JP7472249B2 - Anti-vibration floating floor support spring extension mechanism and anti-vibration floating floor construction method - Google Patents
[go: Go Back, main page]

JP7472249B2 - Anti-vibration floating floor support spring extension mechanism and anti-vibration floating floor construction method - Google Patents

Anti-vibration floating floor support spring extension mechanism and anti-vibration floating floor construction method Download PDF

Info

Publication number
JP7472249B2
JP7472249B2 JP2022192980A JP2022192980A JP7472249B2 JP 7472249 B2 JP7472249 B2 JP 7472249B2 JP 2022192980 A JP2022192980 A JP 2022192980A JP 2022192980 A JP2022192980 A JP 2022192980A JP 7472249 B2 JP7472249 B2 JP 7472249B2
Authority
JP
Japan
Prior art keywords
floating floor
spring unit
jack
spring
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2022192980A
Other languages
Japanese (ja)
Other versions
JP2023025164A (en
Inventor
祥江 小槻
和彦 磯田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Corp
Original Assignee
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Corp filed Critical Shimizu Corp
Publication of JP2023025164A publication Critical patent/JP2023025164A/en
Application granted granted Critical
Publication of JP7472249B2 publication Critical patent/JP7472249B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)
  • Floor Finish (AREA)
  • Vibration Prevention Devices (AREA)
  • Springs (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Description

本発明は、防振浮き床支持ばね伸縮機構、及び防振浮き床の施工方法に関するものである。 The present invention relates to an anti-vibration floating floor support spring extension mechanism and an anti-vibration floating floor construction method.

従来から、床上で生じる加振力による振動が地盤を介して周囲に伝わり、振動問題が起きるケースがある。ライブハウスやコンサートホール、ダンススタジオ等では多人数が音楽に合わせて動く、いわゆるタテノリ動作に起因する振動によって、周囲の建物が揺れて問題となった事例がある。 In the past, there have been cases where vibrations caused by excitation forces on the floor have been transmitted through the ground to the surrounding area, resulting in vibration problems. In live music venues, concert halls, dance studios, etc., there have been cases where vibrations caused by so-called vertical movement, where many people move in time with the music, have caused surrounding buildings to shake, resulting in problems.

このような振動問題に対する対策として、RCスラブで構成された床を構造躯体と絶縁した浮き床として設計し、振動伝播を抑制する方法がある(下記の特許文献1参照)。このような防振浮き床の構成を図34に示す。構造躯体を部分的に凹ませ、ばねで支持された浮き床を設けたものである。浮き床は構造躯体に対して鉛直方向に相対変位する必要があり、支持ばねの変位はそれに対応する。防振効果を高めるためには支持ばねの剛性を小さくし、床を柔らかく支持するほど良い。しかし、支持ばねの剛性が小さすぎると、上載荷重による過大な沈込みや、歩行時に床が動いて不快感を生じる等、床としての使用性に問題が起こる可能性がある。よって、一般的には浮き床の鉛直固有振動数を1Hz程度以上とし、通常使用時の鉛直変位が20mm程度以下となるように支持ばねの特性を設定する。 As a countermeasure against such vibration problems, there is a method of designing a floor made of RC slabs as a floating floor that is insulated from the structural frame to suppress vibration propagation (see Patent Document 1 below). The structure of such a vibration-proof floating floor is shown in Figure 34. The structural frame is partially recessed, and a floating floor supported by springs is provided. The floating floor needs to be displaced vertically relative to the structural frame, and the displacement of the support springs corresponds to this. In order to increase the vibration-proof effect, the stiffness of the support springs should be reduced and the floor should be supported more softly. However, if the stiffness of the support springs is too small, problems may occur in the usability of the floor, such as excessive sinking due to the load on top and discomfort caused by the floor moving when walking. Therefore, the vertical natural frequency of the floating floor is generally set to about 1 Hz or more, and the characteristics of the support springs are set so that the vertical displacement during normal use is about 20 mm or less.

上記のような浮き床の支持ばねとしては、空気ばねや皿ばね・コイルばねが用いられている。ただし、空気ばねは高価でコンプレッサー等の機械設備を必要とするため、建築物においては皿ばねやコイルばねが採用される場合が多い。このようなばね部材は、一般的に軸方向(支持力方向)のみに変形することを想定されており、軸直交方向に変形が生じると所定の性能が発揮されない虞がある。このため、図34に示すように浮き床と構造体の間は隙間を設けて絶縁し、浮き床が構造躯体に対して円滑に相対鉛直変位できるようにする。また、支持ばねに支持力方向以外の変位が生じるのを防ぐため、浮き床の水平方向への変位を拘束するための水平拘束材を浮き床と構造躯体の間に設ける場合もある。 Air springs, coned disc springs, and coil springs are used as support springs for floating floors like the one described above. However, air springs are expensive and require mechanical equipment such as compressors, so coned disc springs and coil springs are often used in buildings. Such spring members are generally expected to deform only in the axial direction (support force direction), and there is a risk that the specified performance will not be achieved if deformation occurs in a direction perpendicular to the axis. For this reason, as shown in Figure 34, a gap is provided between the floating floor and the structure to insulate them, allowing the floating floor to smoothly move vertically relative to the structural frame. Also, in order to prevent the support springs from being displaced in directions other than the support force direction, horizontal restraint materials to restrain the horizontal displacement of the floating floor may be provided between the floating floor and the structural frame.

特開2013-53720号公報JP 2013-53720 A

しかしながら、浮き床を施工する段階で浮き床の水平方向移動を防ぐことは困難である。支持ばねで支えられた状態で浮き床コンクリートを打設すると、打設時の作業の影響やコンクリートの乾燥収縮によって、支持ばねに水平変位が生じてばねの性能に悪影響を及ぼす虞がある。これを防ぐためには、浮き床コンクリートの打設時には支持ばねで荷重を支持せず支保工等の仮設支持部材で荷重を支持して、浮き床コンクリート硬化後に支持ばねに荷重を受け替えることが望ましい。このような荷重の受け替え作業を行うためには、支持ばねを設置位置において伸縮させる必要がある。
また、大地震等により想定外の外力が加わることで、万一支持ばねが損傷した場合には、支持ばねの取替が必要となる。支持ばねを交換するためには、支保工等の仮設支持部材を設置して浮き床自重を仮支持した後、損傷した支持ばねを縮ませて取り出す作業、新規の支持ばねを所定位置に設置した後、新規の支持ばねに荷重を受け替える作業が発生し、このためにも支持ばねを設置位置にて伸縮させる必要がある。
However, it is difficult to prevent the floating floor from moving horizontally during construction. If the floating floor concrete is poured while supported by the support springs, the work involved in pouring the concrete or the drying shrinkage of the concrete may cause horizontal displacement of the support springs, which may adversely affect the performance of the springs. To prevent this, it is preferable to support the load not with the support springs but with temporary support members such as shoring when pouring the floating floor concrete, and then transfer the load to the support springs after the floating floor concrete has hardened. To perform such load transfer work, it is necessary to expand and contract the support springs at the installation position.
Furthermore, in the unlikely event that the support springs are damaged by the application of unexpected external forces such as a major earthquake, the support springs will need to be replaced. In order to replace the support springs, temporary support members such as shoring must be installed to temporarily support the floating floor's own weight, the damaged support springs must then be compressed and removed, and new support springs must be installed in the designated position, after which the load must be transferred to the new support springs, which also requires the support springs to be expanded and contracted at the installed position.

そこで、本発明は、上記事情に鑑みてなされたものであり、施工時及び取替時に支持ばねを設置位置にて伸縮可能とする防振浮き床支持ばね伸縮機構、及び防振浮き床の施工方法を提供する。 The present invention has been made in consideration of the above circumstances, and provides an anti-vibration floating floor support spring extension mechanism that allows the support spring to be extended or contracted at the installation position during construction and replacement, and a construction method for an anti-vibration floating floor.

上記目的を達成するために、本発明は以下の手段を採用している。
すなわち、本発明に係る防振浮き床支持ばね伸縮機構は、基礎の上方に浮き床を設置する際に使用される防振浮き床支持ばね伸縮機構であって、前記基礎上に設置される下部体と、該下部体の上方に配置され、浮き床が設置される上部体と、前記下部体に固定された下部プレートと、前記上部体の下方に該上部体を支持可能に配置された上部プレートと、前記下部プレートと前記上部プレートとの間に配置された支持ばねと、を有する第一ばねユニットと、前記下部体または前記下部プレートに固定され、前記上部プレートに下向きの力を付与可能な第一ジャッキセットと、前記浮き床を支持可能な第一仮設支持部材と、を備え、前記第一ジャッキセットは、前記下部体または前記下部プレートに固定された反力支持架構と、前記上部プレートに連結された第一鋼棒と、該第一鋼棒に下向きの力を付与可能な第一ジャッキと、前記第一鋼棒を前記反力支持架構の任意の位置に固定及び固定解除が可能な位置保持部材と、を備えることを特徴とする。
In order to achieve the above object, the present invention employs the following means.
In other words, the vibration-proof floating floor support spring extension mechanism of the present invention is a vibration-proof floating floor support spring extension mechanism used when installing a floating floor above a foundation, and comprises a first spring unit having a lower body installed on the foundation, an upper body arranged above the lower body and on which the floating floor is installed, a lower plate fixed to the lower body, an upper plate arranged below the upper body so as to be able to support the upper body, and a support spring arranged between the lower plate and the upper plate, a first jack set fixed to the lower body or the lower plate and capable of applying a downward force to the upper plate, and a first temporary support member capable of supporting the floating floor, and the first jack set comprises a reaction support structure fixed to the lower body or the lower plate, a first steel rod connected to the upper plate, a first jack capable of applying a downward force to the first steel rod, and a position holding member capable of fixing and releasing the first steel rod to any position of the reaction support structure.

このように構成された防振浮き床支持ばね伸縮機構では、浮き床を施工時に、第一ジャッキセットによって第一ばねユニットの上部プレートに下向きの力を付与して、第一ばねユニットの全長を短くしておく。浮き床を施工する際には、支保工等の第一仮設支持部材で浮き床を支持させる。浮き床の少なくとも一部ができた(例えば1層目のコンクリートが硬化した)後に、第一ジャッキセットによって第一ばねユニットから下向きの力を除去して、第一ばねユニットの全長を長くして、第一ばねユニットで浮き床を支持させる。よって、浮き床の施工初期段階で、浮き床の自重を支持するのは支保工等の第一仮設支持部材であって、第一ばねユニットは浮き床から絶縁しているため、施工作業に起因する外力が第一ばねユニットに作用するのを防ぐ。 In the vibration-proof floating floor support spring extension mechanism configured in this manner, when constructing the floating floor, a downward force is applied to the upper plate of the first spring unit by the first jack set to shorten the overall length of the first spring unit. When constructing the floating floor, the floating floor is supported by a first temporary support member such as a shoring. After at least a portion of the floating floor is completed (for example, the first layer of concrete has hardened), the downward force is removed from the first spring unit by the first jack set, the overall length of the first spring unit is lengthened, and the floating floor is supported by the first spring unit. Therefore, in the initial stage of construction of the floating floor, it is the first temporary support member such as a shoring that supports the floating floor's own weight, and the first spring unit is insulated from the floating floor, so that external forces caused by construction work are prevented from acting on the first spring unit.

また、このように構成された防振浮き床支持ばね伸縮機構では、上部プレートが上部体に連結されていない状態で、第一ジャッキセットの第一ジャッキを載荷すると第一鋼棒は下向きに引っ張られて、反力支持架構に対して相対的に下方に移動する。第一鋼棒と連結された第一ばねユニットの上部プレートには、下向きの力が付与されるため、第一ばねユニットの全長は短くなる。この状態で位置保持部材によって第一鋼棒を反力支持架構に現位置で固定すると、第一ばねユニットの全長が短い状態が維持される。この状態において、第一ジャッキセットの第一ジャッキは除荷、撤去することが可能である。この状態で、第一鋼棒には上部プレートとの連結部と位置保持部材との間に引張力が生じている。
また、この状態から第一ジャッキを設置し、第一ばねユニットを縮めた際の荷重以上の力を載荷して第一鋼棒全体に引張力を作用させた後、第一鋼棒を反力支持架構に固定している位置保持部材の固定を解除してから、第一ジャッキを除荷すると、第一ばねユニットに作用していた下向きの力が除荷されて、第一ばねユニットの全長は長くなる。
このように、支持ばね伸縮機構を用いることで、第一ばねユニットの設置時寸法を縮めつつ長さの調整を容易に行うことができる。
In addition, in the vibration-proof floating floor support spring extension mechanism configured in this manner, when the first jack of the first jack set is loaded with the upper plate not connected to the upper body, the first steel rod is pulled downward and moves downward relative to the reaction support frame. A downward force is applied to the upper plate of the first spring unit connected to the first steel rod, so the overall length of the first spring unit is shortened. In this state, when the first steel rod is fixed in its current position to the reaction support frame by the position retaining member, the short overall length of the first spring unit is maintained. In this state, the first jack of the first jack set can be unloaded and removed. In this state, a tensile force is generated in the first steel rod between the connection part with the upper plate and the position retaining member.
Furthermore, from this state, the first jack is installed and a force greater than the load when the first spring unit is compressed is applied to apply a tensile force to the entire first steel rod. After that, the position retaining member that secures the first steel rod to the reaction support structure is released and the first jack is unloaded. This removes the downward force that was acting on the first spring unit, and the overall length of the first spring unit becomes longer.
In this way, by using the support spring expansion and contraction mechanism, the installed dimensions of the first spring unit can be reduced while the length can be easily adjusted.

また、本発明に係る防振浮き床の施工方法は、下部体上に、第一ばねユニットを設置するばねユニット設置工程と、第一ジャッキセットを前記下部体上に設置して、前記第一ジャッキセットの第一鋼棒を前記第一ばねユニットの上部プレートに連結するジャッキセット設置工程と、浮き床を支持可能な第一仮設支持部材を設置する第一仮設支持部材設置工程と、前記第一ばねユニット及び前記第一ジャッキセットの上方に上部体を設置する上部体設置工程と、前記第一ジャッキセットから前記第一ばねユニットの上部プレートに下向きの力を付与する下向きの力付与工程と、前記上部体の上方に前記浮き床を施工して、該浮き床を前記第一仮設支持部材で支持させる浮き床施工工程と、前記上部プレートに付与していた下向きの力を除去し、前記浮き床を前記第一ばねユニットで支持させる荷重受け替え工程と、を備えることを特徴とする。 The vibration-isolating floating floor construction method according to the present invention is characterized by comprising a spring unit installation step of installing a first spring unit on a lower body, a jack set installation step of installing a first jack set on the lower body and connecting a first steel rod of the first jack set to the upper plate of the first spring unit, a first temporary support member installation step of installing a first temporary support member capable of supporting a floating floor, an upper body installation step of installing an upper body above the first spring unit and the first jack set, a downward force application step of applying a downward force from the first jack set to the upper plate of the first spring unit, a floating floor construction step of constructing the floating floor above the upper body and supporting the floating floor with the first temporary support member, and a load transfer step of removing the downward force applied to the upper plate and supporting the floating floor with the first spring unit.

このように構成された防振浮き床の施工方法では、下向きの力付与工程で、第一ジャッキセットによって第一ばねユニットの上部プレートに下向きの力を付与する。これにより、第一ばねユニットの全長が短くなる。浮き床施工工程では、浮き床自重を第一仮設支持部材に支持させる。浮き床の少なくとも一部ができた(例えば1層目のコンクリートが硬化した)後に、荷重受け替え工程で上部プレートに付与していた下向きの力を除去する。これにより、第一ばねユニットが伸長し、浮き床を第一ばねユニットが支持する。よって、浮き床の施工初期段階で、浮き床の自重を支持するのは支保工等の第一仮設支持部材であって、第一ばねユニットは浮き床から絶縁しているため、施工作業に起因する外力が第一ばねユニットに作用して第一ばねユニットの性能に悪影響を及ぼすことを防ぐことができる。 In the vibration-isolation floating floor construction method configured in this manner, in the downward force application process, a downward force is applied to the upper plate of the first spring unit by the first jack set. This shortens the overall length of the first spring unit. In the floating floor construction process, the floating floor's own weight is supported by the first temporary support member. After at least a portion of the floating floor is completed (for example, the first layer of concrete has hardened), the downward force applied to the upper plate in the load transfer process is removed. This causes the first spring unit to expand and support the floating floor. Therefore, in the initial stage of floating floor construction, it is the first temporary support member such as a shoring that supports the floating floor's own weight, and the first spring unit is insulated from the floating floor, so it is possible to prevent external forces caused by construction work from acting on the first spring unit and adversely affecting the performance of the first spring unit.

本発明に係る防振浮き床支持ばね伸縮機構、及び防振浮き床の施工方法によれば、施工時に、ばねユニットに施工作業に起因する外力が作用して、ばねユニットの性能に悪影響を及ぼすことを防ぐことができる。 The anti-vibration floating floor support spring extension mechanism and the anti-vibration floating floor construction method of the present invention can prevent external forces caused by construction work from acting on the spring unit during construction, which can adversely affect the performance of the spring unit.

本発明の一実施形態に係る防振浮き床支持ばね伸縮機構の皿ばねユニットの基本構成を示す図である。1 is a diagram showing the basic configuration of a disc spring unit of an anti-vibration floating floor support spring extension mechanism according to one embodiment of the present invention. FIG. 本発明の一実施形態に係る防振浮き床支持ばね伸縮機構の皿ばねユニットの伸縮の概念図であり、(a)はプレロード無しで搬入時を示し、(b)はプレロード無しで床自重支持時を示し、(c)はプレロード有りで搬入時を示し、(d)はプレロード有りで床自重支持時を示している。1A and 1B are conceptual diagrams of the expansion and contraction of a disc spring unit of an anti-vibration floating floor support spring expansion mechanism according to one embodiment of the present invention, in which (a) shows the time of loading without preload, (b) shows the time of supporting the floor's own weight without preload, (c) shows the time of loading with preload, and (d) shows the time of supporting the floor's own weight with preload. 本発明の一実施形態に係る防振浮き床支持ばね伸縮機構の皿ばねの荷重と変位との関係上に、皿ばねユニットの可動域を示したグラフである。1 is a graph showing the range of motion of a disc spring unit in relation to the load and displacement of the disc spring of an anti-vibration floating floor support spring extension mechanism according to one embodiment of the present invention. 本発明の一実施形態に係る防振浮き床支持ばね伸縮機構において、(a)ばねユニット及びジャッキセットの構成を示す立面図であり、(b)ばねユニット及びジャッキセットの構成を示す平面図である。In an anti-vibration floating floor support spring extension mechanism according to one embodiment of the present invention, (a) is an elevational view showing the configuration of a spring unit and a jack set, and (b) is a plan view showing the configuration of the spring unit and the jack set. 本発明の一実施形態の変形例1に係る防振浮き床支持ばね伸縮機構において、(a)ばねユニット及びジャッキセットの構成を示す立面図であり、(b)ばねユニット及びジャッキセットの構成を示す平面図である。In an anti-vibration floating floor support spring extension mechanism relating to a variant 1 of one embodiment of the present invention, (a) is an elevational view showing the configuration of a spring unit and a jack set, and (b) is a plan view showing the configuration of the spring unit and the jack set. 本発明の一実施形態の変形例1に係る防振浮き床支持ばね伸縮機構において仮設支持部材の設置例を示し、(a)正面図であり、(b)平面図である。1A and 1B are front and plan views showing an example of installation of a temporary support member in an anti-vibration floating floor support spring extension mechanism relating to a variant 1 of one embodiment of the present invention. 本発明の一実施形態の変形例1に係る防振浮き床支持ばね伸縮機構の施工方法を示す図である。A diagram showing a construction method of an anti-vibration floating floor support spring extension mechanism relating to variant 1 of one embodiment of the present invention. 本発明の一実施形態の変形例1に係る防振浮き床支持ばね伸縮機構の施工方法を示す図であり、図7に示す工程の後工程を示している。This is a diagram showing a construction method for an anti-vibration floating floor support spring extension mechanism relating to variant 1 of one embodiment of the present invention, and shows a process subsequent to the process shown in Figure 7. 本発明の一実施形態の変形例1に係る防振浮き床支持ばね伸縮機構の施工方法を示す図であり、図8に示す工程の後工程を示している。This is a diagram showing a construction method for the vibration-isolating floating floor support spring extension mechanism relating to variant 1 of one embodiment of the present invention, and shows a process subsequent to the process shown in Figure 8. 本発明の一実施形態の変形例1に係る防振浮き床支持ばね伸縮機構の施工方法を示す図であり、図9に示す工程の後工程を示している。This is a diagram showing a construction method for an anti-vibration floating floor support spring extension mechanism relating to variant 1 of one embodiment of the present invention, and shows a process subsequent to the process shown in Figure 9. 本発明の一実施形態の変形例1に係る防振浮き床支持ばね伸縮機構の施工方法を示す図であり、図10に示す工程の後工程を示している。This is a diagram showing a construction method for an anti-vibration floating floor support spring extension mechanism relating to variant 1 of one embodiment of the present invention, and shows a process subsequent to the process shown in Figure 10. 本発明の一実施形態の変形例1に係る防振浮き床支持ばね伸縮機構の施工方法を示す図であり、図11に示す工程の後工程を示している。This is a diagram showing a construction method for an anti-vibration floating floor support spring extension mechanism relating to variant 1 of one embodiment of the present invention, and shows a process subsequent to the process shown in Figure 11. 本発明の一実施形態の変形例1に係る防振浮き床支持ばね伸縮機構の施工方法を示す図であり、図12に示す工程の後工程を示している。This is a diagram showing a construction method for an anti-vibration floating floor support spring extension mechanism relating to variant 1 of one embodiment of the present invention, and shows a process subsequent to the process shown in Figure 12. 本発明の一実施形態の変形例1に係る防振浮き床支持ばね伸縮機構の施工方法を示す図であり、図13に示す工程の後工程を示している。This is a diagram showing a construction method for an anti-vibration floating floor support spring extension mechanism relating to variant 1 of one embodiment of the present invention, and shows a process subsequent to the process shown in Figure 13. 本発明の一実施形態の変形例1に係る防振浮き床支持ばね伸縮機構の施工方法を示す図であり、図14に示す工程の後工程を示している。This is a diagram showing a construction method for an anti-vibration floating floor support spring extension mechanism relating to variant 1 of one embodiment of the present invention, and shows a process subsequent to the process shown in Figure 14. 本発明の一実施形態の変形例1に係る防振浮き床支持ばね伸縮機構の施工方法を示す図であり、図15に示す工程の後工程を示している。This is a diagram showing a construction method for an anti-vibration floating floor support spring extension mechanism relating to variant 1 of one embodiment of the present invention, and shows a process subsequent to the process shown in Figure 15. 本発明の一実施形態の変形例1に係る防振浮き床支持ばね伸縮機構の施工方法を示す図であり、図16に示す工程の後工程を示している。This is a diagram showing a construction method for an anti-vibration floating floor support spring extension mechanism relating to variant 1 of one embodiment of the present invention, and shows a process subsequent to the process shown in Figure 16. 本発明の一実施形態の変形例2に係る防振浮き床支持ばね伸縮機構の下部体及び下部プレートの構成を示す平面図である。A plan view showing the configuration of the lower body and lower plate of the vibration-proof floating floor support spring expansion mechanism related to variant 2 of one embodiment of the present invention. 本発明の一実施形態の変形例2に係る防振浮き床支持ばね伸縮機構を図18のA方向から見た立面図である。This is an elevational view of the vibration-proof floating floor support spring extension mechanism related to variant 2 of one embodiment of the present invention, viewed from direction A in Figure 18. 本発明の一実施形態の変形例2に係る防振浮き床支持ばね伸縮機構を図18のB方向から見た立面図である。This is an elevational view of the vibration-proof floating floor support spring extension mechanism related to variant 2 of one embodiment of the present invention, viewed from direction B in Figure 18. 本発明の一実施形態の変形例2に係る防振浮き床支持ばね伸縮機構の上部プレートの構成を示す平面図である。A plan view showing the configuration of the upper plate of the vibration-proof floating floor support spring expansion mechanism related to variant 2 of one embodiment of the present invention. 本発明の一実施形態の変形例2に係る防振浮き床支持ばね伸縮機構の中間プレートの構成を示す平面図である。A plan view showing the configuration of the intermediate plate of the vibration-proof floating floor support spring expansion mechanism related to variant 2 of one embodiment of the present invention. 本発明の一実施形態の変形例2に係る防振浮き床のばねユニットの交換方法の既存ばねユニットの設置状態を示す立面図である。This is an elevational view showing the installation state of an existing spring unit in a method for replacing a spring unit of an anti-vibration floating floor in accordance with variant 2 of one embodiment of the present invention. 本発明の一実施形態の変形例2に係る防振浮き床のばねユニットの交換方法の既存用ジャッキセット設置工程を示す立面図である。This is an elevational view showing the existing jack set installation process of the method for replacing a spring unit of an anti-vibration floating floor in accordance with variant 2 of one embodiment of the present invention. 本発明の一実施形態の変形例2に係る防振浮き床のばねユニットの交換方法の既存ばねユニット収縮工程の直前の状態を示す立面図である。This is an elevational view showing the state immediately before the existing spring unit contraction process in the method for replacing a spring unit of an anti-vibration floating floor in accordance with variant 2 of one embodiment of the present invention. 本発明の一実施形態の変形例2に係る防振浮き床のばねユニットの交換方法の既存ばねユニット収縮工程を示す立面図である。This is an elevational view showing the existing spring unit contraction process of the method for replacing a spring unit of an anti-vibration floating floor in accordance with variant 2 of one embodiment of the present invention. 本発明の一実施形態の変形例2に係る防振浮き床のばねユニットの交換方法の既存ばねユニット収縮保持工程を示す立面図である。This is an elevational view showing the existing spring unit contraction retention process of the method for replacing a spring unit of an anti-vibration floating floor in accordance with variant 2 of one embodiment of the present invention. 本発明の一実施形態の変形例2に係る防振浮き床のばねユニットの交換方法の既存ばねユニット撤去工程を示す立面図である。This is an elevational view showing the process of removing an existing spring unit in the method of replacing a spring unit of a vibration-isolation floating floor in accordance with variant 2 of one embodiment of the present invention. 本発明の一実施形態の変形例2に係る防振浮き床のばねユニットの交換方法の新規ばねユニット設置工程を示す立面図である。This is an elevational view showing the new spring unit installation process of the method for replacing a spring unit of an anti-vibration floating floor in accordance with variant 2 of one embodiment of the present invention. 本発明の一実施形態の変形例2に係る防振浮き床のばねユニットの交換方法の新規用ジャッキ設置工程を示す立面図である。This is an elevational view showing the new jack installation process in the method for replacing a spring unit of an anti-vibration floating floor in accordance with variant 2 of one embodiment of the present invention. 本発明の一実施形態の変形例2に係る防振浮き床のばねユニットの交換方法の鋼棒撤去工程を示す立面図である。This is an elevational view showing the steel bar removal process in the method for replacing a spring unit of a vibration-isolation floating floor in accordance with variant 2 of one embodiment of the present invention. 本発明の一実施形態の変形例2に係る防振浮き床のばねユニットの交換方法の新規ばねユニット伸長工程を示す立面図である。This is an elevational view showing the new spring unit extension process of the method for replacing a spring unit of an anti-vibration floating floor in accordance with variant 2 of one embodiment of the present invention. 本発明の一実施形態の変形例2に係る防振浮き床のばねユニットの交換方法の新規ばねユニット固定工程を示す立面図である。This is an elevational view showing the new spring unit fixing process in the method for replacing a spring unit of an anti-vibration floating floor in accordance with variant 2 of one embodiment of the present invention. 従来の防振浮き床の構成を示す図である。FIG. 1 is a diagram showing the configuration of a conventional vibration-isolating floating floor.

本発明の防振浮き床支持ばね伸縮機構及び防振浮き床の施工方法について、説明する。
まず、本発明の防振浮き床支持ばね伸縮機構で用いられる支持ばね(ばねユニット2)、及びプレロードの有無による支持ばねの沈み込みの違いについて説明する。
The vibration-isolating floating floor support spring expansion mechanism and the vibration-isolating floating floor construction method of the present invention will be described.
First, we will explain the support spring (spring unit 2) used in the vibration-isolating floating floor support spring expansion mechanism of the present invention, and the difference in sinking of the support spring depending on whether or not there is a preload.

防振浮き床に必要な剛性と鉛直方向のストロークを確保すると、支持ばねの長さはかなり長くなり搬入・設置時及び取替作業時に扱いにくい。また、浮き床コンクリート打設時に随時ばねが縮んでいくと非常に施工しにくい。例えば、床面積600m2(厚さ1m)のRC床で1Hzの浮き床を想定する。 To ensure the rigidity and vertical stroke required for an anti-vibration floating floor, the length of the support springs becomes quite long, making them difficult to handle when transporting, installing, and replacing. Furthermore, construction is extremely difficult if the springs continually shrink when the floating floor concrete is poured. For example, consider a 1 Hz floating floor on an RC floor with a floor area of 600 m2 (thickness of 1 m).

床自重:2.4t/m×600m×1m=1440t、浮き床固有振動1Hz、支持ばね剛性57kN/mmとすると、下記の式(1)に示すように、支持ばねの必要鉛直変位量は270mm以上となる。 If the floor weight is 2.4 t/m 3 × 600 m 2 × 1 m = 1,440 t, the floating floor natural vibration is 1 Hz, and the support spring rigidity is 57 kN/mm, then the required vertical displacement of the support spring is 270 mm or more, as shown in the following formula (1).

Figure 0007472249000001
Figure 0007472249000001

図1は、皿ばねユニットの基本構成を示す図である。
支持ばねとして、図1のような皿ばねユニット110を想定する。図1に示すように、皿ばねユニット110は、下部プレート101と、上部プレート102と、上下の座板103,104と、複数の皿ばね105と、ガイド106と、を主に備えている。
FIG. 1 is a diagram showing a basic structure of a disc spring unit.
The support spring is assumed to be a disc spring unit 110 as shown in Fig. 1. As shown in Fig. 1, the disc spring unit 110 mainly includes a lower plate 101, an upper plate 102, upper and lower seat plates 103 and 104, a plurality of disc springs 105, and a guide 106.

皿ばねユニット110は、その形状と組み合わせにより任意の特性を設定できる。所定の剛性とストロークを得るために、任意形状の多数の皿ばね105を組み合わせたものが図1に示すものである。 The disc spring unit 110 can be configured with any desired characteristics depending on its shape and combination. Figure 1 shows a combination of multiple disc springs 105 of any shape to obtain a desired stiffness and stroke.

図2は、皿ばねユニット110の伸縮の概念図であり、(a)はプレロード無しで搬入時を示し、(b)はプレロード無しで床自重支持時を示し、(c)はプレロード有りで搬入時を示し、(d)はプレロード有りで床自重支持時を示している。
図2に示すように、皿ばねを重ね合わせた部分の長さを約1,000mmとする。
FIG. 2 is a conceptual diagram of the expansion and contraction of the disc spring unit 110, where (a) shows the time of loading without preload, (b) shows the time of supporting the floor's own weight without preload, (c) shows the time of loading with preload, and (d) shows the time of supporting the floor's own weight with preload.
As shown in FIG. 2, the length of the overlapping disc springs is approximately 1,000 mm.

図2(a),(b)のように、プレロードなしの場合、必要鉛直変位量全てを可動域(290mmと設定)として設定する必要があるため、搬入時の皿ばねユニット110の全長が長く、施工時の床自重による沈み込み量が大きい。 As shown in Figures 2(a) and (b), when there is no preload, the entire required vertical displacement must be set as the range of motion (set at 290 mm), so the overall length of the disc spring unit 110 is long when delivered, and the amount of sinking due to the floor's own weight during installation is large.

一方、図2(c),(d)は、床自重による沈み込み量の7割分(174mm)に相当する荷重を工場製作時に予めプレロードとしてかけて、所定の寸法までばねの長さを縮めた場合である。この場合、可動域は床自重の残り3割(74mm)と観客重量、動的変位分で計96mm以上とすればよいため小さく抑えられ(図2中では120mmと設定)、皿ばねユニット110の搬入時の全長を短くでき、運搬・移動作業が容易になる。また、コンクリート打設量が7割を超えるまではばねが鉛直方向に変位しないのでばねによる沈下量のばらつきが小さくなり、施工がしやすくなる。 On the other hand, Figures 2(c) and (d) show the case where a load equivalent to 70% (174 mm) of the sinking amount due to the floor's own weight is applied as a preload during manufacturing at the factory, and the length of the spring is shortened to the specified dimension. In this case, the range of motion is kept small (set to 120 mm in Figure 2) because it is sufficient to have a total of 96 mm or more, consisting of the remaining 30% (74 mm) of the floor's own weight, the weight of the spectators, and the dynamic displacement. This shortens the overall length of the disc spring unit 110 when it is brought in, making transportation and moving easier. In addition, because the spring does not displace vertically until the amount of concrete poured exceeds 70%, the variation in the amount of sinking due to the spring is small, making construction easier.

プレロードの導入量は、浮き床使用時に必要な鉛直可動域と施工方法を考慮して決定する。
図3は、本発明の一実施形態に係る支持ばね伸縮機構の皿ばねの荷重と変位との関係上に、皿ばねユニット110の可動域を示したグラフである。
図3に示すように、観客重量による沈み込み(静的変位)とタテノリ振動による変位(動的変位)、必要に応じて地震時の変位量等を考慮して必要な鉛直可動域を決める。その鉛直可動域が確保できるプレロード設定可能範囲内で、浮き床コンクリートの打設方法等を考慮してプレロードの設定値を決定する。
The amount of preload to be introduced is determined taking into consideration the vertical range of motion required when using a floating floor and the construction method.
FIG. 3 is a graph showing the range of motion of the disc spring unit 110 in relation to the load and displacement of the disc spring of the support spring expansion/contraction mechanism according to one embodiment of the present invention.
As shown in Figure 3, the necessary vertical movement range is determined by considering sinking due to the weight of spectators (static displacement), displacement due to vertical vibration (dynamic displacement), and, if necessary, the amount of displacement during an earthquake. The preload setting value is determined within the preload setting range that can secure that vertical movement range, taking into account the method of pouring the floating floor concrete, etc.

次に、防振浮き床支持ばね伸縮機構について説明する。
図4は、防振浮き床支持ばね伸縮機構において、(a)ばねユニット及びジャッキセットの構成を示す立面図であり、(b)ばねユニット及びジャッキセットの構成を示す平面図である。図4は、後述する1層目コンクリートが硬化した後に、ジャッキを除荷して皿ばねを伸ばして、皿ばねユニットで荷重を受けている状態を示している。
防振浮き床支持ばね伸縮機構は、支保工等の仮設支持部材に一旦浮き床荷重を支持させ、その後支持ばねに荷重を受け替える時に使用される支持ばねの長さを調整するための機構である。
Next, the vibration-isolating floating floor support spring expansion/contraction mechanism will be described.
4A is an elevation view showing the configuration of the spring unit and the jack set in the vibration-proof floating floor support spring extension mechanism, and FIG. 4B is a plan view showing the configuration of the spring unit and the jack set. FIG. 4 shows the state in which the jack is unloaded and the disc spring is extended after the first layer concrete described later has hardened, and the disc spring unit is supported by the load.
The vibration-isolating floating floor support spring extension mechanism is a mechanism for adjusting the length of the support springs used when temporarily supporting the floating floor load on temporary support members such as shoring and then transferring the load to the support springs.

図4に示すように、防振浮き床支持ばね伸縮機構100は、基礎マット(基礎)M上に設置された下部キャピタル(下部体)11と、浮き床Fが設置される上部キャピタル(上部体)12と、下部キャピタル11と上部キャピタル12との間に配置されたばねユニット(第一ばねユニット)2及びジャッキセット(第一ジャッキセット)3と、を備えている。 As shown in FIG. 4, the vibration-proof floating floor support spring extension mechanism 100 comprises a lower capital (lower body) 11 installed on a foundation mat (foundation) M, an upper capital (upper body) 12 on which the floating floor F is installed, and a spring unit (first spring unit) 2 and a jack set (first jack set) 3 arranged between the lower capital 11 and the upper capital 12.

図4(b)に示すように、平面視で、下部キャピタル11及び上部キャピタル12は、ばねユニット2及びジャッキセット3よりも大きい。本実施形態では、平面視で、下部キャピタル11及び上部キャピタル12は、矩形をなしているが、形状は適宜設定可能である。 As shown in FIG. 4(b), in plan view, the lower capital 11 and the upper capital 12 are larger than the spring unit 2 and the jack set 3. In this embodiment, in plan view, the lower capital 11 and the upper capital 12 are rectangular, but the shape can be set as appropriate.

ばねユニット2は、下部プレート21と、上部プレート22と、ばね本体(支持ばね)23と、を有している。本実施形態では、ばね本体23は、皿ばね23aが上下方向に複数設置されて構成されている。本実施形態では、下部プレート21、上部プレート22及び皿ばね23aは、平面視円形をなしているが、形状は矩形等適宜設定可能である。 The spring unit 2 has a lower plate 21, an upper plate 22, and a spring body (support spring) 23. In this embodiment, the spring body 23 is configured with multiple disc springs 23a arranged in the vertical direction. In this embodiment, the lower plate 21, the upper plate 22, and the disc springs 23a are circular in plan view, but the shape can be appropriately set to a rectangle or other shape.

下部プレート21は、下部キャピタル11にアンカーボルトa1等で固定されている。上部プレート22は、上部キャピタル12の下方に配置されている。図4に示す状態では、上部プレート22は、上部キャピタル12の下面に当接配置されている。上部プレート22は、上部固定ナットn1で上部キャピタル12に固定可能とされている。 The lower plate 21 is fixed to the lower capital 11 with an anchor bolt a1 or the like. The upper plate 22 is disposed below the upper capital 12. In the state shown in FIG. 4, the upper plate 22 is disposed in contact with the lower surface of the upper capital 12. The upper plate 22 can be fixed to the upper capital 12 with an upper fixing nut n1.

ジャッキセット3は、反力支持架構30と、PC鋼棒(第一鋼棒)41と、センターホールジャッキ(第一ジャッキ)43と、を有している。本実施形態では、ジャッキセット3は、ばねユニット2の両側にセットされている。 The jack set 3 has a reaction support structure 30, a PC steel bar (first steel bar) 41, and a center hole jack (first jack) 43. In this embodiment, the jack set 3 is set on both sides of the spring unit 2.

反力支持架構30は、下部固定プレート31と、上部締結プレート32と、支持フレーム33と、を有している。 The reaction support structure 30 has a lower fixed plate 31, an upper fastening plate 32, and a support frame 33.

下部固定プレート31は、ばねユニット2の下部プレート21に隣接配置されている。下部固定プレート31は、下部キャピタル11にアンカーボルトa2等で固定されている。上部締結プレート32は、下部固定プレート31の上方に配置されている。支持フレーム33は、下部固定プレート31と上部締結プレート32とを連結している。 The lower fixing plate 31 is disposed adjacent to the lower plate 21 of the spring unit 2. The lower fixing plate 31 is fixed to the lower capital 11 with an anchor bolt a2 or the like. The upper fastening plate 32 is disposed above the lower fixing plate 31. The support frame 33 connects the lower fixing plate 31 and the upper fastening plate 32.

PC鋼棒41は、上下方向に延びている。PC鋼棒41の上端部は、上部プレート22に形成された貫通孔(不図示)に挿通され、上部ナットn11で締結されている。PC鋼棒41の上下方向の中間に、中間ナット(位置保持部材)n12が設けられている。中間ナットn12は、上部締結プレート32の下方に設けられている。PC鋼棒41の下端部には、センターホールジャッキ43をPC鋼棒41に固定する下部ナットn13が設けられている。 The PC steel rod 41 extends in the vertical direction. The upper end of the PC steel rod 41 is inserted into a through hole (not shown) formed in the upper plate 22 and fastened with an upper nut n11. An intermediate nut (position-retaining member) n12 is provided in the vertical middle of the PC steel rod 41. The intermediate nut n12 is provided below the upper fastening plate 32. A lower nut n13 is provided at the lower end of the PC steel rod 41 to secure the center hole jack 43 to the PC steel rod 41.

センターホールジャッキ43は、例えば油圧式等であって、平面視で円形をなし、中心に鉛直方向に貫通する貫通孔(不図示)が形成されている。貫通孔には、PC鋼棒41が挿通されている。 The center hole jack 43 is, for example, hydraulic, has a circular shape in a plan view, and has a through hole (not shown) that penetrates vertically through the center. A PC steel bar 41 is inserted through the through hole.

上記の防振浮き床支持ばね伸縮機構の変形例1を図5に示す。
図5は、本発明の一実施形態の変形例1に係る防振浮き床支持ばね伸縮機構において、(a)ばねユニット及びジャッキセットの構成を示す立面図であり、(b)ばねユニット及びジャッキセットの構成を示す平面図である。
図5に示すように、本変形例の防振浮き床支持ばね伸縮機構100Aでは、ばねユニット(第一ばねユニット)2Aの下部プレート21Aが、ジャッキセット3の下部固定プレート31と一体化しており、ジャッキセット3の支持フレーム33は下部プレート21Aに固定されている。
FIG. 5 shows a first modified example of the vibration-isolating floating floor support spring expansion mechanism.
Figure 5 is a cross-sectional view showing the configuration of a spring unit and a jack set in a vibration-proof floating floor support spring extension mechanism relating to variant 1 of one embodiment of the present invention, and (a) a plan view showing the configuration of the spring unit and the jack set.
As shown in Figure 5, in this modified example of the vibration-proof floating floor support spring extension mechanism 100A, the lower plate 21A of the spring unit (first spring unit) 2A is integrated with the lower fixed plate 31 of the jack set 3, and the support frame 33 of the jack set 3 is fixed to the lower plate 21A.

図6は、防振浮き床支持ばね伸縮機構の変形例1において仮設支持部材の設置例を示し、(a)正面図であり、(b)平面図である。
図6に示すように、防振浮き床支持ばね伸縮機構100Aでは、基礎マットMと浮き床Fとの間、及び下部キャピタル11と上部キャピタル12との間に、それぞれ支保工(第一仮設支持部材)45,46が設置されている。支保工45は、下部キャピタル11及び上部キャピタル12の両側に設けられている。支保工46は、平面視で矩形をなす下部キャピタル11及び上部キャピタル12の四隅に設置されている。
6A and 6B show an example of installation of a temporary support member in the first modified example of the vibration-isolating floating floor support spring extension mechanism, where (a) is a front view and (b) is a plan view.
As shown in Fig. 6, in the vibration-isolating floating floor support spring extension mechanism 100A, shoring (first temporary support members) 45, 46 are installed between the base mat M and the floating floor F, and between the lower capital 11 and the upper capital 12. The shoring 45 is installed on both sides of the lower capital 11 and the upper capital 12. The shoring 46 is installed at the four corners of the lower capital 11 and the upper capital 12, which are rectangular in plan view.

次に、防振浮き床Fの施工方法について、図7から図17を用いて説明する。以下の施工方法の説明では、防振浮き床支持ばね伸縮機構100を用いた方法を説明する。
(ばねユニット設置工程)
図7に示すように、下部キャピタル11を、基礎マットMに固定する。ばねユニット2の下部プレート21を、アンカーボルトa1(図4(a)参照)等で下部キャピタル11に固定する。
Next, a method for constructing the vibration-isolating floating floor F will be described with reference to Figures 7 to 17. In the following description of the construction method, a method using the vibration-isolating floating floor support spring expansion mechanism 100 will be described.
(Spring unit installation process)
7, the lower capital 11 is fixed to the base mat M. The lower plate 21 of the spring unit 2 is fixed to the lower capital 11 by an anchor bolt a1 (see FIG. 4(a)) or the like.

(ジャッキセット設置工程)
下部キャピタル11上に、反力支持架構30を設置する。反力支持架構30の下部固定プレート31(図4(a)参照)をアンカーボルトa2(図4(a)参照)等で下部キャピタル11に固定する。PC鋼棒41を、ばねユニット2の上部プレート22の貫通孔に挿通して、上部プレート22にナットn11で締結する。PC鋼棒41に、センターホールジャッキ43をセットする。PC鋼棒41の下端部に下部ナットn13を締結して、センターホールジャッキ43をPC鋼棒41に固定する。ばねユニット2の皿ばね23a(図4参照。以下同じ。)の与圧(プレロード)は、296kNとする。
(Jack set installation process)
The reaction support structure 30 is installed on the lower capital 11. The lower fixing plate 31 (see FIG. 4(a)) of the reaction support structure 30 is fixed to the lower capital 11 with anchor bolts a2 (see FIG. 4(a)) or the like. The PC steel rod 41 is inserted into the through hole of the upper plate 22 of the spring unit 2 and fastened to the upper plate 22 with a nut n11. The center hole jack 43 is set on the PC steel rod 41. The lower nut n13 is fastened to the lower end of the PC steel rod 41 to fix the center hole jack 43 to the PC steel rod 41. The preload of the disc spring 23a (see FIG. 4; the same applies below) of the spring unit 2 is 296 kN.

(仮設支持部材設置工程)
図8に示すように、基礎マットMに支保工45を設置して、支保工45の長さを調整して、型枠F1を支持させる。また、下部キャピタル11に支保工46を設置して、支保工46の長さを調整して、上部キャピタル12を支持させる。
(Temporary support member installation process)
As shown in Fig. 8, a support 45 is installed on the base mat M, and the length of the support 45 is adjusted to support the formwork F1. Also, a support 46 is installed on the lower capital 11, and the length of the support 46 is adjusted to support the upper capital 12.

(上部キャピタル(上部体)設置工程)
ばねユニット2の上部プレート22及び反力支持架構30の上方に、上部キャピタル12を設置する。上部キャピタル12上に、浮き床Fの型枠F1をセットする。
(Upper capital (upper body) installation process)
The upper capital 12 is installed above the upper plate 22 of the spring unit 2 and the reaction support frame 30. The formwork F1 of the floating floor F is set on the upper capital 12.

(下向きの力付与工程)
図9に示すように、センターホールジャッキ43を載荷して、PC鋼棒41を下方に引っ張る。PC鋼棒41の上端部は、上部ナットn11によってばねユニット2の皿ばね23aに連結されている。これにより、ばねユニット2の上部プレート22に下向きの力が付与される。
(Downward force application process)
As shown in Fig. 9, the center hole jack 43 is loaded to pull the PC steel rod 41 downward. The upper end of the PC steel rod 41 is connected to the disc spring 23a of the spring unit 2 by the upper nut n11. This applies a downward force to the upper plate 22 of the spring unit 2.

図10に示すように、中間ナットn12を上部締結プレート32まで締め付けて、PC鋼棒41を反力支持架構30の現位置で位置保持させる。センターホールジャッキ43を除荷する。PC鋼棒41には、上部プレート22に締結された上部ナットn11の位置から上部締結プレート32に締結された中間ナットn12の位置までの間に、174kNの引張力が生じる。PC鋼棒41に、下部ナットn13の位置をマークP(図11参照)しておく。 As shown in Figure 10, the intermediate nut n12 is tightened up to the upper fastening plate 32 to hold the PC steel rod 41 in its current position on the reaction support structure 30. The center hole jack 43 is unloaded. A tensile force of 174 kN is generated in the PC steel rod 41 between the position of the upper nut n11 fastened to the upper plate 22 and the position of the intermediate nut n12 fastened to the upper fastening plate 32. The position of the lower nut n13 is marked on the PC steel rod 41 with a mark P (see Figure 11).

図11に示すように、PC鋼棒41から下部ナットn13を外して、センターホールジャッキ43を撤去する。センターホールジャッキ43は、後工程のばねユニット2を伸ばす際に再度使用するため、仮置きしておく。 As shown in Figure 11, remove the lower nut n13 from the PC steel bar 41 and remove the center hole jack 43. The center hole jack 43 is temporarily placed in place as it will be used again in the subsequent process of extending the spring unit 2.

(浮き床施工工程)
図12に示すように、1層目のコンクリートF11を打設する。なお、コンクリートは複数層に分割して打設するため、この段階では1層目のコンクリートF11のみを打設することとする。この状態において、1層目のコンクリートF11は、支保工45及び上部キャピタル12を支持しいている支保工46に支持されている。
(Floating floor construction process)
As shown in Fig. 12, the first layer of concrete F11 is poured. Since the concrete is poured in multiple layers, only the first layer of concrete F11 is poured at this stage. In this state, the first layer of concrete F11 is supported by the shoring 45 and the shoring 46 that supports the upper capital 12.

1層目のコンクリートを、硬化、乾燥収縮させる。床外周部には、水平振れ止め(不図示)を設置する。 The first layer of concrete is allowed to harden and dry and shrink. Horizontal vibration prevention devices (not shown) are installed around the perimeter of the floor.

図13に示すように、PC鋼棒41にセンターホールジャッキ43をセットし、マークしておいた箇所に下部ナットn13を締結する。 As shown in Figure 13, set the center hole jack 43 on the PC steel bar 41 and tighten the lower nut n13 at the marked location.

(荷重受け替え工程)
図14に示すように、センターホールジャッキ43を載荷して、ばねユニット2を縮めた際の荷重よりも僅かに大きい荷重をかける。これにより、PC鋼棒41全体に引張力が生じ、PC鋼棒41の中間ナットn12が解除可能となる。中間ナットn12は、上部締結プレート32との間に30mm隙間を生じる位置まで緩めておく。
(Load transfer process)
14, the center hole jack 43 is loaded to apply a load slightly larger than the load when the spring unit 2 is compressed. This generates a tensile force on the entire PC steel rod 41, making it possible to release the intermediate nut n12 of the PC steel rod 41. The intermediate nut n12 is loosened to a position where a gap of 30 mm is created between the upper fastening plate 32.

図15に示すように、センターホールジャッキ43をゆっくり除荷して、ばねユニット2の皿ばね23aを伸長させて、ばねユニット2で上部キャピタル12及びコンクリートF11を支持するようにする。ばねユニット2の上部プレート22を上部固定ナットn1(図4参照。以下同じ。)で上部キャピタル12に固定する。 As shown in Figure 15, slowly unload the center hole jack 43 to stretch the disc spring 23a of the spring unit 2 so that the spring unit 2 supports the upper capital 12 and the concrete F11. The upper plate 22 of the spring unit 2 is fixed to the upper capital 12 with the upper fixing nut n1 (see Figure 4; the same applies below).

図16に示すように、PC鋼棒41から下部ナットn13を外して、センターホールジャッキ43を撤去する。センターホールジャッキ43は、他のばねユニット2を伸ばしたり、縮めたりする際に使用する。 As shown in FIG. 16, remove the lower nut n13 from the PC steel bar 41 and remove the center hole jack 43. The center hole jack 43 is used to extend or contract other spring units 2.

図17に示すように、支保工45,46を撤去し、この状態で残りのコンクリートを打設する。なお、ばねユニット2の交換の際に使用できるように、反力支持架構30及びPC鋼棒41は設置したままとしてもよい。
なお、防振浮き床支持ばね伸縮機構100Aを用いた場合の施工方法は、反力支持架構30がばねユニット2の下部プレート21Aに予め固定され、ばねユニット2とジャッキセット3が一体となっているため、設置も一体で設置される点を除いて、他は防振浮き床支持ばね伸縮機構100を用いた場合と同様である。
17, the supports 45, 46 are removed, and the remaining concrete is poured in this state. Note that the reaction support structure 30 and the PC steel rods 41 may be left in place so that they can be used when replacing the spring unit 2.
In addition, the construction method when using the vibration-proof floating floor support spring extension mechanism 100A is the same as when using the vibration-proof floating floor support spring extension mechanism 100, except that the reaction support structure 30 is fixed in advance to the lower plate 21A of the spring unit 2, and the spring unit 2 and the jack set 3 are integrated, so they are also installed as a single unit.

上記の防振浮き床Fの施工方法では、多数のばねユニット2を設置する際、反力支持架構30はばねユニット2の台数分必要となるが、センターホールジャッキ43は複数の反力支持架構30で順々に使い回すことができるため、センターホールジャッキ43はばねユニット2の台数分用意する必要がない。 When installing a large number of spring units 2 in the construction method of the vibration-isolating floating floor F described above, a reaction support structure 30 is required for each spring unit 2. However, since the center hole jack 43 can be used in turn by multiple reaction support structures 30, there is no need to prepare a center hole jack 43 for each spring unit 2.

また、施工時にはコンクリート打設作業の影響やコンクリートの乾燥収縮によって、荷重支持部材に水平方向の外力が加わり、これを防ぐのは難しい。1層目のコンクリートの打設作業が終了し、コンクリートの乾燥収縮も完了してからばねユニット2に荷重を受け替えることで、ばねユニット2に水平変位が生じることを防ぐことができる。1層目コンクリートは、2~3層目コンクリートの乾燥収縮の影響がばねユニット2に及ばない程度の厚さを確保し、2~3層目コンクリート打設前に、仮の水平拘束治具で浮き床Fを固定して、水平移動を拘束しておく。 During construction, horizontal external forces are applied to the load-bearing members due to the effects of concrete pouring and drying shrinkage of concrete, which is difficult to prevent. By transferring the load to spring unit 2 after the pouring of the first layer of concrete is completed and the drying shrinkage of the concrete is also complete, horizontal displacement of spring unit 2 can be prevented. The first layer of concrete is ensured to be thick enough to prevent the drying shrinkage of the second and third layers of concrete from affecting spring unit 2, and before pouring the second and third layers of concrete, the floating floor F is fixed with a temporary horizontal restraining jig to restrain horizontal movement.

また、浮き床Fは多数のばねユニット2で支持されるが、ばねユニット2の剛性や浮き床Fの自重にはばらつきがあるためコンクリート打設によって床天端レベルを調整するのは非常に困難である。よって、打設が全て終了してから、必要に応じてジャッキセット3を用いてばねユニット2を縮めてフィラー挿入等によってばねユニット2の高さを調整し、床天端レベルの調整を行う。この作業は浮き床Fのコンクリートの打設完了後であればいつでも実施可能である。 In addition, the floating floor F is supported by many spring units 2, but since there is variation in the rigidity of the spring units 2 and the weight of the floating floor F, it is very difficult to adjust the floor top level by pouring concrete. Therefore, after all pouring is completed, if necessary, the spring units 2 are compressed using a jack set 3, and the height of the spring units 2 is adjusted by inserting filler, etc., to adjust the floor top level. This work can be performed at any time after the concrete pouring of the floating floor F has been completed.

次に、防振浮き床Fのばねユニット2の交換方法について説明する。
地震等により想定外の外力が作用し、防振浮き床Fのばねユニット2に損傷が生じ、損傷が生じたばねユニット2を交換する必要があることがある。
まず、防振浮き床支持ばね伸縮機構100のばねユニット2を交換する場合について説明する。
図17のように、ばねユニット2、反力支持架構30及びPC鋼棒41が設置された状態から、支保工45,46(図6参照)を設置する。
Next, a method for replacing the spring unit 2 of the vibration-isolating floating floor F will be described.
An unexpected external force such as an earthquake may act on the spring unit 2 of the vibration-isolation floating floor F, causing damage to the spring unit 2, making it necessary to replace the damaged spring unit 2.
First, replacement of the spring unit 2 of the vibration-isolating floating floor support spring expansion mechanism 100 will be described.
As shown in FIG. 17, after the spring unit 2, the reaction support structure 30 and the PC steel rod 41 are installed, supports 45, 46 (see FIG. 6) are installed.

ばねユニット2の上部プレート22及び下部プレート21に、それぞれ交換用仮固定治具51,52(図4参照。以下同じ。)を設置する。交換用仮固定治具51は、上部プレート22から下方に延びるように設置する。交換用仮固定治具52は、下部プレート21から上方に延びるように設置する。この段階では、交換用仮固定治具51,52どうしを連結しておく必要はない。交換用仮固定治具51,52として、例えば平鋼を採用することができる。 Replacement temporary fixtures 51, 52 (see FIG. 4; the same applies below) are installed on the upper plate 22 and lower plate 21 of the spring unit 2, respectively. The replacement temporary fixture 51 is installed so as to extend downward from the upper plate 22. The replacement temporary fixture 52 is installed so as to extend upward from the lower plate 21. At this stage, it is not necessary to connect the replacement temporary fixtures 51, 52 to each other. Flat steel, for example, can be used as the replacement temporary fixtures 51, 52.

次に、図9に示すように、PC鋼棒41にセンターホールジャッキ43をセットして、上部固定ナットn1(図4参照)を外す。センターホールジャッキ43を載荷して、PC鋼棒41を下方に引っ張り、ばねユニット2の皿ばねを縮める。 Next, as shown in Figure 9, set the center hole jack 43 on the PC steel bar 41 and remove the upper fixing nut n1 (see Figure 4). Load the center hole jack 43 to pull the PC steel bar 41 downward and compress the disc spring of the spring unit 2.

交換用仮固定治具51,52どうしをボルト53(図4参照。以下同じ。)等で連結し、ばねユニット2が縮んだ状態を維持する。 The replacement temporary fixing jigs 51, 52 are connected to each other with a bolt 53 (see Figure 4; the same applies below) or the like, and the spring unit 2 is maintained in a compressed state.

図10に示すように、センターホールジャッキ43を除荷する。上部ナットn11を外して、PC鋼棒41を引き下ろして、上部プレート22とPC鋼棒41との締結を解除する。下部プレート21と下部キャピタル11との接合を解除して、ばねユニット2を撤去する。 As shown in Figure 10, the center hole jack 43 is unloaded. The upper nut n11 is removed and the PC steel rod 41 is pulled down to release the fastening between the upper plate 22 and the PC steel rod 41. The connection between the lower plate 21 and the lower capital 11 is released and the spring unit 2 is removed.

新規のばねユニット2を、交換用仮固定治具51,52で縮めた状態で搬入・設置する。PC鋼棒41を、上部プレート22の貫通孔に挿通して、上部プレート22に締結する。センターホールジャッキ43で一旦載荷して、交換用仮固定治具51,52を外す。その後、センターホールジャッキ43を除荷して、ばねユニット2を伸ばし、荷重を支保工45,46からばねユニット2側に受け替える。最後に、支保工45,46を撤去する。 The new spring unit 2 is brought in and installed in a contracted state using the replacement temporary fixing jigs 51, 52. The PC steel rod 41 is inserted into the through hole of the upper plate 22 and fastened to the upper plate 22. A load is applied using the center hole jack 43, and the replacement temporary fixing jigs 51, 52 are removed. The center hole jack 43 is then unloaded to extend the spring unit 2, and the load is transferred from the supports 45, 46 to the spring unit 2. Finally, the supports 45, 46 are removed.

次に、防振浮き床支持ばね伸縮機構100Aのばねユニット2を交換する場合について説明する。
図17のように、ばねユニット2、反力支持架構30及びPC鋼棒41が設置された状態から、支保工45,46(図6参照)を設置する。
Next, replacement of the spring unit 2 of the vibration-isolating floating floor support spring expansion mechanism 100A will be described.
As shown in FIG. 17, after the spring unit 2, the reaction support structure 30 and the PC steel rod 41 are installed, supports 45, 46 (see FIG. 6) are installed.

図9に示すように、PC鋼棒41にセンターホールジャッキ43をセットして、上部固定ナットn1を外す。センターホールジャッキ43を載荷して、PC鋼棒41を下方に引っ張り、ばねユニット2の皿ばねを縮める。 As shown in Figure 9, set the center hole jack 43 on the PC steel bar 41 and remove the upper fixing nut n1. Load the center hole jack 43 to pull the PC steel bar 41 downward and compress the disc spring of the spring unit 2.

次に、図10に示すように、中間ナットn12を上部締結プレート32まで締め付けて、センターホールジャッキ43を除荷する。PC鋼棒41から下部ナットn13を外して、センターホールジャッキ43を撤去する。 Next, as shown in FIG. 10, the intermediate nut n12 is tightened up to the upper fastening plate 32, and the center hole jack 43 is unloaded. The lower nut n13 is removed from the PC steel bar 41, and the center hole jack 43 is removed.

下部プレート21と下部キャピタル11との接合を解除して、ばねユニット2、反力支持架構30及びPC鋼棒41を一体として撤去する。 The connection between the lower plate 21 and the lower capital 11 is released, and the spring unit 2, reaction support structure 30, and PC steel bar 41 are removed as a unit.

新規のばねユニット2及び反力支持架構30を、ばねユニット2を縮めた状態で搬入・設置する。PC鋼棒41を、上部プレート22の貫通孔に挿通して、上部プレート22に締結する。センターホールジャッキ43をセット、載荷して一旦中間ナットn12を緩める。その後、センターホールジャッキ43を除荷して、ばねユニット2を伸ばし、荷重を支保工45,46からばねユニット2側に受け替える。最後に、支保工45,46を撤去する。 The new spring unit 2 and reaction support structure 30 are brought in and installed with the spring unit 2 in a contracted state. The PC steel rod 41 is inserted into the through hole of the upper plate 22 and fastened to the upper plate 22. The center hole jack 43 is set and loaded, and the intermediate nut n12 is loosened once. The center hole jack 43 is then unloaded, the spring unit 2 is extended, and the load is transferred from the supports 45, 46 to the spring unit 2 side. Finally, the supports 45, 46 are removed.

このように構成された防振浮き床支持ばね伸縮機構100及び防振浮き床Fの施工方法では、浮き床Fの施工時に、ばねユニット2にジャッキセット3で下向きの力を付与して、ばねユニット2の全長を短くしておく。浮き床Fを施工する際には、支保工45,46で浮き床Fを支持させる。浮き床Fの少なくとも一部ができた(例えば1層目のコンクリートが硬化した)後に、ばねユニット2からジャッキセット3を用いて下向きの力を除去して、ばねユニット2の全長を長くして、ばねユニット2で浮き床Fを支持させる。よって、浮き床Fの施工時に、浮き床Fの自重を支持するのは支保工45,46であって、ばねユニット2は浮き床Fから絶縁しているため、施工作業に起因する外力がばねユニット2に作用してばねユニット2の性能に悪影響を及ぼすことを防ぐことができる。 In the vibration-proof floating floor support spring extension mechanism 100 and the construction method of the vibration-proof floating floor F thus configured, when constructing the floating floor F, a downward force is applied to the spring unit 2 by the jack set 3 to shorten the overall length of the spring unit 2. When constructing the floating floor F, the floating floor F is supported by the supports 45, 46. After at least a part of the floating floor F is completed (for example, the first layer of concrete has hardened), the downward force is removed from the spring unit 2 by using the jack set 3, the overall length of the spring unit 2 is lengthened, and the floating floor F is supported by the spring unit 2. Therefore, when constructing the floating floor F, it is the supports 45, 46 that support the weight of the floating floor F, and the spring unit 2 is insulated from the floating floor F, so that it is possible to prevent external forces caused by the construction work from acting on the spring unit 2 and adversely affecting the performance of the spring unit 2.

また、ばねユニット2に工場製作時に予めプレロードを導入して、ばね長を縮めておくことで、搬入・施工時のばねユニット2の全長が短くなるため扱いやすく、施工性が良い。 In addition, by introducing a preload into the spring unit 2 during manufacturing at the factory and shortening the spring length, the overall length of the spring unit 2 is shortened when it is delivered and installed, making it easier to handle and install.

また、上部プレート22が上部キャピタル12に固定されていない状態で、センターホールジャッキ43を載荷するとPC鋼棒41は下向きに引っ張られて、反力支持架構30に対して相対的に下方に移動する。PC鋼棒41と連結されたばねユニット2の上部プレート22には、下向きの力が付与されるため、ばねユニット2の全長は短くなる。この状態で中間ナットn12によりPC鋼棒41を反力支持架構30に現位置で固定すると、ばねユニット2の全長が短い状態が維持される。この状態において、センターホールジャッキ43は除荷、撤去することが可能である。この状態で、PC鋼棒41には上部プレート22との位置保持部材と中間ナットn12との間に引張力が生じている。
また、この状態から、センターホールジャッキ43を設置し、ばねユニット2を縮めた際の荷重以上の力を載荷して、PC鋼棒41全体に引張力を作用させた後、PC鋼棒41を反力支持架構30に固定している中間ナットn12を緩めてからセンターホールジャッキ43を除荷すると、ばねユニット2の全長は長くなる。
このように防振浮き床支持ばね伸縮機構100を用いることで、ばねユニット2の長さの調整を容易に行うことができる。
Furthermore, when the center hole jack 43 is loaded while the upper plate 22 is not fixed to the upper capital 12, the PC steel rod 41 is pulled downward and moves downward relative to the reaction support structure 30. A downward force is applied to the upper plate 22 of the spring unit 2 connected to the PC steel rod 41, so the overall length of the spring unit 2 becomes shorter. In this state, when the PC steel rod 41 is fixed to the reaction support structure 30 in the current position by the intermediate nut n12, the overall length of the spring unit 2 remains short. In this state, the center hole jack 43 can be unloaded and removed. In this state, a tensile force is generated in the PC steel rod 41 between the position retaining member with the upper plate 22 and the intermediate nut n12.
Furthermore, from this state, if a center hole jack 43 is installed and a force greater than the load when the spring unit 2 is compressed is applied to apply a tensile force to the entire PC steel rod 41, and then the intermediate nut n12 that fixes the PC steel rod 41 to the reaction support structure 30 is loosened and the center hole jack 43 is unloaded, the overall length of the spring unit 2 will be increased.
By using the vibration-isolating floating floor support spring extension mechanism 100 in this manner, the length of the spring unit 2 can be easily adjusted.

また、浮き床Fのコンクリート施工時は、支保工45,46で浮き床Fの自重を受けることで、ばねユニット2に施工作業の影響や乾燥収縮によって水平変位が生じるのを防ぐことができる。これにより、ばねユニット2に荷重支持方向以外の方向に荷重が作用し、ばね性能に悪影響を及ぼすことを防ぐことができる。 In addition, when constructing the floating floor F with concrete, the weight of the floating floor F is supported by the supports 45, 46, which prevents horizontal displacement of the spring unit 2 caused by the construction work or drying shrinkage. This prevents the spring unit 2 from being subjected to loads in directions other than the load support direction, which could adversely affect the spring performance.

また、ばねユニット2及びジャッキセット3を用いることで、浮き床Fのコンクリート打設終了後にばね高さの調整によって浮き床Fの天端の高さ調整及び水平調整することができる。 In addition, by using the spring unit 2 and jack set 3, the height and level of the top edge of the floating floor F can be adjusted by adjusting the spring height after concrete pouring for the floating floor F is completed.

また、反力支持架構30及びPC鋼棒41を常設としておくことで、ばねユニット2の交換が必要な場合にセンターホールジャッキ43及び支保工45,46を準備すれば、ジャッキセット3を用いて交換作業を行うことができる。床全体を持ち上げるのではなく、ばねユニット2を縮ませて古いばねユニット2を取り出すため、周囲に影響を与えず1台ずつの交換作業が可能である。 In addition, by keeping the reaction support structure 30 and PC steel rods 41 permanently installed, if the spring units 2 need to be replaced, the center hole jack 43 and supports 45, 46 can be prepared and the replacement work can be carried out using the jack set 3. Instead of lifting the entire floor, the spring units 2 are compressed and the old spring units 2 are removed, making it possible to replace them one by one without affecting the surrounding area.

次に、本発明の一実施形態の変形例2に係る防振浮き床支持ばね伸縮機構及びこの防振浮き床支持ばね伸縮機構を用いた防振浮き床のばねユニットの交換方法について、主に図18~図33を用いて説明する。
下記に示す変形例の説明において、前述した部材と同一の部材には同一の符号を付して、その説明を省略する。
図18~図22に示すように、防振浮き床支持ばね伸縮機構100Bは、基礎マット(図4に示すM)上に設置された下部キャピタル(下部体)11Bと、浮き床(図4に示すF)が設置される上部キャピタル(上部体)12Bと、下部キャピタル11Bと上部キャピタル12Bとの間に配置されたばねユニット(第二ばねユニット)2B及びジャッキセット(第二ジャッキセット)3Bと、上部キャピタル12Bを支持する支保工(第二仮設支持部材)46B(図24参照)と、を備えている。
Next, the anti-vibration floating floor support spring extension mechanism related to variant 2 of one embodiment of the present invention and the method of replacing the spring unit of a vibration-proof floating floor using this anti-vibration floating floor support spring extension mechanism will be explained mainly using Figures 18 to 33.
In the following description of the modified examples, the same members as those described above are given the same reference numerals and the description thereof will be omitted.
As shown in Figures 18 to 22, the vibration-proof floating floor support spring extension mechanism 100B comprises a lower capital (lower body) 11B installed on a foundation mat (M shown in Figure 4), an upper capital (upper body) 12B on which the floating floor (F shown in Figure 4) is installed, a spring unit (second spring unit) 2B and a jack set (second jack set) 3B arranged between the lower capital 11B and the upper capital 12B, and a support structure (second temporary support member) 46B (see Figure 24) that supports the upper capital 12B.

図18に示すように、平面視で、下部キャピタル11Bは、矩形をなしているが、形状は適宜設定可能である。 As shown in FIG. 18, the lower capital 11B has a rectangular shape in plan view, but the shape can be set as desired.

ここで、水平方向のうち、矩形をなす下部キャピタル11Bの一辺11cに沿う方向(図18に示す紙面左右方向)をX方向として、辺11cと直交する辺11dに沿う方向(図18に示す紙面上下方向)をY方向とする。 Here, among the horizontal directions, the direction along one side 11c of the rectangular lower capital 11B (the left-right direction on the paper in FIG. 18) is defined as the X direction, and the direction along side 11d perpendicular to side 11c (the up-down direction on the paper in FIG. 18) is defined as the Y direction.

下部キャピタル11Bの上面には、辺11c及び辺11cと対向する辺11eから中央側に向かって凹む切欠き部11jが形成されている。換言すると、切欠き部11jは、下部キャピタル11Bの平面視内側からY方向に延びている。切欠き部11jは、下部キャピタル11BのY方向の両側に形成されている。 The upper surface of the lower capital 11B is formed with a notch 11j that is recessed toward the center from side 11c and side 11e opposite side 11c. In other words, the notch 11j extends in the Y direction from the inside of the lower capital 11B in a plan view. The notch 11j is formed on both sides of the lower capital 11B in the Y direction.

図19に示すように、ばねユニット2Bは、下部プレート21Bと、上部プレート22Bと、中間プレート22Cと、ばね本体(支持ばね)23Bと、連結パイプ(連結部)24と、を有している。 As shown in FIG. 19, the spring unit 2B has a lower plate 21B, an upper plate 22B, an intermediate plate 22C, a spring body (support spring) 23B, and a connecting pipe (connecting portion) 24.

図18に示すように、平面視で、下部プレート21Bは、円形をなしているが、形状は適宜設定可能である。下部プレート21Bには、上下方向に貫通するボルト取付孔21hが複数形成されている。 As shown in FIG. 18, the lower plate 21B is circular in plan view, but the shape can be set as appropriate. The lower plate 21B has multiple bolt mounting holes 21h that penetrate in the vertical direction.

下部プレート21Bには、Y方向の外側の両端部から内側に向かって凹む切欠き部21j,21k,21mが形成されている。切欠き部21j,21k,21mは、X方向にこの順に配置されている。切欠き部21j,21k,21mは、下部プレート21BのY方向の両側に形成されている。 The lower plate 21B has cutouts 21j, 21k, and 21m that are recessed inward from both outer ends in the Y direction. The cutouts 21j, 21k, and 21m are arranged in this order in the X direction. The cutouts 21j, 21k, and 21m are formed on both sides of the lower plate 21B in the Y direction.

図19に示すように、ボルトc1が下部プレート21Bのボルト取付孔21h(図18参照。以下同じ)に挿通され、下部キャピタル11Bに設けられたアンカーボルトb1に螺合されている。 As shown in FIG. 19, the bolt c1 is inserted into the bolt mounting hole 21h of the lower plate 21B (see FIG. 18; the same applies below) and is screwed into the anchor bolt b1 provided in the lower capital 11B.

図21に示すように、平面視で、上部プレート22Bは、矩形をなしているが、形状は適宜設定可能である。上部プレート22Bには、上下方向に貫通するボルト取付孔22hが複数形成されている。図19に示すように、ボルトc2が上部プレート22Bのボルト取付孔21h(図21参照。以下同じ)に挿通され、上部キャピタル12Bのアンカーボルトb2に螺合されている。 As shown in FIG. 21, the upper plate 22B is rectangular in plan view, but the shape can be set as appropriate. The upper plate 22B has a plurality of bolt mounting holes 22h that penetrate in the vertical direction. As shown in FIG. 19, the bolt c2 is inserted into the bolt mounting hole 21h (see FIG. 21; the same applies below) of the upper plate 22B and is screwed into the anchor bolt b2 of the upper capital 12B.

中間プレート22Cは、下部プレート21Bと上部プレート22Bとの間に配置されている。図22に示すように、平面視で、中間プレート22Cは、円形をなしているが、形状は適宜設定可能である。 The intermediate plate 22C is disposed between the lower plate 21B and the upper plate 22B. As shown in FIG. 22, the intermediate plate 22C has a circular shape in a plan view, but the shape can be set as appropriate.

中間プレート22Cには、Y方向の外側の両端部から内側に向かって凹む切欠き部22j,22k,22mが形成されている。切欠き部22j,22k,22mは、X方向にこの順に配置されている。切欠き部22j,22k,22mは、中間プレート22CのY方向の両側に形成されている。 The intermediate plate 22C has cutouts 22j, 22k, and 22m that are recessed inward from both outer ends in the Y direction. The cutouts 22j, 22k, and 22m are arranged in this order in the X direction. The cutouts 22j, 22k, and 22m are formed on both sides of the intermediate plate 22C in the Y direction.

図19に示すように、ばね本体23Bは、下部プレート21Bと中間プレート22Cとの間に配置されている。本実施形態では、ばね本体23Bは、皿ばね23aが上下方向に複数設置されて構成されている。平面視で、皿ばね23aは、円形をなしているが、形状は適宜設定可能である。 As shown in FIG. 19, the spring body 23B is disposed between the lower plate 21B and the middle plate 22C. In this embodiment, the spring body 23B is configured with multiple disc springs 23a arranged in the vertical direction. In a plan view, the disc springs 23a are circular, but the shape can be set as appropriate.

連結パイプ24は、上下方向に延びる筒状をなしている。連結パイプ24は、上部プレート22Bと中間プレート22Cとを連結している。 The connecting pipe 24 is tubular and extends vertically. The connecting pipe 24 connects the upper plate 22B and the middle plate 22C.

ジャッキセット3Bは、固定用PC鋼棒(第二鋼棒)41Bと、センターホールジャッキ(第二ジャッキ)43Bと、ジャッキ用PC鋼棒41Cと、を有している。 The jack set 3B has a fixing PC steel bar (second steel bar) 41B, a center hole jack (second jack) 43B, and a PC steel bar for the jack 41C.

固定用PC鋼棒41Bは、上下方向に延びている。固定用PC鋼棒41Bは、下部プレート21Bと中間プレート22Cとを連結している。 The fixing PC steel rod 41B extends in the vertical direction. The fixing PC steel rod 41B connects the lower plate 21B and the middle plate 22C.

センターホールジャッキ43Bは、例えば油圧式等である。センターホールジャッキ43Bは、中間プレート22Cに下向きの力を付与可能である。 The center hole jack 43B is, for example, hydraulic. The center hole jack 43B can apply a downward force to the intermediate plate 22C.

平面視で、センターホールジャッキ43Bは、円形をなしているが、形状は適宜設定可能である。センターホールジャッキ43Bの平面視中心には、鉛直方向に貫通する貫通孔(不図示)が形成されている。貫通孔には、ジャッキ用PC鋼棒41Cが挿通されている。ジャッキ用PC鋼棒41Cは、下部プレート21Bに固定されている。 In plan view, the center hole jack 43B has a circular shape, but the shape can be set as appropriate. A through hole (not shown) that penetrates vertically is formed in the center of the center hole jack 43B in plan view. A PC steel rod 41C for the jack is inserted into the through hole. The PC steel rod 41C for the jack is fixed to the lower plate 21B.

図18に示すように、固定用PC鋼棒41Bの下端部は、下部プレート21Bの切欠き部21j,21mのY方向の内側の縁部に配置されている。ジャッキ用PC鋼棒41Cの下端部は、下部プレート21Bの切欠き部21kのY方向の内側の縁部に配置されている。 As shown in FIG. 18, the lower end of the fixing PC steel bar 41B is positioned on the inner edge in the Y direction of the notches 21j and 21m of the lower plate 21B. The lower end of the jack PC steel bar 41C is positioned on the inner edge in the Y direction of the notch 21k of the lower plate 21B.

図22に示すように、固定用PC鋼棒41Bの上端部は、中間プレート22Cの切欠き部22j,22mのY方向の内側の縁部に配置されている。ジャッキ用PC鋼棒41Cの上端部は、中間プレート22Cの切欠き部22kのY方向の内側の縁部に配置されている。 As shown in FIG. 22, the upper end of the fixing PC steel bar 41B is located on the inner edge of the notches 22j and 22m of the intermediate plate 22C in the Y direction. The upper end of the jack PC steel bar 41C is located on the inner edge of the notch 22k of the intermediate plate 22C in the Y direction.

次に、上記の防振浮き床支持ばね伸縮機構100Bを用いた防振浮き床のばねユニットの交換方法について、主に図23~図33を用いて説明する。本方法は、既存のばねユニットを新規のばねユニットに交換するものである。
以下の説明において、ばねユニット2Bのうち、既存のものを既存ばねユニット2B1とし、新規のものを新規ばねユニット2B2とする。
Next, a method for replacing the spring unit of the vibration-isolating floating floor using the above-mentioned vibration-isolating floating floor support spring expansion mechanism 100B will be described mainly with reference to Figures 23 to 33. This method involves replacing the existing spring unit with a new spring unit.
In the following description, of the spring units 2B, the existing one is referred to as an existing spring unit 2B1, and the new one is referred to as a new spring unit 2B2.

図23に示すように、下部キャピタル11Bと上部キャピタル12Bとの間には、既存ばねユニット2B1が設置されている。 As shown in FIG. 23, an existing spring unit 2B1 is installed between the lower capital 11B and the upper capital 12B.

(既存用ジャッキセット設置工程S1)
図24に示すように、ジャッキ用PC鋼棒41Cで下部プレート21Bと中間プレート22Cとを連結する。下部プレート21B及び中間プレート22Cには、それぞれ切欠き部21k,22kが形成されているため、ジャッキ用PC鋼棒41Cを設置する際には、ジャッキ用PC鋼棒41CをY方向に水平移動させればよい。ジャッキ用PC鋼棒41Cを切欠き部21k,22kの内側の縁部に当接させれば、ジャッキ用PC鋼棒41Cが位置決めされる。
また、ジャッキ用PC鋼棒41Cにセンターホールジャッキ43Bを取り付け、センターホールジャッキ43Bを中間プレート22C上に設置する。
(Existing jack set installation process S1)
As shown in Fig. 24, the lower plate 21B and the intermediate plate 22C are connected by the PC steel bar 41C for the jack. Since the lower plate 21B and the intermediate plate 22C are formed with notches 21k and 22k, respectively, when the PC steel bar 41C for the jack is installed, it is sufficient to move the PC steel bar 41C for the jack horizontally in the Y direction. The PC steel bar 41C for the jack is positioned by abutting it against the inner edges of the notches 21k and 22k.
In addition, a center hole jack 43B is attached to the PC steel bar 41C for the jack, and the center hole jack 43B is placed on the intermediate plate 22C.

(仮設支持部材設置工程S2)
下部キャピタル11B上に支保工46Bを設置する。支保工46Bで上部キャピタル12B及び上部キャピタル12Bの上方の浮き床F(図4参照。以下同じ。)の自重を支持(仮受け)させる。
(Temporary support member installation process S2)
A support 46B is installed on the lower capital 11B. The support 46B supports (temporarily supports) the weight of the upper capital 12B and the floating floor F (see FIG. 4; the same applies below) above the upper capital 12B.

(既存ばねユニット収縮工程S3)
図25に示すように、下部プレート21Bを下部キャピタル11Bに固定しているボルトc1(図24参照。以下同じ。)及び上部プレート22Bを上部キャピタル12Bに固定しているボルトc2(図24参照。以下同じ。)を取り外す。そして、図26に示すように、センターホールジャッキ43Bを載荷して、既存ばねユニット2B1のばね本体23Bを所定の高さに縮める。この状態では、支保工46Bが上部キャピタル12Bを支持している。
(Existing spring unit contraction process S3)
As shown in Fig. 25, the bolt c1 (see Fig. 24; the same below) that secures the lower plate 21B to the lower capital 11B and the bolt c2 (see Fig. 24; the same below) that secures the upper plate 22B to the upper capital 12B are removed. Then, as shown in Fig. 26, the center hole jack 43B is loaded to reduce the spring body 23B of the existing spring unit 2B1 to a predetermined height. In this state, the support 46B supports the upper capital 12B.

(既存ばねユニット収縮保持工程S4)
図27に示すように、固定用PC鋼棒41Bで下部プレート21Bと中間プレート22Cとを連結して、ばね本体23Bを所定の高さに縮んだ状態を保持させる。下部プレート21B及び中間プレート22Cには、それぞれ切欠き部21m,21j,22m,22jが形成されているため、固定用PC鋼棒41Bを設置する際には、固定用PC鋼棒41BをY方向に水平移動させればよい。固定用PC鋼棒41Bを切欠き部21m,21j,22m,22jの内側の縁部に当接させれば、固定用PC鋼棒41Bが位置決めされる。
(Existing spring unit contraction holding process S4)
As shown in Fig. 27, the fixing PC steel bar 41B connects the lower plate 21B and the intermediate plate 22C to hold the spring body 23B in a contracted state at a predetermined height. Since the lower plate 21B and the intermediate plate 22C are formed with notches 21m, 21j, 22m, and 22j, respectively, the fixing PC steel bar 41B can be installed by horizontally moving the fixing PC steel bar 41B in the Y direction. The fixing PC steel bar 41B is positioned by abutting the inner edges of the notches 21m, 21j, 22m, and 22j.

(既存ばねユニット撤去工程S5)
センターホールジャッキ43Bを除荷して、図28に示すように、センターホールジャッキ43B(図27参照)及びジャッキ用PC鋼棒41C(図27参照)を撤去するとともに、既存ばねユニット2B1を縮んだ状態で撤去する。ジャッキ用PC鋼棒41Cを撤去する際には、ジャッキ用PC鋼棒41Cを下部プレート21B及び中間プレート22Cの切欠き部21k,22kを通してY方向に水平移動させればよい。
(Existing spring unit removal process S5)
The center hole jack 43B is unloaded, and the center hole jack 43B (see FIG. 27) and the jack PC steel bar 41C (see FIG. 27) are removed as shown in FIG. 28, and the existing spring unit 2B1 is removed in a contracted state. When removing the jack PC steel bar 41C, it is sufficient to move the jack PC steel bar 41C horizontally in the Y direction through the cutout portions 21k, 22k of the lower plate 21B and the intermediate plate 22C.

(新規ばねユニット設置工程S6)
図29に示すように、新規ばねユニット2B2を縮め、固定用PC鋼棒41Bで下部プレート21Bと中間プレート22Cとを連結して、ばね本体23Bを所定の高さに縮んだ状態を保持させる。このようにした新規ばねユニット2B2を搬入し、下部キャピタル11B上に設置する。固定用PC鋼棒41Bの下端部は下部プレート21Bより飛び出した状態となっているため、下部キャピタル11BのY方向の切欠き部11jに飛び出した突出部がくるように設置する。このように設置することでばねユニット交換後に固定用PC鋼棒41B及びジャッキ用PC鋼棒41Cを水平に取り出すことが可能となる。
(New spring unit installation process S6)
As shown in Figure 29, the new spring unit 2B2 is contracted, and the lower plate 21B and the middle plate 22C are connected with the fixing PC steel bar 41B to maintain the spring body 23B in a contracted state at a predetermined height. The new spring unit 2B2 thus constructed is carried in and installed on the lower capital 11B. Since the lower end of the fixing PC steel bar 41B protrudes from the lower plate 21B, it is installed so that the protruding portion is aligned with the Y-direction notch 11j of the lower capital 11B. By installing it in this manner, it becomes possible to remove the fixing PC steel bar 41B and the jack PC steel bar 41C horizontally after replacing the spring unit.

(新規用ジャッキセット設置工程S7)
図30に示すように、ジャッキ用PC鋼棒41Cで下部プレート21Bと中間プレート22Cとを連結する。ジャッキ用PC鋼棒41Cにセンターホールジャッキ43Bを取り付け、センターホールジャッキ43Bを中間プレート22C上に設置する。ジャッキ用PC鋼棒41Cを設置する際には、ジャッキ用PC鋼棒41Cを下部プレート21B及び中間プレート22Cの切欠き部21k,22kを通してY方向に水平移動させればよい。
(New jack set installation process S7)
As shown in Figure 30, the lower plate 21B and the intermediate plate 22C are connected with the PC steel bar 41C for the jack. A center hole jack 43B is attached to the PC steel bar 41C for the jack, and the center hole jack 43B is placed on the intermediate plate 22C. When placing the PC steel bar 41C for the jack, it is sufficient to move the PC steel bar 41C for the jack horizontally in the Y direction through the cutouts 21k, 22k of the lower plate 21B and the intermediate plate 22C.

(鋼棒撤去工程S8)
図31に示すように、センターホールジャッキ43Bを載荷して、ばね本体23Bを縮めたときよりも僅かに大きい荷重をかけて、固定用PC鋼棒41B(図30参照。以下同じ。)のナットを緩められる状態とし、固定用PC鋼棒41Bを撤去する。固定用PC鋼棒41Bを撤去する際には、固定用PC鋼棒41Bを下部プレート21B及び中間プレート22Cの切欠き部21m,21j,22m,22jを通してY方向に水平移動させればよい。
(Steel bar removal process S8)
As shown in Figure 31, the center hole jack 43B is loaded to apply a load slightly larger than that when the spring body 23B is compressed, so that the nuts of the fixing PC steel rods 41B (see Figure 30; the same applies below) can be loosened, and the fixing PC steel rods 41B are removed. When removing the fixing PC steel rods 41B, they can be moved horizontally in the Y direction through the cutouts 21m, 21j, 22m, and 22j of the lower plate 21B and the intermediate plate 22C.

(新規ばねユニット伸長工程S9)
図32に示すように、センターホールジャッキ43Bを除荷して、ばね本体23Bを伸ばして、浮き床Fの自重を新規ばねユニット2B2に受け替える。
(New spring unit extension process S9)
As shown in FIG. 32, the center hole jack 43B is unloaded, the spring body 23B is stretched, and the weight of the floating floor F is transferred to the new spring unit 2B2.

(新規ばねユニット固定工程S10)
図33に示すように、下部プレート21Bと下部キャピタル11Bとをボルトc1で固定する。上部プレート22Bと上部キャピタル12Bとをボルトc2で固定する。センターホールジャッキ43B(図32参照)、ジャッキ用PC鋼棒41C(図32参照)及び支保工46Bを撤去する。ジャッキ用PC鋼棒41Cを撤去する際には、ジャッキ用PC鋼棒41Cを下部プレート21B及び中間プレート22Cの切欠き部21k,22kを通してY方向に水平移動させればよい。
(New spring unit fixing process S10)
As shown in Figure 33, the lower plate 21B and the lower capital 11B are fixed with bolt c1. The upper plate 22B and the upper capital 12B are fixed with bolt c2. The center hole jack 43B (see Figure 32), the PC steel bar for the jack 41C (see Figure 32), and the support 46B are removed. When removing the PC steel bar for the jack 41C, it is sufficient to move the PC steel bar for the jack 41C horizontally in the Y direction through the cutout portions 21k, 22k of the lower plate 21B and the middle plate 22C.

なお、新規ばねユニット2B1を設置した後の新規用ジャッキセット設置工程S7から新規ばねユニット伸長工程S9までにおいて、新規ばねユニット2B2への荷重の受け替えでは、センターホールジャッキ43Bによりばね本体23Bを伸ばす方法の他に、上部プレート22Bと上部キャピタル12Bとの間をグラウト(不図示)で埋める方法をとることも可能である。グラウトで埋める方法の場合は、上部キャピタル12Bの設置精度の影響を受けずに、新規ばねユニット2B2の立ち上がり精度を確保できる利点がある。ただし、グラウトで埋める方法により設置されたばねユニットの交換時においてはグラウトを撤去する作業が必要となる。 In addition, in the process from the new jack set installation step S7 to the new spring unit extension step S9 after the new spring unit 2B1 is installed, in order to transfer the load to the new spring unit 2B2, in addition to the method of extending the spring body 23B with the center hole jack 43B, it is also possible to fill the gap between the upper plate 22B and the upper capital 12B with grout (not shown). The method of filling with grout has the advantage that the rise accuracy of the new spring unit 2B2 can be ensured without being affected by the installation accuracy of the upper capital 12B. However, when replacing a spring unit installed by filling with grout, the grout must be removed.

次に、上記の防振浮き床支持ばね伸縮機構100Bを用いた防振浮き床の施工方法について説明する。
上記の防振浮き床のばねユニットの交換方法に示す(新規)ばねユニット設置工程S6を行う。
Next, a method for constructing a vibration-isolating floating floor using the above-mentioned vibration-isolating floating floor support spring expansion mechanism 100B will be described.
The (new) spring unit installation step S6 shown in the method for replacing the spring unit of the vibration-isolating floating floor described above is carried out.

(仮設支持部材設置工程)
次に、後述する浮き床Fを支持可能な支保工46Bを設置する。
(Temporary support member installation process)
Next, a support structure 46B capable of supporting the floating floor F described below is installed.

(上部体設置工程)
ばねユニット2B2及びジャッキセット3Bの上方に上部キャピタル12Bを設置する。
(Upper body installation process)
An upper capital 12B is installed above the spring unit 2B2 and the jack set 3B.

(浮き床施工工程)
上部キャピタル12Bの上方に浮き床Fを施工する。
(Floating floor construction process)
A floating floor F is constructed above the upper capital 12B.

次に、上記の防振浮き床のばねユニットの交換方法に示す(新規用)ジャッキセット設置工程S7、鋼棒撤去工程S8、(新規)ばねユニット伸長工程S9及び(新規)ばねユニット固定工程S10を行う。
ばねユニット伸長工程S9及びばねユニット固定工程S1により、浮き床Fの自重をばねユニット2B2で支持させる(荷重受け替え工程)ことができる。
Next, the (new) jack set installation process S7, the steel bar removal process S8, the (new) spring unit extension process S9, and the (new) spring unit fixing process S10 are carried out as shown in the method for replacing the spring unit of the vibration-isolation floating floor described above.
The spring unit extension process S9 and the spring unit fixing process S1 enable the spring unit 2B2 to support the weight of the floating floor F (load transfer process).

浮き床Fの天端レベルの高さ調整を行う場合には、上記の既存用ジャッキセット設置工程S1から既存ばねユニット収縮工程S3を行った後、上部プレート22Bと上部キャピタル12Bとの間に必要の厚さのはさみ材(鋼板等)を設置し、上記の新規ばねユニット伸長工程S9及び新規ばねユニット固定工程S10の手順、または設置したはさみ材と上部キャピタル12Bとの間にグラウト材を充填することで復旧する。 When adjusting the height of the top level of the floating floor F, after carrying out the steps from the existing jack set installation step S1 to the existing spring unit contraction step S3 described above, a clamping material (steel plate, etc.) of the required thickness is installed between the upper plate 22B and the upper capital 12B, and the procedure of the new spring unit extension step S9 and the new spring unit fixing step S10 described above is followed, or the gap between the installed clamping material and the upper capital 12B is filled with grout material to restore the structure.

このように構成された防振浮き床支持ばね伸縮機構100Bでは、ばねユニット2Bとは別にジャッキ反力の支持架構を設置する必要がない。よって、ばねユニット2Bを当該ばねユニット2Bが設置されている箇所で伸縮させて、ばねユニット2Bの設置及び交換をより簡便に行うことができる。 In the vibration-proof floating floor support spring extension mechanism 100B configured in this manner, there is no need to install a support structure for the jack reaction force separately from the spring unit 2B. Therefore, the spring unit 2B can be extended or contracted at the location where the spring unit 2B is installed, making it easier to install and replace the spring unit 2B.

また、固定用PC鋼棒41Bで下部プレート21Bと中間プレート22Cとを連結してばね本体23Bを収縮させる力を、センターホールジャッキ43Bを載荷することでセンターホールジャッキ43Bに移行し、下部プレート21Bと中間プレート22Cとの連結を解除した上でセンターホールジャッキ43Bを除荷してばね本体23Bを伸長させることができる。 The force that connects the lower plate 21B and the intermediate plate 22C with the fixing PC steel rod 41B to contract the spring body 23B can be transferred to the center hole jack 43B by loading the center hole jack 43B, and the connection between the lower plate 21B and the intermediate plate 22C can be released and the center hole jack 43B can be unloaded to expand the spring body 23B.

また、浮き床施工工程では、浮き床Fの自重を支保工46Bに支持させる。浮き床Fの少なくとも一部ができた(例えば1層目のコンクリートが硬化した)後に、荷重受け替え工程でセンターホールジャッキ43Bを除荷し、ばねユニット2Bが伸長し、浮き床Fをばねユニット2Bが支持する。よって、浮き床Fの施工時に、浮き床Fの自重を支持するのは支保工46B等の第二仮設支持部材であって、ばねユニット2Bは浮き床Fから絶縁しているため、施工作業に起因する外力が第二ばねユニットに作用してばねユニット2Bの性能に悪影響を及ぼすことを防ぐことができる。 In addition, in the floating floor construction process, the weight of the floating floor F is supported by the support 46B. After at least a portion of the floating floor F is completed (for example, the first layer of concrete has hardened), the center hole jack 43B is unloaded in the load transfer process, the spring unit 2B extends, and the spring unit 2B supports the floating floor F. Therefore, during construction of the floating floor F, it is the second temporary support member such as the support 46B that supports the weight of the floating floor F, and the spring unit 2B is insulated from the floating floor F, so that it is possible to prevent external forces caused by the construction work from acting on the second spring unit and adversely affecting the performance of the spring unit 2B.

また、固定用PC鋼棒41Bを用いてばねユニット2Bの縮んだ状態を保持でき、センターホールジャッキ43Bはばねユニット2Bを伸縮させるとき(瞬間)のみ使用する。つまり、センターホールジャッキ43Bで一のばねユニット2Bを縮めた後には、センターホールジャッキ43Bを他のばねユニット2Bを縮める作業に使用することができる。よって、センターホールジャッキ43Bをばねユニット2Bの台数分用意する必要がない。 The spring unit 2B can be held in a contracted state using the fixing PC steel rod 41B, and the center hole jack 43B is used only when expanding or contracting the spring unit 2B (momentarily). In other words, after one spring unit 2B is contracted with the center hole jack 43B, the center hole jack 43B can be used to contract another spring unit 2B. Therefore, there is no need to prepare a number of center hole jacks 43B for each spring unit 2B.

下部プレート21B及び中間プレート22Cには、それぞれ切欠き部21j,21k21m,22j,22k,22mが形成されているため、固定用PC鋼棒41B及びジャッキ用PC鋼棒41Cを設置及び撤去する際には、固定用PC鋼棒41B及びジャッキ用PC鋼棒41CをY方向に水平移動させればよい。よって、固定用PC鋼棒41B及びジャッキ用PC鋼棒41Cを上方に持ち上げたりする必要がないため、作業性が良い。 Because the lower plate 21B and the intermediate plate 22C have cutouts 21j, 21k, 21m, 22j, 22k, and 22m, respectively, when installing and removing the fixing PC steel rod 41B and the jack PC steel rod 41C, the fixing PC steel rod 41B and the jack PC steel rod 41C can be moved horizontally in the Y direction. This eliminates the need to lift the fixing PC steel rod 41B and the jack PC steel rod 41C upwards, improving workability.

なお、上述した実施の形態において示した各構成部材の諸形状や組み合わせ等は一例であって、本発明の主旨から逸脱しない範囲において設計要求等に基づき種々変更可能である。 The shapes and combinations of the components shown in the above-mentioned embodiment are merely examples, and may be modified in various ways based on design requirements, etc., without departing from the spirit of the present invention.

2,2A…ばねユニット(第一ばねユニット)
3…ジャッキセット(第一ジャッキセット)
11…下部キャピタル(下部体)
12…上部キャピタル(上部体)
21,21A…下部プレート
22…上部プレート
23…ばね本体(支持ばね)
30…反力支持架構
31…下部固定プレート
32…上部締結プレート
33…支持フレーム
41…PC鋼棒(第一鋼棒)
43…センターホールジャッキ(第一ジャッキ)
45,46…支保工(第一仮設支持部材)
100,100A…防振浮き床支持ばね伸縮機構
F…浮き床
M…基礎マット(基礎)
n12…中間ナット(位置保持部材)
2, 2A...Spring unit (first spring unit)
3...Jack set (first jack set)
11...Lower capital (lower body)
12...Upper capital (upper body)
21, 21A... Lower plate 22... Upper plate 23... Spring body (support spring)
30... Reaction support structure 31... Lower fixed plate 32... Upper fastening plate 33... Support frame 41... PC steel bar (first steel bar)
43...Center hole jack (first jack)
45, 46... Shoring (first temporary support member)
100, 100A... Anti-vibration floating floor support spring extension mechanism F... Floating floor M... Foundation mat (foundation)
n12...Intermediate nut (position retaining member)

Claims (2)

基礎の上方に浮き床を設置する際に使用される防振浮き床支持ばね伸縮機構であって、
前記基礎上に設置される下部体と、
該下部体の上方に配置され、浮き床が設置される上部体と、
前記下部体に固定された下部プレートと、前記上部体の下方に該上部体を支持可能に配置された上部プレートと、前記下部プレートと前記上部プレートとの間に配置された支持ばねと、を有する第一ばねユニットと、
前記下部体または前記下部プレートに固定され、前記上部プレートに下向きの力を付与可能な第一ジャッキセットと、
前記浮き床を支持可能な第一仮設支持部材と、を備え、
前記第一ジャッキセットは、
前記下部体または前記下部プレートに固定された反力支持架構と、
前記上部プレートに連結された第一鋼棒と、
該第一鋼棒に下向きの力を付与可能な第一ジャッキと、
前記第一鋼棒を前記反力支持架構の任意の位置に固定及び固定解除が可能な位置保持部材と、を備え、
前記反力支持架構は、前記上部プレートの下方に配された上部締結プレートを有し、
前記位置保持部材は、前記上部締結プレートの下方に設けられ、
前記第一鋼棒の下端部には、前記第一ジャッキが着脱可能に設けられていることを特徴とする防振浮き床支持ばね伸縮機構。
A vibration-proof floating floor support spring extension mechanism used when installing a floating floor above a foundation,
A lower body installed on the foundation;
an upper body disposed above the lower body and on which a floating floor is installed;
a first spring unit including a lower plate fixed to the lower body, an upper plate arranged below the upper body so as to be able to support the upper body, and a support spring arranged between the lower plate and the upper plate;
a first set of jacks fixed to the lower body or the lower plate and capable of applying a downward force to the upper plate;
A first temporary support member capable of supporting the floating floor,
The first jack set includes:
A reaction support structure fixed to the lower body or the lower plate;
a first steel rod connected to the upper plate;
A first jack capable of applying a downward force to the first steel bar;
A position retaining member capable of fixing and releasing the first steel rod to any position of the reaction support frame,
The reaction support structure has an upper fastening plate disposed below the upper plate,
The position retaining member is provided below the upper fastening plate,
An anti-vibration floating floor support spring extension mechanism characterized in that the first jack is detachably attached to the lower end of the first steel bar.
下部体上に、第一ばねユニットを設置するばねユニット設置工程と、
第一ジャッキ、反力支持架構、および第一鋼棒を備えた第一ジャッキセットを前記下部体上に設置して、前記第一ジャッキセットの前記第一鋼棒を前記第一ばねユニットの上部プレートに連結するジャッキセット設置工程と、
浮き床を支持可能な仮設支持部材を設置する仮設支持部材設置工程と、
前記第一ばねユニット及び前記第一ジャッキセットの上方に上部体を設置する上部体設置工程と、
前記第一ジャッキセットの前記第一ジャッキを載荷して、前記第一鋼棒を下方に引っ張り、前記第一ばねユニットの上部プレートに下向きの力を付与するとともに、前記第一ジャッキセットに設けられた位置保持部材を操作して前記第一鋼棒を前記反力支持構の所定位置に保持する下向きの力付与工程と、
前記上部体の上方に前記浮き床を施工して、該浮き床を前記仮設支持部材で支持させる浮き床施工工程と、
前記第一ジャッキを取り外して、前記上部プレートに付与していた下向きの力を除去し、前記浮き床を前記第一ばねユニットで支持させる荷重受け替え工程と、を備えることを特徴とする防振浮き床の施工方法。
a spring unit installation step of installing a first spring unit on the lower body;
a jack set installation process for installing a first jack set including a first jack, a reaction support structure, and a first steel bar on the lower body and connecting the first steel bar of the first jack set to an upper plate of the first spring unit;
A temporary support member installation process for installing a temporary support member capable of supporting the floating floor;
an upper body installation process of installing an upper body above the first spring unit and the first jack set;
a downward force applying step of loading the first jack of the first jack set to pull the first steel rod downward and apply a downward force to the upper plate of the first spring unit, and operating a position-retaining member provided on the first jack set to hold the first steel rod at a predetermined position on the reaction support frame ;
a floating floor construction process in which the floating floor is constructed above the upper body and the floating floor is supported by the temporary support members;
a load transfer process of removing the first jack, eliminating the downward force applied to the upper plate, and supporting the floating floor with the first spring unit.
JP2022192980A 2018-08-09 2022-12-01 Anti-vibration floating floor support spring extension mechanism and anti-vibration floating floor construction method Active JP7472249B2 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2018150173 2018-08-09
JP2018150173 2018-08-09
JP2019036041A JP7214507B2 (en) 2018-08-09 2019-02-28 Anti-vibration floating floor support spring expansion and contraction mechanism, construction method of anti-vibration floating floor, and replacement method of spring unit of anti-vibration floating floor

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP2019036041A Division JP7214507B2 (en) 2018-08-09 2019-02-28 Anti-vibration floating floor support spring expansion and contraction mechanism, construction method of anti-vibration floating floor, and replacement method of spring unit of anti-vibration floating floor

Publications (2)

Publication Number Publication Date
JP2023025164A JP2023025164A (en) 2023-02-21
JP7472249B2 true JP7472249B2 (en) 2024-04-22

Family

ID=69619762

Family Applications (2)

Application Number Title Priority Date Filing Date
JP2019036041A Active JP7214507B2 (en) 2018-08-09 2019-02-28 Anti-vibration floating floor support spring expansion and contraction mechanism, construction method of anti-vibration floating floor, and replacement method of spring unit of anti-vibration floating floor
JP2022192980A Active JP7472249B2 (en) 2018-08-09 2022-12-01 Anti-vibration floating floor support spring extension mechanism and anti-vibration floating floor construction method

Family Applications Before (1)

Application Number Title Priority Date Filing Date
JP2019036041A Active JP7214507B2 (en) 2018-08-09 2019-02-28 Anti-vibration floating floor support spring expansion and contraction mechanism, construction method of anti-vibration floating floor, and replacement method of spring unit of anti-vibration floating floor

Country Status (1)

Country Link
JP (2) JP7214507B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7662149B2 (en) * 2020-03-19 2025-04-15 株式会社竹中工務店 Spring device
JP7687933B2 (en) * 2021-10-12 2025-06-03 清水建設株式会社 Anti-vibration structure
JP7712190B2 (en) * 2021-11-30 2025-07-23 清水建設株式会社 Anti-vibration structure
JP7790986B2 (en) * 2022-01-18 2025-12-23 清水建設株式会社 Spring members and vibration-proof structures

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000193033A (en) 1998-12-25 2000-07-14 Shimizu Corp Anti-vibration bearing and its installation method
JP2011132769A (en) 2009-12-25 2011-07-07 Hitachi-Ge Nuclear Energy Ltd Method of replacing laminated rubber for base isolation
JP2018084038A (en) 2016-11-21 2018-05-31 清水建設株式会社 Seismic isolator replacement method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5944732B2 (en) 2012-04-25 2016-07-05 株式会社竹中工務店 Installation method of elastic bearing

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000193033A (en) 1998-12-25 2000-07-14 Shimizu Corp Anti-vibration bearing and its installation method
JP2011132769A (en) 2009-12-25 2011-07-07 Hitachi-Ge Nuclear Energy Ltd Method of replacing laminated rubber for base isolation
JP2018084038A (en) 2016-11-21 2018-05-31 清水建設株式会社 Seismic isolator replacement method

Also Published As

Publication number Publication date
JP2020026730A (en) 2020-02-20
JP2023025164A (en) 2023-02-21
JP7214507B2 (en) 2023-01-30

Similar Documents

Publication Publication Date Title
JP7472249B2 (en) Anti-vibration floating floor support spring extension mechanism and anti-vibration floating floor construction method
KR101891942B1 (en) Earthquake reinforcement method of existing structure
JP6022631B1 (en) Seismic isolation device replacement method and seismic isolation structure
KR101683080B1 (en) Construction method for addition pile
KR20160099768A (en) Construction method for addition pile
JP5078863B2 (en) Replacement method of support device and replacement support device used in the method
JP6404013B2 (en) Construction method of seismic isolation building
KR101607485B1 (en) Curved-psc girder with outrigger and curved-psc girder bridge construction method therewith
JP2005306445A (en) Lateral wall members for pre-cast pc tank and joint structure between lateral wall members and bottom plate
JP2003206509A (en) Function change repair construction method for existing elastic support
JP2018003559A (en) Column-beam frame repairing method and repaired column-beam frame
JP3581691B2 (en) Mounting method and mounting structure of horizontal force damper for structure
JP6717656B2 (en) Bridge widening method
JP6546755B2 (en) Seismic isolation repair method
KR101402183B1 (en) Manufacturing method for composite girder
JP7009725B2 (en) Construction method of seismic isolation structure
JP5749606B2 (en) Seismic isolation method for existing buildings
JP2018009346A (en) Seismic isolator installation method
JP2022096117A (en) Equipment foundation structure
JP7669260B2 (en) Building structure with multiple column capitals
JP5301508B2 (en) Climbing crane support method and support jig
JP6114071B2 (en) Seismic isolation method for existing buildings and temporary structure under construction
JP6104658B2 (en) Structure and its construction method
JP2005113465A (en) Deformation suppressing device
JP2006097325A (en) Seismic isolation device, seismic isolation building construction method, and seismic isolation building

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20221201

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20230808

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20231003

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20231212

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240129

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20240402

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20240410

R150 Certificate of patent or registration of utility model

Ref document number: 7472249

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150