JP7660458B2 - Chimney unit spacing jig and building chimney construction method - Google Patents
[go: Go Back, main page]

JP7660458B2 - Chimney unit spacing jig and building chimney construction method - Google Patents

Chimney unit spacing jig and building chimney construction method Download PDF

Info

Publication number
JP7660458B2
JP7660458B2 JP2021128169A JP2021128169A JP7660458B2 JP 7660458 B2 JP7660458 B2 JP 7660458B2 JP 2021128169 A JP2021128169 A JP 2021128169A JP 2021128169 A JP2021128169 A JP 2021128169A JP 7660458 B2 JP7660458 B2 JP 7660458B2
Authority
JP
Japan
Prior art keywords
chimney
jig
chimney unit
building
pair
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021128169A
Other languages
Japanese (ja)
Other versions
JP2023023023A (en
Inventor
友弘 江水
元宏 中澤
芳宣 佐藤
泰照 野上
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujimori Sangyo Co Ltd
Original Assignee
Fujimori Sangyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujimori Sangyo Co Ltd filed Critical Fujimori Sangyo Co Ltd
Priority to JP2021128169A priority Critical patent/JP7660458B2/en
Publication of JP2023023023A publication Critical patent/JP2023023023A/en
Application granted granted Critical
Publication of JP7660458B2 publication Critical patent/JP7660458B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Chimneys And Flues (AREA)

Description

本発明は、建物用煙突を構築する際の治具及び該治具を用いた建物用煙突の構築方法に関し、特に上下に積層される煙突ユニットの間に設けられる煙突ユニット間隔保持治具及び建物用煙突の構築方法に関する。 The present invention relates to a jig for constructing a chimney for a building and a method for constructing a chimney for a building using said jig, and in particular to a chimney unit spacing jig that is provided between chimney units stacked vertically, and a method for constructing a chimney for a building.

例えば、特許文献1に記載の建物用煙突は、複数の煙突ユニットに分割されている。これら煙突ユニットが、建物の煙突用吹き抜け区画内に上下に積層されている。各煙突ユニットの上側部からアームが突出されて建物躯体の支持台に連結されている。これによって、各煙突ユニットが建物躯体に吊支持されている。したがって、各煙突ユニットの荷重の大部分が建物躯体にかかっており、それよりも下側の煙突ユニットにかかることがない。上下に隣接する2つの煙突ユニットの間には、シール部材が設けられている。 For example, the chimney for a building described in Patent Document 1 is divided into multiple chimney units. These chimney units are stacked vertically within the chimney atrium section of the building. An arm protrudes from the upper part of each chimney unit and is connected to a support base of the building frame. This allows each chimney unit to be suspended and supported by the building frame. Therefore, most of the load of each chimney unit is borne by the building frame, and is not borne by the chimney units below it. A sealing member is provided between two chimney units adjacent vertically.

特許文献2には、この種の建物用煙突を構築する方法が記載されている。具体的には、下段煙突ユニットの上に上段煙突ユニットを積層する際、予め、長い全ネジボルトを鉛直に向けて上段煙突ユニットから下方へ延び出るように取り付けておく。該上段煙突ユニットをクレーンで吊って下段煙突ユニットの真上に配置するとともに、前記全ネジボルトを下段煙突ユニットにナットで連結して、上下の煙突ユニットどうしの間隔、更には、これら煙突ユニット間に挟まれたシール部材の厚みが所定になるよう、前記全ネジボルト及びナットで上段煙突ユニットの高さを微調節する。その高さを保ちながら、上段煙突ユニットを建物躯体に連結する。その後、前記全ネジボルト及びナットを撤去する。 Patent Document 2 describes a method for constructing this type of chimney for a building. Specifically, when stacking the upper chimney unit on top of the lower chimney unit, a long fully threaded bolt is attached in advance so that it extends vertically downward from the upper chimney unit. The upper chimney unit is hung by a crane and positioned directly above the lower chimney unit, and the fully threaded bolt is connected to the lower chimney unit with a nut. The height of the upper chimney unit is finely adjusted with the fully threaded bolt and nut so that the distance between the upper and lower chimney units and the thickness of the sealing material sandwiched between these chimney units are specified. While maintaining that height, the upper chimney unit is connected to the building frame. The fully threaded bolt and nut are then removed.

特開2016-056633号公報JP 2016-056633 A 特開2021-063347号公報JP 2021-063347 A

前掲特許文献2に記載の施工方法においては、建物躯体が上段煙突ユニットの荷重を受けるまでは、その荷重が、長い全ネジボルトを軸方向へ圧縮するようにかかり、全ネジボルトが変形して破断するおそれがある。本発明は、かかる事情に鑑み、上段煙突ユニットの荷重に十分に耐えることのできる煙突ユニット間隔保持治具及び該治具を用いた煙突施工方法を提供することを目的とする。 In the construction method described in Patent Document 2, the load of the upper chimney unit acts in the axial direction on the long fully threaded bolts until the building frame bears the load, which may cause the fully threaded bolts to deform and break. In view of this situation, the present invention aims to provide a chimney unit spacing jig that can adequately withstand the load of the upper chimney unit, and a chimney construction method using said jig.

前記課題を解決するため、本発明装置は、四角形断面の複数の煙突ユニットを積み重ね、かつ各煙突ユニットを建物躯体に吊支持させてなる建物用煙突の構築において隣接する上段煙突ユニット及び下段煙突ユニットの間に設けられる煙突ユニット間隔保持治具であって、
上下一対のL字状の平面断面形状に形成され、互いに相対高さ調節可能に内外に重ね合わされて、前記下段煙突ユニットの上端コーナー部に設置される治具本体と、
前記一対の治具本体どうしを圧接可能かつ圧接解除可能な圧接手段と、
を備えたことを特徴とする。
In order to solve the above problems, the present invention provides a chimney unit spacing jig that is provided between adjacent upper and lower chimney units in the construction of a chimney for a building, in which a plurality of chimney units having a rectangular cross section are stacked and each chimney unit is suspended from a building framework, the jig comprising:
A jig body formed into a pair of upper and lower L-shaped planar cross sections, stacked inside and outside so as to be able to adjust the relative height of each other, and installed at the upper end corner portion of the lower chimney unit;
a pressure contact means capable of pressing the pair of jig bodies together and releasing the pressure contact;
The present invention is characterized by comprising:

当該煙突ユニット間隔保持治具を前記下段煙突ユニットの上端コーナー部に設置するとともに、上段煙突ユニットを吊り降ろすと、上段煙突ユニットの下端部が上側の治具本体に突き当たる。
前記圧接手段による圧接解除によって、前記一対の治具本体の相対高さ調節が許容され、煙突ユニット間隔保持治具を高さ調節できる。これによって、上段煙突ユニットと下段煙突ユニットとの間隔を調節でき、これら煙突ユニット間のシール部材の厚み、ひいては圧縮度合を調整できる。
前記圧接手段による圧接によって、一対の治具本体どうし間に強い摩擦力が働き、相対高さ調節が阻止される。これによって、上段煙突ユニットと下段煙突ユニットとの間隔を保持できる。鉛直なボルトの軸力で上段煙突ユニットを支持するものではなく、十分な耐荷重性を得ることができる。
When the chimney unit spacing jig is installed at the upper corner of the lower chimney unit and the upper chimney unit is hung down, the lower end of the upper chimney unit abuts against the upper jig body.
By releasing the pressure from the pressure means, the relative height of the pair of jig bodies can be adjusted, and the height of the chimney unit spacing jig can be adjusted. This makes it possible to adjust the spacing between the upper and lower chimney units, and thus adjust the thickness of the seal material between these chimney units, and therefore the degree of compression.
The pressure welding by the pressure welding means creates a strong frictional force between the pair of jig bodies, preventing relative height adjustment. This allows the spacing between the upper chimney unit and the lower chimney unit to be maintained. The upper chimney unit is not supported by the axial force of a vertical bolt, and sufficient load resistance can be obtained.

前記一対の治具本体の一方には上下に延びる長孔が形成されており、
前記圧接手段が、他方の治具本体に係止又は固定されるとともに前記長孔を通されたボルトと、前記ボルトにねじ込まれたナットとを含むことが好ましい。
ボルト及びナットを緩めることによって、圧接を解除でき、ボルトが長孔に沿って上下へ相対変位でき、一対の治具本体どうしの相対高さ調節が許容される。
ボルト及びナットの締め込みによって、一対の治具本体どうしが圧接され、相対高さ調節が阻止される。
A vertically extending long hole is formed in one of the pair of jig bodies,
It is preferable that the pressure contact means includes a bolt that is engaged with or fixed to the other jig body and passed through the long hole, and a nut that is screwed onto the bolt.
By loosening the bolts and nuts, the pressure can be released and the bolts can be relatively displaced up and down along the long holes, allowing adjustment of the relative heights of the pair of jig bodies.
By tightening the bolts and nuts, the pair of jig bodies are pressed against each other, preventing adjustment of the relative heights.

前記一対の治具本体の各々が互いに直交する一対の添板部を有し、これら一対の治具本体の互いに同じ向きの添板部どうしが重ね合わされて前記圧接手段にて圧接されることが好ましい、
各治具本体の直角をなす一対の添板部を前記上端コーナー部に宛がうことによって、煙突ユニット間隔保持治具を下段煙突ユニットに対して位置決めできる。一対の治具本体の一方向を向く添板部どうし、及び前記一方向と直交する添板部どうしをそれぞれ圧接することによって、一対の治具本体どうし間の摩擦力を一層高くでき、煙突ユニット間隔保持治具の耐荷重性を確実に確保できる。
It is preferable that each of the pair of jig bodies has a pair of splice portions perpendicular to each other, and the splice portions of the pair of jig bodies facing the same direction are overlapped and pressed together by the pressing means.
The chimney unit spacing jig can be positioned with respect to the lower-stage chimney unit by applying a pair of right-angled splice parts of each jig body to the upper corner parts. By pressing the splice parts facing one direction of the pair of jig bodies against each other and the splice parts perpendicular to the one direction against each other, the friction between the pair of jig bodies can be further increased, and the load-bearing capacity of the chimney unit spacing jig can be reliably ensured.

本発明方法は、前記煙突ユニット間隔保持治具を用いた前記建物用煙突の構築方法であって、
前記煙突ユニット間隔保持治具を、前記上端コーナー部に宛がうようにして、前記下段煙突ユニットの上端部から水平に突出されたフランジに載せる工程と、
前記下側の治具本体に対する上側の治具本体の高さを調節する工程と、
前記圧接手段により前記高さ調節後の上下の治具本体どうしを圧接させる工程と、
前記上段煙突ユニットを前記上側の治具本体の上端部に突き当てる工程と、
を備えたことを特徴とする。
これによって、上段煙突ユニットと下段煙突ユニットとの間隔ひいてはこれら煙突ユニット間のシール部材の圧縮度合を所望になるよう調整できる。一対の治具本体どうしの圧接による摩擦力によって、上段煙突ユニットの荷重を支えることができる。鉛直なボルトの軸力で上段煙突ユニットを支持するものではなく、十分な耐荷重性が得られる。
The method of the present invention is a method for constructing a chimney for a building using the chimney unit spacing retaining jig, comprising the steps of:
A step of placing the chimney unit spacing jig on a flange horizontally protruding from an upper end of the lower chimney unit so as to fit the upper end corner portion;
adjusting the height of the upper jig body relative to the lower jig body;
a step of pressing the upper and lower jig bodies after the height adjustment against each other by the pressing means;
A step of abutting the upper chimney unit against an upper end of the upper jig body;
The present invention is characterized by comprising:
This allows the distance between the upper and lower chimney units, and therefore the compression of the seal between these chimney units, to be adjusted as desired. The load of the upper chimney unit can be supported by the frictional force caused by the pressure contact between the pair of jig bodies. The upper chimney unit is not supported by the axial force of the vertical bolts, and sufficient load resistance is obtained.

前記圧接及び前記突き当て状態で、前記上段煙突ユニットを前記建物躯体に吊り支持可能に連結した後、前記圧接を解除して前記煙突ユニット間隔保持治具を撤去することが好ましい。
撤去した煙突ユニット間隔保持治具は、別の新たな煙突ユニットどうしの間隔保持に適用できる。
新たな煙突ユニットどうしの好適間隔に合わせて、煙突ユニット間隔保持治具を高さ調節できる。
It is preferable that after the upper chimney unit is connected to the building structure in the pressure-welded and abutted state so that it can be suspended, the pressure is released and the chimney unit spacing jig is removed.
The removed chimney unit spacing jig can be used to maintain spacing between new chimney units.
The height of the chimney unit spacing jig can be adjusted to match the desired spacing between the new chimney units.

本発明によれば、上段煙突ユニットの荷重に十分に耐えることのできる煙突ユニット間隔保持治具及び該治具を用いた煙突施工方法を提供することができる。 The present invention provides a chimney unit spacing jig that can adequately withstand the load of the upper chimney unit and a chimney construction method using the jig.

図1は、本発明の一実施形態に係る煙突ユニット間隔保持治具を用いて、建物用煙突を構築する様子を、下段煙突ユニットの設置後、上段煙突ユニットを設置しようとする状態で示す正面図である。FIG. 1 is a front view showing the process of constructing a chimney for a building using a chimney unit spacing retaining jig according to one embodiment of the present invention, showing the state in which an upper chimney unit is about to be installed after the lower chimney unit has been installed. 図2は、図1のII-II線に沿う平面図である。FIG. 2 is a plan view taken along the line II-II in FIG. 図3は、前記煙突ユニット間隔保持治具の斜視図である。FIG. 3 is a perspective view of the chimney unit spacing retaining jig. 図4は、図1の円部IVの拡大正面図である。FIG. 4 is an enlarged front view of the circle IV in FIG. 図5は、図4のV-V線に沿う平面断面図である。FIG. 5 is a plan sectional view taken along line VV in FIG. 図6は、前記建物用煙突を構築する様子を、上段煙突ユニットを設置した状態で示す正面図である。FIG. 6 is a front view showing the construction of the chimney for a building with the upper chimney unit installed. 図7は、前記上段煙突ユニットを設置した状態における図5のVII-VII線に沿う正面断面図である。FIG. 7 is a front cross-sectional view taken along line VII-VII in FIG. 5 with the upper chimney unit installed.

以下、本発明の一実施形態を図面にしたがって説明する。
図1及び図6に示すように、建物10の建物躯体11には、煙突用吹き抜け区画12が設けられ、該区画12内に建物用煙突20が構築されている。建物用煙突20は、複数(図では2つだけ図示)の煙突ユニット21,22に分割されている。図2に示すように、各煙突ユニット21,22は、平面視で四角形の筒形状に形成されている。図6に示すように、これら煙突ユニット21,22が上下に積層されている。各煙突ユニット21,22の上側部からアーム23が突出されて建物躯体11の支持台13に連結されている。これによって、各煙突ユニット21,22が、建物躯体11に吊支持されて、荷重の大部分が建物躯体11にかかっている。
Hereinafter, one embodiment of the present invention will be described with reference to the drawings.
As shown in Figures 1 and 6, a chimney open-air section 12 is provided in the building structure 11 of a building 10, and a building chimney 20 is constructed in the section 12. The building chimney 20 is divided into a plurality of chimney units 21, 22 (only two are shown in the figure). As shown in Figure 2, each of the chimney units 21, 22 is formed in a rectangular cylindrical shape in a plan view. As shown in Figure 6, these chimney units 21, 22 are stacked one on top of the other. An arm 23 protrudes from the upper side of each of the chimney units 21, 22 and is connected to the support base 13 of the building structure 11. As a result, each of the chimney units 21, 22 is suspended and supported by the building structure 11, and most of the load is applied to the building structure 11.

図1に示すように、建物用煙突20において上下に隣接する2つの煙突ユニットのうち、下段煙突ユニット22の上端部には差し込み部22bが設けられている。図6に示すように、上段煙突ユニット21の下端部が、差し込み部22bに差し込まれている。
勿論、上段煙突ユニットであるか下段煙突ユニットであるかは相対的であり、各煙突ユニットが、直下の煙突ユニットに対しては上段煙突ユニットとなり、直上の煙突ユニットに対しては下段煙突ユニットとなる。
As shown in Fig. 1, of the two chimney units adjacent vertically in the building chimney 20, an insertion portion 22b is provided at the upper end of the lower chimney unit 22. As shown in Fig. 6, the lower end of the upper chimney unit 21 is inserted into the insertion portion 22b.
Of course, whether it is an upper chimney unit or a lower chimney unit is relative, and each chimney unit is an upper chimney unit in relation to the chimney unit immediately below, and a lower chimney unit in relation to the chimney unit immediately above.

図1に示すように、上段煙突ユニット21の断熱壁21aの下端面にはパッキン24aが設けられている。下段煙突ユニット22の断熱壁22aの上端面にはパッキン24bが設けられている。図7に示すように、これらパッキン24a,24bが重ね合わされることによって、煙突ユニット21,22どうしの間のシール部材24が構成されている。煙突ユニット21,22どうしの間隔が所定になるように調節されることによって、シール部材24の厚み、ひいては圧縮度合いが所望の大きさになるように調整されている。 As shown in FIG. 1, a packing 24a is provided on the lower end surface of the insulating wall 21a of the upper chimney unit 21. A packing 24b is provided on the upper end surface of the insulating wall 22a of the lower chimney unit 22. As shown in FIG. 7, these packings 24a, 24b are overlapped to form the sealing member 24 between the chimney units 21, 22. By adjusting the gap between the chimney units 21, 22 to a predetermined value, the thickness of the sealing member 24, and therefore the degree of compression, can be adjusted to the desired size.

図1に示すように、前記煙突ユニット21,22どうしの間隔調節のために、建物用煙突20の構築施工に際して、煙突ユニット間隔保持治具9が用いられている。図2に示すように、煙突ユニット21,22の間の四隅にそれぞれ煙突ユニット間隔保持治具9が設置されている。 As shown in Figure 1, a chimney unit spacing jig 9 is used during construction of a building chimney 20 to adjust the spacing between the chimney units 21 and 22. As shown in Figure 2, a chimney unit spacing jig 9 is installed at each of the four corners between the chimney units 21 and 22.

図3~図5に示すように、煙突ユニット間隔保持治具9は、上下一対の治具本体30,40と、圧接手段50を備えている。治具本体30,40は、それぞれL字状の平面断面形状に形成され、互いに相対高さ調節可能に内外に重ね合わされている。 As shown in Figures 3 to 5, the chimney unit spacing jig 9 comprises a pair of upper and lower jig bodies 30, 40 and a pressure contact means 50. The jig bodies 30, 40 are each formed with an L-shaped planar cross section and are stacked inside and outside each other so that their relative heights can be adjusted.

詳しくは、上側(一方)の治具本体30は、平面視でL字状の断面のアングル部材31と、天板部33とを有している。アングル部材31は、互いに直交する一対の添板部32を含む。各添板部32には、上下に延びる長孔34が形成されている。天板部33は、平面視でL字状の平板状に形成され、アングル部材31の一対の添板部32の上端部に跨っている。アングル部材31と天板部33とは、溶接等によって接合されている。 More specifically, the upper (one) jig body 30 has an angle member 31 with an L-shaped cross section in a plan view, and a top plate portion 33. The angle member 31 includes a pair of splice portions 32 that are perpendicular to each other. Each splice portion 32 has a long hole 34 that extends vertically. The top plate portion 33 is formed as an L-shaped flat plate in a plan view, and spans the upper ends of the pair of splice portions 32 of the angle member 31. The angle member 31 and the top plate portion 33 are joined by welding or the like.

下側(他方)の治具本体40は、平面視でL字状のアングル部材41と、ベース板部43とを有している。アングル部材41は、互いに直交する一対の添板部42を含む。各添板部42には円形の挿通孔13が形成されている。ベース板部43は、平面視でL字状の平板状に形成され、アングル部材41の一対の添板部42の下端部に跨っている。アングル部材41とベース板部43とは、溶接等によって接合されている。
治具本体30,40の材質は、鋼鉄、鉄等の金属である。
The lower (other) jig body 40 has an angle member 41 that is L-shaped in a plan view, and a base plate portion 43. The angle member 41 includes a pair of splice portions 42 that are perpendicular to each other. Each splice portion 42 has a circular insertion hole 13 formed therein. The base plate portion 43 is formed in an L-shaped flat plate in a plan view, and straddles the lower ends of the pair of splice portions 42 of the angle member 41. The angle member 41 and the base plate portion 43 are joined by welding or the like.
The jig bodies 30, 40 are made of a metal such as steel or iron.

下側の治具本体40の各添板部42の外側に、上側の治具本体30の同じ向きの添板部32が重ね合わされている。重ね合わされた添板部32,42の長孔34と挿通孔44とが連通している。 The outer side of each splice plate portion 42 of the lower jig body 40 is overlapped with the splice plate portion 32 of the upper jig body 30 in the same orientation. The long holes 34 and the insertion holes 44 of the overlapped splice plate portions 32, 42 are connected.

図3~図5に示すように、圧接手段50は、互いに直交する2組のボルト51及びナット52を有している。互いに重ね合わされた添板部32,42ごとに、一組のボルト51及びナット52が設けられている。ボルト51は、対応する添板部41の内面側から、挿通孔44及び長孔34に通されている。ボルト51の頭部51aが、添板部41の内面に突き当てられることで、ボルト51が治具本体40に係止されている。ボルト51における長孔34から外方へ突出された部分には、ワッシャ53を介してナット52がねじ込まれている。 As shown in Figures 3 to 5, the pressure contact means 50 has two sets of bolts 51 and nuts 52 that are perpendicular to each other. One set of bolts 51 and nuts 52 is provided for each of the overlapping splice plate parts 32, 42. The bolts 51 are passed through the insertion holes 44 and the long holes 34 from the inner surface side of the corresponding splice plate part 41. The heads 51a of the bolts 51 are abutted against the inner surface of the splice plate part 41, so that the bolts 51 are engaged with the jig body 40. A nut 52 is screwed into the part of the bolt 51 that protrudes outward from the long hole 34 via a washer 53.

ナット52を緩めた状態では、ボルト51が長孔34に沿って上下へ相対変位でき、上下の治具本体30,40の相対高さ調節が許容される。ナット52を締め込むことによって、添板部31,41どうしが強く圧接され、上下の治具本体30,40の相対高さ調節が阻止される。 When the nut 52 is loosened, the bolt 51 can be displaced vertically along the long hole 34, allowing the relative height adjustment of the upper and lower jig bodies 30, 40. By tightening the nut 52, the splice plate portions 31, 41 are strongly pressed against each other, preventing the relative height adjustment of the upper and lower jig bodies 30, 40.

建物用煙突20は、次のようにして構築される。
好ましくは、煙突ユニット間隔保持治具9を予め組み立てておく。
<治具設置工程>
図1及び図2に示すように、下段煙突ユニット22の建て込み後、四隅の上端コーナー部22cに煙突ユニット間隔保持治具9を設置する。詳しくは、図4に示すように、各煙突ユニット間隔保持治具9を、下段煙突ユニット22の上端コーナー部22cに宛がうようにして、下段煙突ユニット22の上端部から水平に突出されたフランジ22fに下側治具本体40を載せる。図5に示すように、好ましくは、ベース板部43の直角をなす2つの内側端面43cを、下段煙突ユニット22のコーナー部22cにおける直角をなす2つの側面にそれぞれ突き当てる。これによって、煙突ユニット間隔保持治具9を下段煙突ユニット22に対して位置決めできる。好ましくは、ベース板部43をコーナー部22cに突き当てた状態で、ボルト頭部51aは下段煙突ユニット22から僅かに離れている。
The building chimney 20 is constructed as follows.
Preferably, the chimney unit spacing jig 9 is preassembled.
<Jig installation process>
As shown in Fig. 1 and Fig. 2, after the lower chimney unit 22 is erected, the chimney unit spacing jig 9 is installed at the upper corners 22c of the four corners. More specifically, as shown in Fig. 4, the chimney unit spacing jig 9 is placed on the flange 22f protruding horizontally from the upper end of the lower chimney unit 22 so that it faces the upper corners 22c of the lower chimney unit 22. As shown in Fig. 5, preferably, the two inner end faces 43c of the base plate 43 that form a right angle are abutted against two side faces that form a right angle at the corners 22c of the lower chimney unit 22. This allows the chimney unit spacing jig 9 to be positioned relative to the lower chimney unit 22. Preferably, when the base plate 43 is abutted against the corners 22c, the bolt heads 51a are slightly separated from the lower chimney unit 22.

<上段煙突ユニットの吊り工程>
図1及び図6に示すように、前記煙突ユニット間隔保持治具9の設置工程と前後して、クレーンなどの吊り手段(図示省略)によって、上段煙突ユニット21を吊って、下段煙突ユニット22の上方に配置するとともに所定高さまで吊り降ろすことによって、上段煙突ユニット21の下端部を下段煙突ユニット22の上端部の差し込み部22bに差し込む。上段煙突ユニット21を所定高さに位置させることによって、煙突ユニット30,40どうしの間隔が所定の大きさになる。
<Upper chimney unit lifting process>
1 and 6, before or after the installation process of the chimney unit spacing jig 9, the upper-stage chimney unit 21 is suspended by a hoisting means (not shown) such as a crane, positioned above the lower-stage chimney unit 22, and lowered to a predetermined height, whereby the lower end of the upper-stage chimney unit 21 is inserted into the insertion portion 22b at the upper end of the lower-stage chimney unit 22. By positioning the upper-stage chimney unit 21 at the predetermined height, the spacing between the chimney units 30, 40 becomes a predetermined size.

<治具高さ調節工程>
続いて、前記クレーンなどの吊り手段によって上段煙突ユニット21を所定高さに吊り支持したまま、各煙突ユニット間隔保持治具9の高さ調節を行なう。すなわち、ボルト51及びナット52を少し緩めた状態で、下側治具本体40に対して上側治具本体30を昇降させる。これによって、図7に示すように、上段煙突ユニット21から突出された下部フランジ21fに天板部33を突き当てる。その状態でボルト51及びナット52を締め込む。これによって、治具本体30,40の添板部31,41どうしが強く圧接され、煙突ユニット間隔保持治具9の高さが固定される。
<Jig height adjustment process>
Next, the height of each chimney unit spacing jig 9 is adjusted while the upper chimney unit 21 is suspended and supported at a predetermined height by the hoisting means such as the crane. That is, with the bolts 51 and nuts 52 slightly loosened, the upper jig body 30 is raised and lowered relative to the lower jig body 40. As a result, the top plate portion 33 is abutted against the lower flange 21f protruding from the upper chimney unit 21, as shown in Fig. 7. In this state, the bolts 51 and nuts 52 are tightened. As a result, the splice portions 31, 41 of the jig bodies 30, 40 are strongly pressed against each other, and the height of the chimney unit spacing jig 9 is fixed.

<吊り手段の解除工程>
その後、前記クレーンなどの吊り手段を外す。これによって、上段煙突ユニット21の荷重がフランジ21fを介して煙突ユニット間隔保持治具9にかかる。煙突ユニット30,40どうしの間隔は所定の大きさに保持される。
煙突ユニット間隔保持治具9は、添板部31,41どうしの圧接による摩擦によって上段煙突ユニット21の荷重を受けることができる。ボルト51には締め付けトルクが作用する一方、上段煙突ユニット21の荷重がボルト51の軸方向へ作用することはない。したがって、ボルト51の変形及び破壊を回避できる。
<Step of releasing the hanging means>
Thereafter, the lifting means such as the crane is removed, so that the weight of the upper chimney unit 21 is applied to the chimney unit spacing maintaining jig 9 via the flange 21f. The spacing between the chimney units 30, 40 is maintained at a predetermined size.
The chimney unit spacing jig 9 can bear the load of the upper chimney unit 21 by friction caused by the pressure contact between the splice plates 31, 41. While a tightening torque acts on the bolts 51, the load of the upper chimney unit 21 does not act in the axial direction of the bolts 51. Therefore, deformation and destruction of the bolts 51 can be avoided.

<上段煙突ユニットの連結工程>
続いて、図6に示すように、上段煙突ユニット21にアーム23を取り付け、該アーム23を支持台13に連結する。これによって、上段煙突ユニット21が建物躯体11に吊り支持可能になる。
<治具撤去工程>
その後、煙突ユニット間隔保持治具9を撤去する。詳しくは、ナット52を緩み方向へ回して、添板部31,41どうしの圧接を解除する。これによって、上側治具本体30が下降して、煙突ユニット間隔保持治具9の高さが低くなり、煙突ユニット間隔保持治具9を上下のフランジ21f,22fの間から簡単に取り出すことができる。
煙突ユニット間隔保持治具9の撤去後の上段煙突ユニット21の荷重の大部分は、アーム23及び支持台13を介して、建物躯体11に受け渡される。
<Upper chimney unit connection process>
6, an arm 23 is attached to the upper chimney unit 21, and the arm 23 is connected to the support base 13. This makes it possible for the upper chimney unit 21 to be supported in a suspended state by the building framework 11.
<Jig removal process>
Thereafter, the chimney unit spacing jig 9 is removed. More specifically, the nut 52 is turned in the loosening direction to release the pressure contact between the splice plate parts 31, 41. This causes the upper jig body 30 to descend, lowering the height of the chimney unit spacing jig 9, allowing the chimney unit spacing jig 9 to be easily removed from between the upper and lower flanges 21f, 22f.
After the chimney unit spacing retaining jig 9 is removed, most of the load of the upper chimney unit 21 is transferred to the building structure 11 via the arm 23 and the support base 13.

同様にして、煙突ユニット21の上方に、更に上段の煙突ユニットを積層する。これら煙突ユニットどうしの間隔調節のために、前記煙突ユニット間隔保持治具9を使い回す。
このようにして構築された建物用煙突20においては、上下の煙突ユニット21,22どうしの間隔が所定の大きさに設定されているため、シール部材24の厚みひいては圧縮度合いを所定の大きさにすることができ、煙突ユニット間の気密性を確保できる。
In the same manner, a chimney unit in an upper stage is further stacked above the chimney unit 21. The chimney unit spacing jig 9 is reused to adjust the spacing between these chimney units.
In the building chimney 20 constructed in this manner, the distance between the upper and lower chimney units 21, 22 is set to a predetermined size, so that the thickness of the sealing member 24 and therefore the degree of compression can be set to a predetermined size, thereby ensuring airtightness between the chimney units.

本発明は、前記実施形態に限定されるものではなく、その趣旨を逸脱しない範囲において種々の改変をなすことができる。
例えば、上側治具本体30を下側治具本体40の内面側に配置してもよい。
上側治具本体30にボルト51の挿通孔44が形成され、下側治具本体40に長孔34が形成されていてもよい。
一方の治具本体にボルト51が溶接等によって固定されていてもよい。他方の治具本体に形成された長孔が、他方の治具本体の上下いずれかの端面まで達していてもよい。
建物用煙突20の構築手順は適宜変更できる。煙突ユニット間隔保持治具9の高さ調節は、当該治具9をコーナー部22cに設置する前に行ってもよく、上段煙突ユニット21を所定高さまで吊り降ろす前に行ってもよく、上段煙突ユニット21を所定高さに配置するのと並行して行ってもよい。アーム23を介して上段煙突ユニット1と支持台13との連結後、クレーンなどの吊り手段を上段煙突ユニット21から外してもよい。
The present invention is not limited to the above-described embodiment, and various modifications can be made without departing from the spirit of the present invention.
For example, the upper jig body 30 may be disposed on the inner surface side of the lower jig body 40 .
The upper jig body 30 may have an insertion hole 44 for the bolt 51 , and the lower jig body 40 may have an elongated hole 34 .
The bolt 51 may be fixed to one of the jig bodies by welding, etc. The long hole formed in the other jig body may reach either the upper or lower end face of the other jig body.
The construction procedure of the building chimney 20 can be changed as appropriate. The height adjustment of the chimney unit spacing jig 9 may be performed before the jig 9 is installed at the corner portion 22c, before the upper chimney unit 21 is suspended down to a predetermined height, or in parallel with placing the upper chimney unit 21 at a predetermined height. After the upper chimney unit 1 and the support base 13 are connected via the arm 23, the lifting means such as a crane may be removed from the upper chimney unit 21.

本発明は、例えば建物用煙突の構築施工に適用できる。 The present invention can be applied, for example, to the construction of chimneys for buildings.

9 煙突ユニット間隔保持治具
10 建物
11 建物躯体
20 建物用煙突
21 上段煙突ユニット
22 下段煙突ユニット
22b 差し込み部
22c 上端コーナー部
22f フランジ
23 アーム
24 シール部材
30 上側の治具本体
32 添板部
33 天板部
34 長孔
40 下側の治具本体
42 添板部
43 ベース板部
44 挿通孔
50 圧接手段
51 ボルト
52 ナット
Description of the Reference Signs 9 Chimney unit spacing jig 10 Building 11 Building framework 20 Building chimney 21 Upper chimney unit 22 Lower chimney unit 22b Insertion portion 22c Upper corner portion 22f Flange 23 Arm 24 Sealing member 30 Upper jig body 32 Splice plate portion 33 Top plate portion 34 Slot 40 Lower jig body 42 Splice plate portion 43 Base plate portion 44 Insertion hole 50 Pressing means 51 Bolt 52 Nut

Claims (5)

四角形断面の複数の煙突ユニットを積み重ね、かつ各煙突ユニットを建物躯体に吊支持させてなる建物用煙突の構築において隣接する上段煙突ユニット及び下段煙突ユニットの間に設けられる煙突ユニット間隔保持治具であって、
上下一対のL字状の平面断面形状に形成され、互いに相対高さ調節可能に内外に重ね合わされて、前記下段煙突ユニットの上端コーナー部に設置される治具本体と、
前記一対の治具本体どうしを圧接可能かつ圧接解除可能な圧接手段と、
を備えたことを特徴とする煙突ユニット間隔保持治具。
A chimney unit spacing jig that is provided between adjacent upper and lower chimney units in constructing a chimney for a building, in which a plurality of chimney units having a rectangular cross section are stacked and each chimney unit is suspended from a building framework,
A jig body formed into a pair of upper and lower L-shaped planar cross sections, stacked inside and outside so as to be able to adjust the relative height of each other, and installed at the upper end corner portion of the lower chimney unit;
a pressure contact means capable of pressing the pair of jig bodies together and releasing the pressure contact;
A chimney unit spacing maintaining jig comprising:
前記一対の治具本体の一方には上下に延びる長孔が形成されており、
前記圧接手段が、他方の治具本体に係止又は固定されるとともに前記長孔を通されたボルトと、前記ボルトにねじ込まれたナットとを含むことを特徴とする請求項1に記載の煙突ユニット間隔保持治具。
A vertically extending long hole is formed in one of the pair of jig bodies,
2. The chimney unit spacing maintaining jig as described in claim 1, characterized in that the pressure contact means includes a bolt that is engaged or fixed to the other jig body and passed through the long hole, and a nut screwed onto the bolt.
前記一対の治具本体の各々が互いに直交する一対の添板部を有し、これら一対の治具本体の互いに同じ向きの添板部どうしが重ね合わされて前記圧接手段にて圧接されることを特徴とする請求項1又は2に記載の煙突ユニット間隔保持治具。 The chimney unit spacing jig according to claim 1 or 2, characterized in that each of the pair of jig bodies has a pair of splice parts that are perpendicular to each other, and the splice parts of the pair of jig bodies that face in the same direction are overlapped and pressed together by the pressing means. 請求項1~3の何れか1項に記載の煙突ユニット間隔保持治具を用いた前記建物用煙突の構築方法であって、
前記煙突ユニット間隔保持治具を、前記上端コーナー部に宛がうようにして、前記下段煙突ユニットの上端部から水平に突出されたフランジに載せる工程と、
前記上下一対の治具本体のうち下側の治具本体に対する上側の治具本体の高さを調節する工程と、
前記圧接手段により前記高さ調節後の上下の治具本体どうしを圧接させる工程と、
前記上段煙突ユニットを前記上側の治具本体の上端部に突き当てる工程と、
を備えた建物用煙突の構築方法。
A method for constructing a chimney for a building using the chimney unit spacing jig according to any one of claims 1 to 3,
A step of placing the chimney unit spacing jig on a flange horizontally protruding from an upper end of the lower chimney unit so as to fit the upper end corner portion;
adjusting a height of an upper jig body relative to a lower jig body of the pair of upper and lower jig bodies;
a step of pressing the upper and lower jig bodies after the height adjustment against each other by the pressing means;
A step of abutting the upper chimney unit against an upper end of the upper jig body;
A method for constructing a chimney for a building comprising:
前記圧接及び前記突き当て状態で、前記上段煙突ユニットを前記建物躯体に吊り支持可能に連結した後、前記圧接を解除して前記煙突ユニット間隔保持治具を撤去することを特徴とする請求項4に記載の建物用煙突の構築方法。 The method for constructing a chimney for a building according to claim 4, characterized in that after the upper chimney unit is connected to the building structure in such a manner that it can be suspended while being pressed against the building structure and butted against the building structure, the pressing is released and the chimney unit spacing jig is removed.
JP2021128169A 2021-08-04 2021-08-04 Chimney unit spacing jig and building chimney construction method Active JP7660458B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021128169A JP7660458B2 (en) 2021-08-04 2021-08-04 Chimney unit spacing jig and building chimney construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021128169A JP7660458B2 (en) 2021-08-04 2021-08-04 Chimney unit spacing jig and building chimney construction method

Publications (2)

Publication Number Publication Date
JP2023023023A JP2023023023A (en) 2023-02-16
JP7660458B2 true JP7660458B2 (en) 2025-04-11

Family

ID=85203308

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021128169A Active JP7660458B2 (en) 2021-08-04 2021-08-04 Chimney unit spacing jig and building chimney construction method

Country Status (1)

Country Link
JP (1) JP7660458B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116464240A (en) * 2023-05-31 2023-07-21 中冶建工集团有限公司 Construction method of building smoke exhaust pipe

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002322701A (en) 2001-04-26 2002-11-08 Inax Corp Structure and method for execution of piping
JP2016056633A (en) 2014-09-11 2016-04-21 フジモリ産業株式会社 Chimney for building
JP2016160680A (en) 2015-03-03 2016-09-05 松沢 庄次 Anchor bolt adjusting tool and anchor bolt support device
JP2021063347A (en) 2019-10-10 2021-04-22 コーキ株式会社 Chimney unit mounting method

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5854230B2 (en) * 1979-03-01 1983-12-03 フジモリ産業株式会社 chimney device
JPS5644519A (en) * 1979-09-19 1981-04-23 Fujimori Sangyo Kk Smokestack
JPH08144381A (en) * 1994-11-21 1996-06-04 Nippon Chuzo Kk Anchor bolt fixing device
JPH116303A (en) * 1997-06-16 1999-01-12 Nihon Ytong Co Ltd Ruler angle attaching jig

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002322701A (en) 2001-04-26 2002-11-08 Inax Corp Structure and method for execution of piping
JP2016056633A (en) 2014-09-11 2016-04-21 フジモリ産業株式会社 Chimney for building
JP2016160680A (en) 2015-03-03 2016-09-05 松沢 庄次 Anchor bolt adjusting tool and anchor bolt support device
JP2021063347A (en) 2019-10-10 2021-04-22 コーキ株式会社 Chimney unit mounting method

Also Published As

Publication number Publication date
JP2023023023A (en) 2023-02-16

Similar Documents

Publication Publication Date Title
JPS5944941B2 (en) A method for joining flat parts of two metal parts with parallel spacing
JP5727162B2 (en) Exposed type column base plate
US9447573B2 (en) Multi-story building and method for construction thereof
JP7660458B2 (en) Chimney unit spacing jig and building chimney construction method
KR102935414B1 (en) Connecting device of modular structure and installation method of modular structure using the same
JP7657261B2 (en) Truss and truss construction method
CN110805149B (en) Support column self-locking splicing structure
JP7320712B2 (en) CONTAINER CONNECTION STRUCTURE, CONTAINER AND CONTAINER CONNECTION METHOD
JP6690823B2 (en) Jig for T-plate assembly
CN218540997U (en) Steel column hoisting connection structure
CN118704615A (en) Mortise and tenon joint structure and beam-column connection method
JP3229113U (en) Slab formwork lifting device
JP4134692B2 (en) Elevator tower unit joint structure
JP3103294B2 (en) Pillar steel frame, jig used for the connection, and steel frame connection method
JP2023118286A (en) Fall prevention device for temporary enclosure
JP5281463B2 (en) Structure of load-bearing frame, manufacturing method and building adjustment method using this load-bearing frame
CN113879950A (en) Plate hanger and method of using the same
CN214995814U (en) A climb a attachment structure for super high-rise building steel column
CN212799202U (en) Assembled elevator framework
CN223087435U (en) Hoisting auxiliary device
JP2025183691A (en) Construction method for the upper member installation structure
CN113502916B (en) A kind of profile quick locking device and construction method thereof
JP3010003B2 (en) Connection structure of columns and beams in steel structure
JP2016125190A (en) Vertical piling method for extrusion molded cement plate, and structure thereof
JP6975556B2 (en) Support device and elevating device

Legal Events

Date Code Title Description
A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20230309

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20230309

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240517

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20241119

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20241120

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20241224

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20250311

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250401

R150 Certificate of patent or registration of utility model

Ref document number: 7660458

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150