Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP6970883B2 - Steel-concrete synthetic structural material - Google Patents
[go: Go Back, main page]

JP6970883B2 - Steel-concrete synthetic structural material - Google Patents

Steel-concrete synthetic structural material Download PDF

Info

Publication number
JP6970883B2
JP6970883B2 JP2017166450A JP2017166450A JP6970883B2 JP 6970883 B2 JP6970883 B2 JP 6970883B2 JP 2017166450 A JP2017166450 A JP 2017166450A JP 2017166450 A JP2017166450 A JP 2017166450A JP 6970883 B2 JP6970883 B2 JP 6970883B2
Authority
JP
Japan
Prior art keywords
steel
partition plate
concrete
structural material
stiffener
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2017166450A
Other languages
Japanese (ja)
Other versions
JP2019044395A (en
Inventor
友亮 木作
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IHI Corp
Original Assignee
IHI Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IHI Corp filed Critical IHI Corp
Priority to JP2017166450A priority Critical patent/JP6970883B2/en
Publication of JP2019044395A publication Critical patent/JP2019044395A/en
Application granted granted Critical
Publication of JP6970883B2 publication Critical patent/JP6970883B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Lining And Supports For Tunnels (AREA)

Description

本発明は、鋼コンクリート合成構造材に関し、特に、鋼材とコンクリート材とのずれを低減可能な鋼コンクリート合成構造材に関する。 The present invention relates to a steel-concrete synthetic structural material, and more particularly to a steel-concrete synthetic structural material capable of reducing the deviation between the steel material and the concrete material.

鋼コンクリート合成構造材は、鋼材とコンクリート材とを一体に構成したものであり、耐久性、施工性等に優れている。かかる鋼コンクリート合成構造材は、例えば、橋梁の床版、トンネルのセグメント、鋼構造物の壁材等の分野において使用されている。 The steel-concrete synthetic structural material is composed of a steel material and a concrete material integrally, and is excellent in durability, workability, and the like. Such steel-concrete synthetic structural materials are used in the fields of, for example, bridge decks, tunnel segments, wall materials for steel structures, and the like.

例えば、特許文献1〜3に記載されたように、鋼コンクリート合成床版は、底鋼板上に配置されたリブ(一般に、長手方向のリブを縦リブ、短手方向のリブを横リブと称する。)やスタッドジベルを備えた鋼層と、該鋼層上に打設されたコンクリート層と、を備えている。なお、「リブ」は床版の剛性を補う部材であることから「補剛材」と称し、「スタッドジベル」は鋼層とコンクリート層とのずれを低減する部材であることから「ずれ止め」と称することもある。 For example, as described in Patent Documents 1 to 3, the steel-concrete synthetic slab is referred to as a rib arranged on a bottom steel plate (generally, a rib in the longitudinal direction is referred to as a vertical rib and a rib in the lateral direction is referred to as a horizontal rib. ) And a steel layer with stud gibber and a concrete layer cast on the steel layer. Since the "rib" is a member that supplements the rigidity of the floor slab, it is called a "stiffener", and the "stud gibber" is a member that reduces the displacement between the steel layer and the concrete layer, so it is a "slip prevention". It may also be called.

鋼材とコンクリート材との間にずれが生じた場合には、鋼コンクリート合成構造材の機能が低下したり、劣化を早めたりすることとなることから、鋼材とコンクリート材とのずれを低減したいというニーズがある。一般に、スタッドジベル等のずれ止めを増やせば、鋼材とコンクリート材とのずれを低減することができるものの、部品点数や作業工数が増加しコスト高になってしまうという問題がある。 If there is a gap between the steel material and the concrete material, the function of the steel-concrete synthetic structural material will deteriorate or the deterioration will be accelerated, so it is desired to reduce the gap between the steel material and the concrete material. There is a need. In general, if the slip prevention of the stud gibber or the like is increased, the slip between the steel material and the concrete material can be reduced, but there is a problem that the number of parts and the work man-hours increase and the cost increases.

また、特許文献3に記載されたように、横リブに縦方向のリブを設けることにより、コンクリートの拘束力を高めて、スタッドジベルを省略することも既に提案されている。 Further, as described in Patent Document 3, it has already been proposed that the horizontal ribs are provided with ribs in the vertical direction to increase the binding force of concrete and omit the stud gibber.

特開2011−157733号公報Japanese Unexamined Patent Publication No. 2011-157733 特開2013−11107号公報Japanese Unexamined Patent Publication No. 2013-11107 特開2017−72018号公報Japanese Unexamined Patent Publication No. 2017-72018

一方、リブ等の補剛材が底鋼板に平行な平面(例えば、形鋼のフランジ部分)を有する場合には、その先端部分からコンクリート層に亀裂(ひび割れ)が生じ易いという問題がある。 On the other hand, when the stiffener such as a rib has a flat surface parallel to the bottom steel plate (for example, a flange portion of a shaped steel), there is a problem that cracks are likely to occur in the concrete layer from the tip portion thereof.

本発明はかかる問題点に鑑み創案されたものであり、コンクリート層の劣化を抑制しつつ、鋼材とコンクリート材との間のずれを低減することができる、鋼コンクリート合成構造材を提供することを目的とする。 The present invention has been devised in view of such a problem, and provides a steel-concrete synthetic structural material capable of reducing the deviation between a steel material and a concrete material while suppressing deterioration of a concrete layer. The purpose.

本発明によれば、鋼層を形成する鋼板と、該鋼板上に配置された補剛材と、を含む鋼構造材と、前記補剛材を埋め込むように打設され前記鋼構造材上にコンクリート層を形成するコンクリート材と、を備え、前記補剛材は、ウェブとフランジとを備えた形鋼により構成されるとともに、前記補剛材の長手方向に沿って配置された複数の仕切板を備え、前記複数の仕切板は、前記フランジの先端を超えた位置まで延設され前記コンクリート層に亀裂を生じさせる起点となる先端を備えた所定の横幅を有する第一仕切板と、前記フランジの先端を超えない位置まで延設され前記第一仕切板よりも小さい横幅を有する第二仕切板と、を含み、前記第一仕切板と前記第二仕切板とは交互に配置されている、ことを特徴とする鋼コンクリート合成構造材が提供される。
According to the present invention, a steel structural material containing a steel plate forming a steel layer and a stiffener arranged on the steel plate, and a steel structural material placed so as to embed the stiffener are placed on the steel structural material. A plurality of partition plates provided with a concrete material forming a concrete layer, wherein the stiffener is made of shaped steel with a web and a flange, and is arranged along the longitudinal direction of the stiffener. The plurality of partition plates are provided with a first partition plate having a predetermined width and having a tip extending to a position beyond the tip of the flange and serving as a starting point for causing a crack in the concrete layer, and the flange. A second partition plate extending to a position not exceeding the tip of the first partition plate and having a width smaller than that of the first partition plate is included, and the first partition plate and the second partition plate are alternately arranged. A steel-concrete synthetic structural material characterized by this is provided.

前記複数の仕切板は、前記ウェブ又は前記フランジの何れか一方に対して隙間を有するように配置されていてもよい。 The plurality of partition plates may be arranged so as to have a gap with respect to either the web or the flange.

前記複数の仕切板は、開口部を有していてもよい。 The plurality of partition plates may have an opening.

前記補剛材は、前記フランジに形成された開口部を有していてもよい。 The stiffener may have an opening formed in the flange.

上述した本発明に係る鋼コンクリート合成構造材によれば、補剛材に複数の仕切板を配置したことにより、鋼構造材によるコンクリート材の拘束力を向上させることができ、鋼構造材とコンクリート材との間のずれを低減することができる。また、仕切板をフランジの先端を超えた位置まで延設したことにより、コンクリート層に亀裂(ひび割れ)を生じさせる起点を部分的に移動させることができ、亀裂(ひび割れ)の進展を抑制することができ、コンクリート層の劣化を抑制することができる。 According to the steel-concrete synthetic structural material according to the present invention described above, by arranging a plurality of partition plates in the stiffener, the binding force of the concrete material by the steel structural material can be improved, and the steel structural material and concrete can be improved. It is possible to reduce the deviation from the material. In addition, by extending the partition plate to a position beyond the tip of the flange, the starting point that causes cracks (cracks) in the concrete layer can be partially moved, and the growth of cracks (cracks) can be suppressed. It is possible to suppress the deterioration of the concrete layer.

本発明の一実施形態に係る鋼コンクリート合成構造材を示す平面図である。It is a top view which shows the steel-concrete synthetic structural material which concerns on one Embodiment of this invention. 図1に示したII部を示す拡大図であり、(a)は平面図、(b)は図2(a)におけるB−B線矢視断面図、である。It is an enlarged view which shows the part II shown in FIG. 1, (a) is a plan view, (b) is the cross-sectional view taken along the line BB in FIG. 2 (a). 鋼構造材の変形例を示す平面図であり、(a)は第1変形例、(b)は第2変形例、(c)は第3変形例、を示している。It is a top view which shows the deformation example of a steel structural material, (a) is a 1st deformation example, (b) is a 2nd deformation example, (c) is a 3rd deformation example. 鋼構造材の変形例を示す断面図であり、(a)は第4変形例、(b)は第5変形例、(c)は第6変形例、(d)は第7変形例、(e)は第8変形例、(f)は第9変形例、を示している。It is sectional drawing which shows the deformation example of a steel structural material, (a) is a 4th deformation example, (b) is a 5th deformation example, (c) is a 6th deformation example, (d) is a 7th deformation example, ( e) shows an eighth modification, and (f) shows a ninth modification. 鋼構造材の変形例を示す断面図であり、(a)は第10変形例、(b)は第11変形例、(c)は第12変形例、(d)は第13変形例、(e)は第14変形例、を示している。It is sectional drawing which shows the deformation example of a steel structural material, (a) is a tenth deformation example, (b) is an eleventh deformation example, (c) is a twelfth deformation example, (d) is a thirteenth deformation example, ( e) shows the 14th modification.

以下、本発明の実施形態について、図1〜図5(e)を用いて説明する。ここで、図1は、本発明の一実施形態に係る鋼コンクリート合成構造材を示す平面図である。図2は、図1に示したII部を示す拡大図であり、(a)は平面図、(b)は図2(a)におけるB−B線矢視断面図、である。なお、説明の便宜上、図1において、コンクリート層の一部を切り欠いた状態を図示している。 Hereinafter, embodiments of the present invention will be described with reference to FIGS. 1 to 5 (e). Here, FIG. 1 is a plan view showing a steel-concrete synthetic structural material according to an embodiment of the present invention. 2A and 2B are enlarged views showing a part II shown in FIG. 1, where FIG. 2A is a plan view and FIG. 2B is a cross-sectional view taken along the line BB in FIG. 2A. For convenience of explanation, FIG. 1 illustrates a state in which a part of the concrete layer is cut out.

本発明の一実施形態に係る鋼コンクリート合成構造材1は、図1〜図2(b)に示したように、鋼層を形成する鋼板21と、該鋼板21上に配置された補剛材22と、を含む鋼構造材2と、補剛材22を埋め込むように打設され鋼構造材2上にコンクリート層を形成するコンクリート材3と、を備え、補剛材22は、ウェブ22wとフランジ22fとを備えた溝形鋼により構成されるとともに、補剛材22の長手方向に沿って配置された複数の仕切板23を備え、仕切板23は、フランジ22fの先端を超えた位置まで延設された第一仕切板23aと、フランジ22fの先端を超えない位置まで延設された第二仕切板23bと、を備えている。 As shown in FIGS. 1 to 2 (b), the steel-concrete synthetic structural material 1 according to the embodiment of the present invention includes a steel plate 21 forming a steel layer and a stiffener arranged on the steel plate 21. A steel structural material 2 including 22 and a concrete material 3 cast so as to embed the stiffening material 22 to form a concrete layer on the steel structural material 2 are provided, and the stiffening material 22 is provided with a web 22w. It is made of channel steel with a flange 22f, and is provided with a plurality of partition plates 23 arranged along the longitudinal direction of the stiffener 22. The partition plate 23 extends to a position beyond the tip of the flange 22f. It includes an extended first partition plate 23a and a second partition plate 23b extended to a position not exceeding the tip of the flange 22f.

鋼コンクリート合成構造材1は、例えば、橋梁の床版、トンネルのセグメント、鋼構造物の壁材等に使用される。鋼コンクリート合成構造材1は、例えば、図1に示したように、矩形の板材形状を有し、鋼層とコンクリート層とを上下に積層した構造を有している。鋼層は、鋼コンクリート合成構造材1の一面を形成する鋼板21(例えば、床版の底鋼板)によって構成される。補剛材22は、鋼板21の剛性を高める補強部材であるとともに、コンクリート層との一体性を高める結合部材でもある。 The steel-concrete synthetic structural material 1 is used, for example, as a deck of a bridge, a segment of a tunnel, a wall material of a steel structure, or the like. As shown in FIG. 1, for example, the steel-concrete synthetic structural material 1 has a rectangular plate shape, and has a structure in which a steel layer and a concrete layer are vertically laminated. The steel layer is composed of a steel plate 21 (for example, a bottom steel plate of a deck slab) forming one surface of the steel-concrete synthetic structural material 1. The stiffener 22 is a reinforcing member that enhances the rigidity of the steel plate 21, and is also a coupling member that enhances the integrity with the concrete layer.

鋼構造材2は、例えば、図1に示したように、補剛材22が配置されている。一般に、短手方向(図のX軸方向)に沿って配置された補剛材22を横リブと称する。本実施形態では、仕切板23は、横リブを構成する補剛材22に配置されている。なお、鋼構造材2は、鋼板21上に配置されたスタッドジベル24等のずれ止めを備えていてもよい。

Steel material 2, for example, as shown in FIG. 1, the complement Tsuyoshizai 22 is disposed. Generally, the stiffener 22 arranged along the lateral direction (X-axis direction in the figure) is referred to as a lateral rib. In the present embodiment, the partition plate 23 is arranged on the stiffener 22 constituting the lateral rib. The steel structural material 2 may be provided with a slip stopper such as a stud gibber 24 arranged on the steel plate 21.

コンクリート材3は、鋼構造材2上に打設され、例えば、図2(b)に示したように、補剛材22はコンクリート材3内に埋め込まれる。したがって、打設時にコンクリート材3を補剛材22の周囲に流し込んでコンクリート材3を固化させると、コンクリート材3が鋼構造材2に結合することとなる。なお、図2(b)において、説明の便宜上、コンクリート材3を透過させて第一仕切板23aを図示している。 The concrete material 3 is cast on the steel structural material 2, and for example, as shown in FIG. 2B, the stiffener 22 is embedded in the concrete material 3. Therefore, when the concrete material 3 is poured around the stiffener 22 to solidify the concrete material 3 at the time of casting, the concrete material 3 is bonded to the steel structural material 2. In FIG. 2B, for convenience of explanation, the first partition plate 23a is shown by allowing the concrete material 3 to pass through.

補剛材22は、例えば、図2(b)に示したように、溝形鋼によって構成される。したがって、補剛材22は、一枚のウェブ22wと一対のフランジ22fとを有している。ウェブ22wの下端に配置されたフランジ22fは鋼板21に固定されている。ウェブ22wの上端に配置されたフランジ22fはウェブ22wとともにコンクリート材3内に埋め込まれる。 The stiffener 22 is made of channel steel, for example, as shown in FIG. 2 (b). Therefore, the stiffener 22 has a single web 22w and a pair of flanges 22f. The flange 22f arranged at the lower end of the web 22w is fixed to the steel plate 21. The flange 22f arranged at the upper end of the web 22w is embedded in the concrete material 3 together with the web 22w.

複数の仕切板23は、図2(a)及び図2(b)に示したように、補剛材22のウェブ22w及びフランジ22fによって囲まれた長手方向(図のX軸方向)に延びる空間をX軸に略垂直な面を形成するように、一定の間隔で配置される。第一仕切板23a及び第二仕切板23bは、例えば、ウェブ22w及びフランジ22fの内側に沿って固定される矩形形状を有している。なお、図2(a)では、説明の便宜上、コンクリート材3を省略し、鋼構造材2のみを図示している。 As shown in FIGS. 2A and 2B, the plurality of partition plates 23 are spaces extending in the longitudinal direction (X-axis direction in the figure) surrounded by the web 22w and the flange 22f of the stiffener 22. Are arranged at regular intervals so as to form a plane substantially perpendicular to the X-axis. The first partition plate 23a and the second partition plate 23b have, for example, a rectangular shape fixed along the inside of the web 22w and the flange 22f. In FIG. 2A, for convenience of explanation, the concrete material 3 is omitted and only the steel structural material 2 is shown.

また、図2(a)に示したように、第一仕切板23aは、フランジ22fの幅よりも大きい横幅W1を有し、第二仕切板23bはフランジ22fの幅に略等しい横幅W2を有している。したがって、図示したように、第一仕切板23aは、フランジ22fの先端から超えた位置まで延設され、第二仕切板23bはフランジ22fの先端を超えないように延設される。
なお、第二仕切板23bの横幅W2は、フランジ22fの幅よりも小さく設定されていてもよい。また、第一仕切板23aの突出量は、補剛材22の大きさや第一仕切板23aの板厚等の条件によって任意に設計される。また、配置される位置によって第一仕切板23aの突出量を異なる大きさに設計してもよい。
Further, as shown in FIG. 2A, the first partition plate 23a has a width W1 larger than the width of the flange 22f, and the second partition plate 23b has a width W2 substantially equal to the width of the flange 22f. doing. Therefore, as shown in the figure, the first partition plate 23a is extended to a position beyond the tip of the flange 22f, and the second partition plate 23b is extended so as not to exceed the tip of the flange 22f.
The width W2 of the second partition plate 23b may be set smaller than the width of the flange 22f. Further, the protruding amount of the first partition plate 23a is arbitrarily designed according to conditions such as the size of the stiffener 22 and the plate thickness of the first partition plate 23a. Further, the protrusion amount of the first partition plate 23a may be designed to have a different size depending on the position where the first partition plate 23a is arranged.

本実施形態では、図1及び図2(a)に示したように、第一仕切板23aと第二仕切板23bとは交互に配置されている。ただし、かかる配置に限定されるものではなく、例えば、一対の第一仕切板23aの間に複数枚の第二仕切板23bを配置するようにしてもよいし、一対の第二仕切板23bの間に複数枚の第一仕切板23aを配置するようにしてもよい。 In the present embodiment, as shown in FIGS. 1 and 2A, the first partition plate 23a and the second partition plate 23b are arranged alternately. However, the arrangement is not limited to this, and for example, a plurality of second partition plates 23b may be arranged between the pair of first partition plates 23a, or the pair of second partition plates 23b may be arranged. A plurality of first partition plates 23a may be arranged between them.

このように、補剛材22に複数の仕切板23(第一仕切板23a及び第二仕切板23b)を配置したことにより、鋼構造材2によるコンクリート材3の拘束力を向上させることができ、鋼構造材2とコンクリート材3との間のずれを低減することができる。また、補剛材22に仕切板23を配置することによって、スタッドジベル24等のずれ止めを省略することもでき、鋼コンクリート合成構造材1のコストダウンを図ることもできる。 By arranging the plurality of partition plates 23 (first partition plate 23a and second partition plate 23b) on the stiffener 22 in this way, the binding force of the concrete material 3 by the steel structural material 2 can be improved. , The deviation between the steel structural material 2 and the concrete material 3 can be reduced. Further, by arranging the partition plate 23 on the stiffener 22, it is possible to omit the slip prevention of the stud gibber 24 and the like, and it is possible to reduce the cost of the steel-concrete synthetic structural material 1.

ところで、補剛材22をコンクリート層に埋設した場合、フランジ22fの先端からコンクリート層に亀裂(ひび割れ)が生じやすい。すなわち、補剛材22を有する鋼コンクリート合成構造材1は、フランジ22fの先端P1を起点として、図2(b)に示した線分L1に沿って亀裂(ひび割れ)が生じやすい。また、先端P1から生じた亀裂(ひび割れ)は、図2(a)のX軸方向に進展することとなる。 By the way, when the stiffener 22 is embedded in the concrete layer, cracks are likely to occur in the concrete layer from the tip of the flange 22f. That is, the steel-concrete synthetic structural material 1 having the stiffener 22 is likely to have cracks (cracks) along the line segment L1 shown in FIG. 2B, starting from the tip P1 of the flange 22f. Further, the cracks (cracks) generated from the tip P1 will propagate in the X-axis direction of FIG. 2A.

本実施形態では、第一仕切板23aをフランジ22fの先端P1を超えた位置まで延設したことにより、第一仕切板23aを配置した部分におけるコンクリート層に亀裂(ひび割れ)を生じさせる起点を第一仕切板23aの先端P2に移動させることができる。したがって、先端P1から生じた亀裂(ひび割れ)が、図のX軸方向に進展しようとした場合であっても、途中で起点の位置がずれていることによって、亀裂(ひび割れ)の進展を抑制することができ、コンクリート層の劣化を抑制することができる。 In the present embodiment, by extending the first partition plate 23a to a position beyond the tip P1 of the flange 22f, the starting point at which the concrete layer in the portion where the first partition plate 23a is arranged is cracked is set as the starting point. It can be moved to the tip P2 of the partition plate 23a. Therefore, even if the crack (crack) generated from the tip P1 tries to grow in the X-axis direction in the figure, the position of the starting point is displaced in the middle, so that the crack (crack) growth is suppressed. It is possible to suppress the deterioration of the concrete layer.

ここで、鋼構造材2の変形例について、図3(a)〜図3(c)を参照しつつ説明する。図3は、鋼構造材の変形例を示す平面図であり、(a)は第1変形例、(b)は第2変形例、(c)は第3変形例、を示している。なお、各図において、コンクリート材3を省略し、鋼構造材2のみを図示している。 Here, a modified example of the steel structural material 2 will be described with reference to FIGS. 3 (a) to 3 (c). 3A and 3B are plan views showing a modified example of a steel structural material, where FIG. 3A shows a first modified example, FIG. 3B shows a second modified example, and FIG. 3C shows a third modified example. In each figure, the concrete material 3 is omitted and only the steel structural material 2 is shown.

図3(a)に示した第1変形例は、補剛材22のフランジ22fに開口部22hを形成したものである。補剛材22に第一仕切板23a及び第二仕切板23bを配置した場合、これらの仕切板23と補剛材22とによって囲まれた空間が形成されることから、開口部22hを形成することによって、コンクリート打設時にコンクリートの流動性を向上させることができる。また、補剛材22の上方のフランジ22fに開口部22hを形成することによって、空気抜き用の孔として利用することもでき、コンクリート層の欠陥を低減することもできる。 In the first modification shown in FIG. 3A, the opening 22h is formed in the flange 22f of the stiffener 22. When the first partition plate 23a and the second partition plate 23b are arranged on the stiffener 22, a space surrounded by these partition plates 23 and the stiffener 22 is formed, so that the opening 22h is formed. Thereby, the fluidity of the concrete can be improved at the time of placing the concrete. Further, by forming the opening 22h in the flange 22f above the stiffener 22, it can be used as a hole for venting air, and defects in the concrete layer can be reduced.

なお、図3(a)では、開口部22hを第二仕切板23bの根元部分に形成しているが、かかる位置に限定されるものではない。例えば、開口部22hは、第一仕切板23aの根元部分に形成されていてもよいし、第一仕切板23aと第二仕切板23bとの中間部に形成されていてもよい。 In FIG. 3A, the opening 22h is formed at the root of the second partition plate 23b, but the position is not limited to this. For example, the opening 22h may be formed at the root portion of the first partition plate 23a, or may be formed at an intermediate portion between the first partition plate 23a and the second partition plate 23b.

図3(b)に示した第2変形例は、仕切板23の全てを第一仕切板23aで構成したものである。このように、全ての仕切板23をフランジ22fの先端を超えた位置まで延設した第一仕切板23aに構成した場合であっても、上述した実施形態と同様の効果を得ることができる。 In the second modification shown in FIG. 3B, all of the partition plates 23 are composed of the first partition plate 23a. As described above, even when all the partition plates 23 are configured on the first partition plate 23a extending to a position beyond the tip of the flange 22f, the same effect as that of the above-described embodiment can be obtained.

図3(c)に示した第3変形例は、補剛材22のフランジ22fが存在しない部分のウェブ22wに第三仕切板23cを配置したものである。図示した変形例では、図2(a)に示した第二仕切板23bの裏側に相当する位置に第三仕切板23cを配置し、第二仕切板23bを省略している。このように、補剛材22のウェブ22wに背面に第三仕切板23cを配置した場合であっても、鋼構造材2によるコンクリート材3の拘束力を向上させることができる。また、第二仕切板23bを残したまま第三仕切板23cを配置するようにしてもよいし、第一仕切板23aの裏側に第三仕切板23cを配置するようにしてもよい。 In the third modification shown in FIG. 3C, the third partition plate 23c is arranged on the web 22w of the portion where the flange 22f of the stiffener 22 does not exist. In the illustrated modification, the third partition plate 23c is arranged at a position corresponding to the back side of the second partition plate 23b shown in FIG. 2A, and the second partition plate 23b is omitted. As described above, even when the third partition plate 23c is arranged on the back surface of the web 22w of the stiffener 22, the binding force of the concrete material 3 by the steel structural material 2 can be improved. Further, the third partition plate 23c may be arranged while leaving the second partition plate 23b, or the third partition plate 23c may be arranged on the back side of the first partition plate 23a.

次に、鋼構造材2の変形例について、図4(a)〜図4(f)を参照しつつ説明する。図4は、鋼構造材の変形例を示す断面図であり、(a)は第4変形例、(b)は第5変形例、(c)は第6変形例、(d)は第7変形例、(e)は第8変形例、(f)は第9変形例、を示している。なお、各図において、コンクリート材3を省略し、鋼構造材2のみを図示している。 Next, a modification of the steel structural material 2 will be described with reference to FIGS. 4 (a) to 4 (f). 4A and 4B are cross-sectional views showing a modified example of a steel structural material, where FIG. 4A is a fourth modified example, (b) is a fifth modified example, (c) is a sixth modified example, and (d) is a seventh modified example. A modified example, (e) shows an eighth modified example, and (f) shows a ninth modified example. In each figure, the concrete material 3 is omitted and only the steel structural material 2 is shown.

図4(a)に示した第4変形例は、仕切板23に開口部23hを形成したものである。開口部23hは、第一仕切板23a及び第二仕切板23bの両方に形成されていてもよいし、何れか一方にのみ形成されていてもよい。かかる開口部23hを形成することにより、仕切板23と補剛材22とによって囲まれた空間におけるコンクリート打設時のコンクリートの流動性を向上させることができる。 In the fourth modification shown in FIG. 4A, the opening 23h is formed in the partition plate 23. The opening 23h may be formed on both the first partition plate 23a and the second partition plate 23b, or may be formed on only one of them. By forming such an opening 23h, it is possible to improve the fluidity of concrete at the time of placing concrete in the space surrounded by the partition plate 23 and the stiffener 22.

図4(b)に示した第5変形例は、仕切板23と上方のフランジ22fとの間に隙間23sを形成したものである。隙間23sは、第一仕切板23a及び第二仕切板23bの両方に形成されていてもよいし、何れか一方にのみ形成されていてもよい。かかる隙間23sを形成することにより、仕切板23と補剛材22とによって囲まれた空間におけるコンクリート打設時のコンクリートの流動性を向上させることができる。 In the fifth modification shown in FIG. 4B, a gap 23s is formed between the partition plate 23 and the upper flange 22f. The gap 23s may be formed in both the first partition plate 23a and the second partition plate 23b, or may be formed in only one of them. By forming such a gap 23s, it is possible to improve the fluidity of concrete at the time of placing concrete in the space surrounded by the partition plate 23 and the stiffener 22.

図4(c)に示した第6変形例は、仕切板23と下方のフランジ22fとの間に隙間23tを形成したものである。隙間23tは、第一仕切板23a及び第二仕切板23bの両方に形成されていてもよいし、何れか一方にのみ形成されていてもよい。かかる隙間23tを形成することにより、仕切板23と補剛材22とによって囲まれた空間におけるコンクリート打設時のコンクリートの流動性を向上させることができる。また、図示したように、第一仕切板23aの高さと第二仕切板23bの高さとを異なる大きさに形成してもよい。 In the sixth modification shown in FIG. 4C, a gap 23t is formed between the partition plate 23 and the lower flange 22f. The gap 23t may be formed in both the first partition plate 23a and the second partition plate 23b, or may be formed in only one of them. By forming such a gap 23t, it is possible to improve the fluidity of concrete at the time of placing concrete in the space surrounded by the partition plate 23 and the stiffener 22. Further, as shown in the figure, the height of the first partition plate 23a and the height of the second partition plate 23b may be formed to be different sizes.

図4(d)に示した第7変形例は、仕切板23とウェブ22wとの間に隙間23uを形成したものである。隙間23uは、第一仕切板23a及び第二仕切板23bの両方に形成されていてもよいし、何れか一方にのみ形成されていてもよい。かかる隙間23uを形成することにより、仕切板23と補剛材22とによって囲まれた空間におけるコンクリート打設時のコンクリートの流動性を向上させることができる。 In the seventh modification shown in FIG. 4D, a gap 23u is formed between the partition plate 23 and the web 22w. The gap 23u may be formed in both the first partition plate 23a and the second partition plate 23b, or may be formed in only one of them. By forming such a gap 23u, it is possible to improve the fluidity of concrete at the time of placing concrete in the space surrounded by the partition plate 23 and the stiffener 22.

図4(e)に示した第8変形例は、第一仕切板23aを三角形状に形成したものである。三角形状の第一仕切板23aは、例えば、上方のフランジ22fに固定される。かかる構成により、第一仕切板23aの下方に隙間23tを形成し、第二仕切板23bの上方に隙間23sを形成することができる。 In the eighth modification shown in FIG. 4 (e), the first partition plate 23a is formed in a triangular shape. The triangular first partition plate 23a is fixed to, for example, the upper flange 22f. With such a configuration, the gap 23t can be formed below the first partition plate 23a, and the gap 23s can be formed above the second partition plate 23b.

図4(f)に示した第9変形例は、第一仕切板23a及び第二仕切板23bを三角形状に形成するとともに、第一仕切板23aを上方のフランジ22fに固定し、第二仕切板23bを下方のフランジ22fに配置したものである。かかる構成によっても、鋼構造材2におけるコンクリート層の拘束力を保持しつつ、コンクリート流動性を向上させることができる。 In the ninth modification shown in FIG. 4 (f), the first partition plate 23a and the second partition plate 23b are formed in a triangular shape, and the first partition plate 23a is fixed to the upper flange 22f to form the second partition. The plate 23b is arranged on the lower flange 22f. Even with such a configuration, it is possible to improve the concrete fluidity while maintaining the binding force of the concrete layer in the steel structural material 2.

次に、鋼構造材2の変形例について、図5(a)〜図5(e)を参照しつつ説明する。図5は、鋼構造材の変形例を示す断面図であり、(a)は第10変形例、(b)は第11変形例、(c)は第12変形例、(d)は第13変形例、(e)は第14変形例、を示している。なお、各図において、コンクリート材3を省略し、鋼構造材2のみを図示している。 Next, a modification of the steel structural material 2 will be described with reference to FIGS. 5 (a) to 5 (e). 5A and 5B are cross-sectional views showing a modified example of a steel structural material, where FIG. 5A is a 10th modified example, (b) is an 11th modified example, (c) is a 12th modified example, and (d) is a 13th modified example. A modified example, (e) shows a 14th modified example. In each figure, the concrete material 3 is omitted and only the steel structural material 2 is shown.

図5(a)に示した第10変形例は、補剛材22をL形鋼(山形鋼)によって構成したものである。補剛材22をL形鋼によって構成した場合には、フランジ22fを上方に配置してウェブ22wの先端を鋼板21に固定する。そして、鋼板21とL形鋼とにより囲まれた空間に仕切板23(第一仕切板23a及び第二仕切板23b)が配置される。なお、仕切板23の配置は、図示した構成に限定されるものではなく、上述した変形例に示したものを適宜適用することができる。 In the tenth modification shown in FIG. 5A, the stiffener 22 is made of L-shaped steel (angle steel). When the stiffener 22 is made of L-shaped steel, the flange 22f is arranged upward and the tip of the web 22w is fixed to the steel plate 21. Then, the partition plate 23 (first partition plate 23a and second partition plate 23b) is arranged in the space surrounded by the steel plate 21 and the L-shaped steel. The arrangement of the partition plate 23 is not limited to the configuration shown in the figure, and the one shown in the above-described modification can be appropriately applied.

図5(b)及び図5(c)に示した変形例は、補剛材22をH形鋼によって構成したものである。補剛材22をH形鋼によって構成した場合には、上述した実施形態と同様に、下方のフランジ22fを鋼板21に固定する。そして、ウェブ22wとフランジ22fとにより囲まれた空間に仕切板23(第一仕切板23a及び第二仕切板23b)が配置される。なお、仕切板23の配置は、図示した構成に限定されるものではなく、上述した変形例に示したものを適宜適用することができる。 In the modified examples shown in FIGS. 5 (b) and 5 (c), the stiffener 22 is made of H-shaped steel. When the stiffener 22 is made of H-shaped steel, the lower flange 22f is fixed to the steel plate 21 in the same manner as in the above-described embodiment. Then, the partition plate 23 (first partition plate 23a and second partition plate 23b) is arranged in the space surrounded by the web 22w and the flange 22f. The arrangement of the partition plate 23 is not limited to the configuration shown in the figure, and the one shown in the above-described modification can be appropriately applied.

また、補剛材22をH形鋼によって構成した場合、図5(b)に示した第11変形例のように、片側にのみ仕切板23(第一仕切板23a及び第二仕切板23b)を配置するようにしてもよいし、図5(c)に示した第12変形例のように、両側に仕切板23(第一仕切板23a及び第二仕切板23b)を配置するようにしてもよい。なお、補剛材22をI形鋼で構成した場合も同様である。 Further, when the stiffener 22 is made of H-shaped steel, the partition plate 23 (first partition plate 23a and second partition plate 23b) is formed only on one side as in the eleventh modification shown in FIG. 5 (b). Or the partition plates 23 (first partition plate 23a and second partition plate 23b) may be arranged on both sides as in the twelfth modification shown in FIG. 5 (c). May be good. The same applies when the stiffener 22 is made of I-shaped steel.

図5(d)及び図5(e)に示した変形例は、補剛材22をT形鋼によって構成したものである。補剛材22をT形鋼によって構成した場合には、フランジ22fを上方に配置してウェブ22wの先端を鋼板21に固定する。そして、鋼板21とT形鋼とにより囲まれた空間に仕切板23(第一仕切板23a及び第二仕切板23b)が配置される。なお、仕切板23の配置は、図示した構成に限定されるものではなく、上述した変形例に示したものを適宜適用することができる。 In the modified examples shown in FIGS. 5 (d) and 5 (e), the stiffener 22 is made of T-shaped steel. When the stiffener 22 is made of T-shaped steel, the flange 22f is arranged upward and the tip of the web 22w is fixed to the steel plate 21. Then, the partition plate 23 (first partition plate 23a and second partition plate 23b) is arranged in the space surrounded by the steel plate 21 and the T-shaped steel. The arrangement of the partition plate 23 is not limited to the configuration shown in the figure, and the one shown in the above-described modification can be appropriately applied.

また、補剛材22をT形鋼によって構成した場合、図5(d)に示した第13変形例のように、片側にのみ仕切板23(第一仕切板23a及び第二仕切板23b)を配置するようにしてもよいし、図5(e)に示した第14変形例のように、両側に仕切板23(第一仕切板23a及び第二仕切板23b)を配置するようにしてもよい。 Further, when the stiffener 22 is made of T-shaped steel, the partition plate 23 (first partition plate 23a and second partition plate 23b) is formed only on one side as in the thirteenth deformation example shown in FIG. 5 (d). Or the partition plates 23 (first partition plate 23a and second partition plate 23b) may be arranged on both sides as in the 14th modification shown in FIG. 5 (e). May be good.

本発明は、上述した実施形態に限定されず、本発明の趣旨を逸脱しない範囲で種々変更が可能であることは勿論である。 It goes without saying that the present invention is not limited to the above-described embodiment, and various modifications can be made without departing from the spirit of the present invention.

1 鋼コンクリート合成構造材
2 鋼構造材
3 コンクリート材
21 鋼板
22 補剛材
22f フランジ
22h 開口部
22w ウェブ
23 仕切板
23a 第一仕切板
23b 第二仕切板
23c 第三仕切板
23h 開口部
23s,23t,23u 隙間
24 スタッドジベル

1 Steel-concrete synthetic structural material 2 Steel structural material 3 Concrete material 21 Steel plate 22 Stiffening material 22f Flange 22h Opening 22w Web 23 Partition plate 23a First partition plate 23b Second partition plate 23c Third partition plate 23h Openings 23s, 23t , 23u Gap 24 Stud Jibel

Claims (4)

鋼層を形成する鋼板と、該鋼板上に配置された補剛材と、を含む鋼構造材と、
前記補剛材を埋め込むように打設され前記鋼構造材上にコンクリート層を形成するコンクリート材と、を備え、
前記補剛材は、ウェブとフランジとを備えた形鋼により構成されるとともに、前記補剛材の長手方向に沿って配置された複数の仕切板を備え、
前記複数の仕切板は、前記フランジの先端を超えた位置まで延設され前記コンクリート層に亀裂を生じさせる起点となる先端を備えた所定の横幅を有する第一仕切板と、前記フランジの先端を超えない位置まで延設され前記第一仕切板よりも小さい横幅を有する第二仕切板と、を含み、
前記第一仕切板と前記第二仕切板とは交互に配置されている、
ことを特徴とする鋼コンクリート合成構造材。
A steel structural material containing a steel plate forming a steel layer and a stiffener arranged on the steel plate,
A concrete material that is cast so as to embed the stiffener and forms a concrete layer on the steel structural material is provided.
The stiffener is composed of a shaped steel with a web and a flange, and also includes a plurality of partition plates arranged along the longitudinal direction of the stiffener.
The plurality of partition plates extend to a position beyond the tip of the flange, and have a first partition plate having a predetermined width and a tip that serves as a starting point for causing a crack in the concrete layer, and the tip of the flange. Includes a second partition plate that extends to a position that does not exceed and has a width smaller than that of the first partition plate.
The first partition plate and the second partition plate are alternately arranged.
A steel-concrete synthetic structural material characterized by this.
前記複数の仕切板は、前記ウェブ又は前記フランジに対して隙間を有するように配置されている、請求項1に記載の鋼コンクリート合成構造材。 The steel-concrete synthetic structural material according to claim 1, wherein the plurality of partition plates are arranged so as to have a gap with respect to the web or the flange. 前記複数の仕切板は、開口部を有する、請求項1に記載の鋼コンクリート合成構造材。 The steel-concrete synthetic structural material according to claim 1, wherein the plurality of partition plates have openings. 前記補剛材は、前記フランジに形成された開口部を有する、請求項1に記載の鋼コンクリート合成構造材。
The steel-concrete synthetic structural material according to claim 1, wherein the stiffener has an opening formed in the flange.
JP2017166450A 2017-08-31 2017-08-31 Steel-concrete synthetic structural material Active JP6970883B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017166450A JP6970883B2 (en) 2017-08-31 2017-08-31 Steel-concrete synthetic structural material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017166450A JP6970883B2 (en) 2017-08-31 2017-08-31 Steel-concrete synthetic structural material

Publications (2)

Publication Number Publication Date
JP2019044395A JP2019044395A (en) 2019-03-22
JP6970883B2 true JP6970883B2 (en) 2021-11-24

Family

ID=65813834

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017166450A Active JP6970883B2 (en) 2017-08-31 2017-08-31 Steel-concrete synthetic structural material

Country Status (1)

Country Link
JP (1) JP6970883B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB202018986D0 (en) 2020-12-02 2021-01-13 Modular Walling Systems Ltd Reinforced modular structures

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5111864Y2 (en) * 1971-07-27 1976-03-31
JPH09235813A (en) * 1996-03-01 1997-09-09 Nakayama Steel Works Ltd Deck plate
JP3865915B2 (en) * 1997-12-29 2007-01-10 Jfeエンジニアリング株式会社 Steel bottom formwork and floor slab
JP3866998B2 (en) * 2002-03-26 2007-01-10 株式会社ダイクレ Steel / concrete composite floor slab
JP5047060B2 (en) * 2008-05-28 2012-10-10 株式会社Ihiインフラシステム Synthetic floor slab and its reinforcement method
JP5635272B2 (en) * 2010-01-14 2014-12-03 新日鉄住金エンジニアリング株式会社 Integration method of bottom steel plate and concrete in composite floor slab.
JP5596876B1 (en) * 2014-02-07 2014-09-24 株式会社Ihiインフラシステム Precast floor slab manufacturing apparatus and precast floor slab manufacturing method

Also Published As

Publication number Publication date
JP2019044395A (en) 2019-03-22

Similar Documents

Publication Publication Date Title
WO2016002851A1 (en) Construction block and wall face structure using same
JP6970883B2 (en) Steel-concrete synthetic structural material
KR101680649B1 (en) Steel box girder using folded plate
KR101228642B1 (en) HolloW core slab having difference of level joint for enhanced unified body
JP6449805B2 (en) Synthetic deck deck plate
JP6368510B2 (en) PC box girder bridge and the method of constructing lower floor board concrete below the steel flange connected to the corrugated steel plate
US775927A (en) Self-centering plate.
JP6625146B2 (en) Concrete member connection method
JP6041144B2 (en) Top floor joint structure
CN110241726A (en) A Prefabricated Reinforced Concrete Composite Bridge Deck and Wet Joint Structure
JP7072773B2 (en) Lateral stiffening structure of steel beam
JP2017066714A (en) Steel beam support reinforcement structure of slab
JP7206060B2 (en) Composite panel construction
JP5300644B2 (en) RC slab construction method for building structures using end-clad flat deck plates
JP2018150749A (en) Deck plate
JP4146314B2 (en) Synthetic floor slab
JP7092488B2 (en) Reinforcing bar members and reinforced concrete structures using reinforcing bar members
JP6437625B1 (en) Deck plate and method for manufacturing deck plate
JP6878128B2 (en) Joining structure between wall balustrades
JP6449080B2 (en) Building
KR20160063682A (en) Prestressed Steel-Concrete Composite Girder with Upper Hollow Portion, and Continuous Structure of such Prestressed Steel-Concrete Composite Girders
JP5861886B2 (en) Wall-type mixed beam structure
JP6969903B2 (en) Synthetic deck
JP7560380B2 (en) Deck plate and deck construction method
JP5676385B2 (en) Concrete filling method and steel concrete composite structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20200803

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20210726

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210810

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210914

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20210930

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20211013

R151 Written notification of patent or utility model registration

Ref document number: 6970883

Country of ref document: JP