Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7274332B2 - junction structure - Google Patents
[go: Go Back, main page]

JP7274332B2 - junction structure - Google Patents

junction structure Download PDF

Info

Publication number
JP7274332B2
JP7274332B2 JP2019072258A JP2019072258A JP7274332B2 JP 7274332 B2 JP7274332 B2 JP 7274332B2 JP 2019072258 A JP2019072258 A JP 2019072258A JP 2019072258 A JP2019072258 A JP 2019072258A JP 7274332 B2 JP7274332 B2 JP 7274332B2
Authority
JP
Japan
Prior art keywords
existing
new
wall
connecting member
skeleton
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2019072258A
Other languages
Japanese (ja)
Other versions
JP2020169514A (en
Inventor
翼 志田
正則 篠原
貴秀 砂井
貴穂 河野
博人 熊谷
康大 前
昭次 山川
健太郎 石井
進一 谷田
裕介 中山
優子 津司
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Corp
Original Assignee
Takenaka Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Corp filed Critical Takenaka Corp
Priority to JP2019072258A priority Critical patent/JP7274332B2/en
Publication of JP2020169514A publication Critical patent/JP2020169514A/en
Application granted granted Critical
Publication of JP7274332B2 publication Critical patent/JP7274332B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Description

本発明は、接合構造体に関する。 The present invention relates to a bonded structure.

従来、既設躯体と新設躯体とを接合する技術の一つとして、既設躯体の表面に接着剤により貼付された鋼材と、鋼材の表面から突設されることで新設躯体内に埋設されたアンカーと、既設躯体と新設躯体との接合部分に対して接着剤によって取付けられたアングル材とを備えた構造が提案されている。 Conventionally, as one of the technologies to join the existing frame and the new frame, steel materials are attached to the surface of the existing frame with an adhesive, and anchors are embedded in the new frame by protruding from the surface of the steel. , and angle members attached to the joints between the existing frame and the new frame with an adhesive.

特開2008-208643号公報JP 2008-208643 A

しかしながら、上記従来の構造においては、鋼材が既設躯体の表面に対して接着剤によって取り付けられていると共に、アングル材が既設躯体と新設躯体との接合部分に対して接着剤によって取付けられているので、例えば、既設躯体又は新設躯体のいずれか一方に外力が加えられた際に、鋼材又はアングル材に貼付された接着剤の接着状態によっては上記外力を既設躯体又は新設躯体のいずれか他方に十分に伝達できなくなるおそれがあることから、既設躯体と新設躯体との相互間で力の伝達を確実に行う観点からは改善の余地があった。 However, in the above conventional structure, the steel material is attached to the surface of the existing frame with an adhesive, and the angle material is attached to the joint between the existing frame and the new frame with an adhesive. For example, when an external force is applied to either the existing frame or the new frame, depending on the adhesion state of the adhesive applied to the steel material or the angle material, the external force may be applied to either the existing frame or the new frame. Therefore, there is room for improvement from the viewpoint of ensuring the mutual transmission of force between the existing frame and the new frame.

本発明は、上記に鑑みてなされたものであって、既設躯体と新設躯体との相互間での力の伝達を確実に行うことが可能となる、接合構造体を提供することを目的とする。 SUMMARY OF THE INVENTION It is an object of the present invention to provide a joint structure capable of reliably transmitting force between an existing skeleton and a new skeleton. .

上述した課題を解決し、目的を達成するために、請求項1に記載の接合構造体は、既設躯体と、前記既設躯体とは別体に形成された新設躯体とを接合するための接合構造体であって、前記既設躯体と前記新設躯体との相互間に設けられるコンクリート体と、前記コンクリート体に挿通された第1連結部材であって、前記既設躯体と前記新設躯体とを連結するための第1連結部材と、を備え、前記既設躯体は、既設の外壁であり、前記新設躯体は、新設の山留杭である。 In order to solve the above-described problems and achieve the object, the joint structure according to claim 1 is a joint structure for joining an existing skeleton and a new skeleton formed separately from the existing skeleton. a body, which is a concrete body provided between the existing skeleton and the new skeleton; and a first connecting member inserted through the concrete body, for connecting the existing skeleton and the new skeleton. and a first connecting member , wherein the existing skeleton is an existing outer wall, and the new skeleton is a newly installed earth retaining pile.

請求項2に記載の接合構造体は、請求項1に記載の接合構造体において、前記既設躯体又は前記新設躯体の少なくともいずれか一方と前記コンクリート体とを連結するための第2連結部材を備える。 The joint structure according to claim 2 is the joint structure according to claim 1, further comprising a second connecting member for connecting at least one of the existing skeleton or the new skeleton and the concrete body. .

請求項3に記載の接合構造体は、請求項2に記載の接合構造体において、前記第1連結部材は、ボルト部材であり、前記第2連結部材は、スタッド部材又はアンカー部材である。 A joint structure according to claim 3 is the joint structure according to claim 2, wherein the first connecting member is a bolt member, and the second connecting member is a stud member or an anchor member.

請求項1に記載の接合構造体によれば、既設躯体と新設躯体との相互間に設けられるコンクリート体と、コンクリート体に挿通された第1連結部材であって、既設躯体と新設躯体とを連結するための第1連結部材と、を備えたので、接合構造体を介して既設躯体と新設躯体とを接合でき、既設躯体と新設躯体の一体化を図ることができる。また、既設躯体又は新設躯体のいずれか一方に作用した外力を接合構造体を介して既設躯体又は新設躯体のいずれか他方に伝達することができ、従来技術(既設躯体と新設躯体とを接合するための部材を既設躯体又は新設躯体に対して接着剤によって接続する技術)に比べて、既設躯体と新設躯体との相互間で力の伝達を確実に行うことが可能となる。また、既設躯体及び新設躯体を利用した構造体(例えば、山留壁等)を形成できるので、既設躯体を残すことによって既設躯体の解体の手間を削減し、且つ環境負荷を低減できると共に、既設躯体と新設躯体との一体化によって上記構造体の剛性を高め、且つ切梁段数の削減に寄与できる。よって、他の既設躯体の解体に用いる重機等のサイズを大きくしたり、重機等の台数を増やすことができ、既設躯体の解体の合理化を図りやすくなる。
また、既設躯体が既設の外壁であり、新設躯体が新設の山留杭であるので、既設の外壁及び新設の山留杭を利用して山留壁を形成できる。よって、既設の外壁を残すことによって既設の外壁の解体の手間を削減し、且つ環境負荷を低減できると共に、既設の外壁と新設の山留杭との一体化によって山留壁の剛性を高め、且つ切梁段数の削減に寄与できる、よって、他の既設の外壁の解体に用いる重機等のサイズを大きくしたり、重機等の台数を増やすことができ、既設の外壁の解体の合理化を図りやすくなる。
According to the joint structure according to claim 1, the concrete body provided between the existing skeleton and the new skeleton, and the first connecting member inserted through the concrete body, the existing skeleton and the new skeleton are connected. and the first connecting member for connecting, the existing skeleton and the new skeleton can be joined via the joint structure, and the existing skeleton and the new skeleton can be integrated. In addition, the external force acting on either the existing skeleton or the new skeleton can be transmitted to the other of the existing skeleton or the new skeleton via the joint structure, and the conventional technology (joining the existing skeleton and the new skeleton In comparison with the technique of connecting the members to the existing frame or the new frame with an adhesive agent), it is possible to reliably transmit force between the existing frame and the new frame. In addition, since a structure (for example, retaining wall) can be formed using the existing frame and the new frame, leaving the existing frame can reduce the labor of dismantling the existing frame, reduce the environmental load, and reduce the environmental load. The integration of the skeleton and the new skeleton can increase the rigidity of the structure and contribute to the reduction of the number of strut steps. Therefore, it is possible to increase the size of the heavy machinery used for dismantling other existing skeletons, or to increase the number of heavy machinery, etc., making it easier to rationalize the dismantling of the existing skeletons.
In addition, since the existing frame is the existing outer wall and the new frame is the newly installed earth retaining pile, the existing external wall and the newly installed earth retaining pile can be used to form the earth retaining wall. Therefore, by leaving the existing outer wall, the labor of dismantling the existing outer wall can be reduced and the environmental load can be reduced. In addition, it can contribute to a reduction in the number of steps of struts. Therefore, it is possible to increase the size of heavy machinery, etc. used for dismantling other existing exterior walls, or to increase the number of heavy machinery, etc., making it easy to rationalize the demolition of existing exterior walls. Become.

請求項2に記載の接合構造体によれば、既設躯体又は新設躯体の少なくともいずれか一方とコンクリート体とを連結するための第2連結部材を備えるので、既設躯体又は新設躯体のいずれか一方に作用した外力(特に、せん断力)を第2連結部材を介して既設躯体又は新設躯体のいずれか他方に伝達することができる。また、例えば第2連結部材を設けない場合に比べて第1連結部材の本数等を低減でき、接合構造体の製造コストの低減化を図りやすくなる。 According to the joint structure described in claim 2, since the second connecting member is provided for connecting at least one of the existing skeleton or the new skeleton and the concrete body, either the existing skeleton or the new skeleton The applied external force (in particular, shear force) can be transmitted to either the existing skeleton or the new skeleton via the second connecting member. In addition, the number of the first connecting members can be reduced compared to the case where the second connecting member is not provided, and the manufacturing cost of the joined structure can be easily reduced.

請求項3に記載の接合構造体によれば、第1連結部材が、ボルト部材であり、第2連結部材が、スタッド部材又はアンカー部材であるので、第1連結部材及び第2連結部材を比較的安価に構成することができ、接合構造体の製造コストを低減できる。 According to the joint structure of claim 3, the first connecting member is the bolt member, and the second connecting member is the stud member or the anchor member, so the first connecting member and the second connecting member are compared. It can be constructed at a relatively low cost, and the manufacturing cost of the joint structure can be reduced.

本発明の実施の形態に係る建物の地下階を概念的に示す平面図である(一部図示省略)。It is a top view which shows notionally the basement floor of the building which concerns on embodiment of this invention (partial illustration abbreviation). 図1のA-A矢視断面図である(一部図示省略)。FIG. 2 is a cross-sectional view taken along the line AA in FIG. 1 (partially omitted). 図2の接合構造体の周辺の領域の拡大図である。3 is an enlarged view of a peripheral area of the bonded structure of FIG. 2; FIG. 図3の平面図である(一部図示省略)。4 is a plan view of FIG. 3 (partially omitted); FIG. 図3の側面図である(一部図示省略)。4 is a side view of FIG. 3 (partially omitted); FIG.

以下に添付図面を参照して、この発明に係る接合構造体の実施の形態を詳細に説明する。まず、〔I〕実施の形態の基本的概念を説明した後、〔II〕実施の形態の具体的内容について説明し、最後に、〔III〕実施の形態に対する変形例について説明する。ただし、実施の形態によって本発明が限定されるものではない。 Exemplary embodiments of a joint structure according to the present invention will be described in detail below with reference to the accompanying drawings. First, [I] the basic concept of the embodiment will be described, then [II] the specific contents of the embodiment will be described, and finally [III] modifications of the embodiment will be described. However, the present invention is not limited by the embodiment.

〔I〕実施の形態の基本的概念
まず、実施の形態の基本的概念について説明する。実施の形態は、概略的に、既設躯体と、既設躯体とは別体に形成された新設躯体とを接合するための接合構造体に関する。ここで、「既設躯体」及び「新設躯体」を備える「建物」は、1つ以上の数の階層を有する建物であって、既設建物の一部が解体された後に一部新設されたものである。この「建物」は、例えば、アパートやマンションの如き集合住宅、オフィスビル、商業施設、公共施設、及び工場施設等を含む概念であるが、実施の形態では、地下階を有するオフィスビルであって、地下階を施工している途中のオフィスビルとして説明する。また、「既設躯体」とは、上記建物を構成する躯体(例えば、柱、梁、壁、床等)のうち、既設建物の解体後に撤去されずに残された躯体を意味し、実施の形態では、新設躯体の近傍に位置する既設の外壁や内壁として説明する。また、「新設躯体」とは、上記建物を構成する躯体のうち、新設された躯体(すなわち、既設躯体とは別体に形成された躯体)を意味し、実施の形態では、新設の山留杭や内壁として説明する。
[I] Basic concept of the embodiment First, the basic concept of the embodiment will be described. Embodiments generally relate to a joint structure for joining an existing skeleton and a new skeleton formed separately from the existing skeleton. Here, a “building” comprising an “existing frame” and a “new frame” is a building with one or more floors, which was partly newly constructed after part of the existing building was demolished. be. This "building" is a concept including, for example, collective housing such as apartments and condominiums, office buildings, commercial facilities, public facilities, and factory facilities. , is explained as an office building in the middle of construction of the basement floor. In addition, the "existing frame" means the frame that remains after the dismantling of the existing building, among the frames that make up the building (e.g., columns, beams, walls, floors, etc.). In this case, the existing outer wall and inner wall located near the new frame will be explained. In addition, the “new framework” means a newly constructed framework (that is, a framework formed separately from the existing framework) among the frameworks that make up the above-mentioned building. Described as a pile or an inner wall.

〔II〕実施の形態の具体的内容
次に、実施の形態の具体的内容について説明する。
[II] Specific contents of the embodiment Next, specific contents of the embodiment will be described.

(構成)
最初に、実施の形態に係る接合構造体50の構成と、この接合構造体50が設置される建物1の構成とについて説明する。
(composition)
First, the configuration of the joint structure 50 according to the embodiment and the configuration of the building 1 in which the joint structure 50 is installed will be described.

(構成-建物)
まず、建物の構成について説明する。図1は、本発明の実施の形態に係る建物1の地下階を概念的に示す平面図である(一部図示省略)。図2は、図1のA-A矢視断面図である。以下の説明では、図1のX方向を建物1の左右方向(-X方向を建物1の左方向、+X方向を建物1の右方向)、図1のY方向を建物1の前後方向(+Y方向を建物1の前方向、-Y方向を建物1の後方向)、図1のZ方向を建物1の上下方向(+Z方向を建物1の上方向、-Z方向を建物1の下方向)と称する。
(Composition - Building)
First, the structure of the building will be explained. FIG. 1 is a plan view conceptually showing a basement floor of a building 1 according to an embodiment of the present invention (partially omitted). 2 is a cross-sectional view taken along the line AA in FIG. 1. FIG. In the following description, the X direction in FIG. The direction is the front direction of building 1, the -Y direction is the rear direction of building 1), the Z direction in FIG. called.

建物1は、例えば鉄筋コンクリート造の建物であり、所定の敷地内に設けられており、図1、図2に示すように、床(図示省略)、梁(図示省略)、柱(図示省略)、壁10、及び新設杭20を備えている。 The building 1 is, for example, a building made of reinforced concrete, and is provided on a predetermined site. As shown in FIGS. A wall 10 and a new pile 20 are provided.

(構成-建物-床、梁、柱)
床は、建物1の階層を構成するものであり、相互に間隔を隔てて上下方向に向けて複数並設されている。また、柱は、床を支持するものであり、床同士の相互間(すなわち、建物1の各階層の空間)に複数設けられている。また、梁は、床を支持するものであり、各床の下面と当接するように複数設けられている。
(Construction-Building-Floors, Beams, Columns)
The floors constitute the floors of the building 1, and are arranged side by side in the vertical direction at intervals. Also, the pillars support the floors, and are provided in plurality between the floors (that is, the spaces of each floor of the building 1). Also, the beams support the floors, and are provided in plurality so as to abut on the lower surface of each floor.

(構成-壁)
図1に戻り、壁10は、床同士の相互間を仕切るためのものであり、床同士の相互間に複数設けられている。また、この壁10は、図1、図2に示すように、第1既設壁11、第2既設壁12、及び新設壁13を備えている。なお、「第1既設壁11」及び「第2既設壁12」の各々は特許請求の範囲における「既設躯体」に対応すると共に、「新設壁13」は特許請求の範囲における「新設躯体」に対応する。
(Composition - Wall)
Returning to FIG. 1, the wall 10 is for partitioning between the floors, and a plurality of walls 10 are provided between the floors. 1 and 2, the wall 10 includes a first existing wall 11, a second existing wall 12, and a new wall 13. As shown in FIGS. Each of the "first existing wall 11" and "second existing wall 12" corresponds to the "existing skeleton" in the claims, and the "new wall 13" corresponds to the "new skeleton" in the claims. handle.

(構成-壁-第1既設壁、第2既設壁、新設壁)
第1既設壁11は、実施の形態では既設の外壁(例えば、コンクリート製の外壁)を用いて構成されており、図1に示すように、建物1の地下階の外縁部に複数設けられている。また、第2既設壁12は、実施の形態では既設の内壁(例えば、コンクリート製の内壁)を用いて構成されており、図1に示すように、建物1の地下階のうち第1既設壁11よりも建物1の屋内側に複数設けられている。また、新設壁13は、実施の形態では新設の内壁(例えば、コンクリート製の内壁)を用いて構成されており、図1に示すように、建物1の地下階のうち新設杭20の近傍に設けられている。
(Composition - Wall - First existing wall, second existing wall, new wall)
The first existing wall 11 is configured using an existing outer wall (for example, an outer wall made of concrete) in the embodiment, and as shown in FIG. there is In addition, the second existing wall 12 is configured using an existing inner wall (for example, an inner wall made of concrete) in the embodiment, and as shown in FIG. 11 are provided on the indoor side of the building 1 . In addition, the new wall 13 is configured using a newly installed inner wall (for example, an inner wall made of concrete) in the embodiment, and as shown in FIG. is provided.

ここで、第1既設壁11の具体的な構成については任意であるが、実施の形態では、図2に示すように、縦断面形状がL字状となる厚肉な矩形状体にて形成されており、L字状の横棒部分が建物1の屋内側に向けて突出するように配置されている。なお、以下では、第1既設壁11のL字状の横棒部分11aを「下側突出部11a」と称する。 Here, the specific configuration of the first existing wall 11 is arbitrary, but in the embodiment, as shown in FIG. It is arranged so that the L-shaped horizontal bar portion protrudes toward the indoor side of the building 1. - 特許庁In addition, below, the L-shaped horizontal bar part 11a of the 1st existing wall 11 is called the "lower side protrusion part 11a."

なお、第1既設壁11及び第2既設壁12を建物1の解体時に撤去せずに残した理由については、以下の通りとなる。すなわち、まず、第1既設壁11及び第2既設壁12を解体して埋戻し材を設置しようとすると、第1既設壁11及び第2既設壁12の解体及び撤去に対するコスト、並びに埋戻し材の設置に対するコストが生じるため、建物1の設置コストを増大させるおそれがある。また、第1既設壁11等の解体作業や搬出作業、又は埋戻し材の搬入作業及び設置作業を行う際に、地盤Gの崩落等の災害のリスクが生じる。以上のことから、これらの問題が生じることを回避するために、第1既設壁11及び第2既設壁12を建物1の解体時に撤去せずに残すこととしている。 The reason why the first existing wall 11 and the second existing wall 12 were left without being removed when the building 1 was demolished is as follows. That is, first, when the first existing wall 11 and the second existing wall 12 are dismantled and the backfilling material is installed, the cost for dismantling and removing the first existing wall 11 and the second existing wall 12 and the refilling material , the installation cost of the building 1 may be increased. In addition, there is a risk of disaster such as collapse of the ground G when carrying out dismantling work and carry-out work of the first existing wall 11 and the like, or carry-in work and installation work of the backfilling material. In view of the above, in order to avoid these problems from occurring, the first existing wall 11 and the second existing wall 12 are left without being removed when the building 1 is demolished.

(構成-新設杭)
図1に戻り、新設杭20は、接合構造体50を介して第1既設壁11を支持するための新設躯体である。この新設杭20は、実施の形態では新設の山留杭(例えば、鋼製の山留杭用芯材)を用いて構成されており、図1、図2に示すように、建物1の地下階のうち第1既設壁11の近傍に複数設けられている。
(Composition - new pile)
Returning to FIG. 1 , the new pile 20 is a new skeleton for supporting the first existing wall 11 via the joint structure 50 . In the embodiment, the new pile 20 is constructed using a newly installed earth retaining pile (for example, steel core material for earth retaining pile), and as shown in FIGS. A plurality of them are provided in the vicinity of the first existing wall 11 on the floor.

また、新設杭20の具体的な構成については任意であるが、実施の形態では、以下の通りとなる。 Moreover, although it is arbitrary about the specific structure of the new pile 20, it becomes as follows in embodiment.

すなわち、新設杭20は、長尺なH形鋼にて形成されており、具体的には、後述する図4に示すように、建物1の屋外側に位置する第1フランジ部21と、建物1の屋内側に位置する第2フランジ部22と、第1フランジ部21と第2フランジ部22とを接続するウェブ部23とを有している。また、この新設杭20は、図2に示すように新設杭20の長手方向が上下方向に沿うように設置されると共に、新設杭20の上端部及びその近傍部分が第1既設壁11の下側突出部11aよりも上方に位置するように設置されている。 That is, the new pile 20 is formed of a long H-shaped steel, and specifically, as shown in FIG. 1 and a web portion 23 connecting the first flange portion 21 and the second flange portion 22 . 2, the new pile 20 is installed such that the longitudinal direction of the new pile 20 extends along the vertical direction, and the upper end portion of the new pile 20 and its vicinity are located below the first existing wall 11. It is installed so as to be positioned above the side projecting portion 11a.

また、新設杭20の第2フランジ部22における建物1の屋内側の端部には、接続部24が設けられている。接続部24は、後述する第1連結部材70を新設杭20に対して接続するための接続手段である。この接続部24は、例えば鋼製の長尺な板材(例えば、アングル材)等を用いて構成されており、後述する図4に示すように接続部24の長手方向が前後方向に沿うように設けられていると共に、相互に間隔を隔てて上下方向に複数並設されている(後述する図5では、4つ並設されている)。そして、第2フランジ部22に対して溶接等によってそれぞれ接続されている。 A connection portion 24 is provided at the end portion of the second flange portion 22 of the new pile 20 on the indoor side of the building 1 . The connecting portion 24 is connecting means for connecting a first connecting member 70 to be described later to the new pile 20 . The connecting portion 24 is made of, for example, an elongated steel plate (for example, an angle material) or the like, and as shown in FIG. A plurality of them are vertically arranged side by side at intervals (in FIG. 5, which will be described later, four are arranged side by side). Then, they are connected to the second flange portion 22 by welding or the like.

(構成-接合構造体)
次に、接合構造体50の構成について説明する。図3は、図2の接合構造体50の周辺の領域の拡大図である。図4は、図3の平面図である(一部図示省略)。図5は、図3の側面図である(一部図示省略)。接合構造体50は、第1既設壁11と新設杭20とを接合するためのものである。この接合構造体50は、図2から図5に示すように、第1既設壁11と新設杭20との相互間に設けられており、コンクリート体60、第1連結部材70、既設側第2連結部材80、及び新設側第2連結部材90を備えている。
(Construction-joint structure)
Next, the configuration of the joint structure 50 will be described. FIG. 3 is an enlarged view of the peripheral area of the joint structure 50 of FIG. FIG. 4 is a plan view of FIG. 3 (partially omitted). FIG. 5 is a side view of FIG. 3 (partially omitted). The joint structure 50 is for joining the first existing wall 11 and the new pile 20 . As shown in FIGS. 2 to 5, the joint structure 50 is provided between the first existing wall 11 and the new pile 20, and includes a concrete body 60, a first connecting member 70, an existing second A connection member 80 and a newly installed side second connection member 90 are provided.

(構成-接合構造体-コンクリート体)
コンクリート体60は、接合構造体50の基本構造体である。このコンクリート体60は、例えばコンクリート製の厚肉な矩形状体にて形成されており、第1既設壁11と新設杭20との相互間に設けられている。具体的には、図4に示すように、コンクリート体60は、第1既設壁11と新設杭20に加えて、当該相互間以外の部分に設けられている。ここで、第1既設壁11と新設杭20との相互間に設けられるコンクリート体60については、第1既設壁11のうち下側突出部11aよりも上方の部分と、新設杭20の第1フランジ部21のうち第1既設壁11の下側突出部11aよりも上側部分との相互間に設けられている。また、新設杭20の第1フランジ部21から第2フランジ部22に至る部分にも設けられている。また、第1既設壁11と新設杭20との相互間以外の部分に設けられるコンクリート体60については、第1既設壁11と新設杭20との相互間に設けられるコンクリート体60よりも幅方向の外側(図4では、前後方向の外側)に設けられている。さらに、上記相互間以外の部分に設けられるコンクリート体60の建物1の屋内側の端部と上記相互間に設けられるコンクリート体60の建物1の屋内側の端部とが相互に面一となり、且つ、上記相互間以外の部分に設けられるコンクリート体60の上端部と上記相互間に設けられるコンクリート体60の上端部とが相互に面一となるように設けられている。
(Construction-joint structure-concrete body)
The concrete body 60 is the basic structure of the joint structure 50 . The concrete body 60 is formed of, for example, a thick rectangular body made of concrete, and is provided between the first existing wall 11 and the new pile 20 . Specifically, as shown in FIG. 4, in addition to the first existing wall 11 and the new piles 20, the concrete body 60 is provided in a portion other than the inter-between. Here, regarding the concrete body 60 provided between the first existing wall 11 and the new pile 20, the portion of the first existing wall 11 above the lower protruding portion 11a and the first wall of the new pile 20 It is provided between the flange portion 21 and the portion above the lower projecting portion 11 a of the first existing wall 11 . Moreover, it is also provided in a portion from the first flange portion 21 to the second flange portion 22 of the new pile 20 . In addition, the concrete body 60 provided in the portion other than between the first existing wall 11 and the new pile 20 is wider than the concrete body 60 provided between the first existing wall 11 and the new pile 20 in the width direction. (outside in the front-rear direction in FIG. 4). Furthermore, the indoor-side end of the building 1 of the concrete body 60 provided in the portion other than the above-mentioned mutual and the indoor-side end of the building 1 of the concrete body 60 provided between the above-mentioned are flush with each other, In addition, the upper end portion of the concrete body 60 provided in the portion other than the above-mentioned mutual portion and the upper end portion of the concrete member 60 provided between the above-mentioned mutual portions are provided so as to be flush with each other.

また、コンクリート体60の具体的な形状及び大きさについては任意であるが、実施の形態では、以下の通りに設定している。すなわち、図3に示すように、コンクリート体60の縦断面形状については、縦断面形状が略長方形状に設定している。また、コンクリート体60の幅(前後方向の長さ)については、第1既設壁11の幅と略同一に設定している。また、コンクリート体60の奥行(図3では、左右方向の長さ)については、第1既設壁11の奥行と新設杭20の奥行との合計長さよりも若干大きく(又は略同一に)設定している。また、コンクリート体60の高さ(図3では、上下方向の長さ)については、第1既設壁11における下側突出部11aの上端から新設杭20の上端部までの高さと略同一に(又は、異なるように)設定している。 Moreover, although the specific shape and size of the concrete body 60 are arbitrary, they are set as follows in the embodiment. That is, as shown in FIG. 3, the vertical cross-sectional shape of the concrete body 60 is set to be substantially rectangular. Further, the width (the length in the front-rear direction) of the concrete body 60 is set substantially equal to the width of the first existing wall 11 . The depth of the concrete body 60 (the length in the left-right direction in FIG. 3) is set slightly larger (or substantially the same) as the total length of the depth of the first existing wall 11 and the depth of the new pile 20. ing. In addition, the height of the concrete body 60 (length in the vertical direction in FIG. 3) is substantially the same as the height from the upper end of the lower projecting portion 11a of the first existing wall 11 to the upper end of the new pile 20 ( or differently).

このようなコンクリート体60の構成により、第1既設壁11又は新設杭20のいずれか一方に作用した外力をコンクリート体60を介して第1既設壁11又は新設杭20のいずれか他方に伝達することができる。 With such a structure of the concrete body 60, an external force acting on either the first existing wall 11 or the new pile 20 is transmitted to the other of the first existing wall 11 or the new pile 20 via the concrete body 60. be able to.

(構成-接合構造体-第1連結部材)
第1連結部材70は、第1既設壁11と新設杭20とを連結するためのものである。この第1連結部材70は、長尺な棒状体であり、コンクリート体60に挿通されるように複数設けられている。具体的には、図3に示すように、各第1連結部材70の長手方向が左右方向に沿うように配置され、相互に間隔を隔ててそれぞれ配置されている(図3、図4では、前後方向に2本ずつ、上下方向に4本ずつ配置されている)。そして、各第1連結部材70の建物1の屋外側の端部が第1既設壁11に埋め込まれると共に(例えば、図示しないケミカルアンカー等を介して埋め込まれる)、各第1連結部材70の建物1の屋内側の端部が新設杭20における対応する接続部24に設けられた挿通孔(図示省略)に挿通されることで固定されている。なお、実施の形態では、第1連結部材70の建物1の屋内側の端部には、脱落防止部71(例えばナット等)を取り付けることにより、第1連結部材70が接続部24から脱落することを防止している。
(Construction-joint structure-first connecting member)
The first connecting member 70 is for connecting the first existing wall 11 and the new pile 20 . The first connecting member 70 is a long rod-shaped body, and a plurality of the first connecting members 70 are provided so as to be inserted through the concrete body 60 . Specifically, as shown in FIG. 3, the first connecting members 70 are arranged so that the longitudinal direction of each first connecting member 70 extends along the left-right direction, and are spaced apart from each other (in FIGS. 3 and 4, 2 each in the front and rear direction, and 4 each in the vertical direction). Then, the end portion of each first connecting member 70 on the outdoor side of the building 1 is embedded in the first existing wall 11 (for example, embedded via a chemical anchor or the like (not shown)), and the building of each first connecting member 70 is embedded. 1 is fixed by being inserted through an insertion hole (not shown) provided in the corresponding connection portion 24 of the new pile 20 . In the embodiment, the first connecting member 70 falls off from the connecting portion 24 by attaching a drop-off prevention portion 71 (for example, a nut or the like) to the end portion of the first connecting member 70 on the indoor side of the building 1. prevent this from happening.

また、第1連結部材70の具体的な構成については任意であるが、実施の形態では、ボルト部材(例えば、鋼製の全ネジボルト等)を用いて構成されている。これにより、第1連結部材70を比較的安価に構成することができ、接合構造体50の製造コストを低減できる。 Moreover, although the specific configuration of the first connecting member 70 is arbitrary, in the embodiment, it is configured using a bolt member (for example, a fully threaded steel bolt or the like). Accordingly, the first connecting member 70 can be configured at a relatively low cost, and the manufacturing cost of the joint structure 50 can be reduced.

このような第1連結部材70の構成により、第1既設壁11と新設杭20とを連結しながら、第1既設壁11又は新設杭20のいずれか一方に作用した外力を第1連結部材70を介して第1既設壁11又は新設杭20のいずれか他方に伝達することができる。 With such a configuration of the first connecting member 70, the external force acting on either the first existing wall 11 or the new pile 20 is applied to the first connecting member 70 while connecting the first existing wall 11 and the new pile 20. can be transmitted to either the first existing wall 11 or the new pile 20 via the .

(構成-接合構造体-既設側第2連結部材)
図3に戻り、既設側第2連結部材80は、第1既設壁11とコンクリート体60とを連結するための第2連結部材である。この既設側第2連結部材80は、長尺な棒状体であり(ただし、第1連結部材70よりも短い棒状体)、コンクリート体60に挿通されるように複数設けられている。具体的には、図3に示すように、第1既設壁11における新設杭20の上端部及びその近傍部分と対応する部分から建物1の屋内側に向けて張り出すように設けられ、既設側第2連結部材80の建物1の屋外側の端部が埋め込まれることで(例えば、図示しないケミカルアンカー等を介して埋め込まれる)第1既設壁11に対して固定されている。
(Construction-joint structure-existing side second connecting member)
Returning to FIG. 3 , the existing-side second connecting member 80 is a second connecting member for connecting the first existing wall 11 and the concrete body 60 . The existing-side second connecting member 80 is a long rod-shaped body (however, the rod-shaped body is shorter than the first connecting member 70 ), and a plurality of the existing-side second connecting members 80 are provided so as to be inserted into the concrete body 60 . Specifically, as shown in FIG. 3, it is provided so as to protrude toward the indoor side of the building 1 from the portion corresponding to the upper end portion of the new pile 20 and the vicinity thereof in the first existing wall 11, and the existing side The second connecting member 80 is fixed to the first existing wall 11 by embedding the end portion of the second connecting member 80 on the outdoor side of the building 1 (for example, embedding via a chemical anchor or the like (not shown)).

また、既設側第2連結部材80の具体的な構成については任意であるが、実施の形態では、アンカー部材(例えば、鋼製の差筋アンカー等)を用いて構成されている。これにより、既設側第2連結部材80を比較的安価に構成することができ、接合構造体50の製造コストを低減できる。 Moreover, although the specific configuration of the existing-side second connecting member 80 is arbitrary, in the embodiment, it is configured using an anchor member (for example, a steel insert anchor or the like). As a result, the existing-side second connecting member 80 can be configured at a relatively low cost, and the manufacturing cost of the joint structure 50 can be reduced.

このような既設側第2連結部材80の構成により、第1既設壁11又は新設杭20のいずれか一方に作用した外力(特に、せん断力)を既設側第2連結部材80を介して第1既設壁11又は新設杭20のいずれか他方に伝達することができる。また、例えば既設側第2連結部材80を設けない場合に比べて第1連結部材70の本数等を低減でき、接合構造体50の製造コストの低減化を図りやすくなる。 With such a configuration of the existing-side second connecting member 80 , the external force (especially shear force) acting on either the first existing wall 11 or the new pile 20 is transferred to the first connecting member 80 via the existing-side second connecting member 80 . It can be transmitted to either the existing wall 11 or the new pile 20 . In addition, for example, the number of the first connecting members 70 can be reduced compared to the case where the existing side second connecting member 80 is not provided, and the manufacturing cost of the joint structure 50 can be easily reduced.

(構成-接合構造体-新設側第2連結部材)
新設側第2連結部材90は、新設杭20とコンクリート体60とを連結するための第2連結部材である。この新設側第2連結部材90は、長尺な棒状体であり(ただし、第1連結部材70よりも短い棒状体)、コンクリート体60に挿通されるように複数設けられている。具体的には、図3に示すように、新設杭20の上端部及びその近傍部分から建物1の屋外側に向けて張り出すように設けられ、新設杭20に対して溶接等によって固定されている。
(Construction-joint structure-newly installed side second connecting member)
The newly installed side second connecting member 90 is a second connecting member for connecting the newly installed pile 20 and the concrete body 60 . The newly installed side second connecting member 90 is a long rod-shaped body (however, a rod-shaped body shorter than the first connecting member 70 ), and is provided in plurality so as to be inserted into the concrete body 60 . Specifically, as shown in FIG. 3, it is provided so as to protrude from the upper end of the new pile 20 and the vicinity thereof toward the outside of the building 1, and is fixed to the new pile 20 by welding or the like. there is

また、新設側第2連結部材90の具体的な構成については任意であるが、実施の形態では、スタッド部材(例えば、鋼製のスタッドジベル等)を用いて構成されている。これにより、新設側第2連結部材90を比較的安価に構成することができ、接合構造体50の製造コストを低減できる。 Moreover, although the specific configuration of the newly installed side second connecting member 90 is arbitrary, in the embodiment, it is configured using a stud member (for example, a steel stud dowel or the like). Thereby, the newly installed side second connecting member 90 can be configured at a relatively low cost, and the manufacturing cost of the joint structure 50 can be reduced.

このような新設側第2連結部材90の構成により、第1既設壁11又は新設杭20のいずれか一方に作用した外力(特に、せん断力)を新設側第2連結部材90を介して第1既設壁11又は新設杭20のいずれか他方に伝達することができる。また、例えば新設側第2連結部材90を設けない場合に比べて第1連結部材70の本数等を低減でき、接合構造体50の製造コストの低減化を図りやすくなる。 With such a configuration of the newly installed side second connecting member 90 , the external force (especially shear force) acting on either the first existing wall 11 or the newly installed pile 20 is transferred to the first through the newly installed side second connecting member 90 . It can be transmitted to either the existing wall 11 or the new pile 20 . In addition, for example, the number of first connecting members 70 can be reduced compared to the case where the newly installed side second connecting member 90 is not provided, and the manufacturing cost of the joint structure 50 can be easily reduced.

(構成-接合構造体-その他の構成)
また、この接合構造体50の具体的な構成については任意であるが、実施の形態では、第1既設壁11又は新設杭20のいずれか一方に加えられた外力を第1既設壁11又は新設杭20のいずれか他方に効果的に伝達できるように、以下の工夫が施されている。
(Construction - Joined structure - Other construction)
Further, although the specific configuration of this joint structure 50 is arbitrary, in the embodiment, an external force applied to either the first existing wall 11 or the new pile 20 is applied to the first existing wall 11 or the new pile 20 . In order to effectively transmit to one of the piles 20, the following measures are taken.

まず、既設側第2連結部材80の設置本数については、下記式(1)から式(5)を用いて算出される。

Figure 0007274332000001
(ここで、n:既設側第2連結部材80の必要本数
Q:第1既設壁11に作用するせん断耐力
Qa:既設側第2連結部材80における1本あたりのせん断耐力
Qa:鋼材の耐力で決まる既設側第2連結部材80における1本あたりのせん断耐力
Qa:第1既設壁11の支圧強度で決まる既設側第2連結部材80における1本あたりのせん断耐力
sAe:接続面における既設側第2連結部材80の断面積
σ:既設側第2連結部材80の規格降伏点強度
c:第1既設壁11の圧縮強度
c:第1既設壁11のヤング係数
γ:コンクリートの単位体積重量) First, the installed number of the existing side second connecting members 80 is calculated using the following formulas (1) to (5).
Figure 0007274332000001
(Here, n: the required number of existing side second connecting members 80
Q: Shear strength acting on the first existing wall 11
Qa: Shear strength per existing side second connecting member 80
Qa 1 : Shear strength per one existing side second connecting member 80 determined by the strength of the steel material
Qa 2 : Shear strength per one existing side second connecting member 80 determined by the bearing pressure strength of the first existing wall 11
sAe: Cross-sectional area of the existing side second connecting member 80 on the connecting surface
σ y : Standard yield point strength of the existing side second connecting member 80
F c: compressive strength of the first existing wall 11
E c: Young's modulus of the first existing wall 11
γ: Unit weight of concrete)

このような下記式(1)から式(5)を用いて既設側第2連結部材80の設置本数を設定することにより、例えば第1既設壁11又は新設杭20の変形に伴って第1既設壁11に作用したせん断力を新設杭20に効果的に伝達することが可能となる。 By setting the installation number of the existing side second connecting members 80 using the following formulas (1) to (5), for example, the first existing wall 11 or the newly installed pile 20 is deformed. It becomes possible to effectively transmit the shearing force acting on the wall 11 to the new pile 20 .

次に、新設側第2連結部材90の設置本数及び設置間隔については、下記式(6)から式(9)を用いて算出される。

Figure 0007274332000002
(ここで、n:接合構造体50の流動化処理土と新設杭20を合成する場合に必要な新設側第2連結部材90の本数
Q´:新設杭20における1本あたりに作用するせん断力
s19:新設側第2連結部材90のせん断耐力
:接合構造体50の流動化処理土と新設杭20を合成する場合に必要な新設側第2連結部材90の設置間隔
scA:新設側第2連結部材90の断面積
L:第1既設壁11における下側突出部11aの上端から新設杭20の上端部までの高さ) Next, the installation number and the installation interval of the newly installed side second connecting members 90 are calculated using the following equations (6) to (9).
Figure 0007274332000002
(Here, n: the number of newly installed side second connecting members 90 required when combining the fluidized soil of the joint structure 50 and the newly installed pile 20
Q′: Shear force acting on each newly installed pile 20
q s19 : Shear strength of the newly installed side second connecting member 90
p s : Installation interval of the newly installed side second connecting member 90 required when combining the fluidized soil of the joint structure 50 and the newly installed pile 20
sc A: Cross-sectional area of the newly installed side second connecting member 90
L: Height from the upper end of the lower projecting portion 11a of the first existing wall 11 to the upper end of the new pile 20)

このような下記式(6)から式(9)を用いて新設側第2連結部材90の設置本数及び設置間隔を設定することにより、例えば第1既設壁11又は新設杭20の変形に伴って新設杭20に作用したせん断力を第1既設壁11に効果的に伝達することが可能となる。 By setting the installation number and the installation interval of the newly installed side second connecting members 90 using the following equations (6) to (9), for example, with the deformation of the first existing wall 11 or the newly installed pile 20 It becomes possible to effectively transmit the shearing force acting on the new pile 20 to the first existing wall 11 .

次に、第1連結部材70の断面積については、下記式(10)から式(12)を用いて算出される。

Figure 0007274332000003
(ここで、σ:接合構造体50に作用する圧縮応力度
max:接合構造体50に作用する最大曲げモーメント
k:係数
j:圧縮側の躯体面から引張側の鉄筋外面までの長さ≒(断面長さ―被り厚さ)
b:接合構造体50の幅(単位幅)
d:接合構造体50の上端部から引張鉄筋までの距離
:流動化処理土の許容圧縮応力度
p:引張鉄筋比
:第1連結部材70の断面積) Next, the cross-sectional area of the first connecting member 70 is calculated using the following formulas (10) to (12).
Figure 0007274332000003
(Here, σ c : degree of compressive stress acting on the joint structure 50
M max: Maximum bending moment acting on the joint structure 50
k: coefficient
j: Length from the frame surface on the compression side to the outer surface of the reinforcing bar on the tension side ≒ (section length - covering thickness)
b: Width (unit width) of the joint structure 50
d: distance from the upper end of the joint structure 50 to the tension reinforcing bar
f c : Permissible compressive stress of fluidized soil
p: Tensile rebar ratio
A t : cross-sectional area of the first connecting member 70)

このような下記式(10)から式(12)を用いて第1連結部材70の断面積を設定することにより、例えば第1既設壁11が建物1の屋内側に向けて変形した際に接合構造体50に作用した圧縮力を第1既設壁11及び新設杭20に効果的に伝達することが可能となる。 By setting the cross-sectional area of the first connecting member 70 using the following formulas (10) to (12), for example, when the first existing wall 11 is deformed toward the indoor side of the building 1, it can be joined. It becomes possible to effectively transmit the compressive force acting on the structure 50 to the first existing wall 11 and the new pile 20 .

次に、第1連結部材70の断面積については、下記式(13)、式(14)を用いてさらに算出される。
max=A×f×j=A×f×7/8×d・・・式(13)
σ=Mmax/(a×j)<f・・・式(14)
(ここで、σ:接合構造体50に作用する引張応力度
:第1連結部材70の許容圧縮応力度)
Next, the cross-sectional area of the first connecting member 70 is further calculated using the following formulas (13) and (14).
M max =A t ×f t ×j=A t ×f t ×7/8×d Expression (13)
σ t =M max /(a t ×j)<f t Expression (14)
(Here, σ t : Degree of tensile stress acting on the joint structure 50
f t : allowable compressive stress of the first connecting member 70)

このような下記式(13)、式(14)を用いて第1連結部材70の断面積を設定することにより、例えば第1既設壁11が建物1の屋内側に向けて変形した際に接合構造体50に作用した引張力を第1既設壁11及び新設杭20に効果的に伝達することが可能となる。 By setting the cross-sectional area of the first connecting member 70 using the following formulas (13) and (14), for example, when the first existing wall 11 is deformed toward the indoor side of the building 1, it can be joined. It becomes possible to effectively transmit the tensile force acting on the structure 50 to the first existing wall 11 and the new pile 20 .

以上のような接合構造体50の構成により、接合構造体50を介して第1既設壁11と新設杭20とを接合でき、第1既設壁11と新設杭20の一体化を図ることができる。また、第1既設壁11又は新設杭20のいずれか一方に作用した外力を接合構造体50を介して第1既設壁11又は新設杭20のいずれか他方に伝達することができ、従来技術(既設躯体と新設躯体とを接合するための部材を既設躯体又は新設躯体に対して接着剤によって接続する技術)に比べて、第1既設壁11と新設杭20との相互間で力の伝達を確実に行うことが可能となる。また、第1既設壁11が既設の外壁であり、新設杭20が新設の山留杭であるので、第1既設壁11及び新設杭20を利用して山留壁を形成できる。よって、第1既設壁11を残すことによって第1既設壁11の解体の手間を削減し、且つ環境負荷を低減できると共に、第1既設壁11と新設杭20との一体化によって山留壁の剛性を高め、且つ切梁段数の削減に寄与できる、よって、他の第1既設壁11の解体に用いる重機等のサイズを大きくしたり、重機等の台数を増やすことができ、第1既設壁11の解体の合理化を図りやすくなる。 With the configuration of the joint structure 50 as described above, the first existing wall 11 and the new pile 20 can be joined through the joint structure 50, and the first existing wall 11 and the new pile 20 can be integrated. . In addition, the external force acting on either the first existing wall 11 or the new pile 20 can be transmitted to the other of the first existing wall 11 or the new pile 20 via the joint structure 50. In comparison with the technique of connecting a member for joining the existing skeleton and the new skeleton to the existing skeleton or the new skeleton with an adhesive, force transmission between the first existing wall 11 and the new pile 20 is reduced. It can be done with certainty. Further, since the first existing wall 11 is an existing outer wall and the new pile 20 is a newly installed earth retaining pile, the first existing wall 11 and the new pile 20 can be used to form an earth retaining wall. Therefore, by leaving the first existing wall 11, it is possible to reduce the labor of dismantling the first existing wall 11 and reduce the environmental load. It is possible to increase the rigidity and contribute to the reduction of the number of steps of struts. It will be easier to rationalize the dismantling of 11.

(第1既設壁と新設杭との接合方法)
続いて、実施の形態に係る第1既設壁11と新設杭20との接合方法について説明する。この接合方法は、設置工程、第1取付工程、第2取付工程、第3取付工程、及び形成工程を含んでいる。なお、以下では、図3に示す第1既設壁11と新設杭20との接合方法に着目して説明する。
(Method of joining first existing wall and new pile)
Next, a method for joining the first existing wall 11 and the new pile 20 according to the embodiment will be described. The joining method includes a setting step, a first attaching step, a second attaching step, a third attaching step, and a forming step. In addition, below, it demonstrates paying attention to the joining method of the 1st existing wall 11 and the new pile 20 which are shown in FIG.

(第1既設壁と新設杭との接合方法-設置工程)
まず、設置工程について説明する。設置工程は、新設杭20を所定位置(具体的には、第1既設壁11の近傍位置)に設置する工程である。
(Method of joining first existing wall and new pile - installation process)
First, the installation process will be described. The installation step is a step of installing the new pile 20 at a predetermined position (specifically, a position near the first existing wall 11).

具体的には、図示しない公知のクレーン等を用いて、新設杭20を所定位置まで搬送させた後、地盤Gのうち所定位置に対応する部分にあらかじめ形成された掘削孔(図示省略)に新設杭20の一部を埋め込む。 Specifically, after the new pile 20 is transported to a predetermined position using a known crane or the like (not shown), the new pile 20 is newly installed in an excavation hole (not shown) previously formed in a portion of the ground G corresponding to the predetermined position. A part of the stake 20 is embedded.

(第1既設壁と新設杭との接合方法-第1取付工程)
次に、第1取付工程について説明する。第1取付工程は、第1既設壁11及び新設杭20に対して第1連結部材70を取り付ける工程である。
(Method of joining first existing wall and new pile - first installation process)
Next, the first mounting process will be described. The first attachment step is a step of attaching the first connecting member 70 to the first existing wall 11 and the new pile 20 .

具体的には、まず、複数の第1連結部材70の各々における建物1の屋外側の端部を第1既設壁11にあらかじめ形成された埋込孔(図示省略)にそれぞれ埋め込む。次に、複数の第1連結部材70の各々における建物1の屋内側の端部を新設杭20に取り付けられた接続部24の挿通孔にそれぞれ挿通する。そして、複数の第1連結部材70の各々における建物1の屋内側の端部に対して脱落防止部71をそれぞれ取り付ける。 Specifically, first, the ends of the plurality of first connecting members 70 on the outdoor side of the building 1 are embedded in embedding holes (not shown) previously formed in the first existing wall 11 . Next, the end portion of each of the plurality of first connecting members 70 on the indoor side of the building 1 is inserted through the insertion hole of the connection portion 24 attached to the new pile 20 . Then, the drop-off preventing portions 71 are attached to the ends of the plurality of first connecting members 70 on the indoor side of the building 1 .

(第1既設壁と新設杭との接合方法-第2取付工程)
次に、第2取付工程について説明する。第2取付工程は、新設杭20に対して新設側第2連結部材90を取り付ける工程である。
(Method of joining the first existing wall and the new pile - second installation process)
Next, the second mounting process will be described. The second attachment step is a step of attaching the newly installed side second connecting member 90 to the newly installed pile 20 .

具体的には、複数の新設側第2連結部材90を新設杭20の建物1の屋外側の端部にそれぞれ配置した後に、新設杭20に対して溶接等によってそれぞれ接続する。ただし、これに限らず、例えば、複数の新設側第2連結部材90が固定された図示しない固定プレート(例えば鋼板)を新設杭20の建物1の屋外側の端部に配置した後に、新設杭20に対して溶接等によって接続してもよい。あるいは、設置工程を行う前に、複数の新設側第2連結部材90を新設杭20に対して溶接等によってそれぞれ接続してもよい。 Specifically, after arranging the plurality of new-installation-side second connecting members 90 at the ends of the new-installation piles 20 on the outdoor side of the building 1, they are connected to the installation-installation piles 20 by welding or the like. However, not limited to this, for example, after arranging a fixing plate (for example, a steel plate) (not shown) to which a plurality of newly installed side second connecting members 90 are fixed at the end of the newly installed pile 20 on the outdoor side of the building 1, the newly installed pile It may be connected to 20 by welding or the like. Alternatively, the plurality of newly installed side second connecting members 90 may be connected to the newly installed piles 20 by welding or the like, respectively, before performing the installation process.

(第1既設壁と新設杭との接合方法-第3取付工程)
次に、第3取付工程について説明する。第3取付工程は、第1既設壁11に対して既設側第2連結部材80を取り付ける工程である。
(Method of joining first existing wall and new pile - third installation process)
Next, the 3rd attachment process is demonstrated. The third attachment step is a step of attaching the existing-side second connecting member 80 to the first existing wall 11 .

具体的には、複数の既設側第2連結部材80の各々における建物1の屋外側の端部を第1既設壁11にあらかじめ形成された埋込孔(図示省略)にそれぞれ埋め込む。このように、第3取付工程を第1取付工程及び第2取付工程よりも後に行うことで新設杭20を所望位置に確実に設置することができ、新設杭20の設置性を確保しやすくなる。ただし、これに限らず、例えば、第1取付工程又は第2取付工程よりも前に、第3取付工程を行ってもよい。 Specifically, the ends of the plurality of existing-side second connecting members 80 on the outdoor side of the building 1 are respectively embedded in embedding holes (not shown) previously formed in the first existing wall 11 . In this way, by performing the third mounting process after the first mounting process and the second mounting process, the new pile 20 can be reliably installed at the desired position, and the installability of the new pile 20 can be easily secured. . However, not limited to this, for example, the third attachment process may be performed before the first attachment process or the second attachment process.

(第1既設壁と新設杭との接合方法-形成工程)
次に、形成工程について説明する。形成工程は、コンクリート体60を形成する工程である。
(Method of joining first existing wall and new pile - forming process)
Next, the formation process will be described. The forming step is a step of forming the concrete body 60 .

具体的には、まず、コンクリート体60が設置される周辺に型枠を設置する。次に、型枠にコンクリートを流し込んで打設する。そして、打設したコンクリートを所定期間固化した後に、型枠を撤去する。 Specifically, first, a formwork is installed around where the concrete body 60 is to be installed. Next, the concrete is poured into the formwork and poured. After the placed concrete is solidified for a predetermined period, the formwork is removed.

以上のような接合方法により、接合構造体50を介して第1既設壁11と新設杭20とを接合でき、第1既設壁11と新設杭20の一体化を図ることができる。 By the joining method as described above, the first existing wall 11 and the new pile 20 can be joined through the joined structure 50, and the first existing wall 11 and the new pile 20 can be integrated.

(実施の形態の効果)
このように実施の形態によれば、第1既設壁11と新設杭20との相互間に設けられるコンクリート体60と、コンクリート体60に挿通された第1連結部材70であって、第1既設壁11と新設杭20とを連結するための第1連結部材70と、を備えたので、接合構造体50を介して第1既設壁11と新設杭20とを接合でき、第1既設壁11と新設杭20の一体化を図ることができる。また、第1既設壁11又は新設杭20のいずれか一方に作用した外力を接合構造体50を介して第1既設壁11又は新設杭20のいずれか他方に伝達することができ、従来技術(既設躯体と新設躯体とを接合するための部材を既設躯体又は新設躯体に対して接着剤によって接続する技術)に比べて、第1既設壁11と新設杭20との相互間で力の伝達を確実に行うことが可能となる。また、第1既設壁11及び新設杭20を利用した構造体(例えば、山留壁等)を形成できるので、第1既設壁11を残すことによって第1既設壁11の解体の手間を削減し、且つ環境負荷を低減できると共に、第1既設壁11と新設杭20との一体化によって上記構造体の剛性を高め、且つ切梁段数の削減に寄与できる。よって、他の第1既設壁11の解体に用いる重機等のサイズを大きくしたり、重機等の台数を増やすことができ、第1既設壁11の解体の合理化を図りやすくなる。
(Effect of Embodiment)
Thus, according to the embodiment, the concrete body 60 provided between the first existing wall 11 and the new pile 20, and the first connecting member 70 inserted through the concrete body 60, the first existing Since the first connecting member 70 for connecting the wall 11 and the new pile 20 is provided, the first existing wall 11 and the new pile 20 can be joined via the joint structure 50, and the first existing wall 11 and the new pile 20 can be integrated. In addition, the external force acting on either the first existing wall 11 or the new pile 20 can be transmitted to the other of the first existing wall 11 or the new pile 20 via the joint structure 50. In comparison with the technique of connecting a member for joining the existing frame and the new frame to the existing frame or the new frame with an adhesive, force transmission between the first existing wall 11 and the new pile 20 is reduced. It can be done with certainty. In addition, since a structure (for example, a retaining wall or the like) can be formed using the first existing wall 11 and the new piles 20, leaving the first existing wall 11 in place can reduce the labor required to dismantle the first existing wall 11. In addition, the environmental load can be reduced, and the rigidity of the structure can be increased by integrating the first existing wall 11 and the new pile 20, and the number of steps of struts can be reduced. Therefore, it is possible to increase the size of the heavy machinery used for demolishing the other first existing wall 11 or to increase the number of heavy machinery, etc., which makes it easier to rationalize the demolishing of the first existing wall 11 .

また、第1既設壁11又は新設杭20の少なくともいずれか一方とコンクリート体60とを連結するための第2連結部材(既設側第2連結部材80及び新設側第2連結部材90)を備えるので、第1既設壁11又は新設杭20のいずれか一方に作用した外力(特に、せん断力)を第2連結部材を介して第1既設壁11又は新設杭20のいずれか他方に伝達することができる。また、例えば第2連結部材を設けない場合に比べて第1連結部材70の本数等を低減でき、接合構造体50の製造コストの低減化を図りやすくなる。 Moreover, since the second connecting member (the existing side second connecting member 80 and the newly installed side second connecting member 90) is provided for connecting at least one of the first existing wall 11 or the new pile 20 and the concrete body 60, , the external force (in particular, shear force) acting on either the first existing wall 11 or the new pile 20 can be transmitted to the other of the first existing wall 11 or the new pile 20 via the second connecting member. can. In addition, for example, the number of the first connecting members 70 can be reduced compared to the case where the second connecting member is not provided, and the manufacturing cost of the joint structure 50 can be easily reduced.

また、第1連結部材70が、ボルト部材であり、既設側第2連結部材80が、アンカー部材であり、新設側第2連結部材90が、スタッド部材であるので、第1連結部材70、既設側第2連結部材80、及び新設側第2連結部材90を比較的安価に構成することができ、接合構造体50の製造コストを低減できる。 Further, since the first connecting member 70 is a bolt member, the existing second connecting member 80 is an anchor member, and the newly installed second connecting member 90 is a stud member, the first connecting member 70 and the existing The side second connecting member 80 and the newly installed side second connecting member 90 can be configured at relatively low cost, and the manufacturing cost of the joint structure 50 can be reduced.

また、第1既設壁11が既設の外壁であり、新設杭20が新設の山留杭であるので、既設の外壁及び新設の山留杭を利用して山留壁を形成できる。よって、既設の外壁を残すことによって既設の外壁の解体の手間を削減し、且つ環境負荷を低減できると共に、既設の外壁と新設の山留杭との一体化によって山留壁の剛性を高め、且つ切梁段数の削減に寄与できる、よって、他の既設の外壁の解体に用いる重機等のサイズを大きくしたり、重機等の台数を増やすことができ、既設の外壁の解体の合理化を図りやすくなる。 Further, since the first existing wall 11 is the existing outer wall and the new pile 20 is the newly installed earth retaining pile, the existing outer wall and the newly installed earth retaining pile can be used to form the earth retaining wall. Therefore, by leaving the existing outer wall, the labor of dismantling the existing outer wall can be reduced and the environmental load can be reduced. In addition, it can contribute to a reduction in the number of steps of struts. Therefore, it is possible to increase the size of heavy machinery, etc. used for dismantling other existing exterior walls, or to increase the number of heavy machinery, etc., making it easy to rationalize the demolition of existing exterior walls. Become.

〔III〕実施の形態に対する変形例
以上、本発明の実施の形態について説明したが、本発明の具体的な構成及び手段は、特許請求の範囲に記載した各発明の技術的思想の範囲内において、任意に改変及び改良することができる。以下、このような変形例について説明する。
[III] Modifications to the Embodiments Although the embodiments of the present invention have been described above, specific configurations and means of the present invention are within the scope of the technical ideas of each invention described in the claims. , can be arbitrarily modified and improved. Such modifications will be described below.

(解決しようとする課題や発明の効果について)
まず、発明が解決しようとする課題や発明の効果は、前記した内容に限定されるものではなく、本発明によって、前記に記載されていない課題を解決したり、前記に記載されていない効果を奏することもでき、また、記載されている課題の一部のみを解決したり、記載されている効果の一部のみを奏することがある。
(Problem to be solved and effect of invention)
First, the problems to be solved by the invention and the effects of the invention are not limited to the above-described contents, and the present invention solves problems not described above or achieves effects not described above. and may solve only part of the problems described or provide only part of the advantages described.

(形状、数値、構造、時系列について)
実施の形態や図面において例示した構成要素に関して、形状、数値、又は複数の構成要素の構造若しくは時系列の相互関係については、本発明の技術的思想の範囲内において、任意に改変及び改良することができる。
(Regarding shapes, numbers, structures, and time series)
With respect to the components illustrated in the embodiments and drawings, the shape, numerical value, structure of multiple components, or time-series interrelationships may be arbitrarily modified and improved within the scope of the technical idea of the present invention. can be done.

(既設躯体について)
上記実施の形態では、接合構造体50に接合される既設躯体が、第1既設壁11(既設の外壁)であると説明したが、これに限らず、例えば、第1既設壁11以外の他の躯体(一例として、既設の内壁、柱、梁、床等)であってもよい。
(About the existing framework)
In the above-described embodiment, the existing skeleton that is joined to the joint structure 50 is the first existing wall 11 (existing outer wall). (existing inner walls, pillars, beams, floors, etc.).

また、上記実施の形態では、第1既設壁11が、縦断面形状がL字状となる矩形状体にて形成されていると説明したが、これに限らず、例えば、略平坦な矩形状体にて形成されてもよい。この場合には、第1既設壁11と新設杭20との相互間に接合構造体50が設けられる。 Further, in the above-described embodiment, the first existing wall 11 has been described as being formed in a rectangular body having an L-shaped vertical cross-section, but is not limited to this, for example, a substantially flat rectangular shape. It may be formed in the body. In this case, a joint structure 50 is provided between the first existing wall 11 and the new pile 20 .

(新設躯体について)
上記実施の形態では、接合構造体50に接合される新設躯体が、新設杭20(新設の山留杭)であると説明したが、これに限らず、例えば、新設杭20以外の他の躯体(一例として、新設の壁、柱、梁、床等)であってもよい。
(About the new framework)
In the above-described embodiment, the new skeleton to be joined to the joint structure 50 is the new pile 20 (new earth retaining pile). (For example, it may be newly installed walls, columns, beams, floors, etc.).

(新設杭について)
上記実施の形態では、新設杭20に接続部24が取り付けられていると説明したが、これに限らず、例えば、接続部24を省略してもよい。この場合には、第1連結部材70は、新設杭20に対して溶接又は固定具等によって直接接続されてもよい。
(Regarding new piles)
In the above-described embodiment, the connecting portion 24 is attached to the new pile 20, but the present invention is not limited to this, and the connecting portion 24 may be omitted, for example. In this case, the first connecting member 70 may be directly connected to the new pile 20 by welding or fixtures.

(接合構造体について)
上記実施の形態では、接合構造体50が、既設側第2連結部材80及び新設側第2連結部材90を備えていると説明したが、これに限らず、例えば、既設側第2連結部材80又は新設側第2連結部材90の少なくともいずれか一方を省略してもよい。この場合には、第1既設壁11と新設杭20との接合方法において、第2取付工程又は第3取付工程を省略できる。
(Regarding the junction structure)
In the above-described embodiment, the joint structure 50 includes the existing-side second connection member 80 and the new-installation-side second connection member 90 . Alternatively, at least one of the newly installed side second connecting members 90 may be omitted. In this case, in the joining method of the first existing wall 11 and the new pile 20, the second attachment step or the third attachment step can be omitted.

(コンクリート体について)
上記実施の形態では、コンクリート体60が、第1既設壁11と新設杭20との相互間に加えて、当該相互間以外の部分に設けられていると説明したが、これに限らず、例えば、第1既設壁11と新設杭20との相互間のみに設けられてもよい。
(About concrete body)
In the above-described embodiment, the concrete body 60 is provided not only between the first existing wall 11 and the new pile 20, but also in a portion other than the mutual space. , may be provided only between the first existing wall 11 and the new pile 20 .

(第1連結部材、第2連結部材について)
上記実施の形態では、第1連結部材70が、ボルト部材であると説明したが、これに限らず、例えば、ボルト部材以外の他の部材(一例として、鉄筋、アンカー部材等)であってもよい。また、上記実施の形態では、既設側第2連結部材80がアンカー部材であると説明したが、これに限らず、例えば、アンカー部材以外の他の部材(一例として、ボルト部材)であってもよい。また、上記実施の形態では、新設側第2連結部材90がスタッド部材であると説明したが、これに限らず、例えば、スタッド部材以外の他の部材(一例として、ボルト部材)であってもよい。
(Regarding the first connecting member and the second connecting member)
In the above embodiment, the first connecting member 70 is described as being a bolt member, but is not limited to this. good. Further, in the above-described embodiment, the existing-side second connecting member 80 is described as an anchor member, but the present invention is not limited to this. good. Further, in the above-described embodiment, the installation-side second connecting member 90 is described as being a stud member. good.

また、上記実施の形態では、第1連結部材70に脱落防止部71が設けられていると説明したが、これに限らず、例えば、脱落防止部71を省略してもよい。 Further, in the above-described embodiment, it is explained that the first connecting member 70 is provided with the drop-off preventing portion 71, but the drop-off preventing portion 71 may be omitted, for example.

(付記)
付記1の接合構造体は、既設躯体と、前記既設躯体とは別体に形成された新設躯体とを接合するための接合構造体であって、前記既設躯体と前記新設躯体との相互間に設けられるコンクリート体と、前記コンクリート体に挿通された第1連結部材であって、前記既設躯体と前記新設躯体とを連結するための第1連結部材と、を備えた。
(Appendix)
The joint structure of Supplementary Note 1 is a joint structure for joining an existing skeleton and a new skeleton formed separately from the existing skeleton, wherein the joint structure between the existing skeleton and the new skeleton and a first connecting member inserted through the concrete body to connect the existing skeleton and the new skeleton.

付記2の接合構造体は、付記1に記載の接合構造体において、前記既設躯体又は前記新設躯体の少なくともいずれか一方と前記コンクリート体とを連結するための第2連結部材を備える。 The joint structure according to Appendix 2 is the joint structure according to Appendix 1, further comprising a second connecting member for connecting at least one of the existing skeleton or the new skeleton and the concrete body.

付記3の接合構造体は、付記2に記載の接合構造体において、前記第1連結部材は、ボルト部材であり、前記第2連結部材は、スタッド部材又はアンカー部材である、 The joint structure according to Appendix 3 is the joint structure according to Appendix 2, wherein the first connecting member is a bolt member, and the second connecting member is a stud member or an anchor member.

付記4の接合構造体は、付記1から3のいずれか一項に記載の接合構造体において、前記既設躯体は、既設の外壁であり、前記新設躯体は、新設の山留杭である。 The joint structure of Appendix 4 is the joint structure according to any one of Appendixes 1 to 3, wherein the existing skeleton is an existing outer wall, and the new skeleton is a newly installed earth retaining pile.

(付記の効果)
付記1に記載の接合構造体によれば、既設躯体と新設躯体との相互間に設けられるコンクリート体と、コンクリート体に挿通された第1連結部材であって、既設躯体と新設躯体とを連結するための第1連結部材と、を備えたので、接合構造体を介して既設躯体と新設躯体とを接合でき、既設躯体と新設躯体の一体化を図ることができる。また、既設躯体又は新設躯体のいずれか一方に作用した外力を接合構造体を介して既設躯体又は新設躯体のいずれか他方に伝達することができ、従来技術(既設躯体と新設躯体とを接合するための部材を既設躯体又は新設躯体に対して接着剤によって接続する技術)に比べて、既設躯体と新設躯体との相互間で力の伝達を確実に行うことが可能となる。また、既設躯体及び新設躯体を利用した構造体(例えば、山留壁等)を形成できるので、既設躯体を残すことによって既設躯体の解体の手間を削減し、且つ環境負荷を低減できると共に、既設躯体と新設躯体との一体化によって上記構造体の剛性を高め、且つ切梁段数の削減に寄与できる。よって、他の既設躯体の解体に用いる重機等のサイズを大きくしたり、重機等の台数を増やすことができ、既設躯体の解体の合理化を図りやすくなる。
(Effect of Supplementary Note)
According to the joint structure described in Supplementary Note 1, the concrete body provided between the existing skeleton and the new skeleton and the first connecting member inserted through the concrete body connect the existing skeleton and the new skeleton. and the first connecting member for connecting, the existing skeleton and the new skeleton can be joined via the joint structure, and the existing skeleton and the new skeleton can be integrated. In addition, the external force acting on either the existing skeleton or the new skeleton can be transmitted to the other of the existing skeleton or the new skeleton via the joint structure, and the conventional technology (joining the existing skeleton and the new skeleton In comparison with the technique of connecting the members to the existing frame or the new frame with an adhesive agent), it is possible to reliably transmit force between the existing frame and the new frame. In addition, since a structure (for example, retaining wall) can be formed using the existing frame and the new frame, leaving the existing frame can reduce the labor of dismantling the existing frame, reduce the environmental load, and reduce the environmental load. The integration of the skeleton and the new skeleton can increase the rigidity of the structure and contribute to the reduction of the number of strut steps. Therefore, it is possible to increase the size of the heavy machinery used for dismantling other existing skeletons, or to increase the number of heavy machinery, etc., making it easier to rationalize the dismantling of the existing skeletons.

付記2に記載の接合構造体によれば、既設躯体又は新設躯体の少なくともいずれか一方とコンクリート体とを連結するための第2連結部材を備えるので、既設躯体又は新設躯体のいずれか一方に作用した外力(特に、せん断力)を第2連結部材を介して既設躯体又は新設躯体のいずれか他方に伝達することができる。また、例えば第2連結部材を設けない場合に比べて第1連結部材の本数等を低減でき、接合構造体の製造コストの低減化を図りやすくなる。 According to the joint structure described in Supplementary Note 2, since the second connecting member is provided for connecting at least one of the existing frame or the new frame and the concrete body, it acts on either the existing frame or the new frame. The applied external force (especially shear force) can be transmitted to either the existing skeleton or the new skeleton via the second connecting member. In addition, the number of the first connecting members can be reduced compared to the case where the second connecting member is not provided, and the manufacturing cost of the joined structure can be easily reduced.

付記3に記載の接合構造体によれば、第1連結部材が、ボルト部材であり、第2連結部材が、スタッド部材又はアンカー部材であるので、第1連結部材及び第2連結部材を比較的安価に構成することができ、接合構造体の製造コストを低減できる。 According to the joint structure described in appendix 3, the first connecting member is the bolt member, and the second connecting member is the stud member or the anchor member, so that the first connecting member and the second connecting member are relatively It can be constructed at a low cost, and the manufacturing cost of the joint structure can be reduced.

付記4に記載の接合構造体によれば、既設躯体が既設の外壁であり、新設躯体が新設の山留杭であるので、既設の外壁及び新設の山留杭を利用して山留壁を形成できる。よって、既設の外壁を残すことによって既設の外壁の解体の手間を削減し、且つ環境負荷を低減できると共に、既設の外壁と新設の山留杭との一体化によって山留壁の剛性を高め、且つ切梁段数の削減に寄与できる、よって、他の既設の外壁の解体に用いる重機等のサイズを大きくしたり、重機等の台数を増やすことができ、既設の外壁の解体の合理化を図りやすくなる。 According to the joint structure described in Supplementary Note 4, the existing frame is the existing outer wall, and the new frame is the newly installed earth retaining piles. can be formed. Therefore, by leaving the existing outer wall, the labor of dismantling the existing outer wall can be reduced and the environmental load can be reduced. In addition, it can contribute to a reduction in the number of steps of struts. Therefore, it is possible to increase the size of heavy machinery, etc. used for dismantling other existing exterior walls, or to increase the number of heavy machinery, etc., making it easy to rationalize the demolition of existing exterior walls. Become.

1 建物
10 壁
11 第1既設壁
11a 下側突出部
12 第2既設壁
13 新設壁
20 新設杭
21 第1フランジ部
22 第2フランジ部
23 ウェブ部
24 接続部
50 接合構造体
60 コンクリート体
70 第1連結部材
71 脱落防止部
80 既設側第2連結部材
90 新設側第2連結部材
G 地盤
REFERENCE SIGNS LIST 1 building 10 wall 11 first existing wall 11a lower projecting portion 12 second existing wall 13 new wall 20 new pile 21 first flange portion 22 second flange portion 23 web portion 24 connecting portion 50 joint structure 60 concrete body 70 second 1 connecting member 71 fall prevention part 80 existing side second connecting member 90 newly installed side second connecting member G ground

Claims (3)

既設躯体と、前記既設躯体とは別体に形成された新設躯体とを接合するための接合構造体であって、
前記既設躯体と前記新設躯体との相互間に設けられるコンクリート体と、
前記コンクリート体に挿通された第1連結部材であって、前記既設躯体と前記新設躯体とを連結するための第1連結部材と、を備え、
前記既設躯体は、既設の外壁であり、
前記新設躯体は、新設の山留杭である、
接合構造体。
A joint structure for joining an existing skeleton and a new skeleton formed separately from the existing skeleton,
a concrete body provided between the existing skeleton and the new skeleton;
a first connecting member inserted through the concrete body, the first connecting member for connecting the existing skeleton and the new skeleton ;
The existing skeleton is an existing outer wall,
The new frame is a newly installed earth retaining pile,
junction structure.
前記既設躯体又は前記新設躯体の少なくともいずれか一方と前記コンクリート体とを連
結するための第2連結部材を備える、
請求項1に記載の接合構造体。
A second connecting member for connecting at least one of the existing skeleton or the new skeleton and the concrete body,
The joined structure according to claim 1.
前記第1連結部材は、ボルト部材であり、
前記第2連結部材は、スタッド部材又はアンカー部材である、
請求項2に記載の接合構造体。
The first connecting member is a bolt member,
The second connecting member is a stud member or an anchor member,
The joined structure according to claim 2.
JP2019072258A 2019-04-04 2019-04-04 junction structure Active JP7274332B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2019072258A JP7274332B2 (en) 2019-04-04 2019-04-04 junction structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2019072258A JP7274332B2 (en) 2019-04-04 2019-04-04 junction structure

Publications (2)

Publication Number Publication Date
JP2020169514A JP2020169514A (en) 2020-10-15
JP7274332B2 true JP7274332B2 (en) 2023-05-16

Family

ID=72745747

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2019072258A Active JP7274332B2 (en) 2019-04-04 2019-04-04 junction structure

Country Status (1)

Country Link
JP (1) JP7274332B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7314432B1 (en) 2023-02-17 2023-07-25 鹿島建設株式会社 Foundation structure of building and construction method of foundation structure

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003206636A (en) 2002-01-11 2003-07-25 Oriental Construction Co Ltd Earthquake-resistant reinforced constriction and method used for repairing for existing veranda in common
JP2005155139A (en) 2003-11-25 2005-06-16 Oriental Construction Co Ltd Seismic reinforcing external frame construction method of existing building
JP2009249851A (en) 2008-04-02 2009-10-29 Fujita Corp Seismic strengthening method for existing building
JP2010281185A (en) 2009-06-04 2010-12-16 Itoo:Kk Method for reconstructing existing building with basement
JP2014001550A (en) 2012-06-18 2014-01-09 Okumura Corp Slab for connection and construction method thereof
JP2016199915A (en) 2015-04-10 2016-12-01 株式会社竹中工務店 Foundation structure and foundation construction method

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3148138B2 (en) * 1997-01-09 2001-03-19 株式会社ショックベトン・ジャパン Mounting method of PC formwork in driving formwork method
JP2010196130A (en) * 2009-02-26 2010-09-09 Sumitomo Wiring Syst Ltd Method and apparatus for modifying steel surface

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003206636A (en) 2002-01-11 2003-07-25 Oriental Construction Co Ltd Earthquake-resistant reinforced constriction and method used for repairing for existing veranda in common
JP2005155139A (en) 2003-11-25 2005-06-16 Oriental Construction Co Ltd Seismic reinforcing external frame construction method of existing building
JP2009249851A (en) 2008-04-02 2009-10-29 Fujita Corp Seismic strengthening method for existing building
JP2010281185A (en) 2009-06-04 2010-12-16 Itoo:Kk Method for reconstructing existing building with basement
JP2014001550A (en) 2012-06-18 2014-01-09 Okumura Corp Slab for connection and construction method thereof
JP2016199915A (en) 2015-04-10 2016-12-01 株式会社竹中工務店 Foundation structure and foundation construction method

Also Published As

Publication number Publication date
JP2020169514A (en) 2020-10-15

Similar Documents

Publication Publication Date Title
KR101377327B1 (en) Method for reinforcing seismic capability of existing moment frames buildings of reinforced concrete by section enlargement
KR101780370B1 (en) Composite structure using shear connector made of anchor and socket shoe
KR20090094971A (en) Under ground top-down method
JP6166560B2 (en) Extension structure of seismic isolation building
KR102357963B1 (en) Earthquake resistant slurry wall structure
KR102396786B1 (en) Underground expansion and top-down method of new building using reinforcement of existing underground outer wall
JP3690437B2 (en) Seismic reinforcement structure for existing buildings
JP7274332B2 (en) junction structure
KR101200993B1 (en) Precast concrete column material for permanent column pre-establishment method
KR102317705B1 (en) Seismic retrofit structure and construction method thereof
JP5541520B2 (en) Underground construction
JP2003105861A (en) High-rise buildings using HFC columns, HFC beams, etc.
KR200469319Y1 (en) Construction structure for joining steel or reinforced steel concrete column and beam with reinforcing end part
JP7665807B2 (en) CLT-based earthquake-resistance reinforcement for existing buildings
JP6574336B2 (en) Steel-framed reinforced concrete columns and buildings using the same
KR101685632B1 (en) Shear connector to increase strength and ductility
KR101908943B1 (en) RC WALL STRUCTURE FOR TOP-DOWN AND METHOD FOR CONSTRUCTING THE STRUCTUREa
KR102452802B1 (en) A construction method to use the seismic resistant precast concrete members
JP3362019B2 (en) Earth retaining wall and RC composite structure
JP6461690B2 (en) Foundation structure and foundation construction method
JP6261964B2 (en) Seismic reinforcement structure
JP7442268B2 (en) underground structure
KR20170036949A (en) Connecting sturcture between column and beam
JP7283659B2 (en) Mountain retaining structure
KR102286505B1 (en) Seismic retrofit structure using existing slab and construction method thereof

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20220324

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20230126

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20230207

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20230215

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20230404

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20230501

R150 Certificate of patent or registration of utility model

Ref document number: 7274332

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150