Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7616660B2 - Construction plan creation support system and method thereof - Google Patents
[go: Go Back, main page]

JP7616660B2 - Construction plan creation support system and method thereof - Google Patents

Construction plan creation support system and method thereof Download PDF

Info

Publication number
JP7616660B2
JP7616660B2 JP2021190036A JP2021190036A JP7616660B2 JP 7616660 B2 JP7616660 B2 JP 7616660B2 JP 2021190036 A JP2021190036 A JP 2021190036A JP 2021190036 A JP2021190036 A JP 2021190036A JP 7616660 B2 JP7616660 B2 JP 7616660B2
Authority
JP
Japan
Prior art keywords
road surface
data
road
construction
image
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021190036A
Other languages
Japanese (ja)
Other versions
JP2023076976A (en
Inventor
良 岩田
考弘 横山
Original Assignee
アース・クリエイト有限会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by アース・クリエイト有限会社 filed Critical アース・クリエイト有限会社
Priority to JP2021190036A priority Critical patent/JP7616660B2/en
Publication of JP2023076976A publication Critical patent/JP2023076976A/en
Application granted granted Critical
Publication of JP7616660B2 publication Critical patent/JP7616660B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Repair (AREA)

Description

本発明は、道路標示および道路標識を含む交通用表示の施工計画書の作成を支援するための施工計画書作成支援システム、および、その支援方法に関するものである。 The present invention relates to a construction plan creation support system and method for supporting the creation of construction plans for traffic signs, including road markings and road signs.

横断歩道、止まれ、区画線、のような道路標示を施工するための施工計画書の作成は、初めに、作業者が施工現場において、道路標示を施工する道路の距離や幅員、道路標示を施す位置などを測量する。そして、測量した数値を基に、道路標示などを記載した施工現場の図面を作成した上で、見積書を含む施工計画書を作成していた。 When creating a construction plan for constructing road markings such as crosswalks, stop signs, and dividing lines, workers would first go to the construction site and measure the distance and width of the road where the road markings would be installed, as well as the locations where the road markings would be installed. Then, based on the measurements obtained, they would create a drawing of the construction site showing the road markings, and then create a construction plan that includes an estimate.

しかしながら、施工現場の測量は、メジャーなどを使用するため、複数の作業者を必要としたり、道路を通行する車両などに注意を払う必要があったりし、手間と時間がかかると共に危険が伴う作業であった。また、手書きにより施工現場の図面を作成しており、ここでも手間と時間がかかっていた。そのため、安全且つ短時間で施工計画書を作成することが可能な施工計画書の作成支援システムが要請されていた。 However, surveying a construction site requires the use of tools such as tape measures, which requires multiple workers and requires attention to vehicles passing on the road, making it a time-consuming, labor-intensive and dangerous task. In addition, drawings of the construction site are created by hand, which is also time-consuming and labor-intensive. For this reason, there was a demand for a construction plan creation support system that could create construction plans safely and in a short time.

そこで、本発明は、上記の実情に鑑み、道路標示および道路標識を含む交通用表示の施工計画書を安全且つ短時間で作成することが可能な施工計画書作成支援システム、および、その支援方法の提供を課題とするものである。 In view of the above, the present invention aims to provide a construction plan creation support system and a support method for the same that can safely and quickly create construction plans for traffic signs, including road markings and road signs.

上記の課題を解決するために、本発明にかかる施工計画書作成支援システムは、
「道路標示および道路標識を含む交通用表示を施工する道路上または道路の上方を移動しながら一定の時間間隔ごとに路面を撮影して路面画像を取得する路面カメラと、
該路面カメラと一緒に移動し、GPS衛星からの信号を受信して一定の時間間隔ごとにGPS情報を取得するGPSユニットと、
取得した複数の前記路面画像と複数の前記GPS情報とから施工計画書を作成する制御手段と
を具備している施工計画書作成支援システムであり、
前記制御手段は、
取得された複数の前記GPS情報に基づいて、複数の前記路面画像を地図データ上に並べて合成路面画像を生成する画像合成手段と、
前記合成路面画像上に、予め設定されており単価を含む前記交通用表示のアイテムデータを貼り付けることにより、施工データを生成する施工データ生成手段と、
前記施工データに基づいて見積金額を含む見積データを生成する見積データ生成手段と、
前記施工データおよび前記見積データに基づいて施工計画書を作成する書類作成手段と
を備えている」ことを特徴とする。
In order to solve the above problems, the construction plan creation support system according to the present invention comprises:
"A road surface camera that captures images of a road surface at regular time intervals while moving on or above a road on which traffic signs, including road markings and road signs, are installed;
a GPS unit that moves together with the road surface camera and receives signals from GPS satellites to acquire GPS information at regular time intervals;
a control means for creating a construction plan from the acquired plurality of road surface images and the plurality of GPS information,
The control means
an image synthesis means for generating a synthetic road surface image by arranging the plurality of road surface images on map data based on the plurality of acquired GPS information;
a construction data generating means for generating construction data by pasting item data of the traffic signs, which is set in advance and includes a unit price, onto the synthetic road surface image;
An estimate data generating means for generating estimate data including an estimate amount based on the construction data;
and a document creation means for creating a construction plan based on the construction data and the estimate data.

ここで、施工する交通用表示とは、道路法および道路交通法に定められているものであり、路面に施される道路標示、路面または路肩に立設される看板状の道路標識(本標識および補助標識)、を例示することができる。具体的には、例えば、交通用表示の道路標示としては、センターライン(中央線)や路側帯のような区画線、「40」のような最高速度を示す数字、「止まれ」のような文字、矢印、横断歩道ありを示すひし形の図形、横断歩道、を例示することができる。アイテムデータは、上記の交通用表示をデータ化したものであり、例えば、交通用表示としての道路標示の場合、道路標示の名称、線の幅、線の長さ、図形や文字などの形状および大きさ、単価、などがデータ化されている。 Here, the traffic signs to be installed are those stipulated in the Road Act and the Road Traffic Act, and examples thereof include road markings applied to the road surface and billboard-like road signs (main signs and auxiliary signs) erected on the road surface or road shoulders. Specifically, for example, examples of road markings as traffic signs include dividing lines such as center lines and shoulders, numbers such as "40" indicating maximum speed, letters such as "Stop," arrows, diamond-shaped figures indicating the presence of a pedestrian crossing, and pedestrian crossings. The item data is the above-mentioned traffic signs converted into data, and for example, in the case of road markings as traffic signs, the name of the road marking, the line width, the line length, the shape and size of figures and letters, the unit price, etc. are converted into data.

本構成では、例えば、自動車やドローンなどの移動媒体に路面カメラとGPSユニットとを設ける。そして、その移動媒体を、交通用表示を施工する道路上または道路の上方で移動させて複数の路面画像と複数のGPS情報とを取得する。次に、制御手段の画像合成手段より、複数のGPS情報に基づいて、複数の路面画像が並べられて合成される。詳述すると、GPS情報には取得した時の位置情報が含まれているため、その位置情報に基づいて対応する路面画像の撮影位置を特定することができる。従って、GPS情報に基づいて、地図データ上の該当する位置に路面画像を順番に並べることができるため、複数の路面画像を一つの合成路面画像に合成することができる。 In this configuration, a road surface camera and a GPS unit are provided on a mobile medium such as an automobile or a drone. The mobile medium is then moved on or above the road on which the traffic signs are to be installed to acquire multiple road surface images and multiple GPS information. Next, the multiple road surface images are arranged and synthesized based on the multiple GPS information by the image synthesis means of the control means. In more detail, since the GPS information contains location information at the time of acquisition, the shooting location of the corresponding road surface image can be identified based on the location information. Therefore, since the road surface images can be arranged in order at the corresponding positions on the map data based on the GPS information, the multiple road surface images can be synthesized into one synthetic road surface image.

続いて、制御手段の施工データ生成手段により、合成路面画像に、様々な種類の交通用表示のアイテムデータを貼り付けて、施工データを生成する。合成路面画像は、施工現場の実際の写真であるため、道路の路面や路肩などの状態を把握し易い。また、合成路面画像は、GPS情報に基づいて合成されているため、道路に対して施工されている既存の交通用表示、側溝や縁石のような既存の構造物、などの位置や大きさなど(道路情報)が地図データよりも正確である。従って、施工データは、貼り付けられているアイテムデータの位置や大きさや長さが、実際に施工する交通用表示の位置や大きさや長さと比例関係になる。そして、施工データは、合成路面画像上、つまり、地図データ上に、アイテムデータ(交通用表示)が貼り付けたものであることから、施工現場の図面として利用することができる。 Then, the construction data generating means of the control means pastes item data of various types of traffic signs onto the synthetic road surface image to generate construction data. Since the synthetic road surface image is an actual photograph of the construction site, it is easy to grasp the condition of the road surface, road shoulders, etc. In addition, since the synthetic road surface image is synthesized based on GPS information, the positions and sizes of existing traffic signs, existing structures such as gutters and curbs, etc. that are installed on the road (road information) are more accurate than the map data. Therefore, the positions, sizes, and lengths of the pasted item data in the construction data are proportional to the positions, sizes, and lengths of the traffic signs to be actually installed. And since the construction data is the item data (traffic signs) pasted onto the synthetic road surface image, i.e., onto the map data, it can be used as a drawing of the construction site.

その後、制御手段の見積データ生成手段により、施工データから見積金額を含む見積データが生成される。そして、制御手段の書類作成手段により、施工データおよび見積データに基づいて施工計画書が作成される。 Then, the control means's estimate data generating means generates estimate data including an estimated amount from the construction data. Then, the control means's document creation means creates a construction plan based on the construction data and the estimate data.

このように、本構成によれば、交通用表示の施工現場において、路面カメラとGPSユニットとが設けられた移動媒体を道路上または道路の上方で移動させるだけで正確な道路の情報を取得することができるため、従来のように施工現場を測量する必要はなく、道路を通行している車両に注意して作業したり、車両の通行を規制したりする必要はない。従って、作業者の数や作業時間を低減させることが可能であると共に、道路の情報の取得に対する安全性を高めることが可能である。また、合成路面画像に予め設定されたアイテムデータを貼り付けているため、施工現場の図面を簡単に短期間で作成することができる。 Thus, according to this configuration, accurate road information can be obtained at a construction site for traffic signs simply by moving a mobile vehicle equipped with a road surface camera and a GPS unit on or above the road, so there is no need to survey the construction site as in the past, and there is no need to pay attention to vehicles passing on the road or to restrict vehicle traffic. This makes it possible to reduce the number of workers and work time, while also increasing safety in obtaining road information. Also, because pre-set item data is attached to the synthetic road surface image, drawings of the construction site can be easily created in a short period of time.

また、本構成によれば、施工データにはアイテムデータが含まれており、そのアイテムデータから、実際に施工する交通用表示の種類、数、長さ、大きさ、などが判ると共に、アイテムデータには単価も含まれているため、施工データから施工にかかる見積データ(見積金額)を容易に生成することができ、見積にかかる手間と時間を低減させることができる。このようなことから、交通用表示の施工計画書を安全且つ短時間で作成することができる。 Furthermore, according to this configuration, the construction data includes item data, which indicates the type, number, length, size, etc. of the traffic signs to be actually constructed. The item data also includes unit prices, so estimate data (estimated amount) for construction can be easily generated from the construction data, reducing the effort and time required for estimates. As a result, construction plans for traffic signs can be created safely and quickly.

本発明にかかる施工計画書作成支援システムは、上記の構成に加えて、
「前記路面画像は撮影時間に対応付けられていると共に、前記GPS情報は取得時間に対応付けられており、
前記画像合成手段は、
時系列順に並んでいる二つの前記GPS情報のそれぞれの前記取得時間を使用して移動方向と平均移動速度とを算出した上で、二つの前記取得時間の間の前記撮影時間を有する前記路面画像を前記移動方向に応じて回転させると共に、前記撮影時間と前記平均移動速度とにより前記路面画像の撮影位置を算出し、前記地図テータ上における前記撮影位置に回転させた前記路面画像を貼り付け、これを順次繰り返して前記合成路面画像を生成する」
ことを特徴とする。
In addition to the above configuration, the construction plan creation support system according to the present invention further comprises:
"The road surface image is associated with the shooting time, and the GPS information is associated with the acquisition time,
The image synthesis means includes:
The acquisition times of the two pieces of GPS information arranged in chronological order are used to calculate the direction of travel and the average travel speed, and the road surface image having the photographing time between the two acquisition times is rotated according to the direction of travel, and the photographing position of the road surface image is calculated based on the photographing time and the average travel speed, and the rotated road surface image is pasted at the photographing position on the map data, and this is repeated in sequence to generate the synthetic road surface image.
It is characterized by:

本構成によれば、隣接して取得された二つのGPS情報の取得時間と、路面画像の撮影時間とから、路面画像の撮影位置を特定するようにしているため、GPS情報の取得時間と路面画像の撮影時間とが異なっている場合や、路面画像の撮影時間間隔とGPS情報の取得時間間隔とが異なっている場合、などでも対応することができる。また、二つのGPS情報により算出された移動方向に応じて路面画像を回転させるようにしているため、施工現場の道路がカーブしていても追従することができ、施工計画書の内容をより正確なものにすることが可能となる。 According to this configuration, the shooting position of the road surface image is identified from the acquisition time of two adjacent GPS information pieces and the shooting time of the road surface image, so it can handle cases where the acquisition time of the GPS information and the shooting time of the road surface image are different, or where the shooting time interval of the road surface image is different from the acquisition time interval of the GPS information. In addition, since the road surface image is rotated according to the moving direction calculated from the two GPS information pieces, it can be followed even if the road at the construction site is curved, making it possible to make the contents of the construction plan more accurate.

本発明にかかる施工計画書作成支援方法は、
「道路標示および道路標識を含む交通用表示を施工する道路上または道路の上方を移動しながら一定の時間間隔ごとに路面を撮影して路面画像を取得する路面カメラと、
該路面カメラと一緒に移動し、GPS衛星からの信号を受信して一定の時間間隔ごとにGPS情報を取得するGPSユニットと、
取得した複数の前記路面画像と複数の前記GPS情報とから施工計画書を作成する制御手段と
を具備している施工計画書作成支援システムを使用する施工計画書作成支援方法であり、
前記制御手段は、
取得した複数の前記GPS情報に基づいて、複数の前記路面画像を地図データ上に並べて合成路面画像を生成した上で、
該合成路面画像上に、予め設定されており単価を含む前記交通用表示のアイテムデータを貼り付けることにより施工データを生成すると共に、
該施工データに基づいて見積金額を含む見積データを生成し、
前記施工データおよび前記見積データに基づいて施工計画書を作成する」
ことを特徴とする。
The construction plan creation support method according to the present invention comprises:
"A road surface camera that captures images of a road surface at regular time intervals while moving on or above a road on which traffic signs, including road markings and road signs, are installed;
a GPS unit that moves together with the road surface camera and receives signals from GPS satellites to acquire GPS information at regular time intervals;
A construction plan creation support method using a construction plan creation support system including a control means for creating a construction plan from the acquired plurality of road surface images and the acquired plurality of GPS information,
The control means
Based on the acquired plurality of pieces of GPS information, the plurality of road surface images are arranged on map data to generate a synthetic road surface image,
generating construction data by pasting item data of the traffic sign, which is set in advance and includes a unit price , onto the synthetic road surface image;
generating estimate data including an estimated amount based on the construction data;
Create a construction plan based on the construction data and the estimate data.
It is characterized by:

本構成の支援方法によれば、交通用表示を施工するための施工計画書を、従来よりも安全且つ短時間で作成することができる。 This support method allows construction plans for constructing traffic signs to be created more safely and in a shorter time than ever before.

以上のように、本発明の効果として、道路標示および道路標識を含む交通用表示の施工計画書を安全且つ短時間で作成することが可能な施工計画書作成支援システム、および、その支援方法を提供することができる。 As described above, the effect of the present invention is to provide a construction plan creation support system and a support method for the same that can safely and quickly create construction plans for traffic signs, including road markings and road signs.

(a)は本発明の一実施形態である施工計画書作成支援システムにおける路面の撮影から合成路面画像を生成するまでを模式的に示す説明図であり、(b)は路面カメラと道路の幅との関係を示す説明図である。1A is an explanatory diagram showing a schematic diagram of the process from photographing the road surface to generating a synthetic road surface image in a construction plan creation support system which is one embodiment of the present invention, and FIG. 1B is an explanatory diagram showing the relationship between the road surface camera and the width of the road. 図1の施工計画書作成支援システムのブロック図である。FIG. 2 is a block diagram of the construction plan creation support system of FIG. 1. 路面画像・GPS情報取得用の表示画面である。This is a display screen for acquiring road surface images and GPS information. 合成範囲設定処理のフローチャートである。13 is a flowchart of a synthesis range setting process. 合成路面画像生成用の表示画面である。1 is a display screen for generating a synthetic road surface image. 画像合成処理のフローチャートである。13 is a flowchart of an image synthesis process. (a)は路面画像およびGPS情報と時間との関係を模式的に示す説明図であり、(b)は隣接する二つのGPS情報の間の移動軌跡上に含まれる路面画像の撮影位置を模式的に示す説明図であり、(c)は回転させた路面画像を移動軌跡上の撮影位置に貼り付けた状態を模式的に示す説明図である。(a) is an explanatory diagram showing a schematic diagram of the relationship between a road surface image and GPS information and time, (b) is an explanatory diagram showing a schematic diagram of the shooting position of a road surface image included on a movement trajectory between two adjacent GPS information, and (c) is an explanatory diagram showing a schematic diagram of a rotated road surface image pasted at the shooting position on the movement trajectory. (a)施工データを生成するために表示されるエディタツール画面、道路標示作図・編集画面、ナビゲーション画面の三つの画面を示す説明図であり、(b)はナビゲーション画面における別の表示を示す説明図である。FIG. 1A is an explanatory diagram showing three screens, an editor tool screen, a road marking drawing/editing screen, and a navigation screen, which are displayed to generate construction data; FIG. 1B is an explanatory diagram showing another display on the navigation screen; 作成された見積書を示す説明図である。FIG. 13 is an explanatory diagram showing a created quotation.

以下、本発明の一実施形態である施工計画書作成支援システムについて、図面を参照して説明する。本実施形態の施工計画書作成支援システムは、交通用表示としての道路標示を施工するための施工計画書の作成を支援するためのものである。 The construction plan creation support system according to one embodiment of the present invention will be described below with reference to the drawings. The construction plan creation support system according to this embodiment is intended to support the creation of construction plans for constructing road markings as traffic signs.

施工計画書作成支援システムは、道路R上を移動する移動媒体としての自動車10と、自動車10にそれぞれ設けられている路面カメラ11、周辺カメラ12、GPSアンテナ13、GPSユニット14、モバイルルーター15、および第一コンピュータ16と、を備えている。また、施工計画書作成支援システムは、データサーバ20と、第二コンピュータ30と、第二コンピュータ30に接続されている入力装置31、表示装置32、および印刷装置33と、を備えている。 The construction plan creation support system includes an automobile 10 as a vehicle moving on a road R, and a road surface camera 11, a peripheral camera 12, a GPS antenna 13, a GPS unit 14, a mobile router 15, and a first computer 16, which are each installed on the automobile 10. The construction plan creation support system also includes a data server 20, a second computer 30, and an input device 31, a display device 32, and a printing device 33 connected to the second computer 30.

自動車10は、図1(a)に示すように、後方へ突出するように屋根上に取付けられている支持ステー10aと、支持ステー10aの上面に取付けられている防水性能を有する収納ケース10bと、を備えている。支持ステー10aには、路面カメラ11、周辺カメラ12、GPSアンテナ13、およびモバイルルーター15が取付けられている。収納ケース10bは、支持ステー10aにおける自動車10の直上の部位に取付けられている。この収納ケース10bには、GPSユニット14、および第一コンピュータ16が収納されている。 As shown in FIG. 1(a), the automobile 10 is equipped with a support stay 10a attached to the roof so as to protrude rearward, and a waterproof storage case 10b attached to the upper surface of the support stay 10a. A road camera 11, a surrounding camera 12, a GPS antenna 13, and a mobile router 15 are attached to the support stay 10a. The storage case 10b is attached to a portion of the support stay 10a directly above the automobile 10. The storage case 10b houses a GPS unit 14 and a first computer 16.

路面カメラ11は、デジタルカメラである。路面カメラ11は、支持ステー10aの後端においてレンズを下方へ向けて取付けられており、路面RSを撮影して路面画像21を取得するためのものである。路面カメラ11は、広い方の画角αが自動車10の幅方向を向くように取付けられている。路面カメラ11は、道路における少なくとも車線の幅員Wが撮影できるように、その画角αと路面RSからの高さHと、がそれぞれ設定されている(図1(b)を参照)。なお、路面画像21のデータは、撮影時間を対応させて取得される。 The road surface camera 11 is a digital camera. The road surface camera 11 is attached to the rear end of the support stay 10a with the lens facing downward, and is used to capture the road surface RS and obtain a road surface image 21. The road surface camera 11 is attached so that the wider angle of view α faces in the width direction of the automobile 10. The angle of view α and height H from the road surface RS of the road surface camera 11 are set so that it can capture at least the width W of the lanes on the road (see Figure 1 (b)). The data of the road surface image 21 is acquired in accordance with the capture time.

本実施形態の路面カメラ11は、画角αが120度であり、路面RSからの高さHが1930mmの位置に取付けられている。これにより、約6.7mの幅の範囲を撮影することが可能である。また、道路Rの長手方向に対しては約2mの範囲を撮影することが可能である。また、1枚の路面画像21の容量は、約0.05MBである。 The road surface camera 11 of this embodiment has an angle of view α of 120 degrees and is mounted at a height H of 1930 mm from the road surface RS. This makes it possible to capture an image of a range of approximately 6.7 m in width. It is also possible to capture an image of a range of approximately 2 m in the longitudinal direction of the road R. The capacity of one road surface image 21 is approximately 0.05 MB.

周辺カメラ12は、デジタルカメラである。周辺カメラ12は、支持ステー10aの後端においてレンズを後方へ向けて取付けられており、自動車10の後方の周辺を撮影して周辺画像22を取得するためのものである。なお、周辺画像22のデータは、撮影時間を対応させて取得される。 The peripheral camera 12 is a digital camera. The peripheral camera 12 is attached to the rear end of the support stay 10a with its lens facing rearward, and is used to capture images of the surroundings behind the automobile 10 to obtain peripheral images 22. The data of the peripheral images 22 is acquired in accordance with the time of capture.

GPSアンテナ13は、複数のGPS衛星1からの信号を受信するためのものであり、支持ステー10aの上面に取付けられている。GPSユニット14は、GPSアンテナ13によって受信された複数のGPS衛星1からの信号に基づいてGPS情報23を取得するためのものである。GPS情報23には、取得時間、日付、経緯度、標高、測位ステータス(受信状態)、使用衛星数、などが含まれている。 The GPS antenna 13 is for receiving signals from multiple GPS satellites 1 and is attached to the upper surface of the support stay 10a. The GPS unit 14 is for acquiring GPS information 23 based on the signals from multiple GPS satellites 1 received by the GPS antenna 13. The GPS information 23 includes acquisition time, date, longitude and latitude, altitude, positioning status (reception state), number of satellites used, etc.

モバイルルーター15は、モバイル基地局2(アクセスポイントを含む)からの信号を受信して現在位置としての補助位置情報24を取得するためのものである。補助位置情報24には、取得時間、日付、経緯度、標高、などが含まれている。この補助位置情報24は、GPS情報23の測位ステータスが低い時に、補助として使用することが可能である。 The mobile router 15 receives signals from the mobile base station 2 (including an access point) to obtain auxiliary location information 24 as the current location. The auxiliary location information 24 includes the acquisition time, date, longitude and latitude, altitude, etc. This auxiliary location information 24 can be used as an auxiliary when the positioning status of the GPS information 23 is low.

第一コンピュータ16は、本実施形態では、パーソナルコンピュータである。第一コンピュータ16は、中央処理装置と、キーボートおよびタッチパッドからなる入力部16aと、液晶表示ディスプレイからなる表示部16bと、HDDやSSDからなる記憶部16cと、を備えている。第一コンピュータ16は、記憶部16cに記憶された所定のプログラムが実行されることにより、路面カメラ11、周辺カメラ12、GPSユニット14、およびモバイルルーター15を制御することが可能であり、取得した路面画像21、周辺画像22、GPS情報23、および補助位置情報24が、記憶部16cに記憶される。 In this embodiment, the first computer 16 is a personal computer. The first computer 16 includes a central processing unit, an input unit 16a consisting of a keyboard and a touchpad, a display unit 16b consisting of an LCD display, and a memory unit 16c consisting of an HDD or SSD. The first computer 16 is capable of controlling the road surface camera 11, the peripheral camera 12, the GPS unit 14, and the mobile router 15 by executing a specific program stored in the memory unit 16c, and the acquired road surface image 21, peripheral image 22, GPS information 23, and auxiliary position information 24 are stored in the memory unit 16c.

第一コンピュータ16の記憶部16cに記憶された各種のデータは、モバイルルーター15によるインターネットのような通信ネットワーク、或いは、USBメモリーのような外部ストレージ、などを介してデータサーバ20に記憶される。 The various data stored in the memory unit 16c of the first computer 16 is stored in the data server 20 via a communication network such as the Internet via the mobile router 15, or via external storage such as a USB memory.

データサーバ20は、例えば、インターネットのような通信ネットワークを介して接続可能に設けられている。データサーバ20には、路面画像21、周辺画像22、GPS情報23、および補助位置情報24、が記憶される。また、データサーバ20には、地図データ25、アイテムデータ26、施工データ27、見積データ28、および書類データ29、が記憶される。地図データ25およびアイテムデータ26は、予めデータサーバ20に記憶されているものである。更に、データサーバ20には、後述する合成路面画像40が記憶される。 The data server 20 is provided so as to be connectable via a communication network such as the Internet. The data server 20 stores a road surface image 21, a surrounding image 22, GPS information 23, and auxiliary position information 24. The data server 20 also stores map data 25, item data 26, construction data 27, estimate data 28, and document data 29. The map data 25 and item data 26 are stored in the data server 20 in advance. The data server 20 also stores a synthetic road surface image 40, which will be described later.

地図データ25は、詳細は後述する第二コンピュータ30の表示装置32に施工現場の地図を表示させるためのデータであり、所定のメッシュ状に仕切られている緯度および経度に対して、例えば、道路、鉄道、河川、建物、地名、行政上の境界線、などの情報が記載されているデータである。 The map data 25 is data for displaying a map of the construction site on the display device 32 of the second computer 30, which will be described in detail later, and contains information such as roads, railways, rivers, buildings, place names, and administrative boundaries for latitudes and longitudes divided into a predetermined mesh pattern.

アイテムデータ26は、道路法および道路交通法に定められている道路標示をデータ化したものである。具体的には、例えば、センターラインや路肩ラインのような「ライン」表示(いわゆる区画線)の場合は、道路標示の名称、W15やW30やW45のような幅の種類(Wの後ろの数字はcmを意味している)、白線や黄線のような線の色、単位長さ当りの単価、が定められている。また、「ライン」以外の、「止まれ」や「40」や「50」のような文字や数字、横断歩道ありを示すひし形の図形、矢印、横断歩道、のような文字や数字などを含む図形の場合は、道路標示の名称、図形のベクタデータ、図形を構成している線の長さ、線の幅、線の色、単位長さ当りの単価、が定められている。なお、図形の場合、図形の種類(道路標示の種類)ごとに1個当たりの単価を定めるようにしても良い。 Item data 26 is a digitalized version of road markings as defined in the Road Act and the Road Traffic Act. Specifically, for example, in the case of "line" markings (so-called dividing lines) such as center lines and shoulder lines, the name of the road marking, the type of width such as W15, W30, and W45 (the number after W means cm), the color of the line such as a white line or a yellow line, and the unit price per unit length are defined. In addition, in the case of figures that include letters and numbers such as "Stop", "40", and "50" other than "lines", diamond shapes indicating a pedestrian crossing, arrows, and crosswalks, the name of the road marking, vector data of the figure, the length of the lines that make up the figure, the width of the line, the color of the line, and the unit price per unit length are defined. In addition, in the case of figures, the unit price per piece may be determined for each type of figure (type of road marking).

施工データ27、見積データ28、および書類データ29は、詳細は後述するが、第二コンピュータ30において生成されたデータである。 The construction data 27, the estimate data 28, and the document data 29 are data generated in the second computer 30, as will be described in detail later.

第二コンピュータ30は、本実施形態では、パーソナルコンピュータであり、中央処理装置と、RAM、HDDやSSDからなる記憶手段30eと、を備えている。第二コンピュータ30は、所定のプログラムを実行することで、以下の機能を発揮する。詳述すると、第二コンピュータ30の記憶手段30eには、複数のGPS情報23に基づいて、複数の路面画像21を地図データ25上に並べて合成路面画像40を生成する画像合成手段30aと、合成路面画像40上にアイテムデータ26を貼り付けることにより施工データ27を生成する施工データ生成手段30bと、施工データ27に基づいて見積金額を含む見積データ28を生成する見積データ生成手段30cと、施工データ27および見積データ28に基づいて施工計画書を作成する書類作成手段30dとして、第二コンピュータ30を機能させるプログラムが記憶されている。 In this embodiment, the second computer 30 is a personal computer, and includes a central processing unit and a storage means 30e consisting of a RAM, HDD, and SSD. The second computer 30 performs the following functions by executing a predetermined program. In detail, the storage means 30e of the second computer 30 stores programs that cause the second computer 30 to function as an image synthesis means 30a that generates a synthetic road surface image 40 by arranging multiple road surface images 21 on map data 25 based on multiple GPS information 23, a construction data generation means 30b that generates construction data 27 by pasting item data 26 on the synthetic road surface image 40, an estimate data generation means 30c that generates estimate data 28 including an estimate amount based on the construction data 27, and a document creation means 30d that creates a construction plan based on the construction data 27 and the estimate data 28.

また、第二コンピュータ30の記憶手段30eには、生成された合成路面画像40や施工データ27などが、データベース化されて記憶される。本実施形態の第二コンピュータ30は、本発明の制御手段に相当している。 The generated synthetic road surface image 40 and construction data 27 are stored in a database in the storage means 30e of the second computer 30. The second computer 30 in this embodiment corresponds to the control means of the present invention.

入力装置31は、キーボードおよびマウスなどのポインティングデバイスにより構成されている。表示装置32は、液晶表示ディスプレイなどのモニタである。印刷装置33は、インクジェットプリンタまたはレーザープリンタにより構成されている。 The input device 31 is composed of a keyboard and a pointing device such as a mouse. The display device 32 is a monitor such as a liquid crystal display. The printing device 33 is composed of an inkjet printer or a laser printer.

次に、上記の支援システムを使用した道路標示の施工計画書を作成する支援方法について説明する。まず、道路標示を施工する予定の現場(以下では、単に施工現場と称する)における路面画像21およびGPS情報23などの取得について説明する。初めに、自動車10の屋根上に取付けられている収納ケース10bを開き、第一コンピュータ16を起動させる。その後、路面画像21などを撮影するためのプログラムを実行させると、第一コンピュータ16の表示部16bに、図3に示すような路面画像・GPS情報取得画面が表示される。この際に、当該画面内において、路面カメラ11の映像と、周辺カメラ12の映像とが表示される。そして、入力部16aを使用して施工現場名、記録者名、カメラ位置補正、を入力する。なお、路面RSから路面カメラ11までの高さH、路面カメラ11の画角α、なども入力できるようにしても良い。 Next, a method of supporting the creation of a road marking construction plan using the above support system will be described. First, the acquisition of road surface images 21 and GPS information 23 at the site where road markings are to be constructed (hereinafter simply referred to as the construction site) will be described. First, the storage case 10b attached to the roof of the automobile 10 is opened, and the first computer 16 is started. After that, when a program for photographing the road surface images 21 and the like is executed, a road surface image/GPS information acquisition screen as shown in FIG. 3 is displayed on the display unit 16b of the first computer 16. At this time, the image of the road surface camera 11 and the image of the surrounding camera 12 are displayed on the screen. Then, the input unit 16a is used to input the construction site name, the name of the recorder, and the camera position correction. It is also possible to input the height H from the road surface RS to the road surface camera 11, the angle of view α of the road surface camera 11, and the like.

ここで、カメラ位置補正は、GPSアンテナ13から路面カメラ11までの距離である。これは、取得したGPS情報23に含まれる位置情報は、GPSアンテナ13の位置であり、路面カメラ11の位置ではないため、路面カメラ11までの距離を入力することにより、GPS情報23の位置情報を路面カメラ11の位置に補正するようにしている。なお、路面カメラ11とGPSアンテナ13との位置が固定されているような場合は、カメラ位置補正の値が予め入力されているようにしても良い。 Here, the camera position correction is the distance from the GPS antenna 13 to the road camera 11. This is because the position information included in the acquired GPS information 23 is the position of the GPS antenna 13, not the position of the road camera 11, so by inputting the distance to the road camera 11, the position information of the GPS information 23 is corrected to the position of the road camera 11. Note that if the positions of the road camera 11 and the GPS antenna 13 are fixed, the camera position correction value may be input in advance.

本実施形態では、図示は省略するが、路面カメラ11により路面画像21を撮影する一定の時間間隔(第一時間)や、GPSユニット14によりGPS情報23を取得する一定の時間間隔(第二時間)を設定することが可能である。第一時間は、40ms~200msの範囲内とすることが望ましい。その理由は、第一時間が上記の範囲よりも短いと、路面画像21の枚数が相対的に多くなることで合成路面画像40のデータ容量が大きくなりすぎてしまうためであり、第一時間が上記の範囲よりも長いと、自動車10の走行速度によっては複数の路面画像21を合成する際に、隣接する路面画像21同士が重ならずに隙間が開いてしまい合成路面画像40が不完全なものとなるためである。 In this embodiment, although not shown in the figures, it is possible to set a fixed time interval (first time) for capturing road surface images 21 by the road surface camera 11 and a fixed time interval (second time) for acquiring GPS information 23 by the GPS unit 14. It is preferable that the first time is within the range of 40 ms to 200 ms. This is because if the first time is shorter than the above range, the number of road surface images 21 will be relatively large, resulting in an excessively large data capacity for the composite road surface image 40. If the first time is longer than the above range, depending on the traveling speed of the automobile 10, when multiple road surface images 21 are synthesized, adjacent road surface images 21 will not overlap each other, leaving gaps, resulting in an incomplete composite road surface image 40.

一方、第二時間は、200ms~500msの範囲内とすることが望ましい。その理由は、第二時間が上記の範囲よりも短いと、GPS情報23の精度誤差の影響により同じ位置情報が取得されてしまう恐れがあるためであり、第二時間が上記の範囲よりも長いと、道路Rのカーブなどの形状に対する再現性が低くなり、実際に近い形の合成路面画像40を生成することができなくなるためである。 On the other hand, it is desirable to set the second time within the range of 200 ms to 500 ms. This is because if the second time is shorter than the above range, there is a risk that the same position information will be acquired due to the influence of accuracy errors in the GPS information 23, and if the second time is longer than the above range, the reproducibility of the shape of the curves of the road R and other features will be reduced, making it impossible to generate a synthetic road surface image 40 that is close to the actual shape.

なお、本実施形態では、第一時間が100ms、第二時間が250ms、にそれぞれ予め設定されている。また、本実施形態では、周辺カメラ12により周辺画像22を撮影する間隔を、路面カメラ11と同じ第一時間の間隔としているが、路面カメラ11とは別にその撮影時間間隔を設定できるようにしても良い。 In this embodiment, the first time is preset to 100 ms, and the second time is preset to 250 ms. In this embodiment, the interval at which the peripheral camera 12 captures the peripheral image 22 is set to the same first time interval as the road surface camera 11, but the capture time interval may be set separately from the road surface camera 11.

施工現場名などを入力したら、GPS測位状態(測位ステータス)の部位において受信レベルが良好であることを確認した上で、「記録開始」ボタンをクリックして記録を開始させる。なお、「記録開始」ボタンをクリックすると、ボタンの表示が「記録停止」に切り替わる。そして、収納ケース10bを閉じて、自動車10を施工現場の道路R上を走行させる。この際に、施工現場よりも外側から施工現場を越えた位置まで自動車10を走行させる。 After inputting the name of the construction site, etc., confirm that the reception level is good at the location of the GPS positioning state (positioning status), then click the "Start recording" button to start recording. Note that when the "Start recording" button is clicked, the button display changes to "Stop recording". Then, close the storage case 10b, and drive the automobile 10 on the road R at the construction site. At this time, drive the automobile 10 from outside the construction site to a position beyond the construction site.

これにより、道路R上を移動しながら路面カメラ11により撮影された路面画像21と周辺カメラ12により撮影された周辺画像22とを記憶させることができると共に、GPSユニット14により取得されたGPS情報23を記憶させることができる。なお、道路Rの幅が路面カメラ11の画角αの範囲よりも広い場合は、自動車10を往復させたり、異なる車線を走行させたりする。 This allows the road surface image 21 captured by the road surface camera 11 and the surrounding image 22 captured by the surrounding camera 12 to be stored while moving on the road R, and also allows the GPS information 23 acquired by the GPS unit 14 to be stored. Note that if the width of the road R is wider than the range of the angle of view α of the road surface camera 11, the automobile 10 will travel back and forth or will travel in different lanes.

自動車10の走行が完了したら、収納ケース10bを開き、第一コンピュータ16の表示部16bに表示されている「記録停止」ボタンをクリックして、路面画像21などの記録を停止させる。これにより、第一コンピュータ16の記憶部16cには、施工現場名を名称とした施工現場フォルダ内に、記録された路面画像21、周辺画像22、およびGPS情報23が格納された状態となる。この施工現場フォルダ内には、設定された第一時間や第二時間、入力された記録者名やカメラ位置補正、なども格納される。その後、モバイルルーター15によりデータサーバ20に接続し、記録された路面画像21などを施工現場フォルダごと、通信ネットワークを介してデータサーバ20に送信して記憶させる。 When the automobile 10 has finished traveling, the storage case 10b is opened and the "Stop Recording" button displayed on the display unit 16b of the first computer 16 is clicked to stop recording the road surface images 21 and the like. As a result, the recorded road surface images 21, surrounding images 22, and GPS information 23 are stored in a construction site folder named after the construction site in the memory unit 16c of the first computer 16. The construction site folder also stores the set first and second times, the inputted name of the recorder, camera position correction, and the like. After that, the mobile router 15 connects to the data server 20, and the recorded road surface images 21 and the like are sent together with the construction site folder to the data server 20 via the communication network for storage.

続いて、画像合成手段30aによる合成路面画像40の生成について説明する。第二コンピュータ30において、施工計画書を作成するためのプログラムを実行させると、図5に示すような合成路面画像生成画面が表示装置32に表示され、合成範囲設定処理(図4を参照)が実行される。この合成範囲設定処理では、初めに、「施工現場フォルダ選択」と表記されている部位の右方の「選択」ボタンをクリックして、施工現場フォルダを選択する(ステップS101)。詳述すると、「選択」ボタンをクリックすると、データサーバ20に記憶されている施工現場フォルダの一覧が表示されるため、その一覧の中から所望の施工現場フォルダをクリックして選択する。 Next, the generation of the composite road surface image 40 by the image synthesis means 30a will be described. When a program for creating a construction plan is executed in the second computer 30, a composite road surface image generation screen as shown in FIG. 5 is displayed on the display device 32, and the synthesis range setting process (see FIG. 4) is executed. In this synthesis range setting process, first, the "Select" button to the right of the part labeled "Select construction site folder" is clicked to select the construction site folder (step S101). In more detail, when the "Select" button is clicked, a list of construction site folders stored in the data server 20 is displayed, and the desired construction site folder is selected from the list by clicking on it.

施工現場フォルダが選択されると、該当する施工現場フォルダをデータサーバ20から読み込んで記憶手段30eに記憶させると共に、施工現場周辺の地図データ25をデータサーバ20から抽出して記憶手段30eに記憶させる。以下では、記憶手段30eに記憶された施工現場フォルダのデータや地図データ25を使用して各種の処理が実行される。データサーバ20から抽出された地図データ25は、画面の中央部分に施工現場の地図として表示される(ステップS102)。この際に、施工現場名も表示される。また、施工現場フォルダに格納されている複数のGPS情報23により、自動車10が走行した軌跡が地図上に表示される(図5では破線で示している)。 When a construction site folder is selected, the corresponding construction site folder is read from the data server 20 and stored in the storage means 30e, and map data 25 of the surrounding area of the construction site is extracted from the data server 20 and stored in the storage means 30e. Various processes are executed below using the data of the construction site folder and the map data 25 stored in the storage means 30e. The map data 25 extracted from the data server 20 is displayed as a map of the construction site in the center of the screen (step S102). At this time, the name of the construction site is also displayed. In addition, the trajectory traveled by the automobile 10 is displayed on the map based on the multiple GPS information 23 stored in the construction site folder (shown by dashed lines in FIG. 5).

なお、ここで表示される施工現場周辺の地図データ25は、施工現場よりも広い範囲であり、例えば、施工現場フォルダに格納されている複数のGPS情報23を基に、緯度・経度それぞれの最小値と最大値に対して、所定の緯度・経度をプラスした範囲の地図データ25をデータサーバ20から抽出している。 The map data 25 around the construction site displayed here is for a wider area than the construction site itself. For example, based on multiple GPS information 23 stored in the construction site folder, map data 25 for a range obtained by adding a specified latitude and longitude to the minimum and maximum values of latitude and longitude is extracted from the data server 20.

この合成路面画像生成画面では、図示は省略するが、表示した地図の縮尺(スケール)が表示される他に、選択した施工現場フォルダに格納されている記録者名、第一時間、第二時間、なども表示される。また、合成路面画像生成画面では、画像の合成を行った者である合成者名、カメラ角度補正、などを入力することが可能である。 Although not shown in the figure, this composite road surface image generation screen displays the scale of the displayed map, as well as the name of the recorder, first time, second time, etc. stored in the selected construction site folder. In addition, the composite road surface image generation screen allows you to input the name of the person who synthesized the images, camera angle correction, etc.

ここで、カメラ角度補正とは、路面RSを撮影する路面カメラ11のレンズ方向と垂直方向との間の角度のことである。詳述すると、路面カメラ11のレンズ方向を下方へ垂直に向けることが望ましいが、その場合、撮影範囲に自動車10が入って路面RSの撮影範囲が狭くなることがあるため、路面RSが広く入るように路面カメラ11のレンズ方向を傾けて路面RSを撮影することとなる。このように傾けて撮影された路面画像21は、路面RSが歪んで写っているため、路面カメラ11を傾けた角度(カメラ角度補正)により路面画像21を矯正して使用する。 Here, camera angle correction refers to the angle between the lens direction of the road surface camera 11 that captures the road surface RS and the vertical direction. In more detail, it is desirable to point the lens direction of the road surface camera 11 vertically downward, but in that case, the capture range of the road surface RS may be narrowed when the automobile 10 enters the capture range, so the lens direction of the road surface camera 11 is tilted to capture the road surface RS so that a wide area of the road surface RS is captured. Since the road surface RS is distorted in the road surface image 21 captured in this tilted manner, the road surface image 21 is corrected by the angle at which the road surface camera 11 is tilted (camera angle correction) before use.

そして、複数の路面画像21を合成したい合成範囲(道路標示を施工する施工範囲)を、入力装置31としてのマウスを使用して矩形(図5において太線の枠で示す部位)で囲むことにより選択する(ステップS103)。なお、合成範囲の選択としては、矩形で囲む他に、始点をクリックした後に終点をクリックすることにより合成範囲を選択できるようにしても良い。 Then, the synthesis range (the construction range where road markings are to be constructed) in which multiple road surface images 21 are to be synthesized is selected by encircling it with a rectangle (the area indicated by the thick frame in FIG. 5) using the mouse as the input device 31 (step S103). Note that, in addition to encircling it with a rectangle, the synthesis range may also be selected by clicking the start point and then the end point.

合成範囲を選択すると、その範囲内に含まれている路面画像21のそれぞれの容量を積算して合成される合成路面画像40の容量が算出される(ステップS104)。そして、算出された容量が、所定値(例えば、1GB)をオーバーしているか否かを判定する(ステップS105)。容量が所定値をオーバーしている場合は(ステップS105においてYES)、その旨を表示すると共にマウスにより描かれた矩形状を消去し、ふたたび合成範囲を選択させる(ステップS103へ戻る)。一方、容量が所定値をオーバーしていない場合は(ステップS105においてNO)、「合成開始」ボタンをクリックするように促し、「合成開始」ボタンがクリック(押下)される(ステップS106)と、合成範囲設定処理が終了して次の画像合成処理が開始される。 Once the synthesis range is selected, the capacity of each road surface image 21 included within that range is added up to calculate the capacity of the synthesized road surface image 40 to be synthesized (step S104). Then, it is determined whether the calculated capacity exceeds a predetermined value (e.g., 1 GB) (step S105). If the capacity exceeds the predetermined value (YES in step S105), a message to that effect is displayed, the rectangle drawn with the mouse is erased, and the synthesis range is selected again (return to step S103). On the other hand, if the capacity does not exceed the predetermined value (NO in step S105), the user is prompted to click the "Start synthesis" button, and when the "Start synthesis" button is clicked (pressed) (step S106), the synthesis range setting process ends and the next image synthesis process begins.

画像合成処理は、図6に示すように、まず、設定された合成範囲内の複数のGPS情報23を取得する(ステップS201)。そして、取得した複数のGPS情報23の中から最も早い取得時間を有するGPS情報23(以下では、第一のGPS情報23と称する)を合成範囲間ループの開始点にセットする(ステップS202)。また、最も遅い取得時間を有するGPS情報23(以下では、第nのGPS情報23と称する。)を合成範囲間ループの終了点(ステップS210)にセットする。 As shown in FIG. 6, the image synthesis process first acquires multiple pieces of GPS information 23 within the set synthesis range (step S201). Then, the GPS information 23 with the earliest acquisition time among the acquired multiple pieces of GPS information 23 (hereinafter referred to as the first GPS information 23) is set as the start point of the synthesis range loop (step S202). Also, the GPS information 23 with the latest acquisition time (hereinafter referred to as the nth GPS information 23) is set as the end point of the synthesis range loop (step S210).

複数のGPS情報23は、図7(a)に示すように、時間軸に対して一定の第二時間の間隔で並んでいる。複数の路面画像21もまた、時間軸に対して一定の第一時間の間隔で並んでいる。本実施形態では、第一時間と第二時間とが異なっており、取得時間が隣接している二つのGPS情報23の間に、複数の路面画像21が存在している。 As shown in FIG. 7(a), the multiple GPS information 23 are arranged at regular second time intervals on the time axis. The multiple road surface images 21 are also arranged at regular first time intervals on the time axis. In this embodiment, the first time and the second time are different, and multiple road surface images 21 exist between two GPS information 23 that were acquired at adjacent times.

そして、次の合成範囲間ループ(ステップS203~ステップS210)では、まず、取得時間が隣接している二つのGPS情報23から、方位(進行方向の角度)、距離、速度を算出する(ステップS204)。詳述すると、例えば、第一のGPS情報23と、その次の取得時間を有する第二のGPS情報23との二つのGPS情報23のそれぞれの経緯度などから、基準方向に対する進行方向の角度β1を算出する。続いて、第一のGPS情報23と第二のGPS情報23のそれぞれの経緯度から、それらの間の距離を、例えばヒュベニの公式を使用して算出する。そして、算出された距離と、第一のGPS情報23と第二のGPS情報23との間の時間差とから、それらの間の平均移動速度v1を算出する(図7(b)を参照)。これにより、自動車10の移動軌跡が求められる。 In the next synthesis range loop (steps S203 to S210), the direction (angle of the traveling direction), distance, and speed are calculated from the two pieces of GPS information 23 that were acquired at adjacent times (step S204). In more detail, for example, the angle β1 of the traveling direction with respect to the reference direction is calculated from the longitude and latitude of the first GPS information 23 and the second GPS information 23 that was acquired the next time. Next, the distance between the first GPS information 23 and the second GPS information 23 is calculated from the longitude and latitude of the first GPS information 23 and the second GPS information 23, for example, using the Hubeny formula. Then, the average traveling speed v1 between them is calculated from the calculated distance and the time difference between the first GPS information 23 and the second GPS information 23 (see FIG. 7B). This allows the movement trajectory of the automobile 10 to be obtained.

なお、GPS情報23に含まれている測位ステータスが低い場合、モバイルルーター15による補助位置情報24を使用して、進行方向の角度や速度を算出するようにしても良い。 If the positioning status included in the GPS information 23 is low, the angle of the direction of travel and the speed may be calculated using auxiliary position information 24 from the mobile router 15.

次に、二つのGPS情報23の間の撮影時間に対応付けられた路面画像21を抽出し(ステップS205)、処理範囲間ループ(ステップS206~ステップS209)へ進む。本実施形態では、複数の路面画像21が抽出される。そして、抽出された複数の路面画像21の枚数が、処理範囲として処理範囲間ループの開始点(ステップS206)と終了点(ステップS209)にそれぞれセットされる。 Next, the road surface images 21 associated with the shooting times between the two GPS information 23 are extracted (step S205), and the process proceeds to the inter-processing range loop (steps S206 to S209). In this embodiment, multiple road surface images 21 are extracted. Then, the number of the multiple extracted road surface images 21 is set as the processing range at the start point (step S206) and end point (step S209) of the inter-processing range loop, respectively.

処理範囲間ループでは、抽出された路面画像21の撮影位置を上述したようにGPS情報23に基づいて一つずつ算出(ステップS207)した上で、算出した撮影位置を記憶手段30eに記憶(ステップS208)し、次の路面画像21に移る。具体的には、ステップS204において算出された方位および平均移動速度と、路面画像21に含まれている撮影時間と、から移動軌跡上における撮影位置を算出する。そして、方位(進行方向の角度)と撮影位置とを路面画像21と関連付けて画像編集データとして記憶手段30eに記憶する。これを、抽出された路面画像21の枚数分繰り返す。 In the processing range loop, the shooting position of the extracted road surface image 21 is calculated one by one based on the GPS information 23 as described above (step S207), and the calculated shooting position is stored in the storage means 30e (step S208), and the process moves to the next road surface image 21. Specifically, the shooting position on the movement trajectory is calculated from the direction and average movement speed calculated in step S204 and the shooting time included in the road surface image 21. Then, the direction (angle of the traveling direction) and the shooting position are associated with the road surface image 21 and stored in the storage means 30e as image editing data. This is repeated the number of times equal to the number of extracted road surface images 21.

処理範囲間ループが終了したら、次のGPS情報23を取得し、そのGPS情報23が合成範囲内であれば、上記の合成範囲間ループ内の処理を繰り返す(ステップS210)。具体的には、例えば、次のGPS情報23が第三のGPS情報23の場合、第二のGPS情報23と第三のGPS情報23とで、進行方向の角度β2と平均移動速度v2とを算出した上で、第二のGPS情報23と第三のGPS情報23との間の路面画像21に対する撮影位置を算出し、画像編集データを記憶させる。 When the processing range loop is completed, the next GPS information 23 is obtained, and if the GPS information 23 is within the synthesis range, the processing in the synthesis range loop is repeated (step S210). Specifically, for example, if the next GPS information 23 is the third GPS information 23, the angle β2 of the traveling direction and the average moving speed v2 are calculated between the second GPS information 23 and the third GPS information 23, and then the shooting position for the road surface image 21 between the second GPS information 23 and the third GPS information 23 is calculated, and the image editing data is stored.

そして、合成範囲間ループが終了したら、第二コンピュータ30の記憶手段30eまたはRAM(図示は省略)において複数の路面画像21を合成するための作業領域を確保する(ステップS211)。その後、画像貼り付けループ(ステップS212~ステップS215)として、終了点に合成範囲内の路面画像21の枚数をセットして画像貼り付けループを開始する。 When the synthesis range loop is completed, a working area for synthesizing multiple road surface images 21 is secured in the storage means 30e or RAM (not shown) of the second computer 30 (step S211). After that, as an image pasting loop (steps S212 to S215), the number of road surface images 21 within the synthesis range is set as the end point, and the image pasting loop is started.

画像貼り付けループでは、初めに1枚目の路面画像21を抽出(ステップS213)した上で、その路面画像21と関連付けられている画像編集データに基づいて、路面画像21を回転させると共に、作業領域の該当位置に貼り付ける(ステップS214)。これを、合成範囲内にある路面画像21の枚数分繰り返す(ステップS215)。 In the image pasting loop, the first road surface image 21 is extracted (step S213), and then the road surface image 21 is rotated and pasted at the corresponding position in the work area based on the image editing data associated with the road surface image 21 (step S214). This is repeated for the number of road surface images 21 within the synthesis range (step S215).

具体的には、図7(c)に示すように、例えば、第一のGPS情報23と第二のGPS情報23との間の1枚目から3枚目の路面画像21に対しては、対応しているそれぞれの画像編集データに含まれている方位(進行方向の角度)が、同じ角度β1であるため、それぞれの路面画像21を角度β1で回転させる。この際に、カメラ角度補正に入力された値(路面カメラ11を傾けた角度)により、路面画像21の歪を矯正するようにしても良い。そして、画像編集データに含まれている撮影位置により、路面画像21の中心を作業領域内の仮想座標上(仮想の移動軌跡上)の該当位置に移動させ、当該位置に路面画像21を貼り付ける。これを順番に繰り返すことにより、複数の路面画像21が並べられた状態となる。なお、図7(c)では、判り易くするために、並べられている路面画像21に対して交互に網掛けを施している。 Specifically, as shown in FIG. 7(c), for example, the first to third road surface images 21 between the first GPS information 23 and the second GPS information 23 have the same orientation (angle of the traveling direction) included in the corresponding image editing data, β1, so each road surface image 21 is rotated by angle β1. At this time, the distortion of the road surface image 21 may be corrected by the value input to the camera angle correction (the angle at which the road surface camera 11 is tilted). Then, the center of the road surface image 21 is moved to the corresponding position on the virtual coordinates (on the virtual movement trajectory) in the work area according to the shooting position included in the image editing data, and the road surface image 21 is pasted at that position. By repeating this in order, multiple road surface images 21 are arranged. Note that in FIG. 7(c), the arranged road surface images 21 are alternately shaded for ease of understanding.

画像貼り付けループが終了したら、作業領域に貼り付けられた複数の路面画像21を合成路面画像40として出力(ステップS216)し、その合成路面画像40を表示(ステップS217)して画像合成処理が終了する。合成された合成路面画像40は、施工現場フォルダに格納され、記憶手段30eやデータサーバ20に記憶される。 When the image pasting loop is completed, the multiple road surface images 21 pasted in the work area are output as a composite road surface image 40 (step S216), and the composite road surface image 40 is displayed (step S217), completing the image synthesis process. The synthesized composite road surface image 40 is stored in the construction site folder and stored in the storage means 30e or the data server 20.

なお、複数の路面画像21の合成中は、合成路面画像生成画面の下部に、画像合成処理の進捗状況がバー表示される。また、「合成開始」ボタンをクリックして画像合成処理が開始されると、その表示が「合成中止」の表示に切り替わり(図示は省略)、当該ボタンをクリックすると画像合成処理を中止することができる。 While multiple road surface images 21 are being synthesized, a progress bar showing the progress of the image synthesis process is displayed at the bottom of the synthetic road surface image generation screen. When the "Start synthesis" button is clicked to start the image synthesis process, the display changes to "Stop synthesis" (not shown), and the image synthesis process can be stopped by clicking this button.

続いて、施工データ生成手段30bによる施工データ27の生成について説明する。まず、図示しないメニューバーにおいて「道路標示作図・編集」を選択すると、図8(a)に示すような、施工データ27を生成するための三つの画面が表示装置32に表示される。三つの画面は、左からエディタツール画面、道路標示作図・編集画面、ナビゲーション画面である。まず、中央に表示されている道路標示作図・編集画面内の左上に表記されている「施工現場フォルダ選択」の横の「選択」ボタンをクリックして、施工データ27を生成する施工現場フォルダを選択する。 Next, the generation of construction data 27 by the construction data generating means 30b will be described. First, when "Road marking drawing/editing" is selected in the menu bar (not shown), three screens for generating construction data 27 are displayed on the display device 32 as shown in FIG. 8(a). The three screens are, from the left, an editor tool screen, a road marking drawing/editing screen, and a navigation screen. First, click the "Select" button next to "Select construction site folder" in the upper left corner of the road marking drawing/editing screen displayed in the center to select the construction site folder for generating construction data 27.

施工現場フォルダが選択されると、該当する施工現場フォルダと施工現場周辺の地図データ25とがデータサーバ20から読み込まれて、施工現場フォルダ内の合成路面画像40が道路標示作図・編集画面に表示される。読み込まれた施工現場フォルダと地図データ25は、記憶手段30eに記憶され、後述する「保存」ボタンがクリックされるまでは記憶手段30eに記憶されたデータが使用される。 When a construction site folder is selected, the corresponding construction site folder and map data 25 of the surrounding area of the construction site are read from the data server 20, and the composite road surface image 40 in the construction site folder is displayed on the road marking drawing and editing screen. The construction site folder and map data 25 that have been read are stored in the storage means 30e, and the data stored in the storage means 30e is used until the "Save" button described below is clicked.

なお、図示は省略するが、表示されている合成路面画像40は、所定のレイヤーに存在しており、合成路面画像40のレイヤーの後には地図データ25のレイヤーが存在している。従って、施工現場フォルダ内に合成路面画像40が存在していない場合には、地図データ25による地図が表示される。また、道路標示作図・編集画面では、合成路面画像40の表示/非表示を切り替えることが可能である。 Although not shown in the figure, the displayed composite road surface image 40 exists in a specified layer, and the layer of the map data 25 exists after the layer of the composite road surface image 40. Therefore, if the composite road surface image 40 does not exist in the construction site folder, a map based on the map data 25 is displayed. Also, on the road marking drawing/editing screen, it is possible to switch between displaying and hiding the composite road surface image 40.

この道路標示作図・編集画面では、表示されている合成路面画像40を任意に拡大・縮小して表示させることができると共に、拡大表示させた時の表示範囲を移動させることができる。例えば、合成路面画像40上にマウスポインタを移動させた状態で、マウスホイールを回転させることで合成路面画像40を拡大・縮小表示させ、クリックしたままマウスを移動させることで表示範囲を移動させるようにしても良い。 On this road marking drawing and editing screen, the displayed composite road surface image 40 can be enlarged or reduced as desired, and the display range when enlarged can be moved. For example, with the mouse pointer moved over the composite road surface image 40, the composite road surface image 40 can be enlarged or reduced by rotating the mouse wheel, and the display range can be moved by clicking and moving the mouse.

また、施工現場フォルダを選択すると、ナビゲーション画面のナビゲーションタブに、合成路面画像40が表示される。このナビゲーション画面は、ナビゲーション、周辺地図、周辺画像、の三つのタブを有しており、起動時はナビゲーションタブが表示される。ナビゲーションタブと周辺地図タブでは、施工現場の全体が表示され、道路標示作図・編集画面において拡大表示させると、その表示範囲を示す矩形の枠線が表示される。また、周辺画像タブでは、道路標示作図・編集画面に表示されている施工現場の道路上おいてマウスでクリックした部位に近い周辺画像22が表示される。 When the construction site folder is selected, a synthetic road surface image 40 is displayed in the navigation tab of the navigation screen. This navigation screen has three tabs: navigation, surrounding map, and surrounding image, and the navigation tab is displayed when the screen is started. The navigation tab and surrounding map tab display the entire construction site, and when the screen is enlarged on the road marking drawing/editing screen, a rectangular frame line indicating the display range is displayed. In addition, the surrounding image tab displays a surrounding image 22 close to the area clicked with the mouse on the road of the construction site displayed on the road marking drawing/editing screen.

そして、道路標示を合成路面画像40に貼り付けて施工データを生成する場合、貼り付けたい所望の道路標示をエディタツール画面から選択する。なお、エディタツール画面に所望の道路標示が表示されていない場合は、当該画面の下部に表示されている「前」ボタンまたは「次」ボタンをクリックすると、別の道路標示が表示される。また、エディタツール画面では、道路標示の一つである「ライン」(センターライン、路肩ライン)の色を選択することが可能である。 When generating construction data by pasting road markings onto the synthetic road surface image 40, the desired road marking to be pasted is selected from the editor tool screen. If the desired road marking is not displayed on the editor tool screen, another road marking will be displayed by clicking the "Previous" or "Next" button displayed at the bottom of the screen. Also, on the editor tool screen, it is possible to select the color of the "line" (center line, shoulder line), which is one of the road markings.

道路標示の貼り付けは、エディタツール画面に表示されている所望の道路標示を、マウスでクリックして選択する。次に、道路標示が「ライン」である場合、道路標示作図・編集画面に表示されている合成路面画像40上において、貼り付けたい位置の始点にマウスポインタを移動させて右クリックした後に、マウスポインタを終点に移動させて右クリックする。また、道路標示が「止まれ」の文字、進行可能な方向を示す矢印、横断歩道などである場合、これらの道路標示を表示させる基準位置にマウスポインタを位置させて右クリックする。なお、図示しない「曲線」のラジオボタンを押した状態にすると、マウスにより道路Rのカーブに合わせてベジェ曲線やスプライン曲線の通過点を指定することができ、道路Rのカーブに沿った曲線の「ライン」を貼り付けることも可能である。 To paste a road marking, the user clicks the mouse on the desired road marking displayed on the editor tool screen to select it. Next, if the road marking is a "line", the user moves the mouse pointer to the start point of the desired position on the composite road surface image 40 displayed on the road marking drawing/editing screen and right-clicks, and then moves the mouse pointer to the end point and right-clicks. If the road marking is a "STOP" character, an arrow indicating the direction of travel, a pedestrian crossing, or the like, the user positions the mouse pointer at the reference position where the road marking is to be displayed and right-clicks. If the "Curve" radio button (not shown) is pressed, the user can use the mouse to specify passing points for a Bezier curve or spline curve in accordance with the curve of road R, and it is also possible to paste a curved "line" that follows the curve of road R.

上記のように操作することで、表示されている合成路面画像40の縮尺に合わせた大きさの道路標示画像が、合成路面画像40よりも前のレイヤーに貼り付けられる。また、貼り付けられた道路標示画像の近傍には、道路標示の名称や長さなどが記載されたテキストボックスが表示される(図示は省略)。なお、道路標示画像をエディタツール画面から道路標示作図・編集画面へ、ドラッグ&ドロップにより貼り付けられるようにしても良い。 By performing the above operations, a road marking image with a size that matches the scale of the displayed composite road surface image 40 is pasted onto a layer before the composite road surface image 40. In addition, a text box containing the name and length of the road marking is displayed near the pasted road marking image (not shown). Note that the road marking image may be pasted onto the road marking drawing/editing screen by dragging and dropping from the editor tool screen.

そして、貼り付けられた道路標示画像は、その道路標示画像をクリックすることで、その向きや長さ、位置などを自由に変更したり、削除したりすることができる。道路標示画像が貼り付けられる合成路面画像40は、実際の施工現場の写真であると共に、上述したように自由に拡大縮小させることができるため、道路標示画像を所望の位置に正確に貼り付けることが可能である。例えば、合成路面画像40に既存の道路標示が写っている場合、その既存の道路標示を目安にすることで所望の位置に道路標示画像を容易に貼り付けることができる。 The orientation, length, position, etc. of the pasted road marking image can be freely changed or deleted by clicking on the road marking image. The composite road surface image 40 onto which the road marking image is pasted is a photograph of the actual construction site, and can be freely enlarged or reduced as described above, so it is possible to accurately paste the road marking image in the desired position. For example, if an existing road marking is shown in the composite road surface image 40, the road marking image can be easily pasted in the desired position by using the existing road marking as a guide.

なお、エディタツール画面の下部の「UNDO」ボタンをクリックすると、直前に貼り付けた道路標示画像が削除される。また、エディタツール画面の下部の「選択解除」ボタンをクリックすると、選択されている道路標示の選択が解除される。 Clicking the "UNDO" button at the bottom of the editor tool screen will delete the previously pasted road marking image. Clicking the "Deselect" button at the bottom of the editor tool screen will deselect the selected road marking.

このようにして、合成路面画像40上に道路標示画像を貼り付けることで、アイテムデータ26が合成路面画像40および地図データ25と関連付けられ、合成路面画像40上にアイテムデータ26が貼り付けられた施工データ27が生成される。そして、合成路面画像40上への道路標示画像の貼り付けが終了したら、道路標示作図・編集画面の「保存」ボタンをクリックすることで、施工データ27が該当する施工現場フォルダに格納されると共に、記憶手段30eやデータサーバ20に記憶される。 In this way, by pasting the road marking image onto the synthetic road surface image 40, the item data 26 is associated with the synthetic road surface image 40 and the map data 25, and construction data 27 is generated in which the item data 26 is pasted onto the synthetic road surface image 40. Then, once the road marking image has been pasted onto the synthetic road surface image 40, the construction data 27 is stored in the corresponding construction site folder by clicking the "Save" button on the road marking drawing/editing screen, and is also stored in the storage means 30e and the data server 20.

なお、道路標示作図・編集画面では、道路標示画像が、合成路面画像40とは異なるレイヤーに貼り付けられているため、合成路面画像40を非表示にすると、地図データ25の地図上に道路標示画像が表示された状態となり、施工現場の図面として使用することが可能となる。 In addition, on the road marking drawing/editing screen, the road marking image is pasted on a different layer from the composite road surface image 40. Therefore, when the composite road surface image 40 is hidden, the road marking image is displayed on the map of the map data 25, and can be used as a drawing of the construction site.

続いて、見積データ生成手段30cによる見積データ28の生成について説明する。図示は省略するが、メニューバーにおいて「見積作成」を選択すると、施工現場フォルダを選択するための画面が表示装置32に表示されるため、見積を作成したい施工現場フォルダを選択する。この際に、施工現場フォルダ内に施工データ27があれば、データサーバ20から該当する施工データ27を抽出する。一方、選択した施工現場フォルダ内に施工データ27がなければ、その旨を表示して施工データ27の生成を促す。 Next, the generation of estimate data 28 by the estimate data generation means 30c will be described. Although not shown in the figure, when "Create estimate" is selected from the menu bar, a screen for selecting a construction site folder is displayed on the display device 32, and the construction site folder for which an estimate is to be created is selected. At this time, if there is construction data 27 in the construction site folder, the corresponding construction data 27 is extracted from the data server 20. On the other hand, if there is no construction data 27 in the selected construction site folder, a message to that effect is displayed, and the user is prompted to generate the construction data 27.

抽出された施工データ27に含まれているアイテムデータ26から、道路標示の名称ごとに長さ(数量)を算出した上で、単価に基づいて金額を算出し、更に、小計、諸費税、合計、のような見積金額を算出する。道路標示の長さの算出は、例えば、直線であれば、始点と終点を特定して算出し、曲線であれば、その曲線を通るベジェ曲線やスプライン曲線の長さを算出する数式(プログラム内やデータベース20に記憶されている)に基づいて算出したり、曲線を短い直線が連なっているものとして算出したりする。これにより、見積データ28が生成される。そして、生成された見積データ28を、施工現場フォルダに格納すると共に、データサーバ20に記憶させる。なお、見積データ28を生成する際に、見積書の提出先や工事名などを入力できるようにしても良い。 The length (quantity) of each road marking is calculated from the item data 26 included in the extracted construction data 27, and then the amount is calculated based on the unit price. Furthermore, the estimated amount such as the subtotal, various expenses and taxes, and the total is calculated. For example, the length of the road marking is calculated by identifying the start point and end point if it is a straight line, and if it is a curved line, it is calculated based on a formula (stored in the program or in the database 20) that calculates the length of a Bezier curve or spline curve that passes through the curve, or the curve is calculated as if it is a series of short straight lines. In this way, the estimate data 28 is generated. The generated estimate data 28 is then stored in the construction site folder and in the data server 20. Note that when generating the estimate data 28, it may be possible to input the destination to which the estimate is to be submitted, the name of the work, and the like.

次に、書類作成手段30dによる書類データ29の生成について説明する。図示は省略するが、メニューバーにおいて「書類作成」を選択すると、施工現場フォルダを選択するための画面が表示装置32に表示されるため、施工計画書を作成したい施工現場フォルダを選択する。この際に、施工現場フォルダ内に施工データ27および見積データ28があれば、データサーバ20から該当する施工データ27および見積データ28を抽出する。一方、選択した施工現場フォルダ内に施工データ27や見積データ28がなければ、その旨を表示して施工データ27や見積データ28の生成を促す。なお、見積データ28のみがない場合は、施工データ27から見積データ28を算出するようにしても良い。 Next, the generation of document data 29 by document creation means 30d will be described. Although not shown, when "Document Creation" is selected from the menu bar, a screen for selecting a construction site folder is displayed on display device 32, and the construction site folder for which a construction plan is to be created is selected. At this time, if construction data 27 and estimate data 28 are present in the construction site folder, the corresponding construction data 27 and estimate data 28 are extracted from data server 20. On the other hand, if construction data 27 or estimate data 28 is not present in the selected construction site folder, a message to that effect is displayed, and the user is prompted to generate construction data 27 and estimate data 28. Note that if only estimate data 28 is not present, estimate data 28 may be calculated from construction data 27.

そして、抽出した施工データ27および見積データ28から施工計画書を作成する。具体的には、施工データ27に含まれている地図データ25およびアイテムデータ26から施工現場の図面を作成し、見積データ28から図9に示すような見積書を作成する。作成された施工現場の図面と見積書は、施工計画書に纏められてプレビュー画像として表示装置32に表示される。この際に、施工計画書に対して不足事項や注釈などを入力したり、当該施工現場の周辺画像22を挿入したりすることが可能である。そして、図示しない「保存」ボタンをクリックすると、作成された施工計画書が書類データ29として施工現場フォルダに格納された上で、データサーバ20に記憶される。 A construction plan is then created from the extracted construction data 27 and estimate data 28. Specifically, a drawing of the construction site is created from the map data 25 and item data 26 contained in the construction data 27, and an estimate as shown in FIG. 9 is created from the estimate data 28. The created drawing of the construction site and estimate are compiled into a construction plan and displayed as a preview image on the display device 32. At this time, it is possible to enter missing items and annotations into the construction plan, and to insert an image 22 of the surrounding area of the construction site. Then, when the "Save" button (not shown) is clicked, the created construction plan is stored as document data 29 in the construction site folder and then stored in the data server 20.

その後、作成された書類データ29を印刷装置33により印刷することで、施工計画書の作成が完了する。なお、本実施形態では、施工現場の図面、見積書、を別々に印刷することも可能である。 Then, the created document data 29 is printed by the printer 33, and the creation of the construction plan is completed. Note that in this embodiment, it is also possible to print the construction site drawings and the estimate separately.

このように、本実施形態によれば、道路標示の施工現場において、路面カメラ11とGPSユニット14とが設けられた自動車10を道路R上で移動させるだけで正確な道路の情報を取得することができるため、従来のように施工現場を測量する必要はなく、道路Rを通行している車両に注意して作業したり、車両の通行を規制したりする必要はない。従って、作業者の数や作業時間を低減させることが可能であると共に、道路Rの情報の取得に対する安全性を高めることが可能である。また、合成路面画像40に予め設定されたアイテムデータ26を貼り付けているため、施工現場の図面を簡単に短期間で作成することができる。 As described above, according to this embodiment, accurate road information can be obtained at a road marking construction site simply by moving an automobile 10 equipped with a road surface camera 11 and a GPS unit 14 along road R, so there is no need to survey the construction site as in the past, and there is no need to pay attention to vehicles passing along road R or to restrict vehicle traffic. This makes it possible to reduce the number of workers and work time, while also increasing safety in obtaining information about road R. In addition, because preset item data 26 is attached to the synthetic road surface image 40, drawings of the construction site can be easily created in a short period of time.

また、本実施形態によれば、施工データ27にはアイテムデータ26が含まれており、そのアイテムデータ26から、実際に施工する道路標示の種類、数、長さ、大きさ、などが判ると共に、アイテムデータ26には単価も含まれているため、施工データ27から施工にかかる見積データ28(見積金額)を容易に生成することができ、見積にかかる手間と時間を低減させることができる。このようなことから、道路標示の施工計画書を安全且つ短時間で作成することができる。 In addition, according to this embodiment, the construction data 27 includes item data 26, which indicates the type, number, length, size, etc. of the road markings to be actually constructed. Since the item data 26 also includes unit prices, estimate data 28 (estimated amount) for construction can be easily generated from the construction data 27, reducing the effort and time required for estimates. As a result, construction plans for road markings can be created safely and in a short time.

更に、本実施形態によれば、合成路面画像40が施工現場を撮影したものであるため、合成路面画像40を見ることで、施工現場の道路Rにおける路面や路肩などの詳細な状態を確認することが可能となる。これにより、施工の際の留意点などを検討することが可能となり、より詳細な施工計画書を作成することが可能となる。 Furthermore, according to this embodiment, since the synthetic road surface image 40 is an image of the construction site, by looking at the synthetic road surface image 40, it is possible to confirm the detailed condition of the road surface, road shoulders, etc. of the road R at the construction site. This makes it possible to consider points to note during construction, and to create a more detailed construction plan.

また、本実施形態によれば、隣接して取得された二つのGPS情報23の取得時間と、路面画像21の撮影時間とから、路面画像21の撮影位置を特定するようにしているため、GPS情報23の取得時間と路面画像21の撮影時間とが異なっている場合や、路面画像21の撮影時間間隔とGPS情報23の取得時間間隔とが異なっている場合、などでも対応することができる。また、二つのGPS情報23により算出された移動方向に応じて路面画像21を回転させるようにしているため、施工現場の道路Rがカーブしていても追従することができ、施工計画書の内容をより正確なものにすることが可能となる。 In addition, according to this embodiment, the photographing position of the road surface image 21 is identified from the acquisition time of two adjacent GPS information 23 and the photographing time of the road surface image 21, so it can handle cases where the acquisition time of the GPS information 23 and the photographing time of the road surface image 21 are different, or where the photographing time interval of the road surface image 21 and the acquisition time interval of the GPS information 23 are different. In addition, since the road surface image 21 is rotated according to the moving direction calculated by the two GPS information 23, it can be followed even if the road R at the construction site is curved, making it possible to make the contents of the construction plan more accurate.

以上、本発明について好適な実施形態を挙げて説明したが、本発明は上記の実施形態に限定されるものではなく、本発明の要旨を逸脱しない範囲において、種々の改良および設計の変更が可能である。 The present invention has been described above with reference to preferred embodiments, but the present invention is not limited to the above embodiments, and various improvements and design changes are possible without departing from the spirit of the present invention.

例えば、上記の実施形態では、路面カメラ11やGPSユニット14などを自動車10に設けたものを示したが、これに限定するものではなく、自動車に牽引される車両、自転車、自律走行するロボット装置、ヘリコプター型を含む無人飛行するドローン、などに設けても良い。 For example, in the above embodiment, the road surface camera 11, GPS unit 14, etc. are shown to be mounted on the automobile 10, but this is not limited thereto, and the road surface camera 11, GPS unit 14, etc. may be mounted on a vehicle towed by an automobile, a bicycle, an autonomous robotic device, an unmanned flying drone including a helicopter type, etc.

また、上記の実施形態では、交通用表示としての道路標示の施工計画書を作成するものを示したが、これに限定するものではなく、看板状の道路標識の施工計画書を作成するようにしても良い。例えば、路面画像21(合成路面画像40)は、路面RSを撮影することから、路面RSに加えて路肩の一部も写っているため、路面RSや路肩に設けられている道路標識の根元が写っており、合成路面画像40から道路標識の位置(座標)が判る。そして、その道路標識の位置に、道路標識のデータが追加されたアイテムデータ26の道路標識画像を貼り付けることにより、施工データ27を生成することができる。この際に、路面画像21と一緒に撮影された周辺画像22を利用することで、道路Rに設けられている道路標識の種類を判別できる。従って、道路標示の施工計画書の他に、道路標識の施工計画書や、道路標示および道路標識を含む交通用表示の施工計画書を容易に作成することができる。 In the above embodiment, a construction plan for road markings as traffic signs is created, but the present invention is not limited to this, and a construction plan for signboard-like road signs may be created. For example, the road surface image 21 (synthetic road surface image 40) captures the road surface RS and also captures a part of the road shoulder, so the road surface RS and the roots of the road signs installed on the road shoulder are captured, and the position (coordinates) of the road sign can be determined from the synthetic road surface image 40. Then, the construction data 27 can be generated by pasting the road sign image of the item data 26 to which the data of the road sign has been added at the position of the road sign. At this time, the type of road sign installed on the road R can be determined by using the surrounding image 22 captured together with the road surface image 21. Therefore, in addition to the construction plan for road markings, construction plans for road signs and construction plans for traffic signs including road markings and road signs can be easily created.

1 GPS衛星
10 自動車
11 路面カメラ
12 周辺カメラ
13 GPSアンテナ
14 GPSユニット
16 第一コンピュータ
20 データサーバ
21 路面画像
22 周辺画像
23 GPS情報
24 補助位置情報
25 地図データ
26 アイテムデータ
27 施工データ
28 見積データ
29 書類データ
30 第二コンピュータ
30a 画像合成手段
30b 施工データ生成手段
30c 見積データ生成手段
30d 書類データ生成手段
30e 記憶手段
31 入力装置
32 表示装置
33 印刷装置
40 合成路面画像
R 道路
RS 路面
REFERENCE SIGNS LIST 1 GPS satellite 10 Automobile 11 Road surface camera 12 Peripheral camera 13 GPS antenna 14 GPS unit 16 First computer 20 Data server 21 Road surface image 22 Peripheral image 23 GPS information 24 Auxiliary position information 25 Map data 26 Item data 27 Construction data 28 Estimate data 29 Document data 30 Second computer 30a Image synthesis means 30b Construction data generation means 30c Estimate data generation means 30d Document data generation means 30e Storage means 31 Input device 32 Display device 33 Printing device 40 Synthesized road surface image R Road RS Road surface

Claims (3)

道路標示および道路標識を含む交通用表示を施工する道路上または道路の上方を移動しながら一定の時間間隔ごとに路面を撮影して路面画像を取得する路面カメラと、
該路面カメラと一緒に移動し、GPS衛星からの信号を受信して一定の時間間隔ごとにGPS情報を取得するGPSユニットと、
取得した複数の前記路面画像と複数の前記GPS情報とから施工計画書を作成する制御手段と
を具備している施工計画書作成支援システムであり、
前記制御手段は、
取得された複数の前記GPS情報に基づいて、複数の前記路面画像を地図データ上に並べて合成路面画像を生成する画像合成手段と、
前記合成路面画像上に、予め設定されており単価を含む前記交通用表示のアイテムデータを貼り付けることにより、施工データを生成する施工データ生成手段と、
前記施工データに基づいて見積金額を含む見積データを生成する見積データ生成手段と、
前記施工データおよび前記見積データに基づいて施工計画書を作成する書類作成手段と
を備えていることを特徴とする施工計画書作成支援システム。
A road surface camera that captures images of a road surface at regular time intervals while moving on or above a road on which traffic signs including road markings and road signs are installed;
a GPS unit that moves together with the road surface camera and receives signals from GPS satellites to acquire GPS information at regular time intervals;
a control means for creating a construction plan from the acquired plurality of road surface images and the plurality of GPS information,
The control means
an image synthesis means for generating a synthetic road surface image by arranging the plurality of road surface images on map data based on the plurality of acquired GPS information;
a construction data generating means for generating construction data by pasting item data of the traffic signs, which is set in advance and includes a unit price, onto the synthetic road surface image;
An estimate data generating means for generating estimate data including an estimate amount based on the construction data;
A construction plan creation support system comprising: a document creation means for creating a construction plan based on the construction data and the estimate data.
前記路面画像は撮影時間に対応付けられていると共に、前記GPS情報は取得時間に対応付けられており、
前記画像合成手段は、
時系列順に並んでいる二つの前記GPS情報のそれぞれの前記取得時間を使用して移動方向と平均移動速度とを算出した上で、二つの前記取得時間の間の前記撮影時間を有する前記路面画像を前記移動方向に応じて回転させると共に、前記撮影時間と前記平均移動速度とにより前記路面画像の撮影位置を算出し、前記地図テータ上における前記撮影位置に回転させた前記路面画像を貼り付け、これを順次繰り返して前記合成路面画像を生成する
ことを特徴とする請求項1に記載の施工計画書作成支援システム。
The road surface image is associated with a photographing time, and the GPS information is associated with an acquisition time,
The image synthesis means includes:
The construction plan creation support system described in claim 1, characterized in that the movement direction and average movement speed are calculated using the acquisition times of each of the two GPS information items arranged in chronological order, the road surface image having the shooting time between the two acquisition times is rotated according to the movement direction, the shooting position of the road surface image is calculated using the shooting time and the average movement speed, the rotated road surface image is pasted onto the shooting position on the map data, and this is repeated sequentially to generate the synthetic road surface image.
道路標示および道路標識を含む交通用表示を施工する道路上または道路の上方を移動しながら一定の時間間隔ごとに路面を撮影して路面画像を取得する路面カメラと、
該路面カメラと一緒に移動し、GPS衛星からの信号を受信して一定の時間間隔ごとにGPS情報を取得するGPSユニットと、
取得した複数の前記路面画像と複数の前記GPS情報とから施工計画書を作成する制御手段と
を具備している施工計画書作成支援システムを使用する施工計画書作成支援方法であり、
前記制御手段は、
取得した複数の前記GPS情報に基づいて、複数の前記路面画像を地図データ上に並べて合成路面画像を生成した上で、
該合成路面画像上に、予め設定されており単価を含む前記交通用表示のアイテムデータを貼り付けることにより施工データを生成すると共に、
該施工データに基づいて見積金額を含む見積データを生成し、
前記施工データおよび前記見積データに基づいて施工計画書を作成する
ことを特徴とする施工計画書作成支援方法。
A road surface camera that captures images of a road surface at regular time intervals while moving on or above a road on which traffic signs including road markings and road signs are installed;
a GPS unit that moves together with the road surface camera and receives signals from GPS satellites to acquire GPS information at regular time intervals;
A construction plan creation support method using a construction plan creation support system including a control means for creating a construction plan from the acquired plurality of road surface images and the acquired plurality of GPS information,
The control means
Based on the acquired plurality of pieces of GPS information, the plurality of road surface images are arranged on map data to generate a synthetic road surface image,
generating construction data by pasting item data of the traffic sign, which is set in advance and includes a unit price , onto the synthetic road surface image;
generating estimate data including an estimated amount based on the construction data;
A construction plan creation support method, comprising creating a construction plan based on the construction data and the estimate data.
JP2021190036A 2021-11-24 2021-11-24 Construction plan creation support system and method thereof Active JP7616660B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021190036A JP7616660B2 (en) 2021-11-24 2021-11-24 Construction plan creation support system and method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021190036A JP7616660B2 (en) 2021-11-24 2021-11-24 Construction plan creation support system and method thereof

Publications (2)

Publication Number Publication Date
JP2023076976A JP2023076976A (en) 2023-06-05
JP7616660B2 true JP7616660B2 (en) 2025-01-17

Family

ID=86610164

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021190036A Active JP7616660B2 (en) 2021-11-24 2021-11-24 Construction plan creation support system and method thereof

Country Status (1)

Country Link
JP (1) JP7616660B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2025178802A (en) * 2024-05-27 2025-12-09 T.A.G株式会社 Road marking construction support device and road marking construction support method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003193439A (en) 2001-12-28 2003-07-09 Atomix Co Ltd Traffic safety facility management system
JP2005121050A (en) 2003-10-14 2005-05-12 Nippon Steel Corp Pipeline laying route video recording system
JP2014211710A (en) 2013-04-17 2014-11-13 株式会社Lixil Estimation support device, information processor and estimation support method
JP2017182612A (en) 2016-03-31 2017-10-05 倉敷紡績株式会社 Image placement method and computer program for image placement

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003193439A (en) 2001-12-28 2003-07-09 Atomix Co Ltd Traffic safety facility management system
JP2005121050A (en) 2003-10-14 2005-05-12 Nippon Steel Corp Pipeline laying route video recording system
JP2014211710A (en) 2013-04-17 2014-11-13 株式会社Lixil Estimation support device, information processor and estimation support method
JP2017182612A (en) 2016-03-31 2017-10-05 倉敷紡績株式会社 Image placement method and computer program for image placement

Also Published As

Publication number Publication date
JP2023076976A (en) 2023-06-05

Similar Documents

Publication Publication Date Title
Carrera-Hernández et al. Is UAV-SfM surveying ready to replace traditional surveying techniques?
US8351704B2 (en) Method of capturing linear features along a reference-line across a surface for use in a map database
US8315456B2 (en) Methods and apparatus for auditing signage
CN111540048A (en) Refined real scene three-dimensional modeling method based on air-ground fusion
CN101523157A (en) Method and apparatus for generating an orthorectified tile
CN106227843A (en) A kind of geological disaster field investigation information acquisition system and method
JP7616660B2 (en) Construction plan creation support system and method thereof
CN107291820B (en) A method of boundary pile information management based on panoramic image
JP4712202B2 (en) Survey drawing drawing system such as land parcel map
CN202057328U (en) Vehicle-mounted scale-free traffic accident scene quick surveying system based on binocular vision
Iheaturu et al. Combining Google Earth historical imagery and UAV photogrammetry for urban development analysis
JPH10281728A (en) Image data processor and image pickup unit
JP5814497B2 (en) Map / handwritten information input / utilization system, method and program thereof
Brown et al. High-resolution (centimetre-scale) GPS/GIS-based 3D mapping and spatial analysis of in situ fossils in two horned-dinosaur bonebeds in the Dinosaur Park Formation (Upper Cretaceous) at Dinosaur Provincial Park, Alberta, Canada
Reeder et al. Implementation manual—3D engineered models for highway construction: The Iowa experience
TW201229459A (en) Navigation method with increased accuracy
JP2001140257A (en) Development plan design support system and recording medium
CN113514037A (en) Rock mass outcrop measurement method based on portable drone photography screening
JP5467124B2 (en) A method for selecting where a moving object is stationary from a record of each sighting consisting of location and time, and a method for calibrating route planning parameters in a route planning system according to each sighting record
JP7667395B2 (en) Structure survey support system, structure survey support method and program
RU2616103C2 (en) Automated method of charting road traffic accident by using global positioning system and cameras
Rowe et al. A remote sensing strategy for measuring logging road system length from small-format aerial photography
Fellas et al. Comparing the methods of terrestrial laser scanning and photogrammetry for the geometric documentation of stone bridges through the case study of Tzelefos bridge
JP7280028B2 (en) Map image projection device and program
Reeder et al. 3D engineered models for highway construction: the Iowa experience.

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240201

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240924

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20241001

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20241115

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20241210

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20241223

R150 Certificate of patent or registration of utility model

Ref document number: 7616660

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150