Jig tool and laminated beam structure, and construction method of laminated beam structure Download PDF

Info

Publication number
JP6919480B2
JP6919480B2 JP2017194092A JP2017194092A JP6919480B2 JP 6919480 B2 JP6919480 B2 JP 6919480B2 JP 2017194092 A JP2017194092 A JP 2017194092A JP 2017194092 A JP2017194092 A JP 2017194092A JP 6919480 B2 JP6919480 B2 JP 6919480B2
Authority
JP
Japan
Prior art keywords
jig
face material
tool
face
fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2017194092A
Other languages
Japanese (ja)
Other versions
JP2019065640A (en
Inventor
亮介 佐藤
亮介 佐藤
慎太郎 市川
慎太郎 市川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui House Ltd
Original Assignee
Sekisui House Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui House Ltd filed Critical Sekisui House Ltd
Priority to JP2017194092A priority Critical patent/JP6919480B2/en
Publication of JP2019065640A publication Critical patent/JP2019065640A/en
Application granted granted Critical
Publication of JP6919480B2 publication Critical patent/JP6919480B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Rod-Shaped Construction Members (AREA)

Description

本発明は、治工具及び積層梁構造体と、積層構造体の施工方法に関する。 The present invention relates to a jig and a laminated beam structure, and a method of constructing the laminated structure.

木造建築物においては、室内側から見た場合に、天井面に梁が現れる、所謂、現し仕上げの小屋部が採用される場合がある。このように小屋部を現し仕上げとすることにより、木造建築物に高い意匠性を具備させることができる。 In a wooden building, a so-called exposed hut part in which beams appear on the ceiling surface when viewed from the indoor side may be adopted. By exposing and finishing the hut portion in this way, it is possible to give the wooden building a high degree of design.

特許文献1には、互いに並設された複数の野縁(基材)Xと、当該複数の野縁Xの下方を覆うように複数の野縁Xに固定された天井材(面材)Yと、天井材Yの下方に固定された中空の化粧材2と、を備える積層構造体が開示されている。 In Patent Document 1, a plurality of field edges (base materials) X juxtaposed with each other and a ceiling material (face material) Y fixed to the plurality of field edges X so as to cover the lower side of the plurality of field edges X. A laminated structure including the hollow decorative material 2 fixed below the ceiling material Y and the hollow decorative material 2 is disclosed.

また、特許文献1では、天井材Yを下方から持ち上げた状態を維持しながら、天井材Yを野縁(基材)Xに固定するとともに、天井材Yを介した状態で野縁(基材)Xに対してベース材1を固定する、という施工方法が開示されている。そして、特許文献1に開示の施工方法では、ベース材1に対して化粧材2を固定している。 Further, in Patent Document 1, while maintaining the state in which the ceiling material Y is lifted from below, the ceiling material Y is fixed to the field edge (base material) X, and the field edge (base material) is interposed through the ceiling material Y. ) A construction method of fixing the base material 1 to X is disclosed. Then, in the construction method disclosed in Patent Document 1, the decorative material 2 is fixed to the base material 1.

特許文献1では、上記のように中空の化粧梁を採用することで、面材より下方の部分の重量を軽減し、簡易な構造で現し仕上げの小屋部を実現しようとしている。 In Patent Document 1, by adopting a hollow decorative beam as described above, the weight of the portion below the face material is reduced, and an attempt is made to realize an exposed and finished hut portion with a simple structure.

特開2003−293509号公報Japanese Unexamined Patent Publication No. 2003-293509

ところで、小屋部における面方向の剛性を保つために従来用いられていた火打ち梁を省略し、その代わりに面材として高剛性のCLT(Cross Laminated Timber)板を用いる試みがなされている。このCLT板は、従来用いられていた石膏ボードや合板等に比べて重力が重い。 By the way, an attempt has been made to omit the flint beam conventionally used in order to maintain the rigidity in the surface direction in the cabin, and to use a high-rigidity CLT (Cross Laminated Timber) plate as a surface material instead. This CLT board has a heavier gravity than the conventionally used gypsum board, plywood, and the like.

このようなCLT板を面材として用いる場合等を考慮するとき、上記特許文献1に開示の構造を含む従来構造には施工性の観点から改善の余地がある。即ち、上記特許文献1で開示された施工方法において、天井材としてCLT板を用いようとした場合に、CLT板を下方から持ち上げた状態を維持しながら、野縁に対してCLT板を固定しなければならず、作業性が悪く、また安全性に問題を有する。 Considering the case where such a CLT plate is used as a face material, there is room for improvement in the conventional structure including the structure disclosed in Patent Document 1 from the viewpoint of workability. That is, in the construction method disclosed in Patent Document 1, when a CLT board is used as a ceiling material, the CLT board is fixed to the field edge while maintaining the state in which the CLT board is lifted from below. It must be, workability is poor, and there is a problem in safety.

本発明は、上記のような問題の解決を図ろうとなされたものであって、用いる面材の重量にかかわらず、優れた施工性を実現することができる治工具及び積層梁構造体と、積層構造体の施工方法を提供することを目的とする。 The present invention has been made to solve the above-mentioned problems, and is laminated with a jig and tool and a laminated beam structure capable of realizing excellent workability regardless of the weight of the face material used. The purpose is to provide a method of constructing a structure.

本発明の一態様に係る治工具は、第1梁と、当該第1梁の下方の第2梁とを、前記第1梁と前記第2梁との間に面材を挟んだ状態で固定するために用いる治工具であって、所定の延設方向に延びる延設部と、前記延設部における所定の部分に設けられ、前記第1梁との固定に用いられる第1梁固定部と、前記延設部における前記第1梁固定部が設けられた部分よりも下方の部分に設けられ、前記第2梁との固定に用いられる第2梁固定部と、前記延設部における前記第1梁固定部が設けられた部分から下方に所定間隔だけ離間した位置から、前記延設部が延びる延設方向と交差する方向に延びる掛部と、を備え、前記所定間隔は、前記第1梁固定部に前記第1梁が固定された場合に、前記第1梁固定部から前記第1梁の下面までの間隔と、前記面材の厚み寸法とを足し合わせた値よりも大きい間隔となっている。 In the jig tool according to one aspect of the present invention, the first beam and the second beam below the first beam are fixed with a face material sandwiched between the first beam and the second beam. An extension portion extending in a predetermined extension direction and a first beam fixing portion provided at a predetermined portion of the extension portion and used for fixing to the first beam. The second beam fixing portion provided in the extension portion below the portion where the first beam fixing portion is provided and used for fixing to the second beam, and the first beam fixing portion in the extension portion. (1) A hanging portion extending in a direction intersecting the extending direction in which the extending portion extends from a position separated downward by a predetermined interval from a portion provided with the beam fixing portion, and the predetermined interval is the first. When the first beam is fixed to the beam fixing portion, the spacing from the first beam fixing portion to the lower surface of the first beam and the spacing larger than the sum of the thickness dimensions of the face material It has become.

上記態様に係る治工具では、延設部に第1梁固定部と第2梁固定部とが設けられているので、面材を挟んだ状態で第1梁と第2梁との固定に用いることができる。 In the jig and tool according to the above aspect, since the first beam fixing portion and the second beam fixing portion are provided in the extending portion, they are used for fixing the first beam and the second beam with the face material sandwiched between them. be able to.

また、上記態様に係る治工具では、掛部を備えているとともに、掛部の形成箇所を規定する上記所定間隔を、第1梁固定部から第1梁の下面までの間隔と、面材の厚み寸法とを足し合わせた値よりも大きい間隔としているので、第1梁に対して面材を固定する際に、治工具を第1梁に固定した後に、当該掛部を面材の仮受け部として用いることができ、重量の重い面材を用いる場合にあっても、高い施工性を実現することができる。即ち、上記態様に係る治工具を用いた施工に際しては、治工具を第1梁に固定し、当該治工具の掛部に面材の端面部を引っ掛けることで、面材の重量の少なくとも一部を掛部で仮受けさせることができ、当該仮受けさせた状態でねじや釘を用いて第1梁と面材とを固定することができる。 Further, the jig / tool according to the above aspect is provided with a hooking portion, and the predetermined spacing for defining the forming portion of the hanging portion is set to the distance from the first beam fixing portion to the lower surface of the first beam and the face material. Since the interval is larger than the value obtained by adding the thickness dimensions, when fixing the face material to the first beam, after fixing the jig and tool to the first beam, the hanging part is temporarily received by the face material. It can be used as a part, and high workability can be realized even when a heavy face material is used. That is, in the construction using the jig and tool according to the above aspect, at least a part of the weight of the face material is obtained by fixing the jig and tool to the first beam and hooking the end face portion of the face material on the hooking portion of the jig and tool. Can be temporarily received at the hanging portion, and the first beam and the face material can be fixed by using screws or nails in the temporarily received state.

また、上記態様では、上記のように、掛部の形成箇所を規定する上記所定間隔を、第1梁固定部から第1梁の下面までの間隔と、面材の厚み寸法とを足し合わせた値よりも大きい間隔としているので、治工具の掛部に対して面材の端面部を引っ掛ける際に、端面部を差し込み易く、高い作業性を確保することができる。 Further, in the above aspect, as described above, the predetermined interval that defines the forming portion of the hanging portion is added to the interval from the first beam fixing portion to the lower surface of the first beam and the thickness dimension of the face material. Since the interval is larger than the value, when the end face portion of the face material is hooked on the hooking portion of the jig and tool, the end face portion can be easily inserted and high workability can be ensured.

なお、面材の重量が軽い場合にあっても、作業者が下方から面材を支えておくという作業の軽減を図ることができ、この点において、高い施工性を実現することができる。 Even when the weight of the face material is light, it is possible to reduce the work of the operator supporting the face material from below, and in this respect, high workability can be realized.

従って、上記態様に係る治工具では、当該治工具を用いることにより、用いる面材の重量にかかわらず、優れた施工性を実現することができる。 Therefore, in the jig and tool according to the above aspect, excellent workability can be realized regardless of the weight of the face material used by using the jig and tool.

本発明の別態様に係る治工具は、上記態様であって、前記第2梁固定部は、前記第1梁固定部に前記第1梁が固定され、前記第2梁固定部に前記第2梁が固定された場合に、前記第1梁の下面と前記第2梁の上面との間隔が前記面材の厚み寸法に合致する部分に設けられている。 The jig and tool according to another aspect of the present invention is the above-mentioned aspect, and in the second beam fixing portion, the first beam is fixed to the first beam fixing portion, and the second beam fixing portion is fixed to the second beam fixing portion. When the beam is fixed, the distance between the lower surface of the first beam and the upper surface of the second beam is provided at a portion that matches the thickness dimension of the face material.

上記態様に係る治工具では、第1梁固定部に第1梁を固定し、第2梁固定部に第2梁を固定したと想定した場合に、治工具における第1梁の下面と第2梁の上面との間の間隔を、面材の厚み寸法に合致させるようにしているので、該治工具を用いて施工した第1梁と面材と第2梁とからなる積層梁構造体において、互いの間に隙間を生じることがなく、高い意匠性を確保できるとともに、高さ方向でのサイズを小さく抑えることができる。 In the jig and tool according to the above aspect, assuming that the first beam is fixed to the first beam fixing portion and the second beam is fixed to the second beam fixing portion, the lower surface of the first beam and the second beam in the jig and tool are assumed to be fixed. Since the distance between the upper surface of the beam and the upper surface of the beam is made to match the thickness dimension of the face material, in the laminated beam structure composed of the first beam, the face material, and the second beam constructed by using the jig and tool. , There is no gap between each other, high design can be ensured, and the size in the height direction can be kept small.

本発明の別態様に係る治工具は、上記態様であって、前記掛部は、前記延設方向と直交する方向に延びる本掛部と、当該本掛部に連続するとともに、前記本掛部から離れるに従って、前記第1梁固定部から漸次離れるように傾斜する傾斜部と、を有する。 The jig and tool according to another aspect of the present invention is the above-mentioned aspect, in which the hanging portion is continuous with the main hanging portion extending in a direction orthogonal to the extending direction and the main hanging portion. It has an inclined portion that inclines gradually away from the first beam fixing portion as the distance from the first beam is fixed.

上記態様に係る治工具では、掛部に傾斜部が設けられているので、掛部に対して面材の端面部を引っ掛ける際に、当該面材の端面部を掛部と第1梁の下面との間に差し込み易い。よって、上記態様に係る治工具を用いることで、更に高い施工性を実現することができる。 In the jig and tool according to the above aspect, since the hooked portion is provided with an inclined portion, when the end face portion of the face material is hooked on the hooked portion, the end face portion of the face material is hooked on the hooked portion and the lower surface of the first beam. Easy to insert between. Therefore, even higher workability can be realized by using the jig and tool according to the above aspect.

本発明の一態様に係る積層梁構造体は、上記の何れかの治工具と、前記治工具における前記第1梁固定部に固定される第1梁と、前記治工具における前記第2梁固定部に固定される第2梁と、前記第1梁と前記第2梁との間に配設された状態で、前記第1梁に固定されてなる面材と、を備える。 The laminated beam structure according to one aspect of the present invention includes any of the above jigs and tools, a first beam fixed to the first beam fixing portion in the jigs and tools, and the second beam fixing in the jigs and tools. A second beam fixed to the portion and a face material fixed to the first beam in a state of being disposed between the first beam and the second beam are provided.

上記態様に係る積層梁構造体では、面材が互いの間に配設された状態での第1梁と第2梁との固定に、上記の各態様に係る治工具を用いているので、上記のように、用いる面材の重量にかかわらず、優れた施工性を以って施工することができる。 In the laminated beam structure according to the above aspect, the jigs and tools according to each of the above aspects are used for fixing the first beam and the second beam in a state where the face members are arranged between each other. As described above, the work can be carried out with excellent workability regardless of the weight of the face material used.

本発明の別態様に係る積層梁構造体は、上記態様であって、前記面材は、前記治工具の前記延設部における前記第1梁の下面と前記第2梁の上面との間の領域をかわすように配設されている。 The laminated beam structure according to another aspect of the present invention is the above aspect, and the face material is between the lower surface of the first beam and the upper surface of the second beam in the extension portion of the jig and tool. It is arranged so as to dodge the area.

上記態様に係る積層梁構造体では、面材が治工具における上記領域をかわすように配設されているので、面材と治工具との干渉が避けられ、第1梁の長手方向における隣接する面材同士の間での隙間の発生を避けることができる。 In the laminated beam structure according to the above aspect, since the face material is arranged so as to avoid the above area in the jig and tool, interference between the face material and the jig and tool is avoided, and the first beam is adjacent in the longitudinal direction. It is possible to avoid the occurrence of gaps between the face materials.

本発明の別態様に係る積層梁構造体は、上記態様であって、前記第1梁には、前記治工具の前記延設部における前記面材の上面よりも上部の侵入を許す凹部が設けられており、前記第2梁には、前記治工具の前記延設部における前記面材の下面よりも下部の侵入を許す凹部が設けられている。 The laminated beam structure according to another aspect of the present invention is the above-mentioned aspect, and the first beam is provided with a recess in the extending portion of the jig and tool so as to allow an upper portion of the face material to enter above the upper surface. The second beam is provided with a recess in the extending portion of the jig and tool that allows the intrusion of the lower portion of the face material below the lower surface.

上記態様に係る積層梁構造体では、第1梁には治工具における延設部の上部の侵入を許す凹部が設けられ、第2梁には治工具における延設部の下部の侵入を許す凹部が設けられているので、第1梁と面材、及び面材と第2梁の各間に隙間が空くのを抑制することができる。よって、当該積層梁構造体の高さ方向の寸法を低く抑えることができ、また、高い意匠性を確保することができる。 In the laminated beam structure according to the above aspect, the first beam is provided with a recess that allows the upper part of the extension portion of the jig and tool to enter, and the second beam is provided with a recess that allows the lower part of the extension portion of the jig and tool to enter. Is provided, so that it is possible to prevent a gap from being formed between the first beam and the face material and between the face material and the second beam. Therefore, the dimension of the laminated beam structure in the height direction can be kept low, and high designability can be ensured.

本発明の一態様に係る積層梁構造体の施工方法は、上記の何れかの治工具を2つ準備する工程と、第1梁を設置する工程と、前記第1梁に対して、当該第1梁の長手方向に沿って、所定ピッチで前記2つの治工具を固定する工程と、前記第1梁の下面に面材を固定する工程と、前記面材の下面に第2梁を設置し、当該第2梁を前記2つの治工具に固定する工程と、を備え、前記治工具を固定する工程では、前記所定ピッチとして、前記第1梁の長手方向における前記面材の長さを採用し、前記面材を固定する工程は、前記第1梁の長手方向における前記面材の一方の側の端面部を、前記2つの治工具の内の一方の治工具における前記掛部の上面に引っ掛ける第1サブ工程と、前記一方の側の端面部を前記掛部の上面に引っ掛けた後、前記第1梁の長手方向における前記面材の他方の側の端面部を前記第1梁の下面に向けて回動させる第2サブ工程と、前記面材の前記他方の側の端面部を回動させた後、前記面材を前記第1梁の長手方向に沿ってスライド移動させ、前記他方の側の端面部を、前記2つの治工具の内の他方の治工具における前記掛部の上面に引っ掛ける第3サブ工程と、前記面材における両端面部をそれぞれ引っ掛けた状態で、前記第1梁に対して前記面材を固定する第4サブ工程と、を有する。 The method of constructing the laminated beam structure according to one aspect of the present invention includes a step of preparing two of the above jigs and tools, a step of installing the first beam, and the first beam. A step of fixing the two jigs and tools at a predetermined pitch along the longitudinal direction of one beam, a step of fixing a face material on the lower surface of the first beam, and a step of installing a second beam on the lower surface of the face material. The step of fixing the second beam to the two jigs and tools is provided, and in the step of fixing the jigs and tools, the length of the face material in the longitudinal direction of the first beam is adopted as the predetermined pitch. Then, in the step of fixing the face material, the end face portion on one side of the face material in the longitudinal direction of the first beam is placed on the upper surface of the hook portion in one of the two jigs and tools. After the first sub-step of hooking and the end face portion on one side are hooked on the upper surface of the hook portion, the end face portion on the other side of the face material in the longitudinal direction of the first beam is the lower surface of the first beam. After rotating the second sub-step of rotating the face material and the end face portion on the other side of the face material, the face material is slid and moved along the longitudinal direction of the first beam, and the other side. The third sub-step of hooking the end face portion on the side of the two jigs and tools on the upper surface of the hooking portion of the other jig and tool, and the first beam with both end surface portions of the face material hooked. It has a fourth sub-step of fixing the face material.

上記態様に係る積層梁構造体の施工方法では、上記と同様の構成を有する治工具を2つ用いるとともに、面材を固定する工程に、第1サブ工程と、第2サブ工程と、を有するので、2つの治工具に面材の両端面部を引っ掛けた状態で、第1梁に面材を固定することができる。 In the method of constructing the laminated beam structure according to the above aspect, two jigs and tools having the same configuration as described above are used, and the steps of fixing the face material include a first sub-step and a second sub-step. Therefore, the face material can be fixed to the first beam with both end faces of the face material hooked on the two jigs and tools.

従って、上記態様に係る積層梁構造体の施工方法では、上記のような仮受け状態を経て、第1梁に面材を固定することができるので、用いる面材の重量にかかわらず、優れた施工性を実現することができる。 Therefore, in the method of constructing the laminated beam structure according to the above aspect, since the face material can be fixed to the first beam through the temporary receiving state as described above, it is excellent regardless of the weight of the face material used. Workability can be realized.

本発明の別態様に係る積層梁構造体の施工方法は、上記態様であって、前記面材の隅部には、前記掛部に対応して、平面視矩形の切欠き部が設けられており、前記隅部に前記切欠き部を設けることにより、前記第1サブ工程から前記第2サブ工程までの間で、前記治工具における前記延設部に対する前記面材の干渉を避ける。 The method for constructing a laminated beam structure according to another aspect of the present invention is the above aspect, wherein a notch portion having a rectangular shape in a plan view is provided at a corner portion of the face material corresponding to the hanging portion. By providing the notch portion in the corner portion, interference of the face material with the extension portion in the jig and tool is avoided between the first sub-step and the second sub-step.

このように、面材の隅部に切欠き部を設け、治工具の延設部に対する面材の干渉を避けることにより、面材を治工具の掛部に引っ掛けるサブ工程において、作業がし易くなり、効率の向上を図ることができる。 In this way, by providing notches at the corners of the face material and avoiding interference of the face material with the extending part of the jig and tool, it is easy to work in the sub-process of hooking the face material on the hooking part of the jig and tool. Therefore, efficiency can be improved.

上記の各態様では、用いる面材の重量にかかわらず、優れた施工性を実現することができる。 In each of the above aspects, excellent workability can be realized regardless of the weight of the face material used.

第1実施形態に係る小屋部の概略構造を示す模式側面図である。It is a schematic side view which shows the schematic structure of the hut part which concerns on 1st Embodiment. 図1のII−II断面を示す模式断面図である。It is a schematic cross-sectional view which shows the II-II cross section of FIG. 図2のIII−III断面を示す模式断面図である。It is a schematic cross-sectional view which shows the III-III cross section of FIG. 治工具の構造を示す図であって、(a)は模式正面図、(b)は模式平面図、(c)は模式側面図である。It is a figure which shows the structure of a jig and tool, (a) is a schematic front view, (b) is a schematic plan view, and (c) is a schematic side view. 積層梁構造体の構造を示す模式断面図である。It is a schematic cross-sectional view which shows the structure of the laminated beam structure. 治工具が固定された上部勾配梁を示す模式断面図である。It is a schematic cross-sectional view which shows the upper slope beam to which the jig tool is fixed. 面材の構成の一部を示す模式平面図である。It is a schematic plan view which shows a part of the structure of a face material. 治工具に対して面材を仮掛けする工程を示す模式断面図である。It is a schematic cross-sectional view which shows the process of temporarily hanging a face material on a jig and tool. 治工具に対して面材を仮掛けする工程を示す模式平面図であって、(a)は上側切欠き部の縁部を治工具の掛部に仮掛けした状態を示す模式平面図であり、(b)は2つの治工具の掛部に対して面材の仮掛けが完了した状態を示す模式平面図である。It is a schematic plan view which shows the process of temporarily hanging a face material on a jig and tool, and (a) is a schematic plan view which shows the state which the edge part of the upper notch part is temporarily hung on the hanging part of a jig and tool. , (B) is a schematic plan view showing a state in which the temporary hooking of the face material is completed on the hooking portions of the two jigs and tools. 上部勾配梁に対して面材を固定した後、下部勾配梁を固定する工程を示す模式断面図である。It is a schematic cross-sectional view which shows the process of fixing the lower slope beam after fixing the face material to the upper slope beam. 第2実施形態に係る治工具の構造を示す図であって、(a)は模式正面図、(b)は模式平面図、(c)は模式側面図である。It is a figure which shows the structure of the jig tool which concerns on 2nd Embodiment, (a) is a schematic front view, (b) is a schematic plan view, (c) is a schematic side view. 第2実施形態に係る積層梁構造体の構造を示す模式断面図である。It is a schematic cross-sectional view which shows the structure of the laminated beam structure which concerns on 2nd Embodiment.

以下では、本発明の実施形態について、図面を参酌しながら説明する。なお、以下で説明の形態は、本発明の一態様であって、本発明は、その本質的な構成を除き何ら以下の形態に限定を受けるものではない。 Hereinafter, embodiments of the present invention will be described with reference to the drawings. The form described below is one aspect of the present invention, and the present invention is not limited to any of the following forms except for its essential configuration.

[第1実施形態]
1.小屋部1の概略構造
本実施形態に係る木造建築物の小屋部1の概略構造について、図1及び図2を用い説明する。
[First Embodiment]
1. 1. Schematic structure of the cabin 1 The schematic structure of the cabin 1 of the wooden building according to the present embodiment will be described with reference to FIGS. 1 and 2.

図1に示すように、本実施形態に係る小屋部1は、2本の柱2,3と、棟木4と、軒桁5と、積層梁構造体6と、母屋12と、垂木13と、を備える。2本の柱2,3は、X方向において互いに間隔を空けて配置されている。本実施形態に係る小屋部1では、柱2の方が柱3よりも高い。 As shown in FIG. 1, the hut portion 1 according to the present embodiment includes two pillars 2 and 3, a building tree 4, an eaves girder 5, a laminated beam structure 6, a purlin 12, and a rafter 13. To be equipped. The two pillars 2 and 3 are arranged so as to be spaced apart from each other in the X direction. In the cabin 1 according to the present embodiment, the pillar 2 is higher than the pillar 3.

棟木4は、柱2の上端部において、紙面に垂直な方向に延びるように組まれている。軒桁5は、柱3の上端部において、紙面に垂直な方向であって、棟木4と並行するように組まれている。 The purlin 4 is assembled so as to extend in a direction perpendicular to the paper surface at the upper end of the pillar 2. The eaves girder 5 is assembled at the upper end of the pillar 3 in a direction perpendicular to the paper surface and parallel to the purlin 4.

積層梁構造体6は、上部勾配梁(第1梁に相当)7と、面材8,9,10と、下部勾配梁(第2梁に相当)11と、を有している。上部勾配梁7は、積層梁構造体6の構成中、剛性を担保するための構造梁であって、勾配を以って棟木4と軒桁5との間に架け渡されている。上部勾配梁7と棟木4及び軒桁5との固定構造についての詳細は省略しているが、例えば、金具を間に介してなされている。 The laminated beam structure 6 has an upper slope beam (corresponding to the first beam) 7, face members 8, 9, and 10 and a lower slope beam (corresponding to the second beam) 11. The upper slope beam 7 is a structural beam for ensuring rigidity in the configuration of the laminated beam structure 6, and is bridged between the purlin 4 and the eaves girder 5 with a slope. Details of the fixed structure of the upper slope beam 7, the purlin 4 and the eaves girder 5 are omitted, but for example, the metal fittings are interposed between them.

面材8,9,10は、上部勾配梁7の下方に、隙間なく固定されている。上部勾配梁7と面材8,9,10との固定は、例えば、ねじ止めによりなされている。なお、本実施形態では、面材8,9,10として、CLT(Cross Laminated Timber)板を採用している。 The face members 8, 9 and 10 are fixed to the lower part of the upper slope beam 7 without any gap. The upper slope beam 7 and the face members 8, 9 and 10 are fixed by, for example, screwing. In this embodiment, CLT (Cross Laminated Timber) plates are used as the face materials 8, 9 and 10.

このため、本実施形態に係る小屋部1においては、上部勾配梁7と棟木4及び軒桁5との各突合せ部分の近傍での火打ち梁の配設を省略している。 Therefore, in the hut portion 1 according to the present embodiment, the arrangement of the flint beam in the vicinity of the butted portion of the upper slope beam 7, the purlin 4 and the eaves girder 5 is omitted.

下部勾配梁11は、小屋部1における下方の空間に露出する梁である。下部勾配梁11は、面材8,9,10の下方に、隙間なく固定されている。 The lower slope beam 11 is a beam exposed in the space below the hut portion 1. The lower slope beam 11 is fixed below the face members 8, 9 and 10 without a gap.

なお、本実施形態に係る小屋部1では、Z方向において、棟木4及び軒桁5の高さが、上部勾配梁7、面材8,9,10、及び下部勾配梁11を重ねた際のZ方向での寸法よりも高くなっている。これにより、下側に居る人が、下部勾配梁11が棟木4及び軒桁5に組まれているように見えることになる。 In the hut portion 1 according to the present embodiment, when the heights of the purlins 4 and the eaves girder 5 in the Z direction are such that the upper slope beams 7, the face materials 8, 9, 10 and the lower slope beams 11 are overlapped with each other. It is higher than the dimension in the Z direction. As a result, the person on the lower side can see that the lower slope beam 11 is assembled on the purlin 4 and the eaves girder 5.

図2に示すように、Z方向から上部勾配梁7と下部勾配梁11とを見たとき、下部勾配梁11は、上部勾配梁7と重なる位置に配置されている。そして、Y方向における面材8,9,10のそれぞれ同士の突合せ箇所も、上部勾配梁7と下部勾配梁11とが重なる位置に配置されている。 As shown in FIG. 2, when the upper slope beam 7 and the lower slope beam 11 are viewed from the Z direction, the lower slope beam 11 is arranged at a position overlapping the upper slope beam 7. The butting points of the face members 8, 9 and 10 in the Y direction are also arranged at positions where the upper slope beam 7 and the lower slope beam 11 overlap.

図1に戻って、母屋12は、棟木4と軒桁5との間の位置に配設され、棟木4及び軒桁5に並行するように紙面に垂直な方向に延びている。 Returning to FIG. 1, the purlin 12 is arranged at a position between the purlin 4 and the eaves girder 5, and extends in a direction perpendicular to the paper surface so as to be parallel to the purlin 4 and the eaves girder 5.

図2に示すように、Y方向における垂木13同士のピッチは、上部勾配梁7同士及び下部勾配梁11同士のピッチよりも狭く設定されている。 As shown in FIG. 2, the pitch of the rafters 13 in the Y direction is set to be narrower than the pitch of the upper slope beams 7 and the lower slope beams 11.

2.上部勾配梁7と下部勾配梁11との固定構造
積層梁構造体6における上部勾配梁7と下部勾配梁11との固定構造について、図3を用い説明する。図3は、図2のIII−III断面を示す模式断面図である。
2. Fixed structure of upper slope beam 7 and lower slope beam 11 The fixed structure of upper slope beam 7 and lower slope beam 11 in the laminated beam structure 6 will be described with reference to FIG. FIG. 3 is a schematic cross-sectional view showing a section III-III of FIG.

図3に示すように、積層梁構造体6は、面材8,9,10を挟んだ状態で上部勾配梁7と下部勾配梁11とを固定するための治工具14を備える。本実施形態に係る積層梁構造体6では、治工具14として金属材料からなる治工具を採用している。 As shown in FIG. 3, the laminated beam structure 6 includes a jig 14 for fixing the upper slope beam 7 and the lower slope beam 11 with the face members 8, 9 and 10 sandwiched between them. In the laminated beam structure 6 according to the present embodiment, a jig tool made of a metal material is used as the jig tool 14.

図3に示すように、上部勾配梁7には、治工具14における上方の一部の侵入を許す凹部7aが設けられており、下部勾配梁11にも、治工具14における下方の一部の侵入を許す凹部11aが設けられている。これら凹部7a及び凹部11aに形成により、上部勾配梁7と面材8,9,10との間、及び面材8,9,10と下部勾配梁11との間、に隙間が空くことが抑制される。これより、積層梁構造体6の高さ方向(略Z方向)のサイズを抑えることができるとともに、高い意匠性を実現することができる。 As shown in FIG. 3, the upper slope beam 7 is provided with a recess 7a that allows a part of the upper part of the jig 14 to enter, and the lower slope beam 11 is also provided with a part of the lower part of the jig 14. A recess 11a is provided to allow intrusion. By forming the recesses 7a and the recesses 11a, it is possible to prevent gaps from being created between the upper slope beam 7 and the face members 8, 9, 10 and between the face materials 8, 9, 10 and the lower slope beam 11. Will be done. As a result, the size of the laminated beam structure 6 in the height direction (substantially Z direction) can be suppressed, and high designability can be realized.

3.治工具14の構造
治工具14の構造について、図4を用い説明する。図4は、(a)が模式正面図であり、(b)が模式平面図であり、(c)が模式側面図である。なお、図4(a)、(c)において、図の上方が積層梁構造体6の上方(上部勾配梁7が配された側)に相当し、図の下方が積層梁構造体6の下方(下部勾配梁11が配された側)に相当する。図4(b)において、紙面手前側が積層梁構造体6の上方(上部勾配梁7が配された側)に相当する。
3. 3. Structure of Jig Tool 14 The structure of the jig 14 will be described with reference to FIG. 4A is a schematic front view, FIG. 4B is a schematic plan view, and FIG. 4C is a schematic side view. In addition, in FIGS. 4A and 4C, the upper part of the figure corresponds to the upper part of the laminated beam structure 6 (the side where the upper gradient beam 7 is arranged), and the lower part of the figure is the lower part of the laminated beam structure 6. Corresponds to (the side on which the lower slope beam 11 is arranged). In FIG. 4B, the front side of the paper surface corresponds to the upper side of the laminated beam structure 6 (the side on which the upper gradient beam 7 is arranged).

図4(a)、(b)、(c)に示すように、治工具14は、筒状部140と、板状部(延設部に相当)141と、掛部142,143と、を有する。筒状部140は、治工具14における上部を構成しており、略円筒形状を有し、内方に中空部140aを有する。 As shown in FIGS. 4A, 4B, and 4C, the jig 14 includes a tubular portion 140, a plate-shaped portion (corresponding to an extension portion) 141, and hanging portions 142, 143. Have. The tubular portion 140 constitutes the upper portion of the jig 14 and has a substantially cylindrical shape, and has a hollow portion 140a inward.

板状部141は、一部が筒状部140の中空部140aに挿入された筒内挿入部141aを有する。図4(a)に示すように、筒内挿入部141aの上部には、孔部(第1梁固定部に相当)141bが設けられている。孔部141bは、筒内挿入部141aを板厚方向に貫通する貫通孔である。 The plate-shaped portion 141 has an in-cylinder insertion portion 141a, which is partially inserted into the hollow portion 140a of the tubular portion 140. As shown in FIG. 4A, a hole portion (corresponding to the first beam fixing portion) 141b is provided in the upper portion of the in-cylinder insertion portion 141a. The hole portion 141b is a through hole that penetrates the in-cylinder insertion portion 141a in the plate thickness direction.

なお、筒状部140には、筒内挿入部141aの孔部141bに相当する位置の両側に、孔部140bが設けられている。孔部140bも、筒状部140の板厚方向に貫通する貫通孔である。 The tubular portion 140 is provided with hole portions 140b on both sides of the position corresponding to the hole portion 141b of the in-cylinder insertion portion 141a. The hole portion 140b is also a through hole penetrating the tubular portion 140 in the plate thickness direction.

図4(a)、(c)に示すように、板状部141における孔部141bが設けられた部分とは反対側の下部には、孔部(第2梁固定部に相当)141cが設けられている。孔部141cも、板状部141の板厚方向に貫通する貫通孔である。 As shown in FIGS. 4A and 4C, a hole portion (corresponding to a second beam fixing portion) 141c is provided in the lower portion of the plate-shaped portion 141 opposite to the portion provided with the hole portion 141b. Has been done. The hole portion 141c is also a through hole penetrating the plate-shaped portion 141 in the plate thickness direction.

ここで、図4(c)に示すように、板状部131における下方の部分は、矩形ではなく、一部が切り欠かれた状態となっている(斜辺部141d)。斜辺部141dの傾斜角度θ141dは、上部勾配梁7及び下部勾配梁11の傾斜角度(水平線に対する傾斜角度)に略等しくなっている。 Here, as shown in FIG. 4C, the lower portion of the plate-shaped portion 131 is not a rectangle but a part thereof is cut out (hypotenuse portion 141d). The inclination angle theta 141d of the inclined portion 141d is substantially equal to the inclination angle of the upper slope beam 7 and the lower slope beam 11 (angle of inclination relative to the horizontal).

掛部142,143は、板状部141の延設方向(上下方向)における孔部141bと孔部141cとの間の位置に設けられており、図4(b)に示すように、板状部141をその厚み方向に挟んだ、一方側に掛部142が設けられ、他方側に掛部143が設けられている。掛部142と掛部143とは、板状部141を挟んで線対称の関係を以って構成されている。 The hanging portions 142 and 143 are provided at positions between the hole portions 141b and the hole portions 141c in the extending direction (vertical direction) of the plate-shaped portions 141, and are plate-shaped as shown in FIG. 4 (b). A hanging portion 142 is provided on one side and a hanging portion 143 is provided on the other side, sandwiching the portion 141 in the thickness direction thereof. The hanging portion 142 and the hanging portion 143 are configured in a line-symmetrical relationship with the plate-shaped portion 141 interposed therebetween.

図4(c)に示すように、掛部142,143は、板状部141の延設方向(上下方向)に対して交差する方向に延びるようにヒレ状に形成されている。図4(b)、(c)に示すように、水平部(本掛部に相当)142a,143aと、傾斜部142b,143bと、を有する。水平部142a,143aと傾斜部142b,143bとは、隙間や段差がなく連続している。 As shown in FIG. 4C, the hanging portions 142 and 143 are formed in a fin shape so as to extend in a direction intersecting the extending direction (vertical direction) of the plate-shaped portion 141. As shown in FIGS. 4 (b) and 4 (c), it has horizontal portions (corresponding to the main hook portion) 142a and 143a and inclined portions 142b and 143b. The horizontal portions 142a and 143a and the inclined portions 142b and 143b are continuous without any gaps or steps.

図4(b)、(c)に示すように、水平部142a,143aは、板状部141の延設方向(上下方向)に対して直交する方向に延びている。傾斜部142b,143bは、水平部142a,143aの先端から下部勾配梁11が固定される側(下向き)に傾斜している。 As shown in FIGS. 4B and 4C, the horizontal portions 142a and 143a extend in a direction orthogonal to the extending direction (vertical direction) of the plate-shaped portion 141. The inclined portions 142b and 143b are inclined from the tips of the horizontal portions 142a and 143a to the side (downward) to which the lower inclined beam 11 is fixed.

4.上部勾配梁7及び下部勾配梁11と治工具14との具体的な固定構造
上部勾配梁7及び下部勾配梁11と治工具14との具体的な固定構造について、図5を用い説明する。図5は、積層梁構造体6における上部勾配梁7及び下部勾配梁11と治工具14との具体的な固定構造を示す模式断面図である。
4. Specific fixing structure of the upper slope beam 7 and the lower slope beam 11 and the jig 14 A specific fixing structure of the upper slope beam 7 and the lower slope beam 11 and the jig tool 14 will be described with reference to FIG. FIG. 5 is a schematic cross-sectional view showing a specific fixed structure of the upper gradient beam 7, the lower gradient beam 11, and the jig 14 in the laminated beam structure 6.

図5に示すように、上部勾配梁7には、側面部からY方向に向けて孔部7bが設けられている。孔部7bは、凹部7aに連通するように設けられており、凹部7aに対して治工具14の上部を侵入させた場合に、治工具14の孔部140b,141bと連通する位置に設けられている。 As shown in FIG. 5, the upper slope beam 7 is provided with a hole portion 7b from the side surface portion in the Y direction. The hole portion 7b is provided so as to communicate with the recess 7a, and is provided at a position where the hole portion 7b communicates with the hole portions 140b, 141b of the jig tool 14 when the upper portion of the jig tool 14 penetrates into the recess 7a. ing.

同様に、下部勾配梁11には、側面部からY方向に向けて孔部11bが設けられている。孔部11bは、凹部11aに連通するように設けられており、凹部11aに対して治工具14の下部を侵入させた場合に、治工具14の孔部141cと連通する位置に設けられている。なお、孔部11bの出口部分には、ザグリ部11cが設けられている。 Similarly, the lower slope beam 11 is provided with a hole portion 11b from the side surface portion in the Y direction. The hole portion 11b is provided so as to communicate with the recess 11a, and is provided at a position where the hole portion 11b communicates with the hole portion 141c of the jig tool 14 when the lower portion of the jig tool 14 penetrates into the recess 11a. .. A counterbore portion 11c is provided at the outlet portion of the hole portion 11b.

図5に示すように、上部勾配梁7の凹部7aに治工具14の上部を侵入させた状態で、孔部7bには、掛止ピン(ピンに相当)15が挿入される。掛止ピン15は、治工具14の孔部140b,141bを挿通している。当該掛止ピン15の挿入により、上部勾配梁7と治工具14との固定がなされる。 As shown in FIG. 5, a hook pin (corresponding to a pin) 15 is inserted into the hole portion 7b in a state where the upper portion of the jig 14 is inserted into the recess 7a of the upper slope beam 7. The hook pin 15 inserts the holes 140b and 141b of the jig 14 through the hook pin 15. By inserting the hook pin 15, the upper slope beam 7 and the jig 14 are fixed.

同様に、上部勾配梁7の凹部11aに治工具14の下部を侵入させた状態で、孔部11bには、掛止ピン(ピンに相当)16が挿入される。掛止ピン16は、治工具14の孔部141cを挿通している。当該掛止ピン16の挿入により、治工具14と下部勾配梁11との固定がなされる。 Similarly, a hook pin (corresponding to a pin) 16 is inserted into the hole portion 11b in a state where the lower portion of the jig 14 is inserted into the recess 11a of the upper slope beam 7. The hook pin 16 has a hole 141c of the jig 14 inserted through the hook pin 16. By inserting the hook pin 16, the jig 14 and the lower slope beam 11 are fixed.

なお、ザグリ部11cには、栓部材17が嵌入される。栓部材17は、下部勾配梁11と同じ木材から構成されており、下方から孔部11bが見えないようにするための部材である。 The stopper member 17 is fitted into the counterbore portion 11c. The plug member 17 is made of the same wood as the lower slope beam 11 and is a member for making the hole 11b invisible from below.

ここで、図5に示すように、積層梁構造体6においては、上部勾配梁7と面材9との間、面材9と下部勾配梁11との間に隙間が空かないように構成されているが、治工具14の掛部142,143の上面(掛面142c,143c)と面材9の下面9aとの間には、隙間が空くように構成されている。 Here, as shown in FIG. 5, the laminated beam structure 6 is configured so that there is no gap between the upper slope beam 7 and the face material 9 and between the face material 9 and the lower slope beam 11. However, there is a gap between the upper surfaces (hanging surfaces 142c, 143c) of the hanging portions 142 and 143 of the jig tool 14 and the lower surface 9a of the face material 9.

5.積層梁構造体6の施工方法
積層梁構造体6の施工方法について、図6から図10を用い説明する。図6、図8、及び図10は、積層梁構造6の施工方法について、工程順に示す模式断面図である。また、図7は、面材9の構成の一部を示す平面図であり、図9は、積層梁構造体6の施工における工程の一部を示す模式平面図である。
5. Construction method of the laminated beam structure 6 The construction method of the laminated beam structure 6 will be described with reference to FIGS. 6 to 10. 6, FIG. 8 and FIG. 10 are schematic cross-sectional views showing the construction method of the laminated beam structure 6 in the order of processes. Further, FIG. 7 is a plan view showing a part of the structure of the face member 9, and FIG. 9 is a schematic plan view showing a part of the steps in the construction of the laminated beam structure 6.

《治工具14の準備工程》
図4に示す構成を有する治工具14を少なくとも2つ準備する。
<< Preparation process of jig 14 >>
At least two jigs and tools 14 having the configuration shown in FIG. 4 are prepared.

《上部勾配梁7の設置工程》
図6に示すように、傾斜方向に間隔を空けて複数の治工具14を固定した上部勾配梁7を棟木4と軒桁5(図1を参照。)との間に架け渡した状態で設置する。棟木4及び軒桁5への上部勾配梁7の設置は、例えば、棟木4及び軒桁5に予め固定された金具を用い行われる。
<< Installation process of upper slope beam 7 >>
As shown in FIG. 6, an upper slope beam 7 to which a plurality of jigs and tools 14 are fixed at intervals in the inclination direction is installed in a state of being bridged between the purlin 4 and the eaves girder 5 (see FIG. 1). do. The upper slope beam 7 is installed on the purlin 4 and the eaves girder 5, for example, by using metal fittings previously fixed to the purlin 4 and the eaves girder 5.

上部勾配梁7には、予め凹部7aが設けられている。また、図5を用い説明したように、孔部7bも設けられている。そして、各凹部7aに治工具14の筒状部140の一部を挿入し、掛止ピン15(図6では、図示を省略。)を孔部7bに差し込んで、孔部140b、141b(図6では、孔部141bの図示を省略。)を挿通させることにより、上部勾配梁7に対する治工具14の固定がなされる。 The upper slope beam 7 is provided with a recess 7a in advance. Further, as described with reference to FIG. 5, a hole portion 7b is also provided. Then, a part of the tubular portion 140 of the jig tool 14 is inserted into each recess 7a, and the hook pin 15 (not shown in FIG. 6) is inserted into the hole portion 7b, and the hole portions 140b and 141b (FIG. 6) are inserted. In No. 6, the jig 14 is fixed to the upper slope beam 7 by inserting the hole 141b (not shown).

ここで、図6に示すように、上部勾配梁7への治工具14の固定は、治工具14における傾斜部142bが傾斜後方の下側を向くようになされる。そして、上部勾配梁7の下面と水平部142a,143a(図6では、水平部143aの図示を省略。)との間の間隙は、面材8.9.10の厚み以上となっている。換言すると、上部勾配梁7に治工具14を固定した状態において、上部勾配梁7の固定部である孔部140bから掛部142までの間隔は、孔部140bから上部固定梁7の下面までの距離xと、上部勾配梁7の下面から掛部142までの距離xと、を足し合わせた値となっている。そして、距離xは、面材8,9,10の厚み寸法よりも大きくなっている。これにより、後述の面材8,9,10を差し込む際の作業性が向上する。 Here, as shown in FIG. 6, the jig 14 is fixed to the upper slope beam 7 so that the inclined portion 142b of the jig 14 faces the lower side behind the inclination. The gap between the lower surface of the upper slope beam 7 and the horizontal portions 142a and 143a (the horizontal portion 143a is not shown in FIG. 6) is equal to or larger than the thickness of the face member 8.9.10. In other words, when the jig 14 is fixed to the upper slope beam 7, the distance from the hole 140b, which is the fixing part of the upper slope beam 7, to the hanging part 142 is from the hole 140b to the lower surface of the upper fixing beam 7. the distance x 1, the distance x 2 from the lower surface of the upper slope beam 7 to the hook 142, has a value obtained by adding. The distance x 2 is larger than the thickness dimension of the face materials 8, 9, and 10. As a result, workability when inserting the face materials 8, 9 and 10 described later is improved.

なお、本実施形態では、先に治工具14を固定した状態で上部勾配梁7を設置することとしたが、上部勾配梁7を設置した後に治工具14を固定することとしてもよい。 In the present embodiment, the upper slope beam 7 is installed with the jig 14 fixed first, but the jig 14 may be fixed after the upper slope beam 7 is installed.

《面材8,9,10を準備する工程》
図7に示すように、面材9の隅部には、予め切欠き部9b,9cが設けられている。傾斜方向の上方に配置される予定の上側切欠き部9bは、X方向の切欠き長さL9bが、下方に配置される予定の下側切欠き部9cの切欠き長さL9cよりも長く設定されている。
<< Process of preparing face materials 8, 9 and 10 >>
As shown in FIG. 7, notches 9b and 9c are provided in advance at the corners of the face material 9. In the upper notch portion 9b to be arranged above in the inclined direction, the notch length L 9b in the X direction is larger than the notch length L 9c of the lower notch portion 9c to be arranged below. It has been set for a long time.

なお、面材9において、横側端面部9dは、傾斜方向に対して直交する側に配される面部とその周囲の部分であり、上側端面部9eは、面材10の側に配される面部とその周囲の部分であり、下側端面部9fは、面材8の側に配される面部とその周囲の部分である。具体的には、上側端面部9eには上側切欠き部9bの縁部も含まれ、下側端面部9fには下側切欠き部9cの縁部も含まれる。 In the face material 9, the lateral end face portion 9d is a face portion arranged on the side orthogonal to the inclination direction and a peripheral portion thereof, and the upper end face portion 9e is arranged on the side of the face material 10. The face portion and the peripheral portion thereof, and the lower end face portion 9f is the face portion arranged on the side of the face member 8 and the peripheral portion thereof. Specifically, the upper end face portion 9e also includes the edge portion of the upper notch portion 9b, and the lower end face portion 9f also includes the edge portion of the lower notch portion 9c.

《上部勾配梁7に面材9を固定する工程》
(i)面材9の上側端面部9を治工具14の掛部142,143に引っ掛けるサブ工程
図8に示すように、上部勾配梁7に対して斜め下方から面材9の上側端面部9を持ち上げて行き、傾斜方向の上側に位置する治工具14の傾斜部142bに面材9の上側切欠き部9bの縁部を引っ掛ける。なお、図8では、治工具14の傾斜部142bに対して面材9を引っ掛ける状態だけを図示しているが、Y方向(図8の紙面に垂直な方向)に隣接して設置される治工具14の傾斜部143bに対して面材9を引っ掛けるのも同様の方法で実施される。
<< Process of fixing the face material 9 to the upper slope beam 7 >>
(I) Sub-process of hooking the upper end surface portion 9 of the face material 9 on the hanging portions 142 and 143 of the jig tool 14 As shown in FIG. 8, the upper end surface portion 9 of the face material 9 from diagonally below with respect to the upper slope beam 7. Is lifted, and the edge portion of the upper notch portion 9b of the face material 9 is hooked on the inclined portion 142b of the jig tool 14 located on the upper side in the inclined direction. Although FIG. 8 shows only the state in which the face member 9 is hooked on the inclined portion 142b of the jig tool 14, the jig is installed adjacent to the Y direction (the direction perpendicular to the paper surface of FIG. 8). The face member 9 is hooked on the inclined portion 143b of the tool 14 in the same manner.

そして、面材9の上側端面部9eを、上側切欠き部9bの長手方向奥まで傾斜方向上側に位置する治工具14に対して差し込んで行く。 Then, the upper end surface portion 9e of the face material 9 is inserted into the jig tool 14 located on the upper side in the inclined direction to the back in the longitudinal direction of the upper notch portion 9b.

(ii)面材9の下側端面部9fを上部勾配梁7に向けて持ち上げるサブ工程
図8に示す状態から、作業者は、面材9の下側端面部9fを上方に持ち上げて行く。これにより、面材9は、上側端面部9eあるいはその近傍を支点として回動する。図9(a)に示すように、本実施形態に係る施工方法では、面材9の隅部に切欠き部9b,9cが設けられているので、面材9の下側端面部9fが傾斜方向下側に位置する治工具14の水平部142aなどに干渉することなく、面材9の下側端面部9fを上部勾配梁7に当接するまで持ち上げることができる。
(Ii) Sub-process of lifting the lower end surface portion 9f of the face material 9 toward the upper slope beam 7 From the state shown in FIG. 8, the operator lifts the lower end surface portion 9f of the face material 9 upward. As a result, the face material 9 rotates with the upper end face portion 9e or its vicinity as a fulcrum. As shown in FIG. 9A, in the construction method according to the present embodiment, notches 9b and 9c are provided at the corners of the face material 9, so that the lower end face portion 9f of the face material 9 is inclined. The lower end surface portion 9f of the face material 9 can be lifted until it comes into contact with the upper slope beam 7 without interfering with the horizontal portion 142a of the jig 14 located on the lower side in the direction.

(iii)面材9を傾斜方向下側にスライド移動させるサブ工程
図9(b)に示すように、面材9を上部勾配梁7の長手に沿って傾斜方向下側にスライド移動させる。これにより、面材9における上側切欠き部9bの縁部と、下側切欠き部の縁部と、がそれぞれ治工具14の水平部142aの上面に引っ掛かった状態となる。
(Iii) Sub-process of sliding the face material 9 downward in the inclined direction As shown in FIG. 9B, the face material 9 is slid downward in the inclined direction along the length of the upper slope beam 7. As a result, the edge portion of the upper notch portion 9b and the edge portion of the lower notch portion of the face material 9 are caught on the upper surface of the horizontal portion 142a of the jig tool 14, respectively.

ここで、小屋部1の施工において、上部勾配梁7に対して面材8,9,10を固定する場合においては、傾斜方向下側の面材8から順に、上側の面材9,10の順で固定して行く。このような施工を行うため、図9(b)に示すように、面材9を治工具14の水平部142aに引っ掛ける場合には、面材9の下側端面部9fの端面を面材8の上側端面部の端面に当接させた状態で行うことができる。面材10についても同様の方法で施工することができる。 Here, in the construction of the hut portion 1, when the face materials 8, 9 and 10 are fixed to the upper slope beam 7, the upper face materials 9 and 10 are sequentially arranged from the lower face material 8 in the inclination direction. Fix in order. In order to perform such construction, as shown in FIG. 9B, when the face material 9 is hooked on the horizontal portion 142a of the jig tool 14, the end face of the lower end face portion 9f of the face material 9 is used as the face material 8. It can be carried out in a state of being in contact with the end face of the upper end face portion of the above. The face material 10 can be constructed in the same manner.

なお、図9(b)でも、治工具14の水平部142aの上面に対して面材9を引っ掛ける状態だけを図示しているが、Y方向に隣接して設置される治工具14の水平部143aの上面に対して面材9を引っ掛けるのも同様の方法で実施される。 Although FIG. 9B also shows only the state in which the face member 9 is hooked on the upper surface of the horizontal portion 142a of the jig 14, the horizontal portion of the jig 14 installed adjacent to the Y direction is shown. Hooking the face material 9 on the upper surface of the 143a is also carried out in the same manner.

(iv)上部勾配梁7に対する面材8,9,10の固定
図9(b)を用い説明した状態から、作業者により上部勾配梁7に対して面材8,9,10を固定する。面材8,9,10の固定は、例えば、ねじ止めによりなされる。
(Iv) Fixing the face materials 8, 9 and 10 to the upper slope beam 7 From the state described with reference to FIG. 9 (b), the operator fixes the face materials 8, 9 and 10 to the upper slope beam 7. The face members 8, 9 and 10 are fixed by, for example, screwing.

なお、上部勾配梁7に対する面材8,10の固定については、図9(a)、(b)で示したような仮受け状態を介して行うこととしてもよいし、仮受け状態を介さずに行うこととしてもよい。 The face members 8 and 10 may be fixed to the upper slope beam 7 through the temporary receiving state as shown in FIGS. 9A and 9B, or not through the temporary receiving state. It may be done in.

《治工具14への下部勾配梁11の固定工程》
図10に示すように、予め凹部11aが設けられた下部勾配梁11を持ち上げ、面材8,9,10と略隙間がない状態とする。そして、図5を用い説明したように、掛止ピン16を孔部11bに差し込み、孔部141cを挿通するようにする。これにより、治工具14に対する下部勾配梁11の固定、換言すると、上部勾配梁7及び面材8,9,10に対する下部勾配梁11の固定がなされる。
<< Step of fixing the lower slope beam 11 to the jig 14 >>
As shown in FIG. 10, the lower slope beam 11 provided with the recess 11a in advance is lifted so that there is almost no gap between the face members 8, 9 and 10. Then, as described with reference to FIG. 5, the hook pin 16 is inserted into the hole portion 11b so that the hole portion 141c is inserted. As a result, the lower slope beam 11 is fixed to the jig 14 and, in other words, the lower slope beam 11 is fixed to the upper slope beam 7 and the face members 8, 9 and 10.

ここで、下部勾配梁11の持ち上げに際しては、Z方向に沿った方向に行う。これにより、凹部11aに対して治工具14を鉛直方向に挿入させることができ、作業者の負担を軽減することができる。そして、本実施形態に係る治工具14において、板状部141の斜辺部141dは、下部勾配梁11の持ち上げ時に凹部11aの上側縁との干渉を空けるために設けられている。 Here, the lower slope beam 11 is lifted in the direction along the Z direction. As a result, the jig tool 14 can be inserted vertically into the recess 11a, and the burden on the operator can be reduced. Then, in the jig tool 14 according to the present embodiment, the hypotenuse portion 141d of the plate-shaped portion 141 is provided to allow interference with the upper edge of the recess 11a when the lower slope beam 11 is lifted.

なお、図10では、図示を省略しているが、最後にザグリ部11cに栓部材17を嵌入させることで積層梁構造体6が完成する。 Although not shown in FIG. 10, the laminated beam structure 6 is completed by finally fitting the plug member 17 into the counterbore portion 11c.

6.効果
本実施形態に係る積層梁構造体6が具備する治工具14では、孔部(第1梁固定部)141bと孔部(第2梁固定部)141cとが板状部(延設部)141に設けられているので、面材9を挟んだ状態で上部勾配梁(第1梁)7と下部勾配梁(第2梁)11との固定に用いることができる。
6. Effect In the jig 14 provided in the laminated beam structure 6 according to the present embodiment, the hole portion (first beam fixing portion) 141b and the hole portion (second beam fixing portion) 141c are plate-shaped portions (extended portions). Since it is provided in 141, it can be used for fixing the upper slope beam (first beam) 7 and the lower slope beam (second beam) 11 with the face member 9 sandwiched between them.

また、本実施形態に係る積層梁構造体6が具備する治工具14では、掛部142,143を備えているとともに、図6を用い説明したように、距離xが面材8,9,10の厚み寸法よりも大きくなるように、孔部140b、141bから掛部142,143の形成箇所までの間隔を規定しているので、第1梁である上部勾配梁7に対して面材8,9,10を固定する際に、治工具14を上部勾配梁7に固定した後に、当該掛部142,143を面材8,9,10の仮受け部として用いることができ、重量の重い面材8,9,10を用いる場合にあっても、高い施工性を実現することができる。 Further, the jig 14 provided in the laminated beam structure 6 according to the present embodiment includes hanging portions 142 and 143, and as described with reference to FIG. 6, the distance x 2 is the face members 8, 9, and Since the distance from the holes 140b and 141b to the forming portions of the hanging portions 142 and 143 is defined so as to be larger than the thickness dimension of 10, the face material 8 is relative to the upper gradient beam 7 which is the first beam. When fixing the parts 8, 9 and 10, after fixing the jig tool 14 to the upper slope beam 7, the hanging parts 142 and 143 can be used as temporary receiving parts for the face materials 8, 9 and 10, and the weight is heavy. Even when the face materials 8, 9 and 10 are used, high workability can be realized.

即ち、本実施形態に係る治工具14を用いた施工に際しては、上部勾配梁7に対して、その傾斜方向の上下のそれぞれに治工具14を上部勾配梁7に固定し、これら治工具14のそれぞれの掛部142,143に面材8,9,10端面部9e,9fを引っ掛けることで、面材8,9,10の重量の少なくとも一部を掛部で仮受けさせることができ、当該仮受けさせた状態でねじや釘を用いて上部勾配梁7と面材8,9,10とを固定することができる。 That is, in the construction using the jig 14 according to the present embodiment, the jig 14 is fixed to the upper slope beam 7 at the upper and lower sides in the inclination direction of the upper slope beam 7, and the jig 14 is used. By hooking the end face portions 9e and 9f of the face materials 8, 9 and 10 on the respective hook portions 142 and 143, at least a part of the weight of the face materials 8, 9 and 10 can be temporarily received by the hook portion. The upper gradient beam 7 and the face members 8, 9 and 10 can be fixed by using screws or nails in the temporarily received state.

また、本実施形態では、治工具14における掛部142,143の形成箇所を上記のような寸法関係を以って規定しているので、治工具14の掛部142,143に対して面材8,9,10の端面部9eを引っ掛ける際に、端面部9eを差し込み易く、高い作業性を確保することができる。 Further, in the present embodiment, since the formed portions of the hanging portions 142 and 143 of the jig and tool 14 are defined by the above-mentioned dimensional relationship, the facing material is provided with respect to the hanging portions 142 and 143 of the jig and tool 14. When hooking the end face portions 9e of 8, 9 and 10, the end face portion 9e can be easily inserted and high workability can be ensured.

なお、面材8,9,10の重量が軽い場合にあっても、作業者が下方から面材を支えておくという作業の軽減を図ることができ、この点において、高い施工性を実現することができる。 Even when the weights of the face materials 8, 9 and 10 are light, it is possible to reduce the work of the operator supporting the face materials from below, and in this respect, high workability is realized. be able to.

従って、本実施形態に係る積層梁構造体6が具備する治工具14では、当該治工具14を用いることにより、用いる面材8,9,10の重量にかかわらず、優れた施工性を実現することができる。 Therefore, in the jig 14 provided in the laminated beam structure 6 according to the present embodiment, excellent workability is realized by using the jig 14 regardless of the weight of the face materials 8, 9 and 10 used. be able to.

また、本実施形態に係る積層梁構造体6では、図5を用い説明したように、上部勾配梁7と面材8,9,10との間、及び面材8,9,10と下部勾配梁11との間に隙間が空かないように治工具14の孔部141b、141cと掛部142,143を設けているので、高い意匠性を確保することができるとともに、高さ方向での無駄なスペースを排除することができる。 Further, in the laminated beam structure 6 according to the present embodiment, as described with reference to FIG. 5, between the upper slope beam 7 and the face members 8, 9, 10 and between the face materials 8, 9, 10 and the lower slope. Since the holes 141b and 141c of the jig tool 14 and the hanging portions 142 and 143 are provided so that there is no gap between the beam and the beam 11, high designability can be ensured and waste in the height direction can be ensured. Space can be eliminated.

本実施形態に係る積層梁構造体6が具備する治工具14では、掛部142,143に傾斜部142b,143bが設けられているので、掛部142,143に対して面材9の上側端面部9eを引っ掛ける際に、当該面材9の上側端面部9eを掛部142,143と上部勾配梁(第1梁)7の下面との間に差し込み易い。よって、本実施形態に係る積層構造体6の施工において、治工具14を用いることで、更に高い施工性を実現することができる。 In the jig 14 provided in the laminated beam structure 6 according to the present embodiment, since the inclined portions 142b and 143b are provided on the hanging portions 142 and 143, the upper end surface of the face material 9 with respect to the hanging portions 142 and 143. When hooking the portion 9e, it is easy to insert the upper end surface portion 9e of the face material 9 between the hanging portions 142, 143 and the lower surface of the upper slope beam (first beam) 7. Therefore, in the construction of the laminated structure 6 according to the present embodiment, even higher workability can be realized by using the jig tool 14.

本実施形態に係る積層梁構造体6では、孔部141bに掛止ピン15を挿通させるという簡易な構造を以って、上部勾配梁7に治工具14を固定することとしているので、複雑な構造を採用しなくてもよく、製造コストの低減を図ることができる。 In the laminated beam structure 6 according to the present embodiment, the jig 14 is fixed to the upper slope beam 7 with a simple structure in which the hook pin 15 is inserted through the hole 141b, which is complicated. It is not necessary to adopt a structure, and the manufacturing cost can be reduced.

同様に、本実施形態に係る積層梁構造体6では、孔部141cに掛止ピン16を挿通させるという簡易な構造を以って、治工具14に下部勾配梁11を固定することとしているので、複雑な構造を採用しなくてもよく、製造コストの低減を図ることができる。 Similarly, in the laminated beam structure 6 according to the present embodiment, the lower slope beam 11 is fixed to the jig 14 with a simple structure in which the hook pin 16 is inserted through the hole 141c. , It is not necessary to adopt a complicated structure, and the manufacturing cost can be reduced.

本実施形態に係る積層梁構造体6では、上部勾配梁(第1梁)7に治工具14の筒状部140及び筒内挿入部141aの一部の侵入を許す凹部7aが設けられ、下部勾配梁(第2梁)11には治工具14の板状部141の一部の侵入を許す凹部11aが設けられているので、上部勾配梁7と面材8,9,10、及び面材8,9,10と下部勾配梁(第2梁)11の各間に隙間が空くのを抑制することができる。よって、当該積層梁構造体6の高さ方向の寸法を低く抑えることができ、また、高い意匠性を確保することができる。 In the laminated beam structure 6 according to the present embodiment, the upper inclined beam (first beam) 7 is provided with a recess 7a that allows a part of the tubular portion 140 of the jig tool 14 and the in-cylinder insertion portion 141a to enter, and the lower portion is provided. Since the inclined beam (second beam) 11 is provided with a recess 11a that allows a part of the plate-shaped portion 141 of the jig tool 14 to enter, the upper inclined beam 7, the face materials 8, 9, 10 and the face material It is possible to suppress a gap between each of 8, 9 and 10 and the lower slope beam (second beam) 11. Therefore, the dimension of the laminated beam structure 6 in the height direction can be suppressed low, and high designability can be ensured.

本実施形態に係る積層梁構造体6の施工方法では、治工具14を用いて、上部勾配梁7に面材8,9,10を仮受けさせるので、作業者の負担を軽減しながらの作業を可能とすることができる。 In the construction method of the laminated beam structure 6 according to the present embodiment, the jigs and tools 14 are used to temporarily receive the face materials 8, 9 and 10 on the upper slope beam 7, so that the work while reducing the burden on the operator. Can be made possible.

また、本実施形態に係る積層梁構造体6の施工方法では、面材9の隅部に切欠き部9b,9cを設けることにより、面材9を治工具14の掛部142,143に引っ掛ける際に、作業がし易くなり、効率の向上を図ることができる。 Further, in the construction method of the laminated beam structure 6 according to the present embodiment, the face material 9 is hooked on the hook portions 142 and 143 of the jig 14 by providing the cutout portions 9b and 9c at the corners of the face material 9. At that time, the work becomes easier and the efficiency can be improved.

[第2実施形態]
第2実施形態に係る積層梁構造体の構成について、図11及び図12を用い説明する。図11は、(a)が第2実施形態に係る積層梁構造体26が具備する治工具34の模式正面図であり、(b)がその模式平面図であり、(c)がその模式側面図である。また、図12は、積層梁構造体26の構造を示す模式断面図である。
[Second Embodiment]
The configuration of the laminated beam structure according to the second embodiment will be described with reference to FIGS. 11 and 12. 11A and 11B are a schematic front view of a jig 34 included in the laminated beam structure 26 according to the second embodiment, FIG. 11B is a schematic plan view thereof, and FIG. 11C is a schematic side view thereof. It is a figure. Further, FIG. 12 is a schematic cross-sectional view showing the structure of the laminated beam structure 26.

1.治工具34の構造
図11(a)、(b)、(c)に示すように、本実施形態に係る治工具34は、柱状部(延設部)340と掛部341とから構成されている。柱状部340は、略円柱形状を有し、上部において、径方向に貫通する孔部(第1梁固定部)340aが設けられている。
1. 1. Structure of Jig Tool 34 As shown in FIGS. 11A, 11B, and 11C, the Jig Tool 34 according to the present embodiment is composed of a columnar portion (extended portion) 340 and a hanging portion 341. There is. The columnar portion 340 has a substantially cylindrical shape, and a hole portion (first beam fixing portion) 340a penetrating in the radial direction is provided at the upper portion.

また、柱状部340には、柱状部340の下面から孔部340aの下部まで、断面中心を長手方向に延びるねじ孔(第2梁固定部)340bを有する。 Further, the columnar portion 340 has a screw hole (second beam fixing portion) 340b extending in the longitudinal direction at the center of the cross section from the lower surface of the columnar portion 340 to the lower portion of the hole portion 340a.

掛部341は、柱状部340の下端部に接合されており、柱状部340よりも大きな径を有する円板形状をしている。掛部341の上側の面は、面材を引っ掛けるための掛面341cである。 The hanging portion 341 is joined to the lower end portion of the columnar portion 340, and has a disk shape having a diameter larger than that of the columnar portion 340. The upper surface of the hanging portion 341 is a hanging surface 341c for hooking the face material.

なお、本実施形態に係る孔部340aから掛部341の上面までの間隔は、上記第1実施形態に係る治工具14と同様に、孔部340aに上部勾配梁7が固定された場合に、孔部340aから上部勾配梁7の下面までの間隔と、面材8,9,10の厚み寸法とを足し合わせた値よりも大きい間隔となっている。 The distance from the hole portion 340a according to the present embodiment to the upper surface of the hanging portion 341 is the same as that of the jig 14 according to the first embodiment when the upper slope beam 7 is fixed to the hole portion 340a. The distance from the hole 340a to the lower surface of the upper slope beam 7 is larger than the sum of the thickness dimensions of the face members 8, 9 and 10.

2.積層梁構造体26の構造
図12に示すように、本実施形態に係る積層梁構造体26は、上部勾配梁7と、面材8,9,10と(図12では、面材9のみを図示。)、下部勾配梁31と、治工具34と、を備える。また、積層梁構造体26は、掛止ピン15と、ボルト36と、ワッシャ38と、栓部材37と、を備える。
2. Structure of Laminated Beam Structure 26 As shown in FIG. 12, the laminated beam structure 26 according to the present embodiment includes an upper gradient beam 7 and face materials 8, 9, and 10 (in FIG. 12, only the face material 9 is used. A lower gradient beam 31 and a jig 34 are provided. Further, the laminated beam structure 26 includes a hooking pin 15, a bolt 36, a washer 38, and a plug member 37.

なお、上部勾配梁7、面材8,9,10、及び掛止ピン15については、上記第1実施形態と同じ構成であるので、再度の説明を省略する。 Since the upper slope beam 7, the face members 8, 9, 10 and the hook pin 15 have the same configuration as that of the first embodiment, the description thereof will be omitted again.

図12に示すように、下部勾配梁31には、下端面からZ方向に向けて孔部31aが設けられている。孔部31aは、上部に設けられた上側ザグリ部(凹部)31bに連通するように設けられている。また、孔部31aの下部には、下側ザグリ部31cが設けられている。孔部31aの断面径は、ボルト36の断面径以上となっており、下側ザグリ部31cの断面径は、ボルト36の頭部の断面径以上となっている。 As shown in FIG. 12, the lower slope beam 31 is provided with a hole 31a from the lower end surface in the Z direction. The hole portion 31a is provided so as to communicate with the upper counterbore portion (recessed portion) 31b provided in the upper portion. Further, a lower counterbore portion 31c is provided below the hole portion 31a. The cross-sectional diameter of the hole portion 31a is equal to or larger than the cross-sectional diameter of the bolt 36, and the cross-sectional diameter of the lower counterbore portion 31c is equal to or larger than the cross-sectional diameter of the head of the bolt 36.

ボルト36は、下部勾配梁31の下側ザグリ部31cから挿入され、治工具34のねじ孔340bに先端のねじ部36aが螺結されている。なお、ボルト36の螺合に当たり、ワッシャ38が挿入されている。 The bolt 36 is inserted from the lower counterbore portion 31c of the lower slope beam 31, and the threaded portion 36a at the tip is screwed into the screw hole 340b of the jig tool 34. A washer 38 is inserted when the bolt 36 is screwed.

ここで、図12に示すように、治工具34の掛面341cと面材9の下面9aとの間には、隙間が空いている。該隙間は、積層梁構造体26の施工において、上記第1実施形態と同様に、上部勾配梁7に対して面材9を仮受け状態とする際に、良好な施工性を確保するために設けられている。 Here, as shown in FIG. 12, there is a gap between the hanging surface 341c of the jig tool 34 and the lower surface 9a of the surface material 9. In the construction of the laminated beam structure 26, the gap is provided in order to ensure good workability when the face member 9 is temporarily received by the upper slope beam 7 as in the first embodiment. It is provided.

栓部材37は、下方から下側ザグリ部31cやボルト36の頭部等が見えないようにするため、下側ザグリ部31cに嵌入されている。なお、栓部材37は、栓部材17と同様に、下部勾配梁31と同じ木材を用い形成されている。 The plug member 37 is fitted into the lower counterbore portion 31c so that the lower counterbore portion 31c and the head of the bolt 36 cannot be seen from below. The stopper member 37 is formed of the same wood as the lower slope beam 31, similarly to the stopper member 17.

本実施形態に係る積層梁構造体26においても、掛部341を有する治工具34を用いることにより、上部勾配梁7に面材8,9,10を固定する際に、面材8,9,10を上部勾配梁7に対して仮受け状態とすることができ、用いる面材の重量にかかわらず、優れた施工性を実現することができる。 Also in the laminated beam structure 26 according to the present embodiment, when the face materials 8, 9 and 10 are fixed to the upper slope beam 7 by using the jig tool 34 having the hanging portion 341, the face materials 8, 9 and 10 can be temporarily received with respect to the upper slope beam 7, and excellent workability can be realized regardless of the weight of the face material used.

また、本実施形態では、図12を用い説明したように、治工具34に対する下部勾配梁31の固定を、下部勾配梁31の下部から差し込んだボルト36を治工具34のねじ孔340bに螺合させることとしているので、高い作業性を確保することができる。具体的には、作業者は、上部勾配梁7に対して面材8,9,10を固定する際と同じ上向きの作業により、治工具34に下部勾配梁31を固定するので、高い効率での作業が可能である。 Further, in the present embodiment, as described with reference to FIG. 12, the lower slope beam 31 is fixed to the jig tool 34, and the bolt 36 inserted from the lower part of the lower slope beam 31 is screwed into the screw hole 340b of the jig tool 34. Since it is supposed to be made, high workability can be ensured. Specifically, the operator fixes the lower slope beam 31 to the jig 34 by the same upward work as when fixing the face materials 8, 9 and 10 to the upper slope beam 7, so that the efficiency is high. Work is possible.

[変形例]
上記第1実施形態及び上記第2実施形態では、小屋部1に適用する積層梁構造体6,26を一例としたが、本発明は、これに限定を受けるものではない。例えば、梁が水平に架け渡される天井部に本発明の積層梁構造体を適用することも可能である。
[Modification example]
In the first embodiment and the second embodiment, the laminated beam structures 6 and 26 applied to the cabin 1 are taken as an example, but the present invention is not limited thereto. For example, it is also possible to apply the laminated beam structure of the present invention to the ceiling portion where the beams are horizontally laid.

上記第1実施形態に係る治工具14及び上記第2実施形態に係る治工具34について、構成材料は強度面及びコスト面を満足できれば特に限定を受けるものではない。例えば、鋼材や強化樹脂などを用いることができる。 The jigs and tools 14 according to the first embodiment and the jigs and tools 34 according to the second embodiment are not particularly limited as long as the constituent materials can satisfy the strength and cost aspects. For example, a steel material, a reinforced resin, or the like can be used.

上記第1実施形態及び上記第2実施形態では、構成中に含まれる面材9の隅部に切欠き部9b、9cを設けることとしたが、本発明は、これに限定を受けるものではない。隅部に切欠き部を設けないこととしてもよい。 In the first embodiment and the second embodiment, notches 9b and 9c are provided at the corners of the face member 9 included in the configuration, but the present invention is not limited thereto. .. It may be possible not to provide a notch in the corner.

上記第1実施形態及び上記第2実施形態では、面材8,9,10として、高剛性のCLT板を採用することとしたが、本発明は、これに限定を受けるものではない。他の種々の材料を面材として用いることができ、例えば、コンクリートパネルや石膏ボードなどを用いることもできる。 In the first embodiment and the second embodiment, high-rigidity CLT plates are used as the face materials 8, 9 and 10, but the present invention is not limited thereto. Various other materials can be used as the face material, and for example, concrete panels, gypsum boards, and the like can also be used.

上記第1実施形態及び上記第2実施形態では、上部勾配梁7への治工具14,34の固定に掛止ピン15を用いることとしたが、本発明は、これに限定を受けるものではない。例えば、ボルトやねじ、あるいは釘などで固定することとしてもよい。 In the first embodiment and the second embodiment, the hook pins 15 are used for fixing the jigs and tools 14 and 34 to the upper slope beam 7, but the present invention is not limited thereto. .. For example, it may be fixed with bolts, screws, nails, or the like.

図1及び図2では、面材8,9,10の上方が空間である小屋部1を示したが、本発明は、これに限定を受けるものではない。例えば、面材8,9,10の上に断熱材や防音材などを載置することとしてもよい。 In FIGS. 1 and 2, the hut portion 1 in which the space above the face members 8, 9 and 10 is shown, but the present invention is not limited thereto. For example, a heat insulating material, a soundproofing material, or the like may be placed on the face materials 8, 9, and 10.

上記第2実施形態に係る治工具34では、掛部341が平面視円形をした構成を採用したが、本発明は、これに限定を受けるものではない。例えば、平面視で四角形や六角形などの多角形をした掛部を採用することもできる。 In the jig tool 34 according to the second embodiment, the hook portion 341 has a circular shape in a plan view, but the present invention is not limited to this. For example, it is also possible to adopt a hanging portion having a polygonal shape such as a quadrangle or a hexagon in a plan view.

また、上記第2実施形態では、柱状部340と掛部341とが接合されてなる治工具34を採用することとしたが、本発明は、これに限定を受けるものではない。例えば、柱状部と掛部とが一体形成されてなる治工具を採用することもできる。この場合には、柱状の部材を型枠に入れてプレス成形などすることで所望の形状の治工具を製造することができる。 Further, in the second embodiment, the jig tool 34 in which the columnar portion 340 and the hanging portion 341 are joined is adopted, but the present invention is not limited to this. For example, a jig or tool in which a columnar portion and a hanging portion are integrally formed can be adopted. In this case, a jig and tool having a desired shape can be manufactured by putting a columnar member in a mold and performing press molding or the like.

1 小屋部
6,26 積層梁構造体
7 上部勾配梁(第1梁)
8〜10 面材
11,31 下部勾配梁(第2梁)
14,34 治工具
141 板状部(延設部)
141b 孔部(第1梁固定部)
141c 孔部(第2梁固定部)
142,143 掛部
142a,143a 水平部(本掛部)
142b,143b 傾斜部
340 柱状部(延設部)
340a 孔部(第1梁固定部)
340b ねじ孔(第2梁固定部)
1 Hut 6,26 Laminated beam structure 7 Upper gradient beam (1st beam)
8-10 Face material 11,31 Lower slope beam (second beam)
14,34 Jig tool 141 Plate-shaped part (extended part)
141b Hole (1st beam fixing part)
141c hole (second beam fixing part)
142, 143 Hanging part 142a, 143a Horizontal part (main hanging part)
142b, 143b Inclined part 340 Columnar part (extended part)
340a Hole (1st beam fixing part)
340b screw hole (second beam fixing part)

Claims (8)

第1梁と、当該第1梁の下方の第2梁とを、前記第1梁と前記第2梁との間に面材を挟んだ状態で固定するために用いる治工具において、
所定の延設方向に延びる延設部と、
前記延設部における所定の部分に設けられ、前記第1梁との固定に用いられる第1梁固定部と、
前記延設部における前記第1梁固定部が設けられた部分よりも下方の部分に設けられ、前記第2梁との固定に用いられる第2梁固定部と、
前記延設部における前記第1梁固定部が設けられた部分から下方に所定間隔だけ離間した位置から、前記延設部が延びる延設方向と交差する方向に延びる掛部と、
を備え、
前記所定間隔は、前記第1梁固定部に前記第1梁が固定された場合に、前記第1梁固定部から前記第1梁の下面までの間隔と、前記面材の厚み寸法とを足し合わせた値よりも大きい間隔となっている、
治工具。
In a jig and tool used to fix a first beam and a second beam below the first beam with a face material sandwiched between the first beam and the second beam.
An extension part that extends in a predetermined extension direction,
A first beam fixing portion provided at a predetermined portion of the extending portion and used for fixing to the first beam, and a first beam fixing portion.
A second beam fixing portion provided in a portion of the extension portion below the portion provided with the first beam fixing portion and used for fixing to the second beam, and a second beam fixing portion.
A hanging portion extending in a direction intersecting the extending direction in which the extending portion extends from a position separated by a predetermined interval from a portion of the extending portion provided with the first beam fixing portion.
With
The predetermined interval is the sum of the interval from the first beam fixing portion to the lower surface of the first beam and the thickness dimension of the face material when the first beam is fixed to the first beam fixing portion. The interval is larger than the combined value,
Jig tool.
請求項1に記載の治工具であって、
前記第2梁固定部は、前記第1梁固定部に前記第1梁が固定され、前記第2梁固定部に前記第2梁が固定された場合に、前記第1梁の下面と前記第2梁の上面との間隔が前記面材の厚み寸法に合致する部分に設けられている、
治工具。
The jig and tool according to claim 1.
In the second beam fixing portion, when the first beam is fixed to the first beam fixing portion and the second beam is fixed to the second beam fixing portion, the lower surface of the first beam and the first beam are fixed. 2 The distance between the beam and the upper surface is provided at a portion that matches the thickness dimension of the face material.
Jig tool.
請求項1又は請求項2に記載の治工具であって、
前記掛部は、前記延設方向と直交する方向に延びる本掛部と、当該本掛部に連続するとともに、前記本掛部から離れるに従って、前記第1梁固定部から漸次離れるように傾斜する傾斜部と、を有する、
治工具。
The jig or tool according to claim 1 or 2.
The hanging portion is continuous with the main hanging portion extending in a direction orthogonal to the extending direction, and is inclined so as to be gradually separated from the first beam fixing portion as the distance from the main hanging portion increases. With an inclined part,
Jig tool.
請求項1から請求項3の何れかの治工具と、
前記治工具における前記第1梁固定部に固定される第1梁と、
前記治工具における前記第2梁固定部に固定される第2梁と、
前記第1梁と前記第2梁との間に配設された状態で、前記第1梁に固定されてなる面材と、
を備える、
積層梁構造体。
The jig and tool according to any one of claims 1 to 3 and
The first beam fixed to the first beam fixing portion in the jig and tool,
The second beam fixed to the second beam fixing portion in the jig and tool,
A face material fixed to the first beam in a state of being disposed between the first beam and the second beam, and
To prepare
Laminated beam structure.
請求項4に記載の積層梁構造体であって、
前記面材は、前記治工具の前記延設部における前記第1梁の下面と前記第2梁の上面との間の領域をかわすように配設されている、
積層梁構造体。
The laminated beam structure according to claim 4.
The face material is arranged so as to avoid a region between the lower surface of the first beam and the upper surface of the second beam in the extension portion of the jig and tool.
Laminated beam structure.
請求項4又は請求項5に記載の積層梁構造体であって、
前記第1梁には、前記治工具の前記延設部における前記面材の上面よりも上部の侵入を許す凹部が設けられており、
前記第2梁には、前記治工具の前記延設部における前記面材の下面よりも下部の侵入を許す凹部が設けられている、
積層梁構造体。
The laminated beam structure according to claim 4 or 5.
The first beam is provided with a recess in the extension portion of the jig and tool that allows the intrusion of the upper part of the face material above the upper surface.
The second beam is provided with a recess in the extending portion of the jig and tool that allows the intrusion of the lower part of the face material below the lower surface.
Laminated beam structure.
請求項1から請求項3の何れかの治工具を2つ準備する工程と、
第1梁を設置する工程と、
前記第1梁に対して、当該第1梁の長手方向に沿って、所定ピッチで前記2つの治工具を固定する工程と、
前記第1梁の下面に面材を固定する工程と、
前記面材の下面に第2梁を設置し、当該第2梁を前記2つの治工具に固定する工程と、
を備え、
前記治工具を固定する工程では、前記所定ピッチとして、前記第1梁の長手方向における前記面材の長さを採用し、
前記面材を固定する工程は、
前記第1梁の長手方向における前記面材の一方の側の端面部を、前記2つの治工具の内の一方の治工具における前記掛部の上面に引っ掛ける第1サブ工程と、
前記一方の側の端面部を前記掛部の上面に引っ掛けた後、前記第1梁の長手方向における前記面材の他方の側の端面部を前記第1梁の下面に向けて回動させる第2サブ工程と、
前記面材の前記他方の側の端面部を回動させた後、前記面材を前記第1梁の長手方向に沿ってスライド移動させ、前記他方の側の端面部を、前記2つの治工具の内の他方の治工具における前記掛部の上面に引っ掛ける第3サブ工程と、
前記面材における両端面部をそれぞれ引っ掛けた状態で、前記第1梁に対して前記面材を固定する第4サブ工程と、
を有する、
積層梁構造体の施工方法。
The step of preparing two jigs and tools according to any one of claims 1 to 3 and
The process of installing the first beam and
A step of fixing the two jigs and tools to the first beam at a predetermined pitch along the longitudinal direction of the first beam.
The process of fixing the face material to the lower surface of the first beam and
A process of installing a second beam on the lower surface of the face material and fixing the second beam to the two jigs and tools.
With
In the step of fixing the jig and tool, the length of the face material in the longitudinal direction of the first beam is adopted as the predetermined pitch.
The step of fixing the face material is
The first sub-step of hooking the end face portion of one side of the face material in the longitudinal direction of the first beam to the upper surface of the hook portion of one of the two jigs and tools.
After hooking the end face portion on one side to the upper surface of the hook portion, the end face portion on the other side of the face material in the longitudinal direction of the first beam is rotated toward the lower surface of the first beam. 2 sub-processes and
After rotating the end face portion on the other side of the face material, the face material is slid and moved along the longitudinal direction of the first beam, and the end face portion on the other side is moved to the two jigs and tools. The third sub-step of hooking on the upper surface of the hooking portion in the other jig and tool of the
A fourth sub-step of fixing the face material to the first beam with both end faces of the face material hooked.
Have,
Construction method of laminated beam structure.
請求項7に記載の積層梁構造体の施工方法であって、
前記面材の隅部には、前記掛部に対応して、平面視矩形の切欠き部が設けられており、
前記隅部に前記切欠き部を設けることにより、前記第1サブ工程から前記第2サブ工程までの間で、前記治工具における前記延設部に対する前記面材の干渉を避ける、
積層梁構造体の施工方法。
The method for constructing a laminated beam structure according to claim 7.
At the corner of the face material, a notch having a rectangular shape in a plan view is provided corresponding to the hanging portion.
By providing the notch portion in the corner portion, interference of the face material with the extending portion in the jig and tool is avoided between the first sub-step and the second sub-step.
Construction method of laminated beam structure.
JP2017194092A 2017-10-04 2017-10-04 Jig tool and laminated beam structure, and construction method of laminated beam structure Active JP6919480B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017194092A JP6919480B2 (en) 2017-10-04 2017-10-04 Jig tool and laminated beam structure, and construction method of laminated beam structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017194092A JP6919480B2 (en) 2017-10-04 2017-10-04 Jig tool and laminated beam structure, and construction method of laminated beam structure

Publications (2)

Publication Number Publication Date
JP2019065640A JP2019065640A (en) 2019-04-25
JP6919480B2 true JP6919480B2 (en) 2021-08-18

Family

ID=66338439

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017194092A Active JP6919480B2 (en) 2017-10-04 2017-10-04 Jig tool and laminated beam structure, and construction method of laminated beam structure

Country Status (1)

Country Link
JP (1) JP6919480B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7533539B2 (en) * 2022-08-17 2024-08-14 積水ハウス株式会社 Connecting structures and building roofs
CN119177742B (en) * 2024-09-25 2025-11-14 中国一冶集团有限公司 A steel-concrete prefabricated pitched roof construction device and construction method

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6015847Y2 (en) * 1978-12-02 1985-05-18 三井化学株式会社 Ceiling board mounting device
JPH07247626A (en) * 1994-03-03 1995-09-26 Masato Kurosawa Structure of house building member
JP2003213798A (en) * 2002-01-21 2003-07-30 Sekisui House Ltd Connection structure between main column and small column
JP2003293509A (en) * 2002-03-29 2003-10-15 Wood One:Kk Beam decorative member and method of construction

Also Published As

Publication number Publication date
JP2019065640A (en) 2019-04-25

Similar Documents

Publication Publication Date Title
US20230392366A1 (en) Structural modular building connector
US11035114B2 (en) Pillar fixing metal fitting
CA3013892A1 (en) Building framework and method for constructing same
JP2020527202A (en) Balcony device
JP6919480B2 (en) Jig tool and laminated beam structure, and construction method of laminated beam structure
AU2020215910B2 (en) Installation construction method for wall panels
CN104763059A (en) Connector for building, frame structure and method for assembling frame structure with connector
JP7685148B2 (en) Shear wall panel connection structure
JP7163796B2 (en) Wall panel installation method
US11021866B2 (en) Building and construction method for same
KR102477121B1 (en) Deck panel for Euroform
JP2016194208A (en) Rafter joint structure
JP6860354B2 (en) Building structure
US20240229485A1 (en) Interlockable Wall Reinforcement Panel, Wall Reinforcement Assembly and Method for Wall Reinforcement
JPWO2013015316A1 (en) Masonry building and construction method of masonry building
JP4708912B2 (en) Roof construction method
JP2017066666A (en) Bearing wall panel and bearing wall panel system
JP7689049B2 (en) Rectangular wall frame components
JP7841677B2 (en) How to install the deck plate assembly
JP2013241803A (en) Force bearing wall
JP7278131B2 (en) External wall panel installation method
JP2023072180A (en) Building plate material and fixing structure for building plate material
JP4769040B2 (en) Roof construction method
JP6709412B2 (en) Building units and unit buildings that connect them
JP2018194126A (en) Connected structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20200601

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20210405

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210413

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210518

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20210622

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20210705

R150 Certificate of patent or registration of utility model

Ref document number: 6919480

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250