JPH0625410B2 - Cap concrete block for steel sheet pile wall - Google Patents
Cap concrete block for steel sheet pile wallInfo
- Publication number
- JPH0625410B2 JPH0625410B2 JP1139624A JP13962489A JPH0625410B2 JP H0625410 B2 JPH0625410 B2 JP H0625410B2 JP 1139624 A JP1139624 A JP 1139624A JP 13962489 A JP13962489 A JP 13962489A JP H0625410 B2 JPH0625410 B2 JP H0625410B2
- Authority
- JP
- Japan
- Prior art keywords
- steel sheet
- concrete block
- sheet pile
- pile wall
- shade
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims description 97
- 239000010959 steel Substances 0.000 title claims description 97
- 239000000945 filler Substances 0.000 claims description 10
- 210000000078 claw Anatomy 0.000 claims description 6
- 230000002093 peripheral effect Effects 0.000 claims description 4
- 239000000463 material Substances 0.000 description 14
- 238000010276 construction Methods 0.000 description 9
- 238000009415 formwork Methods 0.000 description 8
- 239000003566 sealing material Substances 0.000 description 7
- 125000006850 spacer group Chemical group 0.000 description 5
- 239000004570 mortar (masonry) Substances 0.000 description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 241000718541 Tetragastris balsamifera Species 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 238000009751 slip forming Methods 0.000 description 2
- 238000004140 cleaning Methods 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005187 foaming Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000011417 postcuring Methods 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
Landscapes
- Revetment (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Description
【発明の詳細な説明】 [産業上の利用分野] 本発明は鋼矢板壁用笠コンクリートブロックに関する。TECHNICAL FIELD The present invention relates to a shade concrete block for steel sheet pile wall.
[従来の技術] 従来、海,河川等の岸壁、あるいは地上における擁壁等
として一般にU型などの鋼矢板が互いにその爪部を係合
して連続打設されてなる鋼矢板壁が使用される。[Prior Art] Conventionally, a steel sheet pile wall in which U-shaped steel sheet piles are generally piled up with their claw portions engaged with each other has been used as a quay wall of a sea, a river or the like, or a retaining wall on the ground. It
この鋼矢板壁の上部は体裁をよくするために笠コンクリ
ートブロックが設けられる。この笠コンクリートブロッ
クは鋼矢板壁の上部に縦、横の鉄筋を篭状に配筋固着
し、その外周にコンクリート型枠をセットした後、コン
クリート型枠内にコンクリートを打設し、硬化後型枠を
はずして形成している。A cap concrete block is provided on the upper part of the steel sheet pile wall to improve the appearance. This shade concrete block has vertical and horizontal rebars fixed to the upper part of the steel sheet pile wall in a cage shape.After setting the concrete formwork on the outer periphery, concrete is placed in the concrete formwork, and after hardening It is formed by removing the frame.
しかし、このように、鋼矢板壁の上部にコンクリート型
枠をセットした後、コンクリート型枠内にコンクリート
を打設する場合、そのコンクリート型枠の配筋工事およ
び複雑な形状をしたコンクリート型枠の取付け、取りは
ずしに手間がかかる欠点があった。However, in this way, after setting the concrete formwork on the top of the steel sheet pile wall, when placing concrete in the concrete formwork, the reinforcement work of the concrete formwork and the concrete formwork of complicated shape There was a drawback that it took a lot of time to install and remove.
そこで、このような欠点を解消するために、特開昭52
−154227号公報には、鋼矢板壁の上端部に取り付
ける笠コンクリートブロックを予め成型し、この笠コン
クリートブロックを施工現場で締結ボルトによって組み
付けることで、コンクリート型枠の取付けおよび施工後
における撤去を省略できる擁壁の構築方法が提案されて
いる。Then, in order to eliminate such a defect, Japanese Patent Laid-Open No.
In Japanese Patent No. 154227, a cap concrete block to be attached to the upper end of a steel sheet pile wall is molded in advance, and the cap concrete block is assembled with fastening bolts at a construction site, thereby omitting installation and removal of the concrete formwork after construction. A possible retaining wall construction method is proposed.
[発明が解決しようとする課題] 前記従来の擁壁の構築方法においては、鋼矢板壁の上端
部に取り付ける笠コンクリートブロックを内面にスペー
サーを一体的に突設した2枚の平板状のプレキャスト版
で構成し、各プレキャスト版のスペーサーを突き合わせ
て各プレキャスト版間の間隙を鋼矢板壁の巾より広く設
定した状態で締結ボルトで一体化し、このように一体化
した笠コンクリートブロック吊り上げてプレキャスト版
の下部間隙内に鋼矢板壁の上端部が納まるように挿入し
て、各プレキャスト版間の間隙にコンクリートを打設し
て鋼矢板壁とコンクリートブロックとを一体化するか
ら、構造的に笠コンクリートブロックの下部が開口し、
プレキャスト版間にコンクリートを打設する前に笠コン
クリートブロックの下側開口部をシール材によって塞ぐ
必要があるとともに、そのシール材にプレキャスト版間
に充填されたコンクリートの荷重がかかることから、シ
ール材はコンクリートの荷重に耐え得る強度も要求さ
れ、比較的厚いシール材を用いる必要があるが、その厚
いシール材によって、コンクリートを充填する空間が狭
められるとともに、従来例ではプレキャスト版の内面に
突設するスペーサーを鋼矢板壁の上端部に載置して鋼矢
板壁上にプレキャスト版を取り付けることから、コンク
リートが充填される空間は、スペーサーから下側のプレ
キャスト版と鋼矢板壁で囲まれた狭い空間であり、しか
も、その狭い空間内には先のシール材を装着して笠コン
クリートブロックの下側開口部を塞ぐことから、コンク
リートを充填する空間は極めて狭いものとなり、その空
間に充填されたコンクリートによって鋼矢板壁と各プレ
キャスト版とを緊密に一体化できない面がある。また、
各プレキャスト版の内面に突設するスペーサーを突き合
わせて各プレキャスト版間の間隙を鋼矢板壁の巾より広
く設定することから、鋼矢板壁に対してプレキャスト版
の前後の位置が定まらず、施工に際し、連設する各笠コ
ンクリートブロックを揃えるように位置調整しながら個
々の笠コンクリートブロックを組み付ける必要もあり、
このような手間の掛かる笠コンクリートブロックの位置
決め作業により、施工性に劣るという課題が残されてい
る。[Problems to be Solved by the Invention] In the conventional method for constructing a retaining wall, two flat plate-shaped precast plates in which a spacer concrete block is integrally projectingly provided on an inner surface of a cap concrete block attached to an upper end portion of a steel sheet pile wall. The spacers of each precast plate are abutted against each other, and the gap between each precast plate is set wider than the width of the steel sheet pile wall by the fastening bolts. The steel sheet pile wall and the concrete block are integrated by inserting the steel sheet pile wall so that the upper end of the steel sheet pile wall fits in the lower gap and placing concrete in the gap between the precast plates. The bottom of the
Before the concrete is placed between the precast plates, it is necessary to close the lower opening of the cap concrete block with a sealing material, and the sealing material is loaded with the concrete filled between the precast plates. Is required to have the strength to withstand the load of concrete, and it is necessary to use a relatively thick sealing material, but this thick sealing material narrows the space for filling the concrete, and in the conventional example, it projects on the inner surface of the precast plate. The spacer is placed on the upper edge of the steel sheet pile wall and the precast plate is attached to the steel sheet pile wall.Therefore, the space filled with concrete is narrow, surrounded by the precast plate below the spacer and the steel sheet pile wall. It is a space, and moreover, the sealing material is installed in the narrow space of the shade concrete block. Since closing the side opening, the space filling concrete becomes extremely narrow, there is a surface that can not be tightly integrated with the steel sheet pile wall and the precast plate by concrete filled in the space. Also,
Since the spacers protruding from the inner surface of each precast plate are abutted to set the gap between each precast plate to be wider than the width of the steel sheet pile wall, the position before and after the precast plate with respect to the steel sheet pile wall is not fixed, and it is necessary to carry out the construction. , It is also necessary to assemble the individual shade concrete blocks while adjusting the positions so that the shade concrete blocks to be aligned are aligned.
Due to such troublesome positioning work of the shade concrete block, the problem of poor workability remains.
本発明は前記問題点を解決して笠コンクリートブロック
と鋼矢板壁とを緊密に一体化できるとともに、現場での
施工作業を簡略化できる鋼矢板壁用笠コンクリートブロ
ックを提供することを目的とする。It is an object of the present invention to solve the above problems and provide a shade concrete block for a steel sheet pile wall that can tightly integrate the shade concrete block and the steel sheet pile wall and can simplify the construction work on site. .
[課題を解決するための手段] 本発明は、両端部に形成する爪部を相互に係合させて多
数の鋼矢板を連続打設し、これら鋼矢板が凹凸状に連続
する鋼矢板壁を構成し、この鋼矢板壁の上部に笠コンク
リートブロックを取り付ける鋼矢板壁用笠コンクリート
ブロックにおいて、前記鋼矢板壁を介在してプレキャス
トから成る笠コンクリートブロック一側部と笠コンクリ
ートブロック他側部とを対向させて配置し、これら笠コ
ンクリートブロック一側部、笠コンクリートブロック他
側部および鋼矢板壁を組付け固定する固定手段を設ける
とともに、各笠コンクリートブロックの下端部に前記鋼
矢板壁の凹所にほぼ沿わせる底板部を一体に突設し、こ
の底板部と笠コンクリートブロックの内周面及び鋼矢板
壁で囲まれる空洞部に充填材を充填したものである。MEANS FOR SOLVING THE PROBLEM The present invention is a steel sheet pile wall in which a large number of steel sheet piles are continuously cast by mutually engaging the claw portions formed at both end portions and these steel sheet piles are continuously formed in an uneven shape. In a steel sheet pile wall shade concrete block configured to attach a shade concrete block to the upper portion of the steel sheet pile wall, a shade concrete block one side portion and a shade concrete block other side portion consisting of precast with the steel sheet pile wall interposed Fixing means for assembling and fixing the one side portion of the cap concrete block, the other side portion of the cap concrete block and the steel sheet pile wall, which are arranged facing each other, and the recess of the steel sheet pile wall at the lower end portion of each cap concrete block. The bottom plate part that almost runs along the inner wall of the concrete block and the cavity surrounded by the steel sheet pile wall are filled with filler. Of.
[作用] 鋼矢板壁の両側に笠コンクリートブロック一側部および
笠コンクリートブロック他側部を配置し、固定手段で鋼
矢板壁に組み付け固定すると、一側部および笠コンクリ
ートブロック他側部の内周面と底板部および鋼矢板壁で
囲まれた空洞部が形成され、この空洞部内に充填材を充
填する際、空洞部の下部開口部が底板部で塞がれ、充填
材の下方への漏れが防止される。そして、空洞部内の充
填材によって一側部および笠コンクリートブロック他側
部と鋼矢板壁とが一体化される。[Operation] When one side portion of the shade concrete block and the other side portion of the shade concrete block are arranged on both sides of the steel sheet pile wall and assembled and fixed to the steel sheet pile wall by the fixing means, the inner circumference of the one side portion and the shade concrete block other side portion A cavity surrounded by the surface, the bottom plate and the steel sheet pile wall is formed.When the filler is filled in the cavity, the bottom opening of the cavity is closed by the bottom plate, and the filler leaks downward. Is prevented. Then, the filling material in the hollow portion integrates the one side portion and the other side portion of the cap concrete block with the steel sheet pile wall.
[実施例] 次に本発明の実施例を添付図面を参照して説明する。[Embodiment] Next, an embodiment of the present invention will be described with reference to the accompanying drawings.
第1図ないし第3図は第1実施例を示しており、1は鋼
矢板であり、相互の爪部2を係合させて連続打設して鋼
矢板壁3が形成されている。尚、この鋼矢板壁3の上部
4はほぼ水面5と同一高さに設定されている。そしてこ
の鋼矢板壁3の上部4に笠コンクリートブロック6が設
けられる。この笠コンクリートブロック6は鋼矢板壁3
の一側に配設される笠コンクリートブロック一側部7と
鋼矢板壁3の他側に配設される笠コンクリートブロック
他側部8からなり、これら笠コンクリートブロック一側
部7と笠コンクリートブロック他側部8はプレキャスト
により工場等により形成されている。そして笠コンクリ
ートブロック一側部7は前記鋼矢板壁3の一側に沿わせ
る側板部7Bとこの側板部7Bの上端部に鋼矢板壁3側
に向かって突設される天板部7C及び側板部7Bの下端
部に前記鋼矢板壁3に形成される凹所1Aに対向して前
記凹所1Aよりも小さい底板部7Dとを有している。そ
して、前記天板部7Cを鋼矢板壁3の上端部に載せ、か
つ底板部7Dを鋼矢板壁3の凹所1Aに嵌め合わせるよ
うにして笠コンクリートブロック一側部7を鋼矢板壁3
に組み付けると、その側板部7Bの天板部7C及び底板
部7Dの内周面と鋼矢板壁3で囲まれる一側空洞部7A
が形成される。また笠コンクリートブロック他側部8も
同様に側板部8Bの上、下部には天板部8Cと、凹所1
Bに対向する底板部8Dが一体に設けられ、その側板部
8B、天板部8C、底板部8Dと鋼矢板壁3で囲まれる
他側空洞部8Aを形成する。なお、この例では笠コンク
リートブロック他側部8の側板部8Bが鋼矢板壁3に接
するよう、その天板部8C、底板部8Dを笠コンクリー
トブロック一側部7の天板部7C、底板部7Dより短く
形成する。そして前記天板部7C,8C間には後述する
充填材を投入する隙間9が形成されている。1 to 3 show a first embodiment, in which 1 is a steel sheet pile, and a steel sheet pile wall 3 is formed by continuously placing the steel sheet piles with engaging claw portions 2. The upper portion 4 of the steel sheet pile wall 3 is set to be substantially level with the water surface 5. A shade concrete block 6 is provided on the upper portion 4 of the steel sheet pile wall 3. This shade concrete block 6 is a steel sheet pile wall 3
The one side portion 7 of the cap concrete block arranged on one side and the other side portion 8 of the cap concrete block arranged on the other side of the steel sheet pile wall 3, and the one side portion 7 and the concrete block of the cap concrete block. The other side portion 8 is formed by a factory or the like by precasting. The one side portion 7 of the shade concrete block is a side plate portion 7B extending along one side of the steel sheet pile wall 3, and a top plate portion 7C and a side plate projecting from the upper end portion of the side sheet portion 7B toward the steel sheet pile wall 3 side. At the lower end of the portion 7B, there is a bottom plate portion 7D facing the recess 1A formed in the steel sheet pile wall 3 and smaller than the recess 1A. Then, the top plate portion 7C is placed on the upper end portion of the steel sheet pile wall 3, and the bottom plate portion 7D is fitted into the recess 1A of the steel sheet pile wall 3 so that the cap concrete block one side portion 7 is attached to the steel sheet pile wall 3.
When assembled on the one side cavity portion 7A surrounded by the inner peripheral surfaces of the top plate portion 7C and the bottom plate portion 7D of the side plate portion 7B and the steel sheet pile wall 3.
Is formed. Similarly, the other side portion 8 of the shade concrete block is also provided with a top plate portion 8C and a recess 1 above and below the side plate portion 8B.
A bottom plate portion 8D facing B is integrally provided, and forms a side plate portion 8B, a top plate portion 8C, a bottom plate portion 8D and the other side cavity portion 8A surrounded by the steel sheet pile wall 3. In addition, in this example, the top plate portion 8C and the bottom plate portion 8D of the other side portion 8 of the shade concrete block are in contact with the steel sheet pile wall 3 so that the top plate portion 7C and the bottom plate portion of the one side portion 7 of the shade concrete block are formed. Form shorter than 7D. A gap 9 is formed between the top plate portions 7C and 8C into which a filling material described later is put.
10は前記笠コンクリートブロック一側部7および笠コン
クリートブロック他側部8を鋼矢板壁3に固定した状態
で前記一側および他側空洞部7A,8Aに打設される中
詰めコンクリート,モルタルなどの充填材である。Reference numeral 10 denotes a filling concrete, a mortar, etc. which is placed in the hollow portions 7A, 8A on one side and the other side with the one side portion 7 of the concrete block and the other side portion 8 of the concrete block fixed to the steel sheet pile wall 3. Is a filling material.
11,12は前記笠コンクリートブロック一側部および他側
部7,8の上部に設けた上部貫通孔であり、この上部貫
通孔11,12には上部螺子棒13が貫挿するとともに、この
上部螺子棒13の両端にはナット14が螺着している。また
15,16は下部貫通孔であり、下部螺子棒17が貫挿すると
ナット18が螺着している。Reference numerals 11 and 12 denote upper through-holes provided on one side portion and the other side portions 7 and 8 of the shade concrete block. The upper screw rod 13 is inserted into the upper through-holes 11 and 12, and Nuts 14 are screwed on both ends of the screw rod 13. Also
Reference numerals 15 and 16 denote lower through holes, and nuts 18 are screwed on when the lower screw rod 17 is inserted.
これら上部貫通孔11,12、上部螺子棒13、ナット14およ
び下部貫通孔15,16、下部螺子棒17、ナット18によって
固定手段19が形成される。The upper through holes 11, 12, the upper screw rod 13, the nut 14, the lower through holes 15, 16, the lower screw rod 17, and the nut 18 form a fixing means 19.
尚、図中20はゴムなどからなる座金、21は腹起し22を介
して鋼矢板壁3に一端を連結したタイロッド、23は前記
一側および他側の底板部7D,8Dと充填材10間に介在
する砂利などの骨材、発泡材、砕石、栗石、コンクリー
ト片などの底板部7D,8Dと鋼矢板壁3間の隙間Xを
埋める埋設材である。In the drawing, 20 is a washer made of rubber or the like, 21 is a tie rod whose one end is connected to the steel sheet pile wall 3 via an agitator 22, 23 is the bottom plate portions 7D and 8D on the one side and the other side, and the filling material 10 It is an embedding material that fills the gap X between the bottom plate portions 7D and 8D and the steel sheet pile wall 3, such as aggregates such as gravel, foaming materials, crushed stones, crushed stones, concrete pieces, etc.
次に前記構成につきその作用を説明する。Next, the operation of the above configuration will be described.
予め上部4を水面5と略同一レベルになるように鋼矢板
1を連続打設して鋼矢板壁3を形成する。次にクレーン
(図示せず)等により笠コンクリートブロック一側部お
よび他側部7,8を吊り下げて鋼矢板壁3の両側に配設
し、そして上部螺子棒13を上部貫通孔11,12に貫挿して
ナット14で緊締し、また下部螺子棒17を下部貫通孔15,
16と鋼矢板壁3に形成した貫通孔1Cに貫通してナット
18を緊締して、笠コンクリートブロック一側部7および
他側部8を鋼矢板壁3に固定する。次に一側および他側
空洞部7A,8Aに埋設材23を投入して隙間Xを塞ぎそ
して中詰めコンクリート,モルタル等充填材10を打設し
て養生後工事を完了するものである。The steel sheet pile 1 is continuously cast in advance so that the upper portion 4 and the water surface 5 are substantially level with each other to form the steel sheet pile wall 3. Next, the one side portion and the other side portions 7 and 8 of the shade concrete block are hung by a crane (not shown) and disposed on both sides of the steel sheet pile wall 3, and the upper screw rod 13 is attached to the upper through holes 11 and 12. And tighten the nut 14 to tighten the lower screw rod 17 into the lower through hole 15,
16 and a nut through the through hole 1C formed in the steel sheet pile wall 3
Tighten 18 to fix the one side portion 7 and the other side portion 8 of the shade concrete block to the steel sheet pile wall 3. Next, the embedding material 23 is put into the one-side and other-side cavities 7A and 8A to close the gap X and the filling material 10 such as filling concrete and mortar is placed to complete the post-curing work.
以上のように、笠コンクリートブロック一側部および他
側部7,8をプレキャストにより予め製作し、これを鋼
矢板壁3にセットした後上部および下部螺子棒13,17、
ナット14,18により両者を固定することにより、笠コン
クリートブロック6を設けることができるため、現場で
の配筋、コンクリート打設などを一掃して短時間で作業
を完了でき、工期の短縮化を図ることができる。また現
場での配筋工事および複雑な形状をしたコンクリート型
枠の取付け、取りはずしの手間を無くしたため工事費の
低減を図ることができるとともに施工が天候の影響を受
けることはない。As described above, the one side portion and the other side portions 7 and 8 of the shade concrete block are pre-cast and set on the steel sheet pile wall 3, and then the upper and lower screw rods 13 and 17,
Since the cap concrete block 6 can be provided by fixing both with the nuts 14 and 18, the work can be completed in a short time by cleaning up the bar arrangement and concrete placement at the site, and shortening the construction period. Can be planned. In addition, the work cost of the construction can be reduced and the construction will not be affected by the weather because there is no need for the on-site reinforcement work and the installation and removal of the concrete formwork having a complicated shape.
さらには、笠コンクリートブロック6を前記従来例のよ
うに鋼矢板壁3上に載せるのではなく、鋼矢板壁3を介
在して笠コンクリートブロック一側部7と笠コンクリー
トブロック他側部8とを鋼矢板壁3に沿わせて対向配置
することにより、笠コンクリートブロック一側部7およ
び笠コンクリートブロック他側部8の内周面と鋼矢板壁
3とで囲まれた広い各空洞部7A,8Aを形成すること
ができ、その空洞部7A,8Aに中詰めコンクリート等
充填材10を打設することから、その充填材10によって笠
コンクリートブロック一側部7および笠コンクリートブ
ロック他側部8と鋼矢板壁3とを緊密に一体化できる。Furthermore, instead of placing the shade concrete block 6 on the steel sheet pile wall 3 as in the conventional example, the shade concrete block one side portion 7 and the shade concrete block other side portion 8 are interposed with the steel sheet pile wall 3 interposed therebetween. By arranging them facing each other along the steel sheet pile wall 3, wide hollow portions 7A, 8A surrounded by the inner peripheral surfaces of the one side portion 7 of the shade concrete block and the other side portion 8 of the shade concrete block and the steel sheet pile wall 3. Since the filling material 10 such as filled concrete is placed in the cavities 7A and 8A, the filling material 10 causes the one side portion 7 of the concrete block and the other side portion 8 of the concrete block and the steel The sheet pile wall 3 can be tightly integrated.
また、各笠コンクリートブロック7,8の下端部に鋼矢
板壁3の凹所1A,1Bにほぼ沿わせる底板部7D,8
Dを一体形成することによって、空洞部7A,8Aの下
部開口部をほぼ塞ぐことができるため、充填材10を打設
したとき下方への落下を防止でき、その底板部7D,8
Dと鋼矢板壁3との僅かな隙間Xを塞ぐだけで作業性に
も優れるとともに、各笠コンクリートブロック7,8に
底板部7D,8Dを一体形成することで、底板部7D,
8Dを薄く形成したとしても、充填材10の荷重に十分耐
える強度を得ることができるため、その底板部7D,8
Dによって空洞部7A,8Aが狭められる空間を少なく
抑え、空洞部7A,8Aを中詰めコンクリート等充填材
10の充填空間として確保することができるとともに、各
底板部7D,8Dの形状を鋼矢板壁3の凹所1A,1B
すなわち、鋼矢板壁3の凹凸面に対応させて一体形成す
ることによって、鋼矢板壁3の凹所1A,1Bと底板部
7D,8Dとを合わせるように笠コンクリートブロック
一側部7と笠コンクリートブロック他側部8を鋼矢板壁
3に組み付けることで、鋼矢板壁3に対する笠コンクリ
ートブロック一側部7および笠コンクリートブロック他
側部8の位置合わせが容易であり、施工性にも優れる。In addition, bottom plate portions 7D and 8 which are substantially along the recesses 1A and 1B of the steel sheet pile wall 3 at the lower end portions of the respective shade concrete blocks 7 and 8.
By integrally forming D, the lower openings of the cavities 7A and 8A can be almost closed, so that the filler 10 can be prevented from falling downward when the filler 10 is placed, and the bottom plate portions 7D and 8A thereof can be prevented.
The workability is excellent only by closing the slight gap X between the steel sheet pile wall 3 and the steel sheet pile wall 3, and the bottom plate portions 7D and 8D are integrally formed on the respective shade concrete blocks 7 and 8 so that the bottom plate portion 7D,
Even if 8D is thinly formed, it is possible to obtain sufficient strength to withstand the load of the filler 10, so that the bottom plate portions 7D, 8
The space in which the cavities 7A and 8A are narrowed by D is reduced, and the cavities 7A and 8A are filled with a filling material such as concrete.
It can be secured as a filling space for 10 and the shape of each bottom plate portion 7D, 8D can be made into the recesses 1A, 1B of the steel sheet pile wall 3.
That is, by integrally forming in correspondence with the uneven surface of the steel sheet pile wall 3, the concave portion 1A, 1B of the steel sheet pile wall 3 and the bottom plate portions 7D, 8D are aligned so that the shade concrete block one side portion 7 and the shade concrete. By assembling the block other side portion 8 to the steel sheet pile wall 3, it is easy to align the shade concrete block one side portion 7 and the shade concrete block other side portion 8 with the steel sheet pile wall 3, and the workability is also excellent.
さらに笠コンクリートブロック一側部7、笠コンクリー
トブロック他側部8はプレキャスト製のために水中部で
も施工でき、したがって鋼矢板壁3の上部4を水面5と
略同一高さに設定できる。このため、鋼矢板壁3の長さ
を短くでき、コストダウンを図ることができるととも
に、笠コンクリートブロック6の品質の向上を図ること
ができる。また補修時には上部および下部螺子棒13,17
のナット14,18を弛めることによって笠コンクリートブ
ロック6の入替えを簡単に行うことができる。Further, since the one side portion 7 of the shade concrete block and the other side portion 8 of the shade concrete block are made of precast, they can be constructed even in the underwater portion, so that the upper portion 4 of the steel sheet pile wall 3 can be set at substantially the same height as the water surface 5. Therefore, the length of the steel sheet pile wall 3 can be shortened, the cost can be reduced, and the quality of the shade concrete block 6 can be improved. When repairing, upper and lower screw bars 13, 17
By loosening the nuts 14 and 18 of the above, the cap concrete block 6 can be easily replaced.
しかも笠コンクリートブロック一側部および他側部7,
8には一側および他側空洞部7A,8Aを有し、この空
洞部7A,8Aに中詰めコンクリート等充填材10を打設
することによって、現場でのコンクリートまたはモルタ
ルなどの充填材10の量を少なくできさらに笠コンクリー
トブロック6の上面を美しく仕上げることができる。Moreover, the shade concrete block one side and the other side 7,
8 has cavities 7A and 8A on one side and the other side, and by filling a filling material 10 such as filling concrete into the cavities 7A and 8A, the filling material 10 such as concrete or mortar on site can be obtained. The amount can be reduced and the upper surface of the shade concrete block 6 can be finished beautifully.
また前記底板部7D,8Dは凹所1A,1Bよりも若干
小さくしたことによって、各種の鋼矢板1に対応でき、
また笠コンクリートブロック一側部および他側部7,8
を美しく並べて設置できる。Further, by making the bottom plate portions 7D, 8D slightly smaller than the recesses 1A, 1B, various steel sheet piles 1 can be accommodated,
In addition, one side and the other side 7, 8 of the shade concrete block
Can be installed side by side beautifully.
第4図は第2実施例を示しており、前記第1実施例と同
一部分には同一符号を付しその詳細な説明を省略する。FIG. 4 shows the second embodiment. The same parts as those in the first embodiment are designated by the same reference numerals and detailed description thereof will be omitted.
第2実施例においては、一側および他側空洞部7A,8
Aの上方を同幅に開口したものであり、また一側および
他側底板部7D,8Dと鋼矢板壁3の隙間Xを塞ぐため
に該隙間Xにはシール材24が貼着されており、そして充
填材22が空洞部7A,8Aに設けられるものである。In the second embodiment, the one side and the other side cavities 7A, 8
The upper part of A is opened to the same width, and a sealing material 24 is adhered to the gap X to close the gap X between the one side and other side bottom plate portions 7D, 8D and the steel sheet pile wall 3, The filler 22 is provided in the hollow portions 7A and 8A.
このようにシール材24によって隙間Xを塞ぐことによっ
て確実に充填材10の落下を防止できる。In this way, by closing the gap X with the sealing material 24, it is possible to reliably prevent the filling material 10 from falling.
尚、本発明は前記実施例に限定されるものではなく、例
えば固定手段を他の固定装置などを用いてもよいなど種
々の変形が可能である。The present invention is not limited to the above embodiment, and various modifications can be made, for example, the fixing means may be another fixing device.
[発明の効果] 本発明は両端部に形成する爪部を相互に係合させて多数
の鋼矢板を連続打設し、これら鋼矢板が凹凸状に連続す
る鋼矢板壁を構成し、この鋼矢板壁の上部に笠コンクリ
ートブロックを取り付ける鋼矢板壁用笠コンクリートブ
ロックにおいて、前記鋼矢板壁を介在してプレキャスト
から成る笠コンクリートブロック一側部と笠コンクリー
トブロック他側部とを対向させて配置し、これら笠コン
クリートブロック一側部、笠コンクリートブロック他側
部および鋼矢板壁を組付け固定する固定手段を設けると
ともに、各笠コンクリートブロックの下端部に前記鋼矢
板壁の凹所にほぼ沿わせる底板部を一体に突設し、この
底板部と笠コンクリートブロックの内周面及び鋼矢板壁
で囲まれる空洞部に充填材を充填したことにより、笠コ
ンクリートブロックと鋼矢板壁とを緊密に一体化できる
とともに、現場での施工作業を簡略化できる鋼矢板壁用
笠コンクリートブロックを提供することができる。[Advantage of the Invention] The present invention forms a steel sheet pile wall in which a large number of steel sheet piles are continuously driven by engaging claw portions formed at both ends with each other, and these steel sheet piles are continuously formed in an uneven shape. In a cap concrete block for a steel sheet pile wall that attaches a cap concrete block to the upper part of the sheet pile wall, one side portion of the cap concrete block made of precast and the other side portion of the cap concrete block are arranged to face each other with the steel sheet wall interposed. , A bottom plate which is provided with a fixing means for assembling and fixing one side of the shade concrete block, the other side of the shade concrete block and the steel sheet pile wall, and which is substantially along the recess of the steel sheet pile wall at the lower end of each shade concrete block. By projecting the part integrally, and filling the bottom plate part, the inner peripheral surface of the cap concrete block and the cavity surrounded by the steel sheet pile wall with a filler, It is possible to provide a shade concrete block for a steel sheet pile wall that can tightly integrate the cleat block and the steel sheet pile wall and can simplify the construction work on site.
第1図ないし第3図は第1実施例を示しており、第1図
は一部切欠き斜視図、第2図は縦断面図、第3図は平断
面図、第4図は第2実施例を示す縦断面図である。 1……鋼矢板 1A,1B……凹所 2……爪部 3……鋼矢板壁 4……上部 6……笠コンクリートブロック 7……笠コンクリートブロック一側部 7A,8A……空洞部 7D,8D……底板部 8……笠コンクリートブロック他側部 10……充填材 19……固定手段1 to 3 show a first embodiment, FIG. 1 is a partially cutaway perspective view, FIG. 2 is a longitudinal sectional view, FIG. 3 is a horizontal sectional view, and FIG. It is a longitudinal section showing an example. 1 …… Steel sheet pile 1A, 1B …… Concave 2 …… Claw part 3 …… Steel sheet pile wall 4 …… Upper part 6 …… Masa concrete block 7 …… Masa concrete block one side 7A, 8A …… Cavity part 7D , 8D ...... Bottom plate 8 ...... Kasa concrete block other side 10 ...... Filler 19 ...... Fixing means
Claims (1)
多数の鋼矢板を連続打設し、これら鋼矢板が凹凸状に連
続する鋼矢板壁を構成し、この鋼矢板壁の上部に笠コン
クリートブロックを取り付ける鋼矢板壁用笠コンクリー
トブロックにおいて、前記鋼矢板壁を介在してプレキャ
ストから成る笠コンクリートブロック一側部と笠コンク
リートブロック他側部とを対向させて配置し、これら笠
コンクリートブロック一側部、笠コンクリートブロック
他側部および鋼矢板壁を組付け固定する固定手段を設け
るとともに、各笠コンクリートブロックの下端部に前記
鋼矢板壁の凹所にほぼ沿わせる底板部を一体に突設し、
この底板部と笠コンクリートブロックの内周面及び鋼矢
板壁で囲まれる空洞部に充填材を充填して成ることを特
徴とする鋼矢板壁用笠コンクリートブロック。1. A plurality of steel sheet piles are continuously driven by engaging claw portions formed at both end portions with each other to form a steel sheet pile wall in which these steel sheet piles are continuous in a concavo-convex shape. In a cap concrete block for a steel sheet pile wall to which a cap concrete block is attached at an upper portion, one side portion of the cap concrete block made of precast and the other side portion of the cap concrete block are arranged so as to face each other with the steel sheet wall interposed therebetween, and these caps are arranged. A fixing means for assembling and fixing the one side of the concrete block, the other side of the shade concrete block and the steel sheet pile wall is provided, and the bottom plate portion which substantially follows the recess of the steel sheet pile wall is integrally provided at the lower end portion of each shade concrete block. Protruding from the
A shade concrete block for a steel sheet pile wall, characterized in that the bottom plate portion, the inner peripheral surface of the shade concrete block, and a cavity surrounded by the steel sheet pile wall are filled with a filler.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP1139624A JPH0625410B2 (en) | 1989-05-31 | 1989-05-31 | Cap concrete block for steel sheet pile wall |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP1139624A JPH0625410B2 (en) | 1989-05-31 | 1989-05-31 | Cap concrete block for steel sheet pile wall |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH035510A JPH035510A (en) | 1991-01-11 |
| JPH0625410B2 true JPH0625410B2 (en) | 1994-04-06 |
Family
ID=15249619
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP1139624A Expired - Fee Related JPH0625410B2 (en) | 1989-05-31 | 1989-05-31 | Cap concrete block for steel sheet pile wall |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0625410B2 (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP6971874B2 (en) * | 2018-02-07 | 2021-11-24 | ジオスター株式会社 | Connection structure between steel structure and precast concrete member, structural wall having the connection structure, and connection method between steel structure and precast concrete member |
| JP7240284B2 (en) * | 2019-08-05 | 2023-03-15 | ジオスター株式会社 | Connection structure of steel structure and precast concrete member, structural wall having the connection structure, and connection method of steel structure and precast concrete member |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS52154227A (en) * | 1976-06-18 | 1977-12-21 | Shinkouzou Gijiyutsu Kk | Method of building breast wall |
-
1989
- 1989-05-31 JP JP1139624A patent/JPH0625410B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH035510A (en) | 1991-01-11 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPH07102528A (en) | Precast balustrade, and method for connecting precast balustrade to slab | |
| JP3519378B2 (en) | Retaining wall structure and members for retaining wall construction in the observer passage in the tunnel | |
| JPH0625410B2 (en) | Cap concrete block for steel sheet pile wall | |
| JPS609178B2 (en) | How to install garden or boundary wall panels | |
| JPH0625408B2 (en) | Cap concrete block for steel sheet pile wall | |
| JP2025044627A (en) | Block assembly construction method and sheet material | |
| JP3936435B2 (en) | Construction method of wall-like concrete structure | |
| JP3530656B2 (en) | Construction method of the bottom inspection corridor at the fill dam | |
| JP3211228B2 (en) | Shaft concrete block for steel sheet pile wall | |
| JP2552435B2 (en) | Installation method of retaining wall | |
| JPH06330507A (en) | Abutment | |
| JPH03191116A (en) | How to construct underground beams | |
| JP2950393B2 (en) | Side groove | |
| JP4933489B2 (en) | Raised block of concrete frame | |
| JPH09256515A (en) | Precast wall slab and constructing method of building using the wall slab | |
| JP3729890B2 (en) | Single-sided precast concrete underground beam and its components | |
| JP3095417U (en) | Large assembled culvert constructed of precast concrete and cast-in-place concrete | |
| KR102181535B1 (en) | Easily replaceable extension joint device and how to replace expansion joints | |
| JPH0641685B2 (en) | Construction method of cap concrete for steel sheet pile wall and cap concrete block | |
| JPH0841893A (en) | Manufacture of caisson bottom slab section and bottom slab section structure of caisson | |
| JP2927783B1 (en) | Top level adjustment method of reinforced concrete cloth foundation and precast reinforced concrete cloth foundation member | |
| JPH09242040A (en) | Revetment slope covering structure | |
| KR20090095158A (en) | The enlargement construction method for base of bridge with guides and molds in the shape of pipes | |
| JP2026015118A (en) | Repair structure of concrete embankment | |
| JP2001140237A (en) | Construction method for coping concrete to revetment steel pipe sheet pile and coping concrete block |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| LAPS | Cancellation because of no payment of annual fees |