JP7008580B2 - 発電計画策定装置 - Google Patents
発電計画策定装置 Download PDFInfo
- Publication number
- JP7008580B2 JP7008580B2 JP2018108616A JP2018108616A JP7008580B2 JP 7008580 B2 JP7008580 B2 JP 7008580B2 JP 2018108616 A JP2018108616 A JP 2018108616A JP 2018108616 A JP2018108616 A JP 2018108616A JP 7008580 B2 JP7008580 B2 JP 7008580B2
- Authority
- JP
- Japan
- Prior art keywords
- power generation
- operation plan
- pumped storage
- generation facility
- unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
図4を参照して、発電設備運用計画は、#1~#NのN台(N:2以上の任意の自然数)の発電機の時間帯毎の発電電力によって示される。当該N台の発電機には、揚水発電設備の発電機、及び、揚水発電設備以外の発電設備(火力発電設備等)の発電機の両方が含まれる。図4の例では、30分刻みの24区間のそれぞれについて、第i番目の発電機(i:1~Nの自然数)の発電電力P(i)1~P(i)24が策定される。尚、発電電力=0は、当該発電機の停止を意味する。
Claims (3)
- 送配電事業者による発電設備運用計画を策定する発電計画策定装置であって、
系統安定化のために予備的に必要とされる調整力必要量を算出する調整力必要量算出部と、
前記調整力必要量が確保されるように、揚水発電設備を含む発電設備に係る前記発電設備運用計画を策定する発電設備運用計画策定部と、
前記発電設備運用計画における前記揚水発電設備の運用計画の経済性を評価する揚水発電評価部と、
前記揚水発電評価部による評価結果に基づいて、前記発電設備運用計画の成否を判定する運用計画判定部と、
前記運用計画判定部によって否定された前記発電設備運用計画について前記揚水発電設備の運用計画を修正するための揚水発電設備運用計画修正部とを備え、
前記発電設備運用計画策定部は、発電事業者によって策定された発電設備運用計画に対して、需給バランス及び前記調整力必要量を確保するための修正を加えることによって、前記発電設備運用計画を策定し、
前記揚水発電設備の運用計画は、揚水発電に備えて水を汲み上げる揚水運転期間と、前記需給バランスを目的として揚水発電機を運転する第1の揚発運転期間と、前記調整力必要量を確保する目的で前記揚水発電機を運転する第2の揚発運転期間との時刻スケジュールを含み、
前記揚水発電評価部は、前記揚水運転期間における前記水を汲み上げる際の電力単価と、前記第1及び第2の揚発運転期間の各々における、前記揚水発電設備を用いないときの発電単価との比較に基づいて、前記揚水発電設備の運用計画の経済性を評価する、発電計画策定装置。 - 前記揚水発電評価部及び前記運用計画判定部は、前記揚水発電設備運用計画修正部によって前記揚水発電設備の運用計画が修正される毎に、修正された前記運用計画の経済性の評価及び前記修正された運用計画が反映された前記発電設備運用計画の成否を判定し、
前記運用計画判定部によって前記発電設備運用計画が肯定されるまで、前記揚水発電設備運用計画修正部は、前記揚水発電設備の運用計画を繰り返し修正する、請求項1記載の発電計画策定装置。 - 前記発電設備は、火力発電設備をさらに含み、
前記第1の揚発運転期間における前記発電単価は、前記揚水発電設備を使用せずに前記火力発電設備で発電した場合の運転費用を、前記揚水発電設備での計画発電電力量で除算することによって算出され、
前記第2の揚発運転期間における前記発電単価は、前記調整力必要量を確保するための前記火力発電設備の出力を変化させる運転での前記発電単価に従って算出される、請求項1又は2に記載の発電計画策定装置。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2018108616A JP7008580B2 (ja) | 2018-06-06 | 2018-06-06 | 発電計画策定装置 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2018108616A JP7008580B2 (ja) | 2018-06-06 | 2018-06-06 | 発電計画策定装置 |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| JP2019213374A JP2019213374A (ja) | 2019-12-12 |
| JP2019213374A5 JP2019213374A5 (ja) | 2021-01-21 |
| JP7008580B2 true JP7008580B2 (ja) | 2022-01-25 |
Family
ID=68844164
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2018108616A Active JP7008580B2 (ja) | 2018-06-06 | 2018-06-06 | 発電計画策定装置 |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP7008580B2 (ja) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112541673A (zh) * | 2020-12-08 | 2021-03-23 | 国家电网有限公司 | 抽水蓄能电站过渡过程性能评价方法及装置 |
| JP7021384B1 (ja) | 2021-05-07 | 2022-02-16 | 日鉄エンジニアリング株式会社 | 発電制御装置、発電制御方法及びプログラム |
| CN116805792B (zh) * | 2023-06-21 | 2024-06-11 | 国网湖南省电力有限公司 | 高比例新能源系统中火电-储能调节需求判定方法及系统 |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2005196300A (ja) | 2003-12-26 | 2005-07-21 | Toshiba Corp | 温室効果ガス排出量予測システム、プログラム |
| JP2007124765A (ja) | 2005-10-26 | 2007-05-17 | Tokyo Electric Power Co Inc:The | 発電に関する最経済算出装置及び方法並びにプログラム |
| JP2007228676A (ja) | 2006-02-22 | 2007-09-06 | Hitachi Ltd | 発電所運用計画作成装置およびその方法 |
| WO2011142296A1 (ja) | 2010-05-10 | 2011-11-17 | 三菱電機株式会社 | 発電計画作成装置 |
| US20120119579A1 (en) | 2010-11-17 | 2012-05-17 | Battelle Memorial Institute | Controller for hybrid energy storage |
| WO2017090519A1 (ja) | 2015-11-26 | 2017-06-01 | 日本電気株式会社 | 情報処理装置、情報処理方法、及び、記録媒体 |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4734059B2 (ja) * | 2005-08-04 | 2011-07-27 | 株式会社東芝 | 電力取引入札支援システムと方法、およびプログラム |
| JP5208388B2 (ja) * | 2006-08-23 | 2013-06-12 | 中国電力株式会社 | 電気料金契約・清算システム |
-
2018
- 2018-06-06 JP JP2018108616A patent/JP7008580B2/ja active Active
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2005196300A (ja) | 2003-12-26 | 2005-07-21 | Toshiba Corp | 温室効果ガス排出量予測システム、プログラム |
| JP2007124765A (ja) | 2005-10-26 | 2007-05-17 | Tokyo Electric Power Co Inc:The | 発電に関する最経済算出装置及び方法並びにプログラム |
| JP2007228676A (ja) | 2006-02-22 | 2007-09-06 | Hitachi Ltd | 発電所運用計画作成装置およびその方法 |
| WO2011142296A1 (ja) | 2010-05-10 | 2011-11-17 | 三菱電機株式会社 | 発電計画作成装置 |
| US20120119579A1 (en) | 2010-11-17 | 2012-05-17 | Battelle Memorial Institute | Controller for hybrid energy storage |
| WO2017090519A1 (ja) | 2015-11-26 | 2017-06-01 | 日本電気株式会社 | 情報処理装置、情報処理方法、及び、記録媒体 |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2019213374A (ja) | 2019-12-12 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Asimakopoulou et al. | Leader-follower strategies for energy management of multi-microgrids | |
| Ciornei et al. | A GA-API solution for the economic dispatch of generation in power system operation | |
| TWI222258B (en) | Power generator controller | |
| US10418822B2 (en) | Energy production and frequency regulation Co-optimization for power generation systems | |
| JP7048797B1 (ja) | 管理装置、管理方法、および管理プログラム | |
| JP7008580B2 (ja) | 発電計画策定装置 | |
| KR20110136803A (ko) | 분산 전력 생산 시스템 및 그 제어 방법 | |
| JP2009211185A (ja) | エネルギー貯蔵装置の運転計画作成方法および運転計画作成装置 | |
| JP6515640B2 (ja) | 潮流計算装置、潮流計算方法、及びプログラム | |
| Fan et al. | Flexibility management in economic dispatch with dynamic automatic generation control | |
| CN104901314B (zh) | 消费者设备运用管理系统及方法 | |
| JPWO2020004454A1 (ja) | エネルギーシステム最適化プログラム、エネルギーシステム最適化方法及びエネルギーシステム最適化装置 | |
| JP2019135901A (ja) | デマンドレスポンスシステム | |
| JP2017126183A (ja) | 電力取引支援装置、電力取引支援方法及びプログラム | |
| KR20200022255A (ko) | 에너지 발전량 및 입찰량을 기초로 에너지 저장 장치를 최적화하는 방법 및 장치 | |
| JP2020039222A (ja) | 電力需給制御装置、電力需給制御システムおよび電力需給制御方法 | |
| JP7463885B2 (ja) | エネルギーマネジメントシステム、エネルギー管理方法、及びプログラム | |
| Mujeeb et al. | Optimizing virtual power plant operations in energy and frequency regulation reserve markets: A Risk‐Averse Two‐Stage Scenario‐Oriented stochastic approach | |
| JPWO2016189756A1 (ja) | 発電制御装置、制御装置、制御方法及びプログラム | |
| CN108764543A (zh) | 一种电力调度方法及系统 | |
| Esmaeeli et al. | Determination of optimal reserve contribution of thermal units to afford the wind power uncertainty | |
| CN118679435A (zh) | 用于控制电解槽工厂的操作的方法 | |
| JP7069655B2 (ja) | アグリゲーション装置、電力需要制御方法、及び電力需要制御プログラム | |
| JP7808531B2 (ja) | 電力系統運用計画生成装置及び電力系統運用計画生成方法 | |
| JP6652481B2 (ja) | 運転計画作成装置、運転計画作成方法およびプログラム |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20201127 |
|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20201127 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20210922 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20211005 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20211130 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20211214 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20220111 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 7008580 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |