A sliding construction method for structures using a moving platform Download PDF

Info

Publication number
JP7645506B2
JP7645506B2 JP2021017335A JP2021017335A JP7645506B2 JP 7645506 B2 JP7645506 B2 JP 7645506B2 JP 2021017335 A JP2021017335 A JP 2021017335A JP 2021017335 A JP2021017335 A JP 2021017335A JP 7645506 B2 JP7645506 B2 JP 7645506B2
Authority
JP
Japan
Prior art keywords
partial
platform
frame
column
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021017335A
Other languages
Japanese (ja)
Other versions
JP2022120437A (en
Inventor
誠司 澤井
祥紘 岩崎
俊之 川添
照政 藤野
浩 栗本
徹哉 久金
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maeda Corp
Original Assignee
Maeda Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maeda Corp filed Critical Maeda Corp
Priority to JP2021017335A priority Critical patent/JP7645506B2/en
Publication of JP2022120437A publication Critical patent/JP2022120437A/en
Application granted granted Critical
Publication of JP7645506B2 publication Critical patent/JP7645506B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

特許法第30条第2項適用 (1)公開場所:北陸新幹線福井駅の上屋鉄骨工事現場(福井県福井市中央一丁目1-1)公開日:令和2年10月5日 (2)配布場所:北陸新幹線福井駅の上屋鉄骨工事現場(福井県福井市中央一丁目1-1)配布日:令和2年10月5日 配布資料:「北陸新幹線、福井駅新築工事の駅舎工事開始について」2020.10.5 (3)放送番組:福井テレビ 「LiveNews」、「タイムリーふくい」 放送日:令和2年10月5日、令和2年10月18日 (4)放送番組:NHK福井放送局 「NHKニュース」、「ニュースザウルス」 放送日:令和2年10月5日 (5)刊行物:株式会社福井新聞社 福井新聞(日刊) 令和2年10月6日付、第1面及び第2面 (6)刊行物:株式会社北陸工業新聞社 建設工業新聞(日刊) 令和2年10月7日付、第5面 (7)刊行物:株式会社中日新聞社 日刊県民福井 令和2年10月6日付、第1面 (8)刊行物:株式会社北國新聞社 北國新聞(日刊) 令和2年10月6日付、第28面、富山新聞(日刊) 令和2年10月6日付、第28面Application of Article 30, Paragraph 2 of the Patent Act (1) Place of publication: Steel frame construction site of the Fukui Station canopy on the Hokuriku Shinkansen Line (1-1-1 Chuo, Fukui City, Fukui Prefecture) Date of publication: October 5, 2020 (2) Place of distribution: Steel frame construction site of the Fukui Station canopy on the Hokuriku Shinkansen Line (1-1-1 Chuo, Fukui City, Fukui Prefecture) Date of distribution: October 5, 2020 Distributed material: "Start of construction of new Fukui Station building on the Hokuriku Shinkansen Line" October 5, 2020 (3) Broadcast program: Fukui Television "LiveNews", "Timely Fukui" Broadcast date: October 5, 2020, October 18, 2020 (4) Broadcast program: NHK Fukui Broadcasting Station "NHK News", "Newssaurus" Broadcast date: October 5, 2020 (5) Publication: Fukui Shimbun Co., Ltd. Fukui Shimbun (daily) (6) Publication: Hokuriku Kogyo Shimbun Co., Ltd. Construction Industry Newspaper (daily) October 7, 2020, page 5 (7) Publication: Chunichi Shimbun Co., Ltd. Prefectural Fukui Daily October 6, 2020, page 1 (8) Publication: Hokuriku Shimbun Co., Ltd. Hokuriku Shimbun (daily) October 6, 2020, page 28, Toyama Shimbun (daily) October 6, 2020, page 28

本発明は、ラーメン構造物を建方する場合に適用するスライド工法に関する。 The present invention relates to a slide construction method that is applied when erecting rigid frame structures.

鉄道駅のプラットホーム上屋などの長大な構造物を構築する建方工法として、スライド工法が採用されることがあった。スライド工法は、これら建物の桁行が長大である場合、その部分架構を組立て場所(以下、特定位置と称す)にて組立て、仕上げ材等を取付けて順次送り出すことができるので、施工効率がよいとされている。 The slide method has been used as an erection method for constructing long structures such as platform roofs at railway stations. When the span of these buildings is long, the slide method is considered to be efficient in construction because the partial frames can be assembled at the assembly site (hereafter referred to as the specific position), and finishing materials, etc., can be attached and sent out one by one.

前記構造物の張間方向はラーメン構造であることが多く、図13(a)に図示の柱脚がピン支持されたラーメン架構で説明すると、梁部の鉛直荷重wによって図13(b)に図示のような曲げモーメントM1およびM2が発生し、柱脚部には外側に蹴り出そうとする力(以下、柱脚部水平力と称す)に対抗する水平反力Hが生じる。その大きさは、ラーメン架構の張間寸法が長い程大きくなる。 The span direction of the structure is often a rigid frame structure, and if we explain it as a rigid frame frame with pin-supported column bases as shown in Figure 13(a), the vertical load w on the beams generates bending moments M1 and M2 as shown in Figure 13(b), and the column base generates a horizontal reaction force H that counters the force that tries to kick it outward (hereinafter referred to as the column base horizontal force). The magnitude of this force increases as the span dimension of the rigid frame becomes longer.

従来、そのようなラーメン構造物をスライド工法にて建方する場合、その部分架構がスライド移動中も構造的に安定するように、前記柱脚部水平力を支持するための十分な水平剛性と強度を有する基礎を設けておく必要があった。 Conventionally, when constructing such rigid frame structures using the sliding method, it was necessary to provide foundations with sufficient horizontal rigidity and strength to support the horizontal force of the column base so that the partial frame would remain structurally stable even during sliding movement.

また、スライド用レールとして、鉛直荷重を受けるレールの他に、前記柱脚部水平力を直接受けて前記基礎に力を伝達するための水平力受けレールも必要であった。 In addition to the rails that receive vertical loads, horizontal force-receiving rails were also required as slide rails to directly receive the horizontal force from the column base and transmit the force to the foundation.

更にまた、前記柱脚部水平力により、柱脚部が前記水平力受けレールに押し付けられながらスライド移動するため摩擦抵抗力が発生するので、より大きな牽引力が必要になり、そのため牽引設備が大掛かりになるという問題もあった。この問題は、牽引する部分架構が長くなりその重量がより重くなる程、その影響が大きくなる。 Furthermore, the horizontal force on the column base causes the column base to slide while being pressed against the horizontal force receiving rail, which generates frictional resistance, requiring a larger traction force, which in turn leads to the problem of larger traction equipment. The longer the partial structure to be towed is and the heavier it is, the greater the impact of this problem.

このように、従来のスライド工法では、柱脚部水平力を処理するための前記基礎や水平力受けレールの設置費用に加え、牽引設備の能力増強とコストアップも考慮する必要があった。 As such, with the conventional sliding method, in addition to the cost of installing the foundation and horizontal force-receiving rails to handle the horizontal force at the column base, it was also necessary to consider the increased capacity and cost of the towing equipment.

また、スライド移動中においても、水平力受けレールには外側に拡がろうとする前記柱脚部水平力が常に作用しているので、十分な安全対策も必要であった。 In addition, even during sliding movement, the horizontal force of the column base, which tends to spread outward, is constantly acting on the horizontal force receiving rail, so sufficient safety measures were also necessary.

スライド移動中における部分架構の前記柱脚部水平力を抑制する方法として、例えば、両側柱の柱脚部同士を張間方向につなぐテンション材を水平に設けかつ張力を導入して、柱脚部が水平方向に開こうとする大きな水平力と吊り合せる工法が考えられる。この場合、両柱脚部をつなぐテンション材の高さ以上の既存物があれば干渉するので適用不可であり、また、張力導入装置等を、スライド移動が完了して柱脚部が定着されるまで、全ての柱脚部に対して存置しておく必要があるので、牽引設備以外に多額の仮設費用がかかる。 One possible method for suppressing the horizontal force of the column base of the partial frame during sliding movement is to install tension members horizontally connecting the column bases of both sides in the span direction and introduce tension to counterbalance the large horizontal force that tries to open the column bases horizontally. In this case, if there is an existing object that is taller than the tension members connecting the two column bases, it will interfere and so cannot be applied. In addition, tension introduction devices etc. must remain in place for all column bases until the sliding movement is complete and the column bases are fixed, which means a large amount of temporary construction costs in addition to the traction equipment.

ラーメン架構のスライド工法において、前記柱脚部水平力への対処に関する先行技術としては、例えば、特許文献1記載の発明がある。 In the sliding construction method for rigid frame structures, the prior art for dealing with the horizontal force at the column base is, for example, the invention described in Patent Document 1.

特許文献1記載の発明は以下のような工法である。1回目スライドの門型部分架構を、屋根梁部両端と柱部とをピン接合状態にて仮受けして組立て、その状態でその他各部材の接合部のボルトを本締めしてジャッキダウンし、屋根仕上げ等を取付けた後、屋根梁部両端に部材を追加してラーメン架構として完成させる。ラーメン架構となった前記門型部分架構は、スライドレール上を牽引装置によりスライド移動される。 The invention described in Patent Document 1 is a construction method as follows. The first sliding gate-shaped partial frame is assembled by temporarily supporting both ends of the roof beams and the columns with pin joints, and in this state, the bolts of the joints of each other member are fully tightened and the structure is jacked down. After the roof finish and other fittings are installed, members are added to both ends of the roof beams to complete the rigid frame. The gate-shaped partial frame, now a rigid frame, is slid along the slide rails by a towing device.

次に、前記スライド移動により空いた場所にて、新たな門型部分架構を、1回目と同様に屋根梁部両端をピン接合状態にて仮受けして組立て、前記スライド済みの門型部分架構とを連結する屋根部材をピン接合状態にて組立て、その状態にてジャッキダウンする。 Next, in the space vacated by the sliding movement, a new gate-shaped partial frame is assembled by temporarily supporting both ends of the roof beams with pin joints in the same way as the first time, and the roof members that connect to the slid gate-shaped partial frame are assembled with pin joints, and in this state, the structure is jacked down.

その後、屋根仕上げ等を取付け、前記新たな門型部分架構の屋根梁部両端に部材を追加してラーメン架構とし、前記スライド済みと前記新たな門型部分架構とを連結する前記屋根部材を本締めして一体化する。そして、それら門型部分架構全体を、前記牽引装置より2回目のスライド移動をする。
以上の手順を必要回数繰り返す、大張間架構のスライド工法が開示されている。
After that, the roof finishing is installed, members are added to both ends of the roof beams of the new portal partial frame to form a rigid frame, and the roof members that connect the slid part and the new portal partial frame are fully tightened to integrate them. Then, the entire portal partial frame is slid a second time by the towing device.
A sliding construction method for large span structures has been disclosed, in which the above steps are repeated the required number of times.

このスライド工法によれば、梁部の自重によって発生する柱脚部水平力がスライド移動中に生じないので、従来の前記問題は解消されるとしている。 This sliding method is said to solve the above-mentioned problems, since the horizontal force on the column base caused by the beam's own weight does not occur during the sliding movement.

この方法では、門型部分架構の組立てにおいて、屋根梁部両端と柱部とがピン接合状態でジャッキダウンし、屋根部の仕上げ材等を取付けた後、前記門型部分架構の屋根梁部両端に部材を追加してラーメン架構として自立させる。即ち、ラーメン架構が完成する前であって、梁部が単純梁状態の時に鉛直荷重が載荷されるので、ラーメン架構完成後に屋根部の仕上げ材等を取付ける場合よりも、梁部材サイズが大きく(重く)なり、その傾向は張間寸法が長い程著しい。 In this method, when assembling the portal partial frame, both ends of the roof beam and the columns are jacked down with pin joints, and after the roof finishing materials are attached, members are added to both ends of the roof beam of the portal partial frame to make it stand on its own as a rigid frame. In other words, since the vertical load is applied before the rigid frame is completed and the beams are in a simple beam state, the beam members are larger (heavier) than when the roof finishing materials are attached after the rigid frame is completed, and this tendency is more pronounced the longer the span dimension.

本来、ラーメン構造の架構は、梁部と柱部とが剛接されているので、梁部両端部がピン接合状態の時よりも、部材に発生する最大曲げモーメントが小さいので、部材サイズを小さくすることができる。しかし、特許文献1記載の発明は、梁部の自重によって発生する柱脚部水平力を生じさせないことの代償として、その利点が発揮できずコストアップになるという問題があった。 In a rigid frame structure, the beams and columns are rigidly connected, so the maximum bending moment generated in the members is smaller than when both ends of the beams are pin-jointed, and the size of the members can be reduced. However, the invention described in Patent Document 1 had the problem that the cost of not generating horizontal force at the column base caused by the weight of the beams was increased because the advantage could not be realized.

また、例えば、高架化式の鉄道駅既設プラットホームあるいは既設鉄道線路の上部に上屋が増設される場合、クレーンによる在来工法では、少なくとも既設プラットホーム等沿線片側に、クレーンを据え付けられる場所の確保が必要だが、それが十分でない場合にスライド工法を採用することが考えられる。その場合に、例えば、特許文献1記載のスライド工法を適用すると、次のような問題があった。 For example, when a roof is added to an existing platform of an elevated railway station or on top of an existing railway track, the conventional construction method using a crane requires securing space to install the crane on at least one side of the existing platform or track, but when this is not sufficient, the slide construction method can be used. In such cases, applying the slide construction method described in Patent Document 1, for example, poses the following problems.

即ち、増設される前記上屋の柱を載せる仮設のスライドレールは、高架式の前記既設プラットホームや前記鉄道線路を支える下部躯体(柱または梁)の上に敷設されるが、前記スライドレールを受けるそれら既設下部躯体には、増設される上屋がスライド移動される時の鉛直荷重が設計荷重として想定されていないので、その荷重に耐えられるように、追加で補強する必要があった。 In other words, the temporary slide rails on which the columns of the additional building are placed are laid on top of the lower structure (pillars or beams) that supports the existing elevated platform and the railway track, but the vertical load that occurs when the additional building is slid is not considered as a design load for the existing lower structure that receives the slide rails, so additional reinforcement was required to ensure that it could withstand that load.

特許第6636091号公報Patent No. 6636091

本発明は、張間方向がラーメン構造の架構で、桁行が長大である建物の建方工法として用いられることの多いスライド工法において、ラーメン構造の部分架構のスライド移動中に、建物自重によって発生する柱脚部水平力を生じさせることなく、また、例えば、高架式の既設プラットホームや既設鉄道線路の上部に上屋が増設される場合であっても、その既設下部躯体を補強することなく、安全に施工できるスライド工法を提供するものである。 The present invention provides a slide construction method that is often used as a construction method for buildings with a rigid-frame structure in the span direction and long girders, but that does not generate horizontal force at the column base caused by the building's own weight during the sliding movement of a partial rigid-frame structure, and can be safely carried out without reinforcing the existing lower structure, even when, for example, a roof is to be added above an existing elevated platform or existing railway track.

本発明に係る移動構台を用いた構造物のスライド工法は、高架式の鉄道駅既設プラットホームまたは既設鉄道線路の上部に上屋を増設するためのラーメン構造物のスライド工法であって、
1)ラーメン構造物の部分架構を組立てる構台が、鉄道の軌道に構築されているコンクリート路盤の上に敷設されているスライドレール上を移動可能に特定位置に設置される工程。
2)前記特定位置に設置された前記構台において組立てられたラーメン構造物の1つ目の部分架構は、その大梁部が前記構台によって支持され、かつ前記部分架構の柱脚部が宙に浮いた状態で、前記スライドレール上を前記1つ目の部分架構の桁行幅分だけ運搬される工程。
3)前記特定位置に設置された新たな構台において、2つ目の部分架構が組立てられ、その大梁部が前記新たな構台によって支持され、かつ前記2つ目の部分架構の柱脚部が宙に浮いた状態で前記1つ目の部分架構に連結され、一体的に前記スライドレール上を前記2つ目の部分架構の桁行幅分だけ運搬される工程。
4)以下同様に、順次設置された新たな構台を用いて組立てられた部分架構は、1つ前の部分架構と連結され、一体的に前記スライドレール上を、最後尾の部分架構の桁行幅分だけ運搬される工程。
5)前記部分架構が全て連結された全架構は、最終的に運搬された所定位置において、ジャッキダウンにより前記構台による支持が解除され、全ての前記柱脚部が所定の基礎柱上に定着されて自立する工程。
6)前記全架構の全ての柱脚部が所定の基礎柱上に定着されて自立した後、前記部分架構を支持していた前記構台が、順次スライドレール上を移動して特定位置付近まで戻され、解体される工程。
以上の工程を含むことを特徴とするものである。
The sliding construction method for a structure using a movable platform according to the present invention is a sliding construction method for a rigid frame structure for adding a roof to an existing platform of an elevated railway station or an existing railway track,
1) A process in which a platform for assembling the partial framework of a rigid frame structure is set up at a specific position so that it can be moved along slide rails laid on the concrete roadbed constructed on a railway track .
2) A process in which the first partial frame of the rigid frame structure assembled on the platform installed at the specific position is transported on the slide rail a distance equal to the girder width of the first partial frame with its main girder portion supported by the platform and with the column base portion of the partial frame suspended in air.
3) A process in which a second partial structure is assembled on a new platform installed at the specific position, its main girder portion is supported by the new platform, and the column base portion of the second partial structure is connected to the first partial structure in a suspended state, and the two are transported together on the slide rails a distance equal to the span width of the second partial structure.
4) In the same manner, each partial structure assembled using a new platform installed in sequence is connected to the previous partial structure and transported together on the slide rail a distance equal to the girder width of the rearmost partial structure.
5) The entire structure, in which all of the partial structures are connected, is finally transported to a designated location, where it is jacked down to release the support from the platform, and all of the column bases are fixed onto the designated foundation columns, making it self-supporting.
6) After all of the column bases of the entire structure have been fixed onto the designated foundation columns and become independent, the platform that supported the partial structure is moved sequentially on the slide rails back to the vicinity of a specific position and then dismantled.
The method is characterized by including the above steps.

本発明は、以上のような手段であるので、スライド移動中において、部分架構の柱脚部は宙に浮いた状態なので柱脚部水平力は生じず、また、クレーンが届かない範囲の全架構の組立て、運搬、仮設機器材の解体撤去の各工程の作業効率および安全性が向上する。 The present invention uses the above-mentioned means, so that during sliding movement, the column base of the partial structure is suspended in the air, so no horizontal force is generated at the column base, and work efficiency and safety are improved in each process of assembling the entire structure in areas the crane cannot reach, transporting it, and dismantling and removing temporary equipment and materials.

また、前記本発明の移動構台を用いた構造物のスライド工法において、前記構台が鉄道の軌道に構築されているコンクリート路盤の上に敷設されているスライドレール上をスライド移動する際、前記スライドレールを介して前記コンクリート路盤に伝達される、前記部分架構を支持する前記構台からの荷重が、前記軌道に対する設計荷重を超えない範囲に収められていることを特徴とするものである Furthermore, in the sliding construction method for a structure using a mobile gantry of the present invention, when the gantry slides on a slide rail laid on a concrete roadbed constructed on a railway track , the load from the gantry supporting the partial frame, which is transmitted to the concrete roadbed via the slide rail, is kept within a range that does not exceed the design load for the track.

従って本発明は、高架式の鉄道駅既設プラットホームや既設鉄道線路の上部に上屋増設する場合に用いることができ、本発明高架式の鉄道駅既設プラットホーム等に用いられる場合、既設軌道およびそれを支える既設下部躯体の設計許容応力を超過することが防止される。 Therefore , the present invention can be used when adding a roof over an existing platform of an elevated railway station or over an existing railway track, and when the present invention is used on an existing platform of an elevated railway station, etc., it is possible to prevent the design allowable stress of the existing track and the existing substructure supporting it from being exceeded.

また、前記の本発明に係る移動構台を用いた構造物のスライド工法において、前記ラーメン構造物の部分架構の柱脚部が、ジャッキダウンによって所定の基礎柱上に載置される前に、前記柱脚部の正確な据付位置とのずれが、位置調整手段を用いて修正される工程を含んでいてもよい。 Furthermore, the sliding construction method for a structure using a movable platform according to the present invention may include a step of correcting any deviation from the exact installation position of the column base of the partial frame of the rigid frame structure using a position adjustment means before the column base is placed on a specified foundation column by jacking down.

前記位置調整の工程では、前記ジャッキダウンの際、前記柱脚部が所定の基礎柱上に載置される前に、前記柱脚部の正確な据付位置とのずれを修正するため、前記柱脚部と前記構台との間に仮設置された位置調整手段(装置)にて、前記柱脚部に水平力が加えられて正確な位置に修正することができる。 In the position adjustment process, during the jacking down, before the column base is placed on the designated foundation column, a horizontal force is applied to the column base by a position adjustment means (device) temporarily installed between the column base and the platform in order to correct any deviation from the exact installation position of the column base, thereby correcting it to the exact position.

また、本発明に係る移動構台を用いた構造物のスライド工法において、前記ラーメン構造物の部分架構の張間方向に並んで相対して立設された各構台の支保工の一部と前記部分架構の大梁部とを繋ぐ補強部材が設置されている、もしくは、相対して立設された前記各構台同士がトラス梁のような構造体にて相互に直接連結されていてもよい。 Furthermore, in the sliding construction method for a structure using a movable platform according to the present invention, a reinforcing member may be installed that connects a part of the support of each platform that is erected opposite to each other in the span direction of the partial frame of the rigid frame to the main girder portion of the partial frame, or the platforms that are erected opposite to each other may be directly connected to each other by a structure such as a truss beam .

なお、前記構台をスライド移動させる方法は、ウインチによるワイヤーロープ巻取り方式あるいは油圧ジャッキによる尺取り方式など、建設現場の諸条件等を考慮して決定すればよい。 The method for sliding the platform can be determined taking into account the conditions at the construction site, such as a wire rope winding method using a winch or a length measuring method using a hydraulic jack.

本発明は、以上のように、ラーメン構造物のスライド工法において、スライドレール上を移動可能な構台を取入れたことにより、次のような効果が得られる。 As described above, the present invention provides the following advantages by incorporating a platform that can move on slide rails in the sliding construction method for rigid frame structures.

(1)スライド移動中は部分架構の支持点を大梁部に設けて柱脚部を宙に浮かすので、従来のラーメン構造物のスライド工法において問題であった柱脚部水平力が発生せず、スライド移動中の安全性が高い。 (1) During sliding movement, the support points of the partial frame are set on the girder section and the column base is suspended in the air, so horizontal force at the column base, which was a problem with conventional sliding construction methods for rigid frame structures, is not generated, and safety during sliding movement is high.

(2)スライド移動中の柱脚部水平力が生じないので、その水平力を受けるスライド用基礎の補強が不要であり、そのための費用が削減できる。 (2) Since no horizontal force is generated at the column base during sliding, there is no need to reinforce the sliding foundation to withstand that horizontal force, which reduces the costs involved.

(3)部分架構の柱脚部が宙に浮いた状態にあるので、柱脚部が所定の基礎柱上に載置される際、仮設置された位置調整手段(装置)を用いて、容易に正確な据付位置とのずれを修正することができる。 (3) Because the column base of the partial structure is suspended in mid-air, when the column base is placed on the specified foundation column, any deviation from the correct installation position can be easily corrected using a temporarily installed position adjustment means (device).

(4)柱脚部が宙に浮いた状態でスライド移動されるので、建物の桁行方向に並ぶ柱列が、スライド方向に平行でなくても、各柱の所定位置への据付けが可能である。 (4) Because the column bases are slid while suspended in mid-air, each column can be installed in its designated position even if the columns aligned in the building's girder direction are not parallel to the sliding direction.

(5)クレーンが届かない施工範囲に構築される構造物の架構組立てや二次部材取付け作業、および構台等仮設材の解体が、クレーンが使用可能な特定位置にて実施されるので、作業効率がよい。 (5) The assembly of structures and installation of secondary components for structures constructed in areas that cranes cannot reach, as well as the dismantling of temporary materials such as platforms, are carried out in specific locations where cranes can be used, resulting in high work efficiency.

(6)高架式の鉄道駅既設プラットホームや既設鉄道線路の上部に上屋が増設される場合、軌道のコンクリート路盤上にスライドレールを敷設することで、既設プラットホームを支える下部躯体の補強が不要となるので、極めて合理的かつ経済的である。 (6) When a roof is added to an existing platform at an elevated railway station or on top of an existing railway track, by laying slide rails on the concrete roadbed of the track, it is unnecessary to reinforce the lower structure supporting the existing platform, which is extremely rational and economical.

本発明の実施例における建設現場の仮設機器材配置例であり、特定位置Sにおいて組立てられた1つ目の部分架構3がスライド移動開始される直前の状況を示す伏図である。FIG. 13 is a floor plan showing an example of temporary equipment arrangement at a construction site in an embodiment of the present invention, illustrating the state immediately before the first partial frame 3 assembled at a specific position S starts to slide. 本発明の実施例において、2つ目の部分架構3が1つ目の部分架構3に連結され、スライド移動開始する直前の状況を示す伏図である。FIG. 2 is a plan view showing a state immediately before a second partial frame 3 is connected to a first partial frame 3 and starts to slide in an embodiment of the present invention. 本発明の実施例において、3つ目の部分架構3が組立て済みの部分架構3に連結され、スライド移動開始する直前の状況を示す伏図である。FIG. 11 is a floor plan showing a state immediately before a third partial frame 3 is connected to an already assembled partial frame 3 and starts to slide in the embodiment of the present invention. 本発明の実施例において、全ての部分架構3が組立て完了し、所定位置へのスライド移動が完了した状況を示す伏図である。FIG. 2 is a plan view showing a state in which all of the partial frames 3 have been assembled and slid to their designated positions in the embodiment of the present invention. ジャッキダウン前の状態を示す図4のX-X断面視である。5 is a cross-sectional view taken along the line XX in FIG. 4, showing a state before jacking down. ジャッキダウンが完了し全架構が自立した後に、構台2を引き戻して解体する手順を説明する図であって、(a)は各部分架構3が連結されたまま引き戻され、特定位置S寄りで最後尾の部分架構3を分離して順次解体する場合であり、図(b)は、最後尾の部分架構3から分離して引き戻し、順次解体する場合である。FIG. 11 illustrates the procedure for pulling back and dismantling the platform 2 after jacking down is complete and the entire structure is independent. FIG. 11(a) illustrates the case in which each partial structure 3 is pulled back while remaining connected, and the rearmost partial structure 3 is separated near a specific position S and dismantled one by one. FIG. 11(b) illustrates the case in which the rearmost partial structure 3 is separated and pulled back, and dismantled one by one. 本発明の実施例におけるスライド直交方向の断面架構図であり、(a)は、ブレースによる構台2の張間方向の補強方法を示し、(b)は、(a)のイ断面視、(c)は、(a)のロ断面視である。1A and 1B are cross-sectional structural views in a direction perpendicular to the slide in an embodiment of the present invention, in which (a) shows a method of reinforcing the platform 2 in the span direction using braces, (b) is a cross-sectional view taken along line A in (a), and (c) is a cross-sectional view taken along line B in (a). 本発明の実施例において、図7(a)とは別案の構台補強方法を示す、スライド直交方向の断面架構図である。FIG. 8 is a cross-sectional view of the frame perpendicular to the slide, showing a method of reinforcing the platform in an embodiment of the present invention, which is different from that shown in FIG. 7( a ). 図7(a)において、部分架構3の大梁Gが山形の場合の断面架構図である。FIG. 7(a) is a cross-sectional view of the partial frame 3 when the girder G is angle-shaped. 本発明の実施例におけるスライド直交方向の断面架構図であって、張間方向2スパンの部分架構3をスライドする場合の説明図である。FIG. 13 is a cross-sectional frame diagram in a direction perpendicular to the sliding direction in an embodiment of the present invention, illustrating the case where a partial frame 3 having two spans in the span direction is slid. 大梁Gが支持点A、Aで支持されたラーメン架構の例題として、構造解析に用いた架構モデルと荷重条件を示す図である。This figure shows the frame model and loading conditions used in the structural analysis as an example of a rigid frame in which a main girder G is supported at support points A and A. 図11の架構モデルの解析結果であり、(a)は曲げモーメント図、(b)は変位図、(c)は柱下端部の水平移動を拘束した時の曲げモーメント図と反力を示す。These are the analysis results of the frame model in Figure 11, where (a) is the bending moment diagram, (b) is the displacement diagram, and (c) is the bending moment diagram and reaction force when the horizontal movement of the lower end of the column is restrained. 図13(a)は、柱脚ピン支持のラーメン架構の梁部に鉛直荷重wが載荷された架構モデルを示し、図13(b)は、前記ラーメン架構に発生する曲げモーメントM1、M2の分布状態と柱脚部反力Hを示す図である。Figure 13(a) shows a model of a rigid frame supported by column base pins with a vertical load w applied to the beams, and Figure 13(b) shows the distribution of bending moments M1 and M2 generated in the rigid frame and the column base reaction force H. 鉄道駅の高架プラットホームの1例を示す断面図である。FIG. 1 is a cross-sectional view showing an example of an elevated platform at a railway station.

本発明の第1実施例を図1乃至図7を参照して説明する。図1は、建物の建設現場において、仮設のスライドレール(2本1組)1、1が敷設され、その上を自立して移動可能な構台2、2と、それを用いて組立てられた1つ目の部分架構3が特定位置Sに設置されている様子を示す配置図である。 The first embodiment of the present invention will be described with reference to Figures 1 to 7. Figure 1 is a layout diagram showing a building construction site where temporary slide rails (a set of two) 1, 1 are laid, on which autonomously movable platforms 2, 2 are mounted, and a first partial frame 3 assembled using the rails is installed at a specific position S.

構台2、2は、ワイヤーロープ4、4を巻取り装置(ウインチ)のドラム5a、5a(5b、5b)で巻き取ることで、スライドレール1、1上を前後に移動可能となっている。 The gantry 2, 2 can move back and forth on the slide rails 1, 1 by winding the wire rope 4, 4 on the drums 5a, 5a (5b, 5b) of the winding device (winch).

部分架構3は、図7に図示のように、大梁Gと2本の柱Cとで構成されるラーメン架構Fが3面と、それらを連結する小梁g、g、…、および屋根面と壁面の面内に配置されたブレースv、v、…等から成る。実際の工事では、胴縁などの二次部材や仕上げ材等が取付けられることが多いと思われるが、本例では省略する。
なお、図中のf、f、…は、柱C、C、…が据付けられる基礎柱、9は既設もしくは後施工の構築物(例えば、鉄道駅のプラットフォーム等)を示す。
As shown in Fig. 7, the partial frame 3 is made up of three rigid frame structures F each consisting of a girder G and two columns C, sub-beams g, g, ... that connect them, and braces v, v, ... that are arranged within the roof and wall surfaces. In actual construction, secondary members such as furring strips and finishing materials are likely to be attached, but they will be omitted in this example.
In the figure, f, f, ... indicate foundation columns on which columns C, C, ... are installed, and 9 indicates an existing or later constructed structure (for example, a railway station platform, etc.).

本実施例において、スライド工事を実施する手順は以下の通りである。
1)特定位置Sに設置された構台2、2の支保工2a、2aを跨ぐようにして、3面の各ラーメン架構Fの大梁Gがそれぞれ2箇所の支持点A、Aにて支持された1つ目の部分架構3が組立てられる。この時、柱C、C、…の柱脚部(柱下端)は、基礎柱f、f、…の天端よりも少し高い位置で、宙に浮いた状態になっている(図7(a)参照)。
In this embodiment, the procedure for performing the slide construction is as follows.
1) The first partial frame 3 is assembled with the girder G of each of the three rigid frame structures F supported at two support points A, A, across the supports 2a, 2a of the gantry 2, 2 installed at a specific position S. At this time, the bases (lower ends) of the columns C, C, ... are suspended in the air at a position slightly higher than the top ends of the foundation columns f, f, ... (see Figure 7(a)).

2)各大梁Gがそれぞれ2箇所の支持点A、Aで支持された1つ目の部分架構3を乗せた構台2、2は、ワイヤーロープ4、4がドラム5a、5aにて巻取られることにより、スライドレール1、1上を1つ目の部分架構3の桁行幅分だけ、矢印方向(図1参照)に運搬される。 2) The gantry 2, 2 carrying the first partial structure 3, with each girder G supported at two support points A, A, is transported on the slide rails 1, 1 in the direction of the arrow (see Figure 1) by the span width of the first partial structure 3 as the wire ropes 4, 4 are wound around the drums 5a, 5a.

3)次に、特定位置Sに設置された新たな構台2、2において、2つ目の部分架構3が組立てられ、その大梁Gが前記新たな構台2、2によって支持され、かつ2つ目の部分架構3の柱脚部が宙に浮いた状態で1つ目の部分架構3に連結され、一体的にスライドレール1、1上を2つ目の部分架構3の桁行幅分だけ、矢印方向(図2参照)に運搬される。 3) Next, the second partial structure 3 is assembled on the new platforms 2, 2 installed at the specific position S, its main girder G is supported by the new platforms 2, 2, and the column base of the second partial structure 3 is connected to the first partial structure 3 while suspended in the air, and the whole structure is transported on the slide rails 1, 1 in the direction of the arrow (see Figure 2) for the width of the girder of the second partial structure 3.

4)以下同様に、順次設置された新たな構台2、2を用いて組立てられた部分架構3、3、・・・は、1つ前の部分架構3と連結され、一体的にスライドレール1、1上を、最新の部分架構3の桁行幅分だけ、矢印方向(図3参照)に運搬される。 4) Similarly, the partial frames 3, 3, ... assembled using the new platforms 2, 2 installed in sequence are connected to the previous partial frame 3 and transported together on the slide rails 1, 1 in the direction of the arrow (see Figure 3) by the width of the latest partial frame 3.

5)部分架構3、3、・・・が全て連結された全架構は(図4、5参照)、所定位置において、ジャッキダウンにより前記全架構の支持が解除され、全ての部分架構3、3、・・・の柱脚部が所定の基礎柱f、f、・・・上に定着されて自立する。 5) When the entire structure, in which all the partial frames 3, 3, ... are connected (see Figures 4 and 5), support for the entire structure is released by jacking down at the specified position, and the column bases of all the partial frames 3, 3, ... are fixed on the specified foundation columns f, f, ... and become independent.

6)前記ジャッキダウンの際、柱C、C、…の柱脚部が所定の基礎柱f、f、・・・上に載置される前に、前記柱脚部の正確な据付位置とのずれを修正するため、前記柱脚部と構台2、2、・・・との間に仮設置された位置調整装置6、6(図7(a)参照)にて、前記柱脚部に水平力が加えられることにより正確な位置に修正される。 6) During the jacking down, before the bases of the columns C, C, ... are placed on the specified foundation columns f, f, ..., in order to correct any deviation from the exact installation position of the column bases, a horizontal force is applied to the column bases by position adjustment devices 6, 6 (see Figure 7 (a)) temporarily installed between the column bases and the gantry 2, 2, ..., thereby correcting them to the exact position.

なお、上記の水平力Pについては具体例を後述するが、正確な据付位置とのずれが少ない場合は、位置調整装置6、6を用いることなく、柱脚部ベースプレート(図示せず)のアンカーボルト孔を予め大き目に開けておいて、アンカーボルトが挿通され、柱脚部がf、f、…に載置された後に、前記アンカーボルト孔を覆う座金板を前記ベースプレートに溶接する従来の方法でも、対応可能である。 A specific example of the horizontal force P will be given later, but if there is little deviation from the exact installation position, it is possible to use the conventional method of drilling a large anchor bolt hole in the column base plate (not shown) beforehand without using the position adjustment devices 6, 6, inserting the anchor bolt, and welding a washer plate covering the anchor bolt hole to the base plate after the column base is placed on f, f, ....

7)部分架構3、3、・・・の全ての柱脚部が所定の基礎柱f、f、・・・上に定着されて自立した後に、部分架構3、3、・・・の支持を解除された構台2、2、・・・は、スライドレール1、1上を移動して特定位置S付近まで引き戻され、解体される。この時、図6(a)に図示のように、一旦、全ての構台2、2、・・・が連結された状態で引き戻され、特定位置S側の構台2が、その連結部2bの部材が撤去され分離した後、解体、という手順が繰り返される。または、図6(b)に図示のように、特定位置S側の構台2のみ、あるいはそれを含む複数の構台2、2、・・・が部分的に分離され、特定位置S付近まで順次引き戻されて解体されるようにしてもよい。 7) After all the column bases of the partial frames 3, 3, ... are fixed on the specified foundation columns f, f, ... and become independent, the gantry 2, 2, ... from which the support of the partial frames 3, 3, ... is released is moved on the slide rails 1, 1 and pulled back to the vicinity of the specific position S and dismantled. At this time, as shown in FIG. 6(a), all the gantry 2, 2, ... are pulled back in a connected state, and the gantry 2 on the specific position S side is dismantled after the members of its connecting part 2b are removed. Alternatively, as shown in FIG. 6(b), only the gantry 2 on the specific position S side, or multiple gantry 2, 2, ... including it, may be partially separated and pulled back to the vicinity of the specific position S in sequence and dismantled.

8)構台2、2、・・・が全て解体された後、前記スライドレール1、1および牽引装置(ドラム5a、5b他)が撤去される。 8) After all of the platforms 2, 2, ... have been dismantled, the slide rails 1, 1 and traction devices (drums 5a, 5b, etc.) are removed.

上記手順6)において、柱C、C、…の柱脚部が所定の基礎柱f、f、…に載置される前に、正確な据付位置とのずれが修正される必要があるが、それは、本発明による方法特有の課題を含む。以下、図11および図12により説明する。 In step 6) above, before the bases of the columns C, C, ... are placed on the designated foundation columns f, f, ..., it is necessary to correct any deviations from the exact installation positions, which involves issues specific to the method according to the present invention. This will be explained below with reference to Figures 11 and 12.

図11は、1構面のラーメン架構Fの大梁Gが2箇所の支持点A、Aで鉛直支持され、柱C、Cの下端部が宙に浮いた状態の解析用架構モデル(左右対称とする)を示す。大梁Gには等分布荷重(大梁自重)wgの他に二次部材と仕上げ材を含む節点荷重Pgが載荷されており、大梁Gの両端に剛接合された柱C、Cには二次部材と仕上げ材が取付いて、柱自重を含む等分布荷重wcが鉛直荷重となっている。 Figure 11 shows an analytical frame model (symmetrical) in which the girder G of a one-plane rigid frame F is supported vertically at two support points A, A, and the lower ends of columns C, C are suspended in midair. In addition to the uniformly distributed load (the girder's own weight) wg, the girder G is loaded with a nodal load Pg including secondary members and finishing materials, and secondary members and finishing materials are attached to columns C, C, which are rigidly connected to both ends of the girder G, and the uniformly distributed load wc including the column's own weight acts as a vertical load.

このような条件でのラーメン架構Fは、柱C、Cの下端部に、内側水平方向への変位δhが生じるので(図12(b)参照)、本発明では、柱C、Cの柱脚部が基礎柱f、fに載置される前に、その柱脚部に水平力Pを外方向に加えて変位δhをゼロ(柱C、Cが鉛直である状態)に押し戻すことが必要となる。 Under these conditions, in the rigid frame F, an inward horizontal displacement δh occurs at the lower ends of columns C, C (see Figure 12(b)). In this invention, therefore, before the bases of columns C, C are placed on foundation columns f, f, it is necessary to apply a horizontal force P outward to the bases to push back the displacement δh to zero (a state in which columns C, C are vertical).

ここで、1例として、変位δhとそれをゼロに押し戻すのに必要な水平力Pがどの程度になるかを求めた計算例を示す。計算条件は、図11において下記のように仮定した。
梁長さs=19.115m、柱長さh=9.015m
大梁G:H-900×300×16×32
wg=3.04kN/m(大梁自重)、Pg=5.65~15.21kN(二次部材+仕上げ材)
柱C :□-550×550×32、wc=7.17kN/m(柱自重+二次部材+仕上げ材)
Here, as an example, a calculation example is shown to determine the displacement δh and the horizontal force P required to push it back to zero. The calculation conditions are assumed as follows in FIG.
Beam length s = 19.115m, column length h = 9.015m
Beam G: H-900×300×16×32
wg = 3.04kN/m (weight of main beam), Pg = 5.65 to 15.21kN (secondary members + finishing materials)
Column C: □-550×550×32, wc=7.17kN/m (column weight + secondary member + finishing material)

計算結果を図12(a)~(c)に示す。図12(a)は曲げモーメント図、図12(b)は変位図である。また、図12(c)は、柱脚部の変位δhをゼロに押し戻した場合の水平力Pを求めるために、柱下端部の水平移動を拘束した場合の曲げモーメント図である。図12(b)より、柱下端部の水平変位はδh=19.6mmである。また、図12(c)より、変位δhをゼロに押し戻すのに必要な水平力はP(=124kNm/9.015m)≒13.8kNであることが分かる。 The calculation results are shown in Figures 12(a) to (c). Figure 12(a) is a bending moment diagram, and Figure 12(b) is a displacement diagram. Figure 12(c) is a bending moment diagram when the horizontal movement of the lower end of the column is restrained in order to find the horizontal force P when the displacement δh of the column base is pushed back to zero. From Figure 12(b), the horizontal displacement of the lower end of the column is δh = 19.6 mm. From Figure 12(c), it can be seen that the horizontal force required to push back the displacement δh to zero is P (= 124 kNm/9.015m) ≒ 13.8 kN.

上記の例から、柱C、Cの下端部の水平変位δh(=19.6mm)とそれをゼロに押し戻すのに必要な水平力Pの大きさ(≒13.8kN)は、それ程大きなものではないことが分かる。従って、この程度の水平力Pであれば、柱C、Cの下端部と同じ高さにあるベント支柱2a、2aの足元でその反力受けても、ベント支柱2a、2aの脚部からスライドレール1、1を介して地盤へ、安全に力を伝達できる。 From the above example, we can see that the horizontal displacement δh (= 19.6 mm) of the bottom ends of columns C, C and the magnitude of the horizontal force P (≒ 13.8 kN) required to push it back to zero are not that large. Therefore, with this level of horizontal force P, even if the reaction force is received at the base of the bent columns 2a, 2a, which are at the same height as the bottom ends of columns C, C, the force can be safely transmitted from the legs of the bent columns 2a, 2a to the ground via the slide rails 1, 1.

なお、構台2の構成は、例えば、図7(a)、(b)のように、1箇所の支持点Aが1台のベント支柱2aにより支持され、片側のスライドレール1側の支持点Aの数(図7では3箇所)と同じ台数のベント支柱2a同士が、繋ぎ材b、b、…とブレースv、v、…にて連結され、一体化されたものである。 The configuration of the platform 2 is such that, for example, as shown in Figures 7(a) and (b), one support point A is supported by one bent support column 2a, and the same number of bent support columns 2a as the number of support points A on one side of the slide rail 1 (three in Figure 7) are connected together by connecting members b, b, ... and braces v, v, ... to form an integrated unit.

また、部分架構3を支持する1対の構台2、2には、スライド直交方向の地震水平力等に対する抵抗力を確保するため、図7(a)に図示のように、補強ブレース7、7が大梁Gの支持点A、Aとベント支柱2a、2aの最下部とに掛け渡されている。本設の大梁Gを利用した簡易な仮補強方法である。 In addition, to ensure resistance to horizontal earthquake forces in the direction perpendicular to the slide, a pair of platforms 2, 2 supporting the partial frame 3 are fitted with reinforcing braces 7, 7 that span support points A, A of the girder G and the bottom of the bent columns 2a, 2a, as shown in Figure 7(a). This is a simple temporary reinforcement method that utilizes the permanent girder G.

スライド直交方向の抵抗力を確保する他の方法として、例えば、図8に図示のように、一対の構台2、2を、例えばトラス梁Tで連結して、水平荷重に対して十分安定したトラスラーメン架構にすることが考えられる。この場合、両構台2、2間の往来を可能にできるので、部分架構3の組立て作業時の足場としても利用できる。 As another method for ensuring resistance in the direction perpendicular to the slide, for example, as shown in Figure 8, a pair of platforms 2, 2 can be connected with, for example, a truss beam T to create a truss rigid frame structure that is sufficiently stable against horizontal loads. In this case, since it is possible to move between the platforms 2, 2, it can also be used as a scaffold during the assembly work of the partial frame 3.

以上のように、本発明における構台2は、繰り返し使用を前提とするベント支柱2aを利用するので、解体と組立てが容易であり、仮設費は安価である。 As described above, the platform 2 of the present invention uses bent columns 2a that are designed for repeated use, making it easy to disassemble and assemble, and the temporary construction costs are low.

以上の実施例では、ラーメン架構Fの大梁Gが水平の場合であったが、例えば、図9に図示のように、棟部が軒部よりも高い場合、大梁Gの支持点A、Aは自重によって外側に広がろうとするので、それを抑制するため、支持点A、Aを繋ぐタイバー8を設置することが好ましい。 In the above examples, the main girder G of the rigid frame structure F is horizontal, but for example, as shown in Figure 9, if the ridge is higher than the eaves, the support points A, A of the main girder G will tend to spread outward due to their own weight, so in order to suppress this, it is preferable to install tie bars 8 connecting the support points A, A.

また、図10は、ラーメン架構Fが2スパン連続する場合であり、スライド直交方向の架構図を示す。各スパン内にそれぞれ1対のスライドレール1、1と構台2、2が設けられている。この場合、4列ある構台2、2、・・・のスライド移動速度の同期について、2列の場合よりも、より慎重に操作する必要がある。 Figure 10 shows the frame structure in the direction perpendicular to the slide when the rigid frame structure F has two consecutive spans. A pair of slide rails 1, 1 and platforms 2, 2 are provided in each span. In this case, the synchronization of the slide movement speed of the four rows of platforms 2, 2, ... must be performed more carefully than in the case of two rows.

図14は、鉄道駅の高架プラットホーム9と鉄道線路のコンクリート路盤12、12を支える下部躯体および上屋架構の1例を示す断面図であり、下部躯体はRC柱10、10、RC梁11、11、・・・および片持ち梁11a、11a等から構成されている。このような既設構造物に上屋を増設する場合、次のような課題があった。 Figure 14 is a cross-sectional view showing an example of the lower structure and roof structure supporting the elevated platform 9 of a railway station and the concrete roadbed 12, 12 of the railway track. The lower structure is composed of RC columns 10, 10, RC beams 11, 11, ... and cantilever beams 11a, 11a, etc. When adding a roof to such an existing structure, the following problems arise.

クレーンによる在来工法で施工するには、少なくとも既設プラットホーム沿線片側に、クレーンが据え付けられる場所の確保が必要だが、それが十分でない場合にスライド工法を採用することが考えられる。その場合に、例えば、特許文献1記載の発明のように、スライド移動中にラーメン架構の柱脚部に生じる外側へ蹴り出そうとする水平力が発生しないスライド工法であっても、次のような課題があった。 To carry out construction using a conventional crane method, it is necessary to secure a place to install the crane on at least one side of the existing platform, but when this is not sufficient, it is possible to adopt the slide method. In such cases, even if the slide method does not generate horizontal forces that tend to kick the structure outward during sliding movement at the base of the columns of the rigid frame structure, as in the invention described in Patent Document 1, the following problems still exist.

即ち、増設上屋のラーメン架構Fの柱C、Cを載せる仮設のスライドレールは、前記既設高架プラットホームを支える下部躯体の両端部(図14では、片持ち梁11a、11aの先端)付近を線路方向に繋ぐ線上に敷設されるため、片持ち梁11a、11aおよびそれらを線路方向に繋ぐ下部躯体には、複数のラーメン架構F、F、・・・がスライド移動される時の鉛直荷重が負荷される。しかし、その荷重は前記下部躯体部分の設計荷重としては想定されていないので、その荷重に耐えられるように補強することが必要となる。 In other words, the temporary slide rails on which the columns C, C of the rigid frame structure F of the additional roof are placed are laid on a line connecting the ends of the lower structure supporting the existing elevated platform in the direction of the tracks (the tips of the cantilever beams 11a, 11a in Figure 14) and therefore the cantilever beams 11a, 11a and the lower structure connecting them in the direction of the tracks are subjected to a vertical load when the multiple rigid frame structures F, F, ... slide. However, this load is not anticipated as a design load for the lower structure, and so it will need to be reinforced to withstand this load.

つまり、既設の高架プラットホームの上屋増設にスライド工法を適用する場合では、上記のような既設下部躯体の補強を如何にして不要にするかが課題であった。
そこで、本発明の第2実施例は、既設下部躯体を補強することなくスライド工法を用いて、既設高架プラットホームに上屋を増設する工法を提供するものである。
In other words, when applying the slide method to add a roof to an existing elevated platform, the challenge was how to eliminate the need to reinforce the existing lower structure as described above.
Therefore, the second embodiment of the present invention provides a construction method for adding a roof to an existing elevated platform using a slide construction method without reinforcing the existing lower structure.

ラーメン構造物の部分架構3、3、・・・を組立てる構台2、2、・・・(図7参照)を載せる仮設のスライドレール1、1は、鉄道の軌道に構築されているコンクリート路盤12、12(図14参照)の上に敷設される。 The temporary slide rails 1, 1 on which the platforms 2, 2, ... (see Figure 7) on which the partial frames 3, 3, ... of the rigid frame structure are assembled are placed are laid on the concrete roadbeds 12, 12 (see Figure 14) built on the railway track.

そして、スライド移動中にスライドレール1、1を介してコンクリート路盤12、12に伝達される荷重が、鉄道の軌道に対する設計荷重(列車の重量等)を超えない範囲で、部分架構3、3、・・・および構台2、2、・・・が組立てられる。 Then, the partial frames 3, 3, ... and the platforms 2, 2, ... are assembled so that the load transmitted to the concrete roadbed 12, 12 via the slide rails 1, 1 during sliding movement does not exceed the design load for the railway track (train weight, etc.).

以上の要件を、本発明の第1実施例に反映させることによって、既設下部躯体の補強が不要となるラーメン構造物のスライド工法が実現する。 By incorporating the above requirements into the first embodiment of the present invention, a sliding construction method for rigid frame structures is realized that does not require reinforcement of the existing lower structure.

なお、第2実施例では、既設の高架プラットホームの場合を取上げたが、高架式の既設鉄道線路の上部に上屋を設ける場合にも適用できることは言うまでもない。 In the second embodiment, we have looked at the case of an existing elevated platform, but it goes without saying that the same can also be applied to cases where a roof is installed above an existing elevated railway track.

本発明は、張間方向がラーメン構造で、例えば、鉄道駅のプラットホーム上屋のように、桁行が長大である構造物の建方工法としてスライド工法が採用された場合、従来のような、スライド移動中の柱脚部に生じる外側に蹴り出そうとする水平力が発生しないので、基礎工事費削減と安全性向上、更には施工効率向上に貢献できる。特に、高架式の鉄道駅既設プラットホームや既設鉄道線路の上部に上屋を増設する場合においては、既設下部躯体の補強が不要となるので、極めて合理的かつ経済的である。 When the sliding method is used to construct a structure with a rigid frame structure in the span direction and a long girder span, such as a platform roof at a railway station, the present invention contributes to reducing foundation construction costs, improving safety, and improving construction efficiency, since no horizontal force is generated at the base of the column during sliding movement as in the past, which tends to push the column outward. In particular, when adding a roof to an existing platform at an elevated railway station or above an existing railway track, there is no need to reinforce the existing lower structure, making it extremely rational and economical.

1:スライドレール
2:構台
2a:支保工(ベント支柱)
2b:連結部
3:部分架構
4:ワイヤーロープ
5a、5b:ドラム
6:位置調整装置
7:補強ブレース
8:タイバー
9:プラットホーム
10:RC柱
11:RC梁
11a:片持ち梁
12:コンクリート路盤
A:支持点
C:柱
F:ラーメン架構
G:大梁
H:水平反力
P:水平力
S:特定位置(組立て場所)
T:トラス梁
b:繋ぎ材
f:基礎柱
g:小梁
v:ブレース
1: Slide rail 2: Platform 2a: Support (bent support)
2b: Connection part 3: Partial frame 4: Wire rope 5a, 5b: Drum 6: Position adjustment device 7: Reinforcement brace 8: Tie bar 9: Platform 10: RC column 11: RC beam 11a: Cantilever beam 12: Concrete roadbed A: Support point C: Column F: Rigid frame G: Girder H: Horizontal reaction force P: Horizontal force S: Specific position (assembly location)
T: Truss beam b: Tie f: Foundation column g: Small beam v: Brace

Claims (4)

高架式の鉄道駅既設プラットホームまたは既設鉄道線路の上部に上屋を増設するためのラーメン構造物のスライド工法であって、
1)ラーメン構造物の部分架構を組立てる構台が、鉄道の軌道に構築されているコンクリート路盤の上に敷設されているスライドレール上を移動可能に特定位置に設置される工程。
2)前記特定位置に設置された前記構台において組立てられたラーメン構造物の1つ目の部分架構は、その大梁部が前記構台によって支持され、かつ前記部分架構の柱脚部が宙に浮いた状態で、前記スライドレール上を前記1つ目の部分架構の桁行幅分だけ運搬される工程。
3)前記特定位置に設置された新たな構台において、2つ目の部分架構が組立てられ、その大梁部が前記新たな構台によって支持され、かつ前記2つ目の部分架構の柱脚部が宙に浮いた状態で前記1つ目の部分架構に連結され、一体的に前記スライドレール上を前記2つ目の部分架構の桁行幅分だけ運搬される工程。
4)以下同様に、順次設置された新たな構台を用いて組立てられた部分架構は、1つ前の部分架構と連結され、一体的に前記スライドレール上を、最後尾の部分架構の桁行幅分だけ運搬される工程。
5)前記部分架構が全て連結された全架構は、最終的に運搬された所定位置において、ジャッキダウンにより前記構台による支持が解除され、全ての前記柱脚部が所定の基礎柱上に定着されて自立する工程。
6)前記全架構の全ての柱脚部が所定の基礎柱上に定着されて自立した後、前記部分架構を支持していた前記構台が、順次スライドレール上を移動して特定位置付近まで戻され、解体される工程。
以上の工程を含むことを特徴とする、移動構台を用いた構造物のスライド工法。
A sliding construction method for a rigid frame structure for adding a roof to an existing platform of an elevated railway station or an existing railway track ,
1) A process in which a platform for assembling the partial framework of a rigid frame structure is set up at a specific position so that it can be moved along slide rails laid on the concrete roadbed constructed on a railway track .
2) A process in which the first partial frame of the rigid frame structure assembled on the platform installed at the specific position is transported on the slide rail a distance equal to the girder width of the first partial frame with its main girder portion supported by the platform and with the column base portion of the partial frame suspended in air.
3) A process in which a second partial structure is assembled on a new platform installed at the specific position, its main girder portion is supported by the new platform, and the column base portion of the second partial structure is connected to the first partial structure in a suspended state, and the two are transported together on the slide rails a distance equal to the span width of the second partial structure.
4) In the same manner, each partial structure assembled using a new platform installed in sequence is connected to the previous partial structure and transported together on the slide rail a distance equal to the girder width of the rearmost partial structure.
5) The entire structure, in which all of the partial structures are connected, is finally transported to a designated location, where it is jacked down to release the support from the platform, and all of the column bases are fixed onto the designated foundation columns, making it self-supporting.
6) After all of the column bases of the entire structure have been fixed onto the designated foundation columns and become independent, the platform that supported the partial structure is moved sequentially on the slide rails back to the vicinity of a specific position and then dismantled.
A sliding construction method for a structure using a movable platform, comprising the above steps.
請求項1記載の移動構台を用いた構造物のスライド工法において、前記構台が鉄道の軌道に構築されているコンクリート路盤の上に敷設されているスライドレール上をスライド移動する際、前記スライドレールを介して前記コンクリート路盤に伝達される、前記部分架構を支持する前記構台からの荷重が、前記軌道に対する設計荷重を超えない範囲に収められていることを特徴とする、移動構台を用いた構造物のスライド工法。 2. A sliding construction method for a structure using a movable platform as described in claim 1, characterized in that , when the platform slides on a slide rail laid on a concrete roadbed constructed on a railway track , the load from the platform supporting the partial frame that is transmitted to the concrete roadbed via the slide rail is kept within a range that does not exceed the design load for the track. 請求項1または2記載の移動構台を用いた構造物のスライド工法において、前記ラーメン構造物の部分架構の柱脚部が、ジャッキダウンによって所定の基礎柱上に載置される前に、前記柱脚部の正確な据付位置とのずれが、位置調整手段を用いて修正される工程を含むことを特徴とする移動構台を用いた構造物のスライド工法。 3. A sliding construction method for a structure using a movable platform as claimed in claim 1 or 2, characterized in that it includes a step of correcting any deviation from the exact installation position of the column base of the partial frame of the rigid frame structure using a position adjustment means before the column base is placed on a specified foundation column by jacking down. 請求項1乃至3の何れかに記載の移動構台を用いた構造物のスライド工法において、前記ラーメン構造物の部分架構の張間方向に並んで相対して立設された各構台の支保工の一部と前記部分架構の大梁部とを繋ぐ補強部材が設置されている、もしくは、相対して立設された前記各構台同士がトラス梁にて相互に直接連結されていることを特徴とする移動構台を用いた構造物のスライド工法。 A sliding construction method for a structure using a movable platform as described in any one of claims 1 to 3, characterized in that a reinforcing member is installed connecting a part of the support of each platform erected opposite to each other in the span direction of the partial frame of the rigid frame structure to the main girder portion of the partial frame , or the platforms erected opposite to each other are directly connected to each other by truss beams .
JP2021017335A 2021-02-05 2021-02-05 A sliding construction method for structures using a moving platform Active JP7645506B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021017335A JP7645506B2 (en) 2021-02-05 2021-02-05 A sliding construction method for structures using a moving platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021017335A JP7645506B2 (en) 2021-02-05 2021-02-05 A sliding construction method for structures using a moving platform

Publications (2)

Publication Number Publication Date
JP2022120437A JP2022120437A (en) 2022-08-18
JP7645506B2 true JP7645506B2 (en) 2025-03-14

Family

ID=82849243

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021017335A Active JP7645506B2 (en) 2021-02-05 2021-02-05 A sliding construction method for structures using a moving platform

Country Status (1)

Country Link
JP (1) JP7645506B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7413473B1 (en) 2022-09-28 2024-01-15 株式会社巴コーポレーション Slide construction method and reinforcement member installation structure for diagonal truss frames

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070006401A1 (en) 2005-07-09 2007-01-11 James Thomson Load bearing construction and method for installation

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS525770B2 (en) * 1973-10-05 1977-02-16
JPH0949330A (en) * 1995-08-07 1997-02-18 Tomoe Corp Slidingly erecting construction method of structure
JP2008057226A (en) * 2006-08-31 2008-03-13 Sumikei-Nikkei Engineering Co Ltd Building construction method on bridge girder and bridge having the building

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070006401A1 (en) 2005-07-09 2007-01-11 James Thomson Load bearing construction and method for installation

Also Published As

Publication number Publication date
JP2022120437A (en) 2022-08-18

Similar Documents

Publication Publication Date Title
JP7330646B2 (en) Sliding method for Rahmen structures
CN107090975B (en) Formwork erecting construction method for ultrahigh large-span concrete cast-in-place beam bailey truss
JP5097313B2 (en) Suspended scaffold and its installation method
IL114850A (en) Crane for modular bridge construction
JP2022179455A (en) Side-span shoring structure of a continuous T-girder viaduct straddling an existing railroad track
CN110409624A (en) A large-scale equipment installation and main structure reverse calculation and construction method
CN115627912A (en) Construction method of assembled externally-mounted flower basket type overhanging scaffold
CN111218987A (en) Bearing type net rack construction method
CN114319145B (en) Bridge erection method using bridge girder erection machine
JP6636091B2 (en) Slide method for ramen structures
JP7645506B2 (en) A sliding construction method for structures using a moving platform
CN109424072A (en) The connecting node and construction method of spacer bar concrete column on a kind of girder steel
CN113250085A (en) Arch stiffening continuous beam steel pipe arch pushing construction process
JP2008169552A (en) Cutting and rehabilitating connecting bridges with different distances between buildings
CN107419902A (en) The method of steel-structure factory building crane girder construction roofing
CN118498732A (en) Sliding pushing construction method for large-span steel structure roof
CN217325044U (en) Cast-in-place crossbeam bracket of reassembling type
CN218541249U (en) Prefabricated motor vehicle ramp plate structure
JPH0828053A (en) Travelling construction method
JP2021130952A (en) Protective working platform and its construction method
CN112431431B (en) Reinforcement construction method for steel structure factory building in crane beam dismantling
CN116464164A (en) Multi-conjoined large-span roof steel grid system and construction method thereof
JP2018199933A (en) Structure body and construction method of structure constructed on top of tower-like building
CN220319075U (en) Guy rope hanging basket assembling platform
CN119243589B (en) Large-span floor arch structure installation method with arch foot prestress balance cable

Legal Events

Date Code Title Description
A80 Written request to apply exceptions to lack of novelty of invention

Free format text: JAPANESE INTERMEDIATE CODE: A80

Effective date: 20210205

A80 Written request to apply exceptions to lack of novelty of invention

Free format text: JAPANESE INTERMEDIATE CODE: A80

Effective date: 20210212

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240125

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240909

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20241015

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20241129

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20241129

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20241129

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20250212

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250221

R150 Certificate of patent or registration of utility model

Ref document number: 7645506

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150