Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP6976680B2 - Cold water circulation system - Google Patents
[go: Go Back, main page]

JP6976680B2 - Cold water circulation system - Google Patents

Cold water circulation system Download PDF

Info

Publication number
JP6976680B2
JP6976680B2 JP2016238360A JP2016238360A JP6976680B2 JP 6976680 B2 JP6976680 B2 JP 6976680B2 JP 2016238360 A JP2016238360 A JP 2016238360A JP 2016238360 A JP2016238360 A JP 2016238360A JP 6976680 B2 JP6976680 B2 JP 6976680B2
Authority
JP
Japan
Prior art keywords
control
control device
heat exchanger
cooling
cold water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2016238360A
Other languages
Japanese (ja)
Other versions
JP2018096552A (en
Inventor
由貴 戸倉
健 相良
次良 福田
庸聡 栗原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NTT Facilities Inc
Original Assignee
NTT Facilities Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NTT Facilities Inc filed Critical NTT Facilities Inc
Priority to JP2016238360A priority Critical patent/JP6976680B2/en
Priority to PCT/JP2017/044211 priority patent/WO2018105732A1/en
Priority to PCT/JP2017/044213 priority patent/WO2018105734A1/en
Publication of JP2018096552A publication Critical patent/JP2018096552A/en
Application granted granted Critical
Publication of JP6976680B2 publication Critical patent/JP6976680B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Air Conditioning Control Device (AREA)

Description

本願は、冷熱を生成する熱源機と熱交換器との間で冷水を循環させて冷却対象の冷却を行う冷水循環システムに関する。 The present application relates to a cold water circulation system in which cold water is circulated between a heat source machine that generates cold heat and a heat exchanger to cool an object to be cooled.

商業施設やオフィスビル等の比較的広い空間を冷却対象とする空調システムでは、複数箇所それぞれに設置された熱交換器(例えば、ファンコイルユニット)に求められる空調能力が設置箇所毎に大きく異なる場合がある。そして、冷水を各熱交換器に循環させる冷水循環システム方式の空調システムでは、各熱交換器で発揮させる空調能力、つまり冷却能力を適切に制御することが難しい場合がある。 In an air-conditioning system that targets a relatively large space such as a commercial facility or office building, the air-conditioning capacity required for heat exchangers (for example, fan coil units) installed at multiple locations varies greatly from installation to location. There is. In a cold water circulation system type air conditioning system that circulates cold water to each heat exchanger, it may be difficult to appropriately control the air conditioning capacity exerted by each heat exchanger, that is, the cooling capacity.

これに対して、例えば、特許文献1の発明では、1つの空調システムに対して相反する空調温度要求がされた場合、一方の要望情報の率と第1の基準値とを比較することで一方の方向へ目標温度を変化させ、他方の要望情報の率と第2の基準値とを比較することで他方の方向へ目標温度を変化させている。 On the other hand, for example, in the invention of Patent Document 1, when conflicting air conditioning temperature requirements are made for one air conditioning system, the rate of one request information is compared with the first reference value. The target temperature is changed in the direction of the other, and the target temperature is changed in the other direction by comparing the rate of the other requested information with the second reference value.

特開2008−241160号公報Japanese Unexamined Patent Publication No. 2008-241160

本願は、簡便な手法にて各熱交換器で発揮させる冷却能力を適切に制御可能な冷水循環システムを提供する。 The present application provides a cold water circulation system capable of appropriately controlling the cooling capacity exerted by each heat exchanger by a simple method.

本願では、冷水を冷却する熱源機(11)、並びに冷却された冷水と冷却対象を冷却する複数の熱交換器(12A)を有する冷却装置(10)と、冷却装置(10)の稼働状態を制御するための制御パラメータ(Tw)を用いて当該冷却装置(10)の作動を制御する制御装置(20)と、冷却対象の状態を直接的又は間接的に示す第1パラメータ(以下、第1管理項目という。)の値を検出する第1検出部(S1)と、冷却対象の状態を直接的又は間接的に示す第2パラメータ(以下、第2管理項目という。)の値を検出する第2検出部(S2)とを少なくとも備えている。 In the present application, an operating state of a heat source machine (11) for cooling cold water, a cooling device (10) having a plurality of heat exchangers (12A) for cooling the cooled cold water and a cooling target, and a cooling device (10) are described. A control device (20) that controls the operation of the cooling device (10) using a control parameter (Tw) for control, and a first parameter (hereinafter, first) that directly or indirectly indicates the state of the cooling target. The first detection unit (S1) that detects the value of the control item) and the second parameter that directly or indirectly indicates the state of the cooling target (hereinafter referred to as the second control item) are detected. 2 It is provided with at least a detection unit (S2).

そして、制御装置(20)は、第1検出部(S1)により検出された値が、第1管理項目について予め設定された第1管理条件を満たすか否かを判断する第1判断処理、第1管理条件を満たさないと判断されたときに、第1管理項目について予め設定された値(以下、第1設定値という。)を設定する第1設定処理、第2検出部(S2)により検出された値が、第2管理項目について予め設定された管理条件を満たすか否かを判断する第2判断処理を実行可能である。 Then, the control device (20) determines whether or not the value detected by the first detection unit (S1) satisfies the first management condition preset for the first management item, the first determination process, the first. 1 When it is determined that the control conditions are not satisfied, it is detected by the first setting process and the second detection unit (S2) that set preset values (hereinafter referred to as first set values) for the first control item. It is possible to execute the second determination process for determining whether or not the set value satisfies the management condition preset for the second control item.

さらに、制御装置(20)は、第2管理条件を満たさないと判断されたときに、第2管理項目について予め設定された値(以下、第2設定値という。)を設定する第2設定処理、並びに少なくとも第1設定値及び第2設定値に基づいて統計量を算出し、当該統計量を利用して予め設定されたルールに従って制御パラメータ(Tw)を決定する決定処理を実行可能である。 Further, the control device (20) sets a preset value (hereinafter referred to as a second set value) for the second control item when it is determined that the second control condition is not satisfied. , And at least, it is possible to calculate a statistic based on the first set value and the second set value, and execute a determination process of determining a control parameter (Tw) according to a preset rule using the statistic.

なお、統計量とは、一組の標本データに相当する第1設定値及び第2設定値に目的に応じた統計学的なアルゴリズムを適用して得られた値である。例えば、第1設定値と第2設定値との和、及び第1設定値と第2設定値との平均値等である。 The statistic is a value obtained by applying a statistical algorithm according to the purpose to the first set value and the second set value corresponding to a set of sample data. For example, the sum of the first set value and the second set value, the average value of the first set value and the second set value, and the like.

これにより、例えば、第1管理項目が第2管理項目より重要である場合に、第1設定値を第2設定値より大きくする、つまり第1管理項目の重み付けを第2管理項目の重み付けより大きくすることにより、第1管理項目が第2管理項目より反映された制御を実行することが可能となる。 Thereby, for example, when the first control item is more important than the second control item, the first set value is made larger than the second set value, that is, the weight of the first control item is made larger than the weight of the second control item. By doing so, it becomes possible to execute the control in which the first control item is reflected from the second control item.

したがって、「各管理項目に対して重み付けを行う」といった簡便な手法にて、各熱交換器(12A)で発揮させる冷却能力を適切に制御可能な冷水循環システムを得ることができ得る。なお、本願発明は、3つ以上の管理項目を設定してもよいことは当然である。 Therefore, it is possible to obtain a cold water circulation system capable of appropriately controlling the cooling capacity exerted by each heat exchanger (12A) by a simple method such as "weighting each control item". It is natural that the invention of the present application may set three or more management items.

因みに、上記各括弧内の符号は、後述する実施形態に記載の具体的構成等との対応関係を示す一例であり、本発明は上記括弧内の符号に示された具体的構成等に限定されるものではない。 Incidentally, the reference numeral in each of the parentheses is an example showing a correspondence relationship with the specific configuration and the like described in the embodiment described later, and the present invention is limited to the specific configuration and the like shown in the reference numeral in the parentheses. It's not something.

本願の実施形態に係る熱媒体循環システム(冷水循環システム)の一例を示す図である。It is a figure which shows an example of the heat medium circulation system (cold water circulation system) which concerns on embodiment of this application. 本願の実施形態に係る制御モード切替を示す図である。It is a figure which shows the control mode switching which concerns on embodiment of this application. 本願の第1実施形態に係る第3制御モードのフローチャートである。It is a flowchart of the 3rd control mode which concerns on 1st Embodiment of this application. 本願の第1実施形態に係る第2制御モードのフローチャートである。It is a flowchart of the 2nd control mode which concerns on 1st Embodiment of this application. 本願の第1実施形態に係る第2制御モードのフローチャートである。It is a flowchart of the 2nd control mode which concerns on 1st Embodiment of this application. 本願の第1実施形態に係る第2制御モードのフローチャートである。It is a flowchart of the 2nd control mode which concerns on 1st Embodiment of this application. 本願の第1実施形態に係る第1制御モードのフローチャートである。It is a flowchart of the 1st control mode which concerns on 1st Embodiment of this application.

以下に説明する「発明の実施形態」は、本願発明の技術的範囲に属する実施形態の一例を示すものである。つまり、特許請求の範囲に記載された発明特定事項等は、下記の実施形態に示された具体的構成や構造等に限定されるものではない。 The "embodiment of the invention" described below is an example of an embodiment belonging to the technical scope of the present invention. That is, the matters specifying the invention described in the claims are not limited to the specific configuration, structure, etc. shown in the following embodiments.

以下、本発明の実施形態を図面と共に説明する。なお、各図に付された方向を示す矢印等は、各図相互の関係を理解し易くするために記載したものである。本発明は、各図に付された方向に限定されるものではない。 Hereinafter, embodiments of the present invention will be described with reference to the drawings. It should be noted that the arrows and the like indicating the directions attached to each figure are described in order to make it easier to understand the relationship between each figure. The present invention is not limited to the directions attached to each figure.

少なくとも符号を付して説明した部材又は部位は、「1つの」等の断りをした場合を除き、少なくとも1つ設けられている。つまり、当該部材が2以上設けられていてもよい。
(第1実施形態)
本実施形態は、熱媒体循環システムに本発明に係る冷水循環システムを適用したものである。熱媒体循環システムは、冷却又は加熱された熱媒体を循環させて温度管理対象を冷却又は加熱するシステムである。
At least one member or part described with a reference numeral is provided, except when a notice such as "one" is given. That is, two or more of the members may be provided.
(First Embodiment)
In this embodiment, the cold water circulation system according to the present invention is applied to a heat medium circulation system. The heat medium circulation system is a system that circulates a cooled or heated heat medium to cool or heat a temperature controlled object.

具体的には、商業施設やオフィスビル等の比較的広い空間(室内)の空気を冷却対象とする空調システムに本発明に係る冷水循環システムを適用したものである。以下、冷房用空調システムを例に本実施形態を説明する。 Specifically, the cold water circulation system according to the present invention is applied to an air conditioning system that cools air in a relatively large space (indoor) such as a commercial facility or an office building. Hereinafter, the present embodiment will be described using an air conditioning system for cooling as an example.

1.冷水循環システムの構成(図1参照)
空調装置10は、室内空気を冷却する冷却装置の一例である。当該空調装置10は、熱源機11、熱交換器12A及びバイパス配管13等の機器それぞれを少なくとも1つ有する。熱源機11は、熱媒体を冷却又は加熱するための熱を生成する。
1. 1. Configuration of cold water circulation system (see Fig. 1)
The air conditioner 10 is an example of a cooling device that cools the indoor air. The air conditioner 10 has at least one device such as a heat source machine 11, a heat exchanger 12A, and a bypass pipe 13. The heat source machine 11 generates heat for cooling or heating the heat medium.

本実施形態に係る熱源機11は、熱媒体を冷却するための冷熱を生成する。以下、熱源機11にて冷却された熱媒体を冷水という。熱源機11は、例えば蒸気圧縮式冷凍機等の冷凍機により構成されている。 The heat source machine 11 according to the present embodiment generates cold heat for cooling the heat medium. Hereinafter, the heat medium cooled by the heat source machine 11 is referred to as cold water. The heat source machine 11 is composed of a refrigerator such as a steam compression type refrigerator.

なお、熱源機11で必要な最大冷熱量が大きい場合には、複数の冷凍機にて熱源機11が構成される場合もある。そして、熱源機11は、その仕様上、生成可能な最小冷熱量が決まっている。 If the maximum amount of cooling heat required by the heat source machine 11 is large, the heat source machine 11 may be configured by a plurality of refrigerators. The minimum amount of cold heat that can be generated is determined by the specifications of the heat source machine 11.

つまり、1台の冷凍機にて熱源機11が構成されている場合には、当該1台の冷凍機で生成可能な最小冷熱量が熱源機11の最小冷熱量となる。複数台の冷凍機にて熱源機11が構成されている場合には、最小冷熱量が最も小さい冷凍機のみが稼働しているときの当該冷凍機の最小冷熱量が熱源機11の最小冷熱量となる。 That is, when the heat source machine 11 is configured by one refrigerator, the minimum amount of cold heat that can be generated by the one refrigerator is the minimum amount of cold heat of the heat source machine 11. When the heat source machine 11 is composed of a plurality of refrigerators, the minimum cooling amount of the refrigerator when only the refrigerator having the smallest minimum cooling amount is operating is the minimum cooling amount of the heat source machine 11. It becomes.

冷熱生成時に発生した廃熱は、冷却水を介して冷却塔11Aから大気中に放熱される。冷却水ポンプ11Bは、熱源機11と冷却塔11Aとの間で冷却水を循環させる。三方弁11Cは、熱源機11から流出した冷却水を冷却塔11Aを迂回させて熱源機11に戻す流量を調整するバルブである。 The waste heat generated during the generation of cold heat is dissipated to the atmosphere from the cooling tower 11A via the cooling water. The cooling water pump 11B circulates cooling water between the heat source machine 11 and the cooling tower 11A. The three-way valve 11C is a valve that adjusts the flow rate of the cooling water flowing out of the heat source machine 11 by bypassing the cooling tower 11A and returning it to the heat source machine 11.

熱交換器12Aは、冷却対象の一例である室内に供給する空気と冷水とを熱交換器し、当該空気を冷却する。本実施形態に係る熱交換器12Aは、当該熱交換器12Aに空気を送風する送風機12Bと一体化(ユニット化)されたファンコイルユニット12である。 The heat exchanger 12A heat exchangers the air supplied to the room, which is an example of the object to be cooled, and cold water, and cools the air. The heat exchanger 12A according to the present embodiment is a fan coil unit 12 integrated (unitized) with a blower 12B that blows air to the heat exchanger 12A.

熱交換器12A、つまりファンコイルユニット12(以下、FCU12と記す。)は、複数のフロア又は複数の部屋それぞれに少なくとも1台ずつ設置されている。つまり、空調装置10は少なくとも2つのFCU12を有する。なお、一つのフロア又は一つの部屋に複数のFCU12が設置されていてもよい。 At least one heat exchanger 12A, that is, a fan coil unit 12 (hereinafter referred to as FCU12) is installed on each of a plurality of floors or a plurality of rooms. That is, the air conditioner 10 has at least two FCU 12. In addition, a plurality of FCU12s may be installed on one floor or one room.

各フロア等には、当該フロア等に設置されたFCU12の空調能力を調整するためのコントローラ(図示せず。)が設けられている。利用者は、当該コントローラを操作して空調能力(冷却能力)を調整できる。 Each floor or the like is provided with a controller (not shown) for adjusting the air conditioning capacity of the FCU 12 installed on the floor or the like. The user can adjust the air conditioning capacity (cooling capacity) by operating the controller.

すなわち、各FCU12には、熱交換器12Aを流通する冷水量を調節するバルブ12Cが設けられている。各コントローラは、利用者の操作に応じてバルブ12Cの開度を調整して当該FCU12で発生させる空調能力を調整する。 That is, each FCU 12 is provided with a valve 12C for adjusting the amount of cold water flowing through the heat exchanger 12A. Each controller adjusts the opening degree of the valve 12C according to the operation of the user to adjust the air conditioning capacity generated by the FCU 12.

具体的には、冷却能力を大きくする操作がされた場合、コントローラは、バルブ12Cの開度を大きくして熱交換器12Aに流通させる冷水量を増大させる。冷却能力を小さくする操作がされた場合、コントローラは、バルブ12Cの開度を小さくして熱交換器12Aに流通させる冷水量を減少させる。 Specifically, when the operation of increasing the cooling capacity is performed, the controller increases the opening degree of the valve 12C to increase the amount of cold water to be distributed to the heat exchanger 12A. When the operation of reducing the cooling capacity is performed, the controller reduces the opening degree of the valve 12C to reduce the amount of cold water flowing through the heat exchanger 12A.

バイパス配管13は、複数の熱交換器12Aの冷水流入側とそれら熱交換器12Aの冷水流出側とを繋ぐ配管である。一次ポンプP1及び二次ポンプP2は、熱源機11と複数の熱交換器12Aとの間で冷水を循環させるためポンプである。 The bypass pipe 13 is a pipe connecting the chilled water inflow side of the plurality of heat exchangers 12A and the chilled water outflow side of the heat exchangers 12A. The primary pump P1 and the secondary pump P2 are pumps for circulating cold water between the heat source machine 11 and the plurality of heat exchangers 12A.

一次ポンプP1は、複数の熱交換器12Aから流出した冷水を熱源機11に送るポンプである。二次ポンプP2は、熱源機11から供給された冷水を各熱交換器12Aに送るポンプである。 The primary pump P1 is a pump that sends the cold water flowing out from the plurality of heat exchangers 12A to the heat source machine 11. The secondary pump P2 is a pump that sends cold water supplied from the heat source machine 11 to each heat exchanger 12A.

なお、図1では、1台のポンプにより一次ポンプP1が構成され、複数のポンプにより二次ポンプP2が構成されている。しかし、一次ポンプP1及び二次ポンプP2の構成は、これに限定されるものではない。 In FIG. 1, one pump constitutes a primary pump P1, and a plurality of pumps constitute a secondary pump P2. However, the configurations of the primary pump P1 and the secondary pump P2 are not limited to this.

すなわち、例えば、一次ポンプP1も複数のポンプにより構成されていてもよい。なお、熱源機11が複数の熱源機により構成されている場合には、通常、一次ポンプP1も複数のポンプにより構成される。 That is, for example, the primary pump P1 may also be composed of a plurality of pumps. When the heat source machine 11 is composed of a plurality of heat source machines, the primary pump P1 is also usually composed of a plurality of pumps.

バイパス配管13は、二次ポンプP2の吸入側と一次ポンプP1の吸入側とを接続する。本実施形態に係るバイパス配管13は、一次往水ヘッダ14Aと一次還水ヘッダ14Bとを繋ぐように設けられている。 The bypass pipe 13 connects the suction side of the secondary pump P2 and the suction side of the primary pump P1. The bypass pipe 13 according to the present embodiment is provided so as to connect the primary outflow header 14A and the primary return water header 14B.

一次往水ヘッダ14Aは、例えば、熱源機11が複数の熱源機により構成されている場合には、それら複数の熱源機11から流出した冷水を集合させる。さらに、一次往水ヘッダ14Aは、二次ポンプP2を構成する各ポンプに分配する。 For example, when the heat source machine 11 is composed of a plurality of heat source machines, the primary water flow header 14A collects the cold water flowing out from the plurality of heat source machines 11. Further, the primary outflow header 14A is distributed to each pump constituting the secondary pump P2.

一次還水ヘッダ14Bは、例えば、熱源機11が複数の熱源機により構成されている場合に、二次還水ヘッダ15Bから流出した冷水を一次ポンプP1を構成する各ポンプに分配する。 For example, when the heat source machine 11 is composed of a plurality of heat source machines, the primary return water header 14B distributes the cold water flowing out from the secondary return water header 15B to each pump constituting the primary pump P1.

二次還水ヘッダ15Bは、複数の熱交換器12Aから流出した冷水を集合させて一次還水ヘッダ14B側に流出する集合器である。二次往水ヘッダ15Aは、二次ポンプP2を構成する各ポンプから吐出された冷水を集合させて各熱交換器12Aに分配する集合分配器である。 The secondary return water header 15B is an aggregate that collects the cold water that has flowed out from the plurality of heat exchangers 12A and flows out to the primary return water header 14B side. The secondary outflow header 15A is a collective distributor that collects cold water discharged from each pump constituting the secondary pump P2 and distributes it to each heat exchanger 12A.

2.冷水循環システムの制御
2.1 制御構成
制御装置20は、一次ポンプP1、二次ポンプP2、各送風機12B及び熱源機11等の稼働状態、つまり空調装置10の稼働状態を直接的又は間接的に制御する。制御装置20は、CPU、ROM及びRAM等にて構成されたマイクロコンピュータであって、ROM等の不揮発性記憶部に予め記憶されたプログラム(ソフトウェア)に従って空調装置10の作動を制御する。
2. 2. Control of cold water circulation system 2.1 Control configuration The control device 20 directly or indirectly controls the operating state of the primary pump P1, the secondary pump P2, each blower 12B, the heat source machine 11, etc., that is, the operating state of the air conditioner 10. Control. The control device 20 is a microcomputer composed of a CPU, a ROM, a RAM, and the like, and controls the operation of the air conditioning device 10 according to a program (software) stored in advance in a non-volatile storage unit such as the ROM.

なお、「間接的に制御する」とは、例えば、制御装置20が送風機12Bの送風量(ファン回転数)及びバルブ12Cの開度の作動、つまりFCU12の作動を制御する場合等の制御である。 The "indirect control" is, for example, a control when the control device 20 controls the air flow amount (fan rotation speed) of the blower 12B and the operation of the opening degree of the valve 12C, that is, the operation of the FCU 12. ..

すなわち、制御装置20がFCU12を制御する際、制御装置20は、FCU12に設けられたコントローラに制御指令信号を発信し、当該信号を送風機12B等に直接的に発信しない。つまり、制御装置20は、コントローラを介して間接的に送風機12B等を制御する。 That is, when the control device 20 controls the FCU 12, the control device 20 transmits a control command signal to the controller provided in the FCU 12, and does not directly transmit the signal to the blower 12B or the like. That is, the control device 20 indirectly controls the blower 12B and the like via the controller.

制御装置20には、管理項目の値を示す信号が入力されている。管理項目は、冷却対象である室内の状態を直接的又は間接的に示すパラメータである。当該管理項目は、例えば、(a)室内空気の温度及び相対湿度、(b)設定温度と現実の室内温度との差、並びに(c)各バルブ12Cの開度等である。 A signal indicating the value of the management item is input to the control device 20. The control item is a parameter that directly or indirectly indicates the state of the room to be cooled. The control items include, for example, (a) the temperature and relative humidity of the indoor air, (b) the difference between the set temperature and the actual indoor temperature, and (c) the opening degree of each valve 12C.

室内空気の温度及び相対湿度は、FCU12に吸い込まれる空気の温度を検出する温度センサS1等を利用して検出される。温度センサS1等は、各FCU12に設けられている。設定温度(以下、SV値)は、コントローラを介して利用者又は管理者が設定した目標とする室内空気温度(空調能力)である。現実の室内温度は温度センサS1の検出温度(以下、PV値)である。 The temperature and relative humidity of the indoor air are detected by using a temperature sensor S1 or the like that detects the temperature of the air sucked into the FCU 12. The temperature sensor S1 and the like are provided in each FCU 12. The set temperature (hereinafter, SV value) is a target indoor air temperature (air conditioning capacity) set by the user or the administrator via the controller. The actual room temperature is the detected temperature (hereinafter referred to as PV value) of the temperature sensor S1.

そして、各コントローラは、例えば、以下の(a)〜(c)を管理条件として、管理条件を満たすか否かを判断するとともに、当該管理条件を満たさないと判断したときには、その旨の信号(以下、発報信号という。)を制御装置20に向けて出力する。 Then, for example, each controller determines whether or not the management conditions are satisfied with the following (a) to (c) as management conditions, and when it is determined that the management conditions are not satisfied, a signal to that effect ( Hereinafter, it is referred to as an alarm signal) to be output to the controller 20.

具体的には、各コントローラは、(a)「室内空気の温度又は相対湿度が予め設定された室内温度又は相対湿度を越えたとき」、(b)「SV値とPV値との差が予め設定された温度差を越えたとき」、及び(c)「バルブ12Cの開度が予め設定された開度(例えば、80%)を越えたとき」のうちいずれかのときに、発報信号を発信する。 Specifically, each controller has (a) "when the temperature or relative humidity of the room air exceeds a preset room temperature or relative humidity", and (b) "the difference between the SV value and the PV value is predetermined". A warning signal when either "when the set temperature difference is exceeded" or (c) "when the opening degree of the valve 12C exceeds the preset opening degree (for example, 80%)". To send.

なお、各FCU12毎に管理項目及び管理条件が予め設定されている。各コントローラは、予め設定されたそれぞれの管理項目及び管理条件に従って管理条件を満たすか否かを判断した後、当該管理条件を満たさないと判断したときには発報信号を発信する。 The management items and management conditions are set in advance for each FCU 12. Each controller determines whether or not the management conditions are satisfied according to the respective management items and management conditions set in advance, and then emits an alarm signal when it is determined that the management conditions are not satisfied.

すなわち、図1に示す2つのFCU12のうち、紙面上側のFCU12を第1FCU121とし、紙面下側のFCU12を第2FCU122とした場合において、第1FCU121についての管理項目及び管理条件を第1管理項目及び第1管理条件とし、第2FCU122についての管理項目及び管理条件を第2管理項目及び第2管理条件とする。 That is, when the FCU 12 on the upper side of the paper is the first FCU 121 and the FCU 12 on the lower side of the paper is the second FCU 122 among the two FCU 12 shown in FIG. 1, the management items and management conditions for the first FCU 121 are the first management item and the first management condition. 1 The management condition and the management item and the management condition for the 2nd FCU 122 are the 2nd management item and the 2nd management condition.

この場合において、第1FCU121のコントローラは、第1FCU121に関係するセンサ(例えば温度センサS1)等の検出値に基づいて第1管理項目を取得した後、その取得した第1管理項目が第1管理条件を満たすか否かを判断する。 In this case, the controller of the first FCU 121 acquires the first control item based on the detected value of the sensor (for example, the temperature sensor S1) related to the first FCU 121, and then the acquired first control item is the first control condition. Determine if it meets or not.

同様に、第2FCU122のコントローラは、第2FCU122に関係する温度センサS1等の検出値に基づいて第2管理項目を取得した後、その取得した第2管理項目が第2管理条件を満たすか否かを判断する。 Similarly, the controller of the second FCU 122 acquires the second control item based on the detected value of the temperature sensor S1 or the like related to the second FCU 122, and then whether or not the acquired second control item satisfies the second control condition. To judge.

したがって、各コントローラは、互い独立した状態で取得した管理項目が管理条件を満たしているか否かを判断する。なお、上記した管理項目の種類、及び管理条件を満たすか否かの判断は、本願発明の一例であって、上記管理項目の種類及び管理条件に本願発明は限定されるものではない。 Therefore, each controller determines whether or not the management items acquired in an independent state satisfy the management conditions. The type of the above-mentioned control item and the determination as to whether or not the control condition is satisfied are an example of the present invention, and the present invention is not limited to the type of the above-mentioned control item and the control condition.

制御装置20には、冷水の温度及び冷却水の温度を示す信号も入力されている。第1冷水温センサS3は、各熱交換器12Aに供給される冷水の温度を検出する温度検出部である。本実施形態に係る第1冷水温センサS3は、二次往水ヘッダ15Aにて冷水温度を検出する。 A signal indicating the temperature of the cold water and the temperature of the cooling water is also input to the control device 20. The first chilled water temperature sensor S3 is a temperature detecting unit that detects the temperature of the chilled water supplied to each heat exchanger 12A. The first chilled water temperature sensor S3 according to the present embodiment detects the chilled water temperature with the secondary outflow header 15A.

第2冷水温センサS4は、二次還水ヘッダ15Bから流出した冷水の温度を検出する温度検出部である。本実施形態に係る第2冷水温センサS4は、一次還水ヘッダ14Bにて冷水温度を検出する。 The second cold water temperature sensor S4 is a temperature detection unit that detects the temperature of the cold water flowing out from the secondary return water header 15B. The second chilled water temperature sensor S4 according to the present embodiment detects the chilled water temperature with the primary return water header 14B.

第3冷水温センサS5は、熱源機11から二次ポンプP2側に供給される冷水の温度検出する温度検出部である。第4冷水温センサS6は、熱源機11に戻ってくる冷水の温度検出する温度検出部である。 The third chilled water temperature sensor S5 is a temperature detecting unit that detects the temperature of the chilled water supplied from the heat source machine 11 to the secondary pump P2 side. The fourth cold water temperature sensor S6 is a temperature detection unit that detects the temperature of the cold water returning to the heat source machine 11.

制御装置20は、第3冷水温センサS5の温度が予め設定された温度範囲となるように熱源機11の稼働状態を制御する。なお、第3冷水温センサS5の温度と第4冷水温センサS6の温度との差が予め設定された範囲となるように熱源機11の稼働状態を制御してもよい。 The control device 20 controls the operating state of the heat source machine 11 so that the temperature of the third chilled water temperature sensor S5 is within a preset temperature range. The operating state of the heat source machine 11 may be controlled so that the difference between the temperature of the third chilled water temperature sensor S5 and the temperature of the fourth chilled water temperature sensor S6 is within a preset range.

第1冷却水温センサS7は、冷却塔11Aから熱源機11に戻る冷却水の温度検出する温度検出部である。第2冷却水温センサS8は、熱源機11から冷却塔11Aに送られる冷却水の温度検出する温度検出部である。 The first cooling water temperature sensor S7 is a temperature detecting unit that detects the temperature of the cooling water returning from the cooling tower 11A to the heat source machine 11. The second cooling water temperature sensor S8 is a temperature detecting unit that detects the temperature of the cooling water sent from the heat source machine 11 to the cooling tower 11A.

制御装置20は、第1冷却水温センサS7の温度が予め設定された温度範囲となるように冷却水ポンプ11B及び三方弁11Cを制御する。なお、第1冷却水温センサS7の温度と第2冷却水温センサS8の温度との差が予め設定された範囲となるように冷却水ポンプ11B及び三方弁11Cを制御してもよい。 The control device 20 controls the cooling water pump 11B and the three-way valve 11C so that the temperature of the first cooling water temperature sensor S7 is in a preset temperature range. The cooling water pump 11B and the three-way valve 11C may be controlled so that the difference between the temperature of the first cooling water temperature sensor S7 and the temperature of the second cooling water temperature sensor S8 is within a preset range.

2.2 制御の概要
制御装置20は、少なくとも3つの制御モード(第1制御モード、第2制御モード及び第3制御モード)に分けて空調装置10の稼働状態、及び熱交換器12A側に循環させる冷水流量等を制御する。
2.2 Outline of control The control device 20 is divided into at least three control modes (first control mode, second control mode, and third control mode) and circulates to the operating state of the air conditioner 10 and the heat exchanger 12A side. Control the flow rate of cold water to be made to flow.

なお、各FCU12の稼働状態、つまり当該FCU12の熱交換器12A及び送風機12Bの状態は、上述したように、直接的には、各FCU12に設けられたコントローラが制御する。 As described above, the operating state of each FCU 12, that is, the state of the heat exchanger 12A and the blower 12B of the FCU 12 is directly controlled by the controller provided in each FCU 12.

<第1制御モード>
第1制御モードは省電力運転モードの一例である。省電力運転モード、つまり第1制御モードは、第2制御モード時に空調装置10で消費する電力を余熱時電力としたとき、当該余熱時電力より小さな電力で運転可能な運転モードである。
<First control mode>
The first control mode is an example of a power saving operation mode. The power saving operation mode, that is, the first control mode is an operation mode in which the air conditioner 10 can be operated with a smaller power than the preheat power when the power consumed by the air conditioner 10 in the second control mode is the preheat power.

具体的には、制御装置20は、少なくとも各送風機12Bの稼働を許可した状態で、一次ポンプP1、二次ポンプP2、熱源機11及び冷却水ポンプ11Bを停止させる。これにより、第1制御モードでは、バルブ12Cの開度によらず熱交換器12Aに冷水が供給されないので、各FCU12では送風機能のみ実行可能となる。 Specifically, the control device 20 stops the primary pump P1, the secondary pump P2, the heat source machine 11, and the cooling water pump 11B with at least the operation of each blower 12B permitted. As a result, in the first control mode, cold water is not supplied to the heat exchanger 12A regardless of the opening degree of the valve 12C, so that only the ventilation function can be executed in each FCU 12.

なお、「第2制御モード時に空調装置10で消費する電力」とは、第2制御モード時に空調装置10で消費する最大電力、又は第2制御モード時に空調装置10で消費する平均電力等をいう。 The "power consumed by the air conditioner 10 in the second control mode" means the maximum power consumed by the air conditioner 10 in the second control mode, the average power consumed by the air conditioner 10 in the second control mode, and the like. ..

<第2制御モード>
第2制御モードは「配管余熱運転モード」の一例である。配管余熱運転モード、つまり第2制御モードでは、バイパス配管13内の冷水を各熱交換器12Aに供給して当該熱交換器12Aで冷却能力を発揮させる運転モードである。
<Second control mode>
The second control mode is an example of the “piping residual heat operation mode”. The pipe residual heat operation mode, that is, the second control mode, is an operation mode in which the cold water in the bypass pipe 13 is supplied to each heat exchanger 12A to exert the cooling capacity in the heat exchanger 12A.

具体的には、制御装置20は、一次ポンプP1、熱源機11及び冷却水ポンプ11Bを停止させる。これにより、第2制御モードでは、主にバイパス配管13内に滞留している冷水が二次ポンプP2を経由して各熱交換器12Aに供給される。各コントローラは、SV値に基づいて予め記憶されたプログラムに従って送風機12B及びバルブ12Cを制御する。 Specifically, the control device 20 stops the primary pump P1, the heat source machine 11, and the cooling water pump 11B. As a result, in the second control mode, the cold water mainly staying in the bypass pipe 13 is supplied to each heat exchanger 12A via the secondary pump P2. Each controller controls the blower 12B and the valve 12C according to a program stored in advance based on the SV value.

<第3制御モード>
第3制御モードは通常運転モードの一例である。第2制御モード(配管余熱運転モード)時に熱交換器12Aで発揮可能な冷却能力を余熱能力としたとき、第3制御モードは、当該余熱能力より大きな冷却能力を熱交換器12Aで発揮可能な運転モードをいう。
<Third control mode>
The third control mode is an example of the normal operation mode. When the cooling capacity that can be exhibited by the heat exchanger 12A in the second control mode (piping residual heat operation mode) is set as the residual heat capacity, in the third control mode, the cooling capacity larger than the residual heat capacity can be exhibited by the heat exchanger 12A. Refers to the operation mode.

具体的には、制御装置20は、空調装置10の全ての機器、つまり一次ポンプP1、二次ポンプP2、熱源機11及び冷却水ポンプ11B等を稼働可能な状態とする。これにより、余熱能力より大きな冷却能力を熱交換器12Aで発揮可能となる。 Specifically, the control device 20 makes all the devices of the air conditioner 10, that is, the primary pump P1, the secondary pump P2, the heat source machine 11, the cooling water pump 11B, and the like operational. As a result, the heat exchanger 12A can exert a cooling capacity larger than the residual heat capacity.

<制御モードの選択(能力増大時)>
制御装置20は、3つの制御モードのうちいずれかの制御モードを実行している場合において、発報信号が発信されたときには、先ず、FCU12の熱交換器12Aで発揮させる冷却能力を増大させる処理を実行する。
<Selection of control mode (when capacity increases)>
When the control device 20 is executing one of the three control modes and the alarm signal is transmitted, the control device 20 first increases the cooling capacity exerted by the heat exchanger 12A of the FCU 12. To execute.

制御装置20は、冷却能力を増大させる処理の実行後も発報信号が発信されていると判断したときには、現時の制御モードを停止し、現時の制御モードより大きな冷却能力を発揮することが可能な制御モードを実行する。 When the control device 20 determines that the alarm signal is transmitted even after the execution of the process for increasing the cooling capacity, the control device 20 can stop the current control mode and exhibit a larger cooling capacity than the current control mode. Control mode is executed.

つまり、制御装置20は、現時の制御モードが第1制御モードの場合には、第2制御モード又は第3制御モードを実行する。制御装置20は、現時の制御モードが第2制御モードの場合には、第3制御モードを実行する(図2参照)。 That is, when the current control mode is the first control mode, the control device 20 executes the second control mode or the third control mode. The control device 20 executes the third control mode when the current control mode is the second control mode (see FIG. 2).

例えば、第2制御モードの実行時において、発報信号が発信された場合には、制御装置20は、先ず、二次ポンプP2の吐き出し量を増大させることにより、発報信号が出力されたFCU12の熱交換器12Aで発揮させる冷却能力を増大させる処理を実行する。 For example, when the alarm signal is transmitted during the execution of the second control mode, the control device 20 first increases the discharge amount of the secondary pump P2 to output the alarm signal FCU12. A process of increasing the cooling capacity exerted by the heat exchanger 12A of the above is executed.

制御装置20は、(a)二次ポンプP2を稼働させる電動モータへの印加電圧周波数を大きくする処理を実行、又は(b)ポンプの稼働台数を増加させる処理を実行することにより、二次ポンプP2の吐き出し量を増大させる。 The control device 20 executes (a) a process of increasing the voltage frequency applied to the electric motor that operates the secondary pump P2, or (b) a process of increasing the number of operating pumps to increase the number of operating secondary pumps. Increases the amount of P2 exhaled.

本実施形態では、上記電動モータの回転数は、インバータにより周波数制御されている。そこで、制御装置20は、二次ポンプP2の吐き出し量を増大させる際には、先ず、印加電圧周波数を大きくする。 In the present embodiment, the rotation speed of the electric motor is frequency controlled by an inverter. Therefore, when increasing the discharge amount of the secondary pump P2, the control device 20 first increases the applied voltage frequency.

二次ポンプP2を構成する各ポンプは、機器の特性上、最小回転数(最小吐き出し量)及び最大回転数(最大吐き出し量)が決まっている。そこで、制御装置20は、印加電圧周波数が最大回転数に相当する周波数を超えたときには、ポンプの稼働台数を増加させて吐き出し量を増大させる。 Each pump constituting the secondary pump P2 has a minimum rotation speed (minimum discharge amount) and a maximum rotation speed (maximum discharge amount) determined by the characteristics of the equipment. Therefore, when the applied voltage frequency exceeds the frequency corresponding to the maximum rotation speed, the control device 20 increases the number of operating pumps to increase the discharge amount.

そして、第2制御モードの実行時において、ポンプが稼働して二次ポンプP2の吐き出し量が最大吐き出し量まで増大した場合であっても、発報信号が発信されているときは、制御装置20は、第2制御モードを停止し、第3制御モードを実行する。 Then, even when the pump is operated and the discharge amount of the secondary pump P2 is increased to the maximum discharge amount at the time of executing the second control mode, when the alarm signal is transmitted, the control device 20 Stops the second control mode and executes the third control mode.

なお、現時の制御モードが第1制御モードである場合において、発報信号が発信されたときには、制御装置20は、先ず、送風機12Bの回転数を増大させて送風量を増大させることにより、FCU12の熱交換器12Aで発揮させる冷却能力を増大させる処理を実行する。 In the case where the current control mode is the first control mode, when the alarm signal is transmitted, the control device 20 first increases the rotation speed of the blower 12B to increase the amount of air blown, thereby increasing the FCU12. A process of increasing the cooling capacity exerted by the heat exchanger 12A of the above is executed.

そして、送風機12Bの回転数が予め設定された最大回転数となったときに、制御装置20は、第1制御モードを停止して第2制御モードを実行する。なお、第2制御モードが実行可能状態でない場合には、制御装置20は、第3制御モードを実行する。 Then, when the rotation speed of the blower 12B reaches the preset maximum rotation speed, the control device 20 stops the first control mode and executes the second control mode. If the second control mode is not in the executable state, the control device 20 executes the third control mode.

なお、「第2制御モードが実行可能状態でない」とは、例えば、(a)管理者により第2制御モード(配管余熱運転モード)の実行が許可されていない状態、又は(b)バイパス配管13内の冷水温度(第1冷水温センサS3の検出温度)が予め設定された能力条件を満たしていない状態等をいう。 In addition, "the second control mode is not an executable state" means, for example, (a) a state in which the administrator is not permitted to execute the second control mode (pipe residual heat operation mode), or (b) a bypass pipe 13. It refers to a state in which the chilled water temperature (detected temperature of the first chilled water temperature sensor S3) does not satisfy the preset capacity conditions.

「バイパス配管13内の冷水温度が能力条件を満たしていない状態」とは、例えば、当該冷水温度が予め設定された温度を超えている等、十分な冷却能力を熱交換器12Aで発生させることができないと推定可能な状態をいう。 The "state in which the chilled water temperature in the bypass pipe 13 does not satisfy the capacity condition" means that the heat exchanger 12A generates a sufficient cooling capacity, for example, the chilled water temperature exceeds a preset temperature. It is a state that can be estimated that it cannot be done.

<制御モードの選択(能力減少時)>
制御装置20は、3つの制御モードのうちいずれかの制御モードを実行している場合において、発報信号が発信されていないときには、先ず、FCU12の熱交換器12Aで発揮させる冷却能力を低下させる処理を実行する。
<Selection of control mode (when capacity decreases)>
When the control device 20 is executing any of the three control modes and the alarm signal is not transmitted, the control device 20 first lowers the cooling capacity exerted by the heat exchanger 12A of the FCU 12. Execute the process.

制御装置20は、冷却能力を低下させる処理の実行後も発報信号が発信されていない場合であって、現時の制御モードでは冷却能力を更に低下させることができないと判断したときには、現時の制御モードを停止し、現時の制御モードより小さな冷却能力を発揮することが可能な制御モードを実行する(図2参照)。 When the control device 20 determines that the alarm signal has not been transmitted even after the execution of the process of reducing the cooling capacity and the current control mode cannot further reduce the cooling capacity, the control device 20 at the present time controls. The mode is stopped and a control mode capable of exerting a smaller cooling capacity than the current control mode is executed (see FIG. 2).

すなわち、熱源機11は、その構造上、最小生成冷熱量より小さい冷熱を生成することができない。一次ポンプP1も二次ポンプP2と同様に最小回転数(最小吐き出し量)及び最大回転数(最大吐き出し量)が決まっている。 That is, the heat source machine 11 cannot generate cold heat smaller than the minimum amount of cold heat generated due to its structure. Similar to the secondary pump P2, the primary pump P1 also has a minimum rotation speed (minimum discharge amount) and a maximum rotation speed (maximum discharge amount).

そこで、制御装置20は、冷却能力を増大させる処理と同様に、二次ポンプP2の吐き出し量を調整して熱交換器12Aで発揮させる冷却能力を調整する。つまり、制御装置20は、二次ポンプP2の吐出し量を減少させることにより、冷却能力を減少させる処理を実行する。 Therefore, the control device 20 adjusts the discharge amount of the secondary pump P2 to adjust the cooling capacity exerted by the heat exchanger 12A, as in the process of increasing the cooling capacity. That is, the control device 20 executes a process of reducing the cooling capacity by reducing the discharge amount of the secondary pump P2.

具体的には、制御装置20は、先ず、印加電圧周波数を小さくする。印加電圧周波数が最小回転数に相当する周波数未満となったときには、制御装置20は、ポンプの稼働台数を減少させることにより、二次ポンプP2の吐出し量を減少させる。 Specifically, the control device 20 first reduces the applied voltage frequency. When the applied voltage frequency becomes less than the frequency corresponding to the minimum rotation speed, the control device 20 reduces the discharge amount of the secondary pump P2 by reducing the number of operating pumps.

例えば、第3制御モードの実行時において、発報信号が発信されていない場合には、制御装置20は、二次ポンプP2の吐き出し量を減少させることにより、熱交換器12Aで発揮させる冷却能力を低下させる。 For example, when the third control mode is executed, when the alarm signal is not transmitted, the control device 20 reduces the discharge amount of the secondary pump P2, thereby exerting a cooling capacity in the heat exchanger 12A. To reduce.

そして、冷却能力を低下させる処理の実行後も発報信号が発信されていない場合であって、二次ポンプP2の吐き出し量が最小吐き出し量まで低下し、制御装置20が第3制御モードでは冷却能力を更に低下させることができないと判断したときには、第3制御モードを停止し、第2制御モードを実行する。 Then, even after the processing for lowering the cooling capacity is executed, the alarm signal is not transmitted, the discharge amount of the secondary pump P2 is reduced to the minimum discharge amount, and the control device 20 is cooled in the third control mode. When it is determined that the capacity cannot be further reduced, the third control mode is stopped and the second control mode is executed.

なお、第2制御モードを実行することができない状態である場合には、制御装置20は、第1制御モードを実行する。第2制御モードを実行することができない状態とは、「能力増大時」の場合と同じである。 When the second control mode cannot be executed, the control device 20 executes the first control mode. The state in which the second control mode cannot be executed is the same as in the case of "when the capacity is increased".

第2制御モードの実行時において、冷却能力を低下させる処理の実行後も発報信号が発信されていない場合であって、制御装置20が第2制御モードでは冷却能力を更に低下させることができないと判断したときには、制御装置20は第1制御モードを実行する。 When the second control mode is executed, the alarm signal is not transmitted even after the processing for lowering the cooling capacity is executed, and the control device 20 cannot further reduce the cooling capacity in the second control mode. When it is determined, the control device 20 executes the first control mode.

<制御モード選択等の判断>
制御装置20は、熱交換器12Aで発揮させる冷却能力を変更する処理を実行した後、予め設定されたルールに従って決定された時間(以下、効果待ち時間Twという。)が経過したときに、(a)発報信号が発信されているか否かの判断処理、(b)冷却能力を更に変更するか否かの判断処理、及び(c)制御モードを変更するか否かの判断処理のうちいずれかの処理を実行する。
<Judgment of control mode selection, etc.>
After executing the process of changing the cooling capacity exerted by the heat exchanger 12A, the control device 20 (hereinafter referred to as the effect waiting time Tw) elapses when a time determined according to a preset rule (hereinafter referred to as an effect waiting time Tw) elapses. A) Judgment process of whether or not the alarm signal is transmitted, (b) Judgment process of whether or not to further change the cooling capacity, and (c) Judgment process of whether or not to change the control mode. Execute the process.

すなわち、制御装置20は、例えば、吐き出し量を増大させる指令信号を二次ポンプP2に向けて発信した時から効果待ち時間Twが経過したときに、(a)〜(c)のうちいずれか処理を実行する。つまり、効果待ち時間Twは、空調装置10の稼働状態を制御するための制御パラメータの一例である。 That is, for example, when the effect waiting time Tw has elapsed from the time when the command signal for increasing the discharge amount is transmitted to the secondary pump P2, the control device 20 processes any of (a) to (c). To execute. That is, the effect waiting time Tw is an example of a control parameter for controlling the operating state of the air conditioner 10.

2.3 効果待ち時間Twの決定プロセス
<決定プロセスの概要>
制御装置20は、第1FCU121から発報信号が発信されたとき、つまり第1管理条件を満たさないと判断されたときに、第1管理項目について予め設定された値(以下、第1設定値N1という。)を設定する。
2.3 Effect waiting time Tw determination process <Overview of determination process>
When the alarm signal is transmitted from the first FCU 121, that is, when it is determined that the first control condition is not satisfied, the control device 20 has a value preset for the first control item (hereinafter, the first set value N1). ) Is set.

同様に、制御装置20は、第2FCU122から発報信号が発信されたとき、つまり第2管理条件を満たさないと判断されたときに、第2管理項目について予め設定された値(以下、第2設定値N2という。)を設定する。 Similarly, when the alarm signal is transmitted from the second FCU 122, that is, when it is determined that the second management condition is not satisfied, the control device 20 has a value preset for the second management item (hereinafter, the second). The set value N2) is set.

そして、制御装置20は、少なくとも第1設定値N1及び第2設置値N2に基づいて統計量を算出し、当該統計量を利用して予め設定されたルールに従って効果待ち時間Twを決定する。なお、統計量とは、一組の標本データに相当する第1設定値N1及び第2設定値N2に目的に応じた統計学的なアルゴリズムを適用して得られた値である。 Then, the control device 20 calculates a statistic based on at least the first set value N1 and the second set value N2, and determines the effect waiting time Tw according to a preset rule using the statistic. The statistic is a value obtained by applying a statistical algorithm according to a purpose to the first set value N1 and the second set value N2 corresponding to a set of sample data.

<決定プロセスの具体例>
本実施形態に係る制御装置20は、各FCU12毎に重み付け付けを行い、発報信号が発信されたFCU12の重みの集計値を利用して効果待ち時間Twを決定する。
<Specific example of decision process>
The control device 20 according to the present embodiment weights each FCU 12 and determines the effect waiting time Tw by using the aggregated value of the weights of the FCU 12 to which the alarm signal is transmitted.

すなわち、空調装置10がn個のFCU12(FCU121、FCU122・・・FCU12n)を有し、かつ、各FCU12j(j=1・・n)の重みをWjとし、FCU12j(j=1〜k:k<n)から発報信号が発信されたとき、制御装置20は、発報信号があったFCU12の重みW1〜Wkの総和(集計値)を利用して効果待ち時間Twを決定する。 That is, the air conditioner 10 has n FCU12s (FCU121, FCU122 ... FCU12n), and the weight of each FCU12j (j = 1 ... n) is Wj, and the FCU12j (j = 1 to k: k). When the alarm signal is transmitted from <n), the control device 20 determines the effect waiting time Tw by using the sum (aggregated value) of the weights W1 to Wk of the FCU 12 on which the alarm signal is transmitted.

なお、制御装置20には、集計値と効果待ち時間Twとの関係を示す関数等が予め記憶されている。空調制御を行う上で重要な箇所に設置されたFCU12iの重みWiは、その他のFCU12kの重みWkに比べて大きな値が設定されている。すなわち、重みの総和に応じて効果待ち時間Twが短く設定されているので、需要な箇所が発報しているときほど、相対的に素早く制御を対応でき得る。 The control device 20 stores in advance a function or the like indicating the relationship between the aggregated value and the effect waiting time Tw. The weight Wi of the FCU 12i installed at an important place for controlling the air conditioning is set to a larger value than the weight Wk of the other FCU 12k. That is, since the effect waiting time Tw is set short according to the sum of the weights, it is possible to respond to the control relatively quickly as the demanded portion issues a report.

2.4 制御の詳細
<第3制御モード(図3参照)>
本実施形態に係る冷水循環システムでは、システムの始動スイッチ(図示せず。)が管理者により投入されると、制御装置20は先ず、第3制御モードを実行する。
2.4 Details of control <Third control mode (see Fig. 3)>
In the cold water circulation system according to the present embodiment, when the start switch (not shown) of the system is turned on by the administrator, the control device 20 first executes the third control mode.

第3制御モードが起動されると、制御装置20は、効果待ち時間Twが経過したときに、二次往水ヘッダ15Aでの冷水温度、つまり第1冷水温センサS3の冷水温度(以下、往水ヘッダ温度という。)が予め設定された温度範囲の上限値未満であるか否かを判断する(S1)。 When the third control mode is activated, the control device 20 determines the cold water temperature in the secondary forward water header 15A, that is, the cold water temperature of the first cold water temperature sensor S3 (hereinafter, forward) when the effect waiting time Tw has elapsed. It is determined whether or not the water header temperature) is less than the upper limit of the preset temperature range (S1).

制御装置20は、往水ヘッダ温度が上限値を超えていると判断したときには(S1:NO)、第3制御モードを実行し続ける(S9)。制御装置20は、往水ヘッダ温度が上限値未満であると判断したときには(S1:YES)、熱源機11で生成可能な最小冷熱量、つまり熱源機11で供給可能な最小冷却能力であるか否かを判断する(S3)。 When the control device 20 determines that the outgoing water header temperature exceeds the upper limit value (S1: NO), the control device 20 continues to execute the third control mode (S9). When the control device 20 determines that the outgoing water header temperature is less than the upper limit value (S1: YES), is it the minimum cooling amount that can be generated by the heat source machine 11, that is, the minimum cooling capacity that can be supplied by the heat source machine 11. It is determined whether or not (S3).

制御装置20は、最小冷熱量でないと判断したときには(S3:NO)、第3制御モードを実行し続ける(S9)。制御装置20は、最小冷熱量であると判断したときには(S3:YES)、発報信号が発信されているか否かを判断する(S5)。 When the control device 20 determines that the amount of cold heat is not the minimum (S3: NO), the control device 20 continues to execute the third control mode (S9). When the control device 20 determines that the amount of cold heat is the minimum (S3: YES), the control device 20 determines whether or not the alarm signal is transmitted (S5).

なお、S1の判断処理は、効果待ち時間Twが経過したときに実行され、S5の判断処理はS1の実行後に実行される。したがって、S5の実行時は効果待ち時間Twが経過したときとなる。 The determination process of S1 is executed when the effect waiting time Tw has elapsed, and the determination process of S5 is executed after the execution of S1. Therefore, when S5 is executed, the effect waiting time Tw has elapsed.

制御装置20は、発報信号が発信されていると判断したときは(S5:YES)、第3制御モードを実行し続ける(S9)。この場合、制御装置20は、熱源機11で生成する冷熱を増大させて冷却能力を増大させる処理を実行する。 When the control device 20 determines that the alarm signal has been transmitted (S5: YES), the control device 20 continues to execute the third control mode (S9). In this case, the control device 20 executes a process of increasing the cooling heat generated by the heat source machine 11 to increase the cooling capacity.

なお、この処理の実行時において制御装置20は、一次ポンプP1及び冷却水ポンプ11Bの吐き出し量を必要に応じて増大させる。制御装置20は、発報信号が発信されていないと判断したときは(S5:NO)、第2制御モード(配管余熱運転モード)が実行可能状態であるか否かを判断する(S7)。 At the time of executing this process, the control device 20 increases the discharge amount of the primary pump P1 and the cooling water pump 11B as necessary. When the control device 20 determines that the alarm signal has not been transmitted (S5: NO), the control device 20 determines whether or not the second control mode (pipe residual heat operation mode) is in an executable state (S7).

第2制御モードが実行可能状態であるか否かの判断は、上記「制御モードの選択」で説明した手法と同一である。S7の判断処理もS5と同様に、効果待ち時間Twが経過したときの実行となる。 The determination of whether or not the second control mode is in the executable state is the same as the method described in the above-mentioned "selection of control mode". Similar to S5, the determination process of S7 is also executed when the effect waiting time Tw has elapsed.

制御装置20は、第2制御モードが実行可能状態であると判断したときは(S7:YES)、第2制御モードを実行する。制御装置20は、第2制御モードが実行可能状態でないと判断したときには(S7:NO)、第1制御モードが実行可能状態であるか否かを判断する(S11)。 When the control device 20 determines that the second control mode is in the executable state (S7: YES), the control device 20 executes the second control mode. When the control device 20 determines that the second control mode is not in the executable state (S7: NO), the control device 20 determines whether or not the first control mode is in the executable state (S11).

第1制御モードが実行可能状態であるか否かの判断は、第1制御モードの実行を許可する旨が管理者等に予め設定されているか否か等に判断される。例えば、夏場等の空調負荷が大きい場合、管理者は、通常、第1制御モードの実行を許可しない旨を設定する。 The determination as to whether or not the first control mode is in the executable state is determined by whether or not the administrator or the like is preset to permit the execution of the first control mode. For example, when the air conditioning load is large, such as in the summer, the administrator usually sets that the execution of the first control mode is not permitted.

そして、制御装置20は、第1制御モードが実行可能状態であると判断したときには(S11:YES)、第1制御モードを実行する。制御装置20は、第1制御モードが実行可能状態でないと判断したときには(S11:NO)、S1に戻り、第3制御モードを実行し続ける。なお、S11の判断処理もS5と同様に、効果待ち時間が経過したときの実行となる。 Then, when the control device 20 determines that the first control mode is in the executable state (S11: YES), the control device 20 executes the first control mode. When the control device 20 determines that the first control mode is not in the executable state (S11: NO), the control device 20 returns to S1 and continues to execute the third control mode. The determination process of S11 is also executed when the effect waiting time has elapsed, as in S5.

S1に戻り、第3制御モードを実行し続ける場合は、発報信号が発信されていないので、制御装置20は、熱源機11で生成する冷却能力を減少させる処理を実行する。なお、この処理の実行時において制御装置20は、一次ポンプP1及び冷却水ポンプ11Bの吐き出し量を必要に応じてさせる。 When returning to S1 and continuing to execute the third control mode, since the alarm signal has not been transmitted, the control device 20 executes a process of reducing the cooling capacity generated by the heat source machine 11. At the time of executing this process, the control device 20 causes the discharge amounts of the primary pump P1 and the cooling water pump 11B to be discharged as necessary.

<第2制御モード(図4〜図6参照)>
制御装置20は、制御を第2制御モード用制御に移行させた後、効果待ち時間Twが経過したときに、図4に示すように、配管余熱運転モード(第2制御モード)が実行可能状態であるか否かを判断する(S21)。
<Second control mode (see FIGS. 4 to 6)>
After shifting the control to the control for the second control mode, the control device 20 is in a state in which the pipe residual heat operation mode (second control mode) can be executed when the effect waiting time Tw elapses, as shown in FIG. It is determined whether or not it is (S21).

制御装置20は、配管余熱運転モードが実行可能状態でないと判断すると(S21:NO)、第3制御モードを実行する(S25)。制御装置20は、配管余熱運転モードが実行可能状態であると判断すると(S21:YES)、往水ヘッダ温度が予め設定された温度範囲の上限値未満であるか否か、つまり能力条件を満たすか否かを判断する(S23)。 When the control device 20 determines that the pipe residual heat operation mode is not in the executable state (S21: NO), the control device 20 executes the third control mode (S25). When the control device 20 determines that the pipe residual heat operation mode is in an executable state (S21: YES), whether or not the outgoing water header temperature is less than the upper limit of the preset temperature range, that is, the capacity condition is satisfied. Whether or not it is determined (S23).

制御装置20は、往水ヘッダ温度が予め設定された温度範囲の上限値未満でないと判断すると(S23:NO)、第3制御モードを実行する(S25)。制御装置20は、往水ヘッダ温度が上限値未満であると判断すると(S23:YES)、発報信号が発信されているか否か、つまり管理項目について予め設定された管理条件を満たすか否かを判断する(S27)。 When the control device 20 determines that the outgoing water header temperature is not less than the upper limit of the preset temperature range (S23: NO), the control device 20 executes the third control mode (S25). When the control device 20 determines that the outgoing water header temperature is less than the upper limit value (S23: YES), whether or not the alarm signal is transmitted, that is, whether or not the management condition preset for the management item is satisfied. Is determined (S27).

なお、S21の判断処理は、効果待ち時間Twが経過したときに実行されるので、S23及びS27の判断処理も効果待ち時間Twが経過したときに実行されることになる。
制御装置20は、発報信号が発信されていると判断したときは(S27:YES)、二次ポンプP2を構成する複数のポンプのうち稼働中のポンプの回転数を増速させて吐き出し量を増大させる(S29)。
Since the determination process of S21 is executed when the effect waiting time Tw has elapsed, the determination process of S23 and S27 is also executed when the effect waiting time Tw has elapsed.
When the control device 20 determines that the alarm signal is being transmitted (S27: YES), the control device 20 speeds up the rotation speed of the operating pump among the plurality of pumps constituting the secondary pump P2 to discharge the amount. (S29).

そして、制御装置20は、増速させたポンプの回転数(印加電圧周波数)が予め設定された最大回転数を越えているか否かを判断する(S33)。制御装置20は、ポンプの回転数が最大回転数を越えていないと判断したときには(S33:NO)、効果待ち時間が経過したときに(S31)、S21を実行する。 Then, the control device 20 determines whether or not the rotation speed (applied voltage frequency) of the accelerated pump exceeds the preset maximum rotation speed (S33). The control device 20 executes S21 when it is determined that the rotation speed of the pump does not exceed the maximum rotation speed (S33: NO) and when the effect waiting time has elapsed (S31).

制御装置20は、ポンプの回転数が最大回転数を越えていると判断したときには(S33:YES)、図5に示すように、停止中のポンプを稼働させて二次ポンプP2を増段させる(S41)。 When the control device 20 determines that the rotation speed of the pump exceeds the maximum rotation speed (S33: YES), as shown in FIG. 5, the control device 20 operates the stopped pump to increase the stage of the secondary pump P2. (S41).

次に、制御装置20は、稼働中の各ポンプの回転数(印加電圧周波数)を予め設定された調整用回転数(調整用周波数)とした後(S47)、稼働ポンプの台数が予め設定された最大台数以上であるか否かを判断する(S45)。 Next, in the control device 20, the number of operating pumps is preset after the rotation speed (applied voltage frequency) of each operating pump is set to the preset adjustment rotation speed (adjustment frequency) (S47). It is determined whether or not the number is equal to or greater than the maximum number (S45).

調整用回転数とは、増段後の稼働ポンプ台数に応じて予め設定された回転数である。本実施形態では、増段後の稼働ポンプ台数が多くなるほど、調整用回転数が小さくなるように設定されている。なお、S47で用いられる調整用回転数は、増段前の回転数より小さい回転数となる。 The adjustment rotation speed is a rotation speed preset according to the number of operating pumps after the stage increase. In the present embodiment, the adjustment rotation speed is set to decrease as the number of operating pumps after the stage increase increases. The adjustment rotation speed used in S47 is smaller than the rotation speed before the step increase.

制御装置20は、稼働ポンプの台数が最大台数以上であると判断したときは(S45:YES)、第3制御モードを実行する。制御装置20は、稼働ポンプの台数が最大台数以上でないと判断したときは(S45:NO)、効果待ち時間が経過したときに(S43)、S21を実行する。 When the control device 20 determines that the number of operating pumps is the maximum number or more (S45: YES), the control device 20 executes the third control mode. The control device 20 executes S21 when it is determined that the number of operating pumps is not the maximum number or more (S45: NO) and when the effect waiting time has elapsed (S43).

また、制御装置20は、S27にて発報信号が発信されていないと判断したときは(S27:NO)、図4に示すように、二次ポンプP2を構成する複数のポンプのうち稼働中のポンプの回転数を減速させて吐き出し量を減少させる(S35)。 Further, when the control device 20 determines that the alarm signal has not been transmitted in S27 (S27: NO), as shown in FIG. 4, the control device 20 is in operation among the plurality of pumps constituting the secondary pump P2. The rotation speed of the pump is decelerated to reduce the discharge amount (S35).

そして、制御装置20は、減速させたポンプの回転数(印加電圧周波数)が予め設定された最小回転数未満であるか否かを判断する(S39)。制御装置20は、ポンプの回転数が最小回転数未満でないと判断したときには(S39:NO)、効果待ち時間が経過したときに(S37)、S21を実行する。 Then, the control device 20 determines whether or not the rotation speed (applied voltage frequency) of the decelerated pump is less than the preset minimum rotation speed (S39). The control device 20 executes S21 when it is determined that the rotation speed of the pump is not less than the minimum rotation speed (S39: NO) and when the effect waiting time has elapsed (S37).

制御装置20は、ポンプの回転数が最小回転数未満であると判断したときには(S39:YES)、図6に示すように、稼働中のポンプを停止させて二次ポンプP2を減段させる(S51)。 When the control device 20 determines that the rotation speed of the pump is less than the minimum rotation speed (S39: YES), the control device 20 stops the operating pump and decrements the secondary pump P2 as shown in FIG. 6 (S39: YES). S51).

次に、制御装置20は、稼働中の各ポンプの回転数(印加電圧周波数)を予め設定された調整用回転数(調整用周波数)とした後(S59)、稼働ポンプの台数が予め設定された最小台数以下であるか否かを判断する(S55)。 Next, in the control device 20, the number of operating pumps is preset after the rotation speed (applied voltage frequency) of each operating pump is set to the preset adjustment rotation speed (adjustment frequency) (S59). It is determined whether or not the number is equal to or less than the minimum number (S55).

調整用回転数とは、減段後の稼働ポンプ台数に応じて予め設定された回転数である。本実施形態では、減段後の稼働ポンプ台数が少なくなるほど、調整用回転数が大きくなるように設定されている。なお、S59で用いられる調整用回転数は、減段前の回転数より大きい回転数となる。 The adjustment rotation speed is a rotation speed preset according to the number of operating pumps after the stage reduction. In the present embodiment, the adjustment rotation speed is set to increase as the number of operating pumps after the stage reduction decreases. The adjustment rotation speed used in S59 is higher than the rotation speed before the step reduction.

制御装置20は、稼働ポンプの台数が最小台数以下であると判断したときは(S55:YES)、第1制御モードが実行可能状態であるか否かを判断する(S57)。制御装置20は、第1制御モードが実行可能状態であると判断したきは(S57:YES)、第1制御モードを実行する。 When the control device 20 determines that the number of operating pumps is equal to or less than the minimum number (S55: YES), the control device 20 determines whether or not the first control mode is in an executable state (S57). When the control device 20 determines that the first control mode is in the executable state (S57: YES), the control device 20 executes the first control mode.

制御装置20は、第1制御モードが実行可能状態でないと判断したときは(S57:NO)、効果待ち時間が経過したときに(S53)、S21を実行する。制御装置20は、稼働ポンプの台数が最小台数以上でないと判断したときは(S55:NO)、効果待ち時間が経過したときに(S53)、S21を実行する。 The control device 20 executes S21 when it is determined that the first control mode is not in the executable state (S57: NO) and when the effect waiting time has elapsed (S53). The control device 20 executes S21 when it is determined that the number of operating pumps is not the minimum number or more (S55: NO) and when the effect waiting time has elapsed (S53).

<第1制御モード(図7参照)>
制御装置20は、制御を第1制御モード用制御に移行させると、効果待ち時間が経過したときに、発報信号が発信されているか否かを判断する(S61)。制御装置20は、発報信号が発信されていないと判断したときには(S61:NO)、再び、S61を実行する。
<First control mode (see FIG. 7)>
When the control device 20 shifts the control to the control for the first control mode, the control device 20 determines whether or not the alarm signal is transmitted when the effect waiting time has elapsed (S61). When the control device 20 determines that the alarm signal has not been transmitted (S61: NO), the control device 20 executes S61 again.

制御装置20は、発報信号が発信されていると判断したときには(S61:YES)、往水ヘッダ温度が予め設定された温度範囲の上限値未満であるか否かを判断する(S65)。制御装置20は、往水ヘッダ温度が上限値未満でないと判断したときは(S65:NO)、第3制御モードを実行する。 When the control device 20 determines that the alarm signal has been transmitted (S61: YES), the control device 20 determines whether or not the outgoing water header temperature is less than the upper limit of the preset temperature range (S65). When the control device 20 determines that the outgoing water header temperature is not less than the upper limit value (S65: NO), the control device 20 executes the third control mode.

制御装置20は、往水ヘッダ温度が上限値未満であると判断したときは(S65:YES)、第2制御モード(配管余熱運転モード)が実行可能状態であるか否かを判断する(S63)。 When the control device 20 determines that the outgoing water header temperature is less than the upper limit value (S65: YES), the control device 20 determines whether or not the second control mode (pipe residual heat operation mode) is in an executable state (S63). ).

制御装置20は、第2制御モードが実行可能状態であると判断したときには(S63:YES)、第2制御モード(配管余熱運転モード)を実行する。制御装置20は、第2制御モードが実行可能状態でないと判断したときには(S63:NO)、第3制御モードを実行する。 When the control device 20 determines that the second control mode is in the executable state (S63: YES), the control device 20 executes the second control mode (pipe residual heat operation mode). When the control device 20 determines that the second control mode is not in the executable state (S63: NO), the control device 20 executes the third control mode.

3.本実施形態に係る冷水循環システムの特徴
例えば、第1管理項目が第2管理項目より重要である場合に、第1設定値N1を第2設定値N2より大きくする、つまり第1管理項目の重みW1を第2管理項目の重みW2より大きくすることにより、第1管理項目が第2管理項目より反映された制御を実行することが可能となる。
3. 3. Features of the cold water circulation system according to the present embodiment For example, when the first control item is more important than the second control item, the first set value N1 is made larger than the second set value N2, that is, the weight of the first control item. By making W1 larger than the weight W2 of the second management item, it is possible to execute the control in which the first management item is reflected from the second management item.

したがって、「各管理項目に対して重み付けを行う」といった簡便な手法にて、各熱交換器12Aで発揮させる冷却能力を適切に制御可能な冷水循環システムを得ることができ得る。延いては、重要度の小さい箇所(以下、小重要箇所という。)であっても、多数の小重要箇所で発報があった場合には、その発報に対応した制御を迅速に実行することが可能となる。 Therefore, it is possible to obtain a cold water circulation system capable of appropriately controlling the cooling capacity exerted by each heat exchanger 12A by a simple method such as "weighting each control item". As a result, even if the location is of low importance (hereinafter referred to as "small important location"), if a report is issued at a large number of minor important locations, the control corresponding to the alert is promptly executed. It becomes possible.

本実施形態に係る制御装置20は、(a)発報信号が発信されているか否か、つまり管理項目について管理条件を満たすか否かを判断し(S27)、かつ、(b)バイパス配管13内の冷水温度が予め設定された温度範囲の上限値未満であるか否か、つまり第1冷水温センサS3の検出温度が能力条件を満たしているか否かを判断する。 The control device 20 according to the present embodiment determines (a) whether or not the alarm signal is transmitted, that is, whether or not the management condition is satisfied for the management item (S27), and (b) the bypass pipe 13. It is determined whether or not the chilled water temperature inside is less than the upper limit of the preset temperature range, that is, whether or not the detected temperature of the first chilled water temperature sensor S3 satisfies the capacity condition.

そして、制御装置20は、少なくとも管理条件及び能力条件を満たしているときに、配管余熱運転モードにて空調装置10を稼働させる余熱運転処理を実行する。したがって、より省電力化が可能な冷水循環システムを提供できる。 Then, the control device 20 executes the residual heat operation process for operating the air conditioner 10 in the pipe residual heat operation mode when at least the control condition and the capacity condition are satisfied. Therefore, it is possible to provide a cold water circulation system capable of further power saving.

すなわち、「配管余熱運転モード」は、バイパス配管13内の冷水を熱交換器12Aに供給して当該熱交換器12Aで冷却能力を発揮させる運転モードである。このため、バイパス配管13に存在する冷水及び当該バイパス配管13等に蓄熱された冷熱等、つまり配管余熱を利用した空調が実行可能である。 That is, the "pipe residual heat operation mode" is an operation mode in which the cold water in the bypass pipe 13 is supplied to the heat exchanger 12A to exert the cooling capacity in the heat exchanger 12A. Therefore, it is possible to perform air conditioning using the cold water existing in the bypass pipe 13, the cold heat stored in the bypass pipe 13 and the like, that is, the residual heat of the pipe.

このとき、仮に、配管余熱が空調を行うに十分な状態でない場合、つまり能力条件を満たしていない状態で配管余熱運転モードを実行すると、十分な冷却能力を発揮させることができず、管理条件を満たす空調能力を提供できないおそれがある。 At this time, if the residual heat of the pipe is not sufficient for air conditioning, that is, if the residual heat operation mode of the pipe is executed in a state where the capacity condition is not satisfied, the sufficient cooling capacity cannot be exhibited, and the management condition is changed. May not be able to provide the required air conditioning capacity.

これに対して、本実施形態では、少なくとも管理条件及び能力条件を満たしているときに、配管余熱運転モードにて空調装置10を稼働させるので、より省電力化を図りながら、確実に室内の空調を行うことが可能となる。 On the other hand, in the present embodiment, since the air conditioner 10 is operated in the pipe residual heat operation mode when at least the control conditions and the capacity conditions are satisfied, the air conditioner in the room is surely air-conditioned while further reducing the power consumption. Can be done.

すなわち、制御装置20は、熱源機11を停止させた状態で配管余熱運転モードを実行させることが望ましい。これにより、更なる省電力化を図ることが可能となる。
制御装置20は、管理条件を満たさない、つまり発報信号が発信されていると判断されたときに、配管余熱運転モード(第2制御モード)にて管理条件を満たす冷却能力を熱交換器12Aにて発揮可能であるか否か、つまり往水ヘッダ温度が上限値未満であるか否かを判断する。
That is, it is desirable that the control device 20 executes the pipe residual heat operation mode with the heat source machine 11 stopped. This makes it possible to further reduce power consumption.
When it is determined that the control device 20 does not satisfy the control conditions, that is, the alarm signal is transmitted, the heat exchanger 12A has a cooling capacity that satisfies the control conditions in the pipe residual heat operation mode (second control mode). It is determined whether or not it can be exhibited in, that is, whether or not the outgoing water header temperature is less than the upper limit value.

そして、制御装置20は、管理条件を満たすと判断し、かつ、往水ヘッダ温度が上限値未満でないと判断したときに、通常運転モード(第3制御モード)にて空調装置10を稼働させる通常運転処理を実行可能である。これにより、不必要なとき通常運転モードが実行されることを抑制できるので、効果的に省電力化を図ることができる。 Then, when the control device 20 determines that the management condition is satisfied and the outgoing water header temperature is not less than the upper limit value, the control device 20 normally operates the air conditioner 10 in the normal operation mode (third control mode). The operation process can be executed. As a result, it is possible to suppress the execution of the normal operation mode when it is unnecessary, so that it is possible to effectively save power.

制御装置20は、管理条件を満たすと判断されたときに、配管余熱運転モード(第2制御モード)にて熱交換器12Aで発揮させる冷却能力を更に低下させることが可能であるか否かを判断する。 Whether or not the control device 20 can further reduce the cooling capacity exhibited by the heat exchanger 12A in the pipe residual heat operation mode (second control mode) when it is determined that the control condition is satisfied. to decide.

そして、制御装置20は、管理条件を満たすと判断し、かつ、冷却能力を更に低下させることができないと判断したときに、省電力運転モード(第1制御モード)にて空調装置10を稼働させる省電力運転処理を実行する。これにより、二次ポンプP2の稼働を抑制できるので、効果的に省電力化を図ることができる。 Then, when it is determined that the control condition is satisfied and the cooling capacity cannot be further reduced, the control device 20 operates the air conditioner 10 in the power saving operation mode (first control mode). Execute power saving operation processing. As a result, the operation of the secondary pump P2 can be suppressed, so that power saving can be effectively achieved.

制御装置20は、省電力運転モードとして、熱交換器12Aへの冷水供給を停止させた状態で送風機12Bを稼働させる運転モードを実行可能である。これにより、効果的に省電力化を図ることができる。 As a power saving operation mode, the control device 20 can execute an operation mode in which the blower 12B is operated with the cold water supply to the heat exchanger 12A stopped. As a result, power saving can be effectively achieved.

制御装置20は、熱交換器12Aで発揮させる冷却能力を変更する処理を実行した後、効果待ち時間Twが経過したときに、管理条件を満たすか否かの判断処理を実行する。これにり、ハンチング等の発生を抑制して適切なタイミングで第2制御モードへ移行でき得る。 The control device 20 executes a process of changing the cooling capacity exerted by the heat exchanger 12A, and then executes a process of determining whether or not the management condition is satisfied when the effect waiting time Tw elapses. As a result, it is possible to suppress the occurrence of hunting and the like and shift to the second control mode at an appropriate timing.

制御装置20は、熱交換器12Aで発揮させる冷却能力を変更する処理を実行した後、効果待ち時間Twが経過したときに、冷却能力を更に変更するか否かの処理、及び制御モードを変更するか否かを判断する。ハンチング等の発生を抑制して適切なタイミングで制御モードの移行等を実行できる。 After executing the process of changing the cooling capacity exerted by the heat exchanger 12A, the control device 20 changes the process of whether or not to further change the cooling capacity and the control mode when the effect waiting time Tw elapses. Decide whether to do it or not. It is possible to suppress the occurrence of hunting and execute the transition of the control mode at an appropriate timing.

制御装置20は、配管余熱運転モード時には、一次ポンプP1を停止させた状態で二次ポンプP2を稼働させる。これにより、配管余熱運転モードを実現するために、別途、バルブを追加する等の追加工事を必要としない。このため、既存の冷水循環システムにも容易に本実施形態を適用することができる。 The control device 20 operates the secondary pump P2 with the primary pump P1 stopped in the pipe residual heat operation mode. As a result, in order to realize the piping residual heat operation mode, no additional work such as adding a valve is required. Therefore, the present embodiment can be easily applied to the existing cold water circulation system.

(その他の実施形態)
上述の実施形態では、制御装置20は、各FCU12毎に重み付け付けを行い、発報信号が発信されたFCU12の重みの集計値を利用して効果待ち時間Twを決定する。しかし、本発明はこれに限定されるものではなく、他の統計的手法にて統計量を算出し、当該統計量から効果待ち時間Tw等の制御パラメータを決定してもよい。
(Other embodiments)
In the above-described embodiment, the control device 20 weights each FCU 12 and determines the effect waiting time Tw by using the aggregated value of the weights of the FCU 12 to which the alarm signal is transmitted. However, the present invention is not limited to this, and a statistic may be calculated by another statistical method, and a control parameter such as an effect waiting time Tw may be determined from the statistic.

上述の実施形態では、二次ポンプP2を構成する各ポンプの回転数を変更することにより二次ポンプP2の吐き出し量を制御し、当該ポンプの回転数が最小回転数又は最大回転数となったときに、稼働ポンプの台数を増減した。 In the above-described embodiment, the discharge amount of the secondary pump P2 is controlled by changing the rotation speed of each pump constituting the secondary pump P2, and the rotation speed of the pump becomes the minimum rotation speed or the maximum rotation speed. Occasionally, the number of operating pumps was increased or decreased.

しかし、本発明はこれに限定されるものではない。すなわち、例えば、各ポンプの回転数を変更する制御処理を廃止し、稼働ポンプの台数を増減変更することにより、二次ポンプP2の吐き出し量を制御してもよい。 However, the present invention is not limited to this. That is, for example, the discharge amount of the secondary pump P2 may be controlled by abolishing the control process for changing the rotation speed of each pump and increasing or decreasing the number of operating pumps.

上述の実施形態では、制御モードを3つの制御モード(第1制御モード〜第3制御モード)に分けて冷水循環システムを制御した。しかし、本発明はこれに限定されるものではない。すなわち、例えば、4つ以上の制御モードに分けて冷水循環システムを制御してもよい。 In the above-described embodiment, the cold water circulation system is controlled by dividing the control mode into three control modes (first control mode to third control mode). However, the present invention is not limited to this. That is, for example, the cold water circulation system may be controlled by dividing it into four or more control modes.

例えば、送風機12Bも含めて全ての機器(第1冷水温センサS3等のセンサは除く。)を停止させる第4制御モードを設け、第1制御モード時において、発報信号が発信されていないときに、第4制御モードを実行してもよい。 For example, when a fourth control mode is provided to stop all devices (excluding sensors such as the first chilled water temperature sensor S3) including the blower 12B, and the alarm signal is not transmitted in the first control mode. In addition, the fourth control mode may be executed.

上述の実施形態では、管理項目の具体的な種類及びその内容、並びに効果待ち時間Tw等は、管理者が予め設定した固定値であった。しかし、本発明はこれに限定されるものではない。すなわち、例えば、管理項目の具体的内容等を制御装置20が自動的に変更してもよい。 In the above-described embodiment, the specific types and contents of the management items, the effect waiting time Tw, and the like are fixed values preset by the administrator. However, the present invention is not limited to this. That is, for example, the control device 20 may automatically change the specific contents of the management items.

自動変更する処理は、例えば、(a)制御装置20内のカレンダー情報や外気温度等により、制御装置20が季節を判断し、当該季節に応じて管理項目の具体的内容(数値等)を変更する処理、(b)制御装置20内の時計情報を利用して時刻に応じて管理項目の具体的内容(数値等)を変更する処理等である。 In the process of automatically changing, for example, (a) the control device 20 determines the season based on the calendar information in the control device 20, the outside air temperature, etc., and the specific contents (numerical values, etc.) of the management items are changed according to the season. Processing, (b) processing for changing the specific contents (numerical value, etc.) of the management item according to the time by using the clock information in the control device 20 and the like.

上述の実施形態では、各FCU12の重みWjは、管理者が予め設定した固定値であった。しかし、本発明はこれに限定されるものではない。すなわち、例えば、重みWjの具体的値を制御装置20が自動的に変更してもよい。なお、管理者が季節毎に手動操作にて各FCU12の重みWjを変更してもよい。 In the above-described embodiment, the weight Wj of each FCU 12 is a fixed value preset by the administrator. However, the present invention is not limited to this. That is, for example, the control device 20 may automatically change the specific value of the weight Wj. The administrator may manually change the weight Wj of each FCU 12 for each season.

上述の実施形態では、FCU12に設けられたコントローラが発報信号を発信するか否かを判断した。しかし、本発明はこれに限定されるものではない。すなわち、制御装置20が直接的に発報信号を発信する条件を満たしているか否かを判断してもよい。なお、FCU12は、空気調和機(AHU)又は外気調和機(OHU)にて構成されたものであってもよい。 In the above-described embodiment, it is determined whether or not the controller provided in the FCU 12 transmits the alarm signal. However, the present invention is not limited to this. That is, it may be determined whether or not the control device 20 directly satisfies the condition for transmitting the alarm signal. The FCU 12 may be configured by an air conditioner (AHU) or an outside air conditioner (OHU).

上述の実施形態では、効果待ち時間Tw、管理条件及び能力条件等が予め設定された固定値又は制御装置20が季節等に応じて自動的に設定していた。しかし、本発明はこれに限定されるものではない。すなわち、例えば、季節毎に管理者が手動操作にて管理条件及び能力条件等を設定変更してもよい。 In the above-described embodiment, the fixed value or the control device 20 in which the effect waiting time Tw, the management condition, the capacity condition, and the like are set in advance are automatically set according to the season and the like. However, the present invention is not limited to this. That is, for example, the manager may manually change the settings of the management conditions, the ability conditions, and the like for each season.

上述の実施形態では、熱源機11を停止させた状態で配管余熱運転モード(第2制御モード)を実行した。しかし、本発明はこれに限定されるものではない。すなわち、例えば、熱源機11を停止させることなく、配管余熱運転モードを実行してもよい。このとき、熱源機11は、最小出力で稼働さることが望ましい。 In the above-described embodiment, the pipe residual heat operation mode (second control mode) is executed with the heat source machine 11 stopped. However, the present invention is not limited to this. That is, for example, the pipe residual heat operation mode may be executed without stopping the heat source machine 11. At this time, it is desirable that the heat source machine 11 operates at the minimum output.

上述の実施形態では、一次ポンプP1を停止させた状態で配管余熱運転モード(第2制御モード)を実行した。しかし、本発明はこれに限定されるものではない。すなわち、例えば、三方弁等の流路切替弁を設け、一次ポンプP1を稼働させた状態で配管余熱運転モードを実行してもよい。 In the above-described embodiment, the pipe residual heat operation mode (second control mode) is executed with the primary pump P1 stopped. However, the present invention is not limited to this. That is, for example, a flow path switching valve such as a three-way valve may be provided, and the pipe residual heat operation mode may be executed with the primary pump P1 operating.

上述の実施形態では、効果待ち時間Tw等は、制御モードによらず同一の値であった。しかし、本発明はこれに限定されるものではない。すなわち、例えば、制御モードに応じて効果待ち時間Tw等を自動変更してもよい。 In the above-described embodiment, the effect waiting time Tw and the like have the same value regardless of the control mode. However, the present invention is not limited to this. That is, for example, the effect waiting time Tw or the like may be automatically changed according to the control mode.

上述の実施形態では、電動モータへの印加電圧周波数を変更することにより、ポンプの回転数、つまり吐き出し量を制御した。しかし、本発明はこれに限定されるものではない。すなわち、例えば、電動モータへの印加電圧を変更して吐き出し量を制御してもよい。 In the above-described embodiment, the rotation speed of the pump, that is, the discharge amount is controlled by changing the voltage applied to the electric motor. However, the present invention is not limited to this. That is, for example, the discharge amount may be controlled by changing the voltage applied to the electric motor.

上述の実施形態に係る冷水循環システムでは、システムの始動スイッチが管理者により投入されると、制御装置20は先ず、第3制御モードを実行した。しかし、本発明はこれに限定されるものではなく、例えば、システムの始動スイッチが管理者により投入されると、制御装置20は先ず、第1制御モードを実行してもよい。 In the cold water circulation system according to the above-described embodiment, when the start switch of the system is turned on by the administrator, the control device 20 first executes the third control mode. However, the present invention is not limited to this, and for example, when the start switch of the system is turned on by the administrator, the control device 20 may first execute the first control mode.

上述の実施形態では、冷水循環システム用プログラムが冷水循環システムの不揮発性記憶部に予め記憶されたものであった。しかし、本発明はこれに限定されるものではない。すなわち、例えば、冷水循環システム用プログラムが記録された媒体を介して既存の冷水循環システム当該プログラムをインストールしてもよい。 In the above-described embodiment, the program for the cold water circulation system is stored in advance in the non-volatile storage unit of the cold water circulation system. However, the present invention is not limited to this. That is, for example, the existing cold water circulation system program may be installed via a medium in which the cold water circulation system program is recorded.

本願発明は、特許請求の範囲に記載された発明の趣旨に合致するものであればよく、上述の実施形態に限定されるものではない。つまり、上述の実施形態では、制御パラメータとして「効果待ち時間Tw」を例に本願発明を説明したが、本発明の適用はこれに限定されるものではない。 The invention of the present application is not limited to the above-described embodiment as long as it conforms to the gist of the invention described in the claims. That is, in the above-described embodiment, the present invention has been described by taking "effect waiting time Tw" as an example as a control parameter, but the application of the present invention is not limited to this.

さらに、上述した複数の実施形態のうち少なくとも2つの実施形態を組み合わせてもよい。また、上述の実施形態は、暖房装置等の温熱を加熱対象に供給する熱媒体循環システムにも適用できる。 Furthermore, at least two of the plurality of embodiments described above may be combined. Further, the above-described embodiment can also be applied to a heat medium circulation system that supplies heat to a heating target such as a heating device.

10… 空調装置 11… 熱源機 11A… 冷却塔 11B… 冷却水ポンプ
11C… 三方弁 12…FCU(ファンコイルユニット)
12A… 熱交換器 12B… 送風機 12C… バルブ 13… バイパス配管
14A… 一次往水ヘッダ 14B… 一次還水ヘッダ 15B… 二次還水ヘッダ
15A… 二次往水ヘッダ 20… 制御装置 P1… 一次ポンプ
P2… 二次ポンプ S1… 温度センサ S3… 第1冷水温センサ
S4… 第2冷水温センサ S5… 第3冷水温センサ S6… 第4冷水温センサ
S7… 第1冷却水温センサ S8… 第2冷却水温センサ
10 ... Air conditioner 11 ... Heat source machine 11A ... Cooling tower 11B ... Cooling water pump 11C ... Three-way valve 12 ... FCU (fan coil unit)
12A ... Heat exchanger 12B ... Blower 12C ... Valve 13 ... Bypass piping 14A ... Primary outflow header 14B ... Primary return water header 15B ... Secondary return water header 15A ... Secondary outflow header 20 ... Control device P1 ... Primary pump P2 ... Secondary pump S1 ... Temperature sensor S3 ... 1st cold water temperature sensor S4 ... 2nd cold water temperature sensor S5 ... 3rd cold water temperature sensor S6 ... 4th cold water temperature sensor S7 ... 1st cooling water temperature sensor S8 ... 2nd cooling water temperature sensor

Claims (3)

冷水を冷却する熱源機、並びに冷却された冷水と冷却対象を冷却する複数の熱交換器を有する冷却装置と、
前記複数の熱交換器で発揮させる冷却能力を制御する制御装置であって、当該熱交換器で発揮させる冷却能力を変更する処理を実行した後、予め設定されたルールに従って決定された時間(以下、制御パラメータという。)が経過したときに、前記冷却装置の作動を制御するための次の処理を実行する制御装置と、
前記複数の熱交換器のうち第1の熱交換器の冷却対象の状態を直接的又は間接的に示す第1パラメータ(以下、第1管理項目という。)の値を検出する第1検出部と、
前記複数の熱交換器のうち第2の熱交換器の冷却対象の状態を直接的又は間接的に示す第2パラメータ(以下、第2管理項目という。)の値を検出する第2検出部とを少なくとも備え、
前記制御装置は、
前記第1検出部により検出された値が、前記第1管理項目について予め設定された第1管理条件を満たすか否かを判断する第1判断処理、
前記第1管理条件を満たさないと判断されたときに、前記第1管理項目について予め設定された重みである第1設定値を設定する第1設定処理、
前記第2検出部により検出された値が、前記第2管理項目について予め設定された第2管理条件を満たすか否かを判断する第2判断処理、
前記第2管理条件を満たさないと判断されたときに、前記第2管理項目について予め設定された重みである第2設定値を設定する第2設定処理、並びに
少なくとも前記第1設定値及び前記第2設定値に基づいて統計量を算出し、当該統計量を利用して予め設定されたルールに従って前記制御パラメータを決定する決定処理を実行可能であり、
さらに、前記制御装置は、
前記第1判断処理により前記第1管理条件を満たさないと判断されたときには、前記第1の熱交換器で発揮させる冷却能力を増大させ、
前記第2判断処理により前記第2管理条件を満たさないと判断されたときには、前記第2の熱交換器で発揮させる冷却能力を増大させ、
前記重みは、前記冷却装置の制御を行う上で重要な箇所に設置された前記熱交換器の重みが、その他の前記熱交換器の重みに比べて大きな値となるように設定されており、
そして、前記要な箇所とは、当該重要な箇所と異なる箇所に比べて相対的に素早く対応する箇所である冷水循環システム。
A heat source machine that cools cold water, and a cooling device that has multiple heat exchangers that cool the cooled cold water and the object to be cooled.
A control device that controls the cooling capacity exerted by the plurality of heat exchangers, and after executing a process of changing the cooling capacity exerted by the heat exchanger, a time determined according to a preset rule (hereinafter referred to as , A control device that executes the next process for controlling the operation of the cooling device when the control parameter) has elapsed.
A first detection unit that detects the value of a first parameter (hereinafter referred to as a first control item) that directly or indirectly indicates the state of the cooling target of the first heat exchanger among the plurality of heat exchangers. ,
A second detector for detecting the value of a second parameter (hereinafter referred to as a second control item) that directly or indirectly indicates the state of the cooling target of the second heat exchanger among the plurality of heat exchangers. At least prepare
The control device is
The first determination process for determining whether or not the value detected by the first detection unit satisfies the first management condition preset for the first management item.
A first setting process for setting a first setting value which is a preset weight for the first management item when it is determined that the first management condition is not satisfied.
A second determination process for determining whether or not the value detected by the second detection unit satisfies the second management condition preset for the second management item.
When it is determined that the second management condition is not satisfied, a second setting process for setting a second setting value which is a preset weight for the second management item, and at least the first setting value and the first setting value. 2 It is possible to calculate a statistic based on the set value and execute a determination process to determine the control parameter according to a preset rule using the statistic.
Further, the control device is
The first when it is determined not to satisfy the first control conditions by determining process increases the cooling capacity to exert in the first heat exchanger,
The second when it is determined not to satisfy the second management condition by the determining process increases the cooling capacity to exert in the second heat exchanger,
The weight is set so that the weight of the heat exchanger installed at an important place for controlling the cooling device is larger than the weight of other heat exchangers.
Then, said an important point, cold water circulation system is a relatively quick corresponding parts in comparison with the critical points and different locations.
前記制御装置は、発揮可能な最大冷却能力が異なる少なくとも3つの制御モードに分けて前記冷却装置の運転を制御可能であり、
さらに、前記制御装置は、前記熱交換器で発揮させる冷却能力を変更する処理を実行した後、前記制御パラメータが経過したときに、現時の制御モードを変更するか否かを判断する請求項1に記載の冷水循環システム。
The control device can control the operation of the cooling device by dividing it into at least three control modes having different maximum cooling capacities that can be exerted.
Further, claim 1 determines whether or not the current control mode is changed when the control parameter elapses after the control device executes a process of changing the cooling capacity exerted by the heat exchanger. The cold water circulation system described in.
冷水を冷却する熱源機、並びに冷却された冷水と冷却対象を冷却する複数の熱交換器を有する冷却装置と、
前記複数の熱交換器で発揮させる冷却能力を制御する制御装置であって、当該熱交換器で発揮させる冷却能力を変更する処理を実行した後、予め設定されたルールに従って決定された時間(以下、制御パラメータという。)が経過したときに、前記冷却装置の作動を制御するための次の処理を実行する制御装置と、
前記複数の熱交換器のうち第1の熱交換器の冷却対象の状態を直接的又は間接的に示す第1パラメータ(以下、第1管理項目という。)の値を検出する第1検出部と、
前記複数の熱交換器のうち第2の熱交換器の冷却対象の状態を直接的又は間接的に示す第2パラメータ(以下、第2管理項目という。)の値を検出する第2検出部とを少なくとも備える冷水循環システムに適用され、前記制御装置に組み込まれる冷水循環システム用プログラムにおいて、
前記制御装置に、
前記第1検出部により検出された値が、前記第1管理項目について予め設定された第1管理条件を満たすか否かを判断するとともに、前記第1の熱交換器で発揮させる冷却能力を増大させる必要があるときに当該管理条件を満たすと判断する第1判断処理、
前記第1管理条件を満たさないと判断されたときに、前記第1管理項目について予め設定された重みである第1設定値を設定する第1設定処理、
前記第2検出部により検出された値が、前記第2管理項目について予め設定された管理条件を満たすか否かを判断するとともに、前記第2の熱交換器で発揮させる冷却能力を増大させる必要があるときに当該管理条件を満たすと判断する第2判断処理、
前記第2管理条件を満たさないと判断されたときに、前記第2管理項目について予め設定された重みである第2設定値を設定する第2設定処理、並びに
少なくとも前記第1設定値及び前記第2設定値に基づいて統計量を算出し、当該統計量を利用して予め設定されたルールに従って前記制御パラメータを決定する決定処理を実行させるとともに、
前記第1判断処理により前記第1管理条件を満たさないと判断されたときには、前記第1の熱交換器で発揮させる冷却能力を増大させ、
前記第2判断処理により前記第2管理条件を満たさないと判断されたときには、前記第2の熱交換器で発揮させる冷却能力を増大させ、
前記重みは、前記冷却装置の制御を行う上で重要な箇所に設置された前記熱交換器の重みが、その他の前記熱交換器の重みに比べて大きな値となるように設定されおり、
そして、前記要な箇所とは、当該重要な箇所と異なる箇所に比べて相対的に素早く対応する箇所である冷水循環システム用プログラム。
A heat source machine that cools cold water, and a cooling device that has multiple heat exchangers that cool the cooled cold water and the object to be cooled.
A control device that controls the cooling capacity exerted by the plurality of heat exchangers, and after executing a process of changing the cooling capacity exerted by the heat exchanger, a time determined according to a preset rule (hereinafter referred to as , A control device that executes the next process for controlling the operation of the cooling device when the control parameter) has elapsed.
A first detection unit that detects the value of a first parameter (hereinafter referred to as a first control item) that directly or indirectly indicates the state of the cooling target of the first heat exchanger among the plurality of heat exchangers. ,
A second detector for detecting the value of a second parameter (hereinafter referred to as a second control item) that directly or indirectly indicates the state of the cooling target of the second heat exchanger among the plurality of heat exchangers. In the program for the cold water circulation system applied to the cold water circulation system including at least the above-mentioned control device and incorporated in the control device.
To the control device
It is determined whether or not the value detected by the first detection unit satisfies the first control condition preset for the first control item, and the cooling capacity exerted by the first heat exchanger is increased. The first judgment process, which determines that the management condition is satisfied when it is necessary to make it
A first setting process for setting a first setting value which is a preset weight for the first management item when it is determined that the first management condition is not satisfied.
It is necessary to determine whether or not the value detected by the second detection unit satisfies the control condition preset for the second control item, and to increase the cooling capacity exerted by the second heat exchanger. The second judgment process, which determines that the management condition is satisfied when there is
When it is determined that the second management condition is not satisfied, a second setting process for setting a second set value which is a preset weight for the second control item, and at least the first set value and the first setting value. 2 A statistic is calculated based on the set value, and a determination process for determining the control parameter is executed according to a preset rule using the statistic.
The first when it is determined not to satisfy the first control conditions by determining process increases the cooling capacity to exert in the first heat exchanger,
The second when it is determined not to satisfy the second management condition by the determining process increases the cooling capacity to exert in the second heat exchanger,
The weight is set so that the weight of the heat exchanger installed at an important place for controlling the cooling device is larger than the weight of the other heat exchangers.
Then, the A critical point, cold water circulation system program is a corresponding position relatively quickly compared to the importance of a point different locations.
JP2016238360A 2016-12-08 2016-12-08 Cold water circulation system Active JP6976680B2 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
JP2016238360A JP6976680B2 (en) 2016-12-08 2016-12-08 Cold water circulation system
PCT/JP2017/044211 WO2018105732A1 (en) 2016-12-08 2017-12-08 Heat medium circulation system and coolant circulation system
PCT/JP2017/044213 WO2018105734A1 (en) 2016-12-08 2017-12-08 Heat medium circulation system and coolant circulation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016238360A JP6976680B2 (en) 2016-12-08 2016-12-08 Cold water circulation system

Publications (2)

Publication Number Publication Date
JP2018096552A JP2018096552A (en) 2018-06-21
JP6976680B2 true JP6976680B2 (en) 2021-12-08

Family

ID=62632729

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016238360A Active JP6976680B2 (en) 2016-12-08 2016-12-08 Cold water circulation system

Country Status (1)

Country Link
JP (1) JP6976680B2 (en)

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2635209B2 (en) * 1990-11-22 1997-07-30 株式会社日立製作所 Process control method and apparatus
JP5955495B2 (en) * 2010-03-10 2016-07-20 株式会社Nttファシリティーズ Cold water circulation system

Also Published As

Publication number Publication date
JP2018096552A (en) 2018-06-21

Similar Documents

Publication Publication Date Title
KR101317614B1 (en) Controlling apparatus and controlling method
US10203128B2 (en) Cold water circulation system with control of supply of cold water based on degree of air handler surplus
JP5657110B2 (en) Temperature control system and air conditioning system
WO2013172327A1 (en) Air conditioning device
JP2012154528A (en) Air-conditioning control system, and air-conditioning control method
JP6052883B2 (en) Cold water circulation system
JP6363428B2 (en) Heat medium circulation system
JP4905939B2 (en) Operation control method for air conditioning system
JP6676418B2 (en) air conditioner
JP6849419B2 (en) Cold water circulation system
JP7100423B2 (en) Cold water circulation system
JP6125836B2 (en) Cold water circulation system
JP6538420B2 (en) Air conditioning system
CN116182290A (en) Equipment management system
WO2018105732A1 (en) Heat medium circulation system and coolant circulation system
JP6976680B2 (en) Cold water circulation system
JP6453715B2 (en) Air conditioning system and air conditioning system program
JP6517171B2 (en) Air conditioning system
JP5285925B2 (en) Air conditioning system
JP5940608B2 (en) Heat medium circulation system
JP4160861B2 (en) Refrigeration cycle equipment
CN112393391A (en) Heat storage control method for air conditioner
CN119222731A (en) Control method, control device, air conditioning system, storage medium and program product
JP2021089099A (en) Air conditioning system
JP2023040510A (en) temperature control system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20191203

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20201006

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20201204

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210202

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210401

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210622

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210823

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20211109

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20211110

R150 Certificate of patent or registration of utility model

Ref document number: 6976680

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250