Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7449540B2 - How to install plate members for joint formation - Google Patents
[go: Go Back, main page]

JP7449540B2 - How to install plate members for joint formation - Google Patents

How to install plate members for joint formation Download PDF

Info

Publication number
JP7449540B2
JP7449540B2 JP2021050557A JP2021050557A JP7449540B2 JP 7449540 B2 JP7449540 B2 JP 7449540B2 JP 2021050557 A JP2021050557 A JP 2021050557A JP 2021050557 A JP2021050557 A JP 2021050557A JP 7449540 B2 JP7449540 B2 JP 7449540B2
Authority
JP
Japan
Prior art keywords
joint forming
formwork
forming plate
tunnel
plate member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021050557A
Other languages
Japanese (ja)
Other versions
JP2022148752A (en
Inventor
隆弘 齋藤
元 浜田
緑 目黒
豊也 横山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Okumura Corp
Original Assignee
Okumura Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Okumura Corp filed Critical Okumura Corp
Priority to JP2021050557A priority Critical patent/JP7449540B2/en
Publication of JP2022148752A publication Critical patent/JP2022148752A/en
Application granted granted Critical
Publication of JP7449540B2 publication Critical patent/JP7449540B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

本発明は、目地部形成用プレート部材の設置方法に関し、特に、トンネル覆工コンクリートに誘発目地を形成するための目地部形成用プレート部材を、コンクリートが硬化した後に引抜き可能な状態で設置するための目地部形成用プレート部材の設置方法に関する。 The present invention relates to a method for installing a joint forming plate member, and particularly to a method for installing a joint forming plate member for forming induced joints in tunnel lining concrete in a state where it can be pulled out after the concrete has hardened. The present invention relates to a method for installing a plate member for forming joint portions.

例えば山岳トンネル工法等のトンネル工法において、掘削したトンネルの内周面の地山を覆って構築されるトンネル覆工コンクリートを形成するための方法として、セントルと呼ばれるトンネル覆工用型枠を用いる工法が一般的に採用されている(例えば、特許文献1、特許文献2参照)。トンネル覆工用型枠50は、例えば図9に示すように、馬蹄形等のアーチ形状部分52を含む形状のトンネル53の内周面に沿って、トンネル53の側壁部55から上部に亘って設置されるものであり、設置されたトンネル覆工用型枠50と、トンネル53の内周面の吹き付けコンクリート54によって覆われる地山との間の覆工空間61に、好ましくは無筋コンクリートを打設して硬化させることにより、トンネル底部のインバート部51のコンクリートと連続させるようにして、トンネル覆工コンクリートが形成されることになる。 For example, in tunnel construction methods such as the mountain tunnel construction method, a method that uses a tunnel lining formwork called a center is used as a method for forming tunnel lining concrete that is constructed to cover the ground on the inner circumferential surface of an excavated tunnel. is generally adopted (for example, see Patent Document 1 and Patent Document 2). For example, as shown in FIG. 9, the tunnel lining formwork 50 is installed along the inner peripheral surface of the tunnel 53, which has a shape that includes an arch-shaped portion 52 such as a horseshoe shape, and extends from the side wall portion 55 of the tunnel 53 to the upper portion. The lining space 61 between the installed tunnel lining formwork 50 and the ground covered with the shotcrete 54 on the inner peripheral surface of the tunnel 53 is preferably filled with unreinforced concrete. By setting and curing the concrete, tunnel lining concrete is formed so as to be continuous with the concrete of the invert section 51 at the bottom of the tunnel.

また、トンネル覆工用型枠50として、例えばバラセントルと呼ばれる組立式のトンネル覆工用型枠の他、スライドセントルと呼ばれる移動式のトンネル覆工用型枠が知られており、トンネル53の掘削作業の進行に伴って、例えば10.5m程度の所定の施工スパン毎にトンネル覆工用型枠50を据え付け直しながら、トンネル53の掘進方向の後方から前方に向かって、トンネル覆工用型枠50を用いてトンネル53の側部及び上部の覆工コンクリートを順次打設して形成して行くことになる。 Further, as the formwork 50 for tunnel lining, for example, in addition to an assembled formwork for tunnel lining called a rose center, a movable formwork for tunnel lining called a slide center is known. As the work progresses, the tunnel lining formwork 50 is reinstalled every predetermined construction span of about 10.5 m, for example, and the tunnel lining formwork 50 is reinstalled from the rear to the front in the excavation direction of the tunnel 53. 50 will be used to sequentially cast and form the lining concrete for the side and upper portions of the tunnel 53.

そして、トンネル覆工用型枠50を用いてトンネルの側部及び上部の覆工コンクリートを打設するには、例えば図10(a)~(d)に示すように、設置したトンネル覆工用型枠50に設けられた検査窓56からコンクリートを打設可能な高さ領域として、例えばトンネル53の側壁部55からアーチ形状部分52の肩部までの領域に対しては、検査窓56を介してコンクリート57を供給すると共に、バイブレータ58を検査窓56から挿入し、供給されたコンクリート57を締固めながらコンクリート57を打設する(図10(a)~(c)参照)。しかる後に、検査窓56からコンクリート57を供給しながらバイブレータ58によって締固めることが困難な高さ領域として、トンネル53の冠部(クラウン部)59(図9参照)の領域に対しては、トンネル覆工用型枠50の天端部に設けた吹き上げ投入口60から、コンクリート57を吹き上げ方式で圧入して打ち込み、冠部59のコンクリート57を形成するパターンが採用されている(図10(d)参照)。 In order to use the tunnel lining formwork 50 to cast lining concrete for the sides and top of the tunnel, for example, as shown in FIGS. 10(a) to 10(d), As a height area in which concrete can be cast through the inspection window 56 provided in the formwork 50, for example, the area from the side wall 55 of the tunnel 53 to the shoulder of the arch-shaped portion 52 is placed through the inspection window 56. At the same time, a vibrator 58 is inserted through the inspection window 56, and the concrete 57 is poured while compacting the supplied concrete 57 (see FIGS. 10(a) to 10(c)). After that, while supplying concrete 57 through the inspection window 56, a tunnel A pattern is adopted in which concrete 57 is press-fitted and poured in a blow-up method from a blow-up inlet 60 provided at the top of the lining formwork 50 to form the concrete 57 of the crown portion 59 (Fig. 10(d) )reference).

より具体的には、所定位置にトンネル覆工用型枠50を設置した後に、例えば側壁部55の下部より、下段の検査窓56を介してコンクリート57を流し込みながらバイブレータ58を用いて締固める工程(図10(a)参照)と、さらに側壁部55の上部のアーチ形状部分52に向かって、中段の検査窓56を介してコンクリート57を流し込みながらバイブレータ58を用いて締固める工程(図10(b)参照)と、さらにアーチ形状部分52の冠部59の手前まで、上段の検査窓56及び必要に応じて吹き上げ投入口60を介してコンクリート57を流し込みながら、バイブレータ58を用いて締固める工程(図10(c)参照)と、冠部59における既設の覆工コンクリート62側の部分から吹き上げ投入口60を介してコンクリート57を吹き上げ方式で圧入し、妻型枠50aまでコンクリートを充填する工程(図10(d)参照)とによって、覆工コンクリートが打設されることになる。 More specifically, after installing the tunnel lining form 50 at a predetermined position, concrete 57 is poured from the lower part of the side wall 55 through the lower inspection window 56 and compacted using a vibrator 58. (See FIG. 10(a)), and a step of compacting using a vibrator 58 while pouring concrete 57 toward the upper arch-shaped portion 52 of the side wall 55 through the middle inspection window 56 (see FIG. 10(a)). b)) and further compacting using a vibrator 58 while pouring concrete 57 through the upper inspection window 56 and, if necessary, the blow-up inlet 60, up to just before the crown portion 59 of the arch-shaped portion 52. (See FIG. 10(c)) and the process of press-fitting concrete 57 from the part of the crown part 59 on the side of the existing lining concrete 62 through the blow-up injection port 60 and filling the concrete up to the gable form 50a. (See FIG. 10(d)), the lining concrete is placed.

特開2001-280094号公報Japanese Patent Application Publication No. 2001-280094 特開2003-262096号公報Japanese Patent Application Publication No. 2003-262096 特開2015-67949号公報Japanese Patent Application Publication No. 2015-67949

一方、近年のトンネル工法では、掘削技術の改良によって、コンクリートの打設から養生及びトンネル覆工用型枠の脱型までの、覆工コンクリートを形成するための工程の進捗が、トンネルの切羽面を掘削する工程の進捗に追随できなくなっている。このため、覆工コンクリートを形成する工程の進捗を早める技術として、複数のコンクリートポンプを用いたり(例えば、特許文献3参照)、一般的に使用される10.5m程度の施工延長を有するトンネル覆工用型枠に代えて、好ましくは18m~22m程度の施工延長を有するロングスパンのトンネル覆工用型枠を使用して、1サイクルで行うトンネル覆工コンクリートの施工スパンを延ばすことにより、工期を短縮することが検討されている。 On the other hand, in recent tunnel construction methods, improvements in excavation technology have allowed the progress of the process of forming concrete lining, from pouring concrete to curing and demolding of tunnel lining formwork, to improve the progress of the tunnel face surface. It has become impossible to follow the progress of the excavation process. For this reason, techniques for speeding up the process of forming concrete lining include using multiple concrete pumps (for example, see Patent Document 3), Instead of construction formwork, long-span tunnel lining formwork with a construction length of approximately 18 m to 22 m is used to extend the construction span of tunnel lining concrete, which is carried out in one cycle, thereby reducing the construction period. It is being considered to shorten the

また、好ましくは18m~22m程度の施工延長を有するロングスパンのトンネル覆工用型枠を使用して、1サイクルで行うトンネル覆工コンクリートの施工スパンを延ばした場合、施工スパンの中間部分に、乾燥収縮や温度収縮に伴うひび割れが発生し易くなることから、特に施工スパンが長いトンネル覆工コンクリートを形成する場合には、これの中間部分に、乾燥収縮や温度収縮に伴うひび割れを誘発させる誘発目地を設けることが望ましい。このようなことから、本願出願人は、トンネル覆工コンクリートの中間部分に誘発目地を設ける方法として、例えば特開2020-20246号公報において、トンネル覆工用型枠の型枠面から覆工空間に目地部形成部を突出させて、複数の目地部形成用プレート部材を、周方向に連設配置して引抜き可能に取り付けておき、覆工空間に打設されたコンクリートが硬化したら、目地部形成用プレート部材を覆工空間から引き抜くことによって、誘発目地を形成する方法を開示している。 In addition, when the construction span of tunnel lining concrete performed in one cycle is extended using a long-span tunnel lining formwork that preferably has a construction extension of about 18 m to 22 m, in the middle part of the construction span, Since cracks are likely to occur due to drying shrinkage and temperature shrinkage, especially when forming tunnel lining concrete with a long construction span, it is necessary to induce cracks due to drying shrinkage and temperature shrinkage in the middle part of the tunnel lining concrete. It is desirable to provide joints. For this reason, the applicant of the present application proposed a method for providing an induced joint in the middle part of tunnel lining concrete, for example in JP-A-2020-20246, in which the lining space is formed from the formwork surface of the tunnel lining formwork. The joint forming part is made to protrude, and a plurality of joint forming plate members are arranged consecutively in the circumferential direction and attached so that they can be pulled out. When the concrete poured in the lining space hardens, the joint forming part is A method of forming an induced joint by pulling out a forming plate member from a lining space is disclosed.

ここで、トンネル覆工用型枠の型枠面から覆工空間に目地部形成部を突出させて、複数の目地部形成用プレート部材を、周方向に連設配置して引抜き可能に取り付ける際に、これらの各々の目地部形成用プレート部材は、トンネル覆工用型枠の型枠面から覆工空間に目地部形成部を垂直に精度良く立設させると共に、隣接する目地部形成用プレート部材との間で目地部形成部が周方向に精度良く連続するよう設置することが望ましく、これらの目地部形成用プレート部材が精度良く取り付けられていないと、覆工空間に打設されたコンクリートが硬化した後に目地部形成用プレート部材を撤去する際に、覆工コンクリートからから目地部形成用プレート部材を引き抜き難くなる。 Here, when the joint forming portion is made to protrude from the formwork surface of the tunnel lining formwork into the lining space, and a plurality of joint forming plate members are arranged in succession in the circumferential direction and are removably attached. In addition, each of these joint forming plate members allows the joint forming part to stand vertically and accurately in the lining space from the formwork surface of the tunnel lining formwork, and also to erect the joint forming part vertically and precisely from the formwork surface of the tunnel lining formwork, and to It is desirable to install so that the joint forming part continues accurately in the circumferential direction between the parts, and if these joint forming plates are not installed accurately, the concrete placed in the lining space will be damaged. When removing the joint forming plate member after it has hardened, it becomes difficult to pull out the joint forming plate member from the lining concrete.

特に、周方向に連設配置された目地部形成用プレート部材のうち先行して撤去されることになる、周方向の両側の側部辺部間の間隔が、外周辺部側から内周辺部側に向かって拡大するハの字形状部分を含む目地部形成用プレート部材や、これに隣接する目地部形成用プレート部材が、精度良く立設して取り付けられていないと、目地部形成部が前後方向にずれて周方向に連続しなくなることで、ハの字状プレート部材となっている目地部形成用プレート部材を先行して引き抜いた後に、隣接する目地部形成用プレート部材を引き抜く際に、ずれた部分で側部辺部が硬化したコンクリートに引っ掛かることになって、当該隣接する目地部形成用プレート部材を引き抜くことが困難になる。 In particular, the distance between the side edges on both sides in the circumferential direction, which are to be removed first among the joint forming plate members arranged in series in the circumferential direction, is from the outer circumferential side to the inner circumferential side. If the joint forming plate member including the V-shaped portion that expands toward the side and the joint forming plate member adjacent thereto are not installed in an accurate upright manner, the joint forming portion may By shifting in the front-back direction and discontinuing in the circumferential direction, after the joint forming plate member that is a V-shaped plate member is pulled out first, when pulling out the adjacent joint forming plate member. , the side edges of the displaced portions become caught in the hardened concrete, making it difficult to pull out the adjacent joint forming plate member.

本発明は、各々の目地部形成用プレート部材を、トンネル覆工用型枠の型枠面から覆工空間に目地部形成部を垂直に立設させると共に、隣接する目地部形成用プレート部材との
間で目地部形成部が周方向に連続するように、立ち角度を精度良く調整して設置することのできる目地部形成用プレート部材の設置方法を提供することを目的とする。
In the present invention, each joint forming plate member is vertically installed in the lining space from the formwork surface of the tunnel lining formwork, and is connected to the adjacent joint forming plate member. It is an object of the present invention to provide a method for installing a joint forming plate member that can be installed by accurately adjusting the standing angle so that the joint forming part continues in the circumferential direction between the two.

本発明は、山岳トンネル工法において、トンネル覆工コンクリートを構築する際に設置されるトンネル覆工用型枠の軸方向の中間部分に引き抜き可能に取り付けられる、構築されるトンネル覆工コンクリートに誘発目地を形成する目地部形成用プレート部材を、打設されたコンクリートが硬化した後に引抜き可能な状態で設置するための目地部形成用プレート部材の設置方法であって、前記トンネル覆工用型枠は、トンネルの掘進方向に移動可能な架台部と、該架台部に支持されてトンネルの内壁面との間に覆工空間を形成する型枠本体部とを備えており、該型枠本体部は、トンネルの掘進方向に分割された複数の分割型枠本体部によって構成されており、これらの分割型枠本体部の隣接する端部の間には、スリット状の隙間が全周に亘って連続して形成されており、該スリット状の隙間には、複数の前記目地部形成用プレート部材が各々挿入され、挿入された前記目地部形成用プレート部材は、外周辺部側の目地部形成部を前記覆工空間に突出させた状態で、内周辺部側の内側突出把持部を前記分割型枠本体部に固定して、周方向に連設配置されて取り付けられるようになっており、前記目地部形成用プレート部材には、前記内側突出把持部に、表裏両側の面から各々張り出して固定された雌ネジ孔を有する一対の反力板が、周方向に間隔をおいて少なくとも2部位に取り付けられており、少なくとも4箇所の前記反力板の前記雌ネジ孔に、ボルト部材を各々螺着して先端を前記分割型枠本体部に当接させ状態で、これらのボルト部材を回転させつつ進退させることにより、前記目地部形成用プレート部材を、隣接する前記目地部形成用プレート部材との間で前記目地部形成部が周方向に連続するように、立ち角度を調整して設置する目地部形成用プレート部材の設置方法を提供することにより、上記目的を達成したものである。 In the mountain tunnel construction method, the present invention provides an induction joint in the tunnel lining concrete to be constructed, which is removably attached to the axially intermediate portion of the tunnel lining formwork installed when constructing the tunnel lining concrete. A method for installing a joint forming plate member for installing a joint forming plate member forming a joint forming plate member in a state where it can be pulled out after poured concrete has hardened, the tunnel lining formwork comprising: , comprising a pedestal section movable in the tunnel excavation direction, and a formwork body supported by the pedestal section to form a lining space between the inner wall surface of the tunnel, and the formwork main body is It is composed of a plurality of split formwork main bodies divided in the direction of tunnel excavation, and a slit-shaped gap is continuous along the entire circumference between the adjacent ends of these split formwork main bodies. The plurality of joint forming plate members are respectively inserted into the slit-like gaps, and the inserted joint forming plate members are formed in the joint forming portion on the outer peripheral side. The inward protruding grip portions on the inner peripheral side are fixed to the split formwork main body in a state in which they protrude into the lining space, so that they can be installed in a continuous manner in the circumferential direction. In the joint forming plate member, a pair of reaction plates each having a female threaded hole protruding from both the front and back surfaces are fixed to the inner protruding grip portion at least at two positions spaced apart in the circumferential direction. The bolt members are screwed into the female threaded holes of the reaction plate in at least four places, and the bolt members are rotated with their tips in contact with the split formwork main body. By moving the joint forming plate member forward and backward while adjusting the standing angle, the joint forming plate member is installed so that the joint forming portion is continuous in the circumferential direction between adjacent joint forming plate members. The above object has been achieved by providing a method for installing a joint forming plate member.

そして、本発明の目地部形成用プレート部材の設置方法は、前記立ち角度を調整して設置される目地部形成用プレート部材が、前記分割型枠本体部の周方向の両側に位置する側部辺部間の間隔が、前記外周辺部側から前記内周辺部側に向かって拡大するハの字形状部分を含む目地部形成用プレート部材と、目地部形成部を周方向に連続させて隣接して配置される目地部形成用プレート部材であることが好ましい。 Further, in the method for installing a joint forming plate member of the present invention, the joint forming plate member installed by adjusting the standing angle is installed on the side portions located on both sides in the circumferential direction of the split formwork main body. A joint forming plate member including a V-shaped part in which the interval between sides increases from the outer peripheral side to the inner peripheral side, and the joint forming part are continuous and adjacent in the circumferential direction. It is preferable that the joint forming plate member is arranged as a joint forming plate member.

本発明の目地部形成用プレート部材の設置方法によれば、各々の目地部形成用プレート部材を、トンネル覆工用型枠の型枠面から覆工空間に目地部形成部を垂直に立設させると共に、隣接する目地部形成用プレート部材との間で目地部形成部が周方向に連続するように、立ち角度を精度良く調整して設置することができる。 According to the method for installing a joint forming plate member of the present invention, each joint forming plate member is vertically installed in the lining space from the formwork surface of the tunnel lining formwork. At the same time, the standing angle can be precisely adjusted and installed so that the joint forming portion is continuous in the circumferential direction between adjacent joint forming plate members.

トンネル覆工型枠において、複数の目地部形成用プレート部材を、目地部形成部を覆工空間に突出させて分割型枠本体部の周方向に連設配置した状態の略示横断面である。This is a schematic cross-sectional view of a tunnel lining formwork in which a plurality of joint forming plate members are arranged in series in the circumferential direction of the split formwork main body with the joint forming parts protruding into the lining space. . 目地部形成用プレート部材が取り付けられたトンネル覆工型枠を説明する略示縦断面図である。FIG. 2 is a schematic vertical sectional view illustrating a tunnel lining formwork to which a joint forming plate member is attached. 目地部形成用プレート部材が取り付けられたトンネル覆工型枠を説明する略示平面図である。It is a schematic plan view explaining the tunnel lining formwork to which the plate member for joint part formation was attached. 目地部形成用プレート部材をトンネル覆工型枠に取り付けるための取付け構造を説明する、図2のA’部における、図1のA-Aに沿った拡大断面図である。FIG. 2 is an enlarged sectional view taken along line AA in FIG. 1 at section A' in FIG. 2, illustrating an attachment structure for attaching a joint forming plate member to a tunnel lining form; ハの字形状部分を含む目地部形成用プレート部材の正面図である。FIG. 2 is a front view of a joint forming plate member including a V-shaped portion. 目地部形成用プレート部材の側面図(図5を左側から見た図)である。FIG. 6 is a side view (view of FIG. 5 from the left side) of the joint forming plate member. ハの字形状部分を含む目地部形成用プレート部材と隣接して配置される目地部形成用プレート部材の説明図である。It is an explanatory view of a joint part forming plate member which is arranged adjacent to a joint part forming plate member including a V-shaped portion. 本発明の好ましい一実施形態に係る目地部形成用プレート部材の設置方法の説明図である。It is an explanatory view of the installation method of the plate member for joint part formation concerning one preferred embodiment of the present invention. 従来のトンネル覆工コンクリートの打設方法において、トンネル覆工用型枠をトンネルの内周面に沿って設置した状態を説明する略示横断面図である。FIG. 2 is a schematic cross-sectional view illustrating a state in which a tunnel lining formwork is installed along the inner circumferential surface of a tunnel in a conventional tunnel lining concrete casting method. (a)~(d)は、従来のトンネル覆工コンクリートの打設方法の作業手順を説明する、一部を断面図として示す略示側面図である。(a) to (d) are schematic side views, partially shown as cross-sectional views, for explaining the work procedure of a conventional tunnel lining concrete placing method.

本発明の好ましい一実施形態に係る目地部形成用プレート部材の設置方法(図8(a)、(b)参照)は、山岳トンネル工法において、トンネルの内壁面を覆うトンネル覆工コンクリート4(図2、図3参照)を、トンネル覆工用型枠1(図1~図3参照)を用いて構築する際に、構築されるトンネル覆工コンクリート4に誘発目地を形成するための目地部形成用プレート部材15,15’(図5参照)を、トンネル覆工用型枠1に支持させて設置するため方法として採用されたものである(図4参照)。本実施形態では、掘削したトンネルTの内周面を覆って構築されるトンネル覆工コンクリート4は、セントルと呼ばれるトンネル覆工用型枠1として、一般的に用いられている10.5m程度の施工延長を有するものに代えて、好ましくは18m~22m程度の施工延長を有するロングスパンのトンネル覆工用型枠1を用いて形成するようになっており、目地部形成用プレート部材15,15’は、構築されるトンネル覆工コンクリート4の施工スパンの中間部分に、乾燥収縮や温度収縮に伴うひび割れを誘発する誘発目地を形成するための部材として設置されることになる。 A method for installing a joint forming plate member according to a preferred embodiment of the present invention (see FIGS. 8(a) and 8(b)) is used in a mountain tunnel construction method using tunnel lining concrete 4 (see FIG. 8) that covers the inner wall surface of a tunnel. 2, see Fig. 3) using the tunnel lining formwork 1 (see Figs. 1 to 3), joint formation for forming induced joints in the tunnel lining concrete 4 to be constructed. This method was adopted for installing the tunnel lining plate members 15, 15' (see FIG. 5) while supporting them on the tunnel lining formwork 1 (see FIG. 4). In this embodiment, the tunnel lining concrete 4 constructed to cover the inner circumferential surface of the excavated tunnel T is a tunnel lining formwork 1 called a center, which is generally used as a tunnel lining formwork 1 of about 10.5 m. Instead of having a construction extension, a long span tunnel lining form 1 having a construction extension of preferably about 18 m to 22 m is used to form the joint part forming plate members 15, 15. ' will be installed in the middle part of the construction span of the tunnel lining concrete 4 to be constructed as a member for forming an inducing joint that induces cracks due to drying shrinkage and temperature shrinkage.

すなわち、近年の山岳トンネル工法では、掘削技術の改良によって、コンクリートの打設から養生及びトンネル覆工用型枠1の脱型までの、覆工コンクリート4を形成するための工程の進捗が、トンネルTの切羽面を掘削する工程の進捗に追随できなくなって、効率良く施工されていないことが多くなっていることから、本実施形態では、一般に用いられる10.5m程度の延長を有するトンネル覆工用型枠に代えて、好ましくは10.5m以上の施工延長を有するロングスパンのトンネル覆工用型枠1として、例えば18~22m程度の延長を有するロングスパンのトンネル覆工用型枠1を用いることで、一サイクルで行なわれる覆工コンクリート4の施工スパンを増大させると共に、2台のコンクリートポンプ30を用いて2系統の圧送配管31からコンクリート12を同時に打設することで、コンクリート12を打設する際の作業時間を短縮させて、覆工コンクリート4を形成するための工程の進捗を早めることができるようになっている。 In other words, in the recent mountain tunnel construction method, improvements in excavation technology have allowed the progress of the process for forming the lining concrete 4, from concrete placement to curing and demolding of the tunnel lining form 1, to improve the tunnel lining. In many cases, it is not possible to keep up with the progress of the process of excavating the T face, and the construction is not carried out efficiently. Therefore, in this embodiment, a commonly used tunnel lining with a length of about 10.5 m is used. Instead of the long-span tunnel lining formwork 1, preferably having a construction extension of 10.5 m or more, for example, a long-span tunnel lining form 1 having an extension of about 18 to 22 m. By using this, the construction span of the concrete lining 4 that is carried out in one cycle is increased, and the concrete 12 is cast simultaneously from two systems of pressure-feeding piping 31 using two concrete pumps 30. By shortening the work time during pouring, it is possible to hasten the progress of the process for forming the lining concrete 4.

また、本実施形態では、ロングスパンのトンネル覆工用型枠1を用いることで、覆工コンクリート4の一サイクルの施工スパンの延長を増大させると、隣接する施工スパンの境目部分だけでは、コンクリートの乾燥収縮や温度収縮によるひび割れを十分に吸収できなくなって、施工スパンの中間部分でひび割れが生じ易くなる。このため、施工スパンの中間部分に、乾燥収縮や温度収縮によるひび割れを誘発させる誘発目地を形成するための目地部形成用プレート部材15,15’が、スリット状の隙間δに挿入されて(図4参照)、目地部形成部15Aを覆工空間Sに突出させた状態で、周方向に連設配置されると共に、トンネル覆工用型枠1の型枠本体部3を構成する一対の分割型枠本体部3A,3Bの端部に、固定されて取り付けられることになる。本実施形態の目地部形成用プレート部材の設置方法(図8(a)、(b)参照)は、周方向に連設配置される目地部形成用プレート部材15,15’(図7参照)の各々を、トンネル覆工用型枠1の型枠面から覆工空間Sに目地部形成部15Aを垂直に立設させると共に、隣接する目地部形成用プレート部材15,15’との間で目地部形成部15Aが周方向に連続するように、立ち角度を精度良く調整して設置できるようするための方法として採用されたものである。 In addition, in this embodiment, when the length of the construction span of one cycle of the lining concrete 4 is increased by using the long-span tunnel lining formwork 1, it is possible to increase the length of the construction span in one cycle of the lining concrete 4. Cracks caused by drying shrinkage and temperature shrinkage cannot be absorbed sufficiently, and cracks are likely to occur in the middle of the construction span. For this reason, joint forming plate members 15 and 15' are inserted into the slit-shaped gap δ in order to form joints that induce cracks due to drying shrinkage and temperature shrinkage in the middle part of the construction span (Fig. 4), a pair of divisions that are arranged in succession in the circumferential direction with the joint forming part 15A protruding into the lining space S, and that constitute the formwork body part 3 of the formwork 1 for tunnel lining. It is fixedly attached to the ends of the formwork main bodies 3A and 3B. The method for installing the joint forming plate members of this embodiment (see FIGS. 8(a) and 8(b)) is as follows: Each of the joint forming portions 15A is vertically erected from the formwork surface of the tunnel lining formwork 1 into the lining space S, and between the adjacent joint forming plate members 15 and 15'. This method was adopted as a method for accurately adjusting the standing angle and installing the joint forming portion 15A so that the joint forming portion 15A is continuous in the circumferential direction.

そして、本実施形態の目地部形成用プレート部材の設置方法は、山岳トンネル工法において、トンネル覆工コンクリート4を構築する際に設置されるトンネル覆工用型枠1の軸方向Xの中間部分に引き抜き可能に取り付けられる、構築されるトンネル覆工コンクリート4に誘発目地を形成するための目地部形成用プレート部材15,15’(図5、図6参
照)を、打設されたコンクリートが硬化した後に引抜き可能な状態で設置するための設置
方法である(図7(a)、(b)参照)。
The method for installing the joint forming plate member of this embodiment is to install the plate member for forming a joint in the middle part in the axial direction Joint forming plate members 15, 15' (see FIGS. 5 and 6) for forming induced joints in tunnel lining concrete 4 to be constructed, which are removably attached, are attached when the poured concrete has hardened. This is an installation method for installing in a state where it can be pulled out later (see FIGS. 7(a) and 7(b)).

図1~図3に示すように、トンネル覆工用型枠1は、トンネルの掘進方向Xに移動可能な架台部2と、この架台部2に支持されてトンネルTの内壁面との間に覆工空間Sを形成する型枠本体部3とを備えている。型枠本体部3は、トンネルの掘進方向に分割(本実施形態では、2分割)された複数(本実施形態では、一対)の分割型枠本体部3A,3Bによって構成されており、これらの分割型枠本体部3A,3Bの隣接する端部の間には、スリット状の隙間δ(図4参照)が全周に亘って連続して形成されている。このスリット状の隙間δには、複数の目地部形成用プレート部材15,15’が各々挿入され(図1参照)、挿入された目地部形成用プレート部材15,15’は、外周辺部側の目地部形成部15A(図5参照)を覆工空間Sに突出させた状態で、内周辺部側の内側突出把持部15Bを好ましくはスリット状の隙間δを挟んだ両側の分割型枠本体部3A,3Bに固定して(図4参照)、周方向に連設配置されて取り付けられている。 As shown in FIGS. 1 to 3, the tunnel lining formwork 1 is placed between a pedestal part 2 movable in the tunnel excavation direction X and an inner wall surface of the tunnel T supported by this pedestal part 2. It includes a formwork main body part 3 that forms a lining space S. The formwork main body 3 is composed of a plurality (in this embodiment, a pair) of split formwork main bodies 3A and 3B that are divided (in this embodiment, into two) in the tunnel excavation direction. A slit-shaped gap δ (see FIG. 4) is formed continuously over the entire circumference between the adjacent ends of the divided formwork main bodies 3A and 3B. A plurality of joint forming plate members 15, 15' are each inserted into this slit-shaped gap δ (see FIG. 1), and the inserted joint forming plate members 15, 15' are on the outer peripheral side. With the joint forming part 15A (see FIG. 5) protruding into the lining space S, the inner protruding grip part 15B on the inner periphery side is preferably attached to the split formwork body on both sides with a slit-shaped gap δ in between. They are fixed to the parts 3A and 3B (see FIG. 4) and are attached in a continuous manner in the circumferential direction.

目地部形成用プレート部材15には、内側突出把持部15Bに、表裏両側の面から各々張り出して固定された雌ネジ孔63aを有する一対の反力板63が、周方向に間隔をおいて少なくとも2部位(本実施形態では2部位)に取り付けられており、少なくとも4箇所(本実施形態では4箇所)の反力板63の雌ネジ孔63aに、ボルト部材64を各々螺着して先端を分割型枠本体部3A,3Bに固着された基板プレート25’に当接させ状態で、これらのボルト部材64を回転させつつ進退させることにより、目地部形成用プレート部材15,15’を、隣接する目地部形成用プレート部材15、15’との間で目地部形成部15Aが周方向に連続するように、立ち角度を調整して設置するようになっている。 In the joint forming plate member 15, a pair of reaction force plates 63 each having a female threaded hole 63a projecting from both the front and back surfaces are fixed to the inner protruding grip part 15B at least at intervals in the circumferential direction. The bolt members 64 are each screwed into the female threaded holes 63a of the reaction force plate 63 at at least four locations (four locations in the present embodiment), and the tips thereof are attached to the ends of the bolt members 64. By moving these bolt members 64 forward and backward while rotating them while in contact with the substrate plate 25' fixed to the split formwork main bodies 3A and 3B, the joint forming plate members 15 and 15' are connected to the adjacent base plate 25'. The standing angle is adjusted so that the joint forming part 15A is continuous in the circumferential direction between the joint forming plate members 15 and 15'.

本実施形態では、中間部分に複数の目地部形成用プレート部材15,15’が取り付けられるトンネル覆工用型枠1は、トンネルTの延長方向(掘進方向)Xに移動可能なスライドセントルとなっており、例えば18~22m程度の延長を有するロングスパンのセントルとなっている。トンネル覆工用型枠1は、ロングスパンのセントルとなっていること以外は、例えば特開2015-67949号公報に記載されたトンネル覆工用型枠と、略同様の構成を備えている。 In this embodiment, the tunnel lining formwork 1 to which a plurality of joint forming plate members 15, 15' are attached to the intermediate portion serves as a sliding center movable in the extension direction (excavation direction) X of the tunnel T. For example, it is a long span center with an extension of about 18 to 22 meters. The tunnel lining formwork 1 has substantially the same configuration as the tunnel lining formwork described in, for example, Japanese Unexamined Patent Publication No. 2015-67949, except that it is a long span center.

すなわち、トンネル覆工用型枠1は、図1~図3に示すように、トンネルTの掘進方向X(図2参照)に連結一体化された、複数の門型台車2Aによる架台部2と、これらの一体化された門型台車2Aによる架台部2によって支持されると共に、例えば吹付けコンクリートによる一次覆工5によって覆われたトンネルTの内周面に沿って配置されて(図1参照)、覆工空間Sの内側の型枠面を形成する型枠本体部3とを含んで構成されている。架台部2を構成する門型台車2Aは、基台部2aと、基台部2aを支持する支持脚部2bとを備えている。支持脚部2bの下端部には、トンネルTの床面に敷設されたレール6に沿って走行可能な走行部7が設けられており、これによってトンネル覆工用型枠1は、トンネルTの掘進方向Xに移動できるようになっている。 That is, as shown in FIGS. 1 to 3, the tunnel lining formwork 1 includes a frame portion 2 formed by a plurality of gate-shaped carts 2A, which are connected and integrated in the excavation direction X of the tunnel T (see FIG. 2). , are supported by the pedestal section 2 formed by these integrated gate-shaped carts 2A, and are arranged along the inner peripheral surface of the tunnel T covered with a primary lining 5 made of, for example, shotcrete (see FIG. 1). ), and a formwork main body part 3 that forms the inner formwork surface of the lining space S. The gate-shaped trolley 2A constituting the gantry portion 2 includes a base portion 2a and support leg portions 2b that support the base portion 2a. A running section 7 that can run along a rail 6 laid on the floor surface of the tunnel T is provided at the lower end of the support leg section 2b. It is designed to be able to move in the excavation direction X.

型枠本体部3は、一次覆工5によって覆われたトンネルTの内周面に沿った形状を備えるように組み付けられており、トンネルTの内周面との間に所定の間隔をおいて配置されることにより、コンクリートの打設空間である、所定の厚さの覆工空間Sを形成する。また、型枠本体部3は、図1に示すように、トンネルTのアーチ形状部分52の上部の覆工空間Sを形成するための上部型枠3aと、アーチ形状部分52の下部及び両側の側壁部5
5の上部の覆工空間Sを形成するための一対の側部型枠3bと、インバート部のコンクリートと接続する側壁部55の下部の覆工空間Sを形成するための一対の下端部型枠3cとを含んで構成されている。上部型枠3aは、架台部2を構成する門型台車2Aの基台部2aに設けられた複数の昇降ジャッキ8によって、上下方向に昇降可能に支持されている。一対の側部型枠3bは、上部型枠3aの両側の下端部に回転連結部3dを介して各々回転可能に接続されており、一対の下端部型枠3cは、各々の側部型枠3bの下端部に下部回転連結部3eを介して回転可能に接続されている。側部型枠3b及び下端部型枠3cは、一端部が門型台車2Aに連結された伸縮ジャッキ9a,9bの他端部と連結しており、これらの伸縮ジャッキ9a,9bを伸縮することで、側部型枠3bや下端部型枠3cを、上部型枠3aや側部型枠3bに対して、回動できるようになっている。
The formwork main body 3 is assembled so as to have a shape that follows the inner circumferential surface of the tunnel T covered by the primary lining 5, and is spaced at a predetermined distance from the inner circumferential surface of the tunnel T. By arranging them, a lined space S with a predetermined thickness is formed, which is a space for placing concrete. Further, as shown in FIG. 1, the formwork main body 3 includes an upper formwork 3a for forming a lining space S above the arch-shaped portion 52 of the tunnel T, and an upper formwork 3a for forming a lining space S above the arch-shaped portion 52, and a lower portion and both sides of the arch-shaped portion 52. Side wall part 5
A pair of side formworks 3b for forming a lined space S in the upper part of the side wall part 55 and a pair of lower end formworks for forming a lined space S in the lower part of the side wall part 55 connected to the concrete of the invert part. 3c. The upper formwork 3a is supported by a plurality of elevating jacks 8 provided on the base portion 2a of the gate-shaped trolley 2A constituting the gantry portion 2 so as to be vertically movable. The pair of side formworks 3b are rotatably connected to the lower ends of the upper formwork 3a on both sides via rotary connecting parts 3d, and the pair of lower end formworks 3c are connected to the lower end portions of the upper formwork 3a on both sides. It is rotatably connected to the lower end of 3b via a lower rotational connection part 3e. One end of the side formwork 3b and the lower end formwork 3c are connected to the other ends of telescopic jacks 9a, 9b connected to the gate-shaped trolley 2A, and these telescopic jacks 9a, 9b cannot be expanded or contracted. The side formwork 3b and the lower end formwork 3c can be rotated with respect to the upper formwork 3a and the side formwork 3b.

これらによって、トンネル覆工用型枠1は、昇降ジャッキ8や伸縮ジャッキ9a,9bを伸縮させることで、型枠本体部3を展開したり内側にまとめたりすることが可能になって、トンネルTの内周面に沿うように型枠本体部3を組み付けたり、型枠本体部3を脱型した後にトンネルTの内部で掘進方向Xに移動させたりできるようになっている。 As a result, the formwork 1 for tunnel lining can expand and contract the formwork body 3 by expanding and contracting the lifting jack 8 and the telescopic jacks 9a and 9b, and the tunnel lining The formwork main body 3 can be assembled along the inner peripheral surface of the tunnel T, or the formwork main body 3 can be moved in the excavation direction X inside the tunnel T after being demolded.

また、本実施形態では、型枠本体部3の上部型枠3aや側部型枠3bには、複数の圧入接続口11a,11bが、トンネルTの掘進方向Xに間隔をおいて各々2箇所に形成されている(図2参照)。型枠本体部3の上部型枠3aの天端部分には、複数の天頂部圧入接続口27が、トンネルTの掘進方向Xに間隔をおいて2箇所に形成されている。これらの圧入接続口11a,11b,27は、後述するように、圧送配管31を介して圧送される覆工用のコンクリート12を、覆工空間Sに流し込んだり圧入したりするため等の目的で用いられる。 In addition, in this embodiment, the upper formwork 3a and the side formwork 3b of the formwork main body 3 are provided with a plurality of press-fit connection ports 11a and 11b at two locations each at intervals in the excavation direction X of the tunnel T. (See Figure 2). At the top end of the upper formwork 3a of the formwork body 3, a plurality of zenith press-fit connection ports 27 are formed at two locations spaced apart in the excavation direction X of the tunnel T. These press-fit connection ports 11a, 11b, and 27 are used for the purpose of pouring or press-fitting concrete 12 for lining, which is pumped through the pressure-feeding pipe 31, into the lining space S, as will be described later. used.

そして、本実施形態では、トンネル覆工用型枠1の型枠本体部3は、上述のように、トンネルTの掘進方向X(図2、図3の左右方向)に、好ましくは2分割された一対の分割型枠本体部3A,3Bによって構成されている。一対の分割型枠本体部3A,3Bは、これらの隣接する端面の間に、一定幅のスリット状の隙間δ(図4参照)が、全周に亘って形成されるように配置されて固定されている。また形成されたスリット状の隙間δには、一対の分割型枠本体部3A,3Bの端面を形成する端部リブプレート21A,21Bに支持させて、各々の施工スパン(L=18m)の中間部に誘発目地を形成するための複数の目地部形成用プレート部材15,15’が、目地部形成部15Aを覆工空間Sに突出させて、引き抜き可能に挿入配置された状態で、全周に亘って連設して配設されるようになっている(図1参照)。 In the present embodiment, the formwork main body 3 of the tunnel lining formwork 1 is preferably divided into two parts in the excavation direction X of the tunnel T (horizontal direction in FIGS. 2 and 3), as described above. It is composed of a pair of split formwork main bodies 3A and 3B. The pair of split formwork main bodies 3A and 3B are arranged and fixed such that a slit-shaped gap δ (see FIG. 4) of a constant width is formed between the adjacent end surfaces over the entire circumference. has been done. In addition, the formed slit-shaped gap δ is supported by end rib plates 21A and 21B that form the end faces of the pair of split formwork main bodies 3A and 3B, and the middle part of each construction span (L = 18 m) is A plurality of joint forming plate members 15, 15' for forming induced joints in the lining space S project the joint forming part 15A into the lining space S and are inserted and arranged in a removable manner. (See Figure 1).

本実施形態では、目地部形成用プレート部材15の内周辺部側の部分である内側突出把持部15Bにおける、目地部形成部15Aと近接する部位には、少なくとも2箇所(本第1実施形態では2箇所)に、プレート側ピン挿通孔16aが形成されている(図5参照)。一対の分割型枠本体部3A,3Bの端面を形成する端部リブプレート21A,21Bには、目地部形成用プレート部材15の外周辺部側の部分である目地部形成部15Aを覆工空間Sに突出させた状態で、これらのプレート側ピン挿通孔16aと合致する位置に、端面ピン挿通孔23aが形成されている(図4参照)。合致させたプレート側ピン挿通孔16aと端面ピン挿通孔23aに、好ましくはプレート側ピン挿通孔16aの内径よりも僅かに小さな外径を備えるピン部材26(図4参照)を挿通させることによって、目地部形成用プレート部材15,15’が、両側の端部リブプレート21A,21Bに挟まれるようにして支持されて、傾倒可能に仮固定された状態で取り付けられている。 In this embodiment, at least two locations (in the first embodiment Plate-side pin insertion holes 16a are formed at two locations (see FIG. 5). The end rib plates 21A, 21B forming the end faces of the pair of split formwork main bodies 3A, 3B have a joint forming portion 15A, which is a portion on the outer periphery side of the joint forming plate member 15, in the lining space. End surface pin insertion holes 23a are formed at positions that match these plate-side pin insertion holes 16a in the state of protruding in the direction S (see FIG. 4). By inserting a pin member 26 (see FIG. 4), preferably having an outer diameter slightly smaller than the inner diameter of the plate side pin insertion hole 16a, into the matched plate side pin insertion hole 16a and end face pin insertion hole 23a, The joint forming plate members 15, 15' are supported between the end rib plates 21A, 21B on both sides, and are temporarily fixed in a tiltable manner.

また、本実施形態では、図4に示すように、好ましくはスリット状の隙間δを挟んだ両側に位置する、一対の分割型枠本体部3A,3Bの各々の端縁部の外周面から立設して、好ましくは直角三角形状または直角台形状の断面形状を有する面木部材22A,22Bが
、覆工空間Sに突出した状態で、好ましくは各々の分割型枠本体部3A,3Bの周方向に全周に亘って連続して取り付けられている。
Further, in this embodiment, as shown in FIG. 4, it is possible to stand up from the outer peripheral surface of each end edge of the pair of split formwork main bodies 3A and 3B, which are preferably located on both sides of the slit-shaped gap δ. The facing wooden members 22A, 22B, which preferably have a right triangular or right trapezoidal cross-sectional shape, protrude into the lining space S, preferably around the respective split formwork main bodies 3A, 3B. It is attached continuously over the entire circumference in the direction.

本実施形態では、目地部形成用プレート部材15,15’は、図5及び図6に示すように、好ましくアルミニウム製又はスチール製の、例えば6~10mm程度の厚さ(本実施形態では、7mm程度の厚さ)の金属ブレートを用いて形成されている。また目地部形成用プレート部材15は、例えば縦幅が300~600mm程度、横幅が400~700mm程度の大きさの、外周辺部と、該外周辺部と対向して配置される内周辺部と、左右両側の側部辺部とを有する、略4辺形状の平面形状を備えている。目地部形成用プレート部材15は、外周辺部側の部分が、型枠面から覆工空間Sに突出して配置される目地部形成部15Aとなっており、内周辺部側の部分が、型枠本体部3の内側に突出して配置される内側突出把持部15Bとなっている。なお、図5には、分割型枠本体部3A,3Bの周方向の両側縁に配置されることになる側部辺部間の間隔が、外周辺部側から内周辺部側に向けて拡大する、ハの字形状部分を含む目地部形成用プレート部材15’が例示されている。 In this embodiment, the joint forming plate members 15, 15' are preferably made of aluminum or steel, and have a thickness of about 6 to 10 mm (in this embodiment, 7 mm), as shown in FIGS. 5 and 6. It is formed using a metal plate with a thickness of approximately Further, the joint forming plate member 15 has an outer periphery having a vertical width of about 300 to 600 mm and a width of about 400 to 700 mm, and an inner periphery disposed opposite to the outer periphery. , and has a substantially four-sided planar shape having left and right side sides. The joint forming plate member 15 has an outer peripheral portion serving as a joint forming portion 15A that protrudes from the formwork surface into the lining space S, and an inner peripheral portion serving as a joint forming portion 15A. This is an inwardly protruding grip portion 15B that is arranged to protrude inside the frame body portion 3. In addition, in FIG. 5, the interval between the side edges that will be arranged on both circumferential edges of the split formwork main bodies 3A and 3B increases from the outer periphery side to the inner periphery side. A joint forming plate member 15' including a V-shaped portion is illustrated.

目地部形成部15Aは、図4に示すように、一対の分割型枠本体部3A,3Bの端面を形成する端部リブプレート21A,21Bの間の部分に周方向に延設して設けられた、スリット状の隙間δを介して、覆工空間Sに向けて目地部形成用プレート部材15が挿入された際に、一対の分割型枠本体部3A,3Bの外周部による型枠面から、例えば200mm程度の突出高さで外側に突出するように配置される部分である。また目地部形成部15Aには、先端に向けて厚さを例えば7mm程度から2mm程度に減少させた、テーパー加工が施されていることが好ましい。 As shown in FIG. 4, the joint forming portion 15A is provided extending in the circumferential direction between the end rib plates 21A and 21B that form the end surfaces of the pair of split formwork main bodies 3A and 3B. In addition, when the joint forming plate member 15 is inserted into the lining space S through the slit-shaped gap δ, from the formwork surface by the outer periphery of the pair of split formwork main bodies 3A and 3B. , for example, is a portion that is arranged to protrude outward with a protrusion height of about 200 mm. Further, it is preferable that the joint forming portion 15A is tapered so that the thickness is reduced from about 7 mm to about 2 mm toward the tip.

内側突出把持部15Bは、上述のプレート側ピン挿通孔16aが形成されていることにより、覆工空間Sに打設したコンクリートが硬化するまでの間、目地部形成用プレート部材15を仮固定しておくための固定部として機能すると共に、コンクリートが硬化した後に当該プレート部材15を型枠本体部3の内側に引き抜く際の、持手部として機能する部分である。 The inward protruding grip part 15B has the above-mentioned plate side pin insertion hole 16a formed therein, so that the joint forming plate member 15 can be temporarily fixed until the concrete poured in the lining space S hardens. This part functions as a fixing part for keeping the concrete in place, and also functions as a handle part when pulling out the plate member 15 inside the form body part 3 after the concrete has hardened.

また、内側突出把持部15Bには、図5及び図6に示すように、表裏両側の面から各々垂直に張り出して、雌ネジ孔63aを有する一対の反力板63が、溶接等により固着されて取り付けられている。これらの一対の反力板63は、プレート側ピン挿通孔16aよりも内周辺部側の部位において、周方向に間隔をおいた少なくとも2部位として、好ましくは横幅方向の中央線Cを挟んだ両側に対称に配置されて、2部位に散り付けられている。これらの合計4箇所の各々の反力板63には、内周辺部側から雌ネジ孔63aに螺着される、ボルト部材64が取り付けられている。各々のボルト部材64は、分割型枠本体部3Aに各々固着された基板プレート25に先端を当接させた状態で、回転することにより進退して、反力板63を基板プレート25に対して相体的に変位させることができるようになっている(図4、図8(a)、(b)参照)。 Further, as shown in FIGS. 5 and 6, a pair of reaction force plates 63 having female screw holes 63a are fixed to the inner protruding grip portion 15B by welding or the like, and extend vertically from both the front and back surfaces, respectively. installed. These pair of reaction force plates 63 are provided as at least two portions spaced apart in the circumferential direction at a portion closer to the inner periphery than the plate-side pin insertion hole 16a, preferably on both sides of the center line C in the width direction. They are arranged symmetrically and scattered in two parts. A bolt member 64 is attached to each of the four reaction force plates 63 in total, which is screwed into the female screw hole 63a from the inner peripheral side. Each bolt member 64 moves forward and backward by rotating with its tip in contact with the substrate plate 25 fixed to the divided formwork main body 3A, and moves the reaction plate 63 against the substrate plate 25. They can be displaced relative to each other (see FIGS. 4, 8(a) and 8(b)).

さらに、本実施形態では、内側突出把持部15Bにおける内周辺部と近接する部分には、横幅方向の中央線Cを挟んだ両側に対称に配置されて、覆工空間Sに打設したコンクリートが硬化した後に、目地部形成用プレート部材15,15’を、分割型枠本体部3A,3Bの内側に引き抜く際の持手部として機能する、横長矩形形状の把手用の開口部19が、一対開口形成されている。 Furthermore, in this embodiment, concrete placed in the lining space S is placed symmetrically on both sides of the center line C in the width direction in a portion of the inner protruding grip portion 15B adjacent to the inner peripheral portion. After hardening, a pair of horizontally elongated rectangular handle openings 19 are provided, which function as handles when pulling out the joint forming plate members 15, 15' inside the divided formwork main bodies 3A, 3B. An opening is formed.

一方、本実施形態では、目地部形成用プレート部材15,15’の目地部形成部15Aが挿入されるスリット状の隙間δを挟んだ両側の、分割型枠本体部3A,3Bの各々には、端部リブプレート21A,12B及び補強リブプレート24A,24Bに支持させて、基板プレート25が固着されている(図4、図8(a)、(b)参照)。 On the other hand, in this embodiment, each of the divided formwork body parts 3A and 3B on both sides of the slit-shaped gap δ into which the joint forming part 15A of the joint forming plate members 15 and 15' is inserted is A substrate plate 25 is fixedly supported by the end rib plates 21A, 12B and the reinforcing rib plates 24A, 24B (see FIGS. 4, 8(a) and 8(b)).

また、本実施形態では、分割型枠本体部3A,3Bの外周面部による型枠面から覆工空間Sに目地部形成部15Aを突出させて、分割型枠本体部3A,3Bの周方向に連設配置される複数の目地部形成用プレート部材15,15’は、図1及び図7に示すように、好ましくは隣接する各一対のプレート部材15の目地部形成部15Aにおける、側部辺部の間の境界部分である各々の分割接続部15aに、隙間が生じないように連続して配設されている。また、これらの連設配置された複数の目地部形成用プレート部材15、15’のうちの一部は、分割型枠本体部3A,3Bの周方向の両側に位置する側部辺部間の間隔が、外周辺部側から内周辺部側に向かって拡大する、内側に末広がりの正面形状を備えるハの字形状部分を含む目地部形成用プレート部材15’となっている(図5参照)。 Moreover, in this embodiment, the joint forming portion 15A is made to protrude into the lining space S from the formwork surface formed by the outer peripheral surface of the split formwork main body parts 3A, 3B, and As shown in FIGS. 1 and 7, the plurality of joint forming plate members 15, 15' arranged in series are preferably arranged along the side edges of the joint forming portions 15A of each pair of adjacent plate members 15. The divided connection parts 15a, which are the boundary parts between the parts, are arranged continuously so that no gaps are formed. In addition, some of the plurality of joint forming plate members 15, 15' arranged in series are located between the side edges located on both sides of the divided formwork body parts 3A, 3B in the circumferential direction. The joint forming plate member 15' includes a V-shaped portion with a front shape that widens inwardly and whose spacing increases from the outer periphery side to the inner periphery side (see FIG. 5). .

周方向に連設配置された複数の目地部形成用プレート部材15,15’のうちの一部が、ハの字形状部分を含む目地部形成用プレート部材15’となっていることにより、当該ハの字形状部分を含む目地部形成用プレート部材15’を先行して引き抜くようにすることで、型枠本体部3の周方向に連設配置された目地部形成用プレート部材15は、隣接する目地部形成用プレート部材15の側部辺部同士が分割接続部15aで競り合うことにより引き抜き難くなるのを回避して、各々の目地部形成用プレート部材15を、スムーズに引き抜けるようにすることが可能になる。 A part of the plurality of joint forming plate members 15, 15' arranged in series in the circumferential direction is the joint forming plate member 15' including the V-shaped portion, so that the By pulling out the joint forming plate member 15' including the V-shaped portion in advance, the joint forming plate members 15 arranged continuously in the circumferential direction of the formwork main body 3 can be To enable each joint forming plate member 15 to be smoothly pulled out by avoiding difficulty in pulling out due to the side edges of the joint forming plate members 15 competing with each other at the split connection part 15a. becomes possible.

そして、本実施形態の目地部形成用プレート部材の設置方法では、各々の目地部形成用プレート部材15,15’を、分割型枠本体部3A,3Bの隣接する端部の間に形成されたスリット状の隙間δに挿入し(図1参照)、外周辺部側の目地部形成部15A(図5参照)を覆工空間Sに突出させた状態で、内周辺部側の内側突出把持部15Bを分割型枠本体部3A,3Bに固定して(図4参照)、周方向に連設配置して取り付ける際に、これらの目地部形成用プレート部材15,15’が、隣接する目地部形成用プレート部材15、15’の間で目地部形成部15Aが周方向に連続するように、立ち角度を容易に調整して設置することができるようになっている。 In the method for installing a joint forming plate member of the present embodiment, each joint forming plate member 15, 15' is formed between the adjacent ends of the split formwork body parts 3A, 3B. Insert into the slit-shaped gap δ (see Fig. 1), and with the joint forming part 15A (see Fig. 5) on the outer periphery side protruding into the lining space S, hold the inner protruding grip portion on the inner periphery side. 15B to the split formwork main bodies 3A, 3B (see FIG. 4), and when installing them in a continuous manner in the circumferential direction, these joint forming plate members 15, 15' are used to form adjacent joints. The standing angle can be easily adjusted and installed so that the joint forming portion 15A is continuous in the circumferential direction between the forming plate members 15 and 15'.

すなわち、本実施形態では、各々の目地部形成用プレート部材15、15’には、内側突出把持部15Bに、表裏両側の面から各々張り出して固定された雌ネジ孔63aを有する一対の反力板63が、好ましくは横幅方向の中央線Cを挟んだ両側に対称に配置されて、2部位に散り付けられている。これらの反力板63による4箇所の雌ネジ孔63aに各々螺着されたボルト部材64の先端を、分割型枠本体部3A,3Bに固着された基板プレート25に当接させ状態で、これらのボルト部材64を回転させつつ進退させることにより、反力板63を基板プレート25に対して、相体的に変位させることがっできるようになっている。これによって、各々の各々の目地部形成用プレート部材15、15’を、トンネル覆工用型枠1の型枠本体部3の型枠面から覆工空間Sに目地部形成部15Aを垂直に精度良く立設させると共に、隣接する目地部形成用プレート部材15、15’との間で目地部形成部15Aが周方向に精度良く連続するように、立ち角度を容易に調整しつつ、周方向に精度良く連設させて設置することが可能になる。 That is, in the present embodiment, each of the joint forming plate members 15, 15' has a pair of reaction forces having female screw holes 63a fixed to the inner protruding grip part 15B so as to protrude from both the front and back surfaces, respectively. The plates 63 are preferably arranged symmetrically on both sides of the center line C in the width direction, and are scattered at two locations. The tips of the bolt members 64 screwed into the four female threaded holes 63a of the reaction plates 63 are brought into contact with the substrate plates 25 fixed to the split formwork main bodies 3A, 3B. By moving the bolt member 64 forward and backward while rotating, the reaction plate 63 can be displaced relative to the base plate 25. As a result, each joint forming plate member 15, 15' is vertically moved from the form surface of the form main body 3 of the tunnel lining form 1 to the lining space S with the joint forming part 15A. The standing angle can be easily adjusted so that the joint forming part 15A can be erected with high accuracy, and the joint forming part 15A can be precisely continuous between the adjacent joint forming plate members 15 and 15' in the circumferential direction. This makes it possible to install them in series with high precision.

本実施形態の目地部形成用プレート部材の設置方法によって、複数の目地部形成用プレート部材15、15’を周方向に連設配置して取り付けたら、一次覆工5によって覆われたトンネルTの内周面と、トンネル覆工用型枠1の型枠本体部3の外周部分による型枠面との間に形成された、コンクリートの打設空間である覆工空間Sに、コンクリートを打設して、トンネル覆工コンクリート4を構築する作業が行なわれる。本実施形態では、トンネル覆工コンクリート4を構築する作業は、図2及び図3に示すように、2台のコンクリートポンプ30からそれぞれ延設された圧送配管31を経て圧送されるコンクリートを、覆工空間Sに同時に供給しながら打設することによって行うことができる。 When the plurality of joint forming plate members 15, 15' are arranged and installed in the circumferential direction by the method of installing the joint forming plate members of this embodiment, the tunnel T covered with the primary lining 5 is Concrete is poured into a lining space S, which is a concrete placement space, formed between the inner peripheral surface and the formwork surface formed by the outer peripheral portion of the formwork main body 3 of the tunnel lining formwork 1. Then, work to construct tunnel lining concrete 4 is performed. In this embodiment, as shown in FIGS. 2 and 3, the work of constructing the tunnel lining concrete 4 involves pumping concrete from two concrete pumps 30 through pressure pipes 31 extending from two concrete pumps 30 to cover the tunnel. This can be done by simultaneously supplying the material to the work space S and pouring it.

本実施形態では、2台のコンクリートポンプ30は、トンネルT内に搬入されたトンネル覆工用型枠1を挟んでトンネルTの掘進方向Xの前方と後方に、それぞれ配置されており、各々のコンクリートポンプ30のホッパー部には、各々のコンクリートミキサー車32からコンクリート12がそれぞれ投入される。ここで、前後2台のコンクリートポンプ30からは圧送配管31がそれぞれ延びており、各々のコンクリートミキサー車32から各々のコンクリートポンプ30のホッパー部へ投入されたコンクリート12は、2系統の各々の圧送配管31から覆工空間Sに同時に圧送されて供給される。このように、2系統のコンクリートポンプ30と圧送配管31とを用いることによって、トンネル覆工コンクリート4を形成するための工程の進捗を効果的に早めることができる。 In this embodiment, the two concrete pumps 30 are placed at the front and rear of the tunnel T in the excavation direction X, sandwiching the tunnel lining formwork 1 carried into the tunnel T. Concrete 12 is charged into the hopper portion of the concrete pump 30 from each concrete mixer truck 32, respectively. Here, pressure-feeding pipes 31 extend from the two front and rear concrete pumps 30, and the concrete 12 charged from each concrete mixer truck 32 to the hopper section of each concrete pump 30 is transferred to each of the two systems for pressure-feeding. They are simultaneously pressure-fed and supplied from the piping 31 to the lining space S. In this way, by using two systems of concrete pumps 30 and pressure-feeding piping 31, the progress of the process for forming tunnel lining concrete 4 can be effectively accelerated.

2台のコンクリートポンプ30からそれぞれ延びる2系統の圧送配管31は、トンネル覆工用型枠1の内側に向かって延びる主配管31aと、主配管31aからロータリバルブ29を介してトンネルTの幅方向両側に枝分かれした左右の分岐管31bとを含んで構成されている。ここで、各々の分岐管31bは、長さの異なる直管や湾曲管等からなる複数のピース管を含んで構成されており、選択した複数のピース管を組み付けて、圧入接続口11a、11bに各々接続されるように配置される。またこれらのピース管を組み替えることによって、当該分岐管31bを、型枠本体部3の2分割された分割型枠本体部3A,3Bの、好ましくは各々の掘進方向Xの後端部に形成された、下段の圧入接続口11aから上段の圧入接続口11bに切り替えて接続したり、上段の圧入接続口11bから天頂部圧入接続口27に切り替えて接続したりして、コンクリート12を打設することができるようになっている。 Two systems of pressure-feeding pipes 31 extending from the two concrete pumps 30 include a main pipe 31a extending toward the inside of the tunnel lining form 1, and a main pipe 31a extending in the width direction of the tunnel T via a rotary valve 29 from the main pipe 31a. It is configured to include left and right branch pipes 31b branched on both sides. Here, each branch pipe 31b is configured to include a plurality of piece pipes such as straight pipes and curved pipes having different lengths, and the selected plurality of piece pipes are assembled to form the press-fit connection ports 11a, 11b. are arranged so as to be connected to each other. Moreover, by rearranging these piece pipes, the branch pipe 31b is formed preferably at the rear end of each of the two divided formwork main bodies 3A and 3B in the excavation direction X. In addition, the concrete 12 is poured by switching from the lower press-fit connection port 11a to the upper press-fit connection port 11b, or by switching from the upper press-fit connection port 11b to the top press-fit connection port 27. It is now possible to do so.

また、本実施形態では、覆工空間Sに打設されたコンクリートが硬化して、トンネル覆工コンクリート4が形成されたら、好ましくは特願2020-61496に記載された目地部形成用プレート部材の引抜き撤去方法によって、複数の目地部形成用プレート部材15,15’の各々を、覆工空間Sから型枠本体部3の内側に引き抜くことによって、誘発目地が形成されることになる。 In addition, in this embodiment, once the concrete poured in the lining space S has hardened and the tunnel lining concrete 4 is formed, it is preferable to use the joint forming plate member described in Japanese Patent Application No. 2020-61496. By pulling out each of the plurality of joint forming plate members 15, 15' from the lining space S to the inside of the formwork main body 3 using the pulling out method, an induced joint is formed.

そして、本実施形態の目地部形成用プレート部材の設置方法によれば、上述のように、各々の目地部形成用プレート部材15,15’を、トンネル覆工用型枠1の型枠本体部3の型枠面から覆工空間Sに目地部形成部15Aを垂直に立設させると共に、隣接する目地部形成用プレート部材15,15’との間で目地部形成部15Aが周方向に連続するように、立ち角度を精度良く調整して設置することができるので、覆工空間Sに打設されたコンクリート4が硬化した後に目地部形成用プレート部材15,15’を撤去する際に、覆工コンクリート4から引き抜き難くなるのを回避して、目地部形成用プレート部材15,15’をスムーズに撤去できるようにすることが可能になる。 According to the method for installing a joint forming plate member of the present embodiment, each of the joint forming plate members 15 and 15' is attached to the formwork main body of the tunnel lining formwork 1, as described above. The joint forming part 15A is vertically installed in the lining space S from the formwork surface of No. 3, and the joint forming part 15A is continuous in the circumferential direction between the adjacent joint forming plate members 15 and 15'. Since the standing angle can be adjusted and installed with high accuracy, when removing the joint forming plate members 15, 15' after the concrete 4 poured in the lining space S has hardened, It becomes possible to avoid difficulty in pulling out the joint forming plate members 15, 15' from the concrete lining 4, and to smoothly remove the joint forming plate members 15, 15'.

また特に、周方向に連設配置された目地部形成用プレート部材15,15’のうち先行して撤去されることになる、周方向の両側の側部辺部間の間隔が、外周辺部側から内周辺部側に向かって拡大するハの字形状部分を含む目地部形成用プレート部材15’や、これに隣接する目地部形成用プレート部材15(図7参照)が、精度良く立設して取り付けられていないと、目地部形成部が前後方向にずれて周方向に連続しなくなることで、ハの字形状部分を含む目地部形成用プレート部材15’を先行して引き抜いた後に、隣接する目地部形成用プレート部材15を引き抜く際に、ずれた部分で側部辺部が硬化したコンクリートに引っ掛かることになって、当該隣接する目地部形成用プレート部材15を引き抜くことが困難になるが、本実施形態によれば、これらのハの字形状部分を含む目地部形成用プレート部材15’やこれに隣接する目地部形成用プレート部材15が、立ち角度が精度良く調整された状態で連設して取り付けられているので、これらの目地部形成用プレート部材15,15’が覆工コンクリート4から引き抜き難くなるのを、効果的に回避することが可能になる。 In particular, the distance between the side edges on both sides in the circumferential direction, which are to be removed in advance among the joint forming plate members 15, 15' arranged in series in the circumferential direction, is The joint forming plate member 15', which includes a V-shaped portion that expands from the side toward the inner periphery, and the adjacent joint forming plate member 15 (see FIG. 7) are erected with high accuracy. If it is not attached, the joint forming part will shift in the front-rear direction and will not be continuous in the circumferential direction. When pulling out the adjacent joint forming plate member 15, the side edge portion gets caught in the hardened concrete at the shifted portion, making it difficult to pull out the adjacent joint forming plate member 15. However, according to the present embodiment, the joint forming plate member 15' including these V-shaped portions and the joint forming plate member 15 adjacent thereto are formed in a state in which the standing angle is precisely adjusted. Since they are attached in series, it is possible to effectively prevent these joint forming plate members 15, 15' from becoming difficult to pull out from the lining concrete 4.

なお、本発明は上記の実施形態に限定されることなく種々の変更が可能である。例えば、トンネル覆工用型枠の型枠本体部は、2分割されたものである必要は必ずしも無く、3分割以上されたものであっても良く、3分割以上された分割型枠本体部の各隣接する端部の間のスリット状の隙間に挿入される目地部形成用プレート部材を設置する際にも、本発明の設置方法を採用することができる。 Note that the present invention is not limited to the above-described embodiments, and various modifications can be made. For example, the formwork main body of the formwork for tunnel lining does not necessarily have to be divided into two parts, but may be divided into three or more parts, and the formwork main body part divided into three or more parts is not necessarily divided into two parts. The installation method of the present invention can also be employed when installing a joint forming plate member to be inserted into a slit-like gap between adjacent end portions.

1 トンネル覆工用型枠
2 架台部
3 型枠本体部
3A、3B 分割型枠本体部
4 トンネル覆工コンクリート(覆工コンクリート)
15 目地部形成用プレート部材
15A 目地部形成部
15B 内側突出把持部
16a プレート側ピン挿通孔
21A,21B 端部リブプレート
23a 端面ピン挿通孔
25 基板プレート
26 ピン部材
63 反力板
63a 雌ネジ孔
64 ボルト部材
δ スリット状の隙間
S 覆工空間
T トンネル
X トンネルの掘進方向(トンネル覆工用型枠の軸方向)
1 Formwork for tunnel lining 2 Frame part 3 Formwork body parts 3A, 3B Divided formwork body part 4 Tunnel lining concrete (lining concrete)
15 Joint forming plate member 15A Joint forming portion 15B Inner protruding grip portion 16a Plate side pin insertion holes 21A, 21B End rib plate 23a End face pin insertion hole 25 Substrate plate 26 Pin member 63 Reaction force plate 63a Female screw hole 64 Bolt member δ Slit-shaped gap S Lining space T Tunnel X Tunnel excavation direction (axial direction of tunnel lining formwork)

Claims (2)

山岳トンネル工法において、トンネル覆工コンクリートを構築する際に設置されるトンネル覆工用型枠の軸方向の中間部分に引き抜き可能に取り付けられる、構築されるトンネル覆工コンクリートに誘発目地を形成する目地部形成用プレート部材を、打設されたコンクリートが硬化した後に引抜き可能な状態で設置するための目地部形成用プレート部材の設置方法であって、
前記トンネル覆工用型枠は、トンネルの掘進方向に移動可能な架台部と、該架台部に支持されてトンネルの内壁面との間に覆工空間を形成する型枠本体部とを備えており、
該型枠本体部は、トンネルの掘進方向に分割された複数の分割型枠本体部によって構成されており、これらの分割型枠本体部の隣接する端部の間には、スリット状の隙間が全周に亘って連続して形成されており、該スリット状の隙間には、複数の前記目地部形成用プレート部材が各々挿入され、挿入された前記目地部形成用プレート部材は、外周辺部側の目地部形成部を前記覆工空間に突出させた状態で、内周辺部側の内側突出把持部を前記分割型枠本体部に固定して、周方向に連設配置されて取り付けられるようになっており、
前記目地部形成用プレート部材には、前記内側突出把持部に、表裏両側の面から各々張り出して固定された雌ネジ孔を有する一対の反力板が、周方向に間隔をおいて少なくとも2部位に取り付けられており、
少なくとも4箇所の前記反力板の前記雌ネジ孔に、ボルト部材を各々螺着して先端を前記分割型枠本体部に当接させ状態で、これらのボルト部材を回転させつつ進退させることにより、前記目地部形成用プレート部材を、隣接する前記目地部形成用プレート部材との間で前記目地部形成部が周方向に連続するように、立ち角度を調整して設置する目地部形成用プレート部材の設置方法。
In the mountain tunnel construction method, a joint that forms an induced joint in the tunnel lining concrete to be constructed, which is removably attached to the axial middle part of the tunnel lining formwork that is installed when constructing the tunnel lining concrete. A method for installing a joint forming plate member for installing the joint forming plate member in a state where it can be pulled out after the poured concrete has hardened, the method comprising:
The tunnel lining formwork includes a pedestal part that is movable in the tunnel excavation direction, and a formwork main body that is supported by the pedestal part and forms a lining space between it and the inner wall surface of the tunnel. Ori,
The formwork body is composed of a plurality of divided formwork body parts divided in the tunnel excavation direction, and a slit-like gap is formed between adjacent ends of these divided formwork body parts. The plurality of joint forming plate members are each inserted into the slit-like gap, and the inserted joint forming plate members are formed continuously over the entire circumference. With the side joint forming part protruding into the lining space, the inner protruding grip part on the inner periphery side is fixed to the split formwork main body part so that it can be installed in a continuous manner in the circumferential direction. has become,
In the joint forming plate member, a pair of reaction plates each having a female threaded hole protruding from both the front and back surfaces are fixed to the inner protruding grip portion at least at two positions spaced apart in the circumferential direction. It is attached to
By screwing bolt members into the female threaded holes of the reaction plate at least four places, and moving the bolt members forward and backward while rotating the bolt members with their tips in contact with the main body of the split formwork. , a joint forming plate in which the standing angle of the joint forming plate member is adjusted and installed so that the joint forming part is continuous in the circumferential direction between adjacent joint forming plate members; How to install parts.
前記立ち角度を調整して設置される目地部形成用プレート部材が、前記分割型枠本体部の周方向の両側に位置する側部辺部間の間隔が、前記外周辺部側から前記内周辺部側に向かって拡大するハの字形状部分を含む目地部形成用プレート部材と、目地部形成部を周方向に連続させて隣接して配置される目地部形成用プレート部材である請求項1記載の目地部形成用プレート部材の設置方法。
The joint forming plate member, which is installed by adjusting the standing angle, is arranged such that the interval between the side edges located on both sides of the divided formwork main body in the circumferential direction is from the outer periphery side to the inner periphery side. Claim 1: A joint forming plate member including a V-shaped portion that expands toward the side, and a joint forming plate member disposed adjacent to the joint forming portion so as to be continuous in the circumferential direction. Installation method of the joint forming plate member described.
JP2021050557A 2021-03-24 2021-03-24 How to install plate members for joint formation Active JP7449540B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021050557A JP7449540B2 (en) 2021-03-24 2021-03-24 How to install plate members for joint formation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021050557A JP7449540B2 (en) 2021-03-24 2021-03-24 How to install plate members for joint formation

Publications (2)

Publication Number Publication Date
JP2022148752A JP2022148752A (en) 2022-10-06
JP7449540B2 true JP7449540B2 (en) 2024-03-14

Family

ID=83462397

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021050557A Active JP7449540B2 (en) 2021-03-24 2021-03-24 How to install plate members for joint formation

Country Status (1)

Country Link
JP (1) JP7449540B2 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002004443A (en) 2000-06-26 2002-01-09 Shimizu Corp Installation method and installation structure of induced joint material
JP2020122303A (en) 2019-01-29 2020-08-13 株式会社奥村組 Arrangement structure of plate member for forming joint

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002004443A (en) 2000-06-26 2002-01-09 Shimizu Corp Installation method and installation structure of induced joint material
JP2020122303A (en) 2019-01-29 2020-08-13 株式会社奥村組 Arrangement structure of plate member for forming joint

Also Published As

Publication number Publication date
JP2022148752A (en) 2022-10-06

Similar Documents

Publication Publication Date Title
JP7178243B2 (en) Tunnel lining construction method
JP7018614B2 (en) Method of forming induced joints in concrete structures
JP2020023797A (en) Method for placing concrete used for lining on upper end portion of tunnel
JP2023076765A (en) Placement method of tunnel lining concrete
CN107558483B (en) A kind of construction method of building foundation that installing wallboard
JP7449540B2 (en) How to install plate members for joint formation
JP7241340B2 (en) Arrangement structure of plate members for joint formation
JP7241336B2 (en) Placement method of tunnel lining concrete
JP7360128B2 (en) How to pull out and remove the joint forming plate member
JP7498928B2 (en) Method for removing joint forming plate member
JP7241339B2 (en) Arrangement structure of plate members for joint formation
JP7326686B2 (en) Mounting structure of joint forming plate member
JP2020122299A (en) Formwork for tunnel lining
JPH02128098A (en) Method of shield lining construction
JPH057359Y2 (en)
JP7154503B2 (en) formwork for tunnel lining
JP7241337B2 (en) Joint forming unit
JP3406280B2 (en) Manufacturing method of synthetic segment
JP7241338B2 (en) Plate member for joint formation
JP7285519B2 (en) Mounting structure of joint forming plate member
JP2001193382A (en) Constructing method for shaft having wall with varied thickness
JPH09310591A (en) Formwork structure
JP7429131B2 (en) Formwork for manufacturing hexagonal segments
JP7702916B2 (en) Invert formwork manufacturing device, invert construction system and invert construction method
JPH02183094A (en) Constructing method of lining

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20230626

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240122

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20240206

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20240222

R150 Certificate of patent or registration of utility model

Ref document number: 7449540

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150