Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7627311B2 - Power information management system and method - Google Patents
[go: Go Back, main page]

JP7627311B2 - Power information management system and method - Google Patents

Power information management system and method Download PDF

Info

Publication number
JP7627311B2
JP7627311B2 JP2023132066A JP2023132066A JP7627311B2 JP 7627311 B2 JP7627311 B2 JP 7627311B2 JP 2023132066 A JP2023132066 A JP 2023132066A JP 2023132066 A JP2023132066 A JP 2023132066A JP 7627311 B2 JP7627311 B2 JP 7627311B2
Authority
JP
Japan
Prior art keywords
power
renewable energy
electricity
equipment
received
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2023132066A
Other languages
Japanese (ja)
Other versions
JP2023138871A5 (en
JP2023138871A (en
Inventor
雅博 青木
広考 高橋
宏 高橋
真悟 吉村
博郎 小泉
杏奈 芝野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP2023132066A priority Critical patent/JP7627311B2/en
Publication of JP2023138871A publication Critical patent/JP2023138871A/en
Publication of JP2023138871A5 publication Critical patent/JP2023138871A5/en
Application granted granted Critical
Publication of JP7627311B2 publication Critical patent/JP7627311B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は電力情報管理システム及び方法に関し、例えば、電力システムに適用して好適なものである。 The present invention relates to a power information management system and method, and is suitable for application to, for example, a power system.

近年、環境問題解決のために再生可能エネルギーの重要度が高まっている。これに伴い、特定の企業の活動全体が消費するエネルギーを太陽光発電エネルギーや風力発電エネルギーなどの再生可能エネルギー由来のみで担うことで環境価値を社会に提供するという目標を掲げる活動(以下、これを環境活動と呼ぶ)が増えてきている(例えば、下記非特許文献1参照)。 In recent years, the importance of renewable energy in solving environmental problems has been growing. Accordingly, there has been an increase in activities (hereinafter referred to as environmental activities) that aim to provide environmental value to society by providing all the energy consumed by the entire activities of a particular company with renewable energy sources such as solar and wind power (for example, see Non-Patent Document 1 below).

また、このような環境活動の拡大に伴って、グリーン電力証書などの環境価値証書の取引も活発化しつつある。環境価値証書は、再生可能エネルギー由来の電力が電力そのものの価値に加えて二酸化炭素の排出を削減するという「環境価値」を有していると考え、この「環境価値」を電力と切り離して第三者機関の認証の上で取引できるようにした証書である。この環境価値証書を購入することにより、その環境価値証書と対応付けられた電力量の非再生可能エネルギーを再生可能エネルギー由来の電力として取り扱うことができる。 In addition, with the expansion of such environmental activities, trading of environmental value certificates such as green power certificates is also becoming more active. Environmental value certificates are certificates that recognize that electricity derived from renewable energy sources has "environmental value" in the form of reduced carbon dioxide emissions in addition to the value of the electricity itself, and allow this "environmental value" to be separated from the electricity and traded upon certification by a third-party organization. By purchasing this environmental value certificate, non-renewable energy with the amount of power associated with the environmental value certificate can be treated as electricity derived from renewable energy sources.

なお、上述の環境価値に関連して、特許文献1には、再生可能エネルギー発電のもつ環境に係る付加価値を正当に評価するシステムが開示されている。 In relation to the environmental value mentioned above, Patent Document 1 discloses a system that fairly evaluates the added environmental value of renewable energy power generation.

特開2012-38342号公報JP 2012-38342 A

“日本初再生可能エネルギー100%による世田谷線の運行を電気記念日の3月25日に開始”、[online]、2019年3月25日、東京急行電鉄株式会社、外2社、[2019年4月3日検索]、インターネット〈URL: https://www.tokyu.co.jp/image/news/pdf/20190325-1-1.pdf〉“Japan’s first 100% renewable energy Setagaya Line operation begins on Electricity Day, March 25th”, [online], March 25, 2019, Tokyu Corporation, and two other companies, [accessed April 3, 2019], Internet〈URL: https://www.tokyu.co.jp/image/news/pdf/20190325-1-1.pdf〉

ところで、企業活動全体を対象とすると、全体を支える再生可能エネルギーの購入に大きな資金が必要となる。つまり資金力がある大企業のみがそのような環境活動を実践することができるが、資金力のない中小企業などの他の構成員にはかかる環境活動を実践することが難しい。 However, if the entire business activity is targeted, a large amount of funding is required to purchase the renewable energy that supports the entire business. In other words, only large companies with financial resources can carry out such environmental activities, and it is difficult for other members, such as small and medium-sized enterprises that do not have the financial resources, to carry out such activities.

そこで、企業活動全体でなく、ある一部の企業活動において再生可能エネルギーのみを利用しているという環境価値の証明手段を提供できれば、大きな資金を必要とせずに環境活動を実践できるようになるため、環境活動を促進させることができるものと考えられる。 Therefore, if a method could be provided to prove the environmental value of using only renewable energy in a certain part of a company's activities, rather than in its entirety, it would be possible to practice environmental activities without requiring large amounts of capital, which would likely promote environmental activities.

本発明は以上の点を考慮してなされたもので、環境活動をより一層と促進させ得る電力情報管理システム及び方法を提案しようとするものである。 The present invention has been made in consideration of the above points, and aims to propose an electric power information management system and method that can further promote environmental activities.

かかる課題を解決するため本発明においては、再生可能エネルギー電力と非再生可能エネルギー電力とを含む設備の受電電力の情報を管理する管理装置と、表示装置と、を備えた電力情報管理システムであって、前記管理装置は、前記設備単位の前記対象期間における受電電力に占める再生可能エネルギー電力の割合を、前記設備と対応付けて前記表示装置に表示させる一方、前記設備の受電電力量と、当該受電電力量に含まれる前記再生可能エネルギー電力の電力量と、当該再生可能エネルギー電力の電力量のうち、環境価値証書の購入分に相当する再生可能エネルギー電力の電力量とを対応付けて受電履歴情報管理データベースで管理し、必要時に前記受電履歴情報管理データベースに格納された情報を表示するようにした。 In order to solve such problems, the present invention provides an electricity information management system comprising a management device that manages information on received electricity of equipment including renewable energy electricity and non-renewable energy electricity, and a display device, wherein the management device causes the display device to display the proportion of renewable energy electricity in the received electricity of the equipment unit during the target period in association with the equipment, while managing in an electricity reception history information management database the amount of received electricity of the equipment, the amount of renewable energy electricity included in the amount of received electricity, and the amount of renewable energy electricity equivalent to the amount of renewable energy electricity purchased for an environmental value certificate among the amount of renewable energy electricity in association with each other, and displays the information stored in the electricity reception history information management database when necessary .

また本発明においては、再生可能エネルギー電力と非再生可能エネルギー電力とを含む設備の受電電力の情報を管理する管理装置と、表示装置と、を備えた電力情報管理システムにより実行される電力情報管理方法であって、前記管理装置が、前記設備単位の対象期間における受電電力に占める再生可能エネルギー電力の割合を、前記設備と対応付けて前記表示装置に表示させる一方、前記設備の受電電力量と、当該受電電力量に含まれる前記再生可能エネルギー電力の電力量と、当該再生可能エネルギー電力の電力量のうち、環境価値証書の購入分に相当する再生可能エネルギー電力の電力量とを対応付けて受電履歴情報管理データベースで管理し、必要時に前記受電履歴情報管理データベースに格納された情報を表示するステップを設けるようにした。 In addition, the present invention provides an electric power information management method executed by an electric power information management system including a management device that manages information on received power of equipment including renewable energy power and non-renewable energy power, and a display device, in which the management device causes the display device to display the proportion of renewable energy power in the received power during a target period for the equipment unit in association with the equipment , while managing in an electric power reception history information management database the amount of received power of the equipment, the amount of renewable energy power included in the amount of received power, and the amount of renewable energy power equivalent to the amount of purchased environmental value certificates among the amount of renewable energy power, in association with each other, and displaying the information stored in the electric power reception history information management database when necessary .

本発明の電力由来管理装置及び方法によれば、環境活動を実践していることを積極的にアピールすることができ、対外的なイメージを向上させることができる。 The electricity-based management device and method of the present invention allow companies to proactively promote their environmental activities and improve their public image.

本発明によれば、環境活動をより一層と促進させ得る電力由来管理装置及び方法を実現できる。 The present invention makes it possible to realize an electricity-based management device and method that can further promote environmental activities.

本実施の形態による電力システムの全体構成を示すブロック図である。1 is a block diagram showing an overall configuration of a power system according to an embodiment of the present invention; 電力由来管理装置の構成例を示すブロック図である。FIG. 2 is a block diagram showing a configuration example of an electric power management device. 受電履歴情報管理データベースの構成例を示す図表である。11 is a diagram showing an example of the configuration of a power reception history information management database. 設定画面の構成例を示す図である。FIG. 13 is a diagram showing an example of the configuration of a setting screen. 電力由来管理処理の処理手順を示すフローチャートである。13 is a flowchart showing a processing procedure of an electric power-related management process. (A)及び(B)は、メッセージの表示例を示す図である。13A and 13B are diagrams showing examples of message display. 本実施の形態の電力由来管理装置による設備の受電電力における再生可能エネルギー電力割合のコントロールを、複数の列車の運行に適用する適用例の説明に供する概念図である。1 is a conceptual diagram for explaining an example of application of the control of the proportion of renewable energy electricity in the received electricity of equipment by the electricity-derived management device of this embodiment to the operation of multiple trains. FIG. 本実施の形態による電力由来管理装置による設備の受電電力における再生可能エネルギー電力割合のコントロールを、工場内の複数の生産ラインの運転に適用する適用例の説明に供する概念図である。FIG. 13 is a conceptual diagram for explaining an example of application of the control of the proportion of renewable energy electricity in the received electricity of equipment by the electricity-derived management device according to this embodiment to the operation of multiple production lines in a factory. 本実施の形態による電力由来管理装置による設備の受電電力における再生可能エネルギー電力割合のコントロールを、空港等に配置された複数の案内ロボットへの充電に適用する適用例の説明に供する概念図である。FIG. 13 is a conceptual diagram for explaining an example of application of the control of the proportion of renewable energy electricity in the received electricity of equipment by the electricity-derived management device according to this embodiment to charging multiple guide robots installed in an airport or the like. 本実施の形態による電力由来管理装置による設備の受電電力における再生可能エネルギー電力割合のコントロールを、ホテルの消費電力に適用する適用例の説明に供する概念図である。FIG. 11 is a conceptual diagram for explaining an example of application of the control of the proportion of renewable energy electricity in the received electricity of equipment by the electricity-derived management device according to this embodiment to the power consumption of a hotel. 本実施の形態による電力由来管理装置による設備の受電電力における再生可能エネルギー電力割合のコントロールを、オフィスビル等に設置された複数のエレベータ装置の運行に適用する適用例の説明に供する概念図である。FIG. 13 is a conceptual diagram for explaining an example of application of the control of the proportion of renewable energy electricity in the received electricity of equipment by the electricity-derived management device according to this embodiment to the operation of multiple elevator devices installed in an office building, etc.

以下図面について、本発明の一実施の形態を詳述する。 One embodiment of the present invention will be described in detail below with reference to the drawings.

(1)本実施の形態による電力システムの構成
図1において、1は全体として本実施の形態による電力システムを示す。この電力システム1は、1又は複数の再生可能エネルギー発電設備2、非再生可能エネルギー発電設備3及び需要家側システム4を備えて構成される。
(1) Configuration of the power system according to the present embodiment In Fig. 1, reference numeral 1 denotes the power system according to the present embodiment as a whole. This power system 1 is configured to include one or more renewable energy power generation facilities 2, non-renewable energy power generation facilities 3, and a consumer-side system 4.

各再生可能エネルギー発電設備2は、需要家側システム4の所有者である需要家と受給電契約を締結した発電事業者が所有する風力発電設備や太陽光発電設備などの再生可能エネルギーの発電設備であり、非再生可能エネルギー発電設備3は、火力発電所、水力発電所及び原子力発電所などの非再生可能エネルギーの発電設備である。これら再生可能エネルギー発電設備2及び非再生可能エネルギー発電設備3は、送電線などの電力ネットワーク5を介して需要家側システム4と接続されており、需要家側システム4に対して電力を供給する。 Each renewable energy power generation facility 2 is a renewable energy power generation facility such as a wind power generation facility or a solar power generation facility owned by a power generation company that has concluded a power supply contract with the consumer, who is the owner of the consumer-side system 4, and the non-renewable energy power generation facility 3 is a non-renewable energy power generation facility such as a thermal power plant, a hydroelectric power plant, and a nuclear power plant. These renewable energy power generation facilities 2 and non-renewable energy power generation facilities 3 are connected to the consumer-side system 4 via a power network 5 such as a power transmission line, and supply power to the consumer-side system 4.

なお以下においては、適宜、再生可能エネルギー発電設備2で発電された再生可能エネルギー由来の電力を再生可能エネルギー電力と呼び、非再生可能エネルギー発電設備3で発電された非再生可能エネルギー由来の電力を非再生可能エネルギー電力と呼ぶものとする。需要家側システム4には、これら再生可能エネルギー電力及び非再生可能エネルギー電力からなる電力が電力ネットワーク5を介して供給される。 In the following, electricity derived from renewable energy generated by the renewable energy power generation facility 2 will be referred to as renewable energy electricity, and electricity derived from non-renewable energy generated by the non-renewable energy power generation facility 3 will be referred to as non-renewable energy electricity, where appropriate. Electricity consisting of this renewable energy electricity and non-renewable energy electricity is supplied to the consumer system 4 via the power network 5.

需要家側システム4は、オフィスビルやホテル、空港、工場、鉄道事業者などの電力の需要家が保持するシステムである。本実施の形態の場合、需要家側システム4は、再生可能エネルギー発電設備6と、1又は複数の設備7と、電力由来管理装置8とを備える。 The consumer-side system 4 is a system maintained by electricity consumers such as office buildings, hotels, airports, factories, and railway operators. In this embodiment, the consumer-side system 4 includes a renewable energy power generation facility 6, one or more facilities 7, and an electricity-derived management device 8.

再生可能エネルギー発電設備6は、例えば、オフィスビル等の建物の側面若しくは屋上などに設置された太陽光発電パネルなどから構成され、発電した再生可能エネルギー電力を需要家側システム4内の送電線9を介して各設備7又は特定の設備7に送電する。また設備7は、それぞれビル内の個々の昇降機や個々のエスカレータ、及び若しくは、工場における個々の生産ライン、又は、個々の蓄電池(電気自動車などの電気を駆動源とする移動体に搭載された蓄電池を含む)などから構成され、送電線9を介して供給される電力を受電して稼動又は蓄電する。 The renewable energy power generation equipment 6 is composed of, for example, solar panels installed on the side or roof of a building such as an office building, and transmits the generated renewable energy power to each equipment 7 or to a specific equipment 7 via power transmission lines 9 in the consumer-side system 4. The equipment 7 is also composed of individual elevators and individual escalators in each building, and/or individual production lines in a factory, or individual storage batteries (including storage batteries mounted on mobile objects powered by electricity such as electric vehicles), and receives the power supplied via the power transmission lines 9 to operate or store the power.

電力由来管理装置8は、電力ネットワーク5上や、需要家側システム4内の随所に設置された各電力計10(10A~10D)からそれぞれ与えられる計測値と、予めユーザにより設備7ごとにそれぞれ設定されたその設備7の単位時間当たりの総受電電力における再生可能エネルギー電力が占める割合の目標値(以下、これを再生可能エネルギー割合目標値と呼ぶ)とに基づいて、需要家側システム4内の設備7ごとに、その設備7の受電電力における再生可能エネルギー電力が占める割合をコントロールする機能を有する。 The electricity-derived management device 8 has the function of controlling the proportion of renewable energy electricity in the power received by each piece of equipment 7 in the consumer-side system 4, based on the measurement values provided by each power meter 10 (10A-10D) installed on the power network 5 and at various locations in the consumer-side system 4, and the target value for the proportion of renewable energy electricity in the total power received per unit time for each piece of equipment 7 set in advance by the user for that piece of equipment 7 (hereinafter referred to as the renewable energy proportion target value).

実際上、電力由来管理装置8は、必要時に必要な再生可能エネルギー分の環境価値証書をネットワーク11を介して外部から購入することができる。 In practice, the electricity-derived management device 8 can purchase environmental value certificates for the amount of renewable energy required from outside via the network 11 when necessary.

また電力由来管理装置8には、各再生可能エネルギー発電設備2及び電力ネットワーク5間にそれぞれ設置された各第1の電力計10(10A)から、対応する再生可能エネルギー発電設備2から出力された再生可能エネルギー電力の計測値(電圧値及び又は電流値)がインターネットなどのネットワーク11を介してそれぞれ逐次与えられる。 The electricity-derived management device 8 is also sequentially provided with the measured values (voltage values and/or current values) of the renewable energy electricity output from the corresponding renewable energy power generation facility 2 from each first power meter 10 (10A) installed between each renewable energy power generation facility 2 and the power network 5 via a network 11 such as the Internet.

さらに需要家側システム4内には、電力ネットワーク5を介して本需要家側システム4に供給される電力の総電力量を計測する第2の電力計10(10B)と、本需要家側システム4内の再生可能エネルギー発電設備6から出力された再生可能エネルギー電力の電力量を計測する第3の電力計10(10C)と、各設備7にそれぞれ対応させて設けられ、対応する設備7が受電した電力量を計測する第4の電力計10(10D)となどが設けられており、これら第2~第4の電力計10(10B~10D)の計測値が電力由来管理装置8に逐次与えられる。 The customer-side system 4 further includes a second power meter 10 (10B) that measures the total amount of power supplied to the customer-side system 4 via the power network 5, a third power meter 10 (10C) that measures the amount of renewable energy power output from the renewable energy power generation equipment 6 in the customer-side system 4, and a fourth power meter 10 (10D) that corresponds to each equipment 7 and measures the amount of power received by the corresponding equipment 7. The measurement values of these second to fourth power meters 10 (10B to 10D) are sequentially provided to the electricity-derived management device 8.

加えて、本実施の形態の場合、ユーザは電力由来管理装置8に対して、図4について後述する設定画面30を用いて設備7ごとに、その設備7における上述の再生可能エネルギー割合目標値と、その再生可能エネルギー割合目標値を達成すべき時間帯となどをそれぞれ設定することができる。 In addition, in the case of this embodiment, the user can use the setting screen 30 described later in FIG. 4 to set, for each piece of equipment 7, the above-mentioned renewable energy ratio target value for that piece of equipment 7 and the time period during which that renewable energy ratio target value should be achieved, etc., in the electricity-derived management device 8.

そして電力由来管理装置8は、かかる第1~第4の電力計10(10A~10D)から与えられる計測値に基づいて、設備7ごとに、その設備7の受電電力に対して、電力系統から供給される電力に含まれる再生可能エネルギー電力と、購入した環境価値証書に相当する電力とを組み合わせて紐付けることにより、その設備7の受電電力における再生可能エネルギー電力が占める割合をそれぞれコントロールする。 The electricity-derived management device 8 then controls the proportion of renewable energy electricity in the power received by each piece of equipment 7 by linking the renewable energy electricity contained in the electricity supplied from the power grid with the electricity equivalent to the purchased environmental value certificate, based on the measurement values provided by the first to fourth power meters 10 (10A to 10D).

また電力由来管理装置8は、必要に応じて、環境価値証書の購入に加えて又は代えて、需要家側システム4内の再生可能エネルギー発電設備6に再生可能エネルギーを発電させたり、蓄電池から再生可能エネルギーを放電させることによって、設備7の受電電力における再生可能エネルギー電力が占める割合をそれぞれコントロールする。 In addition to or instead of purchasing an environmental value certificate, the electricity-derived management device 8 controls the proportion of renewable energy electricity in the electricity received by the equipment 7 by causing the renewable energy power generation equipment 6 in the consumer-side system 4 to generate renewable energy or discharging renewable energy from the storage battery, as necessary.

(2)電力由来管理装置の構成
図2は、電力由来管理装置8の構成例を示す。この図2に示すように、電力由来管理装置8は、CPU(Central Processing Unit)20、主記憶装置21、補助記憶装置22、ネットワークインタフェース23、入力装置24及び表示装置25を備える汎用のコンピュータ装置から構成される。
(2) Configuration of the Electric Power Management Device Fig. 2 shows a configuration example of the electric power management device 8. As shown in Fig. 2, the electric power management device 8 is configured from a general-purpose computer device including a CPU (Central Processing Unit) 20, a main memory device 21, an auxiliary memory device 22, a network interface 23, an input device 24, and a display device 25.

CPU20は、電力由来管理装置8全体の動作制御を司るプロセッサである。また主記憶装置21は、例えば半導体メモリなどから構成され、CPU20のワークメモリとして利用される。後述する電力由来管理プログラム26は、電力由来管理装置8の起動時や必要時に補助記憶装置22から主記憶装置21に読み出され、主記憶装置21において保持される。 The CPU 20 is a processor that controls the overall operation of the electricity-derived management device 8. The main memory device 21 is composed of, for example, a semiconductor memory, and is used as a work memory for the CPU 20. The electricity-derived management program 26, which will be described later, is read from the auxiliary memory device 22 to the main memory device 21 when the electricity-derived management device 8 is started up or when necessary, and is stored in the main memory device 21.

補助記憶装置22は、ハードディスク装置やSSD(Solid State Drive)又はフラッシュメモリなどの大容量の不揮発性の記憶装置から構成され、各種プログラムや各種データを長期間保持するために利用される。環境価値証書データベース27や受電履歴情報管理データベース28もこの補助記憶装置22に格納されて保持される。 The auxiliary storage device 22 is composed of a large-capacity non-volatile storage device such as a hard disk device, SSD (Solid State Drive) or flash memory, and is used to store various programs and data for long periods of time. The environmental value certificate database 27 and the electricity receiving history information management database 28 are also stored and maintained in this auxiliary storage device 22.

なお、環境価値証書データベース27は、電力由来管理装置8がネットワーク11を介して外部から購入した環境価値証書を管理及び保管するためのデータベースであり、受電履歴情報管理データベース28は、需要家側システム4内の各設備7の各時間帯における受電履歴の情報をエビデンスとして保管しておくためのデータベースである。環境価値証書データベース27や受電履歴情報管理データベース28に格納された情報は、必要時に表示装置25に表示させたり、図示しないプリンタにより印刷することができる。 The environmental value certificate database 27 is a database for managing and storing environmental value certificates purchased by the electricity-derived management device 8 from outside via the network 11, and the electricity receiving history information management database 28 is a database for storing information on the electricity receiving history for each time period of each facility 7 in the consumer-side system 4 as evidence. The information stored in the environmental value certificate database 27 and the electricity receiving history information management database 28 can be displayed on the display device 25 or printed out by a printer (not shown) when necessary.

ネットワークインタフェース23は、例えばNIC(Network Interface Card)などから構成され、電力由来管理装置8がネットワーク11を介して第1の電力計10(10A)や他の機器と通信を行う際のプロトコル制御を行う。 The network interface 23 is composed of, for example, a NIC (Network Interface Card) and performs protocol control when the power-derived management device 8 communicates with the first power meter 10 (10A) and other devices via the network 11.

また入力装置24は、キーボードやマウスなどから構成され、ユーザが各種設定等を電力由来管理装置8に入力する際に利用される。さらに表示装置25は、液晶ディスプレイや有機EL(Electro-Luminescence)ディスプレイなどから構成され、後述する設定画面30(図4)などの各種画面や必要な情報を表示するために利用される。 The input device 24 is composed of a keyboard, a mouse, etc., and is used when the user inputs various settings, etc., to the electricity-derived management device 8. The display device 25 is composed of a liquid crystal display, an organic EL (Electro-Luminescence) display, etc., and is used to display various screens such as the setting screen 30 (FIG. 4) described later and necessary information.

なお受電履歴情報管理データベース28の構成例を図3に示す。この図3に示すように、受電履歴情報管理データベース28は、時間帯欄28A、設備ID欄28B、受電電力量欄28C、再生可能エネルギー電力量欄28D及び環境価値証書の購入に相当する再生可能エネルギー電力量欄28Eを備えたテーブル構造を有する。受電履歴情報管理データベース28では、1つの行が1つの設備7の対応する時間帯における受電電力の履歴情報(以下、これを受電履歴情報と呼ぶ)に該当する。 An example of the configuration of the electricity receiving history information management database 28 is shown in FIG. 3. As shown in FIG. 3, the electricity receiving history information management database 28 has a table structure including a time period column 28A, a facility ID column 28B, a received electricity amount column 28C, a renewable energy electricity amount column 28D, and a renewable energy electricity amount column 28E corresponding to the purchase of an environmental value certificate. In the electricity receiving history information management database 28, one row corresponds to the history information of received electricity in the corresponding time period of one facility 7 (hereinafter, this is referred to as electricity receiving history information).

そして時間帯欄28Aには、その行の受電履歴情報を取得した時間帯が格納され、設備ID欄28Bにはその行の受電履歴情報の対象となる設備7の識別子(設備ID)が格納される。また受電電力量欄28Cには、対応する時間帯に対応する設備7が受電した単位時間当たりの電力量が格納され、再生可能エネルギー電力量欄28Dには、その電力量のうちの再生可能エネルギー電力の電力量が格納される。 The time period column 28A stores the time period during which the electricity receiving history information for that row was obtained, and the equipment ID column 28B stores the identifier (equipment ID) of the equipment 7 that is the subject of the electricity receiving history information for that row. The received electricity amount column 28C stores the amount of electricity per unit time received by the equipment 7 corresponding to the corresponding time period, and the renewable energy electricity amount column 28D stores the amount of renewable energy electricity out of that amount of electricity.

さらに環境価値証書の購入に相当する再生可能エネルギー電力量欄28Eには、再生可能エネルギー電力量欄28Dに格納された再生可能エネルギー電力の電力量のうち、環境価値証書の購入分に相当する再生可能エネルギー電力の電力量が格納される。 In addition, the renewable energy power amount column 28E corresponding to the purchase of an environmental value certificate stores the amount of renewable energy power stored in the renewable energy power amount column 28D that corresponds to the amount of renewable energy power purchased by the environmental value certificate.

(3)設定画面の構成
図4は、所定操作により電力由来管理装置8の表示装置25(図2)に表示させることができる上述の設定画面30の構成例を示す。この設定画面30は、需要家側システム4内の設備7ごとに、その設備7の単位時間当たりの総受電電力における再生可能エネルギー電力が占める割合などの各種要件を設定するための画面である。
(3) Configuration of the setting screen Fig. 4 shows an example of the configuration of the above-mentioned setting screen 30 that can be displayed by a predetermined operation on the display device 25 (Fig. 2) of the electricity-derived management device 8. This setting screen 30 is a screen for setting various requirements for each facility 7 in the consumer-side system 4, such as the proportion of renewable energy electricity in the total received electricity per unit time of the facility 7.

実際上、設定画面30には、対象設備ID指定欄31、対象時間帯指定欄32、目標再生可能エネルギー率指定欄33、系統電力再生可能エネルギー含有率登録欄34、複数の第1の優先度指定欄35、及び、複数の第2の優先度指定欄36と、設定ボタン37とが設けられている。 In practice, the setting screen 30 is provided with a target facility ID specification field 31, a target time period specification field 32, a target renewable energy rate specification field 33, a grid power renewable energy content registration field 34, multiple first priority specification fields 35, and multiple second priority specification fields 36, as well as a setting button 37.

そしてユーザは、入力装置24(図2)を操作して、これら対象設備ID指定欄31、対象時間帯指定欄32、目標再生可能エネルギー率指定欄33、系統電力再生可能エネルギー含有率登録欄34、第1の優先度指定欄35、及び、第2の優先度指定欄36に所望する数値をそれぞれ入力することにより、各設備7に対する各種要件の設定を行うことができる。 The user can then operate the input device 24 (Figure 2) to input desired values into the target equipment ID designation field 31, the target time period designation field 32, the target renewable energy rate designation field 33, the grid power renewable energy content registration field 34, the first priority designation field 35, and the second priority designation field 36, thereby setting various requirements for each piece of equipment 7.

具体的に、設定画面30では、対象設備ID指定欄31に所望する設備7の識別子(設備ID)を入力することにより、その設備(以下、これを指定設備と呼ぶ)7をそのとき設定しようとする各種要件の適用対象として指定することができる。 Specifically, on the setting screen 30, by inputting the identifier (equipment ID) of the desired equipment 7 in the target equipment ID specification field 31, the equipment (hereinafter referred to as the designated equipment) 7 can be specified as the target for the various requirements to be set at that time.

また設定画面30では、対象時間帯指定欄32に所望する時間帯を入力することにより、その時間帯(以下、これを指定時間帯と呼ぶ)を、電力由来管理装置4が指定設備7の受電電力における再生可能エネルギー電力が占める割合をコントロールする時間帯として指定することができる。 In addition, on the setting screen 30, by inputting a desired time period in the target time period specification field 32, that time period (hereinafter referred to as the specified time period) can be specified as the time period during which the electricity-derived management device 4 controls the proportion of renewable energy electricity in the received electricity of the specified equipment 7.

さらに設定画面30では、目標再生可能エネルギー率指定欄33に所望する数値を入力することにより、その数値を指定時間帯における指定設備7の再生可能エネルギー割合目標値として指定することができる。 Furthermore, on the setting screen 30, by inputting a desired numerical value into the target renewable energy rate specification field 33, the numerical value can be specified as the target renewable energy ratio value for the specified equipment 7 during the specified time period.

さらに設定画面30では、電力ネットワーク5(図1)を介して電力系統から本需要家側システム4に供給される電力に含まれる再生可能エネルギー電力の現在の割合を系統電力再生可能エネルギー含有率登録欄34に入力することにより、その割合を電力由来管理装置8に設定することができる。ただし、この割合が不明のときには、系統電力再生可能エネルギー含有率登録欄34を空欄にしておいてもよい。 Furthermore, on the setting screen 30, the current proportion of renewable energy power contained in the power supplied from the power grid to the consumer-side system 4 via the power network 5 (FIG. 1) can be input into the grid power renewable energy content registration field 34, and the proportion can be set in the power-derived management device 8. However, when this proportion is unknown, the grid power renewable energy content registration field 34 may be left blank.

さらに設定画面30では、各第1の優先度指定欄35に対してそれぞれ1から始まる連番のうちの互いに異なる数値をそれぞれ入力することにより、指定時間帯の指定設備7の単位時間当たりの総受電電力における再生可能エネルギーが占める割合が再生可能エネルギー割合目標値未満である場合に電力由来管理装置8が実行すべき処理(以下、これを割合増加処理と呼ぶ)として、これら第1の優先度指定欄35とそれぞれ対応付けられた割合増加処理を実施する順番(優先度)を指定することができる。 In addition, on the setting screen 30, by inputting different numbers from the serial numbers starting with 1 into each of the first priority specification fields 35, it is possible to specify the order (priority) of carrying out the proportion increase process associated with each of these first priority specification fields 35 as the process to be executed by the electricity-derived management device 8 when the proportion of renewable energy in the total received power per unit time of the specified equipment 7 in the specified time period is less than the renewable energy proportion target value (hereinafter, this is called the proportion increase process).

なお図4の例の場合、かかる割合増加処理として、必要な再生可能エネルギー電力分の環境価値証書を購入する処理(「環境価値証書の購入」)と、需要家側システム4内の再生可能エネルギー発電設備6(図1)の出力を増加させる処理(「自家設置再生エネ設備の出力を増加」)と、再生可能エネルギー電力を蓄電した蓄電池(設備7)から送電線9に放電するよう蓄電池を制御する処理(「蓄電池からの給電」)と、指定設備7の稼働率を下げるなどしてその指定設備7の受電電力を削減する処理(「受電電力を削減」)とが用意されている。 In the example of Figure 4, the rate increase process includes a process for purchasing environmental value certificates for the required amount of renewable energy electricity ("purchase environmental value certificate"); a process for increasing the output of the renewable energy power generation equipment 6 (Figure 1) in the consumer-side system 4 ("increase output of self-installed renewable energy equipment"); a process for controlling the storage battery (equipment 7) that stores renewable energy electricity so that it discharges to the transmission line 9 ("power supply from storage battery"); and a process for reducing the received power of the designated equipment 7 by, for example, lowering the operating rate of the designated equipment 7 ("reducing received power").

因みに、「蓄電池からの給電」という割合増加処理は、かかる蓄電池から出力された再生可能エネルギー電力がすべて指定設備7に供給されたとみなして数値的に指定設備7の単位時間当たりの総受電電力における再生可能エネルギー電力が占める割合を増加させるものであり、実際にかかる蓄電池から出力された再生可能エネルギー電力をすべて指定設備7に供給するものではない。ただし、実際にかかる蓄電池から指定設備7に直接再生可能エネルギー電力を供給するようにしてもよい。他の割合増加処理についても同様である。 Incidentally, the proportion increase process of "power supply from a storage battery" numerically increases the proportion of renewable energy power in the total power received per unit time of the designated equipment 7 by assuming that all renewable energy power output from the storage battery is supplied to the designated equipment 7, but does not actually supply all renewable energy power output from the storage battery to the designated equipment 7. However, it is also possible to supply renewable energy power directly from the storage battery to the designated equipment 7. The same applies to other proportion increase processes.

さらに設定画面30では、各第2の優先度指定欄36に対してそれぞれ1から始まる連番のうちの互いに異なる数値をそれぞれ入力することにより、指定時間帯の指定設備7の単位時間当たりの総受電電力における再生可能エネルギーが占める割合が再生可能エネルギー割合目標値以上となった場合に電力由来管理装置8が実行すべき処理(以下、これを割合低減処理と呼ぶ)として、これら各第2の優先度指定欄36とそれぞれ対応付けられた割合低減処理を実施する順番(優先度)を指定することができる。 In addition, on the setting screen 30, by inputting different numbers from a sequence number starting with 1 into each of the second priority specification fields 36, it is possible to specify the order (priority) of carrying out the proportion reduction process associated with each of these second priority specification fields 36 as the process to be executed by the electricity-derived management device 8 when the proportion of renewable energy in the total received power per unit time of the specified equipment 7 in the specified time period becomes equal to or exceeds the renewable energy proportion target value (hereinafter, this is referred to as the proportion reduction process).

なお図4の例の場合、かかる割合低減処理として、余剰分の再生可能エネルギー電力の環境価値証書を販売する処理(「環境価値証書の販売」)と、需要家側システム4内の再生可能エネルギー発電設備6(図1)の出力を低減させる処理(「自家設置再生エネ設備の出力を低減」)と、余剰分の再生可能エネルギー電力を他の設備7に振り分ける処理(「他の設備に振り分け」)と、指定設備7の稼働率を上げるなどしてその指定設備7の受電電力を増加する処理(「受電電力を削減」)と、何もしないこととが用意されている。 In the example of Figure 4, the rate reduction processes available include a process of selling environmental value certificates for the surplus renewable energy electricity ("sale of environmental value certificates"), a process of reducing the output of the renewable energy power generation equipment 6 (Figure 1) in the consumer-side system 4 ("reducing output of self-installed renewable energy equipment"), a process of allocating the surplus renewable energy electricity to other equipment 7 ("allocate to other equipment"), a process of increasing the power received by the designated equipment 7 by increasing the operating rate of the designated equipment 7 ("reducing received power"), and doing nothing.

因みに、「他の設備に振り分け」という割合低減処理は、余剰分の再生可能エネルギー電力を他の設備7に振り分けたとみなして数値的に指定設備7の単位時間当たりの総受電電力における再生可能エネルギー電力が占める割合を低減させるものであり、実際に指定設備7の受電電力に含まれる再生可能エネルギー電力を他の設備7に振り分けるものではない。ただし、例えば、再生可能エネルギー電力を蓄電した蓄電池から指定設備7に直接再生可能エネルギー電力が供給されている場合に、実際にその蓄電池から供給される再生可能エネルギー電力を他の設備7に振り分けるようにしてもよい。他の割合低減処理についても同様である。 Incidentally, the proportion reduction process of "allocating to other equipment" numerically reduces the proportion of renewable energy electricity in the total power received per unit time of the designated equipment 7 by regarding the surplus renewable energy electricity as having been allocated to the other equipment 7, and does not actually allocate the renewable energy electricity included in the power received by the designated equipment 7 to the other equipment 7. However, for example, in a case where renewable energy electricity is supplied directly to the designated equipment 7 from a storage battery that stores renewable energy electricity, the renewable energy electricity actually supplied from the storage battery may be allocated to the other equipment 7. The same applies to other proportion reduction processes.

そして設定画面30では、上述のようにして指定設備7や、指定時間帯及び再生可能エネルギー割合目標値などの各要件をそれぞれ指定した上で設定ボタン37をクリックすることにより、これらの内容をその指定設備7の単位時間当たりの総受電電力における再生可能エネルギー電力が占める割合を調整するための設定として電力由来管理装置8に登録することができる。 Then, on the setting screen 30, by specifying each of the requirements such as the designated equipment 7, the designated time period, and the target renewable energy ratio as described above, and then clicking the setting button 37, these details can be registered in the electricity-derived management device 8 as settings for adjusting the ratio of renewable energy electricity to the total received electricity per unit time of the designated equipment 7.

(4)電力由来管理処理
図5は、電力由来管理装置8のCPU20(図2)が主記憶装置21(図2)に格納された上述の電力由来管理プログラム26(図2)を実行することにより行われる一連の処理(以下、これを電力由来管理処理と呼ぶ)の流れを示す。CPU20は、この図5に示す処理手順に従って、需要家側システム4内の各設備7の総受給電力における再生可能エネルギー電力が占める割合をコントロールする。
(4) Electricity-derived management processing Fig. 5 shows the flow of a series of processes (hereinafter, this is called electricity-derived management processing) performed by the CPU 20 (Fig. 2) of the electricity-derived management device 8 executing the above-mentioned electricity-derived management program 26 (Fig. 2) stored in the main memory device 21 (Fig. 2). The CPU 20 controls the proportion of renewable energy electricity in the total received electricity of each facility 7 in the consumer-side system 4 according to the processing procedure shown in Fig. 5.

実際上、CPU20は、少なくとも1つの設備7について上述のように設定画面30を用いて再生可能エネルギー割合目標値などの各種要件が設定されるとこの図5に示す電力由来管理処理を開始し、まず、第1~第4の電力計10(10A~10D)からそれぞれ送信されてくる電力の計測値を取得する(S1)。 In practice, when various requirements such as the renewable energy ratio target value are set for at least one piece of equipment 7 using the setting screen 30 as described above, the CPU 20 starts the electricity-derived management process shown in FIG. 5, and first obtains the measured values of electricity transmitted from each of the first to fourth power meters 10 (10A to 10D) (S1).

続いて、CPU20は、需要家側システム4内の再生可能エネルギー割合目標値が設定されている設備7のうち、現在時刻が設定画面30(図4)で指定された適用対象の時間帯に含まれる設備7を1つ選択し(S2)、選択した設備(以下、これを選択設備と呼ぶ)7の単位時間当たりの総受電電力のうち、再生可能エネルギー電力が占める割合を算出する(S3)。 Next, the CPU 20 selects one of the facilities 7 in the consumer-side system 4 for which a renewable energy ratio target value is set, the facility 7 for which the current time falls within the applicable time period specified on the setting screen 30 (Figure 4) (S2), and calculates the proportion of renewable energy electricity in the total received electricity per unit time of the selected facility 7 (hereinafter referred to as the selected facility) (S3).

具体的に、CPU20は、需要家側システム4内の再生可能エネルギー発電設備6(図1)を稼動させていない状態の場合には、図4について上述した設定画面30の目標再生可能エネルギー率指定欄33(図4)に格納された数値をかかる割合として算出する。 Specifically, when the renewable energy power generation facility 6 (Fig. 1) in the consumer-side system 4 is not in operation, the CPU 20 calculates the ratio as the numerical value stored in the target renewable energy rate specification field 33 (Fig. 4) of the setting screen 30 described above with reference to Fig. 4.

またCPU20は、需要家側システム4内の再生可能エネルギー発電設備6を稼動させている場合には、第1の電力計10(10A)ごとの計測値と、第3の電力計10(10C)の計測値との合計値を、第2の電力計10(図10B)の計測値と、第3の電力計10(10C)の計測値との合計値で除算した商を100倍した値をかかる割合として算出する。 When the renewable energy power generation equipment 6 in the consumer-side system 4 is operating, the CPU 20 calculates the ratio by multiplying the quotient obtained by dividing the sum of the measurement value of each of the first power meters 10 (10A) and the measurement value of the third power meter 10 (10C) by the sum of the measurement value of the second power meter 10 (FIG. 10B) and the measurement value of the third power meter 10 (10C) by 100.

次いで、CPU20は、ステップS3で算出した割合が、選択設備7について設定されている再生可能エネルギー割合目標値以上であるか否かを判断する(S4)。そしてCPU20は、この判断で否定結果を得ると、選択設備7について設定画面30の各第1の優先度指定欄35で指定された最も優先度の高い割合増加処理を開始し(S5)、この後、ステップS4に戻る。 Next, the CPU 20 judges whether the ratio calculated in step S3 is equal to or greater than the renewable energy ratio target value set for the selected equipment 7 (S4). If the CPU 20 obtains a negative result in this judgment, it starts a ratio increase process for the highest priority specified in each first priority specification field 35 of the setting screen 30 for the selected equipment 7 (S5), and then returns to step S4.

そしてCPU20は、この後、ステップS5で実行する割合増加処理を、適宜、次に優先度が高い割合増加処理に順次切り替えながら、ステップS3で算出した割合が選択設備7について設定されている再生可能エネルギー割合目標値以上となるまで、ステップS3~ステップS5-ステップS3のループを繰り返す。 The CPU 20 then switches the percentage increase process executed in step S5 to the percentage increase process with the next highest priority as appropriate, and repeats the loop of steps S3 to S5 and S3 until the percentage calculated in step S3 is equal to or greater than the renewable energy percentage target value set for the selected equipment 7.

そしてCPU20は、やがて直前のステップS3で算出した割合が、選択設備7について設定されている再生可能エネルギー割合目標値以上となることによりステップS4で肯定結果を得ると、選択設備7に所定の制御信号を送信することにより、選択設備7を再生可能エネルギー割合目標値で稼動させている旨の表示をその選択設備7内の表示装置(図示せず)に表示させる(S6)。 When the CPU 20 eventually obtains a positive result in step S4 because the ratio calculated in the previous step S3 becomes equal to or greater than the renewable energy ratio target value set for the selected equipment 7, it transmits a predetermined control signal to the selected equipment 7, thereby causing a display device (not shown) within the selected equipment 7 to display a message indicating that the selected equipment 7 is being operated at the renewable energy ratio target value (S6).

例えば、選択設備7がエレベータ装置の場合、CPU20は、図6(A)に示すような、そのエレベータ装置が再生可能エネルギー割合目標値(図6(A)では「100%」)で運転させている旨のメッセージを乗りかご内の操作盤に設けられた表示装置に表示させる。またCPU20は、選択設備7が鉄道車両や電気自動車などである場合にも、同様のメッセージをその鉄道車両内やその電気自動車内の表示装置に表示させる。ただし、図6(B)に示すような選択設備7の単位時間当たりの受電電力に占める再生可能エネルギー電力の現在の割合を表示させるようにしてもよい。 For example, if the selected equipment 7 is an elevator device, the CPU 20 causes a display device provided on an operation panel in the elevator car to display a message indicating that the elevator device is operating at the renewable energy ratio target value ("100%" in FIG. 6(A)), as shown in FIG. 6(A). Also, if the selected equipment 7 is a railroad car or an electric vehicle, the CPU 20 causes a similar message to be displayed on a display device in the railroad car or the electric vehicle. However, it may also be configured to display the current proportion of renewable energy power in the received power per unit time of the selected equipment 7, as shown in FIG. 6(B).

続いて、CPU20は、直前のステップS3で算出した割合が選択設備7について設定されている再生可能エネルギー割合目標値又は再生可能エネルギー割合目標値よりも予め定められた数%だけ大きい値となるまで、その選択設備7について設定画面30の第2の優先度指定欄36で指定された最も優先度の高い割合低減処理から順番に、適宜、割合低減処理を切り替えながら順次実施する(S7)。 Then, the CPU 20 switches between the rate reduction processes as appropriate, starting with the rate reduction process with the highest priority specified in the second priority specification field 36 of the setting screen 30 for the selected equipment 7, until the rate calculated in the previous step S3 becomes the renewable energy rate target value set for the selected equipment 7 or a value that is a predetermined number of percent greater than the renewable energy rate target value (S7).

この後、CPU20は、ステップS1に戻り、これ以降、ステップS2で選択する設備を需要家側システム4内の再生可能エネルギー割合目標値が設定されている他の設備7にラウンドロビン方式で順次切り替えながらステップS1~ステップS7の処理を繰り返す。 Then, the CPU 20 returns to step S1, and thereafter repeats the processing of steps S1 to S7 while sequentially switching the facility selected in step S2 to another facility 7 in the consumer-side system 4 for which a renewable energy proportion target value has been set, in a round-robin manner.

このようにしてCPU20は、再生可能エネルギー割合目標値が設定された各設備7の受電電力における再生可能エネルギー電力が占める割合をコントロールする。 In this way, the CPU 20 controls the proportion of renewable energy power in the received power of each facility 7 for which a renewable energy proportion target value is set.

なお、CPU20は、この電力由来管理処理と並行して、設備7の受電電力における再生可能エネルギー電力が占める割合をコントロールしている時間帯におけるその設備7の受電履歴情報を、選択的にエビデンスとして受電履歴情報管理データベース28に記録する。 In parallel with this electricity-derived management process, the CPU 20 selectively records, as evidence, the electricity reception history information of the equipment 7 during the time period when the proportion of renewable energy electricity in the electricity received by the equipment 7 is being controlled in the electricity reception history information management database 28.

(5)本実施の形態の効果
以上の本実施の形態の電力システム1によれば、需要家側システム4内の設備7単位で、その設備7の受電電力における再生可能エネルギー電力が占める割合をコントロールでき、またその設備7の受電電力の一定割合が前記再生可能エネルギー由来であることをその設備7の受電履歴情報によって証明することができる。従って、企業活動全体でしか環境活動を実践できない既存の状況に比べて、環境活動の実践をより容易化かつ安価化することができ、かくして環境活動をより一層と促進させることができる。
(5) Effect of this embodiment According to the power system 1 of this embodiment described above, the proportion of renewable energy power in the power received by the facility 7 can be controlled for each facility 7 in the customer-side system 4, and it can be proven that a certain proportion of the power received by the facility 7 comes from the renewable energy by the power receiving history information of the facility 7. Therefore, compared to the existing situation where environmental activities can only be practiced through the entire business activities, it is possible to practice environmental activities more easily and at lower cost, and thus to further promote environmental activities.

また本電力システム1では、図6(A)や図6(B)のようなメッセージを設備単位で表示させることができるため、環境活動を実践していることを積極的にアピールすることができ、対外的なイメージを向上させることもできる。 In addition, with this power system 1, messages like those in Figures 6(A) and 6(B) can be displayed on a facility-by-facility basis, allowing the company to proactively promote the fact that it is implementing environmental activities and improve its external image.

(6)本実施の形態による技術の適用例
図7~図11は、上述した電力由来管理装置8が受電電力の再生可能エネルギー電力が占める割合をコントロールする技術の各種システムへの適用例を示す。
(6) Application Examples of the Technology According to the Present Embodiment FIGS. 7 to 11 show application examples of the technology in which the above-described electric power origin management device 8 controls the proportion of renewable energy electric power in the received electric power to various systems.

まず、図7は、鉄道システムにおける「設備」の1つである列車40を部分的に再生可能エネルギー電力100%で運行する場合の一例を示す。この例では、3つの列車40(40A~40C)が架線41を介して電力の供給を受けており、このうちのある電力供給エリアに位置する1つの列車40(40A)で受電(消費)されるすべての電力が再生可能エネルギー電力と紐付けられている。このように再生可能エネルギー電力を特定の列車40の受電電力(消費電力)に割り当てることによって、限られた再生可能エネルギー電力を利用して、再生可能エネルギー電力100%での列車40の運行をアピールすることができる。 First, FIG. 7 shows an example of a case where a train 40, which is one of the "facilities" in a railway system, is partially operated on 100% renewable energy power. In this example, three trains 40 (40A-40C) receive power via overhead lines 41, and all power received (consumed) by one of these trains 40 (40A) located in a certain power supply area is linked to renewable energy power. In this way, by allocating renewable energy power to the received power (power consumption) of a specific train 40, it is possible to utilize limited renewable energy power and promote the operation of train 40 on 100% renewable energy power.

また図8は、工場における「設備」の1つである生産ライン42を部分的に再生可能エネルギー電力100%で運転する場合の一例を示す。この例では、3つの生産ライン42(42A~42C)が電力の供給を受けており、このうちの1つの生産ライン42(42A)で受電(消費)されるすべての電力が再生可能エネルギー電力と紐付けられている。このように再生可能エネルギー電力を特定の生産ライン42の受電電力(消費電力)に割り当てることによって、限りある再生可能エネルギー電力を利用して、例えば、再生可能エネルギー電力100%で製造した製品であることを検収条件とする企業に対しても製品を出荷できるというメリットがある。 Figure 8 also shows an example of a case where a production line 42, which is one of the "equipment" in a factory, is partially operated using 100% renewable energy electricity. In this example, three production lines 42 (42A-42C) receive power, and all of the power received (consumed) by one of these production lines 42 (42A) is linked to renewable energy electricity. By allocating renewable energy electricity to the received power (power consumption) of a specific production line 42 in this way, there is an advantage in that limited renewable energy electricity can be used to ship products to companies that, for example, require that products be manufactured using 100% renewable energy electricity as an acceptance condition.

さらに図9は、例えば、空港などにおける「設備」の1つとして配設された道案内やその他の各種案内を行う充電型の複数の案内ロボット43を部分的に再生可能エネルギー電力100%で稼動する場合の一例を示す。この例では、3台の案内ロボット43(43A~43C)のうちのその移動エリア内の1台の案内ロボット43(43A)のすべての充電電力が再生可能エネルギー電力と紐付けられている。このように再生可能エネルギー電力を特定の案内ロボット43の充電電力に割り当てることによって、限りある再生可能エネルギー電力を利用して、訪日観光客に対して日本の環境意識が高く、また技術が進んでいることを積極的にアピールできるというメリットがある。 Furthermore, FIG. 9 shows an example of a case where multiple rechargeable guide robots 43 that are installed as one of the "facilities" in an airport or the like to provide route guidance and other types of guidance are partially operated on 100% renewable energy power. In this example, all of the charging power of one guide robot 43 (43A) within the movement area of three guide robots 43 (43A-43C) is linked to renewable energy power. By allocating renewable energy power to the charging power of a specific guide robot 43 in this way, there is the advantage that limited renewable energy power can be used to actively appeal to tourists visiting Japan about Japan's high environmental awareness and advanced technology.

一方、図10は、ホテル44の各フロア45(45A~45E)で消費される電力を部分的に再生可能エネルギー電力100%で賄う場合の一例を示す。この例では、ホテル44の一部のフロア45(45E)で消費されるすべての電力が再生可能エネルギー電力と紐付けられている。このように再生可能エネルギー電力を特定のフロア45で消費されるすべての電力に割り当てることにより、そのホテル44において環境活動を行っていることを対外的にアピールすることで集客効果を期待できると共に、宿泊者にとっても個人レベルで環境活動に参加できるというメリットがある。 On the other hand, FIG. 10 shows an example of a case where the electricity consumed on each floor 45 (45A-45E) of a hotel 44 is partially covered by 100% renewable energy electricity. In this example, all electricity consumed on one floor 45 (45E) of the hotel 44 is linked to renewable energy electricity. By allocating renewable energy electricity to all electricity consumed on a specific floor 45 in this way, the hotel 44 can publicize to the outside world that it is carrying out environmental activities, which is expected to attract more customers, and guests can also benefit from participating in environmental activities on an individual level.

また図11は、オフィスビルやホテル又は商業施設などの建物における「設備」の1つであるエレベータ装置46を部分的に再生可能エネルギー電力100%で運転する場合の一例を示す。この例では、3基設置されたエレベータ装置46(46A~46C)のうちの1つのエレベータ装置46(46A)で受電(消費)されるすべての電力が再生可能エネルギー電力と紐付けられている。このように再生可能エネルギー電力を特定のエレベータ装置46の受電電力(消費電力)に割り当てることによって、その建物を所有するオーナにとっては環境活動をしていることを対外的にアピールすることで集客効果を期待できると共に、個人レベルで環境活動に参加できるというメリットがある。なお、エレベータ装置46に代えて又は加えてエスカレータ装置についても同様に適用することができる。 Figure 11 also shows an example of a case where an elevator device 46, which is one of the "equipment" in a building such as an office building, hotel, or commercial facility, is partially operated with 100% renewable energy power. In this example, all the power received (consumed) by one elevator device 46 (46A) of the three elevator devices 46 (46A-46C) is linked to renewable energy power. By allocating renewable energy power to the power received (power consumption) of a specific elevator device 46 in this way, the owner of the building can expect to attract customers by publicly promoting his or her environmental activities, and has the advantage of being able to participate in environmental activities at an individual level. The same can be applied to escalator devices instead of or in addition to the elevator device 46.

(7)他の実施の形態
なお上述の実施の形態においては、需要家側システム4内の再生可能エネルギー発電設備6をビルや工場等の建物の側面若しくは屋上、又は、車両などに設置された太陽光発電パネルなどから構成するようにした場合について述べたが、本発明はこれに限らず、例えば、工場の敷地内に設置された風力発電施設や、かかる敷地外の他の場所に設けられたその需要家の太陽光発電ファーム又はウィンドファームなどの再生可能エネルギー発電設備を広く適用することができる。
(7) Other embodiments In the above-described embodiment, the renewable energy power generation equipment 6 in the customer-side system 4 is described as being configured from solar power generation panels installed on the side or roof of a building such as a building or a factory, or on a vehicle, etc. However, the present invention is not limited to this and can be widely applied to renewable energy power generation equipment such as a wind power generation facility installed on the premises of a factory, or a customer's solar power generation farm or wind farm installed in another location outside the premises.

また上述の実施の形態においては、設備7の一例が電気自動車である場合について述べたが、本発明はこれに限らず、設備7が電気自動車以外の電動バイクや移動型ロボットなどの電気を駆動原とする移動体である場合にも本発明を広く適用することができる。 In the above embodiment, an example of the equipment 7 is an electric vehicle, but the present invention is not limited to this, and the present invention can be widely applied to cases where the equipment 7 is a moving body that uses electricity as a driving source, such as an electric motorcycle or a mobile robot other than an electric vehicle.

さらに上述の実施の形態においては、設備7ごとに各割合増加処理や各割合低減処理の優先度をそれぞれ別個に設定できるようにした場合について述べたが、本発明はこれに限らず、全部又は一部の複数の設備7に対して各割合増加処理や各割合低減処理の優先度を一括して同様に設定できるようにしてもよい。 Furthermore, in the above embodiment, the priority of each rate increase process and each rate decrease process can be set separately for each piece of equipment 7, but the present invention is not limited to this, and the priority of each rate increase process and each rate decrease process can be set in the same way collectively for all or some of the pieces of equipment 7.

さらに上述の実施の形態においては、1つの需要家側システム4に対して1つの電力由来管理装置8を設けるようにした場合について述べたが、本発明はこれに限らず、1つの電力由来管理装置8により複数の需要家側システム4を制御できるようにしてもよい。 Furthermore, in the above-mentioned embodiment, a case has been described in which one electricity-based management device 8 is provided for one consumer-side system 4, but the present invention is not limited to this, and multiple consumer-side systems 4 may be controlled by one electricity-based management device 8.

さらに上述の実施の形態においては、割合増加処理や割合低減処理として図4について上述した種類の割合増加処理や割合低減処理を用意するようにした場合について述べたが、本発明はこれに限らず、この他種々の割合増加処理や割合低減処理を用意するようにしてもよい。 Furthermore, in the above-mentioned embodiment, the case where the types of percentage increase processing and percentage decrease processing described above in FIG. 4 are prepared as the percentage increase processing and percentage decrease processing are described, but the present invention is not limited to this, and various other types of percentage increase processing and percentage decrease processing may be prepared.

さらに上述の実施の形態においては、図4について上述した設定画面30において、対象設備ID指定欄31に所望する設備7の識別子(設備ID)を入力することにより、設備単位で受電電力における再生可能エネルギー電力が占める割合をコントロールできるようにした場合について述べたが、本発明はこれに限らず、例えば、設定画面30において複数の設備により構成されるエリア(鉄道の電力供給エリア、電気を駆動源とする移動体が移動するエリア、製造ラインを有する工場、ホテルのフロアなど)を指定することにより、そのエリア内における再生可能エネルギー電力が占める割合をコントロールできるようにしてもよい。このようにすることによって、エリア内にどのような設備があるかが不明の場合にも、エリア単位でそのエリア内の各設備の受電電力における再生可能エネルギー電力が占める割合をコントロールすることが可能となる。 Furthermore, in the above-mentioned embodiment, the proportion of renewable energy electricity in the received power can be controlled on a per-facility basis by inputting the identifier (facility ID) of the desired facility 7 in the target facility ID specification field 31 on the setting screen 30 described above with reference to FIG. 4. However, the present invention is not limited to this. For example, it is also possible to specify an area consisting of multiple facilities (a railway power supply area, an area where electrically powered mobile objects move, a factory with a production line, a hotel floor, etc.) on the setting screen 30, thereby making it possible to control the proportion of renewable energy electricity in the area. In this way, even when it is unknown what kind of facilities are present in an area, it is possible to control the proportion of renewable energy electricity in the received power of each facility in the area on an area-by-area basis.

さらに上述の実施の形態においては、図6(A)や図6(B)について上述したメッセージを、受電電力における再生可能エネルギー電力が占める割合をコントロールしている設備7に表示させるようにした場合について述べたが、本発明はこれに限らず、例えば、ビルの入口に表示させるなど、かかるメッセージを当該設備7以外の場所に表示させるようにしてもよい。 Furthermore, in the above-mentioned embodiment, the message described above with reference to Figures 6(A) and 6(B) is displayed on the equipment 7 that controls the proportion of renewable energy electricity in the received electricity, but the present invention is not limited to this, and such a message may be displayed in a location other than the equipment 7, such as at the entrance to a building, for example.

本発明は、電力系統から供給される電力に基づいて動作する設備を有する種々のシステムに広く適用することができる。 The present invention can be widely applied to various systems that have equipment that operates based on power supplied from a power grid.

1……電力システム、2,6……再生可能エネルギー発電設備、3……非再生可能エネルギー発電設備、4……需要家側システム、7……設備、8……電力管理装置、10,10A~10D……電力計、20……CPU、26……電力由来管理プログラム、30……設定画面。 1...Power system, 2, 6...Renewable energy power generation equipment, 3...Non-renewable energy power generation equipment, 4...Demand side system, 7...Equipment, 8...Power management device, 10, 10A-10D...Power meter, 20...CPU, 26...Electricity-derived management program, 30...Settings screen.

Claims (5)

再生可能エネルギー電力と非再生可能エネルギー電力とを含む設備の受電電力の情報を管理する管理装置と、表示装置と、を備えた電力情報管理システムであって、
前記管理装置は、
前記設備単位の前記対象期間における受電電力に占める再生可能エネルギー電力の割合を、前記設備と対応付けて前記表示装置に表示させる一方、
前記設備の受電電力量と、当該受電電力量に含まれる前記再生可能エネルギー電力の電力量と、当該再生可能エネルギー電力の電力量のうち、環境価値証書の購入分に相当する再生可能エネルギー電力の電力量とを対応付けて受電履歴情報管理データベースで管理し、必要時に前記受電履歴情報管理データベースに格納された情報を表示する
ことを特徴とする電力情報管理システム。
A power information management system including a management device that manages information on received power of a facility including renewable energy power and non-renewable energy power, and a display device,
The management device includes:
A ratio of renewable energy power in the received power for the target period for each facility is displayed on the display device in association with the facility ,
The amount of power received by the facility, the amount of power of the renewable energy power included in the amount of received power, and the amount of power of the renewable energy power that corresponds to the amount of purchased environmental value certificates among the amount of power of the renewable energy power are associated and managed in a power reception history information management database, and the information stored in the power reception history information management database is displayed when necessary.
A power information management system comprising:
環境価値証書を管理及び保管する環境価値証書データベースを備え、
前記環境価値証書データベースに格納された情報を前記表示装置に表示させる
ことを特徴とする請求項に記載の電力情報管理システム。
An environmental value certificate database is provided to manage and store environmental value certificates;
The electric power information management system according to claim 1, characterized in that the information stored in the environmental value certificate database is displayed on the display device.
前記管理装置は、
指定時間帯の前記設備の単位時間当たりの前記受電電力における前記再生可能エネルギー電力が占める割合が目標値未満である場合に、該再生可能エネルギー電力を蓄電した蓄電池からの放電を制御することで、前記設備の前記単位時間当たりの前記受電電力における前記再生可能エネルギー電力が占める割合を増加させる
ことを特徴とする請求項1又は2に記載の電力情報管理システム。
The management device includes:
The power information management system according to claim 1 or 2, characterized in that, when the proportion of the renewable energy power in the received power per unit time of the equipment during a specified time period is less than a target value, the proportion of the renewable energy power in the received power per unit time of the equipment is increased by controlling discharge from a storage battery that stores the renewable energy power.
前記管理装置は、
指定時間帯の前記設備の単位時間当たりの前記受電電力における前記再生可能エネルギー電力が占める割合が目標値以上の場合に、該再生可能エネルギー電力を蓄電した蓄電池から前記設備に前記再生可能エネルギー電力が供給されていれば、前記蓄電池から供給される前記再生可能エネルギー電力を他の設備に振り分けることで、前記設備の前記単位時間当たりの前記受電電力における前記再生可能エネルギー電力が占める割合を低減させる
ことを特徴とする請求項1又は2に記載の電力情報管理システム。
The management device includes:
The power information management system according to claim 1 or 2, characterized in that when a proportion of the renewable energy power in the received power per unit time of the equipment during a specified time period is equal to or greater than a target value, if the renewable energy power is supplied to the equipment from a storage battery that stores the renewable energy power, the renewable energy power supplied from the storage battery is allocated to other equipment, thereby reducing the proportion of the renewable energy power in the received power per unit time of the equipment.
再生可能エネルギー電力と非再生可能エネルギー電力とを含む設備の受電電力の情報を管理する管理装置と、表示装置と、を備えた電力情報管理システムにより実行される電力情報管理方法であって、
前記管理装置が、前記設備単位の対象期間における受電電力に占める再生可能エネルギー電力の割合を、前記設備と対応付けて前記表示装置に表示させる一方、前記設備の受電電力量と、当該受電電力量に含まれる前記再生可能エネルギー電力の電力量と、当該再生可能エネルギー電力の電力量のうち、環境価値証書の購入分に相当する再生可能エネルギー電力の電力量とを対応付けて受電履歴情報管理データベースで管理し、必要時に前記受電履歴情報管理データベースに格納された情報を表示するステップ
を備えることを特徴とする電力情報管理方法。
A power information management method executed by a power information management system including a management device that manages information on received power of a facility including renewable energy power and non-renewable energy power, and a display device,
a step of causing the management device to display on the display device the proportion of renewable energy electricity in the received electricity for the target period of the equipment unit in association with the equipment, while managing in an electricity receiving history information management database the amount of electricity received by the equipment, the amount of renewable energy electricity included in the amount of received electricity, and the amount of renewable energy electricity equivalent to the amount of renewable energy electricity purchased for an environmental value certificate among the amount of renewable energy electricity in association with each other, and displaying the information stored in the electricity receiving history information management database when necessary .
JP2023132066A 2019-04-05 2023-08-14 Power information management system and method Active JP7627311B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2023132066A JP7627311B2 (en) 2019-04-05 2023-08-14 Power information management system and method

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2019073173A JP7333191B2 (en) 2019-04-05 2019-04-05 Power-derived management device and method
JP2023132066A JP7627311B2 (en) 2019-04-05 2023-08-14 Power information management system and method

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP2019073173A Division JP7333191B2 (en) 2019-04-05 2019-04-05 Power-derived management device and method

Publications (3)

Publication Number Publication Date
JP2023138871A JP2023138871A (en) 2023-10-02
JP2023138871A5 JP2023138871A5 (en) 2024-03-27
JP7627311B2 true JP7627311B2 (en) 2025-02-05

Family

ID=72746096

Family Applications (2)

Application Number Title Priority Date Filing Date
JP2019073173A Active JP7333191B2 (en) 2019-04-05 2019-04-05 Power-derived management device and method
JP2023132066A Active JP7627311B2 (en) 2019-04-05 2023-08-14 Power information management system and method

Family Applications Before (1)

Application Number Title Priority Date Filing Date
JP2019073173A Active JP7333191B2 (en) 2019-04-05 2019-04-05 Power-derived management device and method

Country Status (1)

Country Link
JP (2) JP7333191B2 (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7740894B2 (en) * 2021-04-22 2025-09-17 株式会社日立製作所 Management system and management method
JP7075530B1 (en) 2021-06-30 2022-05-25 Jfe条鋼株式会社 Information processing method
JP7021388B1 (en) * 2021-08-17 2022-02-16 booost technologies株式会社 Decision-making devices, decision-making methods, and programs for building a carbon-free society
JP7718685B2 (en) * 2021-08-26 2025-08-05 国立大学法人 東京大学 Renewable energy consumption guarantee method, renewable energy trading support system and computer program
JP7678968B2 (en) * 2021-08-31 2025-05-19 マツダ株式会社 Grid computing management device and management method
JP7701256B2 (en) * 2021-12-14 2025-07-01 株式会社日立製作所 System and method for adjusting supply and demand of renewable energy among multiple consumers
JP7645790B2 (en) * 2021-12-28 2025-03-14 三菱電機株式会社 ENVIRONMENTAL VALUE MANAGEMENT DEVICE, ENVIRONMENTAL VALUE MANAGEMENT SYSTEM, ENVIRONMENTAL VALUE MANAGEMENT METHOD, AND PROGRAM
JP7085701B1 (en) * 2022-02-25 2022-06-16 Jfe条鋼株式会社 Information processing method
JP7174189B1 (en) 2022-02-25 2022-11-17 Jfe条鋼株式会社 Information processing method
JP7806600B2 (en) * 2022-04-14 2026-01-27 三菱電機株式会社 Introduction support system, introduction support method, and introduction support program for environmental load reduction measures
JPWO2024090365A1 (en) * 2022-10-26 2024-05-02

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011155756A (en) 2010-01-27 2011-08-11 Verifirm Co Ltd Power system, method of transmitting power, and power receiver
JP2011164700A (en) 2010-02-04 2011-08-25 Omron Corp Power demand/supply system, power supply control device, power receipt control device, green power supply control device, green power receipt control device, green power demand/supply certification device, power blending control device, green power demand/supply fare adjustment device, moving body, building, green power demand/supply system, green power transmission/reception method, green power demand/supply certification method, power blending method, fare adjustment method, and power blending program
JP2014160395A (en) 2013-02-20 2014-09-04 Daiwa House Industry Co Ltd Energy use state display system and energy use state display method

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010128525A (en) * 2008-11-25 2010-06-10 Sekisui Chem Co Ltd Distribution system for green power
JP2010213498A (en) * 2009-03-11 2010-09-24 Omron Corp Charge controller, method, and program
JP2012080664A (en) * 2010-09-30 2012-04-19 Toshiba Corp Consumer energy management system
JP5990897B2 (en) * 2011-11-25 2016-09-14 ソニー株式会社 Power control device, power transmission device, and power control system
US10817916B2 (en) * 2013-09-16 2020-10-27 Amazon Technologies, Inc. Client-selectable power source options for network-accessible service units
WO2016047180A1 (en) * 2014-09-25 2016-03-31 株式会社日立製作所 Social system and management device therefor
JP6750609B2 (en) * 2015-03-23 2020-09-02 日本電気株式会社 Power matching device and power matching program

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011155756A (en) 2010-01-27 2011-08-11 Verifirm Co Ltd Power system, method of transmitting power, and power receiver
JP2011164700A (en) 2010-02-04 2011-08-25 Omron Corp Power demand/supply system, power supply control device, power receipt control device, green power supply control device, green power receipt control device, green power demand/supply certification device, power blending control device, green power demand/supply fare adjustment device, moving body, building, green power demand/supply system, green power transmission/reception method, green power demand/supply certification method, power blending method, fare adjustment method, and power blending program
JP2014160395A (en) 2013-02-20 2014-09-04 Daiwa House Industry Co Ltd Energy use state display system and energy use state display method

Also Published As

Publication number Publication date
JP7333191B2 (en) 2023-08-24
JP2023138871A (en) 2023-10-02
JP2020170484A (en) 2020-10-15

Similar Documents

Publication Publication Date Title
JP7627311B2 (en) Power information management system and method
Xie et al. Optimal service pricing and charging scheduling of an electric vehicle sharing system
JP5577717B2 (en) How to manage power efficiently
Wu et al. GENCO's risk-based maintenance outage scheduling
Barhagh et al. Risk-involved participation of electric vehicle aggregator in energy markets with robust decision-making approach
Deng et al. A survey on demand response in smart grids: Mathematical models and approaches
Wang et al. Stochastic optimization for energy management in power systems with multiple microgrids
JP6114532B2 (en) Energy management system
Shi et al. Vehicle-to-grid service development logic and management formulation
Choi et al. A microgrid energy management system for inducing optimal demand response
US20120253532A1 (en) Systems and methods for forecasting electrical load
An et al. Sto2Auc: A stochastic optimal bidding strategy for microgrids
JP5568660B1 (en) Power saving support system, power saving support method, and power saving support program
Rahmani-Andebili et al. Price-controlled energy management of smart homes for maximizing profit of a GENCO
WO2011118607A1 (en) Power supply device, power storage device, and power control device
JP2012147546A (en) Electric power demand-supply adjusting reservation capacity trading system and electric power demand-supply adjusting reservation capacity trading method
CN111339689A (en) Building integrated energy scheduling method, system, storage medium and computer equipment
JP2013132105A (en) Power measurement device
JP2019054647A (en) Distributed power control apparatus, distributed power control system, and distributed power control method
Roccotelli et al. Smart district energy management with cooperative microgrids
CN111008723B (en) An optimization method for the design of distributed energy PEV charging stations
Wang et al. Day-ahead emission-aware resource planning for data center considering energy storage and batch workloads
KR101775269B1 (en) Management and exchange system for distributed generations and power amount allocation method thereof
Li et al. Decomposed modeling of controllable and uncontrollable components in power systems with high penetration of renewable energies
Celik et al. Analysis of demand response for datacenter energy management using GA and time-of-use prices

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20230814

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240318

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240529

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240604

A601 Written request for extension of time

Free format text: JAPANESE INTERMEDIATE CODE: A601

Effective date: 20240805

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240930

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20241029

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20241225

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20250121

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250124

R150 Certificate of patent or registration of utility model

Ref document number: 7627311

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150