Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7329920B2 - Lifting gear for slinging and conveyor for long objects - Google Patents
[go: Go Back, main page]

JP7329920B2 - Lifting gear for slinging and conveyor for long objects - Google Patents

Lifting gear for slinging and conveyor for long objects Download PDF

Info

Publication number
JP7329920B2
JP7329920B2 JP2018231509A JP2018231509A JP7329920B2 JP 7329920 B2 JP7329920 B2 JP 7329920B2 JP 2018231509 A JP2018231509 A JP 2018231509A JP 2018231509 A JP2018231509 A JP 2018231509A JP 7329920 B2 JP7329920 B2 JP 7329920B2
Authority
JP
Japan
Prior art keywords
slinging
sling
wire
suspension arm
steel material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2018231509A
Other languages
Japanese (ja)
Other versions
JP2020093871A (en
Inventor
健児 佐々木
友敏 村主
俊洋 内海
和彦 星
佑輝 高橋
勇気 赤間
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sangyo Shinko Co Ltd
Original Assignee
Sangyo Shinko Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sangyo Shinko Co Ltd filed Critical Sangyo Shinko Co Ltd
Priority to JP2018231509A priority Critical patent/JP7329920B2/en
Publication of JP2020093871A publication Critical patent/JP2020093871A/en
Application granted granted Critical
Publication of JP7329920B2 publication Critical patent/JP7329920B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Description

本発明は、玉掛け用吊具と、この玉掛け用吊具を備えた長尺物搬送装置に関する。 BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a sling hanger and a long object conveying apparatus equipped with this sling hanger.

工場等では、長尺物、例えば、適切な長さに切断された鋼材を、複数本、番線と称される針金で束ねたものをクレーン等の搬送装置で搬送することがある。
搬送装置を用いて複数本の鋼材を搬送するにあたり、鋼材を、線状の玉掛け用吊具に荷掛けをし、又は、玉掛用吊具から荷外しをする玉掛け作業が行われている。
玉掛け作業の効率化のために、搬送装置の自動化が求められている。
2. Description of the Related Art In a factory or the like, a long object, for example, a plurality of steel materials cut to an appropriate length and bundled with a wire called a cord is sometimes transported by a transportation device such as a crane.
2. Description of the Related Art When conveying a plurality of steel materials using a conveying device, a slinging operation is performed in which the steel materials are loaded onto or unloaded from a linear slinging hoisting tool.
In order to improve the efficiency of slinging work, automation of conveying devices is required.

搬送装置として、長尺ビームに一対の支持枠体をそれぞれ走行可能に吊下し、支持枠体を、水平杆と、水平杆の両端部に上端が回動自在に設けられた吊下アームと、吊下アームの下端にそれぞれ設けられた吊索とを備えた従来例がある(特許文献1)。
特許文献1の従来例では、吊索は、鋼棒等の長尺物を複数本まとめて支持するために、ベルト、チェーン等から構成されている。
As a conveying device, a pair of support frames are suspended from a long beam so as to be able to travel. , and slings provided at the lower ends of the suspension arms (Patent Document 1).
In the conventional example of Patent Document 1, the sling is composed of a belt, a chain, or the like, in order to collectively support a plurality of long objects such as steel bars.

特開2004-35194号公報JP-A-2004-35194

特許文献1の従来例では、吊索がベルト、チェーン等の線状部材から形成されているので、重量のある長尺物を線状部材に荷掛けし、吊具から荷外しをする際に、線状部材が長尺物に擦って所定の位置に円滑に移動させることができないことがある。この場合、作業員が介在して線状部材を所定箇所に移動させるので、玉掛け作業を効率的に行えないという課題がある。 In the conventional example of Patent Document 1, since the sling is formed from a linear member such as a belt or a chain, it is difficult to load a heavy long object on the linear member and unload it from the sling. In some cases, the linear member rubs against the elongated object and cannot be smoothly moved to a predetermined position. In this case, since an operator intervenes to move the linear member to a predetermined position, there is a problem that the slinging work cannot be performed efficiently.

例えば、複数本の長尺物を針金で束ねた状態で玉掛作業を行う場合には、玉掛け作業が効率的に行えないことが多い。長尺物の束を針金で結束するため、針金の中央部分を長尺物の束の外周に沿って這わした後に両端部分を捻るが、捻った後の両端部分が長尺物の周面に対して突出する。針金の両端部分が下方に向いていると、玉掛け作業時に線状部材が針金の両端部分に引っ掛かりやすくなり、玉掛け作業が効率的に行えない。 For example, when slinging a plurality of long objects bundled with a wire, the slinging work cannot be efficiently performed in many cases. In order to bind a bundle of long objects with a wire, the center part of the wire is laid along the outer circumference of the bundle of long objects and then both ends are twisted. protrude against. If both ends of the wire are oriented downward, the linear member is likely to be caught by both ends of the wire during slinging work, and the slinging work cannot be performed efficiently.

本発明の目的は、玉掛け作業時に長尺物に引っ掛かりにくい玉掛け用吊具及び長尺物搬送装置を提供することにある。 SUMMARY OF THE INVENTION An object of the present invention is to provide a sling hanger and a long object conveying device which are less likely to be caught by a long object during sling work.

本発明の玉掛け用吊具は、長尺物を支持する線状部材と、前記線状部材の外周部に回動自在に設けられ前記長尺物を前記線状部材と交差する方向に案内する案内部材とを備えたことを特徴とする。 A slinging sling according to the present invention comprises a linear member that supports a long object, and a rotatable member provided on the outer periphery of the linear member to guide the long object in a direction that intersects with the linear member. and a guide member.

本発明では、重量のある長尺物を荷掛けするために、玉掛け用吊具を、長尺物の端縁から軸方向に沿った外側に位置させ、その後、長尺物の中心側に位置する所定箇所に向けて移動させる。また、長尺物を荷外しするため、玉掛け用吊具を、長尺物の所定箇所から軸方向に沿った外側に向けて移動させる。
ここで、玉掛け用吊具が長尺物に引っ掛かっても、案内部材が線状部材に対して回動するので、長尺物の所定箇所まで玉掛け用吊具が案内される。
例えば、複数本の長尺物を針金で束ねた状態で玉掛作業を行う場合、針金の両端部分が下方に向いていても、玉掛け用吊具の移動に伴って、案内部材が線状部材に対して回動するので、当該針金の両端部分の下を玉掛け用吊具がくぐることになり、長尺物玉掛け用吊具が円滑に長尺物に案内されることになる。
従って、本発明では、長尺物を支持する線状部材に案内部材が回動自在に設けられているので、玉掛け作業の際に、長尺物に玉掛け用吊具が引っ掛かりにくくなり、所定箇所に円滑に案内されることになる。
In the present invention, in order to hang a heavy long object, the sling sling is positioned outside along the axial direction from the edge of the long object, and then positioned toward the center of the long object. move toward a predetermined location. Further, in order to unload the long object, the sling sling is moved outward along the axial direction from a predetermined position on the long object.
Here, even if the slinging hanger is caught on the elongated object, the guide member rotates with respect to the linear member, so that the slinging hanger is guided to a predetermined position on the elongated object.
For example, when slinging a plurality of long objects bundled with a wire, even if both ends of the wire are facing downward, the guide member will move along with the linear member as the sling attachment moves. Since the slinging device rotates against the wire, the slinging device passes under both ends of the wire, and the slinging device is smoothly guided to the long object.
Therefore, in the present invention, since the guide member is rotatably provided on the linear member that supports the elongated object, the slinging hanger is less likely to get caught on the elongated object during slinging work, and the slinging tool is not easily caught on the elongated object. will be smoothly guided to.

本発明では、前記案内部材は、コイル状の弾性部材を有する構成が好ましい。
この構成では、コイル状の弾性部材が弾性変形するが、この弾性変形は、長尺物の外形形状に沿っているので、長尺物に対して案内部材をより円滑に案内することができる。さらに、コイル状の弾性部材は長尺物の外周形状に沿って弾性変形することで、特定箇所に長尺物の重さが集中することがない。そのため、コイル状の弾性部材が潰れることがなく、案内部材の耐久性を向上させることができる。
In the present invention, the guide member preferably has a coil-shaped elastic member.
In this configuration, the coil-shaped elastic member is elastically deformed, and the elastic deformation conforms to the outer shape of the elongated object, so that the guide member can be guided more smoothly with respect to the elongated object. Furthermore, the coil-shaped elastic member is elastically deformed along the outer peripheral shape of the elongated object, so that the weight of the elongated object is not concentrated on a specific portion. Therefore, the coil-shaped elastic member is not crushed, and the durability of the guide member can be improved.

本発明では、前記コイル状の弾性部材は、引張ばねである構成が好ましい。
この構成では、引張ばねは、力を受けない状態では、ばねの螺旋部分が密着しているので、長尺物を円滑に案内することができる。つまり、ばねの螺旋部分に隙間があると、この隙間の部分に長尺物の外周にある突起物が填まり込んで円滑に案内されないことがある。例えば、針金により結束されている複数本の長尺物を荷掛けする場合では、針金の両端部分が螺旋部分の隙間に挟まって、玉掛け用吊具が円滑に案内されないおそれもある。引張ばねでは、螺旋部分が密着しているので、突起物や両端部分が隙間に入ることがなく、長尺物への玉掛け用吊具の案内を確保できる。
In the present invention, it is preferable that the coil-shaped elastic member is a tension spring.
With this configuration, the helical portion of the tension spring is in close contact with the tension spring when it is not subjected to force, so it is possible to smoothly guide a long object. In other words, if there is a gap in the helical portion of the spring, the protrusion on the outer periphery of the elongated object may get caught in the gap and may not be guided smoothly. For example, when hoisting a plurality of long objects bound by a wire, the ends of the wire may get caught in the gaps of the spiral portion, preventing the slinging sling from being smoothly guided. In the tension spring, since the helical portion is in close contact, projections and both end portions do not enter the gaps, and the sling hook can be guided to the long object.

本発明の長尺物搬送装置は、前述の構成の玉掛け用吊具と、前記線状部材の一端部に下端が接続された第一吊下アームと、前記線状部材の他端部に下端が接続された第二吊下アームと、前記第一吊下アームの上端側と前記第二吊下アームの上端側とがそれぞれ回動自在に支持された支持部材と、前記支持部材が長手方向に移動自在に設けられたビーム部材と、を備えたことを特徴とする。 The long object conveying apparatus of the present invention comprises a sling hanger configured as described above, a first suspension arm having a lower end connected to one end of the linear member, and a lower end connected to the other end of the linear member. a second suspension arm to which is connected, a support member in which the upper end side of the first suspension arm and the upper end side of the second suspension arm are respectively rotatably supported, and the support member extends in the longitudinal direction and a beam member that is movably provided in the body.

本発明では、長尺物を荷掛けするために、ビーム部材に対して支持部材を移動させ、第一吊下アームと第二吊下アームとを回動させて玉掛け用吊具を長尺物の下方の所定箇所まで移動させる。
長尺物が玉掛け用吊具に吊り下げられた状態で、ビーム部材を所定位置に移動させた後、長尺物の荷外しをする。荷外しのために、長尺物の中央部分を所定の場所に下ろした後、支持部材を移動させ、あるいは、第一吊下アームと第二吊下アームとを支持部材に対して回動させて玉掛け用吊具を、長尺物から外す。
荷掛け荷外しの作業において、玉掛け用吊具が長尺物に引っ掛かっても、前述の通り、案内部材が線状部材に対して回動するので、玉掛け作業が円滑に行える。
従って、本発明では、玉掛け用吊具として、前述の構成を採用しているので、玉掛け作業の自動化を図れる長尺物搬送装置を提供することができる。
In the present invention, in order to hang a long object, the support member is moved with respect to the beam member, the first suspension arm and the second suspension arm are rotated, and the sling sling is attached to the long object. to a predetermined location below the
After the beam member is moved to a predetermined position while the long object is suspended from the sling hook, the long object is unloaded. For unloading, after the central portion of the long object is lowered to a predetermined location, the support member is moved, or the first suspension arm and the second suspension arm are rotated with respect to the support member. Remove the sling sling from the long object.
Even if the slinging hanger is caught by a long object in the work of loading and unloading, the guide member rotates with respect to the linear member as described above, so that the slinging work can be performed smoothly.
Therefore, in the present invention, since the above-described configuration is adopted as the slinging hanger, it is possible to provide a long object conveying apparatus capable of automating the slinging work.

本発明の第1実施形態にかかる長尺物搬送装置の正面図。1 is a front view of a long object conveying apparatus according to a first embodiment of the present invention; FIG. 長尺物搬送装置の側面図。The side view of a long object conveying apparatus. 第1実施形態にかかる玉掛け用吊具の要部を示す斜視図。The perspective view which shows the principal part of the hanging tool for slinging concerning 1st Embodiment. 玉掛け用吊具の要部を示す正面図。The front view which shows the principal part of the hanging tool for slinging. 本発明の第2実施形態にかかる玉掛け用吊具を示す正面図。The front view which shows the sling hook concerning 2nd Embodiment of this invention.

本発明の実施形態を図面に基づいて説明する。
[第1実施形態]
本発明の第1実施形態を図1から図4に基づいて説明する。
(長尺物搬送装置の概要)
図1及び図2には、第1実施形態にかかる長尺物搬送装置の全体構成が示されている。
図1及び図2において、長尺物搬送装置は、ビーム部材1と、一対の支持部材2と、一対のアーム3と、玉掛け用吊具4と、支持部材移動機構5と、回動機構6と、開閉機構7と、を備えている。
ビーム部材1の上部には、ビーム部材1を、その長手方向と上下方向とに移動させるビーム移動機構(図示せず)が設けられている。
ビーム部材1の両側面には支持部材2を案内するレール11がビーム部材1の長手方向に沿って設けられている。
An embodiment of the present invention will be described based on the drawings.
[First embodiment]
A first embodiment of the present invention will be described with reference to FIGS. 1 to 4. FIG.
(Summary of Long Object Conveying Device)
1 and 2 show the overall configuration of the long object conveying apparatus according to the first embodiment.
1 and 2, the long object conveying apparatus includes a beam member 1, a pair of support members 2, a pair of arms 3, a sling hook 4, a support member moving mechanism 5, and a rotating mechanism 6. , and an opening/closing mechanism 7 .
A beam moving mechanism (not shown) for moving the beam member 1 in the longitudinal direction and the vertical direction is provided on the upper portion of the beam member 1 .
Rails 11 for guiding the support member 2 are provided on both side surfaces of the beam member 1 along the longitudinal direction of the beam member 1 .

一対の支持部材2は、それぞれケース20と、ケース20に回動自在に設けられレール11の上を転動する車輪21とを有する。
ケース20は、ビーム部材1の下方に配置された第一ケース部22と、第一ケース部22の左右両側に設けられた第二ケース部23とを有する。
第二ケース部23は車輪21を回動自在に支持する板状部材である。
Each of the pair of support members 2 has a case 20 and a wheel 21 that is rotatably provided on the case 20 and rolls on the rail 11 .
The case 20 has a first case portion 22 arranged below the beam member 1 and second case portions 23 provided on both left and right sides of the first case portion 22 .
The second case portion 23 is a plate-like member that rotatably supports the wheel 21 .

一対のアーム3は、左右の第二ケース部23のうち一方の第二ケース部23に上端部が回動自在に支持された第一吊下アーム31と、他方の第二ケース部23に上端部が回動自在に支持された第二吊下アーム32とを有する。
第一吊下アーム31と第二吊下アーム32とは、それぞれ第二ケース部23側に配置された基端部30Aと、玉掛け用吊具4側に配置された先端部30Bとを有する。先端部30Bは基端部30Aに対して回動可能に設けられている。
第一吊下アーム31の基端部30Aと、第二吊下アーム32の基端部30Aとの間には、連結リンク33が設けられている。
連結リンク33には、第一吊下アーム31と第二吊下アーム32との開閉動作を許容する機構(図示せず)が設けられている。
The pair of arms 3 includes a first suspension arm 31 whose upper end is rotatably supported by one of the left and right second case portions 23 , and an upper end of which is supported by the other second case portion 23 . and a second suspension arm 32 on which the second suspension arm 32 is rotatably supported.
The first suspending arm 31 and the second suspending arm 32 each have a base end portion 30A arranged on the second case portion 23 side and a tip end portion 30B arranged on the slinging hanger 4 side. The distal end portion 30B is provided rotatably with respect to the proximal end portion 30A.
A connecting link 33 is provided between the base end portion 30A of the first suspension arm 31 and the base end portion 30A of the second suspension arm 32 .
The connecting link 33 is provided with a mechanism (not shown) that allows opening and closing operations of the first suspension arm 31 and the second suspension arm 32 .

支持部材移動機構5は、モータ等からなる駆動源50と、駆動源50に連結され支持部材2、アーム3及び玉掛け用吊具4をビーム部材1の長手方向に沿って移動させる連動機構(図示せず)とを有する。
回動機構6は、第一ケース部22と連結リンク33との間に設けられたシリンダ61と、シリンダ61を駆動するシリンダ駆動部(図示せず)とを有し、シリンダ61が進退駆動することで、アーム3が鉛直平面内で回動する。
開閉機構7は、連結リンク33に固定されたシリンダ71と、シリンダ71とアーム3とに連結された開閉リンク機構72とを有し、シリンダ71が進退駆動することで、アーム3の先端部30B同士が開閉する(図2参照)。
The support member moving mechanism 5 includes a drive source 50 such as a motor, and an interlocking mechanism connected to the drive source 50 to move the support member 2, the arm 3, and the sling hanger 4 along the longitudinal direction of the beam member 1 (Fig. not shown).
The rotating mechanism 6 has a cylinder 61 provided between the first case portion 22 and the connecting link 33, and a cylinder driving portion (not shown) that drives the cylinder 61, and the cylinder 61 is driven to move forward and backward. As a result, the arm 3 rotates within the vertical plane.
The opening/closing mechanism 7 has a cylinder 71 fixed to the connecting link 33 and an opening/closing link mechanism 72 connected to the cylinder 71 and the arm 3 . They open and close each other (see FIG. 2).

(玉掛け用吊具4の構成)
玉掛け用吊具4は、長尺物として鋼材Sを吊り下げるものである。玉掛け用吊具4の一端は、第一吊下アーム31の下端部に接続され、玉掛け用吊具4の他端部は、第二吊下アーム32の下端部に接続されている。
鋼材Sは、複数本毎に1束とされており、この束は、番線と称される針金Wで束ねられている。針金Wは、束の外周に沿って這わした後に両端部分を捻ることで結束され、捻った後の両端部分WOが鋼材Sの周面に対して突出する。
(Structure of sling hook 4)
The sling hanger 4 hangs the steel material S as a long object. One end of the slinging hanger 4 is connected to the lower end of the first suspending arm 31 , and the other end of the slinging hanger 4 is connected to the lower end of the second suspending arm 32 .
A plurality of steel materials S are bundled into one bundle, and this bundle is bundled with a wire W called wire. The wire W is bound by twisting both end portions after being crawled along the outer circumference of the bundle, and the twisted end portions WO protrude from the peripheral surface of the steel material S.例文帳に追加

玉掛け用吊具4の具体的な構成が図3及び図4に示されている。
図3及び図4において、玉掛け用吊具4は、鋼材Sを支持する線状部材としてのワイヤ41と、ワイヤ41の外周部に回動自在に設けられた案内部材としてのコイル状の弾性部材42とを有する。コイル状の弾性部材42は、鋼材Sをワイヤ41と交差する方向に案内するものである。ワイヤ41とコイル状の弾性部材42とは、それぞれ金属から形成されている。
ワイヤ41の直径は、適宜な寸法、例えば、16mmである。
A specific configuration of the sling sling 4 is shown in FIGS. 3 and 4. FIG.
3 and 4, the slinging hanger 4 includes a wire 41 as a linear member for supporting the steel material S, and a coil-shaped elastic member as a guide member rotatably provided on the outer periphery of the wire 41. 42. The coil-shaped elastic member 42 guides the steel material S in a direction intersecting with the wire 41 . The wire 41 and the coiled elastic member 42 are each made of metal.
The diameter of wire 41 is a suitable dimension, for example 16 mm.

コイル状の弾性部材42は、引張ばねであり、引張ばねは、力がかかっていない状態では、螺旋部分が密着している。
コイル状の弾性部材42の外径は、適宜な寸法、例えば、40mmであり、ばね自体の太さ(直径)は、例えば、5mmである。コイル状の弾性部材42の内周とワイヤ41の外周との間には所定の隙間が形成されている。
ワイヤ41は、鋼材Sを支持可能な領域Aと、この領域Aの両側の余白領域Bとを有する。領域Aの長さは、コイル状の弾性部材42の長さと等しい。
余白領域Bは、その長さが適宜設定されるものであって、例えば、0であってもよい。つまり、本実施形態では、鋼材Sを支持可能な領域Aの長さとコイル状の弾性部材42の長さとが等しくてもよい。
The coiled elastic member 42 is a tension spring, and the helical portion of the tension spring is in close contact when no force is applied.
The outer diameter of the coil-shaped elastic member 42 is an appropriate size, for example, 40 mm, and the thickness (diameter) of the spring itself is, for example, 5 mm. A predetermined gap is formed between the inner circumference of the coil-shaped elastic member 42 and the outer circumference of the wire 41 .
The wire 41 has a region A capable of supporting the steel material S and blank regions B on both sides of the region A. As shown in FIG. The length of region A is equal to the length of coiled elastic member 42 .
The length of the margin area B is appropriately set, and may be 0, for example. That is, in the present embodiment, the length of the region A capable of supporting the steel material S and the length of the coiled elastic member 42 may be equal.

[玉掛け作業]
次に、本実施形態の長尺物搬送装置を用いた玉掛け作業を説明する。
まず、複数本の鋼材Sを1束とし、1束の鋼材Sの両端からそれぞれ所定長さ中央よりの位置を針金Wで結束する。そして、針金Wで結束された鋼材Sの複数束を図示しないパレットの上に載置しておく。
次に、荷掛けのために、長尺物搬送装置を複数束が載置された鋼材Sの真上に配置し、開閉機構7を作動して第一吊下アーム31と第二吊下アーム32とを開放して玉掛け用吊具4を張った状態としておく。さらに、支持部材移動機構5と回動機構6との少なくとも一方を予め操作して、玉掛け用吊具4が鋼材Sの端部より軸方向に沿った外側に離れて位置するようにしておく。
[Slinging work]
Next, a slinging operation using the long object conveying apparatus of this embodiment will be described.
First, a plurality of steel materials S are made into one bundle, and a wire W is used to bind a predetermined length from both ends of one bundle of steel materials S to the center thereof. Then, a plurality of bundles of the steel materials S bound by the wire W are placed on a pallet (not shown).
Next, for loading, the long object conveying device is placed directly above the steel material S on which the multiple bundles are placed, and the opening and closing mechanism 7 is operated to move the first suspension arm 31 and the second suspension arm. 32 are opened to keep the slinging hanger 4 in a stretched state. Further, at least one of the support member moving mechanism 5 and the rotating mechanism 6 is operated in advance so that the sling hook 4 is located outside the end of the steel material S in the axial direction.

この状態で、支持部材移動機構5や回動機構6を操作して玉掛け用吊具4を鋼材Sの所定箇所まで移動させて荷掛けを行う。ここで、玉掛け用吊具4に鋼材Sが引っ掛かっても、束となった複数本の鋼材Sの外形形状に沿って、コイル状の弾性部材42が径方向と軸方向との双方に弾性変形しながらワイヤ41の周囲を回動する。
なお、針金Wの両端部分WOが下方に向いていても、玉掛け用吊具4の移動に伴って、コイル状の弾性部材42がワイヤ41に対して回動するので、当該両端部分WOの下方に玉掛け用吊具4がくぐることになり(図3及び図4参照)、鋼材Sの所定箇所までコイル状の弾性部材42が円滑に案内される。
In this state, the supporting member moving mechanism 5 and the rotating mechanism 6 are operated to move the slinging hanger 4 to a predetermined position on the steel material S, thereby carrying out the loading. Here, even if the steel material S is caught on the slinging sling 4, the coil-shaped elastic member 42 is elastically deformed in both the radial direction and the axial direction along the outer shape of the bundled steel materials S. while rotating around the wire 41 .
Even if both ends WO of the wire W face downward, the coiled elastic member 42 rotates with respect to the wire 41 as the slinging hanger 4 moves. (See FIGS. 3 and 4), and the coiled elastic member 42 is smoothly guided to a predetermined position of the steel material S. As shown in FIG.

その後、長尺物搬送装置のビーム部材1を上昇させると、鋼材Sは玉掛け用吊具4に吊り下げられた状態となる。複数束の鋼材Sは玉掛け用吊具4で吊り下げられた状態で所定位置まで搬送される。
所定位置では、図示しないパレット等に複数束の鋼材Sの中央部分を置き、荷外しを行う。ビーム部材1の下降や、開閉機構7の作動により、玉掛け用吊具4を緩める。そして、支持部材移動機構5や回動機構6を操作して、玉掛け用吊具4を鋼材Sから外す。
玉掛け用吊具4を鋼材Sから外すにあたって、玉掛け用吊具4が鋼材Sに引っ掛かっても、前述の通り、コイル状の弾性部材42がワイヤ41の周囲を回動するので、玉掛け用吊具4が鋼材Sから円滑に外れることになる。
After that, when the beam member 1 of the long object conveying device is raised, the steel material S is suspended by the slinging hanger 4 . A plurality of bundles of steel materials S are transported to a predetermined position while being suspended by a slinging hanger 4 .
At a predetermined position, the center portions of the bundles of steel materials S are placed on a pallet or the like (not shown) and unloaded. The lowering of the beam member 1 and the operation of the opening/closing mechanism 7 loosen the slinging hanger 4 . Then, the support member moving mechanism 5 and the rotating mechanism 6 are operated to remove the slinging hanger 4 from the steel material S.
When removing the slinging hanger 4 from the steel material S, even if the slinging hanger 4 is caught on the steel material S, the coiled elastic member 42 rotates around the wire 41 as described above. 4 is smoothly removed from the steel material S.

[実施形態の効果]
(1)鋼材Sを支持する線状部材としてのワイヤ41と、ワイヤ41の外周部に回動自在に設けられ鋼材Sをワイヤ41と交差する方向に案内する案内部材としてのコイル状の弾性部材42とを備えて玉掛け用吊具4を構成した。そのため、玉掛け作業の際に、玉掛け用吊具4が鋼材Sに引っ掛かりにくくなり、所定箇所に円滑に案内されることになる。
[Effects of Embodiment]
(1) A wire 41 as a linear member that supports the steel material S, and a coil-shaped elastic member that is rotatably provided on the outer periphery of the wire 41 and serves as a guide member that guides the steel material S in a direction intersecting the wire 41. 42, and the sling hook 4 is configured. Therefore, during the slinging work, the slinging hanger 4 is less likely to get caught on the steel material S, and is smoothly guided to a predetermined position.

(2)コイル状の弾性部材42は、鋼材Sの外周形状に沿って弾性変形するため、コイル状の弾性部材42にかかる鋼材Sの重さが特定箇所に集中することなく均等に分散されるので、コイル状の弾性部材42が潰れることがなく、高い耐久性を得ることができる。 (2) Since the coil-shaped elastic member 42 is elastically deformed along the outer peripheral shape of the steel material S, the weight of the steel material S applied to the coil-shaped elastic member 42 is evenly distributed without being concentrated at a specific point. Therefore, the coil-shaped elastic member 42 is not crushed, and high durability can be obtained.

(3)コイル状の弾性部材42は、引張ばねであるため、力を受けない状態では、ばねの螺旋部分が密着している。そのため、針金Wにより結束されている複数本が1束の鋼材Sを案内する場合、針金Wの両端部分WOが螺旋部分の隙間に挟まって玉掛け用吊具4を円滑に案内できないおそれが少ない。 (3) Since the coil-shaped elastic member 42 is a tension spring, the helical portion of the spring is in close contact when no force is applied. Therefore, when a bundle of steel materials S is guided by a plurality of bundled wires W, there is little possibility that both end parts WO of the wires W are caught in the gaps of the spiral parts and the sling hook 4 cannot be smoothly guided.

(4)ワイヤ41の鋼材Sを支持可能な領域Aの長さとコイル状の弾性部材42の長さとが等しいから、鋼材Sがワイヤ41のどの位置に配置されていても、鋼材Sがコイル状の弾性部材42により確実に支持されることになる。 (4) Since the length of the region A of the wire 41 capable of supporting the steel material S is equal to the length of the coil-shaped elastic member 42, the steel material S remains coiled regardless of the position of the steel material S on the wire 41. is reliably supported by the elastic member 42 of the .

(5)玉掛け用吊具4と、ワイヤ41の両端に上端が接続された第一吊下アーム31及び第二吊下アーム32と、第一吊下アーム31及び第二吊下アーム32の上端側とがそれぞれ回動自在に支持された支持部材2と、支持部材2が長手方向に移動自在に設けられたビーム部材1と、を備えて長尺物搬送装置を構成したから、ビーム部材1に対して支持部材2を移動させた後、第一吊下アーム31及び第二吊下アーム32を回動させて玉掛け用吊具4を鋼材Sの下方所定位置まで移動させることで、玉掛け作業の自動化を達成できる長尺物搬送装置を提供することができる。 (5) The sling sling sling 4, the first suspension arm 31 and the second suspension arm 32 whose upper ends are connected to both ends of the wire 41, and the upper ends of the first suspension arm 31 and the second suspension arm 32 Since the long object conveying apparatus is configured by including the support member 2 rotatably supported on each side and the beam member 1 on which the support member 2 is movably provided in the longitudinal direction, the beam member 1 After moving the support member 2 with respect to the steel material S, the slinging work is performed by rotating the first suspension arm 31 and the second suspension arm 32 to move the slinging tool 4 to a predetermined position below the steel material S. can be provided.

[第2実施形態]
本発明の第2実施形態を図5に基づいて説明する。
第2実施形態は、案内部材の構成が第1実施形態と異なるもので、他の構成は第1実施形態と同じである。第2実施形態の説明において、第1実施形態と同一の構成要素は同一符号を付して説明を省略する。
図5において、第2実施形態の玉掛け用吊具40は、鋼材Sを支持するワイヤ41と、ワイヤ41の外周部に回動自在に設けられた案内部材としての筒体45とを有する。
ワイヤ41の一端は、第一吊下アーム31の下端と接続され、ワイヤ41の他端は、第二吊下アーム32の下端に接続される。第2実施形態の長尺物搬送装置の他の構成は、第1実施形態と同じである。
筒体45は、鋼材Sをワイヤ41と交差する方向に案内する鋼製の部材であり、鋼材Sを支持可能な領域Aに沿って複数個が並んで配置されている。
筒体45の内周とワイヤ41の外周との間には所定の隙間が形成されている。
[Second embodiment]
A second embodiment of the present invention will be described with reference to FIG.
The second embodiment differs from the first embodiment in the configuration of the guide member, and the rest of the configuration is the same as the first embodiment. In the description of the second embodiment, the same components as those of the first embodiment are denoted by the same reference numerals, and the description thereof is omitted.
In FIG. 5, the sling sling 40 of the second embodiment has a wire 41 for supporting the steel material S, and a cylinder 45 as a guide member rotatably provided around the wire 41 .
One end of the wire 41 is connected to the lower end of the first suspension arm 31 and the other end of the wire 41 is connected to the lower end of the second suspension arm 32 . Other configurations of the long object conveying apparatus of the second embodiment are the same as those of the first embodiment.
The cylindrical body 45 is a member made of steel that guides the steel material S in a direction intersecting with the wire 41, and a plurality of cylindrical bodies 45 are arranged side by side along the area A capable of supporting the steel material S.
A predetermined gap is formed between the inner circumference of the cylindrical body 45 and the outer circumference of the wire 41 .

第2実施形態では、第1実施形態と同様に、鋼材Sを荷掛けするために、玉掛け用吊具40を、鋼材Sの外側に位置させた後、鋼材Sの所定箇所に向けて移動させる。鋼材Sを荷外しするため、玉掛け用吊具40を、鋼材Sの所定箇所から外側に向けて移動させて外す。
これらの玉掛け作業において、玉掛け用吊具40が鋼材Sに引っ掛かっても、筒体45がワイヤ41に対して回動するので、鋼材Sの所定箇所まで玉掛け用吊具40が案内されることになる。
In the second embodiment, in order to load the steel material S, the slinging hanger 40 is positioned outside the steel material S and then moved toward a predetermined location on the steel material S in the same manner as in the first embodiment. . In order to unload the steel material S, the sling hook 40 is moved outward from a predetermined position on the steel material S and removed.
In these slinging operations, even if the slinging hanger 40 is caught on the steel material S, the cylindrical body 45 rotates with respect to the wire 41, so that the slinging hanger 40 can be guided to a predetermined position on the steel material S. Become.

第2実施形態では、第1実施形態の(1)(4)(5)と同様の効果を奏することができる他、次の効果を奏することができる。
(6)案内部材を筒体45としたから、案内部材自体の構造を簡易なものにできる。
In addition to the effects (1), (4), and (5) of the first embodiment, the second embodiment can also achieve the following effects.
(6) Since the guide member is the cylinder 45, the structure of the guide member itself can be simplified.

[変形例]
なお、本発明は前述の各実施形態に限定されるものではなく、本発明の目的を達成できる範囲での変形、改良等は本発明に含まれるものである。
例えば、前記各実施形態では、ワイヤ41の両端に上端が接続された第一吊下アーム31及び第二吊下アーム32と、第一吊下アーム31及び第二吊下アーム32の上端側とがそれぞれ回動自在に支持された支持部材2と、支持部材2が長手方向に移動自在に設けられたビーム部材1と、を備えて長尺物搬送装置を構成したが、本発明では、長尺物搬送装置の構成は前記実施形態に限定されるものではなく、例えば、ビーム部材1と、ビーム部材1に固定された第一吊下アーム31及び第二吊下アーム32とを備えた構成としてもよい。
[Modification]
It should be noted that the present invention is not limited to the above-described embodiments, and includes modifications, improvements, etc. within the scope of achieving the object of the present invention.
For example, in each of the above embodiments, the first suspension arm 31 and the second suspension arm 32 whose upper ends are connected to both ends of the wire 41, and the upper end side of the first suspension arm 31 and the second suspension arm 32 , and the beam member 1 on which the support member 2 is movably provided in the longitudinal direction. The configuration of the transport apparatus for large objects is not limited to the above-described embodiment. may be

また、線状部材はワイヤ41に限定されるものではなく、ベルト、チェーン等であってもよい。
さらに、長尺物は鋼材Sに限定されるものではなく、比較的重量があって、細長いものであれば、本発明の玉掛け用吊具4,40で吊り下げることができる。
長尺物が鋼材Sであっても、複数本を針金Wで束ねることなく吊り下げる場合にも適用できる。例えば、周面に凹凸が形成された鋼材Sを玉掛けする場合には、鋼材Sの凹凸にコイル状の弾性部材42や、筒体45が引っ掛かることなく、所定箇所に案内される。
Moreover, the linear member is not limited to the wire 41, and may be a belt, a chain, or the like.
Furthermore, the long object is not limited to the steel material S, and any object that is relatively heavy and elongated can be hung by the sling hooks 4 and 40 of the present invention.
Even if the long object is steel material S, it can be applied to a case where a plurality of objects are hung without bundling them with a wire W. For example, when slinging a steel material S having unevenness on its peripheral surface, the coiled elastic member 42 and the cylindrical body 45 are guided to a predetermined position without being caught by the unevenness of the steel material S.

また、第1実施形態において、コイル状の弾性部材42として引張ばねを用いたが、力がかかっていない状態で、螺旋部分に隙間がある圧縮ばねを用いてもよい。
さらに、コイル状の弾性部材42として、ばねを用いる場合にあっては、1本からなるものに限定されず、線状部材に沿って並んで配置される複数個から構成されるものでもよい。
Further, in the first embodiment, a tension spring is used as the coiled elastic member 42, but a compression spring having a gap in the helical portion in a state where no force is applied may be used.
Furthermore, when a spring is used as the coil-shaped elastic member 42, it is not limited to a single spring, and may be composed of a plurality of springs arranged side by side along the linear member.

1…ビーム部材、11…レール、2…支持部材、20…ケース、21…車輪、31…第一吊下アーム、32…第二吊下アーム、4,40…玉掛け用吊具、41…ワイヤ(線状部材)、42…コイル状の弾性部材(案内部材)、45…筒体(案内部材)、5…支持部材移動機構、6…回動機構、7…開閉機構、S…鋼材(長尺物) DESCRIPTION OF SYMBOLS 1... Beam member 11... Rail 2... Support member 20... Case 21... Wheel 31... First suspension arm 32... Second suspension arm 4, 40... Sling hook, 41... Wire (Linear member), 42... Coil-shaped elastic member (guide member), 45... Cylindrical body (guide member), 5... Support member moving mechanism, 6... Rotating mechanism, 7... Open/close mechanism, S... Steel material (long length)

Claims (3)

針金により結束されている複数本の長尺物を支持する線状部材と、
前記線状部材の外周部に回動自在に設けられ前記複数本の長尺物を前記線状部材と交差する方向に案内する、金属から形成された複数の引張ばねとを備えた
ことを特徴とする玉掛け用吊具。
a linear member that supports a plurality of elongated objects bound by wires ;
and a plurality of tension springs made of metal, which are rotatably provided on the outer periphery of the linear member and guide the plurality of elongated objects in a direction intersecting with the linear member. A hanging tool for slinging.
請求項1に記載された玉掛け用吊具において、
前記複数の引張ばねは、3個以上の引張ばねである
ことを特徴とする玉掛け用吊具。
In the sling sling according to claim 1,
A sling hanger , wherein the plurality of tension springs are three or more tension springs.
請求項1または請求項に記載された玉掛け用吊具と、前記線状部材の一端部に下端が接続された第一吊下アームと、前記線状部材の他端部に下端が接続された第二吊下アームと、前記第一吊下アームの上端側と前記第二吊下アームの上端側とがそれぞれ回動自在に支持された支持部材と、前記支持部材が長手方向に移動自在に設けられたビーム部材と、を備えた
ことを特徴とする長尺物搬送装置。
A sling hanger according to claim 1 or claim 2 , a first suspension arm having a lower end connected to one end of the linear member, and a lower end connected to the other end of the linear member. a second suspension arm, a support member rotatably supporting the upper end side of the first suspension arm and the upper end side of the second suspension arm, respectively, and the support member being movable in the longitudinal direction. and a beam member provided in the long object conveying apparatus.
JP2018231509A 2018-12-11 2018-12-11 Lifting gear for slinging and conveyor for long objects Active JP7329920B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018231509A JP7329920B2 (en) 2018-12-11 2018-12-11 Lifting gear for slinging and conveyor for long objects

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018231509A JP7329920B2 (en) 2018-12-11 2018-12-11 Lifting gear for slinging and conveyor for long objects

Publications (2)

Publication Number Publication Date
JP2020093871A JP2020093871A (en) 2020-06-18
JP7329920B2 true JP7329920B2 (en) 2023-08-21

Family

ID=71083923

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018231509A Active JP7329920B2 (en) 2018-12-11 2018-12-11 Lifting gear for slinging and conveyor for long objects

Country Status (1)

Country Link
JP (1) JP7329920B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7677756B2 (en) 2020-05-29 2025-05-15 Toppanホールディングス株式会社 Congestion information display system, congestion information display method, and program

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004035194A (en) 2002-07-03 2004-02-05 Daido Steel Co Ltd Automatic hanging equipment for long objects
JP2013256342A (en) 2012-06-11 2013-12-26 Nomura Tekko:Kk Suspension conveying device

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4913249Y1 (en) * 1970-10-22 1974-04-01
JPS60193383U (en) * 1984-05-31 1985-12-23 大同特殊鋼株式会社 hanging equipment
JPS63100478U (en) * 1986-12-16 1988-06-29
JPH0283877U (en) * 1988-12-16 1990-06-28
JPH0412477U (en) * 1990-05-21 1992-01-31
JP3259983B2 (en) * 1992-08-20 2002-02-25 喜和 石渡 Banknote transport and storage device
JPH11180671A (en) * 1997-12-17 1999-07-06 Tokyo Gas Co Ltd Hanging tools

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004035194A (en) 2002-07-03 2004-02-05 Daido Steel Co Ltd Automatic hanging equipment for long objects
JP2013256342A (en) 2012-06-11 2013-12-26 Nomura Tekko:Kk Suspension conveying device

Also Published As

Publication number Publication date
JP2020093871A (en) 2020-06-18

Similar Documents

Publication Publication Date Title
CN111071862A (en) Automatic loading and unloading system for wire spool, loading and unloading method and winding production line
JP6228740B2 (en) Climbing device and automatic sling-type lifting device
JP7329920B2 (en) Lifting gear for slinging and conveyor for long objects
KR102617697B1 (en) Apparatus and method for handling bars
CN109279500A (en) A tongs and a crane used for loading and unloading of circular objects
KR102390815B1 (en) Transferring apparatus having gripper
KR101493072B1 (en) Rolling roll loading system
CN114599594B (en) Bar storage device and method
JP2017178580A (en) Quay crane
JP6756077B2 (en) Quay crane
CN216549320U (en) Lifting and moving device
EP3479698B1 (en) Ham loading and removing device
CN209038880U (en) It is a kind of to load and unload the tongs and crane that use for circular object
CN107434202A (en) Speed limit rope replacing instrument
KR101570397B1 (en) tons crain
JPH08169687A (en) Article transport method and apparatus
JP2004123374A (en) Wire rope tightening tool
RU2812938C2 (en) Installation and method for storing rods
JP2006327735A (en) Container crane
CN108910515B (en) Adjustable loading and unloading mechanical arm
CN109677938B (en) Concrete block stacking system
JP4041551B2 (en) Overhead traveling cargo handling equipment
JPH0537873U (en) Work transfer device
JPH1179650A (en) Heavy bobbin suspension
JP2017178470A (en) Quay crane

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20211118

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20220825

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20220830

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20221027

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20230228

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20230427

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20230711

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20230808

R150 Certificate of patent or registration of utility model

Ref document number: 7329920

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150