Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7593886B2 - Switching valve - Google Patents
[go: Go Back, main page]

JP7593886B2 - Switching valve - Google Patents

Switching valve Download PDF

Info

Publication number
JP7593886B2
JP7593886B2 JP2021100261A JP2021100261A JP7593886B2 JP 7593886 B2 JP7593886 B2 JP 7593886B2 JP 2021100261 A JP2021100261 A JP 2021100261A JP 2021100261 A JP2021100261 A JP 2021100261A JP 7593886 B2 JP7593886 B2 JP 7593886B2
Authority
JP
Japan
Prior art keywords
concrete
pipe
switching valve
formwork
inlet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021100261A
Other languages
Japanese (ja)
Other versions
JP2022191810A (en
Inventor
俊 梁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP2021100261A priority Critical patent/JP7593886B2/en
Publication of JP2022191810A publication Critical patent/JP2022191810A/en
Application granted granted Critical
Publication of JP7593886B2 publication Critical patent/JP7593886B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Description

本発明は、コンクリート圧送配管用の切替バルブに関する。 The present invention relates to a switching valve for concrete pumping piping.

トンネルの覆工ンクリートの打設方法として、トンネル軸方向に移動する移動式型枠(スライドセントル)を利用して、連続的に施工する場合がある。移動式型枠を利用した覆工コンクリートの施工では、型枠に形成された打設口にコンクリート打設管を挿入した状態でコンクリートを流し込む。型枠には、軸方向および周方向に間隔をあけて複数の打設口が形成されており、コンクリート打設時は、コンクリート打設管を各打設口に適宜移動させる。打設口から他の打設口へのコンクリート打設管の移動は、作業員が手作業により行う。ところが、コンクリート打設管を人力により移動させる作業には労力と時間がかかる。
一方、特許文献1には、手作業による配管の切り替えに代えて、型枠の内空上部に配管されたコンクリート打設管から分流器を介して分岐された分岐管を型枠の頂部と側壁部に接続しておき、分岐管を介して供給されたコンクリートを型枠内に打設する方法が開示されている。コンクリート打設管には、型枠の軸方向に対して、複数の分流器が設けられており、コンクリートの打設カ所を打設状況に応じて制御可能に構成されている。すなわち、特許文献1の打設方法は、分流器においてコンクリートの流れを制御することで、選択された打設口にコンクリートを供給するものである。
ところが、分流器から型枠の打設口までの距離が長く、分流器から延設された分岐管の内部には、コンクリート打設後にコンクリートが残留するため、分岐管毎に管内の清掃作業を行う必要がある。また、分岐管に残留したコンクリートは、産業廃棄物となるため、処分に費用と手間がかかる。
As a method of pouring concrete for tunnel lining, a movable formwork (slide center) that moves in the tunnel axial direction may be used to continuously cast the concrete. When casting concrete for lining using a movable formwork, concrete is poured with a concrete casting pipe inserted into a casting hole formed in the formwork. The formwork has multiple casting holes spaced apart in the axial and circumferential directions, and when pouring concrete, the concrete casting pipe is moved to each casting hole as appropriate. The concrete casting pipe is moved from one casting hole to another by a worker manually. However, moving the concrete casting pipe by hand takes time and effort.
On the other hand, Patent Document 1 discloses a method in which, instead of manually switching piping, a branch pipe branched off from a concrete pouring pipe installed in the upper part of the inner space of the formwork via a diverter is connected to the top and side wall of the formwork, and concrete supplied through the branch pipe is poured into the formwork. The concrete pouring pipe is provided with a plurality of diverters in the axial direction of the formwork, and is configured to be able to control the pouring location of the concrete according to the pouring situation. That is, the pouring method of Patent Document 1 supplies concrete to a selected pouring port by controlling the flow of concrete in the diverter.
However, because the distance from the diverter to the pouring port of the formwork is long and concrete remains inside the branch pipes extended from the diverter after pouring, it is necessary to clean the inside of each branch pipe. In addition, the concrete remaining in the branch pipes becomes industrial waste, so disposal is costly and time-consuming.

実公平4-19119号公報Publication No. 4-19119

本発明は、配管の清掃作業の低減化を可能とし、かつ、残留コンクリートの量を最小限に抑えることを可能とした切替バルブを提案することを課題とする。 The objective of the present invention is to propose a switching valve that reduces the amount of pipe cleaning work and minimizes the amount of residual concrete.

前記課題を解決するための本発明は、上流管と下流管との間に介設されて、前記上流管から供給されたコンクリートを型枠内に注入可能な状態と前記下流管に流下可能な状態とを切り替える切替バルブである。前記切替バルブは、前記型枠に接続された筒体と、前記筒体内に収納され、前記筒体の軸方向に摺動することで、前記コンクリートを前記型枠内に注入可能な状態と前記下流管に流下可能な状態とを切り替える摺動体とを備えている。前記上流管および前記下流管は、コンクリートポンプから延設されてスライドセントルの内面に沿って配管されたコンクリート打設管である。前記筒体には、前記筒体の先端において開口する注入口と、前記筒体の側面に形成され、前記上流管が直接接続される流入口と、前記筒体の側面に形成され、前記下流管が接続される流出口とが形成されている。前記流出口は、前記流入口に対して前記筒体の軸方向にオフセットした位置に形成されている。さらに、前記摺動体には、前記摺動体の先端面を前記型枠のコンクリート側の面と一致させた状態で、前記流入口と前記流出口とを連結する内部流路が形成されている。
かかる切替バルブは、コンクリートを輸送するコンクリート打設管の中間部(上流管と下流管との間)に介設されており、コンクリート打設管を介して輸送されたコンクリートを直接的に型枠内に誘導するため、分岐管を利用する従来の方法に比べて、コンクリート打設管内に残留するコンクリートの量を低減できる。また、コンクリート打設管(上流管および下流管)は、切替バルブを介して連続しているため、複数の分岐管毎に清掃作業を必要とする場合に比べて、コンクリート打設管内の清掃作業が容易である。
The present invention for solving the above problem is a switching valve that is interposed between an upstream pipe and a downstream pipe and switches between a state in which the concrete supplied from the upstream pipe can be poured into a formwork and a state in which the concrete can flow down to the downstream pipe. The switching valve includes a cylinder connected to the formwork and a sliding body that is housed in the cylinder and slides in the axial direction of the cylinder to switch between a state in which the concrete can be poured into the formwork and a state in which the concrete can flow down to the downstream pipe . The upstream pipe and the downstream pipe are concrete pouring pipes that are extended from a concrete pump and piped along the inner surface of a slide center. The cylinder has an injection port that opens at the tip of the cylinder, an inlet that is formed on the side of the cylinder and directly connected to the upstream pipe, and an outlet that is formed on the side of the cylinder and connected to the downstream pipe. The outlet is formed at a position offset in the axial direction of the cylinder from the inlet. Furthermore, the sliding body has an internal flow passage formed therein, which connects the inlet and the outlet with the tip surface of the sliding body being flush with the concrete side surface of the formwork.
This switching valve is installed in the middle of the concrete pouring pipe (between the upstream pipe and the downstream pipe) that transports the concrete, and since the concrete transported through the concrete pouring pipe is directly guided into the formwork, the amount of concrete remaining in the concrete pouring pipe can be reduced compared to the conventional method that uses branch pipes. Also, since the concrete pouring pipes (upstream pipe and downstream pipe) are continuous through the switching valve, cleaning work inside the concrete pouring pipe is easier compared to the case where cleaning work is required for each of the multiple branch pipes.

前記筒隊の先端面は、前記型枠の表面(コンクリート側の面)と面一となる形状を有しているのが望ましい。
また、前記内部流路が前記摺動体の移動方向に対して傾斜した直線状の流路であれば、コンクリート打設管の屈曲部を最小限に抑えることができる。
さらに、前記流入口が前記流出口よりも前記注入口側に形成されていれば、コンクリートの型枠内への供給を下流管へ切り替える際に、筒体内から押し出すコンクリート量を最小限に抑えることができる。
It is desirable that the tip surface of the cylindrical member has a shape that is flush with the surface of the formwork (the surface facing the concrete).
Furthermore, if the internal flow passage is a linear flow passage inclined with respect to the moving direction of the sliding body, the number of bends in the concrete pouring pipe can be minimized.
Furthermore, if the inlet is formed closer to the injection port than the outlet, the amount of concrete pushed out from the cylinder can be minimized when the supply of concrete into the formwork is switched to the downstream pipe.

本発明の切替バルブによれば、配管の清掃作業の低減化を可能とし、かつ、残留コンクリートの量を最小限に抑えることが可能となる。 The switching valve of the present invention makes it possible to reduce the amount of pipe cleaning work and minimize the amount of residual concrete.

本発明の実施形態に係る覆工コンクリートの施工状況を示す断面図である。FIG. 2 is a cross-sectional view showing the construction status of the lining concrete according to the embodiment of the present invention. スライドセントルの概要を示す斜視図である。FIG. 2 is a perspective view showing an outline of a slide center. 切替バルブの概要を示す図であって、(a)は平断面図、(b)は横断面図である。1A and 1B are diagrams showing an outline of a switching valve, in which FIG. 1A is a plan sectional view and FIG. (a)はコンクリート注入時の切替バルブを示す断面図、(b)はコンクリート流下時の切替バルブを示す断面図である。4A is a cross-sectional view showing the switching valve when concrete is poured, and FIG. 4B is a cross-sectional view showing the switching valve when concrete is flowing down.

本実施形態では、中流動コンクリートを用いた覆工コンクリート1の自動打設技術について説明する。図1に覆工コンクリート1の施工状況を示す。
覆工コンクリート1は、図1に示すように、トンネル坑内に設置された型枠(スライドセントル2)と地山G(吹付けコンクリート11)との間にフレッシュコンクリート10を打ち込むことにより形成する。本実施形態では型枠として、スライドセントル2を使用する。図2にスライドセントル2の概要を示す。
スライドセントル2は、図2に示すように、複数の型枠部材21,21,…と、複数のバイブレータ22,22,…と、複数の打設感知センサ23,23,…とを備えている。また、スライドセントル2の内空側には、フレッシュコンクリート(中流動コンクリート)10を供給するためのコンクリート打設管3が配管されている。
In this embodiment, an automatic pouring technique for lining concrete 1 using medium fluidity concrete will be described. FIG. 1 shows a construction state of lining concrete 1.
As shown in Fig. 1, the lining concrete 1 is formed by pouring fresh concrete 10 between a formwork (slide center 2) installed in the tunnel and the natural ground G (shotcrete 11). In this embodiment, the slide center 2 is used as the formwork. An outline of the slide center 2 is shown in Fig. 2.
2, the slide center 2 includes a plurality of formwork members 21, 21, ..., a plurality of vibrators 22, 22, ..., and a plurality of pouring detection sensors 23, 23, .... In addition, a concrete pouring pipe 3 for supplying fresh concrete (medium fluidity concrete) 10 is installed on the inner space side of the slide center 2.

スライドセントル2は、複数の型枠部材21,21,…を組み合わせることにより、トンネル断面形状に応じた断面円弧状(半円筒状)を呈している。型枠部材21は、周方向に隣接する他の型枠部材21に対して回動可能に連結されていて、トンネル径方向での移動が可能である。すなわち、スライドセントル2は、型枠部材21を移動させることで、縮径可能である。また、スライドセントル2には、開閉扉を備えた確認窓24が形成されており、コンクリートの打設状況の確認が行えるように構成されている。なお、確認窓24の配置や形状寸法等は、適宜設定する。
バイブレータ22は、スライドセントル2の内面(内空側の面)に固定されている。バイブレータ22は、スライドセントル2と地山Gとの間に打ち込まれたコンクリートに振動を与える。本実施形態では、トンネル周方向に間隔をあけて並べられた複数のバイブレータ22の列が、トンネル軸方向に複数列並設されている。本実施形態では、バイブレータ22を型枠部材21に形成された確認窓24に隣接して設置している。こうすることで、確認窓24から作業員がバイブレータ22による締め固め効果を確認できる。
打設感知センサ23は、型枠部材21の外面(地山G側の面)に固定されている。打設感知センサ23は、スライドセントル2と地山Gとの間に打ち込まれたコンクリートを検知する。打設感知センサ23がコンクリートを検知することで、コンクリートの打設状況を把握できる。本実施形態では、トンネル周方向に間隔をあけて並べられた複数の打設感知センサ23の列が、トンネル軸方向に複数列並設されている。
The slide center 2 is formed by combining a plurality of formwork members 21, 21, ... to have a cross-sectional arc shape (semi-cylindrical shape) corresponding to the cross-sectional shape of the tunnel. The formwork members 21 are rotatably connected to other formwork members 21 adjacent in the circumferential direction, and can move in the tunnel radial direction. That is, the slide center 2 can be reduced in diameter by moving the formwork members 21. In addition, the slide center 2 is formed with a check window 24 equipped with an opening and closing door, and is configured to allow the concrete pouring status to be checked. The arrangement, shape, dimensions, etc. of the check window 24 are set appropriately.
The vibrator 22 is fixed to the inner surface (the surface facing the inner space) of the slide center 2. The vibrator 22 applies vibrations to the concrete poured between the slide center 2 and the natural ground G. In this embodiment, a plurality of rows of the vibrators 22 are arranged at intervals in the circumferential direction of the tunnel, and are arranged in parallel in multiple rows in the axial direction of the tunnel. In this embodiment, the vibrators 22 are installed adjacent to the observation windows 24 formed in the formwork members 21. This allows a worker to check the compaction effect of the vibrators 22 through the observation windows 24.
The pouring detection sensor 23 is fixed to the outer surface (the surface facing the ground G) of the formwork member 21. The pouring detection sensor 23 detects concrete poured between the slide center 2 and the ground G. The pouring detection sensor 23 detects the concrete, so that the concrete pouring status can be grasped. In this embodiment, a plurality of rows of the pouring detection sensors 23 are arranged at intervals in the tunnel circumferential direction, and are arranged in parallel in multiple rows in the tunnel axial direction.

コンクリート打設管3は、コンクリートポンプPから延設されて、スライドセントル2の内面に沿って配管されている。本実施形態では、2本のコンクリート打設管3,3が左右にそれぞれ配管されている。本実施形態では、コンクリートポンプPに接続された管路が分岐バルブを介して左右のコンクリート打設管3,3に分岐されているが、コンクリート打設管3はそれぞれ異なるコンクリートポンプPに接続されていてもよい。
各コンクリート打設管3は、スライドセントル2の内面において、横方向(トンネル軸方向)に延設された横管31と、縦方向(トンネル周方向)に延設された縦管32とを備えている。本実施形態では、トンネルの上半と下半との境界部付近(スプリングライン付近)と、トンネル肩部付近と、トンネル頂部付近において、それぞれ横管31がトンネル軸方向に延設されている。上半と下半との境界部付近に配管された横管31とトンネル肩部付近に配管された横管31は、スライドセントル2の先端側の端部において縦管32を介して連結されている。また、トンネル肩部付近に配管された横管31とトンネル頂部付近に配管された横管31は、スライドセントル2の基端側の端部において縦管32を介して連結されている。すなわち、コンクリート打設管3は、縦管32を介して高さ位置を変化させながら、スライドセントル2の内面を往復している。
The concrete pouring pipe 3 extends from the concrete pump P and is piped along the inner surface of the slide center 2. In this embodiment, two concrete pouring pipes 3, 3 are piped on the left and right. In this embodiment, the pipeline connected to the concrete pump P branches into the left and right concrete pouring pipes 3, 3 via a branch valve, but the concrete pouring pipes 3 may each be connected to a different concrete pump P.
Each concrete pouring pipe 3 includes a horizontal pipe 31 extending in the horizontal direction (tunnel axis direction) and a vertical pipe 32 extending in the vertical direction (tunnel circumferential direction) on the inner surface of the slide center 2. In this embodiment, the horizontal pipes 31 are extended in the tunnel axis direction near the boundary between the upper and lower halves of the tunnel (near the spring line), near the tunnel shoulder, and near the tunnel top. The horizontal pipes 31 piped near the boundary between the upper and lower halves and the horizontal pipes 31 piped near the tunnel shoulder are connected via the vertical pipes 32 at the end of the tip side of the slide center 2. The horizontal pipes 31 piped near the tunnel shoulder and the horizontal pipes 31 piped near the tunnel top are connected via the vertical pipes 32 at the end of the base side of the slide center 2. That is, the concrete pouring pipes 3 reciprocate on the inner surface of the slide center 2 while changing their height position via the vertical pipes 32.

コンクリート打設管3には、複数の切替バルブ4,4,…が間隔をあけて設けられている。切替バルブ4は、コンクリート打設管3(上流管)を介して上流側(コンクリートポンプP側)から供給されたコンクリートを、スライドセントル2と地山の間(型枠内)に注入可能な状態と、下流側(コンプリートポンプP反対側)に接続されたコンクリート打設管3(下流管)に流下可能な状態とを切り替える。本実施形態では、横管31と縦管32との角部や横管31の中間部に切替バルブ4が設けられている。
図3に切替バルブ4の概要を示す。図3に示すように、切替バルブ4は、スライドセントル(型枠)2に接続された筒体5と、筒体5内に収納された摺動体6とを備えている。
A plurality of switching valves 4, 4, ... are provided at intervals on the concrete pouring pipe 3. The switching valves 4 switch between a state in which concrete supplied from the upstream side (concrete pump P side) through the concrete pouring pipe 3 (upstream pipe) can be injected between the slide center 2 and the natural ground (into the formwork) and a state in which concrete can flow down to the concrete pouring pipe 3 (downstream pipe) connected to the downstream side (opposite the complete pump P). In this embodiment, the switching valves 4 are provided at the corners between the horizontal pipe 31 and the vertical pipe 32 and in the middle of the horizontal pipe 31.
Fig. 3 shows an outline of the switching valve 4. As shown in Fig. 3, the switching valve 4 includes a cylindrical body 5 connected to a slide center (form) 2, and a sliding body 6 housed in the cylindrical body 5.

筒体5の先端は、スライドセントル2の型枠部材21に固定されている。また、筒体5の先端は、型枠部材21の表面(コンクリート側の面)と面一となる形状を有している。さらに、筒体5の先端は、注入口51として開口している。注入口51は、型枠部材21に形成された貫通孔と連通している。
筒体5の側面には、流入口52と流出口53とが形成されている。流入口52には、コンクリートポンプP側(輸送方向上流側)から延びるコンクリート打設管3(上流管)が接続されている。一方、流出口53には、コンクリートポンプPと反対側(輸送方向下流側)に延びるコンクリート打設管3(下流管)が接続されている。
流出口53は、流入口52に対して筒体5の軸方向にオフセットした位置に形成されている。本実施形態では、流入口52が流出口53よりも注入口51側に形成されている。流出口53は、外側(型枠部材21側)の縁が流入口52の内空側の縁よりも内空側に位置するように、流入口52よりも内空側(型枠部材21と反対側)にオフセットされている。すなわち、流入口52と流出口53は、筒体5の中心軸と平行な面に投影した際に重ならないように配置されている。
The tip of the cylindrical body 5 is fixed to the formwork member 21 of the slide center 2. The tip of the cylindrical body 5 has a shape that is flush with the surface (the surface on the concrete side) of the formwork member 21. Furthermore, the tip of the cylindrical body 5 is opened as an injection port 51. The injection port 51 communicates with a through hole formed in the formwork member 21.
An inlet 52 and an outlet 53 are formed on the side of the cylinder 5. A concrete pouring pipe 3 (upstream pipe) extending from the concrete pump P side (upstream side in the transport direction) is connected to the inlet 52. On the other hand, a concrete pouring pipe 3 (downstream pipe) extending on the opposite side to the concrete pump P (downstream side in the transport direction) is connected to the outlet 53.
The flow outlet 53 is formed at a position offset from the flow inlet 52 in the axial direction of the cylindrical body 5. In this embodiment, the flow inlet 52 is formed closer to the injection port 51 than the flow outlet 53. The flow outlet 53 is offset toward the inner space side (the opposite side to the formwork member 21) than the flow inlet 52 so that the edge on the outer side (the side of the formwork member 21) is located closer to the inner space than the edge on the inner space side of the flow inlet 52. In other words, the flow inlet 52 and the flow outlet 53 are arranged so as not to overlap when projected onto a plane parallel to the central axis of the cylindrical body 5.

摺動体6は、筒体5の内部において筒体5の軸方向に摺動可能である。摺動体6の先端面61は、型枠部材21の表面(コンクリート側の面)と面一となるように、側面視円弧状に形成されている。また、摺動体6には、摺動体6の先端面61を型枠部材21のコンクリート側の面と一致させた状態で、流入口52と流出口53とを連結する内部流路62が形成されている。内部流路62は、摺動体6の移動方向に対して傾斜した直線状の流路である。
摺動体6は、制御手段7に接続されていて、制御手段7から送信された信号により筒体5内において前後に摺動する。摺動体6が移動することにより、流入口52と注入口51とが連通した状態と、流入口52と流出口53とが連通した状態とが切り替わる。
The sliding body 6 is capable of sliding in the axial direction of the cylindrical body 5 inside the cylindrical body 5. A tip end surface 61 of the sliding body 6 is formed in an arc shape in a side view so as to be flush with the surface (the surface on the concrete side) of the formwork member 21. The sliding body 6 is also formed with an internal flow path 62 that connects the inlet 52 and the outlet 53 in a state in which the tip end surface 61 of the sliding body 6 is flush with the surface on the concrete side of the formwork member 21. The internal flow path 62 is a linear flow path inclined with respect to the moving direction of the sliding body 6.
The sliding body 6 is connected to a control means 7, and slides back and forth within the cylinder 5 in response to a signal transmitted from the control means 7. The movement of the sliding body 6 switches between a state in which the inlet 52 and the injection port 51 are connected to each other and a state in which the inlet 52 and the outlet 53 are connected to each other.

以下、本実施形態の自動打設技術による覆工コンクリート1の打設方法について説明する。まず、トンネル坑内にスライドセントル2を設置する。スライドセントル2は、型枠部材21を折り畳んで縮径させた状態で、所定の位置まで移動させる。スライドセントル2を所定の位置に配置したら、所定の形状になるように拡径させる(図1,2参照)。
次に、コンクリート打設管3にコンクリートポンプPを接続し、コンクリートポンプPによりコンクリート(中流動コンクリート)を圧送する。本実施形態では、下段のコンクリートポンプPに最も近い(最も上流側に設けられた)切替バルブ4から順にコンクリートを打ち込むものとする(図2参照)。図4(a)および(b)に切替バルブ4の使用状況を示す。
Hereinafter, a method for pouring the lining concrete 1 using the automatic pouring technique of this embodiment will be described. First, the slide center 2 is installed inside the tunnel. The slide center 2 is moved to a predetermined position with the formwork members 21 folded and reduced in diameter. Once the slide center 2 is in the predetermined position, it is expanded in diameter to form a predetermined shape (see Figs. 1 and 2).
Next, a concrete pump P is connected to the concrete pouring pipe 3, and concrete (medium-fluidity concrete) is pumped by the concrete pump P. In this embodiment, concrete is poured in order from the changeover valve 4 closest to the lower concrete pump P (located most upstream) (see FIG. 2). Figures 4(a) and (b) show the use of the changeover valve 4.

コンクリートを打ち込む切替バルブ4には、制御手段7から注入開始の信号が送信されて、摺動体6が後退する。摺動体6が後退すると、摺動体6の先端面61が流入口52よりも後側(内空側)に配置される。こうすることで、流入口52が開口したまま、流出口53が摺動体6の側面によって閉口されるとともに、注入口51が開口される。そのため、コンクリート打設管3を介して圧送されたコンクリートは、注入口51から排出されて、型枠内(スライドセントル2と地山Gとの間)に打ち込まれる。このとき、他の切替バルブ4は、摺動体6の先端面61が型枠部材21の表面と一致した状態で、流入口52と流出口53とが連通した状態となっている。 The control means 7 sends a signal to start injection to the switching valve 4 that pours the concrete, and the sliding body 6 retracts. When the sliding body 6 retracts, the tip surface 61 of the sliding body 6 is positioned behind (inner space side) the inlet 52. In this way, the inlet 52 remains open, the outlet 53 is closed by the side of the sliding body 6, and the injection port 51 is opened. Therefore, the concrete pumped through the concrete pouring pipe 3 is discharged from the injection port 51 and poured into the formwork (between the slide center 2 and the ground G). At this time, the other switching valves 4 are in a state where the tip surface 61 of the sliding body 6 coincides with the surface of the formwork member 21, and the inlet 52 and outlet 53 are in communication.

コンクリートの打込みと並行して、当該切替バルブ4の近傍に配設されたバイブレータ22が作動し、型枠部材21を振動させてコンクリートの締固めを行う。また、コンクリート注入中は、コンクリート注入中の切替バルブ4の近傍に配設された打設感知センサ23が作動している。打設感知センサ23により、コンクリートが所定の高さまで打ち込まれたことが検知されたら、制御手段7から切替バルブ4に注入終了の信号が送信されて、摺動体6が前進する。摺動体6が前進すると、注入口51が遮蔽されるとともに、流入口52と流出口53が内部流路62により連通する。 In parallel with pouring of the concrete, a vibrator 22 arranged near the switching valve 4 operates to vibrate the formwork member 21 and compact the concrete. In addition, while the concrete is being poured, a pouring detection sensor 23 arranged near the switching valve 4 during concrete pouring is operating. When the pouring detection sensor 23 detects that the concrete has been poured to a specified height, a signal indicating the end of pouring is sent from the control means 7 to the switching valve 4, and the sliding body 6 advances. When the sliding body 6 advances, the injection port 51 is blocked, and the inlet 52 and outlet 53 are connected by an internal flow path 62.

制御手段7は、切替バルブ4に注入終了の信号を送信するとともに、当該切替バルブ4(コンクリートの注入を終了する切替バルブ4)の下流側に隣接する切替バルブ4に注入開始の信号を送信する。注入開始の信号を受信した切替バルブ4は、摺動体6が後退して、注入口51を開口する。
このように、コンクリート打設管3の上流側(コンクリートポンプP側)の切替バルブ4から順に、コンクリートを注入することで、スライドセントル2の背面にコンクリートを充填する。
The control means 7 transmits a signal to the switching valve 4 to end injection, and transmits a signal to start injection to the adjacent switching valve 4 downstream of the switching valve 4 (the switching valve 4 that ends the injection of concrete). When the switching valve 4 receives the signal to start injection, the sliding body 6 retracts, and the injection port 51 is opened.
In this way, concrete is injected sequentially from the switching valve 4 on the upstream side (concrete pump P side) of the concrete pouring pipe 3, thereby filling the back side of the slide center 2 with concrete.

以上、本実施形態の切替バルブ4は、コンクリートを輸送するコンクリート打設管3に介設されており、コンクリート打設管3を介して輸送されたコンクリートを直接的にスライドセントル2の背面(スライドセントル2と地山Gの間)に誘導することを可能としている。そのため、コンクリート打設管3から複数の分岐管を延設させる従来の施工方法に比べて、管内に残留するコンクリートの量を低減できる。ゆえに、残留コンクリートの処分に要する手間や費用を低減できる。また、コンクリート打設管3(上流管および下流管)は、切替バルブ4を介して連続しているため、複数の分岐管毎に清掃作業を必要とする場合に比べて、コンクリート打設管3内の清掃作業が容易である。 As described above, the switching valve 4 of this embodiment is interposed in the concrete pouring pipe 3 that transports concrete, and makes it possible to guide the concrete transported through the concrete pouring pipe 3 directly to the back of the slide center 2 (between the slide center 2 and the ground G). Therefore, compared to the conventional construction method in which multiple branch pipes are extended from the concrete pouring pipe 3, the amount of concrete remaining in the pipe can be reduced. Therefore, the effort and cost required for disposing of the remaining concrete can be reduced. In addition, since the concrete pouring pipe 3 (upstream pipe and downstream pipe) are continuous through the switching valve 4, cleaning work inside the concrete pouring pipe 3 is easier than when cleaning work is required for each of the multiple branch pipes.

筒体5の先端および摺動体6の先端面61が、スライドセントル2の表面(コンクリート側の面)と面一となる形状を有しているため、コンクリート表面に打設口の痕跡(凹凸)が生じ難い。そのため、スライドセントル2の撤去後(覆工コンクリート1の施工後)に、痕跡の補修作業に要する手間を省略あるいは低減できる。
また、内部流路62が摺動体6の移動方向に対して傾斜した直線状の流路であるため、コンクリート打設管3の屈曲部を最小限に抑えることができる。そのため、圧送中のコンクリートの切替バルブ4通過時の抵抗を最小限におさえることができる。
Since the tip of the cylinder 5 and the tip surface 61 of the sliding body 6 are shaped to be flush with the surface (concrete side) of the slide center 2, traces (unevenness) of the pouring hole are unlikely to appear on the concrete surface. Therefore, the labor required for repairing the traces after removing the slide center 2 (after construction of the lining concrete 1) can be omitted or reduced.
In addition, since the internal flow path 62 is a linear flow path inclined with respect to the moving direction of the sliding body 6, it is possible to minimize the number of bends in the concrete pouring pipe 3. Therefore, it is possible to minimize the resistance of the concrete passing through the switching valve 4 during pumping.

また、切替バルブ4によるコンクリートの注入を終了する際には、摺動体6を注入口51側に先進させるため、筒体5内のコンクリートを押し出した状態で終了するため、注入口51近傍に空気溜りが形成され難い。そのため、覆工コンクリート1をより高品質に施工できる。
さらに、流入口52が流出口53よりも注入口51側に形成されているため、摺動体6を前進させて、コンクリートの打込み状態から、流出口53から流出状態へ切り替える際に、筒体5内から押し出すコンクリート量を最小限に抑えることができる。
In addition, when the injection of concrete by the switching valve 4 is terminated, the sliding body 6 is advanced toward the injection port 51, so that the concrete in the cylindrical body 5 is pushed out and the injection is terminated, so that air pockets are unlikely to form near the injection port 51. Therefore, the lining concrete 1 can be constructed with higher quality.
Furthermore, since the inlet 52 is formed closer to the injection port 51 than the outlet 53, when the sliding body 6 is advanced to switch from a concrete pouring state to an outflow state from the outlet 53, the amount of concrete pushed out from inside the cylindrical body 5 can be minimized.

打設感知センサ23により打設状況を検知して、コンクリートの注入箇所(切替バルブ4)を自動的に移動させるため、目視で打設状況を確認する必要がない。そのため、作業員の手間を低減することができる。また、バイブレータ22による締固めも自動的に行うことで、施工の手間を低減できる。このように、打設状況の確認およびコンクリートの締固めを機械的に行うことで、人力により行う場合に比べて、作業員等の熟練度に関わらず、コンクリートの充填状況にムラが生じ難い。 The pouring sensor 23 detects the pouring status and automatically moves the concrete injection point (switching valve 4), so there is no need to visually check the pouring status. This reduces the amount of work required by workers. Compaction using the vibrator 22 is also performed automatically, reducing the amount of work required for construction. In this way, by mechanically checking the pouring status and compacting the concrete, unevenness in the concrete filling is less likely to occur, regardless of the skill level of the workers, compared to when it is done manually.

以上、本発明の実施形態について説明したが、本発明は、前述の実施形態に限られず、前記の各構成要素については本発明の趣旨を逸脱しない範囲で適宜変更が可能である。
例えば、前記実施形態では、覆工コンクリート1として、中流動コンクリートを打設する場合について説明したが、覆工コンクリート1として使用されるコンクリートの種類は限定されるものではなく、例えば高強度コンクリート、繊維補強コンクリート、普通コンクリート等、あらゆる種類のコンクリートが採用可能である。
また、前記実施形態では、横管31が上下3段に配管されていたが、コンクリート打設管3の配管は、トンネルの形状に応じて適宜決定すればよい。
Although an embodiment of the present invention has been described above, the present invention is not limited to the above-described embodiment, and each of the above-described components can be appropriately modified without departing from the spirit of the present invention.
For example, in the above embodiment, a case has been described in which medium-fluidity concrete is poured as the lining concrete 1, but the type of concrete used as the lining concrete 1 is not limited, and any type of concrete can be used, such as high-strength concrete, fiber-reinforced concrete, ordinary concrete, etc.
In addition, in the above embodiment, the horizontal pipes 31 are arranged in three vertical tiers, but the piping of the concrete pouring pipes 3 may be determined appropriately depending on the shape of the tunnel.

また、切替バルブ4の数および配置は限定されるものではなく、適宜決定すればよい。
流入口52と流出口53は、中心軸が平行になるように筒体5に形成されていてもよいし、中心軸同士が交差する向きに形成されていてもよい。
筒体5の先端は、必ずしも型枠部材21の表面(地山G側の面)と面一である必要はなく、例えば、型枠部材21の内面(内空側の面)に固定されていてもよい。
また、摺動体6の先端面の形状は限定されるものではなく、例えば、平面であってもよい。
また、内部流路62は、必ずしも直線状である必要はなく、例えば、円弧状に流入口52と流出口53とを連通する形状であっても負い。
流入口52と流出口53との位置関係は限定されるものではなく、適宜決定すればよい。
Furthermore, the number and arrangement of the switching valves 4 are not limited and may be determined appropriately.
The inlet 52 and the outlet 53 may be formed in the cylindrical body 5 so that their central axes are parallel to each other, or so that their central axes intersect with each other.
The tip of the cylindrical body 5 does not necessarily need to be flush with the surface of the formwork member 21 (the surface facing the natural ground G) and may be fixed, for example, to the inner surface of the formwork member 21 (the surface facing the inner space).
Furthermore, the shape of the tip end surface of the sliding body 6 is not limited, and may be, for example, a flat surface.
Furthermore, the internal flow passage 62 does not necessarily have to be linear, and may be shaped, for example, in an arc connecting the inlet 52 and the outlet 53 .
The positional relationship between the inlet 52 and the outlet 53 is not limited and may be determined appropriately.

1 覆工コンクリート
2 スライドセントル(型枠)
21 型枠部材
3 コンクリート打設管
4 切替バルブ
5 筒体
51 注入口
52 流入口
53 流出口
6 摺動体
61 先端面
62 内部流路
1 Lining concrete 2 Slide center (formwork)
21 Formwork member 3 Concrete pouring pipe 4 Switching valve 5 Cylinder 51 Inlet 52 Inlet 53 Outlet 6 Slider 61 Tip surface 62 Internal flow path

Claims (4)

上流管と下流管との間に介設されて、前記上流管から供給されたコンクリートを型枠内に注入可能な状態と前記下流管に流下可能な状態とを切り替える切替バルブであって、
前記型枠に接続された筒体と、
前記筒体内に収納され、前記筒体の軸方向に摺動することで、前記コンクリートを前記型枠内に注入可能な状態と前記下流管に流下可能な状態とを切り替える摺動体と、を備えており、
前記上流管および前記下流管は、コンクリートポンプから延設されてスライドセントルの内面に沿って配管されたコンクリート打設管であり、
前記筒体には、前記筒体の先端において開口する注入口と、
前記筒体の側面に形成され、前記上流管が直接接続される流入口と、
前記筒体の側面に形成され、前記下流管が接続される流出口と、が形成されており、
前記流出口は、前記流入口に対して前記筒体の軸方向にオフセットした位置に形成されていて、
前記摺動体には、前記摺動体の先端面を前記型枠のコンクリート側の面と一致させた状態で、前記流入口と前記流出口とを連結する内部流路が形成されていることを特徴とする、切替バルブ。
A switching valve is interposed between an upstream pipe and a downstream pipe, and switches between a state in which concrete supplied from the upstream pipe can be poured into a formwork and a state in which concrete can flow down to the downstream pipe,
A cylinder connected to the formwork;
A sliding body is housed in the cylindrical body and slides in the axial direction of the cylindrical body to switch between a state in which the concrete can be poured into the formwork and a state in which the concrete can flow down to the downstream pipe ,
The upstream pipe and the downstream pipe are concrete pouring pipes extending from a concrete pump and arranged along an inner surface of a slide center,
The cylindrical body has an injection port that opens at a tip of the cylindrical body;
an inlet formed on a side surface of the cylindrical body and directly connected to the upstream pipe;
An outlet port is formed on a side surface of the cylindrical body and connected to the downstream pipe,
The outlet is formed at a position offset in the axial direction of the cylindrical body from the inlet,
a switching valve, characterized in that an internal flow path is formed in the sliding body, the internal flow path connecting the inlet and the outlet with a tip surface of the sliding body being aligned with a concrete side surface of the formwork.
前記筒体の先端面は、前記型枠の表面と面一となる形状を有していることを特徴とする、請求項1に記載の切替バルブ。 The switching valve according to claim 1, characterized in that the tip surface of the cylinder has a shape that is flush with the surface of the mold. 前記内部流路は、前記摺動体の移動方向に対して傾斜した直線状の流路であることを特徴とする、請求項1または請求項2に記載の切替バルブ。 The switching valve according to claim 1 or 2, characterized in that the internal flow path is a linear flow path inclined with respect to the moving direction of the sliding body. 前記流入口は、前記流出口よりも前記注入口側に形成されていることを特徴とする、請求項1乃至請求項3のいずれか1項に記載の切替バルブ。 The switching valve according to any one of claims 1 to 3, characterized in that the inlet is formed closer to the inlet than the outlet.
JP2021100261A 2021-06-16 2021-06-16 Switching valve Active JP7593886B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021100261A JP7593886B2 (en) 2021-06-16 2021-06-16 Switching valve

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021100261A JP7593886B2 (en) 2021-06-16 2021-06-16 Switching valve

Publications (2)

Publication Number Publication Date
JP2022191810A JP2022191810A (en) 2022-12-28
JP7593886B2 true JP7593886B2 (en) 2024-12-03

Family

ID=84624430

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021100261A Active JP7593886B2 (en) 2021-06-16 2021-06-16 Switching valve

Country Status (1)

Country Link
JP (1) JP7593886B2 (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020117996A (en) 2019-01-28 2020-08-06 鹿島建設株式会社 Concrete placing device, formwork unit and concrete placing method

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6378968A (en) * 1986-09-19 1988-04-09 三井建設株式会社 Fluid supply apparatus
JP2698750B2 (en) * 1993-10-04 1998-01-19 戸田建設株式会社 Tunnel lining material mixing and casting device and method
JPH10169196A (en) * 1996-12-11 1998-06-23 Kajima Corp Method and apparatus for placing and filling fluidized concrete

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020117996A (en) 2019-01-28 2020-08-06 鹿島建設株式会社 Concrete placing device, formwork unit and concrete placing method

Also Published As

Publication number Publication date
JP2022191810A (en) 2022-12-28

Similar Documents

Publication Publication Date Title
JP7593886B2 (en) Switching valve
KR100591599B1 (en) Residual concrete discharge device and residual concrete discharge method of concrete pump car
KR101664366B1 (en) concrete cleaning apparatus for concrete pumping car and preparing method for the same
JP7152327B2 (en) CONCRETE PLACING DEVICE, FORM UNIT AND CONCRETE PLACEMENT METHOD
RU2353802C2 (en) Plunger pump for supply of dense mediums
JP6994895B2 (en) Lining concrete placing system
KR101261562B1 (en) A concrete deliver pipe have feed check valve for concrete pumping vehicle
IT201600072149A1 (en) Pump to dispense a liquid.
US20240229645A9 (en) Control fitting, arrangement and method for producing concrete components
WO2014141083A2 (en) Valve for formworks and formworks equipped with said valve
JP2025104691A (en) Switching valve, concrete pouring device, and lining concrete pouring method
KR102143734B1 (en) A concrete pump system
CA3151060C (en) Control fitting, arrangement and method for producing concrete components
KR960009852B1 (en) Gate housing opening and closing device of concrete pump
CN209025454U (en) Concrete pumping device and concrete pumping equipment
JP7241335B2 (en) Method for removing residual concrete in pipes
JPS6329113B2 (en)
JP3775147B2 (en) Placing high fluidity concrete
JP7678990B2 (en) Lining concrete pouring method
CN109184218B (en) Concrete pumping device and concrete pumping equipment
JP6606461B2 (en) Air supply device
JP3220209U (en) Concrete placing device
KR20150010899A (en) Concrete divider for outlet can be opened and closed
CN111164339B (en) Dredging gate valve
JP7738843B2 (en) Lining concrete pouring device and lining concrete pouring method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20231003

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240319

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240402

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240508

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240702

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240827

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20241119

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20241121

R150 Certificate of patent or registration of utility model

Ref document number: 7593886

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150