JP7590169B2 - Power demand leveling system and program - Google Patents
[go: Go Back, main page]

JP7590169B2 - Power demand leveling system and program - Google Patents

Power demand leveling system and program Download PDF

Info

Publication number
JP7590169B2
JP7590169B2 JP2020197491A JP2020197491A JP7590169B2 JP 7590169 B2 JP7590169 B2 JP 7590169B2 JP 2020197491 A JP2020197491 A JP 2020197491A JP 2020197491 A JP2020197491 A JP 2020197491A JP 7590169 B2 JP7590169 B2 JP 7590169B2
Authority
JP
Japan
Prior art keywords
charge
power demand
battery
discharge
charging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2020197491A
Other languages
Japanese (ja)
Other versions
JP2022085689A (en
Inventor
達弘 藤原
秀和 鈴木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Information and Telecommunication Engineering Ltd
Original Assignee
Hitachi Information and Telecommunication Engineering Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Information and Telecommunication Engineering Ltd filed Critical Hitachi Information and Telecommunication Engineering Ltd
Priority to JP2020197491A priority Critical patent/JP7590169B2/en
Publication of JP2022085689A publication Critical patent/JP2022085689A/en
Application granted granted Critical
Publication of JP7590169B2 publication Critical patent/JP7590169B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/12Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
    • Y04S10/126Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation the energy generation units being or involving electric vehicles [EV] or hybrid vehicles [HEV], i.e. power aggregation of EV or HEV, vehicle to grid arrangements [V2G]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S30/00Systems supporting specific end-user applications in the sector of transportation
    • Y04S30/10Systems supporting the interoperability of electric or hybrid vehicles
    • Y04S30/12Remote or cooperative charging
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S30/00Systems supporting specific end-user applications in the sector of transportation
    • Y04S30/10Systems supporting the interoperability of electric or hybrid vehicles
    • Y04S30/14Details associated with the interoperability, e.g. vehicle recognition, authentication, identification or billing

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Secondary Cells (AREA)

Description

本発明は、事業所等における電気自動車(EV)が搭載するバッテリの充放電を考慮した電力需要平準化技術に関する。 The present invention relates to a power demand leveling technology that takes into account the charging and discharging of batteries installed in electric vehicles (EVs) at business establishments, etc.

通勤用に使用されているが昼間の電力需要ピーク時には使用されていないEV等のバッテリを利用して、低コストで電力負荷の平準化を図る技術がある。例えば、特許文献1には、「バッテリに貯えた電力を、電力会社から電気の供給を受ける電力需要者である事業所における電力需要ピーク時に放出して、電力負荷の平準化を図る。事業所において電力需要非ピーク時に、或いは各自動車所有者の深夜電力を利用して、複数の自動車の各バッテリを充電し、この充電した自動車のバッテリに貯えた電力を、事業所において事業所の電力需要ピーク時に放電する(要約抜粋)」技術が開示されている。 There is a technology that uses batteries of EVs and the like that are used for commuting but are not used during the daytime peak power demand to level out the power load at low cost. For example, Patent Document 1 discloses a technology that "levels out the power load by releasing the power stored in the batteries during peak power demand at a business, which is an electricity consumer that receives electricity from a power company. The batteries of multiple automobiles are charged at the business during non-peak power demand times or by using the late-night power of each automobile owner, and the power stored in the charged automobile batteries is discharged at the business during peak power demand times for the business (summary excerpt)."

具体的な手法として、例えば、特許文献2に「電力需要者に駐車中の電気自動車の運用予定に基づき、確保しておきたいバッテリ容量である必要容量を車両の使用開始までの複数の時刻と対応して運転者に入力させ、バッテリの全体容量から必要容量を減算した時刻毎の使用許諾容量を電力需給管理センタに出力する。電力需給の平準化のためにバッテリを充放電制御する際には、電力需給管理センタからの充放電指令に基づき時刻毎の使用許諾容量の範囲内で充放電を行う(要約抜粋)。」技術が開示されている。 As a specific method, for example, Patent Document 2 discloses a technology in which "based on the operation schedule of a parked electric vehicle, the driver of the electric power consumer inputs the required capacity, which is the battery capacity that the driver wants to reserve, corresponding to multiple times before the start of use of the vehicle, and the licensed capacity for each time, calculated by subtracting the required capacity from the total battery capacity, is output to the electric power supply and demand management center. When controlling the charging and discharging of the battery to level out the supply and demand of electric power, charging and discharging are performed within the licensed capacity for each time based on the charging and discharging command from the electric power supply and demand management center (summary excerpt)."

特開2007-282383号公報JP 2007-282383 A 国際公開第2012/017936号International Publication No. 2012/017936

事業者の電気料金契約(基本料金)は、実量制であり、電力需要のピーク負荷の実績で決まる。このため、ピーク負荷の低減(負荷平準化;電力需要平準化)は、事業者の電気料金契約の低減に直結する。 The electricity rate contract (basic rate) of the business operator is a metered system and is determined by the actual peak load of electricity demand. Therefore, reducing the peak load (load leveling; electricity demand leveling) directly leads to a reduction in the business operator's electricity rate contract.

特許文献1に開示の技術は、特定の電力使用モデル(具体的には、「谷-山-谷」モデル)を基準にした電力需要平準化方法であり、放電電力は、予め準備されているか、負荷の少ない期間に充電をして確保することを前提としている。したがって、このモデルから外れた電力使用では、適用が難しく、汎用性がない。また、EVのモビリティニーズ(使いたい時に必要なバッテリ残容量があること)については考慮がない。 The technology disclosed in Patent Document 1 is a power demand leveling method based on a specific power usage model (specifically, the "valley-peak-valley" model), and assumes that discharge power is prepared in advance or secured by charging during periods of low load. Therefore, it is difficult to apply to power usage that deviates from this model, and has no versatility. In addition, no consideration is given to the mobility needs of EVs (having the necessary remaining battery capacity when you want to use it).

特許文献2に開示の技術は、モビリティニーズを満たしながら、電力需要平準化を実現する技術である。しかし、モビリティニーズを満たすために、放電に使用する電力量を、運転者が予め時刻毎に指定し、その指定された上限電力量の範囲内で放電が行われる。すなわち、放電に使用可能な電力量は、運転者に依存する。したがって、EVに余剰電力があったとしても、活用しきれず、さらなる電力需要平準化の余地がある。 The technology disclosed in Patent Document 2 is a technology that achieves power demand leveling while satisfying mobility needs. However, in order to satisfy mobility needs, the driver specifies in advance for each time period the amount of power to be used for discharging, and discharging is performed within the range of the specified upper limit of power. In other words, the amount of power available for discharging depends on the driver. Therefore, even if an EV has surplus power, it cannot be fully utilized, and there is room for further power demand leveling.

本発明は、上記事情に鑑みてなされたもので、高い汎用性を有し、電気自動車のバッテリを十分に有効活用可能な電力需要平準化技術を提供することを目的とする。 The present invention was made in consideration of the above circumstances, and aims to provide a power demand leveling technology that is highly versatile and can fully and effectively utilize the batteries of electric vehicles.

本発明は、接続される電気自動車のバッテリの充放電を制御する充放電制御装置と、事業所全体の電力需要を制御する電力管理装置と、を備え、前記事業所の電力需要を平準化する電力需要平準化システムであって、前記電力管理装置は、前記バッテリが接続された際の残容量と、当該バッテリの予約情報とに基づいて、前記事業所の1日の需要電力の最大値を低減させる前記バッテリの充放電計画を立案する充放電計画立案部と、前記充放電計画立案部が立案した前記充放電計画に従って、前記充放電制御装置に充放電指示を行う指示部と、前記充放電計画を立案する対象日の所定時間帯毎の電力需要値を予測電力需要カーブとして予測する電力需要予測部と、前記予約情報として、前記バッテリの充電完了時刻と完了時の充電量とを取得する予約情報取得部と、前記バッテリの仕様をバッテリ情報として取得するバッテリ情報取得部と、を備え、前記充放電計画立案部は、前記充放電制御装置が検出したバッテリが接続された接続時刻と、前記予測電力需要カーブと、前記予約情報と、前記バッテリ情報と、を用いて、前記所定時間帯毎の当該バッテリに対する充電量および放電量を決定し、前記接続時刻と前記充電完了時刻とで定まる充放電可能期間の前記予測電力需要カーブの形状に応じて予め定めた立案手順に従って前記充放電計画を立案することを特徴とする。 The present invention provides an electric power demand leveling system that includes a charge/discharge control device that controls charging/discharging of a battery of a connected electric vehicle, and a power management device that controls the power demand of an entire business establishment, and that levels out the power demand of the business establishment, the power management device including a charge/discharge plan creating unit that creates a charge/discharge plan for the battery that reduces a maximum value of a daily power demand of the business establishment based on a remaining capacity when the battery is connected and reservation information for the battery, an instruction unit that issues charge/discharge instructions to the charge/discharge control device in accordance with the charge/discharge plan created by the charge/discharge plan creating unit, and a forecast power demand value for each predetermined time slot of a target day for which the charge/discharge plan is created, as a forecast power demand curve. the battery information acquisition unit acquires the charging completion time of the battery and the charge amount at the completion as the reservation information, and a battery information acquisition unit acquires the specifications of the battery as battery information, and the charge/discharge plan creation unit determines the charge amount and discharge amount for the battery for each of the specified time periods using the connection time when the battery was connected detected by the charge/discharge control device, the predicted power demand curve, the reservation information, and the battery information, and creates the charge/discharge plan according to a predetermined creation procedure in accordance with the shape of the predicted power demand curve for a chargeable/dischargeable period determined by the connection time and the charging completion time .

本発明によれば、高い汎用性を有し、電気自動車のバッテリを十分に有効活用可能な電力需要平準化技術を提供できる。上記した以外の課題、構成および効果は、以下の実施形態の説明により明らかにされる。 The present invention provides a highly versatile power demand leveling technology that can fully and effectively utilize the batteries of electric vehicles. Problems, configurations, and effects other than those described above will become clear from the description of the embodiments below.

(a)は、契約電力の決定手法を、(b)および(c)は、本発明の実施形態のユースケースを、それぞれ説明するための説明図である。FIG. 1A is an explanatory diagram for explaining a method for determining a contracted power, and FIGS. 1B and 1C are explanatory diagrams for explaining use cases of an embodiment of the present invention. 本発明の実施形態での電力平準化システムの全体構成図である。1 is an overall configuration diagram of a power leveling system according to an embodiment of the present invention. (a)は、本発明の実施形態の電力管理装置の機能ブロック図であり、(b)は、同電力管理装置のハードウェア構成図である。FIG. 1A is a functional block diagram of a power management apparatus according to an embodiment of the present invention, and FIG. (a)は、本発明の実施形態のEVバッテリの充電状態と用語を、(b)および(c)は、それぞれ、本発明の実施形態のEV予約情報データベース(DB)に格納されるデータ、および、バッテリ情報DBに、格納されるデータの一例を、説明するための説明図である。FIG. 1A is an explanatory diagram for explaining the charging state and terminology of an EV battery in an embodiment of the present invention, and FIG. 1B and FIG. 1C are explanatory diagrams for explaining an example of data stored in an EV reservation information database (DB) and an example of data stored in a battery information DB in an embodiment of the present invention, respectively. (a)、(b)および(c)は、それぞれ、本発明の実施形態の電力使用履歴DB、充放電計画DB、および充放電履歴DBに格納されるデータの一例を、説明するための説明図である。3A, 3B, and 3C are explanatory diagrams for explaining an example of data stored in a power usage history DB, a charge/discharge plan DB, and a charge/discharge history DB, respectively, according to an embodiment of the present invention. (a)および(b)は、それぞれ、本発明の実施形態の本来電力使用値および予測電力需要値の算出手法を説明するための説明図である。5A and 5B are diagrams illustrating a method for calculating an original power usage value and a predicted power demand value according to an embodiment of the present invention. (a)は、本発明の実施形態の予測電力需要カーブの一例を、(b)および(c)は、本発明の実施形態の概要を具体例で、それぞれ、説明するための説明図である。FIG. 1A is an explanatory diagram illustrating an example of a predicted power demand curve according to an embodiment of the present invention, and FIGS. 1B and 1C are explanatory diagrams illustrating an outline of an embodiment of the present invention using specific examples. (a)および(b)は、本発明の実施形態の充放電計画立案処理の概要を説明するための説明図である。1A and 1B are explanatory diagrams for explaining an outline of a charge/discharge plan formulation process according to an embodiment of the present invention. 本発明の実施形態の充放電計画立案処理のフローチャートである。4 is a flowchart of a charge/discharge plan formulation process according to an embodiment of the present invention. 本発明の実施形態の、個々のEVバッテリの充放電計画立案処理の概要を説明するための説明図である。FIG. 2 is an explanatory diagram for explaining an overview of a charging/discharging plan formulation process for each EV battery according to an embodiment of the present invention. (a)から(h)は、本発明の実施形態のモデルパターンをそれぞれ説明するための説明図である。1A to 1H are explanatory diagrams for explaining model patterns according to an embodiment of the present invention. (a)および(b)は、本発明の実施形態のモデルパターンaの充放電計画立案処理を、(c)および(d)は、本発明の実施形態のモデルパターンhの充放電計画立案処理を、それぞれ、説明するための説明図である。1A and 1B are explanatory diagrams for explaining the charge/discharge plan development process for model pattern a of an embodiment of the present invention, and FIG. 1C and 1D are explanatory diagrams for explaining the charge/discharge plan development process for model pattern h of an embodiment of the present invention, respectively. (a)は、本発明の実施形態の立案手順1の充放電計画立案処理のメイン処理のフローチャートであり、(b)は、本発明の実施形態の立案手順1の手順1充電計画立案処理のフローチャートである。1A is a flowchart of a main process of a charge/discharge plan formulation process in a formulation procedure 1 according to an embodiment of the present invention, and FIG. 1B is a flowchart of a charging plan formulation process in step 1 of the formulation procedure 1 according to an embodiment of the present invention. 本発明の実施形態の立案手順1の第一充電処理のフローチャートである。1 is a flowchart of a first charging process of a planning procedure 1 according to an embodiment of the present invention. 本発明の実施形態の立案手順1の第二充電処理のフローチャートである。11 is a flowchart of a second charging process in a planning procedure 1 according to an embodiment of the present invention. (a)および(b)は、本発明の実施形態のモデルパターンbの充放電計画立案処理を、(c)は、本発明の実施形態のモデルパターンhの充放電計画立案処理を、それぞれ、説明するための説明図である。1A and 1B are explanatory diagrams for explaining the charge/discharge plan formulation process for model pattern b of an embodiment of the present invention, and FIG. 1C is an explanatory diagram for explaining the charge/discharge plan formulation process for model pattern h of an embodiment of the present invention, respectively. (a)は、本発明の実施形態の立案手順2の充放電計画立案処理のメイン処理のフローチャートであり、(b)は、本発明の実施形態の立案手順2の手順2充放電計画立案処理のフローチャートである。1A is a flowchart of a main process of the charge/discharge plan formulation process of the planning procedure 2 according to an embodiment of the present invention, and FIG. 1B is a flowchart of the charge/discharge plan formulation process of procedure 2 of the planning procedure 2 according to an embodiment of the present invention. 本発明の実施形態の立案手順2の第一充電処理のフローチャートである。13 is a flowchart of a first charging process of a planning procedure 2 according to an embodiment of the present invention. 本発明の実施形態の立案手順2の第二充電処理のフローチャートである。13 is a flowchart of a second charging process of a planning procedure 2 according to an embodiment of the present invention. 本発明の実施形態の立案手順2の手順2充放電計画立案処理のフローチャートである。13 is a flowchart of a charge/discharge plan formulation process in step 2 of the formulation procedure 2 according to the embodiment of the present invention. (a)および(b)は、本発明の実施形態のモデルパターンdの充放電計画立案処理を、(c)は、本発明の実施形態のモデルパターンgの充放電計画立案処理を、(d)および(e)は、本発明の実施形態のモデルパターンfの充放電計画立案処理を、それぞれ、説明するための説明図である。1A and 1B are explanatory diagrams for explaining the charge/discharge plan formulation process for model pattern d of an embodiment of the present invention, FIG. 1C is an explanatory diagram for explaining the charge/discharge plan formulation process for model pattern g of an embodiment of the present invention, and FIG. 1D and 1E are explanatory diagrams for explaining the charge/discharge plan formulation process for model pattern f of an embodiment of the present invention, respectively. (a)および(b)は、本発明の実施形態のモデルパターンdの充放電計画立案処理を、(c)は、本発明の実施形態の立案手順5のメイン処理のフローチャートである。13A and 13B are flowcharts showing a charge/discharge plan planning process for model pattern d according to an embodiment of the present invention, and FIG. 13C is a flowchart showing a main process of planning procedure 5 according to an embodiment of the present invention. 本発明の実施形態の立案手順5の第一充放電処理のフローチャートである。13 is a flowchart of a first charge/discharge process of a planning procedure 5 according to an embodiment of the present invention. (a)~(c)は、本発明の実施形態の立案手順5の、それぞれ、第四充放電処理、第二充放電処理、および、第三充放電処理のフローチャートである。13A to 13C are flowcharts of a fourth charge/discharge process, a second charge/discharge process, and a third charge/discharge process, respectively, of planning procedure 5 according to an embodiment of the present invention.

以下、図面を参照しながら本発明の実施の形態を説明する。なお、本発明は、本実施形態に制限されず、本発明の思想に合致するあらゆる応用例がその技術的範囲に含まれる。また、特に明示しない限り、各構成要素は複数でも単数でも構わない。 The following describes an embodiment of the present invention with reference to the drawings. Note that the present invention is not limited to this embodiment, and all application examples that conform to the concept of the present invention are included in its technical scope. In addition, unless otherwise specified, each component may be multiple or singular.

まず、本実施形態の概要を、典型的なユースケースに基づいて説明する。本実施形態では、事業所等において、通勤や社用車として用いられるEVの充放電を制御することにより、当該事業所での電力使用を、可能な限り、ピークを低減し、平準化する。 First, an overview of this embodiment will be described based on a typical use case. In this embodiment, by controlling the charging and discharging of EVs used for commuting or as company cars in a business office or the like, the peak power usage in the business office is reduced and leveled out as much as possible.

一般に、契約電力は、実量性で決定される。すなわち、過去1年間の各月の最大需要電力(電力使用量)の最大値(最大需要電力量)が契約電力とされる。そして、最大需要電力量とは、30分毎の平均使用電力のうち、月間で最も大きい値である。例えば、現在が7月であって、過去1年間(7月~7月)の最大需要電力量が、図1(a)に示すように変化したものとする。この場合、最も、最大需要電力量の大きい9月の値に基づいて決定される。もし、この9月の最大需要電力を低減させることができると、契約電力も低減する。電気代は契約電力に比例するため、契約電力を低減させることは、そのままコストダウンにつながる。 Generally, the contracted power is determined based on the actual amount. In other words, the maximum value (maximum demand power amount) of the maximum power demand (power usage) for each month in the past year is set as the contracted power. The maximum demand power amount is the largest value in the month among the average power usage every 30 minutes. For example, it is currently July, and the maximum demand power amount for the past year (July to July) has changed as shown in Figure 1 (a). In this case, it is determined based on the value for September, when the maximum demand power amount was the largest. If the maximum demand power for September can be reduced, the contracted power will also be reduced. Since electricity charges are proportional to the contracted power, reducing the contracted power directly leads to cost reduction.

本実施形態では、日単位で、EVが搭載するバッテリ(以下、EVバッテリと呼ぶ。)の充放電を利用し、使用電力量の最大値を低減させる。具体的には、図1(b)に示すように、1日の電力使用量が変化するとする。図1(b)の例では、最大値PA[kW]である。本実施形態では、EVバッテリの充放電を制御し、最大値を低減させる。図1(c)に示すように、最大値PAに満たない時間帯にEVバッテリに充電し、ピーク時界隈の、電力使用量の多い時間帯に、EVから放電する。これにより、放電により、最大値をPBにまで低減させ、当該日の電力使用量の最大値を下げることができる。このような電力使用量の低減を毎日行うことにより、当該月の最大需要電力を低減でき、その分、電力事業者との契約電力を低減でき、購入電力も低減できる。 In this embodiment, the maximum value of the power usage is reduced on a daily basis by using the charging and discharging of the battery (hereinafter referred to as the EV battery) installed in the EV. Specifically, as shown in FIG. 1(b), the power usage in one day changes. In the example of FIG. 1(b), the maximum value is PA [kW]. In this embodiment, the charging and discharging of the EV battery is controlled to reduce the maximum value. As shown in FIG. 1(c), the EV battery is charged during a time period when the maximum value PA is not reached, and the EV is discharged during a time period when power usage is high around the peak time. This reduces the maximum value to PB by discharging, and the maximum power usage for that day can be reduced. By reducing power usage in this way every day, the maximum power demand for that month can be reduced, and the contracted power with the power company can be reduced accordingly, and the purchased power can also be reduced.

なお、典型的なユースケースは、以下のとおりである。
1)朝、従業員が出社し、充電を開始する。
2)ピーク負荷発生時に、EVバッテリから放電して、ピークを低減する。
3)ピーク負荷後、従業員帰宅時までに、各従業員が必要としているEVバッテリ残容量(必要バッテリ残容量)に達していないものは、充電を行い、必要バッテリ残容量を確保する。
Typical use cases are as follows:
1) In the morning, employees come to work and begin charging.
2) When peak load occurs, discharge the EV battery to reduce the peak.
3) After the peak load, if the EV battery remaining capacity (required battery remaining capacity) required by each employee is not reached by the time the employees return home, charging will be performed to ensure the required battery remaining capacity.

なお、必要バッテリ残容量および充電完了時刻は、従業員等が指定する。その情報を元に、後述する電力管理装置200が、指定した充電完了時刻までに指定した残容量を確保するように不足分を充電するよう充放電計画を立案する。 The required remaining battery capacity and the charging completion time are specified by employees, etc. Based on that information, the power management device 200, which will be described later, creates a charging and discharging plan to charge the shortfall so that the specified remaining capacity is secured by the specified charging completion time.

本実施形態では、指定した充電完了時刻までに指定した残容量が確保できるのであれば、それ以前の過程において、指定した残容量よりも一旦低くなってもよい。このため、放電に使える電力を、より多く、柔軟に、高い融通性をもって確保できる。 In this embodiment, as long as the specified remaining capacity can be secured by the specified charging completion time, the remaining capacity may temporarily become lower than the specified remaining capacity during the process prior to that time. This allows more power to be secured for discharging in a flexible and highly adaptable manner.

[システム構成]
本実施形態の電力需要平準化システム100の全体構成を、図2に示す。本図に示すように、電力需要平準化システム100は、電力管理装置200と、HUB110と、電力メータ120と、事業所内電気系統150と、各EVのバッテリ(EVバッテリ)321、322、323、324それぞれの充放電を制御する充放電制御装置(PCS:Power Control System)311、312、313、314と、を備える。なお、以下、特に区別する必要がない場合は、PCS310、EVバッテリ320で代表する。また、PCS310およびEVバッテリ320の数は、これに限定されない。
[System configuration]
The overall configuration of the power demand leveling system 100 of this embodiment is shown in Fig. 2. As shown in this figure, the power demand leveling system 100 includes a power management device 200, a HUB 110, a power meter 120, an in-house electric system 150, and charge/discharge control devices (PCS: Power Control Systems) 311, 312, 313, and 314 that control the charging and discharging of the batteries (EV batteries) 321, 322, 323, and 324 of the EVs. In the following, unless there is a particular need to distinguish between them, they will be represented by the PCS 310 and the EV battery 320. In addition, the number of the PCS 310 and the EV battery 320 is not limited to this.

電力メータ120は、系統電力130から供給される電力量を取得し、HUB110を介して電力管理装置200に出力する。電力メータ120が検出する電力量は、事業所内電気系統150が使用する電力とPCS310が使用する電力とを含む。 The power meter 120 acquires the amount of power supplied from the grid power 130 and outputs it to the power management device 200 via the HUB 110. The amount of power detected by the power meter 120 includes the power used by the in-house electrical system 150 and the power used by the PCS 310.

電力管理装置200は、電力需要平準化システム100に接続されたEVバッテリ320、それぞれに対する充放電計画を立案し、立案した充放電計画に従って、それぞれのPCS310を制御し、EVバッテリ320に充放電させる。 The power management device 200 creates a charge/discharge plan for each of the EV batteries 320 connected to the power demand leveling system 100, and controls each PCS 310 in accordance with the created charge/discharge plan to charge/discharge the EV batteries 320.

[電力管理装置の機能ブロック]
図3(a)に、本実施形態の電力管理装置200の機能ブロックを示す。本図に示すように、本実施形態の電力管理装置200は、EV予約情報取得部211と、バッテリ情報取得部212と、電力使用量取得部213と、電力需要予測部214と、充放電計画立案部215と、指示部216と、を備える。また、データとして、EV予約情報DB410と、バッテリ情報DB420と、電力使用履歴DB430と、充放電計画DB440と、充放電履歴DB450と、立案手順DB460と、を記憶する。
[Functional block of power management device]
Fig. 3(a) shows functional blocks of the power management device 200 of this embodiment. As shown in this figure, the power management device 200 of this embodiment includes an EV reservation information acquisition unit 211, a battery information acquisition unit 212, a power usage acquisition unit 213, a power demand prediction unit 214, a charge/discharge plan creation unit 215, and an instruction unit 216. In addition, the power management device 200 stores, as data, an EV reservation information DB 410, a battery information DB 420, a power usage history DB 430, a charge/discharge plan DB 440, a charge/discharge history DB 450, and a creation procedure DB 460.

EV予約情報取得部211は、各EVのユーザから、充電完了時刻と、当該時刻に必要なEVバッテリ320の残容量(必要バッテリ残容量)と、をEV予約情報として受け付け、取得する。最適なEVバッテリ320の充放電タイミングは、EVバッテリ320毎に異なる。そこで、本実施形態では、EV予約情報を、ユーザから受け付ける。EV予約情報は、モビリティニーズを満たす条件、例えば、20時までにSOC(State of Charge;充電状態)を90%にする等である。 The EV reservation information acquisition unit 211 accepts and acquires, from each EV user, the charging completion time and the remaining capacity of the EV battery 320 required at that time (required remaining battery capacity) as EV reservation information. The optimal charging and discharging timing of the EV battery 320 differs for each EV battery 320. Therefore, in this embodiment, EV reservation information is accepted from the user. The EV reservation information is a condition that satisfies mobility needs, for example, a state of charge (SOC) of 90% by 8 p.m.

本実施形態では、電力管理装置200が備えるUI(後述する入出力インタフェース)を介して受け付ける。受け付けた情報は、各EVを特定する情報(EVID)に対応づけてEV予約情報DB410に記憶される。 In this embodiment, the information is received via a UI (an input/output interface, described later) provided in the power management device 200. The received information is stored in the EV reservation information DB 410 in association with information (EVID) that identifies each EV.

EV予約情報DB410の説明に先立ち、EVバッテリ320のSOCと、本明細書で用いる各種の用語について図4(a)を用いて説明する。ここでは、EVバッテリ320の総電力量Cfullを100%とした場合の割合で定義される。 Before explaining the EV reservation information DB 410, the SOC of the EV battery 320 and various terms used in this specification will be explained with reference to FIG. 4(a). Here, it is defined as a percentage when the total power Cfull of the EV battery 320 is set to 100%.

上限SOC[%]は、充電可能な最大の電力量(充電量)を示し、充電終止電圧となる値である。これを上回る充電をすると、過充電となる値である。下限SOC[%]は、放電可能な最小の電力量(充電量)を示し、放電終止電圧となる値である。これを下回るまで放電すると過放電となる値である。また、現在SOC[%]は、接続時の電力量(残容量)を示す値であり、完了時SOC[%]は、充電完了時刻にユーザが所望する電力量(上述の必要バッテリ残容量)を示す値である。 The upper limit SOC [%] indicates the maximum amount of power that can be charged (amount of charge) and is the value that becomes the end-of-charge voltage. Charging above this value will result in overcharging. The lower limit SOC [%] indicates the minimum amount of power that can be discharged (amount of charge) and is the value that becomes the end-of-discharge voltage. Discharging below this value will result in overdischarging. In addition, the current SOC [%] is a value that indicates the amount of power (remaining capacity) when connected, and the completion SOC [%] is a value that indicates the amount of power desired by the user at the time charging is completed (the required remaining battery capacity described above).

また、充電必要電力量Cneed[kWh]は、充電完了時刻にユーザが所望する電力量と現在(接続時)のEVバッテリ320の電力量との差である。本実施形態では、EVバッテリ320の総電力量Cfullを用いて以下の式(1)で表される。
Cneed=Cfull×{(完了時SOC-現在SOC)/100}・・・(1)
Further, the amount of energy required for charging Cneed [kWh] is the difference between the amount of energy desired by the user at the time of completion of charging and the current amount of energy (at the time of connection) of the EV battery 320. In this embodiment, it is expressed by the following formula (1) using the total amount of energy Cfull of the EV battery 320.
Cneed=Cfull×{(SOC at completion - current SOC)/100}...(1)

余剰電力量Cexed[kWh]は、充電可能な最大の電力量と充電完了時刻にユーザが所望する電力量との差である。本実施形態では、EVバッテリ320の総電力量Cfullを用いて以下の式(2)で表される。
Cexed=Cfull×{(上限SOC-完了時SOC)/100}・・・(2)
The surplus energy Cexed [kWh] is the difference between the maximum amount of energy that can be charged and the amount of energy desired by the user at the time when charging is completed. In this embodiment, the surplus energy Cexed is expressed by the following formula (2) using the total amount of energy Cfull of the EV battery 320.
Cexed=Cfull×{(upper limit SOC - SOC at completion)/100}...(2)

EV予約情報DB410に記憶されるデータ(予約情報)の一例を図4(b)に示す。本図に示すように、EV予約情報DB410に記憶されるデータは、各PCS310に接続されたEVバッテリ320を特定する情報である411と、接続時刻412と、充電完了時刻413と、完了時SOC414と、を備える。さらに、接続されたPCS310を特定する情報(PCSID415)を備えてもよい。 An example of data (reservation information) stored in the EV reservation information DB 410 is shown in FIG. 4(b). As shown in this figure, the data stored in the EV reservation information DB 410 includes information 411 that identifies the EV battery 320 connected to each PCS 310, connection time 412, charging completion time 413, and completion SOC 414. In addition, the data may include information (PCSID 415) that identifies the connected PCS 310.

なお、EVID411および接続時刻412は、EVバッテリ320が接続されたPCS310が取得した値が記憶される。EVID411は、PCS310が接続されたEVバッテリ320から読み取る。また、接続時刻412は、PCS310が、EVバッテリ320が接続されたことを検出した時刻である。充電完了時刻413および必要バッテリ残容量(完了時SOC414)は、ユーザが入力した値が記憶される。このEV予約情報DB410により、電力管理装置200は、各EVの、モビリティニーズ(使いたい時に必要なバッテリ残容量がある)を把握する。 The EVID 411 and connection time 412 are stored as values acquired by the PCS 310 to which the EV battery 320 is connected. The EVID 411 is read from the EV battery 320 to which the PCS 310 is connected. The connection time 412 is the time when the PCS 310 detects that the EV battery 320 has been connected. The charging completion time 413 and required remaining battery capacity (SOC at completion 414) are stored as values input by the user. Using this EV reservation information DB 410, the power management device 200 grasps the mobility needs of each EV (there is a required remaining battery capacity when it is desired to use it).

なお、EV予約情報のうち、ユーザが入力する充電完了時刻413と、完了時SOC414とは、デフォルト値を予め保持し、EVバッテリ320毎に必要に応じて変更するよう構成してもよい。デフォルト値は、例えば、18時までに90%等である。 In addition, among the EV reservation information, the charging completion time 413 and the completion SOC 414 input by the user may be configured to hold default values in advance and be changed as necessary for each EV battery 320. The default value may be, for example, 90% by 6 p.m.

バッテリ情報取得部212は、各EVバッテリ320の情報(バッテリ情報)を取得する。本実施形態では、EVバッテリ320がPCS310に接続された際、PCS310が、EVバッテリ320から取得し、HUB110を経由して電力管理装置200に送信する。このとき、自装置(PCS310)を特定する情報(PCSID)および接続されたEVバッテリ320を搭載するEVを特定する情報(EVID)も併せて送信する。送信するEV情報は、例えば、EVバッテリ320の容量(バッテリ容量)、現時点のEVバッテリ320の残容量(現在SOC)、EVバッテリ320の最大充放電電力(上限SOC)、EVバッテリ320の下限受電電力値(下限SOC)等を含む。バッテリ情報取得部212は、PCS310から送信されたこれらの情報をバッテリ情報として取得し、バッテリ情報DB420に記憶する。 The battery information acquisition unit 212 acquires information (battery information) of each EV battery 320. In this embodiment, when the EV battery 320 is connected to the PCS 310, the PCS 310 acquires the battery information from the EV battery 320 and transmits it to the power management device 200 via the HUB 110. At this time, information (PCSID) that identifies the device itself (PCS 310) and information (EVID) that identifies the EV that is equipped with the connected EV battery 320 are also transmitted. The transmitted EV information includes, for example, the capacity (battery capacity) of the EV battery 320, the remaining capacity (current SOC) of the EV battery 320 at the current time, the maximum charge/discharge power (upper limit SOC) of the EV battery 320, and the lower limit receiving power value (lower limit SOC) of the EV battery 320. The battery information acquisition unit 212 acquires the information transmitted from the PCS 310 as battery information and stores it in the battery information DB 420.

バッテリ情報DB420に格納されるデータ例を図4(c)に示す。本図に示すように、EVID421と、バッテリ容量422と、現在のバッテリ残容量(現在SOC423)と、バッテリの最大充電量(上限SOC424)と、バッテリの最低充電量(下限SOC425)と、を備える。これらの情報は、EVバッテリ320が接続されると、PCS310が接続されたEVバッテリ320から取得し、送信する。 An example of data stored in the battery information DB 420 is shown in FIG. 4(c). As shown in this figure, the data includes an EVID 421, a battery capacity 422, a current remaining battery capacity (current SOC 423), a maximum charge amount of the battery (upper limit SOC 424), and a minimum charge amount of the battery (lower limit SOC 425). When the EV battery 320 is connected, the PCS 310 obtains and transmits this information from the connected EV battery 320.

電力使用量取得部213は、電力需要実績を取得し、データベースに蓄積する。本実施形態では、電力需要実績として、電力メータ120の値を、取得し、予め定めた時間区切り(時間帯)毎に、当該時間帯に対応づけて電力使用履歴として電力使用履歴DB430に記憶する。 The power usage acquisition unit 213 acquires actual power demand and stores it in a database. In this embodiment, the value of the power meter 120 is acquired as the actual power demand, and for each predetermined time period (time period), the value is stored in the power usage history DB 430 as power usage history in association with the time period.

電力使用履歴DB430に記憶されるデータの一例を図5(a)に示す。本図に示すように、電力使用履歴DB430に記憶されるデータは、各日の電力使用量433の変化を、各日付431の、予め定めた時間帯432単位で記憶する。ここでは、30分単位で記憶する例を示す。また、電力使用履歴DB430は、さらに、月434単位で、当該月の電力使用量433の最大値である最大電力使用量を、最大値435として記憶する。 An example of data stored in the power usage history DB 430 is shown in FIG. 5(a). As shown in this figure, the data stored in the power usage history DB 430 stores the change in power usage 433 for each day in units of a predetermined time period 432 for each date 431. Here, an example is shown in which data is stored in 30-minute units. Furthermore, the power usage history DB 430 further stores, in units of months 434, the maximum power usage, which is the maximum value of the power usage 433 for that month, as a maximum value 435.

電力需要予測部214は、後述する充放電計画立案部215が計画を立案する立案日の、時間帯毎の予測電力需要値を予測電力需要カーブとして算出する。算出の詳細は、後述する。 The power demand forecasting unit 214 calculates the predicted power demand value for each time period on the planning date when the charge/discharge plan planning unit 215 (described later) plans the plan as a predicted power demand curve. Details of the calculation will be described later.

充放電計画立案部215は、各PCS310にそれぞれ接続された各(EVの)EVバッテリ320の充放電計画を立案する。ここで、立案する充放電計画は、各EVバッテリ320の時間帯毎の充放電量である。立案した充放電計画は、充放電計画DB440に記憶される。 The charge/discharge plan creation unit 215 creates a charge/discharge plan for each (EV) EV battery 320 connected to each PCS 310. Here, the created charge/discharge plan is the charge/discharge amount for each time period of each EV battery 320. The created charge/discharge plan is stored in the charge/discharge plan DB 440.

充放電計画DB440に記憶されるデータは、図5(b)に示すように、立案対象日(立案日)441毎に作成される。各データは、EVバッテリ320の識別情報であるEVID444と、当該EVバッテリ320が接続されたPCS310の識別情報であるPCSID445と、予め定めた時間帯442毎の計画充放電電力量443[kWh]と、を備える。すなわち、PCS310毎に、時間帯442毎の計画充放電電力量443[kWh]が記憶される。なお、本図において、計画充放電電力量443[kWh]は、マイナスが充電、プラスが放電である。 As shown in FIG. 5(b), the data stored in the charge/discharge plan DB 440 is created for each planning target date (planning date) 441. Each piece of data includes an EVID 444, which is identification information for the EV battery 320, a PCSID 445, which is identification information for the PCS 310 to which the EV battery 320 is connected, and a planned charge/discharge power amount 443 [kWh] for each predetermined time period 442. That is, the planned charge/discharge power amount 443 [kWh] for each time period 442 is stored for each PCS 310. Note that in this figure, for the planned charge/discharge power amount 443 [kWh], negative values indicate charging and positive values indicate discharging.

本実施形態では、各EVのモビリティニーズに応じて、すなわち、ユーザが指定する充電完了時刻413と、その時点での必要充電量(完了時SOC414)とを満たすよう、充放電計画を立案する。本実施形態では、充放電計画立案部215は、予測電力需要カーブと、立案手順DB460に格納された、予測電力需要カーブに応じた立案手順に従って、充放電計画を立案する。立案は、1つのEVバッテリ320毎に、予め定めた規則に従った順に行う。立案の順序は、例えば、接続時刻順とする。同じ接続時刻のEVバッテリ320が複数ある場合は、予約充電完了時刻の早い順とする。充放電計画立案処理については、後述する。 In this embodiment, a charge/discharge plan is created according to the mobility needs of each EV, that is, to satisfy the charge completion time 413 specified by the user and the required charge amount at that time (completion SOC 414). In this embodiment, the charge/discharge plan creation unit 215 creates a charge/discharge plan according to the predicted power demand curve and the planning procedure corresponding to the predicted power demand curve stored in the planning procedure DB 460. The plan is created for each EV battery 320 in order according to a predetermined rule. The order of creation is, for example, in order of connection time. If there are multiple EV batteries 320 with the same connection time, the order is in order of the earliest scheduled charge completion time. The charge/discharge plan creation process will be described later.

指示部216は、充放電計画立案部215が立案した各EVバッテリ320の充放電計画に従って、当該EVバッテリ320が接続されるPCS310に対し、充電および放電の指示(充放電指示)を行う。さらに、本実施形態では、指示部216は、指示を行った履歴を、充放電履歴DB450として記憶する。 The instruction unit 216 issues charging and discharging instructions (charge and discharge instructions) to the PCS 310 to which the EV battery 320 is connected, according to the charge and discharge plan for each EV battery 320 created by the charge and discharge plan creation unit 215. Furthermore, in this embodiment, the instruction unit 216 stores the history of the instructions as the charge and discharge history DB 450.

充放電履歴DB450に記憶されるデータの一例を、図5(c)に示す。充放電履歴DB450に記憶されるデータが有する項目は、基本的に充放電計画DB440に記憶されるデータが有する項目と同じである。具体的には、本図に示すように、各データは、PCSID455と、各日付451の時間帯452毎の、実際に充放電された充放電量(実行充放電電力量453)と、を備える。すなわち、PCS310毎に、立案日毎の、時間帯毎の、実際に充放電された充放電電力量が記憶される。 An example of data stored in the charge/discharge history DB 450 is shown in FIG. 5(c). The items of the data stored in the charge/discharge history DB 450 are basically the same as the items of the data stored in the charge/discharge plan DB 440. Specifically, as shown in this figure, each data includes a PCSID 455 and the amount of charge/discharge actually performed (actual charge/discharge power amount 453) for each time period 452 on each date 451. That is, for each PCS 310, the amount of charge/discharge power actually performed for each time period on each planning date is stored.

[電力管理装置のハードウェア構成]
図3(b)は、本実施形態の電力管理装置200のハードウェア構図である。本図に示すように、本実施形態の電力管理装置200は、CPU231と、メモリ232と、記憶装置233と、通信インタフェース(I/F)234と、入出力I/F235とを備える汎用の情報処理装置(コンピュータ)で構成される。
[Hardware configuration of power management device]
3B is a hardware configuration diagram of the power management apparatus 200 of this embodiment. As shown in this figure, the power management apparatus 200 of this embodiment is configured as a general-purpose information processing device (computer) including a CPU 231, a memory 232, a storage device 233, a communication interface (I/F) 234, and an input/output I/F 235.

電力管理装置200の各機能は、例えば、記憶装置233に格納されたプログラムを、CPU231がメモリ232にロードして実行することにより実現される。また、各データは、記憶装置233等に記憶される。 Each function of the power management device 200 is realized, for example, by the CPU 231 loading a program stored in the storage device 233 into the memory 232 and executing it. In addition, each piece of data is stored in the storage device 233, etc.

入出力I/F235は、例えば、キーボード、マウス、ディスプレイ、タッチパネル等である。本実施形態では、前記EV予約情報は、この入出力I/F235を介して入力される。 The input/output I/F 235 is, for example, a keyboard, a mouse, a display, a touch panel, etc. In this embodiment, the EV reservation information is input via this input/output I/F 235.

[電力需要予測処理]
次に、電力需要予測部214による、電力需要予測処理について説明する。電力需要予測処理は、過去の電力使用実績から、立案日(当日)の、時間帯毎の予測電力需要値(予測電力需要カーブ)を予測(算出)する処理である。
[Power demand forecast processing]
Next, a description will be given of the power demand forecasting process performed by the power demand forecasting unit 214. The power demand forecasting process is a process for forecasting (calculating) a predicted power demand value (predicted power demand curve) for each time period on the planning date (today) from past power usage records.

まず、電力需要予測部214は、当該事業所の、本来の電力使用値を算出する。電力メータ120から取得する、電力使用履歴DB430に格納される電力使用量433には、PCS310による充放電電力の値も含まれる。そこで、この電力使用量433から、各PCS310の実行充放電電力量453を除き、PCS310の充放電電力を行わなかった場合の、本来の電力使用量(=本来電力使用量)を算出する。具体的には、以下の式(3)に従って算出する。
本来電力使用量=電力使用量
+(PCS1の充放電電力量+PCS2の充放電電力量+・・・
+PCSNの充放電電力量) ・・・(3)
なお、PCS310は、N(Nは1以上の整数)台備えるものとする。
また、各PCS310の充放電電力量は、充放電履歴DB450に記憶されるデータの、対応する日時の実行充放電電力量453を用いる。電力使用量433と、各PCS310の使用量である実行充放電電力量453と、本来電力使用値456との関係を図6(a)に示す。
First, the power demand forecasting unit 214 calculates the original power usage value of the business establishment. The power usage 433 stored in the power usage history DB 430 obtained from the power meter 120 includes the value of the charging/discharging power by the PCS 310. Therefore, from this power usage 433, the actual charging/discharging power amount 453 of each PCS 310 is excluded, and the original power usage (=original power usage) in the case where the charging/discharging power of the PCS 310 is not performed is calculated. Specifically, the calculation is performed according to the following formula (3).
Original power usage = power usage
+ (PCS1 charge/discharge power amount + PCS2 charge/discharge power amount + ...
+ PCSN charge/discharge power amount) ... (3)
It is assumed that N PCSs 310 are provided (N is an integer equal to or greater than 1).
The charge/discharge power amount of each PCS 310 uses the actual charge/discharge power amount 453 at the corresponding date and time of the data stored in the charge/discharge history DB 450. The relationship between the power usage amount 433, the actual charge/discharge power amount 453 which is the usage amount of each PCS 310, and the original power usage value 456 is shown in FIG.

次に、電力需要予測部214は、当該事業所の、予測する時間帯(予測時間帯)の、予測電力需要値を算出する。例えば、予測時間帯の過去データ(過去の本来電力使用値461)に統計処理を施し、算出する。例えば、所定数のサンプリングデータから、最大値および最小値を除き、平均値を算出し、得られた値を予測電力需要値とする。 Next, the power demand forecasting unit 214 calculates the predicted power demand value for the business establishment for the predicted time period (prediction time period). For example, the calculation is performed by performing statistical processing on past data for the prediction time period (past original power usage value 461). For example, the maximum and minimum values are excluded from a predetermined number of sampling data, the average value is calculated, and the obtained value is set as the predicted power demand value.

具体例を、図6(b)に示す。ここでは、予測時間帯が図6(a)の9:00である場合の例を示す。7日前、14日前、21日前、28日前、35日前の、9:00の5件のサンプリングデータから、最大値と最小値を除いた値で平均を算出し、得られた値を、この予測時間帯(9:00)の、予測電力需要値457とする。 A specific example is shown in FIG. 6(b). Here, an example is shown for the case where the predicted time period is 9:00 in FIG. 6(a). The maximum and minimum values are excluded from the five sampling data points at 9:00 7 days, 14 days, 21 days, 28 days, and 35 days ago, and the average is calculated using the values, and the obtained value is set as the predicted power demand value 457 for this predicted time period (9:00).

なお、ここでは、同一曜日の過去データを用いる例を示したが、用いるサンプリングデータは、これに限定されない。1年前の同一日、同一月の平日のみ、同じイベントが開催された過去の日等、任意に選択できる。 Note that, although an example of using past data for the same day of the week has been shown here, the sampling data used is not limited to this. Any data can be selected, such as the same day a year ago, only weekdays of the same month, or past days when the same event was held.

電力需要予測部214は、立案日の各時間帯の予測電力需要値457を算出し、立案日全体の予測電力需要値として、予測電力需要カーブを得る。得られた予測電力需要カーブ510の一例を、図7(a)に示す。ここでは、各棒グラフが、時間帯毎の予測電力需要値457を示す。 The power demand forecasting unit 214 calculates the predicted power demand value 457 for each time period on the planning day, and obtains a predicted power demand curve as the predicted power demand value for the entire planning day. An example of the obtained predicted power demand curve 510 is shown in FIG. 7(a). Here, each bar graph shows the predicted power demand value 457 for each time period.

目標電力量Ptgt[kWh]は、事業所の目標とする電力量の上限値である。目標電力量Ptgtの初期値は、事業所毎に予め決めた値としてもよいし、日毎に、過去の実績から算出してもよい。過去の実績から算出する場合、例えば、過去実績ピーク上限の30%下限等とする。 The target power amount Ptgt [kWh] is the upper limit of the target power amount for the business establishment. The initial value of the target power amount Ptgt may be a value determined in advance for each business establishment, or may be calculated on a daily basis from past performance. When calculated from past performance, the lower limit may be set to, for example, 30% of the upper limit of the past performance peak.

[全体充放電計画立案処理]
次に、本実施形態の充放電計画立案部215による充放電計画立案処理について説明する。予測電力需要カーブ510とモビリティニーズとから、最大限、電力需要のピークを抑えた、最適な充放電計画を立案する。
[Overall charge/discharge plan planning process]
Next, a description will be given of a charging/discharging plan creation process performed by the charging/discharging plan creation unit 215 of this embodiment. An optimal charging/discharging plan that minimizes peaks in power demand is created based on the predicted power demand curve 510 and mobility needs.

充放電計画立案部215は、電力需要予測部214が算出した、立案日の予測電力需要カーブ510を用いて、接続された各EVバッテリ320の充放電計画を立案する。本実施形態では、充放電計画立案部215は、接続された各EVバッテリ320について、予め定めた順に、充放電計画を立案し、予測電力需要カーブ510を更新していく。充放電計画は、モビリティニーズ(使いたい時に必要なバッテリ残容量がある)を満たした上で、事業所の1日の需要電力の最大値を最小に抑えるよう立案される。 The charge/discharge plan creation unit 215 creates a charge/discharge plan for each connected EV battery 320 using the predicted power demand curve 510 for the planning date calculated by the power demand prediction unit 214. In this embodiment, the charge/discharge plan creation unit 215 creates a charge/discharge plan for each connected EV battery 320 in a predetermined order and updates the predicted power demand curve 510. The charge/discharge plan is created to minimize the maximum daily power demand of the business while satisfying mobility needs (remaining battery capacity required when needed).

まず、具体例で概要を説明する。ここでは、図7(a)に示す予測電力需要カーブ510を用いて説明する。また、2つのEVバッテリ321、322が接続されたものとする。図7(b)に示すように、EVバッテリ321は、8:00に接続され、EV予約情報の充電完了時刻として20:00が指定され、図7(c)に示すように、EVバッテリ322は、6:00に接続され、充電完了時刻として9:00が指定されたものとする。以下、EVバッテリが接続される時刻をTs、ユーザが指定する充電完了時刻をTeで表す。 First, an overview will be given using a specific example. Here, explanation will be given using the predicted power demand curve 510 shown in FIG. 7(a). Also, assume that two EV batteries 321, 322 are connected. As shown in FIG. 7(b), EV battery 321 is connected at 8:00, and 20:00 is specified as the charging completion time in the EV reservation information, and as shown in FIG. 7(c), EV battery 322 is connected at 6:00, and 9:00 is specified as the charging completion time. Hereinafter, the time when the EV battery is connected is represented by Ts, and the charging completion time specified by the user is represented by Te.

このような場合、EVバッテリ321については、図7(b)に示すように、A、Cの時間帯で充電を行い、Bの時間帯で放電を行うことが最適な充放電計画と考えられる。また、EVバッテリ322については、図7(c)に示すように、Aの領域で充電を行い、放電は行わないことが最適な充放電計画と考えられる。このように、EVバッテリのニーズに応じて、最適な充放電計画は異なる。 In such a case, the optimal charge/discharge plan for EV battery 321 would be to charge in time periods A and C, and discharge in time period B, as shown in FIG. 7(b). The optimal charge/discharge plan for EV battery 322 would be to charge in area A, and not discharge, as shown in FIG. 7(c). In this way, the optimal charge/discharge plan differs depending on the needs of the EV battery.

充放電計画立案部215は、まず、EVバッテリ322について充放電計画を立案する。EVバッテリ322の充放電計画による充電量512を図8(a)に示す。EVバッテリ322の充電量512が決定すると、この充電量512も加えた時間帯毎の電力需要値を、予測電力需要カーブ510とし、充放電計画立案部215は、EVバッテリ321の充放電計画を立案する。この結果得られたEVバッテリ321の充放電計画による充電量および放電量513を加えた予測電力需要カーブ510を、図8(b)に示す。 The charge/discharge plan creation unit 215 first creates a charge/discharge plan for the EV battery 322. FIG. 8(a) shows the charge amount 512 according to the charge/discharge plan for the EV battery 322. Once the charge amount 512 for the EV battery 322 has been determined, the power demand value for each time period, including the charge amount 512, is set as a predicted power demand curve 510, and the charge/discharge plan creation unit 215 creates a charge/discharge plan for the EV battery 321. FIG. 8(b) shows the predicted power demand curve 510 obtained as a result, which includes the charge amount and discharge amount 513 according to the charge/discharge plan for the EV battery 321.

このように、本実施形態では、予め定めた順に、各EVバッテリ320に最適な充放電計画を立案する。第一EVバッテリの充放電計画を立案し、その結果を各時間帯の予測電力需要値へ反映(充電量を加算、放電量を減算)し、次の第二EVバッテリの計画時には、第一EVバッテリの計画が反映された各時間帯の予測電力需要値に対して、最適な充放電計画を立案する。これを接続されたEVバッテリ320の台数分繰り返し行い、結果的に、全体として最適な充放電計画を立案する。 In this manner, in this embodiment, an optimal charge/discharge plan is created for each EV battery 320 in a predetermined order. A charge/discharge plan is created for the first EV battery, and the result is reflected in the predicted power demand value for each time period (the charge amount is added and the discharge amount is subtracted). When planning the next second EV battery, an optimal charge/discharge plan is created for the predicted power demand value for each time period in which the plan for the first EV battery is reflected. This is repeated for each connected EV battery 320, and as a result, an optimal charge/discharge plan is created overall.

複数のEVバッテリ320が接続されている場合の、充放電計画の立案順は、予めルールを定めておく。ルールは、例えば、EV接続時刻とEV予約充電完了時刻の期間が短く、かつ、EV予約充電完了時刻がより早いEVバッテリ320を優先する、EV予約充電完了時刻の早いEVバッテリを優先する、等である。 When multiple EV batteries 320 are connected, a rule is determined in advance for the order in which the charging and discharging plans are created. The rule is, for example, to give priority to an EV battery 320 with a shorter period between the EV connection time and the EV reservation charging completion time and an earlier EV reservation charging completion time, or to give priority to an EV battery with an earlier EV reservation charging completion time, etc.

また、EVバッテリ320の充放電計画の立案は、EVバッテリ320が接続されたタイミングを契機に実施し、EV予約充電完了時刻またはEVバッテリ320が切断されるまで、定期周期(例えば30分に1回)に実行し、充放電計画を更新する。 The charging and discharging plan for the EV battery 320 is created when the EV battery 320 is connected, and is updated at regular intervals (e.g., once every 30 minutes) until the EV scheduled charging is completed or the EV battery 320 is disconnected.

上記処理を処理フローで示す。図9は、本実施形態の充放電計画立案部215による充放電計画立案処理の処理フローである。上述のように、本処理は、所定の時間間隔(例えば、30分間隔等)で行われる。 The above process is shown in the form of a process flow. FIG. 9 shows the process flow of the charge/discharge plan creation process by the charge/discharge plan creation unit 215 of this embodiment. As described above, this process is performed at a predetermined time interval (e.g., every 30 minutes, etc.).

充放電計画立案部215は、初期予測電力需要カーブと目標電力量Ptgtを取得する(ステップS1101)。初期予測電力需要カーブとして、電力需要予測部214が算出した立案日の予測電力需要カーブ510を用いる。また、目標電力量Ptgtは、予め設定された値を用いる。 The charge/discharge plan creation unit 215 acquires an initial predicted power demand curve and a target power amount Ptgt (step S1101). As the initial predicted power demand curve, the predicted power demand curve 510 for the planning date calculated by the power demand prediction unit 214 is used. In addition, a preset value is used as the target power amount Ptgt.

まず、充放電計画立案部215は、充放電計画を立案していないEVバッテリ320(以下、単に未計画EVと呼ぶ)があるかを判別する(ステップS1102)。ここでは、PCS310に接続され、かつ、本処理を行うタイミングで充放電計画が立案されていないEVバッテリ320があるかを判別する。未計画EVがない場合は、そのまま、処理を終了する。 First, the charge/discharge plan creation unit 215 determines whether there is an EV battery 320 for which a charge/discharge plan has not been created (hereinafter simply referred to as an unplanned EV) (step S1102). Here, it determines whether there is an EV battery 320 that is connected to the PCS 310 and for which a charge/discharge plan has not been created at the time this process is performed. If there is no unplanned EV, the process ends.

一方、未計画EVがある場合、充放電計画立案部215は、その中から、充放電計画を立案する対象のEVバッテリ(対象EV)を抽出する(ステップS1103)。抽出は、予め定めた規則に従って行う。規則は、例えば、接続時間が最も早いEVバッテリ320,接続時間が同じEVバッテリ320の中では、充電完了時刻が最も早いEVバッテリを優先、等とする。また、未計画EVが1台である場合は、当該未計画EVを対象EVとする。 On the other hand, if there are unplanned EVs, the charge/discharge plan creation unit 215 extracts from among them the EV battery (target EV) for which a charge/discharge plan is to be created (step S1103). The extraction is performed according to a predetermined rule. The rule may be, for example, to give priority to the EV battery 320 with the earliest connection time, or, among EV batteries 320 with the same connection time, to the EV battery with the earliest charging completion time. Also, if there is only one unplanned EV, the unplanned EV is set as the target EV.

次に、充放電計画立案部215は、対象EVの充放電計画を立案する(ステップS1104)。具体的には、時間帯毎の、充電量および放電量を決定する。決定の詳細は、後述する。 Next, the charge/discharge plan creation unit 215 creates a charge/discharge plan for the target EV (step S1104). Specifically, it determines the charge and discharge amounts for each time period. The details of the determination will be described later.

その後、充放電計画立案部215は、その時点の予測電力需要カーブに、対象EVの充放電計画を加算し、予測電力需要カーブを更新する(ステップS1105)。充放電計画を加算とは、充放電計画による電力需要値の変化分を加えることである。そして、対象EVを、未計画EVから除き(ステップS1107)、ステップS1102へ戻り、処理を繰り返す。 Then, the charge/discharge plan creation unit 215 adds the charge/discharge plan of the target EV to the predicted power demand curve at that time, and updates the predicted power demand curve (step S1105). Adding the charge/discharge plan means adding the change in the power demand value due to the charge/discharge plan. Then, the target EV is removed from the unplanned EVs (step S1107), and the process returns to step S1102 and is repeated.

[個別充放電計画立案処理]
以下、充放電計画立案部215による個々のEVバッテリ320の充放電計画立案処理(上記ステップS1104の処理)の詳細を説明する。本実施形態では、予測電力需要カーブ510の、EV接続時刻Tsから充電完了時刻Teまでの間の形状に応じて、予め立案手順DB460に記憶された立案手順に従って、充放電計画を立案する。立案手順DB460には、予測電力需要カーブ510の形状に応じた立案手順が格納される。
[Individual charge/discharge plan planning process]
The charge/discharge plan creation process (the process of step S1104) for each EV battery 320 by the charge/discharge plan creation unit 215 will be described in detail below. In this embodiment, a charge/discharge plan is created according to a planning procedure stored in advance in the planning procedure DB 460 in accordance with the shape of the predicted power demand curve 510 from the EV connection time Ts to the charging completion time Te. The planning procedure DB 460 stores the planning procedure in accordance with the shape of the predicted power demand curve 510.

具体的には、本実施形態では、図10に示すように、予測電力需要カーブ510を、EV接続時刻Tsから充電完了時刻Teの間の期間(充放電可能期間)Tdを3等分し、各期間X,Y,Zに対し、識別子を付す。付される識別子は、当該期間の予測電力需要値と、目標電力量Ptgtとの関係で、主として充電を行う期間を意味するCC、および、主として放電を行う期間であることを意味するDDのいずれかである。そして、その識別子の配列でモデルパターンを決定し、決定したモデルパターンに応じた立案手順が立案手順DB460に格納される。 Specifically, in this embodiment, as shown in FIG. 10, the predicted power demand curve 510 is divided into three equal parts for the period Td between the EV connection time Ts and the charging completion time Te (chargeable/dischargeable period), and an identifier is assigned to each period X, Y, and Z. The assigned identifier is either CC, which means that the period is mainly for charging, or DD, which means that the period is mainly for discharging, in relation to the predicted power demand value for that period and the target power amount Ptgt. Then, a model pattern is determined by the arrangement of the identifiers, and a planning procedure corresponding to the determined model pattern is stored in the planning procedure DB 460.

なお、各期間X,Y,Z内の予測電力需要値の大きさが、目標電力量Ptgtよりも大きい時間帯が1つでもある場合、当該期間に識別子DDが付与される。そして、それ以外の期間、すなわち、目標電力量Ptgtよりも大きい時間帯が1つもない期間には、識別子CCが付与される。 If there is even one time period in each of the periods X, Y, and Z in which the magnitude of the predicted power demand value is greater than the target power amount Ptgt, the identifier DD is assigned to that period. The identifier CC is assigned to other periods, i.e., periods in which there is no time period in which the predicted power demand value is greater than the target power amount Ptgt.

モデルパターンは、その組み合わせにより、以下の8パターンがある。それぞれのモデルパターンの予測電力需要カーブ510と目標電力量Ptgtとの関係を、図11(a)~図11(h)に示す。 There are eight model patterns, depending on the combination, as follows. Figures 11(a) to 11(h) show the relationship between the forecasted power demand curve 510 and the target power amount Ptgt for each model pattern.

モデルパターンaの予測電力需要カーブ510aを、図11(a)に示す。モデルパターンaでは、期間(X,Y,Z)には、それぞれ、(CC,CC,CC)の識別子が付与される。 The forecasted power demand curve 510a for model pattern a is shown in FIG. 11(a). In model pattern a, the periods (X, Y, Z) are assigned identifiers (CC, CC, CC), respectively.

モデルパターンbの予測電力需要カーブ510bを、図11(b)に示す。モデルパターンbでは、期間(X,Y,Z)には、それぞれ、(CC,CC,DD)の識別子が付与される。 The forecasted power demand curve 510b for model pattern b is shown in Figure 11 (b). In model pattern b, the periods (X, Y, Z) are assigned identifiers (CC, CC, DD), respectively.

モデルパターンcの予測電力需要カーブ510cを、図11(c)に示す。モデルパターンcでは、期間(X,Y,Z)には、それぞれ、(CC,DD,CC)の識別子が付与される。 The forecasted power demand curve 510c for model pattern c is shown in Figure 11 (c). In model pattern c, the periods (X, Y, Z) are assigned identifiers (CC, DD, CC), respectively.

モデルパターンdの予測電力需要カーブ510dを、図11(d)に示す。モデルパターンdでは、期間(X,Y,Z)には、それぞれ、(DD,CC,CC)の識別子が付与される。 The forecasted power demand curve 510d for model pattern d is shown in FIG. 11(d). In model pattern d, the periods (X, Y, Z) are assigned identifiers (DD, CC, CC), respectively.

モデルパターンeの予測電力需要カーブ510eを、図11(e)に示す。モデルパターンeでは、期間(X,Y,Z)には、それぞれ、(CC,DD,DD)の識別子が付与される。 The forecasted power demand curve 510e for model pattern e is shown in FIG. 11(e). In model pattern e, the periods (X, Y, Z) are assigned identifiers (CC, DD, DD), respectively.

モデルパターンfの予測電力需要カーブ510fを、図11(f)に示す。モデルパターンfでは、期間(X,Y,Z)には、それぞれ、(DD,CC,DD)の識別子が付与される。 The forecasted power demand curve 510f for model pattern f is shown in FIG. 11(f). In model pattern f, the periods (X, Y, Z) are assigned identifiers (DD, CC, DD), respectively.

モデルパターンgの予測電力需要カーブ510gを、図11(g)に示す。モデルパターンgでは、期間(X,Y,Z)には、それぞれ、(DD,DD,CC)の識別子が付与される。 The forecasted power demand curve 510g for model pattern g is shown in FIG. 11(g). In model pattern g, the periods (X, Y, Z) are assigned identifiers (DD, DD, CC), respectively.

モデルパターンhの予測電力需要カーブ510hを、図11(h)に示す。モデルパターンhでは、期間(X,Y,Z)には、それぞれ、(DD,DD,DD)の識別子が付与される。 The forecasted power demand curve 510h for model pattern h is shown in FIG. 11(h). In model pattern h, the periods (X, Y, Z) are assigned identifiers (DD, DD, DD), respectively.

以下、それぞれのモデルパターンに対応づけて立案手順DB460に記憶される立案手順を説明する。 Below, we explain the planning procedures stored in the planning procedure DB460 in association with each model pattern.

まず、モデルパターンaとモデルパターンhに対応づけられた立案手順(立案手順1)について説明する。これらのモデルパターンは、図12(a)および図12(c)に示すように、全ての期間において、予測電力需要カーブ510aは、目標電力量Ptgtより大きく、予測電力需要カーブ510hは、目標電力量Ptgtより小さい。よって、全ての期間X,Y,Zに、CCまたはDDのいずれかの同じ識別子が付与される。 First, we will explain the planning procedure (planning procedure 1) associated with model pattern a and model pattern h. As shown in Figures 12(a) and 12(c), in these model patterns, the predicted power demand curve 510a is greater than the target power amount Ptgt and the predicted power demand curve 510h is less than the target power amount Ptgt in all periods. Therefore, the same identifier, either CC or DD, is assigned to all periods X, Y, and Z.

これらのモデルパターンに適用する立案手順1では、充電計画のみを立案する。すなわち、放電計画は不要である。なお、予測電力需要カーブ510は、目標電力量Ptgtより小さいため、分類上、放電を行う領域としての識別子DDが付与されるが、モビリティニーズを優先するため、放電は行わず、充電のみを行う。以下、立案手順1について、充放電計画立案部215が実行する処理の流れとして説明する。 In the planning procedure 1 applied to these model patterns, only a charging plan is created. In other words, a discharging plan is not necessary. Note that since the predicted power demand curve 510 is smaller than the target power amount Ptgt, an identifier DD is assigned to indicate a discharging area for classification purposes. However, since mobility needs are given priority, discharging is not performed and only charging is performed. Below, planning procedure 1 is explained as the flow of processing executed by the charge/discharge plan creation unit 215.

まず、メイン処理の処理フローを、図13(a)に示す。本図に示すように、充放電計画立案部215は、充電計画を立案する手順1充電計画立案処理を行い(ステップS1201)、処理を終了する。 First, the process flow of the main process is shown in FIG. 13(a). As shown in this figure, the charge/discharge plan creation unit 215 performs step 1 of creating a charging plan (step S1201), and ends the process.

次に、充放電計画立案部215によるステップS1201の、手順1充電計画立案処理の流れを、図13(b)に示す。また、図12(b)および図12(d)を用いて説明する。 Next, the flow of the charging plan creation process of step 1 in step S1201 by the charging/discharging plan creation unit 215 is shown in FIG. 13(b). It will also be described with reference to FIG. 12(b) and FIG. 12(d).

充放電計画立案部215は、まず、図TsからTeまでの期間Tdの、最大の電力需要値Pmax_0を、図12(b)および図12(d)に示すように、Pmax_1とする(ステップS1301)。 First, the charge/discharge plan creation unit 215 sets the maximum power demand value Pmax_0 during the period Td from Ts to Te in the figure to Pmax_1, as shown in Figures 12(b) and 12(d) (step S1301).

そして、充放電計画立案部215は、まず、第一充電処理を行う(ステップS1302)。ここで、第一充電処理は、電力需要値が、Pmax_1以下の時間帯に対して行われる処理である。処理の詳細は、後述する。 Then, the charge/discharge plan creation unit 215 first performs a first charging process (step S1302). Here, the first charging process is a process that is performed during a time period when the power demand value is equal to or less than Pmax_1. Details of the process will be described later.

次に、充放電計画立案部215は、上記第一充電処理において立案された充電量の合計(充電量合計)Ctotalが、図4(a)に示す充電必要電力量Cneedに達しているか、すなわち、Cneed分、充電が完了したかを判別する(ステップS1303)。完了していた場合、充電計画立案処理を終了する。 Next, the charge/discharge plan creation unit 215 determines whether the total charge amount (total charge amount) Ctotal created in the first charging process has reached the required charging power amount Cneed shown in FIG. 4(a), i.e., whether charging has been completed for Cneed (step S1303). If completed, the charging plan creation process is terminated.

一方、未完了の場合、充放電計画立案部215は、第二充電処理を行い(ステップS1304)、処理を終了する。ここで、第二充電処理は、電力需要値が、Pmax_1より大きい時間帯に対して行われる処理である。処理の詳細は、後述する。 On the other hand, if the charging is not completed, the charge/discharge plan creation unit 215 performs a second charging process (step S1304) and ends the process. Here, the second charging process is a process that is performed for a time period when the power demand value is greater than Pmax_1. Details of the process will be described later.

次に、充放電計画立案部215による第一充電処理の流れを、図14に沿って説明する。第一充電処理では、図12(b)および図12(d)に、丸付き数字1、2で示すように、時刻の早い時間帯から順に、充電必要電力量Cneedに達するまで、各時間帯に、充電可能な最大量を充電量として割り当てる。 Next, the flow of the first charging process by the charge/discharge plan creation unit 215 will be described with reference to FIG. 14. In the first charging process, as shown by circled numbers 1 and 2 in FIG. 12(b) and FIG. 12(d), the maximum chargeable amount is assigned as the charging amount to each time slot, starting from the earliest time slot, until the required charging energy amount Cneed is reached.

まず、充放電計画立案部215は、Td期間内の時間帯数を特定する(ステップS1401)。ここでは、M個とする。そして、Td期間内の全時間帯について、処理順を決定する。立案手順1では、時刻の早い方から順に、処理を行うよう決定する。例えば、各時間帯に連番を付し、その順に行う。さらに、充放電計画立案部215は、各時間帯tn(nは、1以上M以下の整数)について、電力需要値Ptnと、Pmax_1との差である空き容量Stnを算出する。 First, the charge/discharge plan creation unit 215 identifies the number of time periods within the Td period (step S1401). Here, it is assumed that there are M time periods. Then, the processing order is determined for all time periods within the Td period. In the creation procedure 1, it is determined that processing will be performed in order from the earliest time period to the latest time period. For example, each time period is assigned a consecutive number and processed in that order. Furthermore, the charge/discharge plan creation unit 215 calculates the available capacity Stn, which is the difference between the power demand value Ptn and Pmax_1, for each time period tn (n is an integer between 1 and M).

充放電計画立案部215は、まず、カウンタnに1を設定する(ステップS1402)。また、このとき、充電量合計Ctotalを0とする。 The charge/discharge plan creation unit 215 first sets the counter n to 1 (step S1402). At this time, the total charge amount Ctotal is set to 0.

充放電計画立案部215は、充電量合計Ctotalが充電必要電力量Cneedに達しているかを判断し(ステップS1403)、達している場合、処理を終了する。 The charge/discharge plan creation unit 215 determines whether the total charge amount Ctotal has reached the required charge power amount Cneed (step S1403), and if so, ends the process.

未達の場合、充放電計画立案部215は、空き容量Stnが、最大充電可能量PCSmaxより大きいか(Stn>PCSmax)判別する(ステップS1404)。ここで、最大充電可能量PCSmaxは、対象EV(EVバッテリ320)が接続されるPCS310の、時間帯幅(ここでは、30分)における最大の充電可能な電力量である。 If not reached, the charge/discharge plan creation unit 215 determines whether the available capacity Stn is greater than the maximum chargeable capacity PCSmax (Stn>PCSmax) (step S1404). Here, the maximum chargeable capacity PCSmax is the maximum amount of chargeable power in a time period (here, 30 minutes) of the PCS310 to which the target EV (EV battery 320) is connected.

Stn>PCSmaxの場合、最大充電可能量PCSmaxを、時間帯tnの充電量Ctnとする(ステップS1405)。そして、当該時間帯tnの電力需要値Ptnを、PCSmaxを加えた値に更新し、充電量合計Ctotalを、PCSmaxを加えた値に更新する(ステップS1406)。なお、最大充電可能量PCSmaxを充電量Ctnとした時間帯tnは、後述する第二充電処理の処理対象から除く(ステップS1409)。 If Stn>PCSmax, the maximum chargeable amount PCSmax is set as the charge amount Ctn for the time period tn (step S1405). Then, the power demand value Ptn for the time period tn is updated to a value obtained by adding PCSmax, and the total charge amount Ctotal is updated to a value obtained by adding PCSmax (step S1406). Note that the time period tn in which the charge amount Ctn is set to the maximum chargeable amount PCSmax is excluded from the processing target of the second charging process described below (step S1409).

一方、Stn≦PCSmaxの場合、当該時間帯tnの充電量Ctnを空き容量Stnとする(ステップS1407)。そして、当該時間帯tnの電力需要値Ptnを、充電量Ctnを加えた値に更新し、充電量合計Ctotalを、充電量Ctnを加えた値に更新する(ステップS1408)。 On the other hand, if Stn≦PCSmax, the charge amount Ctn for the time period tn is set to the available capacity Stn (step S1407). Then, the power demand value Ptn for the time period tn is updated to a value obtained by adding the charge amount Ctn, and the total charge amount Ctotal is updated to a value obtained by adding the charge amount Ctn (step S1408).

時間帯tnの電力需要値Ptnと充電量合計Ctotalを更新後、全ての期間について処理を終えたか判別する(ステップS1409、S1410)。ここでは、カウンタnを1インクリメントし、Mを越えたか否かにより、判別する。超えていない場合は、ステップS1403へ戻り、処理を継続する。 After updating the power demand value Ptn and the total charge amount Ctotal for the time period tn, it is determined whether processing has been completed for all periods (steps S1409 and S1410). Here, the counter n is incremented by 1, and it is determined whether M has been exceeded. If it has not been exceeded, the process returns to step S1403 and continues processing.

一方、全ての期間について処理を終えた場合は、処理を終了する。 On the other hand, if processing has been completed for all periods, the process ends.

次に、充放電計画立案部215による第二充電処理の流れを、図15に沿って説明する。本処理は、第一充電処理のみでは必要量の充電ができない場合に行われる処理である。本処理では、目標電力量Ptgtの範囲(または、最大値Pmax_1)では、必要な充電を行えない時に実行される。したがって、図12(b)および図12(d)に、丸付き数字3で示すように、期間Tdの最大の電力需要値を上げる。これらの図では、Pmax_1からPmax_2に増加させている。なお、本実施形態では、第一充電処理の中で、処理対象から除かれた時間帯tnについては、対象外とする。すまわち、除かれていない時間帯tnのみを対象とする。 Next, the flow of the second charging process by the charge/discharge plan creation unit 215 will be described with reference to FIG. 15. This process is performed when the required amount of charging cannot be achieved by the first charging process alone. This process is performed when the required charging cannot be achieved within the range of the target power amount Ptgt (or the maximum value Pmax_1). Therefore, as shown by the circled number 3 in FIG. 12(b) and FIG. 12(d), the maximum power demand value for the period Td is increased. In these figures, it is increased from Pmax_1 to Pmax_2. Note that in this embodiment, the time slots tn that were excluded from the processing target in the first charging process are not included. In other words, only the time slots tn that are not excluded are included.

図15に示すように、充放電計画立案部215は、まず、第二充電処理に必要な各種の情報を取得、算出する(ステップS1501)。ここでは、第一充電処理で算出した充電量合計Ctotalと、第二充電処理の対象時間帯tnと、その個数M2と、各対象時間帯tnの充電可能な空き容量Stn2である。空き容量Stn2は、PCS310で定まる最大充電可能量PCSmaxと、第一充電処理で定めた充電量Ctnとの差である。 As shown in FIG. 15, the charge/discharge plan creation unit 215 first acquires and calculates various information necessary for the second charging process (step S1501). Here, the information is the total charge amount Ctotal calculated in the first charging process, the target time periods tn of the second charging process, the number M2 of the time periods, and the available charge capacity Stn2 in each target time period tn. The available capacity Stn2 is the difference between the maximum chargeable capacity PCSmax determined by the PCS310 and the charge amount Ctn determined in the first charging process.

これらの各情報を算出後、充放電計画立案部215は、処理対象の時間帯tnの処理順を決定し、以下の処理を行う(ステップS1502)。処理順は、例えば、空き容量Stn2の値が小さく、かつ、時刻の早い時間帯tnを優先とする。nはカウンタである。 After calculating each of these pieces of information, the charge/discharge plan creation unit 215 determines the processing order of the time slot tn to be processed and performs the following processing (step S1502). For example, the processing order is such that the time slot tn having the smallest free space Stn2 value and the earliest time slot is given priority. n is a counter.

充放電計画立案部215は、充電量合計Ctotalが充電必要電力量Cneedに達しているかを判断し(ステップS1503)、達している場合、処理を終了する。 The charge/discharge plan creation unit 215 determines whether the total charge amount Ctotal has reached the required charge power amount Cneed (step S1503), and if so, ends the process.

未達の場合、充放電計画立案部215は、時間帯tnの充電量Ctnに空き容量Stn2を加算する(ステップS1504)。すなわち、時間帯tnの充電量Ctnは、空き容量Stn2を加えた値に更新される。そして、当該時間帯tnの電力需要値Ptnを、空き容量Stn2を加えた値に更新し、充電量合計Ctotalを、空き容量Stn2を加えた値に更新する(ステップS1505)。また、図12(b)および図12(d)に示すように、得られた電力需要値Ptnを期間Tdの最大の電力需要値Pmax_2とする(ステップS1506)。 If the target has not been reached, the charge/discharge plan creation unit 215 adds the free capacity Stn2 to the charge amount Ctn for the time period tn (step S1504). That is, the charge amount Ctn for the time period tn is updated to a value obtained by adding the free capacity Stn2. Then, the power demand value Ptn for the time period tn is updated to a value obtained by adding the free capacity Stn2, and the total charge amount Ctotal is updated to a value obtained by adding the free capacity Stn2 (step S1505). In addition, as shown in Figures 12(b) and 12(d), the obtained power demand value Ptn is set as the maximum power demand value Pmax_2 for the period Td (step S1506).

その後、第二充電処理の対象となる全ての時間帯tnに対して処理を行ったか否かを判別し(ステップS1507、S1508)、行っていれば、そのまま処理を終了し、行っていない場合は、ステップS1503へ戻り、次の時間帯の処理を行う。 Then, it is determined whether processing has been performed for all time periods tn that are the target of the second charging process (steps S1507 and S1508). If processing has been performed, the processing ends. If processing has not been performed, the process returns to step S1503 and processing for the next time period is performed.

以上の充放電計画により、期間Tdの各時間帯tnの、対象EVに対する充電量Ctnと、電力需要値Ptnと、が定まる。すなわち、上記図5(b)に示す、各時間帯の、EVバッテリ320の、計画充放電電力量443が定まる。また、併せて、充放電計画加味後の、期間Tdの最大の電力需要値Pmax_2も定まる。 The above charge and discharge plan determines the charge amount Ctn and power demand value Ptn for the target EV for each time slot tn in the period Td. That is, the planned charge and discharge power amount 443 of the EV battery 320 for each time slot shown in FIG. 5(b) above is determined. In addition, the maximum power demand value Pmax_2 for the period Td after taking into account the charge and discharge plan is also determined.

次に、モデルパターンbおよびeに対応づけて立案手順DB460に記憶される立案手順2について説明する。これらのモデルパターンは、図16(a)および図16(c)に示すように、予測電力需要カーブ510b、510eは、略単調増加し、期間Td内で、目標電力量Ptgtを越えている。すなわち、時刻の早い期間に、CCの識別子が付与され、時刻の遅い期間にDDの識別子が付与される。このようなモデルパターンでは、予測電力需要値が目標電力量Ptgt未満の領域が充電可能領域であり、目標電力量Ptgt以上の領域が放電可能領域である。 Next, we will explain planning procedure 2, which is stored in the planning procedure DB 460 in association with model patterns b and e. As shown in Figures 16(a) and 16(c), in these model patterns, the predicted power demand curves 510b and 510e increase almost monotonically and exceed the target power amount Ptgt within the period Td. In other words, the CC identifier is assigned to the early time period, and the DD identifier is assigned to the later time period. In such a model pattern, the area where the predicted power demand value is less than the target power amount Ptgt is the chargeable area, and the area where the predicted power demand value is equal to or greater than the target power amount Ptgt is the dischargeable area.

これらのモデルパターンに適用する立案手順2では、まず、目標電力量Ptgtより予測電力需要値が小さい時間帯で充電計画を立案し、その後、その充電計画で追加された電力量も含めて、放電計画を立案する。すなわち、図16(b)に丸付き数字で示す順に処理を行う。ここでは、丸付き数字1~3が充電量を決定する処理を示し、同4が放電量を決定する処理である。これにより、当初、Pmax_1であった期間Tdの最大の電力需要値を、Pmax_3まで低減させることができる。 In planning procedure 2 applied to these model patterns, first, a charging plan is created for a time period in which the predicted power demand value is smaller than the target power amount Ptgt, and then a discharging plan is created including the power amount added in the charging plan. That is, the processing is performed in the order shown by the circled numbers in FIG. 16(b). Here, circled numbers 1 to 3 indicate the processing for determining the charging amount, and circled numbers 4 indicates the processing for determining the discharging amount. This makes it possible to reduce the maximum power demand value for the period Td, which was initially Pmax_1, to Pmax_3.

この立案手順2について、充放電計画立案部215が実行する処理の流れとして図17(a)から図20を用いて説明する。 This planning procedure 2 will be explained using Figures 17(a) to 20 as the flow of processing executed by the charge/discharge plan planning unit 215.

まず、メイン処理の処理フローを図17(a)に示す。本図に示すように、充放電計画立案部215は、充電計画を立案する手順2充電計画立案処理を行う(ステップS2201)。その後、放電計画を立案する手順2放電計画立案処理を行い(ステップS2202)、処理を終了する。 First, the process flow of the main process is shown in FIG. 17(a). As shown in this figure, the charge/discharge plan creation unit 215 performs a procedure 2 charge plan creation process to create a charge plan (step S2201). After that, it performs a procedure 2 discharge plan creation process to create a discharge plan (step S2202), and ends the process.

次に、立案手順2の手順2充電計画立案処理の流れは、基本的に立案手順1の手順1充電計画立案処理と同じである。ただし、図17(b)に示すように、ここでは、充放電計画立案部215は、目標電力量PtgtをPmax_1とする(ステップS2301)。また、目標とする充電量は、充電必要電力量Cneedだけでなく、図4(a)に示す余剰電力量Cexedも加える。すなわち、立案手順1と同様に、第一充電処理を行い(ステップS2302)、その後、立案された充電量合計Ctotalが、充電必要電力量Cneedと余剰電力量Cexedの合計に達しているかを判別し(ステップS2303)、未達の場合、第二充電処理等を行う(ステップS2304)。 Next, the flow of the step 2 charging plan planning process of planning procedure 2 is basically the same as the step 1 charging plan planning process of planning procedure 1. However, as shown in FIG. 17(b), here, the charge/discharge plan planning unit 215 sets the target power amount Ptgt to Pmax_1 (step S2301). Also, the target charging amount includes not only the charging required power amount Cneed but also the surplus power amount Cexed shown in FIG. 4(a). That is, as in planning procedure 1, the first charging process is performed (step S2302), and then it is determined whether the planned total charging amount Ctotal has reached the sum of the charging required power amount Cneed and the surplus power amount Cexed (step S2303), and if not, the second charging process, etc. is performed (step S2304).

次に、立案手順2の第一充電処理について、図18を用いて説明する。立案手順2の第一充電処理は、基本的に立案手順1の第一充電処理と同じである。ただし、処理対象の時間帯tnは、その電力需要値Ptnが目標電力量Ptgt(=Pmax_1)より小さい時間帯とする。また、処理順については、空き容量Stnの値が大きいことを最優先とし、時刻は、次の優先項目とする。 Next, the first charging process of planning procedure 2 will be described with reference to FIG. 18. The first charging process of planning procedure 2 is basically the same as the first charging process of planning procedure 1. However, the time period tn to be processed is a time period in which the power demand value Ptn is smaller than the target power amount Ptgt (= Pmax_1). In addition, with regard to the processing order, the largest value of the free capacity Stn is given top priority, and the time is given the next priority.

まず、充放電計画立案部215は、Td期間内の、処理対象の時間帯数を特定する(ステップS2401)。ここでは、上述のように、処理対象の時間帯tnは、電力需要値Ptnが目標電力量Ptgt(=Pmax_1)より小さい時間帯であるため、その個数を特定する(M個とする)。そして、該当時間帯tnについて、電力需要値PtnとPmax_1との差である空き容量Stnを算出する。また、上述のように、空き容量Stnの大きい順で、その中では、時刻の早い順に処理が行われるよう、処理順を決定する。 First, the charge/discharge plan creation unit 215 identifies the number of time periods to be processed within the Td period (step S2401). Here, as described above, the time periods tn to be processed are time periods in which the power demand value Ptn is smaller than the target power amount Ptgt (= Pmax_1), so the number of such time periods is identified (assuming M). Then, for the time periods tn, the available capacity Stn, which is the difference between the power demand value Ptn and Pmax_1, is calculated. Also, as described above, the processing order is determined so that the processing is performed in descending order of the available capacity Stn, and within that, in descending order of time.

カウンタnを1と、充電量合計Ctotalを0とし(ステップS2402)、その後、充放電計画立案部215は、定められたM個の処理対象時間帯tnについて、以下の処理を行う。 The counter n is set to 1 and the total charge amount Ctotal is set to 0 (step S2402), and then the charge/discharge plan creation unit 215 performs the following processing for the M processing time periods tn that have been determined.

充放電計画立案部215は、充電量合計Ctotalが充電必要電力量Cneedと余剰電力量Cexedとの合計に達しているかを判断し(ステップS2403)、達している場合、処理を終了する。 The charge/discharge plan creation unit 215 determines whether the total charge amount Ctotal reaches the sum of the charge required energy amount Cneed and the surplus energy amount Cexed (step S2403), and if so, ends the processing.

未達の場合、充放電計画立案部215は、空き容量Stnが、最大充電可能量PCSmaxより大きいか(Stn>PCSmax)判別する(ステップS2404)。 If not reached, the charge/discharge plan creation unit 215 determines whether the available capacity Stn is greater than the maximum chargeable capacity PCSmax (Stn>PCSmax) (step S2404).

Stn>PCSmaxである場合、最大充電可能量PCSmaxを、時間帯tnの充電量とする(ステップS2405)。そして、当該時間帯tnの電力需要値Ptnを、PCSmaxを加えた値に更新し、充電量合計Ctotalを、PCSmaxを加えた値に更新する(ステップS2406)。なお、最大充電可能量PCSmaxを充電量とした時間帯tnは、後述する第二充電処理の処理対象から除く(ステップS2409)。本処理の対象の時間帯tnを、図16(b)に丸付き数字1で示す。 If Stn>PCSmax, the maximum chargeable amount PCSmax is set as the charge amount for time period tn (step S2405). Then, the power demand value Ptn for that time period tn is updated to a value obtained by adding PCSmax, and the total charge amount Ctotal is updated to a value obtained by adding PCSmax (step S2406). Note that the time period tn in which the charge amount is the maximum chargeable amount PCSmax is excluded from the processing target of the second charging process described below (step S2409). The time period tn that is the target of this processing is indicated by the circled number 1 in FIG. 16(b).

一方、Stn≦PCSmaxである場合、当該時間帯tnの充電量Ctnを空き容量Stnとする(ステップS2407)。そして、当該時間帯tnの電力需要値Ptnを、充電量Ctnを加えた値に更新し、充電量合計Ctotalを、充電量Ctnを加えた値に更新する(ステップS2408)。本処理の対象の時間帯tnを、図16(b)の丸付き数字2で示す。 On the other hand, if Stn≦PCSmax, the charge amount Ctn for the time period tn is set to the available capacity Stn (step S2407). Then, the power demand value Ptn for the time period tn is updated to a value obtained by adding the charge amount Ctn, and the total charge amount Ctotal is updated to a value obtained by adding the charge amount Ctn (step S2408). The time period tn that is the subject of this process is indicated by the circled number 2 in FIG. 16(b).

時間帯tnの電力需要値Ptnと充電量の合計を更新後、全ての期間について処理を終えたか判別する(ステップS2409、S2410)。ここでは、カウンタnを1インクリメントし、Mを越えたか否かにより、判別する。超えていない場合は、ステップS2403へ戻り、処理を継続する。 After updating the power demand value Ptn and the total charge amount for time period tn, it is determined whether processing has been completed for all periods (steps S2409 and S2410). Here, the counter n is incremented by 1, and it is determined whether M has been exceeded. If it has not been exceeded, the process returns to step S2403 and continues processing.

一方、全ての期間について処理を終えた場合は、処理を終了する。 On the other hand, if processing has been completed for all periods, the process ends.

次に、立案手順2の場合の充放電計画立案部215による第二充電処理の流れを、図19に沿って説明する。立案手順1同様、本処理は、第一充電処理のみでは必要量の充電ができない場合に行われる処理である。第一充電処理の中で、除かれなかった時間帯tnのみを対象とする。処理の流れは、基本的に立案手順1の第二充電処理の流れと同じである。また、本処理の対象の時間帯tnを、図16(b)の丸付き数字3で示す。 Next, the flow of the second charging process by the charge/discharge plan planning unit 215 in the case of planning procedure 2 will be described with reference to FIG. 19. As with planning procedure 1, this process is performed when the required amount of charging cannot be achieved by the first charging process alone. Only the time period tn that was not excluded in the first charging process is targeted. The process flow is basically the same as the flow of the second charging process in planning procedure 1. The time period tn targeted by this process is indicated by the circled number 3 in FIG. 16(b).

まず、第二充電処理に必要な各種の情報を取得、算出する(ステップS2501)。ここでは、第一充電処理で算出した充電量合計Ctotalと、第二充電処理の対象時間帯tnと、その個数M2と、各対象時間帯tnの空き容量Stn2である。空き容量Stn2は、最大充電可能量PCSmaxと、第一充電処理で定めた充電量Ctnとの差である。 First, various information required for the second charging process is acquired and calculated (step S2501). Here, the information is the total charge amount Ctotal calculated in the first charging process, the target time periods tn of the second charging process, the number M2 of the time periods, and the free space Stn2 of each target time period tn. The free space Stn2 is the difference between the maximum chargeable amount PCSmax and the charge amount Ctn determined in the first charging process.

これらの各情報を算出後、充放電計画立案部215は、処理対象の時間帯tnの処理順を決定し、以下の処理を行う(ステップS2502)。処理順は、例えば、空き容量Stn2の値が小さく、かつ、時刻の早い時間帯tnを優先とする。nはカウンタである。 After calculating each of these pieces of information, the charge/discharge plan creation unit 215 determines the processing order of the time slot tn to be processed and performs the following processing (step S2502). For example, the processing order is such that the time slot tn having the smallest free space Stn2 value and the earliest time slot is given priority. n is a counter.

充放電計画立案部215は、充電量合計Ctotalが充電必要電力量Cneedと余剰電力量Cexedとの合計に達しているかを判断し(ステップS2503)、達している場合、処理を終了する。 The charge/discharge plan creation unit 215 determines whether the total charge amount Ctotal reaches the sum of the charge required energy amount Cneed and the surplus energy amount Cexed (step S2503), and if so, ends the processing.

未達の場合、充放電計画立案部215は、時間帯tnの充電量Ctnに空き容量Stn2を加算する(ステップS2504)。そして、当該時間帯tnの電力需要値Ptnを、空き容量Stn2を加えた値に更新し、充電量合計Ctotalを、空き容量Stn2を加えた値に更新する(ステップS2505)。また、図16(b)に示すように、得られた電力需要値Ptnを期間Tdの最大の電力需要値Pmax_2とする(ステップS2506)。 If the target has not been reached, the charge/discharge plan creation unit 215 adds the free capacity Stn2 to the charge amount Ctn for the time period tn (step S2504). Then, the power demand value Ptn for the time period tn is updated to a value that includes the free capacity Stn2, and the total charge amount Ctotal is updated to a value that includes the free capacity Stn2 (step S2505). In addition, as shown in FIG. 16(b), the obtained power demand value Ptn is set as the maximum power demand value Pmax_2 for the period Td (step S2506).

その後、第二充電処理の対象となる全ての時間帯tnに対して処理を行ったか否かを判別し(ステップS2507、S2508)、行っていれば、そのまま処理を終了し、行っていない場合は、ステップS2503へ戻り、次の時間帯の処理を行う。 Then, it is determined whether processing has been performed for all time periods tn that are the target of the second charging process (steps S2507 and S2508). If processing has been performed, the processing ends. If processing has not been performed, the process returns to step S2503 and processing for the next time period is performed.

なお、立案手順2では、放電処理もあるため、第二充電処理において、余剰電力量Cexed分も、充電に割り当てている。しかしながら、余剰電力量Cexedは、充電に割当なくてもよい。すなわち、上記ステップS2503で、CtotalがCneedに達した場合、処理を終えてもよい。 Note that in planning procedure 2, since a discharge process is also performed, the surplus power amount Cexed is also allocated to charging in the second charging process. However, the surplus power amount Cexed does not have to be allocated to charging. In other words, if Ctotal reaches Cneed in step S2503 above, the process may end.

次に、立案手順2の場合の充放電計画立案部215による手順2放電計画立案処理の流れを図20に従って、説明する。放電計画は、余剰電力量Cexedがある場合のみ、割り当てる。本処理の対象の時間帯tnを、図16(b)の丸付き数字4で示す。 Next, the flow of the procedure 2 discharge plan creation process by the charge/discharge plan creation unit 215 in the case of creation procedure 2 will be described with reference to FIG. 20. The discharge plan is assigned only when there is surplus power Cexed. The time period tn targeted by this process is indicated by the circled number 4 in FIG. 16(b).

まず、充放電計画立案部215は、期間Td内の最大の電力需要値Pmax_0を、Pmax_1とする(ステップS2601)。 First, the charge/discharge plan creation unit 215 sets the maximum power demand value Pmax_0 within the period Td to Pmax_1 (step S2601).

まず、目標電力量Ptgtより、当初の電力需要値Ptnが大きい時間帯tnを抽出する(ステップS2602)。また、その個数を特定する。ここでは、M3とする。また、電力需要値Ptnの大きい順に処理を行うよう、処理順を決定する。同じ電力需要値の時間帯が複数ある場合は、時刻の早い順に処理を行うよう、処理順を決定する。決定した処理順にしたがって、以下の処理を行う(ステップS2603)。 First, the time periods tn in which the initial power demand value Ptn is large are extracted from the target power amount Ptgt (step S2602). The number of such periods is then identified. Here, this is set to M3. The processing order is then determined so that processing is performed in descending order of power demand value Ptn. If there are multiple time periods with the same power demand value, the processing order is determined so that processing is performed in ascending order of time. The following processing is performed according to the determined processing order (step S2603).

まず、充放電計画立案部215は、余剰電力量Cexedが残っているかを判別する(ステップS2604)。残っていなければ、そのまま処理を終了する。 First, the charge/discharge plan creation unit 215 determines whether or not there is any surplus power Cexed remaining (step S2604). If there is no surplus power remaining, the process ends.

電力需要値が最も大きい時間帯である時間帯tnの電力需要値Ptnと、2番目に電力需要値が大きい時間帯の電力需要値の差ΔPtn1を算出し、それを、電力需要値Ptnが最も大きい時間帯tnの、放電量Dtnとする(ステップS2605)。 The difference ΔPtn1 between the power demand value Ptn of the time period tn in which the power demand value is the highest and the power demand value of the time period in which the power demand value is the second highest is calculated, and this is set as the discharge amount Dtn of the time period tn in which the power demand value Ptn is the highest (step S2605).

そして、時間帯tnの電力需要値Ptnを、Dtnを除いた値に更新するとともに、余剰電力量Cexedを、放電量Dtnを除いた値に更新する(ステップS2606)。また、図16(b)に示すように、得られた電力需要値Ptnを期間Tdの最大の電力需要値Pmax_3とする(ステップS2607)。なお、例えば、電力需要値が最も大きい時間帯が複数ある場合は、これらの時間帯の処理が全て終わった時に、電力需要値Ptnを期間Tdの最大の電力需要値Pmax_3とする。 Then, the power demand value Ptn for the time period tn is updated to a value excluding Dtn, and the surplus power amount Cexed is updated to a value excluding the discharge amount Dtn (step S2606). As shown in FIG. 16(b), the obtained power demand value Ptn is set as the maximum power demand value Pmax_3 for the period Td (step S2607). Note that, for example, if there are multiple time periods with the highest power demand value, when processing of all of these time periods is completed, the power demand value Ptn is set as the maximum power demand value Pmax_3 for the period Td.

そして、M3個の時間帯について、全て処理を終えたか判別する(ステップS2608、S2609)。終えていれば、余剰電力量Cexedを残し、そのまま処理を終了する。一方、未処理の時間帯tnがある場合は、ステップS2604に戻り、処理順で決めた次の時間帯の処理を行う。 Then, it is determined whether processing has been completed for all M3 time slots (steps S2608, S2609). If processing has been completed, the surplus power amount Cexed is left and processing ends. On the other hand, if there are unprocessed time slots tn, the process returns to step S2604 and processing is performed for the next time slot determined in the processing order.

なお、モデルパターンdおよびモデルパターンgに対応づけられた立案手順3、また、モデルパターンfに対応づけられた立案手順4についても、基本的に立案手順2と同様の処理である。ただし、第一充電処理の処理順を決定する際、立案手順2の場合は、時刻の早いものを優先しているが、立案手順3では、時刻の遅いものを優先する。立案手順4の場合は、いずれであってもよい。 Planning procedure 3 associated with model pattern d and model pattern g, and planning procedure 4 associated with model pattern f are basically the same as planning procedure 2. However, when determining the processing order of the first charging process, planning procedure 2 prioritizes the earlier one, whereas planning procedure 3 prioritizes the later one. In the case of planning procedure 4, either is acceptable.

図21(a)および図21(c)に示すように、モデルパターンdおよびgでは、予測電力需要カーブ510d、510gは、略単調に減少し、期間Td内で、目標電力量Ptgtより小さくなる。すなわち、時刻の早い期間にDDの識別子が付与され、時刻の遅い期間にCCの識別子が付与される。このようなモデルパターンでは、予測電力需要値の目標電力量Ptgt以上の領域が放電可能領域であり、目標電力量Ptgt未満の領域が充電可能領域である。 As shown in Figures 21(a) and 21(c), in model patterns d and g, the predicted power demand curves 510d, 510g decrease almost monotonically and become smaller than the target power amount Ptgt within period Td. That is, the early time period is assigned the DD identifier, and the later time period is assigned the CC identifier. In such model patterns, the area of the predicted power demand value equal to or greater than the target power amount Ptgt is the dischargeable area, and the area below the target power amount Ptgt is the chargeable area.

これらのモデルパターンに適用する立案手順3では、まず、目標電力量Ptgtより予測電力需要値の小さい時間帯で充電計画を立案し、その後、その充電計画で追加された電力量も含めて、放電計画を立案する。すなわち、図21(b)に丸付き数字で示す順に処理を行う。ここでは、丸付き数字1~3が充電量を決定する処理を示し、同4が放電量を決定する処理である。これにより、当初、Pmax_1であった期間Tdの最大の電力需要値を、Pmax_3まで低減させることができる。 In planning procedure 3 applied to these model patterns, first, a charging plan is created for a time period in which the predicted power demand value is smaller than the target power amount Ptgt, and then a discharging plan is created including the power amount added in the charging plan. That is, the processing is performed in the order shown by the circled numbers in FIG. 21(b). Here, circled numbers 1 to 3 indicate the processing for determining the charging amount, and circled numbers 4 is the processing for determining the discharging amount. This makes it possible to reduce the maximum power demand value for the period Td, which was initially Pmax_1, to Pmax_3.

また、モデルパターンfでは、予測電力需要カーブ510fは、期間Td内で減少から増加に転じる。このようなモデルパターンfにおいても、図21(d)に示すように、他のモデルパターンと同様に、予測電力需要値の目標電力量Ptgt以上の領域が放電可能領域であり、目標電力量Ptgt未満の領域が充電可能領域である。 In addition, in model pattern f, the predicted power demand curve 510f changes from decreasing to increasing within the period Td. As shown in FIG. 21(d), in this model pattern f, as in the other model patterns, the area where the predicted power demand value is equal to or greater than the target power amount Ptgt is the dischargeable area, and the area where the predicted power demand value is less than the target power amount Ptgt is the chargeable area.

このモデルパターンfに適用する立案手順4では、まず、目標電力量Ptgtより予測電力需要値の小さい時間帯で充電計画を立案し、その後、その充電計画で追加された電力量も含めて、放電計画を立案する。すなわち、図21(e)に丸付き数字で示す順に処理を行う。ここでは、丸付き数字1~3が充電量を決定する処理を示し、同4が放電量を決定する処理である。これにより、当初、Pmax_1であった期間Tdの最大の電力需要値を、Pmax_3まで低減させることができる。 In planning procedure 4 applied to this model pattern f, first, a charging plan is created for a time period in which the predicted power demand value is smaller than the target power amount Ptgt, and then a discharging plan is created including the power amount added in the charging plan. That is, the processing is performed in the order shown by the circled numbers in FIG. 21(e). Here, circled numbers 1 to 3 indicate the processing for determining the charging amount, and circled numbers 4 is the processing for determining the discharging amount. This makes it possible to reduce the maximum power demand value for the period Td, which was initially Pmax_1, to Pmax_3.

次に、モデルパターンcに対応付けられた立案手順5について説明する。このモデルパターンcは、図22(a)に示すように、予測電力需要カーブ510cは、期間Tdの間に、増加から減少に転じ、最小値は目標電力量Ptgtより小さく、最大値は、目標電力量Ptgtより大きい。モデルパターンcにおいても、本図に示すように、他のモデルパターンと同様に、予測電力需要値が目標電力量Ptgt未満の領域が充電可能領域であり、目標電力量Ptgt以上の領域が放電可能領域である。 Next, we will explain the planning procedure 5 associated with model pattern c. As shown in FIG. 22(a), in this model pattern c, the predicted power demand curve 510c changes from increasing to decreasing during the period Td, with the minimum value being smaller than the target power amount Ptgt and the maximum value being larger than the target power amount Ptgt. As shown in this figure, in model pattern c, as in the other model patterns, the area where the predicted power demand value is less than the target power amount Ptgt is the chargeable area, and the area where the predicted power demand value is equal to or greater than the target power amount Ptgt is the dischargeable area.

モデルパターンcに適用する立案手順5では、まず、時刻の遅い期間で、充電計画を立案し(図22(b)の丸付き数字1、2)、次に、時刻の早い期間で充電計画を立案し(図22(b)の丸付き数字3、4)、最後に、放電可能領域の放電計画を立案する(図22(b)の丸付き数字5)。これにより、当初、Pmax_1であった期間Tdの最大の電力需要値を、Pmax_3まで低減させることができる。以下、立案手順5について、充放電計画立案部215が実行する処理の流れとして説明する。 In the planning procedure 5 applied to the model pattern c, first, a charging plan is created for a later time period (circled numbers 1 and 2 in FIG. 22(b)), then a charging plan is created for an earlier time period (circled numbers 3 and 4 in FIG. 22(b)), and finally a discharging plan for the dischargeable region is created (circled number 5 in FIG. 22(b)). This makes it possible to reduce the maximum power demand value for the period Td, which was initially Pmax_1, to Pmax_3. Below, the planning procedure 5 is explained as the flow of the process executed by the charge and discharge plan creation unit 215.

まず、充放電計画立案部215による立案手順5のメイン処理の流れを、図22(c)に示す。 First, the flow of the main processing of planning procedure 5 by the charge/discharge plan planning unit 215 is shown in Figure 22 (c).

まず、充放電計画立案部215は、期間Zの充電計画を立案する期間Z充電処理を行う(ステップS5101)。 First, the charge/discharge plan creation unit 215 performs period Z charging processing to create a charging plan for period Z (step S5101).

その後、充放電計画立案部215は、立案された充電量合計Ctotalが、充電必要電力量Cneedと余剰電力量Cexedの合計に達しているかを判別し(ステップS5102)、達している場合は、第一充放電処理を行い(ステップS5103)、処理を終了する。 Then, the charge/discharge plan creation unit 215 determines whether the created total charge amount Ctotal reaches the sum of the required charge energy amount Cneed and the surplus energy amount Cexed (step S5102), and if so, performs the first charge/discharge process (step S5103) and ends the process.

一方、未達の場合、充放電計画立案部215は、立案された充電量合計Ctotalが、充電必要電力量Cneedに達しているかを判別し(ステップS5104)、達している場合は、第二充放電処理を行い(ステップS5105)、処理を終了する。 On the other hand, if the required charging amount Cneed has not been reached, the charge/discharge plan creation unit 215 determines whether the planned total charging amount Ctotal has reached the required charging amount Cneed (step S5104), and if so, performs a second charge/discharge process (step S5105) and ends the process.

一方、未達の場合、充放電計画立案部215は、第三充放電処理を行い(ステップS5106)、処理を終了する。 On the other hand, if the target has not been reached, the charge/discharge plan creation unit 215 performs a third charge/discharge process (step S5106) and ends the process.

期間Z充電処理について説明する。 Explains period Z charging processing.

期間Z充電処理は、基本的に立案手順2の第一充電処理と同じである。ただし、処理順は、遅い方を優先とする。他の処理は、第一充電処理と同じであるため、ここでは、説明を省略する。 The period Z charging process is basically the same as the first charging process in planning procedure 2. However, the order of processing is such that the later one takes precedence. The other processes are the same as the first charging process, so a description will be omitted here.

次に、ステップS5103の第一充放電処理について説明する。図23は、第一充放電処理の処理フローである。 Next, the first charging/discharging process of step S5103 will be described. Figure 23 shows the processing flow of the first charging/discharging process.

充放電計画立案部215は、期間Yの中の最大の電力需要値を、Pmax_1とする(ステップS5201)。期間Yは、3つの領域の中で、唯一、目標電力量Ptgt以上の時間帯を有する領域である。したがって、期間Tdの最大の電力需要値(Pmax_0)を、Pmax_1とすることと同義である。 The charge/discharge plan creation unit 215 sets the maximum power demand value in the period Y to Pmax_1 (step S5201). Period Y is the only region among the three regions that has a time period that is equal to or greater than the target power amount Ptgt. Therefore, this is equivalent to setting the maximum power demand value (Pmax_0) in the period Td to Pmax_1.

次に、期間Yの中の各時間帯のうち、電力需要値が目標電力量Ptgtより大きい時間帯を放電対象期間とし、その個数を特定するとともに、処理順を決定する(ステップS5202)。個数は、M3とする。また、電力需要値Ptnの大きい順に処理を行うよう、処理順を決定する。同じ電力需要値の時間帯が複数ある場合は、時刻の早い順に処理を行うよう、処理順を決定する。決定した処理順に従って、以下の処理を行う(ステップS5203)。 Next, among the time periods in period Y, the time periods in which the power demand value is greater than the target power amount Ptgt are set as discharge target periods, the number of such time periods is identified, and the processing order is determined (step S5202). The number is set to M3. The processing order is determined so that processing is performed in descending order of the power demand value Ptn. If there are multiple time periods with the same power demand value, the processing order is determined so that processing is performed in ascending order of time. The following processing is performed according to the determined processing order (step S5203).

まず、充放電計画立案部215は、現在SOCと、下限SOCとの差ΔSOC1が、余剰電力量Cexed以上であるかを判別する(ステップS5204)。現在SOCおよび下限SOCは、それぞれ、バッテリ情報DB420から取得する。 First, the charge/discharge plan creation unit 215 determines whether the difference ΔSOC1 between the current SOC and the lower limit SOC is equal to or greater than the surplus power amount Cexed (step S5204). The current SOC and the lower limit SOC are each obtained from the battery information DB 420.

差ΔSOC1が余剰電力量Cexed以上である場合は、小さい方の余剰電力量Cexedを上限として、放電計画を立案する。放電計画の立案処理の流れは、基本的に立案手順2の放電計画立案処理と同じである。 If the difference ΔSOC1 is equal to or greater than the surplus power amount Cexed, a discharge plan is created with the smaller surplus power amount Cexed as the upper limit. The flow of the discharge plan creation process is basically the same as the discharge plan creation process in the creation procedure 2.

すなわち、まず、余剰電力量Cexedが残っているかを判別する(ステップS5205)。残っている場合、ステップS5202で定めた処理順にしたがって、電力需要値が最も大きい時間帯である時間帯tnの電力需要値Ptnと、2番目に電力需要値が大きい時間帯の電力需要値の差ΔPtn1を算出し、それを、電力需要値Ptnが最も大きい時間帯tnの、放電量Dtnとする(ステップS5206)。 That is, first, it is determined whether surplus power Cexed remains (step S5205). If so, according to the processing order determined in step S5202, the difference ΔPtn1 between the power demand value Ptn of the time slot tn with the highest power demand value and the power demand value of the time slot with the second highest power demand value is calculated, and this is set as the discharge amount Dtn of the time slot tn with the highest power demand value Ptn (step S5206).

そして、時間帯tnの電力需要値Ptnを、Dtnを除いた値に更新するとともに、余剰電力量Cexedを、放電量Dtnを除いた値に更新する(ステップS5207)。また、その時点の最大の電力需要値Ptnを期間Yの最大の電力需要値Pmax_3とする(ステップS5208)。 Then, the power demand value Ptn for the time period tn is updated to a value excluding Dtn, and the surplus power amount Cexed is updated to a value excluding the discharge amount Dtn (step S5207). The maximum power demand value Ptn at that time point is set as the maximum power demand value Pmax_3 for the period Y (step S5208).

そして、M3個の時間帯について、全て処理を終えたか判別する(ステップS5209、S5210)。終えていない場合、ステップS5205へ戻る。 Then, it is determined whether processing has been completed for all M3 time periods (steps S5209 and S5210). If not, the process returns to step S5205.

一方、全ての放電対象時間帯について処理を終えた場合は、立案手順5の場合、後述するS5221へ移行する。また、ステップS5205において、余剰電力量Cexedが残っていない場合も、S5221へ移行する。 On the other hand, if processing has been completed for all target discharge time periods, in the case of planning procedure 5, the process proceeds to S5221 described below. Also, if there is no surplus power Cexed remaining in step S5205, the process proceeds to S5221.

また、ステップS5204において、差ΔSOC1が余剰電力量Cexed未満である場合は、小さい方の差ΔSOC1を上限として、放電計画を立案する。放電計画の立案処理の流れは、基本的に立案手順2の放電計画立案処理および上述の余剰電力量Cexedを上限として立案する場合と同じである。 In addition, in step S5204, if the difference ΔSOC1 is less than the surplus power amount Cexed, a discharge plan is created with the smaller difference ΔSOC1 as the upper limit. The flow of the discharge plan creation process is basically the same as the discharge plan creation process in the creation procedure 2 and the above-mentioned case where the surplus power amount Cexed is used as the upper limit.

すなわち、差ΔSOC1が残っている間、あるいは、M3個全ての時間帯tnについて処理を終えるまで(ステップS5215、S5219、S5220)、tnの放電量Dtnを決定し(ステップS5216)、電力需要値Ptnを、Dtnを除いた値に更新するとともに、差ΔSOC1を、放電量Dtnを除いた値に更新し(ステップS5217)、その時点の最大の電力需要値Ptnを期間Yの最大の電力需要値Pmax_3とする(ステップS5218)。 That is, while the difference ΔSOC1 remains, or until processing is completed for all M3 time periods tn (steps S5215, S5219, S5220), the discharge amount Dtn for tn is determined (step S5216), the power demand value Ptn is updated to a value excluding Dtn, and the difference ΔSOC1 is updated to a value excluding the discharge amount Dtn (step S5217), and the maximum power demand value Ptn at that time point is set as the maximum power demand value Pmax_3 for period Y (step S5218).

その後、充放電計画立案部215は、未処理の放電対象時間帯があるか否かを判別し(ステップS5221)、未処理の時間帯があれば、第四充放電処理を行い(ステップS5222)、処理を終了する。なお、未処理の時間帯があるのは、余剰電力量Cexedまたは差ΔSOC1がなくなり、ステップS5221へ進んだ場合である。 Then, the charge/discharge plan creation unit 215 determines whether there is an unprocessed discharge target time period (step S5221), and if there is an unprocessed time period, performs the fourth charge/discharge process (step S5222) and ends the process. Note that an unprocessed time period exists when the surplus power amount Cexed or the difference ΔSOC1 has disappeared and the process proceeds to step S5221.

ここで、この第四充放電処理の流れを、図24(a)を用いて説明する。この第四充放電処理は、未処理の放電対象時間帯の放電可能な電力量PDと、上限SOCと現在SOCとの差ΔSOC2との、小さいほうを上限に、期間Xの時間帯と、期間Yの目標電力量Ptgtより電力需要値が小さい時間帯と、を用いて、充電計画を立案する。その後、その充電分を加え、未処理の放電対象時間帯の放電量を決定する。 Here, the flow of this fourth charge/discharge process will be explained using Figure 24 (a). This fourth charge/discharge process creates a charging plan using the time period of period X and the time period in which the power demand value is smaller than the target power amount Ptgt for period Y, with the smaller of the dischargeable power amount PD for the unprocessed target discharge time period and the difference ΔSOC2 between the upper limit SOC and the current SOC as the upper limit. Then, the amount of charge is added to determine the discharge amount for the unprocessed target discharge time period.

本図に示すように、充放電計画立案部215は、放電可能な電力量PDを算出し、当該電力量PDが差ΔSOC2より大きいか判別する(ステップS5301)。そして、当該電力量PDが大きい場合、小さいほうの差ΔSOC2を上限に、充電計画を立案する(ステップS5302)。それ以外の場合は、電力量PDを上限に充電計画を立案する(ステップS5303)。 As shown in this figure, the charge/discharge plan creation unit 215 calculates the amount of dischargeable power PD and determines whether the amount of power PD is greater than the difference ΔSOC2 (step S5301). If the amount of power PD is greater, a charging plan is created with the smaller difference ΔSOC2 as the upper limit (step S5302). Otherwise, a charging plan is created with the amount of power PD as the upper limit (step S5303).

このとき、充電計画を立案する時間帯は、期間Xに含まれる時間帯と、期間Yの放電対象時間帯以外の時間帯である。また、充電計画の立案は、上述の第一充電処理と基本的に同様である。ただし、上記第一充電処理では、上限値が充電必要電力量Cneedであるところを、ここでは、それぞれ、差ΔSOC2または電力量PDとする。 At this time, the time periods for which the charging plan is created are the time periods included in period X and the time periods other than the discharge target time periods in period Y. The creation of the charging plan is basically the same as the first charging process described above. However, whereas in the first charging process, the upper limit is the amount of energy required for charging Cneed, here it is the difference ΔSOC2 or the amount of energy PD, respectively.

次に、ステップS5302または、ステップS5303で確保した充電量を上限に、未処理の時間帯に関し、放電計画を立案し(ステップS5304)、処理を終了する。 Next, a discharge plan is created for the unprocessed time period with the charge amount secured in step S5302 or step S5303 as the upper limit (step S5304), and the process ends.

この放電計画も、基本的に、上記立案手順2の放電計画立案処理と同じである。ただし、立案手順2の放電計画立案処理では、上限値を余剰電力量Cexedとしているところを、ここでは、ステップS5302または、ステップS5303で確保した充電量とする。 This discharge plan is basically the same as the discharge plan formulation process in the above-mentioned formulation procedure 2. However, whereas in the discharge plan formulation process in formulation procedure 2, the upper limit is set to the surplus power amount Cexed, here, the upper limit is set to the charge amount secured in step S5302 or step S5303.

次に、ステップS5105の第二充放電処理について説明する。図24(b)は、第二充放電処理の処理フローである。 Next, the second charging/discharging process of step S5105 will be described. FIG. 24(b) shows the processing flow of the second charging/discharging process.

充放電計画立案部215は、第一充放電処理と同様に、期間Yの中の最大の電力需要値(=Pmax_0)を、Pmax_1とする(ステップS5401)。 As in the first charging/discharging process, the charging/discharging plan creation unit 215 sets the maximum power demand value (=Pmax_0) during period Y to Pmax_1 (step S5401).

その後、第一充放電処理と同様に、期間Yの中の各時間帯のうち、電力需要値が目標電力量Ptgtより大きい時間帯を放電対象期間とし、上記第四充放電処理を実行する(ステップS5402)。 Then, similar to the first charging/discharging process, among the time periods in period Y, the time periods in which the power demand value is greater than the target power amount Ptgt are set as the discharging target period, and the fourth charging/discharging process is executed (step S5402).

次に、ステップS5106の第三充放電処理について説明する。図24(c)は、第三充放電処理の処理フローである。 Next, the third charging/discharging process of step S5106 will be described. Figure 24 (c) shows the processing flow of the third charging/discharging process.

充放電計画立案部215は、第一充放電処理と同様に、期間Yの中の最大の電力需要値を、Pmax_1とする(ステップS5501)。 As in the first charging/discharging process, the charging/discharging plan creation unit 215 sets the maximum power demand value during period Y to Pmax_1 (step S5501).

充放電計画立案部215は、充電必要電力量Cneedと余剰電力量Cexedとの合計を上限に、充電計画を立案する(ステップS5502)。ここで、充電計画を立案する時間帯は、期間Xに含まれる時間帯と、期間Yの放電対象時間帯以外の時間帯である。また、充電計画の立案は、上述の第一充電処理と基本的に同様である。ただし、上記第一充電処理では、上限値が充電必要電力量Cneedであるところを、ここでは、充電必要電力量Cneedと余剰電力量Cexedとの合計とする。 The charge/discharge plan creation unit 215 creates a charging plan with the sum of the charging required energy Cneed and the surplus energy Cexed as the upper limit (step S5502). Here, the time period for which the charging plan is created is the time period included in period X and the time period other than the discharge target time period in period Y. The charging plan is created basically in the same manner as the first charging process described above. However, whereas in the first charging process, the upper limit is the charging required energy Cneed, here it is the sum of the charging required energy Cneed and the surplus energy Cexed.

そして、充放電計画立案部215は、ステップS5502で得られた余剰電力量Cexedを上限に、放電計画を立案する(ステップS5503)。この放電計画も、基本的に、上記立案手順2の放電計画立案処理と同じである。 Then, the charge/discharge plan creation unit 215 creates a discharge plan with the surplus power amount Cexed obtained in step S5502 as the upper limit (step S5503). This discharge plan is also basically the same as the discharge plan creation process in the above-mentioned planning procedure 2.

以上説明したように、本実施形態では、接続される電気自動車(EV)のバッテリ(EVバッテリ320)の充放電を制御する充放電制御装置(PCS310)と、事業所全体の電力需要を制御する電力管理装置200と、を備え、事業所の電力需要を平準化する電力需要平準化システム100であって、電力管理装置200は、EVバッテリ320が接続された際の残容量である現在SOCと、EVバッテリ320の予約情報とに基づいて、事業所の1日の需要電力の最大値を最小に抑えるようEVバッテリ320の充放電計画を立案する充放電計画立案部215と、充放電計画立案部215が立案した充放電計画に従って、PCS310に充放電指示を行う指示部216と、を備える。 As described above, in this embodiment, the power demand leveling system 100 includes a charge/discharge control device (PCS310) that controls the charging/discharging of the battery (EV battery 320) of the connected electric vehicle (EV) and a power management device 200 that controls the power demand of the entire business, and levels out the power demand of the business. The power management device 200 includes a charge/discharge plan creation unit 215 that creates a charge/discharge plan for the EV battery 320 so as to minimize the maximum daily power demand of the business based on the current SOC, which is the remaining capacity when the EV battery 320 is connected, and reservation information for the EV battery 320, and an instruction unit 216 that issues charge/discharge instructions to the PCS 310 according to the charge/discharge plan created by the charge/discharge plan creation unit 215.

本実施形態では、接続時の残容量と予約情報とのみに基づいて充放電計画が立案される。放電量の限定がなく、指定した充電完了時刻までに指定した残容量が確保できるのであれば、それ以前の過程において、指定した残容量よりも一旦低くなってもよい。このため、より多くの電力量を放電に使うことができ、より柔軟かつ有効に充放電計画を立案できる。 In this embodiment, a charge/discharge plan is created based only on the remaining capacity at the time of connection and the reservation information. As long as there is no limit to the amount of discharge and the specified remaining capacity can be secured by the specified charging completion time, the remaining capacity may temporarily become lower than the specified remaining capacity in the process prior to that. This allows a larger amount of power to be used for discharging, making it possible to create a charge/discharge plan more flexibly and effectively.

また、本実施形態では、予め予測された対象日の所定時間帯毎の電力需要値である予測電力需要カーブに応じて、網羅的に立案手順を予め定め、記憶しておく。そして、充放電計画を立案するにあたり、充放電計画立案部215は、この立案手順に従って充放電計画を立案する。 In addition, in this embodiment, a comprehensive planning procedure is determined in advance and stored according to a predicted power demand curve, which is the power demand value for each specified time period on a target day that is predicted in advance. Then, when planning a charge/discharge plan, the charge/discharge plan planning unit 215 plans the charge/discharge plan according to this planning procedure.

したがって、本実施形態によれば、予測電力需要カーブの形状、予測電力需要値の変化態様によらず、充放電計画を立案できる。すなわち、事業者ごとに異なる電力需要のモデルカーブに適した、電力需要の平準化を実現できる。そして、このとき、モビリティニーズを犠牲にしない。このように、本実施形態によれば、多種多様な電力需要カーブに最適な立案手順で、電気自動車のモビリティニーズを犠牲にすることなく、ピーク負荷の低減を最大限実現できる。 Therefore, according to this embodiment, a charge/discharge plan can be created regardless of the shape of the predicted power demand curve or the change in the predicted power demand value. In other words, it is possible to achieve power demand leveling that is suitable for the model curve of power demand that differs from one business operator to another. And at the same time, mobility needs are not sacrificed. In this way, according to this embodiment, a planning procedure that is optimal for a wide variety of power demand curves can be used to maximize the reduction in peak load without sacrificing the mobility needs of electric vehicles.

例えば、本実施形態によれば、従業員が通勤車等に用いる電気自動車が搭載するEVバッテリ320を、午前中や夕方の事業所の電力使用量が低い期間に充電し、昼間の電力使用量がピークとなる期間に放電するなどにより、モビリティニーズを犠牲にすることなく、事業所の電力需要のピークを低減することができる。すなわち、EVバッテリ320を効果的に蓄電池、電力供給源として利用でき、電力需要の最適化を実現できる。 For example, according to this embodiment, the EV battery 320 installed in an electric vehicle used by employees for commuting, etc., can be charged in the morning or evening when the office's power usage is low, and discharged during the daytime when power usage is at its peak, thereby reducing the peak power demand of the office without sacrificing mobility needs. In other words, the EV battery 320 can be effectively used as a storage battery and power supply source, and power demand can be optimized.

<変形例1>
なお、上記実施形態では、EV接続時刻Tsから充電完了時刻Teまでの期間Tdを、3等分にし、パターンを決定して処理を行っているが、これに限定されない。例えば、パターンに分類せずに処理を行ってもよい。この場合、基本的に、時刻の早い方から充電計画を立案し、その後、放電計画を立案する。
<Modification 1>
In the above embodiment, the period Td from the EV connection time Ts to the charging completion time Te is divided into three equal parts, and the pattern is determined and processed, but this is not limiting. For example, the processing may be performed without classifying into patterns. In this case, the charging plan is basically created from the earlier time, and then the discharging plan is created.

そして、例えば、接続時刻Tsと充電完了時刻Teとで定まる充放電可能な期間Td内の電力需要値Ptnが予め定めた目標値である目標電力量Ptgtより小さい所定の時間帯tnを充電期間として充電計画を立案し、充放電可能な期間Td内の電力需要値Ptnが目標電力量Ptgt以上の所定の時間帯tnを放電期間として放電計画を立案する。 For example, a charging plan is created with a charging period being a predetermined time period tn during which the power demand value Ptn within the charging/discharging period Td, determined by the connection time Ts and the charging completion time Te, is smaller than the target power amount Ptgt, which is a predetermined target value, and a discharging plan is created with a predetermined time period tn during which the power demand value Ptn within the charging/discharging period Td is equal to or greater than the target power amount Ptgt.

<変形例2>
また、上記実施形態および変形例の電力需要平準化システム100は、契約電力(基本料金)に影響を与えない場合、EVバッテリ320の放電によるピーク負荷の低減を行わず、EVバッテリ320の充放電回数を不必要に増やさないよう充放電計画を立案するモード(充放電回数低減モード)を備えてもよい。
<Modification 2>
Furthermore, the power demand leveling system 100 of the above embodiment and modified examples may be provided with a mode (charge/discharge frequency reduction mode) in which, when there is no impact on the contracted power (basic charge), a charge/discharge plan is formulated so as not to reduce the peak load by discharging the EV battery 320 and not to unnecessarily increase the number of times the EV battery 320 is charged/discharged.

一般に、EVバッテリ320の充放電回数の増加は、EVバッテリ320の劣化進行に繋がることが知られている。また、上述したように、契約電力(基本料金)は、過去1年間の各月の最大需要電力値で決まる。従って、同月中は、立案日までの最大需要電力値を超えなければ、契約電力(基本料金)への影響はない。このような場合、放電を行い、ピーク負荷を低減する放電計画の立案は不要であり、充電計画のみ立案すればよい。 It is generally known that an increase in the number of times the EV battery 320 is charged and discharged leads to the deterioration of the EV battery 320. As described above, the contracted power (basic charge) is determined by the maximum power demand value for each month of the past year. Therefore, if the maximum power demand value up to the planning date is not exceeded during the same month, there is no impact on the contracted power (basic charge). In such a case, there is no need to create a discharge plan to discharge and reduce peak loads, and only a charging plan needs to be created.

具体的には、例えば、電力管理装置200は、さらに、事業者から充放電計画立案モードの指示を受け付ける受付部を備え、当該受付部を介して、事業者から、通常モードで充放電計画を立案するか、充放電回数低減モードで充放電計画を立案するか、の指示を受け付ける。なお、通常モードは、上述の実施形態で説明した充放電計画立案処理を行うモードである。 Specifically, for example, the power management device 200 further includes a reception unit that receives an instruction for the charge/discharge plan creation mode from the business operator, and receives an instruction from the business operator via the reception unit as to whether to create a charge/discharge plan in the normal mode or in the reduced charge/discharge frequency mode. Note that the normal mode is a mode in which the charge/discharge plan creation process described in the above embodiment is performed.

そして、充放電回数低減モードの指示を受け付けた場合、充放電計画立案部215は、充放電回数低減モードで充放電計画を立案する。充放電回数低減モードでは、上記実施形態の目標電力量Ptgtを、同月中の、立案日までの最大需要電力値とし、立案日の予測電力需要カーブ510のモデルパターンを決定する。以後の処理は、上記実施形態と同様である。 When an instruction for the charge/discharge count reduction mode is received, the charge/discharge plan creation unit 215 creates a charge/discharge plan in the charge/discharge count reduction mode. In the charge/discharge count reduction mode, the target power amount Ptgt in the above embodiment is set to the maximum power demand value during the same month up to the planning date, and a model pattern of the forecast power demand curve 510 for the planning date is determined. Subsequent processing is the same as in the above embodiment.

なお、本発明は上記した実施例に限定されるものではなく、様々な変形例が含まれる。また、上記した実施例は本発明を分かりやすく説明するために詳細に説明したものであり、必ずしも説明した全ての構成を備えるものに限定されるものではない。また、ある実施例の構成の一部を他の実施例の構成に置き換えることが可能であり、また、ある実施例の構成に他の実施例の構成を加えることも可能である。また、各実施例の構成の一部について、他の構成の追加・削除・置換をすることが可能である。 The present invention is not limited to the above-described embodiments, but includes various modified examples. The above-described embodiments have been described in detail to clearly explain the present invention, and are not necessarily limited to those having all of the configurations described. It is also possible to replace part of the configuration of one embodiment with the configuration of another embodiment, and it is also possible to add the configuration of another embodiment to the configuration of one embodiment. It is also possible to add, delete, or replace part of the configuration of each embodiment with other configurations.

また、上記の各構成、機能、処理部、処理手段等は、それらの一部または全部を、例えば集積回路で設計する等によりハードウェアで実現してもよい。また、上記の各構成、機能等は、プロセッサがそれぞれの機能を実現するプログラムを解釈し、実行することによりソフトウェアで実現してもよい。各機能を実現するプログラム、テーブル、ファイル等の情報は、メモリや、ハードディスク、SSD等の記録装置、または、ICカード、SDカード、光ディスク等の記録媒体に置いてもよい。また、制御線や情報線は説明上必要と考えられるものを示しており、製品上必ずしも全ての制御線や情報線を示しているとは限らない。例えば実際には殆ど全ての構成が相互に接続されていると考えてもよい。 In addition, the above-mentioned configurations, functions, processing units, processing means, etc. may be realized in part or in whole in hardware, for example by designing them as integrated circuits. In addition, the above-mentioned configurations, functions, etc. may be realized in software by a processor interpreting and executing a program that realizes each function. Information such as programs, tables, files, etc. that realize each function may be stored in a memory, a recording device such as a hard disk or SSD, or a recording medium such as an IC card, SD card, or optical disk. In addition, the control lines and information lines shown are those that are considered necessary for explanation, and do not necessarily show all control lines and information lines in the product. For example, it may be considered that almost all of the configurations are actually connected to each other.

100:電力需要平準化システム、110:HUB、120:電力メータ、130:系統電力、150:事業所内電気系統、
200:電力管理装置、211:EV予約情報取得部、212:バッテリ情報取得部、213:電力使用量取得部、214:電力需要予測部、215:充放電計画立案部、216:指示部、231:CPU、232:メモリ、233:記憶装置、235:入出力I/F、
310:PCS、311:PCS、312:PCS、313:PCS、314:PCS、320:EVバッテリ、321:EVバッテリ、322:EVバッテリ、323:EVバッテリ、324:EVバッテリ、
410:EV予約情報DB、411:EVID、412:接続時刻、413:充電完了時刻、414:完了時SOC、415:PCSID、420:バッテリ情報DB、421:EVID、422:バッテリ容量、423:現在SOC、424:下限SOC、425:上限SOC、430:電力使用履歴DB、431:日付、432:時間帯、433:電力使用量、434:月、435:最大値、440:充放電計画DB、441:立案日、442:時間帯、443:計画充放電電力量、444:EVID、445:PCSID、450:充放電履歴DB、451:日付、452:時間帯、453:実行充放電電力量、455:PCSID、456:本来電力使用量、457:予測電力需要値、460:立案手順DB、
510:予測電力需要カーブ、510a:予測電力需要カーブ、510b:予測電力需要カーブ、510c:予測電力需要カーブ、510d:予測電力需要カーブ、510e:予測電力需要カーブ、510f:予測電力需要カーブ、510g:予測電力需要カーブ、510h:予測電力需要カーブ、512:充電量、513:放電量、
Cexed:余剰電力量、Cfull:総電力量、Cneed:充電必要電力量、Ctotal:充電量合計、Ctn:充電量、Dtn:放電量、PA:最大値、PD:放電可能な電力量、PCSmax:最大充電可能量、Pmax_0:電力需要値、Pmax_1:最大電力需要値、Pmax_2:最大電力需要値、Pmax_3:最大電力需要値、Ptgt:目標電力量、Ptn:電力需要値、Stn:空き容量、Stn2:空き容量、Td:期間、Te:充電完了時刻、Ts:EV接続時刻、X:期間、Y:期間、Z:期間、tn:時間帯
100: power demand leveling system, 110: HUB, 120: power meter, 130: system power, 150: business electrical system,
200: power management device, 211: EV reservation information acquisition unit, 212: battery information acquisition unit, 213: power usage acquisition unit, 214: power demand prediction unit, 215: charge/discharge plan creation unit, 216: instruction unit, 231: CPU, 232: memory, 233: storage device, 235: input/output I/F,
310: PCS, 311: PCS, 312: PCS, 313: PCS, 314: PCS, 320: EV battery, 321: EV battery, 322: EV battery, 323: EV battery, 324: EV battery,
410: EV reservation information DB, 411: EVID, 412: connection time, 413: charging completion time, 414: completion SOC, 415: PCSID, 420: battery information DB, 421: EVID, 422: battery capacity, 423: current SOC, 424: lower limit SOC, 425: upper limit SOC, 430: power usage history DB, 431: date, 432: time zone, 433: power usage Usage, 434: month, 435: maximum value, 440: charge/discharge plan DB, 441: planning date, 442: time period, 443: planned charge/discharge power amount, 444: EVID, 445: PCSID, 450: charge/discharge history DB, 451: date, 452: time period, 453: actual charge/discharge power amount, 455: PCSID, 456: original power usage amount, 457: predicted power demand value, 460: planning procedure DB,
510: predicted power demand curve, 510a: predicted power demand curve, 510b: predicted power demand curve, 510c: predicted power demand curve, 510d: predicted power demand curve, 510e: predicted power demand curve, 510f: predicted power demand curve, 510g: predicted power demand curve, 510h: predicted power demand curve, 512: charged amount, 513: discharged amount,
Cexed: surplus energy, Cfull: total energy, Cneed: energy required for charging, Ctotal: total charging amount, Ctn: charging amount, Dtn: discharging amount, PA: maximum value, PD: dischargeable energy amount, PCSmax: maximum chargeable amount, Pmax_0: power demand value, Pmax_1: maximum power demand value, Pmax_2: maximum power demand value, Pmax_3: maximum power demand value, Ptgt: target energy amount, Ptn: power demand value, Stn: available capacity, Stn2: available capacity, Td: period, Te: charging completion time, Ts: EV connection time, X: period, Y: period, Z: period, tn: time zone

Claims (5)

接続される電気自動車のバッテリの充放電を制御する充放電制御装置と、事業所全体の電力需要を制御する電力管理装置と、を備え、前記事業所の電力需要を平準化する電力需要平準化システムであって、
前記電力管理装置は、
前記バッテリが接続された際の残容量と、当該バッテリの予約情報とに基づいて、前記事業所の1日の需要電力の最大値を低減させる前記バッテリの充放電計画を立案する充放電計画立案部と、
前記充放電計画立案部が立案した前記充放電計画に従って、前記充放電制御装置に充放電指示を行う指示部と、
前記充放電計画を立案する対象日の所定時間帯毎の電力需要値を予測電力需要カーブとして予測する電力需要予測部と、
前記予約情報として、前記バッテリの充電完了時刻と完了時の充電量とを取得する予約情報取得部と、
前記バッテリの仕様をバッテリ情報として取得するバッテリ情報取得部と、を備え、
前記充放電計画立案部は、前記充放電制御装置が検出したバッテリが接続された接続時刻と、前記予測電力需要カーブと、前記予約情報と、前記バッテリ情報と、を用いて、前記所定時間帯毎の当該バッテリに対する充電量および放電量を決定し、
前記接続時刻と前記充電完了時刻とで定まる充放電可能期間の前記予測電力需要カーブの形状に応じて予め定めた立案手順に従って前記充放電計画を立案すること
を特徴とする電力需要平準化システム。
A power demand leveling system comprising: a charge/discharge control device that controls charging/discharging of a battery of an electric vehicle connected thereto; and a power management device that controls power demand of an entire business establishment, and the system levels out the power demand of the business establishment,
The power management device includes:
a charge/discharge plan creation unit that creates a charge/discharge plan for the battery that reduces a maximum value of a daily power demand of the business establishment based on a remaining capacity when the battery is connected and reservation information for the battery;
An instruction unit that issues a charge/discharge instruction to the charge/discharge control device according to the charge/discharge plan formulated by the charge/discharge plan formulation unit;
an electric power demand forecasting unit that forecasts an electric power demand value for each predetermined time period on a target day for which the charge/discharge plan is to be created as a forecast electric power demand curve;
a reservation information acquisition unit that acquires, as the reservation information, a charging completion time of the battery and a charging amount at the completion;
a battery information acquisition unit that acquires the specifications of the battery as battery information;
the charge/discharge plan formulation unit determines a charge amount and a discharge amount for the battery for each of the predetermined time periods using a connection time when the battery is connected, the connection time being detected by the charge/discharge control device, the predicted power demand curve, the reservation information, and the battery information;
creating the charge/discharge plan according to a predetermined planning procedure according to a shape of the predicted power demand curve in a chargeable/dischargeable period determined by the connection time and the charge completion time;
A power demand leveling system characterized by the above.
請求項1記載の電力需要平準化システムであって、
前記充放電計画立案部は、前記接続時刻と前記充電完了時刻とで定まる充放電可能期間内の前記電力需要値が予め定めた目標値より小さい前記所定時間帯を充電期間とし、充電計画を立案すること
を特徴とする電力需要平準化システム。
2. The power demand leveling system according to claim 1,
The charge/discharge plan creation unit creates a charging plan by setting a charging period to the predetermined time period during which the power demand value is smaller than a predetermined target value within a chargeable/dischargeable period determined by the connection time and the charging completion time.
A power demand leveling system characterized by the above.
請求項2記載の電力需要平準化システムであって、
前記充放電計画立案部は、前記充放電可能期間内の前記電力需要値が前記目標値以上の前記所定時間帯を放電期間とし、放電計画を立案すること
を特徴とする電力需要平準化システム。
3. The power demand leveling system according to claim 2,
The charge/discharge plan creation unit defines the predetermined time period during which the power demand value within the chargeable/dischargeable period is equal to or greater than the target value as a discharge period, and creates a discharge plan.
A power demand leveling system characterized by the above.
請求項記載の電力需要平準化システムであって、
前記バッテリは複数であり、
前記充放電計画立案部は、複数の前記バッテリについて、予め定めた順でそれぞれ前記充放電計画を立案し、1の前記バッテリの充放電計画を立案後、前記予測電力需要カーブに前記充放電計画による電力需要値の変化分を加えて当該予測電力需要カーブを更新し、次の前記バッテリの充放電計画を立案すること
を特徴とする電力需要平準化システム。
2. The power demand leveling system according to claim 1 ,
the battery is a plurality of batteries;
the charge/discharge plan creation unit creates the charge/discharge plan for each of the plurality of batteries in a predetermined order, and after creating a charge/discharge plan for one of the batteries, updates the predicted power demand curve by adding a change in the power demand value due to the charge/discharge plan to the predicted power demand curve, and creates a charge/discharge plan for the next battery.
A power demand leveling system characterized by the above.
コンピュータを、
充放電制御装置に接続された電気自動車のバッテリの充放電計画を立案する充放電計画立案部であって、前記バッテリが接続された際の残容量と、当該バッテリの予約情報とに基づいて、前記充放電制御装置を備える事業所の1日の需要電力の最大値を低減させる前記バッテリの充放電計画を立案する充電計画立案部と、
前記充放電計画に従って、前記充放電制御装置に充放電指示を行う指示部と、
前記充放電計画を立案する対象日の所定時間帯毎の電力需要値を予測電力需要カーブとして予測する電力需要予測部と、
前記予約情報として、前記バッテリの充電完了時刻と完了時の充電量とを取得する予約情報取得部と、
前記バッテリの仕様をバッテリ情報として取得するバッテリ情報取得部、として機能させ、
前記充放電計画立案部は、
前記充放電制御装置が検出したバッテリが接続された接続時刻と、前記予測電力需要カーブと、前記予約情報と、前記バッテリ情報と、を用いて、前記所定時間帯毎の当該バッテリに対する充電量および放電量を決定し、
前記接続時刻と前記充電完了時刻とで定まる充放電可能期間の前記予測電力需要カーブの形状に応じて予め定めた立案手順に従って、前記充放電計画を立案する
ことを特徴とするプログラム
Computer,
a charge and discharge plan creating unit that creates a charge and discharge plan for a battery of an electric vehicle connected to a charge and discharge control device, the charge and discharge plan creating unit creating a charge and discharge plan for the battery that reduces a maximum value of a daily power demand of a business establishment equipped with the charge and discharge control device based on a remaining capacity of the battery when the battery is connected and reservation information for the battery;
An instruction unit that issues a charge/discharge instruction to the charge/discharge control device according to the charge/discharge plan;
an electric power demand forecasting unit that forecasts an electric power demand value for each predetermined time period on a target day for which the charge/discharge plan is to be created as a forecast electric power demand curve;
a reservation information acquisition unit that acquires, as the reservation information, a charging completion time of the battery and a charging amount at the completion;
a battery information acquisition unit that acquires the specifications of the battery as battery information;
The charge/discharge plan planning unit,
determining a charge amount and a discharge amount for the battery for each of the predetermined time periods using a connection time when the battery was connected, the connection time detected by the charge/discharge control device, the predicted power demand curve, the reservation information, and the battery information;
A program characterized by formulating the charge/discharge plan according to a predetermined planning procedure according to a shape of the predicted power demand curve for a chargeable/dischargeable period determined by the connection time and the charging completion time .
JP2020197491A 2020-11-27 2020-11-27 Power demand leveling system and program Active JP7590169B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020197491A JP7590169B2 (en) 2020-11-27 2020-11-27 Power demand leveling system and program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020197491A JP7590169B2 (en) 2020-11-27 2020-11-27 Power demand leveling system and program

Publications (2)

Publication Number Publication Date
JP2022085689A JP2022085689A (en) 2022-06-08
JP7590169B2 true JP7590169B2 (en) 2024-11-26

Family

ID=81892400

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020197491A Active JP7590169B2 (en) 2020-11-27 2020-11-27 Power demand leveling system and program

Country Status (1)

Country Link
JP (1) JP7590169B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7740212B2 (en) * 2022-11-28 2025-09-17 トヨタ自動車株式会社 Server, system, and management method
CN121816678A (en) * 2023-09-19 2026-04-07 日产自动车株式会社 Electric power supply and demand system and charging and discharging management method of electric vehicle

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012196028A (en) 2011-03-16 2012-10-11 Mitsubishi Electric Corp Electric power management system
JP2013027190A (en) 2011-07-22 2013-02-04 Mitsubishi Electric Corp Charging device, charging system and charging method
JP2014053989A (en) 2012-09-05 2014-03-20 Mitsubishi Electric Corp Battery charge/discharge system
JP2014158404A (en) 2013-02-18 2014-08-28 Mitsubishi Heavy Ind Ltd Power management device, charge/discharge planning device, charge/discharge planning method, and program
JP2014220942A (en) 2013-05-09 2014-11-20 三菱電機株式会社 Electric vehicle management system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012196028A (en) 2011-03-16 2012-10-11 Mitsubishi Electric Corp Electric power management system
JP2013027190A (en) 2011-07-22 2013-02-04 Mitsubishi Electric Corp Charging device, charging system and charging method
JP2014053989A (en) 2012-09-05 2014-03-20 Mitsubishi Electric Corp Battery charge/discharge system
JP2014158404A (en) 2013-02-18 2014-08-28 Mitsubishi Heavy Ind Ltd Power management device, charge/discharge planning device, charge/discharge planning method, and program
JP2014220942A (en) 2013-05-09 2014-11-20 三菱電機株式会社 Electric vehicle management system

Also Published As

Publication number Publication date
JP2022085689A (en) 2022-06-08

Similar Documents

Publication Publication Date Title
US11970075B2 (en) Optimized charging of electric vehicles over distribution grid
Amamra et al. Vehicle-to-grid aggregator to support power grid and reduce electric vehicle charging cost
US11101677B2 (en) Systems and methods for determining and managing battery charging rules
JP6942295B1 (en) Charge / discharge plan creation device, command device, power system management system, terminal device, power storage system, charge / discharge system, storage battery, electric vehicle, charge / discharge plan creation method and charge / discharge plan creation program
JP7590169B2 (en) Power demand leveling system and program
US20160193932A1 (en) Electrical vehicle charging devices, systems, and methods
KR101566715B1 (en) Efficient electric vehicles charging algorithm with priority index method
JP6882613B1 (en) Charging power management device and charging power management method
JP7459305B2 (en) Charge/discharge control device and charge/discharge control method
CN112488444A (en) Electric vehicle fast-slow synchronous ordered charging scheduling method and electric quantity settlement method
JP6996494B2 (en) Power controllers, power control methods, and programs
CN107872067A (en) Charge and discharge control device and method
KR102064525B1 (en) Systems and methods for charge and discharge of electric vehicles
JP7445511B2 (en) vehicle charging system
Lee et al. Genetic algorithm-based charging task scheduler for electric vehicles in smart transportation
JP7001732B2 (en) How to adjust the power supply and demand balance
JP2021197862A (en) Vehicle charging planning system
JP7002894B2 (en) Storage battery control device and its method
KR102705921B1 (en) Integrated optimization Method and Apparatus for pricing, charging scheduling, and renewable energy management for electric vehicle charging stations
Abdelwahab et al. PV and EV charger allocation with V2G capabilities
JP7101798B2 (en) Energy management system
Sakulphaisan et al. Optimizing maximum profit for electric vehicle users in a bipolar DC distribution grid with probabilistic EV load demand and V2G integration
Ferro et al. Optimal charging of electric vehicles in microgrids through discrete event optimization
US20260116240A1 (en) Self-balanced managed charging of electric vehicles
Walker et al. Grid compatible flexibility management with a Quota-based aggregator of electric vehicles using a split charging approach in residential grids

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20231023

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240705

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240806

A601 Written request for extension of time

Free format text: JAPANESE INTERMEDIATE CODE: A601

Effective date: 20241004

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20241008

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20241105

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20241114

R150 Certificate of patent or registration of utility model

Ref document number: 7590169

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150