforced concrete vertical wall 2. Further, the upper ends of the adjacent columns 4a are erected by the handrail rod 4b, and the handrail 4 is formed by the support column 4a and the handrail rod 4b.

本発明の適用対象は、鉄筋コンクリート製縦壁2であるが、その劣化の程度は、下記の表1に示す外観上のグレードが「I(潜伏期)」から「III−2(加速期後期)」までであり、かつ下記の表2に示す鉄筋の腐食グレードが「I(コンクリート面にさびの付着なし)」から「III(断面欠損なし)」までであるものが、本発明の効果を享受しやすい点で好ましい。即ち、本発明の補修方法は、縦壁コンクリート内の鉄筋を交換あるいは追加しないものに好適に適用することができる。 The object of application of the present invention is a vertical wall 2 made of reinforced concrete, and the degree of deterioration thereof is as follows: The appearance grades shown in Table 1 below are "I (incubation period)" to "III-2 (late acceleration period)". The effect of the present invention is enjoyed when the corrosion grade of the reinforcing bar shown in Table 2 below is from "I (no rust adhered to the concrete surface)" to "III (no cross-sectional defect)". It is preferable because it is easy. That is, the repair method of the present invention can be suitably applied to those in which the reinforcing bars in the vertical wall concrete are not replaced or added.

Figure 0006904937
Figure 0006904937

Figure 0006904937
Figure 0006904937

次に、本発明の補修方法について説明する。本発明の補修方法は、第1の工程、第2の工程、第3の工程及び第4の工程を含むものである。以下、各工程について、図面を参照しながら詳細に説明する。 Next, the repair method of the present invention will be described. The repair method of the present invention includes a first step, a second step, a third step, and a fourth step. Hereinafter, each step will be described in detail with reference to the drawings.

<第1の工程>
第1の工程は、鉄筋コンクリート製縦壁2の天端部2aのコンクリートを除去する工程である。
本工程に先立ち、手摺支柱4aのあと施工アンカー4cを切断し撤去する。次いで、図3に示されるように、天端部2aのコンクリートを、コンクリート内に埋設されているあと施工アンカー4cの一部とともに除去する。天端部2aのコンクリートの除去量は、コンクリートの劣化状況に応じて適宜設定可能であるが、あと施工アンカー4cの錆等により天端部2aのコンクリートが劣化しているため、縦壁2天端より200mm程度までコンクリートを除去することが好ましい。コンクリートの除去作業は、一般的な方法で行うことが可能であり、例えば、ウォールソー等を使用することができる。
<First step>
The first step is a step of removing the concrete at the top end 2a of the reinforced concrete vertical wall 2.
Prior to this step, the construction anchor 4c is cut and removed after the handrail support 4a. Next, as shown in FIG. 3, the concrete at the top end 2a is removed together with a part of the post-installed anchor 4c embedded in the concrete. The amount of concrete removed from the top end 2a can be set as appropriate according to the deterioration status of the concrete, but since the concrete at the top end 2a has deteriorated due to rust or the like of the post-installed anchor 4c, the vertical wall 2 ceiling It is preferable to remove the concrete to about 200 mm from the edge. The concrete removal work can be performed by a general method, and for example, a wall saw or the like can be used.

また、本発明においては、天端部2aのコンクリート除去後、図3に示されるように、コンクリート除去部分に所定間隔でアンカー6を打設する工程を有していてもよい。アンカー6の打設は、第3の工程前までに行えばよく、更に強度を高めるために、アンカー6の縦筋に対して、異形鉄筋を横筋に配筋してもよい。このようにアンカー6を打設することで、後述する第3の工程において、UFCパネルを配置する際にアンカー6にUFCパネルの上端を固定できるため、位置合わせが容易になり、隣り合うUFCパネルとの不陸を抑制することができる。なお、アンカー6の打設間隔は、UFCパネルの大きさに応じて適宜設定することが可能であるが、通常250mm程度である。 Further, in the present invention, after removing the concrete from the top end portion 2a, as shown in FIG. 3, there may be a step of placing anchors 6 at predetermined intervals in the concrete removing portion. The anchor 6 may be placed before the third step, and in order to further increase the strength, deformed reinforcing bars may be arranged in the horizontal bars with respect to the vertical bars of the anchor 6. By placing the anchor 6 in this way, the upper end of the UFC panel can be fixed to the anchor 6 when arranging the UFC panel in the third step described later, so that the alignment becomes easy and the adjacent UFC panels are adjacent to each other. It is possible to suppress the non-landing with. The placement interval of the anchor 6 can be appropriately set according to the size of the UFC panel, but is usually about 250 mm.

<第2の工程>
第2の工程は、鉄筋コンクリート製縦壁2の側面2bのかぶりをはつる工程である。はつり工程は、縦壁2の側面2bの上面からコンクリートの劣化部を除去すればよい。
はつり量は、はつり後の鉄筋コンクリート製縦壁2が背面土圧に耐えうる厚さを有すれば、コンクリートの劣化状況に応じて適宜設定可能であるが、通常30〜50mmである。なお、はつり作業は、一般的な方法で行うことが可能であり、例えば、電動ハンマ又はエアーピック等を使用することができる。
<Second step>
The second step is a step of hanging the cover of the side surface 2b of the reinforced concrete vertical wall 2. In the chipping step, the deteriorated portion of the concrete may be removed from the upper surface of the side surface 2b of the vertical wall 2.
The amount of chipping can be appropriately set according to the deterioration state of the concrete as long as the vertical wall 2 made of reinforced concrete after chipping has a thickness that can withstand the back earth pressure, but is usually 30 to 50 mm. The chipping work can be performed by a general method, and for example, an electric hammer or an air pick can be used.

また、本工程においては、図3に示されるように、かぶり面の下端部、即ち鉄筋コンクリート製縦壁2の基礎部に溝8を設ける工程を有していてもよい。このように溝8を設けることで、後述する第3の工程において、UFCパネルを配置する際に溝8内にUFCパネルの下端を落とし込むことができるため、位置合わせが容易になり、隣り合うUFCパネルとの不陸を抑制することができる。なお、溝8の形成は、はつり工程前、又ははつり工程後だけでなく、はつり工程とともに行うことができる。
溝8の深さは、UFCパネルの下端を埋設できれば適宜設定可能であるが、通常50mm程度である。また、溝8の奥行きは、後述する第3の工程においてUFCパネルを配置する際のはつり面からの間隔を考慮して適宜設定することができる。なお、溝8の形成は、一般的な方法で行うことが可能であり、例えば、電動ハンマ又はエアーピック等を使用することができる。
Further, in this step, as shown in FIG. 3, a step of providing a groove 8 in the lower end portion of the covering surface, that is, the foundation portion of the reinforced concrete vertical wall 2 may be provided. By providing the grooves 8 in this way, the lower end of the UFC panel can be dropped into the grooves 8 when arranging the UFC panels in the third step, which will be described later, which facilitates alignment and makes adjacent UFCs. It is possible to suppress the non-landing with the panel. The groove 8 can be formed not only before the chipping step or after the chipping step, but also together with the chipping step.
The depth of the groove 8 can be set appropriately as long as the lower end of the UFC panel can be embedded, but it is usually about 50 mm. Further, the depth of the groove 8 can be appropriately set in consideration of the distance from the hanging surface when arranging the UFC panel in the third step described later. The groove 8 can be formed by a general method, and for example, an electric hammer or an air pick can be used.

<第3の工程>
先ず、本発明で使用するUFCパネルについて説明する。
本発明において「UFCパネル」とは、超高強度繊維補強コンクリート(Ultra High Strength Fiber Reinforced Concrete)をパネル状に成型したものであり、例えば、「超高強度繊維補強コンクリートの設計・施工指針(案)」(以下UFC指針)に示された超高強度繊維補強コンクリート、又は、UFC指針に示された物質移動に関する諸物性(透気係数、塩化物イオンの拡散係数)と同等の超高強度の繊維補強コンクリートを使用して製造することができる。このように超高強度繊維補強コンクリートを使用することで、パネルの軽量化が可能になり、その結果、少人数での運搬、設置が容易になるため、労力を軽減し、工期を短縮することができる。
<Third step>
First, the UFC panel used in the present invention will be described.
In the present invention, the "UFC panel" is formed by molding Ultra High Strength Fiber Reinforced Concrete into a panel shape. For example, "design / construction guideline for ultra high strength fiber reinforced concrete (draft)". ) ”(Hereinafter referred to as UFC guideline), ultra-high strength fiber reinforced concrete, or ultra-high strength equivalent to various physical properties (air permeability coefficient, chloride ion diffusion coefficient) related to substance movement shown in UFC guideline. It can be manufactured using fiber reinforced concrete. By using ultra-high-strength fiber reinforced concrete in this way, it is possible to reduce the weight of the panel, and as a result, it is easy to transport and install with a small number of people, reducing labor and shortening the construction period. Can be done.

本発明では、UFCパネルを型枠としても使用するため、高強度、高靭性、高耐久性といった特性が求められる。例えば、下記の表3の特性を具備するUFCパネルを使用することが好ましい。 In the present invention, since the UFC panel is also used as a mold, characteristics such as high strength, high toughness, and high durability are required. For example, it is preferable to use a UFC panel that has the characteristics shown in Table 3 below.

Figure 0006904937
Figure 0006904937

UFCパネルの大きさは、鉄筋コンクリート製縦壁の大きさに応じて適宜設定することが可能であるが、高さが通常800〜1200mm、好ましくは1000mm程度であり、幅が通常500〜1500mm、好ましくは750〜1200mmであり、厚さが通常10〜50mm、好ましくは15〜30mmである。
また、UFCパネルの形状は、鉄筋コンクリート製縦壁に対して水平方向に設置できれば特に限定されないが、その一例を図4に示す。図4(a)に示すUFCパネル5は、矩形平板の一部に突起部5aを有するものであり、突起部5aには開口5bが設けられている。なお、図4(b)に、図4(a)に示すUFCパネル5のI−I線に沿った断面図を示す。図4(a)に示すUFCパネル5は、矩形平板の一部に手摺を埋設するための開口5bを有する突起部5aを備えるものであり、例えば、図4(c)に示す開口5bの下面にインサートアンカー5cを取り付けることにより手摺支柱を簡便に設置することができる。なお、突起部5a及び開口5bの大きさは、手摺支柱に応じて適宜設定可能である。例えば、突起部5aの厚みは10〜30mm、好ましくは15〜25mmである。また、突起部5aに設けられた開口5bの数は、手摺の設置状況により適宜設定可能であり、図4(a)に示すUFCパネルには、開口5bが2つ設けられている。また、開口5bの端部は、図4(b)に示されるように、開放端でもよく、また手摺を立設できれば閉塞端であっても構わない。
また、UFCパネル5の後述するモルタルが充填される側の面には、モルタルとの付着を向上させるために凹凸や突起などを設けてもよい。
The size of the UFC panel can be appropriately set according to the size of the reinforced concrete vertical wall, but the height is usually 800 to 1200 mm, preferably about 1000 mm, and the width is usually 500 to 1500 mm, preferably. Is 750 to 1200 mm, and the thickness is usually 10 to 50 mm, preferably 15 to 30 mm.
The shape of the UFC panel is not particularly limited as long as it can be installed horizontally with respect to the reinforced concrete vertical wall, and an example thereof is shown in FIG. The UFC panel 5 shown in FIG. 4A has a protrusion 5a on a part of a rectangular flat plate, and the protrusion 5a is provided with an opening 5b. Note that FIG. 4B shows a cross-sectional view of the UFC panel 5 shown in FIG. 4A along the I-I line. The UFC panel 5 shown in FIG. 4A includes a protrusion 5a having an opening 5b for embedding a handrail in a part of a rectangular flat plate. For example, the lower surface of the opening 5b shown in FIG. 4C. By attaching the insert anchor 5c to the handrail support, the handrail support can be easily installed. The sizes of the protrusions 5a and the openings 5b can be appropriately set according to the handrail support. For example, the thickness of the protrusion 5a is 10 to 30 mm, preferably 15 to 25 mm. Further, the number of openings 5b provided in the protrusion 5a can be appropriately set depending on the installation situation of the handrail, and the UFC panel shown in FIG. 4A is provided with two openings 5b. Further, as shown in FIG. 4B, the end portion of the opening 5b may be an open end, or may be a closed end as long as the handrail can be erected.
Further, the surface of the UFC panel 5 on the side to be filled with mortar, which will be described later, may be provided with irregularities or protrusions in order to improve adhesion to the mortar.

次に、第3の工程について説明する。
第3の工程は、複数枚のUFCパネル5を、はつり面から所定間隔を空けて互いに隣り合うように配置する工程である。
UFCパネル5は、はつり面から所定間隔を空け、UFCパネル5の側面同士を当接させて互いに隣り合うように配置し、図4(d)に示すように、結合ピン5dをガイドキーとして隣り合うUFCパネル5に設けられたそれぞれの孔部5eに差し込み、天端位置を確定することができる。結合ピンとしては、例えば樹脂製の棒状のもので、通常は直径8〜12mm、長さ80〜100mmである。
また、図3に示されるように、鉄筋コンクリート製縦壁2の天端部2aにアンカー6が打設されている場合には、アンカー6に連結された金具にUFCパネル5の上端部を固定してもよい。例えば、アンカー6にボルト7aを鉄筋クランプで固定し、ボルトにUFCパネル5に貫通させ、ボルトの端部をリップ溝型鋼7bで嵌合してUFCパネル5を固定すればよい。
更に、図3に示されるように、鉄筋コンクリート製縦壁2の下端部に溝8が設けられている場合には、溝8にUFCパネル5の下端を落とし込み、はつり面から所定間隔を空けて、UFCパネル5の側面同士を当接させて互い隣り合うように配置すればよい。この場合、UFCパネル5の下端部を、金具を介して所定間隔で固定してもよい。例えば、UFCパネル5の下端部の車道側露出面と車道面とをL型金具9で固定すればよい。
Next, the third step will be described.
The third step is a step of arranging a plurality of UFC panels 5 so as to be adjacent to each other at a predetermined interval from the fishing surface.
The UFC panels 5 are placed next to each other with the sides of the UFC panel 5 in contact with each other at a predetermined distance from the chipping surface, and as shown in FIG. 4 (d), the coupling pin 5d is used as a guide key to be adjacent to each other. The top position can be determined by inserting it into each of the holes 5e provided in the matching UFC panel 5. The coupling pin is, for example, a resin rod-shaped one, usually having a diameter of 8 to 12 mm and a length of 80 to 100 mm.
Further, as shown in FIG. 3, when the anchor 6 is placed on the top end 2a of the reinforced concrete vertical wall 2, the upper end of the UFC panel 5 is fixed to the metal fitting connected to the anchor 6. You may. For example, the bolt 7a may be fixed to the anchor 6 with a reinforcing bar clamp, the bolt may be passed through the UFC panel 5, and the end of the bolt may be fitted with the lip channel steel 7b to fix the UFC panel 5.
Further, as shown in FIG. 3, when a groove 8 is provided at the lower end of the reinforced concrete vertical wall 2, the lower end of the UFC panel 5 is dropped into the groove 8 at a predetermined distance from the fishing surface. The sides of the UFC panel 5 may be brought into contact with each other and placed next to each other. In this case, the lower ends of the UFC panel 5 may be fixed at predetermined intervals via metal fittings. For example, the exposed surface on the roadway side of the lower end of the UFC panel 5 and the roadway surface may be fixed with the L-shaped metal fitting 9.

また、UFCパネル5の側面及び/又は底面に、樹脂製テープを貼付した後、UFCパネル5の配置を行ってもよい。これにより、第4の工程において、UFCパネル5間やUFCパネル5の底部からのモルタルの漏出を防止することができる。樹脂製テープとしては、例えば、スポンジ状の素材の片面に粘着層が形成された隙間テープ等を挙げることができる。 Further, the UFC panel 5 may be arranged after the resin tape is attached to the side surface and / or the bottom surface of the UFC panel 5. This makes it possible to prevent mortar from leaking between the UFC panels 5 and from the bottom of the UFC panel 5 in the fourth step. Examples of the resin tape include a gap tape in which an adhesive layer is formed on one side of a sponge-like material.

はつり面からUFCパネル5までの間隔は、はつり量により適宜設定可能であるが、通常10〜80mm、好ましくは15〜65mmである。なお、UFCパネル5が突起部5aを有する場合には、突起部5a以外の部分が上記間隔を確保していればよい。 The distance from the chipping surface to the UFC panel 5 can be appropriately set depending on the amount of chipping, but is usually 10 to 80 mm, preferably 15 to 65 mm. When the UFC panel 5 has a protrusion 5a, it is sufficient that the portions other than the protrusion 5a secure the above interval.

<第4の工程>
第4の工程は、UFCパネル5と、はつり面との間隙10に防錆剤含有無収縮モルタルを注入する工程である。
無収縮モルタルとしては、土木・建築用の材料として公知の各種無収縮モルタルを使用することができる。
防錆剤としては、例えば、第3級アミン等のアミン;亜硝酸カルシウムや亜硝酸リチウム等の亜硝酸塩;リン酸塩;クロム酸塩;有機リン酸エステル;エステル塩;有機酸;スルホン酸;アルキルフェノール;メルカプタン;ニトロ化合物等を挙げることができる。防錆剤は、2種以上を併用しても構わない。なお、防錆剤は、無収縮モルタルを練り混ぜる際に添加すればよく、防錆剤の添加量は、無収縮モルタル中に、通常0.1〜0.5質量%、好ましくは0.2〜0.4質量%である。
<Fourth step>
The fourth step is a step of injecting a rust preventive-containing non-shrink mortar into the gap 10 between the UFC panel 5 and the fishing surface.
As the non-shrink mortar, various non-shrink mortars known as materials for civil engineering and construction can be used.
Examples of the rust preventive include amines such as tertiary amines; nitrites such as calcium nitrite and lithium nitrite; phosphates; chromate; organic phosphate esters; ester salts; organic acids; sulfonic acids; Alkylphenol; mercaptan; nitro compound and the like can be mentioned. Two or more kinds of rust preventives may be used in combination. The rust preventive may be added when kneading the non-shrink mortar, and the amount of the rust preventive added is usually 0.1 to 0.5% by mass, preferably 0.2 in the non-shrink mortar. ~ 0.4% by mass.

防錆剤含有無収縮モルタルの注入は、一般的な方法で行うことが可能であり、例えば、スクイズポンプ等を使用することができる。
また、防錆剤含有無収縮モルタルの注入は、モルタル充填の確実性、作業効率の向上の観点から、複数回に分けて行うことが好ましい。例えば、UFCパネル5の上端の間隙10に注入ホースを挿入し、防錆剤含有無収縮モルタルを鉄筋コンクリート製縦壁2の底部から中段まで注入して一層目のモルタル層を形成した後、4〜6時間程度養生する。次いで、はつり面の上端まで防錆剤含有無収縮モルタルを注入し2層目のモルタル層を形成した後、4〜6時間程度養生する。次いで、UFCパネル5の上面までコンクリートを打設し、鉄筋コンクリート製縦壁2の天端部2aを形成する。コンクリートを打設する際には膨張材を添加してもよく、膨張材としては、例えば、JIS A 6202コンクリート用膨張材に適合した石灰系膨張材等が挙げられる。膨張剤材の添加量は、コンクリート1m3当り、通常10〜30kgである。
The injection of the rust preventive-containing non-shrink mortar can be performed by a general method, and for example, a squeeze pump or the like can be used.
Further, the injection of the rust preventive-containing non-shrink mortar is preferably performed in a plurality of times from the viewpoint of reliability of mortar filling and improvement of work efficiency. For example, after inserting an injection hose into the gap 10 at the upper end of the UFC panel 5 and injecting rust preventive-containing non-shrink mortar from the bottom to the middle of the reinforced concrete vertical wall 2 to form the first mortar layer, 4 to 4 to Cure for about 6 hours. Next, a rust preventive-containing non-shrink mortar is injected to the upper end of the chipping surface to form a second mortar layer, and then cured for about 4 to 6 hours. Next, concrete is cast up to the upper surface of the UFC panel 5 to form the top end 2a of the reinforced concrete vertical wall 2. An expansion material may be added when placing concrete, and examples of the expansion material include a lime-based expansion material suitable for JIS A 6202 concrete expansion material. The amount of the leavening agent added is usually 10 to 30 kg per 1 m 3 of concrete.

鉄筋コンクリート製縦壁2の天端部2aのコンクリートが硬化したことを確認した後、鉄筋コンクリート製縦壁2の上面に手摺を設置する。手摺の設置は、例えば、鉄筋コンクリート製縦壁2の上面に手摺取付用治具をボルトで固定した後、手摺取付用治具に手摺支柱を立設し、手摺支柱に手摺棒を架設すればよい。 After confirming that the concrete at the top end 2a of the reinforced concrete vertical wall 2 has hardened, a handrail is installed on the upper surface of the reinforced concrete vertical wall 2. For the installation of the handrail, for example, after fixing the handrail mounting jig to the upper surface of the reinforced concrete vertical wall 2 with bolts, the handrail strut may be erected on the handrail mounting jig, and the handrail rod may be erected on the handrail strut. ..

また、第3の工程において、UFCパネル5の固定に使用した金具のうち、車道3側に突出した金具は撤去することができる。この場合、金属金具の撤去後の跡穴に、無収縮モルタルを充填することができる。 Further, in the third step, among the metal fittings used for fixing the UFC panel 5, the metal fittings protruding toward the roadway 3 side can be removed. In this case, the trace hole after the removal of the metal fitting can be filled with non-shrink mortar.

<第5の工程>
第4の工程後、UFCパネル5間の目地に充填材を充填する第5の工程を有していてもよい。これにより、コンクリートの劣化をより一層防止することができる。充填材としては、例えば、モルタル、樹脂等が挙げられる。なお、充填材の充填は、一般的な方法で行うことが可能である。
<Fifth step>
After the fourth step, it may have a fifth step of filling the joints between the UFC panels 5 with a filler. Thereby, deterioration of concrete can be further prevented. Examples of the filler include mortar, resin and the like. The filler can be filled by a general method.

以上、本発明をその実施形態に基づいて詳細に説明した。しかし、本発明は上記実施形態に限定されるものではない。本発明は、その要旨を逸脱しない範囲で様々な変形が可能である。例えば、上記実施形態では、図4(a)に示す突起部を有するUFCパネルを使用するが、図4(e)に示す矩形平板状のUFCパネルを使用することもできる。この場合、手摺を設置する際には、第4の工程後、鉄筋コンクリート製縦壁2の天端面に手摺支柱を固定するためのあと施工アンカーを設置し手摺支柱取り付け後、手摺棒を架設すればよい。 The present invention has been described in detail above based on the embodiment. However, the present invention is not limited to the above embodiment. The present invention can be modified in various ways without departing from the gist thereof. For example, in the above embodiment, the UFC panel having the protrusion shown in FIG. 4A is used, but the rectangular flat plate-shaped UFC panel shown in FIG. 4E can also be used. In this case, when installing the handrail, after the fourth step, a post-installed anchor for fixing the handrail support to the top surface of the reinforced concrete vertical wall 2 is installed, and after the handrail support is attached, the handrail rod is erected. good.

1 監視員通路
2 鉄筋コンクリート製縦壁
3 車道
4 手摺
5 UFCパネル
6 アンカー
7a、7b、9 金具
8 溝
10 間隙
1 Observer passage 2 Reinforced concrete vertical wall 3 Roadway 4 Handrail 5 UFC panel 6 Anchors 7a, 7b, 9 Metal fittings 8 Grooves 10 Gap

Claims (6)

トンネル監視員通路の鉄筋コンクリート製縦壁の補修方法であって
鉄筋コンクリート製縦壁天端部のコンクリートを除去する第1の工程と、
鉄筋コンクリート製縦壁側面のかぶりをはつる第2の工程と、
上端部に開口部を有する型枠兼用UFCパネルであって、複数枚の型枠兼用UFCパネルを、はつり面から所定間隔を空けて互いに隣り合うように配置する第3の工程と、
型枠兼用UFCパネルと、はつり面との間隙に防錆剤含有無収縮モルタルを注入する第4の工程
を含む、補修方法。
The first step of repairing the reinforced concrete vertical wall of the tunnel guard passage and removing the concrete at the top of the reinforced concrete vertical wall,
The second process of hanging the cover on the side of the vertical wall made of reinforced concrete,
A third step of arranging a plurality of formwork-combined UFC panels having an opening at the upper end so as to be adjacent to each other at a predetermined interval from the hanging surface.
A repair method comprising a fourth step of injecting a rust preventive-containing non-shrink mortar into the gap between the UFC panel that also serves as a formwork and the hanging surface.
第2の工程において、はつり面の下端部に溝を設ける工程を更に含み、
第3の工程において、複数枚の型枠兼用UFCパネルを、該型枠兼用UFCパネルの下端を溝内に落とし込み、はつり面から所定間隔を空けて互いに隣り合うように配置する、
請求項1記載の補修方法。
The second step further includes a step of providing a groove at the lower end of the fishing surface.
In the third step, a plurality of formwork-combined UFC panels are arranged so as to be adjacent to each other at a predetermined distance from the hanging surface by dropping the lower ends of the formwork-combined UFC panels into the groove.
The repair method according to claim 1.
第3の工程において、型枠兼用UFCパネルの側面及び/又は底面に、樹脂製テープの貼付した後、複数枚の型枠兼用UFCパネルを、はつり面から所定間隔を空けて互いに隣り合うように配置し、結合ピンを隣り合うUFCパネルの側面の孔部に差し込むことによりUFCパネルの天端位置を確定させる、請求項1又は2記載の補修方法。 In the third step, after the resin tape is attached to the side and / or bottom of the UFC panel that also serves as a formwork, a plurality of UFC panels that also serve as a formwork are placed next to each other at a predetermined interval from the hanging surface. The repair method according to claim 1 or 2, wherein the top position of the UFC panel is determined by arranging and inserting a coupling pin into a hole on the side surface of the adjacent UFC panel. 第1の工程後、第3の工程前において、天端部のコンクリート除去部分に所定間隔でアンカーを打設する工程を更に含み、
第3の工程後、第4の工程前に、アンカーに連結された金具に型枠兼用UFCパネルの上端部を固定する工程を含む、
請求項1〜3のいずれか1項に記載の補修方法。
After the first step and before the third step, the step of placing anchors at predetermined intervals in the concrete removing portion at the top end is further included.
After the third step and before the fourth step, the step of fixing the upper end portion of the UFC panel also used as a formwork to the metal fitting connected to the anchor is included.
The repair method according to any one of claims 1 to 3.
第3の工程後、第4の工程前に、型枠兼用UFCパネルの下端部を、連結金具を介して所定間隔で固定する工程を含む、請求項1〜4のいずれか1項に記載の補修方法。 The invention according to any one of claims 1 to 4, further comprising a step of fixing the lower end portion of the UFC panel that also serves as a formwork at predetermined intervals via a connecting metal fitting after the third step and before the fourth step. Repair method. 第4の工程後、型枠兼用UFCパネル間の目地に充填剤を充填する第5の工程を含む、請求項1〜のいずれか1項に記載の補修方法。 The repair method according to any one of claims 1 to 5 , further comprising a fifth step of filling the joints between the UFC panels that also serve as formwork with a filler after the fourth step.
JP2018190952A 2018-10-09 2018-10-09 How to repair the reinforced concrete vertical wall of the tunnel guard passage Active JP6904937B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018190952A JP6904937B2 (en) 2018-10-09 2018-10-09 How to repair the reinforced concrete vertical wall of the tunnel guard passage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018190952A JP6904937B2 (en) 2018-10-09 2018-10-09 How to repair the reinforced concrete vertical wall of the tunnel guard passage

Publications (2)

Publication Number Publication Date
JP2020060012A JP2020060012A (en) 2020-04-16
JP6904937B2 true JP6904937B2 (en) 2021-07-21

Family

ID=70218838

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018190952A Active JP6904937B2 (en) 2018-10-09 2018-10-09 How to repair the reinforced concrete vertical wall of the tunnel guard passage

Country Status (1)

Country Link
JP (1) JP6904937B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7730508B2 (en) * 2022-06-07 2025-08-28 日本サミコン株式会社 Repair panel for tunnel shoulder structure and repair method

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL8800353A (en) * 1988-02-12 1989-09-01 Hollandsche Betongroep Nv METHOD FOR COATING A WALL OF CONCRETE WITH A PLASTIC COATING
JP3158438U (en) * 2010-01-06 2010-04-02 有限会社 菅恒コンクリート工業所 Reinforced connecting material for concrete formwork
JP5688937B2 (en) * 2010-09-14 2015-03-25 株式会社ネクスコ・メンテナンス新潟 Repair panel
JP2014148825A (en) * 2013-02-01 2014-08-21 Central Nippon Expressway Co Ltd Wall structure in road tunnel and construction method thereof
JP2015117515A (en) * 2013-12-18 2015-06-25 中日本高速道路株式会社 Tunnel observer passage structure and construction method thereof
JP6608131B2 (en) * 2014-11-14 2019-11-20 東日本高速道路株式会社 Repair method and repair structure of concrete structure using repair panel
JP5761701B1 (en) * 2015-02-09 2015-08-12 株式会社ヒロコーポレーション How to repair the wall that raises the observer passage in the tunnel

Also Published As

Publication number Publication date
JP2020060012A (en) 2020-04-16

Similar Documents

Publication Publication Date Title
KR101994852B1 (en) Concrete structure using reinforcing member reinforced by embedded grid, and repairing and strengthening method for the same
US11773610B2 (en) Concrete structure strengthened using grid reinforcement material and non-shrink grout and method of strengthening the same
JP6370729B2 (en) Road bridge protective fence installation method
KR101701089B1 (en) Method of repairing and reinforcing damaged part of concrete structure using assemblable anchor and panel
US10253627B2 (en) Method of repairing a tunnel
CN113756339A (en) Construction method of prestressed anchor cable frame beam structure
JP6845501B2 (en) Vertical member installation structure, vertical member installation method, and precast vertical member
JP3880738B2 (en) Reinforcement method of concrete structure by cement mortar composite board with carbon fiber sheet
JP6904937B2 (en) How to repair the reinforced concrete vertical wall of the tunnel guard passage
JP4093428B2 (en) High-strength reinforced concrete precast plate
KR101978443B1 (en) High strength concrete pannel structure and road safety structure of reinforcent method using the same
JP4582585B2 (en) Fasteners for joint members
JP2893490B2 (en) Waterway repair method
KR102397868B1 (en) Structure for reinforcing by continuous construction of precast textile reinforced concrete (trc) panel, and construction method for the same
JP2020066962A (en) Planar material construction method
KR101742775B1 (en) repair/reinforcement method of land reclamation type using Steel wire rope
US10689869B1 (en) System method and device for structural repair
JP7123335B2 (en) Construction method of water stop structure of concrete joint
JP7730508B2 (en) Repair panel for tunnel shoulder structure and repair method
KR200286645Y1 (en) a joint structure of building using anchor and plate
JP2024107899A (en) Resin concrete panel structure
JP2001152403A (en) High strength reinforced concrete precast plate
JP4093427B2 (en) High-strength reinforced concrete precast plate
US11203932B2 (en) Method of installing fiber liner for large tunnel repair
KR101379923B1 (en) Expansion joint for concrete slab structure and construction method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20201224

A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20201224

A975 Report on accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A971005

Effective date: 20210107

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210323

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210512

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20210615

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20210624

R150 Certificate of patent or registration of utility model

Ref document number: 6904937

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250