JP7542454B2 - Construction performance data management system - Google Patents
[go: Go Back, main page]

JP7542454B2 - Construction performance data management system - Google Patents

Construction performance data management system Download PDF

Info

Publication number
JP7542454B2
JP7542454B2 JP2021022228A JP2021022228A JP7542454B2 JP 7542454 B2 JP7542454 B2 JP 7542454B2 JP 2021022228 A JP2021022228 A JP 2021022228A JP 2021022228 A JP2021022228 A JP 2021022228A JP 7542454 B2 JP7542454 B2 JP 7542454B2
Authority
JP
Japan
Prior art keywords
construction
data
risk
disaster
management system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021022228A
Other languages
Japanese (ja)
Other versions
JP2022124532A (en
Inventor
廣海 丹羽
春人 桑名
徹 安藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujita Corp
Original Assignee
Fujita Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujita Corp filed Critical Fujita Corp
Priority to JP2021022228A priority Critical patent/JP7542454B2/en
Publication of JP2022124532A publication Critical patent/JP2022124532A/en
Application granted granted Critical
Publication of JP7542454B2 publication Critical patent/JP7542454B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A50/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE in human health protection, e.g. against extreme weather

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、建設物の災害対策に適用可能な施工実績データ管理システムに関する。 The present invention relates to a construction performance data management system that can be applied to disaster prevention measures for buildings.

従来、災害対策に適用されるシステムの先行技術として、土砂災害システムや砂防情報システム、震度情報システム等の所定地域内に設置された各種の防災システムを統合し、各防災システムで取り扱う情報をリアルタイム且つ一括で収集しながら、運用と管理を行う統合防災システムが知られている(例えば、特許文献1参照。)。この先行技術は、所定地域内に設置した複数の計測手段から収集した水位や雨量、震度等の計測情報をGIS情報と統合して情報出力する。出力した統合情報は、災害予防や避難勧告の発出等の防災計画を動的に立案する際に利用したり、将来のシステム環境整備に反映させたりすることができる。 Conventionally, as a prior art for systems applied to disaster countermeasures, an integrated disaster prevention system is known that integrates various disaster prevention systems installed within a given area, such as a landslide disaster system, a sabo information system, and a seismic intensity information system, and operates and manages the systems while collecting information handled by each disaster prevention system in real time and all at once (see, for example, Patent Document 1). This prior art integrates measurement information such as water levels, rainfall, and seismic intensity collected from multiple measuring means installed within a given area with GIS information and outputs the information. The output integrated information can be used when dynamically formulating disaster prevention plans such as disaster prevention and issuance of evacuation advisories, and can be reflected in future system environment development.

特開2006-268360号公報JP 2006-268360 A

上述した先行技術は、既存施設がある地域内で防災計画を立案したり、今後のシステム環境を整備したりする用途にはある程度利用できると考えられる。 The above-mentioned prior art is believed to be of some use in creating disaster prevention plans in areas where existing facilities are located and in developing future system environments.

しかしながら、新たな土地での建設を計画する場合、建設予定施設の事業継続計画(BCP)や災害対策工を検討するためには、その都度、建設計画地の土地情報に基づく様々な災害リスク情報を一から個別に参照しなければならないため、既存の防災システムでは役に立たない。 However, when planning construction on new land, in order to consider a business continuity plan (BCP) or disaster prevention measures for the proposed facility, various disaster risk information based on land information for the proposed construction site must be individually referenced from scratch each time, making existing disaster prevention systems useless.

例えば、建築物等の施設を新たに計画する際には、土地特有のリスク条件が建設候補地それぞれについて異なるため、その都度、ハザードマップ等を参照して災害リスクを把握したり、近隣のボーリングデータベースを参照して地盤条件を把握し、必要な災害対策工や基礎の形式を検討したりする必要がある。特に、建設費の概算見積もりを行う上では、このような細かいプロセスが不可欠である。また、そうやって施設が建設された後は、自然災害等により被災した際の施設の点検結果や補修等の記録は、当該施設に対しては活用されてきたものの、同様の条件で被災が想定される他の施設に対してシステマチックに活用できるものではなかった。 For example, when planning a new building or other facility, the risk conditions specific to each site are different, so it is necessary to refer to hazard maps and other documents to understand disaster risks, refer to a nearby boring database to understand ground conditions, and consider the necessary disaster prevention works and foundation type. This detailed process is particularly essential when making rough estimates of construction costs. Furthermore, after a facility is constructed in this way, the inspection results and repair records of the facility when it is damaged by a natural disaster, etc., are used for that facility, but they cannot be used systematically for other facilities that are expected to be damaged under similar conditions.

そこで本発明は、建設計画に際して災害対策に適用可能なシステムの提供を目的とする。 The present invention aims to provide a system that can be applied to disaster prevention measures during construction planning.

本発明は、施工実績データ管理システムを提供する。このシステムは、以下の第1~第3システムの構成をとる。 The present invention provides a construction performance data management system. This system has the following first to third system configurations.

〔第1システム〕
第1システムは、建設計画地から概算見積に必要な情報を得やすくするものである。本システムは、例えば建設事業者が保有する施工実績データを蓄積した施工実績データベースを有する。施工実績データは、少なくとも建設物の所在地及び施工内容を含むものであり、施工内容には、災害リスクに対して建設物に施された対策工や、工事費用等の情報を含むことができる。また本システムは、ハザードマップ等を含むGISデータと施工実績データベースとを関連付けて参照可能とする機能を有する。この関連付けは、例えば施工実績データベース上の所在地や対策工が対応する災害リスク等のデータをハザードマップ等のGISデータと連係させて利用できることを意味する。
[First System]
The first system makes it easy to obtain information necessary for rough estimates from a planned construction site. This system has a construction record database that accumulates construction record data held by, for example, construction companies. The construction record data includes at least the location and construction details of the building, and the construction details can include information such as countermeasures taken on the building against disaster risks and construction costs. This system also has a function that enables GIS data, including hazard maps, etc., to be linked with the construction record database for reference. This linking means that data such as the disaster risks corresponding to the locations and countermeasures in the construction record database can be used in conjunction with GIS data such as hazard maps.

そして第1システムは、これから建設を予定する建設計画地を取得すると、その建設計画地に関連付けられた災害リスクをハザードマップ等のGISデータから抽出し、その抽出した災害リスクに対して施された対策工を施工内容に含む施工実績データをデータベースから抽出することができる。そのようにして抽出した施工実績データを出力することで、これから建設を計画する土地に対して必要な対策工としてどのようなものがあるか、対策工費がどの程度必要になるかといった概算見積もりに有用な情報を容易に得ることができ、建設計画に必要なトータルコストをイメージしやすくなる。 When the first system acquires the planned construction site, it can extract disaster risks associated with the planned construction site from GIS data such as hazard maps, and extract construction performance data from the database that includes countermeasures taken against the extracted disaster risks. By outputting the construction performance data extracted in this way, it is possible to easily obtain information that is useful for rough estimates such as what countermeasures are necessary for the land where construction is planned, and how much the countermeasures will cost, making it easier to visualize the total costs required for the construction plan.

第1システムによれば、例えば施設用途、規模(階高、延べ床面積等)、想定されるハザード条件(想定浸水深、土砂災害の種別、想定最大震度等)、基礎形式(杭長等)、用途地域区分等の条件から、複数の条件が一致する過去の施工実績を自動的に抽出し、見積や設計情報を表示することができる。また、想定されるハザード情報から、実際に同様の災害で被災した施設の点検結果や補修記録が施工実績データベースから自動的に抽出され、計画案として提示することもできる。 According to the first system, past construction records that match multiple conditions, such as facility use, scale (floor height, total floor area, etc.), expected hazard conditions (expected flood depth, type of landslide, expected maximum seismic intensity, etc.), foundation type (pile length, etc.), and zoning, can be automatically extracted, and estimates and design information can be displayed. In addition, inspection results and repair records of facilities that have actually been affected by a similar disaster can be automatically extracted from a construction record database based on the expected hazard information, and presented as a proposed plan.

〔第2システム〕
第2システムは、特定の災害リスク(想定浸水深、想定震度、液状化危険度等)から概算見積もりに必要な情報を得やすくするものである。第2システムもまた、第1システムと同様の施工実績データベースを備える。また、第2システムは、ハザードマップ等を含むGISデータとの連係を可能とする機能を有する。第2システムの場合、これから建設を予定する建設物がどのような災害リスクに対策を要するかの情報を要対策リスクとして取得する。そして、対策を要する災害リスクがハザードマップ等のGISデータ上で関連付けられた土地にて施された対策工を施工内容に含む施工実績データをデータベースから抽出する。そのようにして抽出した施工実績データを結果出力することで、これから建設を計画する建設物が対策を要する土地の災害リスクを想定するだけで、実際の土地で施された対策工としてどのようなものがあるか、対策工費がどの程度必要になるかといった概算見積もりに有用な情報を容易に得ることができ、建設計画に必要なトータルコストをイメージしやすくなる。
[Second System]
The second system makes it easier to obtain information necessary for a rough estimate from a specific disaster risk (expected flood depth, expected seismic intensity, liquefaction risk, etc.). The second system also has a construction record database similar to the first system. The second system also has a function that enables linkage with GIS data including hazard maps, etc. In the case of the second system, information on what disaster risks a building to be constructed needs measures against is acquired as a risk requiring measures. Then, construction record data including the construction content of countermeasures taken on land associated with the disaster risk requiring measures on GIS data such as hazard maps is extracted from the database. By outputting the construction record data extracted in this way, it is possible to easily obtain information useful for a rough estimate, such as what countermeasures have been taken on the actual land and how much the countermeasures will cost, simply by assuming the disaster risk of the land requiring measures for the building to be constructed, and it becomes easier to imagine the total cost required for the construction plan.

第2システムによれば、特定の災害リスク(想定浸水深、想定震度、液状化危険度等)を指定すると、そのリスクがある土地に建設された施工実績を抽出することができる。また、施工実績データベースには、建設後の被災記録や復旧工事の記録を紐づけて登録することができ、実際の災害で建物に生じた被害等をリストアップすることができる。これにより、建設計画地が災害リスクを有する土地に決まっている場合に、同様の土地条件での対策工を含む施工実績を対策工選定のための条件にしたり、採用された対策工と被害実績、補修実績を対比したりして、最適な対策工諸元を決定するための条件にすることができる。 According to the second system, when a specific disaster risk (expected flood depth, expected seismic intensity, liquefaction risk, etc.) is specified, it is possible to extract construction records on land with that risk. Furthermore, the construction record database can be linked and registered with records of damage suffered after construction and restoration work, making it possible to list damage caused to buildings in actual disasters. As a result, if the planned construction site is determined to be land with a disaster risk, construction records including countermeasures on similar land conditions can be used as conditions for selecting countermeasures, and the adopted countermeasures can be compared with damage records and repair records to determine the optimal countermeasure specifications.

〔第3システム〕
第3システムは、予め災害対策工を選択・指定すると、これまでに蓄積された施工実績データを統計し、その結果をGISデータと関連付けて提示するものである。第3システムは、第1、第2システム同様に施工実績データベースを備える。また、第3システムは、ハザードマップ等を含むGISデータとの連係を可能とする機能を有する。その上で、第3システムの場合、災害リスクに必要な対策工の中から指定された選択対策工を取得すると、その選択対策工に関係する施工内容をデータベースから抽出することができる。これにより、選択対策工が実際に採用された施工実績として、どのようなものがあるかを容易に確認することができる。さらに、第3システムは、それらの統計データ(対策工の採用率、平米あたりの平均対策工費、最小・最大・平均の対策工規模(止水板高さ、免制震装置諸元、薬液注入量等))を地図上にコンター図やヒートマップ等の形式で表すことができる。これにより、対策工費の高低度合いや対策工別の採用率といった施工実績の数値的な分布を地図上に視覚化し、今後の建設候補地を選定する場面では、災害対策工に要する費用を見積もることができ、最適な建設地を選定する計画に資することができる。
[Third System]
The third system compiles statistics on the construction performance data accumulated so far when disaster prevention works are selected and specified in advance, and presents the results in association with GIS data. The third system has a construction performance database like the first and second systems. In addition, the third system has a function that enables linkage with GIS data including hazard maps. In addition, in the case of the third system, when a selected countermeasure work specified from the countermeasure works necessary for disaster risk is acquired, the construction content related to the selected countermeasure work can be extracted from the database. This makes it easy to check what kind of construction work has actually been adopted as the selected countermeasure work. Furthermore, the third system can display these statistical data (adoption rate of countermeasure work, average countermeasure work cost per square meter, minimum, maximum, and average countermeasure work scale (waterstop height, seismic isolation device specifications, amount of chemical injection, etc.)) on a map in the form of a contour diagram, heat map, etc. This makes it possible to visualize on a map the numerical distribution of construction results, such as the cost of countermeasures and the adoption rate of each type of countermeasure. When selecting potential construction sites in the future, it is possible to estimate the costs required for disaster countermeasures, which can be useful in planning the selection of the most suitable construction site.

本発明によれば、建設計画に際して災害対策に適用可能なシステムを提供することができる。 The present invention provides a system that can be applied to disaster prevention measures during construction planning.

施工実績データ管理システム100の構成を示すブロック図である。FIG. 1 is a block diagram showing a configuration of a construction performance data management system 100. 施工実績データベース110に蓄積・記録される施工実績データの構成例を示す図である。1 is a diagram showing an example of the configuration of construction record data accumulated and recorded in a construction record database 110. FIG. システム処理(1)の手順例を示すフローチャートである。1 is a flowchart showing an example of a procedure of system processing (1). 災害リスクの抽出例を示す概要図である。FIG. 1 is a schematic diagram showing an example of disaster risk extraction. 項目の選択及び抽出結果の出力例を示す概要図である。FIG. 13 is a schematic diagram showing an example of item selection and extraction result output. システム処理(2)の手順例を示すフローチャートである。13 is a flowchart showing an example of a procedure of system processing (2). 要対策リスク情報の入力とデータ抽出結果の出力例を示す概要図である。FIG. 13 is a schematic diagram showing an example of input of risk information requiring measures and output of data extraction results. システム処理(3)の手順例を示すフローチャートである。13 is a flowchart showing an example of a procedure of system processing (3). 災害対策工情報の入力と施工実績データの抽出、そして統計データを地形図データと関連付けた出力例を示す概要図である。This is an overview diagram showing an example of inputting disaster prevention construction information, extracting construction performance data, and outputting statistical data associated with topographical map data.

以下、本発明の実施形態について図面を参照しながら説明する。以下の実施形態では、施工実績データ管理システムの好適な一例を挙げているが、本発明の形態は例示のものに限らない。 The following describes an embodiment of the present invention with reference to the drawings. In the following embodiment, a preferred example of a construction performance data management system is given, but the present invention is not limited to the illustrated example.

〔システムの構成例〕
図1は、施工実績データ管理システム100の構成を示すブロック図である。図1には施工実績データ管理システム100のブロック構成とともに、施工実績データ管理システム100に関係する要素もまた、合わせて示されている。
[System configuration example]
Fig. 1 is a block diagram showing the configuration of a construction record data management system 100. In Fig. 1, elements related to the construction record data management system 100 are also shown together with the block configuration of the construction record data management system 100.

施工実績データ管理システム100は、施工実績データベース110を有する。施工実績データベース110には、例えば本システム100の所有者である建設事業者や、本システム100の利用者、運用者、管理者等が保有する過去の施工実績が所定のデータフォーマットで記録・蓄積されている。施工実績としては、例えば過去に採用された災害対策工、工事費、施設の諸元、対策工の諸元、顧客満足度・評価等が挙げられるが、これらに限られない。なお、施工実績データベース110の構成例については、別の図面を用いてさらに後述する。 The construction performance data management system 100 has a construction performance database 110. In the construction performance database 110, past construction performance data held by, for example, the construction company that is the owner of this system 100, or the user, operator, manager, etc. of this system 100 is recorded and accumulated in a specified data format. Examples of construction performance data include, but are not limited to, disaster prevention measures adopted in the past, construction costs, facility specifications, countermeasure work specifications, customer satisfaction and evaluations, etc. An example of the configuration of the construction performance database 110 will be described further below using another drawing.

施工実績データ管理システム100は、GISデータ120と連係することが可能である。GISデータ120は、例えば一般に公開されている外部システムを利用することもできるし、独自に構築することもできる。本システム100では、GISデータ120が提供するハザードマップ122、都市計画上の用途地域124、地盤情報126等のデータを利用することができる。利用可能なハザードマップ122としては、例えば土砂災害警戒区域、洪水浸水想定区域、津波浸水想定区域、想定最大震度、液状化危険度等の分布を地図データ等で表したものが挙げられる。また、都市計画上の用途地域124としては、例えば第一種低層住居専用地域、第一種中高層住居専用地域、商業地域、準工業地域、工業地域等の区分を地図データ等で表したものが挙げられる。地盤情報126としては、例えば地形分類、ボーリングデータ、表層地盤の土質、地すべり地形、旧地形、過去の土地利用状況等の情報を地図データ等で表したものが挙げられる。なお、GISデータ120には、これら以外のものが含まれていてもよい。 The construction performance data management system 100 can be linked to GIS data 120. The GIS data 120 can be, for example, an external system that is publicly available, or can be constructed independently. In this system 100, data such as a hazard map 122, a use zone 124 in urban planning, and ground information 126 provided by the GIS data 120 can be used. Examples of the available hazard map 122 include a map data representation of the distribution of landslide warning areas, flood inundation expected areas, tsunami inundation expected areas, expected maximum seismic intensity, and liquefaction risk. Examples of the use zone 124 in urban planning include a map data representation of the classification of a first-class low-rise residential area, a first-class medium- and high-rise residential area, a commercial area, a semi-industrial area, and an industrial area. Examples of the ground information 126 include a map data representation of information such as topography classification, boring data, soil quality of the surface ground, landslide topography, old topography, and past land use conditions. Note that the GIS data 120 may also include other data.

施工実績データ管理システム100は、中枢部分に例えば管理制御部130を備える。管理制御部130は、例えば汎用のサーバ型コンピュータを用いたり、パーソナルコンピュータを用いたり、ワークステーション型コンピュータを用いたりすることができる。管理制御部130は、機能的な要素として入力処理部132、出力処理部134、データ連係部136、データ抽出部138、演算部140等を備える。これらの機能的な要素は、例えば管理制御部130のハードウェア資源や、これを用いたソフトウェア処理によって実現することができる。 The construction performance data management system 100 has, for example, a management control unit 130 in its central part. The management control unit 130 can be, for example, a general-purpose server-type computer, a personal computer, or a workstation-type computer. The management control unit 130 has, as functional elements, an input processing unit 132, an output processing unit 134, a data linking unit 136, a data extraction unit 138, a calculation unit 140, and the like. These functional elements can be realized, for example, by the hardware resources of the management control unit 130, or by software processing using these.

管理制御部130には、例えば端末機器150が接続されており、端末機器150は、ディスプレイ152等の表示装置、キーボード154やマウス156等の入力装置、プリンタ等の出力装置158である。なお、管理制御部130がサーバ型コンピュータである場合、端末機器150をリモートのクライアントコンピュータとしてもよい。 For example, a terminal device 150 is connected to the management control unit 130, and the terminal device 150 is a display device such as a display 152, an input device such as a keyboard 154 and a mouse 156, and an output device 158 such as a printer. Note that if the management control unit 130 is a server-type computer, the terminal device 150 may be a remote client computer.

管理制御部130の機能的要素について概略的に説明すると、入力処理部132は、端末機器150からの信号入力処理を行い、管理制御部130内での処理に供する。出力処理部134は、逆に端末機器150への信号出力処理を行い、端末機器150での処理に供する。データ連係部136は、GISデータ120との連係を可能にする。特に本システム100では、施工実績データベース110とGISデータ120とを関連付けて利用する処理を行うことができる。なお、データ連係部136による処理については、具体例を挙げてさらに後述する。 To give a brief overview of the functional elements of the management control unit 130, the input processing unit 132 processes signals input from the terminal device 150 and provides them for processing within the management control unit 130. Conversely, the output processing unit 134 processes signals output to the terminal device 150 and provides them for processing in the terminal device 150. The data linking unit 136 enables linking with the GIS data 120. In particular, the system 100 can perform processing to associate the construction record database 110 and the GIS data 120 for use. The processing by the data linking unit 136 will be described further below with specific examples.

データ抽出部138は、データ連係部136で関連付けた施工実績データベース110とGISデータ120を元に、そこから必要なデータを抽出する処理を行う。抽出したデータは、例えば出力処理部134から端末機器150に出力して提供したり、さらに管理制御部130内で演算部140に提供したりすることができる。なお、データ抽出部138による処理についても、具体例を挙げてさらに後述する。 The data extraction unit 138 performs processing to extract necessary data based on the construction performance database 110 and the GIS data 120 that are associated by the data linking unit 136. The extracted data can be provided, for example, by outputting it from the output processing unit 134 to the terminal device 150, or further provided to the calculation unit 140 within the management control unit 130. The processing by the data extraction unit 138 will be described further below with a specific example.

演算部140は、例えばデータ抽出部138が抽出したデータを用いた演算処理を行う。演算処理の結果は、例えば出力処理部134から端末機器150に出力して提供することができる。なお、演算部140による処理についても、具体例を挙げてさらに後述する。 The calculation unit 140 performs calculation processing using, for example, the data extracted by the data extraction unit 138. The results of the calculation processing can be provided, for example, by outputting them from the output processing unit 134 to the terminal device 150. Note that the processing by the calculation unit 140 will be described further below with a specific example.

〔システムアップデート〕
以上の構成から本実施形態の施工実績データ管理システム100が構築されているが、図1に示されているように、本システム100は、施工実績データベース110及びGISデータ120について適宜アップデートが行われる。すなわち、施工実績データベース110には、事後的に施工実績データの更新・追加が行われる。例えば、新規施工実績の追加、施設ごとのアフターフォロー記録、施設完成後の被災履歴・被害情報、施設ごとのメンテナンス記録、施設被災後の補修工事記録等のデータが適宜、施工実績データベース110に追加・更新される。
[System Update]
The construction record data management system 100 of this embodiment is constructed from the above configuration, and as shown in Fig. 1, this system 100 appropriately updates the construction record database 110 and the GIS data 120. In other words, construction record data is updated and added to the construction record database 110 after the fact. For example, data such as the addition of new construction records, follow-up records for each facility, damage history and damage information after the completion of the facility, maintenance records for each facility, and repair work records after the facility is damaged are appropriately added and updated to the construction record database 110.

また、GISデータ120は、例えば外部機関によるデータ更新・追加が行われている。例えば、ハザードマップ122については、マップの再整備に伴う追加・更新が行われる。都市計画上の用途地域124については、行政上の都市計画変更に伴う更新等が行われる。また、地盤情報126については、新規ボーリングデータ等が随時追加・更新されている。 The GIS data 120 is updated and supplemented by external organizations, for example. For example, the hazard map 122 is updated and supplemented when the map is redeveloped. The urban planning zoning 124 is updated and supplemented when administrative changes are made to the urban plan. Furthermore, new boring data and the like are added and updated as needed for the ground information 126.

〔施工実績データベース〕
図2は、施工実績データベース110に蓄積・記録される施工実績データの構成例を示す図である。施工実績データ管理システム100は、施工実績データベース110を構築することによって運用が可能となる。また、上記のように施工実績データベース110をアップデートすることで、より有用性を高めることができる。
[Construction performance database]
2 is a diagram showing an example of the configuration of the construction record data accumulated and recorded in the construction record database 110. The construction record data management system 100 can be operated by constructing the construction record database 110. In addition, by updating the construction record database 110 as described above, the usefulness can be further improved.

施工実績データベース110は、例えば大きく分けて入力データDI及び自動計算データDCから構成されている。入力データDIには、図2の左カラムから順に示すように、施設名、位置情報(緯度経度、住所)、総工費、規模、対策工等の施工内容を表す各種データが含まれており、このうち規模には、法定床面積及び地上階数の情報がさらに含まれ、また、対策工には、種別、施工方法・メーカー等及び対策工費の情報がさらに含まれている。施工実績データベース110の構築に際して、建設事業者は過去の施工実績データをこれらのフォーマットに従って入力する。 The construction record database 110 is broadly composed of input data DI and automatically calculated data DC, for example. As shown in the left column of FIG. 2, the input data DI includes various data indicating the construction details such as the facility name, location information (latitude and longitude, address), total construction cost, scale, and countermeasure work, of which the scale further includes information on the legal floor area and number of above-ground floors, and the countermeasure work further includes information on the type, construction method/manufacturer, etc., and countermeasure work cost. When building the construction record database 110, construction companies input past construction record data according to these formats.

自動計算データDCには、対策工費の割合として、法定床面積あたり対策工費(円/m)、地上階数あたり対策工費(億円/階)、総工費に占める対策工費の割合(%)といったデータが含まれる。これらの自動計算データDCは、入力データDIに基づいて自動的に計算され、施設名に紐づけて施工実績データベース110内に記録される。あるいは、自動計算データDCは、必要とするタイミングで入力データDIを用いて動的に計算されることとしてもよい。 The automatically calculated data DC includes data on the proportion of countermeasure construction costs, such as the countermeasure construction cost per legal floor area (yen/ m2 ), the countermeasure construction cost per number of above-ground floors (billion yen/floor), and the proportion (%) of the countermeasure construction cost in the total construction cost. These automatically calculated data DC are automatically calculated based on the input data DI, and are recorded in the construction performance database 110 in association with the facility name. Alternatively, the automatically calculated data DC may be dynamically calculated using the input data DI at the required timing.

次に、施工実績データ管理システム100の利用例について説明する。施工実績データ管理システム100は、例えばユーザが何らかの条件を指定・入力すると、内部で必要な処理を実行し、その結果をユーザに返すことができる。施工実績データ管理システム100の管理制御部130は、ユーザの様々な利用パターンに応じて、以下に挙げる複数の処理を実行することができる。 Next, an example of how the construction performance data management system 100 can be used will be described. For example, when a user specifies/inputs some conditions, the construction performance data management system 100 can execute the necessary processing internally and return the results to the user. The management control unit 130 of the construction performance data management system 100 can execute multiple processes listed below according to various usage patterns of users.

〔システム処理(1)〕
図3は、施工実績データ管理システム100の管理制御部130で実行されるシステム処理(1)の手順例を示すフローチャートである。このシステム処理(1)は、例えばユーザが施設の建設を予定する建設計画地が決まっている場合に実行することができる。以下、手順例に沿って説明する。
[System Processing (1)]
3 is a flowchart showing an example of the procedure of the system process (1) executed by the management control unit 130 of the construction performance data management system 100. This system process (1) can be executed, for example, when the construction planning site where the user plans to construct the facility has been decided. The procedure will be described below along with the example.

ステップS100:管理制御部130は、計画条件入力処理を実行する。この処理では、例えば端末機器150を通じて建設計画地の情報が取得される。また適宜、用途や規模といった計画施設の諸元が取得される。端末機器150は、例えば本システム100のユーザにより操作される。ユーザは、施設の建設を予定する建設計画地の情報を、端末機器150を用いて入力する。建設計画地の情報は、例えばディスプレイ152上に表示される地図上で位置を指定(マウス156のクリック操作、範囲指定操作等)してもよいし、キーボード154で住所を入力したり、緯度経度を入力したりしてもよい。また、計画施設の諸元は、例えばディスプレイ152の画面上で表示される選択肢の中から選択したり、入力欄にキーボード154で入力したりすることができる。いずれにしても、建設計画地の情報や計画施設の諸元といった計画条件を取得すると、管理制御部130は次のステップS102に移行する。 Step S100: The management control unit 130 executes a planning condition input process. In this process, information on the construction plan site is acquired, for example, through the terminal device 150. In addition, specifications of the planned facility, such as its use and size, are acquired as appropriate. The terminal device 150 is operated, for example, by a user of the present system 100. The user inputs information on the construction plan site where the facility is to be constructed using the terminal device 150. The information on the construction plan site may be specified, for example, by specifying a position on a map displayed on the display 152 (clicking the mouse 156, specifying a range, etc.), or the address or latitude and longitude may be entered using the keyboard 154. In addition, the specifications of the planned facility may be selected, for example, from options displayed on the screen of the display 152, or entered into an input field using the keyboard 154. In any case, when the planning conditions, such as information on the construction plan site and specifications of the planned facility, are acquired, the management control unit 130 proceeds to the next step S102.

ステップS102:管理制御部130は、GISデータ参照処理を実行する。この処理では、管理制御部130のデータ連係部136がGISデータ120のハザードマップ122を参照し、取得した建設計画地で想定される災害リスク(ハザード)の種別や危険度といった情報を抽出する。例えば、今回の建設計画地が「A県B市C町○○番地」であったとすると、その建設計画地に想定されている各種の災害リスク(洪水浸水リスク、津波浸水リスク、土砂災害リスク等)とそれらの危険度をハザードマップ122から自動抽出する。 Step S102: The management control unit 130 executes a GIS data reference process. In this process, the data linking unit 136 of the management control unit 130 references the hazard map 122 of the GIS data 120, and extracts information such as the type and degree of risk of disaster (hazard) anticipated at the acquired construction site. For example, if the construction site is "No. XX, C-cho, B-city, A-prefecture," the various disaster risks anticipated at the construction site (flood inundation risk, tsunami inundation risk, landslide risk, etc.) and their degrees of risk are automatically extracted from the hazard map 122.

〔災害リスク(ハザード)の抽出例〕
ここで、図4は、ステップS102の実行に伴う災害リスクの抽出例を示す概要図である。上記のように、端末機器150から建設計画地を入力すると、管理制御部130がデータ連係部136によりGISデータ120を参照し、今回の建設計画地(図中に「計画地」で示す)に対して想定されている各種の災害リスク及びその危険度を、各種ハザードマップ122a~122gから抽出する。今回の抽出例では、津波ハザードマップ122aから「津波浸水リスクが3~5m」であること、洪水ハザードマップ122bから「洪水浸水リスクが1~2m」であること、土砂災害ハザードマップ122cから「土砂災害リスクが無し」であること等が抽出されたことになる。なお、その他のハザードマップ122d~122gからも、それぞれ建設計画地に対して想定される「土石流リスク」、「急傾斜地崩壊リスク」、「地すべりリスク」、「想定震度」・・・等が土地によっては抽出される場合があるが、今回の建設計画地では抽出されなかったものとして図示を省略している。また、図示していないが、管理制御部130は、建設計画地の用途地域区分、地形分類等の土地条件を都市計画上の用途地域124から自動抽出し、次にステップS104を実行する。
[Example of disaster risk (hazard) extraction]
4 is a schematic diagram showing an example of disaster risk extraction associated with the execution of step S102. As described above, when the construction site is input from the terminal device 150, the management control unit 130 refers to the GIS data 120 via the data linking unit 136, and extracts various disaster risks and their degrees of danger assumed for the current construction site (shown as "Planned site" in the figure) from the various hazard maps 122a to 122g. In this extraction example, "tsunami inundation risk of 3 to 5 m" is extracted from the tsunami hazard map 122a, "flood inundation risk of 1 to 2 m" is extracted from the flood hazard map 122b, and "no landslide risk" is extracted from the landslide hazard map 122c. Note that from the other hazard maps 122d to 122g, "debris flow risk,""steep slope collapse risk,""landsliderisk,""expected seismic intensity," etc., expected for the proposed construction site may be extracted depending on the land, but these are not shown in the figure as they were not extracted for the proposed construction site this time. Also, although not shown, the management control unit 130 automatically extracts land conditions such as the use zoning and topographical classification of the proposed construction site from the use zoning 124 in the city plan, and then executes step S104.

〔図3:システム処理(1)続き〕
ステップS104:次に管理制御部130は、項目選択処理を実行する。この処理では、先のステップS102で自動抽出した災害リスクとその危険度、土地条件の情報を出力処理部134から端末機器150に出力して返すことで、ユーザによる任意の項目選択操作を可能にする。ユーザは、例えばディスプレイ152に表示されている計画施設の諸元や、返された災害リスクと危険度、土地条件等の中から所望の項目を選択することができる。なお、抽出したデータを端末機器150に返すのは、先のステップS102で行うこととし、ここでは項目選択操作の入力だけを受け付けることとしてもよい。管理制御部130は、選択された項目を端末機器150から取得すると、次にステップS106を実行する。
[Figure 3: System Processing (1) Continued]
Step S104: Next, the management control unit 130 executes an item selection process. In this process, the disaster risk, its hazard level, and land condition information automatically extracted in the previous step S102 are output from the output processing unit 134 to the terminal device 150 and returned, thereby enabling the user to perform any item selection operation. The user can select a desired item from, for example, the specifications of the planned facility displayed on the display 152, the returned disaster risk, hazard level, land condition, etc. Note that the extracted data is returned to the terminal device 150 in the previous step S102, and here, only the input of the item selection operation may be accepted. When the management control unit 130 acquires the selected item from the terminal device 150, it next executes step S106.

ステップS106:管理制御部130は、施工実績データ抽出処理を実行する。この処理では、データ連係部136が施工実績データベース110を検索すると、データ抽出部138が先のステップS104で選択された項目について条件が一致する施工実績データを抽出する。なお、施工実績データベース110の検索は、データ抽出部138が行ってもよい。そして、次にステップS108を実行する。 Step S106: The management control unit 130 executes a construction performance data extraction process. In this process, when the data linking unit 136 searches the construction performance database 110, the data extraction unit 138 extracts construction performance data that matches the conditions for the items selected in the previous step S104. Note that the search of the construction performance database 110 may be performed by the data extraction unit 138. Then, step S108 is executed.

ステップS108:管理制御部130は、データ出力処理を実行する。この処理では、先のステップS106で抽出した施工実績データの結果を端末機器150に出力する。これを受けて端末機器150では、ディスプレイ152に施工実績データの抽出結果を表示し、ユーザの確認に供することができる。また、抽出結果はプリンタ等の出力装置158から印刷出力することもできる。 Step S108: The management control unit 130 executes a data output process. In this process, the results of the construction performance data extracted in the previous step S106 are output to the terminal device 150. In response to this, the terminal device 150 displays the extracted results of the construction performance data on the display 152, so that the user can confirm them. The extracted results can also be printed out from an output device 158 such as a printer.

〔項目選択及び抽出結果出力例〕
図5は、ステップS104,S106の実行に伴う項目の選択及び抽出結果の出力例を示す概要図である。図5中の左上欄に示されているように、今回の建設計画地に対して自動抽出された各種の災害リスクは、端末機器150のディスプレイ152等に表示してユーザが確認することができる。そしてユーザは、例えばマウス156を用いてディスプレイ152上で項目選択操作を行うことができる。今回の例では、自動抽出された想定災害リスクの「津波浸水リスクが3~5m」、「洪水浸水リスクが1~2m」、「土砂災害リスクが無し」の全ての項目が選択されている(図中のチェックマーク)。また、ディスプレイ152に表示された施工実績データベース110の登録情報の「用途」、「構造」、「総工費」、「規模」・・・等の中から、今回の建設計画地が該当する用途地域区分「工場」の項目が選択されている(図中のチェックマーク)。なお、ここでは図示されていないが、土地条件に地形分類の項目がある場合は、当該項目の選択も可能である。
[Item selection and extraction result output example]
FIG. 5 is a schematic diagram showing an example of the selection of items and the output of the extraction results associated with the execution of steps S104 and S106. As shown in the upper left column in FIG. 5, various disaster risks automatically extracted for the current construction project site can be displayed on the display 152 of the terminal device 150, etc., so that the user can check them. The user can then perform an item selection operation on the display 152 using, for example, the mouse 156. In this example, all of the items of the automatically extracted expected disaster risks, "tsunami inundation risk of 3 to 5 m,""flood inundation risk of 1 to 2 m," and "no landslide risk," are selected (check marks in the figure). In addition, from the registered information of the construction performance database 110 displayed on the display 152, such as "use,""structure,""total construction cost,""scale," etc., the item of the use zoning classification "factory" to which the current construction project site corresponds is selected (check mark in the figure). Although not shown here, if there is an item of topography classification in the land conditions, it is also possible to select that item.

次に、図5中の右側欄に示されているように、管理制御部130では、選択された項目について条件が一致する施工実績データを抽出する。この抽出例では、選択された項目の条件である「津波浸水リスクが3~5m」、「洪水浸水リスクが1~2m」、「土砂災害リスクが無し」に対応する対策工が過去に施工されており、かつ、用途地域区分が「工場」に該当する土地で施工された施設の施工実績データが2例、抽出されている(図中に「OUTPUT」で示す)。 Next, as shown in the right column of Figure 5, the management control unit 130 extracts construction history data that matches the conditions for the selected items. In this extraction example, countermeasures corresponding to the selected item conditions of "tsunami inundation risk of 3-5m," "flood inundation risk of 1-2m," and "no landslide risk" have been carried out in the past, and two examples of construction history data for facilities constructed on land zoning that corresponds to "factory" are extracted (indicated as "OUTPUT" in the figure).

そして、図5中の左下欄に示されているように、端末機器150に抽出結果が出力され、ディスプレイ152での表示が行われる。この例では、施工実績データ2例の施設に紐づけられた「対策工費」、「被災/補修履歴」・・・等が表示されている。ユーザは、これらの施工実績データを参考情報として利用することで、今回の建設予定施設と条件が類似する施設で実際に採用された対策工費がどの程度の規模であるかを知ることができる。また、施工実績データに紐づけられた既存の見積書、採用された対策工や技術、設計図、竣工図等を適宜参照することで、概算見積もりや概略計画を作成する際の参考情報として利用することができ、効率良く工事の見積もりや計画を立てることができる。 Then, as shown in the lower left column of FIG. 5, the extraction results are output to the terminal device 150 and displayed on the display 152. In this example, "countermeasure construction costs," "damage/repair history," etc. linked to the facilities in the two examples of construction history data are displayed. By using this construction history data as reference information, the user can know the scale of countermeasure construction costs actually adopted in facilities with similar conditions to the facility to be constructed this time. In addition, by appropriately referring to existing estimates, adopted countermeasure construction and technology, design drawings, completion drawings, etc. linked to the construction history data, it can be used as reference information when creating rough estimates and outline plans, allowing efficient construction estimates and plans.

〔システム処理(2)〕
次に図6は、システム処理(2)の手順例を示すフローチャートである。このシステム処理(2)は、例えばユーザが予め特定の災害リスクを指定することで、施工実績データを今後の建設計画の参考にする場合に利用することができる。以下、手順例に沿って説明する。
[System Processing (2)]
Next, Fig. 6 is a flowchart showing an example of the procedure of system process (2). This system process (2) can be used, for example, when a user specifies a specific disaster risk in advance and uses the construction performance data as a reference for future construction plans. The procedure will be described below along with the example.

ステップS200:管理制御部130は、リスク条件入力処理を実行する。この処理では、例えば端末機器150を通じて要対策リスクの情報が取得される。要対策リスクの情報は、これから建設を予定する施設(建設物)がどのような災害リスクへの対策を必要とするかの情報である。要対策リスクの情報は、例えばディスプレイ152上に表示される選択肢の中からユーザが選択(マウス156のクリック操作等)したり、入力欄にキーボード154で入力したりすることができる。また、このときユーザは、要対策リスクの情報として、リスク種類ごとに危険度を詳細に指定することもできる。いずれにしても、要対策リスクの情報を取得すると、管理制御部130は次のステップS202に移行する。 Step S200: The management control unit 130 executes a risk condition input process. In this process, information on risks requiring countermeasures is acquired, for example, via the terminal device 150. The information on risks requiring countermeasures is information on what disaster risk countermeasures are required for a facility (structure) that is planned to be constructed in the future. The information on risks requiring countermeasures can be selected by the user from options displayed on the display 152 (e.g., by clicking the mouse 156), or can be entered into an input field using the keyboard 154. In addition, at this time, the user can also specify the degree of danger in detail for each risk type as information on risks requiring countermeasures. In either case, once the information on risks requiring countermeasures has been acquired, the management control unit 130 proceeds to the next step S202.

ステップS202:管理制御部130は、GISデータ参照処理を実行する。この処理では、管理制御部130のデータ連係部136がGISデータ120のハザードマップ122を参照し、取得した要対策リスクの種別や、リスクごとの危険度等の条件が関連付けられた土地をピックアップし、次のステップS206に進む。 Step S202: The management control unit 130 executes a GIS data reference process. In this process, the data linking unit 136 of the management control unit 130 references the hazard map 122 of the GIS data 120, picks out land associated with the acquired types of risks requiring countermeasures and conditions such as the degree of danger for each risk, and proceeds to the next step S206.

ステップS206:管理制御部130は、施工実績データ抽出処理を実行する。この処理では、先のステップS202でピックアップした土地で施された対策工が施工内容に含まれている施工実績データをデータ抽出部138が探索し、施工実績データベース110から抽出する。そして、次にステップS208を実行する。 Step S206: The management control unit 130 executes a construction history data extraction process. In this process, the data extraction unit 138 searches for construction history data whose construction details include countermeasure work carried out on the land picked up in the previous step S202, and extracts it from the construction history database 110. Then, step S208 is executed.

ステップS208:管理制御部130は、データ出力処理を実行する。この処理では、先のステップS206で抽出した施工実績データの結果を端末機器150に出力する。これを受けて端末機器150では、ディスプレイ152に施工実績データの抽出結果を表示し、ユーザの確認に供することができる。また、抽出結果はプリンタ等の出力装置158から印刷出力することもできる。 Step S208: The management control unit 130 executes a data output process. In this process, the results of the construction performance data extracted in the previous step S206 are output to the terminal device 150. In response to this, the terminal device 150 displays the extracted results of the construction performance data on the display 152, so that the user can confirm them. The extracted results can also be printed out from an output device 158 such as a printer.

〔情報入力及び抽出結果出力例〕
図7は、システム処理(2)の実行に伴う要対策リスク情報の入力とデータ抽出結果の出力例を示す概要図である。図7中の左上欄に示されているように、要対策リスク情報の入力は、端末機器150のディスプレイ152等に表示された選択肢の中から、例えばマウス156を用いてユーザが選択・指定することができる。今回の例では、想定する要対策リスクとして「洪水浸水リスク」と「津波浸水リスク」があり、このうち「洪水浸水リスク」の危険度は「1.0~2.0m」、また、「津波浸水リスク」の危険度は「2.0~5.0m」が選択されている(図中のチェックマーク)。なお、今回の例で「土砂災害リスク」は選択されていない(図中のチェックマーク無)。また、ここでは図示されていないが、上記以外の災害リスクとその危険度が選択肢として表示されている場合は、そのような選択肢からの選択も可能である。選択されたリスク情報は、端末機器150から管理制御部130に入力される。
[Example of information input and extraction result output]
FIG. 7 is a schematic diagram showing an example of input of risk information requiring countermeasures and output of data extraction results associated with execution of system process (2). As shown in the upper left column of FIG. 7, the input of risk information requiring countermeasures can be selected and specified by the user, for example, using the mouse 156, from among options displayed on the display 152 of the terminal device 150. In this example, the assumed risks requiring countermeasures include "flood inundation risk" and "tsunami inundation risk," and the risk level of "flood inundation risk" is selected as "1.0 to 2.0 m," and the risk level of "tsunami inundation risk" is selected as "2.0 to 5.0 m" (check mark in the figure). In this example, "landslide risk" is not selected (no check mark in the figure). Although not shown here, if disaster risks other than those mentioned above and their risk levels are displayed as options, it is also possible to select from such options. The selected risk information is input from the terminal device 150 to the management control unit 130.

次に、図7中の右側欄に示されているように、管理制御部130では、入力されたリスク情報に該当する災害リスクがGISデータ120上で関連付けられた土地をピックアップし、そのような土地での施工実績データを抽出する。この抽出例では、津波ハザードマップ122a及び洪水ハザードマップ122b上で要対策リスクに該当する土地の施工実績データが3例、抽出されている(図中に「OUTPUT(1)~(3)」で示す)。なお、この例では土砂災害ハザードマップ122cは参照していないが、要対策リスク情報に「土砂災害リスク」が含まれている場合、土砂災害ハザードマップ122cも参照する対象となる(その他の種類の要対策リスクが選択された場合も同様に、該当のハザードマップが参照される。)。 Next, as shown in the right column of FIG. 7, the management control unit 130 picks out land that is associated on the GIS data 120 with a disaster risk that corresponds to the input risk information, and extracts construction history data for such land. In this extraction example, three examples of construction history data for land that corresponds to a risk requiring countermeasures on the tsunami hazard map 122a and the flood hazard map 122b are extracted (shown as "OUTPUT (1) to (3)" in the figure). Note that, although the landslide hazard map 122c is not referenced in this example, if the risk requiring countermeasures information includes "landslide risk," the landslide hazard map 122c will also be referenced (the corresponding hazard map will be referenced in the same way if any other type of risk requiring countermeasures is selected).

そして、図7中の左下欄に示されているように、端末機器150に抽出結果が出力され、ディスプレイ152での表示が行われる。この例では、施工実績データの3例である「(1)○○工場」、「(2)△△倉庫」及び「(3)××センター」が施設名称として表示されるとともに、それぞれの施設に紐づけられた「法定床面積」、「階高」、「浸水対策工」、「工事費」、「補助金申請書類」、「被災/補修履歴」・・・等が表示されている。ユーザは、これらの施工実績データを参考情報として利用することで、今回の想定する要対策リスクへの対策工が施された施設で実際に採用された対策工費がどの程度の規模になるかを容易にイメージすることができ、効率良く工事の見積もりや計画を立てることができる。 Then, as shown in the lower left column of FIG. 7, the extraction results are output to the terminal device 150 and displayed on the display 152. In this example, three examples of construction performance data, "(1) XX Factory," "(2) △△ Warehouse," and "(3) XX Center," are displayed as facility names, along with "Legal Floor Area," "Story Height," "Flood Prevention Work," "Construction Costs," "Subsidy Application Documents," "Disaster/Repair History," and so on, linked to each facility. By using this construction performance data as reference information, the user can easily imagine the scale of the countermeasure construction costs actually adopted in a facility where countermeasure construction work has been implemented against the assumed risks, and can efficiently make construction estimates and plans.

また、施工実績データベースには建設後の被災記録や復旧工事の記録を紐づけて登録することができるため、そこから実際の災害で建物に生じた被害等をリストアップすることもできる。これにより、建設予定地が災害リスクを有する土地に決まっている場合に、同様の土地条件での対策工を含む施工実績を対策工選定の条件にすることができる。また、採用された対策工と被害実績、補修実績を対比することができ、最適な対策工諸元を決定するための条件にすることができる。 In addition, the construction record database can be linked to and registered with records of damage caused after construction and restoration work, making it possible to list damage caused to buildings in actual disasters. This makes it possible to use construction records, including countermeasures on similar land conditions, as a criterion for selecting countermeasures, if the planned construction site is determined to be on land with a risk of disaster. It is also possible to compare adopted countermeasures with past damage records and past repair records, which can be used as a criterion for determining the optimal countermeasure specifications.

〔システム処理(3)〕
次に図8は、システム処理(3)の手順例を示すフローチャートである。このシステム処理(3)は、例えばユーザが災害対策工をリストから選択すると、想定リスクレベル(例えば想定浸水深、想定震度、液状化危険度等の度合い)別に、その対策工の採用率、平均対策工費、平均対策工規模(止水板高さ、免制震装置諸元、薬液注入量等)といった統計データを算出し、地図上にコンター図やヒートマップの形で表すことができるものである。以下、手順例に沿って説明する。
[System Processing (3)]
8 is a flowchart showing an example of the procedure of system process (3). For example, when a user selects a disaster prevention work from a list, this system process (3) calculates statistical data such as the adoption rate of the work, the average cost of the work, and the average scale of the work (waterstop height, specifications of the seismic isolation device, amount of chemical solution injected, etc.) according to the expected risk level (e.g. expected flood depth, expected seismic intensity, degree of liquefaction risk, etc.), and can display the data on a map in the form of a contour diagram or heat map. The procedure will be described below along with the example.

ステップS300:管理制御部130は、災害対策工入力処理を実行する。この処理では、例えば端末機器150を通じて災害対策工の情報が取得される。災害対策工の情報は、例えばこれから施設の建設を予定する際に、計画施設に対してどのような災害対策工を適用するかの情報である。災害対策工の情報は、例えばディスプレイ152上に表示される選択肢の中からユーザが選択(マウス156のクリック操作等)したり、入力欄にキーボード154で入力したりすることができる。また、このときユーザは、災害対策工の情報として、災害対策工の種類ごとに想定リスクレベルの条件を詳細に指定することもできる。いずれにしても、災害対策工の情報を取得すると、管理制御部130は次のステップS302に移行する。 Step S300: The management control unit 130 executes a disaster prevention work input process. In this process, information on disaster prevention work is acquired, for example, through the terminal device 150. Information on disaster prevention work is information on what kind of disaster prevention work should be applied to a planned facility, for example, when planning the construction of a facility. Information on disaster prevention work can be selected by the user from options displayed on the display 152 (e.g., by clicking the mouse 156), or can be entered into an input field using the keyboard 154. In addition, at this time, the user can specify in detail the expected risk level conditions for each type of disaster prevention work as information on disaster prevention work. In either case, once the information on disaster prevention work is acquired, the management control unit 130 proceeds to the next step S302.

ステップS302:管理制御部130は、施工実績データ抽出処理を実行する。この処理では、管理制御部130のデータ連係部136が施工実績データベース110を参照し、先のステップS300で取得した災害対策工が採用された施工実績データをデータ抽出部138が抽出する。そして、次のステップS304に進む。 Step S302: The management control unit 130 executes a construction performance data extraction process. In this process, the data linking unit 136 of the management control unit 130 refers to the construction performance database 110, and the data extraction unit 138 extracts construction performance data in which the disaster prevention work acquired in the previous step S300 has been adopted. Then, the process proceeds to the next step S304.

ステップS304:管理制御部130は、データ統計処理を実行する。この処理では、先のステップS302で抽出した施工実績データについて演算部140が統計処理を実行し、上記のような統計データを算出する。そして、次にステップS306を実行する。 Step S304: The management control unit 130 executes data statistical processing. In this process, the calculation unit 140 executes statistical processing on the construction performance data extracted in the previous step S302, and calculates the statistical data as described above. Then, step S306 is executed.

ステップS306:管理制御部130は、GISデータ参照処理を実行する。この処理では、管理制御部130のデータ連係部136がGISデータ120を参照し、例えば地盤情報126から地形図のデータを取得する。そして、次にステップS308を実行する。 Step S306: The management control unit 130 executes a GIS data reference process. In this process, the data linking unit 136 of the management control unit 130 references the GIS data 120 and obtains topographical map data from, for example, the ground information 126. Then, step S308 is executed.

ステップS308:管理制御部130は、データ出力処理を実行する。この処理では、先のステップS304で算出した統計データを地形図データと関連付けて端末機器150のディスプレイ152等に出力する。このとき、統計データには、施工実績データで紐づけられた所在地及び災害対策工の内容が含まれるため、例えば、災害対策工についての統計値を地形図データ上で視覚化し、コンター図やヒートマップの形で表すことができる。 Step S308: The management control unit 130 executes a data output process. In this process, the statistical data calculated in the previous step S304 is associated with the topographical map data and output to the display 152 of the terminal device 150, etc. At this time, the statistical data includes the location and details of the disaster prevention work linked with the construction performance data, so that, for example, the statistical values for the disaster prevention work can be visualized on the topographical map data and displayed in the form of a contour diagram or heat map.

〔情報入力及びデータ出力例〕
図9は、システム処理(3)の実行に伴う災害対策工情報の入力と施工実績データの抽出、そして統計データを地形図データと関連付けた出力例を示す概要図である。図9中の左上欄に示されているように、災害対策工情報の入力は、端末機器150のディスプレイ152等に表示された選択肢の中から、例えばマウス156を用いてユーザが選択・指定することができる。今回の例では、災害対策工として「洪水浸水対策工」が選択され、さらにその種類として「止水壁」が選択されている(図中のチェックマーク)。なお、この例では「止水壁」の想定リスクレベル(想定浸水深)の条件までは指定されていないが、ユーザは適宜、想定リスクレベルの想定浸水深として「H=0.0~1.0m」、「H=1.0~3.0m」、「H=3.0m以上」といった詳細条件を指定することもできる。今回の例では「止水壁」が選択され、その他の「非常電源設備」や「土地嵩上げ」の対策工は選択されていないが、これらも所望によりユーザが選択することができる。
[Examples of information input and data output]
FIG. 9 is a schematic diagram showing an example of input of disaster prevention work information and extraction of construction performance data accompanying execution of system process (3), and output in which statistical data is associated with topographical map data. As shown in the upper left column of FIG. 9, the input of disaster prevention work information can be selected and specified by the user, for example, using the mouse 156, from among options displayed on the display 152 of the terminal device 150. In this example, "flood inundation prevention work" is selected as the disaster prevention work, and "waterstop wall" is selected as the type (check mark in the figure). In this example, the expected risk level (expected inundation depth) condition of "waterstop wall" is not specified, but the user can appropriately specify detailed conditions such as "H = 0.0 to 1.0 m", "H = 1.0 to 3.0 m", and "H = 3.0 m or more" as the expected inundation depth of the expected risk level. In this example, "waterstop wall" is selected, and other measures such as "emergency power supply equipment" and "land raising" are not selected, but these can also be selected by the user as desired.

また、その他の「土砂災害対策工」や「津波浸水対策工」、「地震対策工」の条件は選択されていないが(図中のチェックマーク無)、これらも所望によりユーザが選択することができる。なお、ここでは図示されていないが、上記以外の災害対策工とその種類、リスクレベルが選択肢として表示されている場合は、そのような選択肢からの選択も可能である。選択されたリスク情報は、端末機器150から管理制御部130に入力される。 Although the other conditions "Landslide prevention works", "Tsunami inundation prevention works", and "Earthquake prevention works" have not been selected (no check marks in the figure), the user can select these as well if desired. Although not shown here, if disaster prevention works other than those mentioned above, their types, and risk levels are displayed as options, it is also possible to select from such options. The selected risk information is input from the terminal device 150 to the management control unit 130.

次に、図9中の左下欄に示されているように、管理制御部130では、入力された災害対策工(今回は「浸水対策工」として「止水壁」)が採用された施工実績データを施工実績データベース110から抽出する。抽出結果には、「浸水対策工=止水壁」の施工内容が含まれる全ての施設についての施工実績データが含まれ、かつ、各施設に紐づけられた法定床面積、階高、工事費、補助金申請書類、被災/補修履歴・・・等の登録情報が含まれる。 Next, as shown in the lower left column of Figure 9, the management control unit 130 extracts construction history data from the construction history database 110 in which the input disaster prevention work (in this case, "waterstop wall" as a "flood prevention work") has been adopted. The extraction results include construction history data for all facilities that include the construction content of "flood prevention work = waterstop wall", as well as registered information such as the legal floor area, floor height, construction costs, subsidy application documents, damage/repair history, etc. linked to each facility.

また、管理制御部130では、上記の抽出結果である施工内容についての統計処理を実行し、例えば法定床面積あたりの対策費、対策工(止水壁)の採用率といった統計データを算出する。これらの統計処理の結果は、例えば図9中の右上欄に示されているように、「法定床面積あたり対策費コンターマップ」として画像データの形式で出力表示したり、図9中の右下欄に示されているように、「対策工(止水壁)採用率ヒートマップ」として画像データの形式で出力表示したりすることができる。 The management control unit 130 also performs statistical processing on the construction details that are the results of the extraction described above, and calculates statistical data such as the countermeasure cost per legal floor area and the adoption rate of countermeasure work (waterstop walls). The results of these statistical processing can be output and displayed in the form of image data as a "countermeasure cost contour map per legal floor area" as shown in the upper right column of Figure 9, or as a "countermeasure work (waterstop walls) adoption rate heat map" as shown in the lower right column of Figure 9.

〔法定床面積あたり対策費コンターマップの表示内容〕
図9中の右上欄に示されるコンター図では、地図上のグレーに着色した点(○)が止水壁を災害対策工として採用した施設の所在地(分布)を表しており、点を取り囲む曲線が法定床面積あたり対策費の等値線を表している。また、等値線で囲まれた範囲の濃淡で対策費の大小を表しており、色が濃いエリアほど法定床面積あたり対策費は高く、薄いエリアほど対策費が安いことを表している。
[Statutory floor area countermeasure cost contour map display content]
In the contour diagram shown in the upper right column of Figure 9, the gray dots (circles) on the map represent the locations (distribution) of facilities that use water cutoff walls as disaster prevention construction, and the curves surrounding the dots represent contour lines of the countermeasure costs per legal floor area. The shade of the area surrounded by the contour lines represents the magnitude of the countermeasure costs, with the darker areas representing higher countermeasure costs per legal floor area and the lighter areas representing lower countermeasure costs.

〔対策工(止水壁)採用率ヒートマップの表示内容〕
図9中の右下欄に示されるヒートマップでは、地図上の標準地域メッシュ別に対策工(止水壁)の採用率の分布を表している。メッシュの着色濃淡は、採用率の高低度合いを表しており、色が濃いエリアほど採用率が高く、薄いエリアほど採用率が低いことを表しており、無着色(白地図)のエリアでは対策工(止水壁)が採用されていないことを表している。
[Heat map showing the adoption rate of countermeasures (waterstop walls)]
The heat map shown in the lower right column of Figure 9 shows the distribution of adoption rates of countermeasure works (waterstop walls) by standard regional mesh on the map. The shade of the mesh color indicates the degree of adoption rate, with darker areas indicating a higher adoption rate and lighter areas indicating a lower adoption rate, and no color (white map) areas indicating that countermeasure works (waterstop walls) have not been adopted.

このように、災害対策工が採用された施工実績データを統計処理し、コンター図やヒートマップの形に視覚化して出力表示することにより、建設候補地を選定する場面では、災害対策工に要する費用をマップから容易に見積もることができる。したがって、費用計画に応じた最適な建設地を選定することができる。 In this way, by statistically processing construction data on cases where disaster prevention measures have been adopted and visualizing and displaying it in the form of contour diagrams and heat maps, when selecting potential construction sites, the costs required for disaster prevention measures can be easily estimated from the map. This makes it possible to select the optimal construction site according to the cost plan.

上述した実施形態の施工実績データ管理システム100によれば、以下の利点が得られる。
(1)従来、建設事業者が保有する施工実績は、データとして蓄積されてはいたものの、建築物等の施設を新たに計画する際には、建設候補地に特有の災害リスクをハザードマップ等で確認し、施工実績の前例等を調べた上で、必要な災害対策工を個別に検討していたため、システマチックな活用はされていなかった。この点、本システム100によれば、建設候補地を入力すると、当該土地に関連付けられた災害リスクを自動で判別した上で、既存の施工実績から類似のケースに該当する災害対策工の施工内容を容易に参照することができ、さらには対策工費やその後のメンテナンス記録等の情報も得られるため、概算見積もりに必要な情報を容易に入手することができる点で極めて利便である。
According to the construction performance data management system 100 of the above-described embodiment, the following advantages can be obtained.
(1) In the past, construction companies had accumulated data on their construction records, but when planning a new facility such as a building, the disaster risks specific to the proposed construction site were checked using hazard maps, etc., and precedents of construction records were examined before considering the necessary disaster prevention works individually, so the data was not used systematically. In this regard, according to the present system 100, when a proposed construction site is input, the disaster risks associated with the land are automatically determined, and the contents of disaster prevention works corresponding to similar cases can be easily referenced from existing construction records, and information such as the cost of the countermeasures and subsequent maintenance records can also be obtained, making it extremely convenient in that the information necessary for a rough estimate can be easily obtained.

(2)また、従来は建設計画地に災害リスクがあることが予め分かっていても、対策工としてどのようなものがあり、どのような対策工を検討すればよいかといった指標となるものがなかったが、本システム100によれば、災害リスクを入力すると、そのリスクがある土地の施工実績から対策工の施工内容が自動的に抽出されるため、抽出された結果を参考にして対策工を容易に選定することができる。 (2) Furthermore, in the past, even if it was known in advance that there was a disaster risk at a planned construction site, there was no indicator of what countermeasures were available and what countermeasures should be considered. However, with this system 100, when a disaster risk is input, the construction details of countermeasures are automatically extracted from the construction history of land with that risk, so countermeasures can be easily selected by referring to the extracted results.

(3)また、従来は建設計画地を選定する際に、土地の災害リスクに対する対策工費がどの程度になるか、どのような対策工が多く採用されているか、といった俯瞰的な情報を与えるものがなかったが、本システム100によれば、災害対策工やその詳細を選定するだけで、地域ごとの対策工費や採用率といった統計データを地図上に視覚化して表示できるので、予算等のバランスから適切な建設計画地を容易に選定することができる。 (3) In addition, in the past, when selecting a construction site, there was no information that provided comprehensive information such as the cost of countermeasures against disaster risks on the land or the types of countermeasures that are commonly adopted. However, with this system 100, by simply selecting disaster countermeasures and their details, statistical data such as the cost of countermeasures and adoption rates by region can be visualized and displayed on a map, making it easy to select an appropriate construction site based on a balance of budgets, etc.

本発明は上述した実施形態に制約されることなく、種々に変形して実施することが可能である。
既に述べたように、施工実績データ管理システム100は、管理制御部130をサーバ型としてクラウド上に構築することもできる。この場合、利用権限を付与されたユーザが遠隔地から施工実績データ管理システム100にアクセスし、抽出結果の出力を得ることができる。
The present invention is not limited to the above-described embodiment, and can be implemented in various modified forms.
As already mentioned, the construction record data management system 100 can be constructed on the cloud with the management control unit 130 as a server type. In this case, a user who has been granted the usage authority can access the construction record data management system 100 from a remote location and obtain the output of the extraction result.

施工実績データベース110の内容は、図2に示されるものだけでなく、その他の入力データDIとその自動計算データDCが含まれていてもよい。また、施工実績データベース110に登録可能な施設は、商業施設やアトラクション施設、戸建て住宅等、多様な建設物が含まれていてもよい。 The contents of the construction history database 110 may include not only the data shown in FIG. 2, but also other input data DI and its automatically calculated data DC. In addition, the facilities that can be registered in the construction history database 110 may include a variety of buildings, such as commercial facilities, attraction facilities, and detached houses.

システム処理(1)では、例えばステップS100で建設計画地を入力すると、リアルタイムでステップS102,S106,S108が実行され、項目選択(絞り込む)前の全ての施工実績を抽出することとしてもよい。そして、抽出結果を確認しながらユーザが項目選択によって条件を絞り込むと、ステップS104で項目選択された条件で抽出結果の出力がリアルタイムで更新されることとしてもよい。 In system processing (1), for example, when a construction planning site is input in step S100, steps S102, S106, and S108 may be executed in real time to extract all construction records before item selection (narrowing down). Then, when the user narrows down the conditions by selecting items while checking the extraction results, the output of the extraction results may be updated in real time with the conditions selected in step S104.

システム処理(2)では、例えばステップS200で要対策リスクの大項目(「土砂災害リスク」、「洪水浸水リスク」、「津波浸水リスク」等)を指定すると、危険度を細かく指定する(絞り込む)前の全ての施工実績を抽出することとしてもよい。そして、抽出結果を確認しながらユーザが項目選択によって危険度等の条件を絞り込むと、その都度、項目選択された条件で抽出結果の出力がリアルタイムで更新されることとしてもよい。 In system processing (2), for example, when a major category of risk requiring countermeasures (such as "landslide risk," "flood inundation risk," or "tsunami inundation risk") is specified in step S200, all construction records before the risk level is specified (narrowed down) in detail may be extracted. Then, when the user narrows down the conditions such as risk level by selecting an item while checking the extraction results, the output of the extraction results may be updated in real time according to the conditions selected for the item each time.

システム処理(3)では、ステップS300の入力条件に応じてステップS302~S308までの処理が随時更新され、ユーザがディスプレイ152の画面上で入力条件を変更すると、それに応じてリアルタイムでコンター図やヒートマップの表示が更新されることとしてもよい。 In system processing (3), the processing from steps S302 to S308 is updated as needed in response to the input conditions in step S300, and when the user changes the input conditions on the screen of display 152, the display of the contour diagram and heat map may be updated in real time accordingly.

その他、実施形態において図示とともに挙げたものはいずれも、あくまで好ましい一例であり、基本的な態様に各種の要素を付加し、あるいは一部を置換しても本発明を好適に実施可能であることはいうまでもない。 All of the other aspects shown in the figures in the embodiments are merely preferred examples, and it goes without saying that the present invention can be implemented in a suitable manner by adding various elements to the basic aspects or by substituting some parts.

100 施工実績データ管理システム
110 施工実績データベース
120 GISデータ
130 管理制御部
136 データ連係部
138 データ抽出部
140 演算部
150 端末機器
REFERENCE SIGNS LIST 100 Construction record data management system 110 Construction record database 120 GIS data 130 Management control unit 136 Data linking unit 138 Data extraction unit 140 Calculation unit 150 Terminal device

Claims (8)

少なくとも建設物の所在地及び施工内容を含む施工実績データを蓄積した施工実績データベースを備え、
GISデータと前記施工実績データベースとを関連付けて参照可能とするデータ連係手段と、
建設を予定する建設計画地を取得すると、前記建設計画地に関連付けられた災害リスクをGISデータから抽出し、当該抽出した災害リスクへの対策が施された対策工を施工内容に含む施工実績データを前記施工実績データベースから抽出する計画地別抽出手段と、
前記計画地別抽出手段の抽出結果である施工実績データを出力する出力手段と
を備えた施工実績データ管理システム。
A construction record database is provided that accumulates construction record data including at least the location and construction details of the building,
A data linking means for linking the GIS data with the construction record database so that the data can be referenced;
a planned site-specific extraction means for extracting disaster risks associated with the planned construction site from the GIS data when the planned construction site is acquired, and extracting construction record data including countermeasure works for the extracted disaster risks from the construction record database;
and an output means for outputting the construction performance data which is the extraction result of the planning site-specific extraction means.
請求項1に記載の施工実績データ管理システムにおいて、
前記計画地別抽出手段は、
抽出した災害リスクの種別及び危険度を含むリスク条件とともに、前記建設計画地の用途地域区分及び地形分類を含む土地条件をGISデータから合わせて抽出し、当該抽出したリスク条件及び土地条件の中から指定された条件に一致する施工実績データを前記施工実績データベースから抽出することを特徴とする施工実績データ管理システム。
In the construction performance data management system according to claim 1,
The planning area extraction means includes:
A construction performance data management system characterized by extracting from GIS data risk conditions including the extracted disaster risk type and hazard level, as well as land conditions including the zoning and topographical classification of the planned construction site, and extracting from the construction performance database construction performance data that matches specified conditions from the extracted risk conditions and land conditions.
請求項2に記載の施工実績データ管理システムにおいて、
前記出力手段は、
前記施工実績データの出力に先立って前記計画地別抽出手段が抽出したリスク条件及び土地条件を出力することにより、前記計画地別抽出手段へのリスク条件及び土地条件の指定を可能とすることを特徴とする施工実績データ管理システム。
In the construction performance data management system according to claim 2,
The output means includes:
A construction performance data management system characterized in that risk conditions and land conditions extracted by the planning site extraction means are output prior to output of the construction performance data, thereby making it possible to specify risk conditions and land conditions to the planning site extraction means.
少なくとも建設物の所在地及び施工内容を含む施工実績データを蓄積した施工実績データベースを備え、
GISデータと前記施工実績データベースとを関連付けて参照可能とするデータ連係手段と、
予定する建設物が対策を要する災害リスクを要対策リスクとして取得することで、前記要対策リスクに該当する災害リスクがGISデータ上で関連付けられた土地にて施された対策工を施工内容に含む施工実績データを前記施工実績データベースから抽出する災害リスク別抽出手段と、
前記災害リスク別抽出手段の抽出結果である施工実績データを出力する出力手段と
を備えた施工実績データ管理システム。
A construction record database is provided that accumulates construction record data including at least the location and construction details of the building,
A data linking means for linking the GIS data with the construction record database so that the data can be referenced;
A disaster risk-specific extraction means for extracting, from the construction record database, construction record data including construction details of countermeasure works implemented on land associated on the GIS data with a disaster risk corresponding to the disaster risk requiring countermeasures for a planned construction as a countermeasure-required risk;
and an output means for outputting construction performance data which is the extraction result of the disaster risk-specific extraction means.
請求項4に記載の施工実績データ管理システムにおいて、
前記災害リスク別抽出手段は、
災害リスクの種別及び危険度を含むリスク条件が指定されることで前記要対策リスクを抽出し、前記リスク条件に該当する災害リスクをGISデータ上で関連付けられた前記土地を抽出し、前記土地に施された対策工を含む施工実績データを前記施工実績データベースから抽出することを特徴とする施工実績データ管理システム。
In the construction performance data management system according to claim 4,
The disaster risk extraction means includes:
A construction history data management system characterized by extracting the risks requiring countermeasures by specifying risk conditions including the type and hazard level of disaster risk, extracting the land associated on GIS data with the disaster risk that meets the risk conditions, and extracting construction history data including countermeasures implemented on the land from the construction history database.
少なくとも建設物の所在地及び施工内容を含む施工実績データを蓄積した施工実績データベースを備え、
GISデータと前記施工実績データベースとを関連付けて参照可能とするデータ連係手段と、
災害リスク対策として実施可能な複数の対策工の中から選択対策工を選択すると、前記施工実績データベースに蓄積された施工実績データから前記選択対策工に関係する施工内容を抽出する対策工別抽出手段と
を備えた施工実績データ管理システム。
A construction record database is provided that accumulates construction record data including at least the location and construction details of the building,
A data linking means for linking the GIS data with the construction record database so that the data can be referenced;
A construction record data management system including a countermeasure work-specific extraction means for extracting construction details related to a selected countermeasure work from the construction record data accumulated in the construction record database when the selected countermeasure work is selected from a plurality of countermeasure works that can be implemented as disaster risk countermeasures.
請求項6に記載の施工実績データ管理システムにおいて、
前記対策工別抽出手段は、
災害リスクの種別及び危険度を含むリスク条件がさらに指定されることで前記災害リスクに必要となる対策工を前記選択対策工として取得することを特徴とする施工実績データ管理システム。
In the construction performance data management system according to claim 6,
The countermeasure work extraction means includes:
A construction performance data management system characterized in that risk conditions including a disaster risk type and a danger level are further specified, and countermeasure works required for the disaster risk are acquired as the selected countermeasure works.
請求項6又は7に記載の施工実績データ管理システムにおいて、
前記対策工別抽出手段が抽出した施工内容についての統計処理を実行する処理手段と、
前記処理手段の処理結果である施工内容についての統計データをGISデータと関連付けて出力する出力手段と
をさらに備えた施工実績データ管理システム。
In the construction performance data management system according to claim 6 or 7,
A processing means for executing statistical processing on the construction details extracted by the countermeasure work extraction means;
The construction performance data management system further comprises an output means for outputting statistical data on the construction contents, which is a processing result of the processing means, in association with the GIS data.
JP2021022228A 2021-02-16 2021-02-16 Construction performance data management system Active JP7542454B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021022228A JP7542454B2 (en) 2021-02-16 2021-02-16 Construction performance data management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021022228A JP7542454B2 (en) 2021-02-16 2021-02-16 Construction performance data management system

Publications (2)

Publication Number Publication Date
JP2022124532A JP2022124532A (en) 2022-08-26
JP7542454B2 true JP7542454B2 (en) 2024-08-30

Family

ID=82942129

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021022228A Active JP7542454B2 (en) 2021-02-16 2021-02-16 Construction performance data management system

Country Status (1)

Country Link
JP (1) JP7542454B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7541395B2 (en) * 2023-02-01 2024-08-28 日本消防・防災デザイン株式会社 Planning device, planning method, and planning program
JP7720048B1 (en) * 2024-03-07 2025-08-07 株式会社リバスタ Performance management system, performance management method, and performance management program

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011170496A (en) 2010-02-17 2011-09-01 Mitsubishi Heavy Ind Ltd Device and method for supporting plant construction plan
JP2017166156A (en) 2016-03-14 2017-09-21 ジャパンホームシールド株式会社 Information providing device, information providing system, information providing method, and program
US20180336652A1 (en) 2017-05-16 2018-11-22 One Concern, Inc. Estimation of damage prevention with building retrofit

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011170496A (en) 2010-02-17 2011-09-01 Mitsubishi Heavy Ind Ltd Device and method for supporting plant construction plan
JP2017166156A (en) 2016-03-14 2017-09-21 ジャパンホームシールド株式会社 Information providing device, information providing system, information providing method, and program
US20180336652A1 (en) 2017-05-16 2018-11-22 One Concern, Inc. Estimation of damage prevention with building retrofit

Also Published As

Publication number Publication date
JP2022124532A (en) 2022-08-26

Similar Documents

Publication Publication Date Title
AU2010263261B2 (en) Methods and apparatus for assessing locate request tickets
JP6058884B2 (en) Building quality evaluation apparatus, method, program and storage medium
JP7542454B2 (en) Construction performance data management system
CN118096471B (en) Detection and evaluation system for city updating history item
JP2019159351A (en) Real estate business plan support apparatus, program and method
KR102530194B1 (en) Integration system for sewerage pipe asset management utilizing web applications
JP7528000B2 (en) Construction performance data management system
JP4047061B2 (en) Data structure of a map database that stores multiple records in time series
JP6568989B1 (en) Fixed asset management system
JP2005158081A (en) Management method and device for earthquake-related derivative, and computer program
JP2003162641A (en) Earthquake-related derivative management method and device, computer program
JP2007219769A (en) Risk assessment system
JP2021114149A (en) Disaster prevention system
JP4351230B2 (en) Design document data generation system and design document data generation method
Atay et al. Spatial analysis based health and safety risk assessment for linear construction projects
Atay et al. GIS as a planning tool for health and safety management in linear construction projects
Abante Exposure-Stance Concept Model
Atay et al. GIS based decision support system for health and safety management in linear projects
KR20220096881A (en) Integration system for waterworks pipe asset management utilizing web applications
Hamdamov FORMATION OF ATTRIBUTABLE DATA OF THE THEMATIC LAYER OF" UNDERGROUND SEWAGE PIPES" AND INTEGRATION INTO THE SINGLE GEOSPATIC INFORMATION BASE
SHEWA GIS BASED WATERGEMS INTEGRATED MODELING FOR JINKA TOWN WATER SUPPLY DISTRIBUTION NETWORK, SOUTHERN ETHIOPIA MSc THESIS
Sanchez et al. Florida Radon Research Program: Technical Support for the Development of Radon Resistant Construction Standards
Sekar Web-based and Geospatially enabled Tool for Water and Wastewater Pipeline Infrastructure Risk Management
Akam et al. A WebGIS for data Collection and Decision Support in Natural Disaster Management: A Case of Bamenda, Cameroon
Fritsch Modeling and Analyzing Earthquake Induced Building Damages in a Gis

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20231020

TRDD Decision of grant or rejection written
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240731

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20240813

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20240820

R150 Certificate of patent or registration of utility model

Ref document number: 7542454

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350