Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP6946064B2 - How to build a revetment - Google Patents
[go: Go Back, main page]

JP6946064B2 - How to build a revetment - Google Patents

How to build a revetment Download PDF

Info

Publication number
JP6946064B2
JP6946064B2 JP2017112989A JP2017112989A JP6946064B2 JP 6946064 B2 JP6946064 B2 JP 6946064B2 JP 2017112989 A JP2017112989 A JP 2017112989A JP 2017112989 A JP2017112989 A JP 2017112989A JP 6946064 B2 JP6946064 B2 JP 6946064B2
Authority
JP
Japan
Prior art keywords
revetment
building
formwork member
steel material
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2017112989A
Other languages
Japanese (ja)
Other versions
JP2018204365A (en
Inventor
和木 多克
多克 和木
和宏 西
和宏 西
木原 一禎
一禎 木原
Original Assignee
ワールドエンジニアリング株式会社
三井住友建設鉄構エンジニアリング株式会社
エム・エムブリッジ株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ワールドエンジニアリング株式会社, 三井住友建設鉄構エンジニアリング株式会社, エム・エムブリッジ株式会社 filed Critical ワールドエンジニアリング株式会社
Priority to JP2017112989A priority Critical patent/JP6946064B2/en
Publication of JP2018204365A publication Critical patent/JP2018204365A/en
Application granted granted Critical
Publication of JP6946064B2 publication Critical patent/JP6946064B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/11Hard structures, e.g. dams, dykes or breakwaters

Landscapes

  • Revetment (AREA)

Description

本発明は、護岸構築方法に関する。 The present invention relates to a revetment construction method.

沿岸部に埋め立て地や防波堤等を造成する場合、対象区域の海底地盤上に護岸を構築することが行われる。この護岸は、対象区域を囲うように配置された複数の護岸構造物(ケーソン、L型ブロック等)によって構成される。このような護岸構造物は、例えば陸上の造船ドック、フローティングドック等の製作施設で建造され、建造後に進水させて浮上させ、船舶により曳航することで設置区域まで運搬される。 When reclaiming land or breakwaters are to be constructed along the coast, revetments will be constructed on the seabed ground of the target area. This revetment is composed of a plurality of revetment structures (caisson, L-shaped block, etc.) arranged so as to surround the target area. Such a revetment structure is constructed in a manufacturing facility such as a shipbuilding dock or a floating dock on land, and is transported to the installation area by being launched and surfaced after construction and towed by a ship.

一方、上記手法においては、護岸構造物の建造及び運搬に要する設備等が大掛かりとなる。このため、海上に建造設備を構築して護岸構造物を建造することにより、護岸構造物の建造及び運搬に要する設備上の負担を軽減する手法が提案されている(例えば、特許文献1参照)。 On the other hand, in the above method, the equipment required for the construction and transportation of the revetment structure becomes large-scale. Therefore, a method has been proposed in which the burden on the equipment required for the construction and transportation of the revetment structure is reduced by constructing the construction equipment on the sea and constructing the revetment structure (see, for example, Patent Document 1). ..

特開2001−214418号公報Japanese Unexamined Patent Publication No. 2001-214418

上記の特許文献1のような手法では、海上に護岸構造物の建造設備を構築する必要があるため、設備上の負担がそれほど軽減されない。また、建造設備を構築する期間及び解体する期間等が必要となるため、工数や工期が掛かってしまう。このため、護岸構造物を短期間で低コストかつ効率的に構築することが求められる。 In the method as described in Patent Document 1 above, since it is necessary to construct the construction equipment of the revetment structure on the sea, the burden on the equipment is not reduced so much. In addition, since a period for constructing construction equipment and a period for dismantling are required, man-hours and construction period are required. Therefore, it is required to construct the revetment structure in a short period of time at low cost and efficiently.

本発明は、上記に鑑みてなされたものであり、短期間で低コストかつ効率的に護岸を構築することが可能な護岸構築方法を提供することを目的とする。 The present invention has been made in view of the above, and an object of the present invention is to provide a revetment construction method capable of constructing a revetment efficiently at low cost in a short period of time.

本発明に係る護岸構築方法は、海底地盤上に1つ以上の函状の護岸構造物を配置して護岸を構築する護岸構築方法であって、陸上において、底面から途中の高さまで打設材料を打設して、前記護岸構造物の第1部分を水に浮上可能な形状に建造する第1部分建造工程と、前記護岸構造物の残りの部分である第2部分の外形に沿った型枠部材を、前記第1部分の上部に設置する型枠部材設置工程と、前記第1部分及び前記型枠部材を含む建造物を水に浮かせた状態とし、前記護岸構造物が配置される対象区域に前記建造物を運搬する運搬工程と、前記型枠部材の内部に前記打設材料を打設し、前記第1部分の上部に前記第2部分を建造する第2部分建造工程とを含む。 The revetment construction method according to the present invention is a revetment construction method in which one or more box-shaped revetment structures are arranged on the seabed ground to construct a revetment, and is a material for placing from the bottom surface to an intermediate height on land. The first part construction process in which the first part of the revetment structure is constructed in a shape that allows it to float on water, and the mold along the outer shape of the second part, which is the remaining part of the revetment structure. An object in which the shore protection structure is placed in a state in which the frame member is installed in the upper part of the first portion and the building including the first portion and the mold member is floated in water. It includes a transportation step of transporting the structure to the area and a second part construction step of placing the casting material inside the mold member and constructing the second part on the upper part of the first part. ..

本発明によれば、陸上においては第1部分及び第2部分の型枠部材を形成するだけであるため、護岸構造物全体を陸上で建造する場合に比べて、陸上における製造期間を短縮することができる。このため、所定期間における製造数を向上させることができる。また、第1部分及び第2部分の型枠部材を建造した状態で水に浮かせて運搬するため、水に浮上させる際、水面下に沈む部分の深さを浅くすることができる。型枠部材を輸送後に現地で組立てる均合がある。このため、運搬時の負担を低減することができ、また、大型の護岸構造物を建造する場合であっても効率的に運搬することができる。さらに、第1部分及び第2部分の型枠部材が形成された状態で第2部分の打設材料を打設するため、水上において効率的に第2部分の建造を行うことができる。また、第1部分と第2部分とで上下分割方式であるため、第1部分が軽くなり、進水及び浮上の際に一般的な重機を用いることができるため、低コスト化を図ることができる。これにより、短期間で低コストかつ効率的に護岸を構築することが可能となる。なお、打設材料としては、例えばコンクリート等が挙げられる。 According to the present invention, since only the formwork members of the first part and the second part are formed on land, the manufacturing period on land can be shortened as compared with the case where the entire revetment structure is constructed on land. Can be done. Therefore, the number of products manufactured in a predetermined period can be improved. Further, since the formwork members of the first portion and the second portion are floated on water and transported in the built state, the depth of the portion submerged under the water surface can be made shallow when the formwork members are floated on water. There is a balance to assemble the formwork members locally after transportation. Therefore, the burden during transportation can be reduced, and even when a large-scale revetment structure is constructed, it can be efficiently transported. Further, since the casting material of the second portion is cast in the state where the formwork members of the first portion and the second portion are formed, the construction of the second portion can be efficiently performed on the water. Further, since the first part and the second part are divided into upper and lower parts, the first part becomes lighter and a general heavy machine can be used for launching and ascending, so that the cost can be reduced. can. This makes it possible to construct a revetment efficiently at low cost in a short period of time. Examples of the casting material include concrete and the like.

また、少なくとも1つの前記護岸構造物は、鋼材と前記打設材料とを構成材料に含むハイブリッドケーソンであってもよい。 Further, at least one revetment structure may be a hybrid caisson containing a steel material and the casting material as constituent materials.

本発明によれば、ハイブリッドケーソンを用いた護岸を短期間で効率的に構築することができる。 According to the present invention, a revetment using a hybrid caisson can be efficiently constructed in a short period of time.

また、前記第1部分建造工程は、前記鋼材を前記第1部分から上方に上端まで突出した状態としてもよい。 Further, in the first part construction process, the steel material may be in a state of protruding upward from the first part to the upper end.

本発明によれば、第1部分建造工程において鋼材を上端まで建造しておくことにより、第2部分建造工程における負担を低減させることができる。 According to the present invention, the burden in the second partial construction process can be reduced by constructing the steel material up to the upper end in the first partial construction process.

また、前記第1部分建造工程は、前記鋼材のうち前記第1部分から上方に突出する部分を、前記第2部分の外形に沿った位置に配置し、前記型枠部材設置工程は、前記鋼材との間で前記第2部分の外形に沿った型枠部材を配置してもよい。 Further, in the first part construction process, a portion of the steel material that protrudes upward from the first part is arranged at a position along the outer shape of the second part, and in the formwork member installation step, the steel material is used. A formwork member may be arranged along the outer shape of the second portion.

本発明によれば、鋼材の一部を型枠として用いることにより、第2部分建造工程において効率的に打設材料を打設することができる。 According to the present invention, by using a part of the steel material as a formwork, the casting material can be efficiently cast in the second partial construction process.

また、前記第1部分建造工程は、前記鋼材のうち前記第1部分から上方に突出する部分に前記護岸構造物の補助施設を設置してもよい。 Further, in the first partial construction process, an auxiliary facility of the revetment structure may be installed in a portion of the steel material that protrudes upward from the first portion.

本発明によれば、鋼材のうち第1部分から上方に突出する部分に護岸構造物の補助施設を設置しておくことにより、第2部分建造工程における負担を低減させることができる。なお、護岸構造物の補助施設としては、例えば水処理設備等が挙げられる。 According to the present invention, the burden in the second part construction process can be reduced by installing the auxiliary facility of the revetment structure in the part of the steel material protruding upward from the first part. Examples of auxiliary facilities for revetment structures include water treatment facilities.

また、前記第2部分建造工程は、前記第1部分を水に浮かせた状態で行ってもよい。 Further, the second part construction process may be performed with the first part floating in water.

本発明によれば、第1部分を水に浮かせた状態で第2部分の打設材料を打設するため、設備上の負担を低減することができる。 According to the present invention, since the casting material of the second portion is cast while the first portion is floated on water, the burden on the equipment can be reduced.

また、前記運搬工程に先立ち、前記対象区域の前記海底地盤上にマウンド部を造成する造成工程を更に備え、前記運搬工程は、前記建造物を前記マウンド部に載置し、前記第2部分建造工程は、前記建造物を前記マウンド部に載置した状態で行ってもよい。 Further, prior to the transportation step, a construction step of creating a mound portion on the seabed ground in the target area is further provided, and in the transportation step, the building is placed on the mound portion and the second partial construction is performed. The step may be carried out in a state where the structure is placed on the mound portion.

本発明によれば、建造物をマウンド部に載置させた状態で打設材料を打設するため、建造物の姿勢を安定させて第2部分を建造することができる。なお、マウンド部は、例えば捨石等を用いて構築することができる。 According to the present invention, since the casting material is placed in a state where the building is placed on the mound portion, the posture of the building can be stabilized and the second portion can be constructed. The mound portion can be constructed using, for example, rubble.

本発明によれば、短期間で効率的に護岸を構築することが可能な護岸構築方法を提供することができる。 According to the present invention, it is possible to provide a revetment construction method capable of efficiently constructing a revetment in a short period of time.

図1は、第1実施形態に係る護岸構築方法の一例を示すフローチャートである。FIG. 1 is a flowchart showing an example of a revetment construction method according to the first embodiment. 図2は、本実施形態に係る第1部分建造工程の一例を示す図である。FIG. 2 is a diagram showing an example of the first partial construction process according to the present embodiment. 図3は、本実施形態に係る型枠部材設置工程の一例を示す図である。FIG. 3 is a diagram showing an example of a formwork member installation process according to the present embodiment. 図4は、本実施形態に係る運搬工程の一例を示す図である。FIG. 4 is a diagram showing an example of a transportation process according to the present embodiment. 図5は、本実施形態に係る第2部分建造工程の一例を示す図である。FIG. 5 is a diagram showing an example of the second partial construction process according to the present embodiment. 図6は、本実施形態に係るマウンド部造成工程及び構造物運搬工程の他の例を示す図である。FIG. 6 is a diagram showing other examples of the mound portion forming step and the structure transporting step according to the present embodiment. 図7は、本実施形態に係る第2部分建造工程の他の例を示す図である。FIG. 7 is a diagram showing another example of the second partial construction process according to the present embodiment. 図8は、本実施形態に係る運搬工程の後の状態を示す図である。FIG. 8 is a diagram showing a state after the transportation step according to the present embodiment. 図9は、本実施形態に係る第2部分建造工程の他の例を示す図である。FIG. 9 is a diagram showing another example of the second partial construction process according to the present embodiment. 図10は、第2実施形態に係る護岸構築方法の第1部分建造工程の一例を示す図である。FIG. 10 is a diagram showing an example of the first partial construction process of the revetment construction method according to the second embodiment. 図11は、本実施形態に係る型枠部材設置工程の一例を示す図である。FIG. 11 is a diagram showing an example of a formwork member installation process according to the present embodiment. 図12は、本実施形態に係る運搬工程の一例を示す図である。FIG. 12 is a diagram showing an example of a transportation process according to the present embodiment. 図13は、本実施形態に係る第2部分建造工程の一例を示す図である。FIG. 13 is a diagram showing an example of the second partial construction process according to the present embodiment. 図14は、本実施形態に係る運搬工程の他の例を示す図である。FIG. 14 is a diagram showing another example of the transportation process according to the present embodiment. 図15は、本実施形態に係る第2部分建造工程の他の例を示す図である。FIG. 15 is a diagram showing another example of the second partial construction process according to the present embodiment.

以下、本発明に係る護岸構築方法の実施形態を図面に基づいて説明する。なお、この実施形態によりこの発明が限定されるものではない。また、下記実施形態における構成要素には、当業者が置換可能かつ容易なもの、あるいは実質的に同一のものが含まれる。さらに、以下に記載した構成要素は適宜組み合わせることが可能であり、また、実施形態が複数ある場合には、各実施形態を組み合わせることも可能である。 Hereinafter, embodiments of the revetment construction method according to the present invention will be described with reference to the drawings. The present invention is not limited to this embodiment. In addition, the components in the following embodiments include those that can be easily replaced by those skilled in the art, or those that are substantially the same. Further, the components described below can be appropriately combined, and when there are a plurality of embodiments, each embodiment can be combined.

<第1実施形態>
図1は、第1実施形態に係る護岸構築方法の一例を示すフローチャートである。本実施形態に係る護岸構築方法は、海底地盤上に1つ以上の函状の護岸構造物を配置して護岸を構築するものである。図1に示すように、本実施形態に係る護岸構築方法は、第1部分建造工程(S10)と、型枠部材設置工程(S20)と、運搬工程(S30)と、第2部分建造工程(S40)とを含んでいる。
<First Embodiment>
FIG. 1 is a flowchart showing an example of a revetment construction method according to the first embodiment. The revetment construction method according to the present embodiment is to construct a revetment by arranging one or more box-shaped revetment structures on the seabed ground. As shown in FIG. 1, the revetment construction method according to the present embodiment includes a first partial construction process (S10), a formwork member installation process (S20), a transportation process (S30), and a second partial construction process (S10). S40) and is included.

なお、本実施形態において、護岸は、例えば沿岸部に埋め立て地や防波堤等を造成する場合に、対象区域の海底地盤上に構築される。護岸は、例えば対象区域を囲んで、又は対象区域に沿って配置される複数の護岸構造物(ケーソン、L型ブロック等)によって構成される。護岸は、例えば埋め立て地を囲んで配置される場合、埋め立てに用いられる廃棄物や土砂等が海域に流出することを防ぐため、隣り合う護岸構造物同士が目地構造によって閉塞された構成となっている。また、本実施形態では、護岸構造物として、鋼材と打設材料とを構成材料に含むハイブリッドケーソンを例に挙げて説明する。 In the present embodiment, the revetment is constructed on the seabed ground of the target area, for example, when a landfill, a breakwater, or the like is constructed in a coastal area. The revetment is composed of a plurality of revetment structures (caisson, L-shaped block, etc.) arranged around the target area or along the target area, for example. When the revetment is arranged around the landfill, for example, the adjacent revetment structures are closed by a joint structure in order to prevent the waste and earth and sand used for the landfill from flowing out to the sea area. There is. Further, in the present embodiment, as the revetment structure, a hybrid caisson containing a steel material and a casting material as constituent materials will be described as an example.

図2は、第1部分建造工程S10の一例を示す図である。図2に示すように、第1部分建造工程S10は、ハイブリッドケーソンの一部である第1部分10を建造する工程である。第1部分建造工程S10では、まず、ハイブリッドケーソンの構成材料である函状の鋼材30を建造する。鋼材30は、底部30aから上端部30bまでの全体が建造される。 FIG. 2 is a diagram showing an example of the first partial construction process S10. As shown in FIG. 2, the first partial construction step S10 is a step of constructing the first portion 10 which is a part of the hybrid caisson. In the first partial construction step S10, first, a box-shaped steel material 30 which is a constituent material of the hybrid caisson is constructed. The entire steel material 30 is constructed from the bottom portion 30a to the upper end portion 30b.

鋼材30を建造した後、ハイブリッドケーソンの構成材料である打設材料14を打設することにより、第1部分10を建造する。この場合、鋼材30が打設材料14の内枠となるため、効率的に第1部分10を建造することができる。第1部分10は、例えば水に浮上可能な形状に建造される。この第1部分10は、打設材料14で構成される部分のうち、底面10aから高さh1までの部分である。この高さh1は、底面10aからハイブリッドケーソンの全体の高さh2までの途中の高さである。高さh1は、第1部分10が水に浮上可能となる高さに設定される。具体的には、高さh1は、第1部分10を水に浮上させた場合の水面高さhwよりも高い位置に設定される。これにより、第1部分10のうち水面高さhwから底面10aまでの深さ(吃水)に制約を受けることなく、後述の運搬工程S20を行うことができる。 After the steel material 30 is constructed, the first portion 10 is constructed by driving the driving material 14 which is a constituent material of the hybrid caisson. In this case, since the steel material 30 serves as the inner frame of the casting material 14, the first portion 10 can be efficiently constructed. The first part 10 is constructed, for example, in a shape that allows it to float on water. The first portion 10 is a portion composed of the casting material 14 from the bottom surface 10a to the height h1. This height h1 is an intermediate height from the bottom surface 10a to the total height h2 of the hybrid caisson. The height h1 is set to a height at which the first portion 10 can float on water. Specifically, the height h1 is set at a position higher than the water surface height hw when the first portion 10 is floated on water. As a result, the transportation step S20 described later can be performed without being restricted by the depth (draft) from the water surface height hw to the bottom surface 10a of the first portion 10.

第1部分建造工程S10は、第1部分10の底部11を建造する工程と、第1部分10の側部を建造する工程とを含む。底部11は、台状に形成され、対象領域の海底地盤上に配置される部分である。側部12は、平面視において矩形環状に形成される。第1部分建造工程では、第1部分10のうち側部12に囲まれる部分に空洞部13が形成される。空洞部13が形成されることにより、第1部分10は、水に浮上可能な構成となる。また、第1部分建造工程S10において、第1部分10を建造することにより、第1部分10の上端部10bから鋼材30が上方に突出した状態となる。なお、鋼材30のうち第1部分10から上方に突出する突出部分31は、後述する第2部分20を建造する際、第2部分20の外形に反った位置、つまり第2部分20の内枠となる位置に配置される。 The first partial construction step S10 includes a step of constructing the bottom portion 11 of the first portion 10 and a step of constructing a side portion of the first portion 10. The bottom portion 11 is a portion formed in a trapezoidal shape and arranged on the seabed ground of the target area. The side portion 12 is formed in a rectangular annular shape in a plan view. In the first partial construction process, the hollow portion 13 is formed in the portion of the first portion 10 surrounded by the side portion 12. By forming the cavity portion 13, the first portion 10 has a structure that allows it to float on water. Further, in the first partial construction step S10, by constructing the first portion 10, the steel material 30 is in a state of protruding upward from the upper end portion 10b of the first portion 10. The protruding portion 31 of the steel material 30 that protrudes upward from the first portion 10 is located at a position that warps the outer shape of the second portion 20, that is, the inner frame of the second portion 20, when the second portion 20 described later is constructed. It is placed in the position where

図3は、型枠部材設置工程S20の一例を示す図である。なお、図3には、第1部分10及び鋼材30を上方から矢印A方向に見た場合の図を併せて示している。図3に示すように、型枠部材設置工程S20は、第1部分10の上部に型枠部材40を設置する。型枠部材40は、ハイブリッドケーソンの残りの部分である第2部分20(図5参照)の外形に沿って設置する。型枠部材40としては、例えば鋼板等が用いられる。本実施形態において、型枠部材40は、第2部分20の外枠となる位置に配置される。なお、上述したように、第2部分20の内枠となる位置には、鋼材30が配置される。このため、鋼材30と型枠部材40との間には、平面視(矢印A方向視)において矩形環状の空間部50が形成される。なお、本実施形態において、型枠部材40は、後述の運搬工程S30及び第2部分建造工程S40において第1部分10、鋼材30及び型枠部材40からなる建造物70を水に浮上させる場合、空間部50に水が浸入しないように設置する。 FIG. 3 is a diagram showing an example of the formwork member installation step S20. Note that FIG. 3 also shows a view when the first portion 10 and the steel material 30 are viewed from above in the direction of arrow A. As shown in FIG. 3, in the formwork member installation step S20, the formwork member 40 is installed on the upper part of the first portion 10. The formwork member 40 is installed along the outer shape of the second portion 20 (see FIG. 5), which is the remaining portion of the hybrid caisson. As the formwork member 40, for example, a steel plate or the like is used. In the present embodiment, the formwork member 40 is arranged at a position that serves as an outer frame of the second portion 20. As described above, the steel material 30 is arranged at a position serving as an inner frame of the second portion 20. Therefore, a rectangular annular space portion 50 is formed between the steel material 30 and the formwork member 40 in a plan view (arrow A direction view). In the present embodiment, the formwork member 40 is used when the building 70 composed of the first portion 10, the steel material 30, and the formwork member 40 is floated on water in the transportation step S30 and the second partial construction step S40, which will be described later. Install so that water does not enter the space 50.

図4は、運搬工程S30の一例を示す図である。図4に示すように、運搬工程S30は、建造物70を水(例えば、海水)Wに浮かせた状態として、ハイブリッドケーソンが設置される対象区域にこの建造物70を運搬する。運搬工程S30では、例えば運搬船60等により建造物70を運搬する。 FIG. 4 is a diagram showing an example of the transportation process S30. As shown in FIG. 4, the transportation step S30 transports the building 70 to the target area where the hybrid caisson is installed, with the building 70 floating in water (for example, seawater) W. In the transportation step S30, the building 70 is transported by, for example, a transport ship 60 or the like.

建造物70は、海水Wに浮いた状態において、第1部分10の上端部10bが水面Waよりも上方に配置される。また、建造物70は、空洞部13が鋼材30によって囲まれた構成であり、遮水性が確保される。加えて、建造物70は、空間部50に型枠部材40が設置されている。 In the building 70, the upper end portion 10b of the first portion 10 is arranged above the water surface Wa in a state of floating on the seawater W. Further, the building 70 has a structure in which the cavity 13 is surrounded by the steel material 30, and water shielding is ensured. In addition, in the building 70, the formwork member 40 is installed in the space 50.

また、運搬工程S30では、ハイブリッドケーソン全体を運搬するのではなく、建造物70を運搬すればよいため、運搬船60を小型化できる等、運搬に要する負担を低減することができる。 Further, in the transportation step S30, since the building 70 may be transported instead of transporting the entire hybrid caisson, the load required for transportation can be reduced, for example, the carrier 60 can be miniaturized.

図5は、第2部分建造工程S40の一例を示す図である。図5に示すように、第2部分建造工程S40では、建造物70を対象区域Pに配置した後、海水Wに浮かせた状態で、型枠部材40の内部に打設材料14を打設する。具体的には、型枠部材40と鋼材30との間に形成される空間部50に打設材料14を打設する。第2部分建造工程S40は、建造物70を海水Wに浮かせた状態で行うため、平面視における空間部50の周方向に均等に打設材料14を打設してもよい。これにより、建造物70の浮上姿勢を安定させつつ、空間部50に打設材料14を打設可能となる。なお、建造物70は、例えば海底地盤BT上にシンカーを配置し、当該シンカーにワイヤー等で連結された構成であってもよい。これにより、建造物70が風又は潮流等により対象区域Pから流されて移動することを防ぐことができる。打設材料14を打設する際、例えば桟橋等を形成して打設材料14の供給部を支持させてもよいし、コンクリートミキサー船等の船舶から打設材料14を供給してもよい。打設材料14を打設することにより、建造物70の重量が大きくなっていく。これにより、建造物70の吃水が増大し、第1部分10の底面10aが海底地盤BTに接地する。その後、第1部分10が海底地盤BTに支持された状態で、打設材料14が空間部50に供給される。この場合、例えば、型枠部材40を水密型枠とはせずに打設材料14を常に気中で充填させることができる。 FIG. 5 is a diagram showing an example of the second partial construction process S40. As shown in FIG. 5, in the second partial construction process S40, after the building 70 is arranged in the target area P, the casting material 14 is placed inside the formwork member 40 while floating in seawater W. .. Specifically, the driving material 14 is placed in the space 50 formed between the formwork member 40 and the steel material 30. Since the second partial construction step S40 is performed in a state where the building 70 is floated in the seawater W, the casting material 14 may be evenly cast in the circumferential direction of the space portion 50 in a plan view. As a result, the driving material 14 can be placed in the space 50 while stabilizing the floating posture of the building 70. The building 70 may have a structure in which a sinker is arranged on the seabed ground BT and is connected to the sinker by a wire or the like. As a result, it is possible to prevent the building 70 from being swept away from the target area P by wind, tidal current, or the like and moving. When casting the casting material 14, for example, a pier or the like may be formed to support the supply portion of the casting material 14, or the casting material 14 may be supplied from a ship such as a concrete mixer ship. By placing the driving material 14, the weight of the building 70 increases. As a result, the draft of the building 70 increases, and the bottom surface 10a of the first portion 10 comes into contact with the seabed ground BT. After that, the casting material 14 is supplied to the space portion 50 in a state where the first portion 10 is supported by the seabed ground BT. In this case, for example, the casting material 14 can always be filled in the air without making the formwork member 40 a watertight formwork.

空間部50に打設材料14を打設した後、打設材料14が固化することにより、第2部分20が建造される。これにより、ハイブリッドケーソン100が構築されると共にハイブリッドケーソン100が対象区域に設置される。第2部分20が建造された後、型枠部材40を第1部分10及び第2部分20から取り外す。なお、型枠部材40を残置させる事ができる。この場合、型枠部材40がハイブリッドケーソン100の一部として残留することになる。 After the casting material 14 is placed in the space portion 50, the casting material 14 is solidified to construct the second portion 20. As a result, the hybrid caisson 100 is constructed and the hybrid caisson 100 is installed in the target area. After the second portion 20 is constructed, the formwork member 40 is removed from the first portion 10 and the second portion 20. The formwork member 40 can be left behind. In this case, the formwork member 40 remains as a part of the hybrid caisson 100.

以上のように、本実施形態に係る護岸構築方法は、ハイブリッドケーソン100の全体を陸上で建造する場合に比べて、陸上における製造期間を短縮することができる。このため、所定期間における製造効率を向上させる(製造数増大)ことができる。また、第1部分10を建造した状態で水に浮かせて運搬するため、第1部分10を水に浮上させる際、水面下に沈む部分の深さを浅くすることができる。このため、運搬時の負担を低減することができ、また、大型のハイブリッドケーソン100を建造する場合であっても効率的に運搬することができる。さらに、第1部分10及び型枠部材40が形成された状態で第2部分20の打設材料14を打設するため、水上において効率的に第2部分20の建造を行うことができる。これにより、短期間で効率的に護岸を構築することが可能となる。 As described above, the revetment construction method according to the present embodiment can shorten the manufacturing period on land as compared with the case where the entire hybrid caisson 100 is constructed on land. Therefore, it is possible to improve the manufacturing efficiency in a predetermined period (increase the number of manufactured products). Further, since the first portion 10 is floated on water and transported in the built state, when the first portion 10 is floated on water, the depth of the portion submerged under the water surface can be made shallow. Therefore, the burden during transportation can be reduced, and even when a large hybrid caisson 100 is constructed, it can be efficiently transported. Further, since the casting material 14 of the second portion 20 is cast with the first portion 10 and the formwork member 40 formed, the second portion 20 can be efficiently constructed on the water. This makes it possible to efficiently construct a revetment in a short period of time.

本実施形態に係る護岸構築方法においては、ハイブリッドケーソンが鋼材30と打設材料14とを構成材料に含むハイブリッドケーソンであり、このようなハイブリッドケーソンを用いた護岸を短期間で効率的に構築することができる。 In the revetment construction method according to the present embodiment, the hybrid caisson is a hybrid caisson containing a steel material 30 and a casting material 14 as constituent materials, and a revetment using such a hybrid caisson is efficiently constructed in a short period of time. be able to.

本実施形態に係る護岸構築方法において、第1部分建造工程S10は、鋼材30を第1部分10から上方に上端部30bまで突出した状態とするため、第2部分建造工程S40において鋼材30を建造しなくても済み、第2部分建造工程S40における負担を低減させることができる。 In the revetment construction method according to the present embodiment, in the first partial construction process S10, the steel material 30 is constructed in the second partial construction process S40 so that the steel material 30 protrudes upward from the first portion 10 to the upper end portion 30b. It is not necessary to do so, and the burden in the second partial construction process S40 can be reduced.

本実施形態に係る護岸構築方法において、第1部分建造工程S10では鋼材30のうち突出部分31を第2部分20の外形に沿った位置に配置し、型枠部材設置工程S20では鋼材30との間で第2部分20の外形に沿った型枠部材40を配置するため、鋼材30の一部を型枠部材として用いることができる。これにより、第2部分建造工程S40において、効率的に打設材料14を打設することができる。 In the revetment construction method according to the present embodiment, in the first partial construction process S10, the protruding portion 31 of the steel material 30 is arranged at a position along the outer shape of the second portion 20, and in the formwork member installation step S20, the steel material 30 is used. Since the formwork member 40 is arranged between them along the outer shape of the second portion 20, a part of the steel material 30 can be used as the formwork member. As a result, the casting material 14 can be efficiently cast in the second partial construction step S40.

本実施形態に係る護岸構築方法において、第2部分建造工程S40では、建造物70を海水Wに浮かせた状態で第2部分20の打設材料14を打設するため、建造物70を支持する設備等を別途設置する必要が無い。これにより、設備上の負担を低減することができる。 In the revetment construction method according to the present embodiment, in the second partial construction step S40, the building 70 is supported in order to cast the casting material 14 of the second portion 20 in a state where the building 70 is floated in the seawater W. There is no need to install equipment separately. As a result, the burden on the equipment can be reduced.

なお、本実施形態では、第2部分建造工程S40において、建造物70を海水Wに浮かせた状態で第2部分20の打設材料14を打設する場合を例に挙げて説明したが、これに限定されない。図6は、造成工程及び運搬工程S30の他の例を示す図である。図7は、第2部分建造工程S40の他の例を示す図である。 In the present embodiment, in the second partial construction process S40, the case where the casting material 14 of the second portion 20 is driven while the building 70 is floating in the seawater W has been described as an example. Not limited to. FIG. 6 is a diagram showing another example of the preparation process and the transportation process S30. FIG. 7 is a diagram showing another example of the second partial construction process S40.

例えば、図6に示すように、運搬工程S30に先立ち、対象区域Pの近傍の比較的水深の浅い海底地盤BT上に、マウンド部MDを造成する造成工程を行ってもよい。造成工程では、例えば捨石、砕石等を用いてマウンド部MDを形成する。マウンド部MDを形成した後、運搬工程S30において建造物70をマウンド部MDの上方に配置する。そして、第1部分10の空洞部13に海水W等を注入することにより、建造物70を沈ませてマウンド部MD上に載置する。その後、図7に示すように、建造物70をマウンド部MDに載置した状態で第2部分建造工程S40を行ってもよい。これにより、建造物70をマウンド部MDに載置させた状態で打設材料14を打設するため、建造物70の姿勢を安定させて第2部分20を建造することができる。 For example, as shown in FIG. 6, prior to the transportation step S30, a creation step of creating a mound portion MD may be performed on a relatively shallow seabed ground BT near the target area P. In the construction process, for example, rubble, crushed stone, or the like is used to form the mound portion MD. After forming the mound portion MD, the building 70 is arranged above the mound portion MD in the transportation step S30. Then, by injecting seawater W or the like into the cavity 13 of the first portion 10, the building 70 is submerged and placed on the mound MD. After that, as shown in FIG. 7, the second partial construction step S40 may be performed with the building 70 mounted on the mound portion MD. As a result, since the casting material 14 is driven while the building 70 is placed on the mound portion MD, the posture of the building 70 can be stabilized and the second portion 20 can be constructed.

また、本実施形態では、函状の護岸構造物を例に挙げて説明したが、これに限定されない。図8は、運搬工程S30の後の状態を示す図である。図9は、第2部分建造工程S40の他の例を示す図である。例えば、図8及び図9に示すように、護岸構造物がL型ブロックであってもよい。 Further, in the present embodiment, the box-shaped revetment structure has been described as an example, but the present invention is not limited to this. FIG. 8 is a diagram showing a state after the transportation step S30. FIG. 9 is a diagram showing another example of the second partial construction process S40. For example, as shown in FIGS. 8 and 9, the revetment structure may be an L-shaped block.

図8に示すように、第1部分15は、底部16の水平方向の端部に側部17が配置されている。鋼材35は、底部16及び側部17に亘って配置され、側部17の上端部17bから上方に突出する突出部分36を有する。型枠部材45は、第2部分25(図9参照)の外形に沿って設置する。鋼材35と型枠部材45との間には、平面視(矢印B方向視)において矩形環状の空間部55が形成される。 As shown in FIG. 8, the first portion 15 has a side portion 17 arranged at a horizontal end portion of the bottom portion 16. The steel material 35 is arranged over the bottom portion 16 and the side portion 17, and has a protruding portion 36 protruding upward from the upper end portion 17b of the side portion 17. The formwork member 45 is installed along the outer shape of the second portion 25 (see FIG. 9). A rectangular annular space portion 55 is formed between the steel material 35 and the formwork member 45 in a plan view (arrow B direction view).

そして、図9に示すように、第2部分建造工程S40において、型枠部材45と鋼材35との間に形成される空間部55に打設材料14を打設する。これにより、建造物75が海水Wに沈み、第1部分15の底面15aが海底地盤BTに接地する。空間部55に打設材料14を打設した後、打設材料14が固化することにより、第2部分25が建造される。これにより、L型ブロック100Aが構築されると共にL型ブロック100Aが対象区域に配置される。よって、護岸構造物がL型ブロック100Aであっても、短期間で効率的に護岸を構築することが可能となる。 Then, as shown in FIG. 9, in the second partial construction step S40, the casting material 14 is driven into the space portion 55 formed between the formwork member 45 and the steel material 35. As a result, the building 75 is submerged in the seawater W, and the bottom surface 15a of the first portion 15 comes into contact with the seabed ground BT. After the casting material 14 is placed in the space portion 55, the casting material 14 is solidified to construct the second portion 25. As a result, the L-shaped block 100A is constructed and the L-shaped block 100A is arranged in the target area. Therefore, even if the revetment structure is an L-shaped block 100A, it is possible to efficiently construct the revetment in a short period of time.

また、本実施形態では、第1部分建造工程S10において、鋼材30の突出部分31に護岸構造物の水処理設備などの補助施設を予め設置してもよい。これにより、第2部分建造工程S40において打設材料14を打設する場合に、補助施設を設置する際の負担を低減させることができる。 Further, in the present embodiment, in the first partial construction process S10, an auxiliary facility such as a water treatment facility for the revetment structure may be installed in advance on the protruding portion 31 of the steel material 30. As a result, when the casting material 14 is cast in the second partial construction process S40, the burden of installing the auxiliary facility can be reduced.

<第2実施形態>
続いて、第2実施形態を説明する。上記第1実施形態では、護岸構造物としてハイブリッドケーソンを例に挙げて説明したが、第2実施形態では、護岸構造物としてRCケーソンを例に挙げて説明する。図10は、第2実施形態に係る護岸構築方法の第1部分建造工程S110の一例を示す図である。
<Second Embodiment>
Subsequently, the second embodiment will be described. In the first embodiment, the hybrid caisson will be described as an example of the revetment structure, but in the second embodiment, the RC caisson will be described as an example of the revetment structure. FIG. 10 is a diagram showing an example of the first partial construction process S110 of the revetment construction method according to the second embodiment.

図10に示すように、第1部分建造工程S110は、RCケーソンの一部である第1部分110を建造する工程である。第1部分建造工程S110では、RCケーソンの構成材料である打設材料114を打設することにより、第1部分110を建造する。第1部分110は、例えば水に浮上可能な形状に建造される。この第1部分110は、打設材料114で構成される部分のうち、底面110aから高さh3までの部分である。この高さh3は、底面110aからRCケーソンの全体の高さまでの途中の高さである。高さh3は、第1部分110が水に浮上可能となる高さに設定される。具体的には、高さh3は、第1部分110を水に浮上させた場合の水面高さ(吃水)hwよりも高い位置に設定される。 As shown in FIG. 10, the first partial construction process S110 is a step of constructing the first portion 110 which is a part of the RC caisson. In the first partial construction process S110, the first portion 110 is constructed by placing the casting material 114, which is a constituent material of the RC caisson. The first portion 110 is constructed, for example, in a shape that allows it to float on water. The first portion 110 is a portion of the portion made of the casting material 114 from the bottom surface 110a to the height h3. This height h3 is an intermediate height from the bottom surface 110a to the total height of the RC caisson. The height h3 is set to a height at which the first portion 110 can float on water. Specifically, the height h3 is set at a position higher than the water surface height (draft) hw when the first portion 110 is floated on water.

第1部分建造工程S110は、第1部分110の底部111を建造する工程と、第1部分110の側部112を建造する工程とを含む。第1部分建造工程S110では、第1部分110のうち側部112に囲まれる部分に空洞部113が形成される。空洞部113が形成されることにより、第1部分110は、水に浮上可能な構成となる。 The first partial construction step S110 includes a step of constructing the bottom portion 111 of the first portion 110 and a step of constructing the side portion 112 of the first portion 110. In the first partial construction step S110, the hollow portion 113 is formed in the portion of the first portion 110 surrounded by the side portions 112. By forming the cavity 113, the first portion 110 has a structure that allows it to float on water.

図11は、型枠部材設置工程S120の一例を示す図である。なお、図11には、第1部分110を上方から矢印C方向に見た場合の図を併せて示している。図11に示すように、型枠部材設置工程S120は、第1部分110の上部に内側型枠部材130及び外側型枠部材140を設置する。内側型枠部材130及び外側型枠部材140は、RCケーソンの残りの部分である第2部分120(図13参照)の外形に沿って設置する。内側型枠部材130及び外側型枠部材140としては、例えば鋼板等が用いられる。本実施形態において、内側型枠部材130は、後述の第2部分120の内枠となる位置に配置される。また、外側型枠部材140は、第2部分120の外枠となる位置に配置される。内側型枠部材130と外側型枠部材140との間には、平面視(矢印C方向視)において矩形環状の空間部150が形成される。なお、本実施形態において、内側型枠部材130及び外側型枠部材140は、後述の運搬工程S130及び第2部分建造工程S140において第1部分110、内側型枠部材130及び外側型枠部材140からなる建造物170を水に浮上させる場合、空間部150に水が浸入しないように設置する。 FIG. 11 is a diagram showing an example of the formwork member installation step S120. Note that FIG. 11 also shows a view when the first portion 110 is viewed from above in the direction of arrow C. As shown in FIG. 11, in the formwork member installation step S120, the inner formwork member 130 and the outer formwork member 140 are installed above the first portion 110. The inner formwork member 130 and the outer formwork member 140 are installed along the outer shape of the second portion 120 (see FIG. 13), which is the remaining portion of the RC caisson. As the inner formwork member 130 and the outer formwork member 140, for example, a steel plate or the like is used. In the present embodiment, the inner formwork member 130 is arranged at a position that serves as an inner frame of the second portion 120, which will be described later. Further, the outer formwork member 140 is arranged at a position that serves as an outer frame of the second portion 120. A rectangular annular space 150 is formed between the inner form member 130 and the outer form member 140 in a plan view (arrow C direction view). In the present embodiment, the inner formwork member 130 and the outer formwork member 140 are separated from the first part 110, the inner formwork member 130, and the outer formwork member 140 in the transportation step S130 and the second part construction process S140, which will be described later. When the building 170 is floated on water, it is installed so that water does not enter the space 150.

図12は、運搬工程S130の一例を示す図である。図12に示すように、運搬工程S130は、建造物170を水(例えば、海水)Wに浮かせた状態として、RCケーソンが配置される対象区域にこの建造物170を運搬する。運搬工程S130では、例えば運搬船160等により建造物170を運搬する。建造物170は、海水Wに浮いた状態において、第1部分110の上端部110bが水面Waよりも上方に配置される。このため、第1部分110の空洞部113に海水Wが進入することなく、安定して建造物170を運搬することができる。 FIG. 12 is a diagram showing an example of the transportation process S130. As shown in FIG. 12, the transportation step S130 transports the building 170 to the target area where the RC caisson is arranged, with the building 170 floating in water (for example, seawater) W. In the transportation step S130, the building 170 is transported by, for example, a transport ship 160 or the like. In the building 170, the upper end portion 110b of the first portion 110 is arranged above the water surface Wa in a state of floating on the seawater W. Therefore, the building 170 can be stably transported without the seawater W entering the cavity 113 of the first portion 110.

図13は、第2部分建造工程S140の一例を示す図である。図13に示すように、第2部分建造工程S140では、建造物170を対象区域Pに配置した後、海水Wに浮かせた状態で、空間部150に打設材料114を打設する。第2部分建造工程S140は、建造物170を海水Wに浮かせた状態で行うため、平面視における空間部150の周方向に均等に打設材料114を打設してもよい。これにより、建造物170の浮上姿勢を安定させつつ、空間部150に打設材料114を打設可能となる。なお、建造物170は、第1実施形態と同様、例えば海底地盤BT上にシンカーを配置し、当該シンカーにワイヤー等で連結された構成であってもよい。これにより、建造物170が風又は潮流等により対象区域Pから流されて移動することを防ぐことができる。また、打設材料114を打設する際、例えば桟橋等を形成して打設材料114の供給部を支持させてもよいし、コンクリートミキサー船等の船舶から打設材料114を供給してもよい。打設材料114を打設することにより、建造物170の重量が大きくなっていく。これにより、建造物170が海水Wに沈み、第1部分110の底面110aが海底地盤BTに接地する。その後、第1部分110が海底地盤BTに支持された状態で、打設材料114が空間部150に供給される。なお、空間部150に水が浸入しないように外側型枠部材140が設置されているため、打設材料114を段階的に打設して固化させる等の複数工程を行う必要が無く、一工程で空間部150に打設材料114を打設することができる。 FIG. 13 is a diagram showing an example of the second partial construction process S140. As shown in FIG. 13, in the second partial construction process S140, after the building 170 is arranged in the target area P, the casting material 114 is placed in the space 150 in a state of being floated in the seawater W. Since the second partial construction step S140 is performed in a state where the building 170 is floated in the seawater W, the casting material 114 may be evenly cast in the circumferential direction of the space portion 150 in a plan view. As a result, the driving material 114 can be placed in the space 150 while stabilizing the floating posture of the building 170. As in the first embodiment, the building 170 may have a structure in which a sinker is arranged on the seabed ground BT and is connected to the sinker by a wire or the like. As a result, it is possible to prevent the building 170 from being swept away from the target area P by wind, tidal current, or the like and moving. Further, when casting the casting material 114, for example, a pier or the like may be formed to support the supply portion of the casting material 114, or the casting material 114 may be supplied from a ship such as a concrete mixer ship. good. By placing the driving material 114, the weight of the building 170 increases. As a result, the building 170 is submerged in the seawater W, and the bottom surface 110a of the first portion 110 touches the seabed ground BT. After that, the casting material 114 is supplied to the space portion 150 in a state where the first portion 110 is supported by the seabed ground BT. Since the outer formwork member 140 is installed so that water does not enter the space 150, it is not necessary to perform a plurality of steps such as stepwise casting and solidifying the casting material 114, which is one step. The casting material 114 can be cast in the space portion 150.

空間部150に打設材料114を打設した後、打設材料114が固化することにより、第2部分120が建造される。これにより、RCケーソン200が構築されると共にRCケーソン200が対象区域に配置される。第2部分120が建造された後、内側型枠部材130及び外側型枠部材140を第1部分110及び第2部分120から取り外す。なお、内側型枠部材130及び外側型枠部材140の取り外し作業は、行わなくてもよい。この場合、内側型枠部材130及び外側型枠部材140がRCケーソン200の一部として残留することになる。 After the casting material 114 is placed in the space portion 150, the casting material 114 is solidified to construct the second portion 120. As a result, the RC caisson 200 is constructed and the RC caisson 200 is placed in the target area. After the second portion 120 is constructed, the inner formwork member 130 and the outer formwork member 140 are removed from the first portion 110 and the second portion 120. It is not necessary to remove the inner formwork member 130 and the outer formwork member 140. In this case, the inner formwork member 130 and the outer formwork member 140 will remain as a part of the RC caisson 200.

以上のように、本実施形態に係る護岸構築方法は、護岸構造物としてRCケーソン200を用いる場合であっても、全体を陸上で建造する場合に比べて、陸上における製造期間を短縮することができる。このため、所定期間における製造効率を向上させることができる(製造数増大)。また、第1部分110を建造した状態で水に浮かせて運搬するため、第1部分110を水に浮上させる際、水面下に沈む部分の深さを浅くすることができる。このため、運搬時の負担を低減することができ、また、大型のRCケーソン200を建造する場合であっても効率的に運搬することができる。さらに、第1部分110及び外側型枠部材140が形成された状態で第2部分120の打設材料114を打設するため、水上において効率的に第2部分120の建造を行うことができる。これにより、短期間で効率的に護岸を構築することが可能となる。 As described above, in the revetment construction method according to the present embodiment, even when the RC caisson 200 is used as the revetment structure, the manufacturing period on land can be shortened as compared with the case where the entire revetment is constructed on land. can. Therefore, the manufacturing efficiency in a predetermined period can be improved (the number of manufactured products is increased). Further, since the first portion 110 is floated on water and transported in the built state, when the first portion 110 is floated on water, the depth of the portion submerged under the water surface can be made shallow. Therefore, the burden during transportation can be reduced, and even when a large RC caisson 200 is constructed, it can be efficiently transported. Further, since the casting material 114 of the second portion 120 is cast with the first portion 110 and the outer formwork member 140 formed, the second portion 120 can be efficiently constructed on the water. This makes it possible to efficiently construct a revetment in a short period of time.

なお、上記した第2実施形態では、型枠部材設置工程S120において、第1部分110に内側型枠部材130及び外側型枠部材140を配置する構成を例に挙げて説明したが、これに限定されない。図14は、運搬工程の他の状態を示す図である。図15は、第2部分建造工程の他の例を示す図である。 In the second embodiment described above, in the formwork member installation step S120, a configuration in which the inner formwork member 130 and the outer formwork member 140 are arranged in the first portion 110 has been described as an example, but the present invention is limited to this. Not done. FIG. 14 is a diagram showing other states of the transportation process. FIG. 15 is a diagram showing another example of the second partial construction process.

例えば、図14に示すように、型枠部材設置工程において、内側型枠部材130に替えて、鋼材130Aを配置してもよい。この場合、鋼材130Aは、第2部分120を建造する際、第2部分120の外形に反った位置、つまり第2部分120の内枠となる位置に配置される。鋼材130Aと外側型枠部材140との間には、平面視において矩形環状の空間部150が形成される。その後、図14に示すように、第1部分110、鋼材130A及び外側型枠部材140を有する建造物170Aを運搬する。 For example, as shown in FIG. 14, in the formwork member installation process, the steel material 130A may be arranged instead of the inner formwork member 130. In this case, when the second portion 120 is constructed, the steel material 130A is arranged at a position that warps the outer shape of the second portion 120, that is, a position that serves as an inner frame of the second portion 120. A rectangular annular space 150 is formed between the steel material 130A and the outer form member 140 in a plan view. After that, as shown in FIG. 14, the building 170A having the first portion 110, the steel material 130A, and the outer formwork member 140 is transported.

そして、図15に示すように、第2部分建造工程S40において、鋼材130Aと外側型枠部材140の間に形成される空間部150に打設材料114を打設する。これにより、建造物170Aが海水Wに沈み、第1部分110の底面110aが海底地盤BTに接地する。空間部150に打設材料114を打設した後、打設材料114が固化することにより、第2部分120が建造される。これにより、RCケーソン200Aが構築されると共にRCケーソン200Aが対象区域に配置される。よって、内側型枠部材130に替えて鋼材130Aが配置される場合であっても、短期間で効率的に護岸を構築することが可能となる。 Then, as shown in FIG. 15, in the second partial construction step S40, the casting material 114 is cast in the space portion 150 formed between the steel material 130A and the outer formwork member 140. As a result, the building 170A is submerged in the seawater W, and the bottom surface 110a of the first portion 110 touches the seabed ground BT. After the casting material 114 is placed in the space portion 150, the casting material 114 is solidified to construct the second portion 120. As a result, the RC caisson 200A is constructed and the RC caisson 200A is placed in the target area. Therefore, even when the steel material 130A is arranged instead of the inner formwork member 130, it is possible to efficiently construct the revetment in a short period of time.

なお、本発明の技術範囲は上記実施形態に限定されるものではなく、本発明の趣旨を逸脱しない範囲で適宜変更を加えることができる。 The technical scope of the present invention is not limited to the above-described embodiment, and changes can be made as appropriate without departing from the spirit of the present invention.

10,15,110 第1部分
10a,15a,110a 底面
10b,17b,30b,110b 上端部
11,16,30a,111 底部
12,17,112 側部
13,113 空洞部
14,114 打設材料
20,25,120 第2部分
30,35,130A 鋼材
31,36 突出部分
40,45 型枠部材
50,55,150 空間部
60,160 運搬船
70,75,170,170A 建造物
100 ハイブリッドケーソン
100A L型ブロック
200,200A RCケーソン
130 内側型枠部材
140 外側型枠部材
P 対象区域
S10,S110 第1部分建造工程
S20,S120,S120A 型枠部材設置工程
S30,S130 運搬工程
S40,S140 第2部分建造工程
W 水,海水
MD マウンド部
h1,h2,h3 高さ
Wa 水面
10, 15, 110 First part 10a, 15a, 110a Bottom surface 10b, 17b, 30b, 110b Upper end part 11, 16, 30a, 111 Bottom part 12, 17, 112 Side part 13, 113 Cavity part 14, 114 Casting material 20 , 25,120 Second part 30,35,130A Steel material 31,36 Protruding part 40,45 Formwork member 50,55,150 Space part 60,160 Carrier 70,75,170,170A Building 100 Hybrid caisson 100A L type Block 200, 200A RC caisson 130 Inner formwork member 140 Outer formwork member P Target area S10, S110 First part construction process S20, S120, S120A Formwork member installation process S30, S130 Transport process S40, S140 Second part construction process W water, seawater MD mound part h1, h2, h3 Height Wa Water surface

Claims (7)

海底地盤上に1つ以上の函状の護岸構造物を配置して護岸を構築する護岸構築方法であって、
陸上において、底面から途中の高さまで打設材料を打設して、前記護岸構造物の第1部分を水に浮上可能な形状に建造する第1部分建造工程と、
前記護岸構造物の残りの部分である第2部分の外形に沿った型枠部材を、前記第1部分の上部に設置する型枠部材設置工程と、
前記第1部分及び前記型枠部材を含む建造物を水に浮かせた状態とし、前記護岸構造物が配置される対象区域に前記建造物を運搬する運搬工程と、
前記型枠部材の内部に前記打設材料を打設し、前記第1部分の上部に前記第2部分を建造する第2部分建造工程と
を含む護岸構築方法。
It is a revetment construction method in which one or more box-shaped revetment structures are placed on the seabed ground to construct a revetment.
On land, the first part construction step of building the pouring material from the bottom to the middle height by Da設, the first portion of the revetment structure in a shape capable of floating in water,
A formwork member installation step of installing a formwork member along the outer shape of the second part, which is the remaining part of the revetment structure, on the upper part of the first part.
A transportation process in which the building including the first part and the formwork member is floated on water, and the building is transported to a target area where the revetment structure is arranged.
A revetment construction method including a second part construction step of placing the casting material inside the formwork member and constructing the second part on the upper part of the first part.
少なくとも1つの前記護岸構造物は、鋼材と前記打設材料とを構成材料に含むハイブリッドケーソンである
請求項1に記載の護岸構築方法。
The revetment construction method according to claim 1, wherein the at least one revetment structure is a hybrid caisson containing a steel material and the casting material as constituent materials.
前記第1部分建造工程は、前記鋼材を前記第1部分から上方に上端まで突出した状態とする
請求項2に記載の護岸構築方法。
The revetment construction method according to claim 2, wherein the first part construction step is a state in which the steel material protrudes upward from the first part to the upper end.
前記第1部分建造工程は、前記鋼材のうち前記第1部分から上方に突出する部分を、前記第2部分の外形に沿った位置に配置し、
前記型枠部材設置工程は、前記鋼材との間で前記第2部分の外形に沿った型枠部材を配置する
請求項3に記載の護岸構築方法。
In the first part construction process, a part of the steel material that protrudes upward from the first part is arranged at a position along the outer shape of the second part.
The revetment construction method according to claim 3, wherein the formwork member installation step is for arranging the formwork member along the outer shape of the second portion with the steel material.
前記第1部分建造工程は、前記鋼材のうち前記第1部分から上方に突出する部分に前記護岸構造物の補助施設を設置する
請求項3又は請求項4に記載の護岸構築方法。
The revetment construction method according to claim 3 or 4, wherein the first part construction step is to install an auxiliary facility of the revetment structure in a portion of the steel material protruding upward from the first part.
前記第2部分建造工程は、前記建造物を水に浮かせた状態で行う
請求項1から請求項5のいずれか一項に記載の護岸構築方法。
The revetment construction method according to any one of claims 1 to 5, wherein the second partial construction step is performed in a state where the building is floated on water.
前記運搬工程に先立ち、前記対象区域の前記海底地盤上にマウンド部を造成する造成工程を更に備え、
前記運搬工程は、前記建造物を前記マウンド部に載置し、
前記第2部分建造工程は、前記建造物を前記マウンド部に載置した状態で行う
請求項1から請求項6のいずれか一項に記載の護岸構築方法。
Prior to the transportation step, a construction step of creating a mound portion on the seabed ground in the target area is further provided.
In the transportation process, the building is placed on the mound portion, and the structure is placed on the mound portion.
The revetment construction method according to any one of claims 1 to 6, wherein the second partial construction step is performed with the building mounted on the mound portion.
JP2017112989A 2017-06-07 2017-06-07 How to build a revetment Active JP6946064B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017112989A JP6946064B2 (en) 2017-06-07 2017-06-07 How to build a revetment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017112989A JP6946064B2 (en) 2017-06-07 2017-06-07 How to build a revetment

Publications (2)

Publication Number Publication Date
JP2018204365A JP2018204365A (en) 2018-12-27
JP6946064B2 true JP6946064B2 (en) 2021-10-06

Family

ID=64955321

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017112989A Active JP6946064B2 (en) 2017-06-07 2017-06-07 How to build a revetment

Country Status (1)

Country Link
JP (1) JP6946064B2 (en)

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4819163B1 (en) * 1969-12-19 1973-06-12
JPS55132869A (en) * 1979-04-02 1980-10-16 Mitsubishi Heavy Ind Ltd Method of constructing underground tank
JPS6340024A (en) * 1986-08-04 1988-02-20 Toda Constr Co Ltd Pile-type caisson work
JP2915135B2 (en) * 1990-11-27 1999-07-05 大豊建設株式会社 Caisson and its manufacturing method
JP2000328536A (en) * 1999-05-19 2000-11-28 Hitachi Zosen Corp PC unit type hybrid caisson
JP2001214418A (en) * 2000-02-02 2001-08-07 Penta Ocean Constr Co Ltd Concrete caisson water production installation method
JP4409357B2 (en) * 2004-05-20 2010-02-03 五洋建設株式会社 Construction method for underwater foundation
JP5588929B2 (en) * 2011-06-14 2014-09-10 新日鉄住金エンジニアリング株式会社 Offshore structure construction method and offshore structure

Also Published As

Publication number Publication date
JP2018204365A (en) 2018-12-27

Similar Documents

Publication Publication Date Title
Esteban et al. Gravity based support structures for offshore wind turbine generators: Review of the installation process
CN103228909A (en) Process for installing an offshore tower
CA2329306A1 (en) Modular maritime dock design
JP4819835B2 (en) Offshore structure and construction method of offshore structure
JP6946064B2 (en) How to build a revetment
KR100988053B1 (en) Facility for tearing down underwater structure to prevent water pollution
CA3019884C (en) Device for protecting against the scouring of granular fillings submerged in gravity structures
JP6638937B2 (en) Structure for preventing suction of seawall structures and method for preventing suction
JP6681225B2 (en) How to install a gravity type structure on the bottom of the water
KR101459666B1 (en) Underwater Structures Prefabricated and Construction Method
KR20180062008A (en) Multifunctional Buoyancy Module for Wave Cancellation, Breakout Structure using it and Construction Method thereof
EP2376712A2 (en) A deep-water port
JP3624461B2 (en) Quay restoration method and quay structure
JP6630610B2 (en) How to improve wavebreak structures
JP5458441B2 (en) Environmentally friendly offshore structure and its construction method
KR100884050B1 (en) Foundation construction method for steel wells using steel pontoons
JP2009180056A (en) How to build a long caisson
KR101326773B1 (en) Harbor Structures Easily respond to Differential Settlement
JP5588929B2 (en) Offshore structure construction method and offshore structure
JP6659430B2 (en) How to improve wavebreak structures
JPH1054019A (en) Artificial sands nourishment method of seashore making use of lattice-like frame wave dissipation construction material and construction method thereof
KR102290360B1 (en) Method for constructing of caisson with friction increased structure
Sadeghi et al. Concrete caisson breakwaters: An overview on design and construction
JP4496532B2 (en) How to reuse the pier
JP2008180038A (en) Foundation structure of offshore structure and its construction method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20200511

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20210315

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210323

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210518

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210715

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20210817

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20210915

R150 Certificate of patent or registration of utility model

Ref document number: 6946064

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250