JP7001271B2 - Pile, correction material - Google Patents
[go: Go Back, main page]

JP7001271B2 - Pile, correction material - Google Patents

Pile, correction material Download PDF

Info

Publication number
JP7001271B2
JP7001271B2 JP2018162014A JP2018162014A JP7001271B2 JP 7001271 B2 JP7001271 B2 JP 7001271B2 JP 2018162014 A JP2018162014 A JP 2018162014A JP 2018162014 A JP2018162014 A JP 2018162014A JP 7001271 B2 JP7001271 B2 JP 7001271B2
Authority
JP
Japan
Prior art keywords
pile
pile body
rail
tent
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2018162014A
Other languages
Japanese (ja)
Other versions
JP2019085863A (en
Inventor
栄一 川添
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Total Kankyo Co Ltd
Original Assignee
Total Kankyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Total Kankyo Co Ltd filed Critical Total Kankyo Co Ltd
Priority to JP2018162014A priority Critical patent/JP7001271B2/en
Publication of JP2019085863A publication Critical patent/JP2019085863A/en
Application granted granted Critical
Publication of JP7001271B2 publication Critical patent/JP7001271B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Description

本発明は、水平で且つ直線上に敷設されるレールを、所定間隔で支持するために地表に打込まれる杭に主に関する。 The present invention relates mainly to piles driven into the ground to support rails laid horizontally and in a straight line at predetermined intervals.

例えば、構造物を解体する際に、仮設テントを用いる工法が知られている。仮設テントは、その骨組みとなる骨材とそれを覆う、或いは骨材の間に張り渡されるシートとを備えている。
仮設テントは、構造物を解体するときの音や、有害物質が外部環境に漏れ出すのを防止するために非常に役立つ。騒音や有害物質の飛散防止に関する関連法規は年々厳しさを増しており、工事に用いられる仮設テントは構造物の解体のみならず、構造物の建築にも利用される等、その利用の態様が多様化している。
仮設テントは、その名が示す通り、必要なときに一時的に構築され、不必要になったら撤去される。撤去よりも仮設テントの構築には時間がかかる。仮設テントの構築と撤去に費やされる時間も仮設テントを利用して行われる工事の工期にもちろん影響する。
工期、或いはその長短に伴って変動する費用に対する要求が厳しい昨今、仮設テントをいかに早く、そして安く構築して撤去できるようにするかが、大きな課題となっている。
For example, a construction method using a temporary tent when dismantling a structure is known. The temporary tent is provided with an aggregate that forms the framework thereof and a sheet that covers or is stretched between the aggregates.
Temporary tents are very helpful in preventing the noise of dismantling structures and the leakage of harmful substances into the external environment. Related laws and regulations regarding the prevention of noise and the scattering of harmful substances are becoming stricter year by year, and the temporary tents used for construction are used not only for dismantling structures but also for building structures. It is diversifying.
Temporary tents, as the name implies, are temporarily built when needed and removed when no longer needed. It takes more time to build a temporary tent than to remove it. Of course, the time spent constructing and removing the temporary tent also affects the construction period of the construction that is carried out using the temporary tent.
Nowadays, there are strict demands for costs that fluctuate depending on the construction period or its length, and how quickly and cheaply a temporary tent can be constructed and removed has become a major issue.

ところで、仮設テントを構築するには土台が必要となる。仮設テントは、テントという名称にも関わらず巨大であり、大きいときは一辺も高さも100m近く、或いはそれ以上となる。とはいえ、仮設テントは、その大きさの割には軽いから、風による移動を防止しなければならない。そのような意味合いから、仮設テントを地表に固定する役割を担う土台は重要となる。
従来の一般的な土台は、現場でコンクリートを打設してそれを硬化させることによって作られる。しかしながら、このようにして作られた土台は、仮設テントを撤去する際にそれとともに除去することが必要となり、その扱いが課題となっている。
By the way, a foundation is required to build a temporary tent. Despite the name of the tent, the temporary tent is huge, and when it is large, it has a side and height of nearly 100 m or more. However, temporary tents are light for their size and must be prevented from moving by the wind. From such a meaning, the foundation that plays the role of fixing the temporary tent to the ground surface is important.
Traditional common foundations are made by placing concrete in the field and hardening it. However, the foundation made in this way needs to be removed together with the temporary tent when it is removed, and its handling has become an issue.

それに対して、出願人は、金属製のレールを現場に敷設することによって、それを土台として用いることを提案している。金属製のレールは、直線上且つ水平に配され、また工事が行われる範囲を挟んで2本で一対とされ互いに平行とされる。仮設テントは、一対とされたレールの上に立てられた柱を含む骨材を備えており、工事が行われる範囲を跨ぐようにして構築される。また、出願人は、金属製のレールの上で仮設テント或いはその一部を移動させることを提案している。
例えば、工区外或いはレールの一端側で組立てられた仮設テント或いはその一部をレールの上で移動させることにより、工期を短縮させることが可能となる。仮設テントを移動させることにより、仮設テント或いはその一部の組立て又は移動と、工事のための他の作業とを同時並行的に行うことが可能となるからである。
In response, the applicant proposes to use a metal rail as a base by laying it on site. The metal rails are arranged in a straight line and horizontally, and the two rails are paired with each other so as to be parallel to each other with the construction area in between. Temporary tents are equipped with aggregates, including columns erected on a pair of rails, and are constructed to straddle the area where construction is to be carried out. The applicant also proposes to move the temporary tent or a part thereof on the metal rail.
For example, the construction period can be shortened by moving the temporary tent or a part thereof assembled outside the construction zone or one end side of the rail on the rail. By moving the temporary tent, it is possible to assemble or move the temporary tent or a part thereof and perform other work for construction in parallel.

しかしながら、2本のレールを、予定した通りに、水平に、直線上に、そして互いに平行に配するのはかなり難しい。1本のレールに着目した場合、レールは、平面視した場合に直線上に所定間隔で打込まれた杭に対して、その長さ方向の所定の箇所を固定される。
この場合、杭を正確に直線上に打つことが難しいため、杭が予定された直線上からずれる場合があり得る。かかる杭の水平方向のずれ(直線の長さ方向のずれは大きな問題を生じないが、直線の幅方向のずれは問題を生じる。)は、レールの水平方向のずれを生じるか、若しくはずれた杭をレールに固定できないという状態を生じる。他方、多数のレールを地中に打ち込んだときに、各杭における地表から突出している長さを予定された高さに揃えるのが難しいため、各杭の地表から突出した部分の上側の高さに鉛直方向のずれが生じる場合があり得る。かかる杭の鉛直方向のずれは、レールの鉛直方向のずれを生じるか、若しくはずれた杭をレールに固定できないという状態を生じる。もっとも、杭を精密に打つことで、上述の水平方向及び鉛直方向のずれを生じさせないようにすることも可能ではあるが、重機を用いて大掛かりに行う杭打ちの作業を精密に行うのには時間がかかり、工期の短縮という面から見て妥当ではない。
However, it is quite difficult to arrange the two rails horizontally, in a straight line, and parallel to each other as planned. When focusing on one rail, the rail is fixed at a predetermined position in the length direction with respect to the piles driven in a straight line at predetermined intervals when viewed in a plan view.
In this case, it is difficult to hit the stake exactly on a straight line, so the stake may deviate from the planned straight line. The horizontal deviation of such piles (the length deviation of the straight line does not cause a big problem, but the width deviation of the straight line causes a problem) causes or shifts the horizontal deviation of the rail. It causes a situation where the pile cannot be fixed to the rail. On the other hand, when a large number of rails are driven into the ground, it is difficult to align the length of each pile protruding from the ground surface to the planned height, so the height above the portion protruding from the ground surface of each pile. May cause vertical deviation. The vertical deviation of the pile causes a vertical deviation of the rail, or a state in which the displaced pile cannot be fixed to the rail occurs. Although it is possible to prevent the above-mentioned horizontal and vertical deviations from occurring by precisely striking the piles, it is not possible to precisely perform large-scale pile driving work using heavy machinery. It takes time and is not appropriate in terms of shortening the construction period.

工事が行われる範囲を挟んで設けられる一対のレールが、それぞれ2本ずつとされる場合もある。一対のレールの双方が2本ずつとされるのは、一対のレールの双方が1本のレールである場合、1本のレールで支えることのできる柱の断面積は、レールの幅によってある程度決定されるから制限が厳しいものとなるのに対して、近接して配された2本のレールを用いれば、より太い柱をその2本のレールで支持することが可能となるからである。
そのような場合においても、都合4本のレールを杭を用いて直線上で支持しようとした場合には、上述の場合と同様の問題が生じる。多数の杭には、鉛直方向と水平方向のずれが生じうるからである。
もっといえば、このような、杭の水平方向及び鉛直方向のずれに基づく問題は、レールが、仮設テント用のものでなくても生じる。
In some cases, there are two pairs of rails provided across the area where construction is to be carried out. The reason why both of the pair of rails are two each is that if both of the pair of rails are one rail, the cross-sectional area of the column that can be supported by one rail is determined to some extent by the width of the rail. This is because the restrictions are strict, but if two rails arranged in close proximity are used, a thicker column can be supported by the two rails.
Even in such a case, if an attempt is made to support the four rails on a straight line using piles, the same problem as in the above case arises. This is because many piles can have vertical and horizontal deviations.
For that matter, such problems based on horizontal and vertical displacement of piles arise even if the rails are not for temporary tents.

本願発明は、レールを水平に且つ直線上に固定することのできるようにするための杭、及びその応用技術を提供することをその課題とする。 An object of the present invention is to provide a pile for fixing a rail horizontally and linearly, and an applied technique thereof.

かかる課題を解決するため、本願発明者は以下のような発明を提案する。
本願発明は、水平で且つ直線上に敷設されるレールを、所定間隔で支持するために地表に打込まれる杭である。
そして、その杭は、地表に打込まれる既製杭である杭本体と、前記杭本体の上端に、前記杭本体の長さ方向の任意の位置に位置決めした状態で固定可能に構成されているとともに、その上端に、平面視した場合の前記杭本体から全方向に食み出る、それが前記杭本体に固定された状態で前記杭本体の長さ方向に対して垂直な前記レールが取付けられる平面を持つ取付部を備えている補正材と、を備えている。
かかる杭は、既製杭である杭本体と、補正材とを備えて構成されている。杭本体は、既製品の杭で良い。例えば、杭本体は、公知或いは周知の鋼管杭である。
他方、本願発明の杭は、補正材を備えている。1つの杭本体に対して1つの補正材が組合せて使用される。補正材の存在により、杭本体を地中に打込むときに、水平方向のずれと鉛直方向のずれとの少なくとも一方が仮に生じたとしても、そのずれが吸収されることになる。その理屈は以下のようなものである。
補正材は、杭本体の上端に、杭本体の長さ方向の任意の位置に位置決めした状態で固定可能に構成されている。また、補正材は、その上端に、平面視した場合の杭本体から全方向に食み出る、それが杭本体に固定された状態で杭本体の長さ方向に対して垂直なレールが取付けられる平面を持つ取付部を備えている。
まず、補正材は、杭本体の上端に、杭本体の長さ方向で任意の位置に取付可能となっている。補正材の上端には、レールが取付けられる水平な平面を有する取付部が存在するが、補正材の上下方向の位置を適宜に位置決めすることにより、取付部或いはそれが持つ水平な平面の高さ位置を任意に位置決めすることが可能となる。これにより、このとき、例えば、杭本体の上端から、取付部の上の水平な平面までの距離を調整することで、補正材における取付部の上側の平面の高さ位置を、任意に調整することができる。各杭本体の上端の高さに多少のずれがあったとしても、各杭において、上述の距離を適宜に調整することにより、各杭における取付部の上側の平面の高さを揃えることが可能となる。
他方、杭本体の水平方向のずれは、取付部の上面が、杭本体の断面から外側に向けて広がりを持っていることによって吸収される。取付部の上側の平面は、平面視した場合に杭本体の断面から外側に向けて広がっているのであれば、杭本体の断面内につまり杭本体の内側に向けて広がっていてもよい。レールの杭に対する、より詳細には取付部の上側の平面に対する固定は、レールの杭に対する移動が生じない程度に強固であればどのような方法によっても良いが、例えば、溶接、ネジ止めによりこれを行うことが可能である。
補正材を用いずとも、杭本体の鉛直方向のずれであれば、地表に打ち込んだ多数の杭本体の上側を、例えば一番低いものに合わせて切断すれば吸収することができる。しかしながら、杭本体は一般的にはリース品であり、その一部が切断された杭本体は欠損品扱いになるからかかる対応は妥当ではない。そのような不具合を生じないというのも本願発明の利点の1つである。
なお、レールは、取付部の上の平面に直接固定されても良いし、間接的に取付けられても良い。例えば、前記取付部には、所定の部材が取付けられるようになっており、前記取付部には、前記所定の部材を介して、前記レールが取付けられるようになっていてもよい。
In order to solve such a problem, the inventor of the present application proposes the following inventions.
The present invention is a pile driven into the ground surface to support rails laid horizontally and linearly at predetermined intervals.
The pile is configured to be able to be fixed to a pile main body, which is a ready-made pile to be driven into the ground surface, and to the upper end of the pile main body in a state of being positioned at an arbitrary position in the length direction of the pile main body. , A plane on which the rail, which protrudes in all directions from the pile body when viewed in a plan view and is perpendicular to the length direction of the pile body while being fixed to the pile body, is attached to the upper end thereof. It is equipped with a correction material, which is equipped with a mounting portion having a mounting portion.
Such a pile is configured to include a pile body which is a ready-made pile and a correction material. The pile body may be a ready-made pile. For example, the pile body is a known or well-known steel pipe pile.
On the other hand, the pile of the present invention is provided with a correction material. One compensator is used in combination for one pile body. Due to the presence of the compensator, when the pile body is driven into the ground, even if at least one of the horizontal deviation and the vertical deviation occurs, the deviation is absorbed. The theory is as follows.
The compensator is configured to be able to be fixed to the upper end of the pile body in a state of being positioned at an arbitrary position in the length direction of the pile body. In addition, a rail that protrudes from the pile body in all directions when viewed in a plan view and is fixed to the pile body and is perpendicular to the length direction of the pile body is attached to the upper end of the correction material. It has a mounting part with a flat surface.
First, the correction material can be attached to the upper end of the pile body at an arbitrary position in the length direction of the pile body. At the upper end of the compensator, there is a mounting portion having a horizontal plane on which the rail is mounted, but by appropriately positioning the position of the compensator in the vertical direction, the height of the mounting portion or the horizontal plane it has can be obtained. The position can be arbitrarily positioned. Thereby, at this time, for example, by adjusting the distance from the upper end of the pile body to the horizontal plane above the mounting portion, the height position of the plane above the mounting portion in the correction material can be arbitrarily adjusted. be able to. Even if there is a slight deviation in the height of the upper end of each pile body, it is possible to make the height of the upper flat surface of the mounting part in each pile uniform by adjusting the above distance appropriately in each pile. Will be.
On the other hand, the horizontal displacement of the pile body is absorbed by the upper surface of the mounting portion having a spread outward from the cross section of the pile body. The plane on the upper side of the mounting portion may extend within the cross section of the pile body, that is, toward the inside of the pile body, as long as it extends outward from the cross section of the pile body when viewed in a plan view. Fixing of the rail to the stake, more specifically to the upper plane of the mounting part, may be done by any method as long as it is strong enough to prevent movement of the rail to the stake, for example by welding or screwing. It is possible to do.
Even if a correction material is not used, the vertical deviation of the pile body can be absorbed by cutting the upper side of many pile bodies driven into the ground surface, for example, according to the lowest one. However, the pile body is generally a leased product, and the pile body whose part is cut is treated as a defective product, so such measures are not appropriate. It is one of the advantages of the present invention that such a defect does not occur.
The rail may be directly fixed to the flat surface above the mounting portion, or may be indirectly mounted. For example, a predetermined member may be attached to the attachment portion, and the rail may be attached to the attachment portion via the predetermined member.

本願発明の杭において、前記取付部は、円板又はドーナツ状の板であり、前記補正材が前記杭本体に固定されたときに、円板又はドーナツ状の板である前記取付部の中心が、前記杭本体の軸上に位置するようになっていてもよい。取付部が上述のようなものであれば、補正材を杭本体に対してどのような向きに回転させても取付部の上側の平面の形状は常に同一となる。つまり、補正材を杭本体に対して固定するときに、両者の相対的な取付角度(杭本体の軸回りの角度)を気にせずに作業を行うことができるから、作業時間の短縮の効果を得られる。
本願発明の杭は、前記杭本体の上端近辺で、前記杭本体に案内されながら前記補正材を前記杭本体に対して平行移動させられるようにする被案内部を備えていてもよい。このような被案内部が存在すると、取付部の上の平面が杭本体の軸に対して垂直を保ったまま、言い換えれば取付部の上の平面が水平を保ったまま、杭本体に対して補正材を平行移動させることが可能となるので、杭本体に対する補正材の高さ位置を位置決めする作業を容易に行えるようになる。これも作業時間の短縮の効果を生じる。
被案内部は、前記杭本体の上端近辺で、前記杭本体に案内されながら前記補正材を前記杭本体に対して平行移動させられるようにするものであれば、その構成の詳細は問わない。
多くの場合、前記杭本体は円筒形状である。そのような場合、前記被案内部は、前記杭本体の外面に対応しており前記杭本体の外面に案内される内面、又は前記杭本体の内面に対応しており前記杭本体の内面に案内される外面を有する円筒形状であってもよい。
In the pile of the present invention, the mounting portion is a disk or a donut-shaped plate, and when the correction material is fixed to the pile body, the center of the mounting portion which is a disk or a donut-shaped plate is , May be located on the axis of the pile body. If the mounting portion is as described above, the shape of the plane on the upper side of the mounting portion is always the same regardless of the direction in which the correction material is rotated with respect to the pile body. In other words, when fixing the correction material to the pile body, the work can be performed without worrying about the relative mounting angle of the two (the angle around the axis of the pile body), which has the effect of shortening the work time. Can be obtained.
The pile of the present invention may be provided with a guided portion near the upper end of the pile body so that the correction material can be translated with respect to the pile body while being guided by the pile body. When such a guided portion exists, the plane above the mounting portion remains perpendicular to the axis of the pile body, in other words, the plane above the mounting portion remains horizontal with respect to the pile body. Since the correction material can be moved in parallel, the work of positioning the height position of the correction material with respect to the pile body can be easily performed. This also has the effect of shortening the working time.
The details of the configuration of the guided portion are not limited as long as the correction material can be moved in parallel with the pile body while being guided by the pile body near the upper end of the pile body.
In many cases, the pile body has a cylindrical shape. In such a case, the guided portion corresponds to the outer surface of the pile body and is guided to the outer surface of the pile body, or corresponds to the inner surface of the pile body and is guided to the inner surface of the pile body. It may have a cylindrical shape having an outer surface to be formed.

前記補正材と、前記杭本体とは、互いに溶接可能な素材でできており、前記補正材は、前記杭本体に対して溶接により固定されるようになっていてもよい。例えば、上述の円筒形状の被案内部が杭本体に対して溶接可能な素材でできており、被案内部が杭本体に対して溶接固定されても良い。
上述した通り、多くの場合、前記杭本体は、円筒形状である。その場合において、前記補正材における前記取付部は、ドーナツ状の板であり、前記補正材が前記杭本体に固定されたときに、ドーナツ状の板である前記取付部の中心が、前記杭本体の軸上に位置するようになっているとともに、前記補正材における前記被案内部は、前記杭本体の外面に対応しており前記杭本体の外面に案内される内面、又は前記杭本体の内面に対応しており前記杭本体の内面に案内される外面を有する円筒形状であってもよい。この場合における、円筒形状の前記被案内部には、その上下方向の適宜の範囲に、その内外面を貫通する溝が螺旋状に切られているとともに、前記杭本体の上端付近には、前記杭本体の上端に、前記被案内部の内面を前記杭本体の外面に案内させつつ前記被案内部を被せるか、又は前記被案内部の外面を前記杭本体の内面に案内させつつ前記被案内部を挿入した場合に、前記杭本体の任意の高さ位置にある前記被案内部に設けられた前記溝に、前記被案内部を前記杭本体に対して回転させることにより位置合わせすることが可能な位置に孔が穿たれていてもよい。この場合において、前記杭本体の孔と前記被案内部の前記溝とをまとめて貫通させたボルトにナットを螺合させ、前記ボルトの頭部と前記ナットとの間で前記杭本体と前記取付部とを挟持させることにより、前記補正材は、前記杭本体に対して固定されるようになっていてもよい。これは、補正材を、杭本体に対してボルトとナットとで、着脱自在に固定できるようにした例である。このように両者を着脱自在に固定できるようにすることで、杭本体と補正材とを再利用することが可能となる。
The correction material and the pile body may be made of a material that can be welded to each other, and the correction material may be fixed to the pile body by welding. For example, the above-mentioned cylindrical guided portion may be made of a material that can be welded to the pile body, and the guided portion may be welded and fixed to the pile body.
As mentioned above, in many cases, the pile body has a cylindrical shape. In that case, the mounting portion of the compensator is a donut-shaped plate, and when the compensator is fixed to the pile body, the center of the mounting portion, which is the donut-shaped plate, is the pile body. The guided portion in the correction material corresponds to the outer surface of the pile body and is guided to the outer surface of the pile body, or the inner surface of the pile body. It may be a cylindrical shape having an outer surface guided to the inner surface of the pile body. In this case, the cylindrical guided portion is spirally cut with a groove penetrating the inner and outer surfaces thereof in an appropriate range in the vertical direction, and the pile body is near the upper end of the pile body. The upper end of the pile body is covered with the guided portion while guiding the inner surface of the guided portion to the outer surface of the pile body, or the guided portion is guided while guiding the outer surface of the guided portion to the inner surface of the pile body. When the portion is inserted, the guided portion can be aligned with the groove provided in the guided portion at an arbitrary height position of the pile body by rotating the guided portion with respect to the pile body. A hole may be drilled at a possible position. In this case, a nut is screwed into a bolt that penetrates the hole of the pile body and the groove of the guided portion together, and the pile body and the mounting are provided between the head of the bolt and the nut. The correction material may be fixed to the pile body by sandwiching the portion. This is an example in which the correction material can be detachably fixed to the pile body with bolts and nuts. By making it possible to attach and detach both of them in this way, the pile body and the correction material can be reused.

本願発明者は、上述した補正材をも本願発明の一態様として提案する。補正材による効果は、上述した杭の効果に等しい。
本願発明における一例となる補正材は、以下のようなものである。
補正材は、水平で且つ直線上に敷設されるレールを、所定間隔で支持するために地表に打込まれる杭を、地表に打込まれる既製杭である杭本体との組合せで構成する補正材である。
補正材は、前記杭本体の上端に、前記杭本体の長さ方向の任意の位置に位置決めした状態で固定可能に構成されているとともに、その上端に、少なくとも平面視した場合の前記杭本体から全方向に食み出る、それが前記杭本体に固定された状態で前記杭本体の長さ方向に対して垂直な前記レールが取付けられる平面を持つ取付部を備えている。
The inventor of the present application also proposes the above-mentioned correction material as one aspect of the present invention. The effect of the compensator is equal to the effect of the pile described above.
The correction material as an example in the present invention is as follows.
The compensator is a compensator composed of a pile driven into the ground surface to support a rail laid horizontally and in a straight line at predetermined intervals in combination with a pile body which is a ready-made pile driven into the ground surface. Is.
The compensating material is configured to be fixed to the upper end of the pile body in a state of being positioned at an arbitrary position in the length direction of the pile body, and at least from the pile body when viewed in a plan view at the upper end thereof. It is provided with a mounting portion having a flat surface on which the rail, which protrudes in all directions and is perpendicular to the length direction of the pile body while being fixed to the pile body, is mounted.

本願発明者は、上述した杭のいずれかを用いた、杭とレールを含むレール構造をも本願発明の一態様として提案する。その効果は概ね、上述した杭の効果に等しい。
一例となるレール構造は、水平で且つ直線上に敷設されるレールと、前記直線に平行な直線上に乗るようにして所定間隔で地表に打込まれる既製杭である杭本体、及び前記杭本体それぞれの上端に、前記杭本体の長さ方向の任意の位置に位置決めした状態で固定可能に構成されているとともに、その上端に、平面視した場合の前記杭本体から全方向に食み出る、それが前記杭本体に固定された状態で前記杭本体の長さ方向に対して垂直な前記レールが取付けられる平面を持つ取付部を備えている複数の補正材と、を備えている。
そして、前記杭本体の固定された前記補正材の前記杭本体に対する長さ方向の位置決めを適切に行うことにより、前記直線に平行な前記直線上に乗るすべての杭における前記取付部の平面の高さが揃えられており、前記取付部の平面に対して、前記レールが取付けられている。
なお、かかるレール構造における杭本体は、「前記直線に平行な直線上に乗るようにして所定間隔で地表に打込まれる」ものではあるが、本願では、かかる文章これは、そのように「試みられる」という意味である。上述したように、工事現場で、杭を水平方向の位置が完全に予定通りとなるように正確に打込むことは殆ど不可能であるからである。また、各杭本体の地表から突出する長さも、既に説明したように完全に予定通りとするのは殆ど不可能であり、上記文章にはその旨の記載は無いが事実上そうなっていると考えるべきである。
かかるレール構造によれば、杭の水平方向と鉛直方向のずれを、各杭に含まれた補正材が吸収するから、レールを予定された直線上に水平に配することが可能となる。
本願発明のレール構造において、前記取付部には、所定の部材が取付けられるようになっており、前記取付部には、前記所定の部材を介して、前記レールが取付けられるようになっていても構わない。
本願発明のレール構造において、前記杭は、前記直線に平行な2本の直線上に乗り、且つ当該2本の直線に直交する所定間隔の複数の直線と前記2本の直線上に乗るようにして打たれるとともに、前記杭のうち、前記2本の直線に直交する所定間隔の複数の直線のうちの1つに乗るようにして打たれた2本の杭を一組の杭とした場合に、当該一組の杭の前記取付部に、その上面が水平面となる平面を有する跨ぎ材の両端付近が固定されており、前記レールが、前記跨ぎ材の上面に固定されていることで、前記跨ぎ材を介して、前記杭に固定されていてもよい。跨ぎ材を使用することによって、確実にレールを、予定された直線上に水平に配することが可能となる。
本願発明のレール構造で跨ぎ材が用いられる場合、前記跨ぎ材の前記平面に、前記直線に平行な2本のレールが固定されていても構わない。隣接した2本のレールを1組のレールとして扱うものである。この場合、1組のレールが、その1組のレールと平行で且つ同じ高さにもう1組作られ、それらが一対のレールとして機能することになる。
The inventor of the present application also proposes a rail structure including a pile and a rail using any of the above-mentioned piles as one aspect of the present invention. The effect is roughly equal to the effect of the pile described above.
An example rail structure is a rail laid horizontally and on a straight line, a pile body which is a ready-made pile driven into the ground surface at predetermined intervals so as to ride on a straight line parallel to the straight line, and the pile body. Each upper end is configured to be able to be fixed in a state of being positioned at an arbitrary position in the length direction of the pile body, and the upper end of the pile body protrudes from the pile body in all directions when viewed in a plan view. It comprises a plurality of compensators having a mounting portion having a flat surface to which the rail, which is fixed to the pile body and is perpendicular to the length direction of the pile body, is mounted.
Then, by appropriately positioning the correction material fixed to the pile body in the length direction with respect to the pile body, the height of the plane of the mounting portion in all the piles riding on the straight line parallel to the straight line is obtained. The rails are mounted on the flat surface of the mounting portion.
It should be noted that the pile body in such a rail structure is "dried into the ground surface at predetermined intervals so as to ride on a straight line parallel to the straight line", but in the present application, such a sentence is "trial" as such. It means "to be done". As mentioned above, it is almost impossible to drive the piles exactly as planned at the construction site in the horizontal direction. In addition, it is almost impossible to make the length of each pile protruding from the ground surface completely as planned as already explained, and although there is no description to that effect in the above sentence, it is practically the case. You should think about it.
According to such a rail structure, the correction material contained in each pile absorbs the deviation between the horizontal direction and the vertical direction of the pile, so that the rail can be arranged horizontally on the planned straight line.
In the rail structure of the present invention, even if a predetermined member is attached to the attachment portion and the rail is attached to the attachment portion via the predetermined member. I do not care.
In the rail structure of the present invention, the pile rides on two straight lines parallel to the straight line, and rides on a plurality of straight lines at predetermined intervals orthogonal to the two straight lines and on the two straight lines. When two piles struck so as to ride on one of a plurality of straight lines at predetermined intervals orthogonal to the two straight lines are made into a set of piles. In addition, the vicinity of both ends of the straddle member having a plane whose upper surface is a horizontal plane is fixed to the mounting portion of the set of piles, and the rail is fixed to the upper surface of the straddle member. It may be fixed to the pile via the straddle member. By using the straddle material, it is possible to reliably arrange the rail horizontally on the planned straight line.
When a straddle member is used in the rail structure of the present invention, two rails parallel to the straight line may be fixed to the plane of the straddle member. Two adjacent rails are treated as a set of rails. In this case, one set of rails is made parallel to and at the same height as the other set of rails, and they function as a pair of rails.

一実施形態で建て替えがなされる前の旧構造物の一例となるビルディングを含む対象範囲を含むその周辺も含めた平面図。A plan view including the surrounding area including a building that is an example of an old structure before being rebuilt in one embodiment. 図1に示した対象範囲及びビルディングの斜視図。The perspective view of the target area and the building shown in FIG. 図1に示したビルディングの地上及び地下部分についての図1における矢印A方向から見た側面図。A side view of the above-ground and underground portions of the building shown in FIG. 1 as viewed from the direction of arrow A in FIG. 図1に示したビルディングの旧地上部分が解体された後の図1と同じ範囲についての平面図。A plan view of the same area as in FIG. 1 after the old ground portion of the building shown in FIG. 1 has been demolished. 図1に示したビルディングの旧地上部分が解体された後の図3と同じ範囲についての側面図。A side view of the same area as in FIG. 3 after the old ground portion of the building shown in FIG. 1 has been demolished. 基礎レールが配置された後の図1と同じ範囲についての平面図。Top view for the same range as in FIG. 1 after the foundation rails have been placed. 基礎レールを支持するための杭の構造を示す、一部透視図を含む側面図。A side view including a partial perspective view showing the structure of the pile to support the foundation rail. 図7に示した杭に含まれる補正材の斜視図。The perspective view of the correction material contained in the pile shown in FIG. 図7に示した杭の他の例を示す斜視図。The perspective view which shows the other example of the pile shown in FIG. 図1に示した対象範囲を覆う仮設テントの構築方法を説明するための斜視図。FIG. 3 is a perspective view for explaining a method of constructing a temporary tent covering the target range shown in FIG. 1. 図1に示した対象範囲を覆う仮設テントの構築方法を説明するための斜視図。FIG. 3 is a perspective view for explaining a method of constructing a temporary tent covering the target range shown in FIG. 1. 図1に示した対象範囲を覆う仮設テントの構築方法を説明するための斜視図。FIG. 3 is a perspective view for explaining a method of constructing a temporary tent covering the target range shown in FIG. 1. 図1に示した対象範囲を覆う仮設テントの構築方法を説明するための斜視図。FIG. 3 is a perspective view for explaining a method of constructing a temporary tent covering the target range shown in FIG. 1. 図1に示した対象範囲のうちの特定範囲内に場所打ち杭が打たれた状態を示す対象範囲の付近を拡大して示す平面図。FIG. 3 is an enlarged plan view showing the vicinity of the target range showing a state in which a cast-in-place pile is struck within a specific range of the target range shown in FIG. 図1に示した対象範囲のうちの特定範囲内に場所打ち杭を打つ場合の工程を示す図1における矢印A方向から見た側面図。FIG. 1 is a side view seen from the direction of arrow A in FIG. 1 showing a process in which a cast-in-place pile is driven within a specific range of the target range shown in FIG. 図1に示した対象範囲のうちの特定範囲内に場所打ち杭を打つ場合の工程を示す図15と同じ範囲を示す側面図。The side view which shows the same range as FIG. 15 which shows the process in the case of driving a cast-in-place pile in a specific range of the target range shown in FIG. 図1に示した対象範囲のうちの特定範囲内に場所打ち杭を打つ場合の工程を示す図15と同じ範囲を示す側面図。The side view which shows the same range as FIG. 15 which shows the process in the case of driving a cast-in-place pile in a specific range of the target range shown in FIG. 図1に示した対象範囲のうちの特定範囲内の全域に場所打ち杭を打った後の状態を示す図15と同じ範囲を示す側面図。The side view which shows the same range as FIG. 図1に示した対象範囲のうちの特定範囲内の全域に場所打ち杭を打った後の状態を示す図1における矢印B方向から見た側面図。The side view seen from the direction of the arrow B in FIG. 図19に示した状態となった後で、構台を設けた後の状態を示す図19と同じ範囲を示す側面図。A side view showing the same range as that of FIG. 19 showing a state after the gantry is provided after the state shown in FIG. 19 is reached. 地下空間を形成するためにブルドーザを搬入した後の状態を示す図19と同じ範囲を示す側面図。A side view showing the same range as FIG. 19 showing a state after a bulldozer is carried in to form an underground space. 地下空間が形成されている途中の状態を示す図19と同じ範囲を示す側面図。The side view which shows the same range as FIG. 19 which shows the state in the middle of forming an underground space. 地下空間が完成した後の状態を示す図19と同じ範囲を示す側面図。The side view which shows the same range as FIG. 19 which shows the state after the underground space is completed. 地下空間が完成した後に、地下空間における特定範囲外の場所に場所打ち杭を打つための工程を示す、図19と同じ範囲を示す側面図。A side view showing the same range as FIG. 19, showing a process for driving cast-in-place piles in a place outside a specific range in the underground space after the underground space is completed. 地下空間における特定範囲外の場所に場所打ち杭を打つための工程が終了した後の状態を示す、図19と同じ範囲を示す側面図。A side view showing the same range as FIG. 19, showing a state after the process for driving a cast-in-place pile in a place outside a specific range in an underground space is completed. 地下空間における特定範囲外の場所に場所打ち杭を打つための工程が終了した後の状態を示す、図14と同じ範囲を示す平面図。The plan view which shows the same range as FIG. 14 which shows the state after the process for driving a cast-in-place pile to the place outside a specific range in an underground space is completed. 新しいビルディングの地下部分を構築する過程を説明するための、図19と同じ範囲を示す側面図。A side view showing the same extent as in FIG. 19 to illustrate the process of building the underground part of a new building. 新しいビルディングの地下部分を構築する過程が終了した状態を示す、図19と同じ範囲を示す側面図。A side view showing the same range as in FIG. 19, showing the state where the process of constructing the underground part of the new building is completed. 新しいビルディングの地上部分を構築する過程を説明するための図19と同じ範囲を示す側面図。A side view showing the same extent as in FIG. 19 to illustrate the process of constructing the above-ground part of a new building. 基礎レールと杭の他の固定方法を示す、一組の杭及びそれに取付けられるものの一部透視図を含む側面図。A side view including a partial perspective view of a set of piles and what is attached to them, showing the foundation rails and other fixing methods of the piles. 図30の方法で固定された基礎レールと杭と骨材の柱の位置関係を示す平面図。The plan view which shows the positional relationship between the foundation rail fixed by the method of FIG. 30, a pile, and an aggregate pillar.

以下、本発明の好ましい一実施形態を、図面を参照しながら詳細に説明する。 Hereinafter, a preferred embodiment of the present invention will be described in detail with reference to the drawings.

この実施形態では、ある敷地に建っている構造物であり、地下に構造体を有する旧構造物を構造体ごと解体し、旧構造物が存在していた敷地に、地下に構造体を有する構造物を建築する場合について説明する。
その過程で仮設テントが使用される。仮設テントの基礎として、本願発明におけるレール構造が利用され、また、そのレール構造の一部として、本願発明における杭と、本願発明における補正材とが利用される。もっとも、本願発明の杭、補正材、レール構造の応用先は、仮設テントの基礎には限られない。
In this embodiment, a structure is built on a certain site, and an old structure having an underground structure is dismantled together with the structure, and a structure having an underground structure is provided on the site where the old structure existed. The case of building an object will be described.
Temporary tents are used in the process. The rail structure in the present invention is used as the basis of the temporary tent, and the pile in the present invention and the correction material in the present invention are used as a part of the rail structure. However, the application destination of the pile, the correction material, and the rail structure of the present invention is not limited to the foundation of the temporary tent.

図1~図3に、これから解体される旧構造物10を示す。図1は、平面図、図2は斜視図、図3は、地下も含む図1中の矢印Aで矢視した方向からの側面図である。
旧構造物10は、この実施形態では、3つのビルディング11、12、13である。旧構造物10はいずれも、地上に位置する旧地上部分10Aと、構造体である地下に位置する旧地下部分10Bとを備えている。旧地上部分10Aはいずれも、公知或いは周知のビルディングの地上部分であり、旧地下部分10Bはいずれも、公知或いは周知のビルディングの地下部分である。旧地下部分10Bは典型的には、地下室、地下通路である。
ビルディング11、12、13は、道路15で囲まれた一区画に建てられている(図1)。当該区画において網掛けされているXの符号が付された範囲が、後に新たな構造物である追って説明するビルディングが建てられる範囲であり、本願発明における対象範囲に相当する。後述する場所打ち杭は、この対象範囲内の全域に、複数本、必要に応じて打たれることになる。これには限られないが、対象範囲Xは、この実施形態では、図1において左右方向に長い、横長の矩形である。これには限られないが、この実施形態では、建て替えのために取り壊される旧構造物10は、ビルディング11、12、13の3つであり、その敷地にこれも追って説明するように1つの大型のビルディングである新しい構造物が建てられることになる。これは、小さいビルディングが複数建っていた隣接する敷地に、大きなビルディングを建て替えて建設するものであり、街の再開発でよく見られる建て替えの態様に相当する。
図3に示したように、旧構造物10の旧地下部分10Bの下には、旧構造物10を支えていた杭である旧杭10Cが存在している。旧杭10Cは、場所打ち杭であるか否かを問わない。一般に、高い或いは大きな建造物の杭程その長さが長い。これには限られないが、この実施形態では、一番大きなビルディング11の旧杭10Cが一番長く、一番小さなビルディング13の旧杭10Cが一番短くなっている。
1 to 3 show the old structure 10 to be dismantled. 1 is a plan view, FIG. 2 is a perspective view, and FIG. 3 is a side view from the direction indicated by an arrow A in FIG. 1 including the basement.
The old structure 10 is, in this embodiment, three buildings 11, 12, 13. Each of the old structures 10 includes an old above-ground portion 10A located above the ground and an old underground portion 10B located below the structure. The old above-ground part 10A is an above-ground part of a known or well-known building, and the old underground part 10B is an underground part of a well-known or well-known building. The old underground part 10B is typically a basement or an underground passage.
Buildings 11, 12, and 13 are built in a section surrounded by road 15 (Fig. 1). The shaded area marked with an X in the section is the area where a new structure, which will be described later, will be built, and corresponds to the scope of the present invention. A plurality of cast-in-place piles, which will be described later, will be struck in the entire area within this target range as needed. Although not limited to this, the target range X is, in this embodiment, a horizontally long rectangle that is long in the left-right direction in FIG. Although not limited to this, in this embodiment, the old structures 10 to be demolished for rebuilding are three buildings 11, 12, and 13, and one large-sized structure 10 will be described later on the site. A new structure will be built, which is the building of. This is to rebuild and construct a large building on an adjacent site where multiple small buildings were built, which corresponds to a rebuilding mode often seen in urban redevelopment.
As shown in FIG. 3, under the old underground portion 10B of the old structure 10, there is an old pile 10C which is a pile supporting the old structure 10. The old pile 10C may or may not be a cast-in-place pile. Generally, the taller or larger the pile of a building, the longer it is. Although not limited to this, in this embodiment, the old pile 10C of the largest building 11 is the longest, and the old pile 10C of the smallest building 13 is the shortest.

建て替えの工事を行う場合、まず、旧構造物10の解体を行う。
旧構造物10の解体は、その旧地上部分10Aから行う。旧地上部分10Aの解体は、従来工法によることができる。旧地上部分10Aの解体を行う場合には多くの場合、後述する仮設テントは使用しない。旧構造物10の旧地上部分10Aを解体するために仮設テントを建てようとしても、旧構造物10の地上部分10Aの周囲に仮設テントを建てるために十分なスペースを確保するのが、事実上殆ど不可能であるためである。従来工法による解体は例えば、旧構造物10の旧地上部分10Aの周囲に仮設足場を設けて、散水工法を用いて解体を行うといったものである。
旧地上部分10Aを解体したことによって生じた瓦礫は、対象範囲Xから、外部へ搬出する。かかる瓦礫の搬出も、公知或いは周知技術によって行えば良い。
その後、対象範囲Xの全体を整地する。対象範囲Xを整地するとき、旧地下部分10Bに空間がある場合には、当該空間を埋め戻すのが好ましい。例えば、旧地下部分10Bにある空間は、床スラブや、旧地上部分10Aを破砕することによって生成したコンクリート再生砕石材等によって埋め戻すことができる。
対象範囲Xを整地した後の状態を、図4の平面図と、図5の側面図とに示す。
When rebuilding work, first, the old structure 10 is dismantled.
The dismantling of the old structure 10 is performed from the old ground portion 10A. The old ground portion 10A can be dismantled by the conventional method. When dismantling the old ground part 10A, the temporary tent described later is not used in many cases. Even if an attempt is made to build a temporary tent to dismantle the old ground portion 10A of the old structure 10, it is practically sufficient to secure sufficient space around the ground portion 10A of the old structure 10 to build a temporary tent. This is because it is almost impossible. The dismantling by the conventional construction method is, for example, providing a temporary scaffolding around the old ground portion 10A of the old structure 10 and dismantling by using the sprinkling method.
The rubble generated by dismantling the old ground portion 10A is carried out from the target range X. The rubble may be carried out by a known or well-known technique.
After that, the entire target range X is leveled. When the target range X is leveled, if there is a space in the old underground portion 10B, it is preferable to backfill the space. For example, the space in the old underground portion 10B can be backfilled with a floor slab, a recycled concrete crushed stone material generated by crushing the old above-ground portion 10A, or the like.
The state after leveling the target range X is shown in the plan view of FIG. 4 and the side view of FIG.

以降しばらくの工程は、仮設テントを用いて実施される。
この実施形態における仮設テントは、以下のようにして構築される。
この実施形態では、仮設テントを構築するために、対象範囲Xを挟むようにして、2本で一対の基礎レール110が配置される(図6)。なお、基礎レール110の配置は、それが可能なのであれば、旧構造物10の旧地上部分10Aの解体が終了する前に、旧地上部分10Aの解体作業と並行して行われても構わない。
2本の基礎レール110はいずれも長尺であり、いずれも水平となるようにして、また互いに平行になるようにして配される。この実施形態では2本の基礎レール110は、矩形の対象範囲Xの長辺の長さよりも若干長くなっており、対象範囲Xの長辺の若干外側に、当該長辺からその両端がやや食み出るような状態で、配される。
基礎レール110は、その上に仮設テントを構築するためのものであり、仮設テントのいわば基礎となるものである。仮設テントの下端は、基礎レール110に対して固定されることになる。それにより、仮設テントが、例えば強風によって移動することが防止されることになる。そのような効果が得られるような重量を基礎レール110は備えており、重量を稼ぐ、また剛性が求められる等の事情により、その素材は金属製とされている。仮設テントの少なくとも一部は、後述するようにして、基礎レール110の上を基礎レール110の長さ方向に移動できるようになっている。
基礎レール110は、その上で、仮設テントを案内しながら移動させることが可能となっていればよく、公知、周知のものをこれに応用することができる。基礎レール110は、例えば、鉄道の軌道として用いられているレールをこれに利用することも可能であるし、一般的なH鋼をこれに利用することも可能である。
After that, the process for a while is carried out using a temporary tent.
The temporary tent in this embodiment is constructed as follows.
In this embodiment, in order to construct a temporary tent, a pair of foundation rails 110 are arranged so as to sandwich the target range X (FIG. 6). If it is possible, the foundation rail 110 may be arranged in parallel with the dismantling work of the old ground portion 10A before the dismantling of the old ground portion 10A of the old structure 10 is completed. ..
The two foundation rails 110 are both long and are arranged so as to be horizontal and parallel to each other. In this embodiment, the two foundation rails 110 are slightly longer than the length of the long side of the rectangular target range X, and both ends of the long side are slightly eclipsed slightly outside the long side of the target range X. It is arranged in a state where it sticks out.
The foundation rail 110 is for constructing a temporary tent on the foundation rail 110, and is a so-called foundation of the temporary tent. The lower end of the temporary tent will be fixed to the foundation rail 110. This will prevent the temporary tent from moving, for example, due to strong winds. The foundation rail 110 is provided with a weight that can obtain such an effect, and the material is made of metal due to circumstances such as gaining weight and demanding rigidity. At least a part of the temporary tent can be moved on the foundation rail 110 in the length direction of the foundation rail 110 as described later.
As long as the foundation rail 110 can be moved while guiding the temporary tent on it, known and well-known ones can be applied thereto. As the foundation rail 110, for example, a rail used as a railroad track can be used for this, or general H steel can be used for this.

ところで、2本の基礎レール110は、その長さ方向の所定の複数の箇所で、地表から打たれてその上端が地表から突出している杭の地表から突出している部分の上側に固定される。なお、この杭は、後述する場所打ち杭とは異なる。かかる杭に対して基礎レール110を固定すべきなのは、基礎レール110に固定された仮設テントの移動を防止するためには、まず基礎レール110自体が地表に対して移動を防止されている必要があるからである。杭を介して、基礎レール110は地表に対して強固に固定される。
しかしながら、2本の基礎レール110を、予定した通りに、水平に、且つ互いに平行に配するのはかなり難しい。1本の基礎レール110に着目した場合、基礎レール110は上述した通り、平面視した場合に直線上に所定間隔で打込まれた杭に対して、その長さ方向の所定の箇所を固定される。
この場合、杭を正確に直線上に打つことが難しいため、杭が予定された直線上からずれる場合があり得る。かかる杭の水平方向のずれ(直線の長さ方向のずれは大きな問題を生じないが、直線の幅方向のずれは問題を生じる。)は、基礎レール110の水平方向のずれを生じるか、若しくはずれた杭を基礎レール110に固定できないという状態を生じる。他方、多数の基礎レール110を地中に打ち込んだときに、各杭における地表から突出している長さを予定された高さに揃えるのが難しいため、各杭の地表から突出した部分の上側の高さに鉛直方向のずれが生じる場合があり得る。かかる杭の鉛直方向のずれは、基礎レール110の鉛直方向のずれを生じるか、若しくはずれた杭を基礎レール110に固定できないという状態を生じる。もっとも、杭を精密に打つことで、上述の水平方向及び鉛直方向のずれを生じさせないようにすることも可能ではあるが、重機を用いて大掛かりに行う杭打ちの作業を精密に行うのには時間がかかり、工期の短縮という面から見て妥当ではない。
かかる課題を、この実施形態では以下のようにして克服している。
By the way, the two foundation rails 110 are fixed to the upper side of a portion of a pile that is struck from the ground surface and whose upper end protrudes from the ground surface at a plurality of predetermined points in the length direction thereof. It should be noted that this pile is different from the cast-in-place pile described later. The reason why the foundation rail 110 should be fixed to such a pile is that the foundation rail 110 itself must first be prevented from moving with respect to the ground surface in order to prevent the temporary tent fixed to the foundation rail 110 from moving. Because there is. The foundation rail 110 is firmly fixed to the ground surface via the pile.
However, it is quite difficult to arrange the two foundation rails 110 horizontally and parallel to each other as planned. When focusing on one foundation rail 110, as described above, the foundation rail 110 is fixed at a predetermined position in the length direction with respect to the piles driven in a straight line at predetermined intervals when viewed in a plan view. Rail.
In this case, it is difficult to hit the stake exactly on a straight line, so the stake may deviate from the planned straight line. The horizontal deviation of the pile (the deviation in the length of the straight line does not cause a big problem, but the deviation in the width of the straight line causes a problem) causes the horizontal deviation of the foundation rail 110, or A situation occurs in which the displaced pile cannot be fixed to the foundation rail 110. On the other hand, when a large number of foundation rails 110 are driven into the ground, it is difficult to align the length of each pile protruding from the ground surface to the planned height, so the upper side of the portion protruding from the ground surface of each pile. Vertical deviations may occur in height. The vertical deviation of the pile causes a vertical deviation of the foundation rail 110, or a state in which the displaced pile cannot be fixed to the foundation rail 110 occurs. Although it is possible to prevent the above-mentioned horizontal and vertical deviations from occurring by precisely striking the piles, it is not possible to precisely perform large-scale pile driving work using heavy machinery. It takes time and is not appropriate in terms of shortening the construction period.
This problem is overcome in this embodiment as follows.

この実施形態においても、基礎レール110は、図7に示したような杭120に対して固定される。この実施形態における杭120は、一般的な既製杭である杭本体121と、杭本体121に取付けられる補正材122とにより構成される。杭本体121は、地表から鉛直下方に打込まれる杭であり、例えば一般的に鋼管杭と呼ばれる筒状の杭である。鋼管杭である場合、杭本体121は、公知、或いは周知のものでよく、金属、例えば鉄により構成される。鋼管杭である場合、杭本体121は一般に円筒形である。杭本体121の下端には、杭本体121が地中から抜け出ないようにするための横方向に広がったアンカー体121Aが取付けられている。杭本体121は、公知或いは周知の既製杭用の杭打機を用いて、地中に打込まれる。
地中に打込まれる杭本体121は、上述したように、基礎レール110が配置される予定の直線上に複数本打込まれる。もっとも、杭本体121の水平方向の位置は、それ程正確である必要はなく多少の水平方向のずれは許容される。また、各杭本体121は、それらの上側の一部が地表から幾らか突出した状態とされる。しかしながら、各杭本体121の上端部分の高さは、それ程正確に揃っている必要はなく、多少の鉛直方向のずれは許容される。
Also in this embodiment, the foundation rail 110 is fixed to the pile 120 as shown in FIG. The pile 120 in this embodiment is composed of a pile main body 121, which is a general ready-made pile, and a correction material 122 attached to the pile main body 121. The pile body 121 is a pile driven vertically downward from the ground surface, and is, for example, a cylindrical pile generally called a steel pipe pile. In the case of a steel pipe pile, the pile body 121 may be known or well known, and is made of a metal, for example, iron. In the case of a steel pipe pile, the pile body 121 is generally cylindrical. At the lower end of the pile body 121, an anchor body 121A extending in the lateral direction is attached to prevent the pile body 121 from coming out of the ground. The pile body 121 is driven into the ground using a known or well-known pile driver for ready-made piles.
As described above, a plurality of pile bodies 121 to be driven into the ground are driven into a straight line on which the foundation rail 110 is to be arranged. However, the horizontal position of the pile body 121 does not have to be so accurate, and some horizontal deviation is allowed. Further, each pile main body 121 is in a state where a part of the upper side thereof protrudes from the ground surface to some extent. However, the heights of the upper end portions of the pile main bodies 121 do not have to be so accurately aligned, and some vertical deviation is allowed.

各杭本体121の上端には、図7、図8に示したような補正材122が取付けられる。補正材122は、各杭本体121に生じた水平方向のずれと、鉛直方向のずれとをともに吸収するものである。補正材122が存在することにより、杭本体121に水平方向のずれと鉛直方向のずれとの少なくとも一方が多少存在していたとしても、各杭120に対して基礎レール110は、直線性と水平性とを保った状態で固定可能となる。補正材122は、杭本体121の上端に、杭本体121の長さ方向の適宜の位置に任意に位置決めして固定できるようになっている。
補正材122は、図8の斜視図に示されたように、その下方の筒状の筒部122Aと、筒部122Aの上端に取付けられた取付部122Bとにより構成されている。補正材122は、金属製であり、例えば、杭本体121と同じ金属でできている。この実施形態では、補正材122と、杭本体121とは、互いに溶接可能となっており、それが可能な素材でできている。
筒部122Aは、本願発明における被案内部の一例に相当するものであり、補正材122の杭本体121に対する、杭本体121の軸方向に沿った平行移動を実現するためのものである。筒部122Aが杭本体121の上端付近に案内されることにより、かかる平行移動が実現される。これが実現可能なのであれば、筒部122Aの形状は、その名称によらず、必ずしも筒状である必要はない。
この実施形態における筒部122Aは、筒状であり、杭本体121の外形に対応した内側形状を有している。一般に杭本体121の長さ方向に垂直な方向の断面形状は円形であるので、筒部122Aの内側の空間の断面形状は、円形である。ここで説明する例では、筒部122Aの内径は、杭本体121の外径に事実上等しくされている。それにより筒部122Aは、杭本体121の上端の外面に対してその内面を添わせるようにして、杭本体121の上端近傍に被せたような状態で、取り付けることができるようになっている。それが可能であれば筒部122Aの外形は問わないが、この実施形態における、筒部122Aは、その外形も円筒形とされている。
取付部122Bは、その上面に平面を備えている。かかる平面に、基礎レール110は固定される。取付部122Bは、上面が平面であればその他の部分の形状は問わないが、この実施形態ではすべての部分で同じ厚さの板状とされている。取付部122Bは、筒部122Aの中心軸から外側に向かってすべての方向に伸びている。この実施形態における取付部122Bは、これには限られないが、筒部122Bの上端に取付けられた、筒部122Bの軸に対して垂直であり、平面視した場合にドーナツ型となっている板とされている。ドーナツ型となっている取付部122Bの径方向の幅は、すべての部分で同一となっているが、これはその限りではない。なお、取付部122Bの中心には、図7、図8に示したような、筒部122Aから連通する孔が存在していてもよいが、取付部122Bを円板状として、その孔を無くすことも可能である。また、その孔の大きさを、筒部122Aの孔の大きさよりも小さくする等、筒部122Aの孔と異ならせることも可能である。つまり、取付部122Bの上の平面は、杭本体121から外側に食み出した状態となるようになっていることが必要であるが、杭本体121Bの内側に食み出した状態となっていても良い。
かかる補正材122は、上述したように、杭本体121の上端の外面に対してその内面を添わせるようにして筒部122Aを杭本体121の上端に被せることにより、杭本体121の上端に対して取り付ける(図7(A))。このとき、杭本体121の上端から、筒部122Aの下端までの距離Lを調整することで、補正材122における取付部122Bの上側の面の高さ位置を、任意に調整することができる。各杭120の上端の高さに多少のずれがあったとしても、各杭120において、上述の距離Lを適宜に調整することにより、各杭120における取付部122Bの上側の面の高さを揃えることが可能となる。各杭120における取付部122Bの上側の面の高さの調整可能な幅は、筒部122Aの長さによって決定される。筒部122Aの長さは、必要な調整幅に応じて決定すれば良い。補正材122の杭本体121に対する固定は、その固定が基礎レール110の移動を生じさせない程度に強固なものである限りどのような方法によって行っても良いが、例えば溶接により、それを行うことが可能である。
他方、杭本体121の水平方向のずれは、取付部122Bの上面が広がりを持っていることによって吸収される。図7(A)で示した図で、その長さ方向に対して垂直な断面が示された基礎レール110は、杭本体121の中心軸から多少左にずれた状態で図示されている。本来、杭本体121が予定された上述の直線上にきっちり乗っているのであれば、杭本体121の軸は、基礎レール110の幅方向の中心を貫いているはずである。しかしながら、杭本体121が直線上から多少ずれている場合には、図7(A)に示されたように、基礎レール110の幅方向の中心が、杭本体121の軸から相対的に幾らかずれることになる。しかしながら、杭本体121の位置に、本来予定された位置からの水平方向のずれが存在していたとしても、基礎レール110が取付けられる取付部122Bの上面に幾らかの広がりが存在するため、基礎レール110を杭120に固定するには支障は生じない。各杭120における基礎レール110の水平方向の調整可能な幅は、取付部122Bの形状、大きさによって決定される。取付部122Bの形状、大きさは、必要な調整幅に応じて決定すれば良い。基礎レール110の杭120に対する、より詳細には取付部122Bの上面に対する固定は、基礎レール110の杭120に対する移動が生じない程度に強固であればどのような方法によっても良いが、例えば、溶接によりこれを行うことが可能である。
なお、基礎レール110は、取付部122Bの上面に直接固定されても構わないが、その水平面となる平面をその上に有している所定の部材を各杭120の補正材122における取付部122Bの上の平面に固定して、所定の部材の上のその平面に基礎レール110を固定することも可能である。こうすると、基礎レール110は、所定の部材を介して、杭120に固定されることになる。
A correction material 122 as shown in FIGS. 7 and 8 is attached to the upper end of each pile body 121. The compensating material 122 absorbs both the horizontal deviation and the vertical deviation generated in each pile main body 121. Due to the presence of the compensator 122, the foundation rail 110 is linear and horizontal with respect to each pile 120, even if at least one of the horizontal and vertical deviations is present in the pile body 121. It can be fixed while maintaining its sexuality. The correction material 122 can be arbitrarily positioned and fixed to the upper end of the pile body 121 at an appropriate position in the length direction of the pile body 121.
As shown in the perspective view of FIG. 8, the correction material 122 is composed of a tubular tubular portion 122A below the tubular portion 122A and a mounting portion 122B attached to the upper end of the tubular portion 122A. The compensator 122 is made of metal, for example, the same metal as the pile body 121. In this embodiment, the correction material 122 and the pile body 121 are weldable to each other and are made of a material capable of welding them.
The tubular portion 122A corresponds to an example of the guided portion in the present invention, and is for realizing translation of the correction material 122 with respect to the pile main body 121 along the axial direction of the pile main body 121. By guiding the tubular portion 122A to the vicinity of the upper end of the pile main body 121, such parallel movement is realized. If this is feasible, the shape of the tubular portion 122A does not necessarily have to be tubular, regardless of its name.
The tubular portion 122A in this embodiment has a cylindrical shape and has an inner shape corresponding to the outer shape of the pile main body 121. Generally, the cross-sectional shape of the pile body 121 in the direction perpendicular to the length direction is circular, so that the cross-sectional shape of the space inside the tubular portion 122A is circular. In the example described here, the inner diameter of the tubular portion 122A is substantially equal to the outer diameter of the pile main body 121. As a result, the tubular portion 122A can be attached in such a state that the inner surface thereof is aligned with the outer surface of the upper end of the pile main body 121 so as to cover the vicinity of the upper end of the pile main body 121. If this is possible, the outer shape of the tubular portion 122A does not matter, but the outer shape of the tubular portion 122A in this embodiment is also cylindrical.
The mounting portion 122B has a flat surface on its upper surface. The foundation rail 110 is fixed to such a plane. The mounting portion 122B may have any other portion as long as the upper surface is flat, but in this embodiment, the mounting portion 122B has a plate shape having the same thickness in all the portions. The mounting portion 122B extends outward from the central axis of the tubular portion 122A in all directions. The mounting portion 122B in this embodiment is not limited to this, but is perpendicular to the axis of the tubular portion 122B attached to the upper end of the tubular portion 122B, and has a donut shape when viewed in a plan view. It is said to be a board. The radial width of the donut-shaped mounting portion 122B is the same in all parts, but this is not the case. A hole communicating with the tubular portion 122A may be present at the center of the mounting portion 122B as shown in FIGS. 7 and 8, but the mounting portion 122B is formed into a disk shape to eliminate the hole. It is also possible. Further, it is possible to make the size of the hole different from the hole of the tubular portion 122A, such as making the size of the hole smaller than the size of the hole of the tubular portion 122A. That is, the flat surface on the mounting portion 122B needs to be in a state of protruding outward from the pile body 121, but is in a state of protruding inside the pile body 121B. May be.
As described above, the correction material 122 covers the upper end of the pile body 121 with the tubular portion 122A so that the inner surface thereof is aligned with the outer surface of the upper end of the pile body 121 so as to cover the upper end of the pile body 121. (Fig. 7 (A)). At this time, by adjusting the distance L from the upper end of the pile body 121 to the lower end of the tubular portion 122A, the height position of the upper surface of the mounting portion 122B in the correction material 122 can be arbitrarily adjusted. Even if there is a slight deviation in the height of the upper end of each pile 120, the height of the upper surface of the mounting portion 122B in each pile 120 can be adjusted by appropriately adjusting the above-mentioned distance L in each pile 120. It will be possible to align. The adjustable width of the height of the upper surface of the mounting portion 122B in each pile 120 is determined by the length of the tubular portion 122A. The length of the tubular portion 122A may be determined according to the required adjustment width. The correction material 122 may be fixed to the pile body 121 by any method as long as the fixing is strong enough not to cause the movement of the foundation rail 110, but it may be performed by welding, for example. It is possible.
On the other hand, the horizontal deviation of the pile body 121 is absorbed by the spread of the upper surface of the mounting portion 122B. In the figure shown in FIG. 7A, the foundation rail 110 whose cross section is perpendicular to the length direction is shown in a state of being slightly shifted to the left from the central axis of the pile body 121. Originally, if the pile body 121 is exactly on the planned straight line, the axis of the pile body 121 should penetrate the center of the foundation rail 110 in the width direction. However, when the pile body 121 is slightly deviated from the straight line, as shown in FIG. 7A, the center of the foundation rail 110 in the width direction is not a little relative to the axis of the pile body 121. Will be. However, even if there is a horizontal deviation from the originally planned position at the position of the pile body 121, there is some spread on the upper surface of the mounting portion 122B to which the foundation rail 110 is mounted, so that the foundation There is no problem in fixing the rail 110 to the pile 120. The horizontally adjustable width of the foundation rail 110 in each pile 120 is determined by the shape and size of the mounting portion 122B. The shape and size of the mounting portion 122B may be determined according to the required adjustment width. The fixing of the foundation rail 110 to the pile 120, more specifically to the upper surface of the mounting portion 122B, may be performed by any method as long as it is strong enough not to cause movement of the foundation rail 110 to the pile 120, but for example, welding. It is possible to do this with.
The foundation rail 110 may be directly fixed to the upper surface of the mounting portion 122B, but the mounting portion 122B in the compensating material 122 of each pile 120 has a predetermined member having a flat surface as a horizontal plane thereof. It is also possible to fix the foundation rail 110 to the plane above the predetermined member. In this way, the foundation rail 110 is fixed to the pile 120 via a predetermined member.

なお、上述の例においては、補正材122の筒部122Aの内径は、杭本体121の外径に事実上等しくされており、それにより筒部122Aは、杭本体121の上端の外面に対してその内面を添わせるようにして、杭本体121の上端近傍に被せたような状態で、取り付けることができるようになっていた(図7(A))。これに代えて、補正材122の筒部122Aの外径を、杭本体121の内径に事実上等しくすることにより、それにより筒部122Aを、杭本体121の上端の内面に対してその外面を添わせるようにして、杭本体121の上端近傍に挿入するような状態で、取り付けられるようにすることも可能である(図7(B))。このように、補正材122は、杭本体121に対して、上下方向の位置を適宜に位置決めして取付けられるようになっていれば、特にその筒部122Aの構成は問わない。図7(B)に示した場合においても、杭本体121と補正材122との固定は、例えば溶接によって行うことが可能である。
補正材122と杭本体121との固定を、溶接以外の方法によって行う場合の例を、図9に示す。補正材122と杭本体121とを溶接によって着脱不能に固定してしまった場合には、互いに固定された補正材122と杭本体121とは、それらの位置関係を2度と修正できなくなる。したがって、当該杭本体121と補正材122とは、ある現場において利用された場合には、他の現場において再利用することが難しくなる。他方、補正材122と、杭本体121との固定を着脱自在とした場合には、基礎レール110を杭120に固定するにあたって、ある現場において補正材122と杭本体121とが固定された場合において、基礎レール110の使用が終わった後に、杭本体121と、補正材122との固定を解除することにより、杭本体121と、補正材122とを他の現場で再利用することが可能となる。なお、この場合には、基礎レール110と補正材122との固定も、着脱自在とするべきである。補正材122と基礎レール110の着脱自在な固定の方法は、杭120と、基礎レール110とを、例えばボルト及びナットにより着脱自在に固定する方法が公知或いは周知であるので、それを利用すれば良い。
図9で示した例について説明する。図9(A)は、杭本体121の上端部近辺を示す斜視図である。杭本体121の適宜の位置には、孔121Bが穿たれている。孔121Bは少なくとも1つであり、この実施形態では3つとされている。図9(B)は、補正材122を示す図である。この補正材122は、図8に示したものと同様に、筒部122Aと、取付部122Bとを備えている。筒部122Aには、筒部122Aの下端から上端に向かって切られた螺旋状の取付溝122A1が設けられている。取付溝122A1は、筒部122Aの下端にまで及んでいる。図9に示された例では、筒部122Aを上下させながら回転させることにより、筒部122Aの取付溝122A1と、杭本体121に穿たれた孔121Bとの位置とを、杭本体121に対して補正材122の高さを任意の高さとしつつ、位置合わせすることが可能となっている。その状態で、筒部122Aの内側か外側から、3つの孔121Bとそれと重なっている取付溝122A1とをそれぞれ、ボルト123Aでまとめて貫くとともに、そのボルト123Aにナット123Bを螺合させることにより、ボルト123Aの頭部とナット123Bとにより、筒部122Aと杭本体121とを挟持する(図9(C))。これにより、杭本体121に対して補正材122を、杭本体121に対する高さ位置を適宜に位置決めした状態で固定することが可能となる。ボルト123Aと、ナット123Bによる筒部122Aと杭本体121との挟持には、周知のようにワッシャー123Cを用いることも当然に可能である。
なお、図9に示した例では、筒部122Aに設けられた螺旋状の取付溝122A1は一連となっていた。しかしながら、取付溝122A1が一連であると筒部122Aの強度に影響が生じるおそれがある反面、取付溝122A1は、ボルト123Aに貫かれる部分以外は機能しない。したがって、取付溝122A1のうち、当初からボルト123Aに貫かれることが予定されない部分では取付溝122A1を設けず、筒部122Aの壁をそのまま残すこと、言い換えれば取付溝122A1を分割することも可能である。例えば、図9に示した例では、筒部122Aと、杭本体121とは、3本のボルト123Aに貫かれるのであるから、取付溝122A1は、3つに分割され、それらの間の2箇所に筒部122Aの壁を残すようにすることができる。そのようにすれば、筒部122Aの強度に与える影響を押さえつつも、既に説明した通りの方法での筒部122Aと、杭本体121との着脱自在な固定を実現できることになる。
In the above example, the inner diameter of the cylinder portion 122A of the correction material 122 is substantially equal to the outer diameter of the pile body 121, whereby the cylinder portion 122A is relative to the outer surface of the upper end of the pile body 121. It was possible to attach the pile body 121 in a state of covering the vicinity of the upper end of the pile body 121 so as to be attached to the inner surface thereof (FIG. 7 (A)). Instead, by making the outer diameter of the cylinder portion 122A of the compensator 122 substantially equal to the inner diameter of the pile body 121, thereby making the cylinder portion 122A its outer surface with respect to the inner surface of the upper end of the pile body 121. It is also possible to attach the pile body 121 so as to be inserted in the vicinity of the upper end of the pile body 121 (FIG. 7 (B)). As described above, as long as the correction material 122 can be attached to the pile main body 121 by appropriately positioning the position in the vertical direction, the configuration of the tubular portion 122A is not particularly limited. Even in the case shown in FIG. 7B, the pile body 121 and the correction material 122 can be fixed by welding, for example.
FIG. 9 shows an example in which the correction material 122 and the pile body 121 are fixed by a method other than welding. When the correction material 122 and the pile body 121 are fixed to each other in a detachable manner by welding, the positional relationship between the correction material 122 and the pile body 121 fixed to each other cannot be corrected again. Therefore, when the pile body 121 and the correction material 122 are used at one site, it becomes difficult to reuse them at another site. On the other hand, when the correction material 122 and the pile body 121 are detachably fixed, when the foundation rail 110 is fixed to the pile 120, the correction material 122 and the pile body 121 are fixed at a certain site. After the use of the foundation rail 110 is finished, the pile main body 121 and the correction material 122 can be reused at another site by releasing the fixing between the pile main body 121 and the correction material 122. .. In this case, the foundation rail 110 and the correction material 122 should also be detachably fixed. As a method of detachably fixing the correction material 122 and the foundation rail 110, a method of detachably fixing the pile 120 and the foundation rail 110 with, for example, bolts and nuts is known or well known. good.
The example shown in FIG. 9 will be described. FIG. 9A is a perspective view showing the vicinity of the upper end portion of the pile body 121. Holes 121B are drilled at appropriate positions in the pile body 121. There is at least one hole 121B, and in this embodiment there are three. FIG. 9B is a diagram showing the correction material 122. The correction material 122 includes a tubular portion 122A and a mounting portion 122B, similar to those shown in FIG. The tubular portion 122A is provided with a spiral mounting groove 122A1 cut from the lower end to the upper end of the tubular portion 122A. The mounting groove 122A1 extends to the lower end of the tubular portion 122A. In the example shown in FIG. 9, by rotating the cylinder portion 122A while moving it up and down, the positions of the mounting groove 122A1 of the cylinder portion 122A and the hole 121B drilled in the pile body 121 are set with respect to the pile body 121. Therefore, it is possible to align the correction material 122 while setting the height to an arbitrary height. In that state, the three holes 121B and the mounting groove 122A1 overlapping the three holes 121B are pierced together by the bolt 123A from the inside or the outside of the tubular portion 122A, and the nut 123B is screwed into the bolt 123A. The head of the bolt 123A and the nut 123B sandwich the tubular portion 122A and the pile main body 121 (FIG. 9 (C)). As a result, the correction material 122 can be fixed to the pile body 121 in a state where the height position with respect to the pile body 121 is appropriately positioned. As is well known, a washer 123C can be naturally used for sandwiching the bolt 123A, the tubular portion 122A, and the pile body 121 by the nut 123B.
In the example shown in FIG. 9, the spiral mounting grooves 122A1 provided in the tubular portion 122A were in a series. However, if the mounting grooves 122A1 are in a series, the strength of the tubular portion 122A may be affected, but the mounting grooves 122A1 do not function except for the portion penetrated by the bolt 123A. Therefore, it is possible to leave the wall of the tubular portion 122A as it is without providing the mounting groove 122A1 in the portion of the mounting groove 122A1 that is not planned to be penetrated by the bolt 123A from the beginning, in other words, to divide the mounting groove 122A1. be. For example, in the example shown in FIG. 9, since the tubular portion 122A and the pile main body 121 are penetrated by the three bolts 123A, the mounting groove 122A1 is divided into three parts, and the mounting groove 122A1 is divided into three parts. The wall of the cylinder portion 122A can be left in the cylinder portion 122A. By doing so, it is possible to realize detachable fixing between the cylinder portion 122A and the pile main body 121 by the method as described above while suppressing the influence on the strength of the cylinder portion 122A.

次いで、2本の直線上に並べられた杭120に対して、2本の基礎レール110をそれぞれ固定する。基礎レール110は長尺であるが、1本ものである必要はなく、公知或いは周知のように同一直線上に基礎レール110を構成する複数の部材を並べることで構成されていても良い。
これら2本の基礎レール110を利用して、仮設テントを設ける。仮設テントは、これには限られないが、この実施形態では、図10~図13のようにして設ける。
この実施形態では、仮設テント200(図13参照)は、複数の分割テント210を組み合わせて構成される。分割テント(図10~図12参照)は、仮設テント200の一部となるものである。分割テント210は、図10等に示したように、骨材220と、骨材220の間に張られたシート230とからなる。
骨材220は、仮設テント200の骨組みとなるものであり、仮設テント200を覆うシート230を支持するためのものである。骨材220の構成は、公知或いは周知のものと同じで構わない。この実施形態における骨材220は、平面視した場合に基礎レール110に対して垂直であり、所定の間隔を空けて配置される。これには限られないが、骨材220同士の間隔は、この実施形態では一定であり、且つ骨材220同士は、図示せぬ部材によって互いに接続されることにより、その一定の間隔が保たれるようになっている。この実施形態において、1つの分割テント210に含まれる骨材220の数は3つとされているが、これはこの限りではない。分割テント210は後述するようにしてそれらを基礎レール110の上を移動させた後に組合せることにより仮設テント200を構成するが、分割テント200に含まれる骨材220の数が多ければ、分割テント210の移動の回数を減らすことができるようになるから、分割テント210の移動に関する作業の負担、及び作業時間は減る。もっとも、分割テント210に含まれる骨材220の数を増やすことにより分割テント210の重量が大きくなるため、分割テント210の大きさ乃至それに含まれる骨材220の数は、移動させることの可能な分割テント210の重量によって制限を受けることになるし、また、後述するようにして組立てられる分割テント210の組立て場所の広さによっても制限を受けることになる。
骨材220は、鉛直方向に伸びる柱221と、柱221によって支持される梁222とから構成されている。柱221と梁222とはともに、棒状ではあるが、1本の棒状体で構成されている必要はなく、複数の部材を例えばトラス構造となるように組合せて構成されていても良い。この実施形態における梁222は、仮設テント200の屋根を構成するものとなっており、中央が高くなるように2本が傾斜して接続されている。結果として、仮設テント200は、図13に示されたように切妻型の屋根を持つことになるが、仮設テント200の屋根の構造はこれには限られない。仮設テント200は、対象範囲X全体を覆うことが可能であり、その内部で、後述するような重機(例えば、クレーン車)が作業を行うことができるようなものとする必要がある。仮設テント200の大きさは、例えば、長辺が100mを超える場合があり、高さが50mを超える場合がある。
Next, the two foundation rails 110 are fixed to the piles 120 arranged on the two straight lines. Although the foundation rail 110 is long, it does not have to be one, and may be configured by arranging a plurality of members constituting the foundation rail 110 on the same straight line as is known or well known.
A temporary tent will be provided using these two foundation rails 110. The temporary tent is not limited to this, but in this embodiment, it is provided as shown in FIGS. 10 to 13.
In this embodiment, the temporary tent 200 (see FIG. 13) is configured by combining a plurality of divided tents 210. The split tent (see FIGS. 10-12) is a part of the temporary tent 200. As shown in FIG. 10 and the like, the split tent 210 includes an aggregate 220 and a sheet 230 stretched between the aggregates 220.
The aggregate 220 serves as a framework for the temporary tent 200, and is for supporting the sheet 230 that covers the temporary tent 200. The structure of the aggregate 220 may be the same as that known or well known. The aggregate 220 in this embodiment is perpendicular to the foundation rail 110 when viewed in a plan view, and is arranged at a predetermined interval. Although not limited to this, the distance between the aggregates 220 is constant in this embodiment, and the aggregates 220 are connected to each other by a member (not shown) to maintain the constant distance. It is designed to be used. In this embodiment, the number of aggregates 220 contained in one split tent 210 is three, but this is not the case. The split tent 210 constitutes a temporary tent 200 by moving them on the foundation rail 110 and then combining them as described later. However, if the number of aggregates 220 contained in the split tent 200 is large, the split tent 210 is formed. Since the number of movements of the 210 can be reduced, the work load and the work time related to the movement of the split tent 210 are reduced. However, since the weight of the split tent 210 increases by increasing the number of aggregates 220 contained in the split tent 210, the size of the split tent 210 or the number of aggregates 220 contained therein can be moved. It will be limited by the weight of the split tent 210, and will also be limited by the size of the assembly place of the split tent 210 assembled as described later.
The aggregate 220 is composed of a column 221 extending in the vertical direction and a beam 222 supported by the column 221. Although the columns 221 and the beams 222 are both rod-shaped, they do not have to be composed of one rod-shaped body, and may be configured by combining a plurality of members so as to form a truss structure, for example. The beams 222 in this embodiment constitute the roof of the temporary tent 200, and the two beams are inclined and connected so as to be higher in the center. As a result, the temporary tent 200 will have a gable-shaped roof as shown in FIG. 13, but the structure of the roof of the temporary tent 200 is not limited to this. The temporary tent 200 can cover the entire target range X, and it is necessary that a heavy machine (for example, a mobile crane) as described later can perform work inside the temporary tent 200. The size of the temporary tent 200 may be, for example, a long side exceeding 100 m and a height exceeding 50 m.

シート230は、例えば、樹脂製のシート、或いは、繊維による織物又は編物の少なくとも一方の面を樹脂でコーティングしたシートとすることができる。シート230を構成する樹脂の例は、塩化ビニル樹脂、ポリエチレン等であり、その厚さは、例えば0.5mm~2.0mmである。シート230は、巻取り又は折畳みが可能とされているが、この実施形態ではその双方が可能とされており、少なくとも骨材220に沿って曲折可能な程度の柔軟性を有している。
シート230はこの実施形態では、長尺の矩形である。シート230の幅は隣り合う骨材220の間の間隔と同じかそれよりも若干長い長さとされている。シート230の長手方向の長さは、1つの骨材220の長さ、即ち1つの骨材220に含まれる2つの柱221と2つの梁222の長さを合わせた長さに対応したものとされている。シート230は、複数枚のシート材を熱融着などによって貼り合わせたものであってももちろん構わない。
シート230の幅方向の両端を、隣接する2つの骨材220に沿って固定することにより、シート230が隣接する2つの骨材220の間に張り渡されることになる。シート230と骨材220との固定の仕方は、公知或いは周知技術によれば良い。なお、シート230は、仮設テント200の中の明るさを保つためにある程度の透光性を持つのが好ましく、また、仮設テント200内で行われる作業に基づく音が仮設テント200外に漏れるのを防止するために、ある程度の遮音性を有するのが好ましい。主に、遮音性を向上させる目的で、シート230を二重構造にすることも可能である。また、シート230の選択には、耐候性等必要な機能が勘案される。
The sheet 230 may be, for example, a resin sheet or a sheet in which at least one surface of a woven fabric or knitted fabric made of fibers is coated with resin. Examples of the resin constituting the sheet 230 are vinyl chloride resin, polyethylene and the like, and the thickness thereof is, for example, 0.5 mm to 2.0 mm. The sheet 230 is capable of winding or folding, both of which are possible in this embodiment and is at least flexible enough to bend along the aggregate 220.
The sheet 230 is, in this embodiment, a long rectangle. The width of the sheet 230 is set to be the same as or slightly longer than the distance between adjacent aggregates 220. The length of the sheet 230 in the longitudinal direction corresponds to the length of one aggregate 220, that is, the combined length of the two columns 221 and the two beams 222 contained in one aggregate 220. Has been done. Of course, the sheet 230 may be formed by laminating a plurality of sheet materials by heat fusion or the like.
By fixing both ends of the sheet 230 in the width direction along the two adjacent aggregates 220, the sheet 230 is stretched between the two adjacent aggregates 220. The method of fixing the sheet 230 and the aggregate 220 may be a known or well-known technique. The sheet 230 preferably has a certain degree of translucency in order to maintain the brightness inside the temporary tent 200, and the sound based on the work performed in the temporary tent 200 leaks to the outside of the temporary tent 200. It is preferable to have a certain degree of sound insulation in order to prevent the above. It is also possible to make the sheet 230 a double structure mainly for the purpose of improving sound insulation. Further, in selecting the sheet 230, necessary functions such as weather resistance are taken into consideration.

この実施形態において、分割テント210は、基礎レール110の一方側の端部の上で組上げられる。基礎レール110の一方側の端部付近に、分割テント210を組上げるために必要な重機、例えばクレーンが配置される。
この実施形態では、柱221も梁222も、多数の部材をトラス状に組上げて構成されている。2本の基礎レール110の一方側の端部の上に、各骨材220の2本の柱221が組上げられる。次いで、両柱221の上端に2本の梁222の基端が接続され、梁222を基礎レール110の中心方向に向けて上り傾斜を付けて伸ばして行き、梁222の先端同士が接続される。これにより、骨材220が完成する。この作業を、3つの骨材220に対して行う。
次いで、各骨材220間を上述の図示せぬ部材で繋いで、各骨材220の間隔が一定に保たれるようにする。そして、隣接する2本の骨材220の間に、シート230が張り渡される。
このようにして、1つ目の分割テント210が、基礎レール110の一端側の上で構築される(図10)。
In this embodiment, the split tent 210 is assembled on one end of the foundation rail 110. A heavy machine, for example, a crane, necessary for assembling the split tent 210 is arranged near one end of the foundation rail 110.
In this embodiment, both the columns 221 and the beams 222 are configured by assembling a large number of members in a truss shape. Two pillars 221 of each aggregate 220 are assembled on one end of the two foundation rails 110. Next, the base ends of the two beams 222 are connected to the upper ends of both columns 221 and the beams 222 are extended with an upward slope toward the center of the foundation rail 110, and the tips of the beams 222 are connected to each other. .. As a result, the aggregate 220 is completed. This work is performed on the three aggregates 220.
Next, the aggregates 220 are connected to each other by a member (not shown above) so that the distance between the aggregates 220 is kept constant. Then, the sheet 230 is stretched between the two adjacent aggregates 220.
In this way, the first split tent 210 is constructed on one end side of the foundation rail 110 (FIG. 10).

次いで、1つ目の分割テント210を、図10中で矢視したように、基礎レール110の他端側にスライドさせて移動させる。分割テント210の移動の方法は公知或いは周知技術によることができ、分割テント210の基礎レール110上での移動に用いる動力は適宜選択することが可能である。この実施形態では、これには限られないが、この実施形態では油圧で駆動するジャッキスピンドルを動力として用い、例えば基礎レール110の適宜の位置にジャッキスピンドルの本体を固定するとともに、分割テント210をジャッキスピンドルの本体に対して基礎レール110の長さ方向に平行移動するシリンダに固定して、本体に対して、シリンダを平行移動させる作業を繰返すことで、シリンダの移動距離に応じた距離ずつ、分割テント210を移動させることによりこれを行う。
結果として、分割テント210は、基礎レール110の他端側まで移動させられる(図11)。
Next, the first split tent 210 is slid and moved to the other end side of the foundation rail 110 as pointed out in FIG. The method of moving the split tent 210 can be known or known, and the power used for moving the split tent 210 on the foundation rail 110 can be appropriately selected. In this embodiment, but not limited to this, in this embodiment, a hydraulically driven jack spindle is used as power, for example, the main body of the jack spindle is fixed at an appropriate position on the foundation rail 110, and the split tent 210 is provided. By fixing to a cylinder that moves in parallel to the main body of the jack spindle in the length direction of the foundation rail 110 and repeating the work of moving the cylinder in parallel to the main body, the distance corresponding to the moving distance of the cylinder is increased. This is done by moving the split tent 210.
As a result, the split tent 210 is moved to the other end of the foundation rail 110 (FIG. 11).

次いで、2つ目の分割テント210が、1つ目の分割テント210と同様に、1つ目の分割テント210と同じ過程を経て、基礎レール110の一端側で構築される。なお、2つ目の分割テント210は、1つ目の分割テント210の移動中にその構築が開始されていても良く、これは以後も同様である。
構築された2つ目の分割テント210は、1つ目の分割テント210と同様に、基礎レール110の上を、基礎レール110の他端側に向けて移動させられる。
2つ目の分割テント210は、基礎レール110の他端側寄りで、1つ目の分割テント210と接続される。2つ目の分割テント210と、1つ目の分割テント210とを接続する方法は、以下の2通りであり、そのいずれかを採用する。
1つ目の方法は、1つ目の分割テント210の骨材220のうち、分割テント210の進行方向で考えて最も後ろのものと、2つ目の分割テント210の骨材220のうち、分割テント210の進行方向で考えて最も前のものとを、そのまま接続する、というものである。その場合、接続された部分の骨材220は、分割テント210の進行方向で考えて、他の骨材220の2倍の厚さとなる。それを嫌うのであれば、各分割テント210の骨材220のうち、分割テント210の進行方向で考えて最も前と最も後ろのものとの分割テント210の進行方向で考えた厚さを、他の骨材220の半分としておけば良い。そうすることで、接続された部分の骨材220の厚さを、他の部分の骨材220の厚さと揃えることが可能となる。
2つ目の方法では、まず、1つ目の分割テント210の骨材220のうち、分割テント210の進行方向で考えて最も後ろのものと、2つ目の分割テント210の骨材220のうち、分割テント210の進行方向で考えて最も前のものとの間に、各分割テント210における骨材220間の距離に相当する間隔が空くところまで、2つ目の分割テント210を進める。そして、その後、1つ目の分割テント210の骨材220のうち、分割テント210の進行方向で考えて最も後ろのものと、2つ目の分割テント210の骨材220のうち、分割テント210の進行方向で考えて最も前のものとの間に、分割テント210を作る場合と同様にして、シート230を張り渡す、というものである。この場合、1つ目の分割テント210の骨材220のうち、分割テント210の進行方向で考えて最も後ろのものと、2つ目の分割テント210の骨材220のうち、分割テント210の進行方向で考えて最も前のものとの間に、それら2つの骨材の距離を一定に保つための上述した部材を配しても良い。
いずれの方法を取るにせよ、これにより、2つ目の分割テント210は1つ目の分割テント210に接続される。
Next, the second split tent 210 is constructed on one end side of the foundation rail 110 through the same process as the first split tent 210, similarly to the first split tent 210. The construction of the second split tent 210 may be started while the first split tent 210 is moving, and the same applies thereafter.
The constructed second split tent 210 is moved on the foundation rail 110 toward the other end side of the foundation rail 110, similarly to the first split tent 210.
The second split tent 210 is connected to the first split tent 210 near the other end of the foundation rail 110. There are the following two methods for connecting the second split tent 210 and the first split tent 210, and one of them is adopted.
The first method is among the aggregate 220 of the first split tent 210, the rearmost one in the traveling direction of the split tent 210, and the aggregate 220 of the second split tent 210. The frontmost one in the direction of travel of the split tent 210 is connected as it is. In that case, the aggregate 220 of the connected portion is twice as thick as the other aggregate 220 in the traveling direction of the split tent 210. If you dislike it, of the aggregate 220 of each split tent 210, consider the thickness of the split tent 210 in the direction of travel of the front and back of the split tent 210. It should be half of the aggregate 220 of. By doing so, it becomes possible to make the thickness of the aggregate 220 of the connected portion the same as the thickness of the aggregate 220 of the other portion.
In the second method, first, among the aggregate 220 of the first split tent 210, the rearmost one in the traveling direction of the split tent 210 and the aggregate 220 of the second split tent 210. Among them, the second split tent 210 is advanced until there is a gap corresponding to the distance between the aggregates 220 in each split tent 210 from the front one in the traveling direction of the split tent 210. Then, of the aggregate 220 of the first split tent 210, the rearmost one in the traveling direction of the split tent 210, and the aggregate 220 of the second split tent 210, the split tent 210 In the same way as when the split tent 210 is made, the sheet 230 is stretched between the frontmost one and the one in the direction of travel. In this case, of the aggregate 220 of the first split tent 210, the rearmost one in the traveling direction of the split tent 210, and of the aggregate 220 of the second split tent 210, the split tent 210. The above-mentioned member for keeping the distance between the two aggregates constant may be arranged between the two aggregates and the foremost one in the direction of travel.
Whichever method is taken, the second split tent 210 is connected to the first split tent 210.

同様にして、3つ目の分割テント210、4つ目の分割テント210、5つ目の分割テント210…を基礎レール110の一端側で構築し、基礎レール110の上を基礎レール110の他端側に送った上で、その1つ手前の分割テント210に接続していく(図11)。
最後の分割テント210は、基礎レール110の上を送られなくともよい。最終的に、基礎レール110の略全長にまたがる仮設テント200が略完成する(図12)。
この状態では、仮設テント200の分割テント210の移動方向で考えた場合における前方と後方は開放されている。その開放されている部分を、この実施形態であれば五角形のシート240で覆うことにより、対象範囲Xをすっぽり覆う仮設テント200が完成する(図13)。
シート240は、シート230と形状のみ異なるものとすることが可能である。シート240の仮設テント200の最も前と後ろの骨材220への固定の方法は、公知或いは周知技術に倣えばよい。シート240には必要に応じて、少なくとも一つの開閉可能な扉241が設けられる。扉241は、重機や作業者が仮設テント200に出入りするためのものであり、その構成は、公知或いは周知技術に倣えばよい。なお、シート240を張るタイミングは、仮設テント200が図12で示す状態になった後でなくとも良い。例えば、最初の分割テント210は、基礎レール110の一端側で組上げられた段階で既にシート240が張られていてもよい。
なお、5角形のシート240を仮設テント200に張る際に、仮設テントの前後の5角形の開口部に、図示を省略の柱と梁を適宜に設けることが可能である。この場合において、柱の下端は何らかの基礎に固定すべきである。例えば、上述したような杭120に固定した、対象範囲Xの短辺に沿って配された基礎レール110を基礎とし、その上に柱の下端を固定することが可能である。この場合、仮設テント200が図12に示した状態となってから柱や梁が組上げられ、その後シート240が取付けられるというのが通常での方法として採用可能である。
Similarly, the third split tent 210, the fourth split tent 210, the fifth split tent 210 ... are constructed on one end side of the foundation rail 110, and the other of the foundation rail 110 is placed on the foundation rail 110. After sending it to the end side, it is connected to the split tent 210 in front of it (FIG. 11).
The final split tent 210 does not have to be fed over the foundation rail 110. Finally, the temporary tent 200 that extends over the substantially overall length of the foundation rail 110 is substantially completed (FIG. 12).
In this state, the front and the rear are open when considering the moving direction of the split tent 210 of the temporary tent 200. By covering the open portion with a pentagonal sheet 240 in this embodiment, a temporary tent 200 that completely covers the target range X is completed (FIG. 13).
The seat 240 can be different only in shape from the seat 230. The method of fixing the seat 240 to the front and rear aggregates 220 of the temporary tent 200 may follow a known or well-known technique. The seat 240 is provided with at least one openable door 241 as needed. The door 241 is for heavy machinery and workers to enter and exit the temporary tent 200, and the structure thereof may follow a known or well-known technique. The timing of stretching the seat 240 does not have to be after the temporary tent 200 is in the state shown in FIG. For example, the first split tent 210 may already have a seat 240 stretched when it is assembled on one end side of the foundation rail 110.
When the pentagonal sheet 240 is stretched over the temporary tent 200, columns and beams (not shown) can be appropriately provided in the pentagonal openings before and after the temporary tent. In this case, the bottom edge of the column should be fixed to some foundation. For example, it is possible to base the foundation rail 110 arranged along the short side of the target range X fixed to the pile 120 as described above, and fix the lower end of the pillar on the foundation rail 110. In this case, it can be adopted as a normal method that the columns and beams are assembled after the temporary tent 200 is in the state shown in FIG. 12, and then the seat 240 is attached.

以上で説明したように、仮設テント200は、基礎となる基礎レール110の上に構築される。より詳細には、基礎レール110に対して、骨材220を構成する柱221の下端が乗る。
上述のように、基礎レール110は、対象範囲Xの2本の長辺の外側に、1本ずつ配されることとなっている。もっとも、基礎レール110の幅が小さい場合には、各基礎レール110で支えることのできる、柱221の太さにも制限が生じる可能性がある。そうすると、骨材220の太さ、強度にも制限が生じる可能性がある。
そのような制限を解消するために、対象範囲Xの2本の長辺の外側に配される基礎レール110をそれぞれ、二本一組とすることが可能である。この場合、図30、図31に示したように、杭120は、対象範囲Xの長辺とともに平行な2本の仮想の直線(第1直線)上に、一組で打たれる。多数の杭120は、理想的には、2本の第1直線のいずれととも直交する例えば等間隔で引かれた直線(第2直線)と、2本の第1直線とが交差する交点に打たれる。多数の杭120のうち、共通する第2直線上に位置する杭120が、1組の杭120である。なお、この場合の杭120は、用い方も含めて、ここまでに詳述した杭120と同じである。
そして、1組の杭120には、図30に示したような跨ぎ材150が渡される。跨ぎ材150は、1組の杭120にわたすことのできるだけの長さを持ち、その上に平面を作ることができる、頑丈な部材であれば良い。跨ぎ材150は、例えばH鋼である。H鋼をHの字を横倒しにするように用いれば、その上には平面ができる。
上述の例では、杭120の一部を成す補正材122が備える取付部122Bの上面に基礎レール110が固定されたが、この例では、杭120の取付部122Bの上に固定された跨ぎ材150の上面に、2本の基礎レール110が平行に取付けられる。つまり、この例では、杭120に対して、基礎レール110が、跨ぎ材150を介して間接的に固定される。
ここで重要となるのが、跨ぎ材150の上面が水平を保つこと、及び平面視した場合における跨ぎ材150の長さ(第2直線方向の長さ)の間に2本のレールを収められることである。
上述したように、多数の杭120は、理想的には、2本の第1直線と、多数の第2直線とが交差する交点に打たれる。しかし、各杭120の位置は、第1直線方向にも、第2直線方向にもずれる場合がある。杭120が第1直線方向にずれると、1組の杭120にわたされる跨ぎ材150が、第1直線に対して直交しなくなる。そうすると、平面視した場合における跨ぎ材150の長さの間に2本のレールを収められなくなり得る。杭120が第2直線方向にずれると、特に杭120が2本の第1直線から外側にずれた場合には、1組の杭120に対して跨ぎ材150を固定できなくなる可能性がある。そのような第1直線方向、第2直線方向のずれは、杭120の一部を成す補正材122が備える取付部122Bの広がりによって吸収される。つまり、1組の杭120に対して、跨ぎ材150は、第1直線に直交するようにして、予定された位置に固定することができる。
また、多数の杭120における杭本体121の上端の位置、即ち、杭本体121の地表から突出した長さは、各杭本体121毎に異なってしまう場合がある。そうすると、1組の杭120に対してわたされた跨ぎ材150の上面が水平を保てなくなるおそれがある。また、1組の杭120の高さを揃えられたとしても、すべての1組の杭120にわたされた跨ぎ材150の上面が水平であったとしても、すべての杭120の高さが揃っていないと、各跨ぎ材150の水平な上面の高さが揃わないという事態が生じうる。その場合には、跨ぎ材150の上面に固定される基礎レール110が水平を保てないか、悪い場合には、跨ぎ材150の上面に基礎レール110を固定できなくなる。このような杭本体121の鉛直方向のずれは、杭本体121に対する補正材122の高さ位置の調整によって吸収することができる。
そのようにして、対象範囲Xの2つの長辺の外側のそれぞれに、2本ずつの基礎レール110が配されることになる。隣接する2本の基礎レール110を1組の基礎レール110と称するとすれば、1組の基礎レール110はともに、水平であり、直線状であり、互いに平行である。
この1組の基礎レール110の上に、骨材220の柱221が固定される。図31に示した、4つの221Aの符号で示されているのが、1本の柱221を構成する柱体221Aの断面である。柱体221Aは、例えば鉄骨であって、鉛直方向に伸びる。これには限られないが、この実施形態における柱体221Aは、平面視した場合に、基礎レール110の上にあり、且つ所定の正方形の頂点上に位置するようにされている。そのような鉛直な4本の柱体221Aの間に、例えば、トラス構造を構成するような梁状の補強部材を適宜固定することにより、この場合の柱221は構成されることになる。その場合、梁222も、同様にトラス構造で構成されるのが通常である。
平行に配される多数の跨ぎ材150の上に固定される基礎レール110は、上述した例では2本であるが、これは必要に応じて、1本とすることもできるし、3本以上とすることもできる。
As described above, the temporary tent 200 is constructed on the foundation rail 110 which is the foundation. More specifically, the lower end of the pillar 221 constituting the aggregate 220 rides on the foundation rail 110.
As described above, the foundation rails 110 are arranged one by one on the outside of the two long sides of the target range X. However, when the width of the foundation rail 110 is small, there is a possibility that the thickness of the pillar 221 that can be supported by each foundation rail 110 is also limited. Then, the thickness and strength of the aggregate 220 may be limited.
In order to eliminate such a limitation, it is possible to form a pair of foundation rails 110 arranged outside the two long sides of the target range X, respectively. In this case, as shown in FIGS. 30 and 31, the piles 120 are struck in pairs on two virtual straight lines (first straight lines) parallel to the long side of the target range X. The large number of piles 120 are ideally at the intersection of, for example, a straight line drawn at equal intervals (second straight line) orthogonal to either of the two first straight lines and the two first straight lines. Be struck. Of the large number of piles 120, the pile 120 located on the common second straight line is a set of piles 120. The pile 120 in this case is the same as the pile 120 described in detail so far, including how to use it.
Then, a straddle member 150 as shown in FIG. 30 is passed to one set of piles 120. The straddle member 150 may be a sturdy member having a length sufficient to be passed over a set of piles 120 and capable of forming a flat surface on the straddle member 150. The straddle material 150 is, for example, H steel. If H steel is used so that the letter H is turned sideways, a flat surface is created on it.
In the above example, the foundation rail 110 is fixed to the upper surface of the mounting portion 122B provided by the correction material 122 forming a part of the pile 120, but in this example, the straddle material fixed on the mounting portion 122B of the pile 120. Two foundation rails 110 are mounted in parallel on the upper surface of the 150. That is, in this example, the foundation rail 110 is indirectly fixed to the pile 120 via the straddle member 150.
What is important here is that the upper surface of the straddle member 150 is kept horizontal, and that two rails can be accommodated between the lengths of the straddle member 150 (the length in the second straight line direction) when viewed in a plan view. That is.
As mentioned above, the large number of piles 120 are ideally struck at the intersection of the two first straight lines and the large number of second straight lines. However, the position of each pile 120 may deviate in the first straight line direction or the second straight line direction. When the pile 120 is displaced in the first straight line direction, the straddle member 150 spanned by the set of piles 120 is not orthogonal to the first straight line. Then, it may not be possible to fit the two rails between the lengths of the straddle member 150 in a plan view. When the pile 120 is displaced in the second straight line direction, particularly when the pile 120 is displaced outward from the two first straight lines, the straddle member 150 may not be fixed to the set of piles 120. Such deviations in the first straight line direction and the second straight line direction are absorbed by the expansion of the mounting portion 122B provided in the correction material 122 forming a part of the pile 120. That is, the straddle member 150 can be fixed at a planned position so as to be orthogonal to the first straight line with respect to the set of piles 120.
Further, the position of the upper end of the pile main body 121 in a large number of piles 120, that is, the length of the pile main body 121 protruding from the ground surface may be different for each pile main body 121. Then, there is a possibility that the upper surface of the straddle member 150 passed to the set of piles 120 cannot be kept horizontal. Further, even if the heights of one set of piles 120 are made uniform, and even if the upper surface of the straddle material 150 spanning all one set of piles 120 is horizontal, the heights of all the piles 120 are made uniform. Otherwise, the heights of the horizontal upper surfaces of the straddles 150 may not be the same. In that case, the foundation rail 110 fixed to the upper surface of the straddle member 150 cannot be kept horizontal, or in the worst case, the foundation rail 110 cannot be fixed to the upper surface of the straddle member 150. Such a vertical deviation of the pile body 121 can be absorbed by adjusting the height position of the correction material 122 with respect to the pile body 121.
In this way, two foundation rails 110 are arranged on each of the outer sides of the two long sides of the target range X. If two adjacent foundation rails 110 are referred to as a set of foundation rails 110, the set of foundation rails 110 are both horizontal, linear, and parallel to each other.
The pillar 221 of the aggregate 220 is fixed on the set of foundation rails 110. Indicated by the reference numerals of the four 221A shown in FIG. 31, is a cross section of the pillar body 221A constituting one pillar 221. The prism 221A is, for example, a steel frame and extends in the vertical direction. Although not limited to this, the prism 221A in this embodiment is arranged to be on the foundation rail 110 and to be located on the apex of a predetermined square when viewed in a plan view. The columns 221 in this case are configured by appropriately fixing, for example, a beam-shaped reinforcing member that constitutes a truss structure between the four vertical columns 221A. In that case, the beam 222 is also usually composed of a truss structure as well.
The number of foundation rails 110 fixed on a large number of straddling members 150 arranged in parallel is two in the above example, but this may be one if necessary, or three or more. It can also be.

次いで、建て替えによって建てられる新しい構造物についての杭基礎を構築する。新しい構造物は、追って説明するように、対象範囲Xに建てられる1つのビルディングである。1つのビルディングについての杭基礎は、場所打ち杭である。
ここで打たれる場所打ち杭20Cは、図14に示したように、対象範囲Xの一部である特定範囲Y内にのみ打たれる。なお、図14は、対象範囲Xの平面図であるが、仮設テント200の図示を省略している。特定範囲Yは、後述する構台で覆われる範囲であり、言い換えれば構台の下側に位置する範囲である。
図15~図19を参照して、具体的な場所打ち杭20Cの打ち方について説明する。なお、場所打ち杭20Cの打ち方は、公知或いは周知技術に倣えばよい。今回の特定範囲Yにおける場所打ち杭20Cの打込みの他に、後でもう一度、場所打ち杭20Cを打つ場面が登場するが、その場合も同様である。なお、図15~図18は、図1においてAで示した矢印で矢視された方向から見た、地下も含む対象範囲Xの側面図である。図19は、図1においてBで示した矢印で矢視された方向から見た、地下も含む対象範囲Xの側面図である。図15~18、及び図19はいずれも模式的なものであり、作図上の都合から、図14とは、特に場所打ち杭20Cの本数について正確性を欠いている。
図15に示したように、まず、対象範囲Xのうち、特定範囲Yの場所打ち杭20Cを打つべき位置に対応する整地された地表の所定の位置に、杭打機300を置く。この杭打機300は、地下に向けて鉛直に穴を穿つ機能と、コンクリートを流し込む機能とを備えている。これら機能は、複数の装置に割り振られていてもよく、その場合には杭打機300は複数の装置から構成されることになる。
そして、杭打機300により、鉛直方向に穴301を掘る。穴301は、旧構造物10の旧地下部分10Bや、旧杭10Cと干渉するのであれば、それらを貫きつつ地下に向けて掘り進められる。穴301は、場所打ち杭20Cが後に建てられるビルディングを支えるに足る強度が得られる位置にまで掘り進められる。一般的には、硬い地盤に到達するまで穴301が掘り進められることが多い。穴301の底付近の径をその上の部分よりも大きくすることも可能である。
次いで、穴301の中に、穴301の内壁に層円筒形の図示を省略の一般には鉄筋で作られた、金属製のかごを入れる。かごは、穴301の底から、所定の高さにまで及ぶようにする。そして、穴301の中に杭打機300から、液状のコンクリートを流し込む。コンクリートは、穴301の底から、かごの上端までを満たす。そのコンクリートが硬化することで、場所打ち杭20Cとなる(図16)。かごは、場所打ち杭20C内で、その強度を保証する鉄筋となる。穴301の底付近の径がその上の部分よりも大きくなっている場合には、場所打ち杭20は拡底杭となる。
次いで、他の場所に杭打機300を移動して、同様に穴301を穿つ。そして、上述の場合と同様に、穴301の中にかごを入れ、コンクリートを流し込みそれを硬化させることで、場所打ち杭20Cとする(図17)。
以上を繰返すことにより、図14、図18、図19に示したように、特定範囲Yの全域に、場所打ち杭20Cが打たれることとなる。なお、この実施形態では、場所打ち杭20Cの下端の深さ(高さ位置)は揃っているものとするが、これはこの限りではない。各場所打ち杭20Cの下端の深さは、上述したように、各場所打ち杭20Cが、後に建てられるビルディングを支えるに足る強度が得られるかという観点から決定される。また、この実施形態では、場所打ち杭20Cの上端の深さ(高さ位置)は揃っているものとするが、これもこの限りではない。各場所打ち杭20Cの上端の深さは、後に作られるビルディングの後述する地下部分の、各場所打ち杭20Cがある部分の下面に相当する高さとされる。結果として、場所打ち杭20Cは、下方から構造物としてのビルディングの地下部分を支持することになる。
なお、一般的な場所打ち杭の工法では、場所打ち杭の上端が地下にある場合には、穴の場所打ち杭よりも上側の部分は埋め戻されるのが通常であるが、この実施形態では、当該部分は後述するように周囲の土砂ごと除去されるので、かかる埋め戻しを行う必要は特に無い。
また、この例では、杭打機300は一つとされ、場所打ち杭20Cは一本ずつ打たれていたが、複数の杭打機300を用いて、複数の場所打ち杭20Cを同時並行して同時に打つことももちろん可能である。工期短縮を目指すのであれば、もちろんその方が良い。
また、ここでの特定範囲Yに場所打ち杭20を打つ作業は地上で行われる。かかる作業は、必ずしも仮設テント200が完成してから行われる必要はない。仮設テント200が作られる前、或いは仮設テント200を構築する作業と並行して、特定範囲Yに場所打ち杭20を打つ作業が行われても良い。特に、仮設テント200を構築する作業と並行して、特定範囲Yに場所打ち杭20を打つ作業行うと工期短縮の効果が大きい。なお、特定範囲Yは、後述する構台の下の範囲には限らず、後述する地下空間の底から後述するように場所打ち杭20を打つのが難しい範囲を特定範囲Yとして決定することができる。
Then build a pile foundation for the new structure built by rebuilding. The new structure is a building built in scope X, as will be explained later. The pile foundation for one building is cast-in-place piles.
As shown in FIG. 14, the cast-in-place pile 20C to be struck here is struck only within the specific range Y which is a part of the target range X. Note that FIG. 14 is a plan view of the target range X, but the temporary tent 200 is not shown. The specific range Y is a range covered by a gantry, which will be described later, in other words, a range located below the gantry.
A specific method of driving the cast-in-place pile 20C will be described with reference to FIGS. 15 to 19. The method of driving the cast-in-place pile 20C may follow a known or well-known technique. In addition to the driving of the cast-in-place pile 20C in the specific range Y this time, a scene of hitting the cast-in-place pile 20C again later appears, and the same applies in that case as well. It should be noted that FIGS. 15 to 18 are side views of the target range X including the underground as seen from the direction indicated by the arrow indicated by the arrow A in FIG. 1. FIG. 19 is a side view of the target range X including the underground as seen from the direction indicated by the arrow indicated by the arrow B in FIG. 1. FIGS. 15 to 18 and 19 are schematic, and for convenience of drawing, FIG. 14 lacks accuracy especially with respect to the number of cast-in-place piles 20C.
As shown in FIG. 15, first, the pile driver 300 is placed at a predetermined position on the ground leveled ground surface corresponding to the position where the cast-in-place pile 20C in the specific range Y should be driven in the target range X. The pile driver 300 has a function of drilling a hole vertically toward the basement and a function of pouring concrete. These functions may be assigned to a plurality of devices, in which case the pile driver 300 is composed of a plurality of devices.
Then, the hole 301 is dug in the vertical direction by the pile driver 300. If the hole 301 interferes with the old underground portion 10B of the old structure 10 or the old pile 10C, the hole 301 is dug toward the underground while penetrating them. The hole 301 is dug to a position where the cast-in-place pile 20C is strong enough to support the building to be built later. In general, the hole 301 is often dug until it reaches hard ground. It is also possible to make the diameter near the bottom of the hole 301 larger than the portion above it.
Next, in the hole 301, a metal basket, generally made of a reinforcing bar, is placed on the inner wall of the hole 301, which is not shown as a layer cylinder. The cage extends from the bottom of the hole 301 to a predetermined height. Then, liquid concrete is poured into the hole 301 from the pile driver 300. The concrete fills from the bottom of the hole 301 to the top of the car. When the concrete hardens, it becomes a cast-in-place pile 20C (Fig. 16). The car is a reinforcing bar that guarantees its strength in the cast-in-place pile 20C. When the diameter near the bottom of the hole 301 is larger than the portion above it, the cast-in-place pile 20 becomes a bottom-expanded pile.
Next, the pile driver 300 is moved to another place, and the hole 301 is similarly drilled. Then, as in the above case, a basket is placed in the hole 301, concrete is poured into the hole 301, and the concrete is hardened to obtain a cast-in-place pile 20C (FIG. 17).
By repeating the above, as shown in FIGS. 14, 18, and 19, the cast-in-place pile 20C is struck in the entire area of the specific range Y. In this embodiment, it is assumed that the depths (height positions) of the lower ends of the cast-in-place piles 20C are the same, but this is not the case. As described above, the depth of the lower end of each cast-in-place pile 20C is determined from the viewpoint of whether each cast-in-place pile 20C has sufficient strength to support the building to be built later. Further, in this embodiment, it is assumed that the depths (height positions) of the upper ends of the cast-in-place piles 20C are the same, but this is also not the case. The depth of the upper end of each cast-in-place pile 20C is set to a height corresponding to the lower surface of the portion of the underground portion to be described later of the building to be constructed later, in which each cast-in-place pile 20C is located. As a result, the cast-in-place pile 20C will support the underground part of the building as a structure from below.
In the general cast-in-place pile construction method, when the upper end of the cast-in-place pile is underground, the portion above the cast-in-place pile in the hole is usually backfilled. Since the relevant part is removed together with the surrounding earth and sand as described later, there is no particular need to perform such backfilling.
Further, in this example, the pile driver 300 is one and the cast-in-place piles 20C are struck one by one. However, a plurality of pile-driving machines 300 are used to simultaneously drive a plurality of cast-in-place piles 20C. Of course, it is possible to hit at the same time. Of course, it is better if you aim to shorten the construction period.
Further, the work of striking the cast-in-place pile 20 in the specific range Y here is performed on the ground. Such work does not necessarily have to be performed after the temporary tent 200 is completed. Before the temporary tent 200 is made, or in parallel with the work of constructing the temporary tent 200, the work of striking the cast-in-place pile 20 in the specific range Y may be performed. In particular, if the work of driving the cast-in-place pile 20 in the specific range Y in parallel with the work of constructing the temporary tent 200, the effect of shortening the construction period is great. The specific range Y is not limited to the range under the gantry described later, and the range where it is difficult to hit the cast-in-place pile 20 from the bottom of the underground space described later can be determined as the specific range Y. ..

続けての作業を、図20~図29を用いて説明する。これらのうち、図26の作図法は図14にならっており、その他の図の作図法は、図19にならっている。
特定範囲Yの全体に上述したようにして場所打ち杭20Cを打ったら、次いで、構台410を設置する(図20)。構台410は、その上に重機、車両、作業員が乗って作業を行うための台である。それを行えるだけの強度、広さが構台410には必要である。この実施形態における構台410は、板状である。構台410は、最初に構築されるときはそれのみであっても良いし、それに加えて、後述する支持体のうち上側の最小限の部分を含んでいてもよい。構台410が覆うのは、上述した特定範囲Yである。この実施形態における特定範囲Yは、図14で示したように矩形であったが、これは必ずしもこの限りではなく、また、特定範囲Yの長さは、対象範囲Xの長手方向の全長に及ぶ必要もない。もっとも、構台410の一部は、対象範囲X外から構台410の上に車両等が侵入できるようにするために、対象範囲Xの外縁の一部に接している必要がある。例えば、この実施形態でいえば、仮設テント200の扉241のある部分において、構台410と対象範囲Xの縁とを接するようにするのが便利であり、これには限られないがこの実施形態ではそうされている。
Subsequent work will be described with reference to FIGS. 20 to 29. Of these, the drawing method of FIG. 26 follows that of FIG. 14, and the drawing method of the other figures follows that of FIG.
After the cast-in-place pile 20C is struck in the entire specific range Y as described above, the gantry 410 is then installed (FIG. 20). The gantry 410 is a platform on which heavy machinery, vehicles, and workers ride on the gantry 410 to perform work. The gantry 410 needs to be strong and wide enough to do that. The gantry 410 in this embodiment has a plate shape. The gantry 410 may be the only one when it is first constructed, or may additionally include the minimum upper portion of the support described below. The gantry 410 covers the above-mentioned specific range Y. The specific range Y in this embodiment is rectangular as shown in FIG. 14, but this is not necessarily the case, and the length of the specific range Y extends over the total length of the target range X in the longitudinal direction. There is no need. However, a part of the gantry 410 needs to be in contact with a part of the outer edge of the target range X so that a vehicle or the like can enter the gantry 410 from outside the target range X. For example, in this embodiment, it is convenient, but not limited to, to make the gantry 410 and the edge of the target range X in contact with each other at a part of the door 241 of the temporary tent 200. Then it is done.

整地された地表に構台410を構築したら、対象範囲Xの全体を、掘り下げていくことにより、地下空間を形成していく。対象範囲Xの掘下げが開始されるときには、仮設テント200は完成している。対象範囲Xの掘下げを含む、仮設テント200内で行われる作業は、仮設テント200の防音性能や周囲の環境が許せば、例えば三交代で、毎日24時間連続で施工することが可能である。また、仮設テント200内での作業は、仮設テント200によって雨も避けることができるので、いわゆるドライ施工も実行できる。対象範囲Xの掘り下げには、所定の重機を用いる。この実施形態で、対象範囲Xの掘り下げに用いられる重機は、これには限られないが好ましくは複数のブルドーザ510である(図21、図22)。パワーシャベル等の他の重機がこの作業に用いられても構わない。
ブルドーザ510によって対象範囲Xの全体を掘り下げていくと、土砂が除去されることにより空間が現れる。これが地下空間Sである。地下空間Sを形成する場合、そこに旧構造物10の旧地下部分10Bや、旧杭10Cが存在するのであれば、それらを土砂と一緒に破壊して除去する。旧構造物10Bや、旧杭10Cを土砂と一緒に除去することが可能であるから、この作業に費やされる労力と時間はそれ程大きくない。土砂、破壊された旧地下部分10B及び旧杭10Cは、地下空間Sから取り除かれる。この実施形態では、現れた地下空間Sの底に配置された公知又は周知の排土機520によって土砂等を構台410の上にまで引上げることによりそれを行う。排土機520によって構台410の上に引き上げられた土砂等は、例えば、構台410の上に乗入れているダンプカー530の荷台に積み替えられる。ダンプカー530は、構台410の上を走り、仮設テント200の扉241から外部へ出て、所定の場所に土砂を捨てに走る。このようにして、構台410を利用することにより、土砂を地下空間Sから、対象範囲X外の適当な場所に排出する作業が容易になる。かかる土砂の排出も、昼間のみならず夜間にも行うことができる。夜間であれば一般に、車両の渋滞を考慮する必要がないから、ダンプカー530の往来を予定通りに通常よりも長い距離で行うことができるし、また多くのダンプカー530を集めることも容易であるから、工期短縮に有用である。土砂と、破壊された旧地下部分10B及び旧杭10Cとを分別する必要があるのであれば、対象範囲X外で行うのが容易であろうが、それは必ずしもその限りではない。
地下空間Sの底が掘り下げられて行くと、当然に構台410は支えを必要とする。地下空間Sを掘り下げていく場合、構台410の下には、支持体420が設けられる。支持体420は、構台410を下から支えることが可能であればどのような構成でも構わない。支持体420は、例えば、柱と、梁とを適宜に組合せて構成可能である。もっとも、深い穴を掘って打つ必要のある場所打ち杭20Cの数を減らすためには、特定範囲Yの範囲を狭くすべきであるから、その観点からすると、支持体420は、平面視した場合に構台410により隠れる範囲にのみ存在するようにするのが良い。この実施形態ではそうされている。支持体420の下端は、例えば、地下空間Sの底に当接しており、地下空間Sの底が下方に下がっていくと、それに追随して下方に向けてその長さを伸ばされる。このようにすることで、構台410は、当初設けられた位置から、その位置が移動することがない。
地下空間Sを構築する場合、地下空間Sの側面は、例えば鉛直である。地下空間Sの深さは、最終的に、例えば50mを超える場合もあり、何らの処置もしない場合には、地下空間Sの側面が崩落することも考えられる。そのような危険から、地下空間Sで作業を行う作業者を守るため、この実施形態では、これには限られないが、矢板430によって、地下空間Sの側面を補強することとしている。矢板430は、縦長の細長い矩形の板を、並列して地下空間Sの側面に沿って打込むことによって構成される。矢板430は、止水連壁でもよく、SMW(Soil Mixing Wall)でも良い。これらは、板を地中に打込むのではなく、液状のコンクリートを地中に打設してから硬化させることで、地中にコンクリートによる板を形成するものである。矢板430は、例えば、地下空間Sの全面を覆い、且つ最終的に形成される地下空間Sの底よりも深い位置にまでその下端が及ぶようになっている。矢板430には、外側から地下空間Sの側に向けて矢板430を内側に押し倒そうとする力がはたらくが、矢板430がその力に抗することができるようにするために、矢板430の外側に公知のアースアンカー440を設けてもよい。この実施形態では、例えば、図22に示したようにそうされている。アースアンカー440は、矢板430に対して、外向き、且つ下方向きの力を与える。かかる力は、矢板430の上下方向の複数の箇所に与えられる。矢板430は、地下空間Sの形成のための対象範囲Xの掘削開始の前に構築されても構わないし、対象範囲Xの掘削が開始された後、地下空間Sの側面の崩落が予想されない段階の適宜のタイミングで構築されても構わない。
アースアンカー440は、公知或いは周知のように、地下空間Sが下方に向かって掘り進められるに連れ、その上方のものから順に設置されていく。
After constructing the gantry 410 on the leveled ground surface, the entire target range X is dug down to form an underground space. The temporary tent 200 is complete when the digging of the target range X begins. If the soundproofing performance of the temporary tent 200 and the surrounding environment allow, the work performed in the temporary tent 200, including the digging of the target range X, can be performed continuously for 24 hours every day, for example, in three shifts. Further, since the work in the temporary tent 200 can avoid rain by the temporary tent 200, so-called dry construction can also be executed. A predetermined heavy machine is used for digging into the target range X. In this embodiment, the heavy equipment used for digging the target range X is not limited to this, but preferably a plurality of bulldozers 510 (FIGS. 21 and 22). Other heavy equipment such as power shovels may be used for this task.
When the entire target range X is dug down by the bulldozer 510, a space appears by removing the earth and sand. This is the underground space S. When the underground space S is formed, if the old underground portion 10B of the old structure 10 and the old pile 10C exist there, they are destroyed and removed together with the earth and sand. Since it is possible to remove the old structure 10B and the old pile 10C together with the earth and sand, the labor and time spent for this work are not so large. Sediment, the destroyed old underground part 10B and the old pile 10C are removed from the underground space S. In this embodiment, the earth and sand are pulled up to the top of the gantry 410 by a known or well-known earth removal machine 520 arranged at the bottom of the underground space S that appears. The earth and sand pulled up on the gantry 410 by the earth removal machine 520 is transshipped to, for example, the loading platform of the dump truck 530 mounted on the gantry 410. The dump truck 530 runs on the gantry 410, goes out from the door 241 of the temporary tent 200, and runs to dump the earth and sand in a predetermined place. In this way, by using the gantry 410, the work of discharging the earth and sand from the underground space S to an appropriate place outside the target range X becomes easy. Such earth and sand can be discharged not only in the daytime but also at night. At night, it is generally not necessary to consider traffic congestion, so the dump trucks 530 can come and go as scheduled at a longer distance than usual, and it is easy to collect many dump trucks 530. , Useful for shortening the construction period. If it is necessary to separate the earth and sand from the destroyed old underground part 10B and the old pile 10C, it will be easy to do it outside the target range X, but this is not always the case.
As the bottom of the underground space S is dug down, the gantry 410 naturally needs support. When digging down the underground space S, a support 420 is provided under the gantry 410. The support 420 may have any configuration as long as it can support the gantry 410 from below. The support 420 can be configured by appropriately combining columns and beams, for example. However, in order to reduce the number of cast-in-place piles 20C that need to be struck by digging a deep hole, the range of the specific range Y should be narrowed. From that point of view, the support 420 is viewed in a plan view. It is better to exist only in the range hidden by the gantry 410. This is the case in this embodiment. The lower end of the support 420 is in contact with the bottom of the underground space S, for example, and when the bottom of the underground space S goes down, its length is extended downward accordingly. By doing so, the position of the gantry 410 does not move from the initially provided position.
When constructing the underground space S, the side surface of the underground space S is, for example, vertical. The depth of the underground space S may eventually exceed, for example, 50 m, and if no measures are taken, the side surface of the underground space S may collapse. In order to protect the workers who work in the underground space S from such danger, in this embodiment, the side surface of the underground space S is reinforced by the sheet pile 430, although not limited to this. The sheet pile 430 is configured by driving vertically elongated rectangular plates in parallel along the side surface of the underground space S. The sheet pile 430 may be a waterproof wall or an SMW (Soil Mixing Wall). These are not to drive the board into the ground, but to cast liquid concrete into the ground and then harden it to form a concrete board in the ground. The sheet pile 430 covers the entire surface of the underground space S, and its lower end extends to a position deeper than the bottom of the finally formed underground space S, for example. The sheet pile 430 has a force that pushes the sheet pile 430 inward from the outside toward the side of the underground space S, but in order to allow the sheet pile 430 to resist the force, the sheet pile 430 A known earth anchor 440 may be provided on the outside. In this embodiment, for example, as shown in FIG. 22. The earth anchor 440 applies an outward and downward force to the sheet pile 430. The applied force is applied to a plurality of points in the vertical direction of the sheet pile 430. The sheet pile 430 may be constructed before the start of excavation of the target area X for the formation of the underground space S, or after the excavation of the target area X is started, the stage where the side surface of the underground space S is not expected to collapse. It may be constructed at an appropriate timing.
As is known or well known, the earth anchor 440 is installed in order from the one above the underground space S as the underground space S is dug downward.

そして、地下空間Sは、予定された深さまで掘り進められる。予定された地下空間Sの底の深さとは、先程特定範囲Yに打たれた場所打ち杭20Cの上端とその高さ位置が揃う深さか、当該場所打ち杭20Cの上端よりもその高さ位置が幾らか高い程度の深さである。この実施形態では、地下空間Sの底は、特定範囲Yに打たれた場所打ち杭20Cの上端とその高さ位置が揃う深さとされる(図23)。なお、地下空間Sの底の深さは、旧地下部分10Bや旧杭10Cが存在する深さよりも低くなっている必要は必ずしもない。
次いで、地下空間Sの底に、新たに場所打ち杭20Cが打たれる。新たに打たれる場所打ち杭20Cは、平面視した場合における、対象範囲Xのうちの特定範囲Yを除いた範囲に打たれる。今回打たれる場所打ち杭20Cは、地表からではなく、地下空間Sの底から打たれる。
地下空間Sの底で場所打ち杭20Cを打つために、地下空間Sの底に、先程説明したのと同じ杭打機300を降ろす。杭打機300は、一つでも良いし複数でも良い。杭打機300は、例えば、構台410の上に乗入れたクレーン車540によって、構台410の上から、地下空間Sの底に降ろされる(図24)。
この場合における、特定範囲Y外の場所打ち杭20Cの打ち方は、上述した、特定範囲Y内の場所打ち杭20Cの打ち方と変わらない。穴301(図24)を掘って、そこに図示せぬかごを入れ、穴301の中に液状のコンクリートを流し込んで、それを硬化させる。それにより、場所打ち杭20Cが打たれる。場所打ち杭20Cは、地下空間Sの底を平面視した場合における、特定範囲Y外の対象範囲X内の全域にわたって必要に応じて打たれることになる(図25、図26)。ここで場所打ち杭20Cを打つために掘られる穴301の上下方向の長さは、特定範囲Y内に場所打ち杭20Cを打つために掘られる穴301の上下方向の長さよりも短く、また、穴301を掘る際に、旧地下部分10Bや旧杭10Cが穴301を掘る邪魔になることが無いか、少ない。したがって、特定範囲Y外に1本の場所打ち杭20Cを打つ作業は、特定範囲Y内に1本の場所打ち杭20Cを打つ作業にくらべて、格段に時間がかからない。したがって、特定範囲Y外に打たれる場所打ち杭20Cの数が一般に、特定範囲Y内に打たれる場所打ち杭20Cの数よりも遥かに多いことも相俟って、場所打ち杭20Cを打つために必要となる時間の全体は、大幅に節約されることになる。
この実施形態では、特定範囲Y外に打たれる複数の場所打ち杭20Cの下端の高さ位置は、特定範囲Y内に打たれる複数の場所打ち杭20Cの下端の高さ位置と同じく揃っている。しかしこれは、特定範囲Y内に打たれる各場所打ち杭20Cの場合と同じ理由でこの限りではない。また、この実施形態では、特定範囲Y外に打たれる複数の場所打ち杭20Cの上端の高さ位置は、特定範囲Y内に打たれる複数の場所打ち杭20Cの上端の高さ位置と同じく揃っている。しかしこれは、特定範囲Y内に打たれる各場所打ち杭20Cの場合と同じ理由でこの限りではない。
Then, the underground space S is dug to the planned depth. The depth of the bottom of the planned underground space S is the depth at which the upper end of the cast-in-place pile 20C struck in the specific range Y and its height position are aligned, or the height position higher than the upper end of the cast-in-place pile 20C. Is a somewhat higher depth. In this embodiment, the bottom of the underground space S is set to a depth at which the upper end of the cast-in-place pile 20C struck in the specific range Y and its height position are aligned (FIG. 23). The depth of the bottom of the underground space S does not necessarily have to be lower than the depth at which the old underground portion 10B and the old pile 10C exist.
Next, a new cast-in-place pile 20C is struck at the bottom of the underground space S. The cast-in-place pile 20C to be newly struck is struck in a range excluding a specific range Y in the target range X in a plan view. The cast-in-place pile 20C to be struck this time is struck from the bottom of the underground space S, not from the ground surface.
In order to hit the cast-in-place pile 20C at the bottom of the underground space S, the same pile driver 300 as described above is dropped onto the bottom of the underground space S. The pile driver 300 may be one or a plurality. The pile driver 300 is, for example, lowered from the top of the gantry 410 to the bottom of the underground space S by a crane truck 540 mounted on the gantry 410 (FIG. 24).
In this case, the method of driving the cast-in-place pile 20C outside the specific range Y is the same as the method of driving the cast-in-place pile 20C in the specific range Y described above. A hole 301 (FIG. 24) is dug, an unillustrated basket is placed therein, and liquid concrete is poured into the hole 301 to harden it. As a result, the cast-in-place pile 20C is struck. The cast-in-place pile 20C will be struck as needed over the entire area within the target range X outside the specific range Y when the bottom of the underground space S is viewed in a plan view (FIGS. 25 and 26). Here, the vertical length of the hole 301 dug for striking the cast-in-place pile 20C is shorter than the vertical length of the hole 301 dug for striking the cast-in-place pile 20C within the specific range Y, and also. When digging the hole 301, the old underground part 10B and the old pile 10C do not interfere with the digging of the hole 301, or are few. Therefore, the work of striking one cast-in-place pile 20C outside the specific range Y takes much less time than the work of striking one cast-in-place pile 20C in the specific range Y. Therefore, in combination with the fact that the number of cast-in-place piles 20C struck outside the specific range Y is generally much larger than the number of cast-in-place piles 20C struck in the specific range Y, the cast-in-place pile 20C is used. The total time required to hit will be saved significantly.
In this embodiment, the height positions of the lower ends of the plurality of cast-in-place piles 20C struck outside the specific range Y are the same as the height positions of the lower ends of the plurality of cast-in-place piles 20C struck in the specific range Y. ing. However, this is not the case for the same reason as in the case of each cast-in-place pile 20C struck within the specific range Y. Further, in this embodiment, the height position of the upper end of the plurality of cast-in-place piles 20C struck outside the specific range Y is the height position of the upper end of the plurality of cast-in-place piles 20C struck in the specific range Y. They are also available. However, this is not the case for the same reason as in the case of each cast-in-place pile 20C struck within the specific range Y.

このようにして、必要な場所打ち杭20Cが、平面視した場合における対象範囲Xの全体に打たれる。
場所打ち杭20Cが打たれたら、次に、新しいビルディングの地下構造物である地下部分20Bが構築される(図27)。
地下部分20Bを構築するには例えば、構台410の上に乗せられた重機が利用される。この重機は例えば、クレーン、或いはクレーン車である。この実施形態では、重機は、クレーン車540であるものとする。クレーン車540により、例えば、図示せぬダンプカーによって構台410の上に運ばれた図示せぬ資材を地下空間Sの内部に降ろすことにより、地下部分20Bは、地下空間Sの底から順に、上方に向けて構築されていく。地下部分20Bは、柱、壁、床等、公知或いは周知の構造を備えており、また、必要に応じて複数フロアに分割されている。もちろん、地下空間Sには作業者が降りて作業を行っても良い。地下部分20Bの底は、場所打ち杭20Cの上端によって支持される。それにより、地下部分20Bは、下方から場所打ち杭20Cによって支持されることになる。
地下空間S内で地下部分20Bが構築されていると、地下部分20Bが、構台410の支持体420と干渉することがある。その場合には、地下部分20Bと干渉する支持体420を撤去して、撤去された直上の支持体420を地下部分20Bに固定すれば良い。撤去された支持体420は、例えば、クレーン車540によって、構台410の上に引き上げることが可能であり、構台410の上に引き上げられた支持体420は、例えば図示せぬダンプカーによって、仮設テント200外に搬出すれば良い。また、地下部分20Bが構築されていくに連れて、アースアンカー440は、その下方のものから順に撤去されていく。
なお、構台410の支持体420の始末は、以下のように行っても良い。この場合の、支持体420の構成は、ここまで説明したものと若干異なるものとなる。この場合における支持体420には、鉛直方向に伸びる柱と、柱と柱の間を補強的に繋ぐ梁とにより構成される。まず、特定範囲Yに地表から場所打ち杭20Cを打つ場合と同様に、地表から、柱を打込む。この作業は、特定範囲Yに場所打ち杭20Cを打込む作業と同時に、或いはそれに前後して行われる。柱の下端は、少なくとも地下空間Sの底となるよりも深い場所にまで至るようにし、支持体420により構台を安定して支持できる深さまで至るようにする。例えば、支持体420は、特定範囲Yに打たれる場所打ち杭20Cの下端とその下端が揃うようにする。このようにして設けた柱の上に構台410を設置する。その後、上述した如き、対象範囲Xを下方に掘り進め地下空間Sを形成する。地下空間Sを掘り進めて行くと、支持体420の一部である上述した柱がその上側から徐々に露出してくる。露出した柱の長さが長くなってくると、柱の強度に不安が生じる。そこで、露出した部分の柱に対して、適宜梁を固定していく。この作業を地下空間Sを掘り進めて行きながら適宜行い、柱には十分な数の梁が設けられる。結果として、地下空間Sに存在する構台410及び支持体420は、柱の下端が地下空間Sの底よりも下方に至っているという点を除けば、図24、25に示したものと同じになる。
この場合においても、上述したように、地下空間Sには、地下部分20Bがその下方から上方に向けて構築されていく。この場合においては、地下部分20Bと干渉する構台410の支持体420は撤去されない。構台の支持体420が存在していても、それに構わず地下部分20Bを構築していく。地下部分は、非常に大雑把に言えば、鉄骨と打設され硬化されたコンクリート等でできている。支持体420は、鉄骨とは干渉しない位置に予め作られており、部分的にコンクリートの中に埋め込まれる。地下部分20Bの中には、例えば、廊下、居室となる空間があり、支持体420の一部は地下部分20Bの中に埋め込まれ、また支持体420の残部は、その空間内に露出することになる。そして、どこかのタイミングで、例えば、地下部分20Bが完成した後の適当なタイミングで、支持体420のうち、地下部分20Bに埋め込まれている部分はそのままに、地下部分20B内の空間に露出している部分のみを撤去する。そうすると、地下部分20Bの壁、天井等には、支持体420の柱や梁の断面が露出することになる。そのような露出した柱や梁の断面が美観的に問題なのであれば、その上から塗装を行ったり、壁紙を張る等すれば、美観の問題を解消することができる。このように構台410及び支持体420の始末を行うことも可能である。
以上のように作業を行い、地下空間S内に、地下部分20Bが完成する(図28)。地下空間Sの形成開始から、ここまでの作業はすべて仮設テント200内で行われる。
In this way, the required cast-in-place pile 20C is struck over the entire target range X in a plan view.
After the cast-in-place pile 20C is struck, the underground part 20B, which is the underground structure of the new building, is then constructed (Fig. 27).
To construct the underground portion 20B, for example, a heavy machine mounted on the gantry 410 is used. This heavy machine is, for example, a crane or a mobile crane. In this embodiment, the heavy equipment is assumed to be a mobile crane 540. By lowering the material (not shown) carried on the gantry 410 by the crane truck 540, for example, into the underground space S, the underground portion 20B is moved upward in order from the bottom of the underground space S. It will be built for. The underground portion 20B has a known or well-known structure such as pillars, walls, floors, etc., and is divided into a plurality of floors as needed. Of course, a worker may get down to the underground space S to perform the work. The bottom of the underground portion 20B is supported by the upper end of the cast-in-place pile 20C. As a result, the underground portion 20B will be supported by the cast-in-place pile 20C from below.
When the underground portion 20B is constructed in the underground space S, the underground portion 20B may interfere with the support 420 of the gantry 410. In that case, the support 420 that interferes with the underground portion 20B may be removed, and the directly above the removed support 420 may be fixed to the underground portion 20B. The removed support 420 can be lifted onto the gantry 410 by, for example, a mobile crane 540, and the support 420 lifted onto the gantry 410 can be lifted onto the gantry 410 by, for example, a dump truck (not shown) in a temporary tent 200. Just carry it out. Further, as the underground portion 20B is constructed, the earth anchor 440 is removed in order from the one below it.
The support 420 of the gantry 410 may be cleaned up as follows. In this case, the configuration of the support 420 is slightly different from that described so far. In this case, the support 420 is composed of columns extending in the vertical direction and beams connecting the columns in a reinforcing manner. First, a pillar is driven from the ground surface in the same manner as when the cast-in-place pile 20C is driven from the ground surface into the specific range Y. This work is performed at the same time as or before or after the work of driving the cast-in-place pile 20C into the specific range Y. The lower end of the pillar should reach at least a place deeper than the bottom of the underground space S, and the support 420 should reach a depth that can stably support the gantry. For example, in the support 420, the lower end of the cast-in-place pile 20C to be struck in the specific range Y and the lower end thereof are aligned with each other. The gantry 410 is installed on the pillars provided in this way. After that, as described above, the target range X is dug downward to form the underground space S. As the underground space S is dug, the above-mentioned pillars that are part of the support 420 are gradually exposed from above. As the length of the exposed columns increases, the strength of the columns becomes uncertain. Therefore, the beam is appropriately fixed to the exposed column. This work is appropriately performed while digging the underground space S, and a sufficient number of beams are provided on the pillars. As a result, the gantry 410 and the support 420 existing in the underground space S are the same as those shown in FIGS. 24 and 25, except that the lower ends of the columns reach below the bottom of the underground space S. ..
Also in this case, as described above, the underground portion 20B is constructed in the underground space S from the lower side to the upper side. In this case, the support 420 of the gantry 410 that interferes with the underground portion 20B is not removed. Even if the support 420 of the gantry exists, the underground part 20B will be constructed regardless of it. Roughly speaking, the underground part is made of steel frame and concrete that has been cast and hardened. The support 420 is pre-made at a position that does not interfere with the steel frame and is partially embedded in concrete. In the underground portion 20B, for example, there is a space that becomes a corridor or a living room, a part of the support 420 is embedded in the underground portion 20B, and the rest of the support 420 is exposed in the space. become. Then, at some timing, for example, at an appropriate timing after the underground portion 20B is completed, the portion of the support 420 embedded in the underground portion 20B is exposed to the space inside the underground portion 20B as it is. Remove only the part that is doing. Then, the cross sections of the columns and beams of the support 420 are exposed on the walls, ceilings, etc. of the underground portion 20B. If the cross section of such exposed columns or beams is aesthetically problematic, the aesthetic problem can be solved by painting or putting wallpaper on it. It is also possible to dispose of the gantry 410 and the support 420 in this way.
By performing the work as described above, the underground portion 20B is completed in the underground space S (FIG. 28). All the work from the start of formation of the underground space S to this point is performed in the temporary tent 200.

地下部分20Bが完成したら、仮設テント200を撤去する。また、矢板430と地下部分20Bとの間の空間を埋め戻すことで、矢板430が不要になったのであれば、矢板430を撤去しても構わない。矢板430は残しても良い。また、矢板430と地下部分20Bとの間の空間を埋め戻すことで、矢板430が不要になったのであれば、矢板430とアースアンカー440とを撤去しても構わない。仮設テント200とともに、基礎レール110及び既製杭120をも撤去しても良い。
仮設テント200等の撤去は、公知或いは周知技術によれば良い。
仮設テント200、及びその他の不要なものを撤去したら、構造物の地上部分(図示せず)を構築する。構造物の地上部分は、従来工法と同様の工法にて構築することが可能である。
地上部分は、例えば、仮設テント200の撤去に前後して地下部分20Bの上に構築された、タワークレーン用の土台20Dの上に設けられたタワークレーン550を用いてそれを行えば良い。タワークレーン550はマストクライミングタイプでも良いが、フロアクライミングタイプでももちろん構わない。地上部分は、上方に向かって伸びていき、やがて完成する。
地下部分と地上部分とが完成することにより、新しいビルディングが完成する。これにより、ビルディングの建て替えが終了する。
When the underground part 20B is completed, the temporary tent 200 is removed. Further, if the sheet pile 430 is no longer needed by backfilling the space between the sheet pile 430 and the underground portion 20B, the sheet pile 430 may be removed. The sheet pile 430 may be left. Further, if the sheet pile 430 is no longer needed by backfilling the space between the sheet pile 430 and the underground portion 20B, the sheet pile 430 and the earth anchor 440 may be removed. The foundation rail 110 and the ready-made pile 120 may be removed together with the temporary tent 200.
The temporary tent 200 and the like may be removed by publicly known or well-known techniques.
After removing the temporary tent 200 and other unnecessary items, the above-ground part of the structure (not shown) will be constructed. The above-ground part of the structure can be constructed by the same construction method as the conventional construction method.
For the above-ground portion, for example, the tower crane 550 provided on the base 20D for the tower crane constructed on the underground portion 20B before and after the removal of the temporary tent 200 may be used. The tower crane 550 may be a mast climbing type, but of course a floor climbing type may be used. The above-ground part extends upward and is eventually completed.
The new building will be completed by completing the underground part and the above-ground part. This completes the rebuilding of the building.

10 旧構造物
10A 旧地上部分
10B 旧地下部分
10C 旧杭
20B 地下部分
20C 場所打ち杭
20D 土台
110 基礎レール
120 杭
121 杭本体
121A アンカー体
122 補正材
122A 筒部
122A1 取付溝
122B 取付部
123A ボルト
123B ナット
123C ワッシャー
200 仮設テント
210 分割テント
220 骨材
221 柱
222 梁
230 シート
240 シート
300 杭打機
301 穴
410 構台
420 支持体
430 矢板
440 アースアンカー
510 ブルドーザ
520 排土機
530 ダンプカー
540 クレーン車
550 タワークレーン
S 地下空間
X 対象範囲
Y 特定範囲
10 Old structure 10A Old above-ground part 10B Old underground part 10C Old pile 20B Underground part 20C Cast-in-place pile 20D Base 110 Foundation rail 120 Pile 121 Pile body 121A Anchor body 122 Corrective material 122A Crane part 122A1 Mounting groove 122B Mounting part 123A Bolt 123B Nut 123C Washer 200 Temporary tent 210 Split tent 220 Aggregate 221 Pillar 222 Beam 230 Seat 240 Sheet 300 Pile driver 301 Hole 410 Platform 420 Support 430 Sheet pile 440 Earth anchor 510 Bulldozer 520 Drainer 530 Crane S Underground space X Target range Y Specific range

Claims (4)

水平で且つ直線上に敷設されているレールと、
前記直線に平行な直線上に乗るようにして所定間隔で地表に打込まれた既製杭である複数の杭本体と、
前記杭本体それぞれの上端に取付けられた、前記杭本体の長さ方向の任意の位置に位置決めした状態で固定可能に構成されているとともに、その上端に、平面視した場合の前記杭本体から全方向に食み出る、それが前記杭本体に固定された状態で前記杭本体の長さ方向に対して垂直な前記レールが取付けられる平面を持つ取付部を備えている複数の補正材と、
を備えており、
前記補正材は、前記杭本体の上端近辺で、前記杭本体に案内されながら前記補正材を前記杭本体に対して平行移動させられるようにする被案内部を備えているとともに、
前記杭本体は、円筒形状であり、
前記補正材における前記被案内部は、前記杭本体の外面に対応しており前記杭本体の外面に案内される内面、又は前記杭本体の内面に対応しており前記杭本体の内面に案内される外面を有する円筒形状であり、
前記杭本体固定された前記補正材の前記杭本体に対する長さ方向の位置決めを、前記杭本体及び前記被案内部を用いて適切に行うことにより、前記直線に平行な前記直線上に乗る複数の杭本体のすべてに取付けられた前記取付部の平面それぞれの高さが揃えられており、
複数の前記取付部の平面のそれぞれに対して、前記レールが取付けられていることで、前記レールが複数の前記杭本体、及び前記補正材によって下方から支持されている、
レール構造。
Rails laid horizontally and in a straight line,
A plurality of pile bodies, which are ready-made piles driven into the ground surface at predetermined intervals so as to ride on a straight line parallel to the straight line,
It is configured so that it can be fixed in a state of being positioned at an arbitrary position in the length direction of the pile body attached to the upper end of each of the pile bodies, and at the upper end thereof, all from the pile body when viewed in a plan view. A plurality of compensators having a flat mounting portion that squeezes out in the direction and has a flat surface on which the rail is mounted, which is perpendicular to the length direction of the pile body while it is fixed to the pile body.
Equipped with
The correction material is provided with a guided portion near the upper end of the pile body so that the correction material can be translated with respect to the pile body while being guided by the pile body.
The pile body has a cylindrical shape and has a cylindrical shape.
The guided portion in the correction material corresponds to the outer surface of the pile body and is guided to the outer surface of the pile body, or corresponds to the inner surface of the pile body and is guided to the inner surface of the pile body. It has a cylindrical shape with an outer surface.
By appropriately positioning the correction material fixed to the pile body with respect to the pile body in the length direction using the pile body and the guided portion, a plurality of riders on the straight line parallel to the straight line. The heights of the planes of the mounting parts mounted on all of the pile bodies are the same.
By mounting the rail on each of the planes of the plurality of mounting portions, the rail is supported from below by the plurality of pile bodies and the compensating material.
Rail structure.
前記取付部には、所定の部材が取付けられるようになっており、前記取付部には、前記所定の部材を介して、前記レールが取付けられるようになっている、
請求項記載のレール構造。
A predetermined member is attached to the attachment portion, and the rail is attached to the attachment portion via the predetermined member.
The rail structure according to claim 1 .
前記レールが乗る直線に平行な所定間隔の2本の直線上における、当該2本の直線に直交する所定間隔の複数の直線である直交線と前記2本の直線との交点に前記杭本体がそれぞれ打ち込まれているとともに、
前記杭本体のうち、複数の前記直交線のうちの同一のものに乗るようにして打たれた2本の杭を一組の杭本体とした場合に、当該一組の杭の前記取付部に、その上面が水平面となる平面を有する跨ぎ材の両端付近が固定されており、前記レールが、前記跨ぎ材の上面に固定されていることで、前記跨ぎ材を介して、前記杭本体に固定された前記取付部に固定されている、
請求項記載のレール構造。
The pile body is located at the intersection of the two straight lines, which are a plurality of straight lines at predetermined intervals orthogonal to the two straight lines, on the two straight lines parallel to the straight line on which the rail rides. As well as being driven in each
When two piles struck so as to ride on the same one of the plurality of orthogonal lines among the pile main bodies are used as a set of pile main bodies, the attachment portion of the set of piles is used. , Both ends of the straddle having a flat surface whose upper surface is a horizontal plane are fixed, and the rail is fixed to the upper surface of the straddle, so that the rail is fixed to the pile body via the straddle. It is fixed to the mounting part
The rail structure according to claim 1 .
前記跨ぎ材の前記平面に、互いに平行な2本のレールが固定されている、
請求項記載のレール構造。
Two rails parallel to each other are fixed to the plane of the straddle.
The rail structure according to claim 3 .
JP2018162014A 2018-08-30 2018-08-30 Pile, correction material Active JP7001271B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018162014A JP7001271B2 (en) 2018-08-30 2018-08-30 Pile, correction material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018162014A JP7001271B2 (en) 2018-08-30 2018-08-30 Pile, correction material

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP2017213842A Division JP6397110B1 (en) 2017-11-06 2017-11-06 Pile, correction material

Publications (2)

Publication Number Publication Date
JP2019085863A JP2019085863A (en) 2019-06-06
JP7001271B2 true JP7001271B2 (en) 2022-01-19

Family

ID=66764030

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018162014A Active JP7001271B2 (en) 2018-08-30 2018-08-30 Pile, correction material

Country Status (1)

Country Link
JP (1) JP7001271B2 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003193481A (en) 2001-12-28 2003-07-09 Daiwa House Ind Co Ltd Mounting structure of base plate to pile head
JP2005226309A (en) 2004-02-12 2005-08-25 Jfe Steel Kk Joining structure and joining method of superstructure and pile
JP2014025335A (en) 2012-03-15 2014-02-06 Nippon Chiko Co Ltd Metal fitting for frame foundation and construction method of frame beam material using metal fitting for frame foundation
JP2014148871A (en) 2013-02-04 2014-08-21 Nippon Steel & Sumikin Metal Products Co Ltd Support structure of stand
JP2016011528A (en) 2014-06-30 2016-01-21 利親 藤田 Foundation structure of light-weight construction and foundation pile used therefor
JP2016070047A (en) 2014-09-30 2016-05-09 株式会社内藤ハウス Junction structure between pile and building frame, and attachment

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4946963B1 (en) * 1969-02-18 1974-12-13

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003193481A (en) 2001-12-28 2003-07-09 Daiwa House Ind Co Ltd Mounting structure of base plate to pile head
JP2005226309A (en) 2004-02-12 2005-08-25 Jfe Steel Kk Joining structure and joining method of superstructure and pile
JP2014025335A (en) 2012-03-15 2014-02-06 Nippon Chiko Co Ltd Metal fitting for frame foundation and construction method of frame beam material using metal fitting for frame foundation
JP2014148871A (en) 2013-02-04 2014-08-21 Nippon Steel & Sumikin Metal Products Co Ltd Support structure of stand
JP2016011528A (en) 2014-06-30 2016-01-21 利親 藤田 Foundation structure of light-weight construction and foundation pile used therefor
JP2016070047A (en) 2014-09-30 2016-05-09 株式会社内藤ハウス Junction structure between pile and building frame, and attachment

Also Published As

Publication number Publication date
JP2019085863A (en) 2019-06-06

Similar Documents

Publication Publication Date Title
KR101014796B1 (en) Top-down construction method using ready-made concrete pillar member
KR101205783B1 (en) The complex execution method which dismantling work of existing underground structure and constructs of new building simultaneously
KR20160131410A (en) Temporary construction and originally construction the outer layer of a 2-layer wall type underground road building method
JP2012107479A (en) Method for constructing underground and aboveground structure
CN103696429A (en) Concrete support and fish-belly sill combined supporting system of special-shaped foundation pit and construction method
KR102392517B1 (en) Top-down method using by double beam system
JP6654428B2 (en) Building method using reverse construction method
JP3930954B2 (en) Construction method of structure
KR20130021952A (en) Underground structure having slab beam with enhanced bearing power against earth pressure and construction methods of the same
JP7001271B2 (en) Pile, correction material
KR20130087669A (en) Down-up method of underground structure
JP6058470B2 (en) Column base fixing structure for steel columns
JP6404508B1 (en) Rebuilding method
JP6397110B1 (en) Pile, correction material
KR200263526Y1 (en) Hanging semi down up system
JP6378414B1 (en) Cast-in-place pile method and building method
JP7050300B2 (en) Rebuilding method
JP6362863B2 (en) Forming method and structure of onboard platform pile
KR102108622B1 (en) Support structure of temporary strut for construction period reduction
KR101028695B1 (en) PC beam connection structure combined with steel frame or steel pipe column in underground reverse drilling method
JP3806069B2 (en) Seismic isolation method from the ground of existing buildings
JP4332651B2 (en) Foundation reinforcement device and foundation construction method
JP4286737B2 (en) Construction method of pier
JP2019085726A (en) Reconstruction method
KR102583537B1 (en) Top-down construction method for uneven-slope site

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20200826

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210511

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210708

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20211124

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20211217

R150 Certificate of patent or registration of utility model

Ref document number: 7001271

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250