JP7548766B2 - Soil cement diaphragm wall construction method - Google Patents
Soil cement diaphragm wall construction method Download PDFInfo
- Publication number
- JP7548766B2 JP7548766B2 JP2020167581A JP2020167581A JP7548766B2 JP 7548766 B2 JP7548766 B2 JP 7548766B2 JP 2020167581 A JP2020167581 A JP 2020167581A JP 2020167581 A JP2020167581 A JP 2020167581A JP 7548766 B2 JP7548766 B2 JP 7548766B2
- Authority
- JP
- Japan
- Prior art keywords
- excavation
- area
- solidification
- soil cement
- soil
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Description
本発明は、ソイルセメント地中連続壁施工法に関するものである。 The present invention relates to a method for constructing soil cement underground diaphragm walls.
従来より、土留壁や汚染物質拡散防止用止水壁の施工法としてソイルセメント地中連続壁施工法が知られている。 The soil cement diaphragm wall construction method has been known for some time as a construction method for earth retaining walls and water cutoff walls to prevent the diffusion of pollutants.
このソイルセメント地中連続壁施工法は、オーガー撹拌施工機等のソイルセメント施工機を用いて施工する工法であり、その施工方法は、まず、掘削工程としてソイルセメント施工機の移動、設置決めを行い、ソイルセメント施工機の先端部より掘削用注入材としてのセメントミルクを添加しながら、掘削土とセメントミルクの混合土を造成し、この混合土により溝壁の安定性を保たせるとともに、適切な流動性を持たせつつ掘削底まで掘削を行う。 This soil cement diaphragm wall construction method is carried out using a soil cement construction machine such as an auger mixer. The construction method begins with the excavation process, in which the soil cement construction machine is moved and positioned, and then a mixture of excavated soil and cement milk is created while adding cement milk as an excavation injection material from the tip of the soil cement construction machine. This mixture maintains the stability of the trench wall, and excavation is continued to the bottom while maintaining the appropriate fluidity.
次に、固化工程として、掘削底まで掘削を行ったソイルセメント施工機により、掘削工程で造成した混合土に対して、固化材としてのセメントミルクを適量添加しつつ混合・撹拌しながら引き上げて、次工程の芯材の挿入に適した軟らかさのソイルセメントを造成する。そして芯材挿入工程として、クローラークレーン等を用いてそのソイルセメント中にH鋼等の芯材を挿入する。 Next, in the solidification process, a soil cement construction machine excavates to the bottom of the excavation, and then adds an appropriate amount of cement milk as a solidification agent to the mixed soil created in the excavation process, while mixing and stirring it and pulling it up, creating soil cement with a softness suitable for inserting the core material in the next process. Then, in the core material insertion process, a crawler crane or the like is used to insert a core material such as an H-shaped steel beam into the soil cement.
このように、従来のソイルセメント地中連続壁施工法は、掘削工程、固化工程及び芯材挿入工程の3工程を1組とし、この順序で各工程の間隔を置かずに繰り返し施工することにより連続した固化壁体を構築している。 In this way, the conventional soil cement diaphragm wall construction method consists of a set of three steps: excavation, solidification, and core material insertion. A continuous solidified wall is constructed by repeating the steps in this order without any gaps between each step.
一方、上記ソイルセメント地中連続壁の構築を行うために用いる施工機械には、柱列式、水平多軸式、カッターチェイン式等々があり、これらの施工機は、掘削施工性能、混合性能、土質適用性、壁厚対応性、深施工性等、各々特有の性能を有している。そして、施工計画においては、施工するソイルセメント連続壁の要求特性に応じて、使用する施工機の特性を考慮し、選択して単独で用いている。 Meanwhile, the construction machines used to build the above-mentioned soil cement diaphragm walls include column-type, horizontal multi-axis, cutter chain, etc., and each of these construction machines has its own unique capabilities, such as excavation and construction performance, mixing performance, soil adaptability, wall thickness adaptability, and deep construction capability. In the construction plan, the construction machine to be used is selected and used alone, taking into consideration the characteristics of the construction machine to be used according to the required characteristics of the soil cement diaphragm wall to be constructed.
上記の掘削工程、固化工程及び芯材挿入工程の3工程を1組として各工程の間隔を置かずに施工する主な理由は以下の制約による。まず、掘削工程において、掘削注入材としてセメントミルクを使用するため、掘削開始からセメントの水和反応が始まる。そのため、ソイルセメントが硬化するまでに芯材の挿入を終了させる必要があり、セメントの水和反応という時間的な制約がある。 The main reason why the above three processes, the excavation process, solidification process, and core material insertion process, are grouped together and carried out without any gaps between each process is due to the following constraints. First, in the excavation process, cement milk is used as the excavation injection material, so the cement hydration reaction begins as soon as excavation begins. Therefore, it is necessary to finish inserting the core material before the soil cement hardens, and there is a time constraint due to the cement hydration reaction.
また、深いソイルセメント地中連続壁を施工する場合には、掘削工程にかかる時間が長くなるため、芯材の挿入時にはセメントミルクの水和反応が進み、芯材の挿入が困難になることがある。また、掘削時に障害物等が存在した場合には、予定の掘削工程終了時間を超過し、芯材の挿入ができなくなるといった問題がある。 In addition, when constructing a deep soil cement diaphragm wall, the excavation process takes a long time, and the hydration reaction of the cement milk progresses when inserting the core material, making it difficult to insert the core material. In addition, if an obstacle is present during excavation, the excavation process may take longer than planned, making it impossible to insert the core material.
さらに、掘削工程と固化工程をソイルセメント施工機により行った後、芯材挿入工程を芯材挿入用クレーンを用いて行うが、ソイルセメント施工機及び芯材挿入用クレーンの2種類の施工機械を1組の編成とし使用することも、上記3工程を1組としなければならない理由として挙げられる。 Furthermore, after the excavation and solidification processes are carried out using a soil cement construction machine, the core material insertion process is carried out using a core material insertion crane. The fact that two types of construction machinery, the soil cement construction machine and the core material insertion crane, are used together as a set is also a reason why the above three processes must be carried out as a set.
このように、従来のソイルセメント地中連続壁施工法では、上記の施工機械の制約により、掘削工程の作業中に、固化工程、芯材挿入工程の施工ができない状態であり、固化工程中には芯材挿入工程、掘削工程の施工ができず、芯材挿入工程中には掘削工程、固化工程の施工ができない。即ち、3工程中の1工程の施工中には他の2工程の施工はできないため、施工機械の稼働率が悪くなり、その結果、著しく施工効率が悪くなるという問題があった。 In this way, with conventional soil cement diaphragm wall construction methods, due to the above-mentioned restrictions on construction machinery, the solidification process and core material insertion process cannot be carried out during the excavation process; the core material insertion process and excavation process cannot be carried out during the solidification process, and the excavation process and solidification process cannot be carried out during the core material insertion process. In other words, since the other two of the three processes cannot be carried out while one of them is being carried out, the operating rate of the construction machinery is poor, resulting in a problem of significantly poor construction efficiency.
このような問題に対し、本出願人はこれまでに、2台の施工機械を同時並行で使用することにより、施工効率の向上、施工費の低減を目的とした施工方法を提案している。例えば、特許文献1及び特許文献2の提案では、2台の施工機械を同時並行的に使用し、先行する施工機1は原地盤を掘削しつつ非硬化性の気泡を注入して気泡混合土を造成し、後行の施工機で気泡混合土に固化材スラリーを添加しつつ混合、混練して固化土を造成するようにしている。また、これらの提案では、気泡混合土と固化材スラリーを混合する隣接部において、混合の品質を向上させるために隔壁の使用や芯材を隔壁として使用するようにしている。 In response to these problems, the applicant has proposed a construction method that aims to improve construction efficiency and reduce construction costs by using two construction machines in parallel at the same time. For example, in the proposals of Patent Documents 1 and 2, two construction machines are used in parallel at the same time, with the leading construction machine 1 excavating the original ground while injecting non-hardening air bubbles to create aerated soil, and the trailing construction machine adding solidification material slurry to the aerated soil while mixing and kneading it to create solidified soil. In these proposals, partitions or core materials are used as partitions in the adjacent areas where the aerated soil and solidification material slurry are mixed to improve the quality of the mixture.
また、特許文献3の提案では、先行する施工機により掘削時に気泡と少量の固化材スラリーを添加混合し、気泡混合土を軽度に固化させている。そして、後行の施工機械により軽度に固化した気泡混合土を掘削しつつ、固化材スラリーをさらに添加して混合するときに、気泡混合土が自立することを利用して、境界部の品質を良好に保っている。 In addition, in the proposal of Patent Document 3, a leading construction machine adds and mixes air bubbles and a small amount of solidification material slurry during excavation, lightly solidifying the air-bubble mixed soil. Then, a trailing construction machine excavates the lightly solidified air-bubble mixed soil, and further adds and mixes solidification material slurry, utilizing the self-supporting nature of the air-bubble mixed soil to maintain good quality at the boundary.
上記の提案によれば、掘削工程と固化工程を各々の施工に適した施工機を用いて行うことにより、従来の単一の施工機により掘削工程、固化工程を行うソイルセメント地中連続壁施工法に比べて、固化壁の品質を向上させるとともに、工期の短縮が実現できる点で優れた工法である。しかしながら、近年、さらなる高品質なソイルセメント地中連続壁の施工と工期短縮が望まれている。 According to the above proposal, the excavation and solidification processes are carried out using construction machines suitable for each process, which is superior to the conventional soil cement diaphragm wall construction method in which both the excavation and solidification processes are carried out using a single construction machine, in that it improves the quality of the solidified wall and shortens the construction period. However, in recent years, there has been a demand for the construction of soil cement diaphragm walls of even higher quality and for a shorter construction period.
本発明は、以上のとおりの事情に鑑みてなされたものであり、ソイルセメント連続壁の品質を向上させるとともに、施工性を向上させることにより施工コストを低く抑えることが可能なソイルセメント地中連続壁施工法を提供することを課題とする。 The present invention was made in consideration of the above circumstances, and aims to provide a soil cement diaphragm wall construction method that improves the quality of soil cement diaphragm walls and reduces construction costs by improving workability.
本発明は、上記の課題を解決するために、以下のことを特徴としている。
第1に、本発明のソイルセメント地中連続壁施工法は、単軸又は多軸の柱列式施工機の先端部から、非硬化性注入材を吐出しつつ掘削を行い、掘削土と前記非硬化性注入材の混合土からなる掘削領域を造成する掘削工程と、
前記掘削工程の後に、水平多軸式施工機の先端部から固化材スラリーを吐出し、前記混合土領域の混合土と混練、固化させて、固化領域を造成する固化工程を有するソイルセメント地中連続壁工法であって、
前記掘削工程により、前記水平多軸式施工機の掘削幅を基準とした所定の間隔の未施工領域を設けて混合土領域を造成し、
前記未施工領域と隣接する混合土領域に対して前記固化工程を行い固化領域とした後、該固化領域に隣接する前記未施工領域に対して、前記掘削工程及び前記固化工程を行うことを特徴とする。
第2に、前記第1の発明のソイルセメント地中連続壁施工法において、前記水平多軸式施工機の掘削幅を基準とした間隔W’が、水平多軸式施工機の掘削幅をW、ラップ長をLoとしたときに、W’=W-Lo(Loは0を含む)で表されることが好ましい。
第3に、前記第1又は第2の発明のソイルセメント地中連続壁施工法において、前記固化工程の後に、前記固化領域に芯材を挿入する芯材挿入工程を有することが好ましい。
第4に、前記第1から第3の発明のソイルセメント地中連続壁施工法において、前記非硬化性注入材として気泡又は気泡と水を使用することが好ましい。
第5に、前記第4の発明のソイルセメント地中連続壁施工法において、前記気泡の添加量を、TF値が150~220mmの範囲となるように調整することが好ましい。
第6に、前記第1から第5の発明のソイルセメント地中連続壁施工法において、前記非硬化性注入材として、水を吸収し膨張した膨潤吸水ポリマー又は水を吸収して膨潤した膨潤ポリマーに水を添加した膨潤吸水ポリマー分散液を使用することが好ましい。
第7に、前記第1から第6の発明のソイルセメント地中連続壁施工法において、前記固化材スラリーに消泡剤を配合したことが好ましい。
In order to solve the above problems, the present invention has the following features.
First, the soil cement underground diaphragm wall construction method of the present invention includes an excavation step in which an excavation area is created consisting of a mixture of excavated soil and the non-hardening grouting material by excavating the soil while discharging a non-hardening grouting material from the tip of a single-axis or multi-axis column-type construction machine;
A soil cement underground continuous wall construction method having a solidification process in which a solidification material slurry is discharged from the tip of a horizontal multi-axis construction machine after the excavation process, mixed with the mixed soil of the mixed soil area, and solidified to create a solidified area,
The excavation process provides an unconstructed area at a predetermined interval based on the excavation width of the horizontal multi-axis construction machine to create a mixed soil area;
The method is characterized in that the solidification process is carried out on a mixed soil area adjacent to the unconstructed area to form a solidified area, and then the excavation process and the solidification process are carried out on the unconstructed area adjacent to the solidified area.
Secondly, in the soil cement underground continuous wall construction method of the first invention, it is preferable that the interval W' based on the excavation width of the horizontal multi-shaft construction machine is expressed as W' = W - Lo (Lo includes 0), where W is the excavation width of the horizontal multi-shaft construction machine and Lo is the lap length.
Thirdly, in the soil cement diaphragm wall construction method of the first or second invention, it is preferable to have a core material inserting step of inserting a core material into the solidified region after the solidification step.
Fourthly, in the soil cement diaphragm wall construction methods of the first to third inventions, it is preferable to use air bubbles or air bubbles and water as the non-hardening injection material.
Fifth, in the soil cement diaphragm wall construction method of the fourth invention, it is preferable to adjust the amount of air bubbles added so that the TF value is in the range of 150 to 220 mm.
Sixth, in the soil cement underground continuous wall construction method of the first to fifth inventions, it is preferable to use, as the non-hardening injection material, a swelling water-absorbing polymer that has absorbed water and expanded, or a swelling water-absorbing polymer dispersion in which water has been added to a swelling polymer that has absorbed water and expanded.
Seventh, in the soil cement diaphragm wall construction method according to the first to sixth inventions, it is preferable that an antifoaming agent is mixed into the solidification material slurry.
本発明のソイルセメント地中連続壁施工法によれば、特定の順序で、施工能力の異なる柱列式施工機と水平多軸式施工機の2台のソイルセメント施工機を同時並行で使用し、各々の施工能力を最大限に発揮させることにより、ソイルセメント地中連続壁の品質を向上させるとともに、施工単価を安価にすることが可能となる。また、掘削施工時に微小な気泡を掘削土と混合し、非硬化性の気泡混合土壁を造成することにより、2台の施工機の並行作業が可能となる。 According to the soil cement diaphragm wall construction method of the present invention, two soil cement construction machines, a column-type construction machine and a horizontal multi-axis construction machine, which have different construction capabilities, are used simultaneously in a specific order, and by maximizing the construction capabilities of each machine, it is possible to improve the quality of the soil cement diaphragm wall and reduce the construction cost. In addition, by mixing tiny air bubbles with the excavated soil during excavation construction and creating a non-hardening air-bubble mixed soil wall, it is possible to operate the two construction machines in parallel.
本発明のソイルセメント地中連続壁施工法は、単軸又は多軸の柱列式施工機の先端部から非硬化性注入材を吐出しつつ掘削を行い、掘削土と非硬化性注入材の混合土による掘削領域を造成する掘削工程と、該掘削工程の後に、水平多軸式施工機の先端部から、固化材スラリーを吐出・混練しつつ掘削と同時に固化させる固化工程を有している。 The soil cement underground diaphragm wall construction method of the present invention includes an excavation process in which excavation is performed while a non-hardening grout material is discharged from the tip of a single-axis or multi-axis column-type construction machine, and an excavation area is created with a mixture of excavated soil and non-hardening grout material, and a solidification process in which a solidification material slurry is discharged and mixed from the tip of a horizontal multi-axis construction machine after the excavation process, and solidified at the same time as excavation.
そして、掘削工程により、水平多軸式施工機の掘削幅を基準とした所定の間隔の未施工領域を設けて混合土領域を造成し、未施工領域と隣接する混合土領域に対して固化工程を行い固化領域とした後、該固化領域に隣接する未施工領域に対して掘削工程及び前記固化工程を行うことを特徴としている。 Then, in the excavation process, a mixed soil area is created by providing unconstructed areas at a predetermined interval based on the excavation width of the horizontal multi-axis construction machine, and a solidification process is carried out on the mixed soil area adjacent to the unconstructed area to form a solidified area, after which the excavation process and the solidification process are carried out on the unconstructed area adjacent to the solidified area.
以下に、本発明の実施形態について図を用いて説明する。図1は、本発明の施工工程の概略断面図(1)及び概略平面図(2)を示しており、(A)は掘削工程、(B)は固化工程、(C)は芯材挿入工程を示している。 The following describes an embodiment of the present invention with reference to the drawings. Figure 1 shows a schematic cross-sectional view (1) and a schematic plan view (2) of the construction process of the present invention, where (A) shows the excavation process, (B) shows the solidification process, and (C) shows the core material insertion process.
<掘削工程>
本実施形態のソイルセメント地中連続壁施工法の手順は、まず、施工対象の原地盤に対して、単軸又は多軸の柱列式施工機1を用いて、その先端部より非硬化性の注入材を添加しつつ掘削を行い、掘削土と混合土からなる掘削領域11を造成する。
<Drilling process>
The procedure for the soil cement underground continuous wall construction method of this embodiment is as follows: first, a single- or multi-axis column-type construction machine 1 is used to excavate the original ground to be constructed while adding a non-hardening injection material from the tip of the machine, thereby creating an excavation area 11 consisting of excavated soil and mixed soil.
掘削工程を施工する単軸又は多軸の柱列式施工機1は、次工程の固化工程を施工する水平多軸式施工機2よりも掘削能力に優れた柱列式施工機1を選定して使用することが好ましく、特に3軸又は5軸の柱列式施工機1を用いることが好ましい。具体的には、3軸又は5軸のオーガー削孔混練軸施工機械を好適に用いることができる。なお、図1(A)に示す実施形態では、3軸の柱列式施工機1を用いた掘削工程を表している。 It is preferable to select and use a single-axis or multi-axis column-type construction machine 1 that has better excavation capabilities than the horizontal multi-axis construction machine 2 that performs the next solidification process, and it is particularly preferable to use a three-axis or five-axis column-type construction machine 1. Specifically, a three-axis or five-axis auger drilling and kneading shaft construction machine can be suitably used. Note that the embodiment shown in Figure 1 (A) shows the excavation process using a three-axis column-type construction machine 1.
掘削能力に優れた柱列式施工機1を用いることにより、掘削工程の直後に固化工程を施工する場合であっても、固化工程を滞らせることがなくなる。なお、この場合の施工効率とは、単位時間当たりの施工進行速度を意味し、施工効率がよいとは、具体的には、次の固化工程よりも掘削工程の進行時間が短いことを意味している。 By using the column-type construction machine 1 with excellent excavation capabilities, the solidification process will not be delayed even if the solidification process is carried out immediately after the excavation process. Note that in this case, construction efficiency means the construction progress speed per unit time, and good construction efficiency specifically means that the progress time of the excavation process is shorter than that of the following solidification process.
柱列式施工機1の先端部から吐出する非硬化性注入材としては、気泡又は、気泡と水を使用することが好ましい。掘削土と、気泡又は気泡と水の混合比率は、掘削土の物性値と混合土の流動性の要求値により異なるが、一般的には混合土の流動性をテーブルフロー値(以下、TF値と略称する)(JIS R 5201:2015)で表した場合、次の固化行程を好適に行うこと、また、固化工程後に芯材31の挿入を適切に行い、混合土の流動性と壁体の安定性を両立させることを考慮して、TF値は150~220mmの範囲が好ましく、経験値として170~200mmがより好ましい。 As the non-hardening injection material discharged from the tip of the column-type construction machine 1, it is preferable to use air bubbles or air bubbles and water. The mixing ratio of the excavated soil to air bubbles or air bubbles and water varies depending on the physical properties of the excavated soil and the required fluidity of the mixed soil. In general, when the fluidity of the mixed soil is expressed as a table flow value (hereinafter abbreviated as TF value) (JIS R 5201:2015), the TF value is preferably in the range of 150 to 220 mm, and more preferably 170 to 200 mm as an empirical value, in order to perform the next solidification process appropriately and to properly insert the core material 31 after the solidification process and to achieve both the fluidity of the mixed soil and the stability of the wall.
図2に含水比(W:10~25%)の砂質土における気泡添加率とTF値の関係のグラフを示す。なお、気泡添加率とは掘削土の乾燥重量に対する起泡剤の質量%を意味する。このグラフによると、気泡添加率を増加させるとTF値が150~220mmに容易に増加することがわかる。 Figure 2 shows a graph of the relationship between the foam addition rate and TF value for sandy soil with a water content (W: 10-25%). The foam addition rate refers to the mass percentage of foaming agent relative to the dry weight of the excavated soil. This graph shows that increasing the foam addition rate easily increases the TF value to 150-220 mm.
また、混合土のTF値を上記条件とする場合、施工性や経済性の観点から、掘削土が粘性土の場合には、掘削土1m3当たり気泡が0.3m3、水が0.3m3程度の条件が好ましく、砂質土の場合には、気泡が0.2m3、水が0.1m3程度の条件が好ましい。 In addition, when the TF value of the mixed soil is set under the above conditions, from the standpoints of workability and economy, if the excavated soil is clayey, it is preferable to have approximately 0.3 m3 of air bubbles and 0.3 m3 of water per 1 m3 of excavated soil, and if the excavated soil is sandy, it is preferable to have approximately 0.2 m3 of air bubbles and 0.1 m3 of water.
一方、気泡添加率を多くすると流動性は向上するが、混合土の比重は小さくなる。そのため、壁体の安定性を考慮した場合、比重を1.05以上にする必要があり、そのための気泡注入量は約0.8m3/m3以下に保つことが必要である。 On the other hand, if the air foam addition rate is increased, the fluidity improves, but the specific gravity of the mixed soil decreases. Therefore, when considering the stability of the wall, the specific gravity needs to be 1.05 or more, and the amount of air foam injection for this needs to be kept at about 0.8 m3 / m3 or less.
さらに、所望の気泡を発生させるために起泡剤を用いることができる。起泡剤としては、通常公知の界面活性剤を用いることができるが、なかでも気泡そのもの、さらに、掘削土と混合したときにも消泡し難く、酸やアルカリ等の化学的安定性に優れ、かつ起泡能力に優れる起泡剤が望まれ、例えば、アルキルサルフェート系界面活性剤を好適に用いることができる。 Furthermore, a foaming agent can be used to generate the desired bubbles. As the foaming agent, a known surfactant can usually be used, but among them, a foaming agent that is difficult to defoam even when mixed with the excavated soil, has excellent chemical stability against acids and alkalis, and has excellent foaming ability is desired, and for example, an alkyl sulfate surfactant can be preferably used.
具体的には、アルキルサルフェート系界面活性剤のWTM起泡剤(フローリック社のWTM起泡剤原液を清浄な水で20倍に希釈したもの)を25倍に起泡し、比重0.04、最頻値が100μm程度に起泡させたものを好適に使用できる。上記の気泡を使用した場合の実績によると、1週間は気泡混合土の流動性等の変化がなく好適に使用できることが確認されている。このことより、次の固化工程は掘削工程の終了後1週間以内に施工することが望ましい。 Specifically, it is suitable to use WTM foaming agent, an alkyl sulfate surfactant (WTM foaming agent stock solution from Floric Co., Ltd. diluted 20 times with clean water) foamed 25 times to a specific gravity of 0.04 and a mode of about 100 μm. According to the results of using the above foam, it has been confirmed that the foamed soil can be used suitably for one week without any change in the fluidity, etc. of the foamed soil. For this reason, it is desirable to carry out the next solidification process within one week after the end of the excavation process.
また、本実施形態の非硬化性注入材では、水を吸収して膨潤した膨潤ポリマー又は、水を吸収して膨潤した膨潤ポリマーにさらに水を添加した膨潤ポリマー分散液を用いることもできる。膨潤ポリマー分散液を非硬化性注入材とする場合には、TF値を170mm以上とするために、掘削土1m3当たり粘性土では膨潤ポリマー分散液を0.3m3、砂質土では0.2m3を用いるのが好ましい。 In addition, the non-hardening grout of this embodiment can use a swelling polymer that has absorbed water and swelled, or a swelling polymer dispersion in which water has been added to a swelling polymer that has absorbed water and swelled. When using a swelling polymer dispersion as the non-hardening grout, it is preferable to use 0.3 m3 of swelling polymer dispersion for clayey soil and 0.2 m3 for sandy soil per m3 of excavated soil in order to achieve a TF value of 170 mm or more .
膨潤ポリマーの種類は、デンプン系、セルロース系及びポリマー系統があるが合成ポリマー系の膨潤ポリマー(三洋化成社のGEOSAP)では、清浄な水1m3当たりGEOSAPを0.5~1.5kg、好ましくは水1m3当たり1kgを添加し、十分吸水した分散液を非硬化性注入材として使用することが好ましい。 There are three types of swelling polymers: starch-based, cellulose-based, and polymer-based. In the case of a synthetic polymer swelling polymer (GEOSAP from Sanyo Chemical Industries), it is preferable to add 0.5 to 1.5 kg of GEOSAP per 1 m3 of clean water, preferably 1 kg per 1 m3 of water, and use the resulting dispersion that has absorbed sufficient water as a non-hardening injection material.
柱列式施工機1により上記の非硬化性注入材を添加しつつ施工深度まで掘削を行い、引き上げることにより、掘削土と非硬化性注入材の混合土による掘削領域11を造成することができる。この混合土による掘削領域11は、所定の期間、安定を保ち施工に必要な流動性を保つことができるため、時間を置いても次工程の固化工程を適切に行うことができる。 The column-type construction machine 1 excavates to the construction depth while adding the non-hardening grouting material, and then pulls it up, creating an excavation area 11 made of a mixture of excavated soil and non-hardening grouting material. This mixed soil excavation area 11 remains stable for a specified period of time and retains the fluidity required for construction, so the next solidification process can be carried out properly even after a long time has passed.
<固化工程>
次に、上記掘削工程により造成した掘削領域11に対して固化工程を行う。図1(B)は、本実施形態における固化工程を示している。固化工程で使用する水平多軸式施工機2は、撹拌能力に優れた施工機が用いられる。具体的にはBC掘削機(バウアーマシーネン社)、SMX掘削機(東亜利根ボーリング社)等を例示することができる。水平多軸式施工機2は、掘削工程において柱列式施工機1で造成した掘削領域11に対し、先端部から固化材スラリーを注入しつつ、これらと混合土とを混合、攪拌させながら沈下させ、底部に到着後、さらに固化材スラリーを注入しながら混合、攪拌して引き上げる。これにより、ソイルセメント地中壁の固化領域22を造成することができる。
<Solidification process>
Next, a solidification process is performed on the excavation area 11 created by the excavation process. FIG. 1(B) shows the solidification process in this embodiment. The horizontal multi-shaft construction machine 2 used in the solidification process is a construction machine with excellent mixing ability. Specifically, a BC excavator (Bauer Maschinen) and an SMX excavator (Toa Tone Boring) can be exemplified. The horizontal multi-shaft construction machine 2 injects solidification material slurry from the tip into the excavation area 11 created by the column-type construction machine 1 in the excavation process, mixes and stirs the solidification material slurry with the mixed soil, and sinks it down. After arriving at the bottom, the solidification material slurry is further injected, mixed, stirred, and pulled up. This allows the solidification area 22 of the soil cement underground wall to be created.
通常、施工対象の原地盤に対して、水平多軸式施工機2による掘削を行う場合、水平多軸式施工機2は比較的施工進行速度が遅いため掘削に時間がかかっていた。これに対して、本発明のソイルセメント地中連続壁施工法では、まず、柱列式施工機1による掘削領域11を造成しておき、固化工程ではその掘削領域11をなぞるように掘削するとともに、掘削領域11の混合土と固化剤スラリーを撹拌、混合して固化するため、掘削及び撹拌ストレスが少なく、非常に短い施工時間で固化工程を行うことができる。 Normally, when a horizontal multi-axis construction machine 2 is used to excavate the original ground on which construction is to be performed, the horizontal multi-axis construction machine 2 has a relatively slow construction progress speed, so excavation takes a long time. In contrast, in the soil cement diaphragm wall construction method of the present invention, first, an excavation area 11 is created using a column-type construction machine 1, and in the solidification process, excavation is performed by tracing the excavation area 11, and the mixed soil and solidification agent slurry in the excavation area 11 are stirred, mixed, and solidified. This means that there is little excavation and mixing stress, and the solidification process can be completed in a very short construction time.
また、柱列式施工機1による掘削領域11は、オーガー掘削機等により造成された掘削領域11であるため、通常、図1(A)に示すように円柱が繋がった形状の掘削溝が形成される。一方、次の固化工程において、掘削領域11に対して水平多軸式施工機2を用いて固化工程を行うことにより、図1(B)に示すような、掘削溝が上面視で矩形形状の整った固化領域22とすることができる。かかる観点から、固化工程に用いる水平多軸式施工機2の掘削幅は、柱列式施工機1の掘削幅以上の寸法とするのが好ましい。 The excavation area 11 by the columnar construction machine 1 is an excavation area 11 created by an auger excavator or the like, so an excavation groove is usually formed in the shape of connected cylinders as shown in FIG. 1(A). On the other hand, in the next solidification process, the solidification process is performed on the excavation area 11 using a horizontal multi-axis construction machine 2, so that the excavation groove becomes a solidified area 22 with a regular rectangular shape when viewed from above as shown in FIG. 1(B). From this perspective, it is preferable that the excavation width of the horizontal multi-axis construction machine 2 used in the solidification process is equal to or larger than the excavation width of the columnar construction machine 1.
また、使用する水平多軸式施工機2は、上記の固化工程の条件において、掘削工程で用いる柱列式施工機1と、単位時間当たりの施工進行速度が同等程度となる施工機を選択することが望ましい。これにより、掘削工程の直後に連続して固化工程を行うことが可能となり、施工期間を大幅に短縮することが可能となる。 In addition, it is desirable to select a horizontal multi-axis construction machine 2 that, under the conditions of the solidification process described above, has a construction progress speed per unit time that is approximately the same as that of the column row construction machine 1 used in the excavation process. This makes it possible to carry out the solidification process immediately after the excavation process, and significantly shortens the construction period.
また、固化工程において、水平多軸式施工機2の先端部から吐出された固化剤スラリーは、例えば、図1、図3に示すようなBC掘削機を用いた場合、回転するカッターホイールにより混合土に一様に混合され、良質な固化領域22が造成される。なお、本発明で用いる固化剤スラリーとしてはセメントミルク等を好適に用いることができる。 In addition, in the solidification process, when a BC excavator such as that shown in Figures 1 and 3 is used, the solidification agent slurry discharged from the tip of the horizontal multi-axis construction machine 2 is uniformly mixed into the mixed soil by the rotating cutter wheel, creating a high-quality solidified area 22. Note that cement milk or the like can be suitably used as the solidification agent slurry used in the present invention.
さらに、固化材スラリーに対して消泡剤を添加することができる。固化工程において、消泡剤を添加し、掘削工程で造成した混合土中の気泡を消泡させることにより、固化領域22の強度を増加させることができる。消泡剤としては、起泡剤に応じて適宜選択することができる。また、固化工程において、水平多軸式施工機2を引き上げた直後の掘削領域11の流動性は、後述する芯材挿入行程を考慮した場合、TF値で170mm以上とすることが望ましい。 In addition, an antifoaming agent can be added to the solidification material slurry. In the solidification process, an antifoaming agent is added to eliminate the air bubbles in the mixed soil created in the excavation process, thereby increasing the strength of the solidified area 22. The antifoaming agent can be appropriately selected depending on the foaming agent. In addition, in the solidification process, it is desirable that the fluidity of the excavation area 11 immediately after the horizontal multi-axis construction machine 2 is raised be 170 mm or more in terms of TF value, taking into account the core material insertion process described below.
また、本発明のソイルセメント地中連続壁施工法では、図3に示すように、固化工程において、掘削工程による掘削深度よりも深く掘削することもできる。具体的には、掘削工程における合理的な施工深度をD、計画深度をD’とした場合、まず、図3(A)に示すように、柱列式施工機1により掘進機の先端部から非硬化性注入材を吐出しながら、掘削土と非硬化性注入材の気泡混合土を造成しつつ深度Dまで掘削する。なお、この場合の気泡混合土のTF値は150~200mmが好ましい。 In addition, in the soil cement diaphragm wall construction method of the present invention, as shown in Figure 3, in the solidification process, it is also possible to excavate deeper than the excavation depth in the excavation process. Specifically, if the reasonable construction depth in the excavation process is D and the planned depth is D', first, as shown in Figure 3 (A), the column-type construction machine 1 excavates to a depth D while discharging the non-hardening grout from the tip of the tunneling machine, creating an aerated soil mixture of the excavated soil and the non-hardening grout. In this case, the TF value of the aerated soil mixture is preferably 150 to 200 mm.
そして、図3(B)に示すように、固化工程において、さらに計画深度D’までの掘削を行い、水平多軸式施工機2の先端部から固化材スラリーを吐出して、混合土と混練しつつ引上げ、固化領域22のソイルセメント地中壁を造成する。そしてその後、図3(C)に示すように、ソイルセメント地中壁が硬化する前に芯材31を挿入する。 Then, as shown in FIG. 3(B), in the solidification process, further excavation is performed to the planned depth D', and solidification material slurry is discharged from the tip of the horizontal multi-axis construction machine 2 and pulled up while being mixed with the mixed soil, to construct a soil cement underground wall in the solidification area 22. Then, as shown in FIG. 3(C), a core material 31 is inserted before the soil cement underground wall hardens.
<芯材挿入工程>
また、本実施形態のソイルセメント地中連続壁施工法においては、必要に応じて固化工程の後に芯材31を挿入することができる。図1(C)は本実施形態の芯材挿入工程を示している。本実施形態の芯材挿入工程では、クローラークレーン等の芯材挿入用クレーンを用いて芯材31の挿入を行っている。挿入する芯材31としては、一般に造成される固化領域22の補強に用いる芯材を用いることができ、具体的には、例えば、H形鋼等の鋼材、プレキャスト製のコンクリート壁体あるいは鋼製の壁体等を用いることができる。固化領域22に芯材31を挿入することにより、曲げ強度特性に優れたソイルセメント連続壁を造成することができる。
<Core Insertion Process>
In addition, in the soil cement diaphragm wall construction method of this embodiment, the core material 31 can be inserted after the solidification step as necessary. FIG. 1(C) shows the core material insertion step of this embodiment. In the core material insertion step of this embodiment, the core material 31 is inserted using a crane for inserting the core material, such as a crawler crane. As the core material 31 to be inserted, a core material generally used for reinforcing the solidified area 22 that is constructed can be used, and specifically, for example, a steel material such as an H-shaped steel, a precast concrete wall, or a steel wall can be used. By inserting the core material 31 into the solidified area 22, a soil cement diaphragm wall with excellent bending strength characteristics can be constructed.
なお、芯材挿入工程を行う場合には、固化工程での混合土と固化剤スラリーの混練により固化反応が開始するため、できる限り固化剤スラリーの固化反応が進行していない段階、即ち、固化工程の直後に芯材31の挿入を行うことが好ましい。 When performing the core material insertion process, the solidification reaction begins with the mixing of the mixed soil and the solidification agent slurry in the solidification process, so it is preferable to insert the core material 31 at a stage when the solidification reaction of the solidification agent slurry has not progressed as much as possible, that is, immediately after the solidification process.
<施工手順>
本発明のソイルセメント地中連続壁施工法の手順は、上記掘削工程により、所定の間隔の未施工領域12を設けて混合土領域を造成し、該混合土領域に対して固化工程を行い固化領域22とした後、未施工領域12に対して、掘削工程及び固化工程を行うことを特徴としている。
<Installation procedure>
The procedure of the soil cement underground continuous wall construction method of the present invention is characterized in that the excavation process is used to create a mixed soil area by providing unconstructed areas 12 at a predetermined interval, and then a solidification process is performed on the mixed soil area to create a solidified area 22, and then an excavation process and a solidification process are performed on the unconstructed area 12.
ここで、本発明のソイルセメント地中連続壁施工法における、所定の間隔の未施工領域12は、固化工程で使用する水平多軸式施工機2の掘削幅を基準として決定する間隔であり、当該間隔をW’、水平多軸式施工機2の掘削幅をW、ラップ長をLoとしたときに、W’=W-Loで決定することができる。掘削幅Wは、柱列式施工機1と水平多軸式施工機2の掘削幅を比較し、掘削幅の大きいほうに合わせるのが好ましいが、一般に、柱列式施工機1の幅は1450~2000mm程度であり、水平多軸式施工機2の幅は2350mmであるので、通常、水平多軸式施工機2の掘削幅を基準とした掘削幅Wで設定する。なお、ラップ長Loとは、未施工領域12と水平多軸式施工機2の掘削幅の差、即ち、固化領域22と水平多軸式施工機2の掘削幅の重なり部分の寸法を意味している。 Here, in the soil cement underground diaphragm wall construction method of the present invention, the predetermined interval of the unconstructed area 12 is an interval determined based on the excavation width of the horizontal multi-shaft construction machine 2 used in the solidification process, and can be determined by W' = W - Lo, where W' is the interval, W is the excavation width of the horizontal multi-shaft construction machine 2, and Lo is the lap length. It is preferable to compare the excavation widths of the columnar construction machine 1 and the horizontal multi-shaft construction machine 2 and set the excavation width W to the larger one, but since the width of the columnar construction machine 1 is generally about 1450 to 2000 mm and the width of the horizontal multi-shaft construction machine 2 is 2350 mm, the excavation width W is usually set based on the excavation width of the horizontal multi-shaft construction machine 2. The lap length Lo means the difference between the excavation width of the unconstructed area 12 and the horizontal multi-shaft construction machine 2, that is, the dimension of the overlapping part of the excavation width of the solidification area 22 and the horizontal multi-shaft construction machine 2.
また、図4に示すように、未施工領域12と水平多軸式施工機2の掘削幅が隣り合う両側の固化領域22に跨るラップ長Lo1、Lo2が生じるような場合には、LoはLo1とLo2の合計寸法として設定する。上記の条件でLoを設けることにより、未施工領域12が残存することがなく、確実なソイルセメント地中連続壁を構築することが可能となる。なお、高い寸法精度で掘削工程及び固化工程の実施が可能な場合には、重なり部のLoを0にしたり、限りなく0に近づけることもできる。 As shown in FIG. 4, when overlap lengths Lo1 and Lo2 occur that span the solidified areas 22 on both sides of the unconstructed area 12 and the excavation width of the horizontal multi-axis construction machine 2, Lo is set as the total dimension of Lo1 and Lo2. By setting Lo under the above conditions, it is possible to construct a reliable soil cement underground continuous wall without leaving any unconstructed area 12. Furthermore, when the excavation process and the solidification process can be carried out with high dimensional accuracy, Lo in the overlapping portion can be set to 0 or as close to 0 as possible.
さらに、本発明のソイルセメント地中連続壁施工法にける未施工領域12の間隔W’は、通常、水平多軸式施工機2一機分の幅を基準として設定されるが、施工現場の状況等に応じてW’を水平多軸式施工機2一機分の幅の整数倍の寸法に設定することもできる。なお、この場合の整数倍は、通常2~3倍が考慮される。また、この場合の未施工領域12の施工手順としては、未施工領域12W’に対して一度に掘削工程、固化工程を行ってもよいし、複数回に分割して掘削工程、固化工程を行ってもよい。 Furthermore, the spacing W' of the unconstructed area 12 in the soil cement diaphragm wall construction method of the present invention is usually set based on the width of one horizontal multi-axis construction machine 2, but W' can also be set to an integer multiple of the width of one horizontal multi-axis construction machine 2 depending on the conditions at the construction site. In this case, the integer multiple is usually considered to be 2 to 3 times. In addition, as the construction procedure for the unconstructed area 12 in this case, the excavation process and solidification process may be performed on the unconstructed area 12W' all at once, or the excavation process and solidification process may be performed in multiple divided steps.
以下に、本発明のソイルセメント地中連続壁施工法の手順について、さらに詳細に説明する。図5は、本発明のソイルセメント地中連続壁施工法の進行をステップ1~9の平面図で示したものである。図5において、ステップ1は掘削工程、ステップ2は掘削工程、固化工程、ステップ3、4は掘削工程、固化工程、芯材挿入工程を施工中の平面位置を示している。ステップ5以降においては、本発明の特徴である未施工領域12に対して、掘削工程、固化工程及び芯材挿入工程を並行に施工する工程を示している。 The procedure of the soil cement diaphragm wall construction method of the present invention will be described in more detail below. Figure 5 shows the progress of the soil cement diaphragm wall construction method of the present invention in plan views of steps 1 to 9. In Figure 5, step 1 shows the excavation process, step 2 shows the excavation process and solidification process, and steps 3 and 4 show the planar positions during the excavation process, solidification process, and core material insertion process. Step 5 and onwards show the process of carrying out the excavation process, solidification process, and core material insertion process in parallel in the unconstructed area 12, which is a feature of the present invention.
まず、ステップ1では、掘削工程により掘削領域11(1)を造成する。次にステップ2では、掘削領域11(1)に対して固化工程を行い、固化領域22(1)を造成する。また、これと同時に、固化領域22(1)に隣接する未施工領域12(2)の間隔を残して、新たに掘削工程により掘削領域11(3)を造成する。 First, in step 1, an excavation process is carried out to create an excavation area 11(1). Next, in step 2, a solidification process is carried out on the excavation area 11(1) to create a solidified area 22(1). At the same time, a new excavation area 11(3) is created by the excavation process, leaving a gap for the unconstructed area 12(2) adjacent to the solidified area 22(1).
そして、ステップ3では、固化領域22(1)に対して芯材挿入工程を行い、ソイルセメント地中壁(1)を構築する。また、これと同時に掘削領域11(3)に対して固化工程を行い、固化領域22(3)を造成するとともに、未施工領域12(4)の間隔を残して新たに掘削工程により掘削領域11(5)を造成する。 In step 3, a core material insertion process is carried out in the solidified area 22(1) to construct the soil cement underground wall (1). At the same time, a solidification process is carried out in the excavated area 11(3) to create the solidified area 22(3), and a new excavation process is carried out to create the excavated area 11(5), leaving a gap for the unconstructed area 12(4).
ステップ4では、固化領域22(3)に対して芯材挿入工程を行い、ソイルセメント地中壁(3)を構築する。また、これと同時に掘削領域11(5)に対して固化工程を行い、固化領域22(5)を造成するとともに、未施工領域12(6)の間隔を残して新たに掘削工程により掘削領域11(7)を造成する。 In step 4, a core material insertion process is carried out in the solidified area 22 (3) to construct the soil cement underground wall (3). At the same time, a solidification process is carried out in the excavated area 11 (5) to create the solidified area 22 (5), and a new excavation process is carried out to create the excavated area 11 (7), leaving a gap for the unconstructed area 12 (6).
次に、ステップ5では、固化領域22(5)に対して芯材挿入工程を行い、ソイルセメント地中壁(5)を構築する。また、これと同時に掘削領域11(7)に対して固化工程を行い、固化領域22(7)を造成するとともに、未施工領域12(2)に対して新たに掘削工程により掘削領域11(2)を造成する。 Next, in step 5, a core material insertion process is carried out in the solidified area 22 (5) to construct the soil cement underground wall (5). At the same time, a solidification process is carried out in the excavated area 11 (7) to create the solidified area 22 (7), and a new excavation process is carried out in the unconstructed area 12 (2) to create the excavated area 11 (2).
ステップ6では、固化領域22(7)に対して芯材挿入工程を行い、ソイルセメント地中壁(7)を構築する。また、これと同時に掘削領域11(2)に対して固化工程を行い、固化領域22(2)を造成するとともに、未施工領域12(4)に対して新たに掘削工程により掘削領域11(4)を造成する。 In step 6, a core material insertion process is carried out in the solidified area 22 (7) to construct the soil cement underground wall (7). At the same time, a solidification process is carried out in the excavation area 11 (2) to create the solidified area 22 (2), and a new excavation process is carried out in the unconstructed area 12 (4) to create the excavation area 11 (4).
ステップ7では、固化領域22(2)に対して芯材挿入工程を行い、ソイルセメント地中壁(2)を構築する。また、これと同時に掘削領域11(4)に対して固化工程を行い、固化領域22(4)を造成するとともに、未施工領域12(6)に対して掘削領域11(6)を造成する。 In step 7, a core material insertion process is carried out in the solidified area 22(2) to construct the soil cement underground wall (2). At the same time, a solidification process is carried out in the excavated area 11(4) to create the solidified area 22(4) and to create the excavated area 11(6) in the unconstructed area 12(6).
ステップ8では、固化領域22(4)に対して芯材挿入工程を行い、ソイルセメント地中壁(4)を構築する。また、これと同時に掘削領域11(6)に対して固化工程を行い、固化領域22(6)を造成する。 In step 8, a core material insertion process is carried out in the solidified area 22 (4) to construct the soil cement underground wall (4). At the same time, a solidification process is carried out in the excavation area 11 (6) to create the solidified area 22 (6).
最後にステップ9では、残った固化領域22(6)に対して芯材挿入工程を行い、ソイルセメント地中壁(6)を構築する。上記ステップ1~9の順序の工程により、安定した高品質のソイルセメント地中連続壁を施工することができる。 Finally, in step 9, a core material insertion process is carried out in the remaining solidified area 22 (6) to construct the soil cement underground wall (6). By following the above steps 1 to 9 in sequence, a stable, high-quality soil cement underground diaphragm wall can be constructed.
以上、実施形態に基づき本発明のソイルセメント地中連続壁施工法を説明したが、本発明は上記の実施形態に何ら限定されるものではなく、その要旨を逸脱しない範囲内において各種の変更が可能である。 The soil cement underground diaphragm wall construction method of the present invention has been explained above based on an embodiment, but the present invention is not limited to the above embodiment in any way, and various modifications are possible within the scope of the gist of the invention.
例えば、上記実施形態では、直線状のソイルセメント地中連続壁の構築について説明したが、設計に応じて未施工領域12を設けつつ角度を変えたり、場所に応じて掘削幅を調整して施工することもできる。 For example, in the above embodiment, the construction of a linear soil cement underground continuous wall was described, but it is also possible to change the angle while leaving unconstructed areas 12 according to the design, or to adjust the excavation width according to the location.
また、上記実施形態では、芯材挿入工程により、固化領域22に芯材31を挿入してソイルセメント地中連続壁を構築しているが、設計に応じて芯材31を挿入せずソイルセメント地中連続壁を構築することもできる。 In addition, in the above embodiment, the core material 31 is inserted into the solidified area 22 in the core material insertion process to construct a soil cement underground continuous wall, but depending on the design, it is also possible to construct a soil cement underground continuous wall without inserting the core material 31.
以上の説明のとおり、本発明のソイルセメント地中連続壁施工法では、まず、未施工領域12を残しつつ、施工能力の異なる柱列式施工機1と水平多軸式施工機2を並行に使用して掘削領域11及び固化領域22を造成し、芯材挿入工程を行い、ソイルセメント地中壁を構築し、間隔を空けたソイルセメント地中壁を構築した段階で、先に残した未施工領域12に対して掘削領域11及び固化領域22を造成し、芯材挿入工程を行い、ソイルセメント地中連続壁を構築する。これにより、施工計画に柔軟性高い品質のソイルセメント地中連続壁を安価で構築することが可能となる。 As explained above, in the soil cement diaphragm wall construction method of the present invention, first, while leaving an unconstructed area 12, the excavation area 11 and the solidification area 22 are created using a column-type construction machine 1 and a horizontal multi-axis construction machine 2 with different construction capabilities in parallel, a core material insertion process is carried out, and a soil cement diaphragm wall is constructed. After the soil cement diaphragm wall with a gap is constructed, an excavation area 11 and a solidification area 22 are created in the previously left unconstructed area 12, a core material insertion process is carried out, and a soil cement diaphragm wall is constructed. This makes it possible to construct a high-quality soil cement diaphragm wall at low cost with high flexibility in construction planning.
1 柱列式施工機
11 掘削領域
12 未施工領域
2 水平多軸式施工機
22 固化領域(ソイルセメント地中壁)
3 芯材挿入用クレーン
31 芯材
1 Pillar row construction machine 11 Excavation area 12 Unconstructed area 2 Horizontal multi-axis construction machine 22 Solidification area (soil cement underground wall)
3 Core material insertion crane 31 Core material
Claims (7)
前記掘削工程の後に、水平多軸式施工機の先端部から固化材スラリーを吐出し、前記掘削領域の混合土と混練、固化させて、固化領域を造成する固化工程を有するソイルセメント地中連続壁工法であって、
前記掘削工程により前記掘削領域を造成した後、該掘削領域に対して前記固化工程を行い固化領域を造成するのと同時に、該固化領域から、前記水平多軸式施工機の掘削幅を基準とした所定の間隔の未施工領域を設けて、新たに前記掘削工程により掘削領域を造成し、
前記未施工領域と隣接する該掘削領域に対して前記固化工程を行い固化領域とした後、該固化領域に隣接する前記未施工領域に対して、前記掘削工程及び前記固化工程を行うことを特徴とするソイルセメント地中連続壁施工法。 An excavation step of excavating while discharging a non-hardening grout from the tip of a single-axis or multi-axis column-type construction machine to create an excavated area consisting of a mixture of excavated soil and the non-hardening grout;
A soil cement underground continuous wall construction method having a solidification process in which a solidification material slurry is discharged from the tip of a horizontal multi-axis construction machine after the excavation process, mixed with the mixed soil in the excavation area , and solidified to create a solidification area,
After the excavation area is created by the excavation process, the solidification process is performed on the excavation area to create a solidified area, and at the same time, an unconstructed area is provided at a predetermined interval based on the excavation width of the horizontal multi-axis construction machine from the solidified area , and a new excavation area is created by the excavation process .
A soil cement underground continuous wall construction method, characterized in that the solidification process is carried out on the excavated area adjacent to the unconstructed area to form a solidified area, and then the excavation process and the solidification process are carried out on the unconstructed area adjacent to the solidified area.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2020167581A JP7548766B2 (en) | 2020-10-02 | 2020-10-02 | Soil cement diaphragm wall construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2020167581A JP7548766B2 (en) | 2020-10-02 | 2020-10-02 | Soil cement diaphragm wall construction method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2022059775A JP2022059775A (en) | 2022-04-14 |
| JP7548766B2 true JP7548766B2 (en) | 2024-09-10 |
Family
ID=81124791
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2020167581A Active JP7548766B2 (en) | 2020-10-02 | 2020-10-02 | Soil cement diaphragm wall construction method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP7548766B2 (en) |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2008057117A (en) | 2006-08-29 | 2008-03-13 | Ohbayashi Corp | Soil cement structure and its construction method |
| JP5513182B2 (en) | 2009-03-12 | 2014-06-04 | 学校法人早稲田大学 | Stepwise solidification method |
| JP6466101B2 (en) | 2013-08-27 | 2019-02-06 | 学校法人早稲田大学 | Soil cement underground continuous wall construction method |
-
2020
- 2020-10-02 JP JP2020167581A patent/JP7548766B2/en active Active
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2008057117A (en) | 2006-08-29 | 2008-03-13 | Ohbayashi Corp | Soil cement structure and its construction method |
| JP5513182B2 (en) | 2009-03-12 | 2014-06-04 | 学校法人早稲田大学 | Stepwise solidification method |
| JP6466101B2 (en) | 2013-08-27 | 2019-02-06 | 学校法人早稲田大学 | Soil cement underground continuous wall construction method |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2022059775A (en) | 2022-04-14 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP7341429B2 (en) | Soil cement underground wall construction method | |
| JP6973878B2 (en) | Soil cement underground continuous wall construction method | |
| JP7548766B2 (en) | Soil cement diaphragm wall construction method | |
| JP5281213B1 (en) | Core material and soil cement continuous wall method using the same | |
| JP2000073354A (en) | Preparating method of ground improving body and preparating method of continuous walls | |
| JP5513182B2 (en) | Stepwise solidification method | |
| JP6466101B2 (en) | Soil cement underground continuous wall construction method | |
| JP6767542B1 (en) | Construction method of support pile | |
| JP5317938B2 (en) | Construction method of soil cement pillar and soil cement continuous wall | |
| JP4020858B2 (en) | Manufacturing method for underground structures | |
| JP4295880B2 (en) | Construction method of impermeable walls | |
| KR20160109395A (en) | Agitating road for excavating using soil earth cement mixing method and mixing agitator using the same | |
| KR100815220B1 (en) | Method of reinforcing the ground by injecting ground reinforcement into the injection device | |
| CN106638621A (en) | Implanting method of prefabricated plate pile | |
| JP2645322B2 (en) | Construction method of soil cement composite pile | |
| JPS6198817A (en) | Method of forming concrete wall of underground structure employing composite sheet pile and composite sheet pile as weir panel | |
| JP2004257210A (en) | Injection stirring method | |
| KR102733466B1 (en) | System for injecting fixative around high-strength pile using auger bit with compounder installed | |
| JP3523051B2 (en) | Ground improvement method | |
| JP3175368U (en) | Underground wall for preventing liquefaction of ground | |
| JP2007255020A (en) | Construction method of retaining wall | |
| JP2008111240A (en) | Construction method of underground wall | |
| JP3140770U (en) | Auger shaft | |
| JPS63284309A (en) | Formation of angular improved ground | |
| JP2004250897A (en) | Earth retaining wall construction method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20230825 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20240308 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20240312 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20240424 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20240806 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20240829 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 7548766 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |