Power control system, power control device, power control method and program Download PDF

Info

Publication number
JP7444584B2
JP7444584B2 JP2019205744A JP2019205744A JP7444584B2 JP 7444584 B2 JP7444584 B2 JP 7444584B2 JP 2019205744 A JP2019205744 A JP 2019205744A JP 2019205744 A JP2019205744 A JP 2019205744A JP 7444584 B2 JP7444584 B2 JP 7444584B2
Authority
JP
Japan
Prior art keywords
power
control device
power control
discharging
charging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2019205744A
Other languages
Japanese (ja)
Other versions
JP2021078327A (en
Inventor
良太 中澤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kyocera Corp
Original Assignee
Kyocera Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kyocera Corp filed Critical Kyocera Corp
Priority to JP2019205744A priority Critical patent/JP7444584B2/en
Publication of JP2021078327A publication Critical patent/JP2021078327A/en
Application granted granted Critical
Publication of JP7444584B2 publication Critical patent/JP7444584B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E70/00Other energy conversion or management systems reducing GHG emissions
    • Y02E70/30Systems combining energy storage with energy generation of non-fossil origin

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Description

本開示は、電力制御システム、電力制御装置、電力制御方法およびプログラムに関する。 The present disclosure relates to a power control system, a power control device, a power control method, and a program.

近年、所定のエリアの電力需給を管理する電力事業者が、電力の調達計画を広域機関に提出し、この調達計画に従い、所定のエリアにおける電力需要を制御するシステムがある(例えば、特許文献1参照)。 In recent years, there is a system in which an electric power company that manages electricity supply and demand in a predetermined area submits an electricity procurement plan to a wide-area organization, and controls the electricity demand in a predetermined area according to this procurement plan (for example, Patent Document 1 reference).

特開2019-126157号公報JP 2019-126157 Publication

上述したシステムでは、所定期間単位で、所定のエリアにおける電力需要の実績値が調達計画と一致する、すなわち、調達計画が達成されることが望ましい。 In the system described above, it is desirable that the actual value of power demand in a predetermined area match the procurement plan in units of a predetermined period, that is, the procurement plan is achieved.

本開示の目的は、所定のエリアにおける電力の調達計画の達成率の改善を図ることができる電力制御システム、電力制御装置、電力制御方法およびプログラムを提供することにある。 An object of the present disclosure is to provide a power control system, a power control device, a power control method, and a program that can improve the achievement rate of a power procurement plan in a predetermined area.

一実施形態に係る電力制御システムは、蓄電装置と、第1電力制御装置と、第2電力制御装置とを備える。第1電力制御装置は、所定のエリアにおける電力の調達計画に従い、所定期間単位で、前記蓄電装置の充放電を制御する。第2電力制御装置は、前記調達計画と、前記所定のエリアにおける電力需要の実績値との誤差に基づき、前記所定期間において前記所定のエリアにおける電力需要を調整するインバランス調整を行うか否かを判定する。第2電力制御装置は、前記インバランス調整を行うと判定した場合、前記蓄電装置の充放電を制御する。前記第1電力制御装置および前記第2電力制御装置はそれぞれ、前記所定期間単位で、前記蓄電装置に充放電可能な充放電量が割り当てられる。前記第1電力制御装置は、割り当てられた充放電可能な充放電量内で所定のエリアにおける電力需要のピークカットあるいはピークシフトを行うか否かを判定し、前記判定に基づく制御指示を前記第2電力制御装置に送信する。前記第2電力制御装置は、前記インバランス調整を行う場合、前記所定期間に前記第2電力制御装置に割り当てられた充放電量と、前記所定期間に前記第1電力制御装置に割り当てられた充放電量とを合わせた充放電量の範囲で、前記蓄電装置の充放電を制御する。 A power control system according to an embodiment includes a power storage device, a first power control device, and a second power control device. The first power control device controls charging and discharging of the power storage device in units of a predetermined period according to a power procurement plan in a predetermined area. The second power control device determines whether to perform imbalance adjustment to adjust the power demand in the predetermined area during the predetermined period based on the error between the procurement plan and the actual value of the power demand in the predetermined area. Determine. When determining that the imbalance adjustment is to be performed, the second power control device controls charging and discharging of the power storage device. The first power control device and the second power control device are each assigned a charge/discharge amount that can be charged/discharged to the power storage device in units of the predetermined period. The first power control device determines whether or not to perform a peak cut or peak shift of power demand in a predetermined area within the allocated chargeable/dischargeable amount, and issues a control instruction based on the determination to the first power control device. 2 Send to the power control device. When performing the imbalance adjustment, the second power control device compares the amount of charging and discharging allocated to the second power control device during the predetermined period and the amount of charging and discharging allocated to the first power control device during the predetermined period. The charging and discharging of the power storage device is controlled within the range of the amount of charging and discharging including the amount of discharging.

また、一実施形態に係る電力制御装置は、制御部を備える。制御部は、所定のエリアにおける電力の調達計画を立案し、該立案した調達計画に従い、所定期間単位で、前記所定のエリア内の蓄電装置の充放電を制御する、他の電力制御装置により立案された調達計画と、前記所定のエリアにおける電力需要の実績値との誤差に基づき、前記所定期間において前記所定のエリアにおける電力需要を調整するインバランス調整を行うか否かを判定する。制御部は、前記インバランス調整を行うと判定した場合、前記蓄電装置の充放電を制御する。前記電力制御装置および前記他の電力制御装置はそれぞれ、前記所定期間単位で、前記蓄電装置に充放電可能な充放電量が割り当てられる。前記他の電力制御装置は、割り当てられた充放電可能な充放電量内で所定のエリアにおける電力需要のピークカットあるいはピークシフトを行うか否かを判定し、前記判定に基づく制御指示を前記電力制御装置に送信する。前記制御部は、前記インバランス調整を行う場合、前記所定期間に前記電力制御装置に割り当てられた充放電量と、前記所定期間に前記他の電力制御装置に割り当てられた充放電量とを合わせた充放電量の範囲で、前記蓄電装置の充放電量を制御する。 Further, the power control device according to one embodiment includes a control section. The control unit draws up a power procurement plan in a predetermined area, and controls charging and discharging of the power storage device in the predetermined area in accordance with the drawn up procurement plan in units of a predetermined period. Based on the error between the obtained procurement plan and the actual value of power demand in the predetermined area, it is determined whether or not to perform imbalance adjustment to adjust the power demand in the predetermined area during the predetermined period. When determining that the imbalance adjustment is to be performed, the control unit controls charging and discharging of the power storage device. The power control device and the other power control device are each assigned a charge/discharge amount that can be charged/discharged to the power storage device in units of the predetermined period. The other power control device determines whether to perform a peak cut or peak shift of power demand in a predetermined area within the allocated chargeable/dischargeable amount, and issues a control instruction based on the determination to the power Send to control device . When performing the imbalance adjustment, the control unit combines the charge and discharge amount allocated to the power control device during the predetermined period with the charge and discharge amount allocated to the other power control device during the predetermined period. The amount of charge and discharge of the power storage device is controlled within the range of the amount of charge and discharge.

また、一実施形態に係る電力制御装置における電力制御方法は、判定ステップと、制御ステップとを含む。判定ステップでは、所定のエリアにおける電力の調達計画を立案し、該立案した調達計画に従い、所定期間単位で、前記所定のエリア内の蓄電装置の充放電を制御する、他の電力制御装置により立案された調達計画と、前記所定のエリアにおける電力需要の実績値との誤差に基づき、前記所定期間において前記所定のエリアにおける電力需要を調整するインバランス調整を行うか否かを判定する。制御ステップでは、前記インバランス調整を行うと判定した場合、前記蓄電装置の充放電を制御する。前記電力制御装置および前記他の電力制御装置はそれぞれ、前記所定期間単位で、前記蓄電装置に充放電可能な充放電量が割り当てられる。前記他の電力制御装置は、割り当てられた充放電可能な充放電量内で所定のエリアにおける電力需要のピークカットあるいはピークシフトを行うか否かを判定し、前記判定に基づく制御指示を前記電力制御装置に送信する。前記制御ステップでは、前記インバランス調整を行う場合、前記所定期間に前記電力制御装置に割り当てられた充放電量と、前記所定期間に前記他の電力制御装置に割り当てられた充放電量とを合わせた充放電量の範囲で、前記蓄電装置の充放電量を制御する。 Further, a power control method in a power control device according to an embodiment includes a determination step and a control step. In the determination step, a power procurement plan is drawn up in a predetermined area, and according to the drawn up procurement plan, another power control device controls charging and discharging of the power storage device in the predetermined area in units of a predetermined period. Based on the error between the obtained procurement plan and the actual value of power demand in the predetermined area, it is determined whether or not to perform imbalance adjustment to adjust the power demand in the predetermined area during the predetermined period. In the control step, when it is determined that the imbalance adjustment is to be performed, charging and discharging of the power storage device is controlled. The power control device and the other power control device are each assigned a charge/discharge amount that can be charged/discharged to the power storage device in units of the predetermined period. The other power control device determines whether to perform a peak cut or peak shift of power demand in a predetermined area within the allocated chargeable/dischargeable amount, and issues a control instruction based on the determination to the power Send to control device . In the control step, when performing the imbalance adjustment, the amount of charging and discharging allocated to the power control device during the predetermined period is combined with the amount of charging and discharging allocated to the other power control device during the predetermined period. The amount of charge and discharge of the power storage device is controlled within the range of the amount of charge and discharge.

また、一実施形態に係るプログラムは、コンピュータに、判定処理と、制御処理とを実行させる。判定処理では、所定のエリアにおける電力の調達計画を立案し、該立案した調達計画に従い、所定期間単位で、前記所定のエリア内の蓄電装置の充放電を制御する、他の電力制御装置により立案された調達計画と、前記所定のエリアにおける電力需要の実績値との誤差に基づき、前記所定期間において前記所定のエリアにおける電力需要を調整するインバランス調整を行うか否かを判定する。制御処理では、前記インバランス調整を行うと判定した場合、前記蓄電装置の充放電を制御する。前記電力制御装置および前記他の電力制御装置はそれぞれ、前記所定期間単位で、前記蓄電装置に充放電可能な充放電量が割り当てられる。前記他の電力制御装置は、割り当てられた充放電可能な充放電量内で所定のエリアにおける電力需要のピークカットあるいはピークシフトを行うか否かを判定し、前記判定に基づく制御指示を前記電力制御装置に送信する。前記制御処理では、前記インバランス調整を行う場合、前記所定期間に前記電力制御装置に割り当てられた充放電量と、前記所定期間に前記他の電力制御装置に割り当てられた充放電量とを合わせた充放電量の範囲で、前記蓄電装置の充放電量を制御させる。
Further, the program according to one embodiment causes a computer to execute a determination process and a control process. In the determination process, a power procurement plan is drawn up in a predetermined area, and according to the drawn up procurement plan, another power control device controls charging and discharging of power storage devices in the predetermined area in units of a predetermined period. Based on the error between the obtained procurement plan and the actual value of power demand in the predetermined area, it is determined whether or not to perform imbalance adjustment to adjust the power demand in the predetermined area during the predetermined period. In the control process, when it is determined that the imbalance adjustment is to be performed, charging and discharging of the power storage device is controlled. The power control device and the other power control device are each assigned a charge/discharge amount that can be charged/discharged to the power storage device in units of the predetermined period. The other power control device determines whether to perform a peak cut or peak shift of power demand in a predetermined area within the allocated chargeable/dischargeable amount, and issues a control instruction based on the determination to the power Send to control device . In the control process, when performing the imbalance adjustment, the amount of charging and discharging allocated to the power control device during the predetermined period is combined with the amount of charging and discharging allocated to the other power control device during the predetermined period. The amount of charge and discharge of the power storage device is controlled within the range of the amount of charge and discharge.

一実施形態によれば、所定のエリアにおける電力の調達計画の達成率の改善を図ることができる電力制御システム、電力制御装置、電力制御方法およびプログラムを提供することができる。 According to one embodiment, it is possible to provide a power control system, a power control device, a power control method, and a program that can improve the achievement rate of a power procurement plan in a predetermined area.

本発明の一実施形態に係る電力制御システムの構成例を示す図である。1 is a diagram showing a configuration example of a power control system according to an embodiment of the present invention. 図1に示す第1電力制御装置が立案する調達計画について説明するための図である。2 is a diagram for explaining a procurement plan drawn up by the first power control device shown in FIG. 1. FIG. 調達計画、需要予測、発電予測、充電計画および放電計画の変更について説明するための図である。FIG. 3 is a diagram for explaining changes in a procurement plan, demand forecast, power generation forecast, charging plan, and discharge plan. 図1に示す第1電力制御装置の構成例を示す図である。FIG. 2 is a diagram showing a configuration example of a first power control device shown in FIG. 1. FIG. 図1に示す第2電力制御装置の構成例を示す図である。FIG. 2 is a diagram showing a configuration example of a second power control device shown in FIG. 1. FIG. 図1に示す第2電力制御装置によるインバランス調整の要否の判定方法を説明するための図である。FIG. 2 is a diagram for explaining a method of determining whether imbalance adjustment is necessary by the second power control device shown in FIG. 1; 図1に示す第2電力制御装置によるインバランス調整の要否の判定方法を説明するための図である。FIG. 2 is a diagram for explaining a method of determining whether imbalance adjustment is necessary by the second power control device shown in FIG. 1; 従来のインバランス調整について説明するための図である。FIG. 2 is a diagram for explaining conventional imbalance adjustment. 第1電力制御装置による充放電制御について説明するための図である。FIG. 3 is a diagram for explaining charge/discharge control by the first power control device. 従来のインバランス調整による充放電制御について説明するための図である。FIG. 2 is a diagram for explaining charge/discharge control using conventional imbalance adjustment. 図1に示す第2電力制御装置によるインバランス調整について説明するための図である。2 is a diagram for explaining imbalance adjustment by the second power control device shown in FIG. 1. FIG. 図1に示す電力制御システムの動作の一例を示すシーケンス図である。2 is a sequence diagram showing an example of the operation of the power control system shown in FIG. 1. FIG. 図1に示す電力制御システムの動作の他の一例を示すシーケンス図である。2 is a sequence diagram showing another example of the operation of the power control system shown in FIG. 1. FIG.

以下、一実施形態に係る電力制御システム、電力制御装置、電力制御方法およびプログラムについて、図面を参照して説明する。 Hereinafter, a power control system, a power control device, a power control method, and a program according to one embodiment will be described with reference to the drawings.

図1は、一実施形態に係る電力制御システム1の構成例を示す図である。本実施形態に係る電力制御システム1は、例えば、市町村単位といった所定のエリアにおける電力を制御するAEMS(Area Energy Management System)を構成してよい。 FIG. 1 is a diagram showing a configuration example of a power control system 1 according to an embodiment. The power control system 1 according to the present embodiment may configure, for example, an AEMS (Area Energy Management System) that controls power in a predetermined area such as a municipal unit.

図1に示すように、本実施形態に係る電力制御システム1は、第1電力制御装置10と、第2電力制御装置20と、機器30とを備える。第1電力制御装置10は、第2電力制御装置20と接続される。第2電力制御装置20は、ゲートウェイ(GW)40を介して機器30と接続される。機器30は、電力制御システム1が電力を制御する所定のエリア内に設けられる。機器30は、例えば、太陽電池31、電力メータ32、蓄電装置33を含む。図1においては、第2電力制御装置20と機器30とがGW40を介して接続される例を示しているが、これに限られるものではない。第2電力制御装置20と機器30とはGW40を介さずに接続されてよい。 As shown in FIG. 1, the power control system 1 according to the present embodiment includes a first power control device 10, a second power control device 20, and a device 30. The first power control device 10 is connected to the second power control device 20. The second power control device 20 is connected to the device 30 via a gateway (GW) 40. The device 30 is provided within a predetermined area where the power control system 1 controls power. Device 30 includes, for example, a solar cell 31, a power meter 32, and a power storage device 33. Although FIG. 1 shows an example in which the second power control device 20 and the device 30 are connected via the GW 40, the present invention is not limited to this. The second power control device 20 and the device 30 may be connected without going through the GW 40.

第1電力制御装置10は、所定のエリアにおける電力の調達計画を立案し、立案した調達計画に従い、所定のエリアにおける電力を制御する電力制御装置である。 The first power control device 10 is a power control device that creates a power procurement plan for a predetermined area and controls the power in the predetermined area according to the created procurement plan.

図2は、調達計画について説明するための図である。 FIG. 2 is a diagram for explaining the procurement plan.

第1電力制御装置10は、図2に示すように、所定期間(以下、「デマンド区間」と称する。)単位で、所定のエリアにおける電力の需要予測および発電予測に応じて、所定のエリアにおける電力の調達計画を立案する。具体的には、第1電力制御装置10は、需要予測から発電予測を減算し、充電計画および放電計画に応じた値を加算または減算して、調達計画を立案する。デマンド区間は、例えば、30分間である。充電計画および放電計画は、例えば、所定のエリアにおける電力のピークカットあるいはピークシフトを行うための、蓄電装置33の充放電の計画である。電力制御システム1においては、デマンド区間ごとに、所定のエリアにおける電力需要の実績値が調達計画と一致する、すなわち、調達計画を達成することが求められる。 As shown in FIG. 2, the first power control device 10 is configured to control power consumption in a predetermined area in accordance with a power demand forecast and a power generation forecast in a predetermined area in units of a predetermined period (hereinafter referred to as "demand section"). Develop a power procurement plan. Specifically, the first power control device 10 subtracts the power generation forecast from the demand forecast, adds or subtracts values according to the charging plan and the discharging plan, and creates a procurement plan. The demand period is, for example, 30 minutes. The charging plan and the discharging plan are, for example, plans for charging and discharging the power storage device 33 in order to perform peak cutting or peak shifting of power in a predetermined area. In the power control system 1, the actual value of power demand in a predetermined area is required to match the procurement plan for each demand section, that is, the procurement plan is required to be achieved.

第1電力制御装置10は、所定時間(例えば、48時間)だけ先まで調達計画を立案する。ただし、調達計画、需要予測および発電予測はそれぞれ、対象のデマンド区間よりも所定時間だけ前まで変更可能である。例えば、調達計画は、対象のデマンド区間の1時間前まで変更可能である。したがって、対象のデマンド区間が13:00-13:29であるとすると、調達計画は、図3に示すように、11:59まで変更可能である。また、需要予測および発電予測は、対象のデマンド区間の30分前まで変更可能である。したがって、対象のデマンド区間が13:00-13:29であるとすると、需要予測および発電予測は、図3に示すように、12:29まで変更可能である。充電計画および放電計画は、対象のデマンド区間内であっても変更可能である。調達計画、需要予測および発電予測が変更できなくなった後は、充電計画および放電計画を調整することで、調達計画の達成が図られる。 The first power control device 10 creates a procurement plan for a predetermined period of time (for example, 48 hours). However, each of the procurement plan, demand forecast, and power generation forecast can be changed up to a predetermined time before the target demand section. For example, the procurement plan can be changed up to one hour before the target demand section. Therefore, if the target demand section is 13:00-13:29, the procurement plan can be changed up to 11:59, as shown in FIG. Further, the demand forecast and the power generation forecast can be changed up to 30 minutes before the target demand section. Therefore, if the target demand section is 13:00-13:29, the demand forecast and power generation forecast can be changed until 12:29, as shown in FIG. The charging plan and the discharging plan can be changed even within the target demand section. After the procurement plan, demand forecast, and power generation forecast cannot be changed, the procurement plan can be achieved by adjusting the charging plan and the discharge plan.

第1電力制御装置10は、立案した調達計画を広域機関(OCCTO:Organization for Cross-regional Coordination of Transmission Operators)に提出してよい。第1電力制御装置10は、デマンド区間ごとに、立案した調達計画に従い、蓄電装置33の充放電を制御する。すなわち、第1電力制御装置10は、電力の需要予測および発電予測に応じた調達計画に従い、所定期間(デマンド区間)単位で、蓄電装置33の充放電を制御する。詳細は後述するが、第1電力制御装置10は、デマンド区間単位で、蓄電装置33に充放電可能な充放電量が割り当てられている。第1電力制御装置10は、デマンド区間単位で、そのデマンド区間に割り当てられた充放電量の範囲で、蓄電装置33の充放電を制御する。また、第1電力制御装置10は、所定のエリアにおける電力需要のピークカットあるいはピークシフトを行うために、蓄電装置33の充放電を制御してよい。第1電力制御装置10は、蓄電装置33の充放電を制御する制御指示を第2電力制御装置20に送信する。この制御指示に従い、蓄電装置33の充放電が制御される。また、第1電力制御装置10は、調達計画、需要予測および発電予測を、第2電力制御装置20に送信する。 The first power control device 10 may submit the drafted procurement plan to an organization for cross-regional coordination of transmission operators (OCCTO). The first power control device 10 controls charging and discharging of the power storage device 33 for each demand section according to the drafted procurement plan. That is, the first power control device 10 controls charging and discharging of the power storage device 33 in units of a predetermined period (demand section) according to a procurement plan according to a power demand forecast and a power generation forecast. Although details will be described later, in the first power control device 10, a charge/discharge amount that can be charged/discharged to the power storage device 33 is assigned for each demand section. The first power control device 10 controls charging and discharging of the power storage device 33 on a demand interval basis within the range of charging and discharging amount allocated to that demand interval. Further, the first power control device 10 may control charging and discharging of the power storage device 33 in order to perform peak cutting or peak shifting of power demand in a predetermined area. The first power control device 10 transmits a control instruction for controlling charging and discharging of the power storage device 33 to the second power control device 20. According to this control instruction, charging and discharging of power storage device 33 is controlled. Further, the first power control device 10 transmits the procurement plan, demand forecast, and power generation forecast to the second power control device 20.

図4は、第1電力制御装置10の構成例を示す図である。 FIG. 4 is a diagram showing a configuration example of the first power control device 10. As shown in FIG.

図4に示すように、第1電力制御装置10は、記憶部11と、通信部12と、制御部13とを備える。 As shown in FIG. 4, the first power control device 10 includes a storage section 11, a communication section 12, and a control section 13.

記憶部11は、第1電力制御装置10の動作に必要な種々の情報を記憶するメモリである。記憶部11は、制御部13による演算結果などの各種データを記憶してよい。記憶部11は、例えば、半導体メモリまたは磁気ディスクなどにより構成することができるが、これらに限られず、任意の記憶装置により構成することができる。記憶部11は、第1電力制御装置10に挿入されたメモリカードのような記憶媒体であってよい。記憶部11は、後述する制御部13として用いられるCPU(Central Processing Unit)の内部メモリであってよい。 The storage unit 11 is a memory that stores various information necessary for the operation of the first power control device 10. The storage unit 11 may store various data such as calculation results by the control unit 13. The storage unit 11 can be configured by, for example, a semiconductor memory or a magnetic disk, but is not limited to these, and can be configured by any storage device. The storage unit 11 may be a storage medium such as a memory card inserted into the first power control device 10. The storage unit 11 may be an internal memory of a CPU (Central Processing Unit) used as the control unit 13 described later.

通信部12は、無線通信をはじめとする各種の通信機能を有する通信インタフェースである。通信部12は、例えば、LTE(Long Term Evolution)などの種々の通信方式により通信を実現する。通信部12は、例えば、ITU-T(International Telecommunication Union Telecommunication Standardization Sector)において通信方式が標準化されたモデムを含んでよい。通信部12は、WiFi(Wireless Fidelity)またはBluetooth(登録商標)などの種々の方式により無線通信を実現してよい。通信部12が送受信する各種の情報は、記憶部11に記憶してよい。通信部12は、電波を送受信するためのアンテナおよび適当なRF(Radio Frequency)部などを含めて構成してよい。通信部12は、無線通信を行うための既知の技術により構成することができるため、より詳細なハードウェアの説明は省略する。 The communication unit 12 is a communication interface having various communication functions including wireless communication. The communication unit 12 realizes communication using various communication methods such as LTE (Long Term Evolution). The communication unit 12 may include, for example, a modem whose communication method is standardized by the International Telecommunication Union Telecommunication Standardization Sector (ITU-T). The communication unit 12 may realize wireless communication using various methods such as WiFi (Wireless Fidelity) or Bluetooth (registered trademark). Various types of information transmitted and received by the communication unit 12 may be stored in the storage unit 11. The communication unit 12 may include an antenna for transmitting and receiving radio waves, a suitable RF (Radio Frequency) unit, and the like. Since the communication unit 12 can be configured using a known technique for performing wireless communication, a more detailed description of the hardware will be omitted.

通信部12は、制御部13の制御に従い、調達計画、需要予測および発電予測を、第2電力制御装置20に送信してよい。通信部12は、制御部13の制御に従い、蓄電装置33の充放電を制御する制御指示を第2電力制御装置20に送信してよい。通信部12は、機器30による電力需要の実績値を示す実績データを第2電力制御装置20から受信し、制御部13に出力してよい。 The communication unit 12 may transmit the procurement plan, demand forecast, and power generation forecast to the second power control device 20 under the control of the control unit 13 . The communication unit 12 may transmit control instructions for controlling charging and discharging of the power storage device 33 to the second power control device 20 under the control of the control unit 13 . The communication unit 12 may receive performance data indicating the actual value of power demand by the device 30 from the second power control device 20 and output it to the control unit 13 .

制御部13は、第1電力制御装置10全体の動作を制御するコントローラである。制御部13は、種々の機能を実行するための制御および処理能力を提供するために、例えば、CPUのような、少なくとも1つのプロセッサを含んでよい。制御部13は、1つのプロセッサで実現してよいし、複数のプロセッサで実現してよい。制御部13は、単一の集積回路として実現されてよい。プロセッサは、通信可能に接続された複数の集積回路およびディスクリート回路として実現されてよい。制御部13は、CPUおよび当該CPUで実行されるプログラムとして構成されてよい。制御部13において実行されるプログラムおよび制御部13において実行された処理の結果などは、記憶部11に記憶されてよい。 The control unit 13 is a controller that controls the operation of the first power control device 10 as a whole. Control unit 13 may include at least one processor, such as a CPU, to provide control and processing power to perform various functions. The control unit 13 may be implemented by one processor or by multiple processors. Control unit 13 may be realized as a single integrated circuit. A processor may be implemented as a plurality of communicatively connected integrated and discrete circuits. The control unit 13 may be configured as a CPU and a program executed by the CPU. The programs executed by the control unit 13 and the results of the processes executed by the control unit 13 may be stored in the storage unit 11.

制御部13は、所定のエリアにおける電力の需要予測および発電予測に応じた電力の調達計画を立案する。制御部13は、調達計画に従い、デマンド区間単位で、そのデマンド区間に第1電力制御装置10に割り当てられた充放電量の範囲で、蓄電装置33の充放電を制御する。制御部13は、調達計画、需要予測および発電予測を、通信部12に第2電力制御装置20へ送信させてよい。制御部13は、蓄電装置33の充放電を制御する制御指示を、通信部12に第2電力制御装置20へ送信させてよい。 The control unit 13 formulates a power procurement plan according to the power demand forecast and power generation forecast in a predetermined area. The control unit 13 controls charging and discharging of the power storage device 33 in accordance with the procurement plan, for each demand interval, within the range of the charge and discharge amount allocated to the first power control device 10 for that demand interval. The control unit 13 may cause the communication unit 12 to transmit the procurement plan, demand forecast, and power generation forecast to the second power control device 20. The control unit 13 may cause the communication unit 12 to transmit a control instruction for controlling charging and discharging of the power storage device 33 to the second power control device 20.

図1を再び参照すると、第2電力制御装置20は、所定のエリアにおける電力の需要実績と調達計画との不整合(インバランス)を低減するように、所定のエリアにおける電力需要を調整するインバランス調整を行う電力制御装置である。第2電力制御装置20は、第1電力制御装置10から送信されてきた蓄電装置33への制御指示を受信し、GW40を介して蓄電装置33に転送してよい。第2電力制御装置20は、他の電力制御装置である第1電力制御装置10から送信されてきた、調達計画、需要予測および発電予測を受信する。第2電力制御装置20は、機器30からGW40を介して所定の時間間隔(例えば、1分間)で送信されてきた、機器30における電力需要の実績値(実績データ)を受信する。第2電力制御装置20は、各機器30から取得した実績データを所定時間(例えば、30分間)分纏めて、第1電力制御装置10に送信してよい。 Referring again to FIG. 1, the second power control device 20 is configured to have an integrated power control system that adjusts the power demand in a predetermined area so as to reduce the inconsistency (imbalance) between the actual power demand in the predetermined area and the procurement plan. This is a power control device that performs balance adjustment. The second power control device 20 may receive the control instruction for the power storage device 33 transmitted from the first power control device 10 and transfer it to the power storage device 33 via the GW 40 . The second power control device 20 receives the procurement plan, demand forecast, and power generation forecast transmitted from the first power control device 10, which is another power control device. The second power control device 20 receives the actual value (actual data) of the power demand in the device 30, which is transmitted from the device 30 via the GW 40 at predetermined time intervals (for example, one minute). The second power control device 20 may collect performance data acquired from each device 30 for a predetermined period of time (for example, 30 minutes) and transmit it to the first power control device 10.

第2電力制御装置20は、蓄電装置33の充放電制御なしに、調達計画が達成されないと判定すると、インバランス調整を行う。具体的には、第2電力制御装置20は、需要予測および発電予測に応じた調達計画と、所定のエリアにおける電力需要の実績値との誤差に基づき、インバランス調整を行うか否かを判定する。第2電力制御装置20は、インバランス調整を行うと判定した場合、第1電力制御装置10よりも短い所定期間(例えば、1分間)単位で、蓄電装置33の充放電を制御する。ここで、詳細は後述するが、第2電力制御装置20は、デマンド区間単位で、インバランス調整により蓄電装置33に充放電可能な充放電量が割り当てられている。 If the second power control device 20 determines that the procurement plan cannot be achieved without controlling the charging and discharging of the power storage device 33, it performs imbalance adjustment. Specifically, the second power control device 20 determines whether to perform imbalance adjustment based on the error between the procurement plan according to the demand forecast and power generation forecast and the actual value of the power demand in a predetermined area. do. When the second power control device 20 determines to perform the imbalance adjustment, the second power control device 20 controls charging and discharging of the power storage device 33 in units of a predetermined period (for example, one minute) that is shorter than the first power control device 10 . Here, although the details will be described later, the second power control device 20 allocates a charge/discharge amount that can be charged/discharged to the power storage device 33 by imbalance adjustment for each demand section.

図5は、第2電力制御装置20の構成例を示す図である。 FIG. 5 is a diagram showing a configuration example of the second power control device 20. As shown in FIG.

図5に示す第2電力制御装置20は、記憶部21と、通信部22,23と、制御部24とを備える。 The second power control device 20 shown in FIG. 5 includes a storage section 21, communication sections 22 and 23, and a control section 24.

記憶部21は、第2電力制御装置20の動作に必要な種々の情報を記憶するメモリである。記憶部21は、一実施形態に係るプログラムを記憶してよい。記憶部21は、制御部24による演算結果などの各種データを記憶してよい。記憶部21は、例えば、半導体メモリまたは磁気ディスクなどにより構成することができるが、これらに限られず、任意の記憶装置により構成することができる。記憶部21は、第2電力制御装置20に挿入されたメモリカードのような記憶媒体であってよい。記憶部21は、後述する制御部24として用いられるCPUの内部メモリであってよい。 The storage unit 21 is a memory that stores various information necessary for the operation of the second power control device 20. The storage unit 21 may store a program according to an embodiment. The storage unit 21 may store various data such as calculation results by the control unit 24. The storage unit 21 can be configured by, for example, a semiconductor memory or a magnetic disk, but is not limited to these, and can be configured by any storage device. The storage unit 21 may be a storage medium such as a memory card inserted into the second power control device 20. The storage unit 21 may be an internal memory of a CPU used as a control unit 24, which will be described later.

通信部22は、通信部12の通信方式に対応する通信方式による通信機能を有する通信インタフェースである。 The communication unit 22 is a communication interface having a communication function using a communication method corresponding to the communication method of the communication unit 12.

通信部22は、他の電力制御装置である第1電力制御装置10から送信されてきた制御指示を受信し、制御部24に出力してよい。通信部22は、第1電力制御装置10からの、調達計画、需要予測および発電予測を受信し、制御部24に出力する。通信部22は、制御部24の制御に従い、所定時間(例えば、30分間)分の機器30の電力需要の実績データを纏めて、第1電力制御装置10に送信してよい。 The communication unit 22 may receive a control instruction transmitted from the first power control device 10, which is another power control device, and output it to the control unit 24. The communication unit 22 receives the procurement plan, demand forecast, and power generation forecast from the first power control device 10 and outputs it to the control unit 24 . Under the control of the control unit 24, the communication unit 22 may compile performance data of the power demand of the devices 30 for a predetermined period of time (for example, 30 minutes) and transmit it to the first power control device 10.

通信部23は、無線通信をはじめとする各種の通信機能を有する通信インタフェースである。通信部23は、例えば、LTEなどの種々の通信方式により通信を実現する。通信部23は、例えば、ITU-Tにおいて通信方式が標準化されたモデムを含んでよい。通信部23は、WiFiまたはBluetooth(登録商標)などの種々の方式により無線通信を実現してよい。通信部23が送受信する各種の情報は、記憶部21に記憶してよい。通信部23は、電波を送受信するためのアンテナおよび適当なRF部などを含めて構成してよい。通信部23は、無線通信を行うための既知の技術により構成することができるため、より詳細なハードウェアの説明は省略する。 The communication unit 23 is a communication interface having various communication functions including wireless communication. The communication unit 23 realizes communication using various communication methods such as LTE, for example. The communication unit 23 may include, for example, a modem whose communication method is standardized by ITU-T. The communication unit 23 may implement wireless communication using various methods such as WiFi or Bluetooth (registered trademark). Various types of information transmitted and received by the communication unit 23 may be stored in the storage unit 21. The communication unit 23 may include an antenna for transmitting and receiving radio waves, a suitable RF unit, and the like. Since the communication unit 23 can be configured using a known technique for performing wireless communication, a more detailed description of the hardware will be omitted.

通信部23は、GW40を介して機器30から送信されてきた電力需要の実績データを受信し、制御部24に出力してよい。通信部23は、制御部24の制御に従い、蓄電装置33の充放電を制御する制御指示を蓄電装置33に送信してよい。 The communication unit 23 may receive power demand performance data transmitted from the device 30 via the GW 40 and output it to the control unit 24 . The communication unit 23 may transmit control instructions for controlling charging and discharging of the power storage device 33 to the power storage device 33 under the control of the control unit 24 .

制御部24は、第2電力制御装置20全体の動作を制御するコントローラである。制御部24は、種々の機能を実行するための制御および処理能力を提供するために、例えば、CPUのような、少なくとも1つのプロセッサを含んでよい。制御部24は、1つのプロセッサで実現してよいし、複数のプロセッサで実現してよい。制御部24は、単一の集積回路として実現されてよい。プロセッサは、通信可能に接続された複数の集積回路およびディスクリート回路として実現されてよい。制御部24は、CPUおよび当該CPUで実行されるプログラムとして構成されてよい。制御部24において実行されるプログラムおよび制御部24において実行された処理の結果などは、記憶部21に記憶されてよい。 The control unit 24 is a controller that controls the operation of the second power control device 20 as a whole. Control unit 24 may include at least one processor, such as a CPU, to provide control and processing power to perform various functions. The control unit 24 may be implemented by one processor or by multiple processors. Control unit 24 may be implemented as a single integrated circuit. A processor may be implemented as a plurality of communicatively connected integrated and discrete circuits. The control unit 24 may be configured as a CPU and a program executed by the CPU. The program executed by the control unit 24 and the results of the processing executed by the control unit 24 may be stored in the storage unit 21.

制御部24は、通信部22から蓄電装置33への制御指示が出力されると、その制御指示を通信部23にGW40を介して蓄電装置33へ送信させてよい。制御部24は、通信部23から機器30における電力需要の実績データが出力されると、所定時間分の実績データを纏めて、通信部22に第1電力制御装置10へ送信させてよい。 When the communication unit 22 outputs a control instruction to the power storage device 33, the control unit 24 may cause the communication unit 23 to transmit the control instruction to the power storage device 33 via the GW 40. When the communication unit 23 outputs the performance data of the power demand in the device 30, the control unit 24 may compile the performance data for a predetermined period of time and cause the communication unit 22 to transmit the data to the first power control device 10.

制御部24は、調達計画および電力需要の実績データに基づき、インバランス調整を行うか否かを判定する。具体的には、制御部24は、調達計画と、電力需要の実績データ(実績値)との誤差に基づき、インバランス調整を行うか否かを判定する。制御部24は、インバランス調整を行うと判定した場合、第1電力制御装置10よりも短い所定期間(例えば、1分間)単位で蓄電装置33の充放電を制御する。具体的には、制御部24は、蓄電装置33の充放電を制御する制御指示を、通信部23に蓄電装置33へ送信させる。 The control unit 24 determines whether to perform imbalance adjustment based on the procurement plan and the actual power demand data. Specifically, the control unit 24 determines whether to perform imbalance adjustment based on the error between the procurement plan and the actual power demand data (actual value). When determining that the imbalance adjustment is to be performed, the control unit 24 controls charging and discharging of the power storage device 33 in units of a predetermined period (for example, one minute) that is shorter than that of the first power control device 10 . Specifically, the control unit 24 causes the communication unit 23 to transmit a control instruction for controlling charging and discharging of the power storage device 33 to the power storage device 33.

図1を再び参照すると、機器30は、GW40を介して第2電力制御装置20と接続される。機器30は、所定の時間(例えば、1分)間隔で、機器30における電力需要の実績データを、GW40を介して第2電力制御装置20に送信する。上述したように、機器30は、例えば、太陽電池31、電力メータ32および蓄電装置33を含む。 Referring to FIG. 1 again, the device 30 is connected to the second power control device 20 via the GW 40. The device 30 transmits actual power demand data in the device 30 to the second power control device 20 via the GW 40 at predetermined time intervals (for example, one minute). As described above, device 30 includes, for example, solar cell 31, power meter 32, and power storage device 33.

太陽電池31は、太陽光のエネルギーを直流電力に変換する。太陽電池31は、例えば、光電変換セルを有する発電部がマトリクス状に接続され、所定の直流電流を出力するように構成される。太陽電池31は、シリコン系多結晶太陽電池、シリコン系単結晶太陽電池またはCIGSなどの薄膜系太陽電池など、光電変換可能なものであれば種類は制限されない。 The solar cell 31 converts sunlight energy into DC power. The solar cell 31 is configured such that, for example, power generation units having photoelectric conversion cells are connected in a matrix and output a predetermined direct current. The type of solar cell 31 is not limited as long as it can be photoelectrically converted, such as a silicon-based polycrystalline solar cell, a silicon-based single-crystalline solar cell, or a thin film solar cell such as CIGS.

電力メータ32は、負荷により消費されるまたは供給される電力量を計測する。 Power meter 32 measures the amount of power consumed or supplied by the load.

蓄電装置33は、リチウムイオン電池またはニッケル水素電池などの蓄電池を備える。蓄電装置33は、充電された電力を放電することにより、電力を供給可能である。また、蓄電装置33は、電力系統あるいは太陽電池31などから供給された電力を充電可能である。蓄電装置33は、第2電力制御装置20から送信される制御指示に従い、充放電可能である。 The power storage device 33 includes a storage battery such as a lithium ion battery or a nickel metal hydride battery. The power storage device 33 can supply power by discharging the charged power. Further, the power storage device 33 can be charged with power supplied from the power system, the solar battery 31, or the like. The power storage device 33 can be charged and discharged according to control instructions transmitted from the second power control device 20.

次に、第2電力制御装置20によるインバランス調整の要否の判定について、図6A,6Bを参照してより詳細に説明する。図6Aは、調達計画から実績値を減算して、調達計画と実績値との誤差を求める場合を示している。図6Bは、実績値から調達計画と減算して、調達計画と実績値との誤差を求める場合を示している。図6A,6Bにおいて、縦軸は、調達計画に対する、調達計画と実績値との誤差の割合(誤差率)を示し、横軸は、対象のデマンド区間の開始からの経過時間を示す。 Next, the determination of whether imbalance adjustment is necessary by the second power control device 20 will be described in more detail with reference to FIGS. 6A and 6B. FIG. 6A shows a case where the actual value is subtracted from the procurement plan to determine the error between the procurement plan and the actual value. FIG. 6B shows a case where the procurement plan is subtracted from the actual value to find the error between the procurement plan and the actual value. In FIGS. 6A and 6B, the vertical axis indicates the ratio of error between the procurement plan and the actual value (error rate), and the horizontal axis indicates the elapsed time from the start of the target demand section.

第2電力制御装置20は、図6Aに示すように、誤差率が所定の充電閾値を上回ると、すなわち、誤差率が充電閾値よりも大きい充電必要エリアに達すると、インバランス調整による蓄電装置33の充電が必要であると判定する。また、第2電力制御装置20は、誤差率が所定の放電閾値を下回ると、すなわち、誤差率が放電閾値よりも小さい放電必要エリアに達すると、インバランス調整による蓄電装置33の放電が必要であると判定する。 As shown in FIG. 6A, when the error rate exceeds a predetermined charging threshold, that is, when the error rate reaches a charging required area larger than the charging threshold, the second power control device 20 controls the power storage device 33 by imbalance adjustment. It is determined that charging is necessary. Furthermore, when the error rate falls below a predetermined discharge threshold, that is, when the error rate reaches a discharge required area smaller than the discharge threshold, the second power control device 20 determines that the power storage device 33 needs to be discharged by imbalance adjustment. It is determined that there is.

また、第2電力制御装置20は、図6Bに示すように、誤差率が所定の放電閾値を上回ると、すなわち、誤差率が放電閾値よりも大きい放電必要エリアに達すると、インバランス調整による蓄電装置33の放電が必要であると判定する。また、第2電力制御装置20は、誤差率が所定の充電閾値を上回ると、すなわち、誤差率が充電閾値よりも小さい充電必要エリアに達すると、インバランス調整による蓄電装置33の充電が必要であると判定する。 Further, as shown in FIG. 6B, when the error rate exceeds a predetermined discharge threshold, that is, when the error rate reaches a discharge required area larger than the discharge threshold, the second power control device 20 performs power storage by imbalance adjustment. It is determined that the device 33 needs to be discharged. Furthermore, when the error rate exceeds a predetermined charging threshold, that is, when the error rate reaches a charging required area smaller than the charging threshold, the second power control device 20 determines that the power storage device 33 needs to be charged by imbalance adjustment. It is determined that there is.

第2電力制御装置20は、誤差率と充電閾値・放電閾値との比較を、所定の時間間隔(例えば、1分間隔)で行う。第2電力制御装置20は、比較の結果、誤差率が充電必要エリアあるいは放電必要エリアに達した時点で、インバランス調整が必要であると判定する。 The second power control device 20 compares the error rate with the charging threshold and the discharging threshold at predetermined time intervals (for example, every minute). As a result of the comparison, the second power control device 20 determines that imbalance adjustment is necessary when the error rate reaches the charging required area or the discharging required area.

図7は、従来のインバランス調整について説明するための図である。 FIG. 7 is a diagram for explaining conventional imbalance adjustment.

蓄電装置33は、一日に充電可能な充電量(日許容充電量)および一日に放電可能な放電量(日許容放電量)が定められている。第1電力制御装置10は、蓄電装置33の日許容充電量のうち、所定の充電量が、一日に制御可能な充電量(充電制御量)として割り当てられる。また、第1電力制御装置10は、蓄電装置33の日許容放電量のうち、所定の放電量が、一日に制御可能な放電量(放電制御量)として割り当てられる。第1電力制御装置10は、図8に示すように、デマンド区間ごとに、割り当てられた充電制御量および放電制御量の範囲内で、調達計画に従い、蓄電装置33の充電を制御する。 For the power storage device 33, the amount of charge that can be charged per day (permissible daily charge amount) and the amount of discharge that can be discharged per day (permissible daily discharge amount) are determined. The first power control device 10 allocates a predetermined charging amount of the daily allowable charging amount of the power storage device 33 as a controllable charging amount (charging control amount) in one day. Furthermore, the first power control device 10 allocates a predetermined discharge amount of the daily allowable discharge amount of the power storage device 33 as a controllable discharge amount per day (discharge control amount). As shown in FIG. 8, the first power control device 10 controls charging of the power storage device 33 according to the procurement plan within the range of the allocated charge control amount and discharge control amount for each demand section.

従来のインバランス調整による蓄電装置33への充電は、日許容充電量から充電制御量を引いた調整用日充電量の範囲内で制御される。また、従来のインバランスによる蓄電装置33からの放電は、日許容放電量から放電制御量を引いた調整用日放電量の範囲内で制御される。 Charging of the power storage device 33 by conventional imbalance adjustment is controlled within the range of the adjustment daily charge amount obtained by subtracting the charge control amount from the daily allowable charge amount. Further, the discharge from the power storage device 33 due to the conventional imbalance is controlled within the range of the adjustment daily discharge amount obtained by subtracting the discharge control amount from the daily allowable discharge amount.

図9は、従来のインバランス調整における、デマンド区間ごとの、インバランス調整に使用可能な充電量(使用可能充電量)、および、インバランス調整に使用可能な放電量(使用可能放電量)を示す図である。図9に示すように、従来のインバランス調整においては、デマンド区間ごとに、使用可能充電量および使用可能放電量が割り当てられる。1日の最後のデマンド区間における使用可能充電量は調整用日充電量以下である。また、1日の最後のデマンド区間における使用可能放電量は調整用日放電量以下である。すなわち、従来のインバランス調整では、調整用日充電量を超えない、各デマンド区間に割り当てられた使用可能充電量の範囲内で、インバランス調整により蓄電装置33の充電が制御される。また、従来のインバランス調整では、調整用日放電量を超えない、各デマンド区間に割り当てられた使用可能放電量の範囲内で、インバランス調整により蓄電装置33の充電が制御される。 Figure 9 shows the amount of charge that can be used for imbalance adjustment (usable charge amount) and the amount of discharge that can be used for imbalance adjustment (usable discharge amount) for each demand section in conventional imbalance adjustment. FIG. As shown in FIG. 9, in conventional imbalance adjustment, a usable charge amount and a usable discharge amount are allocated to each demand section. The usable charge amount in the last demand section of the day is less than or equal to the adjustment daily charge amount. Further, the usable discharge amount in the last demand section of the day is less than the adjustment daily discharge amount. That is, in the conventional imbalance adjustment, charging of the power storage device 33 is controlled by imbalance adjustment within the range of the usable charge amount allocated to each demand section, which does not exceed the daily charge amount for adjustment. Furthermore, in the conventional imbalance adjustment, charging of the power storage device 33 is controlled by imbalance adjustment within the range of the usable discharge amount allocated to each demand section, which does not exceed the daily discharge amount for adjustment.

したがって、従来のインバランス調整では、蓄電装置33の充電は、日許容充電量から第1電力制御装置10による充電制御量を引いた調整用日充電量の範囲でしか行うことができない。具体的には、従来のインバランス調整では、図7に示すように、インバランス調整を行う対象デマンド区間の使用可能充電量から、蓄電池充電量の実績値を差し引いた充電量が、対象デマンド区間でインバランス調整に使用可能な充電量(対象デマンド区間用充電量)となる。ここで、蓄電池充電量の実績値は、対象デマンド区間の直前のデマンド区間までのインバランス調整による充電量の合計値である。 Therefore, in the conventional imbalance adjustment, the power storage device 33 can be charged only within the range of the adjustment daily charge amount obtained by subtracting the charge control amount by the first power control device 10 from the daily allowable charge amount. Specifically, in conventional imbalance adjustment, as shown in FIG. 7, the amount of charge obtained by subtracting the actual value of the storage battery charge amount from the amount of available charge in the target demand section for which imbalance adjustment is performed is calculated as the amount of charge in the target demand section. becomes the amount of charge that can be used for imbalance adjustment (the amount of charge for the target demand section). Here, the actual value of the storage battery charge amount is the total value of the charge amount by imbalance adjustment up to the demand section immediately before the target demand section.

また、従来のインバランス調整では、蓄電装置33の放電は、日許容放電量から第1電力制御装置10による放電制御量を引いた調整用日放電量の範囲でしか行うことができない。具体的には、従来のインバランス調整では、図7に示すように、対象デマンド区間の使用可能放電量から、蓄電池放電量の実績値を差し引いた放電量が、対象デマンド区間でインバランス調整に使用可能な放電量(対象デマンド区間用放電量)となる。ここで、蓄電池放電量の実績値は、対象デマンド区間の直前のデマンド区間までのインバランス調整による放電量の合計値である。 Further, in the conventional imbalance adjustment, the power storage device 33 can be discharged only within the adjustment daily discharge amount obtained by subtracting the discharge control amount by the first power control device 10 from the daily allowable discharge amount. Specifically, in conventional imbalance adjustment, as shown in Figure 7, the discharge amount obtained by subtracting the actual value of the storage battery discharge amount from the usable discharge amount in the target demand section is used for imbalance adjustment in the target demand section. This is the usable discharge amount (discharge amount for the target demand section). Here, the actual value of the storage battery discharge amount is the total value of the discharge amount due to imbalance adjustment up to the demand section immediately before the target demand section.

このように、従来のインバランス調整では、蓄電装置33の充放電は、調整用日充電量・調整用日放電量の範囲でしか制御できない。そのため、調達計画と需要実績との誤差によっては、調達計画を達成できないことがある。また、インバランス調整が行われる場合、第1電力制御装置10による蓄電装置33の充放電は行われない。そのため、従来のインバランス調整では、第1電力制御装置10に割り当てられた充電制御量および放電制御量を有効に利用することができなかった。すなわち、上述したように、所定の時間間隔(例えば、1分間隔)で、誤差率と充電閾値・放電閾値との比較が行われ、インバランス調整の要否が判定される。ここで、従来のインバランス調整では、インバランス調整が必要であると判定された場合に、調整用日充電量・調整用日放電量の範囲でしか蓄電装置33の充放電を制御することができなかった。したがって、第1電力制御装置10に割り当てられた充電制御量および放電制御量はインバランス調整には利用されないままとなっていた。 In this manner, in the conventional imbalance adjustment, charging and discharging of the power storage device 33 can only be controlled within the range of the daily adjustment charge amount and the adjustment daily discharge amount. Therefore, depending on the error between the procurement plan and actual demand, the procurement plan may not be achieved. Furthermore, when imbalance adjustment is performed, charging and discharging of power storage device 33 by first power control device 10 is not performed. Therefore, in the conventional imbalance adjustment, it was not possible to effectively utilize the charge control amount and the discharge control amount assigned to the first power control device 10. That is, as described above, the error rate is compared with the charging threshold value and the discharging threshold value at predetermined time intervals (for example, every minute), and it is determined whether imbalance adjustment is necessary. Here, in conventional imbalance adjustment, when it is determined that imbalance adjustment is necessary, charging and discharging of the power storage device 33 can be controlled only within the range of the daily charge amount for adjustment and the daily discharge amount for adjustment. could not. Therefore, the charging control amount and the discharging control amount assigned to the first power control device 10 remained unused for imbalance adjustment.

そこで、本実施形態においては、第2電力制御装置20は、インバランス調整を行う対象デマンド区間に第2電力制御装置20に割り当てられた充放電量と、対象デマンド区間に第1電力制御装置10に割り当てられた充放電量とを合わせた充放電量の範囲で、蓄電装置33の充放電を制御する。 Therefore, in the present embodiment, the second power control device 20 sets the charge/discharge amount allocated to the second power control device 20 in the target demand section for which imbalance adjustment is to be performed, and the charge/discharge amount assigned to the second power control device 10 in the target demand section. The charging and discharging of the power storage device 33 is controlled within the range of the charging and discharging amount that is the sum of the charging and discharging amount assigned to .

より具体的には、図10に示すように、第2電力制御装置20は、対象デマンド区間に第2電力制御装置20に割り当てられた使用可能充電量から、蓄電池充電量の実績値を差し引き、対象デマンド区間に第1電力制御装置10に割り当てられた充電制御量を加えた充電量を、対象デマンド区間用充電量とする。また、第2電力制御装置20は、対象デマンド区間に第2電力制御装置20に割り当てられた使用可能放電量から、蓄電池放電量の実績値を差し引き、対象デマンド区間に第1電力制御装置10に割り当てられた放電制御量を加えた充電量を、対象デマンド区間用充電量とする。 More specifically, as shown in FIG. 10, the second power control device 20 subtracts the actual value of the storage battery charge amount from the usable charge amount allocated to the second power control device 20 in the target demand section, The charging amount obtained by adding the charging control amount assigned to the first power control device 10 to the target demand section is set as the charging amount for the target demand section. Further, the second power control device 20 subtracts the actual value of the storage battery discharge amount from the usable discharge amount allocated to the second power control device 20 in the target demand section, and the The amount of charge added to the allocated discharge control amount is set as the amount of charge for the target demand section.

このように本実施形態においては、第2電力制御装置20は、インバランス調整を行う対象デマンド区間に第2電力制御装置20に割り当てられた充放電量と、対象デマンド区間に第1電力制御装置10に割り当てられた充放電量とを合わせた充放電量の範囲で、蓄電装置33の充放電を制御する。そのため、従来のインバランス調整と比べて、より大きな充放電量の範囲でインバランス調整を行うことができるので、調達計画の達成率の向上を図ることができる。 As described above, in the present embodiment, the second power control device 20 uses the charge/discharge amount assigned to the second power control device 20 in the target demand section for which imbalance adjustment is to be performed, and the first power control device in the target demand section. The charging and discharging of the power storage device 33 is controlled within the range of the charging and discharging amount including the charging and discharging amount assigned to No. 10. Therefore, compared to conventional imbalance adjustment, imbalance adjustment can be performed over a larger range of charging and discharging amounts, so it is possible to improve the achievement rate of the procurement plan.

例えば、所定のデマンド区間における第1電力制御装置10の充放電制御量が100kWであり、第2電力制御装置20のインバランス調整に割り当てられた充放電量が30kWであったとする。そのデマンド区間では、従来のインバランス調整では、第2電力制御装置20は、30kWの範囲でしか、蓄電装置33の充放電を制御することができない。一方、本実施形態においては、第2電力制御装置20は、第1電力制御装置10が利用可能な100kWを加えた、130kWの範囲で、蓄電装置33の充放電を制御することができる。したがって、より柔軟にインバランス調整を行うことができ、調達計画の達成率の向上を図ることができる。 For example, assume that the charge/discharge control amount of the first power control device 10 in a predetermined demand section is 100 kW, and the charge/discharge amount allocated to imbalance adjustment of the second power control device 20 is 30 kW. In the demand section, the second power control device 20 can only control charging and discharging of the power storage device 33 within a range of 30 kW using conventional imbalance adjustment. On the other hand, in the present embodiment, the second power control device 20 can control charging and discharging of the power storage device 33 within a range of 130 kW, which is the 100 kW that can be used by the first power control device 10. Therefore, the imbalance can be adjusted more flexibly, and the achievement rate of the procurement plan can be improved.

図11は、電力制御システム1の動作の一例を示すフローチャートであり、第2電力制御装置20における電力制御方法について説明するための図である。図11においては、機器30として電力メータ32および蓄電装置33を示しているが、上述したように、機器30には太陽電池31などが含まれてよい。 FIG. 11 is a flowchart showing an example of the operation of the power control system 1, and is a diagram for explaining the power control method in the second power control device 20. Although FIG. 11 shows the power meter 32 and the power storage device 33 as the device 30, the device 30 may include the solar cell 31 and the like, as described above.

第1電力制御装置10は、調達計画に従い蓄電装置33の充放電を制御する制御指示を第2電力制御装置20に送信する(ステップS101)。 The first power control device 10 transmits a control instruction to control charging and discharging of the power storage device 33 according to the procurement plan to the second power control device 20 (step S101).

第2電力制御装置20は、第1電力制御装置10から制御指示を受信すると、受信した制御指示を蓄電装置33に転送する(ステップS102)。 Upon receiving the control instruction from the first power control device 10, the second power control device 20 transfers the received control instruction to the power storage device 33 (step S102).

蓄電装置33は、第2電力制御装置20から制御指示を受信すると、制御指示に対する受信応答を第2電力制御装置20に送信する(ステップS103)。 Upon receiving the control instruction from the second power control device 20, the power storage device 33 transmits a reception response to the control instruction to the second power control device 20 (step S103).

第2電力制御装置20は、蓄電装置33から制御指示に対する受信応答を受信すると、受信応答を第1電力制御装置10に転送する(ステップS104)。 Upon receiving the reception response to the control instruction from the power storage device 33, the second power control device 20 transfers the reception response to the first power control device 10 (step S104).

電力メータ32および蓄電装置33はそれぞれ、所定時間(例えば、1分)間隔で、電力需要の実績データを第2電力制御装置20に送信する(ステップS105,S106)。 The power meter 32 and the power storage device 33 each transmit power demand performance data to the second power control device 20 at predetermined time intervals (for example, 1 minute) (steps S105, S106).

第2電力制御装置20は、所定の時間間隔(例えば、1分間隔)で、調達計画と、各機器30から受信した実績データに示される電力需要の実績値との誤差に基づき、インバランス調整の要否を判定する(ステップS107)。 The second power control device 20 performs imbalance adjustment at predetermined time intervals (for example, every minute) based on the error between the procurement plan and the actual power demand value indicated in the actual data received from each device 30. It is determined whether or not it is necessary (step S107).

第2電力制御装置20は、インバランス調整が必要であると判定すると、蓄電装置33の充放電を制御する制御指示を蓄電装置33に送信する(ステップS108)。ここで、第2電力制御装置20は、インバランス調整を行う対象デマンド区間に第2電力制御装置20に割り当てられた充放電量と、対象デマンド区間に第1電力制御装置10に割り当てられた充放電量とを合わせた充放電量の範囲で、蓄電装置33の充放電を制御する。 When determining that imbalance adjustment is necessary, second power control device 20 transmits a control instruction to control charging and discharging of power storage device 33 to power storage device 33 (step S108). Here, the second power control device 20 determines the charge/discharge amount allocated to the second power control device 20 in the target demand section for performing imbalance adjustment, and the charge/discharge amount allocated to the first power control device 10 in the target demand section. The charging and discharging of the power storage device 33 is controlled within the range of the charging and discharging amount including the discharging amount.

蓄電装置33は、第2電力制御装置20から制御指示を受信すると、制御指示に対する受信応答を第2電力制御装置20に送信する(ステップS109)。これにより、蓄電装置33の充放電が、第1電力制御装置10による制御から、第2電力制御装置20による制御に切り替わる。 Upon receiving the control instruction from the second power control device 20, the power storage device 33 transmits a reception response to the control instruction to the second power control device 20 (step S109). Thereby, charging and discharging of the power storage device 33 is switched from control by the first power control device 10 to control by the second power control device 20.

このように、本実施形態に係る第2電力制御装置20における電力制御方法は、第1電力制御装置10により立案された調達計画と、所定のエリアにおける電力需要の実績値との誤差に基づき、インバランス調整を行うか否かを判定する判定ステップ(ステップS107)を含む。さらに、本実施形態に係る電力制御方法は、インバランス調整を行うと判定した場合、蓄電装置33の充放電を制御する制御ステップ(ステップS108)を含む。制御ステップでは、インバランス調整を行う場合、所定期間に第2電力制御装置20に割り当てられた充放電量と、所定期間に第1電力制御装置10に割り当てられた充放電量とを合わせた充放電量の範囲で、蓄電装置33の充放電量を制御する。 As described above, the power control method in the second power control device 20 according to the present embodiment is based on the error between the procurement plan drawn up by the first power control device 10 and the actual value of power demand in a predetermined area. It includes a determination step (step S107) of determining whether or not to perform imbalance adjustment. Further, the power control method according to the present embodiment includes a control step (step S108) of controlling charging and discharging of the power storage device 33 when it is determined that imbalance adjustment is to be performed. In the control step, when performing imbalance adjustment, the charge and discharge amount that is the sum of the charge and discharge amount allocated to the second power control device 20 for a predetermined period and the charge and discharge amount allocated to the first power control device 10 for a predetermined period is determined. The amount of charge and discharge of the power storage device 33 is controlled within the range of the amount of discharge.

図1に示すような電力制御システム1においては、上述したように、インバランスを発生させず、調達計画を達成することが求められる。一方で、図1に示すような電力制御システム1においては、所定のエリアにおける電力需要のピークに応じた電力料金が課される。そのため、電力需要のピークをカットあるいはシフトすることが、電力料金のコスト増を防ぐために必要となる。これらの課題を個別の対策により解決しようとすると、各課題に対する対策が相反する場合がある。以下では、電力需要のピークによる電力料金のコスト増およびシフトのインバランスの発生を防ぐための電力制御システム1の動作について、図12に示すシーケンス図を参照して説明する。 In the power control system 1 as shown in FIG. 1, as described above, it is required to achieve the procurement plan without causing an imbalance. On the other hand, in the power control system 1 as shown in FIG. 1, a power rate is imposed according to the peak of power demand in a predetermined area. Therefore, it is necessary to cut or shift peak power demand in order to prevent increases in power rates. If we try to solve these problems using individual measures, the measures for each problem may conflict with each other. Below, the operation of the power control system 1 for preventing an increase in the cost of power charges and occurrence of shift imbalance due to peak power demand will be described with reference to the sequence diagram shown in FIG. 12.

第1電力制御装置10は、需要予測および発電予測に応じた調達計画を立案する(ステップS201)。 The first power control device 10 creates a procurement plan according to the demand forecast and the power generation forecast (step S201).

第1電力制御装置10は、調達計画に基づき、電力需要に所定値以上のピークが発生するか否かを判定する(ステップS202)。 The first power control device 10 determines whether a peak of a predetermined value or more occurs in power demand based on the procurement plan (step S202).

電力需要にピークが発生すると判定した場合(ステップS202:Yes)、第1電力制御装置10は、ピークカットが必要であると判定し、ピークカットを行うために蓄電装置33の充放電を制御するピークカット動作指示を立案する(ステップS203)。 If it is determined that a peak occurs in the power demand (step S202: Yes), the first power control device 10 determines that a peak cut is necessary, and controls charging and discharging of the power storage device 33 in order to perform the peak cut. A peak cut operation instruction is formulated (step S203).

電力需要にピークが発生しないと判定した場合(ステップS202:No)、および、ピークカット動作指示を立案した後、第1電力制御装置10は、電力の購入料金が所定値より高いか否かを判定する(ステップS204)。 If it is determined that a peak does not occur in the power demand (step S202: No), and after formulating a peak cut operation instruction, the first power control device 10 determines whether the power purchase fee is higher than a predetermined value. Determination is made (step S204).

電力の購入料金が高いと判定した場合(ステップS204:Yes)、第1電力制御装置10は、ピークシフトが必要であると判定し、ピークシフトを行うために蓄電装置33の充放電を制御するピークシフト動作指示を立案する(ステップS205)。 If it is determined that the electricity purchase fee is high (step S204: Yes), the first power control device 10 determines that a peak shift is necessary, and controls charging and discharging of the power storage device 33 in order to perform the peak shift. A peak shift operation instruction is formulated (step S205).

電力料金が所定値より高くないと判定した場合(ステップS204:No)、および、ピークシフト動作指示を立案した後、第1電力制御装置10は、ピークカットおよびピークシフトの両方が必要であるか否かを判定する(ステップS206)。 If it is determined that the power rate is not higher than the predetermined value (step S204: No), and after formulating the peak shift operation instruction, the first power control device 10 determines whether both peak cut and peak shift are necessary. It is determined whether or not (step S206).

ピークカットおよびピークシフトの両方が必要であると判定した場合(ステップS206:Yes)、第1電力制御装置10は、ピークカット動作指示を実施することによる経済的効果と、ピークシフト動作指示を実施することによる経済的効果とを試算する。第1電力制御装置10は、経済的効果が優れている動作指示を実施すると決定する(ステップS207)。 If it is determined that both a peak cut and a peak shift are necessary (step S206: Yes), the first power control device 10 determines the economic effect of implementing the peak cut operation instruction and the implementation of the peak shift operation instruction. Estimate the economic effects of doing so. The first power control device 10 determines to implement the operation instruction that is economically effective (step S207).

ピークカットおよびピークシフトの少なくとも一方が必要でないと判定した場合(ステップS206:No)、第1電力制御装置10は、立案している動作指示を実施すると決定する。 If it is determined that at least one of the peak cut and the peak shift is not necessary (step S206: No), the first power control device 10 determines to implement the planned operation instruction.

第1電力制御装置10は、実施すると決定した動作指示に対応する制御指示を第2電力制御装置20に送信する(ステップS208)。この制御指示は、ピークカットあるいはピークシフトを行うために蓄電装置33の充放電を制御するものである。また、第1電力制御装置10は、調達計画、需要予測、発電予測および予測誤差情報を第2電力制御装置20に送信する。 The first power control device 10 transmits a control instruction corresponding to the operation instruction determined to be executed to the second power control device 20 (step S208). This control instruction is for controlling charging and discharging of power storage device 33 in order to perform peak cutting or peak shifting. Further, the first power control device 10 transmits the procurement plan, demand forecast, power generation forecast, and prediction error information to the second power control device 20.

第2電力制御装置20は、第1電力制御装置10から制御指示を受信すると、受信した制御指示を蓄電装置33に転送する(ステップS209)。これにより、制御指示に従って、蓄電装置33の充放電が制御され、ピークカットあるいはピークシフトが行われる。 Upon receiving the control instruction from the first power control device 10, the second power control device 20 transfers the received control instruction to the power storage device 33 (step S209). Thereby, charging and discharging of power storage device 33 is controlled according to the control instruction, and peak cutting or peak shifting is performed.

電力メータ32および蓄電装置33はそれぞれ、所定の時間(例えば、1分)間隔で、電力需要の実績データを第2電力制御装置20に送信する(ステップS210,S211)。 The power meter 32 and the power storage device 33 each transmit power demand performance data to the second power control device 20 at predetermined time intervals (for example, 1 minute) (steps S210, S211).

第2電力制御装置20は、調達計画と、各機器30から受信した実績データとに基づき、インバランス調整の要否を判定する(ステップS212)。 The second power control device 20 determines whether imbalance adjustment is necessary based on the procurement plan and the performance data received from each device 30 (step S212).

第2電力制御装置20は、インバランス調整が必要であると判定すると、蓄電装置33の充放電を制御する制御指示を蓄電装置33に送信する(ステップS213)。この制御指示は、インバランス調整を行うために蓄電装置33の充放電を制御するものである。 When determining that imbalance adjustment is necessary, second power control device 20 transmits a control instruction to control charging and discharging of power storage device 33 to power storage device 33 (step S213). This control instruction is for controlling charging and discharging of power storage device 33 in order to perform imbalance adjustment.

図12においては、第1電力制御装置10によるピークカットまたはピークシフトのための蓄電装置33の充放電制御が行われた後に、第2電力制御装置20によるインバランス調整のための蓄電装置33の充放電制御が行われる。そのため、電力需要のピークによる電力料金のコスト増およびインバランスの発生を防ぐことができる。 In FIG. 12, after the first power control device 10 performs charging and discharging control of the power storage device 33 for peak cut or peak shift, the second power control device 20 controls the power storage device 33 for imbalance adjustment. Charge/discharge control is performed. Therefore, it is possible to prevent an increase in power charges and an imbalance due to peak power demand.

このように本実施形態においては、電力制御システム1は、所定のエリア内の蓄電装置33と、第1電力制御装置10と、第2電力制御装置20とを備える。第1電力制御装置10は、所定のエリアにおける電力の調達計画に従い、所定期間単位で、蓄電装置33の充放電を制御する。第2電力制御装置20は、調達計画と、所定のエリアにおける電力需要の実績値との誤差に基づき、インバランス調整を行うか否かを判定し、インバランス調整を行うと判定した場合、蓄電装置33の充放電を制御する。第1電力制御装置10および第2電力制御装置20はそれぞれ、所定期間単位で、蓄電装置33に充放電可能な充放電量が割り当てられる。第2電力制御装置20は、インバランス調整を行う場合、所定期間に第2電力制御装置20に割り当てられた充放電量と、所定期間に第1電力制御装置10に割り当てられた充放電量とを合わせた充放電量の範囲で、蓄電装置33の充放電を制御する。 As described above, in the present embodiment, the power control system 1 includes the power storage device 33 within a predetermined area, the first power control device 10, and the second power control device 20. The first power control device 10 controls charging and discharging of the power storage device 33 in units of a predetermined period according to a power procurement plan in a predetermined area. The second power control device 20 determines whether or not to perform imbalance adjustment based on the error between the procurement plan and the actual value of power demand in a predetermined area, and if it is determined to perform imbalance adjustment, the power storage Controls charging and discharging of the device 33. The first power control device 10 and the second power control device 20 are each assigned a charge/discharge amount that can be charged/discharged to the power storage device 33 in units of a predetermined period. When performing imbalance adjustment, the second power control device 20 compares the charge and discharge amount allocated to the second power control device 20 in a predetermined period and the charge and discharge amount allocated to the first power control device 10 in a predetermined period. The charging and discharging of the power storage device 33 is controlled within the range of the total amount of charging and discharging.

そのため、より大きな充放電量の範囲でインバランス調整を行うことができるので、調達計画の達成率の向上を図ることができる。 Therefore, the imbalance can be adjusted within a larger range of charge/discharge amounts, and the achievement rate of the procurement plan can be improved.

上述の実施形態は代表的な例として説明したが、本開示の趣旨および範囲内で、多くの変更および置換が可能であることは当業者に明らかである。したがって、本開示は、上述の実施形態によって制限するものと解するべきではなく、特許請求の範囲から逸脱することなく、種々の変形および変更が可能である。例えば、実施形態の構成図に記載の複数の構成ブロックを1つに組み合わせたり、あるいは1つの構成ブロックを分割したりすることが可能である。 Although the embodiments described above have been described as representative examples, it will be apparent to those skilled in the art that many modifications and substitutions can be made within the spirit and scope of this disclosure. Therefore, the present disclosure should not be construed as being limited by the embodiments described above, and various modifications and changes are possible without departing from the scope of the claims. For example, it is possible to combine a plurality of configuration blocks described in the configuration diagram of the embodiment into one, or to divide one configuration block.

上述した実施形態は、電力制御システム1、第1電力制御装置10および第2電力制御装置20としての実施のみに限定されない。例えば、上述した実施形態は、第2電力制御装置20のような電力制御装置における電力制御方法として実施してよい。また、上述した実施形態は、第2電力制御装置20のようなコンピュータにおいて実行されるプログラムとして実施してよい。 The embodiments described above are not limited to implementation as the power control system 1, the first power control device 10, and the second power control device 20. For example, the embodiment described above may be implemented as a power control method in a power control device such as the second power control device 20. Further, the embodiments described above may be implemented as a program executed on a computer such as the second power control device 20.

2015年9月の国連サミットにおいて採択された17の国際目標として、「持続可能な開発目標(Sustainable Development Goals:SDGs)」がある。一実施形態に係る電力制御システム1は、このSDGsの17の目標のうち、例えば「7.エネルギーをみんなに そしてクリーンに」、「9.産業と技術革新の基盤をつくろう」、および「11.「住み続けられるまちづくりを」の目標などの達成に貢献し得る。 The Sustainable Development Goals (SDGs) are among the 17 international goals adopted at the United Nations Summit in September 2015. The power control system 1 according to one embodiment is designed to meet the goals of 17 goals of the SDGs, such as "7. Affordable and clean energy," "9. Create a foundation for industry and technological innovation," and "11. It can contribute to achieving goals such as ``creating cities where people can continue to live''.

1 電力制御システム
10 第1電力制御装置(他の電力制御装置)
11 記憶部
12 通信部
13 制御部
20 第2電力制御装置(電力制御装置)
21 記憶部
22 通信部
23 通信部
24 制御部
30 機器
31 太陽電池
32 電力メータ
33 蓄電装置
40 ゲートウェイ
1 Power control system 10 First power control device (other power control device)
11 Storage unit 12 Communication unit 13 Control unit 20 Second power control device (power control device)
21 Storage unit 22 Communication unit 23 Communication unit 24 Control unit 30 Equipment 31 Solar cell 32 Power meter 33 Power storage device 40 Gateway

Claims (6)

所定のエリア内の蓄電装置と、
前記所定のエリアにおける電力の調達計画に従い、所定期間単位で、前記蓄電装置の充放電を制御する第1電力制御装置と、
前記調達計画と、前記所定のエリアにおける電力需要の実績値との誤差に基づき、前記所定期間において前記所定のエリアにおける電力需要を調整するインバランス調整を行うか否かを判定し、前記インバランス調整を行うと判定した場合、前記蓄電装置の充放電を制御する第2電力制御装置とを備え、
前記第1電力制御装置および前記第2電力制御装置はそれぞれ、前記所定期間単位で、前記蓄電装置に充放電可能な充放電量が割り当てられ、
前記第1電力制御装置は、割り当てられた充放電可能な充放電量内で所定のエリアにおける電力需要のピークカットあるいはピークシフトを行うか否かを判定し、前記判定に基づく制御指示を前記第2電力制御装置に送信し、
前記第2電力制御装置は、前記インバランス調整を行う場合、前記所定期間に前記第2電力制御装置に割り当てられた充放電量と、前記所定期間に前記第1電力制御装置に割り当てられた充放電量とを合わせた充放電量の範囲で、前記蓄電装置の充放電を制御する、電力制御システム。
A power storage device within a predetermined area,
a first power control device that controls charging and discharging of the power storage device in units of a predetermined period according to a power procurement plan in the predetermined area;
Based on the error between the procurement plan and the actual value of power demand in the predetermined area, it is determined whether or not to perform an imbalance adjustment to adjust the power demand in the predetermined area in the predetermined period, and the imbalance is adjusted. a second power control device that controls charging and discharging of the power storage device when it is determined that the adjustment is to be performed;
The first power control device and the second power control device are each assigned a charge/discharge amount that can be charged/discharged to the power storage device in units of the predetermined period,
The first power control device determines whether or not to perform a peak cut or peak shift of power demand in a predetermined area within the allocated chargeable/dischargeable amount, and issues a control instruction based on the determination to the first power control device. 2 to the power control device;
When performing the imbalance adjustment, the second power control device compares the amount of charging and discharging allocated to the second power control device during the predetermined period and the amount of charging and discharging allocated to the first power control device during the predetermined period. A power control system that controls charging and discharging of the power storage device within a range of a charge and discharge amount including a discharge amount.
前記第2電力制御装置は、前記第1電力制御装置から送信されてきた蓄電装置へのピークシフト・ピークカットを含む電力調達計画に基づく前記制御指示を受信し、前記制御指示と、インバランス調整を行う制御指示とを、蓄電装置に送信する、請求項1に記載の電力制御システム。 The second power control device receives the control instruction based on the power procurement plan including peak shift and peak cut for the power storage device transmitted from the first power control device, and performs imbalance adjustment in accordance with the control instruction. The power control system according to claim 1, wherein the power control system transmits a control instruction to perform the following to the power storage device. 前記第2電力制御装置は、前記第1電力制御装置から送信されてきた蓄電装置へのピークシフト・ピークカットを含む電力調達計画に基づく前記制御指示と、前記インバランス調整を行う制御指示に従い、蓄電装置の充放電を制御する、請求項に記載の電力制御システム。 The second power control device follows the control instruction transmitted from the first power control device based on the power procurement plan including peak shift/peak cut to the power storage device and the control instruction to perform the imbalance adjustment, The power control system according to claim 1 , which controls charging and discharging of a power storage device. 電力制御装置であって、
所定のエリアにおける電力の調達計画を立案し、該立案した調達計画に従い、所定期間単位で、前記所定のエリア内の蓄電装置の充放電を制御する、他の電力制御装置により立案された調達計画と、前記所定のエリアにおける電力需要の実績値との誤差に基づき、前記所定期間において前記所定のエリアにおける電力需要を調整するインバランス調整を行うか否かを判定し、前記インバランス調整を行うと判定した場合、前記蓄電装置の充放電を制御する制御部を備え、
前記電力制御装置および前記他の電力制御装置はそれぞれ、前記所定期間単位で、前記蓄電装置に充放電可能な充放電量が割り当てられ、
前記他の電力制御装置は、割り当てられた充放電可能な充放電量内で所定のエリアにおける電力需要のピークカットあるいはピークシフトを行うか否かを判定し、前記判定に基づく制御指示を前記電力制御装置に送信し、
前記制御部は、前記インバランス調整を行う場合、前記所定期間に前記電力制御装置に割り当てられた充放電量と、前記所定期間に前記他の電力制御装置に割り当てられた充放電量とを合わせた充放電量の範囲で、前記蓄電装置の充放電量を制御する、電力制御装置。
A power control device,
A procurement plan drawn up by another power control device that draws up a power procurement plan in a predetermined area, and controls charging and discharging of power storage devices in the predetermined area in accordance with the drawn up procurement plan in units of a predetermined period. and the actual value of power demand in the predetermined area, determine whether or not to perform an imbalance adjustment to adjust the power demand in the predetermined area in the predetermined period, and perform the imbalance adjustment. If it is determined that the power storage device is
The power control device and the other power control device are each assigned a charge/discharge amount that can be charged/discharged to the power storage device in units of the predetermined period,
The other power control device determines whether to perform a peak cut or peak shift of power demand in a predetermined area within the allocated chargeable/dischargeable amount, and issues a control instruction based on the determination to the power send to the control device ,
When performing the imbalance adjustment, the control unit combines the charge and discharge amount allocated to the power control device during the predetermined period with the charge and discharge amount allocated to the other power control device during the predetermined period. A power control device that controls a charge/discharge amount of the power storage device within a range of a charge/discharge amount.
電力制御装置における電力制御方法であって、
所定のエリアにおける電力の調達計画を立案し、該立案した調達計画に従い、所定期間単位で、前記所定のエリア内の蓄電装置の充放電を制御する、他の電力制御装置により立案された調達計画と、前記所定のエリアにおける電力需要の実績値との誤差に基づき、前記所定期間において前記所定のエリアにおける電力需要を調整するインバランス調整を行うか否かを判定する判定ステップと、
前記インバランス調整を行うと判定した場合、前記蓄電装置の充放電を制御する制御ステップと、を含み、
前記電力制御装置および前記他の電力制御装置はそれぞれ、前記所定期間単位で、前記蓄電装置に充放電可能な充放電量が割り当てられ、
前記他の電力制御装置は、割り当てられた充放電可能な充放電量内で所定のエリアにおける電力需要のピークカットあるいはピークシフトを行うか否かを判定し、前記判定に基づく制御指示を前記電力制御装置に送信し、
前記制御ステップでは、前記インバランス調整を行う場合、前記所定期間に前記電力制御装置に割り当てられた充放電量と、前記所定期間に前記他の電力制御装置に割り当てられた充放電量とを合わせた充放電量の範囲で、前記蓄電装置の充放電量を制御する、電力制御方法。
A power control method in a power control device, comprising:
A procurement plan drawn up by another power control device that draws up a power procurement plan in a predetermined area, and controls charging and discharging of power storage devices in the predetermined area in accordance with the drawn up procurement plan in units of a predetermined period. and a determination step of determining whether or not to perform an imbalance adjustment to adjust the power demand in the predetermined area in the predetermined period based on the error between the power demand and the actual value of the power demand in the predetermined area;
If it is determined that the imbalance adjustment is to be performed, a control step of controlling charging and discharging of the power storage device,
The power control device and the other power control device are each assigned a charge/discharge amount that can be charged/discharged to the power storage device in units of the predetermined period,
The other power control device determines whether to perform a peak cut or peak shift of power demand in a predetermined area within the allocated chargeable/dischargeable amount, and issues a control instruction based on the determination to the power send to the control device ,
In the control step, when performing the imbalance adjustment, the amount of charging and discharging allocated to the power control device during the predetermined period is combined with the amount of charging and discharging allocated to the other power control device during the predetermined period. A power control method for controlling the amount of charging and discharging of the power storage device within a range of the amount of charging and discharging.
電力制御装置のコンピュータに、
所定のエリアにおける電力の調達計画を立案し、該立案した調達計画に従い、所定期間単位で、前記所定のエリア内の蓄電装置の充放電を制御する、他の電力制御装置により立案された調達計画と、前記所定のエリアにおける電力需要の実績値との誤差に基づき、前記所定期間において前記所定のエリアにおける電力需要を調整するインバランス調整を行うか否かを判定する判定処理と、
前記インバランス調整を行うと判定した場合、前記蓄電装置の充放電を制御する制御処理と、を実行させ、
前記電力制御装置および前記他の電力制御装置はそれぞれ、前記所定期間単位で、前記蓄電装置に充放電可能な充放電量が割り当てられ、
前記他の電力制御装置は、割り当てられた充放電可能な充放電量内で所定のエリアにおける電力需要のピークカットあるいはピークシフトを行うか否かを判定し、前記判定に基づく制御指示を前記電力制御装置に送信し、
前記制御処理では、前記インバランス調整を行う場合、前記所定期間に前記電力制御装置に割り当てられた充放電量と、前記所定期間に前記他の電力制御装置に割り当てられた充放電量とを合わせた充放電量の範囲で、前記蓄電装置の充放電量を制御させる、プログラム。
In the power control device computer,
A procurement plan drawn up by another power control device that draws up a power procurement plan in a predetermined area, and controls charging and discharging of power storage devices in the predetermined area in accordance with the drawn up procurement plan in units of a predetermined period. and a determination process of determining whether to perform an imbalance adjustment to adjust the power demand in the predetermined area in the predetermined period based on the error between the actual value of the power demand in the predetermined area and the power demand in the predetermined area.
If it is determined that the imbalance adjustment is to be performed, a control process for controlling charging and discharging of the power storage device is executed;
The power control device and the other power control device are each assigned a charge/discharge amount that can be charged/discharged to the power storage device in units of the predetermined period,
The other power control device determines whether to perform a peak cut or peak shift of power demand in a predetermined area within the allocated chargeable/dischargeable amount, and issues a control instruction based on the determination to the power send to the control device ,
In the control process, when performing the imbalance adjustment, the amount of charging and discharging allocated to the power control device during the predetermined period is combined with the amount of charging and discharging allocated to the other power control device during the predetermined period. A program that controls the amount of charging and discharging of the power storage device within the range of the amount of charging and discharging.
JP2019205744A 2019-11-13 2019-11-13 Power control system, power control device, power control method and program Active JP7444584B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2019205744A JP7444584B2 (en) 2019-11-13 2019-11-13 Power control system, power control device, power control method and program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2019205744A JP7444584B2 (en) 2019-11-13 2019-11-13 Power control system, power control device, power control method and program

Publications (2)

Publication Number Publication Date
JP2021078327A JP2021078327A (en) 2021-05-20
JP7444584B2 true JP7444584B2 (en) 2024-03-06

Family

ID=75899693

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2019205744A Active JP7444584B2 (en) 2019-11-13 2019-11-13 Power control system, power control device, power control method and program

Country Status (1)

Country Link
JP (1) JP7444584B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7254737B2 (en) * 2020-02-26 2023-04-10 京セラ株式会社 POWER CONTROL DEVICE, POWER CONTROL SYSTEM, POWER CONTROL METHOD, AND PROGRAM

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012060321A1 (en) 2010-11-02 2012-05-10 三洋電機株式会社 Control apparatus
WO2017203664A1 (en) 2016-05-26 2017-11-30 日本電気株式会社 Control device, storage battery control device, control system, battery unit control device, control method, storage battery control method, battery unit control device operating method, and program
JP2018129939A (en) 2017-02-08 2018-08-16 株式会社東芝 Power management device
JP2019161939A (en) 2018-03-15 2019-09-19 シャープ株式会社 Power control device and power control method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012060321A1 (en) 2010-11-02 2012-05-10 三洋電機株式会社 Control apparatus
WO2017203664A1 (en) 2016-05-26 2017-11-30 日本電気株式会社 Control device, storage battery control device, control system, battery unit control device, control method, storage battery control method, battery unit control device operating method, and program
JP2018129939A (en) 2017-02-08 2018-08-16 株式会社東芝 Power management device
JP2019161939A (en) 2018-03-15 2019-09-19 シャープ株式会社 Power control device and power control method

Also Published As

Publication number Publication date
JP2021078327A (en) 2021-05-20

Similar Documents

Publication Publication Date Title
JP7254737B2 (en) POWER CONTROL DEVICE, POWER CONTROL SYSTEM, POWER CONTROL METHOD, AND PROGRAM
TWI781453B (en) Energy dispatch system, apparatus, and method
JP2014176087A (en) Base station using renewable energy, adjustment method of coverage area, and cellular radio system
CN114946097A (en) Power grid frequency stabilization using infrastructure of communication network
JP7660488B2 (en) Power control systems and power control equipment
CN111144640A (en) Energy storage station optimal configuration method and terminal equipment
CN117674237A (en) Energy storage peak regulation control method and system for power grid interconnection system considering energy storage action
JP2015126554A (en) Power management system, power management device, power management method, and program
JP7007202B2 (en) Power management system and power management method
JP7444584B2 (en) Power control system, power control device, power control method and program
CN104272548B (en) Power management device, power management system, and power management method
US12431712B2 (en) Systems and methods for control of distributed energy resources
JP7215986B2 (en) POWER CONTROL SYSTEM, POWER CONTROL DEVICE, POWER CONTROL METHOD AND PROGRAM
JP6813409B2 (en) Power management device, power management method, power management program
JP6210419B2 (en) Power control method and power control apparatus
CN112803400A (en) Energy consumption regulation and control method for 5G base station
US12525814B2 (en) Control device, power management system, and control method
JP7328803B2 (en) Power management system and power management method
JP2014236561A (en) Secondary battery system, control method thereof, and power generation system
CN111555316A (en) Distributed cloud energy storage scheduling control method capable of participating in power grid auxiliary service
JP2013162560A (en) Demand and supply adjusting system
JP7047224B2 (en) Centralized management device
JP7608548B2 (en) Power control system, device, control method and program
JP2020089231A (en) Power management system and power management method
JP2020089225A (en) Power management system and power management method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20220311

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20230516

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20230718

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20231024

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20231204

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20240123

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20240222

R150 Certificate of patent or registration of utility model

Ref document number: 7444584

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150