Connection structure between steel structure and precast concrete member, structural wall having the connection structure, and connection method between steel structure and precast concrete member Download PDF

Info

Publication number
JP6971874B2
JP6971874B2 JP2018019776A JP2018019776A JP6971874B2 JP 6971874 B2 JP6971874 B2 JP 6971874B2 JP 2018019776 A JP2018019776 A JP 2018019776A JP 2018019776 A JP2018019776 A JP 2018019776A JP 6971874 B2 JP6971874 B2 JP 6971874B2
Authority
JP
Japan
Prior art keywords
precast concrete
concrete member
steel structure
structural wall
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2018019776A
Other languages
Japanese (ja)
Other versions
JP2019137991A (en
Inventor
郁夫 中谷
真樹 松野
Original Assignee
ジオスター株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ジオスター株式会社 filed Critical ジオスター株式会社
Priority to JP2018019776A priority Critical patent/JP6971874B2/en
Publication of JP2019137991A publication Critical patent/JP2019137991A/en
Application granted granted Critical
Publication of JP6971874B2 publication Critical patent/JP6971874B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Description

本発明は、一部が地上に突出した状態で地中に埋設された鋼構造物を用いた構造壁(以下、“鋼構造壁”)と、当該鋼構造壁の上部に設置されるプレキャストコンクリート部材との接続構造に関する。 In the present invention, a structural wall using a steel structure buried in the ground with a part protruding above the ground (hereinafter referred to as “steel structural wall”) and precast concrete installed on the upper part of the steel structural wall. Regarding the connection structure with the member.

地中に埋設される鋼構造壁としては主に鋼矢板や鋼管矢板が用いられる。特に鋼矢板に関しては、従来のU形鋼矢板に対して施工性、構造信頼性、経済性に優れるハット形鋼矢板の開発がなされ、現在広く利用されている。また、ハット形鋼矢板の止水性と鋼管杭の優れた剛性を組み合わせたタイプの鋼構造壁も開発されている。このような鋼構造壁は、地中に埋設されて利用されるのみならず、特許文献1に開示されているように上部を地上に突出させた状態で利用されることもある。 Steel sheet piles and steel pipe sheet piles are mainly used as steel structural walls buried in the ground. In particular, with regard to steel sheet piles, hat-shaped steel sheet piles, which are superior in workability, structural reliability, and economy to conventional U-shaped steel sheet piles, have been developed and are now widely used. In addition, a type of steel structural wall that combines the water stoppage of a hat-shaped steel sheet pile and the excellent rigidity of a steel pipe pile has also been developed. Such a steel structure wall is not only buried in the ground and used, but also may be used in a state where the upper part is projected above the ground as disclosed in Patent Document 1.

特開2013−049981号公報Japanese Unexamined Patent Publication No. 2013-049981

しかしながら、特許文献1に開示された構造壁は素材が鋼材であるために、時間と共に腐食が進み、景観が損なわれてしまう。特に、港湾や海洋等で特許文献1の構造壁を使用する際には、腐食が進みやすい海水に接する環境下での使用となることから、鋼材の腐食防止や構造壁としての景観保全のために施工時においては樹脂などで鋼材の表面を被覆する防食処理が必要となる。鋼構造壁を構築すること自体は効率的な作業が可能であって工期面においても優れているが、上記のような防食処理を行うことは工期面におけるデメリットとなる。 However, since the structural wall disclosed in Patent Document 1 is made of steel, corrosion progresses over time and the landscape is impaired. In particular, when the structural wall of Patent Document 1 is used in a harbor, the ocean, etc., it is used in an environment in contact with seawater where corrosion easily progresses. At the time of construction, anticorrosion treatment is required to cover the surface of the steel material with resin or the like. Although the construction of the steel structural wall itself enables efficient work and is excellent in terms of construction period, the above-mentioned anticorrosion treatment is a disadvantage in terms of construction period.

そこで、地中部に鋼構造物を設置し、地上部においてはその鋼構造物上に防食処理の不要なプレキャストコンクリート部材を設置するといったハイブリッド構造を用いて構造壁を構築することも考えられる。この様な構造を採用する場合には、地中部の鋼構造物と地上部のプレキャストコンクリート部材との接続方法が重要となるが、プレキャストコンクリート部材の鉄筋を鋼矢板等の鋼構造物に溶接することは工事効率などの面で問題がある。 Therefore, it is conceivable to construct a structural wall using a hybrid structure in which a steel structure is installed in the underground part and a precast concrete member that does not require anticorrosion treatment is installed on the steel structure in the above-ground part. When adopting such a structure, the connection method between the steel structure in the underground and the precast concrete member in the ground is important, but the reinforcing bars of the precast concrete member are welded to the steel structure such as steel sheet pile. There is a problem in terms of construction efficiency.

本発明は、上記事情に鑑みてなされたものであり、地中部の鋼構造物と、その上に設置するプレキャストコンクリート部材の強固で工事効率に優れた接続構造とその接続方法、および当該接続構造を利用した構造壁を提供することを目的とする。 The present invention has been made in view of the above circumstances, and is a strong and highly efficient connection structure of a steel structure in the ground and a precast concrete member installed on the structure, a connection method thereof, and the connection structure. The purpose is to provide a structural wall utilizing.

上記課題を解決する本発明は、 鋼構造物とプレキャストコンクリート部材とが接続された接続構造であって、前記鋼構造物は、一部が地上に突出した状態で地中に埋設され、前記プレキャストコンクリート部材は、下端部に開口部を備え、前記鋼構造物の地上に突出した部分である突出部が前記プレキャストコンクリート部材の前記開口部に挿入されるようにして、該プレキャストコンクリート部材が前記鋼構造物の前記突出部に跨るように設置され、前記プレキャストコンクリート部材と前記鋼構造物の両者を貫通するように棒状部材が挿入され、前記プレキャストコンクリート部材内部の主鉄筋より外方に、複数の前記棒状部材が貫通する拘束部材が設けられ、前記プレキャストコンクリート部材の前記開口部内の空隙がモルタルまたはコンクリートで充填されていることを特徴としている。 The present invention for solving the above problems is a connection structure in which a steel structure and a precast concrete member are connected, and the steel structure is buried in the ground with a part of the steel structure protruding above the ground, and the precast is used. The concrete member is provided with an opening at the lower end so that the protruding portion, which is a portion of the steel structure protruding above the ground, is inserted into the opening of the precast concrete member, and the precast concrete member is made of the steel. It is installed so as to straddle the protruding portion of the structure, and a rod-shaped member is inserted so as to penetrate both the precast concrete member and the steel structure, and a plurality of rod-shaped members are inserted outward from the main reinforcing bar inside the precast concrete member. A restraining member through which the rod-shaped member penetrates is provided, and the voids in the opening of the precast concrete member are filled with mortar or concrete.

また、別の観点による本発明は、上記の接続構造を有する構造壁であって、複数の前記プレキャストコンクリート部材が構造壁の延長方向に沿って配列され、該プレキャストコンクリート部材が前記鋼構造物の前記突出部に跨るように設置されていることを特徴としている。 Further, the present invention from another viewpoint is a structural wall having the above-mentioned connection structure, in which a plurality of the precast concrete members are arranged along an extension direction of the structural wall, and the precast concrete members are the steel structure. It is characterized in that it is installed so as to straddle the protruding portion.

さらに別の観点による本発明は、鋼構造物とプレキャストコンクリート部材を接続する接続方法であって、一部が地上に突出した状態で地中に埋設された前記鋼構造物の地上に突出している部分が、前記プレキャストコンクリート部材の一端部に設けられた開口部に挿入されるようにして該プレキャストコンクリート部材を前記鋼構造物の地上に突出している部分に跨るように設置する、第1工程と、棒状部材を用い、前記プレキャストコンクリート部材内部の主鉄筋より外方に設けられた、複数の前記棒状部材を連結する拘束部材と、該プレキャストコンクリート部材と、前記鋼構造物とを貫通するように前記棒状部材を挿入する、第2工程と、前記プレキャストコンクリート部材の前記開口部内の空隙をモルタルまたはコンクリートで充填して凝固させる、第3工程とを有することを特徴としている。 From yet another point of view, the present invention is a connection method for connecting a steel structure and a precast concrete member, and the steel structure is partially projected above the ground and protrudes above the ground. The first step of installing the precast concrete member so as to be inserted into an opening provided at one end of the precast concrete member so as to straddle the portion of the steel structure protruding above the ground. , A restraining member for connecting a plurality of the rod-shaped members provided outside the main reinforcing bar inside the precast concrete member, the precast concrete member, and the steel structure so as to penetrate the rod-shaped member. It is characterized by having a second step of inserting the rod-shaped member and a third step of filling the voids in the opening of the precast concrete member with mortar or concrete and solidifying the concrete.

本発明によれば、地中部の鋼構造物と地上部のプレキャストコンクリート部材とを強固に、かつ優れた作業効率で接続することができる。 According to the present invention, the steel structure in the underground portion and the precast concrete member in the above-ground portion can be firmly connected with excellent work efficiency.

本発明の第1の実施形態に係る構造壁の概略構成を示す正面図である。It is a front view which shows the schematic structure of the structural wall which concerns on 1st Embodiment of this invention. 図1中のA−A断面図である。FIG. 3 is a sectional view taken along the line AA in FIG. 本発明の第1の実施形態に係る鋼構造物とプレキャストコンクリート部材の接続部を拡大した図である。It is an enlarged view of the connection part of the steel structure and the precast concrete member which concerns on 1st Embodiment of this invention. 本発明の第1の実施形態に係る構造壁の部分断面図であり、鋼構造物およびプレキャストコンクリート部材の貫通穴について説明するための図である。It is a partial cross-sectional view of the structural wall which concerns on 1st Embodiment of this invention, and is the figure for demonstrating the through hole of a steel structure and a precast concrete member. 図2中のB−B断面図である。FIG. 2 is a cross-sectional view taken along the line BB in FIG. 図2中のC−C断面図である。FIG. 2 is a sectional view taken along the line CC in FIG. 本発明の第2の実施形態に係る鋼構造物とプレキャストコンクリート部材の接続部を拡大した図である。It is an enlarged view of the connection part of the steel structure and the precast concrete member which concerns on the 2nd Embodiment of this invention. 本発明の第2の実施形態に係る構造壁の概略構成を示す図であり、図2中のC−C断面に相当する図である。It is a figure which shows the schematic structure of the structural wall which concerns on the 2nd Embodiment of this invention, and is the figure which corresponds to the CC cross section in FIG. 本発明の第3の実施形態に係る構造壁の概略構成を示す図であり、図2中のB−B断面に相当する図である。It is a figure which shows the schematic structure of the structural wall which concerns on 3rd Embodiment of this invention, and is the figure which corresponds to the BB cross section in FIG. 本発明の第3の実施形態に係る構造壁の概略構成を示す図であり、図2中のC−C断面に相当する図である。It is a figure which shows the schematic structure of the structural wall which concerns on 3rd Embodiment of this invention, and is the figure which corresponds to the CC cross section in FIG. 本発明の第4の実施形態に係る構造壁の概略構成を示す図であり、図2中のC−C断面に相当する図である。It is a figure which shows the schematic structure of the structural wall which concerns on 4th Embodiment of this invention, and is the figure which corresponds to the CC cross section in FIG. 本発明の第5の実施形態に係る構造壁の概略構成を示す図であり、図2中のB−B断面に相当する図である。It is a figure which shows the schematic structure of the structural wall which concerns on 5th Embodiment of this invention, and is the figure which corresponds to the BB cross section in FIG. 本発明の第5の実施形態に係る構造壁の概略構成を示す図であり、図2中のC−C断面に相当する図である。It is a figure which shows the schematic structure of the structural wall which concerns on 5th Embodiment of this invention, and is the figure which corresponds to the CC cross section in FIG. 本発明の第6の実施形態に係る構造壁の概略構成を示す図であり、図2中のB−B断面に相当する図である。It is a figure which shows the schematic structure of the structural wall which concerns on 6th Embodiment of this invention, and is the figure which corresponds to the BB cross section in FIG. 本発明の第6の実施形態に係る隣り合う拘束部材の連結部を拡大した図である。It is an enlarged view of the connecting part of the adjacent restraint member which concerns on 6th Embodiment of this invention. 本発明の第6の実施形態に係る構造壁の概略構成を示す図であり、図2中のC−C断面に相当する図である。It is a figure which shows the schematic structure of the structural wall which concerns on 6th Embodiment of this invention, and is the figure which corresponds to the CC cross section in FIG. 本発明の第7の実施形態に係るプレキャストコンクリート部材の設置方法の一例を示す図である。It is a figure which shows an example of the installation method of the precast concrete member which concerns on 7th Embodiment of this invention. 本発明の第7の実施形態に係るプレキャストコンクリート部材の設置方法の一例を示す図である。It is a figure which shows an example of the installation method of the precast concrete member which concerns on 7th Embodiment of this invention. 本発明の第7の実施形態に係るプレキャストコンクリート部材の設置方法の一例を示す図である。It is a figure which shows an example of the installation method of the precast concrete member which concerns on 7th Embodiment of this invention. 本発明の第7の実施形態に係るプレキャストコンクリート部材の設置方法の一例を示す図である。It is a figure which shows an example of the installation method of the precast concrete member which concerns on 7th Embodiment of this invention. プレキャストコンクリート部材の形状例を示す図である。It is a figure which shows the shape example of a precast concrete member. プレキャストコンクリート部材の形状例を示す図である。It is a figure which shows the shape example of a precast concrete member. 拘束部材の形状例を示す図である。It is a figure which shows the shape example of the restraint member. 拘束部材の取付例を示す図である。It is a figure which shows the mounting example of the restraint member.

本発明は、基礎部として地中部に設置される鋼構造物と、地上部に設置されるプレキャストコンクリート部材の接続構造および接続方法である。また、本発明は、その接続構造を有した、鋼構造物とプレキャストコンクリート部材からなる構造壁である。この構造壁の用途としては例えば土塁壁、防潮堤、防波堤または桟橋等がある。 The present invention is a connection structure and connection method between a steel structure installed in the underground portion as a foundation portion and a precast concrete member installed in the above-ground portion. Further, the present invention is a structural wall composed of a steel structure and a precast concrete member having the connecting structure. Applications of this structural wall include, for example, earthworks walls, seawalls, breakwaters or piers.

以下、本発明の実施形態について、図面を参照しながら説明する。なお、本明細書および図面において、実質的に同一の機能構成を有する要素においては、同一の符号を付することにより重複説明を省略する。 Hereinafter, embodiments of the present invention will be described with reference to the drawings. In the present specification and the drawings, the elements having substantially the same functional configuration are designated by the same reference numerals, so that duplicate description will be omitted.

<第1の実施形態>
第1の実施形態では、構造壁の基礎部を構成する鋼構造物として鋼矢板が使用されている。図1に示すように構造壁1は、構造壁1の延長方向L(法線方向)に沿って列状に設置された複数の鋼矢板20と、それらの鋼矢板20の上部に設置された複数のプレキャストコンクリート部材50で構成されている。本実施形態におけるプレキャストコンクリート部材50は鋼矢板20の2枚分の幅を有している。
<First Embodiment>
In the first embodiment, a steel sheet pile is used as a steel structure constituting the foundation portion of the structural wall. As shown in FIG. 1, the structural wall 1 is installed on a plurality of steel sheet piles 20 arranged in a row along the extension direction L (normal direction) of the structural wall 1 and above the steel sheet piles 20. It is composed of a plurality of precast concrete members 50. The precast concrete member 50 in the present embodiment has a width equivalent to that of two steel sheet piles 20.

図2および図3に示すように鋼矢板20は地中に埋設されているが、その一部は地上に突出した状態となっている。プレキャストコンクリート部材50の下端部には、鋼矢板20の地上に突出している部分(以下、“突出部21”)を収容可能な開口部51が設けられている。開口部51はプレキャストコンクリート部材50を幅方向W(図1)に貫通するように形成され、図3に示すようにプレキャストコンクリート部材50の下端部は、開口部51を間に挟み、第1の端部52と第2の端部53とに分割された形状となっている。 As shown in FIGS. 2 and 3, the steel sheet pile 20 is buried in the ground, but a part of the steel sheet pile 20 is in a state of protruding above the ground. At the lower end of the precast concrete member 50, an opening 51 capable of accommodating a portion of the steel sheet pile 20 projecting above the ground (hereinafter, “projecting portion 21”) is provided. The opening 51 is formed so as to penetrate the precast concrete member 50 in the width direction W (FIG. 1), and as shown in FIG. 3, the lower end portion of the precast concrete member 50 sandwiches the opening 51 in between and is the first. The shape is divided into an end portion 52 and a second end portion 53.

プレキャストコンクリート部材50は、第1の端部52と第2の端部53との間に鋼矢板20の突出部21が位置する状態で鋼矢板20の上部に設置されている。すなわち、構造壁1の側面視においては、鋼矢板20の突出部21がプレキャストコンクリート部材50の開口部51に挿入されるようにして、プレキャストコンクリート部材50が鋼矢板20の突出部21に跨るように設置されている。プレキャストコンクリート部材50の開口部51内の空隙はモルタルで充填されている。 The precast concrete member 50 is installed on the upper portion of the steel sheet pile 20 in a state where the protruding portion 21 of the steel sheet pile 20 is located between the first end portion 52 and the second end portion 53. That is, in the side view of the structural wall 1, the protruding portion 21 of the steel sheet pile 20 is inserted into the opening 51 of the precast concrete member 50 so that the precast concrete member 50 straddles the protruding portion 21 of the steel sheet pile 20. It is installed in. The voids in the opening 51 of the precast concrete member 50 are filled with mortar.

図4は構造壁1の部分断面図であるが、プレキャストコンクリート部材50の下端部には構造壁1の厚さ方向t(図3)に貫通する貫通穴56が形成されている。貫通穴56はプレキャストコンクリート部材50の幅方向Wに沿って複数設けられ、貫通穴56はプレキャストコンクリート部材50の下端部において異なる高さに3つずつ形成されている。また、鋼矢板20の上部においても構造壁1の厚さ方向tに貫通する貫通穴22が形成されている。構造壁1の延長方向Lに沿って配列される鋼矢板20には、貫通穴22が異なる高さに1つずつ形成された第1の鋼矢板20aと、貫通穴22が異なる高さに2つずつ形成された第2の鋼矢板20bといった2種類の鋼矢板20があり、第1の鋼矢板20aと第2の鋼矢板20bは構造壁1の延長方向Lに沿って交互に設置されている。鋼矢板20の上部に設置されたプレキャストコンクリート部材50は、中央の貫通穴56が第1の鋼矢板20aの貫通穴22の位置に一致し、左側および右側の貫通穴56がそれぞれ異なる第2の鋼矢板20bの貫通穴22の位置に一致した状態で配列されている。すなわち、本実施形態におけるプレキャストコンクリート部材50は、1つのプレキャストコンクリート部材50が3枚の鋼矢板20の上に載るように配列されている。 FIG. 4 is a partial cross-sectional view of the structural wall 1, and a through hole 56 penetrating the structural wall 1 in the thickness direction t (FIG. 3) is formed at the lower end of the precast concrete member 50. A plurality of through holes 56 are provided along the width direction W of the precast concrete member 50, and three through holes 56 are formed at different heights at the lower end portion of the precast concrete member 50. Further, a through hole 22 penetrating the structural wall 1 in the thickness direction t is also formed in the upper portion of the steel sheet pile 20. In the steel sheet piles 20 arranged along the extension direction L of the structural wall 1, the first steel sheet piles 20a in which the through holes 22 are formed at different heights and the through holes 22 at different heights 2 There are two types of steel sheet piles 20 such as the second steel sheet piles 20b formed one by one, and the first steel sheet piles 20a and the second steel sheet piles 20b are alternately installed along the extension direction L of the structural wall 1. There is. In the precast concrete member 50 installed on the upper part of the steel sheet pile 20, the central through hole 56 coincides with the position of the through hole 22 of the first steel sheet pile 20a, and the left and right through holes 56 are different from each other. They are arranged so as to match the positions of the through holes 22 of the steel sheet pile 20b. That is, the precast concrete member 50 in the present embodiment is arranged so that one precast concrete member 50 is placed on three steel sheet piles 20.

図3に示すように鋼矢板20とプレキャストコンクリート部材50の接続部においては、鋼矢板20の貫通穴22(図4)およびプレキャストコンクリート部材50の貫通穴56(図4)を通るように棒状部材2が挿入されている。なお、棒状部材2の素材は強度が大きいものであれば特に限定されず、樹脂でも金属であっても良いが、例えばPC鋼材、PC鋼棒、鉄筋、丸鋼、高強度鉄筋または鋼製ボルト等を用いることが好ましい。 As shown in FIG. 3, at the connection portion between the steel sheet pile 20 and the precast concrete member 50, a rod-shaped member passes through the through hole 22 (FIG. 4) of the steel sheet pile 20 and the through hole 56 (FIG. 4) of the precast concrete member 50. 2 is inserted. The material of the rod-shaped member 2 is not particularly limited as long as it has high strength, and may be resin or metal. For example, PC steel, PC steel rod, reinforcing bar, round steel, high-strength reinforcing bar or steel bolt may be used. Etc. are preferably used.

本実施形態では棒状部材2として鋼製ボルトを使用しているが、挿入された鋼製ボルトはナットで締め上げられており、棒状部材2の長手方向に張力が付与されている。棒状部材2に張力が付与されていなくても鋼矢板20とプレキャストコンクリート部材50を接続することは可能であるが、本実施形態のように棒状部材2に張力を付与することで、鋼矢板20とプレキャストコンクリート部材50の連結をより強固なものにすることができる。 In the present embodiment, a steel bolt is used as the rod-shaped member 2, but the inserted steel bolt is tightened with a nut, and tension is applied in the longitudinal direction of the rod-shaped member 2. Although it is possible to connect the steel sheet pile 20 and the precast concrete member 50 even if tension is not applied to the rod-shaped member 2, the steel sheet pile 20 can be connected by applying tension to the rod-shaped member 2 as in the present embodiment. And the connection between the precast concrete member 50 and the precast concrete member 50 can be made stronger.

プレキャストコンクリート部材50の内部には鉄筋が埋め込まれており、図3に示すようにプレキャストコンクリート部材50の第1の端部52および第2の端部53の内部にはそれぞれ主鉄筋が通っている。なお、配力鉄筋については図示していない。本実施形態の構造壁1においては、プレキャストコンクリート部材50の第1の端部52および第2の端部53の内部に帯状の部材(例えば鋼材)である拘束部材3がそれぞれ設けられている。拘束部材3はプレキャストコンクリート部材50の内部にある主鉄筋54よりも外方に設けられている。換言すると、プレキャストコンクリート部材50の主鉄筋54は拘束部材3と開口部51との間に位置している。また、主鉄筋54の先端部には、本実施形態のようにコンクリートと鉄筋の密着性を向上させるための定着板55が設けられていても良い。定着板55は例えばナット等の他の部材であっても良い。 Reinforcing bars are embedded inside the precast concrete member 50, and as shown in FIG. 3, main reinforcing bars pass through the insides of the first end 52 and the second end 53 of the precast concrete member 50, respectively. .. The force distribution reinforcing bars are not shown. In the structural wall 1 of the present embodiment, a restraining member 3 which is a strip-shaped member (for example, a steel material) is provided inside the first end portion 52 and the second end portion 53 of the precast concrete member 50, respectively. The restraining member 3 is provided outside the main reinforcing bar 54 inside the precast concrete member 50. In other words, the main reinforcing bar 54 of the precast concrete member 50 is located between the restraining member 3 and the opening 51. Further, a fixing plate 55 for improving the adhesion between the concrete and the reinforcing bar may be provided at the tip of the main reinforcing bar 54 as in the present embodiment. The fixing plate 55 may be another member such as a nut.

図5および図6に示すように拘束部材3は、長手方向がプレキャストコンクリート部材50の幅方向Wに向くようにしてプレキャストコンクリート部材50の内部に埋め込まれている。本実施形態の拘束部材3はプレキャストコンクリート部材50の幅よりも、やや短い長さを有し、1つの拘束部材3でプレキャストコンクリート部材50の幅方向Wの3つの貫通穴56を覆うことができる長さとなっている。拘束部材3には、プレキャストコンクリート部材50の貫通穴56と同様、貫通穴(不図示)が形成されており、棒状部材2はその拘束部材3の貫通穴も通るように挿入されている。本実施形態のように拘束部材3を設けることで、複数の棒状部材2が拘束部材3を介して連結されることになり、鋼矢板20とプレキャストコンクリート部材50の連結をより強固なものにすることができる。また、拘束部材3がプレキャストコンクリート部材50の主鉄筋54よりも外方に設けられていることにより、プレキャストコンクリート部材50に負荷がかかった際の主鉄筋54の変形を抑制することが可能となる。 As shown in FIGS. 5 and 6, the restraint member 3 is embedded inside the precast concrete member 50 so that the longitudinal direction faces the width direction W of the precast concrete member 50. The restraint member 3 of the present embodiment has a length slightly shorter than the width of the precast concrete member 50, and one restraint member 3 can cover the three through holes 56 in the width direction W of the precast concrete member 50. It is the length. Similar to the through hole 56 of the precast concrete member 50, the restraint member 3 is formed with a through hole (not shown), and the rod-shaped member 2 is inserted so as to pass through the through hole of the restraint member 3. By providing the restraint member 3 as in the present embodiment, a plurality of rod-shaped members 2 are connected via the restraint member 3, and the connection between the steel sheet pile 20 and the precast concrete member 50 is further strengthened. be able to. Further, since the restraining member 3 is provided outside the main reinforcing bar 54 of the precast concrete member 50, it is possible to suppress deformation of the main reinforcing bar 54 when a load is applied to the precast concrete member 50. ..

また、図6に示すように鋼矢板20は継手部23を介して互いに連結されているが、本実施形態の構造壁1においては、プレキャストコンクリート部材50の幅方向端面50aの位置が鋼矢板20の継手部23の位置と異なる位置となるようにプレキャストコンクリート部材50が設置されている。すなわち、構造壁1の延長方向Lにおける隣り合うプレキャストコンクリート部材50の目地部と、隣り合う鋼矢板20の目地部とが互いに異なる位置となるように構造壁1が構築されている。プレキャストコンクリート部材50をこのように配列することは必須ではないが、プレキャストコンクリート部材50の目地部と鋼矢板20の目地部が重ならないようにすることで、地震発生時等における目地部のずれを抑えることができる。 Further, as shown in FIG. 6, the steel sheet piles 20 are connected to each other via the joint portion 23, but in the structural wall 1 of the present embodiment, the position of the widthwise end surface 50a of the precast concrete member 50 is the steel sheet pile 20. The precast concrete member 50 is installed so as to be at a position different from the position of the joint portion 23 of the above. That is, the structural wall 1 is constructed so that the joint portions of the adjacent precast concrete members 50 and the joint portions of the adjacent steel sheet piles 20 in the extension direction L of the structural wall 1 are located at different positions from each other. It is not essential to arrange the precast concrete members 50 in this way, but by preventing the joints of the precast concrete members 50 and the joints of the steel sheet pile 20 from overlapping, the displacement of the joints in the event of an earthquake or the like can be prevented. It can be suppressed.

図3に示すようにプレキャストコンクリート部材50の棒状部材2の挿入箇所には、プレキャストコンクリート部材50の外面から厚さ方向tにくり抜かれたような形状を有する凹部57が設けられている。この凹部57はプレキャストコンクリート部材50の製造時に予め形成されるものである。凹部57にはモルタルが充填されており、挿入された棒状部材2が外観に現れないようになっている。なお、図3では凹部57に充填されたモルタルを図示しているが、以降の図においては図示を省略している。 As shown in FIG. 3, the insertion portion of the rod-shaped member 2 of the precast concrete member 50 is provided with a recess 57 having a shape as if it were hollowed out from the outer surface of the precast concrete member 50 in the thickness direction t. The recess 57 is formed in advance at the time of manufacturing the precast concrete member 50. The recess 57 is filled with mortar so that the inserted rod-shaped member 2 does not appear in the appearance. Although the mortar filled in the recess 57 is shown in FIG. 3, the illustration is omitted in the subsequent drawings.

第1の実施形態の構造壁1は以上にように構成されている。次に、鋼矢板20とプレキャストコンクリート部材50の接続方法について説明する。 The structural wall 1 of the first embodiment is configured as described above. Next, a method of connecting the steel sheet pile 20 and the precast concrete member 50 will be described.

(第1工程)
まず、構造壁1の基礎部として複数の鋼矢板20を地中に埋設していくが、この際に一部が地上に突出した状態となるように鋼矢板20を設置する。次に、工場で予め製造されたプレキャストコンクリート部材50を鋼矢板20の上部に設置する。ここではプレキャストコンクリート部材50の下端部に形成された開口部51と、鋼矢板20の突出部21との位置を合わせ、鋼矢板20の突出部21にプレキャストコンクリート部材50を被せるようにしてプレキャストコンクリート部材50を地表面に吊り下げていく。これにより、鋼矢板20の突出部21がプレキャストコンクリート部材50の開口部51に挿入されるような状態でプレキャストコンクリート部材50が設置される。また、本実施形態においては1つのプレキャストコンクリート部材50が3枚の鋼矢板20の上に載るようにプレキャストコンクリート部材50を設置している。なお、構造壁1を防潮堤や防波堤等に使用する場合、プレキャストコンクリート部材50を海底面に設置する際には鋼構造物の周囲の仮締切を行い、排水が終了した後に作業を行う。
(First step)
First, a plurality of steel sheet piles 20 are buried in the ground as the foundation of the structural wall 1, and at this time, the steel sheet piles 20 are installed so that a part of them protrudes above the ground. Next, the precast concrete member 50 manufactured in advance at the factory is installed on the upper part of the steel sheet pile 20. Here, the positions of the opening 51 formed at the lower end of the precast concrete member 50 and the protruding portion 21 of the steel sheet pile 20 are aligned, and the protruding portion 21 of the steel sheet pile 20 is covered with the precast concrete member 50 so that the precast concrete is covered with the precast concrete. The member 50 is suspended from the ground surface. As a result, the precast concrete member 50 is installed in such a state that the protruding portion 21 of the steel sheet pile 20 is inserted into the opening 51 of the precast concrete member 50. Further, in the present embodiment, the precast concrete member 50 is installed so that one precast concrete member 50 is placed on the three steel sheet piles 20. When the structural wall 1 is used as a tide embankment, a breakwater, or the like, when the precast concrete member 50 is installed on the seabed, a temporary deadline is set around the steel structure, and the work is performed after the drainage is completed.

(第2工程)
続いて、プレキャストコンクリート部材50の貫通穴56(図4)および鋼矢板20の貫通穴22(図4)をそれぞれ通るように棒状部材2を挿入する。本実施形態においては鋼製ボルトを挿入し、ナットを締めることにより棒状部材2の長手方向に張力を付与する。これにより鋼矢板20とプレキャストコンクリート部材50をより強固に接続することができる。なお、プレキャストコンクリート部材50の貫通穴56は、プレキャストコンクリート部材50の製造時に予め形成するようにしても良いし、プレキャストコンクリート部材50の製造後の加工によって形成するようにしても良い。
(Second step)
Subsequently, the rod-shaped member 2 is inserted so as to pass through the through hole 56 (FIG. 4) of the precast concrete member 50 and the through hole 22 (FIG. 4) of the steel sheet pile 20. In the present embodiment, a steel bolt is inserted and a nut is tightened to apply tension in the longitudinal direction of the rod-shaped member 2. As a result, the steel sheet pile 20 and the precast concrete member 50 can be more firmly connected. The through hole 56 of the precast concrete member 50 may be formed in advance at the time of manufacturing the precast concrete member 50, or may be formed by processing the precast concrete member 50 after manufacturing.

(第3工程)
その後、プレキャストコンクリート部材50に設けられたモルタル注入穴(不図示)を介してプレキャストコンクリート部材50の開口部51内の空隙にモルタルを充填する。そして、充填されたモルタルが凝固することにより鋼矢板20とプレキャストコンクリート部材50とが接続される。このとき、本実施形態においては、プレキャストコンクリート部材50の第1の端部52と第2の端部53との間に鋼矢板20の突出部21が位置し、鋼矢板20とプレキャストコンクリート部材50が重なった状態にあるため、両者がより強固に接続される。特に、構造壁1を防潮堤等の海岸付近で使用する際には、津波などの発生時に海側から陸上側に向かって大きな回転モーメントを受けることになるため、鋼矢板20とプレキャストコンクリート部材50とを重ねて接続することが有用である。
(Third step)
After that, the void in the opening 51 of the precast concrete member 50 is filled with mortar through a mortar injection hole (not shown) provided in the precast concrete member 50. Then, the filled mortar solidifies to connect the steel sheet pile 20 and the precast concrete member 50. At this time, in the present embodiment, the protruding portion 21 of the steel sheet pile 20 is located between the first end portion 52 and the second end portion 53 of the precast concrete member 50, and the steel sheet pile 20 and the precast concrete member 50 are located. Because they are in an overlapping state, they are more firmly connected. In particular, when the structural wall 1 is used near the coast such as a seawall, a large rotational moment is received from the sea side to the land side when a tsunami or the like occurs, so the steel sheet pile 20 and the precast concrete member 50 It is useful to connect with and on top of each other.

以上の方法で鋼矢板20とプレキャストコンクリート部材50を接続すれば、鋼矢板20の突出部21がプレキャストコンクリート部材50に覆われることになる。したがって、この接続構造を有する構造壁1においては鋼矢板20の突出部21が外観に現れないため、施工時における鋼矢板20の防食処理を省略することができる。これにより工期を短縮することが可能となる。 If the steel sheet pile 20 and the precast concrete member 50 are connected by the above method, the protruding portion 21 of the steel sheet pile 20 will be covered with the precast concrete member 50. Therefore, in the structural wall 1 having this connection structure, the protruding portion 21 of the steel sheet pile 20 does not appear in the appearance, so that the anticorrosion treatment of the steel sheet pile 20 at the time of construction can be omitted. This makes it possible to shorten the construction period.

また、この接続構造においては鋼矢板20とプレキャストコンクリート部材50との間に棒状部材2が挿入された状態でモルタルが充填されているため、地震の発生時等において棒状部材2に引抜き抵抗力または押込み抵抗力を発生させることができる。加えて、棒状部材2が挿入されていることによって、鋼矢板20およびプレキャストコンクリート部材50との間で摩擦力を発生させることができる。すなわち、本実施形態の接続構造によれば、それらの力の作用により構造壁1としての剛性を高めることが可能となる。また、本実施形態では、1つのプレキャストコンクリート部材50が複数枚の鋼矢板20に接続されるように各プレキャストコンクリート部材50が配列されているため、構造壁1の剛性をより向上させることができる。 Further, in this connection structure, since the mortar is filled with the rod-shaped member 2 inserted between the steel sheet pile 20 and the precast concrete member 50, the rod-shaped member 2 has a pull-out resistance force or a pull-out resistance force in the event of an earthquake or the like. Push-in resistance can be generated. In addition, by inserting the rod-shaped member 2, a frictional force can be generated between the steel sheet pile 20 and the precast concrete member 50. That is, according to the connection structure of the present embodiment, it is possible to increase the rigidity of the structural wall 1 by the action of those forces. Further, in the present embodiment, since each precast concrete member 50 is arranged so that one precast concrete member 50 is connected to a plurality of steel sheet piles 20, the rigidity of the structural wall 1 can be further improved. ..

また、複数の棒状部材2が貫通する拘束部材3がプレキャストコンクリート部材50の主鉄筋54よりも外方に設けられていることにより、プレキャストコンクリート部材50に負荷がかかった際の主鉄筋54の変形を抑制することも可能となる。 Further, since the restraining member 3 through which the plurality of rod-shaped members 2 penetrate is provided outside the main reinforcing bar 54 of the precast concrete member 50, the main reinforcing bar 54 is deformed when a load is applied to the precast concrete member 50. It is also possible to suppress.

さらに本実施形態では、隣り合うプレキャストコンクリート部材50の目地部と隣り合う鋼矢板20の目地部とが重ならないように両者が接続されているため、地震発生時等における鋼矢板20の目地部のずれや、プレキャストコンクリート部材50の目地部のずれを抑えることができる。このような接続構造の場合、鋼矢板20とプレキャストコンクリート部材50の接続部において曲げ、せん断または軸力を受けた際には、プレキャストコンクリート部材50で受けた力が各鋼矢板20に伝達され、鋼矢板20で受けた力が各プレキャストコンクリート部材50に伝達されるため、構造壁1としての剛性を高めることができる。また、この接続構造の場合、鉛直方向からの荷重に対する抵抗力も大きくすることができる。 Further, in the present embodiment, since the joint portions of the adjacent precast concrete members 50 and the joint portions of the adjacent steel sheet piles 20 are connected so as not to overlap with each other, the joint portions of the steel sheet pile 20 in the event of an earthquake or the like are connected. It is possible to suppress the deviation and the deviation of the joint portion of the precast concrete member 50. In the case of such a connection structure, when bending, shearing or axial force is applied at the connection portion between the steel sheet pile 20 and the precast concrete member 50, the force received by the precast concrete member 50 is transmitted to each steel sheet pile 20. Since the force received by the steel sheet pile 20 is transmitted to each precast concrete member 50, the rigidity of the structural wall 1 can be increased. Further, in the case of this connection structure, the resistance to a load from the vertical direction can be increased.

本実施形態の構造壁1は、以上の第1〜第3工程を繰り返し行うことで構築される。なお、上記の第3工程の終了後においては、棒状部材2の挿入箇所に相当するプレキャストコンクリート部材50外面の凹部57がモルタルで埋められる。 The structural wall 1 of the present embodiment is constructed by repeating the above first to third steps. After the completion of the third step, the recess 57 on the outer surface of the precast concrete member 50 corresponding to the insertion point of the rod-shaped member 2 is filled with mortar.

なお、鋼矢板20とプレキャストコンクリート部材50の接続方法に関し、本実施形態では第2工程で棒状部材2に張力を付与することとしたが、第2工程ではなく第3工程で棒状部材2に張力を付与することにしても良い。この場合、例えば棒状部材2として鋼製ボルトを使用する際には、鋼製ボルトを予め樹脂等で被覆しておくことで、凝固したモルタルとの間で滑りが生じやすくなり、鋼製ボルトを回転させることができる。ただし、棒状部材2に張力を付与せずにモルタルを注入すると、棒状部材2に撓みが生じることがあるため、より強固に鋼矢板20とプレキャストコンクリート部材50を接続するためには、第2工程で棒状部材2に張力を付与することが好ましい。 Regarding the method of connecting the steel sheet pile 20 and the precast concrete member 50, in the present embodiment, tension is applied to the rod-shaped member 2 in the second step, but tension is applied to the rod-shaped member 2 in the third step instead of the second step. May be given. In this case, for example, when a steel bolt is used as the rod-shaped member 2, by covering the steel bolt with a resin or the like in advance, slippage easily occurs between the steel bolt and the solidified mortar, and the steel bolt can be used. Can be rotated. However, if mortar is injected without applying tension to the rod-shaped member 2, the rod-shaped member 2 may bend. Therefore, in order to connect the steel sheet pile 20 and the precast concrete member 50 more firmly, the second step. It is preferable to apply tension to the rod-shaped member 2.

<第2の実施形態>
第2の実施形態では拘束部材3の形状が第1の実施形態と異なっている。図7に示すように第2の実施形態の拘束部材3の上端部および下端部には、プレキャストコンクリート部材50の内方、すなわち開口部51側に突出するフランジ部3aがそれぞれ形成されている。図8に示すように拘束部材3のフランジ部3aには、拘束部材3の長手方向に沿って間隔をおいて貫通穴3bが形成されている。各貫通穴3bにはプレキャストコンクリート部材50の主鉄筋54が通っている。
<Second embodiment>
In the second embodiment, the shape of the restraint member 3 is different from that of the first embodiment. As shown in FIG. 7, the upper end portion and the lower end portion of the restraint member 3 of the second embodiment are formed with flange portions 3a protruding inward of the precast concrete member 50, that is, toward the opening 51. As shown in FIG. 8, through holes 3b are formed in the flange portion 3a of the restraint member 3 at intervals along the longitudinal direction of the restraint member 3. The main reinforcing bar 54 of the precast concrete member 50 passes through each through hole 3b.

このような第2の実施形態の構造壁1においては、拘束部材3のフランジ部3aに主鉄筋54が通っていることにより、拘束部材3を介してコンクリートと鉄筋の密着性を高めることができる。これに加え、複数の主鉄筋54の拘束力を高めることができ、プレキャストコンクリート部材50に負荷がかかった際の主鉄筋54の変形抑制効果を高めることができる。すなわち、第2の実施形態の構造壁1では棒状部材2、拘束部材3および主鉄筋54とが互いに連結されることになり、三者の組み合わせによる相乗効果で、鋼構造物とプレキャストコンクリート部材の接続をより一層強固なものにすることができる。なお、拘束部材3に設けられるフランジ部3aの数や位置は特に限定されない。例えば拘束部材3の上端部または下端部のいずれか一箇所にフランジ部3aが設けられていても良いし、棒状部材2に干渉しなければ拘束部材3の中央部にフランジ部3aが設けられていても良い。 In the structural wall 1 of the second embodiment as described above, since the main reinforcing bar 54 passes through the flange portion 3a of the restraining member 3, the adhesion between the concrete and the reinforcing bar can be enhanced through the restraining member 3. .. In addition to this, the binding force of the plurality of main reinforcing bars 54 can be increased, and the deformation suppressing effect of the main reinforcing bars 54 when a load is applied to the precast concrete member 50 can be enhanced. That is, in the structural wall 1 of the second embodiment, the rod-shaped member 2, the restraining member 3, and the main reinforcing bar 54 are connected to each other, and the synergistic effect of the combination of the three causes the steel structure and the precast concrete member to be connected to each other. The connection can be made even stronger. The number and position of the flange portions 3a provided on the restraint member 3 are not particularly limited. For example, the flange portion 3a may be provided at either the upper end portion or the lower end portion of the restraint member 3, or the flange portion 3a is provided at the center portion of the restraint member 3 as long as it does not interfere with the rod-shaped member 2. May be.

<第3の実施形態>
第3の実施形態では鋼構造物として鋼管矢板30が使用されている。図9および図10に示すように鋼管矢板30は構造壁1の延長方向Lに沿って複数配列されており、各鋼管矢板30は図10に示すように継手部31を介して連結されている。第3の実施形態では1つのプレキャストコンクリート部材50に対して3本の鋼管矢板30が接続されている。また、プレキャストコンクリート部材50は、幅方向端面50aが鋼管矢板30の継手部31の位置と重ならないように配列されている。これにより隣り合うプレキャストコンクリート部材50の目地部のずれの発生を抑えることが可能となる。
<Third embodiment>
In the third embodiment, the steel pipe sheet pile 30 is used as the steel structure. As shown in FIGS. 9 and 10, a plurality of steel pipe sheet piles 30 are arranged along the extension direction L of the structural wall 1, and each steel pipe sheet pile 30 is connected via a joint portion 31 as shown in FIG. .. In the third embodiment, three steel pipe sheet piles 30 are connected to one precast concrete member 50. Further, the precast concrete members 50 are arranged so that the end face 50a in the width direction does not overlap with the position of the joint portion 31 of the steel pipe sheet pile 30. This makes it possible to suppress the occurrence of displacement of the joint portions of the adjacent precast concrete members 50.

第3の実施形態のように鋼構造物として鋼管矢板30が使用される場合も、プレキャストコンクリート部材50を鋼管矢板30の地上に突出した部分に跨るように設置することで、第1の実施形態と同様に構造壁1を構築する際に鋼構造物とプレキャストコンクリート部材50をより一層強固に接続することができる。 Even when the steel pipe sheet pile 30 is used as the steel structure as in the third embodiment, the precast concrete member 50 is installed so as to straddle the portion of the steel pipe sheet pile 30 protruding above the ground, thereby performing the first embodiment. Similarly, when constructing the structural wall 1, the steel structure and the precast concrete member 50 can be connected more firmly.

<第4の実施形態>
第4の実施形態では鋼構造物として鋼管杭40と鋼矢板20を組み合わせた構造物が使用されている。図11に示すように、鋼矢板20は第1の実施形態と同様に構造壁1の延長方向Lに沿って複数配列され、各鋼矢板20は継手部23を介して連結されている。また、鋼管杭40は、構造壁1の延長方向Lに沿って間隔をおいて複数設置されている。鋼管杭40は、平面視において曲面部の一部が鋼矢板20の凹部24(ウェブとフランジに囲まれる部分)に入りこむようにして鋼矢板20に隣接して設置されている。鋼管杭40と鋼矢板20は例えば拘束具で結束されることで連結されている。
<Fourth Embodiment>
In the fourth embodiment, a structure in which a steel pipe pile 40 and a steel sheet pile 20 are combined is used as a steel structure. As shown in FIG. 11, a plurality of steel sheet piles 20 are arranged along the extension direction L of the structural wall 1 as in the first embodiment, and each steel sheet pile 20 is connected via a joint portion 23. Further, a plurality of steel pipe piles 40 are installed at intervals along the extension direction L of the structural wall 1. The steel pipe pile 40 is installed adjacent to the steel sheet pile 20 so that a part of the curved surface portion thereof enters the recess 24 (the portion surrounded by the web and the flange) of the steel sheet pile 20 in a plan view. The steel pipe pile 40 and the steel sheet pile 20 are connected by being bound by, for example, a restraint.

第4の実施形態の構造壁1では、1つのプレキャストコンクリート部材50に挿入される3本の棒状部材2のうち、両側の棒状部材2がそれぞれ鋼管杭40および鋼矢板20の両者を貫通し、中央の棒状部材2は鋼矢板20のみを貫通した状態となっている。また、プレキャストコンクリート部材50は、幅方向端面50aが鋼矢板20の継手部23の位置と重ならないように配列されている。これにより隣り合うプレキャストコンクリート部材50の目地部のずれを抑えることが可能となる。さらに第4の実施形態においては、プレキャストコンクリート部材50の幅方向端面50aの位置、すなわち隣り合うプレキャストコンクリート部材50の目地部の位置に鋼管杭40が設置されている。これにより鋼管杭40がプレキャストコンクリート部材50の目地部のずれを抑える効果がさらに向上する。 In the structural wall 1 of the fourth embodiment, of the three rod-shaped members 2 inserted into one precast concrete member 50, the rod-shaped members 2 on both sides penetrate both the steel pipe pile 40 and the steel sheet pile 20, respectively. The rod-shaped member 2 in the center is in a state of penetrating only the steel sheet pile 20. Further, the precast concrete members 50 are arranged so that the end face 50a in the width direction does not overlap with the position of the joint portion 23 of the steel sheet pile 20. This makes it possible to suppress the displacement of the joint portions of the adjacent precast concrete members 50. Further, in the fourth embodiment, the steel pipe pile 40 is installed at the position of the end face 50a in the width direction of the precast concrete member 50, that is, at the position of the joint portion of the adjacent precast concrete members 50. As a result, the effect of the steel pipe pile 40 in suppressing the displacement of the joint portion of the precast concrete member 50 is further improved.

第4の実施形態のように鋼構造物として鋼管杭40と鋼矢板20を組み合わせた構造物が使用される場合も、プレキャストコンクリート部材50をその組み合わせ構造物の地上に突出した部分に跨るように設置することで、第1の実施形態と同様に構造壁1を構築する際に鋼構造物とプレキャストコンクリート部材50をより一層強固に接続することができる。 Even when a structure in which a steel pipe pile 40 and a steel sheet pile 20 are combined is used as a steel structure as in the fourth embodiment, the precast concrete member 50 is straddled over a portion of the combined structure protruding above the ground. By installing the structure wall 1, the steel structure and the precast concrete member 50 can be more firmly connected when the structural wall 1 is constructed as in the first embodiment.

<第5の実施形態>
第5の実施形態では鋼構造部として鋼管杭40のみが使用されている。図12および図13に示すように鋼管杭40は、構造壁1の延長方向Lに沿って間隔をおいて複数設置されている。第5の実施形態では第1の実施形態と異なり、1つのプレキャストコンクリート部材50に対して棒状部材2が5本挿入されている。また、プレキャストコンクリート部材50の幅は、第1の実施形態のプレキャストコンクリート部材50の幅よりも長くなっている。第5の実施形態では、1つのプレキャストコンクリート部材50に挿入される5本の棒状部材2のうち、中央の棒状部材2の両隣にある2本の棒状部材2がそれぞれ異なる鋼管杭40を貫通している。
<Fifth Embodiment>
In the fifth embodiment, only the steel pipe pile 40 is used as the steel structure portion. As shown in FIGS. 12 and 13, a plurality of steel pipe piles 40 are installed at intervals along the extension direction L of the structural wall 1. In the fifth embodiment, unlike the first embodiment, five rod-shaped members 2 are inserted into one precast concrete member 50. Further, the width of the precast concrete member 50 is longer than the width of the precast concrete member 50 of the first embodiment. In the fifth embodiment, of the five rod-shaped members 2 inserted into one precast concrete member 50, the two rod-shaped members 2 on both sides of the central rod-shaped member 2 penetrate different steel pipe piles 40. ing.

第5の実施形態のように鋼構造物として鋼管杭40が使用される場合も、プレキャストコンクリート部材50を鋼管杭40の地上に突出した部分に跨るように設置することで、第1の実施形態と同様に構造壁1を構築する際に鋼構造物とプレキャストコンクリート部材50をより一層強固に接続することができる。 Even when the steel pipe pile 40 is used as the steel structure as in the fifth embodiment, the precast concrete member 50 is installed so as to straddle the portion of the steel pipe pile 40 protruding above the ground, thereby performing the first embodiment. Similarly, when constructing the structural wall 1, the steel structure and the precast concrete member 50 can be connected more firmly.

<第6の実施形態>
上記の第5の実施形態においては鋼構造物として鋼管杭40を使用したが、隣り合うプレキャストコンクリート部材50の目地部に鋼管杭40が設置されない場合、隣り合うプレキャストコンクリート部材50はモルタルでのみ連結されることになる。第6の実施形態では、そのような場合であっても隣り合うプレキャストコンクリート部材50を連結することができる構造壁1について説明する。
<Sixth Embodiment>
In the fifth embodiment described above, the steel pipe pile 40 is used as the steel structure, but when the steel pipe pile 40 is not installed at the joint portion of the adjacent precast concrete member 50, the adjacent precast concrete member 50 is connected only by the mortar. Will be done. In the sixth embodiment, the structural wall 1 capable of connecting the adjacent precast concrete members 50 even in such a case will be described.

図14〜図16に示すように第6の実施形態のプレキャストコンクリート部材50は、下端部に切り欠きが設けられており、下端部の幅はそれ以外の部分の幅よりも短くなっている。第6の実施形態では、プレキャストコンクリート部材50の内部に埋め込まれた拘束部材3の幅がプレキャストコンクリート部材50と同一の幅を有しており、隣り合う拘束部材3の端面同士が突き合わされた状態となっている。第6の実施形態においては拘束部材3の幅方向両端部にそれぞれ添接板4が設けられている。隣り合う拘束部材3の添接板4同士は例えば溶接やボルト締結等で固定されている。 As shown in FIGS. 14 to 16, the precast concrete member 50 of the sixth embodiment is provided with a notch at the lower end portion, and the width of the lower end portion is shorter than the width of the other portions. In the sixth embodiment, the width of the restraint member 3 embedded in the precast concrete member 50 has the same width as that of the precast concrete member 50, and the end faces of the adjacent restraint members 3 are butted against each other. It has become. In the sixth embodiment, splicing plates 4 are provided at both ends of the restraining member 3 in the width direction. The splicing plates 4 of the adjacent restraint members 3 are fixed to each other by, for example, welding or bolting.

第6の実施形態の構造壁1を構築する際には、プレキャストコンクリート部材50を鋼管杭40の上部に配列した後に隣り合う拘束部材3の添接板4同士を互いに固定する。その後、プレキャストコンクリート部材50の前面側および背面側に型枠を構築し、プレキャストコンクリート部材50の開口部51内の空隙にモルタルを充填する。これにより、隣り合うプレキャストコンクリート部材50の目地部において、添接板4を介して隣り合う拘束部材3が互いに連結された状態で、構造壁1が構築される。その結果、隣り合うプレキャストコンクリート部材50の連結がより強固なものとなる。 When constructing the structural wall 1 of the sixth embodiment, the precast concrete members 50 are arranged on the upper part of the steel pipe pile 40, and then the splicing plates 4 of the adjacent restraint members 3 are fixed to each other. After that, formwork is constructed on the front side and the back side of the precast concrete member 50, and the voids in the opening 51 of the precast concrete member 50 are filled with mortar. As a result, the structural wall 1 is constructed in a state where the adjacent restraint members 3 are connected to each other via the splicing plate 4 at the joint portions of the adjacent precast concrete members 50. As a result, the connection between the adjacent precast concrete members 50 becomes stronger.

なお、第6の実施形態では、添接板4を用いて隣り合う拘束部材3を連結することとしたが、その他の方法で連結しても良い。また、鋼構造物として鋼管杭40以外のものを使用する場合であっても、隣り合う拘束部材3を互いに連結することで、隣り合うプレキャストコンクリート部材50の連結をより強固なものとすることができる。 In the sixth embodiment, the adjacent restraint members 3 are connected by using the splicing plate 4, but they may be connected by other methods. Further, even when a steel structure other than the steel pipe pile 40 is used, the connection between the adjacent precast concrete members 50 can be further strengthened by connecting the adjacent restraint members 3 to each other. can.

<第7の実施形態>
上記の第1〜第6の実施形態では鋼構造物とプレキャストコンクリート部材50の接続方法として、プレキャストコンクリート部材50を地表面に降下させることを前提に説明したが、第7の実施形態ではプレキャストコンクリート部材50を設置する際に、鋼構造物に設けられた受け面にプレキャストコンクリート部材50を降下させる例について説明する。
<Seventh Embodiment>
In the first to sixth embodiments described above, the method of connecting the steel structure and the precast concrete member 50 has been described on the premise that the precast concrete member 50 is lowered to the ground surface, but in the seventh embodiment, the precast concrete is described. An example in which the precast concrete member 50 is lowered onto the receiving surface provided on the steel structure when the member 50 is installed will be described.

例えば図17に示すように鋼構造物の地表面近傍に平板状の基礎コンクリート部材5を設け、この基礎コンクリート部材5にプレキャストコンクリート部材50を降下させるようにしても良い。この際、基礎コンクリート部材5の上面に所定の高さを有するスペーサー6を設けることが好ましい。鋼構造物を設置する際には隣り合う鋼構造物で設置高さにずれが生じることがあるが、高さの異なるスペーサー6を適宜設けることにより、プレキャストコンクリート部材50を設置高さを揃えることができる。これにより構造壁1としての景観を良好なものにすることができる。また、プレキャストコンクリート部材50の設置高さの調節が可能であれば、鋼構造物の貫通穴とプレキャストコンクリート部材50の貫通穴56の位置を一致させることができるよう微調整することもできる。なお、基礎コンクリート部材5とプレキャストコンクリート部材50との間にはパッキン7が設けられており、後に充填されるモルタルが漏出しないようになっている。 For example, as shown in FIG. 17, a flat plate-shaped foundation concrete member 5 may be provided near the ground surface of the steel structure, and the precast concrete member 50 may be lowered onto the foundation concrete member 5. At this time, it is preferable to provide a spacer 6 having a predetermined height on the upper surface of the foundation concrete member 5. When installing a steel structure, the installation height may vary between adjacent steel structures, but by appropriately providing spacers 6 with different heights, the precast concrete members 50 can be installed at the same height. Can be done. As a result, the landscape as the structural wall 1 can be improved. Further, if the installation height of the precast concrete member 50 can be adjusted, fine adjustment can be made so that the positions of the through holes of the steel structure and the through holes 56 of the precast concrete member 50 can be matched. A packing 7 is provided between the foundation concrete member 5 and the precast concrete member 50 so that the mortar to be filled later does not leak.

上記の図17に示す例では、プレキャストコンクリート部材50と、そのプレキャストコンクリート部材50の底面に接する鋼構造物の受け面との間に設けられたギャップ調節機構として、高さの異なる複数のスペーサー6を用いることとしたが、ギャップ調節機構はスペーサー6を用いることに限定されない。例えば図18に示すように、プレキャストコンクリート部材50の下端部に高さ調節用ボルト8を設けるようにしても良い。図18に示す例では、プレキャストコンクリート部材50の下端面から突出するボルトの高さを調節することで、プレキャストコンクリート部材50の設置高さを調節することができる。 In the example shown in FIG. 17 above, a plurality of spacers 6 having different heights are provided as a gap adjusting mechanism between the precast concrete member 50 and the receiving surface of the steel structure in contact with the bottom surface of the precast concrete member 50. However, the gap adjusting mechanism is not limited to using the spacer 6. For example, as shown in FIG. 18, a height adjusting bolt 8 may be provided at the lower end of the precast concrete member 50. In the example shown in FIG. 18, the installation height of the precast concrete member 50 can be adjusted by adjusting the height of the bolt protruding from the lower end surface of the precast concrete member 50.

また、プレキャストコンクリート部材50を地表面から離れた位置に設置する際には、図19に示すように鋼構造物にブラケット9を取り付けるようにしても良い。図19に示す例では、ブラケット9の上面にプレキャストコンクリート部材50の幅方向Wに延びる底型枠10を設置し、図17に示す例のようにスペーサー6によってプレキャストコンクリート部材50の設置高さを調節する。なお、プレキャストコンクリート部材50の設置後のブラケット9については、構造壁1の設置個所の地表面を周囲の地表面と同じ高さになるように土で埋めても良いし、ガス切断により除去しても良い。また、図20に示すように、ギャップ調節機構として図18に示す例のような高さ調節用ボルト8を設けても良い。 Further, when the precast concrete member 50 is installed at a position away from the ground surface, the bracket 9 may be attached to the steel structure as shown in FIG. In the example shown in FIG. 19, the bottom formwork 10 extending in the width direction W of the precast concrete member 50 is installed on the upper surface of the bracket 9, and the installation height of the precast concrete member 50 is set by the spacer 6 as in the example shown in FIG. Adjust. The bracket 9 after the installation of the precast concrete member 50 may be filled with soil so that the ground surface at the installation location of the structural wall 1 is at the same height as the surrounding ground surface, or is removed by gas cutting. May be. Further, as shown in FIG. 20, a height adjusting bolt 8 as in the example shown in FIG. 18 may be provided as the gap adjusting mechanism.

以上、本発明の実施形態について説明したが、本発明はかかる例に限定されない。当業者であれば、特許請求の範囲に記載された技術的思想の範疇内において、各種の変更例または修正例に想到しうることは明らかであり、それらについても当然に本発明の技術的範囲に属するものと了解される。 Although the embodiments of the present invention have been described above, the present invention is not limited to such examples. It is clear that a person skilled in the art can come up with various modifications or modifications within the scope of the technical ideas described in the claims, and of course, the technical scope of the present invention also includes them. It is understood that it belongs to.

例えば鋼構造物の形状や設置位置等は前述の実施形態で説明したものに限定されない。同様に、プレキャストコンクリート部材50の形状は前述の実施形態で説明したものに限定されない。例えば図21に示すように側面視において左右非対称形状であっても良いし、図22に示すように高さが低い形状であっても良い。すなわち、プレキャストコンクリート部材50の形状は構造壁1の用途によって適宜変更される。また、プレキャストコンクリート部材50の開口部51の形状は、使用する鋼構造物の形状、設置位置等において適宜変更される。 For example, the shape and installation position of the steel structure are not limited to those described in the above-described embodiment. Similarly, the shape of the precast concrete member 50 is not limited to that described in the above-described embodiment. For example, as shown in FIG. 21, the shape may be asymmetrical in side view, or the shape may be low as shown in FIG. 22. That is, the shape of the precast concrete member 50 is appropriately changed depending on the use of the structural wall 1. Further, the shape of the opening 51 of the precast concrete member 50 is appropriately changed depending on the shape of the steel structure to be used, the installation position, and the like.

また、前述の実施形態では、1つのプレキャストコンクリート部材50に対して、拘束部材3を棒状部材2の挿入箇所に合わせて2つ設けることとしたが、例えば図23に示すように1つの拘束部材3で全ての棒状部材2を連結できるようにしても良い。また、そのような平板状の拘束部材3と、前述の実施形態の帯状の拘束部材3とを組み合わせて使用しても良い。なお、構造壁1を構築する際には、棒状部材2の挿入箇所に相当するプレキャストコンクリート部材50の凹部57をモルタルで埋めることになるため、この観点からは拘束部材3のサイズは大きすぎないことが好ましい。 Further, in the above-described embodiment, two restraining members 3 are provided for one precast concrete member 50 according to the insertion position of the rod-shaped member 2, but one restraining member is provided, for example, as shown in FIG. 23. 3 may be used to connect all the rod-shaped members 2. Further, such a flat plate-shaped restraining member 3 and the strip-shaped restraining member 3 of the above-described embodiment may be used in combination. When constructing the structural wall 1, the recess 57 of the precast concrete member 50 corresponding to the insertion point of the rod-shaped member 2 is filled with mortar, so that the size of the restraining member 3 is not too large from this viewpoint. Is preferable.

また、前述の実施形態においては、拘束部材3が内部に埋め込まれた状態でプレキャストコンクリート部材50を製造することとしたが、例えばプレキャストコンクリート部材50の設置後に、プレキャストコンクリート部材50外面の凹部57に拘束部材3を取り付けるようにしても良い。この場合、拘束部材3を凹部57に取り付けた後に、棒状部材2を拘束部材3、プレキャストコンクリート部材50および鋼構造物を通るように挿入する。このように拘束部材3を後から取り付ける場合、例えば図24に示すように隣り合うプレキャストコンクリート部材50に掛け渡されるように拘束部材3を取り付けても良い。これにより、隣り合うプレキャストコンクリート部材50の連結がさらに強固なものとなり、プレキャストコンクリート部材50の目地部のずれをさらに抑制することができる。なお、拘束部材3を後から取り付ける場合においても、プレキャストコンクリート部材50外面の凹部57はモルタルで埋められることになるため、構造壁1としての景観は損なわれない。 Further, in the above-described embodiment, the precast concrete member 50 is manufactured in a state where the restraining member 3 is embedded inside. For example, after the precast concrete member 50 is installed, the precast concrete member 50 is formed in a recess 57 on the outer surface of the precast concrete member 50. The restraining member 3 may be attached. In this case, after the restraint member 3 is attached to the recess 57, the rod-shaped member 2 is inserted so as to pass through the restraint member 3, the precast concrete member 50, and the steel structure. When the restraint member 3 is attached later as described above, the restraint member 3 may be attached so as to be hung over the adjacent precast concrete members 50 as shown in FIG. 24, for example. As a result, the connection between the adjacent precast concrete members 50 becomes stronger, and the displacement of the joint portion of the precast concrete members 50 can be further suppressed. Even when the restraint member 3 is attached later, the recess 57 on the outer surface of the precast concrete member 50 is filled with mortar, so that the landscape as the structural wall 1 is not impaired.

以上の説明では、プレキャストコンクリート部材50の開口部51内の空隙や、プレキャストコンクリート部材50外面の凹部57にモルタルを充填することにしているが、モルタルに代えてコンクリートを充填することにしても良い。 In the above description, the voids in the opening 51 of the precast concrete member 50 and the recesses 57 on the outer surface of the precast concrete member 50 are filled with mortar, but concrete may be filled instead of the mortar. ..

本発明は、例えば土塁壁、防潮堤、防波堤または桟橋等に利用することができる。 The present invention can be used, for example, for earthworks walls, seawalls, breakwaters, piers, and the like.

1 構造壁
2 棒状部材
3 拘束部材
3a 拘束部材のフランジ部
3b フランジ部の貫通穴
4 添接板
5 基礎コンクリート部材
6 スペーサー
7 パッキン
8 高さ調節用ボルト
9 ブラケット
10 底型枠
20 鋼矢板
20a 第1の鋼矢板
20b 第2の鋼矢板
21 鋼構造物の突出部
22 鋼矢板の貫通穴
23 鋼矢板の継手部
24 鋼矢板の凹部
30 鋼管矢板
31 鋼管矢板の継手部
40 鋼管杭
50 プレキャストコンクリート部材
50a プレキャストコンクリート部材の幅方向端面
51 プレキャストコンクリート部材の開口部
52 プレキャストコンクリート部材の第1の端部
53 プレキャストコンクリート部材の第2の端部
54 主鉄筋
55 定着板
56 プレキャストコンクリート部材の貫通穴
57 プレキャストコンクリート部材の凹部
L 構造壁の延長方向
t 構造壁の厚さ方向
W プレキャストコンクリート部材の幅方向

1 Structural wall 2 Rod-shaped member 3 Restraining member 3a Flanking member 3b Through hole in flange 4 Splicing plate 5 Foundation concrete member 6 Spacer 7 Packing 8 Height adjustment bolt 9 Bracket 10 Bottom form 20 Steel sheet pile 20a No. 1 steel sheet pile 20b 2nd steel sheet pile 21 Projection part of steel structure 22 Through hole of steel sheet pile 23 Joint part of steel sheet pile 24 Recession of steel sheet pile 30 Steel pipe sheet pile 31 Joint part of steel pipe sheet pile 50 Steel pipe pile 50 Precast concrete member 50a Widthwise end face of precast concrete member 51 Opening of precast concrete member 52 First end of precast concrete member 53 Second end of precast concrete member 54 Main reinforcement 55 Fixing plate 56 Through hole of precast concrete member 57 Precast Recessed concrete member L Extension direction of structural wall t Thickness direction of structural wall W Width direction of precast concrete member

Claims (15)

鋼構造物とプレキャストコンクリート部材とが接続された接続構造であって、
前記鋼構造物は、一部が地上に突出した状態で地中に埋設され、
前記プレキャストコンクリート部材は、下端部に開口部を備え、
前記鋼構造物の地上に突出した部分である突出部が前記プレキャストコンクリート部材の前記開口部に挿入されるようにして、該プレキャストコンクリート部材が前記鋼構造物の前記突出部に跨るように設置され、
前記プレキャストコンクリート部材と前記鋼構造物の両者を貫通するように棒状部材が挿入され、
前記プレキャストコンクリート部材内部の主鉄筋より外方に、複数の前記棒状部材が貫通する拘束部材が設けられ、
前記プレキャストコンクリート部材の前記開口部内の空隙がモルタルまたはコンクリートで充填されていることを特徴とする、鋼構造物とプレキャストコンクリート部材の接続構造。
It is a connection structure in which a steel structure and a precast concrete member are connected.
The steel structure is buried in the ground with a part protruding above the ground.
The precast concrete member has an opening at the lower end and has an opening.
The precast concrete member is installed so as to straddle the protruding portion of the steel structure so that the protruding portion, which is a portion of the steel structure protruding above the ground, is inserted into the opening of the precast concrete member. ,
A rod-shaped member is inserted so as to penetrate both the precast concrete member and the steel structure.
A restraining member through which the plurality of rod-shaped members penetrate is provided outside the main reinforcing bar inside the precast concrete member.
A connection structure between a steel structure and a precast concrete member, wherein the voids in the opening of the precast concrete member are filled with mortar or concrete.
前記拘束部材に、前記プレキャストコンクリート部材の内方に突出するフランジ部が形成され、
前記プレキャストコンクリート部材の前記主鉄筋が前記フランジ部を貫通していることを特徴とする、請求項1に記載の接続構造。
A flange portion is formed on the restraining member so as to project inward from the precast concrete member.
The connection structure according to claim 1, wherein the main reinforcing bar of the precast concrete member penetrates the flange portion.
前記棒状部材の長手方向に張力が付与されていることを特徴とする、請求項1または2に記載の接続構造。 The connection structure according to claim 1 or 2, wherein tension is applied in the longitudinal direction of the rod-shaped member. 請求項1〜3のいずれか一項に記載の接続構造を有する構造壁であって、
複数の前記プレキャストコンクリート部材が構造壁の延長方向に沿って配列され、該プレキャストコンクリート部材が前記鋼構造物の前記突出部に跨るように設置されていることを特徴とする、構造壁。
A structural wall having the connection structure according to any one of claims 1 to 3.
A structural wall, wherein a plurality of the precast concrete members are arranged along an extension direction of the structural wall, and the precast concrete members are installed so as to straddle the protrusions of the steel structure.
前記鋼構造物は、継手部を介して互いに連結された複数の鋼矢板で構成されていることを特徴とする、請求項4に記載の構造壁。 The structural wall according to claim 4, wherein the steel structure is composed of a plurality of steel sheet piles connected to each other via a joint portion. 前記鋼構造物は、継手部を介して互いに連結された複数の鋼管杭で構成されていることを特徴とする、請求項4に記載の構造壁。 The structural wall according to claim 4, wherein the steel structure is composed of a plurality of steel pipe piles connected to each other via a joint portion. 前記鋼構造物は、
継手部を介して互いに連結された複数の鋼矢板と、
平面視において前記鋼矢板の凹部に入り込むように隣接して該鋼矢板に連結された複数の鋼管杭とで構成されていることを特徴とする、請求項4に記載の構造壁。
The steel structure is
With multiple steel sheet piles connected to each other via joints,
The structural wall according to claim 4, wherein the structural wall is composed of a plurality of steel pipe piles adjacent to each other so as to enter the recess of the steel sheet pile in a plan view.
構造壁の延長方向における、前記プレキャストコンクリート部材の幅方向端面の位置と前記鋼構造物の前記継手部の位置が重ならないように前記プレキャストコンクリート部材が配列されていることを特徴とする、請求項5〜7のいずれか一項に記載の構造壁。 The precast concrete member is arranged so that the position of the end face in the width direction of the precast concrete member and the position of the joint portion of the steel structure do not overlap with each other in the extension direction of the structural wall. The structural wall according to any one of 5 to 7. 前記鋼構造物は、間隔をおいて設置された複数の鋼管杭で構成されていることを特徴とする、請求項4に記載の構造壁。 The structural wall according to claim 4, wherein the steel structure is composed of a plurality of steel pipe piles installed at intervals. 隣り合う前記拘束部材が互いに連結されていることを特徴とする、請求項4〜9のいずれか一項に記載の構造壁。 The structural wall according to any one of claims 4 to 9, wherein adjacent restraining members are connected to each other. 鋼構造物とプレキャストコンクリート部材を接続する接続方法であって、
一部が地上に突出した状態で地中に埋設された前記鋼構造物の地上に突出している部分が、前記プレキャストコンクリート部材の一端部に設けられた開口部に挿入されるようにして該プレキャストコンクリート部材を前記鋼構造物の地上に突出している部分に跨るように設置する、第1工程と、
棒状部材を用い、前記プレキャストコンクリート部材内部の主鉄筋より外方に設けられた、複数の前記棒状部材を連結する拘束部材と、該プレキャストコンクリート部材と、前記鋼構造物とを貫通するように前記棒状部材を挿入する、第2工程と、
前記プレキャストコンクリート部材の前記開口部内の空隙をモルタルまたはコンクリートで充填して凝固させる、第3工程とを有することを特徴とする、鋼構造物とプレキャストコンクリート部材の接続方法。
It is a connection method for connecting a steel structure and a precast concrete member.
The precast is such that a portion of the steel structure buried in the ground in a state of protruding above the ground is inserted into an opening provided at one end of the precast concrete member. The first step of installing the concrete member so as to straddle the portion of the steel structure protruding above the ground,
The rod-shaped member is used, and the restraining member for connecting a plurality of the rod-shaped members provided outside the main reinforcing bar inside the precast concrete member, the precast concrete member, and the steel structure so as to penetrate the said. The second step of inserting the rod-shaped member and
A method for connecting a steel structure and a precast concrete member, which comprises a third step of filling the voids in the opening of the precast concrete member with mortar or concrete and solidifying the mixture.
前記拘束部材に、前記プレキャストコンクリート部材の内方に突出するフランジ部が形成され、
前記プレキャストコンクリート部材の前記主鉄筋が前記フランジ部を貫通していることを特徴とする、請求項11に記載の接続方法。
A flange portion is formed on the restraining member so as to project inward from the precast concrete member.
The connection method according to claim 11, wherein the main reinforcing bar of the precast concrete member penetrates the flange portion.
前記第1工程において、前記鋼構造物に設けられた受け面で前記プレキャストコンクリート部材を受け止め、前記受け面と前記プレキャストコンクリート部材との間に設けられるギャップ調節機構で前記プレキャストコンクリート部材の設置高さを調節することを特徴とする、請求項11または12に記載の接続方法。 In the first step, the precast concrete member is received by a receiving surface provided on the steel structure, and the installation height of the precast concrete member is provided by a gap adjusting mechanism provided between the receiving surface and the precast concrete member. The connection method according to claim 11 or 12, wherein the connection method is adjusted. 前記第2工程において、前記棒状部材の挿入後に前記棒状部材の長手方向に張力を付与することを特徴とする、請求項11〜13のいずれか一項に記載の接続方法。 The connection method according to any one of claims 11 to 13, wherein in the second step, tension is applied in the longitudinal direction of the rod-shaped member after the rod-shaped member is inserted. 前記第3工程において、前記モルタルまたは前記コンクリートを凝固させた後、前記棒状部材の長手方向に張力を付与することを特徴とする、請求項11〜13のいずれか一項に記載の接続方法。

The connection method according to any one of claims 11 to 13, wherein in the third step, tension is applied in the longitudinal direction of the rod-shaped member after the mortar or the concrete is solidified.

JP2018019776A 2018-02-07 2018-02-07 Connection structure between steel structure and precast concrete member, structural wall having the connection structure, and connection method between steel structure and precast concrete member Active JP6971874B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018019776A JP6971874B2 (en) 2018-02-07 2018-02-07 Connection structure between steel structure and precast concrete member, structural wall having the connection structure, and connection method between steel structure and precast concrete member

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018019776A JP6971874B2 (en) 2018-02-07 2018-02-07 Connection structure between steel structure and precast concrete member, structural wall having the connection structure, and connection method between steel structure and precast concrete member

Publications (2)

Publication Number Publication Date
JP2019137991A JP2019137991A (en) 2019-08-22
JP6971874B2 true JP6971874B2 (en) 2021-11-24

Family

ID=67695109

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018019776A Active JP6971874B2 (en) 2018-02-07 2018-02-07 Connection structure between steel structure and precast concrete member, structural wall having the connection structure, and connection method between steel structure and precast concrete member

Country Status (1)

Country Link
JP (1) JP6971874B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7240284B2 (en) * 2019-08-05 2023-03-15 ジオスター株式会社 Connection structure of steel structure and precast concrete member, structural wall having the connection structure, and connection method of steel structure and precast concrete member
JP7525789B2 (en) * 2020-11-26 2024-07-31 ジオスター株式会社 Connection structure and method for steel pipe and precast member

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0625410B2 (en) * 1989-05-31 1994-04-06 北日本ブロック工業株式会社 Cap concrete block for steel sheet pile wall
JP2908505B2 (en) * 1990-03-30 1999-06-21 ジオスター株式会社 Sharp stone for sheet pile
JPH06180006A (en) * 1992-12-14 1994-06-28 Nippon Steel Corp Water area structure and construction thereof
JP2001311169A (en) * 2000-04-26 2001-11-09 Modern Material:Kk Block for earth retaining wall
US6578333B1 (en) * 2000-08-30 2003-06-17 Richard J. Gagliano Integrated precast footings
JP3824086B2 (en) * 2004-05-26 2006-09-20 朝日エンヂニヤリング株式会社 Revetment sheet pile cap block mounting structure

Also Published As

Publication number Publication date
JP2019137991A (en) 2019-08-22

Similar Documents

Publication Publication Date Title
JP3747198B2 (en) Steel pipe sheet pile foundation
JP6241325B2 (en) Levee body, dam body component and method of constructing dam body
KR101253410B1 (en) Connection structure of wall steel pipe pile
JP2015183453A (en) Dam body
JP6263864B2 (en) Seawall
JP6971874B2 (en) Connection structure between steel structure and precast concrete member, structural wall having the connection structure, and connection method between steel structure and precast concrete member
CN104271841A (en) Steel wall
JP3905776B2 (en) Revetment structure
JP6477565B2 (en) Reinforcing structure and reinforcing method of existing steel sheet pile wall
JP6532512B2 (en) Quay or revetment structure and its construction method
JP6938199B2 (en) Seawall panel, seawall and seawall construction method
JP5835110B2 (en) Quay-quake-proof structure and quake-quake-proof reinforcement method
JP6714307B2 (en) Reinforcement method for existing steel sheet pile wall
JP2022115624A (en) Quay wall structure, and construction method of the same
JP3547271B2 (en) Water body structure using submerged ground driving member
JP7628594B2 (en) Quay structure and method for constructing the quay structure
JP6298688B2 (en) Embankment
JPH052662Y2 (en)
JP7286468B2 (en) Connection structure of steel structure and precast concrete member, structural wall having the connection structure, and connection method of steel structure and precast concrete member
JP7240284B2 (en) Connection structure of steel structure and precast concrete member, structural wall having the connection structure, and connection method of steel structure and precast concrete member
JP6292028B2 (en) Embankment reinforcement structure
JP2005256571A (en) Continuous wall and its construction method
JP7138945B2 (en) Formwork-attached wall component and formwork-attached wall
KR20110132087A (en) Connection Structure of Combination Steel Sheet Pile
JP6447669B2 (en) Seawall and construction method of seawall

Legal Events

Date Code Title Description
RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20190222

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20201125

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20211001

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20211012

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20211102

R150 Certificate of patent or registration of utility model

Ref document number: 6971874

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250