Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7635985B2 - System and method for providing recommended application date, and system and method for providing predicted application publication date - Google Patents
[go: Go Back, main page]

JP7635985B2 - System and method for providing recommended application date, and system and method for providing predicted application publication date - Google Patents

System and method for providing recommended application date, and system and method for providing predicted application publication date Download PDF

Info

Publication number
JP7635985B2
JP7635985B2 JP2021121741A JP2021121741A JP7635985B2 JP 7635985 B2 JP7635985 B2 JP 7635985B2 JP 2021121741 A JP2021121741 A JP 2021121741A JP 2021121741 A JP2021121741 A JP 2021121741A JP 7635985 B2 JP7635985 B2 JP 7635985B2
Authority
JP
Japan
Prior art keywords
application
country
date
design
filing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021121741A
Other languages
Japanese (ja)
Other versions
JP2023017452A (en
Inventor
大 関
誠 佐藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NGB Corp
Original Assignee
NGB Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NGB Corp filed Critical NGB Corp
Priority to JP2021121741A priority Critical patent/JP7635985B2/en
Publication of JP2023017452A publication Critical patent/JP2023017452A/en
Application granted granted Critical
Publication of JP7635985B2 publication Critical patent/JP7635985B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、出願推奨日提供システムおよびその方法、ならびに、出願公開予測日提供システムおよびその方法に関する。 The present invention relates to a system and method for providing a recommended application date, and a system and method for providing a predicted application publication date.

特許文献1は、産業財産である意匠に関する意匠情報を表示する意匠情報表示装置を開示している。意匠情報表示装置は、意匠情報を記憶するデータベースから意匠情報を検索し、検索した意匠情報を表示部に表示する。さらに、意匠情報装置は、表示部に表示された意匠情報のうちユーザによって選択された意匠情報に関連する意匠情報をデータベースから検索し、検索した意匠情報を表示部に表示する。選択された意匠情報に関連する意匠情報は、例えば、選択された意匠に類似する意匠に関する情報である。 Patent Document 1 discloses a design information display device that displays design information related to designs that are industrial property. The design information display device searches for design information from a database that stores design information, and displays the searched design information on a display unit. Furthermore, the design information device searches the database for design information related to design information selected by a user from the design information displayed on the display unit, and displays the searched design information on the display unit. Design information related to the selected design information is, for example, information about a design similar to the selected design.

特開2015-64836号公報JP 2015-64836 A

ところで、意匠は物品の外観形状を図案化したものであることから、出願された意匠が意匠公報に掲載されることにより公開されると、出願人の将来の意匠の傾向を他人に知られ、またその意匠を転用したような意匠を作り出される恐れがある。 However, since a design is a representation of the external shape of an article, if a design application is made public by being published in the Design Gazette, the applicant's future design trends may become known to others, and there is a risk that others may create designs that are a misappropriation of that design.

本発明の目的は、より早い出願日を確保しつつ意匠に係る製品の公開前に当該意匠の出願が公開されるリスクを軽減することである。 The objective of this invention is to reduce the risk of a design application being published before the product to which the design relates is publicly disclosed while ensuring an earlier filing date.

上記の目的を達成するための一態様は、意匠の製品公開後に出願公開されるような前記意匠の出願推奨日を提供する出願推奨日提供システムであって、
各国における意匠出願の出願日から公開日までの所要日数を含むメインデータベースが記録された記憶部と、
少なくとも一つの意匠の前記出願推奨日を算出する制御部と、
を備えており、
前記制御部は、
前記意匠の製品公開予定日と前記意匠の出願予定国を取得する入力受付部と、
前記メインデータベースから前記出願予定国における前記所要日数を特定する所要日数特定部と、
前記意匠の製品公開予定日と前記所要日数に基づいて、前記出願予定国における前記意匠の出願推奨日を算出する出願推奨日算出部と、
を有する。
One aspect of the present invention for achieving the above object is a system for providing a recommended filing date for a design that is to be published after the product publication of the design, the system comprising:
a memory unit in which a main database including the number of days required from the filing date to the publication date of a design application in each country is recorded;
a control unit that calculates the recommended filing date for at least one design;
Equipped with
The control unit is
An input receiving unit for acquiring a planned product release date of the design and a planned country of application of the design;
a time required specification unit that specifies the time required in the country where the application is to be filed from the main database;
a recommended filing date calculation unit that calculates a recommended filing date for the design in the country where the application is planned based on the planned product release date of the design and the required number of days;
has.

上記の目的を達成するための一態様は、各国における意匠出願日から公開日までの所要日数を含むメインデータベースが記録された記憶部と、プロセッサと、前記プロセッサにより実行されるコンピュータ可読命令を記録する非一時的記録手段と、を用いて、意匠の製品公開後に出願公開されるような前記意匠の出願推奨日を提供する方法であって、前記方法は前記プロセッサに、
前記意匠の製品公開予定日と前記意匠の出願予定国を取得させ、
前記メインデータベースから前記出願予定国における前記所要日数を特定させ、
前記意匠の製品公開予定日と前記所要日数に基づいて、前記出願予定国における前記意匠の出願推奨日を算出させる。
One aspect of the present invention to achieve the above object is a method for providing a recommended filing date for a design to be published after a product publication of the design, using a storage unit in which a main database including the number of days required from the filing date to the publication date of the design in each country is recorded, a processor, and a non-transitory recording means for recording computer readable instructions executed by the processor, the method including:
Obtain the planned product release date of the design and the planned country of application for the design;
Identifying the number of days required in the country where the application is to be filed from the main database;
A recommended filing date for the design in the country where the application is planned is calculated based on the planned product release date of the design and the required number of days.

上記の目的を達成するための一態様は、出願公開予測日提供システムであって、
各国における意匠出願の出願日から公開日までの所要日数を含むメインデータベースが記録された記憶部と、
少なくとも一つの意匠の出願公開予測日を算出する制御部と、
を備えており、
前記制御部は、
前記意匠を最初に出願した第一出願国と、前記第一出願国の出願日と、前記第一出願国の出願後に前記意匠を出願する第二出願予定国と、前記第二出願予定国の出願予定日とを取得する入力受付部と、
前記メインデータベースから前記第一出願国と前記第二出願予定国の各々における前記所要日数を特定する所要日数特定部と、
前記第一出願国の出願日と前記第二出願予定国の出願予定日と前記所要日数とに基づいて、前記第一出願国の出願公開予測日および前記第二出願予定国の出願公開予測日を算出する出願公開予測日算出部と、
を有する。
One aspect of the present invention to achieve the above object is a system for providing predicted publication dates for applications, comprising:
a memory unit in which a main database including the number of days required from the filing date to the publication date of a design application in each country is recorded;
A control unit that calculates a predicted publication date of at least one design application;
It is equipped with
The control unit is
an input receiving unit for acquiring a first filing country where the design was first filed, a filing date of the first filing country, a second filing country where the design will be filed after the filing of the first filing country, and a planned filing date of the second filing country;
a required number of days specification unit that specifies the required number of days in each of the first filing country and the second planned filing country from the main database;
a predicted publication date calculation unit for calculating a predicted publication date of the first application country and a predicted publication date of the second application country based on the application date of the first application country, the planned application date of the second application country, and the required number of days;
has.

上記の目的を達成するための一態様は、各国における意匠出願日から公開日までの所要日数を含むメインデータベースが記録された記憶部と、プロセッサと、前記プロセッサにより実行されるコンピュータ可読命令を記録する非一時的記録手段と、を用いて、意匠の出願公開予測日を提供する方法であって、前記方法は、前記プロセッサに、
前記意匠を最初に出願した第一出願国と、前記第一出願国の出願日と、前記第一出願国の出願後に前記意匠を出願する第二出願予定国と、前記第二出願予定国の出願予定日とを取得させ、
前記メインデータベースから前記第一出願国と前記第二出願予定国の各々における前記所要日数を特定させ、
前記第一出願国の出願日と前記第二出願予定国の出願予定日と前記所要日数とに基づいて、前記第一出願国の出願公開予測日および前記第二出願予定国の出願公開予測日を算出させる、出願公開予測日提供方法。
One aspect of the present invention for achieving the above object is a method for providing a predicted publication date of a design application using a storage unit in which a main database including the number of days required from the application date to the publication date in each country of a design is recorded, a processor, and a non-transitory recording means for recording computer readable instructions executed by the processor, the method including:
Obtain the first filing country where the design was first filed, the filing date of the first filing country, the second filing country where the design will be filed after the first filing country, and the planned filing date of the second filing country;
Identifying the number of days required in each of the first filing country and the second filing country from the main database;
A method for providing a predicted application publication date, which calculates a predicted application publication date in the first application country and a predicted application publication date in the second planned application country based on the application date in the first application country, the planned application date in the second planned application country, and the required number of days.

本発明によれば、より早い出願日を確保しつつ意匠に係る製品の公開前に当該意匠の出願が公開されるリスクを軽減することができる。 The present invention allows for an earlier filing date while reducing the risk of a design application being published before the product to which the design relates is publicly disclosed.

出願推奨日提供システムのシステム構成図の一例を示している。1 shows an example of a system configuration diagram of a system for providing recommended filing dates. メインデータベースの一例を示している。2 shows an example of a main database. 出願推奨日提供システムの制御部が実行する処理のフローチャートの一例を示している。1 shows an example of a flowchart of a process executed by a control unit of the system for providing recommended filing dates. ユーザの端末の出力表示部の画面の一例を示している。2 shows an example of a screen of an output display unit of a user's terminal. ユーザの端末の出力表示部の画面の一例を示している。2 shows an example of a screen of an output display unit of a user's terminal. ユーザの端末の出力表示部の画面の一例を示している。2 shows an example of a screen of an output display unit of a user's terminal. 遅延データベースの一例を示している。1 illustrates an example of a delay database. ユーザの端末の出力表示部の画面の一例を示している。2 shows an example of a screen of an output display unit of a user's terminal. ユーザデータベースの一例を示している。2 shows an example of a user database. 出願公開予測日提供システムのシステム構成図の一例を示している。1 shows an example of a system configuration diagram of a system for providing predicted publication dates for applications. 出願公開予測日提供システムの制御部が実行する処理のフローチャートの一例を示している。1 shows an example of a flowchart of a process executed by a control unit of the system for providing predicted publication dates for applications. ユーザの端末の出力表示部の画面の一例を示している。2 shows an example of a screen of an output display unit of a user's terminal. ユーザの端末の出力表示部の画面の一例を示している。2 shows an example of a screen of an output display unit of a user's terminal. ユーザの端末の出力表示部の画面の一例を示している。2 shows an example of a screen of an output display unit of a user's terminal. ユーザ入力データの一例を示している。1 shows an example of user input data.

添付の図面を参照しつつ、実施形態の例について以下詳細に説明する。 Example embodiments are described in detail below with reference to the accompanying drawings.

(第一実施形態)
以下に、第一実施形態に係る出願推奨日提供システム10の構成について、図1~図9を参照して説明する。出願推奨日提供システム10は、意匠を日本国やそれ以外の国に出願する場合に、意匠に係る製品の公開後に出願公開されるような出願のタイミング(出願推奨日)を算出してユーザに提供するシステムである。図1に例示されるように、出願推奨日提供システム10は、ネットワーク20を介してユーザの端末30と通信可能に接続されている。
First Embodiment
The configuration of the recommended filing date providing system 10 according to the first embodiment will be described below with reference to Figures 1 to 9. The recommended filing date providing system 10 is a system that, when filing a design in Japan or other countries, calculates the timing of filing (recommended filing date) at which the application will be published after the product related to the design is made public, and provides the user with the timing. As illustrated in Figure 1, the recommended filing date providing system 10 is communicably connected to a user's terminal 30 via a network 20.

ユーザの端末30は、ユーザが所有する端末であってもよいし、ユーザがログインした自身が所有していない端末であってもよい。端末とは、パーソナルコンピュータでもよいし、タブレットや携帯電話であってもよい。ユーザの端末30は、入力装置31と出力装置32を備えている。入力装置31は、ユーザが端末30に情報を入力するための装置である。例えば、入力装置31は、マウスやキーボードなどを含む。端末30がタブレットや携帯電話である場合、入力装置31は、タッチパネルディスプレイやマイクなどを含む。出力装置32は、ユーザに対して何らかの情報を出力するための装置である。例えば、出力装置32は、画像情報を出力するためのモニタや音声情報を出力するためのスピーカなどを含む。 The user's terminal 30 may be a terminal owned by the user, or a terminal that the user does not own and into which the user logs in. The terminal may be a personal computer, a tablet, or a mobile phone. The user's terminal 30 has an input device 31 and an output device 32. The input device 31 is a device that allows the user to input information to the terminal 30. For example, the input device 31 includes a mouse and a keyboard. When the terminal 30 is a tablet or a mobile phone, the input device 31 includes a touch panel display and a microphone. The output device 32 is a device that outputs some information to the user. For example, the output device 32 includes a monitor for outputting image information and a speaker for outputting audio information.

図1に例示されるように、出願推奨日提供システム10は、記憶部11と制御部12を備えている。記憶部11には、メインデータベース111が記録されている。図2に例示されるように、メインデータベース111には、各国における意匠出願の出願日から公開日までの所要日数が記録されている。各国における所要日数は、各国における複数の過去の出願案件のデータをもとに算出されうる。所要日数は、日単位、月単位、または年単位で表される。出願日とは、意匠出願が行われる日にちである。公開日とは、意匠出願が最初に公開される日にちである。出願公開制度を有する国においては、公開日は公開意匠公報の発行日である。出願公開制度がない国においては、公開日は登録意匠公報の発行日である。本例においては、所要日数は意匠に係る物品毎に基づいて算出されており、意匠に係る物品毎の所有日数がメインデータベース111に記録されている。意匠に係る物品は、出願される意匠が施される物品であり、出願時に願書に記載される物品名でもよく、当該物品に対応する分類番号であってもよい。 As illustrated in FIG. 1, the recommended application date providing system 10 includes a memory unit 11 and a control unit 12. The memory unit 11 stores a main database 111. As illustrated in FIG. 2, the main database 111 stores the number of days required from the application date to the publication date of a design application in each country. The number of days required in each country can be calculated based on data on multiple past application cases in each country. The number of days required is expressed in days, months, or years. The application date is the date on which the design application is filed. The publication date is the date on which the design application is first published. In countries that have a publication application system, the publication date is the publication date of the published design gazette. In countries that do not have a publication application system, the publication date is the publication date of the registered design gazette. In this example, the number of days required is calculated based on each item related to the design, and the number of days of ownership for each item related to the design is recorded in the main database 111. The article to which the design is applied is the article to which the design being applied for is applied, and may be the name of the article stated in the application at the time of filing, or the classification number corresponding to the article.

制御部12は、意匠の出願推奨日を算出するように構成されている。制御部12は、入力受付部121、所要日数特定部122、出願推奨日算出部123、および出力部124を有している。 The control unit 12 is configured to calculate the recommended application filing date for a design. The control unit 12 has an input receiving unit 121, a required number of days specifying unit 122, a recommended application filing date calculation unit 123, and an output unit 124.

入力受付部121は、意匠の製品公開予定日と意匠の出願予定国の情報を取得する。意匠の製品公開予定日とは、出願する意匠に係る製品を宣伝あるいは販売などにより不特定の者に開示する予定日である。例えば、ユーザは、端末30の入力装置31を使用して意匠の製品公開予定日と意匠の出願予定国を指定する。入力受付部121は、ユーザの端末30からネットワーク20を介して意匠の製品公開予定日と意匠の出願予定国の情報を取得する。 The input reception unit 121 acquires information on the planned product release date of the design and the country in which the design is to be filed. The planned product release date of the design is the date on which the product related to the design being applied for is to be disclosed to unspecified persons through advertising or sales, etc. For example, the user specifies the planned product release date of the design and the country in which the design is to be filed using the input device 31 of the terminal 30. The input reception unit 121 acquires information on the planned product release date of the design and the country in which the design is to be filed from the user's terminal 30 via the network 20.

所要日数特定部122は、メインデータベース111を参照して、入力受付部121により取得された出願予定国における所要日数を特定する。 The number of days required determination unit 122 refers to the main database 111 to determine the number of days required in the country where the application is to be filed, which is obtained by the input reception unit 121.

出願推奨日算出部123は、入力受付部121により取得された意匠の製品公開予定日と所要日数特定部122により特定された所要日数に基づいて、出願予定国における意匠の出願推奨日を算出する。出願推奨日としては、意匠に係る製品の公開前に出願され、かつ、意匠に係る製品の公開後に出願公開されるような、出願日が算出される。具体的には、出願推奨日算出部123は、意匠の製品公開予定日から所要日数を差し引いた(所要日数だけ遡った)日にちを出願推奨日として算出する。出願推奨日の情報は、出力部124からユーザの端末30へ出力される。ユーザの端末30の出力装置32は、出願推奨日を例えば画像として表示する。 The recommended filing date calculation unit 123 calculates the recommended filing date of the design in the country where the application is to be filed, based on the planned product release date of the design acquired by the input acceptance unit 121 and the number of required days identified by the required days identification unit 122. The recommended filing date is calculated as a filing date that will be filed before the product related to the design is released and will be published after the product related to the design is released. Specifically, the recommended filing date calculation unit 123 calculates the date obtained by subtracting the number of required days from the planned product release date of the design (going back by the number of required days) as the recommended filing date. Information on the recommended filing date is output from the output unit 124 to the user's terminal 30. The output device 32 of the user's terminal 30 displays the recommended filing date, for example, as an image.

制御部12は、メモリと協働して動作するプロセッサにより実現されうる。プロセッサとしては、CPU、MPU、GPUが例示されうる。メモリとしては、RAM、ROMが例示されうる。プロセッサは、ROMに記憶されたコンピュータ可読命令の少なくとも一部を指定してRAM上に展開し、RAMと協働して所定の処理を実行することにより、入力受付部121、所要日数特定部122、出願推奨日算出部123などの各機能を実現する。ROMは、プロセッサによりコンピュータ可読命令を記録する非一時的記録手段の一例である。 The control unit 12 may be realized by a processor that operates in cooperation with a memory. Examples of the processor may include a CPU, an MPU, and a GPU. Examples of the memory may include a RAM and a ROM. The processor specifies at least a portion of the computer-readable instructions stored in the ROM, expands them on the RAM, and works in cooperation with the RAM to execute a specified process, thereby realizing each function of the input receiving unit 121, the required number of days determination unit 122, the recommended filing date calculation unit 123, and the like. The ROM is an example of a non-transitory recording means for recording computer-readable instructions by the processor.

図3を参照しつつ、上記のように構成された出願推奨日提供システム10の制御部12により実行される処理の流れの一例について説明する。 With reference to Figure 3, an example of the process flow executed by the control unit 12 of the recommended filing date providing system 10 configured as described above will be described.

まず、制御部12は、意匠の製品公開予定日と意匠の出願予定国の情報が取得されたかを判断する(STEP1)。これらの情報が取得されたと判断されるまで、本処理が繰り返される(STEP1においてNO)。図4は、ユーザの端末30の出力装置32に表示される画面Sの一例を示している。例えば、画面Sに含まれる入力画面ISは、第一入力領域I1、第二入力領域I2、および計算ボタンIBを有している。第一入力領域I1は、ユーザが製品公開予定日を入力するため領域である。第二入力領域I2は、ユーザが出願予定国を入力するための領域である。本例においては、第一入力領域I1と第二入力領域I2は、テキストフィールド入力領域を含んでいる。ユーザは、これらの領域にテキストで情報を入力することにより、意匠の製品公開予定日と出願予定国を指定できる。なお、テキスト入力の代わりにまたは加えて、ドロップダウンリストやチェックボックスなどが利用することによりこれらの情報が入力されてもよい。第一入力領域I1と第二入力領域I2に情報が入力された状態でユーザにより計算ボタンをI4押下されると、入力された情報がユーザの端末30からネットワーク20を介して制御部12へ出力される。 First, the control unit 12 judges whether the information on the planned product release date of the design and the planned country of the design application has been acquired (STEP 1). This process is repeated until it is determined that the information has been acquired (NO in STEP 1). FIG. 4 shows an example of a screen S displayed on the output device 32 of the user's terminal 30. For example, the input screen IS included in the screen S has a first input area I1, a second input area I2, and a calculation button IB. The first input area I1 is an area for the user to input the planned product release date. The second input area I2 is an area for the user to input the planned country of the application. In this example, the first input area I1 and the second input area I2 include text field input areas. The user can specify the planned product release date of the design and the planned country of the application by inputting information in text into these areas. Note that this information may be input by using a drop-down list, a check box, or the like instead of or in addition to text input. When the user presses the calculate button I4 after inputting information into the first input area I1 and the second input area I2, the input information is output from the user's terminal 30 to the control unit 12 via the network 20.

意匠の製品公開予定日と意匠の出願予定国の情報が取得されたと判断されると(STEP1においてYES)、制御部12は、メインデータベース111から出願予定国における所要日数を特定する(STEP2)。例えば、図4に示される入力画面ISにおいて出願予定国として日本が入力された場合、メインデータベース111に基づいて、所要日数は10箇月であると特定される。例えば、図2に示されるように意匠に係る物品毎の所要日数が記録されている場合は、一番少ない所要日数が選択される。 When it is determined that the information on the planned product release date of the design and the country in which the design is to be filed has been acquired (YES in STEP 1), the control unit 12 identifies the number of days required in the country in which the design is to be filed from the main database 111 (STEP 2). For example, if Japan is entered as the country in which the design is to be filed on the input screen IS shown in FIG. 4, the number of days required is identified as 10 months based on the main database 111. For example, if the number of days required for each product related to the design is recorded as shown in FIG. 2, the shortest number of days required is selected.

続いて、制御部12は、意匠の製品公開予定日と所要日数に基づいて、出願予定国における意匠の出願推奨日を算出する(STEP3)。例えば、図4に示される入力画面ISにおいて意匠の製品公開予定日が2022年1月10日であると入力された場合、日本における出願推奨日は、2022年1月10日から10箇月遡った2021年3月10日として算出される。 Next, the control unit 12 calculates the recommended filing date of the design in the country where the application is planned based on the planned product release date of the design and the number of days required (STEP 3). For example, if the planned product release date of the design is input as January 10, 2022 on the input screen IS shown in FIG. 4, the recommended filing date in Japan is calculated as March 10, 2021, which is 10 months back from January 10, 2022.

続いて、制御部12は、出願推奨日の情報を出力する(STEP4)。ユーザの端末30は、ネットワーク20を介して出願推奨日の情報を取得し、当該情報を画像として出力装置32に表示させる。図5は、ユーザの端末30の出力装置32に表示される画面Sの一例を示している。出力画面OSは、入力画面ISの下に表示されうる。例えば、出力画面OSにおいて、出願推奨日(2021年3月10日)は、製品公開予定日から出願推奨日まで延びた棒グラフで表される。なお、棒グラフ表示の代わりにまたは加えて、意匠の製品公開予定日と出願推奨日の箇所にそれぞれ所定のマークが表示されるなど、他の表示形態も採用されうる。 Next, the control unit 12 outputs information on the recommended filing date (STEP 4). The user's terminal 30 acquires the information on the recommended filing date via the network 20 and displays the information as an image on the output device 32. FIG. 5 shows an example of a screen S displayed on the output device 32 of the user's terminal 30. The output screen OS may be displayed below the input screen IS. For example, on the output screen OS, the recommended filing date (March 10, 2021) is represented by a bar graph extending from the planned product release date to the recommended filing date. Note that instead of or in addition to the bar graph display, other display forms may be adopted, such as displaying a predetermined mark at the planned product release date and the recommended filing date of the design.

同一または類似の意匠については、最先の意匠出願人のみがその意匠について意匠登録を受けることができる。このため、その意匠の実施化にまだ取り掛からないという場合でも、まず先願としての出願を確保しておく必要がある。しかしながら、出願国によっては無審査で登録になる場合や方式審査後に出願公開される場合があり、出願してから数日または数週間後に出願が公開されてしまう恐れがある。意匠は物品の外観形状を図案化したものであることから、出願が公開されると、出願人の将来の意匠の傾向を他人に知られ、またその意匠を転用したような意匠を作り出される恐れがある。 For identical or similar designs, only the first applicant to file a design application can obtain a design registration for that design. For this reason, even if you have not yet begun to work the design, you must first secure an application as a first application. However, depending on the country of application, registration may be granted without examination, or the application may be published after a formality examination, meaning that the application may be published a few days or weeks after filing. Because a design is a representation of the external shape of an article, if an application is published, others may become aware of the applicant's future design trends, and there is a risk that designs that are a derivative of that design may be created.

日本を含む複数の国では、所定の期間、意匠出願の公開を遅延する制度が設けられているが、その内容や手続きが統一されていない。あるいは、意匠出願の公開を遅延とする制度自体が設けられていない国もある。このため、意匠を出願する者が、意匠が実施化された製品の公開時期(例えば販売時期)を考慮して意匠出願する時期を判断することは困難である。 Several countries, including Japan, have systems in place that allow for a delay in the publication of design applications for a specified period of time, but the content and procedures of such systems are not standardized. In some countries, there is no system for delaying the publication of design applications at all. For this reason, it is difficult for design applicants to determine when to file a design application, taking into account the timing of the publication of a product in which the design has been worked out (e.g., the timing of its sale).

上記のような構成によれば、意匠の製品公開予定日と意匠出願日から公開日までの所要日数に基づいて、意匠の製品公開後に出願公開されないような意匠の出願推奨日が提供される。例えば、ユーザは、図5に示される出力画面OSを確認することにより、意匠に係る製品の公開前に当該意匠の出願が公開されることが回避するためには、2021年3月10日以降に日本に出願すれば良いことを把握できる。したがって、より早い出願日を確保しつつ、意匠に係る製品の公開前に当該意匠の出願が公開されるリスクを軽減することができる。 According to the above configuration, a recommended design filing date is provided that will prevent the application from being published after the product is published, based on the planned product publication date of the design and the number of days required from the design filing date to the publication date. For example, by checking the output screen OS shown in FIG. 5, the user can understand that in order to avoid the design application being published before the product related to the design is published, the application should be filed in Japan on or after March 10, 2021. Therefore, it is possible to reduce the risk of the design application being published before the product related to the design, while ensuring an earlier filing date.

なお、本実施形態において、入力受付部121は、さらに意匠に係る物品の情報を取得しうる。例えば、図6に示されるように、入力画面ISは、ユーザが意匠に係る物品を入力するための第三入力領域I3を含みうる。第三入力領域I3に入力された情報は、ユーザの端末30からネットワーク20を介して制御部12へ出力される。所要日数特定部122は、入力受付部121により取得された出願予定国と意匠に係る物品に基づいて、メインデータベース111を参照して、出願予定国における意匠に係る物品の所要日数を特定する。例えば、図6に示される入力画面ISにおいて出願予定国として日本、意匠に係る物品として物品A1が入力された場合、メインデータベース111に基づいて、所要日数は10箇月であると特定される。このような構成によれば、意匠の物品に応じて意匠出願の審査状況が異なる場合、より正確な所要日数に基づいて出願推奨日を算出できる。 In this embodiment, the input reception unit 121 may further acquire information on the article related to the design. For example, as shown in FIG. 6, the input screen IS may include a third input area I3 for the user to input the article related to the design. The information input in the third input area I3 is output to the control unit 12 from the user's terminal 30 via the network 20. The required number of days determination unit 122 refers to the main database 111 and determines the number of days required for the article related to the design in the planned application country based on the planned application country and the article related to the design acquired by the input reception unit 121. For example, when Japan is input as the planned application country and the article A1 as the article related to the design in the input screen IS shown in FIG. 6, the required number of days is determined to be 10 months based on the main database 111. With this configuration, when the examination status of the design application differs depending on the article of the design, the recommended application date can be calculated based on a more accurate number of days required.

また、本実施形態において、複数の出願予定国に対してそれぞれ出願推奨日が算出されてもよい。具体的には、入力受付部121は、ユーザの端末30から複数の出願予定国の情報を取得する。例えば、図6に示されるように、ユーザは、第二入力領域I2に複数の出願予定国を入力する。所要日数特定部122は、メインデータベースを参照して、入力受付部121により取得された複数の出願予定国の各々における所要日数を特定する。出願推奨日算出部123は、複数の出願予定国の各々において、意匠の製品公開予定日と所要日数に基づいて、出願推奨日を算出する。 In addition, in this embodiment, a recommended filing date may be calculated for each of multiple planned application countries. Specifically, the input reception unit 121 acquires information on multiple planned application countries from the user's terminal 30. For example, as shown in FIG. 6, the user inputs multiple planned application countries in the second input area I2. The required number of days determination unit 122 refers to the main database and identifies the number of days required for each of the multiple planned application countries acquired by the input reception unit 121. The recommended filing date calculation unit 123 calculates a recommended filing date for each of the multiple planned application countries based on the planned product release date of the design and the required number of days.

例えば、図6に示されるように、入力画面ISにおいて出願予定国として日本に加えて中国が入力された場合、メインデータベース111に基づいて中国出願の出願日から公開日までの所要日数は4箇月であると特定され、中国の出願推奨日は2022年1月10日から4箇月遡った2021年3月10日として算出される。出力画面OSには、日本の出願推奨日と共に、中国の出願推奨日が表示される。このような構成によれば、ユーザは、各国の出願推奨日をまとめて確認できる。 For example, as shown in FIG. 6, if China is entered in addition to Japan as the planned application country on the input screen IS, the number of days required from the filing date to the publication date of the Chinese application is determined to be four months based on the main database 111, and the recommended application date for China is calculated as March 10, 2021, four months back from January 10, 2022. The output screen OS displays the recommended application date for China along with the recommended application date for Japan. With this configuration, the user can check the recommended application dates for each country at once.

また、本実施形態において、出願推奨日は、意匠出願の出願日から公開日までの所要日数に加えて、出願公開遅延可能期間に基づいて算出されてもよい。具体的には、図1に例示されるように、記憶部11は、遅延データベース112を有しうる。遅延データベース112には、意匠出願の公開遅延制度を有する国と当該国の遅延可能期間が記録されている。出願公開遅延制度は、各国の法律または規則で定められた出願の公開を遅らせる制度である。出願公開遅延制度は、登録公報の発行を遅らせる制度、審査や登録を遅らせる制度などを含む。遅延可能期間は、日単位、月単位、または年単位で表される。例えば、図7に示されるように、遅延データベース112には、各国における公開遅延制度の有無や、公開遅延制度の申請時期、公開遅延費用など記録されている。公開遅延費用な、庁費用や代理人費用を含む。 In addition, in this embodiment, the recommended filing date may be calculated based on the possible application publication delay period in addition to the number of days required from the filing date to the publication date of the design application. Specifically, as illustrated in FIG. 1, the storage unit 11 may have a delay database 112. The delay database 112 records countries that have a design application publication delay system and the possible delay period in the country. The application publication delay system is a system for delaying the publication of an application, which is determined by the laws or regulations of each country. The application publication delay system includes a system for delaying the issuance of a registration gazette, a system for delaying examination or registration, and the like. The possible delay period is expressed in days, months, or years. For example, as shown in FIG. 7, the delay database 112 records the presence or absence of a publication delay system in each country, the application timing for the publication delay system, the publication delay cost, and the like. The publication delay cost includes office fees and attorney fees.

出願推奨日算出部123は、遅延データベース112を参照し、出願予定国が公開遅延制度を有する国に該当するか否かを判定する。出願推奨日算出部123は、出願予定国が公開遅延制度を有する国に該当すると判定した場合、遅延データベース112から遅延可能期間を特定し、意匠の製品公開予定日と所要日数と遅延可能期間とに基づいて、出願推奨日を算出する。 The recommended filing date calculation unit 123 refers to the delay database 112 and determines whether the country in which the application is to be filed corresponds to a country that has a publication delay system. If the recommended filing date calculation unit 123 determines that the country in which the application is to be filed corresponds to a country that has a publication delay system, it identifies the allowable delay period from the delay database 112 and calculates the recommended filing date based on the planned product publication date of the design, the required number of days, and the allowable delay period.

出願推奨日算出部123は、入力受付部121を介してユーザから公開遅延制度を利用する指示が取得された場合に、遅延データベース112を参照するように構成されてもよい。例えば、図8に示されるように、入力画面ISは、第四入力領域I4を有しうる。第四入力領域I4は、ユーザが出願公開遅延制度の利用を選択するための領域である。本例においては、第四入力領域I4は、チェックボックスを含んでいる。チェックボックスの代わりまたは加えて、テキストフィールド入力やドロップダウンリストなどが利用されてもよい。また、本例においては、全ての出願予定国に対して一括で出願公開遅延制度の利用が選択されているが、出願予定国ごとに出願公開遅延制度を利用するか否かを選択可能なように構成されてもよい。 The recommended filing date calculation unit 123 may be configured to refer to the delay database 112 when an instruction to use the delayed publication system is acquired from the user via the input reception unit 121. For example, as shown in FIG. 8, the input screen IS may have a fourth input area I4. The fourth input area I4 is an area for the user to select whether to use the delayed publication system. In this example, the fourth input area I4 includes a check box. Instead of or in addition to the check box, a text field input or a drop-down list may be used. Also, in this example, the use of the delayed publication system is selected for all countries in which applications are planned, but the system may be configured to allow selection of whether to use the delayed publication system for each country in which applications are planned.

図8に例示されるように、ユーザにより第四入力領域I4のチェックボックスがチェックされた場合、日本における出願推奨日は、2022年1月10日(製品公開予定日)から10箇月(所要日数)と3年(遅延期間、図7参照)遡った2018年3月10日として算出される。一方、中国は、出願公開遅延制度がないので、中国における出願推奨日は、2022年1月10日(製品公開予定日)から4箇月(所要日数)遡った2021年3月10日が出願推奨日として算出される。図8に例示されるように、出力画面OSにおいては、遅延可能期間と所要日数は異なる形態で表示されてもよい。また、公開遅延制度のみを考慮した出願推奨日2019年1月10日)も表示されてもよい。このように、公開遅延制度を利用することにより、より早い出願日を確保できる。 As illustrated in FIG. 8, when the checkbox in the fourth input area I4 is checked by the user, the recommended filing date in Japan is calculated as March 10, 2018, which is 10 months (required days) and 3 years (delay period, see FIG. 7) back from January 10, 2022 (scheduled product release date). On the other hand, since China does not have a system for delayed publication of applications, the recommended filing date in China is calculated as March 10, 2021, which is 4 months (required days) back from January 10, 2022 (scheduled product release date). As illustrated in FIG. 8, the possible delay period and the required days may be displayed in different forms on the output screen OS. In addition, the recommended filing date (January 10, 2019) that takes into account only the publication delay system may also be displayed. In this way, by utilizing the publication delay system, an earlier filing date can be secured.

また、本実施形態において、図8に例示されるように、出力画面OSには、出願公開遅延制度の申請時期が表示されてもよい。具体的には、図1に例示されるように、制御部12は、申請時期特定部125を有しうる。申請時期特定部125は、遅延データベース112を参照して、出願公開遅延制度の申請時期を特定する。申請時期の情報は出願推奨日と共に出力部124からユーザの端末30へ出力される。このような構成によれば、公開遅延制度の申請時期が国により異なるので、例えば出願推奨日提供システムから出力された出願予定国および申請時期をユーザの端末で表示させることにより、ユーザは出願予定国の申請時期を確認できる。したがって、申請の有無の判断や、申請のし忘れ等を未然に防ぐことができる。 In addition, in this embodiment, as exemplified in FIG. 8, the output screen OS may display the application timing for the delayed publication system. Specifically, as exemplified in FIG. 1, the control unit 12 may have an application timing identification unit 125. The application timing identification unit 125 identifies the application timing for the delayed publication system by referring to the delay database 112. The application timing information is output from the output unit 124 to the user's terminal 30 together with the recommended filing date. With this configuration, since the application timing for the delayed publication system differs depending on the country, the user can check the application timing of the country where the application is planned by displaying, for example, the planned filing country and application timing output from the recommended filing date providing system on the user's terminal. Therefore, it is possible to prevent a decision on whether to apply or not, and to prevent forgetting to apply.

また、本実施形態において、図1に例示されるように、制御部12は、さらに優先権判断部126を有してもよい。優先権判断部126は、複数の出願予定国の各々において、最も早い出願推奨日の出願予定国に基づいて優先権主張が可能か否かを判断する。例えば、第一国目の出願から優先権期間(6箇月)以内に第二国目の出願を行う場合、第二国目の出願は、第一国目の出願に基づいてパリ条約による優先権を主張することができる。優先権期間の情報は、メインデータベース111または遅延データベース112に記録されうる。優先権判断部126は、最も早い出願推奨日と優先権期間に基づいて、優先権主張可否を判断する。優先権主張可否の判断結果は、出願推奨日と共に出力部124からユーザの端末30へ出力される。優先権主張可否の判断結果は、ユーザの端末30の出力装置32の出力画面OSに表示される。 In this embodiment, as illustrated in FIG. 1, the control unit 12 may further include a priority determination unit 126. The priority determination unit 126 determines whether or not a priority claim is possible in each of a plurality of planned application countries based on the planned application country with the earliest recommended application date. For example, if an application is filed in a second country within the priority period (6 months) from the application in the first country, the application in the second country can claim priority under the Paris Convention based on the application in the first country. Information on the priority period can be recorded in the main database 111 or the delayed database 112. The priority determination unit 126 determines whether or not a priority claim is possible based on the earliest recommended application date and the priority period. The result of the determination on whether or not a priority claim is possible is output from the output unit 124 to the user's terminal 30 together with the recommended application date. The result of the determination on whether or not a priority claim is possible is displayed on the output screen OS of the output device 32 of the user's terminal 30.

例えば、図8に示されるように、出願予定国が日本と中国である場合、日本の出願推奨日(2018年3月10日)から優先権期間である6箇月を加算した日にちは2018年9月10日である。2018年9月10日は中国の出願推奨日(2021年9月10日)よりも前であるので、日本の優先権に基づいて中国出願を行うことは不可能であると判断される。出力画面OSにおいて、優先権主張は不可能である旨が表示される。このような構成によれば、最も早い出願推奨日の出願予定国に基づいて優先権を主張が可能か否か判断される。これにより、出願推奨日が遅い国については、出願推奨日が最も早い出願予定国の優先権を主張することにより、実質的に出願日を早めることができる。 For example, as shown in FIG. 8, if the countries in which the application is to be filed are Japan and China, the date obtained by adding the six-month priority period from the recommended filing date in Japan (March 10, 2018) is September 10, 2018. Since September 10, 2018 is before the recommended filing date in China (September 10, 2021), it is determined that it is impossible to file an application in China based on the priority of Japan. The output screen OS displays that it is impossible to claim priority. With this configuration, it is determined whether or not priority can be claimed based on the country in which the application is to be filed with the earliest recommended filing date. As a result, for countries with a later recommended filing date, the filing date can be effectively brought forward by claiming priority from the country in which the application is to be filed with the earliest recommended filing date.

また、本実施形態において、出願予定国はユーザにより入力されている。しかしながら、出願予定国は予め設定されていてもよい。出願件数が多い国が出願予定国として予め設定されてもよいし、ユーザごとに出願予定国が予め設定されてもよい。例えば、図1に示されるように、出願推奨日提供システム10は複数のユーザの端末30に接続されており、記憶部11はユーザデータベース113を記憶しうる。ユーザデータベース113は、ユーザの識別情報と当該ユーザのデフォルト出願予定国とを含む。ユーザの識別情報は、例えば、ユーザの名前やユーザのIDなどである。例えば、図9に示されるように、出願予定国がユーザIDに関連付けられてユーザデータベース113に記憶されている。入力受付部121は、ユーザの識別情報を取得し、ユーザデータベース113から識別情報に対応するデフォルト出願予定国を特定し、特定したデフォルト出願予定国を出願予定国とする。このような構成によれば、出願予定国が予め設定されているので、ユーザが出願予定国を入力する手間が省ける。また、ユーザごとにデフォルト出願予定国が設定される場合は、全ての国をデフォルト出願予定国とする場合に比べて、出願推奨日算出部の処理負担が軽減される。 In addition, in this embodiment, the planned application country is input by the user. However, the planned application country may be set in advance. A country with a large number of applications may be set in advance as the planned application country, or the planned application country may be set in advance for each user. For example, as shown in FIG. 1, the recommended application date providing system 10 is connected to multiple user terminals 30, and the storage unit 11 may store a user database 113. The user database 113 includes user identification information and the default planned application country of the user. The user identification information is, for example, the user's name or user ID. For example, as shown in FIG. 9, the planned application country is associated with the user ID and stored in the user database 113. The input receiving unit 121 acquires the user's identification information, identifies the default planned application country corresponding to the identification information from the user database 113, and sets the identified default planned application country as the planned application country. According to this configuration, since the planned application country is set in advance, the user does not have to input the planned application country. In addition, when a default planned filing country is set for each user, the processing burden on the recommended filing date calculation unit is reduced compared to when all countries are set as the default planned filing countries.

また、本実施形態において、出力画面OSには、出願公開遅延制度の申請に掛かる費用が表示されてもよい。例えば、図7に例示されるように、遅延データベース112には、出願公開遅延制度の申請に掛かる費用が含まれている。申請時期特定部125は、遅延データベース112を参照して、出願公開遅延制度の申請時期と共に申請に係る費用を特定してもよい。申請時期と費用の情報は、出願推奨日と共に出力部124からユーザの端末30へ出力されて、出力装置32の出力画面OSに表示されうる。これにより、ユーザは、申請に掛かる費用を考慮して申請を行うか否かの判断ができる。 In addition, in this embodiment, the output screen OS may display the costs incurred in applying for the delayed publication of an application system. For example, as illustrated in FIG. 7, the delay database 112 contains the costs incurred in applying for the delayed publication of an application system. The application timing identification unit 125 may refer to the delay database 112 to identify the application timing for the delayed publication of an application system as well as the costs associated with the application. Information on the application timing and costs may be output from the output unit 124 to the user's terminal 30 together with the recommended application date, and displayed on the output screen OS of the output device 32. This allows the user to decide whether or not to apply, taking into account the costs incurred in the application.

(第二実施形態)
次に、第二実施形態に係る出願公開予測日提供システム40の構成について、図10~図14を参照して説明する。なお、以下の説明では、第一実施形態の出願推奨日提供システム10と相違する部分について主に説明し、共通する部分については同じ符号を付し、その説明は適宜省略する。
Second Embodiment
Next, the configuration of the system 40 for providing predicted application publication dates according to the second embodiment will be described with reference to Figures 10 to 14. In the following description, differences from the system 10 for providing recommended application publication dates according to the first embodiment will be mainly described, and common parts will be denoted by the same reference numerals and their description will be omitted as appropriate.

出願公開予測日提供システム40は、意匠を複数の国に出願する場合に、第一出願国における出願公開予測日および第二出願予定国における出願公開予測日を算出してユーザに提供するシステムである。図10に例示されるように、出願公開予測日提供システム40は、ネットワーク20を介してユーザの端末30と通信可能に接続されている。 The predicted publication date providing system 40 is a system that, when a design is applied for in multiple countries, calculates the predicted publication date in the first application country and the predicted publication date in the second application country and provides them to the user. As illustrated in FIG. 10, the predicted publication date providing system 40 is communicably connected to the user's terminal 30 via the network 20.

図1に例示されるように、出願公開予測日提供システム40は、記憶部41と制御部42を備えている。記憶部41には、メインデータベース411が記録されている。メインデータベース411は、第一実施形態のメインデータベース111と同様であり、図2に例示されるように、メインデータベース411には各国における意匠出願の出願日から公開日までの所要日数が記録されている。 As illustrated in FIG. 1, the system 40 for providing predicted publication dates for applications includes a memory unit 41 and a control unit 42. A main database 411 is recorded in the memory unit 41. The main database 411 is similar to the main database 111 of the first embodiment, and as illustrated in FIG. 2, the main database 411 records the number of days required from the filing date to the publication date of a design application in each country.

制御部42は、意匠の出願公開予測日を算出するように構成されている。制御部42は、入力受付部421、所要日数特定部422、出願公開予測日算出部423、および出力部424を有している。 The control unit 42 is configured to calculate the predicted publication date of the design application. The control unit 42 has an input receiving unit 421, a required number of days determination unit 422, a predicted publication date calculation unit 423, and an output unit 424.

入力受付部421は、第一出願国、第一出願国の出願日、第二出願予定国、および第二出願予定国の出願予定日の情報を取得する。第一出願国は、意匠を最初に出願した国である。第二出願予定国は、第一出願国の出願後に同一の意匠を出願する予定である第一出願国以外の国である。同一の意匠の出願とは、第一出願国と第二出願予定国の意匠出願において登録を受けようとする範囲が同一の場合に限られず、登録を受けようとする範囲が異なる場合や登録を受けようとする範囲のみが同一である場合も含みうる。ユーザは、端末30の入力装置31を使用して第一出願国、第一出願国の出願日、第二出願予定国、および第二出願予定国の出願予定日を指定する。入力受付部421は、ユーザの端末30からネットワーク20を介して第一出願国、第一出願国の出願日、第二出願予定国、および第二出願予定国の出願予定日の情報を取得する。 The input reception unit 421 acquires information on the first application country, the filing date of the first application country, the second planned application country, and the planned filing date of the second planned application country. The first application country is the country where the design was first applied for. The second planned application country is a country other than the first application country in which the same design is planned to be applied for after the application in the first application country. The application of the same design is not limited to the case where the scope of the design to be registered is the same in the first application country and the second planned application country, but may also include the case where the scope of the design to be registered is different or only the scope of the design to be registered is the same. The user specifies the first application country, the filing date of the first application country, the second planned application country, and the planned filing date of the second planned application country using the input device 31 of the terminal 30. The input reception unit 421 acquires information on the first application country, the filing date of the first application country, the second planned application country, and the planned filing date of the second planned application country from the user's terminal 30 via the network 20.

所要日数特定部422は、メインデータベース411を参照して、入力受付部421により取得された第一出願国と第二出願予定国の各々における所要日数を特定する。 The number of days required determination unit 422 refers to the main database 411 to determine the number of days required in each of the first application country and the second application planned country obtained by the input reception unit 421.

出願公開予測日算出部423は、入力受付部421により取得された第一出願国の出願日と所要日数特定部422により特定された所要日数とに基づいて、第一出願国における出願公開予測日を算出する。具体的には、出願公開予測日算出部423は、第一出願国の出願日に所要日数を加算した日にちを出願公開予測日として算出する。同様に、出願公開予測日算出部423は、入力受付部421により取得された第二出願予定国の出願予定日と所要日数特定部422により特定された所要日数とに基づいて、第二出願予定国における出願公開予測日を算出する。具体的には、出願公開予測日算出部423は、第二出願予定国の出願予定日に所要日数を加算した日にちを出願公開予測日として算出する。第一出願国と第二出願予定国の出願公開予測日の情報は、出力部424からユーザの端末30へ出力される。ユーザの端末30の出力装置32は、第一出願国と第二出願予定国の出願公開予測日を例えば画像として表示する。 The predicted application publication date calculation unit 423 calculates the predicted application publication date in the first application country based on the filing date of the first application country acquired by the input reception unit 421 and the number of required days specified by the required number of days specification unit 422. Specifically, the predicted application publication date calculation unit 423 calculates the date obtained by adding the required number of days to the filing date of the first application country as the predicted application publication date. Similarly, the predicted application publication date calculation unit 423 calculates the predicted application publication date in the second application country based on the planned application date of the second application country acquired by the input reception unit 421 and the required number of days specified by the required number of days specification unit 422. Specifically, the predicted application publication date calculation unit 423 calculates the date obtained by adding the required number of days to the planned application date of the second application country as the predicted application publication date. Information on the predicted application publication dates of the first application country and the second application country is output from the output unit 424 to the user's terminal 30. The output device 32 of the user's terminal 30 displays the predicted publication dates of the application in the first application country and the second application country, for example as an image.

制御部42は、メモリと協働して動作するプロセッサにより実現されうる。プロセッサとしては、CPU、MPU、GPUが例示されうる。メモリとしては、RAM、ROMが例示されうる。プロセッサは、ROMに記憶されたコンピュータ可読命令の少なくとも一部を指定してRAM上に展開し、RAMと協働して所定の処理を実行することにより、入力受付部421、所要日数特定部422、出願公開予測日算出部423などの各機能を実現する。ROMは、プロセッサによりコンピュータ可読命令を記録する非一時的記録手段の一例である。 The control unit 42 may be realized by a processor that operates in cooperation with a memory. Examples of the processor may include a CPU, an MPU, and a GPU. Examples of the memory may include a RAM and a ROM. The processor specifies at least a portion of the computer-readable instructions stored in the ROM, expands them on the RAM, and works in cooperation with the RAM to execute a specified process, thereby realizing each function of the input receiving unit 421, the required number of days determination unit 422, the predicted publication date calculation unit 423, etc. The ROM is an example of a non-transitory recording means for recording computer-readable instructions by the processor.

図11を参照しつつ、上記のように構成された出願公開予測日提供システム40の制御部42により実行される処理の流れの一例について説明する。 With reference to FIG. 11, an example of the flow of processing executed by the control unit 42 of the application publication predicted date providing system 40 configured as described above will be described.

まず、制御部42は、第一出願国、第一出願国の出願日、第二出願予定国、および第二出願予定国の出願予定日の情報が取得されたかを判断する(STEP11)。これらの情報が取得されたと判断されるまで、本処理が繰り返される(STEP11においてNO)。図12は、ユーザの端末30の出力装置32に表示される画面Sの一例を示している。例えば、画面Sに含まれる入力画面ISは、第一入力領域I11、第二入力領域I12、第三入力領域I13、第四入力領域I14、および計算ボタンIBを有している。第一入力領域I11は、ユーザが第一出願国を入力するため領域である。第二入力領域I12は、ユーザが第一出願国の出願日を入力するための領域である。第三入力領域I13は、ユーザが第二出願予定国を入力するための領域である。第四入力領域I14は、ユーザが第二出願予定国の出願予定日を入力するための領域である。第二出願予定国が複数ある場合には、第三入力領域I13と第四入力領域I14は複数設けられてもよい。 First, the control unit 42 judges whether information on the first application country, the filing date of the first application country, the second planned application country, and the planned filing date of the second planned application country has been acquired (STEP 11). This process is repeated until it is judged that this information has been acquired (NO in STEP 11). FIG. 12 shows an example of a screen S displayed on the output device 32 of the user's terminal 30. For example, the input screen IS included in the screen S has a first input area I11, a second input area I12, a third input area I13, a fourth input area I14, and a calculation button IB. The first input area I11 is an area for the user to input the first application country. The second input area I12 is an area for the user to input the filing date of the first application country. The third input area I13 is an area for the user to input the second planned application country. The fourth input area I14 is an area for the user to input the planned filing date of the second planned application country. When there are multiple second planned application countries, multiple third input areas I13 and multiple fourth input areas I14 may be provided.

本例においては、第一入力領域I11、第二入力領域I12、第三入力領域I13は、および第四入力領域I14は、テキストフィールド入力領域を含んでいる。ユーザは、これらの領域にテキストで情報を入力することにより、第一出願国とその出願日および第二出願如帝国とその出願予定日を指定できる。なお、テキスト入力の代わりにまたは加えて、ドロップダウンリストやチェックボックスなどが利用することによりこれらの情報が入力されてもよい。第一入力領域I11、第二入力領域I12、第三入力領域I13および第四入力領域I14に情報が入力された状態でユーザにより計算ボタンIBが押下されると、入力された情報がユーザの端末30からネットワーク20を介して制御部42へ出力される。 In this example, the first input area I11, the second input area I12, the third input area I13, and the fourth input area I14 include text field input areas. The user can specify the first application country and its filing date and the second application country and its planned filing date by entering information in text in these areas. Note that this information may be entered using a drop-down list or check boxes instead of or in addition to text input. When the user presses the calculate button IB with information entered in the first input area I11, the second input area I12, the third input area I13, and the fourth input area I14, the entered information is output from the user's terminal 30 to the control unit 42 via the network 20.

第一出願国、第一出願国の出願日、第二出願予定国、および第二出願予定国の出願予定日の情報が取得されたと判断されると(STEP11においてYES)、制御部42は、メインデータベース411から第一出願国と第二出願予定国における所要日数を特定する(STEP12)。例えば、図12に示される入力画面ISにおいて第一出願国として日本、第二出願予定国として中国とアメリカが入力された場合、メインデータベース411に基づいて、日本の所要日数は10箇月であり、中国の所要日数は4箇月であり、アメリカの所要日数は2年であると特定される。 When it is determined that information on the first application country, the filing date of the first application country, the second planned application country, and the planned filing date of the second planned application country has been acquired (YES in STEP 11), the control unit 42 identifies the number of days required in the first application country and the second planned application country from the main database 411 (STEP 12). For example, if Japan is entered as the first application country and China and the United States as the second planned application countries on the input screen IS shown in FIG. 12, the number of days required is identified to be 10 months in Japan, 4 months in China, and 2 years in the United States based on the main database 411.

続いて、制御部42は、第一出願国の出願日と第二出願予定国の出願予定日と所要日数とに基づいて、第一出願国における出願公開予測日および第二出願予定国における出願公開予測日を算出する(STEP13)。例えば、図12に示される入力画面ISにおいて日本の出願日が2021年1月10日であると入力された場合、日本における出願公開予測日は、2021年1月10日から10箇月後の2021年11月10日として算出される。同様に、中国の出願日が2021年7月10日であると入力された場合、中国の出願公開予測日は、2021年7月10日から4箇月後の2021年11月10日として算出される。同様に、アメリカの出願日が2021年7月10日であると入力された場合、アメリカの出願公開予測日は、2021年7月10日から2年後の2023年7月10日として算出される。 Next, the control unit 42 calculates the predicted publication date in the first application country and the predicted publication date in the second application country based on the application date in the first application country and the planned application date and the number of days required in the second application country (STEP 13). For example, if the application date in Japan is input as January 10, 2021 in the input screen IS shown in FIG. 12, the predicted publication date in Japan is calculated as November 10, 2021, 10 months after January 10, 2021. Similarly, if the application date in China is input as July 10, 2021, the predicted publication date in China is calculated as November 10, 2021, 4 months after July 10, 2021. Similarly, if the application date in the United States is input as July 10, 2021, the predicted publication date in the United States is calculated as July 10, 2023, two years after July 10, 2021.

続いて、制御部42は、第一出願国と第二出願予定国の出願公開予測日の情報を出力する(STEP14)。ユーザの端末30は、ネットワーク20を介して第一出願国と第二出願予定国の出願公開予測日の情報を取得し、当該情報を画像として出力装置32に表示させる。図13は、ユーザの端末30の出力装置32に表示される画面Sの一例を示している。例えば、出力画面OSにおいて、第一出願国(日本)、第二出願予定国(中国、アメリカ)の出願公開予測日はそれぞれ、出願日または出願予定日から出願公開予測日まで延びた棒グラフで表される。なお、棒グラフ表示の代わりにまたは加えて、出願日または出願予定日と出願公開予測日の箇所にそれぞれ所定のマークが表示されるなど、他の表示形態も採用されうる。 Next, the control unit 42 outputs information on the predicted publication dates of the first application country and the second planned application country (STEP 14). The user's terminal 30 obtains information on the predicted publication dates of the first application country and the second planned application country via the network 20, and displays the information as an image on the output device 32. FIG. 13 shows an example of a screen S displayed on the output device 32 of the user's terminal 30. For example, on the output screen OS, the predicted publication dates of the first application country (Japan) and the second planned application country (China, USA) are each represented by a bar graph extending from the application date or planned application date to the predicted publication date. Note that instead of or in addition to the bar graph display, other display forms may be adopted, such as displaying a predetermined mark at the application date or planned application date and the predicted publication date.

各国では、審査制度や公開制度が異なるので、出願された意匠が意匠公報に掲載される時期が異なる。したがって、先に出願した国よりも後に出願した国の出願が先に公開されるケースがありうる。これにより、例えば、意匠の製品公開前に出願公開されないように第一出願国に対して公開を遅らせる手続きを行った場合、後に出願する国においても同様に公開を遅らせる手続きを行う必要性が生じる場合がある。上記の構成によれば、先に出願した公開予測日に加えて、後に出願する公開予測日を算出する。これにより、例えば後に出願する公開予測日が先に出願した公開予測日より早い場合、意匠の製品公開予定日に合わせて、優先権主張の利用有無、公開日を遅らせる手続きの利用の有無、再出願などの検討を行うことができる。結果として、より早い出願日を確保しつつ意匠に係る製品の公開前に当該意匠の出願が公開されるリスクを軽減することができる。 Since each country has a different examination system and publication system, the time when a design is published in the design gazette differs. Therefore, there may be cases where an application in a country where a design is filed later is published before an application in a country where an application is filed earlier. As a result, for example, if a procedure to delay publication is taken in the country where the design is first filed so that the application is not published before the product is published, it may be necessary to take a similar procedure to delay publication in the country where the design is filed later. According to the above configuration, in addition to the predicted publication date of the earlier application, the predicted publication date of the later application is calculated. As a result, for example, if the predicted publication date of the later application is earlier than the predicted publication date of the earlier application, it is possible to consider whether to use a priority claim, whether to use a procedure to delay the publication date, re-application, etc., in accordance with the planned product publication date of the design. As a result, it is possible to reduce the risk of the design application being published before the product related to the design is published while securing an earlier filing date.

なお、本実施形態において、入力受付部421は、さらに意匠に係る物品の情報を取得してもよい。例えば、図14に示されるように、入力画面ISは、ユーザが意匠に係る物品を入力するための第五入力領域I15を含みうる。第五入力領域I15に入力された意匠に係る物品の情報は、ユーザの端末30からネットワーク20を介して制御部42へ出力される。所要日数特定部422は、入力受付部421により取得された出願予定国と意匠に係る物品に基づいて、メインデータベース411を参照して、出願予定国における意匠に係る物品の所要日数を特定する。 In this embodiment, the input reception unit 421 may further acquire information on the article related to the design. For example, as shown in FIG. 14, the input screen IS may include a fifth input area I15 for the user to input the article related to the design. The information on the article related to the design input in the fifth input area I15 is output from the user's terminal 30 to the control unit 42 via the network 20. The required number of days determination unit 422 refers to the main database 411 based on the planned filing country and the article related to the design acquired by the input reception unit 421, and determines the number of days required for the article related to the design in the planned filing country.

また、本実施形態において、出願公開予測日は、意匠出願の出願日から公開日までの所要日数に加えて、出願公開遅延可能期間に基づいて算出されてもよい。具体的には、図1に例示されるように、記憶部41は、遅延データベース412を有しうる。遅延データベース412には、第一実施形態の遅延データベース112と同様に、意匠出願の公開遅延制度を有する国と当該国の遅延可能期間が記録されている。出願公開予測日算出部423は、遅延データベース412を参照し、第一出願国または第二出願予定国が公開遅延制度を有する国に該当すると判定した場合、遅延データベース412から遅延可能期間を特定し、出願日または出願予定日と所要日数と遅延可能期間とに基づいて、出願公開予測日を算する。出力画面OSでは、遅延可能期間と所要日数は異なる形態で表示されてもよく、出願公開遅延制度の申請時期や費用なども一緒に表示されてもよい。 In this embodiment, the predicted publication date may be calculated based on the possible period of delay in publication of the design application in addition to the number of days required from the filing date to the publication date of the design application. Specifically, as illustrated in FIG. 1, the storage unit 41 may have a delay database 412. The delay database 412 records countries that have a system for delaying publication of design applications and the possible period of delay in the countries, similar to the delay database 112 in the first embodiment. When the predicted publication date calculation unit 423 refers to the delay database 412 and determines that the first application country or the country of the second planned application corresponds to a country that has a system for delaying publication, it identifies the possible period of delay from the delay database 412 and calculates the predicted publication date of the design application based on the filing date or the planned filing date, the number of days required, and the possible period of delay. On the output screen OS, the possible period of delay and the number of days required may be displayed in different forms, and the application timing and costs of the system for delaying publication of the design application may be displayed together.

また、本実施形態において、第二出願予定国とその出願予定日はユーザにより入力されている。しかしながら、第二出願予定国は予め設定されていてもよい。出願件数が多い国が第二出願予定国として予め設定されてもよいし、ユーザごとに第二出願予定国が予め設定されてもよい。例えば、図10に示されるように、出願公開予測日提供システム40は複数のユーザの端末30に接続されており、記憶部41は、ユーザデータベース413を記憶しうる。ユーザデータベース413は、第一実施形態のユーザデータベース113と同様に、ユーザの識別情報と当該ユーザのデフォルト出願予定国とを含む。入力受付部421は、ユーザの識別情報を取得し、ユーザデータベース413から識別情報に対応するデフォルト第二出願予定国を特定し、特定したデフォルト第二出願予定国を出願予定国としてもよい。また、出願予定日は自動的に設定されていてもよい。例えば、第二出願予定国の出願予定日は、第一出願国の出願日に優先権期間である6箇月を加算した日に設定されてもよい。 In addition, in this embodiment, the second planned application country and the planned application date are input by the user. However, the second planned application country may be set in advance. A country with a large number of applications may be set in advance as the second planned application country, or the second planned application country may be set in advance for each user. For example, as shown in FIG. 10, the application publication predicted date providing system 40 is connected to the terminals 30 of multiple users, and the storage unit 41 may store a user database 413. The user database 413 includes the user's identification information and the default planned application country of the user, similar to the user database 113 in the first embodiment. The input receiving unit 421 may acquire the user's identification information, identify the default planned second application country corresponding to the identification information from the user database 413, and set the identified default planned second application country as the planned application country. The planned application date may also be set automatically. For example, the planned application date of the planned second application country may be set to a date obtained by adding six months, which is the priority period, to the application date of the first application country.

また、本実施形態において、図14に例示されるように、出力画面OSにおいて意匠の製品公開予定日が表示されてもよい。入力画面ISは、ユーザが製品公開予定日を入力するための第六入力領域I16を含みうる。第六入力領域I16に入力された製品公開予定日は、出力画面OSにおいて、第一出願国と第二出願予定国の出願公開予測日と共に表示されうる。このように、出願公開予測日と共に意匠の製品公開予定日をユーザの端末で表示させることにより、ユーザは、意匠に係る製品の公開前に当該意匠の出願が公開されないように、意匠の優先権主張の利用有無、公開日を遅らせる手続きの利用の有無、再出願などの検討を行うことができる。 In addition, in this embodiment, as exemplified in FIG. 14, the planned product release date of the design may be displayed on the output screen OS. The input screen IS may include a sixth input area I16 for the user to input the planned product release date. The planned product release date input in the sixth input area I16 may be displayed on the output screen OS together with the predicted application publication dates for the first application country and the second application country. In this way, by displaying the planned product release date of the design on the user's terminal together with the predicted application publication date, the user can consider whether to use a design priority claim, whether to use a procedure to delay the publication date, re-file, etc., so that the design application is not published before the product related to the design is published.

以上、本発明の実施形態について説明をしたが、本発明の技術的範囲が本実施形態の説明によって限定的に解釈されるべきではないのは言うまでもない。本実施形態は単なる一例であって、特許請求の範囲に記載された発明の範囲内において、様々な実施形態の変更が可能であることが当業者によって理解されるところである。本発明の技術的範囲は特許請求の範囲に記載された発明の範囲及びその均等の範囲に基づいて定められるべきである。 Although an embodiment of the present invention has been described above, it goes without saying that the technical scope of the present invention should not be interpreted as being limited by the description of this embodiment. This embodiment is merely an example, and it will be understood by those skilled in the art that various modifications of the embodiment are possible within the scope of the invention described in the claims. The technical scope of the present invention should be determined based on the scope of the invention described in the claims and its equivalents.

上記の第一実施形態および第二実施形態では、一つの意匠に係る出願について各国の出願推奨日または出願公開予測日が算出されている。しかしながら、複数の意匠に係る出願について出願推奨日または出願公開予測日が算出されてもよい。例えば、出願推奨日提供システム10において、図15に示される複数の意匠の案件の情報を含むユーザ入力データが、ユーザの端末30から入力受付部121に出力されうる。 In the first and second embodiments described above, the recommended filing date or predicted publication date in each country is calculated for an application relating to one design. However, the recommended filing date or predicted publication date may be calculated for applications relating to multiple designs. For example, in the recommended filing date providing system 10, user input data including information on multiple design cases shown in FIG. 15 may be output from the user's terminal 30 to the input receiving unit 121.

上記の第一実施形態において、出願推奨日提供システム10は、ユーザの端末30とネットワーク20を介して接続されている。しかしながら、例えば、出願推奨日提供システム10の制御部12は、ユーザの端末30に組み込まれていてもよい。或いは、出願推奨日提供システム10は、ユーザの端末30を含んでもよい。 In the first embodiment described above, the recommended filing date providing system 10 is connected to the user's terminal 30 via the network 20. However, for example, the control unit 12 of the recommended filing date providing system 10 may be incorporated in the user's terminal 30. Alternatively, the recommended filing date providing system 10 may include the user's terminal 30.

上記の第二実施形態において、出願公開予測日提供システム40は、ユーザの端末30とネットワーク20を介して接続されている。しかしながら、例えば、出願公開予測日提供システム40の制御部42は、ユーザの端末30に組み込まれていてもよい。或いは、出願公開予測日提供システム40は、ユーザの端末30を含んでもよい。 In the second embodiment described above, the system 40 for providing predicted publication dates is connected to the user's terminal 30 via the network 20. However, for example, the control unit 42 of the system 40 for providing predicted publication dates may be incorporated in the user's terminal 30. Alternatively, the system 40 for providing predicted publication dates may include the user's terminal 30.

ユーザの端末30の出力装置32は、様々な情報を画像として表示されているが、画像表示に加えて音声として出力してもよい。 The output device 32 of the user's terminal 30 displays various information as images, but may also output the information as audio in addition to the image display.

10 出願推奨日提供システム
11 記憶部
12 制御部
20 ネットワーク
30 ユーザの端末
31 入力装置
32 出力装置
40 出願公開予測日提供システム
41 記憶部
42 制御部
111 メインデータベース
112 遅延データベース
113 ユーザデータベース
121 入力受付部
122 所要日数特定部
123 出願推奨日算出部
124 出力部
125 申請時期特定部
126 優先権判断部
411 メインデータベース
412 遅延データベース
413 ユーザデータベース
421 入力受付部
422 所要日数特定部
423 出願公開予測日算出部
424 出力部
10 Recommended filing date providing system 11 Memory unit 12 Control unit 20 Network 30 User terminal 31 Input device 32 Output device 40 Predicted application publication date providing system 41 Memory unit 42 Control unit 111 Main database 112 Delay database 113 User database 121 Input reception unit 122 Required number of days determination unit 123 Recommended filing date calculation unit 124 Output unit 125 Application timing determination unit 126 Priority judgment unit 411 Main database 412 Delay database 413 User database 421 Input reception unit 422 Required number of days determination unit 423 Predicted application publication date calculation unit 424 Output unit

Claims (10)

意匠の製品公開後に出願公開されるような前記意匠の出願推奨日を提供する出願推奨日提供システムであって、
各国における意匠出願の出願日から公開日までの所要日数を含むメインデータベースが記録された記憶部と、
少なくとも一つの意匠の前記出願推奨日を算出する制御部と、
を備えており、
前記制御部は、
前記意匠の製品公開予定日と前記意匠の出願予定国を取得する入力受付部と、
前記メインデータベースから前記出願予定国における前記所要日数を特定する所要日数特定部と、
前記意匠の製品公開予定日と前記所要日数に基づいて、前記出願予定国における前記意匠の出願推奨日を算出する出願推奨日算出部と、
を有する、出願推奨日提供システム。
A system for providing a recommended filing date for a design that is to be published after the product publication of the design,
a memory unit in which a main database including the number of days required from the filing date to the publication date of a design application in each country is recorded;
a control unit that calculates the recommended filing date for at least one design;
It is equipped with
The control unit is
An input receiving unit for acquiring a planned product release date of the design and a planned country of application of the design;
a time required specification unit that specifies the time required in the country where the application is to be filed from the main database;
a recommended filing date calculation unit that calculates a recommended filing date for the design in the country where the application is planned based on the planned product release date of the design and the required number of days;
A system for providing recommended application dates.
前記メインデータベースは、意匠に係る物品毎の前記所要日数を含んでおり、
前記入力受付部は、前記意匠に係る物品情報を取得し、
前記所要日数特定部は、前記メインデータベースから前記出願予定国における前記意匠に係る物品の前記所要日数を特定する、請求項1に記載の出願推奨日提供システム。
The main database includes the number of days required for each article related to a design,
The input receiving unit acquires product information relating to the design,
2. The system for providing recommended filing dates according to claim 1, wherein the required number of days specifying unit specifies the required number of days for an article related to the design in the country where the application is planned from the main database.
前記入力受付部は、複数の前記出願予定国を取得し、
前記所要日数特定部は、前記メインデータベースから前記複数の出願予定国の各々における前記所要日数を特定し、
前記出願推奨日算出部は、前記複数の出願予定国の各々において、前記意匠の製品公開予定日と前記所要日数に基づいて、前記出願推奨日を算出する、請求項1または請求項2に記載の出願推奨日提供システム。
The input receiving unit acquires a plurality of the planned application countries,
the required number of days specification unit specifies the required number of days in each of the plurality of planned application countries from the main database,
3. The system for providing recommended filing dates according to claim 1 or 2, wherein the recommended filing date calculation unit calculates the recommended filing date based on a planned product release date of the design and the required number of days in each of the plurality of countries in which the application is planned to be filed.
前記記憶部は、意匠出願の公開遅延制度を有する国と当該国の遅延可能期間とを含む遅延データベースを有しており、
前記出願推奨日算出部は、前記遅延データベースを参照し、前記出願予定国が前記公開遅延制度を有する国に該当するか否かを判定し、前記出願予定国が前記公開遅延制度を有する国に該当する場合、前記遅延データベースから前記遅延可能期間を特定し、前記意匠の製品公開予定日と前記所要日数と前記遅延可能期間とに基づいて、前記出願推奨日を算出する、請求項1から請求項3の何れか一項に記載の出願推奨日提供システム。
the storage unit includes a delay database including countries that have a system for delaying publication of a design application and the delay period for the countries;
4. The system for providing recommended filing dates according to claim 1, wherein the recommended filing date calculation unit refers to the delay database, and determines whether the country in which the application is to be filed corresponds to a country that has the publication delay system, and if the country in which the application is to be filed corresponds to a country that has the publication delay system, identifies the allowable delay period from the delay database, and calculates the recommended filing date based on the planned product release date of the design, the required number of days, and the allowable delay period.
前記遅延データベースは、意匠出願の公開遅延制度の申請時期を含んでおり、
前記制御部は、前記遅延データベースから前記申請時期を特定する申請時期特定部と、前記申請時期を前記出願推奨日と共に出力する出力部とを有している、請求項4に記載の出願推奨日提供システム。
The delay database includes the application timing of the design application publication delay system;
5. The system for providing a recommended filing date according to claim 4, wherein the control unit has an application time identification unit that identifies the application time from the delay database, and an output unit that outputs the application time together with the recommended filing date.
前記制御部は、
前記複数の出願予定国の各々において、最も早い前記出願推奨日の出願予定国に基づいて優先権主張が可能か否かを判断する優先権判断部と、前記出願推奨日と共に前記優先権主張可否の判断結果を出力する出力部とを有する、請求項3に記載の出願推奨日提供システム。
The control unit is
A system for providing recommended filing dates as described in claim 3, comprising a priority judgment unit that judges whether or not priority can be claimed in each of the plurality of planned filing countries based on the country with the earliest recommended filing date, and an output unit that outputs the judgment result on whether or not priority can be claimed together with the recommended filing date.
各国における意匠出願日から公開日までの所要日数を含むメインデータベースが記録された記憶部と、プロセッサと、前記プロセッサにより実行されるコンピュータ可読命令を記録する非一時的記録手段と、を用いて、意匠の製品公開後に出願公開されるような前記意匠の出願推奨日を提供する方法であって、前記方法は前記プロセッサに、
前記意匠の製品公開予定日と前記意匠の出願予定国を取得させ、
前記メインデータベースから前記出願予定国における前記所要日数を特定させ、
前記意匠の製品公開予定日と前記所要日数に基づいて、前記出願予定国における前記意匠の出願推奨日を算出させる、出願推奨日提供方法。
1. A method for providing a recommended filing date for a design to be published after product publication of the design, using a storage unit storing a main database including a number of days required from a design filing date to a publication date in each country, a processor, and a non-transitory storage means storing computer readable instructions executed by the processor, the method comprising:
Obtain the planned product release date of the design and the planned country of application for the design;
Identifying the number of days required in the country where the application is to be filed from the main database;
A method for providing a recommended filing date, which calculates a recommended filing date for the design in the country where the application is planned based on the planned product release date of the design and the required number of days.
各国における意匠出願の出願日から公開日までの所要日数を含むメインデータベースが記録された記憶部と、
少なくとも一つの意匠の出願公開予測日を算出する制御部と、
を備えており、
前記制御部は、
前記意匠を最初に出願した第一出願国と、前記第一出願国の出願日と、前記第一出願国の出願後に前記意匠を出願する第二出願予定国と、前記第二出願予定国の出願予定日とを取得する入力受付部と、
前記メインデータベースから前記第一出願国と前記第二出願予定国の各々における前記所要日数を特定する所要日数特定部と、
前記第一出願国の出願日と前記第二出願予定国の出願予定日と前記所要日数とに基づいて、前記第一出願国の出願公開予測日および前記第二出願予定国の出願公開予測日を算出する出願公開予測日算出部と、
を有する、出願公開予測日提供システム。
a memory unit in which a main database including the number of days required from the filing date to the publication date of a design application in each country is recorded;
A control unit that calculates a predicted publication date of at least one design application;
It is equipped with
The control unit is
an input receiving unit for acquiring a first filing country where the design was first filed, a filing date of the first filing country, a second filing country where the design will be filed after the filing of the first filing country, and a planned filing date of the second filing country;
a required number of days specification unit that specifies the required number of days in each of the first filing country and the second planned filing country from the main database;
a predicted publication date calculation unit for calculating a predicted publication date of the first application country and a predicted publication date of the second application country based on the application date of the first application country, the planned application date of the second application country, and the required number of days;
A system for providing predicted publication date of an application.
ユーザから前記意匠の製品公開予定日を取得する入力装置と、
前記意匠の出願公開予測日を前記ユーザに出力する出力装置と、を備えており、
前記出力装置は、前記第一出願国、前記第二出願予定国、前記第一出願国における前記出願公開予測日、前記第二出願予定国における前記出願公開予測日、および前記意匠の製品公開予定日を出力する、請求項8に記載の出願公開予測日提供システム。
an input device for acquiring a planned product release date of the design from a user;
and an output device that outputs the predicted publication date of the design to the user,
9. The system for providing a predicted application publication date according to claim 8, wherein the output device outputs the first application country, the second application planned country, the predicted application publication date in the first application country, the predicted application publication date in the second application planned country, and a planned product publication date of the design.
各国における意匠出願日から公開日までの所要日数を含むメインデータベースが記録された記憶部と、プロセッサと、前記プロセッサにより実行されるコンピュータ可読命令を記録する非一時的記録手段と、を用いて、意匠の出願公開予測日を提供する方法であって、前記方法は、前記プロセッサに、
前記意匠を最初に出願した第一出願国と、前記第一出願国の出願日と、前記第一出願国の出願後に前記意匠を出願する第二出願予定国と、前記第二出願予定国の出願予定日とを取得させ、
前記メインデータベースから前記第一出願国と前記第二出願予定国の各々における前記所要日数を特定させ、
前記第一出願国の出願日と前記第二出願予定国の出願予定日と前記所要日数とに基づいて、前記第一出願国の出願公開予測日および前記第二出願予定国の出願公開予測日を算出させる、出願公開予測日提供方法。
A method for providing a predicted publication date for a design application using a storage unit storing a main database including a number of days required from the filing date to the publication date in each country of a design application, a processor, and a non-transitory storage means for storing computer readable instructions executed by the processor, the method comprising:
Obtain the first filing country where the design was first filed, the filing date of the first filing country, the second filing country where the design will be filed after the first filing country, and the planned filing date of the second filing country;
Identifying the number of days required in each of the first filing country and the second filing country from the main database;
A method for providing a predicted application publication date, which calculates a predicted application publication date in the first application country and a predicted application publication date in the second planned application country based on the application date in the first application country, the planned application date in the second planned application country, and the required number of days.
JP2021121741A 2021-07-26 2021-07-26 System and method for providing recommended application date, and system and method for providing predicted application publication date Active JP7635985B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021121741A JP7635985B2 (en) 2021-07-26 2021-07-26 System and method for providing recommended application date, and system and method for providing predicted application publication date

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021121741A JP7635985B2 (en) 2021-07-26 2021-07-26 System and method for providing recommended application date, and system and method for providing predicted application publication date

Publications (2)

Publication Number Publication Date
JP2023017452A JP2023017452A (en) 2023-02-07
JP7635985B2 true JP7635985B2 (en) 2025-02-26

Family

ID=85157751

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021121741A Active JP7635985B2 (en) 2021-07-26 2021-07-26 System and method for providing recommended application date, and system and method for providing predicted application publication date

Country Status (1)

Country Link
JP (1) JP7635985B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20240338625A1 (en) * 2023-04-07 2024-10-10 Mark R. Melanson System and method to generate schedule for product release

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011096223A (en) 2009-10-02 2011-05-12 Yokohama Rubber Co Ltd:The Apparatus for business consultation and management
JP2014179068A (en) 2013-02-18 2014-09-25 Tsukasa Ota Application support system, application file creation support server, and application file creation support program

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011096223A (en) 2009-10-02 2011-05-12 Yokohama Rubber Co Ltd:The Apparatus for business consultation and management
JP2014179068A (en) 2013-02-18 2014-09-25 Tsukasa Ota Application support system, application file creation support server, and application file creation support program

Also Published As

Publication number Publication date
JP2023017452A (en) 2023-02-07

Similar Documents

Publication Publication Date Title
JP7615889B2 (en) Information processing device, information processing method, and program
US10719887B2 (en) Non-transitory computer-readable medium, data management system and data management server
JP7635985B2 (en) System and method for providing recommended application date, and system and method for providing predicted application publication date
KR20180082487A (en) Method, apparatus, terminal and storage medium for prompt modification
EP3439276A1 (en) Wait-for-turn management system, server, method, and program
JP2017010228A (en) Information processing apparatus, information processing method, and program
JP7042035B2 (en) Technical instructor dispatch support device, technical instructor dispatch support system and technical instructor dispatch support method
JP2016528594A (en) Electronic document creation and retrieval method and non-transitory computer-readable recording medium
JP2016067638A5 (en)
JP6253414B2 (en) Order management system and order management program
JP2018169659A (en) Sales system, server, sales system processing method, server processing method and program
US10331818B2 (en) Simulation system and simulation method
JP2020129344A (en) Processing device, processing method, and program
JP7061928B2 (en) Server equipment and programs
JP2016040652A (en) Document output device and document output method
JP6683899B1 (en) Gas meter replacement work support device, gas meter replacement work support method and program
JP2015133014A (en) Business task management device, business task management method, and business task management program
JP5966910B2 (en) Document output device, document output method, and document output program
JP6673436B1 (en) Processing device, processing system, processing method and program
JP2019102034A (en) Determination program, determination apparatus and determination method
JPWO2023175950A5 (en)
JP7467075B2 (en) Information processing device and program
JP2014238641A (en) Guarantee system, control method of the same, guarantee information registration device and determination device
US20220188926A1 (en) Management device, control method and storage media
US10096028B2 (en) Information processor, non-transitory computer readable medium, and information processing method for associating sets of data values

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240403

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20250128

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20250131

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250205

R150 Certificate of patent or registration of utility model

Ref document number: 7635985

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150