Solar power generation output estimation device, solar power generation output estimation method, and solar power generation output estimation program Download PDF

Info

Publication number
JP7300893B2
JP7300893B2 JP2019097335A JP2019097335A JP7300893B2 JP 7300893 B2 JP7300893 B2 JP 7300893B2 JP 2019097335 A JP2019097335 A JP 2019097335A JP 2019097335 A JP2019097335 A JP 2019097335A JP 7300893 B2 JP7300893 B2 JP 7300893B2
Authority
JP
Japan
Prior art keywords
power generation
photovoltaic power
output
photovoltaic
consumer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2019097335A
Other languages
Japanese (ja)
Other versions
JP2020191764A (en
Inventor
一浩 安並
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP2019097335A priority Critical patent/JP7300893B2/en
Publication of JP2020191764A publication Critical patent/JP2020191764A/en
Application granted granted Critical
Publication of JP7300893B2 publication Critical patent/JP7300893B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/12Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
    • Y04S10/123Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation the energy generation units being or involving renewable energy sources
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Photovoltaic Devices (AREA)

Description

この発明は、太陽光発電設備の発電出力の推定に関する。 The present invention relates to estimation of power generation output of photovoltaic power generation equipment.

近年、再生可能エネルギーの利用を拡大することの重要性が高まっており、太陽光発電設備などの分散型電源を設置し、送電系統または配電系統(以下、これらを電力系統という)に電力を供給する需要家が増えてきている。一方、電力系統を運用する電力会社などでは、一部の太陽光発電設備の発電出力は把握しているものの、多くの太陽光発電設備の発電出力は把握できていない。このため、各需要家が設置した太陽光発電設備の発電出力を推定する装置が提案されている(例えば、特許文献1参照)。なお、上記の発電出力を把握できる太陽光発電設備は、全量買取契約の対象となっている太陽光発電設備であり、発電出力を把握できない太陽光発電設備は、余剰買取契約の対象となっている太陽光発電設備である。これは、全量買取契約の対象となっている太陽光発電設備を保有する需要家には、太陽光発電設備の発電量を計測するスマートメータと、需要家内の負荷の消費電力量を計測するスマートメータが個別に設置されているのに対し、余剰買取契約の対象となっている太陽光発電設備を保有する需要家には、太陽発電設備の発電量と負荷の消費電力量の合算値を計測するスマートメータしか設置されていないためである。 In recent years, the importance of expanding the use of renewable energy has increased, and distributed power sources such as solar power generation facilities have been installed to supply power to the transmission or distribution system (hereinafter referred to as the power system). demand is increasing. On the other hand, power companies that operate electric power systems have grasped the power output of some photovoltaic power generation facilities, but have not been able to grasp the power output of many photovoltaic power generation facilities. For this reason, a device for estimating the power output of a photovoltaic power generation facility installed by each consumer has been proposed (see, for example, Patent Document 1). The photovoltaic power generation facilities for which the power output can be ascertained above are those subject to the full power purchase agreement, and the photovoltaic power generation facilities for which the power output cannot be ascertained are subject to the surplus purchase agreement. It is a photovoltaic power generation facility. For consumers who own photovoltaic power generation facilities covered by the purchase agreement, a smart meter that measures the amount of power generated by the photovoltaic power generation facility and a smart meter that measures the power consumption of the load within the consumer While meters are installed individually, for consumers who own solar power generation equipment subject to surplus purchase agreements, the total amount of power generated by the solar power generation equipment and the power consumption of the load is measured. This is because only smart meters that

特許文献1には、電力系統に接続された負荷に電力を供給する太陽光発電設備の所定時点での発電出力である太陽光発電出力を推定する太陽光発電出力推定装置であって、所定時点以前の期間であって、太陽の南中高度が所定時点での当該南中高度から所定範囲内の期間における、所定地点での日射強度と電力系統の有効電力とを用いて、太陽光発電出力を推定する発電出力推定部を備えることを特徴とする、太陽光発電出力推定装置が開示されている。この太陽光発電出力推定装置は、変電所周辺に設置した日射計などで測定した日射強度と、変電所などに設置した計測器で測定した有効電力とを用いて、電力系統に連系した太陽光発電設備の発電出力を推定する。 Patent Document 1 discloses a photovoltaic power generation output estimating device for estimating a photovoltaic power output at a predetermined point in time of a photovoltaic power generation facility that supplies power to a load connected to an electric power system. Solar power generation output using the solar radiation intensity at a predetermined point and the active power of the power system in the previous period, during the period in which the sun's mid-southern altitude is within a predetermined range from the sun's mid-southern altitude at a predetermined point in time A photovoltaic output estimating device is disclosed, characterized by comprising a generated output estimating unit for estimating . This photovoltaic power generation output estimation device uses the solar radiation intensity measured by a pyranometer installed near the substation and the active power measured by a measuring instrument installed in the substation to Estimate the power output of a photovoltaic power plant.

特開2016-139270号公報JP 2016-139270 A

電力会社などが多くの太陽光発電設備の発電出力を把握できていない状況下において、太陽光発電設備が大量に導入された場合、電力系統の運用には様々な問題が生じる。電力会社などでは、自身が所管する変電所などで、太陽光発電設備の発電出力を加味した見かけ上の電力系統の負荷(以下、「見かけ上の負荷」という)の消費電力を計測器などで計測できているものの、電力系統に連系されている全ての太陽光発電設備の発電出力合計値が未知であるため、実際の負荷(以下、「実負荷」という)の消費電力を正確に把握することができない。このため、太陽光発電設備が大量に導入された場合、重回帰分析などを利用して予測を行っている実負荷の消費電力の予測誤差が大きくなるという需給制御上のリスクが増大したり、系統事故後の復旧操作に支障が生じるという系統制御上のリスクが増大したりする。 Under the circumstances where electric power companies and the like cannot grasp the power output of many photovoltaic power generation facilities, if a large number of photovoltaic power generation facilities are introduced, various problems will arise in the operation of the power system. Electric power companies, etc., use measuring instruments to measure the power consumption of the apparent power system load (hereinafter referred to as "apparent load") that takes into account the power output of the photovoltaic power generation equipment at the substations under their control. Although it can be measured, the power consumption of the actual load (hereinafter referred to as "actual load") can be accurately grasped because the total power output of all the photovoltaic power generation facilities connected to the power system is unknown. Can not do it. For this reason, when a large number of photovoltaic power generation facilities are introduced, there is an increase in the risk of supply and demand control that the prediction error of the power consumption of the actual load, which is predicted using multiple regression analysis, will increase. There is an increased risk in terms of system control, such as hindrance to recovery operations after a system failure.

このため、太陽光発電設備の発電出力を正確に推定する必要がある。しかし、特許文献1の太陽光発電出力推定装置によれば、日射強度を測定するために多くの日射計を設置する必要性と、十分高い時間分解能を有する、すなわち十分高いサンプリング周期で計測と記録が可能な計測器を設置する必要性が生じる。また、変電所などの単位で推定を行うため、対象となる電力系統に連系された太陽光発電設備の導入量が実負荷と比較して小さくなるほど、推定精度が低下するという問題もある。それゆえ、電力系統に連系された太陽光発電設備の発電出力を高精度に推定するためには、技術的にもコスト的にも問題がある。 Therefore, it is necessary to accurately estimate the power output of the photovoltaic power generation equipment. However, according to the photovoltaic power generation output estimation device of Patent Document 1, it is necessary to install many pyranometers to measure the solar radiation intensity, and to have sufficiently high time resolution, that is, to measure and record at a sufficiently high sampling period. It becomes necessary to install a measuring instrument capable of In addition, since the estimation is performed for each substation or the like, there is also the problem that the estimation accuracy decreases as the introduction amount of the photovoltaic power generation equipment connected to the target power system becomes smaller compared to the actual load. Therefore, there are technical and cost problems in estimating the power output of the photovoltaic power generation equipment connected to the power system with high accuracy.

そこで、本発明は、このような問題に鑑みてなされたものであり、多くの日射計および十分高い時間分解能をもった計測器を新たに設置することなく、太陽光発電設備の太陽光発電出力を推定することを目的とする。 Therefore, the present invention has been made in view of such problems, and can measure the photovoltaic power output of photovoltaic power generation equipment without newly installing many pyranometers and measuring instruments with sufficiently high time resolution. for the purpose of estimating

本発明の太陽光発電出力推定装置は、複数の第1太陽光発電設備の太陽光発電出力である第1太陽光発電出力と複数の第1太陽光発電設備が1対1で設置された複数の需要家の負荷の消費電力とが複数の需要家の夫々ごとに合算された需要家の見かけ上の消費電力である需要家消費電力と、複数の第1太陽光発電設備から予め定められた距離内に設置された、少なくとも1つの第2太陽光発電設備の太陽光発電出力である第2太陽光発電出力と、を記憶する記憶部と、第2太陽光発電出力と、各需要家の需要家消費電力の合算値とに基づき、第1太陽光発電設備の予め定められた推定時点の太陽光発電出力である第1太陽光発電出力の合算値を推定する発電出力推定部と、を備える。 A photovoltaic power generation output estimating apparatus of the present invention is a plurality of first photovoltaic power generation facilities installed in a one-to-one relationship with a first photovoltaic power generation output, which is a photovoltaic power generation output of a plurality of first photovoltaic power generation facilities. The power consumption of the load of the consumer is the apparent power consumption of the consumer that is summed up for each of the plurality of consumers, and the power consumption of the consumer, which is predetermined from the plurality of first photovoltaic power generation equipment A storage unit that stores a second photovoltaic power generation output that is a photovoltaic power output of at least one second photovoltaic power generation facility installed within a distance; a second photovoltaic power generation output ; a power generation output estimating unit for estimating a total value of the first photovoltaic power generation output, which is the photovoltaic power output at a predetermined estimation time point of each first photovoltaic power generation facility, based on the total value of the consumer power consumption; Prepare.

本発明の太陽光発電出力推定装置は、第2太陽光発電出力と各需要家の需要家消費電力とに基づき第1太陽光発電出力を推定するため、多くの日射計および十分高い時間分解能をもった計測器を新たに設置することなく第1太陽光発電出力を推定することが可能である。

Since the photovoltaic power generation output estimating apparatus of the present invention estimates the first photovoltaic power output based on the second photovoltaic power output and the consumer power consumption of each consumer , many pyranometers and sufficiently high time resolution are used. It is possible to estimate the first photovoltaic power generation output without installing a new measuring instrument.

実施の形態1の太陽光発電出力推定システムの構成図である。1 is a configuration diagram of a photovoltaic power generation output estimation system according to Embodiment 1. FIG. 実施の形態1の太陽光発電出力推定装置の機能を示すブロック図である。1 is a block diagram showing functions of a photovoltaic power generation output estimation device according to Embodiment 1. FIG. 実施の形態1の太陽光発電出力推定装置のハードウェア構成を示す図である。1 is a diagram showing a hardware configuration of a photovoltaic power generation output estimating device according to Embodiment 1; FIG. 実施の形態1の太陽光発電出力推定装置による第1太陽光発電出力の推定処理の一例を示すフローチャートである。5 is a flowchart showing an example of estimation processing of a first photovoltaic power output by the photovoltaic power output estimating device of Embodiment 1. FIG. 第1共分散取得部による第1共分散の取得処理の一例を示すフローチャートである。8 is a flowchart illustrating an example of first covariance acquisition processing by a first covariance acquisition unit; 第2共分散取得部による第2共分散の取得処理の一例を示すフローチャートである。9 is a flowchart illustrating an example of second covariance acquisition processing by a second covariance acquisition unit; 発電出力推定部による第1太陽光発電出力の推定処理の一例を示すフローチャートである。6 is a flowchart showing an example of estimation processing of a first photovoltaic power generation output by a power generation output estimating unit; 第1太陽光発電出力の実測値を示す図である。It is a figure which shows the measured value of a 1st photovoltaic power generation output. 実施の形態1の太陽光発電出力推定装置による第1太陽光発電出力の推定値を示す図である。4 is a diagram showing an estimated value of a first photovoltaic power output by the photovoltaic power output estimating device of Embodiment 1. FIG. 実施の形態1の太陽光発電出力推定装置による第1太陽光発電出力の推定値の誤差のヒストグラムを示す図である。4 is a diagram showing a histogram of errors in the estimated value of the first photovoltaic power output by the photovoltaic output estimating device of Embodiment 1. FIG. 第1太陽光発電出力の実測値を示す図である。It is a figure which shows the measured value of a 1st photovoltaic power generation output. 実施の形態2の太陽光発電出力推定装置による第1太陽光発電出力の推定値を示す図である。FIG. 10 is a diagram showing estimated values of a first photovoltaic power output by the photovoltaic power output estimating device according to Embodiment 2; 実施の形態2の太陽光発電出力推定装置による第1太陽光発電出力の推定値の誤差のヒストグラムを示す図である。FIG. 10 is a diagram showing a histogram of errors in the estimated value of the first photovoltaic power output by the photovoltaic power output estimating device of Embodiment 2; 第1太陽光発電出力の実測値を示す図である。It is a figure which shows the measured value of a 1st photovoltaic power generation output. 実施の形態3の太陽光発電出力推定装置による第1太陽光発電出力の推定値を示す図である。FIG. 12 is a diagram showing an estimated value of a first photovoltaic power output by the photovoltaic power output estimating device of Embodiment 3; 実施の形態3の太陽光発電出力推定装置による第1太陽光発電出力の推定値の誤差のヒストグラムを示す図である。FIG. 11 is a diagram showing a histogram of errors in estimated values of the first photovoltaic power output by the photovoltaic power output estimation apparatus of Embodiment 3; 第1太陽光発電出力の実測値を示す図である。It is a figure which shows the measured value of a 1st photovoltaic power generation output. 実施の形態4の太陽光発電出力推定装置による第1太陽光発電出力の推定値を示す図である。FIG. 12 is a diagram showing an estimated value of a first photovoltaic power output by the photovoltaic power output estimation apparatus of Embodiment 4; 実施の形態5の太陽光発電出力推定装置105が、複数の需要家の太陽光発電出力を順番に推定する様子を示す図である。FIG. 14 is a diagram showing how the photovoltaic power generation output estimating device 105 according to Embodiment 5 sequentially estimates the photovoltaic power output of a plurality of consumers.

<A.実施の形態1>
<A-1.構成>
図1は、実施の形態1の太陽光発電出力推定システム11の構成図である。太陽光発電出力推定システム11は、太陽光発電出力推定装置101と、複数の需要家の下に設置された各種の設備とが、通信ネットワーク50を介して接続された構成である。図1において実線は電力の流れを表し、破線は情報の流れを表している。
<A. Embodiment 1>
<A-1. Configuration>
FIG. 1 is a configuration diagram of a photovoltaic power generation output estimation system 11 according to Embodiment 1. As shown in FIG. The photovoltaic output estimation system 11 has a configuration in which a photovoltaic output estimation device 101 and various facilities installed under a plurality of consumers are connected via a communication network 50 . In FIG. 1, solid lines represent power flow, and dashed lines represent information flow.

図1では、複数の需要家として第1需要家C1、第2需要家C2、第3需要家C3、第4需要家C4、…第m需要家Cm、第n需要家Cnを想定する。これらの第1需要家C1-第n需要家Cnには、負荷L1-Lnと太陽光発電設備PV1-PVnがそれぞれ設置されている。第2需要家C2-第n需要家Cnに設置された太陽光発電設備PV2-PVnは、余剰買取契約対象の太陽光発電設備であり、これらを第1太陽光発電設備とも称する。また、第1需要家C1に設置された太陽光発電設備PV1は、全量買取契約対象の太陽光発電設備であり、第2太陽光発電設備とも称する。太陽光発電設備PV1は、太陽光発電設備PV2-PVnから予め定められた距離内に設置されている。ここで、予め定められた距離とは、特に限定されないが、例えば数kmである。 In FIG. 1, a first consumer C1, a second consumer C2, a third consumer C3, a fourth consumer C4, . Loads L1 to Ln and photovoltaic power generation facilities PV1 to PVn are installed in these first consumer C1 to n-th consumer Cn, respectively. The photovoltaic power generation facilities PV2-PVn installed in the second consumer C2-n-th consumer Cn are the photovoltaic power generation facilities subject to the surplus purchase agreement, and are also referred to as the first photovoltaic power generation facilities. Also, the photovoltaic power generation facility PV1 installed at the first consumer C1 is a photovoltaic power generation facility subject to a purchase contract for the total amount of power generated, and is also referred to as a second photovoltaic power generation facility. The photovoltaic power generation facility PV1 is installed within a predetermined distance from the photovoltaic power generation facilities PV2-PVn. Here, the predetermined distance is not particularly limited, but is, for example, several kilometers.

太陽光発電出力推定装置101は、第2太陽光発電設備の発電出力である第2太陽光発電出力を利用して、第1太陽光発電設備の予め定められた時点(以下、「推定時点」と称する)の太陽光発電出力である第1太陽光発電出力を推定する。推定時点には、現在の時点のみならず、過去または未来の時点が含まれる。太陽光発電出力推定装置101は、パーソナルコンピュータなどの汎用のコンピュータシステムがプログラムを実行することによって実現されても良いし、専用のコンピュータシステムによって実現されても良い。太陽光発電出力推定装置101の詳細な構成については、後述する。 The photovoltaic power generation output estimation device 101 uses the second photovoltaic power generation output, which is the power generation output of the second photovoltaic power generation facility, to determine a predetermined point in time of the first photovoltaic power generation facility (hereinafter, “estimation time” ) is estimated as the first photovoltaic power output. The estimated time includes not only the current time but also the past or future time. The photovoltaic power generation output estimation device 101 may be implemented by a general-purpose computer system such as a personal computer executing a program, or may be implemented by a dedicated computer system. A detailed configuration of the photovoltaic output estimation device 101 will be described later.

太陽光発電設備PV1-PVnは、例えば、需要家が有する建築物の屋根などに設置されている太陽光発電設備であり、小規模な太陽光発電設備のみならず、いわゆるメガソーラーなどの大規模太陽光発電所を含む。太陽光発電設備PV1-PVnは、電力系統20に連系されており、発電した電力を電力系統20に供給する。また、電力系統20には、図1に示すように、負荷L1-Lnが接続されている。負荷L1-Lnは電力系統20から電力供給を受け、電力を消費する。 The photovoltaic power generation facilities PV1-PVn are, for example, photovoltaic power generation facilities installed on the roofs of buildings owned by consumers. Including solar power plants. The photovoltaic power generation facilities PV1-PVn are interconnected to the power system 20 and supply the power system 20 with the generated power. In addition, loads L1 to Ln are connected to the power system 20 as shown in FIG. The loads L1-Ln are supplied with power from the power system 20 and consume power.

このように、電力系統20に接続されている負荷L1-Lnの実際の消費電力と、電力系統20に連系されている太陽光発電設備PV1-PVnの発電出力とによって、電力系統20から見た負荷L1-Lnの見かけ上の消費電力は、変動する。以下では、電力系統20から見た、各需要家の負荷L1-Lnによる見かけ上の消費電力を、需要家消費電力と呼ぶ。 In this way, based on the actual power consumption of the loads L1-Ln connected to the power system 20 and the power output of the photovoltaic power generation facilities PV1-PVn interconnected to the power system 20, the power system 20 sees The apparent power consumption of the loads L1-Ln fluctuates. Hereinafter, the apparent power consumption by the loads L1-Ln of each consumer as seen from the power system 20 is referred to as consumer power consumption.

第2-第n需要家C2-Cnには、スマートメータSMALL2-SMALLnが設置されている。スマートメータSMALL2-SMALLnは、第1太陽光発電設備である太陽光発電設備PV2-PVnの発電出力と負荷L2-Lnの消費電力とが需要家毎に合算された需要家消費電力を計測する。ここで、スマートメータSMALL2-SMALLnが計測する「合算された需要家消費電力」は、負荷L2-Lnの消費電力から、太陽光発電設備PV2-PVnの発電出力が、需要家毎にそれぞれ差し引かれた量である。スマートメータSMALL2-SMALLnが計測した需要家消費電力の情報は、通信網25と通信ネットワーク50を介して、太陽光発電出力推定装置101に送られる。 Smart meters SM ALL2 to SM ALLn are installed in the second to n-th consumers C2-Cn. The smart meters SM ALL2 -SM ALLn measure the power consumption of each consumer, which is the sum of the power output of the photovoltaic power generation facilities PV2-PVn, which are the first photovoltaic power generation facilities, and the power consumption of the loads L2-Ln. do. Here, the “total consumer power consumption” measured by the smart meters SM ALL2 to SM ALLn is the power consumption of the loads L2 to Ln, the power generation output of the photovoltaic power generation facilities PV2 to PVn for each consumer It is the subtracted amount. Information on consumer power consumption measured by the smart meters SM ALL2 to SM ALLn is sent to the photovoltaic power generation output estimation device 101 via the communication network 25 and the communication network 50 .

例えば、第2需要家C2では、スマートメータSMALL2が、太陽光発電設備PV2の発電出力と負荷L2の消費電力との合算値を需要家消費電力として計測および記録する。そして、第2需要家C2の需要家消費電力の情報は、スマートメータSMALL2から通信網25と通信ネットワーク50とを介して、太陽光発電出力推定装置101に送られる。このようにして太陽光発電出力推定装置101は、第1太陽光発電設備である太陽光発電設備PV2-PVnを保有する需要家に設置されたスマートメータSMALL2-SMALLnの計測値である需要家消費電力を取得する。 For example, at the second consumer C2, the smart meter SM ALL2 measures and records the sum of the power output of the photovoltaic power generation facility PV2 and the power consumption of the load L2 as consumer power consumption. Then, the information on the consumer power consumption of the second consumer C2 is sent from the smart meter SM ALL2 to the photovoltaic power generation output estimation device 101 via the communication network 25 and the communication network 50 . In this way, the photovoltaic power output estimating device 101 can calculate the demand, which is the measurement value of the smart meters SM ALL2 -SM ALLn installed in the consumer who owns the photovoltaic power generation equipment PV2-PVn, which is the first photovoltaic power generation equipment. Get home power consumption.

第1需要家C1には、スマートメータSMPV1とスマートメータSML1が設置されている。スマートメータSMPV1は、太陽光発電設備PV1の発電出力を計測および記録する。スマートメータSMPV1が計測した太陽光発電設備PV1の発電出力の情報は、通信網25と通信ネットワーク50とを介して太陽光発電出力推定装置101に送られる。このようにして太陽光発電出力推定装置101は、第2太陽光発電設備である太陽光発電設備PV1の発電出力である第2太陽光発電出力を取得する。 A smart meter SM PV1 and a smart meter SM L1 are installed in the first consumer C1. The smart meter SM PV1 measures and records the power output of the photovoltaic power generation facility PV1. Information on the power output of the photovoltaic power generation facility PV1 measured by the smart meter SM PV1 is sent to the photovoltaic power output estimation device 101 via the communication network 25 and the communication network 50 . In this way, the photovoltaic power generation output estimation device 101 acquires the second photovoltaic power generation output, which is the power output of the photovoltaic power generation facility PV1, which is the second photovoltaic power generation facility.

次に、太陽光発電出力推定装置101の詳細な機能について説明する。図2は、太陽光発電出力推定装置101の機能を示すブロック図である。太陽光発電出力推定装置101は、太陽光発電設備PV2-PVnの推定時点の発電出力である第1太陽光発電出力を推定する装置である。図2に示すように、太陽光発電出力推定装置101は、第1共分散取得部110と、第2共分散取得部120と、発電出力推定部130と、記憶部140とを備えている。 Next, detailed functions of the photovoltaic power generation output estimation device 101 will be described. FIG. 2 is a block diagram showing the functions of the photovoltaic output estimation device 101. As shown in FIG. The photovoltaic power generation output estimation device 101 is a device for estimating the first photovoltaic power output, which is the power output at the time of estimation of the photovoltaic power generation facilities PV2-PVn. As shown in FIG. 2 , the photovoltaic power generation output estimation device 101 includes a first covariance acquisition unit 110 , a second covariance acquisition unit 120 , a power generation output estimation unit 130 , and a storage unit 140 .

記憶部140は、太陽光発電設備PV2-PVnの推定時点の発電出力を推定するためのデータなどを記憶しているメモリである。具体的には、記憶部140は、場所情報データ141、第2太陽光発電出力データ142、需要家消費電力データ143、および算出データ144を記憶している。場所情報データ141は、太陽光発電設備を保有する需要家の住所または緯度経度などの場所情報のデータである。第2太陽光発電出力データ142は、スマートメータSMPV1による太陽光発電設備PV1の発電出力の計測値である。需要家消費電力データ143は、スマートメータSMALL2-SMALLnによる需要家消費電力の計測値である。算出データ144は、第1共分散取得部110、第2共分散取得部120、および発電出力推定部130が算出したデータである。 The storage unit 140 is a memory that stores data for estimating the power output of the photovoltaic power generation facilities PV2-PVn at the time of estimation. Specifically, the storage unit 140 stores location information data 141 , second photovoltaic power generation output data 142 , consumer power consumption data 143 , and calculation data 144 . The location information data 141 is data of location information such as the address or latitude/longitude of the customer who owns the photovoltaic power generation facility. The second photovoltaic power generation output data 142 is the measured value of the power generation output of the photovoltaic power generation facility PV1 by the smart meter SM PV1 . The consumer power consumption data 143 is the measured value of the consumer power consumption by the smart meters SM ALL2 to SM ALLn . Calculation data 144 is data calculated by first covariance acquisition section 110 , second covariance acquisition section 120 , and power generation output estimation section 130 .

図3は、太陽光発電出力推定装置101のハードウェア構成を示す図である。図3に示すように、太陽光発電出力推定装置101は、コンピュータ1、外部記憶装置5、出力装置7、および入力装置8を備えて構成される。コンピュータ1は、CPU(Central Processing Unit)2、主記憶装置3、および補助記憶装置4を備えて構成される。外部記憶装置5は、ネットワーク6を介してコンピュータ1に接続されていてもよい。出力装置7はコンピュータ1の処理結果を表示または出力する。入力装置8はマウスおよびキーボードなどで構成できる。CPU2が主記憶装置3に格納されたプログラムを実行することにより、太陽光発電出力推定装置101の各機能が実行される。すなわち、主記憶装置3には、コンピュータ1を、第1太陽光発電設備が設置された需要家の見かけ上の消費電力である需要家消費電力と、第1太陽光発電設備から予め定められた距離内に設置された、第2太陽光発電設備の太陽光発電出力である第2太陽光発電出力と、を記憶する記憶部140と、第2太陽光発電出力と需要家消費電力とに基づき、第1太陽光発電設備の予め定められた推定時点の太陽光発電出力である第1太陽光発電出力を推定する発電出力推定部130と、して動作させるための、太陽光発電出力推定プログラムが格納されている。 FIG. 3 is a diagram showing the hardware configuration of the photovoltaic output estimation device 101. As shown in FIG. As shown in FIG. 3 , the photovoltaic power generation output estimation device 101 includes a computer 1 , an external storage device 5 , an output device 7 and an input device 8 . The computer 1 comprises a CPU (Central Processing Unit) 2 , a main storage device 3 and an auxiliary storage device 4 . External storage device 5 may be connected to computer 1 via network 6 . The output device 7 displays or outputs the processing result of the computer 1 . The input device 8 can be composed of a mouse, a keyboard, and the like. Each function of the photovoltaic output estimation device 101 is executed by the CPU 2 executing the program stored in the main storage device 3 . That is, in the main storage device 3, the computer 1 is stored in advance from the consumer power consumption, which is the apparent power consumption of the consumer where the first photovoltaic power generation equipment is installed, and the first photovoltaic power generation equipment Based on the storage unit 140 that stores the second photovoltaic power generation output, which is the photovoltaic power output of the second photovoltaic power generation facility installed within the distance, and the second photovoltaic power generation output and the consumer power consumption , a solar power generation output estimation program for estimating a first solar power generation output, which is a solar power generation output at a predetermined estimation time of the first solar power generation facility, and a solar power generation output estimation program for operating as is stored.

発電出力推定部130は、第2太陽光発電出力と需要家消費電力とを用いて、第1太陽光発電出力を推定する。なお、太陽光発電設備PV1-PVnの発電出力と負荷L1-Lnの消費電力には、有効電力と無効電力とが存在する。しかし、一般的な太陽光発電設備、特に家庭用の太陽光発電設備は力率一定で運転されているため、有効電力を推定することで無効電力も容易に推定することが可能である。このため、以下に記載する、太陽光発電設備PV1-PVnの発電出力と負荷L1-Lnの消費電力は、有効電力を指すものとする。 The power output estimation unit 130 estimates the first photovoltaic power output using the second photovoltaic power output and the consumer power consumption. Active power and reactive power exist in the power output of the photovoltaic power generation facilities PV1-PVn and the power consumption of the loads L1-Ln. However, since general photovoltaic power generation equipment, especially home-use photovoltaic power generation equipment, is operated with a constant power factor, it is possible to easily estimate reactive power by estimating active power. Therefore, the power output of the photovoltaic power generation facilities PV1-PVn and the power consumption of the loads L1-Ln, which will be described below, refer to active power.

本実施の形態では説明の簡単化のため、以下、太陽光発電設備PV2を第1太陽光発電設備の代表例として説明する。つまり、第1太陽光発電出力は、太陽光発電設備PV2の発電出力であり、需要家消費電力は、第2需要家C2におけるスマートメータSMALL2の計測値である。しかし、以下の説明は、太陽光発電設備PV3-Pvnについても同様に適用される。 In this embodiment, for simplification of explanation, the photovoltaic power generation facility PV2 will be described below as a typical example of the first photovoltaic power generation facility. That is, the first photovoltaic power generation output is the power output of the photovoltaic power generation facility PV2, and the consumer power consumption is the measured value of the smart meter SM ALL2 at the second consumer C2. However, the following description applies equally to the photovoltaic power plant PV3-Pvn.

発電出力推定部130は、予め定められた期間における第2太陽光発電出力と需要家消費電力とを用いて、第1太陽光発電出力を推定する。この予め定められた期間は、太陽光発電設備PV2の設備容量が推定時点での設備容量から予め定められた範囲内の期間であることが好ましい。つまり、発電出力推定部130は、電力系統20に連系された太陽光発電設備PV2の設備容量が推定時点での設備容量から予め定められた範囲内にある期間における、第2太陽光発電出力と需要家消費電力とを用いて、第1太陽光発電出力を推定する。予め定められた期間とは、第1太陽光発電出力を推定する推定時点以前の期間である。例えば、予め定められた期間は、第1太陽光発電出力を推定する推定時点から1,2週間程度遡った期間であり、具体的には第1太陽光発電出力を推定する日の前日などである。 The power output estimating unit 130 estimates the first photovoltaic power output using the second photovoltaic power output and the consumer power consumption in a predetermined period. This predetermined period is preferably a period within a predetermined range from the installed capacity of the photovoltaic power generation facility PV2 at the time of estimation. That is, the power generation output estimation unit 130 determines the second solar power generation output during a period in which the installed capacity of the photovoltaic power generation facility PV2 interconnected to the power system 20 is within a predetermined range from the installed capacity at the time of estimation. and the consumer power consumption are used to estimate the first photovoltaic power generation output. The predetermined period is a period before the estimation point of time for estimating the first photovoltaic power generation output. For example, the predetermined period is a period about one or two weeks before the estimation time of estimating the first photovoltaic power generation output, specifically the day before the first photovoltaic power generation output is estimated. be.

さらに具体的には、発電出力推定部130は、予め定められた期間内の短時間における、第2太陽光発電出力の時系列データと需要家消費電力の時系列データとを用いて、第1太陽光発電出力を推定する。ここで、短時間とは、例えば、30分から2時間程度の短い期間であり、好ましくは1時間である。つまり、発電出力推定部130は、第1太陽光発電出力を推定する推定時点から1、2週間程度遡った期間内の30分から2時間程度の短時間における、第2太陽光発電出力、および、需要家消費電力の時系列データを用いて、第1太陽光発電出力を推定する。なお、この短時間は、以下の第1期間に相当する。 More specifically, the power generation output estimating unit 130 uses the time-series data of the second photovoltaic power generation output and the time-series data of the consumer power consumption for a short period of time within a predetermined period to calculate the first Estimate solar power output. Here, the short time is, for example, a short period of about 30 minutes to 2 hours, preferably 1 hour. That is, the power output estimating unit 130 estimates the second photovoltaic power output, and The first photovoltaic power generation output is estimated using the time-series data of consumer power consumption. Note that this short period corresponds to the following first period.

発電出力推定部130は、以下で説明する第1共分散取得部110と第2共分散取得部120とが取得した第1共分散と第2共分散とを用いて、第1太陽光発電出力を推定する。 The power generation output estimating unit 130 uses the first covariance and the second covariance obtained by the first covariance obtaining unit 110 and the second covariance obtaining unit 120 described below to obtain the first photovoltaic power output to estimate

第1共分散取得部110は、第2太陽光発電出力と需要家消費電力との時系列データの共分散である第1共分散を取得する。具体的には、第1共分散取得部110は、第1期間における第2太陽光発電出力の時系列データと需要家消費電力の時系列データを取得し、第2太陽光発電出力の時系列データと需要家消費電力の時系列データとの共分散を第1共分散として算出する。 The first covariance acquisition unit 110 acquires the first covariance, which is the covariance of the time-series data of the second photovoltaic power generation output and the consumer power consumption. Specifically, the first covariance acquisition unit 110 acquires the time-series data of the second photovoltaic power generation output and the time-series data of the consumer power consumption in the first period, and obtains the time-series data of the second photovoltaic power generation output. A covariance between the data and the time-series data of consumer power consumption is calculated as a first covariance.

例えば、第1共分散取得部110は、第2太陽光発電出力データ142を参照することで、第1期間における第2太陽光発電出力の時系列データを取得する。ところで、第1共分散取得部110は、記憶部140の場所情報データ141を利用して、太陽光発電設備PV2から予め定められた距離内に存在し、全量買取契約の対象となっている太陽光発電設備の中から第2太陽光発電設備を選択する。 For example, the first covariance acquisition unit 110 acquires the time-series data of the second photovoltaic power output in the first period by referring to the second photovoltaic power output data 142 . By the way, the first covariance acquisition unit 110 uses the location information data 141 of the storage unit 140 to determine the location of the solar power generation facility PV2 that is within a predetermined distance from the photovoltaic power generation facility PV2 and that is the subject of the full purchase contract. A second photovoltaic power generation facility is selected from among the photovoltaic power generation facilities.

つまり、第1需要家C1のスマートメータSMPV1が第1共分散取得部110および記憶部140に接続されている。そして、第1共分散取得部110は、スマートメータSMPV1から読み取った太陽光発電設備PV1の発電出力を、記憶部140の第2太陽光発電出力データ142に随時記憶させる。そして、第1共分散取得部110は、第1期間における第2太陽光発電出力の時系列データを、第2太陽光発電出力データ142から読み出すことで取得する。 That is, the smart meter SM PV1 of the first consumer C1 is connected to the first covariance acquisition unit 110 and the storage unit 140 . Then, the first covariance acquisition unit 110 stores the power output of the photovoltaic power generation facility PV1 read from the smart meter SM PV1 in the second photovoltaic power output data 142 of the storage unit 140 as needed. Then, the first covariance acquisition unit 110 acquires the time-series data of the second photovoltaic power generation output in the first period by reading it from the second photovoltaic power generation output data 142 .

第1共分散取得部110が太陽光発電設備PV1の発電出力を読み取り、第2太陽光発電出力データ142に記憶させる時間間隔は、例えば1秒、10秒、1分、30分、または1時間などであるが、特にこれらには限定されず、ユーザによって適切な数値が定められる。また、第1共分散取得部110は、一定時間間隔ではなくユーザによって任意に定められたタイミングで第2太陽光発電出力を読み取ってもよい。また、第1共分散取得部110が読み取った第2太陽光発電出力を第2太陽光発電出力データ142に記憶させるタイミングについても、特に限定されない。第1共分散取得部110が第2太陽光発電出力を読み取るたびに記憶させてもよいし、ユーザによって任意に定められたタイミングで記憶させてもよい。 The time interval at which the first covariance acquisition unit 110 reads the power output of the photovoltaic power generation facility PV1 and stores it in the second photovoltaic power generation output data 142 is, for example, 1 second, 10 seconds, 1 minute, 30 minutes, or 1 hour. etc., but is not particularly limited to these, and an appropriate numerical value is determined by the user. Also, the first covariance acquisition unit 110 may read the second photovoltaic power output at a timing arbitrarily determined by the user instead of at regular time intervals. The timing for storing the second photovoltaic power output read by the first covariance acquisition unit 110 in the second photovoltaic power output data 142 is also not particularly limited. It may be stored each time the first covariance acquisition unit 110 reads the second photovoltaic power generation output, or may be stored at a timing arbitrarily determined by the user.

需要家消費電力の時系列データは、記憶部140の需要家消費電力データ143に記憶されている。第1共分散取得部110は、需要家消費電力データ143を参照することで、第1期間における需要家消費電力の時系列データを取得する。そして、第1共分散取得部110は、第1期間における第2太陽光発電出力の時系列データと需要家消費電力の時系列データとの共分散である第1共分散を算出する。 Time-series data of consumer power consumption is stored in consumer power consumption data 143 of storage unit 140 . The first covariance acquisition unit 110 acquires time-series data of consumer power consumption in the first period by referring to the consumer power consumption data 143 . Then, the first covariance acquiring unit 110 calculates the first covariance, which is the covariance between the time-series data of the output of the second photovoltaic power generation and the time-series data of the consumer power consumption in the first period.

ここで、第1期間は、上記の短時間に相当する期間であり、例えば上記のように、第1太陽光発電出力を推定する推定時点から1、2週間程度遡った期間内の30分から2時間程度の期間である。また、第1期間は、日射強度が強く、かつ日射強度の変動が大きい期間であるのが好ましい。また、一般的に、負荷は12時から13時の間に一時的に低下する傾向にあるため、第1期間は12時から13時を除いた期間であるのがさらに好ましい。このように、第1共分散取得部110は、日射強度が強くかつ日射強度の変動が大きい期間を第1期間として、第1共分散を算出する。そして、第1共分散取得部110は、算出した第1共分散を、記憶部140の算出データ144に書き込むことで、記憶させる。 Here, the first period is a period corresponding to the above-mentioned short time period. It is a period of about an hour. Moreover, it is preferable that the first period is a period in which the solar radiation intensity is high and the variation in the solar radiation intensity is large. Moreover, since the load generally tends to temporarily decrease between 12:00 and 13:00, it is more preferable that the first period is a period other than 12:00 to 13:00. In this way, the first covariance acquisition unit 110 calculates the first covariance using a period in which the intensity of solar radiation is high and the variation in the intensity of solar radiation is large as the first period. Then, the first covariance acquisition unit 110 stores the calculated first covariance by writing it to the calculation data 144 of the storage unit 140 .

第2共分散取得部120は、第2太陽光発電出力の時系列データのうち、第1期間のデータ群と第1期間から遅延時間だけずれた第2期間のデータ群との自己共分散を第2共分散として算出する。 The second covariance acquisition unit 120 calculates the autocovariance between the data group of the first period and the data group of the second period shifted from the first period by the delay time, among the time-series data of the second photovoltaic power generation output. Calculate as the second covariance.

例えば、第1期間と第2期間における第2太陽光発電出力の時系列データが記憶部140の第2太陽光発電出力データ142に記憶されている。第2共分散取得部120は、第2太陽光発電出力データ142を参照することで、第1期間と第2期間における第2太陽光発電出力の時系列データを取得する。そして、第2共分散取得部120は、取得した2つの期間の第2太陽光発電出力の時系列データの自己共分散である第2共分散を算出する。なお、遅延時間がゼロの場合には、第1期間と第2期間とは同じ期間となるため、第2共分散取得部120は、第1期間における第2太陽光発電出力の時系列データの分散を、第2共分散として算出する。ところで、第2共分散取得部120は、記憶部140の場所情報データ141を利用して、太陽光発電設備PV2から予め定められた距離内に存在し、全量買取契約の対象となっている太陽光発電設備の中から第2太陽光発電設備を選択する。 For example, the time-series data of the second photovoltaic power output in the first period and the second period are stored in the second photovoltaic power output data 142 of the storage unit 140 . The second covariance acquisition unit 120 acquires time-series data of the second photovoltaic power output in the first period and the second period by referring to the second photovoltaic power output data 142 . Then, the second covariance acquisition unit 120 calculates the second covariance, which is the autocovariance of the time-series data of the second photovoltaic power generation output in the two acquired periods. Note that when the delay time is zero, the first period and the second period are the same period. Calculate the variance as the second covariance. By the way, the second covariance acquisition unit 120 uses the location information data 141 of the storage unit 140 to determine the location of the sun that is within a predetermined distance from the photovoltaic power generation facility PV2 and that is the subject of the full purchase contract. A second photovoltaic power generation facility is selected from among the photovoltaic power generation facilities.

第2期間の第1期間に対する遅延時間とは、太陽光発電設備PV1の設置地点と太陽光発電設備PV2の設置地点との間を日射変動が伝播、すなわち日射変動が移動する時間である。具体的には、太陽光発電設備PV1の設置地点上に存在する雲が、太陽光発電設備PV2の設置地点上に到達するまでの期間である。第2共分散取得部120は、例えば、第1期間における第2太陽光発電出力の時系列データと、当該時系列データに対してタイムラグを有する需要家消費電力の時系列データとの共分散が、最小値をとる場合のタイムラグを、当該遅延時間として取得することができる。ここで、当該所定期間とは、上記の第1期間と同じ期間であるのが好ましい。あるいは、第2共分散取得部120は、気象データを参照するなどにより、遅延時間を取得することもできる。そして、第2共分散取得部120は、算出した第2共分散を、記憶部140の算出データ144に書き込むことで、記憶させる。 The delay time of the second period with respect to the first period is the time during which the solar radiation variation propagates between the installation point of the solar power generation facility PV1 and the installation point of the solar power generation facility PV2, that is, the solar radiation fluctuation moves. Specifically, it is a period until a cloud existing over the installation point of the photovoltaic power generation facility PV1 reaches the installation point of the photovoltaic power generation facility PV2. For example, the second covariance acquisition unit 120 determines that the covariance between the time-series data of the second photovoltaic power generation output in the first period and the time-series data of the consumer power consumption having a time lag with respect to the time-series data is , the time lag when taking the minimum value can be obtained as the delay time. Here, the predetermined period is preferably the same period as the first period. Alternatively, the second covariance acquisition unit 120 can also acquire the delay time by referring to weather data. Then, the second covariance acquisition unit 120 stores the calculated second covariance by writing it to the calculation data 144 of the storage unit 140 .

発電出力推定部130は、第1共分散取得部110が取得した第1共分散と第2共分散取得部120が取得した第2共分散とを、算出データ144から読み出し、第1太陽光発電出力を推定する。具体的には、発電出力推定部130は、第1共分散と第2共分散とを用いて得られる第1係数に、推定時点から遅延時間ずれた時点の第2太陽光発電出力を乗じることで、第1太陽光発電出力を算出する。 The power generation output estimation unit 130 reads the first covariance acquired by the first covariance acquisition unit 110 and the second covariance acquired by the second covariance acquisition unit 120 from the calculation data 144, and calculates the first photovoltaic power generation Estimate the output. Specifically, the power generation output estimating unit 130 multiplies the first coefficient obtained using the first covariance and the second covariance by the second photovoltaic power generation output at a delay time shifted from the estimation time. , the first photovoltaic power generation output is calculated.

ここで、第1係数とは、第1共分散を第2共分散で除して-1を乗じた値である。つまり、発電出力推定部130は、第1共分散を第2共分散で除して-1を乗じた値を第1係数として、第1太陽光発電出力を算出する。なお、第1係数は短期間では変化しにくいものの、遅延時間は風向または風速の変化によって短期間で変化しやすい。従って、この第1太陽光発電出力を推定する際の遅延時間は、気象データなどを考慮してリアルタイムで変更されたものが用いられるのが好ましい。そして、発電出力推定部130は、算出した第1太陽光発電出力を、記憶部140の算出データ144に書き込むことで、記憶させる。 Here, the first coefficient is a value obtained by dividing the first covariance by the second covariance and multiplying the result by -1. That is, the power output estimator 130 divides the first covariance by the second covariance and multiplies the result by -1 as the first coefficient to calculate the first photovoltaic power output. Although the first coefficient is difficult to change in a short period of time, the delay time is likely to change in a short period of time due to changes in wind direction or wind speed. Therefore, it is preferable that the delay time when estimating the first photovoltaic power generation output is changed in real time in consideration of weather data and the like. Then, the power generation output estimation unit 130 stores the calculated first photovoltaic power generation output by writing it into the calculation data 144 of the storage unit 140 .

<A-2.動作>
図4は、太陽光発電出力推定装置101による第1太陽光発電出力の推定処理の一例を示すフローチャートである。以下、図4のフローに沿って、太陽光発電出力推定装置101が第1太陽光発電出力を推定する処理について説明する。まず、第1共分散取得部110は、第2太陽光発電出力の時系列データと需要家消費電力の時系列データの共分散である第1共分散を取得する(ステップS101)。具体的には、第1共分散取得部110は、第1共分散を算出することで取得し、取得した第1共分散を記憶部140の算出データ144に書き込む。なお、第1共分散取得部110が第1共分散を取得する処理の詳細な説明については、後述する。
<A-2. Operation>
FIG. 4 is a flowchart showing an example of estimation processing of the first photovoltaic power output by the photovoltaic power output estimation device 101 . Hereinafter, processing for estimating the first photovoltaic output by the photovoltaic output estimation device 101 will be described along the flow of FIG. 4 . First, the first covariance acquisition unit 110 acquires the first covariance, which is the covariance between the time-series data of the output of the second photovoltaic power generation and the time-series data of the consumer power consumption (step S101). Specifically, the first covariance acquisition unit 110 acquires the first covariance by calculating it, and writes the acquired first covariance to the calculation data 144 of the storage unit 140 . A detailed description of the process of obtaining the first covariance by the first covariance obtaining unit 110 will be given later.

そして、第2共分散取得部120は、遅延時間ずれた2つの第2太陽光発電出力の時系列データの自己共分散である第2共分散を取得する(ステップS102)。具体的には、第2共分散取得部120は、第2共分散を算出することで取得し、取得した第2共分散を、記憶部140の算出データ144に書き込む。なお、この第2共分散取得部120が第2共分散を取得する処理の詳細な説明については、後述する。 Then, the second covariance acquisition unit 120 acquires the second covariance, which is the autocovariance of the two time-series data of the second photovoltaic power generation output with the delay time difference (step S102). Specifically, the second covariance acquisition unit 120 acquires the second covariance by calculating the second covariance, and writes the acquired second covariance to the calculation data 144 of the storage unit 140 . A detailed description of the process of acquiring the second covariance by the second covariance acquiring unit 120 will be given later.

そして、発電出力推定部130は、太陽光発電設備PV2から予め定められた距離内に設置された太陽光発電設備PV1の発電出力である第2太陽光発電出力と、需要家消費電力とを用いて、第1太陽光発電出力を推定する(ステップS103)。具体的には、発電出力推定部130は、第1共分散取得部110が取得した第1共分散と、第2共分散取得部120が取得した第2共分散とを算出データ144から読み出し、当該第1共分散と第2共分散とを用いて、第1太陽光発電出力を算出することで推定する。なお、発電出力推定部130が第1太陽光発電出力を推定する処理の詳細な説明については、後述する。以上のようにして、太陽光発電出力推定装置101が第1太陽光発電出力を推定する処理は、終了する。 Then, the power generation output estimation unit 130 uses the second photovoltaic power generation output, which is the power generation output of the photovoltaic power generation facility PV1 installed within a predetermined distance from the photovoltaic power generation facility PV2, and the consumer power consumption. Then, the first photovoltaic power generation output is estimated (step S103). Specifically, the power generation output estimation unit 130 reads the first covariance acquired by the first covariance acquisition unit 110 and the second covariance acquired by the second covariance acquisition unit 120 from the calculation data 144, The first photovoltaic output is estimated by calculating the first photovoltaic output using the first covariance and the second covariance. A detailed description of the process of estimating the first photovoltaic power output by the power output estimating unit 130 will be given later. As described above, the process of estimating the first photovoltaic output by the photovoltaic output estimation device 101 ends.

図5は、第1共分散取得部110による第1共分散の取得処理の一例を示すフローチャートである。以下、第1共分散取得部110が第1共分散を取得する処理(図4のステップS101)について、図5のフローに沿って詳細に説明する。まず、第1共分散取得部110は、第2太陽光発電出力の時系列データを取得する(ステップS201)。具体的には、スマートメータSMPV1によって計測された第2太陽光発電出力の時系列データが、記憶部140の第2太陽光発電出力データ142に記憶されている。第1共分散取得部110は、第2太陽光発電出力データ142から第2太陽光発電出力の時系列データを読み出すことで、取得する。 FIG. 5 is a flowchart showing an example of first covariance acquisition processing by the first covariance acquisition unit 110 . The process of acquiring the first covariance by the first covariance acquiring unit 110 (step S101 in FIG. 4) will be described in detail below along the flow in FIG. First, the first covariance acquisition unit 110 acquires time-series data of the output of the second photovoltaic power generation (step S201). Specifically, time-series data of the second photovoltaic power output measured by the smart meter SM PV1 is stored in the second photovoltaic power output data 142 of the storage unit 140 . The first covariance acquisition unit 110 acquires by reading the time-series data of the second photovoltaic power output from the second photovoltaic power output data 142 .

なお、第1共分散取得部110は、ステップS201において、第2太陽光発電出力の時系列データの実測値ではなく推定値を取得してもよい。この場合、第1共分散取得部110は、例えば本実施の形態の手法または他の手法を用いて第2太陽光発電出力を推定し、第2太陽光発電出力データ142に記憶させていくことで、第2太陽光発電出力の時系列データの推定値を取得することができる。または、ユーザの入力により第2太陽光発電出力の時系列データの実測値または推定値を第2太陽光発電出力データ142に記憶させ、第1共分散取得部110が当該データを取得することにしてもよい。 Note that the first covariance acquisition unit 110 may acquire an estimated value of the time-series data of the output of the second photovoltaic power generation in step S201 instead of the measured value. In this case, the first covariance acquisition unit 110 estimates the second photovoltaic power generation output using, for example, the method of the present embodiment or another method, and stores it in the second photovoltaic power generation output data 142. , it is possible to obtain the estimated value of the time-series data of the output of the second photovoltaic power generation. Alternatively, the measured value or estimated value of the time-series data of the second photovoltaic power generation output is stored in the second photovoltaic power generation output data 142 by user input, and the first covariance acquisition unit 110 acquires the data. may

さらに具体的には、第1共分散取得部110は、第1太陽光発電出力を推定する推定時点以前の期間であって、太陽光発電設備PV2の設備容量が推定時点での当該設備容量から予め定められた範囲内となる期間における第2太陽光発電出力の時系列データを取得する。この太陽光発電設備PV2の設備容量が推定時点での設備容量から予め定められた範囲内となる期間については、例えば、設備容量が推定時点での設備容量から±約5%以内になる期間など、ユーザによって適宜定められる。 More specifically, the first covariance acquisition unit 110 determines that the installed capacity of the photovoltaic power generation facility PV2 is from the installed capacity at the time of estimation in a period before the estimation time of estimating the first photovoltaic power generation output. Time-series data of the output of the second photovoltaic power generation in a period within a predetermined range is acquired. For the period in which the installed capacity of the photovoltaic power generation facility PV2 is within a predetermined range from the installed capacity at the time of estimation, for example, the period in which the installed capacity is within ± about 5% from the installed capacity at the time of estimation. , is appropriately defined by the user.

なお、第1共分散取得部110が取得する第2太陽光発電出力の時系列データの期間は、第1共分散取得部110に予め入力されていてもよいし、ユーザによって適宜変更されてもよいし、第1共分散取得部110が算出して決定してもよい。本実施の形態では、第1共分散取得部110は、当該期間を、例えば、第1太陽光発電出力を推定する日の前日とし、前日における第2太陽光発電出力の時系列データを取得する。 Note that the period of the time-series data of the second photovoltaic power generation output acquired by the first covariance acquisition unit 110 may be input in advance to the first covariance acquisition unit 110, or may be changed as appropriate by the user. Alternatively, it may be calculated and determined by the first covariance acquisition unit 110 . In the present embodiment, the first covariance acquisition unit 110 sets the period to, for example, the day before the day on which the first photovoltaic power generation output is estimated, and acquires the time-series data of the second photovoltaic power generation output on the previous day. .

図5に戻り、第1共分散取得部110は第1期間を探索する(ステップS202)。具体的には、第1共分散取得部110は、取得した第2太陽光発電出力の時系列データを参照し、日射強度が強くかつ日射強度の変動が大きい期間を探索する。例えば、第1共分散取得部110は、第1太陽光発電出力を推定する日の前日のうち、第2太陽光発電出力が大きくかつ第2太陽光発電出力の変動が大きい30分から2時間程度の短い期間を探索する。そして、第1共分散取得部110は、探索した期間を第1期間と決定する。なお、第1期間は12時から13時を含まないことが好ましい。なお、第1共分散取得部110は、上記の期間(例えば、第1太陽光発電出力を推定する日の前日)の中から、第1期間を探索するのではなく、上記の期間自体を探索してから、当該期間の中から第1期間を探索することにしてもよい。 Returning to FIG. 5, the first covariance acquisition unit 110 searches for the first period (step S202). Specifically, the first covariance acquisition unit 110 refers to the acquired time-series data of the output of the second photovoltaic power generation, and searches for a period in which the solar radiation intensity is high and the variation in the solar radiation intensity is large. For example, the first covariance acquisition unit 110 determines that the output of the second photovoltaic power generation is large and the fluctuation of the output of the second photovoltaic power generation is large for the day before the day on which the first photovoltaic power generation output is to be estimated. explore a short period of Then, first covariance acquisition section 110 determines the searched period as the first period. Note that the first period preferably does not include 12:00 to 13:00. Note that the first covariance acquisition unit 110 does not search for the first period from the above period (for example, the day before the day on which the first photovoltaic power generation output is estimated), but searches for the period itself. After that, the first period may be searched from among the periods.

そして、第1共分散取得部110は、第1期間における第2太陽光発電出力の時系列データと需要家消費電力の有効電力の時系列データとを取得する(ステップS203)。具体的には、第1共分散取得部110は、第2太陽光発電出力データ142から、第1期間における第2太陽光発電出力の時系列データを、需要家消費電力データ143から、第1期間における需要家消費電力の時系列データを、それぞれ読み出すことで、取得する。 Then, the first covariance acquisition unit 110 acquires the time-series data of the output of the second photovoltaic power generation and the time-series data of the active power of the consumer power consumption in the first period (Step S203). Specifically, the first covariance acquisition unit 110 obtains the time-series data of the second photovoltaic power generation output in the first period from the second photovoltaic power generation output data 142, from the consumer power consumption data 143, the first covariance acquisition unit 110 Time-series data of consumer power consumption in a period is obtained by reading out each of them.

そして、第1共分散取得部110は、第2太陽光発電出力の時系列データと需要家消費電力の時系列データとの共分散を第1共分散として算出する(ステップS204)。そして、第1共分散取得部110は、算出した第1共分散を、算出データ144に書き込む。以上のようにして、第1共分散取得部110が第1共分散を取得する処理(図4のステップS101)は、終了する。 Then, the first covariance acquisition unit 110 calculates the covariance between the time-series data of the output of the second photovoltaic power generation and the time-series data of the consumer power consumption as the first covariance (step S204). The first covariance acquisition unit 110 then writes the calculated first covariance to the calculation data 144 . As described above, the process of acquiring the first covariance by the first covariance acquisition unit 110 (step S101 in FIG. 4) ends.

図6は、第2共分散取得部120による第2共分散の取得処理の一例を示すフローチャートである。以下、第2共分散取得部120が第2共分散を取得する処理(図4のステップS102)について、図6のフローに沿って詳細に説明する。 FIG. 6 is a flow chart showing an example of a second covariance acquisition process by the second covariance acquisition unit 120 . The process of acquiring the second covariance by the second covariance acquisition unit 120 (step S102 in FIG. 4) will be described in detail below along the flow in FIG.

まず、第2共分散取得部120は、第2太陽光発電設備PV1の設置地点と第1太陽光発電設備PV2の設置地点との間の遅延時間を取得する(ステップS301)。具体的には、第2共分散取得部120は、第1期間における第2太陽光発電出力と需要家消費電力との時系列データの共分散関数が最小値をとる場合のタイムラグを、遅延時間として取得する。そして、第2共分散取得部120は、取得した遅延時間を算出データ144に書き込む。第2共分散取得部120が遅延時間を取得する処理の具体的な説明については、後述する。 First, the second covariance acquisition unit 120 acquires the delay time between the installation point of the second photovoltaic power generation facility PV1 and the installation point of the first photovoltaic power generation facility PV2 (step S301). Specifically, the second covariance acquisition unit 120 determines the time lag when the covariance function of the time-series data of the second photovoltaic power generation output and the consumer power consumption in the first period takes the minimum value as the delay time. to get as Then, the second covariance acquisition unit 120 writes the acquired delay time to the calculation data 144 . A specific description of the process of obtaining the delay time by the second covariance obtaining unit 120 will be given later.

そして、第2共分散取得部120は、遅延時間ずれた2つの第2太陽光発電出力の時系列データを取得する(ステップS302)。つまり、第2共分散取得部120は、第1期間における第2太陽光発電出力の時系列データと、第1期間より遅延時間ずれた第2期間における第2太陽光発電出力の時系列データとを、第2太陽光発電出力データ142から読み出して取得する。 Then, the second covariance acquisition unit 120 acquires two pieces of time-series data of the second photovoltaic power output with a delay time difference (step S302). That is, the second covariance acquisition unit 120 obtains the time-series data of the second photovoltaic power output in the first period and the time-series data of the second photovoltaic power output in the second period shifted by the delay time from the first period. is read from the second photovoltaic power generation output data 142 and acquired.

そして、第2共分散取得部120は、遅延時間ずれた2つの第2太陽光発電出力の時系列データの自己共分散である第2共分散を算出する(ステップS303)。具体的には、第2共分散取得部120は、第1期間における第2太陽光発電出力の時系列データと、第2期間における第2太陽光発電出力の時系列データとの自己共分散を第2共分散として算出する。そして、第2共分散取得部120は、算出した第2共分散を算出データ144に書き込む。以上のようにして、第2共分散取得部120が第2共分散を取得する処理(図4のステップS102)は、終了する。 Then, the second covariance acquisition unit 120 calculates the second covariance, which is the autocovariance of the two time-series data of the second photovoltaic power output with a delay time difference (step S303). Specifically, the second covariance acquisition unit 120 calculates the autocovariance between the time-series data of the second photovoltaic power generation output in the first period and the time-series data of the second photovoltaic power generation output in the second period. Calculate as the second covariance. Then, the second covariance acquisition unit 120 writes the calculated second covariance to the calculation data 144 . As described above, the process of acquiring the second covariance by the second covariance acquisition unit 120 (step S102 in FIG. 4) ends.

図7は、発電出力推定部130による第1太陽光発電出力の推定処理の一例を示すフローチャートである。以下、発電出力推定部130が第1太陽光発電出力を推定する処理(図4のステップS103)について、図7のフローに沿って詳細に説明する。 FIG. 7 is a flowchart showing an example of estimation processing of the first photovoltaic power generation output by the power generation output estimation unit 130 . The process of estimating the first photovoltaic power output by the power output estimating unit 130 (step S103 in FIG. 4) will be described in detail below along the flow in FIG.

まず、発電出力推定部130は、算出データ144から第1共分散、第2共分散、および遅延時間を取得する(ステップS401)。 First, the power generation output estimation unit 130 acquires the first covariance, the second covariance, and the delay time from the calculation data 144 (step S401).

そして、発電出力推定部130は、第1共分散と第2共分散とを用いて第1係数を算出する(ステップS402)。具体的には、発電出力推定部130は、第1共分散を第2共分散で除して-1を乗じることで、第1係数を算出する。 Then, the power generation output estimation unit 130 calculates the first coefficient using the first covariance and the second covariance (step S402). Specifically, power generation output estimation section 130 calculates the first coefficient by dividing the first covariance by the second covariance and multiplying the result by -1.

そして、発電出力推定部130は、算出した第1係数に、推定時点から遅延時間ずれた時点の第2太陽光発電出力を乗じることで、第1太陽光発電出力を算出する(ステップS403)。なお、上記の通り、第1太陽光発電出力を算出する際の遅延時間には、リアルタイムで変更されたものが用いられるのが好ましい。このため、発電出力推定部130は、気象データ等を考慮してリアルタイムで変更された遅延時間を用いて、第1太陽光発電出力を算出するのが好ましい。そして、発電出力推定部130は、算出した第1太陽光発電出力を算出データ144に書き込む。以上のようにして、発電出力推定部130が第1太陽光発電出力を推定する処理(図4のステップS103)は、終了する。 Then, the power generation output estimation unit 130 calculates the first photovoltaic power output by multiplying the calculated first coefficient by the second photovoltaic power output at the time point shifted by the delay time from the estimation time point (step S403). In addition, as described above, it is preferable that the delay time when calculating the first photovoltaic power generation output is changed in real time. Therefore, it is preferable that the power generation output estimation unit 130 calculates the first photovoltaic power generation output using the delay time changed in real time in consideration of weather data and the like. Then, the power generation output estimation unit 130 writes the calculated first photovoltaic power generation output to the calculation data 144 . As described above, the process of estimating the first photovoltaic power output by the power output estimating unit 130 (step S103 in FIG. 4) ends.

次に、発電出力推定部130が第1太陽光発電出力を算出する方法について、具体的に説明する。まず、第2需要家C2の需要家消費電力をP(t)、第2需要家C2の負荷L2の消費電力をPL2(t)、第1太陽光発電設備PV2の発電出力である第1太陽光発電出力をPPV2(t)、第2太陽光発電設備PV1の発電出力である第2太陽光発電出力をPPV1(t)とする。すると、以下の式(1)のように、P(t)に関する式が成り立ち、さらに、式(2)のように、PPV2(t)に関する式を仮定できる。 Next, a method for calculating the first photovoltaic power output by the power output estimating unit 130 will be specifically described. First, the consumer power consumption of the second consumer C2 is P 2 (t), the power consumption of the load L2 of the second consumer C2 is P L2 (t), and the power generation output of the first photovoltaic power generation facility PV2 is the first Let P PV2 (t) be the output of the first photovoltaic power generation, and P PV1 (t) be the output of the second photovoltaic power generation, which is the power output of the second photovoltaic power generation facility PV1. Then, a formula for P 2 (t) is established as in formula (1) below, and a formula for P PV2 (t) can be assumed as in formula (2).

Figure 0007300893000001
Figure 0007300893000001

Figure 0007300893000002
Figure 0007300893000002

ここで、αは第2太陽光発電出力を第1太陽光発電出力に変換する係数である。ε12(t)は時間的外乱である。τは遅延時間、すなわち、第1太陽光発電設備PV2の設置地点と第2太陽光発電設備PV1の設置地点との間を日射変動が伝播する時間である。 Here, α is a coefficient for converting the second photovoltaic power output to the first photovoltaic power output. ε 12 (t) is the temporal disturbance. τ s is the delay time, that is, the time for the solar radiation variation to propagate between the installation point of the first photovoltaic power generation facility PV2 and the installation point of the second photovoltaic power generation facility PV1.

そして、PL2(t)とε12(t)の変動が、それぞれ、PPV1(t)の変動と相関がないと仮定し、上記の式(1)、式(2)において、時間的な定常性が成立すると仮定すると、上記の式(1)と式(2)から、以下の式(3)が導かれる。 Then, assuming that the fluctuations of P L2 (t) and ε 12 (t) are not correlated with the fluctuations of P PV1 (t), in the above equations (1) and (2), the temporal Assuming stationarity, the following equation (3) is derived from the above equations (1) and (2).

Figure 0007300893000003
Figure 0007300893000003

ここで、Cov[ ]は共分散関数を示しており、上記の式(3)におけるCov[PPV1(t),PPV1(t+τ+τ)]は、τ=-τのときに最大値をとる。このため、第2太陽光発電出力と需要家消費電力との時系列データの共分散関数Cov[PPV1(t),P(t+τ)]が最小値(符号が「-」かつ絶対値が最大値)をとるときのタイムラグに-1を乗じた値が、遅延時間τである。 Here, Cov t [ ] indicates the covariance function, and Cov t [P PV1 (t), P PV1 (t + τ + τ s )] in the above equation (3) is maximum when τ = -τ s take a value. Therefore, the covariance function Cov t [P PV1 (t), P 2 (t+τ)] of the time-series data of the second photovoltaic power generation output and the consumer power consumption is the minimum value (the sign is “-” and the absolute value is the maximum) is multiplied by -1 is the delay time τs .

このように、第2共分散取得部120は、第1期間における第2太陽光発電出力と需要家消費電力との時系列データの共分散関数が最小値をとる場合のタイムラグを、当該遅延時間として取得する。 In this way, the second covariance acquisition unit 120 obtains the time lag when the covariance function of the time-series data of the second photovoltaic power generation output and the consumer power consumption in the first period takes the minimum value. to get as

また、上記の式(3)にτ=0を代入すると、以下の式(4)が得られる。 Also, by substituting τ=0 into the above equation (3), the following equation (4) is obtained.

Figure 0007300893000004
Figure 0007300893000004

そして、上記の式(4)を以下の式(5)に変形することで、αの推定値を得ることができる。 By transforming the above equation (4) into the following equation (5), the estimated value of α can be obtained.

Figure 0007300893000005
Figure 0007300893000005

つまり、Cov[PPV1(t),P(t)]は、第2太陽光発電出力PPV1(t)と需要家消費電力P(t)との共分散である第1共分散である。そして、Cov[PPV1(t),PPV1(t+τ)]は、遅延時間τずれた2つの第2太陽光発電出力であるPPV1(t)とPPV1(t+τ)の自己共分散である第2共分散である。そして、αは、第1共分散Cov[PPV1(t),P(t)]を第2共分散Cov[PPV1(t),PPV1(t+τ)]で除して-1を乗じたものであり、第1係数である。 That is, Cov t [P PV1 (t), P 2 (t)] is the first covariance between the second photovoltaic power output P PV1 (t) and the consumer power consumption P 2 (t). is. Cov t [P PV1 ( t ) , P PV1 (t+τ s ) ] is the self A second covariance, which is a covariance. Then α is obtained by dividing the first covariance Cov t [P PV1 (t), P 2 (t)] by the second covariance Cov t [P PV1 (t), P PV1 (t+τ s )] − It is multiplied by 1 and is the first factor.

また、ε12(t+τ)は微小であり無視できると仮定すれば、上記の式(2)から、第1太陽光発電出力に関する近似式である以下の式(6)を得ることができる。 Further, assuming that ε 12 (t+τ) is minute and can be ignored, the following equation (6), which is an approximation equation regarding the first photovoltaic power generation output, can be obtained from the above equation (2).

Figure 0007300893000006
Figure 0007300893000006

以上のようにして、発電出力推定部130は、第1共分散を第2共分散で除して-1を掛け合わせることで得られる第1係数αの推定値に、推定時点tから遅延時間τずれた時点における第2太陽光発電出力PPV1(t+τ)を乗じることで、第1太陽光発電出力PPV2(t)の推定値を算出することができる。 As described above, the power generation output estimating unit 130 divides the first covariance by the second covariance and multiplies the result by −1 to obtain the estimated value of the first coefficient α. The estimated value of the first photovoltaic output PPV2 (t) can be calculated by multiplying by the second photovoltaic output PPV1 (t+[tau] s ) at the time point shifted by [tau] s .

第1期間が一つの期間として設定される場合、発電出力推定部130は式(5)により推定した係数αを第1係数とする。しかし、第1期間が複数の期間として設定される場合、発電出力推定部130は各第1期間に対して式(5)により係数αを推定する。すなわち、第1共分散取得部110と第2共分散取得部120は、複数の第1期間に対して、複数の第1共分散と複数の第2共分散をそれぞれ算出する。そして、発電出力推定部130は、複数の第1共分散と複数の第2共分散とに基づき、複数の係数αを推定する。この場合、発電出力推定部130は、推定した複数の係数αの代表値を第1係数として採用し、当該第1係数を用いて第1太陽光発電出力の推定を行う。なお、複数の係数αの代表値は、複数の係数αの中央値であることを望ましいが、平均値または最頻値のような統計量であってもよい。このような処理を行うことで、稀に発生する係数αの外れ値、すなわち推定誤差が大きい係数αの影響により発生する、第1太陽光発電出力の推定精度の悪化を軽減することができる。 When the first period is set as one period, the power generation output estimator 130 uses the coefficient α estimated by Equation (5) as the first coefficient. However, when the first period is set as a plurality of periods, the power generation output estimator 130 estimates the coefficient α for each first period using Equation (5). That is, the first covariance obtaining unit 110 and the second covariance obtaining unit 120 respectively calculate a plurality of first covariances and a plurality of second covariances for a plurality of first periods. Then, power generation output estimation section 130 estimates a plurality of coefficients α based on a plurality of first covariances and a plurality of second covariances. In this case, the power generation output estimating unit 130 employs a representative value of the multiple estimated coefficients α as the first coefficient, and uses the first coefficient to estimate the first photovoltaic power generation output. The representative value of the plurality of coefficients α is preferably the median value of the plurality of coefficients α, but may be a statistic such as an average value or mode. By performing such processing, it is possible to reduce deterioration in the estimation accuracy of the first photovoltaic power generation output caused by the influence of an outlier value of the coefficient α that rarely occurs, that is, the coefficient α with a large estimation error.

<A-3.効果>
次に、太陽光発電出力推定装置101が奏する効果の検証結果を図8から図10を用いて説明する。この検証では、1軒の全量買取契約の対象である需要家の太陽光発電設備を第2太陽光発電設備とし、1軒の余剰買取契約の対象である需要家の太陽光発電設備を第1太陽光発電設備とした。そして、第1太陽光発電設備を保有する需要家の需要家消費電力と、第2太陽光発電設備の発電出力である第2太陽光発電出力を利用することで、第1太陽光発電設備の発電出力である第1太陽光発電出力を推定した。なお、本検証例では、精度を検証するため、第1太陽光発電出力も特別に測定して実測値として扱い、太陽光発電出力推定装置101の推定結果と比較している。
<A-3. Effect>
Next, verification results of the effects of the photovoltaic power generation output estimation device 101 will be described with reference to FIGS. 8 to 10. FIG. In this verification, the photovoltaic power generation facility of the consumer who is the target of the purchase contract for the full amount of one house is the second photovoltaic power generation facility, and the photovoltaic power generation facility of the consumer who is the target of the surplus purchase contract is the first photovoltaic power generation facility. A solar power generation facility was installed. Then, by using the consumer power consumption of the consumer who owns the first photovoltaic power generation facility and the second photovoltaic power generation output, which is the power output of the second photovoltaic power generation facility, The first photovoltaic power generation output, which is the power generation output, was estimated. In this verification example, in order to verify the accuracy, the first photovoltaic power generation output is also specially measured and treated as an actual measured value, and compared with the estimation result of the photovoltaic power generation output estimation device 101 .

図8は第1太陽光発電出力の実測値を示し、図9は太陽光発電出力推定装置101による第1太陽光発電出力の推定値を示している。これらの図において横軸は時刻を示している。図8の縦軸は第1太陽光発電出力(有効電力)の実測値を示し、図9の縦軸は第1太陽光発電出力(有効電力)の推定値を示している。 FIG. 8 shows measured values of the first photovoltaic power output, and FIG. 9 shows estimated values of the first photovoltaic power output by the photovoltaic power output estimating device 101 . In these figures, the horizontal axis indicates time. The vertical axis of FIG. 8 indicates the measured value of the first photovoltaic power generation output (active power), and the vertical axis of FIG. 9 indicates the estimated value of the first photovoltaic power generation output (active power).

図10は、太陽光発電出力推定装置101による第1太陽光発電出力の推定値から、第1太陽光発電出力の実測値を差し引いたものを誤差とした、誤差のヒストグラムを示している。図10の横軸は誤差を示し、縦軸は頻度を示している。なお、図10中のAvg.は誤差の平均値、SDは誤差の標準偏差、RMSEは2乗平均平方根誤差を、それぞれ表している。図10の結果から、太陽光発電出力推定装置101による第1太陽光発電出力の推定精度は、非常に高いことを確認できた。 FIG. 10 shows an error histogram obtained by subtracting the actually measured value of the first photovoltaic output from the estimated value of the first photovoltaic output by the photovoltaic output estimation device 101 . The horizontal axis of FIG. 10 indicates error, and the vertical axis indicates frequency. Note that Avg. is the mean error, SD is the standard deviation of the error, and RMSE is the root mean square error. From the results of FIG. 10, it was confirmed that the estimation accuracy of the first photovoltaic power output by the photovoltaic power output estimating device 101 is very high.

以上に説明したように、実施の形態1の太陽光発電出力推定装置101は、第1太陽光発電設備が設置された需要家の見かけ上の消費電力である需要家消費電力と、第1太陽光発電設備から予め定められた距離内に設置された、第2太陽光発電設備の太陽光発電出力である第2太陽光発電出力と、を記憶する記憶部140と、第2太陽光発電出力と需要家消費電力とに基づき、第1太陽光発電設備の予め定められた推定時点の太陽光発電出力である第1太陽光発電出力を推定する発電出力推定部130と、を備える。従って、太陽光発電出力推定装置101によれば、太陽光発電出力を取得可能な太陽光発電設備が少なくとも1つあれば、当該太陽光発電設備を第2太陽光発電設備とすることで、日射計および高い時間分解能を有する計測器を設置することなく、他の所望の太陽光発電設備の太陽光発電出力を個別に推定することが可能である。 As described above, the photovoltaic power generation output estimation apparatus 101 according to Embodiment 1 includes the consumer power consumption, which is the apparent power consumption of the consumer in which the first photovoltaic power generation facility is installed, and the power consumption of the first solar power generation facility. A storage unit 140 for storing a second photovoltaic power generation output, which is a photovoltaic power output of a second photovoltaic power generation facility installed within a predetermined distance from the photovoltaic power generation facility; and a second photovoltaic power generation output. and a power generation output estimation unit 130 for estimating a first photovoltaic power generation output, which is a photovoltaic power output of the first photovoltaic power generation facility at a predetermined estimation time, based on the power consumption and the consumer power consumption. Therefore, according to the photovoltaic power generation output estimation device 101, if there is at least one photovoltaic power generation facility that can acquire the photovoltaic power output, the photovoltaic power generation facility is designated as the second photovoltaic power generation facility. It is possible to separately estimate the photovoltaic power output of other desired photovoltaic installations without installing a meter and a measuring instrument with high temporal resolution.

また、実施の形態1の太陽光発電出力推定方法によれば、第1太陽光発電設備が設置された需要家の見かけ上の消費電力である需要家消費電力と、第1太陽光発電設備から予め定められた距離内に設置された、第2太陽光発電設備の太陽光発電出力である第2太陽光発電出力と、を記憶し、第2太陽光発電出力と需要家消費電力とに基づき、第1太陽光発電設備の予め定められた推定時点の太陽光発電出力である第1太陽光発電出力を推定する。従って、太陽光発電出力を取得可能な太陽光発電設備が少なくとも1つあれば、当該太陽光発電設備を第2太陽光発電設備とすることで、日射計および高い時間分解能を有する計測器を設置することなく、他の所望の太陽光発電設備の太陽光発電出力を個別に推定することが可能である。 Further, according to the photovoltaic power generation output estimation method of Embodiment 1, from the consumer power consumption, which is the apparent power consumption of the consumer where the first photovoltaic power generation facility is installed, and the first photovoltaic power generation facility A second photovoltaic power generation output, which is a photovoltaic power output of a second photovoltaic power generation facility installed within a predetermined distance, is stored, and based on the second photovoltaic power output and the consumer power consumption , a first photovoltaic power generation output, which is a photovoltaic power output at a predetermined estimation time of the first photovoltaic power generation facility, is estimated. Therefore, if there is at least one photovoltaic power generation facility that can acquire photovoltaic power output, the photovoltaic power generation facility will be the second photovoltaic power generation facility, and a pyranometer and a measuring instrument with high time resolution will be installed. It is possible to separately estimate the photovoltaic output of other desired photovoltaic installations without having to do so.

<B.実施の形態2>
<B-1.構成>
実施の形態2の太陽光発電出力推定装置102は、実施の形態1の太陽光発電出力推定装置101と同様の構成であり、その構成は図1から図3に示した通りである。
<B. Embodiment 2>
<B-1. Configuration>
The photovoltaic power generation output estimation device 102 of Embodiment 2 has the same configuration as the photovoltaic power generation output estimation device 101 of Embodiment 1, and its configuration is as shown in FIGS. 1 to 3 .

実施の形態1では、第2需要家C2に設置された太陽光発電設備PV2を第1太陽光発電設備の例として、第1太陽光発電出力の推定について説明した。実施の形態1の太陽光発電出力推定装置101は、第1太陽光発電設備が複数の需要家に亘って複数存在する場合に、需要家毎に1軒ずつ第1太陽光発電出力を推定する。これに対して、実施の形態2の太陽光発電出力推定装置102は、第2太陽光発電設備から予め定められた距離内に存在する全ての第1太陽光発電設備の太陽光発電出力の合算値を、推定する。 In the first embodiment, estimation of the first photovoltaic power generation output has been described with the photovoltaic power generation facility PV2 installed at the second consumer C2 as an example of the first photovoltaic power generation facility. The photovoltaic power generation output estimation apparatus 101 according to Embodiment 1 estimates the first photovoltaic power generation output for each consumer when a plurality of first photovoltaic power generation facilities exist across a plurality of consumers. . On the other hand, the photovoltaic power generation output estimating device 102 of Embodiment 2 adds up the photovoltaic power output of all the first photovoltaic power generation facilities existing within a predetermined distance from the second photovoltaic power generation facility. Estimate the value.

実施の形態2の太陽光発電出力推定装置102において、第1共分散取得部110は、記憶部140の場所情報データ141を利用して、第2太陽光発電設備PV1から予め定められた距離内に存在する第1太陽光発電設備を探索する。そして、第1共分散取得部110は、需要家消費電力データ143から、探索した第1太陽光発電設備を保有する全需要家(以下、単に「全需要家」という)の需要家消費電力を取得し、これらを合算する。そして、発電出力推定部130は、第2太陽光発電出力と全需要家の需要家消費電力の合算値とを用いて実施の形態1と同様の処理を行い、全需要家が保有する全ての第1太陽光発電設備の太陽光発電出力の合算値を推定する。 In the photovoltaic power generation output estimation apparatus 102 of Embodiment 2, the first covariance acquisition unit 110 utilizes the location information data 141 of the storage unit 140 to determine the distance from the second photovoltaic power generation facility PV1 within a predetermined distance. Search for the first photovoltaic power generation facility in Then, the first covariance acquisition unit 110 obtains the consumer power consumption of all consumers who own the searched first photovoltaic power generation equipment (hereinafter simply referred to as “all consumers”) from the consumer power consumption data 143. Get them and add them up. Then, the power generation output estimating unit 130 performs the same processing as in Embodiment 1 using the second photovoltaic power generation output and the sum of the consumer power consumption of all consumers, Estimate the total value of the photovoltaic power output of the first photovoltaic power generation facility.

<B-2.効果>
次に、太陽光発電出力推定装置102が奏する効果の検証結果を図11から図13を用いて説明する。この検証では、1軒の全量買取契約の対象である需要家の太陽光発電設備を第2太陽光発電設備とし、500軒程度の余剰買取契約の対象である需要家の太陽光発電設備を第1太陽光発電設備とした。そして、第1太陽光発電設備を保有する全ての需要家の需要家消費電力を合算した、新たな需要家消費電力と、第2太陽光発電設備の発電出力である第2太陽光発電出力を用いることで、全ての第1太陽光発電設備の発電出力を合算した、新たな第1太陽光発電出力を推定した。なお、本検証例では、精度を検証するため、全ての第1太陽光発電出力の合計値も特別に測定して実測値として扱い、太陽光発電出力推定装置102の推定結果と比較している。
<B-2. Effect>
Next, verification results of the effects of the photovoltaic power generation output estimation device 102 will be described with reference to FIGS. 11 to 13. FIG. In this verification, the photovoltaic power generation facility of the consumer who is the target of the purchase contract for the entire amount of one house is the second photovoltaic power generation facility, and the photovoltaic power generation facility of the consumer who is the target of the surplus purchase contract of about 500 houses is the second photovoltaic power generation facility. 1 photovoltaic power generation facility. Then, the new consumer power consumption, which is the sum of the consumer power consumption of all the consumers who own the first solar power generation equipment, and the second solar power generation output, which is the power generation output of the second solar power generation equipment, are calculated. By using this, a new first photovoltaic power output was estimated by summing the power output of all the first photovoltaic power generation facilities. In addition, in this verification example, in order to verify the accuracy, the total value of all the first photovoltaic power generation outputs is also specially measured and treated as an actual measurement value, and compared with the estimation result of the photovoltaic power output estimation device 102. .

図11は第1太陽光発電出力の実測値を示し、図12は太陽光発電出力推定装置102による第1太陽光発電出力の推定値を示している。これらの図において横軸は時刻を示している。図11の縦軸は第1太陽光発電出力(有効電力)の実測値を示し、図12の縦軸は第1太陽光発電出力(有効電力)の推定値を示している。 FIG. 11 shows measured values of the first photovoltaic power output, and FIG. 12 shows estimated values of the first photovoltaic power output by the photovoltaic power output estimating device 102 . In these figures, the horizontal axis indicates time. The vertical axis of FIG. 11 indicates the measured value of the first photovoltaic power generation output (active power), and the vertical axis of FIG. 12 indicates the estimated value of the first photovoltaic power generation output (active power).

図13は、太陽光発電出力推定装置102による第1太陽光発電出力の推定値から、第1太陽光発電出力の実測値を差し引いたものを誤差とした、誤差のヒストグラムを示している。図13の横軸は誤差を示し、縦軸は頻度を示している。なお、図13中のAvg.は誤差の平均値、SDは誤差の標準偏差、RMSEは2乗平均平方根誤差を、それぞれ表している。図13の結果から、太陽光発電出力推定装置102による第1太陽光発電出力の推定精度は、非常に高いことを確認できた。 FIG. 13 shows an error histogram obtained by subtracting the actually measured value of the first photovoltaic output from the estimated value of the first photovoltaic output by the photovoltaic output estimation device 102 . The horizontal axis of FIG. 13 indicates error, and the vertical axis indicates frequency. Note that Avg. is the mean error, SD is the standard deviation of the error, and RMSE is the root mean square error. From the results of FIG. 13, it was confirmed that the estimation accuracy of the first photovoltaic power output by the photovoltaic power output estimating device 102 is very high.

以上に説明したように、実施の形態2の太陽光発電出力推定装置102は、複数の第1太陽光発電設備が1対1で設置された複数の需要家の見かけ上の消費電力である需要家消費電力と、複数の第1太陽光発電設備から予め定められた距離内に設置された、少なくとも1つの第2太陽光発電設備の太陽光発電出力である第2太陽光発電出力と、を記憶する記憶部140と、第2太陽光発電出力と、各需要家の需要家消費電力の合算値とに基づき、各第1太陽光発電設備の予め定められた推定時点の太陽光発電出力である第1太陽光発電出力の合算値を推定する発電出力推定部130と、を備える。従って、太陽光発電出力推定装置102によれば、太陽光発電出力を取得可能な太陽光発電設備が少なくとも1つあれば、当該太陽光発電設備を第2太陽光発電設備とすることで、日射計および高い時間分解能を有する計測器を設置することなく、他の複数の太陽光発電設備の太陽光発電出力の合算値を推定することが可能である。 As described above, the photovoltaic power output estimating apparatus 102 of the second embodiment uses demand power, which is the apparent power consumption of a plurality of consumers in which a plurality of first photovoltaic power generation facilities are installed on a one-to-one basis. Home power consumption, and a second photovoltaic power generation output, which is the photovoltaic power output of at least one second photovoltaic power generation facility installed within a predetermined distance from a plurality of first photovoltaic power generation facilities, Based on the storage unit 140 to store, the second photovoltaic power output, and the total value of the consumer power consumption of each consumer, the photovoltaic power output at a predetermined estimated time of each first photovoltaic power generation facility and a power generation output estimating unit 130 for estimating a total value of a certain first photovoltaic power generation output. Therefore, according to the photovoltaic power generation output estimation device 102, if there is at least one photovoltaic power generation facility from which photovoltaic power generation output can be obtained, the photovoltaic power generation facility is designated as the second photovoltaic power generation facility. It is possible to estimate the total value of the photovoltaic power output of a plurality of other photovoltaic power generation facilities without installing a meter and a measuring instrument with high time resolution.

このように、実施の形態1の太陽光発電出力推定装置101によれば、太陽光発電出力を需要家毎に個別に推定することができる一方、実施の形態2の太陽光発電出力推定装置102によれば、太陽光発電出力を複数の需要家単位でまとめて推定することができる。従って、電力会社などの管理者は、太陽光発電出力推定装置101、102を使い分けることによって、太陽光発電出力を推定する太陽光発電設備の粒度を自由に選択することができる。 As described above, according to the photovoltaic power generation output estimation device 101 of Embodiment 1, the photovoltaic power generation output can be estimated individually for each consumer, while the photovoltaic power generation output estimation device 102 of Embodiment 2 According to the method, it is possible to collectively estimate the photovoltaic power generation output for a plurality of consumers. Therefore, an administrator of an electric power company or the like can freely select the granularity of the photovoltaic power generation equipment for estimating the photovoltaic power output by selectively using the photovoltaic power generation output estimation devices 101 and 102 .

<C.実施の形態3>
<C-1.構成>
実施の形態3の太陽光発電出力推定装置103は、実施の形態1の太陽光発電出力推定装置101と同様の構成であり、その構成は図1から図3に示した通りである。実施の形態3の太陽光発電出力推定装置103は、複数の第2太陽光発電設備の発電出力を用いて第1太陽光発電出力を推定するという点で実施の形態2の太陽光発電出力推定装置102と異なり、それ以外の点では太陽光発電出力推定装置102と同様である。太陽光発電出力推定装置103は、複数の第2太陽光発電設備の発電出力を用いて第1太陽光発電出力を推定することにより、第1太陽光発電出力の推定精度の向上を図る。
<C. Embodiment 3>
<C-1. Configuration>
The photovoltaic output estimation device 103 of Embodiment 3 has the same configuration as the photovoltaic output estimation device 101 of Embodiment 1, and its configuration is as shown in FIGS. 1 to 3 . The photovoltaic power generation output estimation apparatus 103 of Embodiment 3 estimates the first photovoltaic power output using the power output of a plurality of second photovoltaic power generation facilities. Unlike the device 102, it is otherwise similar to the photovoltaic output estimation device 102. FIG. The photovoltaic power generation output estimation device 103 estimates the first photovoltaic power output using the power output of the plurality of second photovoltaic power generation facilities, thereby improving the estimation accuracy of the first photovoltaic power output.

太陽光発電出力推定装置103において、第1共分散取得部110は、記憶部140の場所情報データ141を利用して、第1太陽光発電設備から予め定められた距離内に存在する太陽光発電設備を複数抽出して、第2太陽光発電設備とする。そして、第1共分散取得部110は、第2太陽光発電出力データ142から、複数の第2太陽光発電設備について第2太陽光発電出力を取得し、それらを合算する。また、第1共分散取得部110は複数の第2太陽光発電設備から予め定められた距離内に存在する第1太陽光発電設備を探索する。そして、第1共分散取得部110は、需要家消費電力データ143から、探索した第1太陽光発電設備を保有する全ての需要家の需要家消費電力を取得し、これらを合算する。 In the photovoltaic power generation output estimation device 103, the first covariance acquisition unit 110 uses the location information data 141 of the storage unit 140 to determine the photovoltaic power generation existing within a predetermined distance from the first photovoltaic power generation facility. A plurality of facilities are extracted and set as the second photovoltaic power generation facility. Then, the first covariance acquisition unit 110 acquires the second photovoltaic power generation outputs of the plurality of second photovoltaic power generation facilities from the second photovoltaic power generation output data 142, and adds them up. Also, the first covariance acquisition unit 110 searches for a first photovoltaic power generation facility existing within a predetermined distance from the plurality of second photovoltaic power generation facilities. Then, the first covariance acquisition unit 110 acquires the consumer power consumption of all consumers having the searched first photovoltaic power generation equipment from the consumer power consumption data 143, and adds them up.

実施の形態3の発電出力推定部130は、複数の第2太陽光発電設備の第2太陽光発電出力の合算値と、第1太陽光発電設備が設置された複数の需要家の需要家消費電力の合算値とを用いて、実施の形態1と同様の処理を行い、複数の第1太陽光発電設備の第1太陽光発電出力の合算値を推定する。 The power generation output estimation unit 130 of Embodiment 3 calculates the total value of the second photovoltaic power generation outputs of the plurality of second photovoltaic power generation facilities and the consumer consumption of the plurality of consumers where the first photovoltaic power generation facilities are installed. The same processing as in Embodiment 1 is performed using the total value of electric power, and the total value of the first photovoltaic power generation outputs of the plurality of first photovoltaic power generation facilities is estimated.

<C-2.効果>
次に、太陽光発電出力推定装置103が奏する効果の検証結果を図14から図16を用いて説明する。この検証では、7軒の全量買取契約の対象である需要家の太陽光発電設備を第2太陽光発電設備とし、500軒程度の余剰買取契約の対象である需要家の太陽光発電設備を第1太陽光発電設備とした。そして、第1太陽光発電設備を保有する全ての需要家の需要家消費電力を合算した新たな需要家消費電力と、全ての第2太陽光発電設備の発電出力を合算した、新たな第2太陽光発電出力を用いることで、全ての第1太陽光発電設備の発電出力を合算した新たな第1太陽光発電出力を推定した。なお、本検証例では、精度を検証するため、全ての第1太陽光発電出力の合計値も特別に測定して実測値として扱い、太陽光発電出力推定装置103の推定結果と比較している。
<C-2. Effect>
Next, verification results of the effects of the photovoltaic power generation output estimation device 103 will be described with reference to FIGS. 14 to 16. FIG. In this verification, the photovoltaic power generation facilities of the customers who are the target of the 7 total power purchase agreements are the second photovoltaic power generation facilities, and the photovoltaic power generation facilities of the customers who are the target of the surplus purchase agreement of about 500 houses are the second photovoltaic power generation facilities. 1 photovoltaic power generation facility. Then, a new consumer power consumption that is the sum of the consumer power consumption of all consumers that own the first photovoltaic power generation equipment, and a new second photovoltaic power generation equipment that is the sum of the power generation output of all the second photovoltaic power generation equipment By using the photovoltaic power output, a new first photovoltaic power output was estimated by summing the power output of all the first photovoltaic power generation facilities. In addition, in this verification example, in order to verify the accuracy, the total value of all the first photovoltaic power generation outputs is also specially measured and treated as an actual measurement value, and compared with the estimation result of the photovoltaic power output estimation device 103. .

図14は第1太陽光発電出力の実測値を示し、図15は太陽光発電出力推定装置103による第1太陽光発電出力の推定値を示している。これらの図において横軸は時刻を示している。図14の縦軸は第1太陽光発電出力(有効電力)の実測値を示し、図15の縦軸は第1太陽光発電出力(有効電力)の推定値を示している。 FIG. 14 shows measured values of the first photovoltaic power output, and FIG. 15 shows estimated values of the first photovoltaic power output by the photovoltaic power output estimating device 103 . In these figures, the horizontal axis indicates time. The vertical axis of FIG. 14 indicates the measured value of the first photovoltaic power generation output (active power), and the vertical axis of FIG. 15 indicates the estimated value of the first photovoltaic power generation output (active power).

図16は、太陽光発電出力推定装置103による第1太陽光発電出力の推定値から、第1太陽光発電出力の実測値を差し引いたものを誤差とした、誤差のヒストグラムを示している。図16の横軸は誤差を示し、縦軸は頻度を示している。なお、図16中のAvg.は誤差の平均値、SDは誤差の標準偏差、RMSEは2乗平均平方根誤差を、それぞれ表している。図16の結果から、太陽光発電出力推定装置103による第1太陽光発電出力の推定精度は、非常に高いことを確認できた。 FIG. 16 shows an error histogram obtained by subtracting the measured value of the first photovoltaic output from the estimated value of the first photovoltaic output by the photovoltaic output estimating device 103 as an error. The horizontal axis of FIG. 16 indicates error, and the vertical axis indicates frequency. Note that Avg. is the mean error, SD is the standard deviation of the error, and RMSE is the root mean square error. From the result of FIG. 16, it was confirmed that the estimation accuracy of the first photovoltaic power output by the photovoltaic power output estimation device 103 is very high.

実施の形態3の太陽光発電出力推定装置103において、第2太陽光発電設備は複数であり、発電出力推定部130は、各第2太陽光発電設備の第2太陽光発電出力の合算値と、各需要家の需要家消費電力の合算値とに基づき、各第1太陽光発電設備の推定時点の第1太陽光発電出力の合算値を推定する。従って、第1太陽光発電出力の合算値の推定精度が向上する。 In the photovoltaic power generation output estimation device 103 of Embodiment 3, there are a plurality of second photovoltaic power generation facilities, and the power generation output estimation unit 130 calculates the total value of the second photovoltaic power generation output of each of the second photovoltaic power generation facilities and , and the total value of the consumer power consumption of each consumer, the total value of the first photovoltaic power generation output at the time of estimation of each of the first photovoltaic power generation facilities is estimated. Therefore, the estimation accuracy of the total value of the first photovoltaic power output is improved.

<D.実施の形態4>
<D-1.構成>
実施の形態4の太陽光発電出力推定装置104は、実施の形態1の太陽光発電出力推定装置101と同様の構成であり、その構成は図1から図3に示した通りである。実施の形態1において、遅延時間τは、式(2)において、第1太陽光発電設備の設置地点と第2太陽光発電設備の設置地点との間を日射変動が伝播する時間として定義され、第2共分散取得部120により推定される。しかし、第2太陽光発電出力の時系列データと需要家消費電力の時系列データのどちらか一方の時間分解能(サンプリング周期)が低い場合には、遅延時間τの推定精度が低下する。また、推定に利用できるデータサンプル数が少なくなるため、第1共分散または第2共分散の算出精度が低下し、最終的に、第1太陽光発電出力の推定精度が低下する可能性がある。
<D. Embodiment 4>
<D-1. Configuration>
The photovoltaic power generation output estimation device 104 of Embodiment 4 has the same configuration as the photovoltaic power generation output estimation device 101 of Embodiment 1, and its configuration is as shown in FIGS. 1 to 3 . In Embodiment 1, the delay time τ s is defined as the time during which solar radiation fluctuation propagates between the installation point of the first solar power generation facility and the installation point of the second solar power generation facility in Equation (2). , is estimated by the second covariance acquisition unit 120 . However, if the time resolution (sampling cycle) of either the time-series data of the output of the second photovoltaic power generation or the time-series data of the consumer power consumption is low, the estimation accuracy of the delay time τs decreases. In addition, since the number of data samples that can be used for estimation decreases, the calculation accuracy of the first covariance or the second covariance decreases, and ultimately the estimation accuracy of the first photovoltaic power generation output may decrease. .

そこで、実施の形態4では、第2太陽光発電出力の時系列データと需要家消費電力の時系列データのどちらか一方の時間分解能が低くても、第1太陽光発電出力の推定精度を低下させないことを目的とし、実施の形態1を下記のように変形する。 Therefore, in Embodiment 4, even if the time resolution of either the time-series data of the second photovoltaic power generation output or the time-series data of the consumer power consumption is low, the estimation accuracy of the first photovoltaic power generation output is reduced. For the purpose of preventing this, the first embodiment is modified as follows.

まずは、実施の形態1で用いた式(2)を以下の式(7)のように修正し、遅延時間τを定義しない。言い換えれば、遅延時間τを常に0とする。すなわち、第2共分散取得部120は遅延時間τの推定を行わない。 First, the equation (2) used in the first embodiment is modified to the following equation (7), and the delay time τ s is not defined. In other words, the delay time τ s is always zero. That is, the second covariance acquisition unit 120 does not estimate the delay time τs .

Figure 0007300893000007
Figure 0007300893000007

また、第1期間は、第1太陽光発電出力の推定時点から1、2週間程度遡った期間内の5時間程度の期間とする。具体的には、第1太陽光発電出力の推定時点から1,2週間程度遡った期間内の10時から15時の5時間の期間とするのが好ましい。 In addition, the first period is a period of about 5 hours within a period of about one or two weeks before the estimation of the output of the first photovoltaic power generation. Specifically, it is preferable to set the five-hour period from 10:00 to 15:00 within a period one or two weeks before the estimated time of the first photovoltaic power generation output.

<D-2.効果>
次に、太陽光発電出力推定装置104が奏する効果の検証結果を図17および図18を用いて説明する。この検証では、1軒の全量買取契約の対象である需要家の太陽光発電設備を第2太陽光発電設備とし、500軒程度の余剰買取契約の対象である需要家の太陽光発電設備を第1太陽光発電設備とした。そして、第1太陽光発電設備を保有する全ての需要家の需要家消費電力を合算した新たな需要家消費電力と、第2太陽光発電出力を用いることで、全ての第1太陽光発電設備の発電出力を合算した新たな第1太陽光発電出力を推定した。なお、本検証例では、精度を検証するため、全ての第1太陽光発電出力の合計値も特別に測定して実測値として扱い、太陽光発電出力推定装置104の推定結果と比較している。
<D-2. Effect>
Next, verification results of the effects of the photovoltaic power generation output estimation device 104 will be described with reference to FIGS. 17 and 18. FIG. In this verification, the photovoltaic power generation facility of the consumer who is the target of the purchase contract for the entire amount of one house is the second photovoltaic power generation facility, and the photovoltaic power generation facility of the consumer who is the target of the surplus purchase contract of about 500 houses is the second photovoltaic power generation facility. 1 photovoltaic power generation facility. Then, by using the new consumer power consumption that is the sum of the consumer power consumption of all the consumers who own the first photovoltaic power generation equipment and the second photovoltaic power generation output, all the first photovoltaic power generation equipment A new first photovoltaic power generation output was estimated by adding the power generation output of In this verification example, in order to verify the accuracy, the total value of all the first photovoltaic power generation outputs is also specially measured and treated as an actual measured value, and compared with the estimation result of the photovoltaic power generation output estimation device 104. .

図17は第1太陽光発電出力の実測値を示し、図18は太陽光発電出力推定装置104による第1太陽光発電出力の推定値を示している。これらの図において横軸は時刻を示している。図17の縦軸は第1太陽光発電出力(有効電力)の実測値を示し、図18の縦軸は第1太陽光発電出力(有効電力)の推定値を示している。これらの結果から、太陽光発電出力推定装置104による第1太陽光発電出力の推定精度は、非常に高いことを確認できた。 FIG. 17 shows measured values of the first photovoltaic power output, and FIG. 18 shows estimated values of the first photovoltaic power output by the photovoltaic power output estimating device 104 . In these figures, the horizontal axis indicates time. The vertical axis of FIG. 17 indicates the measured value of the first photovoltaic power generation output (active power), and the vertical axis of FIG. 18 indicates the estimated value of the first photovoltaic power generation output (active power). From these results, it was confirmed that the estimation accuracy of the first photovoltaic power output by the photovoltaic power output estimating device 104 is very high.

<E.実施の形態5>
<E-1.構成>
実施の形態5の太陽光発電出力推定装置105は、実施の形態1の太陽光発電出力推定装置101と同様の構成であり、その構成は図1から図3に示した通りである。実施の形態1の太陽光発電出力推定装置101は、全量買取契約対象の1つの太陽光発電設備を第2太陽光発電設備として固定し、その第2太陽光発電設備の第2太陽光発電出力を基に、第1太陽光発電設備が複数ある場合には需要家毎に1軒ずつ第1太陽光発電出力を推定する。これに対して実施の形態5の太陽光発電出力推定装置105は、実施の形態1の方法で推定した第1太陽光発電設備の第1太陽光発電出力を、新たな第2太陽光発電出力として、別の第1太陽光発電設備の第1太陽光発電出力の推定に利用する。
<E. Embodiment 5>
<E-1. Configuration>
The photovoltaic power generation output estimation device 105 of Embodiment 5 has the same configuration as the photovoltaic power generation output estimation device 101 of Embodiment 1, and its configuration is as shown in FIGS. 1 to 3 . The photovoltaic power generation output estimation device 101 of Embodiment 1 fixes one photovoltaic power generation facility subject to a full purchase contract as a second photovoltaic power generation facility, and the second photovoltaic power generation output of the second photovoltaic power generation facility Based on this, when there are a plurality of first photovoltaic power generation facilities, the first photovoltaic power generation output is estimated for each customer. On the other hand, the photovoltaic power generation output estimation device 105 of Embodiment 5 converts the first photovoltaic power generation output of the first photovoltaic power generation facility estimated by the method of Embodiment 1 into a new second photovoltaic power generation output , to estimate the first photovoltaic power output of another first photovoltaic power generation facility.

図19は、実施の形態5の太陽光発電出力推定装置105が、複数の需要家の太陽光発電出力を順番に推定する様子を示している。図19において、需要家間の矢印内の括弧付き数字は、太陽光発電出力の推定順番を示している。太陽光発電出力推定装置105は、記憶部140の場所情報データ141を利用して、太陽光発電出力を推定する需要家の順番を決定する。そして、その順番に従って、太陽光発電出力推定装置105は、需要家が保有する余剰買取契約対象の太陽光発電設備の発電出力である第1太陽光発電出力を推定する。 FIG. 19 shows how the photovoltaic power generation output estimating apparatus 105 of Embodiment 5 sequentially estimates the photovoltaic power output of a plurality of consumers. In FIG. 19, numbers in parentheses within arrows between consumers indicate the estimated order of photovoltaic power output. The photovoltaic power generation output estimation device 105 uses the location information data 141 in the storage unit 140 to determine the order of the consumers whose photovoltaic power output is to be estimated. Then, according to the order, the photovoltaic power output estimation device 105 estimates the first photovoltaic power output, which is the power output of the photovoltaic power generation facility owned by the customer and subject to the surplus purchase contract.

図19の例において、まず、太陽光発電出力推定装置105は、第1需要家C1が保有する太陽光発電設備PV1を第2太陽光発電設備とし、第3需要家C3が保有する太陽光発電設備PV3を第1太陽光発電設備とする。つまり、太陽光発電出力推定装置105は、太陽光発電設備PV1の発電出力である第2太陽光発電出力と、第3需要家C3の需要家消費電力とを用いて、第3需要家C3が保有する太陽光発電設備PV3の発電出力である第1太陽光発電出力を推定する。 In the example of FIG. 19, first, the photovoltaic power generation output estimation device 105 sets the photovoltaic power generation facility PV1 owned by the first consumer C1 as the second photovoltaic power generation facility, and the photovoltaic power generation facility PV owned by the third consumer C3. Let the facility PV3 be the first photovoltaic power generation facility. That is, the photovoltaic power generation output estimation device 105 uses the second photovoltaic power generation output, which is the power generation output of the photovoltaic power generation facility PV1, and the consumer power consumption of the third consumer C3 to determine whether the third consumer C3 is A first photovoltaic power output, which is the power output of the owned photovoltaic power generation facility PV3, is estimated.

次に、太陽光発電出力推定装置105は、上記で推定の対象とした第3需要家C3が保有する太陽光発電設備PV3を新たな第2太陽光発電設備とした上で、第4需要家C4の太陽光発電設備PV4を新たな第1太陽光発電設備とし、太陽光発電設備PV4の発電出力である第1太陽光発電出力を推定する。言い換えれば、太陽光発電出力推定装置105の発電出力推定部130は、既に推定した第1太陽光発電設備である太陽光発電設備PV3の第1太陽光発電出力を、第2太陽光発電設備の太陽光発電出力として用いて、他の第1太陽光発電設備の第1太陽光発電出力を推定する。 Next, the photovoltaic power generation output estimation device 105 sets the photovoltaic power generation facility PV3 owned by the third consumer C3, which is the target of the estimation above, as a new second photovoltaic power generation facility. The photovoltaic power generation facility PV4 of C4 is set as a new first photovoltaic power generation facility, and the first photovoltaic power generation output, which is the power generation output of the photovoltaic power generation facility PV4, is estimated. In other words, the power generation output estimation unit 130 of the photovoltaic power generation output estimation device 105 converts the already estimated first photovoltaic power generation output of the photovoltaic power generation facility PV3, which is the first photovoltaic power generation facility, to the second photovoltaic power generation facility. Using it as the photovoltaic power output, the first photovoltaic power output of the other first photovoltaic power generation facility is estimated.

つまり、太陽光発電出力推定装置105は、第3需要家C3が保有する太陽光発電設備PV3の第2太陽光発電出力と、第4需要家C4の需要家消費電力とを用いて、第4需要家C4が保有する太陽光発電設備PV4の第1太陽光発電出力を推定する。このような処理を順番に行うことで、太陽光発電出力推定装置105は、余剰買取契約対象の全ての太陽光発電設備の発電出力を、順番に推定していく。 That is, the photovoltaic power generation output estimation device 105 uses the second photovoltaic power generation output of the photovoltaic power generation facility PV3 owned by the third consumer C3 and the consumer power consumption of the fourth consumer C4 to calculate the fourth A first photovoltaic power generation output of photovoltaic power generation facility PV4 owned by customer C4 is estimated. By sequentially performing such processing, the photovoltaic power generation output estimation device 105 sequentially estimates the power output of all the photovoltaic power generation facilities subject to the surplus purchase contract.

<E-2.効果>
以上に説明したように、実施の形態5の太陽光発電出力推定装置105において、発電出力推定部130は、推定した第1太陽光発電設備の第1太陽光発電出力を、第2太陽光発電設備の第2太陽光発電出力として用いて、他の第1太陽光発電設備の第1太陽光発電出力を推定する。
<E-2. Effect>
As described above, in the photovoltaic power generation output estimation device 105 of Embodiment 5, the power generation output estimation unit 130 converts the estimated first photovoltaic power generation output of the first photovoltaic power generation facility to the second photovoltaic power generation It is used as the second photovoltaic power output of the facility to estimate the first photovoltaic power output of the other first photovoltaic power plant.

図19の例で、第1需要家C1の太陽光発電設備PV1のみが全量買取契約対象であり、かつ余剰買取契約対象の太陽光発電設備PVnは太陽光発電設備PV1から予め定められた距離外にあるものとする。このような場合、太陽光発電設備PVnの太陽光発電出力を、太陽光発電設備PV1の太陽光発電出力を基に推定することはできない。しかし、そのような場合でも、太陽光発電出力推定装置105によれば、太陽光発電設備PV1に近い他の需要家の太陽光発電設備の太陽光発電出力から順番に推定することで、元の太陽光発電設備PV1から離れた場所にある太陽光発電設備PVnの太陽光発電出力も推定することが可能である。 In the example of FIG. 19, only the photovoltaic power generation facility PV1 of the first consumer C1 is subject to the full purchase contract, and the photovoltaic power generation facility PVn subject to the surplus purchase contract is outside a predetermined distance from the photovoltaic power generation facility PV1. shall be in In such a case, the photovoltaic power generation output of the photovoltaic power generation facility PVn cannot be estimated based on the photovoltaic power generation output of the photovoltaic power generation facility PV1. However, even in such a case, according to the photovoltaic power generation output estimation device 105, by sequentially estimating the photovoltaic power output of the photovoltaic power generation facilities of other consumers near the photovoltaic power generation facility PV1, the original photovoltaic power generation output can be estimated. It is also possible to estimate the photovoltaic power output of a photovoltaic power plant PVn located away from the photovoltaic plant PV1.

<F.ハードウェア構成>
上述した太陽光発電出力推定装置101-105における各部の構成は、処理回路により実現される。すなわち、処理回路81は太陽光発電出力推定装置101-105における各部の構成を備える。処理回路には、専用のハードウェアが適用されても良いし、メモリに格納されるプログラムを実行するプロセッサが適用されても良い。プロセッサは、例えば中央処理装置、処理装置、演算装置、マイクロプロセッサ、マイクロコンピュータ、DSP(Digital Signal Processor)等である。
<F. Hardware configuration>
The configuration of each unit in the photovoltaic power generation output estimation devices 101 to 105 described above is realized by a processing circuit. That is, the processing circuit 81 has the configuration of each part in the photovoltaic power generation output estimation devices 101-105. Dedicated hardware may be applied to the processing circuit, or a processor that executes a program stored in a memory may be applied. The processor is, for example, a central processing unit, a processing unit, an arithmetic unit, a microprocessor, a microcomputer, a DSP (Digital Signal Processor), or the like.

処理回路が専用のハードウェアである場合、処理回路は、例えば、単一回路、複合回路、プログラム化したプロセッサ、並列プログラム化したプロセッサ、ASIC(Application Specific Integrated Circuit)、FPGA(Field-Programmable Gate Array)、またはこれらを組み合わせたものが該当する。太陽光発電出力推定装置101-105における各部の機能それぞれは、複数の処理回路で実現されてもよいし、各部の機能をまとめて一つの処理回路で実現されてもよい。 When the processing circuit is dedicated hardware, the processing circuit is, for example, a single circuit, a composite circuit, a programmed processor, a parallel programmed processor, an ASIC (Application Specific Integrated Circuit), an FPGA (Field-Programmable Gate Array) ), or a combination thereof. Each function of each unit in the photovoltaic power generation output estimation devices 101 to 105 may be realized by a plurality of processing circuits, or the functions of each unit may be collectively realized by one processing circuit.

処理回路がプロセッサである場合、太陽光発電出力推定装置101-105における各部の機能は、ソフトウェア等(ソフトウェア、ファームウェアまたはソフトウェアとファームウェア)との組み合わせにより実現される。ソフトウェア等はプログラムとして記述され、メモリに格納される。処理回路に適用されるプロセッサは、メモリに記憶されたプログラムを読み出して実行することにより、各部の機能を実現する。ここで、メモリには、例えば、RAM(Random Access Memory)、ROM(Read Only Memory)、フラッシュメモリ、EPROM(Erasable Programmable Read Only Memory)、EEPROM(Electrically Erasable Programmable Read Only Memory)などの、不揮発性または揮発性の半導体メモリ、HDD(Hard Disk Drive)、磁気ディスク、フレキシブルディスク、光ディスク、コンパクトディスク、ミニディスク、DVD(Digital Versatile Disk)及びそのドライブ装置等、または、今後使用されるあらゆる記憶媒体であってもよい。 When the processing circuit is a processor, the function of each unit in the photovoltaic power generation output estimation devices 101-105 is realized by a combination of software or the like (software, firmware, or software and firmware). Software or the like is written as a program and stored in memory. A processor applied to a processing circuit implements the function of each part by reading and executing a program stored in a memory. Here, the memory includes, for example, non-volatile or Volatile semiconductor memory, HDD (Hard Disk Drive), magnetic disk, flexible disk, optical disk, compact disk, mini disk, DVD (Digital Versatile Disk) and its drive device, etc., or any storage medium that will be used in the future. may

以上、太陽光発電出力推定装置101-105の各機能が、ハードウェア及びソフトウェア等のいずれか一方で実現される構成について説明した。しかしこれに限ったものではなく、一部の構成を専用のハードウェアで実現し、別の一部の構成をソフトウェア等で実現する構成であってもよい。以上のように、処理回路は、ハードウェア、ソフトウェア等、またはこれらの組み合わせによって、上述の各機能を実現することができる。 The configuration in which each function of the photovoltaic power generation output estimation devices 101 to 105 is realized by either hardware or software has been described above. However, the configuration is not limited to this, and a configuration in which a part of the configuration is realized by dedicated hardware and another part of the configuration is realized by software or the like may be used. As described above, the processing circuit can implement each of the functions described above using hardware, software, etc., or a combination thereof.

以上、太陽光発電出力推定装置101-105と太陽光発電出力推定システム11について説明した。しかし、本発明は、上記の各実施の形態に限定されるものではない。本発明は、その発明の範囲内において、各実施の形態を自由に組み合わせたり、各実施の形態を適宜、変形、省略したりすることが可能である。 The photovoltaic output estimation devices 101 to 105 and the photovoltaic output estimation system 11 have been described above. However, the present invention is not limited to the above embodiments. Within the scope of the invention, each embodiment can be freely combined, and each embodiment can be appropriately modified or omitted.

例えば、上記の実施の形態において、発電出力推定部130は、第1太陽光発電設備の設備容量が推定時点での設備容量から予め定められた範囲内の期間におけるデータを用いて、第1太陽光発電出力を推定することにした。しかし、発電出力推定部130は、第1太陽光発電設備の設備容量が予め定められた範囲となる期間を考慮することなく、第1太陽光発電出力を推定してもよい。 For example, in the above embodiment, the power generation output estimation unit 130 uses data in a period within a predetermined range from the installed capacity at the time of estimation of the installed capacity of the first solar power generation facility to estimate the first solar power generation facility. We decided to estimate the photovoltaic output. However, the power generation output estimating unit 130 may estimate the first photovoltaic power output without considering the period during which the installed capacity of the first photovoltaic power generation facility is within the predetermined range.

また、上記の実施の形態において、第1太陽光発電設備は、余剰買取契約の対象となっている太陽光発電設備である。しかし、第1太陽光発電設備は、買取契約に関係なく、個別にメータが設置されていないこと等に起因して太陽光発電出力を直接測定できず、太陽光発電出力を把握、推定したい太陽光発電設備であってもよい。 Further, in the above embodiment, the first photovoltaic power generation facility is the photovoltaic power generation facility subject to the surplus purchase contract. However, regardless of the purchase agreement, the first solar power generation facility cannot directly measure the solar power generation output due to the fact that the meter is not installed individually. It may be a photovoltaic facility.

また、上記の実施の形態において、第2太陽光発電設備は、全量買取契約の対象となっている太陽光発電設備である。しかし、第2太陽光発電設備は、買取契約に関係なく、太陽光発電出力を直接測定できている太陽光発電設備であってもよい。また、第2太陽光発電設備の太陽光発電出力である第2太陽光発電出力には、日射強度の測定値または推定値を利用してもよい。 In the above embodiment, the second photovoltaic power generation facility is a photovoltaic power generation facility that is subject to a purchase contract for the total amount of power generated. However, the second photovoltaic power generation facility may be a photovoltaic power generation facility whose photovoltaic power output can be directly measured regardless of the purchase agreement. In addition, a measured value or an estimated value of the solar radiation intensity may be used for the second photovoltaic power generation output, which is the photovoltaic power output of the second photovoltaic power generation facility.

1 コンピュータ、2 CPU、3 主記憶装置、4 補助記憶装置、5 外部記憶装置、6 ネットワーク、7 出力装置、8 入力装置、11 太陽光発電出力推定システム、20 電力系統、25 通信網、50 通信ネットワーク、101-105 太陽光発電出力推定装置、110 第1共分散取得部、120 第2共分散取得部、130 発電出力推定部、140 記憶部、141 場所情報データ、142 第2太陽光発電出力データ、143 需要家消費電力データ、144 算出データ、PV1-PVn 太陽光発電設備、L1-Ln 負荷。 1 computer, 2 CPU, 3 main storage device, 4 auxiliary storage device, 5 external storage device, 6 network, 7 output device, 8 input device, 11 solar power generation output estimation system, 20 power system, 25 communication network, 50 communication Network 101-105 Photovoltaic power generation output estimation device 110 First covariance acquisition unit 120 Second covariance acquisition unit 130 Power generation output estimation unit 140 Storage unit 141 Location information data 142 Second photovoltaic power generation output data, 143 consumer power consumption data, 144 calculation data, PV1-PVn photovoltaic power generation equipment, L1-Ln load.

Claims (14)

複数の第1太陽光発電設備の太陽光発電出力である第1太陽光発電出力と前記複数の第1太陽光発電設備が1対1で設置された複数の需要家の負荷の消費電力とが前記複数の需要家の夫々ごとに合算された前記需要家の見かけ上の消費電力である需要家消費電力と、複数の前記第1太陽光発電設備から予め定められた距離内に設置された、少なくとも1つの第2太陽光発電設備の太陽光発電出力である第2太陽光発電出力と、を記憶する記憶部と、
前記第2太陽光発電出力と、各前記需要家の前記需要家消費電力の合算値とに基づき、各前記第1太陽光発電設備の予め定められた推定時点の太陽光発電出力である第1太陽光発電出力の合算値を推定する発電出力推定部と、を備える、
太陽光発電出力推定装置。
The first photovoltaic power generation output, which is the photovoltaic power output of the plurality of first photovoltaic power generation facilities, and the power consumption of the loads of the plurality of consumers in which the plurality of first photovoltaic power generation facilities are installed on a one-to-one basis Installed within a predetermined distance from the consumer power consumption, which is the apparent power consumption of the consumer added for each of the plurality of consumers, and the plurality of the first photovoltaic power generation facilities, a storage unit that stores a second photovoltaic power output that is a photovoltaic power output of at least one second photovoltaic power generation facility;
Based on the second photovoltaic power generation output and the sum of the consumer power consumption of each consumer, the first A power generation output estimation unit that estimates the total value of the photovoltaic power generation output,
Photovoltaic output estimator.
前記第2太陽光発電設備は複数であり、
前記発電出力推定部は、各前記第2太陽光発電設備の前記第2太陽光発電出力の合算値と、各前記需要家の前記需要家消費電力の合算値とに基づき、各前記第1太陽光発電設備の前記推定時点の前記第1太陽光発電出力の合算値を推定する、
請求項に記載の太陽光発電出力推定装置。
The second photovoltaic power generation facility is a plurality,
The power output estimating unit, based on the total value of the second photovoltaic power generation output of each of the second photovoltaic power generation facilities and the total value of the consumer power consumption of each of the consumers, each of the first solar power estimating the total value of the first photovoltaic power generation output at the estimated time point of the photovoltaic power generation facility;
The photovoltaic power generation output estimation device according to claim 1 .
前記記憶部は、前記第2太陽光発電出力の時系列データと前記需要家消費電力の合算値の時系列データとを記憶し、
前記発電出力推定部は、前記第2太陽光発電出力の時系列データと前記需要家消費電力の合算値の時系列データとに基づき、前記第1太陽光発電出力の合算値を推定する、
請求項1または2に記載の太陽光発電出力推定装置。
The storage unit stores time-series data of the output of the second photovoltaic power generation and time-series data of the total value of the consumer power consumption,
The power output estimating unit estimates the total value of the first photovoltaic power output based on the time-series data of the second photovoltaic power output and the time-series data of the total value of the consumer power consumption.
The photovoltaic power generation output estimation device according to claim 1 or 2 .
前記発電出力推定部は、前記推定時点より前の少なくとも1つの第1期間における、前記第2太陽光発電出力の時系列データと前記需要家消費電力の合算値の時系列データとに基づき、前記第1太陽光発電出力の合算値を推定する、
請求項に記載の太陽光発電出力推定装置。
The power generation output estimating unit, based on the time-series data of the second photovoltaic power generation output and the time-series data of the total value of the consumer power consumption in at least one first period before the estimation time, estimating the combined value of the first photovoltaic power output;
The photovoltaic power generation output estimation device according to claim 3 .
前記第1期間は、前記第1太陽光発電設備の設備容量の合算値の、前記第1太陽光発電設備の前記推定時点における設備容量の合算値に対する差分が予め定められた範囲内となる期間である、
請求項に記載の太陽光発電出力推定装置。
The first period is a period in which the difference between the total value of the installed capacity of the first photovoltaic power generation facility and the total value of the installed capacity of the first photovoltaic power generation facility at the time of estimation is within a predetermined range. is
The photovoltaic power generation output estimation device according to claim 4 .
前記第1期間における、前記第2太陽光発電出力の時系列データと前記需要家消費電力の合算値の時系列データとの共分散である第1共分散を算出する第1共分散取得部と、
前記第2太陽光発電出力の時系列データのうち、前記第1期間のデータ群と前記第1期間から遅延時間だけずれた第2期間のデータ群との自己共分散である第2共分散を算出する第2共分散取得部と、をさらに備え、
前記発電出力推定部は、前記第1共分散、前記第2共分散、および前記第2太陽光発電出力を用いて、前記第1太陽光発電出力の合算値を推定する、
請求項またはに記載の太陽光発電出力推定装置。
a first covariance acquisition unit that calculates a first covariance that is a covariance between the time-series data of the second photovoltaic power generation output and the time-series data of the total value of the consumer power consumption in the first period; ,
A second covariance, which is the autocovariance between the data group in the first period and the data group in the second period shifted from the first period by the delay time, among the time-series data of the second photovoltaic power generation output and a second covariance acquisition unit that calculates,
The power output estimating unit estimates a total value of the first photovoltaic power output using the first covariance, the second covariance, and the second photovoltaic power output.
The photovoltaic power generation output estimation device according to claim 4 or 5 .
前記発電出力推定部は、前記第1共分散と前記第2共分散とに基づき得られる係数を第1係数とし、前記第1係数に前記推定時点から前記遅延時間だけずれた時点の前記第2太陽光発電出力を乗じることで、前記第1太陽光発電出力の合算値を推定する、
請求項に記載の太陽光発電出力推定装置。
The power generation output estimating unit uses a coefficient obtained based on the first covariance and the second covariance as a first coefficient, and sets the second coefficient at a time point shifted from the estimation time point by the delay time to the first coefficient. Estimate the sum of the first photovoltaic output by multiplying the photovoltaic output;
The photovoltaic power generation output estimation device according to claim 6 .
前記第1係数は、前記第1共分散を前記第2共分散で除して-1を乗じた値である、
請求項に記載の太陽光発電出力推定装置。
The first coefficient is a value obtained by dividing the first covariance by the second covariance and multiplying by -1,
The photovoltaic power generation output estimation device according to claim 7 .
前記第1期間は複数であり、
複数の前記第1期間に基づき、前記第1共分散取得部と前記第2共分散取得部は、複数の前記第1共分散と複数の前記第2共分散をそれぞれ算出し、
前記発電出力推定部は、複数の前記第1共分散と複数の前記第2共分散とに基づき得られる複数の前記係数の代表値を前記第1係数とする、
請求項またはに記載の太陽光発電出力推定装置。
The first period is plural,
Based on the plurality of first periods, the first covariance acquisition unit and the second covariance acquisition unit calculate the plurality of first covariances and the plurality of second covariances, respectively;
The power generation output estimating unit uses a representative value of the plurality of coefficients obtained based on the plurality of first covariances and the plurality of second covariances as the first coefficient,
The photovoltaic power generation output estimation device according to claim 7 or 8 .
前記遅延時間は、前記第1太陽光発電設備の設置地点と前記第2太陽光発電設備の設置地点との間を日射変動が伝播する時間である、
請求項からのいずれか1項に記載の太陽光発電出力推定装置。
The delay time is the time for solar radiation fluctuation to propagate between the installation point of the first photovoltaic power generation facility and the installation point of the second photovoltaic power generation facility.
The photovoltaic output estimating device according to any one of claims 6 to 9 .
前記第2共分散取得部は、前記第1期間における前記第2太陽光発電出力の時系列データと、前記第2太陽光発電出力の時系列データに対してタイムラグを有する前記需要家消費電力の合算値の時系列データとの共分散が、最小値をとる場合の前記タイムラグを、前記遅延時間とする、
請求項から10のいずれか1項に記載の太陽光発電出力推定装置。
The second covariance acquisition unit is configured to obtain the time-series data of the second photovoltaic power generation output in the first period and the time-series data of the second photovoltaic power generation output, and the power consumption of the consumer having a time lag with respect to the time-series data of the second photovoltaic power generation output . The time lag when the covariance with the time-series data of the summed value takes the minimum value is the delay time;
The photovoltaic power generation output estimation device according to any one of claims 6 to 10 .
前記第1太陽光発電設備は、余剰買取契約対象の太陽光発電設備であり、
前記第2太陽光発電設備は、全量買取契約対象の太陽光発電設備である、
請求項1から11のいずれか1項に記載の太陽光発電出力推定装置。
The first photovoltaic power generation facility is a photovoltaic power generation facility subject to a surplus purchase contract,
The second photovoltaic power generation facility is a photovoltaic power generation facility subject to a purchase contract for the total amount of power generated,
The photovoltaic output estimating device according to any one of claims 1 to 11.
複数の第1太陽光発電設備の太陽光発電出力である第1太陽光発電出力と前記複数の第1太陽光発電設備が1対1で設置された複数の需要家の負荷の消費電力とが前記複数の需要家の夫々ごとに合算された前記需要家の見かけ上の消費電力である需要家消費電力と、複数の前記第1太陽光発電設備から予め定められた距離内に設置された、少なくとも1つの第2太陽光発電設備の太陽光発電出力である第2太陽光発電出力と、を記憶し、
前記第2太陽光発電出力と、各前記需要家の前記需要家消費電力の合算値とに基づき、前記第1太陽光発電設備の予め定められた推定時点の太陽光発電出力である第1太陽光発電出力の合算値を推定する、
太陽光発電出力推定方法。
The first photovoltaic power generation output, which is the photovoltaic power output of the plurality of first photovoltaic power generation facilities, and the power consumption of the loads of the plurality of consumers in which the plurality of first photovoltaic power generation facilities are installed on a one-to-one basis Installed within a predetermined distance from the consumer power consumption, which is the apparent power consumption of the consumer added for each of the plurality of consumers, and the plurality of the first photovoltaic power generation facilities, a second photovoltaic power output, which is the photovoltaic power output of at least one second photovoltaic power generation facility;
Based on the second photovoltaic power generation output and the sum of the consumer power consumption of each consumer , the first Estimate the total PV output,
PV output estimation method.
コンピュータを、
複数の第1太陽光発電設備の太陽光発電出力である第1太陽光発電出力と前記複数の第1太陽光発電設備が1対1で設置された複数の需要家の負荷の消費電力とが前記複数の需要家の夫々ごとに合算された前記需要家の見かけ上の消費電力である需要家消費電力と、複数の前記第1太陽光発電設備から予め定められた距離内に設置された、少なくとも1つの第2太陽光発電設備の太陽光発電出力である第2太陽光発電出力と、を記憶する記憶部と、
前記第2太陽光発電出力と、各前記需要家の前記需要家消費電力の合算値とに基づき、前記第1太陽光発電設備の予め定められた推定時点の太陽光発電出力である第1太陽光発電出力の合算値を推定する発電出力推定部と、して動作させるための、
太陽光発電出力推定プログラム。
the computer,
The first photovoltaic power generation output, which is the photovoltaic power output of the plurality of first photovoltaic power generation facilities, and the power consumption of the loads of the plurality of consumers in which the plurality of first photovoltaic power generation facilities are installed on a one-to-one basis Installed within a predetermined distance from the consumer power consumption, which is the apparent power consumption of the consumer added for each of the plurality of consumers, and the plurality of the first photovoltaic power generation facilities, a storage unit that stores a second photovoltaic power output that is a photovoltaic power output of at least one second photovoltaic power generation facility;
Based on the second photovoltaic power generation output and the sum of the consumer power consumption of each consumer , the first a power generation output estimating unit for estimating the total value of the photovoltaic power generation output,
Solar power output estimation program.
JP2019097335A 2019-05-24 2019-05-24 Solar power generation output estimation device, solar power generation output estimation method, and solar power generation output estimation program Active JP7300893B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2019097335A JP7300893B2 (en) 2019-05-24 2019-05-24 Solar power generation output estimation device, solar power generation output estimation method, and solar power generation output estimation program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2019097335A JP7300893B2 (en) 2019-05-24 2019-05-24 Solar power generation output estimation device, solar power generation output estimation method, and solar power generation output estimation program

Publications (2)

Publication Number Publication Date
JP2020191764A JP2020191764A (en) 2020-11-26
JP7300893B2 true JP7300893B2 (en) 2023-06-30

Family

ID=73454179

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2019097335A Active JP7300893B2 (en) 2019-05-24 2019-05-24 Solar power generation output estimation device, solar power generation output estimation method, and solar power generation output estimation program

Country Status (1)

Country Link
JP (1) JP7300893B2 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7390951B2 (en) * 2020-03-25 2023-12-04 三菱電機株式会社 Solar power generation output estimation device, solar power generation output estimation method, and solar power generation output estimation program
JP7600651B2 (en) * 2020-12-04 2024-12-17 中国電力株式会社 Distributed power generation estimation system, power generation estimation method, and power generation estimation program
JP7660401B2 (en) * 2021-03-12 2025-04-11 三菱電機株式会社 Photovoltaic power generation output estimation device, photovoltaic power generation output estimation method, and photovoltaic power generation output estimation program
JP2024006333A (en) * 2022-07-01 2024-01-17 東北電力株式会社 Output estimation device, output estimation program, and output estimation method
JP7738537B2 (en) * 2022-10-19 2025-09-12 三菱電機株式会社 Photovoltaic power generation output estimation device, grid control system, supply and demand control system, facility formation support system, photovoltaic power generation output estimation method, and photovoltaic power generation output estimation program

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013157135A1 (en) 2012-04-20 2013-10-24 株式会社日立製作所 Power monitoring device and method
JP2018011494A (en) 2016-07-15 2018-01-18 関西電力株式会社 Photovoltaic power generation output estimation device and solar power generation output estimation method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6410962B2 (en) * 2015-11-26 2018-10-24 三菱電機株式会社 Distribution system management device, measuring device, distribution system management system, and power generation amount estimation method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013157135A1 (en) 2012-04-20 2013-10-24 株式会社日立製作所 Power monitoring device and method
JP2018011494A (en) 2016-07-15 2018-01-18 関西電力株式会社 Photovoltaic power generation output estimation device and solar power generation output estimation method

Also Published As

Publication number Publication date
JP2020191764A (en) 2020-11-26

Similar Documents

Publication Publication Date Title
JP7300893B2 (en) Solar power generation output estimation device, solar power generation output estimation method, and solar power generation output estimation program
Kostylev et al. Solar power forecasting performance–towards industry standards
US10554049B2 (en) Real-time disaggregation of renewable energy generation on an electricity distribution system
Deceglie et al. Quantifying soiling loss directly from PV yield
US20150371151A1 (en) Energy infrastructure sensor data rectification using regression models
US10651788B2 (en) System and method for net load-based inference of operational specifications of a photovoltaic power generation system with the aid of a digital computer
US10627544B2 (en) System and method for irradiance-based estimation of photovoltaic fleet power generation with the aid of a digital computer
JP6782573B2 (en) Photovoltaic power generation output estimation device and photovoltaic power generation output estimation method
JP5415507B2 (en) Photovoltaic power generation output estimation device and solar power generation output estimation method
US20180210976A1 (en) Quantifying a combined effect of interdependent uncertain resources in an electrical power grid
JP2017121133A (en) Power demand prediction device and power demand prediction program
Andrews et al. Improved parametric empirical determination of module short circuit current for modelling and optimization of solar photovoltaic systems
US20210334914A1 (en) System and method for determining power production in an electrical power grid
JP6489846B2 (en) Photovoltaic power output estimation device, solar power output estimation system, and solar power output estimation method
JP6769755B2 (en) Photovoltaic power generation output estimation device and photovoltaic power generation output estimation method
KR20190131808A (en) Apparatus and method for estimating the power generation of photovoltaic generator
JP7390951B2 (en) Solar power generation output estimation device, solar power generation output estimation method, and solar power generation output estimation program
JP7403410B2 (en) Solar power generation output estimation device, solar power generation output estimation method, and solar power generation output estimation program
Al-Hilfi et al. An improved technique to estimate the total generated power by neighboring photovoltaic systems using single-point irradiance measurement and correlational models
Sănduleac et al. Power networks observability, control and automation using Unbundled Smart Meters
JP7660401B2 (en) Photovoltaic power generation output estimation device, photovoltaic power generation output estimation method, and photovoltaic power generation output estimation program
JP7738537B2 (en) Photovoltaic power generation output estimation device, grid control system, supply and demand control system, facility formation support system, photovoltaic power generation output estimation method, and photovoltaic power generation output estimation program
Peper et al. Assessing the impact of weather-induced uncertainties in large-scale electricity systems
JP7450522B2 (en) Solar power generation output estimation device, solar power generation output estimation method, and solar power generation output estimation program
Nakutis et al. An analysis of customer power profile events for non-invasive energy meter error monitoring

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20211105

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20220729

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20220830

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20221013

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20230214

A601 Written request for extension of time

Free format text: JAPANESE INTERMEDIATE CODE: A601

Effective date: 20230331

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20230428

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20230523

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20230620

R150 Certificate of patent or registration of utility model

Ref document number: 7300893

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150