JP7524121B2 - Method for preventing the protrusion of existing PC steel rods and a device for preventing the protrusion of existing PC steel rods - Google Patents
[go: Go Back, main page]

JP7524121B2 - Method for preventing the protrusion of existing PC steel rods and a device for preventing the protrusion of existing PC steel rods - Google Patents

Method for preventing the protrusion of existing PC steel rods and a device for preventing the protrusion of existing PC steel rods Download PDF

Info

Publication number
JP7524121B2
JP7524121B2 JP2021055809A JP2021055809A JP7524121B2 JP 7524121 B2 JP7524121 B2 JP 7524121B2 JP 2021055809 A JP2021055809 A JP 2021055809A JP 2021055809 A JP2021055809 A JP 2021055809A JP 7524121 B2 JP7524121 B2 JP 7524121B2
Authority
JP
Japan
Prior art keywords
sleeve
existing
wedge
steel bar
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021055809A
Other languages
Japanese (ja)
Other versions
JP2022152874A (en
Inventor
拓也 原田
知樹 岩生
明夫 正司
謙一 高橋
博 渡瀬
洋輔 東
智紀 堀井
一成 野田
睦彦 大西
亮介 小林
実花 成子
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
West Nippon Expressway Co Ltd
Kobelco Wire Co Ltd
Central Nippon Expressway Co Ltd
Oriental Shiraishi Corp
Original Assignee
Shinko Wire Co Ltd
West Nippon Expressway Co Ltd
Central Nippon Expressway Co Ltd
Oriental Shiraishi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shinko Wire Co Ltd, West Nippon Expressway Co Ltd, Central Nippon Expressway Co Ltd, Oriental Shiraishi Corp filed Critical Shinko Wire Co Ltd
Priority to JP2021055809A priority Critical patent/JP7524121B2/en
Publication of JP2022152874A publication Critical patent/JP2022152874A/en
Application granted granted Critical
Publication of JP7524121B2 publication Critical patent/JP7524121B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Reinforcement Elements For Buildings (AREA)

Description

本発明は、土木建築分野におけるコンクリート製の梁、桁またはその他の建築部材等において好適に使用されるプレストレストコンクリート部材に圧縮力を付与している既設のPC鋼棒(PC鋼線、PC鋼より線を含まない)が時間の経過やグラウト充填量の不足等による腐食により破断(本発明においては破断の原因は限定されるものではない)した場合に(鋼棒であるがゆえに)瞬時に発生する大きな衝撃力を好適に受け止めることによりコンクリート部材の外にPC鋼棒が突出することを防止することのできる既設PC鋼棒突出防止工法およびそれに用いる既設PC鋼棒突出防止具に関する。 The present invention relates to a method for preventing the protrusion of existing PC steel bars, and a device for preventing the protrusion of existing PC steel bars used therein, which can prevent the PC steel bars from protruding outside the concrete member by appropriately absorbing the large impact force that occurs instantly (because the bars are steel bars) when existing PC steel bars (not including PC steel wires and PC steel strands) that apply compressive force to prestressed concrete members that are preferably used in concrete beams, girders, and other building members in the civil engineering and construction field break due to corrosion caused by the passage of time or insufficient grout filling amount (the cause of breakage is not limited in the present invention). ...

なお、本発明において、楔体、楔、くさび、クサビ、ウェッジ(wedge)と記載する場合があるが、これらは同じ構造を備える。また、本発明は既設のPC鋼棒を対象としているために単にPC鋼棒と記載している場合であっても既設PC鋼棒であることを示すものとなる。 In this invention, the terms wedge, shim, wedge, and wedge may be used, but they all have the same structure. In addition, since this invention is directed to existing PC steel bars, even if the term is simply used as PC steel bar, it indicates that the bar is an existing PC steel bar.

2000年(平成12年)以前に建設されたPC構造の箱桁橋には緊張材としてPC鋼棒が多数使用されており、橋梁の老朽化に伴ってPC鋼棒においても腐食が進行している場合がある。特に、グラウトの注入時にシース内に気泡が残った場合や、グラウト材そのものに問題があった場合などに十分な防錆力が得られず、PC鋼棒の腐食が進行して破断にいたることがある。また、アンカーなどに利用した場合には、地盤の動きによりPC鋼棒の緊張が増し、設計以上の張力となってPC鋼棒が破断することもある。 PC steel bars are used in large numbers as tension members in PC box girder bridges built before 2000 (Heisei 12), and as bridges age, corrosion may also progress in the PC steel bars. In particular, if air bubbles remain in the sheath when the grout is injected, or if there is a problem with the grout material itself, sufficient rust prevention may not be achieved, and corrosion of the PC steel bars may progress and lead to breakage. Furthermore, when used as anchors, ground movement may increase the tension in the PC steel bars, which may exceed the designed tension and cause the PC steel bars to break.

その際、PC鋼棒が緊張されている(PC鋼棒が緊張されることによりPC構造物に圧縮力が付与されている)ため、破断したPC鋼棒は構造物表面から飛び出し、コンクリートの破片を周囲に落下させる危険があった。すなわち、PC鋼棒には大きな緊張力が付与されており、その破断は(たとえばPC鋼より線等と異なり)全断面が瞬時に破断するために破断による衝撃力は大きく、特に路面に対して鉛直に配置されたPC鋼棒が破断すると、その衝撃力で路盤が盛り上がるなどにより車両走行に支障を来すおそれ、コンクリートの破片を周囲に落下させたりするおそれがある。 At that time, because the PC steel rods were tensioned (tensioning the PC steel rods applies a compressive force to the PC structure), there was a risk that the broken PC steel rods would fly out from the surface of the structure and cause concrete fragments to fall into the surrounding area. In other words, the PC steel rods are subjected to a large tension, and when they break, the entire cross section breaks instantly (unlike, for example, PC steel strands), so the impact force caused by the breakage is large, and in particular, when a PC steel rod that is placed perpendicular to the road surface breaks, the impact force can cause the roadbed to rise, hindering vehicle travel and causing concrete fragments to fall into the surrounding area.

PC鋼棒の飛び出しの衝撃力で路盤が盛り上がったりコンクリート片が落下したりすると、人や走行車両などに対して不測の事態を招くおそれがある。そのため、PC鋼棒端部が位置する箇所のPC構造物の表面に鋼板を配置し、その上にアラミド繊維シートなどをエポキシ樹脂のような接着剤で貼り付けることによって、PC鋼棒の破断飛び出しによるコンクリート片の落下を防止する対策がとられていた。 If the impact force of the PC steel rods popping out causes the roadbed to swell or concrete pieces to fall, it could lead to unexpected incidents for people or passing vehicles. For this reason, measures have been taken to prevent concrete pieces from falling due to the breakage of the PC steel rods by placing steel plates on the surface of the PC structure at the points where the ends of the PC steel rods are located and attaching aramid fiber sheets or the like to the top of the steel plates with an adhesive such as epoxy resin.

このようにPC構造物の表面に鋼板やアラミド繊維シートなどを貼り付ける従来の対策では、路面上に設置する場合には、その取り付け作業が極めて面倒であるうえ、構造物の外面に取り付けた場合には、(外面の仕上げ状態にもよるが)構造物の外観上が好ましくない可能性があった。また、鋼板が薄すぎる場合や腐食した場合、あるいはPC鋼棒の飛び出しエネルギーが大きすぎる場合には、PC鋼棒の飛び出しを抑えきれず、コンクリートの破片が周囲に落下することを防止できなかった。 Conventional measures like these, which involve attaching steel plates or aramid fiber sheets to the surface of PC structures, are extremely tedious to install when placed on the road surface, and when attached to the exterior of a structure, there is a possibility that the structure's appearance will be undesirable (depending on the finish of the exterior). Also, if the steel plates are too thin or corroded, or if the ejection energy of the PC steel rods is too high, it is not possible to prevent the PC steel rods from ejecting, and concrete fragments from falling on the surrounding area.

このような従来の事情に鑑み、PC構造物の表面に外観を損なうような鋼板やアラミド繊維シートなどの部材を付加することなく、破断したPC鋼棒の飛び出しを確実に防止して、コンクリートの破片の落下を防ぐことができるPC鋼棒の飛び出し防止機構付き定着構造を、たとえば特開2007-314970号公報(特許文献1)は開示する。
この特許文献1に開示されたPC鋼棒の飛び出し防止機構付き定着構造は、PC鋼棒が挿入される貫通部を有するアンカー部材と、PC鋼棒に螺合しかつアンカー部材に当接する固定ナットとで、PC鋼棒端部を固定する定着構造において、
In view of these conventional circumstances, for example, JP 2007-314970 A (Patent Document 1) discloses an anchoring structure with a mechanism for preventing PC steel bars from jumping out, which can reliably prevent broken PC steel bars from jumping out and prevent concrete fragments from falling, without adding components such as steel plates or aramid fiber sheets that would mar the appearance of the surface of the PC structure.
The fixing structure with a mechanism for preventing the PC steel rod from jumping out disclosed in Patent Document 1 is a fixing structure that fixes the end of the PC steel rod with an anchor member having a penetration portion through which the PC steel rod is inserted and a fixing nut that screws into the PC steel rod and abuts against the anchor member, and

(1)PC鋼棒の固定端側および緊張端側の各アンカー部材の外周部に、それぞれ径方向外側に突出して設けた帯状凸部と、
(2)PC鋼棒の緊張端側において、アンカー部材に固定したアンカーボルトにPC鋼棒端面に対向して固定された飛出防止板と、
(3)PC鋼棒の固定端側において、アンカー部材の固定端側に当接する前記固定ナットとともに、PC鋼棒に螺合しかつアンカー部材の緊張端側に当接する飛出防止ナットとを、備えることを特徴とする。
(1) A band-shaped protrusion is provided on the outer periphery of each anchor member on the fixed end side and the tension end side of the PC steel bar so as to protrude radially outward,
(2) At the tension end side of the PC steel rod, a jump-out prevention plate is fixed to an anchor bolt fixed to an anchor member so as to face the end face of the PC steel rod;
(3) The present invention is characterized in that, at the fixed end side of the PC steel rod, in addition to the fixing nut abutting against the fixed end side of the anchor member, a pop-out prevention nut is provided which screws into the PC steel rod and abuts against the tension end side of the anchor member.

これらの(1)~(3)の構成により、供用後にPC鋼棒が万一判断した場合にも、緊張端側からのPC鋼棒の飛び出しを飛出防止板で防ぐとともに、固定端側からのPC鋼棒の飛び出しは固定ナットと飛出防止ナットのダブルナットによって防止する。その際、破断したPC鋼棒の飛び出しエネルギーは緊張端側および固定端側のアンカー部材に伝達されるが、これらのアンカー部材の外周部には径方向外側に突出した帯状凸部が設けてあるため、飛び出しエネルギーは帯状凸部からコンクリート躯体に逃がされ、PC鋼棒の飛び出しおよびコンクリート片の落下を有効に防止することができる。 With these configurations (1) to (3), even if the PC steel rod is found to be broken after it has been put into service, the anti-jump plate prevents the PC steel rod from jumping out from the tension end, and the double nut consisting of a fixed nut and an anti-jump nut prevents the PC steel rod from jumping out from the fixed end. In this case, the energy of the broken PC steel rod is transmitted to the anchor members on the tension end and fixed end sides, but because the outer periphery of these anchor members has a band-shaped protrusion that protrudes radially outward, the energy of the jump is released from the band-shaped protrusion to the concrete structure, effectively preventing the PC steel rod from jumping out and concrete pieces from falling.

特開2007-314970号公報JP 2007-314970 A

しかしながら、上述した特許文献1に開示されたPC鋼棒の飛び出し防止機構付き定着構造は、プレストレストコンクリート部材を初めて施工する場合に好適に採用されるものに過ぎず、2000年(平成12年)以前に建設されたPC構造の箱桁橋には緊張材としてPC鋼棒が多数使用されており、橋梁の老朽化に伴ってPC鋼棒においても腐食が進行しているという背景の元で、既設のプレストレストコンクリート部材に特許文献1に開示された技術を適用することは施工上大きな問題があり実質的に施工することができない。 However, the anchoring structure with a mechanism to prevent the PC steel bars from jumping out, disclosed in the above-mentioned Patent Document 1, is merely suitable for use when constructing prestressed concrete members for the first time. PC box girder bridges constructed before 2000 (Heisei 12) use a large number of PC steel bars as tendons, and as bridges age, corrosion of the PC steel bars is also progressing. In light of this background, applying the technology disclosed in Patent Document 1 to existing prestressed concrete members poses major construction problems and is practically impossible to implement.

特に、このような既設のPC構造物の一例である箱桁橋に対して、長年にわたりPC構造物に圧縮力を付与し続けているPC鋼棒が腐食破断した場合でも路面に変状が生じないようにするために、PC鋼棒破断時の衝撃力を受け止めて路面に変状が生じなくコンクリート片が落下することのない工法の開発が望まれており、供用中の箱桁橋に対して交通規制を行わずに実施できる工法の開発が強く望まれている。このような強い要望に対して、特許文献1に開示されたPC鋼棒の飛び出し防止機構付き定着構造が好適に適用できないという問題点がある。また、中間定着具など突出防止を目的に設置し、PC鋼棒破断時の衝撃力を完全に受け止めた場合には、中間定着具とコンクリート表面との間(区間)で残存する圧縮力は変わらない状態か大きい状態であるため、その区間におけるPC鋼棒がさらに破断した場合にはPC鋼棒が突出する可能性がある。 In particular, for box girder bridges, which are an example of such existing PC structures, in the event that the PC steel bars that have been applying compressive force to the PC structure for many years corrode and break, there is a need to develop a construction method that can withstand the impact force of the PC steel bars breaking and prevent deformation of the road surface and concrete fragments from falling, and there is a strong demand for a construction method that can be implemented without traffic restrictions on box girder bridges in service. In response to such a strong demand, there is a problem in that the fixing structure with a mechanism to prevent the PC steel bars from jumping out, as disclosed in Patent Document 1, cannot be suitably applied. In addition, if intermediate fixing devices are installed to prevent protrusion and the impact force when the PC steel bars break is completely absorbed, the compressive force remaining between the intermediate fixing devices and the concrete surface (section) remains unchanged or is large, so if the PC steel bars in that section break again, the PC steel bars may protrude.

本発明は、従来技術の上述の問題点に鑑みて開発されたものであり、その目的とするところは、供用中のプレストレストコンクリート部材に圧縮力を付与している既設のPC鋼棒が破断した場合に発生する大きな衝撃力によりコンクリート部材の外にPC鋼棒が突出することを、供用しながらの作業により防止することのできる既設PC鋼棒突出防止工法およびそれに用いる既設PC鋼棒突出防止具を提供することである。さらには、PC鋼棒が破断した際に発生する大きな衝撃力を受け止めて、かつ、その衝撃力を緩衝することにより、既設PC鋼棒突出防止具とコンクリート表面との間(区間)で残存した圧縮力を小さくすることができ、その区間におけるPC鋼棒がさらに破断した場合のPC鋼棒の突出の可能性を低くすることのできる既設PC鋼棒突出防止工法およびそれに用いる既設PC鋼棒突出防止具を提供することである。 The present invention was developed in consideration of the above-mentioned problems of the prior art, and its purpose is to provide an existing PC steel bar protrusion prevention method and an existing PC steel bar protrusion prevention device used therefor, which can prevent the PC steel bar from protruding out of the concrete member due to the large impact force generated when the existing PC steel bar that applies compressive force to the prestressed concrete member in service breaks, while the work is in service. Furthermore, the present invention provides an existing PC steel bar protrusion prevention method and an existing PC steel bar protrusion prevention device used therefor, which can receive the large impact force generated when the PC steel bar breaks and cushion the impact force, thereby reducing the compressive force remaining in the section between the existing PC steel bar protrusion prevention device and the concrete surface, thereby reducing the possibility of the PC steel bar protruding if the PC steel bar in that section breaks again.

上記目的を達成するため、本発明に係る既設PC鋼棒突出防止工法およびそれに用いる既設PC鋼棒突出防止具は、以下の技術的手段を講じている。
すなわち、本発明のある局面に係る既設PC鋼棒突出防止工法は、既設PC鋼棒の長手方向に垂直な面から見て2以上のウェッジ片に分割されたウェッジと、前記ウェッジに組み合わせられるテーパーを備えるとともに前記既設PC鋼棒に装着可能な構造を備えたスリーブとを含む突出防止具を用いて、既設のプレストレストコンクリート部材に圧縮力を付与している既設PC鋼棒が破断した場合の衝撃力を受け止めて前記コンクリート部材の
外部に前記既設PC鋼棒が突出することを防止する工法であって、前記既設PC鋼棒が突出することが予測される前記コンクリート部材の表面から前記既設PC鋼棒に沿って0.25m~2.0mの位置のコンクリートを斫って、前記既設PC鋼棒を露出させる露出ステップと、前記ウェッジのテーパーが狭まる方向が前記表面への方向になるように、分割された2以上のウェッジ片を前記露出した既設PC鋼棒に装着するウェッジ装着ステップと、前記スリーブのテーパーが狭まる方向が前記表面への方向になるように、前記既設PC鋼棒に装着可能な構造を備えたスリーブを前記露出した既設PC鋼棒に装着するスリーブ装着ステップと、前記スリーブを前記ウェッジに組み合わせられるスリーブとして機能させるスリーブ機能化ステップと、前記分割された状態で前記露出した前記既設PC鋼棒に装着された2以上のウェッジ片を、前記ウェッジのテーパーの向きと前記スリーブのテーパーの向きとを一致させて、スリーブとして機能させた前記スリーブに挿入する挿入ステップとを含む。
In order to achieve the above-mentioned object, the method for preventing protrusion of existing PC steel bars and the device for preventing protrusion of existing PC steel bars used therein according to the present invention employ the following technical measures.
That is, the method for preventing protrusion of an existing PC steel bar according to one aspect of the present invention is a method for receiving an impact force when an existing PC steel bar that applies a compressive force to an existing prestressed concrete member breaks by using a protrusion prevention device including a wedge divided into two or more wedge pieces when viewed from a plane perpendicular to the longitudinal direction of the existing PC steel bar, and a sleeve having a taper that can be combined with the wedge and a structure that can be attached to the existing PC steel bar, thereby preventing the existing PC steel bar from protruding outside the concrete member, the method including an exposure step of chipping off concrete at a position 0.25 m to 2.0 m along the existing PC steel bar from the surface of the concrete member where the existing PC steel bar is expected to protrude, to expose the existing PC steel bar; The method includes a wedge mounting step of mounting two or more split wedge pieces to the exposed existing PC steel bar so that the taper of the wedge narrows in the direction toward the surface, a sleeve mounting step of mounting a sleeve having a structure that can be mounted on the existing PC steel bar to the exposed existing PC steel bar so that the taper of the sleeve narrows in the direction toward the surface, a sleeve functioning step of making the sleeve function as a sleeve that can be combined with the wedge, and an insertion step of inserting the two or more wedge pieces mounted to the exposed existing PC steel bar in the split state into the sleeve that has been made to function as a sleeve, by aligning the taper direction of the wedge with the taper direction of the sleeve.

好ましくは、前記既設PC鋼棒に沿った長さであって、前記既設PC鋼棒が突出することが予測される前記コンクリート部材の表面から、前記既設PC鋼棒が突出することが予測される前記コンクリート部材の他の表面までの長さLが2.5m~3.5mを超える場合において、前記露出ステップは、前記表面から0.25m~2.0mの第一位置のコンクリートおよび前記他の表面から0.25m~2.0mの第二位置のコンクリートを2箇所斫って、前記2箇所において前記既設PC鋼棒を露出させるステップを含み、前記第一位置および前記第二位置は、前記表面、前記第一位置、前記第二位置、前記他の表面の順であって、前記ウェッジ装着ステップは、斫り1箇所に対して1個のウェッジを用いて、前記ウェッジのテーパーが狭まる方向が近い方の前記表面への方向になるように、分割された2以上のウェッジ片を前記露出した前記既設PC鋼棒に装着するステップを含み、前記スリーブ装着ステップは、斫り1箇所に対して1個のスリーブを用いて、前記スリーブのテーパーが狭まる方向が近い方の前記表面への方向になるように、前記既設PC鋼棒に装着可能な構造を備えたスリーブを前記露出した前記既設PC鋼棒に装着するステップを含むように構成することができる。 Preferably, when the length L along the existing PC steel bar from the surface of the concrete member from which the existing PC steel bar is predicted to protrude to the other surface of the concrete member from which the existing PC steel bar is predicted to protrude exceeds 2.5 m to 3.5 m, the exposing step includes a step of chipping off two portions of the concrete at a first position 0.25 m to 2.0 m from the surface and at a second position 0.25 m to 2.0 m from the other surface to expose the existing PC steel bar at the two positions, and the first position and the second position are the surface, the first position, the second position, the position, and the other surface in that order, and the wedge attachment step includes a step of attaching two or more divided wedge pieces to the exposed existing PC steel bar using one wedge for each chipping location so that the taper of the wedge narrows in the direction toward the closer surface, and the sleeve attachment step can be configured to include a step of attaching a sleeve having a structure that can be attached to the existing PC steel bar to the exposed existing PC steel bar using one sleeve for each chipping location so that the taper of the sleeve narrows in the direction toward the closer surface.

さらに好ましくは、前記既設PC鋼棒に沿った長さであって、前記既設PC鋼棒が突出することが予測される前記コンクリート部材の表面から、前記既設PC鋼棒が突出することが予測される前記コンクリート部材の他の表面までの長さLが2.5m~3.5mを超えない場合において、前記露出ステップは、前記表面および前記他の表面のいずれかから0.25m~2.0mの位置のコンクリートを1箇所斫って、前記1箇所において前記既設PC鋼棒を露出させるステップを含み、前記ウェッジ装着ステップは、斫り1箇所に対して2個のウェッジを用いて、前記2個のウェッジのテーパーが狭まる方向が互いに対面する方向になるように、分割された2以上のウェッジ片を前記露出した前記既設PC鋼棒に装着するステップを含み、前記スリーブ装着ステップは、斫り1箇所に対して2個のスリーブを用いて、前記2個のスリーブのテーパーが狭まる方向が互いに対面する方向になるように、前記既設PC鋼棒に装着可能な構造を備えたスリーブを前記露出した前記既設PC鋼棒に装着するステップを含むように構成することができる。 More preferably, when the length L along the existing PC steel bar from the surface of the concrete member from which the existing PC steel bar is expected to protrude to the other surface of the concrete member from which the existing PC steel bar is expected to protrude does not exceed 2.5 m to 3.5 m, the exposing step includes a step of chipping the concrete at a location 0.25 m to 2.0 m from either the surface or the other surface to expose the existing PC steel bar at the one location, the wedge attachment step includes a step of attaching two or more divided wedge pieces to the exposed existing PC steel bar using two wedges for one chipping location so that the tapers of the two wedges narrow in the direction facing each other, and the sleeve attachment step includes a step of attaching a sleeve having a structure that can be attached to the existing PC steel bar to the exposed existing PC steel bar using two sleeves for one chipping location so that the tapers of the two sleeves narrow in the direction facing each other.

さらに好ましくは、前記挿入ステップは、前記ウェッジを前記スリーブに、ジャッキを用いることなく作業者の手作業により挿入するステップを含むように構成することができる。
また、本発明の別の局面に係る既設PC鋼棒突出防止具は、上述したいずれかに記載の既設PC鋼棒突出防止工法に用いられる突出防止具であって、前記既設PC鋼棒の長手方向に垂直な面から見て2以上のウェッジ片に分割されたウェッジと、前記ウェッジに組み合わせられるテーパーを備える内筒側のスリーブ片と前記内筒側のスリーブ片の外側に設けられる外筒側のスリーブ片とに分割されるスリーブと、を含み、前記内筒側のスリーブ片および前記外筒側のスリーブ片について、前記既設PC鋼棒の長手方向に垂直な面から見て前記既設PC鋼棒が挿入可能な切欠き部を少なくとも内筒側スリーブ片が備え、前記内筒側のスリーブ片と前記外筒側のスリーブ片とが接合されることによりスリーブとして一体化されて前記ウェッジに組み合わせられるスリーブとして機能することを特徴とする
。また、前記外筒側のスリーブ片は、たとえばFRP(Fiber Reinforced Plastics:繊維強化プラスチック)製のシートで、前記内筒側のスリーブ片と前記外筒側のスリーブ片とは前記内筒側のスリーブ片の外周にシート状の前記外筒側のスリーブ片を巻き付けることにより前記スリーブとして一体化されるものであっても構わない。この場合には、シート状の前記外筒側のスリーブ片の切欠き部は必須の構成ではない。
More preferably, the inserting step may be configured to include a step of manually inserting the wedge into the sleeve by an operator without using a jack.
In addition, a protrusion prevention device for existing PC steel bars according to another aspect of the present invention is a protrusion prevention device used in the protrusion prevention construction method for existing PC steel bars described in any of the above, and includes a wedge divided into two or more wedge pieces when viewed from a plane perpendicular to the longitudinal direction of the existing PC steel bar, and a sleeve divided into an inner tube side sleeve piece with a taper that can be combined with the wedge and an outer tube side sleeve piece that is provided on the outside of the inner tube side sleeve piece, and is characterized in that for the inner tube side sleeve piece and the outer tube side sleeve piece, at least the inner tube side sleeve piece has a notch portion through which the existing PC steel bar can be inserted when viewed from a plane perpendicular to the longitudinal direction of the existing PC steel bar, and the inner tube side sleeve piece and the outer tube side sleeve piece are joined together to form a sleeve that is integrated and functions as a sleeve that can be combined with the wedge. The sleeve piece on the outer tube side may be, for example, a sheet made of FRP (Fiber Reinforced Plastics), and the sleeve piece on the inner tube side and the sleeve piece on the outer tube side may be integrated as the sleeve by wrapping the sheet-like sleeve piece on the outer tube side around the outer periphery of the sleeve piece on the inner tube side. In this case, the notch portion of the sheet-like sleeve piece on the outer tube side is not an essential component.

好ましくは、前記内筒側のスリーブ片の外周面に設けられたキー溝と前記外筒側のスリーブ片の内周面に設けられたキー溝とに跨ってキーが設けられて前記内筒側のスリーブ片と前記外筒側のスリーブ片とが接合されることによりスリーブとして一体化されるように構成することができる。
さらに好ましくは、前記内筒側のスリーブ片の外周面に設けられた雄ねじと前記外筒側のスリーブ片の内周面に設けられた雌ねじとが螺合されて前記内筒側のスリーブ片と前記外筒側のスリーブ片とが接合されることによりスリーブとして一体化されるように構成することができる。
Preferably, a key can be provided spanning a key groove provided on the outer peripheral surface of the sleeve piece on the inner tube side and a key groove provided on the inner peripheral surface of the sleeve piece on the outer tube side, and the sleeve piece on the inner tube side and the sleeve piece on the outer tube side can be joined together to form an integrated sleeve.
More preferably, the sleeve piece on the inner tube side and the sleeve piece on the outer tube side can be configured so that they are integrated as a sleeve by screwing together a male thread provided on the outer peripheral surface of the sleeve piece on the inner tube side and a female thread provided on the inner peripheral surface of the sleeve piece on the outer tube side.

また、本発明のさらに別の局面に係る既設PC鋼棒突出防止具は、上述したいずれかに記載の既設PC鋼棒突出防止工法に用いられる突出防止具であって、前記既設PC鋼棒の長手方向に垂直な面から見て2以上のウェッジ片に分割されたウェッジと、前記ウェッジに組み合わせられるテーパーを備えるとともに、前記既設PC鋼棒の長手方向に垂直な面から見て前記既設PC鋼棒が挿入可能なスリット部を備えるスリーブと、を含み、前記スリット部において互いに対向する壁面が連結部材を用いて連結されることにより前記垂直な面から見た前記スリット部の間隔が規制されて前記ウェッジに組み合わせられるスリーブとして機能することを特徴とする。 In addition, according to yet another aspect of the present invention, the protrusion prevention device for existing PC steel bars is a protrusion prevention device used in any of the above-mentioned methods for preventing protrusion of existing PC steel bars, and includes a wedge divided into two or more wedge pieces when viewed from a plane perpendicular to the longitudinal direction of the existing PC steel bar, and a sleeve having a taper that can be combined with the wedge and a slit portion into which the existing PC steel bar can be inserted when viewed from a plane perpendicular to the longitudinal direction of the existing PC steel bar, and is characterized in that the opposing wall surfaces in the slit portion are connected using a connecting member to regulate the spacing of the slit portion when viewed from the perpendicular plane, thereby functioning as a sleeve that can be combined with the wedge.

好ましくは、前記連結部材は、前記互いに対向する壁面の少なくとも一方の壁面に設けられた雌ねじ穴と、他方の壁面に設けられた穴を通された雄ねじとを含み、前記雌ねじ穴に前記雄ねじが螺合されて前記壁面が連結されることにより前記垂直な面から見た前記スリット部の間隔が規制されるように構成することができる。
さらに好ましくは、前記連結部材は、前記互いに対向する壁面の少なくとも一方の壁面に設けられた雌ねじ穴と、他方の壁面に設けられた穴を通された雄ねじとを含み、前記雌ねじ穴に前記雄ねじが螺合されて前記壁面が連結されることにより前記垂直な面から見た前記スリット部の間隔が規制され、前記雄ねじの径を変更することにより、前記垂直な面から見た前記スリット部の間隔を規制した際に前記連結部材の剛性が変更されて前記PC鋼棒が破断した際の緩衝能力を調整できるように構成することができる。
Preferably, the connecting member includes a female threaded hole provided in at least one of the opposing wall surfaces and a male screw passed through a hole provided in the other wall surface, and the male screw is screwed into the female threaded hole to connect the wall surfaces, thereby regulating the spacing of the slit portions as viewed from the vertical plane.
More preferably, the connecting member includes a female threaded hole provided in at least one of the opposing wall surfaces and a male screw passed through a hole provided in the other wall surface, and the male screw is screwed into the female threaded hole to connect the wall surfaces, thereby regulating the spacing of the slit portions as viewed from the vertical surface, and by changing the diameter of the male screw, the rigidity of the connecting member can be changed when the spacing of the slit portions as viewed from the vertical surface is regulated, thereby enabling the cushioning capacity to be adjusted when the PC steel rod breaks.

さらに好ましくは、前記スリーブにおけるテーパーが広がる方向の端面であって前記既設PC鋼棒の長手方向に垂直な端面にて前記スリーブに接合される、平板状のプレートをさらに含み、前記プレートは、前記既設PC鋼棒の長手方向に垂直な面から見て前記既設PC鋼棒が挿入可能、かつ、前記ウェッジにおけるテーパーが広がる方向の端部に設けられたウェッジ突起部が突出可能な切欠き部を備え、前記プレートが前記スリーブの端面に接合されることにより、前記ウェッジが前記スリーブの所定の位置に位置決めされるとともに、前記ウェッジ突起部が前記プレートの切欠部から突出するように構成することができる。 More preferably, the sleeve further includes a flat plate joined to the sleeve at the end face in the direction in which the taper of the sleeve widens and perpendicular to the longitudinal direction of the existing PC steel bar, the plate being configured so that the existing PC steel bar can be inserted as viewed from a plane perpendicular to the longitudinal direction of the existing PC steel bar, and the plate has a notch through which a wedge protrusion provided at the end of the wedge in the direction in which the taper widens can protrude, and the plate is joined to the end face of the sleeve, so that the wedge is positioned at a predetermined position on the sleeve and the wedge protrusion protrudes from the notch of the plate.

さらに好ましくは、3次元形状のワイヤークリップをさらに含み、前記ワイヤークリップは、前記スリーブにおける、前記既設PC鋼棒の長手方向の長さに対応する直線部と、前記直線部よりも前記スリーブにおけるテーパーが広がる側に、前記ウェッジにおけるテーパーが広がる方向の端部の外周上に設けられたウェッジ溝部に嵌入される円弧部と、前記直線部よりも前記スリーブにおけるテーパーが狭まる側に、前記スリーブにおけるテーパーが狭まる方向の端面であって前記既設PC鋼棒の長手方向に垂直な端面に設けられたスリーブ穴部に嵌入される嵌入片と、を少なくとも備え、前記ワイヤークリップの円弧部が前記ウェッジ溝部に嵌入されるとともに、前記ワイヤークリップの嵌入片が前記スリーブ穴部に嵌入されることにより、前記ウェッジが前記スリーブの所定の位置に位置決めされるとともに、前記ワイヤークリップの直線部が前記スリーブの外周に沿って配置されるように構成することができる。 More preferably, the wire clip further includes a three-dimensional wire clip, the wire clip having at least a straight portion in the sleeve corresponding to the longitudinal length of the existing PC steel bar, an arc portion that is fitted into a wedge groove provided on the outer periphery of the end of the wedge in the direction in which the taper widens on the side where the taper of the sleeve widens from the straight portion, and an insertion piece that is fitted into a sleeve hole provided on the end face of the sleeve in the direction in which the taper narrows, perpendicular to the longitudinal direction of the existing PC steel bar, on the side where the taper of the sleeve narrows from the straight portion, and the arc portion of the wire clip is fitted into the wedge groove and the insertion piece of the wire clip is fitted into the sleeve hole, so that the wedge is positioned at a predetermined position in the sleeve and the straight portion of the wire clip is arranged along the outer periphery of the sleeve.

本発明に係る既設PC鋼棒突出防止工法およびそれに用いる既設PC鋼棒突出防止具によると、供用中のプレストレストコンクリート部材に圧縮力を付与している既設のPC鋼棒が破断した場合に発生する大きな衝撃力によりコンクリート部材の外にPC鋼棒が突出することを、供用しながらの作業により防止することができる。さらには、本発明に係る既設PC鋼棒突出防止工法およびそれに用いる既設PC鋼棒突出防止具によると、PC鋼棒が破断した際に発生する大きな衝撃力を受け止めて、かつ、その衝撃力を緩衝することにより、既設PC鋼棒突出防止具とコンクリート表面との間(区間)で残存した圧縮力を小さくすることができ、その区間におけるPC鋼棒がさらに破断した場合のPC鋼棒の突出の可能性を低くすることができる。 The existing PC steel bar protrusion prevention method and existing PC steel bar protrusion prevention device used therein according to the present invention can prevent the PC steel bar from protruding out of the concrete member due to the large impact force generated when the existing PC steel bar that applies compressive force to the prestressed concrete member in service breaks, while the work is in service. Furthermore, the existing PC steel bar protrusion prevention method and existing PC steel bar protrusion prevention device used therein according to the present invention can receive the large impact force generated when the PC steel bar breaks and buffer the impact force, thereby reducing the compressive force remaining in the section between the existing PC steel bar protrusion prevention device and the concrete surface, and can reduce the possibility of the PC steel bar protruding if the PC steel bar in that section breaks again.

本発明の実施の形態に係る突出防止具30の使用が想定されるPC構造物(プレストレストコンクリート部材)の一例であるPC箱桁橋10を説明するための図である。1 is a diagram for explaining a PC box girder bridge 10, which is an example of a PC structure (prestressed concrete member) in which the use of an extrusion prevention device 30 according to an embodiment of the present invention is envisaged. 図1における上床版から下床版までの長さL(既設PC鋼棒に沿った長さであって、既設PC鋼棒が突出することが予測されるコンクリート部材の表面から既設PC鋼棒が突出することが予測されるコンクリート部材の他の表面までの長さL)が長い場合の突出防止具30の使用態様を説明するための図である。This figure is for explaining the use of the protrusion prevention device 30 when the length L from the upper deck to the lower deck in Figure 1 (the length along the existing PC steel bar, that is, the length L from the surface of the concrete member where the existing PC steel bar is predicted to protrude to another surface of the concrete member where the existing PC steel bar is predicted to protrude) is long. 図2における長さLが短い場合の突出防止具30(2個の突出防止具30を組み合わせた突出防止具32)の使用態様を説明するための図である。3 is a diagram for explaining a usage mode of the protrusion prevention device 30 (a protrusion prevention device 32 formed by combining two protrusion prevention devices 30) when the length L in FIG. 2 is short. FIG. 突出防止具30を構成する(A)スリーブ100(スリーブSに相当)および(B)ウェッジ140(ウェッジWに相当)の平面図である。1A is a plan view of a sleeve 100 (corresponding to sleeve S) and (B) a wedge 140 (corresponding to wedge W) that constitute the protrusion prevention device 30. FIG. 図4のスリーブ100(スリーブSに相当)が、ウェッジ140(ウェッジWに相当)に組み合わせられるスリーブとして機能する状態を示す(A)平面図および(B)せん断キーの機能を説明するための図である。5A is a plan view showing a state in which the sleeve 100 (corresponding to sleeve S) in FIG. 4 functions as a sleeve that can be combined with a wedge 140 (corresponding to wedge W), and FIG. 5B is a diagram for explaining the function of a shear key. 図4のスリーブ100(スリーブSに相当)およびウェッジ140(ウェッジWに相当)を用いた突出防止具30を、PC構造物から露出させた既設PC鋼棒に装着する手順を説明するための図である。This figure explains the procedure for attaching the protrusion prevention device 30 using the sleeve 100 (corresponding to sleeve S) and wedge 140 (corresponding to wedge W) in Figure 4 to an existing PC steel rod exposed from a PC structure. 突出防止具30を構成する(A)(スリーブ100とは別の)スリーブ200(スリーブSに相当)および(B)(ウェッジ140とは別の)ウェッジ240(ウェッジWに相当)の平面図である。13 is a plan view of (A) a sleeve 200 (corresponding to sleeve S) (different from sleeve 100) and (B) a wedge 240 (corresponding to wedge W) (different from wedge 140) that constitute the protrusion prevention device 30. FIG. 図7のスリーブ200(スリーブSに相当)およびウェッジ240(ウェッジWに相当)を用いた突出防止具30を、PC構造物から露出させた既設PC鋼棒に装着する手順を説明するための図である。This figure explains the procedure for attaching a protrusion prevention device 30 using the sleeve 200 (corresponding to sleeve S) and wedge 240 (corresponding to wedge W) in Figure 7 to an existing PC steel rod exposed from a PC structure. 突出防止具30を構成する(スリーブ100およびスリーブ200とは別の)スリーブS10、スリーブS11またはスリーブS20(スリーブSに相当)が、ウェッジW(ウェッジ140と同じ)に組み合わせられるスリーブとして機能する状態を示す平面図である。This is a plan view showing the state in which sleeve S10, sleeve S11 or sleeve S20 (corresponding to sleeve S) that constitutes the protrusion prevention device 30 (separate from sleeve 100 and sleeve 200) functions as a sleeve that can be combined with wedge W (same as wedge 140). 供試体を用いて本発明の実施の形態に係る突出防止具30を評価した試験結果を示す図(その1)である。FIG. 1 is a diagram (part 1) showing test results in which a protrusion prevention device 30 according to an embodiment of the present invention was evaluated using a test specimen. 本発明の実施の形態の第1の変形例に係る突出防止具を説明するための図である。11A and 11B are diagrams for explaining a protrusion prevention device according to a first modified example of an embodiment of the present invention. 本発明の実施の形態の第2の変形例に係る突出防止具を説明するための図である。13A and 13B are diagrams for explaining a protrusion prevention device according to a second modified example of an embodiment of the present invention. 供試体を用いて本発明の実施の形態に係る突出防止具30を評価した試験結果を示す図(その2)である。FIG. 2 is a diagram (part 2) showing the test results of evaluating a protrusion prevention device 30 according to an embodiment of the present invention using a test specimen. 床版およびウェブを模した供試体を用いた破断・突出実験における試験装置全体の概要図である。FIG. 1 is a schematic diagram of the entire test equipment used in fracture and etrusion experiments using specimens simulating decks and webs. 上床版水準の試験体概要図である。This is an outline diagram of the test specimen at the upper deck level. 下床版水準の試験体概要図である。This is an outline diagram of the test specimen at the lower deck level. 緩衝定着具水準の試験体概要図である。FIG. 1 is a schematic diagram of a test specimen for the buffer fixing device level. A区間における舗装あり-1m水準の残留変位を示す図である。This figure shows the residual displacement at the -1m level with pavement in section A. A区間における舗装あり-2m水準の残留変位を示す図である。This shows the residual displacement at the -2m level with pavement in section A. B区間における舗装なし水準のコンクリート天端の状況を示す図である。This is a diagram showing the condition of the concrete top surface at unpaved level in section B. C区間における舗装あり-8m水準の残留変位を示す図である。This figure shows the residual displacement at the -8m level with pavement in section C. 床版およびウェブを模した供試体を用いた破断・突出実験における破断エネルギーを示す図である。FIG. 13 is a diagram showing the fracture energy in fracture and etrusion experiments using specimens simulating a deck and a web.

以下において、本発明の実施の形態に係る、既設のプレストレストコンクリート部材に圧縮力を付与している既設PC鋼棒が破断した場合の衝撃力を受け止めてコンクリート部材の外部に既設PC鋼棒が突出することを防止する突出防止具、および、その突出防止具を用いて既設のプレストレストコンクリート部材を供用しながら実施することのできる既設PC鋼棒突出防止工法について詳しく説明する。なお、この突出防止具自体の構造は定着具に類似する部分を含む場合があり、かつ、衝撃力を和らげるという意味では緩衝材であるために、この突出防止具は緩衝定着具とももいえるために、本明細書においては突出防止具と緩衝定着具とを区別しない場合がある。ただし、この突出防止具は、後述する既設PC鋼棒突出防止工法が完了した時点では(既設PC鋼棒が破断するまでは)定着しているものではない点で定着具と異なる。 The following describes in detail an embodiment of the present invention, which is a protrusion prevention device that prevents the existing PC steel rod from protruding outside the concrete member by receiving the impact force when the existing PC steel rod that applies compressive force to the existing prestressed concrete member breaks, and a construction method for preventing the existing PC steel rod from protruding outside the concrete member, which can be implemented while using the existing prestressed concrete member using the protrusion prevention device. Note that the structure of this protrusion prevention device itself may include parts similar to a fixing device, and since it is a buffer material in the sense that it cushions the impact force, this protrusion prevention device can also be called a buffer fixing device, and therefore in this specification there may be no distinction between the protrusion prevention device and the buffer fixing device. However, this protrusion prevention device differs from a fixing device in that it is not fixed at the time the construction method for preventing the existing PC steel rod from protruding, which will be described later, is completed (until the existing PC steel rod breaks).

ここで、以下の説明において参照する図については、本発明の容易な理解のために、内部ではなく外形で表現すべき部分を内部を透視するように表現している場合があったり、外形ではなく断面で表現すべき部分を外形で表現している場合があったり、断面ではなく外形で表現すべき部分を断面で表現している場合があったり、断面であってもハッチングを付していない場合があったり、断面でないのにハッチングを付している場合があったり、詳細な構造を省略した場合があったり、詳細な構造を省略したために同じ部材であっても図面間で一致しない場合があったりする。 In the drawings referenced in the following description, in order to facilitate understanding of the present invention, parts that should be shown in their external form rather than their internal form may be shown as if looking through the interior, parts that should be shown in cross-section rather than in their external form may be shown in their external form, parts that should be shown in their external form rather than in their cross-section may be shown in cross-section, cross-sections may not be hatched, non-cross-sections may be hatched, detailed structures may be omitted, and drawings of the same components may not match due to the omission of detailed structures.

<突出防止具の使用が想定される構造物およびその部位>
まず、図1を参照して、本発明の実施の形態に係る突出防止具(緩衝定着具)30の使用が想定されるPC構造物(プレストレストコンクリート部材)の一例であるPC箱桁橋10について説明する。
図1に示すPC箱桁橋10とは、その言葉の通りに、橋の形が箱の形(箱形40)をした橋梁であって、車は橋の上(舗装路面12)を通り、箱の中の空洞SPは橋の点検時などに作業者が入れるようになっている。また、箱の上面を?える柱20の部分(ウェブ20またはコンクリート20と記載する場合がある)には、コンクリート製のものや鋼製のものがあり、ここではプレストレストコンクリート製である。
<Structures and areas where protrusion prevention devices are expected to be used>
First, with reference to FIG. 1, a PC box girder bridge 10 will be described as an example of a PC structure (prestressed concrete member) in which the use of a protrusion prevention device (buffer fixing device) 30 according to an embodiment of the present invention is envisaged.
The PC box girder bridge 10 shown in Figure 1 is, as the name suggests, a bridge in the shape of a box (box shape 40), where cars pass over the bridge (paved road surface 12), and the cavity SP inside the box is designed for workers to enter during bridge inspections, etc. Also, the part of the pillar 20 that covers the top surface of the box (sometimes written as web 20 or concrete 20) can be made of concrete or steel, but in this case it is made of prestressed concrete.

さらに詳しくは、PC箱桁橋10は、上床版14および下床版16ならびに2本以上のウェブ20から構成されているために、曲げモーメントによる大きな圧縮力に抵抗できる特性やPC鋼材(ここではPC鋼棒)を有効に配置できること、また、ねじり剛性が大きいなどの断面特性を利用して、連続桁橋、ラーメン橋などの長大橋や曲線橋に数多く採用されている。 More specifically, the PC box girder bridge 10 is composed of an upper deck 14, a lower deck 16, and two or more webs 20, and is therefore used in many long bridges and curved bridges, such as continuous girder bridges and rigid frame bridges, taking advantage of its cross-sectional properties, such as its ability to resist large compressive forces due to bending moments, its ability to effectively arrange PC steel materials (PC steel bars in this case), and its high torsional rigidity.

本実施の形態に係る突出防止具30は、このPC箱桁橋10の上床版14と下床版16との間に鉛直方向に配設されたPC鋼棒が破断した場合の衝撃力を受け止めてコンクリート部材の外部に既設PC鋼棒が突出することを防止する。
まず、このようなPC箱桁橋10に対して供用しながら施工可能な既設PC鋼棒突出防止工法について、上床版14から下床版16までの長さL(既設PC鋼棒Bに沿った長さであって、既設PC鋼棒Bが突出することが予測されるコンクリート部材の表面から既設PC鋼棒が突出することが予測されるコンクリート部材の他の表面までの長さLと略等しい)が長い場合と、その長さLが短い場合の突出防止具30の使用態様について説明する。
The protrusion prevention device 30 in this embodiment absorbs the impact force when the PC steel rod arranged vertically between the upper deck 14 and the lower deck 16 of the PC box girder bridge 10 breaks, thereby preventing the existing PC steel rod from protruding outside the concrete member.
First, regarding a method for preventing the protrusion of existing PC steel bars that can be performed on such a PC box girder bridge 10 while it is in service, we will explain the use of the protrusion prevention device 30 when the length L from the upper deck 14 to the lower deck 16 (the length along the existing PC steel bar B, which is approximately equal to the length L from the surface of the concrete member where the existing PC steel bar B is predicted to protrude to the other surface of the concrete member where the existing PC steel bar is predicted to protrude) is long and when the length L is short.

図2は長さLが2.5m~3.5mを超える場合の突出防止具30の使用態様を、図3
は長さLが2.5m~3.5mを超えない場合の突出防止具32の使用態様を、それぞれ示す模式的な図である。なお、詳しくは後述するが、突出防止具30は、既設PC鋼棒Bを内面に挟み込むとともに外面にテーパーを備えたウェッジWと、そのウェッジWのテーパー面に沿った内面を備えたスリーブSとが組み合わせられて使用される。さらに、突出防止具32は、2個の突出防止具30が組み合わせられて使用される。また、これらのスリーブSおよびウェッジWに用いる材料としては金属、樹脂、化学繊維等であって特に限定されるものではないが、以下においてはPC鋼材の定着具として通常用いられる種類の金属であるとして説明する。
FIG. 2 shows a usage state of the protrusion prevention device 30 when the length L exceeds 2.5 m to 3.5 m, and FIG.
1 and 2 are schematic diagrams showing the use of the protrusion prevention device 32 when the length L does not exceed 2.5 m to 3.5 m. Although described in detail later, the protrusion prevention device 30 is used by combining a wedge W that sandwiches the existing PC steel bar B on its inner surface and has a tapered outer surface, and a sleeve S that has an inner surface that conforms to the tapered surface of the wedge W. Furthermore, the protrusion prevention device 32 is used by combining two protrusion prevention devices 30. The materials used for the sleeve S and the wedge W include metal, resin, chemical fiber, etc., and are not particularly limited, but the following description will be given assuming that they are metals of a type normally used as fixing devices for PC steel materials.

図2を参照して、長さLが2.5m~3.5mを超える場合の突出防止具30の使用態様について説明する。この図2に模式的に示すように、この突出防止具30は、表面(ここでは上床版14近傍)から第一長さL(1)が0.25m~2.0mの第一位置P(1)のコンクリート20、および、他の表面(ここでは下床版16近傍)から第一長さL(1)が0.25m~2.0mの第二位置P(2)のコンクリート20の2箇所のコンクリート20を斫って、2箇所において既設PC鋼棒を露出させて、その露出させた既設PC鋼棒Bに対して施工される。なお、図2に示すように、長さL、第一長さL(1)は上述した範囲であって、かつ、第一位置P(1)および第二位置P(2)の位置関係は、表面(ここでは上床版14近傍)、第一位置P(1)、第二位置P(2)、他の表面(ここでは下床版16近傍)の順である。 With reference to FIG. 2, the use of the protrusion prevention tool 30 when the length L exceeds 2.5 m to 3.5 m will be described. As shown in FIG. 2, the protrusion prevention tool 30 chips the concrete 20 at two locations: the concrete 20 at the first position P(1) where the first length L(1) is 0.25 m to 2.0 m from the surface (here, near the upper deck 14), and the concrete 20 at the second position P(2) where the first length L(1) is 0.25 m to 2.0 m from the other surface (here, near the lower deck 16), exposing the existing PC steel bar at two locations, and is applied to the exposed existing PC steel bar B. As shown in FIG. 2, the length L and the first length L(1) are in the above-mentioned range, and the positional relationship between the first position P(1) and the second position P(2) is the surface (here, near the upper deck 14), the first position P(1), the second position P(2), and the other surface (here, near the lower deck 16).

そして、斫り1箇所に対して、1個のウェッジWおよび1個のスリーブSを、ウェッジWおよびスリーブSのテーパーが狭まる方向が近い方の表面への方向(第一位置P(1)においては上床版14の方向、第二位置P(2)においては下床版16の方向)になるように、露出したPC鋼棒に装着する。より詳しくは、第一位置P(1)に対して1個のウェッジWおよび1個のスリーブS、ならびに、第二位置P(2)に対して1個のウェッジWおよび1個のスリーブSが使用される。 Then, for each chip, one wedge W and one sleeve S are attached to the exposed PC steel bar so that the taper of the wedge W and sleeve S narrows toward the closer surface (toward the upper deck 14 at the first position P(1), and toward the lower deck 16 at the second position P(2)). More specifically, one wedge W and one sleeve S are used for the first position P(1), and one wedge W and one sleeve S are used for the second position P(2).

図3を参照して、長さLが2.5m~3.5mを超えない場合の突出防止具32の使用態様について説明する。図3に模式的に示すように、この突出防止具32は、表面(ここでは上床版14近傍)から第二長さL(2)または他の表面(ここでは下床版16近傍)から第三長さL(3)が0.25m~2.0mの第三位置P(3)のコンクリートのコンクリート20を斫って、1箇所において既設PC鋼棒を露出させて、その露出させた既設PC鋼棒Bに対して施工される。なお、図1に示すように、長さL、第二長さL(2)および第三長さL(3)は上述した範囲であって、かつ、第三位置P(3)の位置関係は、表面(ここでは上床版14近傍)、第三位置P(3)、他の表面(ここでは下床版16近傍)の順である。 With reference to FIG. 3, the use of the protrusion prevention device 32 when the length L does not exceed 2.5 m to 3.5 m will be described. As shown in FIG. 3, the protrusion prevention device 32 is installed on the exposed existing PC steel bar B by chipping the concrete 20 at the third position P(3) where the second length L(2) is 0.25 m to 2.0 m from the surface (here, near the upper deck 14) or the third length L(3) is 0.25 m to 2.0 m from another surface (here, near the lower deck 16). Note that, as shown in FIG. 1, the length L, the second length L(2), and the third length L(3) are in the above-mentioned range, and the positional relationship of the third position P(3) is the surface (here, near the upper deck 14), the third position P(3), and the other surface (here, near the lower deck 16).

そして、斫り1箇所に対して、2個のウェッジWおよび2個のスリーブSを、2個のウェッジWのテーパーが狭まる方向が互いに対面する方向になるように、かつ、2個のスリーブSのテーパーが狭まる方向が互いに対面する方向になるように、露出したPC鋼棒に装着する。より詳しくは、第三位置P(3)に対して2個のウェッジWおよび2個のスリーブSが、それぞれテーパーが狭まる方向が互いに対面する方向になるように使用される。 Then, for one chip, two wedges W and two sleeves S are attached to the exposed PC steel bar so that the tapers of the two wedges W narrow in a direction facing each other, and so that the tapers of the two sleeves S narrow in a direction facing each other. More specifically, for the third position P(3), two wedges W and two sleeves S are used so that the tapers narrow in a direction facing each other.

図3に示す施工方法によると、図2に示す施工方法に対して、作業手間(斫り作業を含む)と施工費用の削減とを図ることができる点で好ましい。
なお、図2において、第一位置P(1)のみだけでもPC鋼棒の飛び出しの衝撃力で路盤(舗装路面12)が盛り上がることを防止できるために、本発明においては図2における第一位置P(1)のみ、または、図2における第二位置P(2)のみ、であっても構わない。
The construction method shown in FIG. 3 is preferable to the construction method shown in FIG. 2 in that it can reduce the labor (including chipping work) and construction costs.
In addition, in Figure 2, since only the first position P(1) can prevent the roadbed (paved road surface 12) from rising due to the impact force of the PC steel bar jumping out, in the present invention, only the first position P(1) in Figure 2 or only the second position P(2) in Figure 2 may be used.

ここで、これらの図2および図3における、第一長さL(1)、第二長さL(2)および第三長さL(3)が0.25m~2.0mであることについて説明する。図2に示すように、既設PC鋼棒Bの破断する位置はコンクリート20に埋設されたPC鋼棒のどの位置で発生するのかはわからない。図2に示すように、表面(ここでは上床版14近傍)から0.25m~2.0mよりも下床版16側であって、かつ、他の表面(ここでは下床版
16近傍)から0.25m~2.0mよりも上床版14側の範囲を、破断想定位置として想定している。当然であるが、このように想定した破断想定位置以外である、さらに上床版14寄りであってもさらに下床版16寄りであっても、PC鋼棒が破断する可能性があるものの、たとえば、上床版14と第一位置P(1)に設けられた突出防止具30との間でPC鋼棒が破断した場合であっても上床版方向へのPC鋼棒の破断エネルギーは小さく、かぶりコンクリートにより破断エネルギーを吸収することができるために、このような0.25m~2.0mが設定されている(下床版16と第二位置P(2)に設けられた突出防止具30との間でPC鋼棒が破断した場合も同じ)。ここで、かぶりコンクリート部分におけるコンクリートのかぶり不足など懸念がある場合、この部分のグラウトの充填不良が見つかった場合等には、この区間のみグラウトを再注入することでPC鋼棒の破断に対する抵抗力を増すことができる点で好ましい。
Here, it will be explained that the first length L(1), the second length L(2), and the third length L(3) are 0.25 m to 2.0 m in Fig. 2 and Fig. 3. As shown in Fig. 2, it is not known at what position of the PC steel bar embedded in the concrete 20 the existing PC steel bar B will break. As shown in Fig. 2, the assumed breakage position is a position on the lower deck 16 side that is 0.25 m to 2.0 m from the surface (near the upper deck 14 here) and on the upper deck 14 side that is 0.25 m to 2.0 m from the other surface (near the lower deck 16 here). Naturally, the PC steel rod may break at a position other than the assumed breakage position, closer to the upper deck 14 or closer to the lower deck 16. However, for example, even if the PC steel rod breaks between the upper deck 14 and the protrusion prevention device 30 installed at the first position P(1), the breaking energy of the PC steel rod toward the upper deck is small, and the breaking energy can be absorbed by the cover concrete, so such a range of 0.25 m to 2.0 m is set (the same applies when the PC steel rod breaks between the lower deck 16 and the protrusion prevention device 30 installed at the second position P(2). Here, if there is a concern about insufficient concrete cover in the cover concrete portion, or if insufficient grout filling in this portion is found, it is preferable to reinject grout only in this section in order to increase the resistance of the PC steel rod to breakage.

これらの図2に示す施工方法において用いられる突出防止具30、および、図3に示す施工方法において用いられる突出防止具32のいずれをも構成する既設PC鋼棒Bを内面に挟み込むとともに外面にテーパーを備えたウェッジWと、そのウェッジWのテーパー面に沿った内面を備えたスリーブSとについて詳しく説明する。ここで、突出防止具32のスリーブSについては、既設PC鋼棒Bの長手方向に後述するスリーブ100またはスリーブ200を2個並べて使用するのではなく、軸方向に一体化され、1つの部材に2つのテーパーを備えた1個の複合スリーブを使用しても構わない。以下においては、突出防止具32のスリーブSについては、既設PC鋼棒Bの長手方向に後述するスリーブ100またはスリーブ200を2個並べて使用するものとして説明する。このため、後述する施工手順(既設PC鋼棒突出防止工法)については、図2の第一位置P(1)についてのみ説明する。 The protrusion prevention tool 30 used in the construction method shown in FIG. 2 and the protrusion prevention tool 32 used in the construction method shown in FIG. 3 are both configured as a wedge W that sandwiches the existing PC steel bar B on its inner surface and has a taper on its outer surface, and a sleeve S that has an inner surface that follows the tapered surface of the wedge W. Here, the sleeve S of the protrusion prevention tool 32 may be a single composite sleeve that is integrated in the axial direction and has two tapers in one member, rather than using two sleeves 100 or 200 described later side by side in the longitudinal direction of the existing PC steel bar B. In the following, the sleeve S of the protrusion prevention tool 32 will be described as using two sleeves 100 or 200 described later side by side in the longitudinal direction of the existing PC steel bar B. For this reason, the construction procedure (existing PC steel bar protrusion prevention construction method) described later will be described only for the first position P (1) in FIG. 2.

なお、本実施の形態に係る突出防止具においては、スリーブSは大きく分別すると2種類あり(図4~図8に示す内筒外筒タイプと図9に示すスリット壁面連結タイプ)、ウェッジWは2種類あるために(ウェッジWは分割数のみ異なり、スリーブSは構造が大きく異なる)、
・図4~図6を用いてスリーブSとしてスリーブ100(内筒外筒タイプのせん断キー接合型)を説明するとともにウェッジWとしてウェッジ140(3分割)を説明して、
・図7および図8を用いてスリーブSとしてスリーブ200(内筒外筒タイプのねじ螺合型)を説明するとともにウェッジWとしてウェッジ240(2分割)を説明して、
・図9を用いてスリーブSとしてスリーブS10およびS20(スリット壁面連結タイプ)を説明する(図9におけるウェッジWはウェッジ240(3分割)と同じ)。
In the protrusion prevention device according to the present embodiment, the sleeve S is roughly classified into two types (the inner cylinder-outer cylinder type shown in Figs. 4 to 8 and the slit wall surface connecting type shown in Fig. 9) and the wedge W is two types (the wedge W differs only in the number of divisions, while the sleeve S has a significantly different structure).
4 to 6, a sleeve 100 (inner cylinder, outer cylinder type, shear key joint type) is described as the sleeve S, and a wedge 140 (split into three parts) is described as the wedge W.
7 and 8, a sleeve 200 (an inner-cylinder, outer-cylinder type screw-in type) will be described as the sleeve S, and a wedge 240 (split into two parts) will be described as the wedge W.
9A and 9B, sleeves S10 and S20 (slit wall surface connection type) will be described as the sleeve S (wedge W in FIG. 9 is the same as wedge 240 (divided into three)).

さらに、これらに共通して用いることのできる2つの変形例を図11および図12を用いて説明する。
なお、本発明に係る突出防止具として採用可能な中間定着具が公知である。公知技術であるために詳しくは説明しないが、すでに緊張力が導入され、両端部が構造物に定着されている緊張材(PC鋼棒を含むPC鋼材)の中間部に取り付けられて、緊張材に緊張力が導入された状態を維持したまま周囲にある構造物に緊張材を定着させるものである。たとえば、特開2018-017029号公報に記載された、互いに分離可能で対となる半割ブロックを結合して定着ブロックが形成され、対となる半割ブロック間に形成された中空孔に緊張状態の緊張材が挿通され、その後に対となる半割ブロックを緊張材の軸線方向に配列された複数列のボルトにより互いに結合させるものである。この中空孔でスリーブを形成してこのスリーブに対応するウェッジを組み合わせて中間定着具(特開2018-017029号公報に記載の中間定着具においてスリーブにウェッジを組み合わせた構成は、半割スリーブと半割ウェッジを用いて半割スリーブをボルト締結する構成となりこの構成は本願の一出願人により出願された実開昭57-084220号公報に記載の中間定着具と略等しい)としたものを、以下の説明において、先行技術または比較例として記載する場合がある。
Furthermore, two modified examples that can be commonly used will be described with reference to FIGS.
An intermediate fixing device that can be used as the protrusion prevention device according to the present invention is known. Although it is a known technology and will not be described in detail, it is attached to the intermediate part of a tension member (PC steel material including PC steel bar) in which tension has already been introduced and both ends are fixed to a structure, and fixes the tension member to a surrounding structure while maintaining the state in which tension is introduced to the tension member. For example, as described in JP 2018-017029 A, a fixing block is formed by connecting a pair of separable half blocks, a tension member in a tensioned state is inserted into a hollow hole formed between the pair of half blocks, and then the pair of half blocks are connected to each other by multiple rows of bolts arranged in the axial direction of the tension member. In the following explanation, an intermediate fixing device in which a sleeve is formed in this hollow hole and combined with a wedge corresponding to this sleeve (the configuration in which a wedge is combined with a sleeve in the intermediate fixing device described in JP 2018-017029 A is a configuration in which the half sleeve is bolted together using a half sleeve and a half wedge, and this configuration is approximately equivalent to the intermediate fixing device described in JP 57-084220 A filed by one of the applicants of the present application) may be described as prior art or comparative example.

<1:内筒外筒タイプ:せん断キー接合型>
まず、スリーブ100およびウェッジ140について説明する。
突出防止具30(または突出防止具32において2個使用される突出防止具30であるが以下においては単に突出防止具30と記載する)を構成する、スリーブ100の平面図を図4(A)に、ウェッジ140の平面図を図4(B)に、図4に示すスリーブ100(スリーブSに相当)が、ウェッジ140(ウェッジWに相当)に組み合わせられるスリーブとして機能する状態を示す平面図を図5(A)に、スリーブとして機能する状態におけるせん断キーの機能を説明するための図を図5(B)に、それらのスリーブ100およびウェッジ140を用いてスリーブ100(スリーブSに相当)が、ウェッジ140(ウェッジWに相当)に組み合わせられるスリーブとして機能するようにして、突出防止具30を、PC構造物から露出させた既設PC鋼棒Bに装着する手順を説明するための図を図6に、それぞれ示す。
<1: Inner cylinder/outer cylinder type: shear key joint type>
First, the sleeve 100 and the wedge 140 will be described.
FIG. 4(A) shows a plan view of sleeve 100 constituting protrusion prevention device 30 (or protrusion prevention device 30, two of which are used in protrusion prevention device 32, but will hereinafter be simply referred to as protrusion prevention device 30), FIG. 4(B) shows a plan view of wedge 140, FIG. 5(A) shows a plan view showing the state in which sleeve 100 (corresponding to sleeve S) shown in FIG. 4 functions as a sleeve that can be combined with wedge 140 (corresponding to wedge W), FIG. 5(B) shows a diagram for explaining the function of the shear key in the state in which it functions as a sleeve, and FIG. 6 shows a diagram for explaining the procedure in which protrusion prevention device 30 is attached to existing PC steel rod B exposed from the PC structure using sleeve 100 and wedge 140 so that sleeve 100 (corresponding to sleeve S) functions as a sleeve that can be combined with wedge 140 (corresponding to wedge W).

この突出防止具30は、図4(A)に示すスリーブ100とそのスリーブ100に組み合わせられる図4(B)に示すウェッジ140とにより構成される。なお、図4(A)において左側に描かれた側面図(一部断面図)は右側に描かれた正面図に示す矢示X方向から見た図であって、図4(B)において左側に描かれた側面図および右側に描かれた正面図は3分割されたウェッジ片を組み合わせてウェッジ140とした図である。ここで、正面図とは既設PC鋼棒Bの長手方向に垂直な面から見た図であって、側面図とは、既設PC鋼棒Bの長手方向に平行な面から見た図である(以下において同じ)。 This protrusion prevention device 30 is composed of a sleeve 100 shown in Fig. 4(A) and a wedge 140 shown in Fig. 4(B) which is combined with the sleeve 100. Note that the side view (partial cross-sectional view) on the left side of Fig. 4(A) is a view seen from the direction of the arrow X shown in the front view on the right side, and the side view on the left side and the front view on the right side of Fig. 4(B) are views of the three divided wedge pieces combined to form the wedge 140. Here, the front view is a view seen from a plane perpendicular to the longitudinal direction of the existing PC steel bar B, and the side view is a view seen from a plane parallel to the longitudinal direction of the existing PC steel bar B (the same applies below).

図4(B)に示すように、ウェッジ140は、既設PC鋼棒Bの長手方向に垂直な面から見て2以上のウェッジ片(ここでは3分割されているために3つのウェッジ片142、ウェッジ片144およびウェッジ片146)に分割されている。このように分割されているので、既設の既設PC鋼棒Bに装着することができる。また、ウェッジ140は3つのウェッジ片を組み合わせることによりテーパー140Tを備えることになる。 As shown in FIG. 4(B), the wedge 140 is divided into two or more wedge pieces (here, it is divided into three pieces, that is, wedge piece 142, wedge piece 144, and wedge piece 146) when viewed from a plane perpendicular to the longitudinal direction of the existing PC steel bar B. Because it is divided in this way, it can be attached to the existing PC steel bar B. In addition, the wedge 140 has a taper 140T by combining the three wedge pieces.

図4(A)に示すように、スリーブ100は、ウェッジ140のテーパー140Tに組み合わせられるテーパー100Tを備えた中空円筒形状の内筒側のスリーブ片110と内筒側のスリーブ片110とせん断キーKにより接合される中空円筒形状の外筒側のスリーブ片120とに分割されている。内筒側のスリーブ片110の外表面116にはせん断キーKを内包するキー溝118が、外筒側のスリーブ片120の内表面126にはせん断キーKを内包するキー溝128が、それぞれ設けられている。また、キー溝からせん断キーKがPC鋼棒Bの長手方向に移動することを抑制するために、たとえば、内筒側のスリーブ片110のキー溝118の溝底面に穴を設けてせん断キーに設けられた突起部を係合させる(さらに、溝底面に雌ねじ穴を切るとともにせん断キーKを貫通する雌ねじ穴を切って全ねじボルト(所謂いもねじと呼ばれることもある全長に亘って雄ねじが切られて端面に六角穴が設けられたボルト)によりせん断キーKの雌ねじ穴と溝底面の雌ねじ穴とを螺合させる)ことも好ましい(せん断キーKに点線で図示)。内筒側のスリーブ片110および外筒側のスリーブ片120は既設PC鋼棒Bの長手方向に垂直な面から見て既設PC鋼棒Bが挿入可能な切欠き部(内筒側のスリーブ片110における本体112の一部を切り欠いた切欠き部114および外筒側のスリーブ片120における本体122の一部を切り欠いた切欠き部124)を備える。 As shown in FIG. 4A, the sleeve 100 is divided into a hollow cylindrical inner sleeve piece 110 having a taper 100T that can be combined with the taper 140T of the wedge 140, and a hollow cylindrical outer sleeve piece 120 that is joined to the inner sleeve piece 110 by a shear key K. The outer surface 116 of the inner sleeve piece 110 has a key groove 118 that contains the shear key K, and the inner surface 126 of the outer sleeve piece 120 has a key groove 128 that contains the shear key K. In addition, in order to prevent the shear key K from moving in the longitudinal direction of the PC steel bar B from the key groove, it is also preferable, for example, to provide a hole in the bottom surface of the key groove 118 of the sleeve piece 110 on the inner tube side to engage a protrusion provided on the shear key (further, a female threaded hole is cut in the bottom surface of the groove and a female threaded hole that passes through the shear key K is cut, and the female threaded hole of the shear key K and the female threaded hole at the bottom surface of the groove are screwed together with a fully threaded bolt (a bolt with a male thread cut along its entire length and a hexagonal hole at its end surface, sometimes called a set screw)) (shown by a dotted line on the shear key K). The sleeve piece 110 on the inner tube side and the sleeve piece 120 on the outer tube side have cutouts (cutout 114 in which part of the body 112 in the sleeve piece 110 on the inner tube side is cut out, and cutout 124 in which part of the body 122 in the sleeve piece 120 on the outer tube side is cut out) into which the existing PC steel bar B can be inserted when viewed from a plane perpendicular to the longitudinal direction of the existing PC steel bar B.

さらに、内筒側のスリーブ片110と外筒側のスリーブ片120とは、それぞれのキー溝118(内筒側のスリーブ片110)およびキー溝128(外筒側のスリーブ片120)にせん断キーKが内包されて、スリーブ片110とスリーブ片120とが接合されることによりスリーブ100として一体化されてウェッジ140に組み合わせられるスリーブとして機能することになる。 Furthermore, the sleeve piece 110 on the inner tube side and the sleeve piece 120 on the outer tube side each have a shear key K embedded in their respective key grooves 118 (sleeve piece 110 on the inner tube side) and 128 (sleeve piece 120 on the outer tube side), and the sleeve pieces 110 and 120 are joined together to form the integrated sleeve 100, which functions as a sleeve that can be combined with the wedge 140.

さらに詳しくは、スリーブ片110は、中心に既設PC鋼棒Bが挿通される(挿通される既設PC鋼棒Bに対応した)テーパー100Tを備えた本体112を備え、その本体112の一部が切欠き部114とされているためにテーパー100Tが全周にわたって存在するものではなく、切欠き部114の部分だけテーパー100Tが存在しないがこの突出防止具30としての機能には問題がない。 More specifically, the sleeve piece 110 has a body 112 with a taper 100T (corresponding to the existing PC steel rod B) through the center, through which the existing PC steel rod B is inserted, and since a portion of the body 112 is made into a notch 114, the taper 100T does not exist along the entire circumference, and only the portion of the notch 114 does not have the taper 100T, but this does not affect the function of this protrusion prevention device 30.

ここで、せん断キーKの機能について図5を参照して説明する。図5(A)は、スリーブ片110とスリーブ片120とが接合されることによりスリーブ100として一体化さ
れてウェッジ140に組み合わせられるスリーブとして機能する状態のスリーブ100とウェッジ140と(より詳しくはせん断キーKと)から構成される突出防止具30の側面図(左側)および正面図(右側)を示している。図5(A)に示すスリーブ100(より詳しくは内筒側のスリーブ片110と外筒側のスリーブ片120)とウェッジ140と(より詳しくはせん断キーKと)から構成される突出防止具30において、既設PC鋼棒Bをウェッジ140が挟持して既設PC鋼棒Bに緊張力が作用すると(より具体的には既設PC鋼棒Bが破断した時に)、ウェッジ140がくさび効果により内筒側のスリーブ片110に喰い込んで(図5(B)の黒塗り矢示)切欠き部114が拡張しよう(切欠き部114の切欠き幅が広がろう)とする(図5(B)の曲線矢示)。このとき、内筒側のスリーブ片110と外筒側のスリーブ片120とは(互いのキー溝118およびキー溝128に内包された)せん断キーKを介して接合されているために、せん断キーKによる引っ掛かりにより内筒側のスリーブ片110の変形(切欠き部114の拡張)がせん断キーKを介して外筒側のスリーブ片120に伝達されるために、内筒側のスリーブ片110の変形(切欠き部114の拡張)を外筒側のスリーブ片120が負担することになる。このため、内筒側のスリーブ片110の変形が抑制されて、所望のくさび効果が発現して、所望の緊張力を(破断した)既設PC鋼棒Bに付与することができる。
Here, the function of the shear key K will be described with reference to Fig. 5. Fig. 5(A) shows a side view (left side) and a front view (right side) of the extrusion prevention device 30 composed of the sleeve 100 and the wedge 140 (more specifically, the shear key K) in a state in which the sleeve piece 110 and the sleeve piece 120 are joined together to form the sleeve 100 and function as a sleeve to be combined with the wedge 140. In the protrusion prevention device 30 shown in Figure 5 (A) which is composed of a sleeve 100 (more specifically, the sleeve piece 110 on the inner tube side and the sleeve piece 120 on the outer tube side) and a wedge 140 (more specifically, the shear key K), when the wedge 140 clamps the existing PC steel rod B and tension is applied to the existing PC steel rod B (more specifically, when the existing PC steel rod B breaks), the wedge 140 bites into the sleeve piece 110 on the inner tube side due to a wedge effect (indicated by the black arrow in Figure 5 (B)), causing the cutout portion 114 to expand (the notch width of the cutout portion 114 to widen) (indicated by the curved arrow in Figure 5 (B)). At this time, since the sleeve piece 110 on the inner tube side and the sleeve piece 120 on the outer tube side are joined via the shear key K (contained in each other's key grooves 118 and 128), the deformation of the sleeve piece 110 on the inner tube side (expansion of the notch portion 114) caused by the shear key K catching is transmitted to the sleeve piece 120 on the outer tube side via the shear key K, so that the deformation of the sleeve piece 110 on the inner tube side (expansion of the notch portion 114) is borne by the sleeve piece 120 on the outer tube side. Therefore, the deformation of the sleeve piece 110 on the inner tube side is suppressed, the desired wedge effect is produced, and the desired tension can be applied to the (broken) existing PC steel bar B.

このような構造を備えた突出防止具30は、図2に示す第一位置P(1)、第二位置P(2)または第三位置P(3)において、以下のように既設PC鋼棒Bに装着される。ここでは、(テーパーの向きが異なるだけであるために)図2の第一位置P(1)における突出防止具30の既設PC鋼棒Bへの装着手順について説明する。なお、突出防止具30を装着する既設PC鋼棒Bがコンクリートに埋設されている場合にはコンクリートを斫って、緊張状態の既設PC鋼棒Bを露出させる露出ステップが、以下に説明するウェッジ装着ステップの前に必要となるが、露出箇所等についての詳細は上述したため、ここでは繰り返して説明しない(以下において同じ)。 The protrusion prevention device 30 having such a structure is attached to the existing PC steel rod B at the first position P(1), second position P(2) or third position P(3) shown in FIG. 2 as follows. Here, the procedure for attaching the protrusion prevention device 30 to the existing PC steel rod B at the first position P(1) in FIG. 2 will be described (since only the taper direction is different). Note that if the existing PC steel rod B to which the protrusion prevention device 30 is attached is buried in concrete, an exposure step is required before the wedge attachment step described below, in which the concrete is chipped to expose the existing PC steel rod B in a tensioned state; however, the details of the exposed location, etc. have been described above, so they will not be described again here (same below).

図6(A)に示すように、ウェッジ140のテーパー140Tが狭まる方向が表面への方向(ここでは上床版14)になるように、分割された2以上のウェッジ片(ここでは3分割されているために3つのウェッジ片142、ウェッジ片144およびウェッジ片146)を露出した既設PC鋼棒Bに、ウェッジ装着ステップとして装着する(ウェッジ側の黒塗り矢示参照)。 As shown in Figure 6 (A), two or more divided wedge pieces (here, it is divided into three, so there are three wedge pieces 142, 144, and 146) are attached to the exposed existing PC steel bar B as a wedge attachment step so that the narrowing direction of the taper 140T of the wedge 140 is toward the surface (here, the upper deck 14) (see the black arrow on the wedge side).

スリーブ100のテーパー100Tが狭まる方向が表面への方向(ここでは上床版14)になるように、分割されたスリーブ片(ここでは2分割されているために2つの内筒側のスリーブ片110および外筒側のスリーブ片120)を露出した既設PC鋼棒Bに、スリーブ装着ステップとして装着する(スリーブ側の黒塗り矢示参照)。より詳しくは、図6(A)における左右方向から2つの内筒側のスリーブ片110および外筒側のスリーブ片120を既設PC鋼棒Bへ接近させて装着する。 In the sleeve installation step, the split sleeve pieces (here, split into two, two inner sleeve pieces 110 and two outer sleeve pieces 120) are installed on the exposed existing PC steel bar B so that the narrowing direction of the taper 100T of the sleeve 100 is toward the surface (here, the upper deck 14) (see the black arrow on the sleeve side). More specifically, the two inner sleeve pieces 110 and the outer sleeve piece 120 are installed close to the existing PC steel bar B from the left and right directions in Figure 6 (A).

次に、図6(B)に示すように、分割されたスリーブ片(ここでは2分割されているために2つの内筒側のスリーブ片110および外筒側のスリーブ片120)をスリーブ100として一体化してウェッジ140に組み合わせられるスリーブとして機能させるために(スリーブ機能化ステップのために)、内筒側のスリーブ片110の外周面116に設けられたキー溝118に内包されたせん断キーKが、外筒側のスリーブ片120の内周面126に設けられたキー溝128に内包されるように(逆に、外筒側のスリーブ片120の内周面126に設けられたキー溝128に内包されたせん断キーKが、内筒側のスリーブ片110の外周面116に設けられたキー溝118に内包されるようにでも構わない)、既設PC鋼棒Bの長手方向において内筒側のスリーブ片110と外筒側のスリーブ片120とを接近せしめて(いずれか一方または双方を既設PC鋼棒Bの長手方向にスライドさせて)、内筒側のスリープ片110と外筒側のスリープ片120とを接合させる。これにより分割されていたスリーブ片(ここでは2分割されているために2つの内筒側のスリーブ片110および外筒側のスリーブ片120)がスリーブとして一体化されてウェッジ140に組み合わせられるスリーブ100として機能させることができるようになる。 Next, as shown in FIG. 6B, in order to integrate the divided sleeve pieces (here, because they are divided into two, the two inner sleeve pieces 110 and the outer sleeve piece 120) into the sleeve 100 and function as a sleeve that can be combined with the wedge 140 (for the sleeve functioning step), the shear key K contained in the key groove 118 provided on the outer peripheral surface 116 of the inner sleeve piece 110 is contained in the key groove 128 provided on the inner peripheral surface 126 of the outer sleeve piece 120. (Conversely, the shear key K contained in the key groove 128 provided on the inner peripheral surface 126 of the sleeve piece 120 on the outer tube side may be contained in the key groove 118 provided on the outer peripheral surface 116 of the sleeve piece 110 on the inner tube side), and the sleeve piece 110 on the inner tube side and the sleeve piece 120 on the outer tube side are brought close to each other in the longitudinal direction of the existing PC steel bar B (by sliding one or both in the longitudinal direction of the existing PC steel bar B), and the sleeve piece 110 on the inner tube side and the sleeve piece 120 on the outer tube side are joined. As a result, the divided sleeve pieces (here, the two sleeve pieces 110 on the inner tube side and the sleeve piece 120 on the outer tube side because they are divided into two) are integrated as a sleeve and can function as a sleeve 100 that can be combined with the wedge 140.

最後に、露出された既設PC鋼棒Bに装着された分割された2以上のウェッジ片(ここ
では3分割されているために3つのウェッジ片142、ウェッジ片144およびウェッジ片146)を、ウェッジ140のテーパー140Tの向きとスリーブ100のテーパー100Tの向きとを一致させて、一体化されてウェッジ140に組み合わせられるスリーブとして機能させることができるようになったスリーブ100に、挿入ステップとして挿入する。
このようにして、図2の第一位置P(1)に突出防止具30が既設PC鋼棒Bへ装着される。このような突出防止具30の既設PC鋼棒Bへの装着作業は、プレストレストコンクリート部材(一例としてPC箱桁橋10)を供用しながら(橋梁を封鎖することなく)作業することが可能である。
Finally, in an insertion step, two or more divided wedge pieces (in this case, three wedge pieces 142, 144 and 146, as the wedge is divided into three) attached to the exposed existing PC steel bar B are inserted into the sleeve 100, which has been integrated and can function as a sleeve to be combined with the wedge 140, by aligning the direction of the taper 140T of the wedge 140 with the direction of the taper 100T of the sleeve 100.
In this way, the protrusion prevention device 30 is attached to the existing PC steel rod B at the first position P(1) in Fig. 2. The work of attaching such a protrusion prevention device 30 to the existing PC steel rod B can be performed while the prestressed concrete member (the PC box girder bridge 10, as an example) is in use (without closing the bridge).

<2:内筒外筒タイプ:ねじ螺合型>
次に、スリーブ200およびウェッジ240について説明する。
突出防止具30を構成するスリーブ200の平面図を図7(A)に、ウェッジ240の平面図を図7(B)に、それらのスリーブ200およびウェッジ240を用いてスリーブ200(スリーブSに相当)が、ウェッジ240(ウェッジWに相当)に組み合わせられるスリーブとして機能するようにして、突出防止具30を、PC構造物から露出させた既設PC鋼棒Bに装着する手順を説明するための図を図8に、それぞれ示す。
<2: Inner and outer cylinder type: Screw-on type>
Next, the sleeve 200 and the wedge 240 will be described.
Figure 7(A) shows a plan view of sleeve 200 that constitutes protrusion prevention device 30, Figure 7(B) shows a plan view of wedge 240, and Figure 8 is a diagram for explaining the procedure for attaching protrusion prevention device 30 to existing PC steel rod B exposed from the PC structure by using sleeve 200 and wedge 240 so that sleeve 200 (corresponding to sleeve S) functions as a sleeve that can be combined with wedge 240 (corresponding to wedge W).

この突出防止具30は、図7(A)に示すスリーブ200とそのスリーブ200に組み合わせられる図7(B)に示すウェッジ240とにより構成される。なお、図7(A)において左側に描かれた側面図(一部断面図)は右側に描かれた正面図に示す矢示X方向から見た図であって、図7(B)において左側に描かれた側面図および右側に描かれた正面図は2分割されたウェッジ片を組み合わせてウェッジ240とした図である。 This protrusion prevention device 30 is composed of a sleeve 200 shown in Fig. 7(A) and a wedge 240 shown in Fig. 7(B) that is combined with the sleeve 200. Note that the side view (partial cross-sectional view) on the left side of Fig. 7(A) is a view seen from the direction of the arrow X shown in the front view on the right side, and the side view on the left side and the front view on the right side of Fig. 7(B) are views of the wedge 240 formed by combining two divided wedge pieces.

図7(B)に示すように、ウェッジ240は、既設PC鋼棒Bの長手方向に垂直な面から見て2以上のウェッジ片(ここでは2分割されているために2つのウェッジ片242およびウェッジ片244)に分割されている。このように分割されているので、既設の既設PC鋼棒Bに装着することができる。また、ウェッジ240は2つのウェッジ片を組み合わせることによりテーパー240Tを備えることになる。 As shown in FIG. 7(B), the wedge 240 is divided into two or more wedge pieces (here, two wedge pieces 242 and 244, as it is divided into two) when viewed from a plane perpendicular to the longitudinal direction of the existing PC steel bar B. Because it is divided in this way, it can be attached to the existing PC steel bar B. In addition, the wedge 240 has a taper 240T by combining the two wedge pieces.

図7(A)に示すように、スリーブ200は、ウェッジ240のテーパー240Tに組み合わせられるテーパー200Tを備え外ねじ(雄ねじ)216を備えた内筒側のスリーブ片210と、内筒側のスリーブ片210の外ねじ(雄ねじ)216に螺合される内ねじ(雌ねじ)226を備えた外筒側のスリーブ片220とに分割されている。内筒側のスリーブ片210および外筒側のスリーブ片220は既設PC鋼棒Bの長手方向に垂直な面から見て既設PC鋼棒Bが挿入可能な切欠き部(内筒側のスリーブ片210における本体部212の一部を切り欠いた切欠き部214および外筒側のスリーブ片220における本体部222の一部を切り欠いた切欠き部224)を備える。なお、既設PC鋼棒Bが挿入可能な切欠き部は、内筒側のスリーブ片210が少なくとも備えればよく、外筒側のスリーブ片220と内筒側のスリーブ片110とが接合できる構造であれば既設PC鋼棒Bが挿入可能な切欠き部224を必ずしも備える必要はない。たとえば、外筒側のスリーブ片220は、たとえばFRP製のシートで、内筒側のスリーブ片210と外筒側のスリーブ片220とは、内筒側のスリーブ片210の外周にシート状の外筒側のスリーブ片220を巻き付けることによりスリーブとして一体化されてウェッジ240に組み合わせられるスリーブとして機能するものであれば構わない。この場合には、シート状の外筒側のスリーブ片220の切欠き部224は必須の構成ではないものとなる。さらに、内筒側のスリーブ片210と外筒側のスリーブ片220とは外ねじ(雄ねじ)216と内ねじ(雌ねじ)226とが螺合することによりスリーブ200として一体化されてウェッジ240に組み合わせられるスリーブとして機能することになる。 As shown in Fig. 7(A), the sleeve 200 is divided into an inner tube sleeve piece 210 having an outer thread (male thread) 216 with a taper 200T that is combined with the taper 240T of the wedge 240, and an outer tube sleeve piece 220 having an inner thread (female thread) 226 that is screwed into the outer thread (male thread) 216 of the inner tube sleeve piece 210. The inner tube sleeve piece 210 and the outer tube sleeve piece 220 have cutouts (cutouts 214 in which a part of the main body 212 in the inner tube sleeve piece 210 is cut out and cutouts 224 in which a part of the main body 222 in the outer tube sleeve piece 220 is cut out) into which the existing PC steel bar B can be inserted when viewed from a plane perpendicular to the longitudinal direction of the existing PC steel bar B. It should be noted that the sleeve piece 210 on the inner tube side is required to have at least the notch portion into which the existing PC steel bar B can be inserted, and as long as the sleeve piece 220 on the outer tube side and the sleeve piece 110 on the inner tube side can be joined, the sleeve piece 220 on the outer tube side does not necessarily have to have the notch portion 224 into which the existing PC steel bar B can be inserted. For example, the sleeve piece 220 on the outer tube side may be, for example, a sheet made of FRP, and the sleeve piece 210 on the inner tube side and the sleeve piece 220 on the outer tube side may be integrated as a sleeve by wrapping the sheet-like sleeve piece 220 on the outer tube side around the outer periphery of the sleeve piece 210 on the inner tube side, and function as a sleeve that can be combined with the wedge 240. In this case, the notch portion 224 of the sheet-like sleeve piece 220 on the outer tube side is not an essential component. Furthermore, the sleeve piece 210 on the inner tube side and the sleeve piece 220 on the outer tube side are integrated as the sleeve 200 by engaging the outer thread (male thread) 216 and the inner thread (female thread) 226, and function as a sleeve that can be combined with the wedge 240.

さらに詳しくは、スリーブ片210は、中心に既設PC鋼棒Bが挿通される(挿通される既設PC鋼棒Bに対応した)テーパー200Tを備えた本体212を備え、その本体212の一部が切欠き部214とされているためにテーパー200Tが全周にわたって存在するものではなく、切欠き部214の部分だけテーパー200Tが存在しないがこの突出防止具30としての機能には問題がない。 More specifically, the sleeve piece 210 has a body 212 with a taper 200T (corresponding to the existing PC steel rod B) through the center, through which the existing PC steel rod B is inserted, and since a portion of the body 212 is made into a notch 214, the taper 200T does not exist along the entire circumference, and only the portion of the notch 214 does not have the taper 200T, but this does not affect the function of this protrusion prevention device 30.

このような構造を備えた突出防止具30は、図2に示す第一位置P(1)、第二位置P(2)または第三位置P(3)において、以下のように既設PC鋼棒Bに装着される。ここでは、(テーパーの向きが異なるだけであるために)図2の第一位置P(1)における突出防止具30の既設PC鋼棒Bへの装着手順について説明する。
図8(A)に示すように、ウェッジ240のテーパー240Tが狭まる方向が表面への方向(ここでは上床版14)になるように、分割された2以上のウェッジ片(ここでは2分割されているために2つのウェッジ片242およびウェッジ片244)を露出した既設PC鋼棒Bに、ウェッジ装着ステップとして装着する(ウェッジ側の黒塗り矢示参照)。
The protrusion prevention device 30 having such a structure is attached to the existing PC steel rod B at the first position P(1), second position P(2) or third position P(3) shown in Figure 2 as follows. Here, the procedure for attaching the protrusion prevention device 30 to the existing PC steel rod B at the first position P(1) in Figure 2 (because only the taper direction is different) will be described.
As shown in Figure 8 (A), two or more divided wedge pieces (here, two wedge pieces 242 and wedge piece 244 because it is divided into two) are attached to the exposed existing PC steel bar B as a wedge attachment step so that the narrowing direction of the taper 240T of the wedge 240 is toward the surface (here, the upper deck 14) (see the black arrow on the wedge side).

スリーブ200のテーパー200Tが狭まる方向が表面への方向(ここでは上床版14)になるように、分割されたスリーブ片(ここでは2分割されているために2つの内筒側のスリーブ片210および外筒側のスリーブ片220)を露出した既設PC鋼棒Bに、スリーブ装着ステップとして装着する(スリーブ側の黒塗り矢示参照)。より詳しくは、図8(A)における左右方向から2つの内筒側のスリーブ片210および外筒側のスリーブ片220を既設PC鋼棒Bへ接近させて装着する。 In the sleeve installation step, the split sleeve pieces (here, two inner sleeve pieces 210 and an outer sleeve piece 220, as it is split into two) are installed on the exposed existing PC steel bar B so that the narrowing direction of the taper 200T of the sleeve 200 is toward the surface (here, the upper deck 14) (see the black arrow on the sleeve side). More specifically, the two inner sleeve pieces 210 and the outer sleeve piece 220 are installed close to the existing PC steel bar B from the left and right directions in Figure 8 (A).

次に、図8(B)に示すように、分割されたスリーブ片(ここでは2分割されているために2つの内筒側のスリーブ片210および外筒側のスリーブ片220)をスリーブ200として一体化してウェッジ240に組み合わせられるスリーブとして機能させるために(スリーブ機能化ステップのために)、内筒側のスリーブ片210の外ねじ(雄ねじ)216と外筒側のスリーブ片220の内ねじ(雌ねじ)226とを螺合させる。これにより分割されていたスリーブ片(ここでは2分割されているために2つの内筒側のスリーブ片210および外筒側のスリーブ片220)がスリーブとして一体化されてウェッジ240に組み合わせられるスリーブ200として機能させることができるようになる。 Next, as shown in FIG. 8(B), in order to integrate the divided sleeve pieces (here, because it is divided into two, the two inner tube side sleeve pieces 210 and the outer tube side sleeve piece 220) as a sleeve 200 and function as a sleeve that can be combined with the wedge 240 (for the sleeve functioning step), the outer thread (male thread) 216 of the inner tube side sleeve piece 210 and the inner thread (female thread) 226 of the outer tube side sleeve piece 220 are screwed together. This allows the divided sleeve pieces (here, because it is divided into two, the two inner tube side sleeve pieces 210 and the outer tube side sleeve piece 220) to be integrated as a sleeve and function as the sleeve 200 that can be combined with the wedge 240.

最後に、露出された既設PC鋼棒Bに装着された分割された2以上のウェッジ片(ここでは2分割されているために2つのウェッジ片242およびウェッジ片244)を、ウェッジ240のテーパー240Tの向きとスリーブ200のテーパー200Tの向きとを一致させて、一体化されてウェッジ240に組み合わせられるスリーブとして機能させることができるようになったスリーブ200に、挿入ステップとして挿入する。
このようにして、図2の第一位置P(1)に突出防止具30が既設PC鋼棒Bへ装着される。このような突出防止具30の既設PC鋼棒Bへの装着作業は、プレストレストコンクリート部材(一例としてPC箱桁橋10)を供用しながら(橋梁を封鎖することなく)作業することが可能である。
Finally, in an insertion step, two or more divided wedge pieces (in this case, two wedge pieces 242 and 244 because the wedge is divided into two) attached to the exposed existing PC steel bar B are inserted into the sleeve 200 so that the orientation of the taper 240T of the wedge 240 matches the orientation of the taper 200T of the sleeve 200 and the integrated sleeve can function as a sleeve that can be combined with the wedge 240.
In this way, the protrusion prevention device 30 is attached to the existing PC steel rod B at the first position P(1) in Fig. 2. The work of attaching such a protrusion prevention device 30 to the existing PC steel rod B can be performed while the prestressed concrete member (the PC box girder bridge 10, as an example) is in use (without closing the bridge).

<3:スリット壁面連結タイプ>
上述したスリーブ100とウェッジ140とから構成される突出防止具30もスリーブ200とウェッジ240とから構成される突出防止具30も、いずれも内筒外筒タイプであったが、次に、スリット壁面連結タイプのスリーブS10、スリーブS11およびスリーブS20を含む突出防止具30について、図9を参照して以下に詳しく説明する。なお、スリーブS10、スリーブS11およびスリーブS20に組み合わせられる図9に示すウェッジWは、上述した3分割されたウェッジ片から構成されるウェッジ140と同じであるために、ここでは繰り返して説明しない。
<3: Slit wall connection type>
The protrusion prevention device 30 composed of the sleeve 100 and the wedge 140 and the protrusion prevention device 30 composed of the sleeve 200 and the wedge 240 described above are both of the inner cylinder/outer cylinder type, but next, the protrusion prevention device 30 including the sleeve S10, the sleeve S11, and the sleeve S20 of the slit wall surface connection type will be described in detail below with reference to Fig. 9. Note that the wedge W shown in Fig. 9, which is combined with the sleeve S10, the sleeve S11, and the sleeve S20, is the same as the wedge 140 composed of the above-mentioned three divided wedge pieces, so a repeated description will not be given here.

突出防止具30を構成する、連結部材として頭付き六角穴付きボルト(以下においてキャップボルトと記載)T10を用いたスリーブS10の平面図を図9(A)に、連結部材として頭なし六角穴付きボルト(全ねじボルト、所謂いもねじ、以下において全ねじボルトと記載)T20を用いたスリーブS11の平面図を図9(B)に、スリーブS10およびスリーブS11とは異なるスリーブS20の平面図を図9(C)に、それぞれ示す。なお、図9(C)に示すスリーブS20は連結部材としてキャップボルトT10を用いているが、連結部材として全ねじボルトT20を用いても構わない。 Figure 9(A) shows a plan view of sleeve S10 that uses a headed hexagon socket bolt (hereinafter referred to as a cap bolt) T10 as the connecting member constituting protrusion prevention device 30, Figure 9(B) shows a plan view of sleeve S11 that uses a headless hexagon socket bolt (fully threaded bolt, so-called set screw, hereinafter referred to as a fully threaded bolt) T20 as the connecting member, and Figure 9(C) shows a plan view of sleeve S20 that is different from sleeve S10 and sleeve S11. Note that while sleeve S20 shown in Figure 9(C) uses cap bolt T10 as the connecting member, fully threaded bolt T20 may also be used as the connecting member.

これらの図9に示すスリット壁面連結タイプは、上述した内筒外筒タイプ(分割型)と異なり、ウェッジWに組み合わせられるテーパーを備えるとともに、既設PC鋼棒Bの長手方向に垂直な面から見て既設PC鋼棒Bが挿入可能なスリット部を備え、このスリット部において互いに対向する壁面が連結部材を用いて連結されることにより垂直な面から見
たスリット部の間隔が規制されてウェッジWに組み合わせられるスリーブとして機能するものである。
These slit wall connection types shown in Figure 9 are different from the inner tube outer tube type (split type) described above in that they have a taper that can be combined with a wedge W, and a slit portion into which the existing PC steel rod B can be inserted when viewed from a plane perpendicular to the longitudinal direction of the existing PC steel rod B, and the opposing wall surfaces at this slit portion are connected using a connecting member, thereby regulating the spacing of the slit portion when viewed from the perpendicular plane, and they function as a sleeve that can be combined with the wedge W.

図9(A)に示すスリーブS10および図9(B)に示すスリーブS11は、連結部材が異なるものの(図9(A)がキャップボルトT10で図9(B)が全ねじボルトT20)、スリーブの構造は、部位B10に設けられる穴が穴H10(スリーブS10)と雌ねじ穴H11(スリーブS11)とで異なる以外は同じである。このスリーブS10およびスリーブS11は偏心した中空部(この中空部にウェッジ140および既設PC鋼棒Bが内包される)を備えた中空円筒形状を備える。そして、偏心により、肉厚が厚い側(部位B10および部位B12がある側)に既設PC鋼棒Bが挿入可能なスリット部を備え、このスリット部において互いに対向する壁面が連結部材を用いて連結される。 Although the sleeve S10 shown in FIG. 9(A) and the sleeve S11 shown in FIG. 9(B) have different connecting members (the cap bolt T10 in FIG. 9(A) and the fully threaded bolt T20 in FIG. 9(B)), the structure of the sleeve is the same except that the hole provided in the portion B10 is hole H10 (sleeve S10) and the female threaded hole H11 (sleeve S11). The sleeves S10 and S11 have a hollow cylindrical shape with an eccentric hollow portion (in which the wedge 140 and the existing PC steel rod B are contained). Due to the eccentricity, the thicker side (the side where the portion B10 and the portion B12 are located) has a slit portion into which the existing PC steel rod B can be inserted, and the opposing wall surfaces in the slit portion are connected using a connecting member.

図9(A)に示すスリーブS10のように、連結部材がキャップボルトT10である場合には、スリット部において互いに対向する壁面の少なくとも一方(ここでは一方の壁面である)の壁面(ここでは部位B12側の壁面とする)に設けられた雌ねじ穴H12と、他方の壁面(ここでは部位B10側の壁面とする)に設けられた穴H10とを備え、穴H10(ねじ穴ではなく貫通穴)を通されたキャップボルトT10の雄ねじが雌ねじ穴H12に螺合されて、互いに対向する壁面が連結されることにより、垂直な面から見たスリット部の間隔が規制されてウェッジWに組み合わせられるスリーブとして機能するものである。 When the connecting member is a cap bolt T10, as in the sleeve S10 shown in FIG. 9(A), it has a female threaded hole H12 on at least one of the opposing wall surfaces (here, one of the wall surfaces) in the slit portion (here, the wall surface on the part B12 side) and a hole H10 on the other wall surface (here, the wall surface on the part B10 side). The male thread of the cap bolt T10 passed through the hole H10 (not a threaded hole but a through hole) is screwed into the female threaded hole H12, connecting the opposing wall surfaces, thereby regulating the spacing of the slit portion as viewed from a vertical plane and functioning as a sleeve that can be combined with the wedge W.

これに対して、図9(B)に示すスリーブS11のように、連結部材が全ねじボルトT20である場合には、スリット部において互いに対向する壁面の少なくとも一方(ここでは両方の壁面である)の壁面(ここでは部位B12側の壁面とする)に設けられた雌ねじ穴H12と、他方の壁面(ここでは部位B10側の壁面とする)に設けられた雌ねじ穴H11とを備え、雌ねじ穴H11に螺合して通された全ねじボルトT20の雄ねじが雌ねじ穴H12に螺合されて、互いに対向する壁面が連結されることにより、垂直な面から見たスリット部の間隔が規制されてウェッジWに組み合わせられるスリーブとして機能するものである
図9(B)に示すスリーブS11においては、部位B12側に雌ねじ穴H12を設けるのみならず部位B10側も雌ねじ穴H11を設けた上で連結部材として全ねじボルトT20を用いているために、部位B10側には雌ねじ穴ではなく穴H10を設けた上で連結部材としてキャップボルトT10を用いている図9(A)に示すスリーブS10と比較して、連結部材による過度の締め付けを防止することができる点が異なる。
In contrast, when the connecting member is a fully threaded bolt T20, as in the sleeve S11 shown in FIG. 9(B), a female threaded hole H12 is provided in at least one (here, both) of the opposing wall surfaces in the slit portion (here, the wall surface on the part B12 side) and a female threaded hole H11 is provided in the other wall surface (here, the wall surface on the part B10 side). The male thread of the fully threaded bolt T20 threadedly inserted into the female threaded hole H11 is threaded into the female threaded hole H12, connecting the opposing wall surfaces, thereby regulating the spacing of the slit portion as viewed from a vertical plane and functioning as a sleeve that can be combined with the wedge W. In the sleeve S11 shown in Figure 9 (B), not only is a female threaded hole H12 provided on the part B12 side, but a female threaded hole H11 is also provided on the part B10 side, and a fully threaded bolt T20 is used as the connecting member. Therefore, compared to the sleeve S10 shown in Figure 9 (A), in which a hole H10 rather than a female threaded hole is provided on the part B10 side, and a cap bolt T10 is used as the connecting member, excessive tightening by the connecting member can be prevented.

次に、図9(C)に示すスリーブS20は、図9(A)に示すスリーブS10および図9(B)に示すスリーブS11と比較して、偏心した中空部(この中空部にウェッジ140および既設PC鋼棒Bが内包される)を備えた中空角柱形状を備える。すなわち、図9(A)に示すスリーブS10および図9(B)に示すスリーブS11が中空円筒形状であるのに対して、図9(C)に示すスリーブS20は中空角柱形状である点が異なる。そして、偏心により、肉厚が厚い側(部位B10および部位B12がある側)に既設PC鋼棒Bが挿入可能なスリット部を備え、このスリット部において互いに対向する壁面が連結部材を用いて連結されることにより、垂直な面から見たスリット部の間隔が規制されてウェッジWに組み合わせられるスリーブとして機能する点は、スリーブS20もスリーブS10およびスリーブS11と同じである。 Next, compared to the sleeve S10 shown in FIG. 9(A) and the sleeve S11 shown in FIG. 9(B), the sleeve S20 shown in FIG. 9(C) has a hollow prism shape with an eccentric hollow portion (in which the wedge 140 and the existing PC steel bar B are contained). That is, the sleeve S10 shown in FIG. 9(A) and the sleeve S11 shown in FIG. 9(B) have a hollow cylindrical shape, while the sleeve S20 shown in FIG. 9(C) has a hollow prism shape. And, the sleeve S20 is the same as the sleeve S10 and the sleeve S11 in that the sleeve S20 has a slit portion into which the existing PC steel bar B can be inserted on the thicker side (the side where the parts B10 and B12 are located) due to the eccentricity, and the opposing wall surfaces of the slit portion are connected by a connecting member, so that the spacing of the slit portion as viewed from a vertical plane is regulated and the sleeve S20 functions as a sleeve that can be combined with the wedge W.

より詳しくは、図9(A)に示したスリーブS10と同じく、スリーブS20においても、穴H10(ねじ穴ではなく貫通穴)を通されたキャップボルトT10の雄ねじが雌ねじ穴H12に螺合されて、互いに対向する壁面が連結されることにより、垂直な面から見たスリット部の間隔が規制されてウェッジWに組み合わせられるスリーブとして機能するものである。なお、上述したように、図9(C)に示すスリーブS20は連結部材としてキャップボルトT10を用いているが、連結部材として全ねじボルトT20を用いても構わない。このときには、図9(B)に示したスリーブS11と同じく、スリーブS20においても、雌ねじ穴H11を螺合して通された全ねじボルトT20の雄ねじが雌ねじ穴H12に螺合されて、互いに対向する壁面が連結されることにより、垂直な面から見たスリ
ット部の間隔が規制されてウェッジWに組み合わせられるスリーブとして機能するものである。
More specifically, in the sleeve S20, as in the sleeve S10 shown in Fig. 9(A), the male thread of the cap bolt T10 passed through the hole H10 (not a screw hole but a through hole) is screwed into the female threaded hole H12, and the opposing wall surfaces are connected to each other, so that the spacing of the slits as viewed from a vertical plane is regulated and the sleeve functions as a sleeve to be combined with the wedge W. As described above, the sleeve S20 shown in Fig. 9(C) uses the cap bolt T10 as the connecting member, but the fully threaded bolt T20 may be used as the connecting member. In this case, as in the sleeve S11 shown in Fig. 9(B), in the sleeve S20, the male thread of the fully threaded bolt T20 passed through the female threaded hole H11 is screwed into the female threaded hole H12, and the opposing wall surfaces are connected to each other, so that the spacing of the slits as viewed from a vertical plane is regulated and the sleeve functions as a sleeve to be combined with the wedge W.

図9に示すように、連結部材は、互いに対向する壁面の少なくとも一方の壁面に設けられた雌ねじ穴と、他方の壁面に設けられた穴を通された雄ねじとを含み、雌ねじ穴に雄ねじが螺合されて壁面が連結されることにより既設PC鋼棒Bの長手方向に垂直な面から見たスリット部の間隔が規制されることにより、スリーブとして機能する。そして、この場合において、雌ねじ穴に螺合する雄ねじの径を変更することにより、既設PC鋼棒Bの長手方向に垂直な面から見たスリット部の間隔を規制した際に連結部材の剛性が変更されるためにPC鋼棒Bが破断した際の緩衝能力を調整できる特徴を備える。 As shown in FIG. 9, the connecting member includes a female threaded hole provided in at least one of the opposing wall surfaces and a male screw threaded through a hole provided in the other wall surface, and functions as a sleeve by restricting the spacing of the slits as viewed from a plane perpendicular to the longitudinal direction of the existing PC steel bar B when the male screw is screwed into the female threaded hole to connect the wall surfaces. In this case, the rigidity of the connecting member is changed by changing the diameter of the male screw threaded into the female threaded hole when the spacing of the slits as viewed from a plane perpendicular to the longitudinal direction of the existing PC steel bar B is restricted, and therefore the characteristic is that the cushioning capacity can be adjusted when the PC steel bar B breaks.

このような構造を備えた突出防止具30は、図2に示す第一位置P(1)、第二位置P(2)または第三位置P(3)において、以下のように既設PC鋼棒Bに装着される。ここでは、(テーパーの向きが異なるだけであるために)図2の第一位置P(1)における突出防止具30の既設PC鋼棒Bへの装着手順について説明する。以下においては、図9(A)に示す突出防止具30を使用する場合について説明する。 The protrusion prevention device 30 having such a structure is attached to the existing PC steel rod B at the first position P(1), second position P(2) or third position P(3) shown in Figure 2 as follows. Here, the procedure for attaching the protrusion prevention device 30 to the existing PC steel rod B at the first position P(1) in Figure 2 (because only the taper direction is different) will be described. Below, the case of using the protrusion prevention device 30 shown in Figure 9 (A) will be described.

図示しないが、ウェッジ140のテーパー140Tが狭まる方向が表面への方向(ここでは上床版14)になるように、分割された2以上のウェッジ片(ここでは3分割されているために3つのウェッジ片142、ウェッジ片144およびウェッジ片146)を露出した既設PC鋼棒Bに、ウェッジ装着ステップとして装着する。
スリーブ100のテーパー100Tが狭まる方向が表面への方向(ここでは上床版14)になるように、スリット部を備えたスリーブS10を露出した既設PC鋼棒Bに、スリーブ装着ステップとして装着する。より詳しくは、スリーブS10のスリット部から既設PC鋼棒Bを挿入させて装着する。
Although not shown, two or more divided wedge pieces (here, it is divided into three, so that there are three wedge pieces 142, 144 and 146) are attached to the exposed existing PC steel bar B as a wedge attachment step so that the narrowing direction of the taper 140T of the wedge 140 is toward the surface (here, the upper deck 14).
In the sleeve mounting step, a sleeve S10 having a slit portion is mounted on the exposed existing PC steel bar B so that the narrowing direction of the taper 100T of the sleeve 100 is the direction toward the surface (here, the upper deck 14). More specifically, the existing PC steel bar B is inserted through the slit portion of the sleeve S10 to mount it.

次に、スリーブS10のスリット部における互いに対向する壁面の1つを構成する部位に設けられた穴H10(ねじ穴ではなく貫通穴)を通されたキャップボルトT10の雄ねじを雌ねじ穴H12に螺合させて、互いに対向する壁面が連結されることにより、垂直な面から見たスリット部の間隔が規制されてウェッジWに組み合わせられるスリーブとして機能させる(スリーブ機能化ステップ)。これによりスリット部を備えたスリーブS10において、スリット部における互いに対向する壁面が連結されることにより、垂直な面から見たスリット部の間隔が規制されてウェッジWに組み合わせられるスリーブ(ここではスリーブ100とする)として機能させることができるようになる。 Next, the male thread of the cap bolt T10 is passed through a hole H10 (not a threaded hole but a through hole) provided in a portion constituting one of the opposing wall surfaces of the slit portion of the sleeve S10, and is screwed into the female threaded hole H12, connecting the opposing wall surfaces, thereby regulating the spacing of the slit portion as viewed from a vertical plane, and allowing the sleeve to function as a sleeve that can be combined with the wedge W (sleeve functioning step). In this way, in the sleeve S10 with a slit portion, by connecting the opposing wall surfaces of the slit portion, the spacing of the slit portion as viewed from a vertical plane is regulated, and the sleeve can function as a sleeve (here, sleeve 100) that can be combined with the wedge W.

最後に、露出された既設PC鋼棒Bに装着された分割された2以上のウェッジ片(ここでは3分割されているために3つのウェッジ片142、ウェッジ片144およびウェッジ片146)を、ウェッジ140のテーパー140Tの向きとスリーブ100のテーパー100Tの向きとを一致させて、一体化されてウェッジ140に組み合わせられるスリーブとして機能させることができるようになったスリーブ100に、挿入ステップとして挿入する。
このようにして、図2の第一位置P(1)に突出防止具30が既設PC鋼棒Bへ装着される。このような突出防止具30の既設PC鋼棒Bへの装着作業は、プレストレストコンクリート部材(一例としてPC箱桁橋10)を供用しながら(橋梁を封鎖することなく)作業することが可能である。
Finally, in an insertion step, two or more divided wedge pieces (in this case, three wedge pieces 142, 144 and 146, as the wedge is divided into three) attached to the exposed existing PC steel bar B are inserted into the sleeve 100, which has been integrated and can function as a sleeve to be combined with the wedge 140, by aligning the direction of the taper 140T of the wedge 140 with the direction of the taper 100T of the sleeve 100.
In this way, the protrusion prevention device 30 is attached to the existing PC steel rod B at the first position P(1) in Fig. 2. The work of attaching such a protrusion prevention device 30 to the existing PC steel rod B can be performed while the prestressed concrete member (the PC box girder bridge 10, as an example) is in use (without closing the bridge).

<第1の評価>
このような突出防止具30(既設PC鋼棒突出防止具)およびこの突出防止具30を用いた施工方法(既設PC鋼棒突出防止工法)の評価(コンクリート部材の外にPC鋼棒が突出することを防止することができるか否か等)について、供試体(全長13.7mで破断位置は最大12m)を用いて試験した結果について、図10を参照して説明する。
図10に示すように、ウェブ20を模した供試体(緊張されたPC鋼棒により圧縮力が付与されているプレストレストコンクリート)において、供試体の表面(上述した上床版14近傍に対応する図10における右端)からの長さL(1)の位置の既設PC鋼棒Bに突出防止具30を上述した手順で取り付けた。
<First evaluation>
The results of testing such a protrusion prevention device 30 (device to prevent protrusion of existing PC steel bars) and a construction method using this protrusion prevention device 30 (construction method to prevent protrusion of existing PC steel bars) (whether or not it is possible to prevent the PC steel bars from protruding outside the concrete member, etc.) using a test specimen (total length 13.7 m, with a maximum breaking position of 12 m) are described with reference to Figure 10.
As shown in Figure 10, in a test specimen simulating a web 20 (prestressed concrete to which a compressive force is applied by tensioned PC steel bars), a protrusion prevention device 30 was attached to the existing PC steel bar B at a position of length L(1) from the surface of the test specimen (the right end in Figure 10 corresponding to the vicinity of the upper deck 14 described above) using the procedure described above.

ここで、図10における箱抜きPC打設とは、突出防止具30を既設PC鋼棒Bに取り
付けた後にコンクリートで埋め戻した場合を意味しており、ジャッキを用いず手で押し込んだとは、上述したウェッジ装着ステップにおいてジャッキを用いることなく作業者の手作業によりウェッジWをスリーブSに挿入した場合を意味しており、ジャッキを用いず手で押し込んだ以外は、上述したウェッジ装着ステップにおいてジャッキを用いてウェッジWを(グラフ横軸の圧入力で)スリーブSに挿入した。
Here, in FIG. 10 , "casting PC without a box" refers to the case where the protrusion prevention device 30 is attached to the existing PC steel rod B and then backfilled with concrete, and "pushing in by hand without using a jack" refers to the case where the wedge W is inserted into the sleeve S by the worker manually without using a jack in the wedge attachment step described above. Except for "pushing in by hand without using a jack," the wedge W was inserted into the sleeve S using a jack (with the press-in force on the horizontal axis of the graph) in the wedge attachment step described above.

また、既設PC鋼棒Bの破断については故意的に切断することにより模擬しており、突出防止具30から2m、4m、8mおよび12mの位置で既設PC鋼棒を切断した。なお、パラメータは挿入ステップにおける(ジャッキまたは手作業)のウェッジをスリーブに挿入する圧入力(図10のグラフの横軸)であって、既設PC鋼棒Bを切断した後の突出防止具30と上床版との間(長さL(1)の範囲)における緊張力(図10のグラフの縦軸)である。 Fracture of the existing PC steel bar B was simulated by intentionally cutting it at positions 2 m, 4 m, 8 m, and 12 m from the protrusion prevention device 30. The parameters are the pressure-insertion force (horizontal axis of the graph in Figure 10) for inserting the wedge (by jack or by hand) into the sleeve in the insertion step, and the tension force (vertical axis of the graph in Figure 10) between the protrusion prevention device 30 and the upper deck (within the range of length L(1)) after the existing PC steel bar B was cut.

(評価その1)
いずれの場合にも、ウェブ20を模した供試体(コンクリート部材)の外に既設PC鋼棒Bが突出することはなく、既設PC鋼棒が破断したときに突出することが適切に防止できることを確認することができた。
(評価その2)
突出防止具30と上床版との間(長さL(1)の範囲)において、図10に示すように、一部を除いて緊張力が残存しており緊張力が0ではないためにこの部分の既設PC鋼棒がずれたり動いたりすることが防止できることが判明した。すなわち、大きな緊張力は残存していなかった。ただし、この再破断が発生する場所は、そもそも上床版14と第一位置P(1)に設けられた突出防止具30との間でPC鋼棒が最初に破断した場合であっても上床版方向へのPC鋼棒の破断エネルギーは小さく、かぶりコンクリートにより破断エネルギーを吸収することができるとして第一長さL(1)、第二長さL(2)および第三長さL(3)を0.25m~2.0mと設定しているために、大きな問題ではない。
(Evaluation 1)
In either case, it was confirmed that the existing PC steel rod B did not protrude outside the test specimen (concrete member) simulating the web 20, and that protrusion of the existing PC steel rod when it breaks could be appropriately prevented.
(Evaluation 2)
It was found that, as shown in FIG. 10, tension remains except for a part between the protrusion prevention tool 30 and the upper deck (within the range of length L(1)), and the tension is not zero, so that the existing PC steel bar in this part can be prevented from shifting or moving. In other words, no large tension remains. However, the location where this re-breakage occurs is not a big problem because even if the PC steel bar first breaks between the upper deck 14 and the protrusion prevention tool 30 installed at the first position P(1), the breaking energy of the PC steel bar toward the upper deck is small, and the breaking energy can be absorbed by the cover concrete, so the first length L(1), second length L(2), and third length L(3) are set to 0.25 m to 2.0 m.

(評価その3)
評価その2における一部には、緊張力がほぼ残存していない場合(たとえば作業者の手作業によりウェッジWをスリーブSに挿入した場合)を含むものの、そのように作業者の手作業によりウェッジWをスリーブSに挿入した場合であっても評価その1のように、既設PC鋼棒が破断したときに突出することが適切に防止できることを確認することができた。
このように、上述したウェッジ装着ステップにおいては、ウェッジWをスリーブSに、ジャッキを用いて挿入するようにしても構わないし、ジャッキを用いることなく作業者の手作業により挿入するようにしても構わないことが明らかとなった。
(Evaluation 3)
Although some parts of Evaluation 2 include cases where almost no tension remains (for example, when the wedge W is manually inserted into the sleeve S by an operator), it was confirmed that even when the wedge W is manually inserted into the sleeve S in such a way, it is possible to appropriately prevent the existing PC steel bar from protruding when it breaks, as in Evaluation 1.
Thus, it has become clear that in the above-mentioned wedge installation step, the wedge W may be inserted into the sleeve S using a jack, or may be inserted manually by an operator without using a jack.

(評価その4)
箱抜き部を断面修復(埋め戻し)してもしなくても、既設PC鋼棒が破断したときに突出することが適切に防止できることを確認することができた。このため、この突出防止具30を既設PC鋼棒に装着した後に(ウェッジ装着ステップの後に)、斫ったコンクリートを埋め戻す必要がないことが明らかになった。
以上のようにして、供用中のプレストレストコンクリート部材に圧縮力を付与している既設のPC鋼棒が破断した場合に発生する大きな衝撃力によりコンクリート部材の外にPC鋼棒が突出することを、供用しながらの作業により防止することのできる既設PC鋼棒突出防止工法およびそれに用いる既設PC鋼棒突出防止具を提供することができる。
(Evaluation 4)
It was confirmed that protrusion of the existing PC steel bar when it breaks can be appropriately prevented regardless of whether or not the cut-out portion is repaired (backfilled). Therefore, it became clear that it is not necessary to backfill the chipped concrete after attaching this protrusion prevention device 30 to the existing PC steel bar (after the wedge attachment step).
In this way, we have provided a method for preventing the protrusion of existing PC steel bars, which can prevent the PC steel bars from protruding outside the concrete member due to the large impact force that occurs when an existing PC steel bar that is applying compressive force to a prestressed concrete member in service breaks, by performing work while the member is in service, and a device for preventing the protrusion of existing PC steel bars used therein.

<変形例>
以下において、本発明の実施の形態の変形例に係る(既設のプレストレストコンクリート部材に圧縮力を付与している既設PC鋼棒が破断した場合の衝撃力を受け止めてコンクリート部材の外部に既設PC鋼棒が突出することを防止する)突出防止具について説明する。以下において説明する第1の変形例に係る突出防止具および第2の変形例に係る突出防止具は、狭小かつ暗い空間でウェッジ(くさび、楔)をセットするため施工状況を容易に確認・判断できることを目的としており、さらに詳しくは、ウェッジ自体の存在確認およびウェッジのセット位置の保持(脱落防止)の確認を容易にするための構造を備える。
なお、ウェッジ自体の存在確認以外およびウェッジのセット位置の保持(脱落防止)の確認以外の既設PC鋼棒突出防止工法については上述した説明と同じであるためにここでは繰り返さない。また、以下において、上述した構造と同じ構造を備えた部材(たとえばウェッジ等)については同じ符号を付しており、その構造も作用効果も同じであるためにここでは繰り返して説明しない。
<Modification>
The following describes a protrusion prevention device according to a modified embodiment of the present invention (which receives the impact force when an existing PC steel bar that applies a compressive force to an existing prestressed concrete member breaks, thereby preventing the existing PC steel bar from protruding outside the concrete member). The protrusion prevention device according to the first modified embodiment and the protrusion prevention device according to the second modified embodiment described below are intended to make it easy to check and determine the construction situation in order to set a wedge in a narrow and dark space, and more specifically, are provided with a structure for easily checking the presence of the wedge itself and checking that the wedge is held in the set position (preventing it from falling off).
In addition, the method for preventing the protrusion of existing PC steel bars other than the confirmation of the presence of the wedge itself and the confirmation of the maintenance of the set position of the wedge (prevention of falling off) is the same as the above-mentioned explanation, so it will not be repeated here. Also, in the following, the same reference numerals are used for members (e.g. wedges, etc.) having the same structure as the above-mentioned structure, and since the structure and the effect are the same, they will not be explained again here.

さらに、以下に示す2つの変形例に係る突出防止具は、図7に示した突出防止具を基本的な構造としているが、図7に示すようにスリーブは外ねじを備えた内筒側のスリーブ片と内筒側のスリーブ片の外ねじに螺合される内ねじを備えた外筒側のスリーブ片とに分割され、内筒側のスリーブ片と外筒側のスリーブ片とは内ねじと外ねじとが螺合することによりスリーブとして一体化されるものには限定されない。たとえば、内筒側のスリーブ片と外筒側のスリーブ片とは、止めねじ取付け穴を通された止めねじが止めねじ用タップに螺合することによりスリーブとして一体化されるものであっても構わない。なお、図11および図12においては、これらの変形例についての容易な理解のために、ハッチングを付していない断面があったり、既設PC鋼棒Bを一部の図にしか記載していない場合があったりする。また、図11(G)は図11(F)のA-A断面を示し、図12(G)は図12(F)のA-A断面を示す。 Furthermore, the protrusion prevention device according to the two modified examples shown below has the basic structure of the protrusion prevention device shown in FIG. 7, but as shown in FIG. 7, the sleeve is divided into an inner tube side sleeve piece with an outer thread and an outer tube side sleeve piece with an inner thread that is screwed into the outer thread of the inner tube side sleeve piece, and the sleeve piece on the inner tube side and the sleeve piece on the outer tube side are not limited to being integrated as a sleeve by screwing the inner thread and the outer thread. For example, the sleeve piece on the inner tube side and the sleeve piece on the outer tube side may be integrated as a sleeve by screwing a set screw passed through a set screw mounting hole into a set screw tap. In addition, in FIG. 11 and FIG. 12, in order to easily understand these modified examples, there are cases where some cross sections are not hatched and the existing PC steel bar B is only shown in some of the figures. Also, FIG. 11(G) shows the A-A cross section of FIG. 11(F), and FIG. 12(G) shows the A-A cross section of FIG. 12(F).

<<第1の変形例>>
図11に示すように、本変形例に係る突出防止具は、押えプレートタイプであって、ウェッジ自体の存在確認についてはウェッジ後端にスリーブ後端から突出する突起を設けて視認可能にすることにより実現しており、ウェッジのセット位置の保持(脱落防止)についてはスリーブとボルト接続可能な押えプレートを設けて、この押えプレートを所定の位置までボルトにより押え付けることにより実現している。
<<First Modification>>
As shown in Figure 11, the protrusion prevention device of this modified example is a pressure plate type, and the presence of the wedge itself can be confirmed by providing a protrusion at the rear end of the wedge that protrudes from the rear end of the sleeve to make it visible, and the wedge is maintained in its set position (to prevent it from falling off) by providing a pressure plate that can be connected to the sleeve with bolts, and pressing this pressure plate to a specified position with bolts.

さらに詳しくは、図11(E)および図11(E)のA-A断面を示す図11(A)に示すように、押えプレート300は、既設PC鋼棒Bの長手方向に垂直な面から見て既設PC鋼棒Bが挿入可能な切欠き部324を備えたたとえば金属製の平板であって、この押えプレート300を後述するスリーブ2100とボルト310により接続(より詳しくは外筒側のスリーブ片2220に設けられた雌ねじ穴2222とボルト310とを螺合させて接続)するためのボルト穴302を備える。 More specifically, as shown in FIG. 11(E) and FIG. 11(A) showing the A-A cross section of FIG. 11(E), the pressure plate 300 is a flat plate, for example made of metal, with a notch 324 into which the existing PC steel bar B can be inserted when viewed from a plane perpendicular to the longitudinal direction of the existing PC steel bar B, and has a bolt hole 302 for connecting the pressure plate 300 to the sleeve 2100 described below with a bolt 310 (more specifically, connecting the bolt 310 by screwing together the female threaded hole 2222 provided in the sleeve piece 2220 on the outer tube side).

図11(B)に示すように、ウェッジ340は上述した3分割タイプのウェッジ140に、ウェッジ340の後端にスリーブ2100の後端から突出する突起342を備えたものである。
図11(C)に示すように、外筒側のスリーブ片2220は上述した外筒側のスリーブ片220にボルト310と螺合するための雌ねじが設けられた雌ねじ穴2222を備えたものである。なお、図11(D)に示すように、内筒側のスリーブ片210は上述した内筒側のスリーブ片210と同じであるために同じ符号を付している。これらの図11(C)に示す外筒側のスリーブ片2220と図11(D)に示す内筒側のスリーブ片210とにより、本変形例に係る突出防止具におけるスリーブ2100が構成される。
As shown in FIG. 11B, the wedge 340 is the three-piece wedge 140 described above, and is provided with a protrusion 342 at the rear end of the wedge 340 that protrudes from the rear end of the sleeve 2100 .
As shown in Fig. 11(C), the sleeve piece 2220 on the outer cylinder side is provided with a female threaded hole 2222 having a female thread for screwing with the bolt 310 in the sleeve piece 220 on the outer cylinder side described above. As shown in Fig. 11(D), the sleeve piece 210 on the inner cylinder side is the same as the sleeve piece 210 on the inner cylinder side described above, and is therefore given the same reference numeral. The sleeve piece 2220 on the outer cylinder side shown in Fig. 11(C) and the sleeve piece 210 on the inner cylinder side shown in Fig. 11(D) constitute the sleeve 2100 in the protrusion prevention device according to this modified example.

このような構造を備えた本変形例に係る突出防止具において、ウェッジ自体の存在確認およびウェッジのセット位置の保持(脱落防止)の確認方法について、図11(E)~図11(G)を参照して以下に説明する。
図11(A)に示した押えプレート300以外およびボルト310以外が既設PC鋼棒Bに図11(F)に示すように組付けられると、図11(E)に示す黒塗り矢示の方向へ、押えプレート300以外およびボルト310以外が既設PC鋼棒Bに組付けられた突出防止具へ、ボルト穴302と雌ねじ穴2222との位置が合致するように、押えプレート300がセットされる。
In the protrusion prevention device of this modified example having such a structure, the method of confirming the presence of the wedge itself and the method of confirming that the wedge is maintained in its set position (preventing it from falling off) will be described below with reference to Figures 11 (E) to 11 (G).
When everything other than the pressure plate 300 and the bolt 310 shown in Figure 11 (A) is assembled to the existing PC steel bar B as shown in Figure 11 (F), the pressure plate 300 is set in the direction of the black arrow shown in Figure 11 (E) so that the positions of the bolt hole 302 and the female thread hole 2222 match up with the positions of the protrusion prevention device to which everything other than the pressure plate 300 and the bolt 310 has been assembled to the existing PC steel bar B.

押えプレート300のボルト穴302にボルト310を通して、雌ねじ穴2222にボルト310を(ここでは上下2箇所において十分に)螺合させる。このような作業過程において、ウェッジ340自体の存在確認についてはウェッジ340の後端にスリーブ2100の後端から突出する突起342を視覚により容易に確認することができる。また、スリーブ2100とボルト310により押えプレート300が螺合により確実に接続可能であるために、この押えプレート300が所定の位置(ボルト310が雌ねじ穴2222に十分に螺合する位置)までボルト310により押え付けられることにより、セット位置の担保と脱落防止とを容易に実現することができる。 The bolt 310 is passed through the bolt hole 302 of the pressing plate 300, and the bolt 310 is screwed into the female threaded hole 2222 (here, fully at two places, top and bottom). During this work process, the presence of the wedge 340 itself can be easily confirmed by visually checking the protrusion 342 protruding from the rear end of the sleeve 2100 at the rear end of the wedge 340. In addition, since the pressing plate 300 can be securely connected by screwing with the sleeve 2100 and the bolt 310, the pressing plate 300 can be pressed down to a specified position (a position where the bolt 310 is fully screwed into the female threaded hole 2222) by the bolt 310, and the set position can be easily secured and the bolt 310 can be prevented from falling off.

<<第2の変形例>>
図12に示すように、本変形例に係る突出防止具は、ワイヤークリップタイプであって、ウェッジ自体の存在確認についてはウェッジが存在しないとワイヤークリップの位置が定まらないために所定の位置にワイヤークリップが存在していることを視認することにより実現しており、ウェッジのセット位置の保持(脱落防止)についてはワイヤークリップでウェッジの端部を拘束するとともにワイヤークリップ端部をスリーブに固定してウェッジとスリーブとの位置関係を決定することにより実現している。
<<Second Modification>>
As shown in Figure 12, the protrusion prevention device of this modified example is a wire clip type, and the presence of the wedge itself is confirmed by visually checking that the wire clip is in a predetermined position because the position of the wire clip would not be determined without the wedge being present, and the set position of the wedge is maintained (prevented from falling off) by restraining the end of the wedge with the wire clip and fixing the end of the wire clip to the sleeve to determine the positional relationship between the wedge and the sleeve.

さらに詳しくは、図12(A)に示すように、ワイヤークリップ400は、図12(A)の紙面の上下方向に対称な所定の形状を備えた金属ワイヤーである。このワイヤークリップ400は、後述するスリーブ2200(より詳しくは内筒側のスリーブ片2210の)スリーブのテーパーが狭まる方向の端面に設けられた嵌合穴2212に嵌入される嵌入片402と、嵌入片402から(図12(A)に示す平面視で)略直角に曲げられてスリーブ2200のテーパーが狭まる方向の端面に位置することになる端面片404と、端面片404から(図12(A)に示す平面視で)略直角に曲げられてスリーブ2200の外周面(より詳しくは外筒側のスリーブ片220の外周面)に位置することになる外周面片406と、外周面片406から(図12(A)に示す平面視で)略直角に曲げられてスリーブ2200のテーパーが広がる方向の端面に位置することになる拘束端面片408と、拘束端面片408から連続してウェッジ140のテーパーが広がる方向の端面に設けられた拘束溝148に嵌入される(図12(F)に示す方向から見た)円弧状の拘束円弧片410とから構成される。 12(A), the wire clip 400 is a metal wire with a predetermined shape that is symmetrical in the vertical direction of the paper of FIG. 12(A). The wire clip 400 is made up of an insertion piece 402 that is inserted into an insertion hole 2212 provided on the end face of the sleeve 2200 (more specifically, the sleeve piece 2210 on the inner tube side) described later in the direction in which the taper of the sleeve narrows, an end face piece 404 that is bent at a substantially right angle from the insertion piece 402 (in the plan view shown in FIG. 12(A)) and positioned on the end face of the sleeve 2200 in the direction in which the taper narrows, and an end face piece 404 that is bent at a substantially right angle from the end face piece 404 (in the plan view shown in FIG. 12(A)) and positioned on the outer peripheral surface of the sleeve 2200. (More specifically, the outer circumferential surface of the sleeve piece 220 on the outer tube side), a restraining end surface piece 408 that is bent at a right angle from the outer circumferential surface piece 406 (in the plan view shown in FIG. 12(A)) and is positioned on the end surface of the sleeve 2200 in the direction in which the taper widens, and an arc-shaped restraining arc piece 410 (as viewed from the direction shown in FIG. 12(F)) that is continuous from the restraining end surface piece 408 and is fitted into a restraining groove 148 provided on the end surface of the wedge 140 in the direction in which the taper widens.

このワイヤークリップ400における特徴的な構造は、スリーブ2200のテーパーが狭まる方向の端面に設けられた嵌合穴2212に嵌入される嵌入片402とウェッジ140の拘束溝148に嵌入される円弧状の拘束円弧片410とを備えることである。なお、図12(A)の寸法Lはスリーブ2200における既設PC鋼棒Bの長手方向の長さに対応している。
図12(B)に示すように、ウェッジ140は、上述した3分割タイプのウェッジ140と同じであるために同じ符号を付している。なお、図4(B)においては、ウェッジ140に拘束溝148の符号を付していない。
The characteristic structure of this wire clip 400 is that it includes an insertion piece 402 that is inserted into an insertion hole 2212 provided on the end face of the sleeve 2200 in the direction in which the taper narrows, and an arc-shaped restraining arc piece 410 that is inserted into the restraining groove 148 of the wedge 140. Note that the dimension L in Fig. 12(A) corresponds to the length of the existing PC steel bar B in the sleeve 2200 in the longitudinal direction.
As shown in Fig. 12B, the wedge 140 is the same as the three-piece wedge 140 described above, and is therefore denoted by the same reference numeral. Note that in Fig. 4B, the reference numeral for the restraining groove 148 is not attached to the wedge 140.

図12(C)に示すように、内筒側のスリーブ片2210は上述した内筒側のスリーブ片210にワイヤークリップ400の嵌入片402が嵌入される嵌合穴2212を備えたものである。なお、図12(C)に示すように、外筒側のスリーブ片220は上述した外筒側のスリーブ片220と同じであるために同じ符号を付している。これらの図12(C)に示す外筒側のスリーブ片220と図12(D)に示す内筒側のスリーブ片2210とにより、本変形例に係る突出防止具におけるスリーブ2200が構成される。
このような構造を備えた本変形例に係る突出防止具において、ウェッジ自体の存在確認およびウェッジのセット位置の保持(脱落防止)の確認方法について、図12(F)~図12(G)を参照して以下に説明する。
As shown in Fig. 12(C), the sleeve piece 2210 on the inner tube side is provided with a fitting hole 2212 into which the fitting piece 402 of the wire clip 400 is fitted in the sleeve piece 210 on the inner tube side described above. As shown in Fig. 12(C), the sleeve piece 220 on the outer tube side is the same as the sleeve piece 220 on the outer tube side described above, and is therefore given the same reference numeral. The sleeve piece 220 on the outer tube side shown in Fig. 12(C) and the sleeve piece 2210 on the inner tube side shown in Fig. 12(D) constitute the sleeve 2200 in the protrusion prevention device according to this modification.
In the protrusion prevention device of this modified example having such a structure, the method of confirming the presence of the wedge itself and the method of confirming that the wedge is maintained in its set position (preventing it from falling off) will be described below with reference to Figures 12 (F) to 12 (G).

図12(A)に示したワイヤークリップ400以外が既設PC鋼棒Bに組付けられると、図12(E)および図12(G)に示すように、ワイヤークリップ400の嵌入片402がスリーブ2200のテーパーが狭まる方向の端面に設けられた嵌合穴2212に嵌入されるとともに、ワイヤークリップ400の拘束円弧片410がウェッジ140の拘束溝148に嵌入されるようにして、ワイヤークリップ400がセットされる。このような作業過程において、ウェッジ140自体の存在確認については所定の位置にワイヤークリップ400が存在していることを視認することでウェッジの存在を容易に確認することができる。また、ワイヤークリップ400でウェッジ140端部における拘束溝148を拘束するとともにワイヤークリップ400の端部(嵌入片402)をスリーブ(嵌合穴2212)に固定することによりウェッジとスリーブとの位置関係を決定することによりセット位置の担保と脱落防止とを容易に実現することができる。 When the wire clip 400 shown in FIG. 12(A) is assembled to the existing PC steel bar B, as shown in FIG. 12(E) and FIG. 12(G), the wire clip 400 is set by fitting the insertion piece 402 of the wire clip 400 into the fitting hole 2212 provided on the end face of the sleeve 2200 in the direction in which the taper narrows, and fitting the restraining arc piece 410 of the wire clip 400 into the restraining groove 148 of the wedge 140. In this work process, the presence of the wedge 140 itself can be easily confirmed by visually confirming that the wire clip 400 is present in a predetermined position. In addition, the wire clip 400 restrains the restraining groove 148 at the end of the wedge 140 and fixes the end of the wire clip 400 (insertion piece 402) to the sleeve (fitting hole 2212), thereby determining the positional relationship between the wedge and the sleeve, and thus ensuring the set position and preventing it from falling off can be easily achieved.

<第2の評価>
このような突出防止具30(既設PC鋼棒突出防止具)およびこの突出防止具30を用いた施工方法(既設PC鋼棒突出防止工法)の評価について、参考重量(ウェッジを含む)とともに、供試体を用いて試験した結果について、図13を参照して説明する。
なお、先行技術は特開2018-017029号公報に記載の中間定着具においてスリーブにウェッジを組み合わせた構成でボルト4本締めの中間定着具を突出防止具30として採用したものであって、実施例2が図9(A)に示す突出防止具30であって、実施例3が図9(B)に示す突出防止具30であって、実施例4が図9(C)に示す突出防止具30であって、実施例5が図4~図6に示す突出防止具30である。
<Second evaluation>
The evaluation of such a protrusion prevention device 30 (device to prevent protrusion of existing PC steel bars) and a construction method using this protrusion prevention device 30 (construction method to prevent protrusion of existing PC steel bars) will be described with reference to Figure 13, along with the results of testing using test specimens along with reference weights (including wedges).
Note that the prior art is an intermediate fixing device described in JP 2018-017029 A that combines a sleeve with a wedge and is fastened with four bolts, and is used as the protrusion prevention device 30. Example 2 is the protrusion prevention device 30 shown in Figure 9(A), Example 3 is the protrusion prevention device 30 shown in Figure 9(B), Example 4 is the protrusion prevention device 30 shown in Figure 9(C), and Example 5 is the protrusion prevention device 30 shown in Figures 4 to 6.

図13(A)に示すように、先行技術(スリーブ2分割、締結ボルト4本、参考重量8.8kg)に対して、実施例2(スリーブ分割なし、締結ボルト2本、参考重量6.2kg)、実施例3(スリーブ分割なし、締結ボルト2本、参考重量6.1kg)、実施例4(スリーブ分割なし、締結ボルト2本、参考重量6.8kg)、実施例5(スリーブ2分割、締結ボルト2本、参考重量8.0kg)、と、部品点数の低減、重量の低減、締結作業工数の削減が認められ、施工性が向上した。 As shown in Figure 13 (A), compared to the prior art (two-piece sleeve, four fastening bolts, reference weight 8.8 kg), Example 2 (no split sleeve, two fastening bolts, reference weight 6.2 kg), Example 3 (no split sleeve, two fastening bolts, reference weight 6.1 kg), Example 4 (no split sleeve, two fastening bolts, reference weight 6.8 kg), and Example 5 (two-piece sleeve, two fastening bolts, reference weight 8.0 kg) showed a reduction in the number of parts, weight, and man-hours required for fastening, improving workability.

次に、性能確認試験結果(静的引張試験)の結果を図13(B)に示す。
試験概要としては、横型引張試験機に(PC鋼材の一例として)PC鋼棒32mm(B種2号)を配置し、一端をPC鋼棒で一般的に使用される定着ナット、他端を本発明に係る突出防止具で定着した状態で引張試験を実施する。試験時の最大荷重を記録して、PC鋼棒の規格最大引張荷重(949kN)に対する最大荷重の割合を示す定着効率を算出する。
Next, the results of the performance verification test (static tensile test) are shown in FIG.
The test outline is as follows: a 32 mm PC steel bar (B type No. 2) (as an example of PC steel material) is placed in a horizontal tensile testing machine, and a tensile test is performed with one end fixed with a fixing nut commonly used for PC steel bars and the other end fixed with the protrusion prevention device of the present invention. The maximum load during the test is recorded, and the fixing efficiency, which indicates the ratio of the maximum load to the standard maximum tensile load (949 kN) of the PC steel bar, is calculated.

このような試験の結果を図13(B)に示す。実施例2~実施例4においては、定着効率が100%以上となり、破断位置も本発明に係る突出防止具の位置ではなく定着ナットであったことより突出防止具(既設PC鋼棒破断時の定着具)として十分な性能を確認することができた。なお、実施例3については、実施例2と同形状・同ボルト径とすることで同様の性能が見込める。また、実施例5については、他の実施例に比べて定着効率(既設PC鋼棒破断時の突出防止効率に繋がる)は小さいものの、せん断キーKの破壊により最大荷重が決定しているためにおり、せん断キーKの断面形状等を見直すことで定着効率の上昇が見込める。 The results of such tests are shown in Figure 13 (B). In Examples 2 to 4, the anchoring efficiency was 100% or more, and the breakage position was the fixing nut and not the position of the protrusion prevention device of the present invention, so sufficient performance as a protrusion prevention device (anchoring device when an existing PC steel bar breaks) was confirmed. For Example 3, similar performance can be expected by using the same shape and bolt diameter as Example 2. Also, for Example 5, the anchoring efficiency (which leads to protrusion prevention efficiency when an existing PC steel bar breaks) is smaller than the other examples, but this is because the maximum load is determined by the destruction of the shear key K, and it is expected that the anchoring efficiency can be increased by reviewing the cross-sectional shape of the shear key K, etc.

次に、性能確認試験結果(衝撃試験)について、図13(C)に示す供試体を用いて試験した結果を図13(D)に示す。
試験概要としては、図13(C)に示すように、横型引張試験機にPC鋼棒26mm(B種1号)とPC鋼棒32mm(B種2号)とを接続した状態で設置して、PC鋼棒32mmに専用架台を介して既設PC鋼棒突出防止具(突出防止具30)を配置する。その状態で引張試験を開始し、荷重500kNの時にミニジャッキを用いて60kNの力でくさびを押込んだ後、引張試験を再開してPC鋼棒26mm(規格最大引張荷重574kN以上)を破断させる。
Next, the performance verification test results (impact test) were carried out using the test piece shown in FIG. 13(C), and the results are shown in FIG. 13(D).
As an outline of the test, as shown in Fig. 13(C), a 26 mm PC steel bar (B type No. 1) and a 32 mm PC steel bar (B type No. 2) are connected and placed in a horizontal tensile testing machine, and an existing PC steel bar protrusion prevention device (protrusion prevention device 30) is placed on the 32 mm PC steel bar via a dedicated stand. The tensile test is started in this state, and when the load is 500 kN, a wedge is pushed in with a force of 60 kN using a mini jack, and then the tensile test is resumed to break the 26 mm PC steel bar (standard maximum tensile load of 574 kN or more).

この試験結果を図13(D)に示す。
この図13(D)に示すように、先行技術に対して、本発明の実施の形態に係る突出防止具30である実施例2~実施例5はいずれも残存張力が低く抑えられており、既設PC鋼棒の破断時にその突出を効果的に防止することができることがわかる。より詳しくは、PC鋼棒の突出エネルギーが1.57kN・m以下の時に、残存張力/破断荷重:実施例2=20.9%、実施例3=24.3%、実施例4=24.2%、実施例5=2.02%であって、残存張力/破断荷重が100%未満であることはもちろんのこと、好ましくは半分(50%)以下、さらに好ましくは25%以下に低く抑えられており、既設PC鋼棒の破断時にその突出を効果的に、かつ、確実に、防止することができる。
The test results are shown in FIG.
As shown in Fig. 13(D), in comparison with the prior art, in all of the examples 2 to 5 which are the protrusion prevention devices 30 according to the embodiment of the present invention, the residual tension is kept low, and it can be seen that the protrusion of the existing PC steel bar when it breaks can be effectively prevented. More specifically, when the protrusion energy of the PC steel bar is 1.57 kNm or less, the residual tension/breaking load is: Example 2 = 20.9%, Example 3 = 24.3%, Example 4 = 24.2%, Example 5 = 2.02%, and the residual tension/breaking load is not only less than 100%, but is preferably kept low to less than half (50%), and more preferably to less than 25%, so that the protrusion of the existing PC steel bar when it breaks can be effectively and reliably prevented.

<床版およびウェブを模した供試体を用いた破断・突出実験>
以下において、本発明の実施の形態に係る突出防止具30によって、PC鋼棒突出の防止の実証や、突出防止具30を入れられない区間である上床版側、または、下床版側の突
出防止の実証するために、床版とウェブを模した供試体で破断・突出実験を行った結果を説明する。なお、以下において、突出防止具を緩衝定着具と記載する場合がある。
<Fracture and protrusion experiments using test specimens simulating decks and webs>
The following describes the results of fracture and protrusion experiments conducted on test specimens simulating a deck and web to demonstrate the prevention of PC steel bar protrusion by the protrusion prevention device 30 according to an embodiment of the present invention, and to demonstrate the prevention of protrusion on the upper deck side or the lower deck side, which are sections where the protrusion prevention device 30 cannot be inserted. Note that in the following, the protrusion prevention device may be referred to as a buffer fixing device.

<<破断・突出実験:概要>>
過去の検討では、PC鋼棒に設置した緩衝定着具によって、緩衝定着具から下床版区間で切断した場合に、上床版~緩衝定着具間に緊張力が残存すれば合格として扱って評価してきた。しかしながら、緩衝定着具~上床版区間内でPC鋼棒が切断した場合や緩衝定着具~下床版区間内でPC鋼棒が切断した場合を想定した試験ではないため、その場合に上床版や下床版がPC鋼棒の突出に対してどのように抵抗するか検討を行うこととした。具体的には、図2に示すA区間、B区間が破断した際の上床版あるいは下床版の性状を把握する。さらに、過去に行ったPC鋼棒の破断想定の時に合格判定としていた状況が、上床版を有する場合にどのような挙動を示すかの確認を行うため、図2に示すC区間が破断した際の上床版の破壊状況を評価した。
<< Overview of Breaking and Ejection Experiments >>
In past studies, when the PC steel rod is broken in the section from the buffer anchor to the lower deck, if tension remains between the upper deck and the buffer anchor, it is considered to pass the test. However, since the test did not assume the case where the PC steel rod is broken in the section from the buffer anchor to the upper deck or the section from the buffer anchor to the lower deck, it was decided to examine how the upper deck or the lower deck would resist the protrusion of the PC steel rod in such a case. Specifically, the properties of the upper deck or the lower deck when the A section or the B section shown in Figure 2 breaks are understood. Furthermore, in order to confirm how the situation that was judged to be pass when the PC steel rod is broken in the past, the destruction state of the upper deck when the C section shown in Figure 2 breaks is evaluated.

図14に試験装置全体の概要図を示す。供試体は上床版あるいは下床版とウェブで構成されるものとした。ウェブ内にはPC鋼棒を配置し、所定の緊張力を導入し、想定する箇所でPC鋼棒を切断できるように切断孔を有する形状とした。また、グラウトについては充填不足の状況を想定したため、グラウトの充填は行わないこととした。上床版あるいは下床版とウェブは分割して製作しており、PC鋼棒によって接続する構造を採用した。 Figure 14 shows an overview of the entire test equipment. The test specimen consisted of an upper or lower deck slab and a web. PC steel bars were placed within the web, and a cutting hole was provided so that the PC steel bars could be cut at the expected locations by introducing a specified tension. Furthermore, as a situation in which the grout was insufficiently filled was assumed, it was decided not to fill the grout. The upper or lower deck slab and the web were manufactured separately, and a structure was adopted in which they were connected by PC steel bars.

以下に、詳細な試験体の概要を示す。はじめに上床版水準の試験体概要を図15に示す。上床版は舗装が敷設されているため、舗装を有する上床版を作製した。上床版は厚さ500mmとし、その上に基層としてFB13を35mm厚さ、表層として高機能I型を40mm厚さとして舗装を施工した。上床版内には、PC鋼棒の定着具を設置しており、後打ちコンクリートを後埋めする形で再現した。後打ちコンクリートは切断時において強度が約46N/mm2となる普通コンクリートを使用した。なお、PC鋼棒のかぶりについては、安全側の評価となるよう上床版天端までPC鋼棒が位置するようにし、かぶり0mmとした。PC鋼棒へ導入した緊張力は、環境条件によって異なる。そのため、本試験ではPC鋼棒破断時期を建設後10年、外気温度を6℃(北海道)、ウェブ厚さ500mm、鋼棒配置間隔を1000mmと仮定し、プレストレスの減少量を道路橋示方書より算出し、PC鋼棒に導入する緊張力は583kN(上床版側)とした。定着具はせん断補強鋼棒の定着システムとして一般的にディビダーク工法が用いられ、その定着具はアンカーグロッケが一般的に採用されているため、それを採用した。PC鋼棒の切断位置について、上床版を想定した実験では支圧板から切断位置までの距離が1000mmあるいは2000mmとなる位置で切断を行った。切断方法は、ディスクサンダーによる切断とした。破断エネルギーは1000mmで1.05kN・m、2000mmで2.10kN・mである。 The detailed outline of the test specimen is shown below. First, the outline of the test specimen at the upper deck level is shown in Figure 15. Since the upper deck had pavement laid, the upper deck with pavement was prepared. The upper deck was 500 mm thick, and pavement was constructed on top of it with FB13 35 mm thick as the base layer and high-performance I-type 40 mm thick as the surface layer. Fixing devices for PC steel bars were installed in the upper deck, and the post-cast concrete was reproduced by filling it in. The post-cast concrete used was ordinary concrete with a strength of about 46 N/ mm2 at the time of cutting. Regarding the cover of the PC steel bars, the PC steel bars were positioned up to the top of the upper deck to be evaluated on the safe side, and the cover was set to 0 mm. The tension introduced into the PC steel bars differs depending on the environmental conditions. Therefore, in this test, the PC steel bar fracture time was assumed to be 10 years after construction, the outside air temperature was 6°C (Hokkaido), the web thickness was 500mm, and the steel bar spacing was 1000mm. The reduction in prestress was calculated from the specifications for road bridges, and the tension introduced to the PC steel bar was set to 583kN (upper deck side). The fixing device is generally used as a fixing system for shear reinforcement steel bars, and the anchor glock is generally used as the fixing device, so it was adopted. Regarding the cutting position of the PC steel bar, in the experiment assuming the upper deck, the cutting was performed at a position where the distance from the bearing plate to the cutting position was 1000mm or 2000mm. The cutting method was cutting with a disk sander. The fracture energy was 1.05kN・m at 1000mm and 2.10kN・m at 2000mm.

次に、下床版水準の試験体概要を図16に示す。下床版の場合、PC鋼棒の定着部はデットアンカー形式となるため、本試験においても定着体が埋め込みとなるようにした。下床版は厚さ500mmとした。下床版のコンクリート強度は46N/mm2とし、PC鋼棒のかぶりは、実施工を参考にかぶり50mmとした。PC鋼棒へ導入した緊張力は、上床版水準と同様に583kNとした。また、定着具についても上床版水準と同様とした。PC鋼棒の切断位置について、下床版を想定した実験では支圧板から切断位置までの距離が1000mmとなる位置で切断を行った。また、下床版の設置方向について、本来は下床版であるため、切断位置と比較して下方向となるべきであるが、今回は実験の都合上切断位置に対して上方向となるように設置・切断を行った。破断エネルギーは1.05kN・mである。 Next, the outline of the test specimen at the lower deck level is shown in Figure 16. In the case of the lower deck, the anchoring part of the PC steel bar is a dead anchor type, so the anchoring body was embedded in this test as well. The thickness of the lower deck was 500 mm. The concrete strength of the lower deck was 46 N/ mm2 , and the cover of the PC steel bar was 50 mm, referring to the actual construction. The tension introduced to the PC steel bar was 583 kN, the same as the upper deck level. The anchoring tool was also the same as the upper deck level. Regarding the cutting position of the PC steel bar, in the experiment assuming the lower deck, the cutting was performed at a position where the distance from the bearing plate to the cutting position was 1000 mm. In addition, regarding the installation direction of the lower deck, since it is originally the lower deck, it should be downward compared to the cutting position, but this time, it was installed and cut so that it was upward relative to the cutting position for the convenience of the experiment. The breaking energy is 1.05 kN・m.

次に、C区間で破断した場合に緩衝定着具を介して上床版の破壊形態がどのようになるのかを確認するために行った試験体の概要を図17に示す(緩衝定着具水準)。上床版の厚さ、舗装条件、PC鋼棒の設置条件、緊張力、後打ちコンクリートの条件等は上床版水準と同様とした。本水準では、上床版側に設置した緩衝定着具よりも下床版側においてPC鋼棒の切断を実施した。具体的に緩衝定着具は定着具から1000mm位置に設置し、箱抜き部の後埋め処理は行わなかった。切断位置は、定着具から8000mm位置とした
。今回試行した緩衝定着具は、過去の検討で試作した定着具を用いた。また、箱抜き内に緩衝定着具を設置して発生する隙間については、鋼板を詰めて設置することで、スリーブやウェッジが脱落することを防いだ。破断エネルギーは8.38kN・mである。
Next, an outline of the test specimen conducted to confirm the fracture mode of the upper deck through the buffer anchor in case of fracture in section C is shown in Figure 17 (buffer anchor level). The thickness of the upper deck, pavement conditions, installation conditions of the PC steel bar, tension, post-cast concrete conditions, etc. were the same as those of the upper deck level. In this level, the PC steel bar was cut on the lower deck side of the buffer anchor installed on the upper deck side. Specifically, the buffer anchor was installed at a position 1000 mm from the anchor, and post-filling of the box cutout part was not performed. The cutting position was set at a position 8000 mm from the anchor. The buffer anchor tried this time was a prototype anchor made in a past study. In addition, the gap generated by installing the buffer anchor in the box cutout was filled with steel plates to prevent the sleeve and wedge from falling off. The fracture energy was 8.38 kN・m.

<<突出確認実験:結果>>
・舗装有り-1m水準の結果(A区間)
舗装有り-1mについて、本水準の試験後の状況を説明する。メッシュは200mm間隔で示しているが、1m位置でPC鋼棒を切断した場合であっても、舗装を有する本供試体はPC鋼棒部で突出する様子は確認できなかった。また、舗装の残留変位は、最大変位が3mmで、その範囲は10cm程度であった(図18)。試験後に舗装部をはつり出し、後打ち部の様子を確認したところ、後打ち部が若干抜け出している状況であった。
・舗装有り-2m水準の結果(A区間)
舗装有り-2mについて、本水準の試験後の状況を説明する。メッシュは200mm間隔で示しているが、2m位置でPC鋼棒を切断した場合であっても、舗装を有する本供試体はPC鋼棒部で突出する様子は確認できなかった。また、舗装の残留変位は、最大変位が6mmで、その範囲は15cm程度であった(図19)。試験後に舗装部をはつり出し、後打ち部の様子を確認したところ、後打ち部が若干抜け出している状況であった。
<<Protrusion confirmation experiment: results>>
・Results for paved road - 1m level (Section A)
The condition after the test for this level is explained for the pavement-1m section. The mesh is shown at 200mm intervals, but even when the PC steel bar was cut at the 1m position, no protrusion of the PC steel bar was observed in the specimen with pavement. In addition, the maximum residual displacement of the pavement was 3mm, and the range was about 10cm (Figure 18). After the test, the pavement was pulled out and the condition of the post-cast section was checked, and it was found that the post-cast section had protruded slightly.
・Results for paved road - 2m level (Section A)
The condition after the test for this level is explained for the pavement-2m section. The mesh is shown at 200mm intervals, but even when the PC steel bar was cut at the 2m position, no protrusion of the PC steel bar was observed in the specimen with pavement. In addition, the maximum residual displacement of the pavement was 6mm, and the range was about 15cm (Figure 19). After the test, the pavement was pulled out and the condition of the post-cast section was checked, and it was found that the post-cast section had protruded slightly.

・舗装なし水準の結果(B区間)
舗装なし水準について、本水準の試験後の状況を図20に示す。メッシュは100mm間隔で示しているが、下床版から1m位置でPC鋼棒を切断した場合であっても、50mmのかぶりを有する本供試体はPC鋼棒部で突出することはなかった。変状を確認すると、コンクリート床版の天端において、ひび割れの発生を確認し、PC鋼材位置を中心に放射状に発生していた。ひび割れの幅は0.05mm以下であり、微細なひび割れであった。また、コンクリート床版の残留変位やコンクリートの浮き・剥離等は確認できなかった。
・緩衝定着具-8m水準の結果(C区間)
緩衝定着具-8mについて、本水準の試験後の状況を説明する。メッシュは200mm間隔で示しているが、上床版から8m位置でPC鋼棒を切断した場合であっても、緩衝定着具や舗装を有する本供試体はPC鋼棒が突出しなかった。また、舗装の残留変位は、最大変位が7mmで、その範囲は15cm程度であった(図21)。試験後に舗装部をはつり出し、後打ち部の様子を確認したところ、後打ち部が若干抜け出している状況であった。
・Results for unpaved road (section B)
Figure 20 shows the condition after the test for the unpaved level. The mesh is shown at 100 mm intervals, but even when the PC steel bar was cut 1 m from the lower deck, the PC steel bar of this specimen with a cover of 50 mm did not protrude. When the deformation was confirmed, cracks were confirmed at the top of the concrete deck, which were radially generated from the PC steel position. The crack width was 0.05 mm or less, and it was a fine crack. In addition, no residual displacement of the concrete deck or lifting or peeling of the concrete was confirmed.
・Buffer anchorage - 8m level results (Section C)
The following explains the condition after the test for this level of shock-absorbing anchorage -8m. The mesh is shown at 200mm intervals, but even when the PC steel bar was cut 8m from the upper deck, the PC steel bar did not protrude in this test specimen that had shock-absorbing anchorage and pavement. In addition, the residual displacement of the pavement was a maximum of 7mm, and the range was about 15cm (Figure 21). After the test, the pavement was pulled out and the condition of the post-cast portion was checked, and it was found that the post-cast portion had come out slightly.

・箱抜き箇所の観察
PC鋼棒を切断時の緩衝定着具の挙動を把握するため、箱抜き箇所を観察した。PC鋼棒破断前の時点では、緩衝定着具のスリーブとウェッジとは接している。次に、切断後の時点では、ウェッジと隙間を埋めるために設置していた支圧板に隙間が生じていた。これについて、動画により確認したところ、PC鋼棒の破断に伴って、ウェッジがスリーブに押し込まれ、その後PC鋼棒の反動で伸びる際にウェッジが同じく移動し、再度スリーブへ押し込まれる状況が何回か繰り返し行われ、最終的にウェッジがスリーブへ押し込まれた状態になった。過去の検討では、箱抜き内を後打ちした際には、残留する緊張力が大きくなることから、上記のような現象が起こりにくい可能性が示唆されるが、緩衝定着具によってPC鋼棒の破断時のエネルギーをウェッジとスリーブにより吸収しているものと推察される。
・Observation of the box removal point In order to understand the behavior of the shock absorber when the PC steel bar is cut, the box removal point was observed. Before the PC steel bar breaks, the sleeve and wedge of the shock absorber are in contact. Next, after the cut, a gap appears between the wedge and the support plate that was installed to fill the gap. When this was confirmed using a video, it was found that the wedge was pushed into the sleeve when the PC steel bar broke, and then the wedge moved in the same way as the PC steel bar stretched due to its reaction, and was pushed into the sleeve again several times, and finally the wedge was pushed into the sleeve. Past studies have suggested that the above phenomenon is less likely to occur when the inside of the box is post-struck because the residual tension is large, but it is presumed that the shock absorber absorbs the energy when the PC steel bar breaks by the wedge and sleeve.

・切断試験のまとめ
A区間(緩衝定着具~上床版間)でPC鋼棒が切断した場合を想定した供試体の破断実験から、上床版からの距離が1mあるいは2mの両方とも、PC鋼棒が突出することはなかった。また、上床版の上に敷設した舗装の変状は残留変位が6mm程度であり、損傷程度も軽微と判断できるものであった。したがって、緩衝定着具の設置は、上床版天端から2m以内に設置すれば、その区間でPC鋼棒が破断したとしても、舗装条件が同程度であればPC鋼棒が突出することがないと判断ができる。
Summary of the cutting test: In a fracture test of a specimen simulating the case where the PC steel bar broke in section A (between the buffer anchor and the upper deck), the PC steel bar did not protrude whether the distance from the upper deck was 1m or 2m. In addition, the deformation of the pavement laid on top of the upper deck was only about 6mm of residual displacement, and the degree of damage was judged to be minor. Therefore, if the buffer anchor is installed within 2m from the top of the upper deck, it can be judged that even if the PC steel bar breaks in that section, the PC steel bar will not protrude if the pavement conditions are the same.

B区間(緩衝定着具~下床版間)でPC鋼棒が切断した場合を想定した供試体の破断実
験から、下床版からの距離が1m以下の場合、PC鋼棒が突出することはなかった。また、下床版はひび割れが放射状に発生した程度で、コンクリートの浮きやはく落などは確認できなかったことから、損傷程度は軽微と判断できるものであった。したがって、緩衝定着具の設置は、下床版下端から1m以内に設置すれば、その区間でPC鋼棒が破断したとしても、かぶり条件や配筋条件が同程度であればPC鋼棒が突出することがないと判断できる。
A fracture test of a specimen simulating the case where the PC steel rod broke in section B (between the buffer anchor and the lower deck) showed that the PC steel rod did not protrude when the distance from the lower deck was 1m or less. In addition, the lower deck only showed radial cracks, and no floating or spalling of concrete was observed, so the damage was judged to be minor. Therefore, if the buffer anchor is installed within 1m from the bottom edge of the lower deck, it can be judged that even if the PC steel rod breaks in that section, the PC steel rod will not protrude if the cover conditions and reinforcement conditions are the same.

C区間でPC鋼棒が切断した場合を想定した供試体の破断実験から、上床版からの切断位置までの距離が8mでその間に緩衝定着具を有する場合、PC鋼棒が突出することはなかった。また、上床版の上に敷設した舗装の変状は残留変位が7mm程度であり、損傷程度も軽微と判断できるものであった。さらに、今回の実験では、緩衝定着具設置箇所の箱抜き部を後打ちしていなかった。そのため、後打ちを実施すれば、緩衝機能がより緩衝できるものと推察される。なお、緩衝定着具を上床版側と下床版側に2箇所設置した場合、緩衝定着具間の距離は7m以内であればPC鋼棒が突出することがないと判断できる。 A fracture experiment on a specimen simulating the case where a PC steel bar breaks in section C showed that if the distance from the upper deck to the break point was 8m and a buffer anchor was provided between them, the PC steel bar would not protrude. The deformation of the pavement laid on top of the upper deck had a residual displacement of about 7mm, and the damage level was judged to be minor. Furthermore, in this experiment, the box-out section where the buffer anchor was installed was not post-cast. Therefore, it is presumed that the buffer function would be further improved if post-casting was performed. Furthermore, if two buffer anchors are installed on the upper deck and lower deck, it can be determined that the PC steel bar will not protrude if the distance between the buffer anchors is within 7m.

以下に参考として、各試験時の破断エネルギーを図22に示す。
なお、今回開示された実施の形態はすべての点で例示であって制限的なものではないと考えられるべきである。本発明の範囲は上記した説明ではなくて特許請求の範囲によって示され、特許請求の範囲と均等の意味および範囲内でのすべての変更が含まれることが意図される。
For reference, the breaking energy during each test is shown in FIG.
It should be noted that the embodiments disclosed herein are illustrative and not restrictive in all respects. The scope of the present invention is defined by the claims, not the above description, and is intended to include all modifications within the meaning and scope of the claims.

たとえば、以下のような変更がその一例として挙げられる。
・既設PC鋼棒突出防止具(突出防止具30)は、既設PC鋼棒Bを把持するウェッジとそのウェッジを格納するスリーブとで構成され、ウェッジとスリーブとは金属製または樹脂製であることが好ましい。
・ウェッジとスリーブとは、既設PC鋼棒に取り付け可能な構造であればよく、上述した構造は一例に過ぎない。
・ウェッジは2分割以上であればよく、スリーブは半割部品をボルトで締結できるものであってもPC鋼棒が通るスリット(切欠き部)を有するものであっても、その形状が円柱形状、中空円筒形状、中実円筒形状、角柱形状、多角柱形状であっても構わない。
For example, the following changes are included:
- The device to prevent the existing PC steel rod from protruding (protruding prevention device 30) is composed of a wedge that grips the existing PC steel rod B and a sleeve that stores the wedge, and it is preferable that the wedge and sleeve are made of metal or resin.
- The wedge and sleeve may have any structure as long as they can be attached to the existing PC steel bar, and the structure described above is merely one example.
The wedge may be divided into two or more parts, and the sleeve may be a half-part that can be fastened with a bolt, or may have a slit (cutout) through which the PC steel rod can pass, and its shape may be cylindrical, hollow cylindrical, solid cylindrical, rectangular prism, or polygonal prism.

・スリーブはPC鋼棒の長手方向(材軸)に対してテーパーは1方向(突出防止具30)、または、相対する向きに2方向(突出防止具32)有していても構わない。
・スリーブおよびウェッジのテーパー角度は任意であるが、5度~15度程度が好ましい。
・スリーブおよびウェッジのPC鋼棒の長手方向の長さは任意であるが、20mm~200mm程度が好ましい。
・スリーブおよびウェッジに用いられる材料は金属であっても樹脂であっても化学繊維であっても構わない。
The sleeve may have a taper in one direction (protrusion prevention device 30) or in two opposing directions (protrusion prevention device 32) relative to the longitudinal direction (material axis) of the PC steel bar.
The taper angle of the sleeve and wedge is arbitrary, but is preferably about 5 to 15 degrees.
- The longitudinal length of the PC steel rods of the sleeve and wedge is arbitrary, but a length of approximately 20 mm to 200 mm is preferable.
The material used for the sleeve and wedge may be metal, resin, or synthetic fiber.

本発明は、プレストレストコンクリート部材に圧縮力を付与している既設のPC鋼棒が破断した場合のPC鋼棒突出防止対策に好ましく、既設のPC鋼棒が破断した場合に発生する大きな衝撃力によりコンクリート部材の外にPC鋼棒が突出することを防止することができる点で特に好ましい。 The present invention is preferable as a measure to prevent the protrusion of PC steel bars when existing PC steel bars that apply compressive force to prestressed concrete members break, and is particularly preferable in that it can prevent the PC steel bars from protruding outside the concrete member due to the large impact force that occurs when existing PC steel bars break.

10 PC箱桁橋
100 スリーブ
110、120 スリーブ片
140 ウェッジ
142、144、146 ウェッジ片
200 スリーブ
210、220 スリーブ片
240 ウェッジ
242、244 ウェッジ片
S スリーブ
W ウェッジ
B 既設PC鋼棒
10 PC box girder bridge 100 Sleeve 110, 120 Sleeve piece 140 Wedge 142, 144, 146 Wedge piece 200 Sleeve 210, 220 Sleeve piece 240 Wedge 242, 244 Wedge piece S Sleeve W Wedge B Existing PC steel bar

Claims (10)

既設PC鋼棒の長手方向に垂直な面から見て2以上のウェッジ片に分割されたウェッジと、前記ウェッジに組み合わせられるテーパーを備えるとともに前記既設PC鋼棒に装着可能な構造を備えたスリーブとを含む突出防止具を用いて、既設のプレストレストコンクリート部材に圧縮力を付与している既設PC鋼棒が破断した場合の衝撃力を受け止めて前記コンクリート部材の外部に前記既設PC鋼棒が突出することを防止する工法であって、
前記既設PC鋼棒が突出することが予測される前記コンクリート部材の表面から前記既設PC鋼棒に沿って0.25m~2.0mの位置のコンクリートを斫って、前記既設PC鋼棒を露出させる露出ステップと、
前記ウェッジのテーパーが狭まる方向が前記表面への方向になるように、分割された2以上のウェッジ片を前記露出した既設PC鋼棒に装着するウェッジ装着ステップと、
前記スリーブのテーパーが狭まる方向が前記表面への方向になるように、前記既設PC鋼棒に装着可能な構造を備えたスリーブを前記露出した既設PC鋼棒に装着するスリーブ装着ステップと、
前記スリーブを前記ウェッジに組み合わせられるスリーブとして機能させるスリーブ機能化ステップと、
前記分割された状態で前記露出した前記既設PC鋼棒に装着された2以上のウェッジ片を、前記ウェッジのテーパーの向きと前記スリーブのテーパーの向きとを一致させて、スリーブとして機能させた前記スリーブに挿入する挿入ステップとを含む、既設PC鋼棒突出防止工法。
A construction method for preventing the existing PC steel rod from protruding outside the concrete member by receiving an impact force when the existing PC steel rod, which applies a compressive force to the existing prestressed concrete member, breaks, using an anti-protrusion device including a wedge divided into two or more wedge pieces when viewed from a plane perpendicular to the longitudinal direction of the existing PC steel rod, and a sleeve having a taper that can be combined with the wedge and a structure that can be attached to the existing PC steel rod, the method comprising:
An exposure step of exposing the existing PC steel rod by chipping off the concrete at a position of 0.25 m to 2.0 m along the existing PC steel rod from the surface of the concrete member where the existing PC steel rod is expected to protrude,
A wedge mounting step of mounting two or more divided wedge pieces to the exposed existing PC steel bar so that the taper of the wedge narrows in the direction toward the surface;
A sleeve mounting step of mounting a sleeve having a structure that can be mounted on the existing PC steel bar to the exposed existing PC steel bar so that the taper of the sleeve narrows in a direction toward the surface;
a sleeve functionalization step of making the sleeve function as a sleeve that can be combined with the wedge;
and an insertion step of inserting two or more wedge pieces attached to the exposed existing PC steel bar in the divided state into the sleeve functioning as a sleeve by aligning the taper direction of the wedge with the taper direction of the sleeve.
前記既設PC鋼棒に沿った長さであって、前記既設PC鋼棒が突出することが予測される前記コンクリート部材の表面から、前記既設PC鋼棒が突出することが予測される前記コンクリート部材の他の表面までの長さLが2.5m~3.5mを超える場合において、
前記露出ステップは、前記表面から0.25m~2.0mの第一位置のコンクリートおよび前記他の表面から0.25m~2.0mの第二位置のコンクリートを2箇所斫って、前記2箇所において前記既設PC鋼棒を露出させるステップを含み、
前記第一位置および前記第二位置は、前記表面、前記第一位置、前記第二位置、前記他の表面の順であって、
前記ウェッジ装着ステップは、斫り1箇所に対して1個のウェッジを用いて、前記ウェッジのテーパーが狭まる方向が近い方の前記表面への方向になるように、分割された2以上のウェッジ片を前記露出した前記既設PC鋼棒に装着するステップを含み、
前記スリーブ装着ステップは、斫り1箇所に対して1個のスリーブを用いて、前記スリーブのテーパーが狭まる方向が近い方の前記表面への方向になるように、前記既設PC鋼棒に装着可能な構造を備えたスリーブを前記露出した前記既設PC鋼棒に装着するステップを含む、請求項1に記載の既設PC鋼棒突出防止工法。
When the length L along the existing PC steel rod, from the surface of the concrete member from which the existing PC steel rod is predicted to protrude to another surface of the concrete member from which the existing PC steel rod is predicted to protrude, exceeds 2.5 m to 3.5 m,
The exposing step includes a step of chipping off two portions of concrete at a first position 0.25 m to 2.0 m from the surface and a second position 0.25 m to 2.0 m from the other surface to expose the existing PC steel rod at the two positions;
The first position and the second position are in the order of the surface, the first position, the second position, and the other surface,
The wedge mounting step includes a step of mounting two or more divided wedge pieces to the exposed existing PC steel bar using one wedge for each chipping location such that the taper of the wedge narrows in a direction toward the closer surface,
The sleeve attachment step includes a step of attaching a sleeve having a structure that can be attached to the existing PC steel bar to the exposed existing PC steel bar, using one sleeve for each chipping location, so that the taper of the sleeve narrows in the direction toward the closer surface. A method for preventing protrusion of an existing PC steel bar as described in claim 1.
前記既設PC鋼棒に沿った長さであって、前記既設PC鋼棒が突出することが予測される前記コンクリート部材の表面から、前記既設PC鋼棒が突出することが予測される前記コンクリート部材の他の表面までの長さLが2.5m~3.5mを超えない場合において、
前記露出ステップは、前記表面および前記他の表面のいずれかから0.25m~2.0mの位置のコンクリートを1箇所斫って、前記1箇所において前記既設PC鋼棒を露出させるステップを含み、
前記ウェッジ装着ステップは、斫り1箇所に対して2個のウェッジを用いて、前記2個のウェッジのテーパーが狭まる方向が互いに対面する方向になるように、分割された2以上のウェッジ片を前記露出した前記既設PC鋼棒に装着するステップを含み、
前記スリーブ装着ステップは、斫り1箇所に対して2個のスリーブを用いて、前記2個のスリーブのテーパーが狭まる方向が互いに対面する方向になるように、前記既設PC鋼棒に装着可能な構造を備えたスリーブを前記露出した前記既設PC鋼棒に装着するステップを含む、請求項1に記載の既設PC鋼棒突出防止工法。
The length along the existing PC steel rod, from the surface of the concrete member from which the existing PC steel rod is predicted to protrude to the other surface of the concrete member from which the existing PC steel rod is predicted to protrude, is not more than 2.5 m to 3.5 m.
The exposing step includes a step of chipping off one portion of concrete at a position 0.25 m to 2.0 m from either the surface or the other surface to expose the existing PC steel bar at the one portion,
The wedge mounting step includes a step of mounting two or more divided wedge pieces to the exposed existing PC steel bar using two wedges for one chipping location such that the tapers of the two wedges narrow in a direction facing each other,
The sleeve attachment step includes a step of attaching a sleeve having a structure that can be attached to the existing PC steel rod to the exposed existing PC steel rod using two sleeves for one chipping location so that the taper directions of the two sleeves narrowing are facing each other, the method for preventing protrusion of existing PC steel rods as described in claim 1.
前記挿入ステップは、前記ウェッジを前記スリーブに、ジャッキを用いることなく作業者の手作業により挿入するステップを含む、請求項1~請求項3のいずれかに記載の既設PC鋼棒突出防止工法。 The method for preventing protrusion of existing PC steel bars according to any one of claims 1 to 3, wherein the insertion step includes a step of manually inserting the wedge into the sleeve by a worker without using a jack. 請求項1~請求項4のいずれかに記載の既設PC鋼棒突出防止工法に用いられる突出防止具であって、
前記既設PC鋼棒の長手方向に垂直な面から見て2以上のウェッジ片に分割されたウェッジと、
前記ウェッジに組み合わせられるテーパーを備える内筒側のスリーブ片と前記内筒側のスリーブ片の外側に設けられる外筒側のスリーブ片とに分割されるスリーブと、を含み、
前記内筒側のスリーブ片および前記外筒側のスリーブ片について、前記既設PC鋼棒の長手方向に垂直な面から見て前記既設PC鋼棒が挿入可能な切欠き部を少なくとも内筒側スリーブ片が備え、
前記内筒側のスリーブ片と前記外筒側のスリーブ片とが接合されることによりスリーブとして一体化されて前記ウェッジに組み合わせられるスリーブとして機能し、
前記内筒側のスリーブ片の外周面に設けられたキー溝と前記外筒側のスリーブ片の内周面に設けられたキー溝とに跨ってキーが設けられて前記内筒側のスリーブ片と前記外筒側のスリーブ片とが接合されることによりスリーブとして一体化されることを特徴とする、既設PC鋼棒突出防止具。
A protrusion prevention device used in the existing PC steel bar protrusion prevention method according to any one of claims 1 to 4,
A wedge divided into two or more wedge pieces when viewed from a plane perpendicular to the longitudinal direction of the existing PC steel bar;
a sleeve divided into an inner sleeve piece having a taper that is combined with the wedge and an outer sleeve piece provided on the outside of the inner sleeve piece;
With respect to the sleeve piece on the inner tube side and the sleeve piece on the outer tube side, at least the inner tube side sleeve piece is provided with a notch portion into which the existing PC steel rod can be inserted when viewed from a plane perpendicular to the longitudinal direction of the existing PC steel rod,
The sleeve piece on the inner cylinder side and the sleeve piece on the outer cylinder side are joined together to form an integrated sleeve that functions as a sleeve to be combined with the wedge ,
This device prevents the protrusion of existing PC steel bars, characterized in that a key is provided across a key groove provided on the outer peripheral surface of the sleeve piece on the inner tube side and a key groove provided on the inner peripheral surface of the sleeve piece on the outer tube side, and the sleeve piece on the inner tube side and the sleeve piece on the outer tube side are joined to form an integrated sleeve .
請求項1~請求項4のいずれかに記載の既設PC鋼棒突出防止工法に用いられる突出防止具であって、
前記既設PC鋼棒の長手方向に垂直な面から見て2以上のウェッジ片に分割されたウェッジと、
前記ウェッジに組み合わせられるテーパーを備えるとともに、前記既設PC鋼棒の長手方向に垂直な面から見て前記既設PC鋼棒が挿入可能なスリット部を備えるスリーブと、を含み、
前記スリット部において互いに対向する壁面が連結部材を用いて前記スリット部を閉塞することなく開放した状態で連結され、前記垂直な面から前記スリット部を見た場合に、前記スリット部内で前記壁面どうしが前記連結部材により連結されるとともに互いの前記壁面どうしが対向する前記スリット部内に前記連結部材が存在して前記既設PC鋼棒に対して前記スリット部の間隔が規制されて、前記互いに対向する2つの壁面と連結部材とが一体化して前記ウェッジに組み合わせられるスリーブとして機能することを特徴とする、既設PC鋼棒突出防止具。
A protrusion prevention device used in the existing PC steel bar protrusion prevention method according to any one of claims 1 to 4,
A wedge divided into two or more wedge pieces when viewed from a plane perpendicular to the longitudinal direction of the existing PC steel bar;
A sleeve having a taper that can be combined with the wedge and a slit portion into which the existing PC steel rod can be inserted when viewed from a plane perpendicular to the longitudinal direction of the existing PC steel rod,
This device prevents the protrusion of existing PC steel bars, characterized in that opposing wall surfaces in the slit section are connected in an open state without blocking the slit section using a connecting member, and when the slit section is viewed from the vertical plane , the wall surfaces within the slit section are connected by the connecting member and the connecting member is present within the slit section where the wall surfaces face each other, regulating the spacing of the slit section with respect to the existing PC steel bar, and the two opposing wall surfaces and the connecting member are integrated to function as a sleeve that can be combined with the wedge.
前記連結部材は、前記互いに対向する壁面の少なくとも一方の壁面に設けられた雌ねじ穴と、他方の壁面に設けられた穴を通された雄ねじとを含み、
前記雌ねじ穴に前記雄ねじが螺合されて前記壁面が連結されることにより前記垂直な面から見た前記スリット部の間隔が規制されることを特徴とする、請求項に記載の既設PC鋼棒突出防止具。
The connecting member includes a female screw hole provided in at least one of the opposing wall surfaces and a male screw passing through a hole provided in the other wall surface,
The device for preventing protrusion of an existing PC steel bar as described in claim 6 , characterized in that the spacing of the slit portion as viewed from the vertical plane is regulated by screwing the male screw into the female threaded hole to connect the wall surfaces.
前記連結部材は、前記互いに対向する壁面の少なくとも一方の壁面に設けられた雌ねじ穴と、他方の壁面に設けられた穴を通された雄ねじとを含み、
前記雌ねじ穴に前記雄ねじが螺合されて前記壁面が連結されることにより前記垂直な面から見た前記スリット部の間隔が規制され、
前記雄ねじの径を変更することにより、前記垂直な面から見た前記スリット部の間隔を規制した際に前記連結部材の剛性が変更されて前記PC鋼棒が破断した際の緩衝能力を調整できることを特徴とする、請求項に記載の既設PC鋼棒突出防止具。
The connecting member includes a female screw hole provided in at least one of the opposing wall surfaces and a male screw passing through a hole provided in the other wall surface,
The male screw is screwed into the female screw hole to connect the wall surfaces, thereby restricting the spacing of the slit portions as viewed from the vertical plane,
The device for preventing protrusion of an existing PC steel rod as described in claim 6, characterized in that by changing the diameter of the male screw, the rigidity of the connecting member is changed when the spacing of the slit portion as viewed from the vertical plane is regulated, thereby adjusting the cushioning capacity when the PC steel rod breaks.
前記スリーブにおけるテーパーが広がる方向の端面であって前記既設PC鋼棒の長手方向に垂直な端面にて前記スリーブに接合される、平板状のプレートをさらに含み、
前記プレートは、前記既設PC鋼棒の長手方向に垂直な面から見て前記既設PC鋼棒が挿入可能、かつ、前記ウェッジにおけるテーパーが広がる方向の端部に設けられたウェッジ突起部が突出可能な切欠き部を備え、
前記プレートが前記スリーブの端面に接合されることにより、前記ウェッジが前記スリーブの所定の位置に位置決めされるとともに、前記ウェッジ突起部が前記プレートの切欠部から突出することを特徴とする、請求項5~請求項のいずれかに記載の既設PC鋼棒突出防止具。
The sleeve further includes a flat plate joined to the sleeve at an end surface in the direction in which the taper widens and perpendicular to the longitudinal direction of the existing PC steel rod,
The plate has a notch portion into which the existing PC steel rod can be inserted when viewed from a plane perpendicular to the longitudinal direction of the existing PC steel rod, and into which a wedge protrusion provided at an end of the wedge in a direction in which the taper widens can protrude,
An existing PC steel bar protrusion prevention device as described in any of claims 5 to 8, characterized in that the plate is joined to the end face of the sleeve, thereby positioning the wedge at a predetermined position on the sleeve and the wedge protrusion portion protruding from the cutout portion of the plate.
3次元形状のワイヤークリップをさらに含み、
前記ワイヤークリップは、
前記スリーブにおける、前記既設PC鋼棒の長手方向の長さに対応する直線部と、
前記直線部よりも前記スリーブにおけるテーパーが広がる側に、前記ウェッジにおけるテーパーが広がる方向の端部の外周上に設けられたウェッジ溝部に嵌入される円弧部と、
前記直線部よりも前記スリーブにおけるテーパーが狭まる側に、前記スリーブにおけるテーパーが狭まる方向の端面であって前記既設PC鋼棒の長手方向に垂直な端面に設けられたスリーブ穴部に嵌入される嵌入片と、を少なくとも備え、
前記ワイヤークリップの円弧部が前記ウェッジ溝部に嵌入されるとともに、前記ワイヤークリップの嵌入片が前記スリーブ穴部に嵌入されることにより、前記ウェッジが前記スリーブの所定の位置に位置決めされるとともに、前記ワイヤークリップの直線部が前記スリーブの外周に沿って配置されることを特徴とする、請求項5~請求項のいずれかに記載の既設PC鋼棒突出防止具。
Further comprising a three-dimensional shaped wire clip;
The wire clip is
A straight portion in the sleeve corresponding to the longitudinal length of the existing PC steel rod;
a wedge groove provided on an outer periphery of an end of the wedge in a direction in which the taper of the wedge widens, the wedge being fitted into the wedge groove on a side of the sleeve where the taper of the wedge widens from the straight portion;
The sleeve has a hole provided on an end surface perpendicular to the longitudinal direction of the existing PC steel bar, the end surface being in the direction in which the taper of the sleeve narrows, and the sleeve hole provided on the end surface being perpendicular to the longitudinal direction of the existing PC steel bar, the end surface being in the direction in which the taper of the sleeve narrows, the end surface being perpendicular to the longitudinal direction of the existing PC steel bar, and the sleeve has a hole provided on the end surface being perpendicular to the longitudinal direction of the existing PC steel bar.
An existing PC steel bar protrusion prevention device as described in any of claims 5 to 8, characterized in that the arc portion of the wire clip is fitted into the wedge groove portion and the fitting piece of the wire clip is fitted into the sleeve hole portion, thereby positioning the wedge at a predetermined position in the sleeve and positioning the straight portion of the wire clip along the outer periphery of the sleeve.
JP2021055809A 2021-03-29 2021-03-29 Method for preventing the protrusion of existing PC steel rods and a device for preventing the protrusion of existing PC steel rods Active JP7524121B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021055809A JP7524121B2 (en) 2021-03-29 2021-03-29 Method for preventing the protrusion of existing PC steel rods and a device for preventing the protrusion of existing PC steel rods

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021055809A JP7524121B2 (en) 2021-03-29 2021-03-29 Method for preventing the protrusion of existing PC steel rods and a device for preventing the protrusion of existing PC steel rods

Publications (2)

Publication Number Publication Date
JP2022152874A JP2022152874A (en) 2022-10-12
JP7524121B2 true JP7524121B2 (en) 2024-07-29

Family

ID=83556275

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021055809A Active JP7524121B2 (en) 2021-03-29 2021-03-29 Method for preventing the protrusion of existing PC steel rods and a device for preventing the protrusion of existing PC steel rods

Country Status (1)

Country Link
JP (1) JP7524121B2 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200344958Y1 (en) 2003-11-17 2004-03-11 서병운 Tension member removable anchoring apparatus with wedge spring and wedge-cone spring
JP2018127866A (en) 2017-02-10 2018-08-16 オリエンタル白石株式会社 Anchorage replacement method of pc structure

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4192215A (en) * 1975-05-05 1980-03-11 Hymans Nelson J Tensioning apparatus and method of applying tension to a tendon
JPS56121808U (en) * 1980-02-19 1981-09-17
JPS56151426U (en) * 1980-04-15 1981-11-13
JPS5862240A (en) * 1981-10-09 1983-04-13 住友電気工業株式会社 Steel fixing method for prestressed structures

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200344958Y1 (en) 2003-11-17 2004-03-11 서병운 Tension member removable anchoring apparatus with wedge spring and wedge-cone spring
JP2018127866A (en) 2017-02-10 2018-08-16 オリエンタル白石株式会社 Anchorage replacement method of pc structure

Also Published As

Publication number Publication date
JP2022152874A (en) 2022-10-12

Similar Documents

Publication Publication Date Title
Zhang et al. Experimental study on the behavior of precast segmental column with domed shear key and unbonded Post-Tensioning tendon under impact loading
US8215068B2 (en) Method and apparatus for increasing the energy dissipation of structural elements
Guan et al. Concept and behaviour of all-steel miniature bar-typed structural fuses with torsional effect
JP6532906B2 (en) Installation structure of precast wall column
Gabauer et al. Pendulum testing as a means of assessing the crash performance of longitudinal barrier with minor damage
JP7524121B2 (en) Method for preventing the protrusion of existing PC steel rods and a device for preventing the protrusion of existing PC steel rods
JP2020100976A (en) Shear reinforcement construction method for pc box girder bridge
EP0824167A1 (en) Method of repairing and reinforcing prestressed concrete structure
US20060265981A1 (en) Wire bolt
JP2021031864A (en) Slab reinforcement method of side fastening pc bridge
JP6444912B2 (en) Steel structure reinforcement and repair structure and method
JP4719625B2 (en) Installation method of bridge fall prevention device
JP2006312822A (en) Tensile anchoring structure
Sennah et al. Vehicle crash testing on a GFRP-reinforced PL-3 concrete bridge barrier
Vonk et al. Latest developments in replacing external post-tensioning tendons
JP7289245B2 (en) Anchor installation structure
JP7186670B2 (en) Concrete floor slab repair method
KR102209681B1 (en) An expansion joint
JP7611750B2 (en) Intermediate fixing device for newly installed or existing PC steel members and intermediate fixing method using the same
JPH1060824A (en) Bridge-drop prevention device of concrete bridge and construction method thereof
Gangi Analytical Modeling of the Repair Impact-Damaged Prestressed Concrete Bridge Girders
JP2006112189A (en) Tensional material anchoring tool
JPH10159021A (en) Proof-stress reinforcing structure of bridge and bridge-fall preventive device and fixture for bridge-fall preventive device thereof
Moga et al. Efficient connection of cross girders of arch steel road bridges
JPH086289B2 (en) Temporary tensioning method for bridge slab repair work

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20230601

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240305

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240416

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240528

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20240709

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20240717

R150 Certificate of patent or registration of utility model

Ref document number: 7524121

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150