Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7015764B2 - Operation management system - Google Patents
[go: Go Back, main page]

JP7015764B2 - Operation management system - Google Patents

Operation management system Download PDF

Info

Publication number
JP7015764B2
JP7015764B2 JP2018163357A JP2018163357A JP7015764B2 JP 7015764 B2 JP7015764 B2 JP 7015764B2 JP 2018163357 A JP2018163357 A JP 2018163357A JP 2018163357 A JP2018163357 A JP 2018163357A JP 7015764 B2 JP7015764 B2 JP 7015764B2
Authority
JP
Japan
Prior art keywords
train
management device
timetable information
operation management
timetable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2018163357A
Other languages
Japanese (ja)
Other versions
JP2020032964A (en
Inventor
聡之 永井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP2018163357A priority Critical patent/JP7015764B2/en
Publication of JP2020032964A publication Critical patent/JP2020032964A/en
Application granted granted Critical
Publication of JP7015764B2 publication Critical patent/JP7015764B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Train Traffic Observation, Control, And Security (AREA)

Description

本発明は運行管理システムに関し、例えば第1の路線における列車の運行と第2の路線における列車の運行とを管理する運行管理システムに適用して好適なものである。 The present invention relates to an operation management system, and is suitable for application to, for example, an operation management system that manages a train operation on a first line and a train operation on a second line.

従来、運行管理システムにおいて、列車が接続駅で他路線との接続を行う場合、運行管理システムが各路線の接続列車の実施ダイヤ情報と実績ダイヤ情報とを入手し、到着予測時間から接続駅での他路線との接続の可否を判断し、トラブル、天候不良などの影響による列車遅延、ダイヤ変更などによる影響により、接続駅に予定通り到着しない場合でも、他路線との接続予定の列車に接続可能であるか否か判断できる(特許文献1、特許文献2参照)。 Conventionally, in the operation management system, when a train connects to another line at a connecting station, the operation management system obtains the implementation timetable information and the actual timetable information of the connecting train of each line, and at the connecting station from the estimated arrival time. Judges whether or not to connect to other lines, and connects to the train scheduled to be connected to other lines even if the train does not arrive at the connecting station as scheduled due to problems, train delays due to bad weather, etc. It can be determined whether or not it is possible (see Patent Document 1 and Patent Document 2).

特開2004-122900号公報Japanese Unexamined Patent Publication No. 2004-122900 特開2011-255766号公報Japanese Unexamined Patent Publication No. 2011-255766

特許文献1または特許文献2に記載の技術によれば、列車の接続において列車が遅延した場合、旅客は、乗り継ぎ予定列車への乗り継ぎが可能であるか否かを判断することができる。一方、指令員は、接続列車が被接続列車と接続不可能と判定された場合、状況に応じて、被接続列車の路線へのダイヤ変更要求とその変更を実行する必要があり、特許文献1または特許文献2に記載の技術では、被接続列車のダイヤに係る変更においてミスが生じてしまう問題がある。 According to the technique described in Patent Document 1 or Patent Document 2, when a train is delayed in connecting a train, the passenger can determine whether or not it is possible to transfer to the train to be connected. On the other hand, when it is determined that the connected train cannot be connected to the connected train, the commander needs to execute the timetable change request to the line of the connected train and the change depending on the situation. Alternatively, the technique described in Patent Document 2 has a problem that an error occurs in the change of the timetable of the connected train.

本発明は以上の点を考慮してなされたもので、列車の接続を適切に行うことができる運行管理システムを提案しようとするものである。 The present invention has been made in consideration of the above points, and an object of the present invention is to propose an operation management system capable of appropriately connecting trains.

かかる課題を解決するため本発明においては、第1の路線における列車の運行を管理する第1の運行管理装置と、第2の路線における列車の運行を管理する第2の運行管理装置とを含んで構成される運行管理システムであって、前記第1の路線の列車のダイヤ情報と前記第2の路線の列車のダイヤ情報とに基づいて、予定通りに到着しない路線の列車である接続列車と前記接続列車に接続される他の路線の列車である被接続列車とが所定の駅で接続可能であるか否かを判定する処理部を備え、前記処理部は、前記接続列車と前記被接続列車とが前記所定の駅で接続可能でないと判定した場合、前記所定の駅において前記被接続列車の停車時間と前記接続列車の停車時間とが所定の時間以上重なるように、前記被接続列車のダイヤ情報に基づいて変更ダイヤ情報を算出し、前記第1の運行管理装置および前記第2の運行管理装置のうち、前記被接続列車の運行を管理する運行管理装置にダイヤ変更問いかけ要求を送信し、前記運行管理装置は、ダイヤ変更問いかけ要求を受信すると、ユーザインターフェイス部を介して前記被接続列車のダイヤ情報を変更する承認が行われたか否かを判定し、承認が行われたと判定した場合、前記変更ダイヤ情報に従って前記被接続列車の運行を管理するようにした。 In order to solve such a problem, the present invention includes a first operation management device for managing the operation of trains on the first line and a second operation management device for managing the operation of trains on the second line. A connecting train that is a train on a line that does not arrive as scheduled based on the timetable information of the train on the first line and the timetable information of the train on the second line. A processing unit for determining whether or not a connected train, which is a train on another line connected to the connecting train, can be connected at a predetermined station, and the processing unit includes the connected train and the connected train. When it is determined that the train cannot be connected at the predetermined station, the connected train is connected so that the stop time of the connected train and the stop time of the connected train overlap at the predetermined station for a predetermined time or more. The change timetable information is calculated based on the timetable information, and a timetable change question request is transmitted to the operation management device that manages the operation of the connected train among the first operation management device and the second operation management device. When the operation management device receives the timetable change inquiry request, it determines whether or not the approval to change the timetable information of the connected train has been given via the user interface unit, and determines that the approval has been given. , The operation of the connected train is managed according to the change timetable information.

上記構成では、運行管理装置は、被接続列車のダイヤ情報を変更する承認が行われたか否かを判定し、承認が行われたと判定した場合、変更ダイヤ情報に従って被接続列車の運行を管理するので、例えば、スムーズかつ正確に列車の接続を行うことができるようになる。 In the above configuration, the operation management device determines whether or not the approval to change the timetable information of the connected train has been made, and if it is determined that the approval has been made, the operation management device manages the operation of the connected train according to the change timetable information. Therefore, for example, trains can be connected smoothly and accurately.

本発明によれば、信頼性の高い運行管理システムを実現することができる。 According to the present invention, a highly reliable operation management system can be realized.

第1の実施の形態による運行管理システムに係る構成の一例を示す図である。It is a figure which shows an example of the structure which concerns on the operation management system by 1st Embodiment. 第1の実施の形態による運行管理システムにおける路線のイメージ図である。It is an image diagram of the route in the operation management system according to the first embodiment. 第1の実施の形態による接続に係る処理の一例を示す図である。It is a figure which shows an example of the process which concerns on the connection by 1st Embodiment. 第2の実施の形態による運行管理システムに係る構成の一例を示す図である。It is a figure which shows an example of the structure which concerns on the operation management system by 2nd Embodiment. 第2の実施の形態による接続に係る処理の一例を示す図である。It is a figure which shows an example of the process which concerns on the connection by 2nd Embodiment. 第3の実施の形態による接続に係る処理の一例を示す図である。It is a figure which shows an example of the process which concerns on the connection by 3rd Embodiment. 第4の実施の形態による運行管理システムに係る構成の一例を示す図である。It is a figure which shows an example of the structure which concerns on the operation management system by 4th Embodiment.

以下図面について、本発明の一実施の形態を詳述する。 Hereinafter, one embodiment of the present invention will be described in detail with reference to the drawings.

(1)第1の実施の形態
図1において、100は全体として第1の実施の形態による運行管理システムを示す。運行管理システム100は、統合管理装置110、路線A運行管理装置120、および路線B運行管理装置130を含んで構成される。
(1) First Embodiment In FIG. 1, 100 indicates an operation management system according to the first embodiment as a whole. The operation management system 100 includes an integrated management device 110, a line A operation management device 120, and a line B operation management device 130.

統合管理装置110は、路線Aの列車と路線Bの列車との接続(所定の駅での乗り換え、所定の駅での乗り継ぎ等)を支援するための装置である。本実施の形態では、路線Aの列車と路線Bの列車とが所定の駅(例えば、後述の接続駅230)で接続が行われるケースにおいて、路線Aの列車が遅延した場合を例に挙げて説明する。なお、以下では、遅延している路線Aの列車を接続列車、接続列車に接続される路線Bの列車を被接続列車と適宜称する。また、所定の駅で接続する列車の組を接続列車ペアと適宜称する。 The integrated management device 110 is a device for supporting connection between a train on line A and a train on line B (transfer at a predetermined station, transfer at a predetermined station, etc.). In the present embodiment, in the case where the train of line A and the train of line B are connected at a predetermined station (for example, the connection station 230 described later), the case where the train of line A is delayed is taken as an example. explain. In the following, the delayed train on line A will be referred to as a connecting train, and the train on line B connected to the connecting train will be referred to as a connected train. Further, a set of trains connected at a predetermined station is appropriately referred to as a connecting train pair.

統合管理装置110は、サーバ装置などのコンピュータであり、処理部111、ダイヤ情報記憶部112、および通信制御部113を備える。 The integrated management device 110 is a computer such as a server device, and includes a processing unit 111, a timetable information storage unit 112, and a communication control unit 113.

より具体的には、統合管理装置110は、CPU(Central Processing Unit)と、RAM(Random Access Memory)、ROM(Read Only Memory)、HDD(Hard Disk Drive)等のメモリと、通信装置とを含んで構成される。 More specifically, the integrated management device 110 includes a CPU (Central Processing Unit), memories such as RAM (Random Access Memory), ROM (Read Only Memory), and HDD (Hard Disk Drive), and a communication device. Consists of.

統合管理装置110の機能(例えば、処理部111)は、例えば、CPUがROMに格納されたプログラムをRAMに読み出して実行すること(ソフトウェア)により実現されてもよいし、専用の回路などのハードウェアにより実現されてもよいし、ソフトウェアとハードウェアとが組み合わされて実現されてもよい。また、統合管理装置110の機能の一部は、統合管理装置110と通信可能な他のコンピュータにより実現されてもよい。 The function of the integrated management device 110 (for example, the processing unit 111) may be realized by, for example, the CPU reading the program stored in the ROM into the RAM and executing it (software), or hardware such as a dedicated circuit. It may be realized by wear, or it may be realized by combining software and hardware. Further, a part of the functions of the integrated management device 110 may be realized by another computer capable of communicating with the integrated management device 110.

処理部111は、例えば、路線A(第1の路線の一例)の列車のダイヤ情報と路線B(第2の路線の一例)の列車のダイヤ情報とに基づいて、列車の遅延、ダイヤ変更などによる影響により、予定通りに到着しない路線の列車である接続列車と接続列車に接続される他の路線の列車である被接続列車とが所定の駅で接続可能であるか否かを判定する。なお、処理部111の具体的な処理については、図3を用いて後述する。 The processing unit 111, for example, delays a train, changes a train schedule, or the like based on the train schedule information of line A (an example of a first line) and the train schedule information of a line B (an example of a second line). It is determined whether or not the connecting train, which is a train on a line that does not arrive as scheduled, and the connected train, which is a train on another line connected to the connecting train, can be connected at a predetermined station. The specific processing of the processing unit 111 will be described later with reference to FIG.

ダイヤ情報記憶部112は、例えば、路線A運行管理装置120から受信したダイヤ情報、路線B運行管理装置130から受信したダイヤ情報を記憶する。ここで、ダイヤ情報は、実施ダイヤ情報、運転整理ダイヤ情報、実績ダイヤ情報などである。実施ダイヤ情報は、基本計画を基に作成される日々の運行計画(運転計画)に係るダイヤ情報である。運転整理ダイヤ情報は、実施ダイヤ情報が運転整理により変更されたときのダイヤ情報である。実績ダイヤ情報は、列車の運行実績を示すダイヤ情報である。 The timetable information storage unit 112 stores, for example, the timetable information received from the line A operation management device 120 and the timetable information received from the line B operation management device 130. Here, the timetable information includes implementation timetable information, operation arrangement timetable information, actual timetable information, and the like. The implementation timetable information is the timetable information related to the daily operation plan (operation plan) created based on the basic plan. The operation arrangement timetable information is the timetable information when the implementation timetable information is changed by the operation arrangement. The actual timetable information is the timetable information indicating the operation record of the train.

通信制御部113は、例えば、NIC(Network Interface Card)から構成され、路線A運行管理装置120との通信時におけるプロトコル制御を行ったり、路線B運行管理装置130との通信時におけるプロトコル制御を行ったりする。 The communication control unit 113 is composed of, for example, a NIC (Network Interface Card) and performs protocol control during communication with the line A operation management device 120 and protocol control during communication with the line B operation management device 130. Or something.

路線A運行管理装置120は、路線Aの列車の運行を管理するための装置である。路線A運行管理装置120は、サーバ装置などのコンピュータであり、処理部121、ダイヤ情報記憶部122、通信制御部123、およびユーザインターフェイス部124を備える。 The line A operation management device 120 is a device for managing the operation of the train on the line A. The route A operation management device 120 is a computer such as a server device, and includes a processing unit 121, a timetable information storage unit 122, a communication control unit 123, and a user interface unit 124.

より具体的には、路線A運行管理装置120は、CPUと、RAM、ROM、HDD等のメモリと、通信装置と、マンマシンとを含んで構成される。なお、マンマシンは、人間と機器との間の伝達を行う装置であり、液晶ディスプレイ、ポインティングデバイス、ボタン、レバー、メーターなどである。 More specifically, the route A operation management device 120 includes a CPU, memories such as RAM, ROM, and HDD, a communication device, and a man machine. The man machine is a device that transmits between a human and a device, and is a liquid crystal display, a pointing device, a button, a lever, a meter, and the like.

路線A運行管理装置120の機能(例えば、処理部121)は、例えば、CPUがROMに格納されたプログラムをRAMに読み出して実行すること(ソフトウェア)により実現されてもよいし、専用の回路などのハードウェアにより実現されてもよいし、ソフトウェアとハードウェアとが組み合わされて実現されてもよい。また、路線A運行管理装置120の機能の一部は、路線A運行管理装置120と通信可能な他のコンピュータにより実現されてもよい。 The function of the route A operation management device 120 (for example, the processing unit 121) may be realized by, for example, the CPU reading the program stored in the ROM into the RAM (software), or a dedicated circuit or the like. It may be realized by the hardware of the above, or it may be realized by the combination of the software and the hardware. Further, a part of the functions of the route A operation management device 120 may be realized by another computer capable of communicating with the route A operation management device 120.

ダイヤ情報記憶部122は、例えば、路線Aの列車のダイヤ情報(接続列車の実施ダイヤ情報、接続列車の運転整理ダイヤ情報、接続列車の実績ダイヤ情報など)を記憶する。 The timetable information storage unit 122 stores, for example, timetable information of trains on route A (implementation timetable information of connected trains, operation arrangement timetable information of connected trains, actual timetable information of connected trains, etc.).

通信制御部123は、例えばNICから構成され、統合管理装置110との通信時におけるプロトコル制御を行う。 The communication control unit 123 is composed of, for example, a NIC, and performs protocol control during communication with the integrated management device 110.

例えば、処理部121は、ダイヤ情報記憶部122から接続列車の現在ダイヤ情報と実績ダイヤ情報とを読み出し、通信制御部123を介して統合管理装置110に送信する。なお、実施ダイヤ情報と運転整理ダイヤ情報との区別を要しないときは、現在ダイヤ情報と適宜称する。 For example, the processing unit 121 reads the current timetable information and the actual timetable information of the connected train from the timetable information storage unit 122, and transmits the current timetable information and the actual timetable information to the integrated management device 110 via the communication control unit 123. When it is not necessary to distinguish between the implementation timetable information and the operation arrangement timetable information, it is appropriately referred to as the current timetable information.

ユーザインターフェイス部124は、例えば、機械の状態(例えば、路線A運行管理装置120が処理した情報)を人間に理解させたり、人間(例えば、指令員)の要求を路線A運行管理装置120に伝達したりする。 The user interface unit 124, for example, makes a human understand the state of the machine (for example, information processed by the route A operation management device 120), or transmits a request of a human (for example, a commander) to the route A operation management device 120. To do.

路線B運行管理装置130は、路線Bの列車の運行を管理するための装置である。路線B運行管理装置130は、サーバ装置などのコンピュータであり、処理部131、ダイヤ情報記憶部132、通信制御部133、およびユーザインターフェイス部134を備える。 The line B operation management device 130 is a device for managing the operation of the train on the line B. The route B operation management device 130 is a computer such as a server device, and includes a processing unit 131, a timetable information storage unit 132, a communication control unit 133, and a user interface unit 134.

より具体的には、路線B運行管理装置130は、CPUと、RAM、ROM、HDD等のメモリと、通信装置と、マンマシンとを含んで構成される。 More specifically, the route B operation management device 130 includes a CPU, memories such as RAM, ROM, and HDD, a communication device, and a man machine.

路線B運行管理装置130の機能(例えば、処理部131)は、例えば、CPUがROMに格納されたプログラムをRAMに読み出して実行すること(ソフトウェア)により実現されてもよいし、専用の回路などのハードウェアにより実現されてもよいし、ソフトウェアとハードウェアとが組み合わされて実現されてもよい。また、路線B運行管理装置130の機能の一部は、路線B運行管理装置130と通信可能な他のコンピュータにより実現されてもよい。 The function of the route B operation management device 130 (for example, the processing unit 131) may be realized by, for example, the CPU reading the program stored in the ROM into the RAM (software), or a dedicated circuit or the like. It may be realized by the hardware of the above, or it may be realized by the combination of the software and the hardware. Further, a part of the function of the route B operation management device 130 may be realized by another computer capable of communicating with the route B operation management device 130.

ダイヤ情報記憶部132は、例えば、路線Bの列車のダイヤ情報(被接続列車の実施ダイヤ情報、被接続列車の運転整理ダイヤ情報、被接続列車の実績ダイヤ情報など)を記憶する。 The timetable information storage unit 132 stores, for example, timetable information of trains on route B (implementation timetable information of connected trains, operation arrangement timetable information of connected trains, actual timetable information of connected trains, etc.).

通信制御部133は、例えばNICから構成され、統合管理装置110との通信時におけるプロトコル制御を行う。 The communication control unit 133 is composed of, for example, a NIC, and performs protocol control during communication with the integrated management device 110.

例えば、処理部131は、ダイヤ情報記憶部132から被接続列車の現在ダイヤ情報と実績ダイヤ情報とを読み出し、通信制御部133を介して統合管理装置110に送信する。 For example, the processing unit 131 reads the current timetable information and the actual timetable information of the connected train from the timetable information storage unit 132, and transmits the current timetable information and the actual timetable information to the integrated management device 110 via the communication control unit 133.

ユーザインターフェイス部134は、例えば、機械の状態(例えば、路線B運行管理装置130が処理した情報)を人間に理解させたり、人間(例えば、指令員)の要求を路線B運行管理装置130に伝達したりする。 The user interface unit 134, for example, makes a human understand the state of the machine (for example, information processed by the route B operation management device 130), or transmits a request of a human (for example, a commander) to the route B operation management device 130. To do.

上述した構成において、統合管理装置110は、通信制御部113を介して、路線A運行管理装置120から、接続列車の現在ダイヤ情報および実績ダイヤ情報を受信すると、ダイヤ情報記憶部112に記憶する。また、統合管理装置110は、路線B運行管理装置130から被接続列車の現在ダイヤ情報および実績ダイヤ情報を受信すると、ダイヤ情報記憶部112に記憶する。 In the above-described configuration, when the integrated management device 110 receives the current timetable information and the actual timetable information of the connected train from the route A operation management device 120 via the communication control unit 113, the integrated management device 110 stores the current timetable information and the actual timetable information in the timetable information storage unit 112. Further, when the integrated management device 110 receives the current timetable information and the actual timetable information of the connected train from the line B operation management device 130, the integrated management device 110 stores them in the timetable information storage unit 112.

また、統合管理装置110は、路線Aの接続列車の現在ダイヤ情報および実績ダイヤ情報と、路線Bの被接続列車の現在ダイヤ情報および実績ダイヤ情報とに基づいて、被接続列車の変更ダイヤ情報(接続を実現するために現在ダイヤ情報を変更したダイヤ情報)を作成し、ダイヤ情報記憶部112に保存する。 Further, the integrated management device 110 is based on the current timetable information and the actual timetable information of the connected train of the line A and the current timetable information and the actual timetable information of the connected train of the line B, and the change timetable information of the connected train ( (Diamond information) whose current timetable information has been changed in order to realize the connection is created and stored in the timetable information storage unit 112.

また、統合管理装置110は、被接続列車の変更ダイヤ情報を作成すると、路線B運行管理装置130にダイヤ変更問いかけ要求を送信する。路線B運行管理装置130は、ダイヤ変更問いかけ要求を受信すると、ダイヤ変更問いかけ要求をユーザインターフェイス部134に通知し、ユーザインターフェイス部134を介してダイヤ変更が承認された場合、被接続列車の変更ダイヤ情報を取得し、路線Bのダイヤ情報記憶部132の被接続列車の現在ダイヤ情報を書き換える。 Further, when the integrated management device 110 creates the change timetable information of the connected train, the integrated management device 110 transmits a timetable change inquiry request to the route B operation management device 130. When the route B operation management device 130 receives the timetable change inquiry request, it notifies the user interface unit 134 of the timetable change inquiry request, and when the timetable change is approved via the user interface unit 134, the timetable change timetable of the connected train The information is acquired, and the current timetable information of the connected train of the timetable information storage unit 132 of the route B is rewritten.

なお、統合管理装置110は、路線A運行管理装置120と直接接続されていてもよいし、ネットワークを介して路線A運行管理装置120と接続されていてもよい。また、統合管理装置110は、路線B運行管理装置130と直接接続されていてもよいし、ネットワークを介して路線B運行管理装置130と接続されていてもよい。 The integrated management device 110 may be directly connected to the line A operation management device 120, or may be connected to the line A operation management device 120 via a network. Further, the integrated management device 110 may be directly connected to the line B operation management device 130, or may be connected to the line B operation management device 130 via a network.

図2は、運行管理システム100における路線のイメージ図である。図2では、例えば、路線A210の列車211の乗客と路線B220の列車221の乗客とは、接続駅230で相互に他の路線の列車に乗り換え可能(乗り継ぎ可能)であることが示されている。なお、本実施の形態は、図2に示す路線の形態に限られるものではない。 FIG. 2 is an image diagram of a route in the operation management system 100. In FIG. 2, for example, it is shown that passengers on train 211 on line A210 and passengers on train 221 on line B220 can mutually transfer (transfer) to trains on other lines at the connecting station 230. .. It should be noted that the present embodiment is not limited to the form of the route shown in FIG.

図3は、運行管理システム100の各装置(統合管理装置110、路線A運行管理装置120、路線B運行管理装置130)における動作(接続に係る処理)の一例を示す図である。 FIG. 3 is a diagram showing an example of operation (processing related to connection) in each device (integrated management device 110, line A operation management device 120, line B operation management device 130) of the operation management system 100.

路線A運行管理装置120は、路線Aに係る各列車のダイヤ情報(現在ダイヤ情報および実績ダイヤ情報)を統合管理装置110に所定のタイミングで(例えば、遅延を監視する駅に到着したときに、所定の位置に到達したときに、定期的に)送信する(ステップS301)。 The line A operation management device 120 transfers the timetable information (current timetable information and actual timetable information) of each train related to the line A to the integrated management device 110 at a predetermined timing (for example, when arriving at a station for monitoring delay). When it reaches a predetermined position, it is transmitted (regularly) (step S301).

路線B運行管理装置130は、路線Bに係る各列車のダイヤ情報(現在ダイヤ情報および実績ダイヤ情報)を統合管理装置110に所定のタイミングで(例えば、遅延を監視する駅に到着したときに、所定の位置に到達したときに、定期的に)送信する(ステップS302)。 The line B operation management device 130 transfers the timetable information (current timetable information and actual timetable information) of each train related to the line B to the integrated management device 110 at a predetermined timing (for example, when arriving at a station for monitoring delay). When it reaches a predetermined position, it is transmitted (regularly) (step S302).

統合管理装置110は、路線A運行管理装置120から受信した現在ダイヤ情報および実績ダイヤと、路線B運行管理装置130から受信した現在ダイヤ情報および実績ダイヤとに基づいて、接続列車ペアの遅延時間の算出を行う(ステップS303)。なお、接続列車ペアの情報については、統合管理装置110に予め記憶されていてもよいし、路線A運行管理装置120の実施ダイヤと路線B運行管理装置130の実施ダイヤとから求められてもよい。 The integrated management device 110 determines the delay time of the connected train pair based on the current timetable information and the actual timetable received from the line A operation management device 120 and the current timetable information and the actual timetable received from the line B operation management device 130. Calculation is performed (step S303). The information of the connected train pair may be stored in advance in the integrated management device 110, or may be obtained from the implementation timetable of the line A operation management device 120 and the implementation timetable of the line B operation management device 130. ..

例えば、統合管理装置110は、接続列車ペアである路線Aの列車211と路線Bの列車221とについて、路線A運行管理装置120の現在ダイヤ情報および実績ダイヤから路線Aの列車211の遅延時間を算出し、路線B運行管理装置130の現在ダイヤ情報および実績ダイヤから路線Bの列車221の遅延時間を算出する。なお、統合管理装置110は、実施ダイヤ情報と実績ダイヤとの差を遅延時間として算出してもよいし、運転整理ダイヤ情報と実績ダイヤとの差を遅延時間として算出してもよい。 For example, the integrated management device 110 determines the delay time of the train 211 of the line A from the current timetable information and the actual timetable of the line A operation management device 120 for the train 211 of the line A and the train 221 of the line B, which are the connecting train pairs. The delay time of the train 221 on the route B is calculated from the current timetable information and the actual timetable of the line B operation management device 130. The integrated management device 110 may calculate the difference between the implementation timetable information and the actual timetable as the delay time, or may calculate the difference between the operation arrangement timetable information and the actual timetable as the delay time.

続いて、統合管理装置110は、各遅延時間の差分が所定の時間(例えば、遅延が5分)以内であるか否かを判定する(ステップS304)。統合管理装置110は、所定の時間以内であると判定した場合、ステップS305に処理を移し、所定の時間を超えると判定した場合、接続に係る処理を終了する。かかる判定によれば、簡易的な計算により、遅延が大きいと判定した場合、接続に係る処理を迅速に終了することができるようになる。なお、本実施の形態は、上述の内容に限られるものではなく、ステップS304の判定を省略してもよい。 Subsequently, the integrated management device 110 determines whether or not the difference between the delay times is within a predetermined time (for example, the delay is 5 minutes) (step S304). If it is determined that the time is within the predetermined time, the integrated management device 110 shifts the process to step S305, and if it is determined that the time exceeds the predetermined time, the integrated management device 110 ends the process related to the connection. According to such a determination, when it is determined that the delay is large by a simple calculation, the process related to the connection can be terminated quickly. The present embodiment is not limited to the above-mentioned contents, and the determination in step S304 may be omitted.

また、本実施の形態は、上述の処理に限られるものではない。例えば、統合管理装置110は、ダイヤ情報に基づいて接続列車が終電列車であるか否かを判定し、終電電車であると判定した場合、各遅延時間の差分が、所定の時間よりも長い特定の時間(例えば、10分)を超えるとき、接続列車の接続を行わずに処理を終了し、特定の時間以内であるとき、ステップS305に処理を移すようにしてもよい。 Further, the present embodiment is not limited to the above-mentioned processing. For example, the integrated management device 110 determines whether or not the connecting train is the last train based on the timetable information, and when it is determined that the connecting train is the last train, the difference between the delay times is longer than the predetermined time. When the time (for example, 10 minutes) is exceeded, the process may be terminated without connecting the connecting train, and when the time is within a specific time, the process may be transferred to step S305.

ステップS305では、統合管理装置110は、接続列車ペアの各列車の到着予測時間および出発予測時間を算出する。例えば、統合管理装置110は、現在ダイヤ情報と遅延時間とに基づいて到着予測時間を算出し、現在ダイヤ情報(停車時間)と到着予測時間とに基づいて出発予測時間を算出する。 In step S305, the integrated management device 110 calculates the estimated arrival time and the estimated departure time of each train of the connecting train pair. For example, the integrated management device 110 calculates the arrival prediction time based on the current timetable information and the delay time, and calculates the departure prediction time based on the current timetable information (stop time) and the arrival prediction time.

続いて、統合管理装置110は、接続列車ペアの到着予測時間と出発予測時間とに基づいて、接続可能であるか否かを判定する(ステップS306)。統合管理装置110は、接続可能であると判定した場合、接続に係る処理を終了し、接続可能でないと判定した場合、ステップS307に処理を移す。例えば、統合管理装置110は、接続駅230への列車211(接続列車)の到着予測時間から列車221(被接続列車)の出発予測時間の範囲が所定の時間(例えば、2分)以上重なる場合、接続可能であると判定する。 Subsequently, the integrated management device 110 determines whether or not the connection is possible based on the predicted arrival time and the predicted departure time of the connected train pair (step S306). When the integrated management device 110 determines that the connection is possible, the process related to the connection is terminated, and when it is determined that the connection is not possible, the integrated management device 110 shifts the process to step S307. For example, in the integrated management device 110, when the range of the estimated departure time of the train 221 (connected train) from the estimated arrival time of the train 211 (connecting train) to the connecting station 230 overlaps with a predetermined time (for example, 2 minutes) or more. , Judge that connection is possible.

また、本実施の形態は、上述の処理に限られるものではない。例えば、統合管理装置110は、ダイヤ情報に基づいて接続列車が終電列車であるか否かを判定し、終電電車であると判定した場合、接続列車の到着予測時間から被接続列車の出発予測時間の範囲が、所定の時間よりも長い特定の時間(例えば、5分)以上重なるとき、接続可能であると判定するようにしてもよい。 Further, the present embodiment is not limited to the above-mentioned processing. For example, the integrated management device 110 determines whether or not the connecting train is the last train based on the timetable information, and if it is determined to be the last train, the estimated departure time of the connected train is determined from the estimated arrival time of the connecting train. When the ranges of are overlapped for a specific time (for example, 5 minutes) longer than a predetermined time, it may be determined that the connection is possible.

続いて、統合管理装置110は、接続列車の到着予測時間および出発予測時間と被接続列車の現在ダイヤ情報および実績ダイヤ情報とに基づいて、被接続列車の変更ダイヤ情報を算出する(ステップS307)。例えば、統合管理装置110は、列車211(接続列車)の接続駅230での停車時間と列車221(被接続列車)の接続駅230での停車時間とが所定の時間(例えば、2分)以上重なるように、被接続列車の変更ダイヤ情報を生成する。 Subsequently, the integrated management device 110 calculates the change timetable information of the connected train based on the arrival prediction time and the departure prediction time of the connected train and the current timetable information and the actual timetable information of the connected train (step S307). .. For example, in the integrated management device 110, the stop time of the train 211 (connecting train) at the connecting station 230 and the stop time of the train 221 (connected train) at the connecting station 230 are a predetermined time (for example, 2 minutes) or more. Generate change timetable information for connected trains so that they overlap.

続いて、統合管理装置110は、ダイヤ変更問いかけ要求を路線B運行管理装置130に送信する(ステップS308)。 Subsequently, the integrated management device 110 transmits a timetable change inquiry request to the route B operation management device 130 (step S308).

路線B運行管理装置130は、ダイヤ変更問いかけ処理を行う(ステップS309)。ダイヤ変更問いかけ処理では、例えば、路線B運行管理装置130は、マンマシンに問いかけを上げる(ユーザインターフェイス部134を介してダイヤ変更の承認を受け付ける)。 The route B operation management device 130 performs a timetable change inquiry process (step S309). In the timetable change inquiry process, for example, the route B operation management device 130 asks the man machine (accepts approval of the timetable change via the user interface unit 134).

なお、本実施の形態は、上述の処理に限られるものではない。例えば、統合管理装置110は、ステップS308の処理を行ってから、ステップS307の処理を行ってもよい。かかる処理によれば、例えば、ダイヤ変更問いかけ処理が行われている間に、変更ダイヤ情報を生成できるので、処理時間を短縮できるようになる。 The present embodiment is not limited to the above-mentioned processing. For example, the integrated management device 110 may perform the process of step S308 and then the process of step S307. According to such a process, for example, the change timetable information can be generated while the timetable change inquiry process is being performed, so that the processing time can be shortened.

路線B運行管理装置130は、ダイヤ変更が承認されたか否かを判定する(ステップS310)。路線B運行管理装置130は、承認されたと判定した場合、ステップS311に処理を移し、承認されなかったと判定した場合、接続に係る処理を終了する。 The route B operation management device 130 determines whether or not the timetable change is approved (step S310). If it is determined that the route B operation management device 130 is approved, the process is transferred to step S311. If it is determined that the route B operation management device 130 is not approved, the process related to the connection is terminated.

ステップS311では、路線B運行管理装置130は、統合管理装置110から変更ダイヤ情報を取得する。 In step S311, the route B operation management device 130 acquires the change timetable information from the integrated management device 110.

続いて、路線B運行管理装置130は、被接続列車のダイヤ変更処理を行い(ステップS312)、接続に係る処理を終了する。ダイヤ変更処理では、例えば、路線B運行管理装置130は、列車221(被接続列車)の現在ダイヤ情報を変更ダイヤ情報で更新し、変更ダイヤ情報に従って列車221の運行を管理する。 Subsequently, the route B operation management device 130 performs a timetable change process of the connected train (step S312), and ends the process related to the connection. In the timetable change process, for example, the line B operation management device 130 updates the current timetable information of the train 221 (connected train) with the change timetable information, and manages the operation of the train 221 according to the change timetable information.

このように、処理部111は、接続列車と被接続列車とが所定の駅で接続可能でないと判定した場合、所定の駅において被接続列車の停車時間と接続列車の停車時間とが所定の時間以上重なるように、被接続列車のダイヤ情報に基づいて変更ダイヤ情報を算出する。また、処理部111は、路線A運行管理装置120(第1の運行管理装置の一例)および路線B運行管理装置130(第2の運行管理装置の一例)のうち、被接続列車の運行を管理する運行管理装置にダイヤ変更問いかけ要求を送信する。当該運行管理装置は、ダイヤ変更問いかけ要求を受信すると、ユーザインターフェイス部(ユーザインターフェイス部124、ユーザインターフェイス部134等)を介して被接続列車のダイヤ情報を変更する承認が行われたか否かを判定し、承認が行われたと判定した場合、変更ダイヤ情報に従って被接続列車の運行を管理する。 In this way, when the processing unit 111 determines that the connected train and the connected train cannot be connected at a predetermined station, the stop time of the connected train and the stop time of the connected train are a predetermined time at the predetermined station. The changed timetable information is calculated based on the timetable information of the connected train so as to overlap the above. Further, the processing unit 111 manages the operation of the connected train among the line A operation management device 120 (an example of the first operation management device) and the line B operation management device 130 (an example of the second operation management device). Send a timetable change question request to the operation management device. Upon receiving the timetable change inquiry request, the operation management device determines whether or not approval has been given to change the timetable information of the connected train via the user interface unit (user interface unit 124, user interface unit 134, etc.). If it is determined that the approval has been given, the operation of the connected train will be managed according to the change timetable information.

本実施の形態によれば、接続列車ペアについて接続可能であるか否かが自動で判定され、承認の問いかけが自動で行われ、承認が行われたときは、変更ダイヤ情報に従って被接続列車の運行が管理されるので、スムーズかつ正確に列車の接続を行うことができるようになる。 According to this embodiment, it is automatically determined whether or not the connected train pair can be connected, the approval question is automatically asked, and when the approval is made, the connected train is in accordance with the change timetable information. Since the operation is managed, trains can be connected smoothly and accurately.

また、承認の問いかけまでの処理時間を短縮することで、承認の判断を遅らすことができるようになるので、承認後にダイヤ変更が更に発生してしまう事態を回避できるようになる。 In addition, by shortening the processing time until the approval request is made, the approval decision can be delayed, so that it is possible to avoid the situation where the timetable is further changed after the approval.

(2)第2の実施の形態
本実施の形態は、第1の実施の形態とは、統合管理装置110が設けられていない点が主に異なる。本実施の形態では、統合管理装置110の機能を所定の路線の運行管理装置が備える。
(2) Second Embodiment This embodiment is mainly different from the first embodiment in that the integrated management device 110 is not provided. In the present embodiment, the operation management device of a predetermined line is provided with the function of the integrated management device 110.

図4は、運行管理システム400に係る構成の一例を示す図である。運行管理システム400は、路線A運行管理装置410および路線B運行管理装置420を含んで構成される。以下では、統合管理装置110で行われる処理を路線A運行管理装置410で行う場合について説明する。なお、路線A運行管理装置410の構成(処理部411、ダイヤ情報記憶部412、通信制御部413、ユーザインターフェイス部414)は、基本的に、路線A運行管理装置120の構成(処理部121、ダイヤ情報記憶部122、通信制御部123、ユーザインターフェイス部124)と同様であるので、その説明については省略する。また、路線B運行管理装置420の構成(処理部421、ダイヤ情報記憶部422、通信制御部423、ユーザインターフェイス部424)は、基本的に、路線B運行管理装置130の構成(処理部131、ダイヤ情報記憶部132、通信制御部133、ユーザインターフェイス部134)と同様であるので、その説明については省略する。 FIG. 4 is a diagram showing an example of the configuration related to the operation management system 400. The operation management system 400 includes a line A operation management device 410 and a line B operation management device 420. Hereinafter, a case where the processing performed by the integrated management device 110 is performed by the route A operation management device 410 will be described. The configuration of the route A operation management device 410 (processing unit 411, timetable information storage unit 412, communication control unit 413, user interface unit 414) is basically the configuration of the route A operation management device 120 (processing unit 121, Since it is the same as the timetable information storage unit 122, the communication control unit 123, and the user interface unit 124), the description thereof will be omitted. Further, the configuration of the route B operation management device 420 (processing unit 421, timetable information storage unit 422, communication control unit 423, user interface unit 424) is basically the configuration of the route B operation management device 130 (processing unit 131, Since it is the same as the timetable information storage unit 132, the communication control unit 133, and the user interface unit 134), the description thereof will be omitted.

図5は、運行管理システム400の各装置(路線A運行管理装置410、路線B運行管理装置420)における動作(接続に係る処理)の一例を示す図である。 FIG. 5 is a diagram showing an example of operation (processing related to connection) in each device (route A operation management device 410, route B operation management device 420) of the operation management system 400.

路線B運行管理装置420は、ダイヤ情報を路線A運行管理装置410に所定のタイミングで送信する(ステップS501)。 The route B operation management device 420 transmits the timetable information to the route A operation management device 410 at a predetermined timing (step S501).

続いて、路線A運行管理装置410は、ステップS502~ステップS507の処理を行う。ステップS502~ステップS507の処理は、ステップS303~ステップS308の処理と同様であるので、その説明を省略する。 Subsequently, the route A operation management device 410 performs the processes of steps S502 to S507. Since the processing of steps S502 to S507 is the same as the processing of steps S303 to S308, the description thereof will be omitted.

続いて、路線B運行管理装置420は、ステップS508~ステップS511の処理を行う。ステップS508~ステップS511の処理は、ステップS309~ステップS312の処理と同様であるので、その説明を省略する。 Subsequently, the route B operation management device 420 performs the processes of steps S508 to S511. Since the processing of steps S508 to S511 is the same as the processing of steps S309 to S312, the description thereof will be omitted.

本実施の形態によれば、路線A運行管理装置410または路線B運行管理装置420において、接続列車ペアについて接続可能であるか否かが自動で判定され、承認の問いかけが自動で行われ、承認が行われたときは、変更ダイヤ情報に従って被接続列車の運行が管理されるので、統合管理装置110を新たに設けることなく、スムーズかつ正確に列車の接続を行うことができるようになる。 According to the present embodiment, the line A operation management device 410 or the line B operation management device 420 automatically determines whether or not the connected train pair can be connected, and automatically asks for approval and approves. When the above is performed, the operation of the connected train is managed according to the change timetable information, so that the train can be connected smoothly and accurately without newly installing the integrated management device 110.

(3)第3の実施の形態
本実施の形態は、第1の実施の形態とは、列車に遅延が生じたこと、またはダイヤ変更が行われたことなどにより、予定通りに列車が到着しないことを契機として、接続に係る処理が行われる点が主に異なる。本実施の形態では、第1の実施の形態と同じ構成については、同じ符号を用いて、その説明を適宜省略する。以下では、路線Aの列車に遅延が発生したケースを例に挙げて説明する。
(3) Third embodiment The present embodiment is different from the first embodiment in that the train does not arrive as scheduled due to a delay in the train or a change in the timetable. The main difference is that the processing related to the connection is performed with this as an opportunity. In the present embodiment, the same reference numerals are used for the same configurations as those in the first embodiment, and the description thereof will be omitted as appropriate. In the following, a case where a delay occurs in the train on Route A will be described as an example.

図6は、接続に係る処理の一例を示す図である。 FIG. 6 is a diagram showing an example of processing related to connection.

路線A運行管理装置120は、予定通りに列車が到着しないと判定した場合(例えば、実施ダイヤ情報と実績ダイヤ情報とに基づいて、当該列車の遅延時間が所定の時間を超えると判定した場合)、路線Aの列車(接続列車)のダイヤ情報を統合管理装置110に送信する(ステップS601)。 When the route A operation management device 120 determines that the train does not arrive as scheduled (for example, when it is determined that the delay time of the train exceeds a predetermined time based on the implementation timetable information and the actual timetable information). , The timetable information of the train (connecting train) of the line A is transmitted to the integrated management device 110 (step S601).

統合管理装置110は、路線Bの列車のダイヤ情報と接続列車のダイヤ情報とに基づいて、接続列車に対応する被接続列車を抽出する(ステップS602)。例えば、統合管理装置110は、路線Bの列車の実施ダイヤ情報と接続列車の実施ダイヤ情報とに基づいて、接続列車に対応する被接続列車を抽出(特定)する。なお、統合管理装置110は、例えば、夜間のバッチ処理により、路線Aの列車の実施ダイヤ情報と路線Bの列車の実施ダイヤ情報とを事前に記憶する。 The integrated management device 110 extracts the connected train corresponding to the connecting train based on the timetable information of the train on the route B and the timetable information of the connecting train (step S602). For example, the integrated management device 110 extracts (identifies) the connected train corresponding to the connecting train based on the implementation timetable information of the train on the route B and the execution timetable information of the connecting train. The integrated management device 110 stores, for example, the implementation schedule information of the train on the route A and the implementation schedule information of the train on the route B in advance by batch processing at night.

統合管理装置110は、被接続列車のダイヤ情報要求を路線B運行管理装置130に送信する(ステップS603)。 The integrated management device 110 transmits the timetable information request of the connected train to the route B operation management device 130 (step S603).

路線B運行管理装置130は、被接続列車のダイヤ情報を統合管理装置110に送信する(ステップS604)。 The route B operation management device 130 transmits the timetable information of the connected train to the integrated management device 110 (step S604).

以降、ステップS303~ステップS312の処理が行われるが、第1の実施の形態で説明した処理と同じであるので、その説明を省略する。 Hereinafter, the processes of steps S303 to S312 are performed, but since the processes are the same as those described in the first embodiment, the description thereof will be omitted.

このように、運行管理システム100は、路線A(第1の線区)の列車を制御する路線A運行管理装置120と、路線B(第2の線区)の列車を制御する路線B運行管理装置130と、路線A運行管理装置120および路線B運行管理装置130のダイヤ情報を参照する統合管理装置110とを備える。統合管理装置110は、路線Aおよび路線Bの列車の運行計画である路線Aのダイヤ情報(第1のダイヤ情報の一例)および路線Bのダイヤ情報(第2のダイヤ情報の一例)を記憶する。また、統合管理装置110は、路線Aのダイヤ情報および路線Bのダイヤ情報を参照し、路線Aおよび路線Bの間で接続が可能な駅である接続駅において、路線Bの列車であって路線Aの列車が接続できる列車である被接続列車を抽出する。また、統合管理装置110は、路線Aの列車の接続駅への到着予測時間と被接続列車の接続駅からの出発予測時間とを既定の時間内にする路線Bのダイヤ情報である変更ダイヤ情報を生成し、生成した変更ダイヤ情報を路線B運行管理装置130に送信する。路線B運行管理装置130は、変更ダイヤ情報に従って列車を運行することを認めるか否かを判断し、その判断の結果、変更ダイヤ情報に従って列車を運行することを認めた場合、路線Bの列車のダイヤ情報を変更ダイヤ情報に従って変更する。 As described above, the operation management system 100 controls the line A operation management device 120 for controlling the train on the line A (first line section) and the line B operation management for controlling the train on the line B (second line section). The device 130 is provided with an integrated management device 110 that refers to the timetable information of the line A operation management device 120 and the line B operation management device 130. The integrated management device 110 stores the timetable information of line A (an example of the first timetable information) and the timetable information of the line B (an example of the second timetable information), which is the operation plan of the trains of the line A and the line B. .. Further, the integrated management device 110 refers to the timetable information of the line A and the timetable information of the line B, and is a train of the line B at the connecting station which is a station capable of connecting between the line A and the line B. The connected trains that the train A can connect to are extracted. Further, the integrated management device 110 is a change timetable information which is the timetable information of the line B in which the estimated arrival time of the train of the line A to the connecting station and the estimated departure time of the connected train from the connecting station are set within a predetermined time. Is generated, and the generated change timetable information is transmitted to the route B operation management device 130. The line B operation management device 130 determines whether or not to allow the train to operate according to the changed timetable information, and as a result of the determination, if it is approved to operate the train according to the changed timetable information, the train of the line B Change the timetable information Change the timetable information according to the timetable information.

本実施の形態によれば、各路線の列車の運行を常に監視することなく、接続に係る処理が行われるので、装置間の通信を抑えつつ、スムーズかつ正確に列車の接続を行うことができるようになる。 According to the present embodiment, since the processing related to the connection is performed without constantly monitoring the operation of the train on each line, it is possible to connect the train smoothly and accurately while suppressing the communication between the devices. It will be like.

(4)第4の実施の形態
本実施の形態は、第1の実施の形態とは、列車の接続(ダイヤ変更)が行われることが駅で放送(報知)される点が主に異なる。なお、第1の実施の形態と同じ構成については、同じ符号を用いて、その説明を適宜省略する。
(4) Fourth Embodiment This embodiment is mainly different from the first embodiment in that the train connection (timetable change) is broadcast (notified) at the station. Regarding the same configuration as that of the first embodiment, the same reference numerals are used and the description thereof will be omitted as appropriate.

図7は、運行管理システム100に係る構成の一例を示す図である。運行管理システム100は、旅客案内装置710と通信可能に接続される。旅客案内装置710は、運行管理システム100に係る路線に設けられる各駅720における放送を制御可能に構成される。 FIG. 7 is a diagram showing an example of the configuration related to the operation management system 100. The operation management system 100 is communicably connected to the passenger information system 710. The passenger guidance device 710 is configured to be able to control the broadcasting at each station 720 provided on the line related to the operation management system 100.

図7の(A)は、ダイヤ変更が承認されたときのダイヤ情報の一例を示す図である。被接続列車の現在ダイヤ731が変更された変更ダイヤ732と接続列車の現在ダイヤ733とが所定の時間以上重なること(接続可能であること)が示されている。 FIG. 7A is a diagram showing an example of timetable information when the timetable change is approved. It is shown that the changed timetable 732 in which the current timetable 731 of the connected train is changed and the current timetable 733 of the connected train overlap (can be connected) for a predetermined time or more.

図7の(B)は、ダイヤ変更が承認されなかったときのダイヤ情報の一例を示す図である。被接続列車の現在ダイヤ734が変更ダイヤ735に更新されず、現在ダイヤ734と接続列車の現在ダイヤ736とが所定の時間以上重なならないこと(接続可能でないこと)が示されている。 FIG. 7B is a diagram showing an example of timetable information when the timetable change is not approved. The current timetable 734 of the connected train is not updated to the changed timetable 735, indicating that the current timetable 734 and the current timetable 736 of the connecting train do not overlap (not connectable) for more than a predetermined time.

本実施の形態では、路線B運行管理装置130は、ステップS310において、承認されたと判定した場合、接続が行われる旨の案内放送要求を旅客案内装置710に送信し、ステップS311に処理を移す。旅客案内装置710は、接続が行われる旨の案内放送要求を受信すると、接続が行われる旨を放送する指示を各駅720に送信する。各駅720では、接続が行われる旨が放送される。また、路線B運行管理装置130は、承認されなかったと判定した場合、接続が行われない旨の案内放送要求を旅客案内装置710に送信し、接続に係る処理を終了する。旅客案内装置710は、接続が行われない旨の案内放送要求を受信すると、接続が行われない旨を放送する指示を各駅720に送信する。各駅720では、接続が行われない旨が放送される。なお、上述の処理については、路線B運行管理装置130に替えて統合管理装置110が行うようにしてもよい。 In the present embodiment, if it is determined in step S310 that the route B operation management device 130 is approved, the route B operation management device 130 transmits a guidance broadcast request to the effect that the connection is made to the passenger guidance device 710, and shifts the process to step S311. Upon receiving the guidance broadcast request indicating that the connection is to be made, the passenger guidance device 710 transmits an instruction to broadcast the connection to each station 720. At each station 720, it is broadcast that the connection will be made. If it is determined that the route B operation management device 130 has not been approved, the route B operation management device 130 transmits a guidance broadcast request to the effect that the connection is not made to the passenger guidance device 710, and ends the processing related to the connection. When the passenger guidance device 710 receives the guidance broadcast request that the connection is not made, it transmits an instruction to broadcast that the connection is not made to each station 720. At each station 720, it is broadcast that the connection will not be made. The above-mentioned processing may be performed by the integrated management device 110 instead of the route B operation management device 130.

本実施の形態によれば、列車の接続が行われる旨の放送または列車の接続が行われない旨の放送が各駅720で行われるので、旅客は、列車の接続が行われるか否かを即座に判断することができようなる。例えば、旅客は、列車の接続が行われない旨の放送を受けた場合、経路を変更して目的の駅まで移動できるかを検討できるようになる。 According to this embodiment, since the broadcast to the effect that the train is connected or the broadcast to the effect that the train is not connected is performed at each station 720, the passenger immediately determines whether or not the train is connected. You will be able to judge. For example, when a passenger receives a broadcast that a train is not connected, he / she will be able to change the route and consider whether he / she can move to the target station.

(5)他の実施の形態
なお上述の実施の形態においては、本発明を運行管理システムに適用するようにした場合について述べたが、本発明はこれに限らず、この他種々のシステム、装置、方法、プログラムに広く適用することができる。
(5) Other Embodiments In the above-described embodiment, the case where the present invention is applied to an operation management system has been described, but the present invention is not limited to this, and various other systems and devices are described. , Methods, can be widely applied to programs.

また上述の実施の形態においては、ステップS308では、統合管理装置110は、ダイヤ変更問いかけ要求を路線B運行管理装置130に送信する場合について述べたが、本発明はこれに限らず、ステップS308では、統合管理装置110は、ダイヤ変更問いかけ要求に替えて、ステップS307で算出した変更ダイヤ情報を路線B運行管理装置130に送信するようにしてもよい(変更ダイヤ情報がダイヤ変更問いかけ要求を兼ねてもよい。)。また、例えば、ステップS308では、統合管理装置110は、ステップS307で算出した変更ダイヤ情報とダイヤ変更問いかけ要求とを路線B運行管理装置130に送信するようにしてもよい。また、例えば、ステップS308では、統合管理装置110は、ステップS303で算出した遅延時間とダイヤ変更問いかけ要求とを路線B運行管理装置130に送信するようにしてもよい。また、例えば、ステップS308では、統合管理装置110は、ステップS305で算出した到着予測時間および出発予測時間とダイヤ変更問いかけ要求とを路線B運行管理装置130に送信するようにしてもよい。かかる情報を路線B運行管理装置130に送信することで、指令員は、状況を正確かつ迅速に把握して承認することができるようになる。 Further, in the above-described embodiment, in step S308, the case where the integrated management device 110 transmits the timetable change inquiry request to the route B operation management device 130 has been described, but the present invention is not limited to this, and in step S308, the present invention is not limited to this. , The integrated management device 110 may transmit the change timetable information calculated in step S307 to the route B operation management device 130 instead of the timetable change question request (the change timetable information also serves as a timetable change question request). It is also good.). Further, for example, in step S308, the integrated management device 110 may transmit the change timetable information calculated in step S307 and the timetable change inquiry request to the route B operation management device 130. Further, for example, in step S308, the integrated management device 110 may transmit the delay time calculated in step S303 and the timetable change inquiry request to the route B operation management device 130. Further, for example, in step S308, the integrated management device 110 may transmit the arrival prediction time and the departure prediction time calculated in step S305 and the timetable change inquiry request to the route B operation management device 130. By transmitting such information to the route B operation management device 130, the commander can accurately and quickly grasp and approve the situation.

また上述の実施の形態においては、統合管理装置110で行っていた処理を路線A運行管理装置410で行う場合について述べたが、本発明はこれに限らず、統合管理装置110で行っていた処理を路線B運行管理装置420で行うようにしてもよい。 Further, in the above-described embodiment, the case where the processing performed by the integrated management device 110 is performed by the route A operation management device 410 has been described, but the present invention is not limited to this, and the processing performed by the integrated management device 110 is not limited to this. May be performed by the route B operation management device 420.

また、上記の説明において各機能を実現するプログラム、テーブル、ファイル等の情報は、メモリや、ハードディスク、SSD(Solid State Drive)等の記憶装置、または、ICカード、SDカード、DVD等の記録媒体に置くことができる。 In addition, the information such as programs, tables, and files that realize each function in the above description is a memory, a hard disk, a storage device such as an SSD (Solid State Drive), or a recording medium such as an IC card, an SD card, or a DVD. Can be placed in.

また上述した構成については、本発明の要旨を超えない範囲において、適宜に、変更したり、組み替えたり、組み合わせたり、省略したりしてもよい。 Further, the above-mentioned configuration may be appropriately changed, rearranged, combined, or omitted as long as it does not exceed the gist of the present invention.

上述した構成によれば、信頼性の高い運行管理システムを実現することができる。 According to the above-mentioned configuration, a highly reliable operation management system can be realized.

100……運行管理システム、110……統合管理装置、120……路線A運行管理装置、130……路線B運行管理装置。 100 ... Operation management system, 110 ... Integrated management device, 120 ... Route A operation management device, 130 ... Route B operation management device.

Claims (3)

第1の路線における列車の運行を管理する第1の運行管理装置および第2の路線における列車の運行を管理する第2の運行管理装置と通信可能に接続され、前記第1の路線における列車の実施ダイヤ情報と前記第2の路線における列車の実施ダイヤ情報とを記憶する統合管理装置を備え、
前記第1の運行管理装置は、現在ダイヤ情報と実績ダイヤ情報とに基づいて遅延時間が所定の時間を超えた列車である接続列車があると判定した場合、前記接続列車の現在ダイヤ情報および実績ダイヤ情報を前記統合管理装置に送信し、
前記統合管理装置は、前記接続列車の実施ダイヤ情報と前記第2の路線の実施ダイヤ情報とに基づいて、前記接続列車に対応する被接続列車を特定し、特定した被接続列車の現在ダイヤ情報および実績ダイヤ情報を前記第2の運行管理装置に要求し、
前記第2の運行管理装置は、前記被接続列車の現在ダイヤ情報および実績ダイヤ情報を前記統合管理装置に送信し、
前記統合管理装置は、前記接続列車の現在ダイヤ情報および実績ダイヤ情報と前記被接続列車の現在ダイヤ情報および実績ダイヤ情報とに基づいて、前記接続列車と前記被接続列車とが所定の駅で接続可能でないと判定した場合、前記所定の駅において前記被接続列車の停車時間と前記接続列車の停車時間とが所定の時間以上重なるように、前記被接続列車の変更ダイヤ情報を算出し、前記第2の運行管理装置にダイヤ変更問いかけ要求を送信し、
記第2の運行管理装置は、前記ダイヤ変更問いかけ要求を受信すると、ユーザインターフェイス部を介して前記被接続列車の現在ダイヤ情報を変更する承認が行われたか否かを判定し、承認が行われたと判定した場合、前記統合管理装置から前記変更ダイヤ情報を取得し、前記現在ダイヤ情報を前記変更ダイヤ情報で更新し、前記変更ダイヤ情報に従って前記被接続列車の運行を管理する、
ことを特徴とする運行管理システム。
A train on the first line that is communicably connected to a first operation management device that manages the operation of trains on the first line and a second operation management device that manages the operation of trains on the second line. Equipped with an integrated management device that stores the implementation schedule information of the above and the implementation schedule information of the train on the second line.
When the first operation management device determines that there is a connecting train that is a train whose delay time exceeds a predetermined time based on the current timetable information and the actual timetable information, the current timetable information and the actual timetable of the connecting train. The timetable information is transmitted to the integrated management device,
The integrated management device identifies the connected train corresponding to the connected train based on the implementation timetable information of the connected train and the implementation timetable information of the second line, and the current timetable information of the specified connected train. And request the actual timetable information from the second operation management device,
The second operation management device transmits the current timetable information and the actual timetable information of the connected train to the integrated management device.
In the integrated management device, the connected train and the connected train are at a predetermined station based on the current timetable information and the actual timetable information of the connected train and the current timetable information and the actual timetable information of the connected train. If it is determined that the connection is not possible, the change timetable information of the connected train is calculated so that the stop time of the connected train and the stop time of the connected train overlap at the predetermined station for a predetermined time or more. , Send a timetable change question request to the second operation management device,
Upon receiving the timetable change inquiry request, the second operation management device determines whether or not approval has been given to change the current timetable information of the connected train via the user interface unit. When it is determined that the approval has been given, the changed timetable information is acquired from the integrated management device , the current timetable information is updated with the changed timetable information, and the operation of the connected train is performed according to the changed timetable information . to manage,
An operation management system characterized by this.
記統合管理装置は、前記接続列車の遅延時間と前記被接続列車の遅延時間との差分が所定の時間以内であるか否かを判定し、前記所定の時間以内であると判定した場合、前記接続列車と前記被接続列車とが前記所定の駅で接続可能であるか否かを判定する、
ことを特徴とする請求項1に記載の運行管理システム。
The integrated management device determines whether or not the difference between the delay time of the connected train and the delay time of the connected train is within a predetermined time, and if it is determined that the difference is within the predetermined time, the integrated management device determines. Determining whether or not the connecting train and the connected train can be connected at the predetermined station.
The operation management system according to claim 1, wherein the operation management system is characterized in that.
前記第1の路線および前記第2の路線に係る各駅の放送を制御する旅客案内装置と通信可能に接続され、
前記第2の運行管理装置は、承認が行われたと判定した場合、前記接続列車と前記被接続列車とが前記所定の駅で接続される旨の放送をする指示を前記旅客案内装置に送信し、承認が行われなかったと判定した場合、前記接続列車と前記被接続列車とが前記所定の駅で接続されない旨の放送をする指示を前記旅客案内装置に送信する、
ことを特徴とする請求項1に記載の運行管理システム。
It is communicably connected to the passenger information system that controls the broadcasting of each station related to the first line and the second line.
When the second operation management device determines that the approval has been given, the second operation management device transmits an instruction to broadcast to the effect that the connecting train and the connected train are connected at the predetermined station to the passenger guidance device. If it is determined that the approval has not been given, an instruction to broadcast that the connecting train and the connected train are not connected at the predetermined station is transmitted to the passenger guidance device.
The operation management system according to claim 1, wherein the operation management system is characterized in that.
JP2018163357A 2018-08-31 2018-08-31 Operation management system Active JP7015764B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018163357A JP7015764B2 (en) 2018-08-31 2018-08-31 Operation management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018163357A JP7015764B2 (en) 2018-08-31 2018-08-31 Operation management system

Publications (2)

Publication Number Publication Date
JP2020032964A JP2020032964A (en) 2020-03-05
JP7015764B2 true JP7015764B2 (en) 2022-02-03

Family

ID=69666822

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018163357A Active JP7015764B2 (en) 2018-08-31 2018-08-31 Operation management system

Country Status (1)

Country Link
JP (1) JP7015764B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7629332B2 (en) * 2021-04-12 2025-02-13 株式会社日立製作所 Timetable change support system, transportation system, and timetable change support method
JP7703195B1 (en) * 2024-10-22 2025-07-07 株式会社Moyai Management system, management method and management program

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008191958A (en) 2007-02-06 2008-08-21 Hitachi Ltd Station transfer guide information display method and transfer guide information creation device
JP2011255766A (en) 2010-06-08 2011-12-22 Toshiba Corp Train location and transit connection information management device
JP2012111375A (en) 2010-11-25 2012-06-14 Hitachi Ltd Device, method and program for predicting connection of last train
JP2013119266A (en) 2011-12-06 2013-06-17 Hitachi Ltd Actual diagram management device, actual diagram management method, and operation management system
JP2014104794A (en) 2012-11-26 2014-06-09 Hitachi Ltd Train traffic control system and control method of train traffic control system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008191958A (en) 2007-02-06 2008-08-21 Hitachi Ltd Station transfer guide information display method and transfer guide information creation device
JP2011255766A (en) 2010-06-08 2011-12-22 Toshiba Corp Train location and transit connection information management device
JP2012111375A (en) 2010-11-25 2012-06-14 Hitachi Ltd Device, method and program for predicting connection of last train
JP2013119266A (en) 2011-12-06 2013-06-17 Hitachi Ltd Actual diagram management device, actual diagram management method, and operation management system
JP2014104794A (en) 2012-11-26 2014-06-09 Hitachi Ltd Train traffic control system and control method of train traffic control system

Also Published As

Publication number Publication date
JP2020032964A (en) 2020-03-05

Similar Documents

Publication Publication Date Title
EP3245762B1 (en) Method and apparatus for router maintenance
JP6600518B2 (en) Bus system
JP6504315B2 (en) Program update system, distribution apparatus and program update method
JP7015764B2 (en) Operation management system
JP2021002172A (en) Daisy chain connection system and system control method
JP7039861B2 (en) Vehicle service management equipment and vehicle service management programs
US9838324B2 (en) Information processing system, information management apparatus, and data transfer control method
JP4728713B2 (en) Train operation management system, diamond management device, and train operation information providing method
WO2012169333A1 (en) Operation rescheduling support system
JP4001772B2 (en) File transfer system
JP2021163095A (en) Storage device, information transfer system, and information transfer method
US9652342B2 (en) Redundancy processing method and system, and information processing apparatus thereof
JP2015161956A (en) Maintenance management device
JP7164175B2 (en) DISTRIBUTED FILE DEVICE, FAILOVER METHOD, PROGRAM AND RECORDING MEDIUM
JP2009289163A (en) Server device and communication system
JP6961091B2 (en) Program transfer system and program transfer method
JP2023047473A (en) Information processing system, information processing device and program
JP2016143359A (en) Electronic device and firmware update method
JP7023411B2 (en) Information control device, information control system and information control method
JP2008225845A (en) Data updating method and data processing system
JP5265493B2 (en) Predictive diamond distribution method, program, and predictive diamond distribution device
US11934881B2 (en) Service program device allocation and release
JP6491999B2 (en) Device data transmission / reception system, device data transmission / reception method, and driving program thereof
JP2006020222A (en) Information transmission equipment
JP2008009852A (en) Load distribution control system and method, and server device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20200813

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20210628

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210706

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210903

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20220111

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20220124

R150 Certificate of patent or registration of utility model

Ref document number: 7015764

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150