JP7670979B2 - Box culvert and its construction method - Google Patents
[go: Go Back, main page]

JP7670979B2 - Box culvert and its construction method - Google Patents

Box culvert and its construction method Download PDF

Info

Publication number
JP7670979B2
JP7670979B2 JP2022125355A JP2022125355A JP7670979B2 JP 7670979 B2 JP7670979 B2 JP 7670979B2 JP 2022125355 A JP2022125355 A JP 2022125355A JP 2022125355 A JP2022125355 A JP 2022125355A JP 7670979 B2 JP7670979 B2 JP 7670979B2
Authority
JP
Japan
Prior art keywords
box culvert
members
precast
corner
side wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2022125355A
Other languages
Japanese (ja)
Other versions
JP2024022047A (en
Inventor
慎八 藤原
誠 久保市
達央 多賀
郁夫 中谷
Original Assignee
ジオスター株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ジオスター株式会社 filed Critical ジオスター株式会社
Priority to JP2022125355A priority Critical patent/JP7670979B2/en
Publication of JP2024022047A publication Critical patent/JP2024022047A/en
Application granted granted Critical
Publication of JP7670979B2 publication Critical patent/JP7670979B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Lining And Supports For Tunnels (AREA)

Description

本発明は、ボックスカルバート及びその構築方法に関する。 The present invention relates to a box culvert and a method for constructing the same.

近年、幹線道路の新設は平野部から山岳部に移行してきており、急峻な山岳部を通過する道路の新設が増加している。山岳部での道路建設では、トンネルや橋梁の比率増加に伴い、高盛土が多くなり、これを横断するカルバート構造物(単にカルバートとも呼称される)の施工が増加する。カルバート構造物の一例として、断面がほぼ長方形枠型のボックスカルバートが知られている。カルバート構造物は、種々の構築方法によって構築され、例えば、プレキャストコンクリート部材と現場打ちコンクリートを組み合わせて構築される。 In recent years, construction of new trunk roads has been shifting from plains to mountainous areas, with an increase in the number of new roads passing through steep mountainous areas. In road construction in mountainous areas, the proportion of tunnels and bridges is increasing, leading to an increase in high embankments, and the construction of culvert structures (also simply called culverts) that cross these is on the rise. One example of a culvert structure is the box culvert, which has a roughly rectangular cross section. Culvert structures are constructed using a variety of construction methods, for example, by combining precast concrete members and cast-in-place concrete.

例えば、特許文献1には、大型ボックスカルバートの構築方法が開示されている。特許文献1では、プレキャスト又は現場打ちの床版上にT型プレキャストブロックを積み重ねて側壁を構築し、その側壁の最上部にプレキャスト頂版を架設して大型ボックスカルバートを構築している。その際、側壁とプレキャスト頂版とを一体化させるためにプレキャスト受台ブロックを重設している。 For example, Patent Document 1 discloses a method for constructing a large box culvert. In Patent Document 1, a large box culvert is constructed by stacking T-shaped precast blocks on a precast or cast-in-place deck to construct side walls, and erecting a precast top plate on the top of the side walls. At that time, a precast support block is placed on top to integrate the side walls and the precast top plate.

また、例えば、特許文献2には、分割式剛性カルバートの構築技術が開示されている。特許文献2では、2以上の頂版単位ブロックを連結して構成される頂版を有した構成が開示されている。2以上の頂版単位ブロックの間においては、機械式継手をコンクリート充填部で覆うといった接合構造を用いている。 For example, Patent Document 2 discloses a construction technique for a split-type rigid culvert. Patent Document 2 discloses a structure with a top plate that is made up of two or more top plate unit blocks connected together. Between the two or more top plate unit blocks, a joint structure is used in which mechanical joints are covered with concrete filling sections.

特開平11-229412号公報Japanese Patent Application Publication No. 11-229412 特開2022-34412号公報JP 2022-34412 A

特許文献1に記載の大型ボックスカルバートにおいては、側壁の最上部にプレキャスト頂版を架設する際にプレキャスト受台ブロックにコンクリートを打設する構成を採っている。このコンクリート打設されたプレキャスト受台ブロックはカルバートの側壁上端に位置しており、カルバートの天井面の剛性が十分でない恐れがある。具体的には、カルバートの縦断方向の曲げに対する剛性が十分でなく、更なる改良の余地がある。 The large box culvert described in Patent Document 1 is configured so that concrete is poured into a precast support block when erecting a precast top plate at the top of the side wall. This precast support block with poured concrete is located at the top end of the culvert's side wall, and there is a risk that the rigidity of the culvert's ceiling surface is insufficient. Specifically, the rigidity of the culvert against bending in the longitudinal direction is insufficient, and there is room for further improvement.

また、特許文献2に記載の分割式剛性カルバートでは、カルバートの大型化に伴い、製造、運搬、施工の制約により頂版部材を分割した構成(頂版単位ブロック)としている。この構成では、左右の頂版単位ブロックと中間頂版単位ブロックとをコンクリート充填部で覆うことで一体化を図っている。しかしながら、特許文献2には、カルバートの幅方向において頂版が分割され、それらを一体化させる旨は記載されているものの、カルバートの長さ方向において頂版が分割された場合については記載がない。そのため、カルバートの縦断方向の曲げに対する剛性が十分でなく、更なる改良の余地がある。 In addition, in the split rigid culvert described in Patent Document 2, the top plate members are split (top plate unit blocks) due to the constraints of manufacturing, transportation, and construction as the culverts become larger. In this configuration, the left and right top plate unit blocks and the middle top plate unit block are integrated by covering them with concrete filling sections. However, while Patent Document 2 describes that the top plate is split in the width direction of the culvert and integrated, it does not describe the case where the top plate is split in the length direction of the culvert. As a result, the rigidity of the culvert against bending in the longitudinal direction is insufficient, and there is room for further improvement.

また、特許文献1、2に記載された構造においては、分割化された頂版単位ブロックに局所的に荷重がかかった場合や、頂版中央近傍に集中して荷重がかかった場合等に、荷重(死荷重や活荷重)が分配されず、カルバートの剛性が十分に担保されない恐れがある。また、カルバートの剛性を担保しようとした際には、部材の厚みなどを大きくする必要がありコンクリート使用料の増加やコスト増が懸念される。 In addition, in the structures described in Patent Documents 1 and 2, when a load is applied locally to the divided top plate unit blocks, or when a load is concentrated near the center of the top plate, the load (dead load or live load) may not be distributed, and the rigidity of the culvert may not be adequately guaranteed. In addition, when trying to guarantee the rigidity of the culvert, it is necessary to increase the thickness of the components, which may increase the amount of concrete used and raise concerns about costs.

近年、カルバート構造物を構築する際には、工場などで予め製作された部材を現場に搬入し、組み付けるといったいわゆるプレキャストコンクリート部材(単にプレキャスト部材とも呼称される)が用いられる場合がある。従来、プレキャスト部材を用いた頂版の施工では、分割した頂版部材をいったん組立架台上で繋ぎ合わせ、一体化させた頂版を吊り上げて設置するといった方法が採られていた。その場合、組立架台構築に伴うヤード確保や、コスト増、吊り上げのためのクレーンの大型化などが問題であった。 In recent years, when constructing culvert structures, so-called precast concrete members (also simply called precast members) are sometimes used; members are prefabricated in a factory or other location, transported to the site, and assembled. Traditionally, when constructing a top plate using precast members, the divided top plate members were first joined together on an assembly frame, and the integrated top plate was then lifted and installed. This posed problems, such as the need to secure a yard for constructing the assembly frame, increased costs, and the need for larger cranes for lifting.

上記事情に鑑み、本発明の目的は、ボックスカルバートの構築において、プレキャスト部材を用いた際の施工性の向上を図り、且つ、縦断方向への荷重分配効果による部材設計の合理化や、縦断方向の曲げに対する剛性の向上を図ることが可能なボックスカルバート及びその構築方法を提供することにある。 In view of the above circumstances, the object of the present invention is to provide a box culvert and a construction method thereof that improves workability when precast members are used in the construction of a box culvert, streamlines member design by distributing loads in the longitudinal direction, and improves rigidity against bending in the longitudinal direction.

前記の目的を達成するため、本発明によれば、天井面を構成する頂版部と、側面を構成する側壁部と、を備えたボックスカルバートであって、前記頂版部は、前記ボックスカルバートの長さ方向に連続して配置された複数列のプレキャスト部材と、前記プレキャスト部材の隣り合う列の間にあって、前記ボックスカルバートの長さ方向に延伸する現場打ちコンクリート製の梁部と、を含み、前記梁部の内部において、一方の列の前記プレキャスト部材から突出する鉄筋と、他方の列の前記プレキャスト部材から突出する鉄筋が互いに連結され、前記梁部の内部には、前記ボックスカルバートの長さ方向に延伸する主鉄筋が埋設され、前記梁部とその内部の前記主鉄筋は、前記ボックスカルバートの長さ方向に隣接する複数の前記プレキャスト部材に跨って構築されることを特徴とする、ボックスカルバートが提供される。
In order to achieve the above-mentioned object, according to the present invention, there is provided a box culvert having a top plate portion that forms a ceiling surface and a side wall portion that forms a side surface, wherein the top plate portion includes a plurality of rows of precast members arranged in succession in the longitudinal direction of the box culvert, and a beam portion made of cast-in-place concrete that extends in the longitudinal direction of the box culvert between adjacent rows of the precast members, wherein inside the beam portion, reinforcing bars protruding from the precast members in one row and reinforcing bars protruding from the precast members in the other row are connected to each other, main reinforcing bars extending in the longitudinal direction of the box culvert are buried inside the beam portion, and the beam portion and the main reinforcing bars therein are constructed across a plurality of the precast members adjacent in the longitudinal direction of the box culvert .

前記側壁部は、前記ボックスカルバートの長さ方向において前記頂版部を構成する前記プレキャスト部材と同一の長さを有する複数のプレキャスト側壁部材を、前記ボックスカルバートの長さ方向に連続して配置することにより構成されても良い。 The side wall portion may be constructed by continuously arranging a plurality of precast side wall members in the longitudinal direction of the box culvert, each having the same length as the precast member constituting the top plate portion in the longitudinal direction of the box culvert.

複数列の前記プレキャスト部材は3列で構成され、第1列及び第2列の前記プレキャスト部材は、前記ボックスカルバートの幅方向に延伸する平板部を備えた隅角部材であり、当該隅角部材は一対の前記側壁部上にそれぞれ配置され、第3列の前記プレキャスト部材は、前記ボックスカルバートの幅方向に延伸する平板部を備えた中間部材であり、第1列の前記プレキャスト部材と第2列の前記プレキャスト部材との間に設置され、第1列の前記プレキャスト部材と第3列の前記プレキャスト部材との間、及び、第2列の前記プレキャスト部材と第3列の前記プレキャスト部材との間には、それぞれ前記梁部が設けられても良い。 The multiple rows of precast members are composed of three rows, the precast members in the first and second rows are corner members having flat plate portions extending in the width direction of the box culvert, and the corner members are arranged on a pair of the side wall portions, respectively, and the precast members in the third row are intermediate members having flat plate portions extending in the width direction of the box culvert and are installed between the precast members in the first row and the precast members in the second row, and the beam portions may be provided between the precast members in the first row and the precast members in the third row, and between the precast members in the second row and the precast members in the third row, respectively.

第3列の前記プレキャスト部材は、前記平板部から下方に延伸する脚部を更に備え、前記脚部は前記ボックスカルバートの中間壁の高さ方向の一部又は全部を構成しても良い。 The precast members of the third row may further include legs extending downward from the flat plate portion, and the legs may constitute part or all of the height of the intermediate wall of the box culvert.

また、本発明によれば、天井面を構成する頂版部と、側面を構成する側壁部と、を備えたボックスカルバートの構築方法であって、一対の前記側壁部上に、前記ボックスカルバートの幅方向に延伸する平板部を備えたプレキャスト製の隅角部材を前記ボックスカルバートの長さ方向に連続して配置して隅角部を構築する隅角部構築工程と、一対の前記側壁部上に構築された前記隅角部間に、前記ボックスカルバートの幅方向に延伸する平板部を備えたプレキャスト製の中間部材を前記ボックスカルバートの長さ方向に連続して配置し、頂版中央部を構築する頂版中央部構築工程と、前記隅角部と前記頂版中央部との間に設けられた間隙部に沿って、前記ボックスカルバートの長さ方向に隣接する複数の前記中間部材に跨って延伸する梁部を構築する梁部構築工程と、を含み、前記梁部構築工程では、前記間隙部において、前記隅角部材及び前記中間部材から互いに向かい合う方向に突出する鉄筋同士を連結させ、更に、前記ボックスカルバートの長さ方向に延伸する主鉄筋を前記ボックスカルバートの長さ方向に隣接する複数の前記中間部材に跨って配置した後に、当該間隙部に現場打ちコンクリートを打設して前記梁部を構築し、前記隅角部、前記頂版中央部、及び前記梁部により前記頂版部を構成することを特徴とする、ボックスカルバートの構築方法が提供される。
Further, according to the present invention, there is provided a method for constructing a box culvert having a top plate portion constituting a ceiling surface and side wall portions constituting side surfaces, the method comprising the steps of: a corner portion construction step of constructing a corner portion by continuously arranging precast corner members having flat plate portions extending in the width direction of the box culvert on a pair of side wall portions in the length direction of the box culvert; a top plate center portion construction step of continuously arranging precast intermediate members having flat plate portions extending in the width direction of the box culvert between the corner portions constructed on the pair of side wall portions in the length direction of the box culvert to construct a top plate center portion; and a gap portion provided between the corner portion and the top plate center portion. and a beam construction process for constructing a beam extending across a plurality of intermediate members adjacent in the longitudinal direction of the box culvert along the gap, in which the beam construction process connects the reinforcing bars protruding in opposite directions from the corner member and the intermediate member in the gap, and further arranges main reinforcing bars extending in the longitudinal direction of the box culvert across a plurality of intermediate members adjacent in the longitudinal direction of the box culvert , and then pours in-situ concrete into the gap to construct the beam, and the top plate is formed by the corner member, the central portion of the top plate, and the beam.

また、本発明によれば、天井面を構成する頂版部と、側面を構成する側壁部と、を備えたボックスカルバートの構築方法であって、一対の前記側壁部上に、前記ボックスカルバートの幅方向に延伸する平板部を備えたプレキャスト製の隅角部材を前記ボックスカルバートの長さ方向に連続して配置して隅角部を構築する隅角部構築工程と、一対の前記側壁部上に構成された前記隅角部間において、一対の隣り合う前記平板部の間設けられた間隙部に沿って、前記ボックスカルバートの長さ方向に隣接する複数の前記隅角部材に跨って延伸する梁部を構築する梁部構築工程と、を含み、前記梁部構築工程では、前記間隙部において、一対の前記隅角部材から互いに向かい合う方向に突出する鉄筋同士を連結させ、更に、前記ボックスカルバートの長さ方向に延伸する主鉄筋を前記ボックスカルバートの長さ方向に隣接する複数の前記隅角部材に跨って配置した後に、当該間隙部に現場打ちコンクリートを打設して前記梁部を構築し、前記隅角部、及び前記梁部により前記頂版部を構成することを特徴とする、ボックスカルバートの構築方法が提供される。 According to the present invention, there is provided a method for constructing a box culvert having a top plate portion constituting a ceiling surface and side wall portions constituting side surfaces, the method comprising: a corner portion construction step of constructing a corner portion by continuously arranging precast corner members having flat plate portions extending in the width direction of the box culvert on a pair of side wall portions in the longitudinal direction of the box culvert; and a beam portion construction step of constructing a beam portion extending across a plurality of the corner members adjacent in the longitudinal direction of the box culvert along a gap portion provided between a pair of adjacent flat plate portions between the corner portions constructed on the pair of side wall portions, the beam portion construction step connecting reinforcing bars protruding in directions facing each other from the pair of corner members in the gap portion, and further arranging main reinforcing bars extending in the longitudinal direction of the box culvert across a plurality of the corner members adjacent in the longitudinal direction of the box culvert , and then pouring cast-in-place concrete into the gap portion to construct the beam portion, and the top plate portion is constituted by the corner portion and the beam portion.

本発明によれば、ボックスカルバートの構築において、プレキャスト部材を用いた際の施工性の向上を図り、且つ、縦断方向への荷重分配効果による部材設計の合理化や、縦断方向の曲げに対する剛性の向上を図ることが可能となる。 According to the present invention, it is possible to improve the workability of box culverts when using precast members, and also to streamline member design by distributing loads in the longitudinal direction and to improve rigidity against bending in the longitudinal direction.

なお、上記の効果は必ずしも限定的なものではなく、上記の効果とともに、又は、上記の効果に代えて、本明細書に示されたいずれかの効果、又は、本明細書から把握され得る他の効果が奏されてもよい。 The above effects are not necessarily limiting, and any of the effects shown in this specification or other effects that can be understood from this specification may be achieved in addition to or instead of the above effects.

本発明の実施の形態に係るボックスカルバートの概略説明図である。1 is a schematic explanatory diagram of a box culvert according to an embodiment of the present invention. FIG. ボックスカルバートの構築方法に関する概略説明図である。FIG. 1 is a schematic diagram illustrating a method for constructing a box culvert. ボックスカルバートの構築方法に関する概略説明図である。FIG. 1 is a schematic diagram illustrating a method for constructing a box culvert. ボックスカルバートの構築方法に関する概略説明図である。FIG. 1 is a schematic diagram illustrating a method for constructing a box culvert. ボックスカルバートの構築方法に関する概略説明図である。FIG. 1 is a schematic diagram illustrating a method for constructing a box culvert. ボックスカルバートの構築方法に関する概略説明図である。FIG. 1 is a schematic diagram illustrating a method for constructing a box culvert. ボックスカルバートの構築方法に関する概略説明図である。FIG. 1 is a schematic diagram illustrating a method for constructing a box culvert. ボックスカルバートの構築方法に関する概略説明図である。FIG. 1 is a schematic diagram illustrating a method for constructing a box culvert. ボックスカルバートの梁部内に埋設される鉄筋の配筋構成を示す概略説明図である。FIG. 2 is a schematic explanatory diagram showing the reinforcing bar arrangement configuration embedded in the beam portion of a box culvert. 図9に示す配筋構成の一部拡大図である。FIG. 10 is a partially enlarged view of the reinforcement configuration shown in FIG. 第1の他実施形態に係るボックスカルバートの構築方法に関する概略説明図である。FIG. 11 is a schematic explanatory diagram of a method for constructing a box culvert according to a first alternative embodiment. 第1の他実施形態に係るボックスカルバートの構築方法に関する概略説明図である。FIG. 11 is a schematic explanatory diagram of a method for constructing a box culvert according to a first alternative embodiment. 第1の他実施形態に係るボックスカルバートの構築方法に関する概略説明図である。FIG. 11 is a schematic explanatory diagram of a method for constructing a box culvert according to a first alternative embodiment. 第1の他実施形態に係るボックスカルバートの構築方法に関する概略説明図である。FIG. 11 is a schematic explanatory diagram of a method for constructing a box culvert according to a first alternative embodiment. 第1の他実施形態に係るボックスカルバートの構築方法に関する概略説明図である。FIG. 11 is a schematic explanatory diagram of a method for constructing a box culvert according to a first alternative embodiment. 第1の他実施形態に係るボックスカルバートの構築方法に関する概略説明図である。FIG. 11 is a schematic explanatory diagram of a method for constructing a box culvert according to a first alternative embodiment. 第1の他実施形態に係るボックスカルバートの構築方法に関する概略説明図である。FIG. 11 is a schematic explanatory diagram of a method for constructing a box culvert according to a first alternative embodiment. 第2の他実施形態に係るボックスカルバートの構築方法に関する概略説明図である。FIG. 11 is a schematic explanatory diagram of a method for constructing a box culvert according to a second alternative embodiment. 第2の他実施形態に係るボックスカルバートの構築方法に関する概略説明図である。FIG. 11 is a schematic explanatory diagram of a method for constructing a box culvert according to a second alternative embodiment. 第2の他実施形態に係るボックスカルバートの構築方法に関する概略説明図である。FIG. 11 is a schematic explanatory diagram of a method for constructing a box culvert according to a second alternative embodiment. 第2の他実施形態に係るボックスカルバートの構築方法に関する概略説明図である。FIG. 11 is a schematic explanatory diagram of a method for constructing a box culvert according to a second alternative embodiment. 第2の他実施形態に係るボックスカルバートの構築方法に関する概略説明図である。FIG. 11 is a schematic explanatory diagram of a method for constructing a box culvert according to a second alternative embodiment.

以下、本発明の実施の形態について図面を参照して説明する。本明細書および図面において、実質的に同一の機能構成を有する構成要素については、同一の符号を付することにより重複説明を省略する場合がある。なお、本実施形態では、説明のために鉄筋構造や配筋構成について、一部図示を省略する場合や、あるいは、部材内部の鉄筋等を図示する場合がある。 The following describes an embodiment of the present invention with reference to the drawings. In this specification and the drawings, components that have substantially the same functional configuration may be given the same reference numerals to avoid repetitive explanation. Note that in this embodiment, for the purpose of explanation, some illustrations of the reinforcement structure and reinforcement arrangement may be omitted, or reinforcement bars inside the components may be illustrated.

<ボックスカルバートの構成>
図1は本発明の実施の形態に係るボックスカルバート1の概略説明図である。図1に示したボックスカルバート1は、例えば幹線道路や鉄道(図示せず)用に設けられるトンネル等の坑口に設置される矩形カルバート状の中空構造物であり、その内部には、例えば自動車や鉄道車両等が通過するための経路(図示せず)が敷設される。以下では、ボックスカルバート1の内部空間が延伸する方向を長さ方向とし、ボックスカルバート1の敷設面に平行且つ上記長さ方向に直交する方向を幅方向とし、ボックスカルバート1が敷設された状態の鉛直方向を高さ方向として説明する。
<Box culvert configuration>
Fig. 1 is a schematic explanatory diagram of a box culvert 1 according to an embodiment of the present invention. The box culvert 1 shown in Fig. 1 is a rectangular culvert-shaped hollow structure installed at the entrance of a tunnel or the like provided for a trunk road or a railway (not shown), and a path (not shown) for automobiles, railway vehicles, etc. is laid inside the box culvert 1. In the following description, the direction in which the internal space of the box culvert 1 extends is defined as the length direction, the direction parallel to the installation surface of the box culvert 1 and perpendicular to the length direction is defined as the width direction, and the vertical direction when the box culvert 1 is installed is defined as the height direction.

図1に示すように、ボックスカルバート1は、地盤に敷設される底板部3と、地盤に対し鉛直方向に構築される側壁部5と、側壁部5の上部において地盤に略平行に構築される頂版部10と、を含む。頂版部10は、側壁部5の上部に載置され、ボックスカルバート1の天井面を構成するように設けられる。また、頂版部10と平行であり、ボックスカルバート1の下部に位置する底面の少なくとも一部をなす底板部3が設けられる。 As shown in FIG. 1, the box culvert 1 includes a bottom plate 3 laid on the ground, a side wall 5 constructed vertically to the ground, and a top plate 10 constructed approximately parallel to the ground at the top of the side wall 5. The top plate 10 is placed on the top of the side wall 5 and is provided to form the ceiling surface of the box culvert 1. In addition, a bottom plate 3 is provided that is parallel to the top plate 10 and forms at least a part of the bottom surface located at the bottom of the box culvert 1.

本実施形態に係る構成では、側壁部5は、ボックスカルバート1の長さ方向に連続して配置される左右一対のプレキャスト側壁部材(以下、単に側壁部材とも記載)5a、5bによって構成される。なお、図1のように、側壁部材5a、5bは、その下端部において、ボックスカルバート1の底面の一部を構成する底面部分6a、6bを含んでも良い。 In the configuration according to this embodiment, the side wall portion 5 is composed of a pair of left and right precast side wall members (hereinafter also simply referred to as side wall members) 5a, 5b arranged continuously in the longitudinal direction of the box culvert 1. As shown in FIG. 1, the side wall members 5a, 5b may include bottom surface portions 6a, 6b at their lower ends that form part of the bottom surface of the box culvert 1.

また、頂版部10は、ボックスカルバート1の長さ方向に連続して配置された複数列のプレキャスト部材を含む。即ち、頂版部10は、その幅方向両端に位置するプレキャスト製の一対の隅角部材12a、12bと、これら隅角部材12aと12bとの間に位置するプレキャスト製の中間部材15と、を含む。即ち、隅角部材12aと隅角部材12bは、幅方向において3列で構成されるプレキャスト部材の第1列と第2列を構成し、中間部材15がプレキャスト部材の第3列を構成する。 The top plate portion 10 also includes multiple rows of precast members arranged continuously along the length of the box culvert 1. That is, the top plate portion 10 includes a pair of precast corner members 12a, 12b located at both ends in the width direction, and a precast intermediate member 15 located between the corner members 12a and 12b. That is, the corner members 12a and 12b form the first and second rows of precast members that are made up of three rows in the width direction, and the intermediate member 15 forms the third row of precast members.

隅角部材12a、12bは、ボックスカルバート1の長さ方向においてそれぞれ側壁部材5a、5bと同じ長さを有し、側壁部材5a、5b上にそれぞれの隅角部材12a、12bが配置される構成となっている。隅角部材12a、12bは、ボックスカルバート1の幅方向に延伸する平板部13a、13bを有し、中間部材15も同様の平板部16を有する。 The corner members 12a, 12b have the same length as the side wall members 5a, 5b in the longitudinal direction of the box culvert 1, and are arranged on the side wall members 5a, 5b. The corner members 12a, 12b have flat plate portions 13a, 13b that extend in the width direction of the box culvert 1, and the intermediate member 15 also has a similar flat plate portion 16.

また、頂版部10は、隅角部材12aと中間部材15との間、及び、隅角部材12bと中間部材15との間において、それぞれ梁部20a、20bを含む。梁部20a、20bは、ボックスカルバート1の長さ方向に延伸し、例えば現場打ちコンクリート製の部材である。梁部20a、20bには、図9及び図10を参照して後述するように、複数の鉄筋が埋設され、ボックスカルバート1の幅方向において隣り合う列の隅角部材12aと中間部材15、及び隅角部材12bと中間部材15を連結させる機能を有する。更には、ボックスカルバート1の長さ方向に連続して配置される複数のプレキャスト部材(ここでは隅角部材12a、12bや中間部材15)同士を連結させ、荷重を分配させる機能も有する。 The top plate portion 10 also includes beam portions 20a and 20b between the corner member 12a and the intermediate member 15, and between the corner member 12b and the intermediate member 15. The beam portions 20a and 20b extend in the longitudinal direction of the box culvert 1 and are made of, for example, cast-in-place concrete. As described later with reference to Figures 9 and 10, the beam portions 20a and 20b have multiple reinforcing bars embedded therein and function to connect the corner member 12a and the intermediate member 15, and the corner member 12b and the intermediate member 15 in adjacent rows in the width direction of the box culvert 1. Furthermore, they also function to connect multiple precast members (here, the corner members 12a, 12b and the intermediate member 15) that are continuously arranged in the longitudinal direction of the box culvert 1 to each other, distributing the load.

<ボックスカルバートの構築方法>
ここで、本実施形態に係るボックスカルバート1の構築方法について説明する。図2~図8は、ボックスカルバート1の構築方法に関する概略説明図であり、図2~図8の順で構築過程を示している。なお、図2~図8において図示した鉄筋の構成は一例であり、これらの配置や本数等は任意に設計される。
<How to construct a box culvert>
Here, a method for constructing the box culvert 1 according to this embodiment will be described. Figures 2 to 8 are schematic diagrams for explaining the method for constructing the box culvert 1, and the construction process is shown in the order of Figures 2 to 8. Note that the configuration of the reinforcing bars shown in Figures 2 to 8 is one example, and the arrangement, number, etc. of these bars can be designed arbitrarily.

図2に示すように、先ず、左右一対のプレキャスト製の側壁部材5a、5bが図示しないクレーン等によって吊り下げられ設置される。これら側壁部材5a、5bは、図示のようにボックスカルバート1の長さ方向に複数隣接して設置される。これにより、複数の側壁部材5a、5bからなる左右一対の側壁部5が構成される。 As shown in FIG. 2, first, a pair of left and right precast side wall members 5a, 5b are hung and installed by a crane or the like (not shown). These side wall members 5a, 5b are installed adjacent to each other in the longitudinal direction of the box culvert 1 as shown in the figure. This forms a pair of left and right side wall sections 5 consisting of multiple side wall members 5a, 5b.

側壁部材5a、5bはプレキャスト部材であり、その上端から突出する複数の鉄筋31や、下端の底面部分6a、6bからボックスカルバート1の内側に向かって突出する複数の鉄筋32が設けられても良い。 The sidewall members 5a, 5b are precast members, and may have multiple reinforcing bars 31 protruding from their upper ends and multiple reinforcing bars 32 protruding from the bottom portions 6a, 6b at their lower ends toward the inside of the box culvert 1.

次いで、図3に示すように、側壁部5の内側において支保工40が設置される。ここでは、一対の側壁部5の内側近傍の計2箇所にそれぞれ支保工40が設置される。そして、図4に示すように、左右一対の側壁部5の上において、側壁部5を構成する側壁部材5a、5bそれぞれの上端に隅角部材12a、12bが設置される(隅角部構築工程)。この時、側壁部材5a、5bの上端から突出する鉄筋31を隅角部材12a、12bが受容するような構成にしても良く、これにより側壁部材5a、5bと隅角部材12a、12bと、を連結させても良い。また、隅角部材12a、12bの上端部内側には、ボックスカルバート1の内側に向かって突出する複数の鉄筋45が設けられる。なお、隅角部材12a、12bはそれぞれ平板部13a、13bを有している。 Next, as shown in FIG. 3, shoring 40 is installed on the inside of the side wall 5. Here, shoring 40 is installed at two locations in total near the inside of the pair of side wall 5. Then, as shown in FIG. 4, corner members 12a and 12b are installed on the upper ends of the side wall members 5a and 5b that constitute the side wall 5 on the pair of left and right side wall 5 (corner construction process). At this time, the corner members 12a and 12b may be configured to receive the reinforcing bars 31 protruding from the upper ends of the side wall members 5a and 5b, thereby connecting the side wall members 5a and 5b to the corner members 12a and 12b. In addition, a plurality of reinforcing bars 45 protruding toward the inside of the box culvert 1 are provided on the inside of the upper ends of the corner members 12a and 12b. The corner members 12a and 12b each have a flat plate portion 13a and 13b.

そして、図5及び図6に示すように、一対の隅角部材12a、12bの間にプレキャスト製の中間部材15が設置される(頂版中央部構築工程)。図示のように、中間部材15は平板部16を有する。中間部材15の幅方向両端部には、当該幅方向端部から外側(隅角部材方向)に向かって突出する複数の鉄筋51が設けられている。即ち、上記鉄筋45と、鉄筋51は互いに向かい合う方向に突出している。中間部材15の設置時には、これら鉄筋45と鉄筋51は連結手段55によって連結される。連結手段55は任意であり、例えばカプラー等を用いた機械式継手でも良い。また、これら鉄筋45、鉄筋51に直交する方向(即ち、ボックスカルバート1の長さ方向)に延伸する主鉄筋60が設置される。 Then, as shown in Figures 5 and 6, a precast intermediate member 15 is installed between a pair of corner members 12a, 12b (top plate central part construction process). As shown in the figures, the intermediate member 15 has a flat plate portion 16. At both widthwise ends of the intermediate member 15, a plurality of reinforcing bars 51 are provided that protrude from the widthwise ends toward the outside (corner member direction). That is, the reinforcing bars 45 and the reinforcing bars 51 protrude in directions facing each other. When the intermediate member 15 is installed, the reinforcing bars 45 and the reinforcing bars 51 are connected by a connecting means 55. The connecting means 55 is optional, and may be, for example, a mechanical joint using a coupler or the like. In addition, a main reinforcing bar 60 is installed that extends in a direction perpendicular to the reinforcing bars 45 and the reinforcing bars 51 (i.e., the length direction of the box culvert 1).

そして、図7に示すように、隅角部材12aと中間部材15との間、及び、隅角部材12bと中間部材15との間に形成された間隙部に現場打ちコンクリートが打設され、梁部20a、20bが構築される(梁部構築工程)。梁部20a、20bはボックスカルバート1の長さ方向に延伸して現場打ちコンクリートにより一体的に構成される。その際、打設される現場打ちコンクリート内には、上述した連結手段55によって連結された鉄筋45及び鉄筋51と、主鉄筋60が埋設される。これにより、ボックスカルバート1の幅方向において隣り合う列の隅角部材12aと中間部材15、及び隅角部材12bと中間部材15は連結された構成となる。更には、ボックスカルバート1の長さ方向に連続して配置される複数のプレキャスト部材(ここでは隅角部材12a、12bや中間部材15)同士は連結された構成となる。隅角部材12a、12bの一部(平板部13a、13b)と、中間部材15と、梁部20a、20bにより、ボックスカルバート1の天井面を構成する頂版部10が構築される。 Then, as shown in FIG. 7, cast-in-place concrete is poured into the gaps formed between the corner member 12a and the intermediate member 15, and between the corner member 12b and the intermediate member 15, to construct the beams 20a and 20b (beam construction process). The beams 20a and 20b extend in the length direction of the box culvert 1 and are integrally constructed by cast-in-place concrete. At that time, the reinforcing bars 45 and 51 connected by the above-mentioned connecting means 55 and the main reinforcing bars 60 are embedded in the cast-in-place concrete. As a result, the corner member 12a and the intermediate member 15, and the corner member 12b and the intermediate member 15 in adjacent rows in the width direction of the box culvert 1 are connected. Furthermore, the multiple precast members (here, the corner members 12a, 12b and the intermediate member 15) arranged continuously in the length direction of the box culvert 1 are connected to each other. The top plate 10 that constitutes the ceiling surface of the box culvert 1 is constructed by parts of the corner members 12a and 12b (flat plate portions 13a and 13b), the intermediate member 15, and the beam portions 20a and 20b.

そして、図8に示すように、側壁部材5a、5bの下端の底面部分6a、6bの間に、底板部3が現場打ちコンクリートの打設により構築される。この底板部3と、底面部分6a、6bによってボックスカルバート1の底面が構成される。底板部3の構築時には、打設されるコンクリート内に複数の鉄筋32が埋設され、側壁部材5a、5bと底板部3とが連結され一体化される。 Then, as shown in FIG. 8, the bottom plate portion 3 is constructed by pouring cast-in-place concrete between the bottom surface portions 6a, 6b at the lower ends of the side wall members 5a, 5b. The bottom surface of the box culvert 1 is formed by this bottom plate portion 3 and the bottom surface portions 6a, 6b. When constructing the bottom plate portion 3, multiple reinforcing bars 32 are embedded in the poured concrete, and the side wall members 5a, 5b and the bottom plate portion 3 are connected and integrated.

以上、図2~図8を参照して説明したように、プレキャスト部材で構成される左右一対の側壁部5と、その上部に設置されるプレキャスト製の隅角部材12a、12bと、隅角部材12a、12bの間に設置されるプレキャスト製の中間部材15と、が、現場打ちコンクリートからなる梁部20a、20b及び底板部3によって一体化される。こうして本実施形態に係るボックスカルバート1が構築される。 As described above with reference to Figures 2 to 8, the pair of left and right side wall sections 5 made of precast members, the precast corner members 12a, 12b installed on the tops of the side wall sections 5, and the precast intermediate member 15 installed between the corner members 12a, 12b are integrated by the beam sections 20a, 20b and the bottom plate section 3 made of cast-in-place concrete. In this manner, the box culvert 1 according to this embodiment is constructed.

<梁部内の配筋構成>
図9は本実施形態に係るボックスカルバート1の梁部20a、20b内に埋設される鉄筋の配筋構成を示す概略説明図である。図9では、説明のためボックスカルバート1の一部を図示しており、隅角部材12aと中間部材15との間の配筋構成を例として示している。また、図10は、図9に示す配筋構成の一部拡大図である。なお、ここでは、梁部20aに現場打ちコンクリートが打設される前の段階、即ち、鉄筋埋設前の状態を図示している。
<Reinforcement configuration within beams>
Fig. 9 is a schematic explanatory diagram showing the reinforcing bar arrangement configuration embedded in the beams 20a and 20b of the box culvert 1 according to this embodiment. Fig. 9 shows a part of the box culvert 1 for the purpose of explanation, and shows the reinforcing bar arrangement configuration between the corner member 12a and the intermediate member 15 as an example. Fig. 10 is a partially enlarged view of the reinforcing bar arrangement configuration shown in Fig. 9. Note that this figure shows the stage before the cast-in-place concrete is poured into the beams 20a, i.e., the state before the reinforcing bars are embedded.

図9、図10に示すように、隅角部材12aと中間部材15との間の間隙部においては、隅角部材12aから突出する複数の鉄筋45と、中間部材15から突出する複数の鉄筋51と、が連結手段55により連結され配置されている。そして、ボックスカルバート1の幅方向に延伸するこれら鉄筋45、鉄筋51に直交し、ボックスカルバート1の長さ方向に延伸する複数の主鉄筋60が配置されている。 As shown in Figures 9 and 10, in the gap between the corner member 12a and the intermediate member 15, multiple reinforcing bars 45 protruding from the corner member 12a and multiple reinforcing bars 51 protruding from the intermediate member 15 are connected and arranged by a connecting means 55. Then, multiple main reinforcing bars 60 are arranged, which extend in the length direction of the box culvert 1 and are perpendicular to these reinforcing bars 45 and reinforcing bars 51 extending in the width direction of the box culvert 1.

また、隅角部材12aと中間部材15との間の間隙部において、ボックスカルバート1の長さ方向に延伸する複数の主鉄筋60は、その少なくとも一部を囲うようにリング状に設けられるリング状鉄筋65が配置されても良い。図10のように、リング状鉄筋65は、ボックスカルバート1の幅方向において環状となるように構成され、複数の主鉄筋60をまとめて囲うことでその補強を行うものである。 In addition, in the gap between the corner member 12a and the intermediate member 15, a ring-shaped reinforcing bar 65 may be arranged in a ring shape to surround at least a portion of the multiple main reinforcing bars 60 extending in the length direction of the box culvert 1. As shown in FIG. 10, the ring-shaped reinforcing bar 65 is configured to be annular in the width direction of the box culvert 1, and reinforces the multiple main reinforcing bars 60 by surrounding them together.

これら鉄筋45、鉄筋51、主鉄筋60、及びリング状鉄筋65を配置した状態で隅角部材12aと中間部材15との間の間隙部に現場打ちコンクリートを打設することで梁部20aが構築される。即ち、梁部20aは、幅方向において隅角部材12aと中間部材15とを連結させると共に、長さ方向において連続して配置される隅角部材12aや中間部材15同士を連結させる機能を持つ。 The beam section 20a is constructed by pouring in-situ concrete into the gap between the corner member 12a and the intermediate member 15 with the reinforcing bars 45, reinforcing bars 51, main reinforcing bars 60, and ring-shaped reinforcing bars 65 in place. In other words, the beam section 20a has the function of connecting the corner member 12a and the intermediate member 15 in the width direction, and also connecting the corner members 12a and the intermediate members 15 that are arranged consecutively in the length direction.

<本実施形態の作用効果>
以上説明したように構成される本実施形態に係るボックスカルバート1によれば、頂版部10を構築するに際し、長さ方向に連続して配置される複数のプレキャスト部材(ここでは隅角部材12a、12bや中間部材15)を用いている。そして、これら複数のプレキャスト部材を、梁部20a、20bを用いて幅方向と長さ方向の両方において連結させるといった構築方法を採っている。これにより、ボックスカルバート1の剛性が十分に担保される。特に、頂版部10の中央近傍に集中して荷重がかかった場合等に、荷重(死荷重や活荷重)が縦断方向において効果的に分配されるため、部材設計の合理化や、縦断方向の曲げに対する剛性の向上が図られる。
<Effects of this embodiment>
According to the box culvert 1 of this embodiment configured as described above, when constructing the top plate portion 10, a plurality of precast members (here, corner members 12a, 12b and intermediate member 15) arranged continuously in the longitudinal direction are used. Then, a construction method is adopted in which these plurality of precast members are connected in both the width direction and the length direction using beams 20a, 20b. This ensures sufficient rigidity of the box culvert 1. In particular, when a load is concentrated near the center of the top plate portion 10, the load (dead load and live load) is effectively distributed in the longitudinal direction, which allows for rationalization of member design and improvement of rigidity against bending in the longitudinal direction.

また、本実施形態に係るボックスカルバート1では、隅角部材12a、12bや中間部材15、側壁部材5a、5bといった複数のプレキャスト部材を組み合わせ、ボックスカルバート1を構築している。このように、分割式のプレキャスト部材を用いることで施工時の作業効率や部材の運搬性を向上させることが可能となる。 In addition, in the box culvert 1 according to this embodiment, the box culvert 1 is constructed by combining multiple precast components, such as corner members 12a, 12b, intermediate member 15, and side wall members 5a, 5b. In this way, by using split precast components, it is possible to improve the work efficiency during construction and the transportability of the components.

以上、本発明の実施の形態の一例を説明したが、本発明は図示の形態に限定されない。当業者であれば、特許請求の範囲に記載された思想の範疇内において、各種の変更例または修正例に想到し得ることは明らかであり、それらについても当然に本発明の技術的範囲に属するものと了解される。 Although one embodiment of the present invention has been described above, the present invention is not limited to the illustrated form. It is clear that a person skilled in the art can come up with various modified or revised examples within the scope of the ideas described in the claims, and it is understood that these also naturally fall within the technical scope of the present invention.

上記実施形態では、側壁部5は、ボックスカルバート1の長さ方向に連続して配置される左右一対のプレキャスト側壁部材5a、5bによって構成される場合について説明したが、側壁部5の構成は必ずしもこれに限定されるものではない。即ち、側壁部5はプレキャスト製の部材から構成されても良く、あるいは現場打ちコンクリートによって構成されても良い。また、側壁部5が長さ方向に連続して配置される複数の側壁部材5a、5bから構成される場合に、その長さ(ボックスカルバート1の長さ方向における長さ)は任意であり、例えば複数の隅角部材12a、12bに跨るように設計されても良い。 In the above embodiment, the side wall portion 5 is described as being composed of a pair of left and right precast side wall members 5a, 5b arranged continuously in the longitudinal direction of the box culvert 1, but the configuration of the side wall portion 5 is not necessarily limited to this. That is, the side wall portion 5 may be composed of precast members, or may be composed of cast-in-place concrete. Furthermore, when the side wall portion 5 is composed of multiple side wall members 5a, 5b arranged continuously in the longitudinal direction, its length (the length in the longitudinal direction of the box culvert 1) is arbitrary, and it may be designed to span multiple corner members 12a, 12b, for example.

また、上記実施形態では、頂版部10が隅角部材12a、12bと中間部材15によって構成され、隅角部材12aと中間部材15との間、及び、隅角部材12bと中間部材15との間に形成された2箇所の間隙部に梁部20a、20bが構築される場合について図示し説明したが、本発明に係るボックスカルバートの構成はこれに限定されるものではない。以下、本発明の他実施形態に係るボックスカルバートの構成や構築方法について図面を参照して説明する。なお、以下の他実施形態において、上記実施の形態と同じ機能構成を有する構成要素については同一の符号を付して図示し、その説明は省略する場合がある。 In the above embodiment, the top plate portion 10 is composed of corner members 12a, 12b and an intermediate member 15, and the beam portions 20a, 20b are constructed in two gaps formed between the corner member 12a and the intermediate member 15, and between the corner member 12b and the intermediate member 15. However, the configuration of the box culvert according to the present invention is not limited to this. Below, the configuration and construction method of the box culvert according to another embodiment of the present invention will be described with reference to the drawings. Note that in the following other embodiments, components having the same functional configuration as the above embodiment are illustrated with the same reference numerals, and their description may be omitted.

<本発明の第1の他実施形態>
図11~図17は、本発明の第1の他実施形態に係るボックスカルバート1aの構築方法に関する概略説明図であり、図11~図17の順で構築過程を示している。なお、図11~図17において図示した鉄筋の構成は一例であり、これらの配置や本数等は任意に設計される。
<First Alternative Embodiment of the Present Invention>
Figures 11 to 17 are schematic diagrams illustrating a method for constructing a box culvert 1a according to the first embodiment of the present invention, and the construction process is shown in the order of Figures 11 to 17. Note that the configuration of the reinforcing bars shown in Figures 11 to 17 is one example, and the arrangement, number, etc. of the reinforcing bars can be designed arbitrarily.

先ず、図11に示すように、上記実施形態と同様、左右一対のプレキャスト製の側壁部材5a、5bが設置される。これら側壁部材5a、5bは、図示のように長さ方向に複数隣接して設置される。これにより、複数の側壁部材5a、5bからなる左右一対の側壁部5が構成される。側壁部材5a、5bには、その上端から突出する複数の鉄筋31や、下端の底面部分6a、6bからボックスカルバート内側に向かって突出する複数の鉄筋32が設けられても良い。 First, as shown in FIG. 11, a pair of left and right precast side wall members 5a, 5b are installed, as in the above embodiment. These side wall members 5a, 5b are installed adjacent to each other in the longitudinal direction as shown in the figure. This forms a pair of left and right side wall sections 5 consisting of multiple side wall members 5a, 5b. The side wall members 5a, 5b may be provided with multiple reinforcing bars 31 protruding from their upper ends, and multiple reinforcing bars 32 protruding from the bottom surfaces 6a, 6b at their lower ends toward the inside of the box culvert.

そして、図12に示すように、一対の側壁部5の中央部に支保工40が設置される。続いて、図13、図14に示すように、左右一対の側壁部5の上において、側壁部5を構成する側壁部材5a、5bそれぞれの上端に隅角部材70a、70bが設置される。この時、側壁部材5a、5bの上端から突出する鉄筋31を隅角部材70a、70bが受容するような構成にしても良く、これにより側壁部材5a、5bと隅角部材70a、70bと、を連結させても良い。また、隅角部材70a、70bは、設置時にその内側端部が互いに対向する構成であり、それぞれの対向面には、内側に向かって突出する複数の鉄筋75a、75bが設けられる。なお、隅角部材70a、70bはそれぞれ平板部73a、73bを有している。 Then, as shown in FIG. 12, a support 40 is installed in the center of the pair of side walls 5. Next, as shown in FIG. 13 and FIG. 14, corner members 70a, 70b are installed on the upper ends of the side wall members 5a, 5b that constitute the side wall 5 on the pair of left and right side walls 5. At this time, the corner members 70a, 70b may be configured to receive the reinforcing bars 31 protruding from the upper ends of the side wall members 5a, 5b, thereby connecting the side wall members 5a, 5b and the corner members 70a, 70b. In addition, the corner members 70a, 70b are configured so that their inner ends face each other when installed, and a plurality of reinforcing bars 75a, 75b that protrude inward are provided on each of the opposing surfaces. The corner members 70a, 70b each have a flat plate portion 73a, 73b.

そして、図15に示すように、上記鉄筋75aと75bは、連結手段78によって連結される。連結手段78は上記実施形態と同様に任意である。また、隅角部材70aと隅角部材70bとの間において、これら鉄筋75a、鉄筋75bに直交する方向(即ち、ボックスカルバート1aの長さ方向)に延伸する主鉄筋80が設置される。なお、図示しないが、上記実施形態と同様に、主鉄筋80の少なくとも一部を囲うようにリング状に設けられるリング状鉄筋が配置されても良い。 As shown in FIG. 15, the reinforcing bars 75a and 75b are connected by a connecting means 78. The connecting means 78 is optional, as in the above embodiment. In addition, a main reinforcing bar 80 is installed between the corner member 70a and the corner member 70b, extending in a direction perpendicular to the reinforcing bars 75a and 75b (i.e., in the longitudinal direction of the box culvert 1a). Although not shown, a ring-shaped reinforcing bar may be arranged to surround at least a portion of the main reinforcing bar 80, as in the above embodiment.

そして、図16に示すように、隅角部材70aと隅角部材70bとの間に形成された間隙部に現場打ちコンクリートが打設され、梁部83が構築される。梁部83はボックスカルバート1aの長さ方向に延伸するように現場打ちコンクリートにより一体的に構成される。その際、内部には連結手段78によって連結された鉄筋75a及び鉄筋75bと、主鉄筋80が埋設される。これにより、ボックスカルバート1aの幅方向において隣り合う列に配置された隅角部材70aと隅角部材70bが連結された構成となる。更には、ボックスカルバート1aの長さ方向に連続して配置される複数のプレキャスト部材(ここでは隅角部材70aと隅角部材70b)同士が連結された構成となる。これにより、隅角部材70a、隅角部材70bと、その間に位置する梁部83でもってボックスカルバート1aの天井面を構成する頂版部10aが構築される。 Then, as shown in FIG. 16, cast-in-place concrete is poured into the gap formed between the corner members 70a and 70b to construct the beam 83. The beam 83 is integrally constructed with cast-in-place concrete so as to extend in the longitudinal direction of the box culvert 1a. At this time, the reinforcing bars 75a and 75b connected by the connecting means 78 and the main reinforcing bars 80 are embedded inside. This results in a configuration in which the corner members 70a and 70b arranged in adjacent rows in the width direction of the box culvert 1a are connected. Furthermore, a configuration in which multiple precast members (here, the corner members 70a and 70b) arranged continuously in the longitudinal direction of the box culvert 1a are connected to each other. This results in the construction of the top plate 10a that constitutes the ceiling surface of the box culvert 1a, consisting of the corner members 70a and 70b and the beam 83 located between them.

そして、図17に示すように、側壁部材5a、5bの下端の底面部分6a、6bの間に、底板部3が現場打ちコンクリートの打設により構築される。この底板部3と、底面部分6a、6bによってボックスカルバート1aの底面が構成される。底板部3の構築時には、打設されるコンクリート内に複数の鉄筋32が埋設され、側壁部材5a、5bと底板部3とが連結され一体化される。 Then, as shown in FIG. 17, the bottom plate portion 3 is constructed by pouring cast-in-place concrete between the bottom surface portions 6a, 6b at the lower ends of the side wall members 5a, 5b. The bottom surface of the box culvert 1a is formed by this bottom plate portion 3 and the bottom surface portions 6a, 6b. When constructing the bottom plate portion 3, multiple reinforcing bars 32 are embedded in the poured concrete, and the side wall members 5a, 5b and the bottom plate portion 3 are connected and integrated.

第1の他実施形態に係るボックスカルバート1aにおいては、頂版部10aが隅角部材70a、隅角部材70bと、その間に位置する梁部83でもって構成される。即ち、ボックスカルバート1aの長さ方向に連続して配置された複数列のプレキャスト部材として2列構成を採用し、隅角部材70a、70bを用いている。換言すると、上記実施形態に記載の中間部材15を用いない構成としている。そのため、上記実施形態で説明した作用効果に加え、更なる施工性の向上が図られる。 In the box culvert 1a according to the first alternative embodiment, the top plate portion 10a is composed of corner members 70a and 70b, and a beam portion 83 located between them. In other words, a two-row configuration is adopted as multiple rows of precast members arranged continuously in the longitudinal direction of the box culvert 1a, and corner members 70a and 70b are used. In other words, the configuration does not use the intermediate member 15 described in the above embodiment. Therefore, in addition to the effects described in the above embodiment, further improvements in workability are achieved.

<本発明の第2の他実施形態>
図18~図22は、本発明の第2の他実施形態に係るボックスカルバート1bの構築方法に関する概略説明図であり、図18~図22の順で構築過程を示している。なお、図18~図22においては簡略化のため一部鉄筋は不図示としている。
Second Alternative Embodiment of the Present Invention
Figures 18 to 22 are schematic explanatory diagrams of a method for constructing a box culvert 1b according to a second embodiment of the present invention, and the construction process is shown in the order of Figures 18 to 22. Note that, for simplification, some reinforcing bars are not shown in Figures 18 to 22.

先ず、図18に示すように、上記実施形態と同様、左右一対のプレキャスト製の側壁部材5a、5bが設置される。これら側壁部材5a、5bは、図示のように長さ方向に複数隣接して設置される。これにより、複数の側壁部材5a、5bからなる左右一対の側壁部5が構成される。側壁部材5a、5bには、その上端から突出する複数の鉄筋(不図示)や、下端の底面部分6a、6bからボックスカルバート内側に向かって突出する複数の鉄筋(不図示)が設けられても良い。 First, as shown in FIG. 18, a pair of left and right precast side wall members 5a, 5b are installed, as in the above embodiment. These side wall members 5a, 5b are installed adjacent to each other in the longitudinal direction as shown. This forms a pair of left and right side wall sections 5 consisting of multiple side wall members 5a, 5b. The side wall members 5a, 5b may be provided with multiple reinforcing bars (not shown) protruding from their upper ends, or multiple reinforcing bars (not shown) protruding from the bottom surfaces 6a, 6b at their lower ends toward the inside of the box culvert.

また、ボックスカルバート1bの底面の一部を構成する底板部3と、底面の略中央において底面の一部を構成する下端部92を含む中壁部材90が設置される。中壁部材90は後述する中間壁110の一部を構成する壁部91と、上記下端部92を含む。中壁部材90は、例えばプレキャスト製の部材であり、幅方向中央において長さ方向に複数隣接するように設置される。 In addition, a middle wall member 90 is installed, which includes a bottom plate portion 3 that constitutes part of the bottom surface of the box culvert 1b, and a lower end portion 92 that constitutes part of the bottom surface at approximately the center of the bottom surface. The middle wall member 90 includes a wall portion 91 that constitutes part of the intermediate wall 110 described below, and the lower end portion 92. The middle wall members 90 are, for example, precast members, and are installed so that multiple members are adjacent to each other in the length direction at the center in the width direction.

そして、図19に示すように、支保工40が設置される。支保工40は、例えば図示のように、幅方向において中壁部材90の両側2箇所に設置されても良い。続いて、図20に示すように、左右一対の側壁部5の上において、側壁部5を構成する側壁部材5a、5bそれぞれの上端に隅角部材100a、100bが設置される。隅角部材100a、100bの内側端部には、内側に向かって突出する複数の鉄筋105a、105bが設けられる。なお、隅角部材100a、100bはそれぞれ平板部103a、103bを有している。 Then, as shown in FIG. 19, the shoring 40 is installed. For example, as shown in the figure, the shoring 40 may be installed at two locations on both sides of the middle wall member 90 in the width direction. Next, as shown in FIG. 20, corner members 100a, 100b are installed on the upper ends of the side wall members 5a, 5b that constitute the side wall portion 5 on the pair of left and right side wall portions 5. A plurality of reinforcing bars 105a, 105b that protrude inward are provided on the inner ends of the corner members 100a, 100b. The corner members 100a, 100b each have a flat plate portion 103a, 103b.

そして、一対の隅角部材100a、100bの間にプレキャスト製の中間部材15が設置される。即ち、隅角部材100aと隅角部材100bは、幅方向において3列で構成されるプレキャスト部材の第1列と第2列を構成し、中間部材15がプレキャスト部材の第3列を構成する。 A precast intermediate member 15 is then installed between the pair of corner members 100a, 100b. That is, corner member 100a and corner member 100b form the first and second rows of precast members, which are made up of three rows in the width direction, and intermediate member 15 forms the third row of precast members.

図示のように、中間部材15は、平板部16を有し、更に、平板部16から下方に向かって延伸する脚部110を有する。即ち、この脚部110と上記の中壁部材90と、が組み合わさりボックスカルバート1bの中間壁として構成される。中間部材15の幅方向両端部には、当該幅方向端部から外側(隅角部材方向)に向かって突出する複数の鉄筋51が設けられている。鉄筋105a、105bと鉄筋51と、は上記実施形態と同様に連結される。 As shown in the figure, the intermediate member 15 has a flat plate portion 16 and further has a leg portion 110 extending downward from the flat plate portion 16. That is, the leg portion 110 is combined with the above-mentioned middle wall member 90 to form the intermediate wall of the box culvert 1b. At both widthwise ends of the intermediate member 15, a plurality of reinforcing bars 51 are provided that protrude outward from the widthwise ends (towards the corner members). The reinforcing bars 105a, 105b and the reinforcing bars 51 are connected in the same manner as in the above embodiment.

そして、図21に示すように、隅角部材100aと中間部材15との間、及び、隅角部材100bと中間部材15との間に形成された間隙部に現場打ちコンクリートが打設され、梁部20a、20bが構築される。その際、梁部20a、20bの内部には、上記鉄筋105a、105bや鉄筋51、に加え、主鉄筋(ここでは不図示)やリング状鉄筋(ここでは不図示)が埋設される。こうして、隅角部材100a、100bの一部と、中間部材15と、梁部20a、20bにより、ボックスカルバート1bの天井面を構成する頂版部10bが構築される。 Then, as shown in FIG. 21, cast-in-place concrete is poured into the gaps formed between the corner member 100a and the intermediate member 15, and between the corner member 100b and the intermediate member 15, to construct the beams 20a and 20b. At this time, in addition to the reinforcing bars 105a, 105b and reinforcing bar 51, main reinforcing bars (not shown here) and ring-shaped reinforcing bars (not shown here) are embedded inside the beams 20a and 20b. In this way, the top plate 10b that constitutes the ceiling surface of the box culvert 1b is constructed by parts of the corner members 100a and 100b, the intermediate member 15, and the beams 20a and 20b.

そして、図22に示すように、支保工40が撤去され、第2の他実施形態に係るボックスカルバート1bが構築される。 Then, as shown in FIG. 22, the support 40 is removed and the box culvert 1b according to the second alternative embodiment is constructed.

以上説明したように構築される第2の他実施形態に係るボックスカルバート1bによれば、上記実施形態で説明した構成に加え、中壁部材90と脚部110を含む中間壁が設けられる。これにより、ボックスカルバート1bでは、例えば自動車や鉄道車両等が通過するための経路が2経路構成される。即ち、2経路構成のカルバートにおいても、上記実施形態と同様の作用効果が享受される。 According to the box culvert 1b according to the second alternative embodiment constructed as described above, in addition to the configuration described in the above embodiment, an intermediate wall including a middle wall member 90 and a leg portion 110 is provided. As a result, in the box culvert 1b, two routes are configured for the passage of, for example, automobiles, railway vehicles, etc. In other words, the same effects as those of the above embodiment can be obtained even in a culvert with a two-route configuration.

また、本明細書に記載された効果は、あくまで説明的または例示的なものであって限定的ではない。つまり、本開示に係る技術は、上記の効果とともに、又は、上記の効果に代えて、本明細書の記載から当業者には明らかな他の効果を奏しうる。 Furthermore, the effects described in this specification are merely descriptive or exemplary and are not limiting. In other words, the technology disclosed herein may achieve other effects that are apparent to a person skilled in the art from the description in this specification, in addition to or in place of the above effects.

本発明は、ボックスカルバート及びその構築方法に適用できる。 The present invention can be applied to box culverts and their construction methods.

1、1a、1b…ボックスカルバート
3…底板部
5…側壁部
5a、5b…側壁部材
6a、6b…(側壁部材の)底面部分
10…頂版部
12a、12b…隅角部材
13a、13b…(隅角部材の)平板部
15…中間部材
16…(中間部材の)平板部
20a、20b…梁部
31…(側壁部材から突出する)鉄筋
32…(底面部分から突出する)鉄筋
40…支保工
45…(隅角部材から突出する)鉄筋
51…(中間部材から突出する)鉄筋
55…連結手段
60…主鉄筋
65…リング状鉄筋
70a、70b…(第1の他実施形態における)隅角部材
75a、75b…(第1の他実施形態における)鉄筋
78…(第1の他実施形態における)連結手段
80…(第1の他実施形態における)主鉄筋
90…中壁部材
91…壁部
92…下端部
100a、100b…(第2の他実施形態における)隅角部材
DESCRIPTION OF SYMBOLS 1, 1a, 1b...Box culvert 3...Bottom plate portion 5...Side wall portion 5a, 5b...Side wall member 6a, 6b...Bottom surface portion (of side wall member) 10...Top plate portion 12a, 12b...Corner member 13a, 13b...Flat plate portion (of corner member) 15...Intermediate member 16...Flat plate portion (of intermediate member) 20a, 20b...Beam portion 31...Reinforcing bar (protruding from side wall member) 32...Reinforcing bar (protruding from bottom surface portion) 40...Support 45...Reinforcing bar (protruding from corner member) 51...Reinforcing bar (protruding from intermediate member) 55...Connecting means 60...Main reinforcing bar 65...Ring-shaped reinforcing bar 70a, 70b...Corner member (in first alternative embodiment) 75a, 75b...Reinforcing bar (in first alternative embodiment) 78... (in the first alternative embodiment) Connection means 80... (in the first alternative embodiment) Main reinforcing bar 90... Middle wall member 91... Wall portion 92... Lower end portion 100a, 100b... (in the second alternative embodiment) Corner member

Claims (6)

天井面を構成する頂版部と、側面を構成する側壁部と、を備えたボックスカルバートであって、
前記頂版部は、前記ボックスカルバートの長さ方向に連続して配置された複数列のプレキャスト部材と、前記プレキャスト部材の隣り合う列の間にあって、前記ボックスカルバートの長さ方向に延伸する現場打ちコンクリート製の梁部と、を含み、
前記梁部の内部において、一方の列の前記プレキャスト部材から突出する鉄筋と、他方の列の前記プレキャスト部材から突出する鉄筋が互いに連結され、
前記梁部の内部には、前記ボックスカルバートの長さ方向に延伸する主鉄筋が埋設され
前記梁部とその内部の前記主鉄筋は、前記ボックスカルバートの長さ方向に隣接する複数の前記プレキャスト部材に跨って構築されることを特徴とする、ボックスカルバート。
A box culvert having a top plate portion constituting a ceiling surface and a side wall portion constituting a side surface,
The top plate portion includes a plurality of rows of precast members arranged in succession in the longitudinal direction of the box culvert, and a cast-in-place concrete beam portion located between adjacent rows of the precast members and extending in the longitudinal direction of the box culvert;
Within the beam portion, a reinforcing bar protruding from one row of the precast members and a reinforcing bar protruding from the other row of the precast members are connected to each other;
A main reinforcing bar extending in the longitudinal direction of the box culvert is embedded inside the beam portion ,
A box culvert, characterized in that the beam portion and the main reinforcing bars therein are constructed across multiple precast members adjacent in the longitudinal direction of the box culvert .
前記側壁部は、前記ボックスカルバートの長さ方向において前記頂版部を構成する前記プレキャスト部材と同一の長さを有する複数のプレキャスト側壁部材を、前記ボックスカルバートの長さ方向に連続して配置することにより構成されることを特徴とする、請求項1に記載のボックスカルバート。 The box culvert of claim 1, characterized in that the side wall portion is constructed by continuously arranging a plurality of precast side wall members in the longitudinal direction of the box culvert, the precast members having the same length as the precast members constituting the top plate portion in the longitudinal direction of the box culvert. 複数列の前記プレキャスト部材は3列で構成され、
第1列及び第2列の前記プレキャスト部材は、前記ボックスカルバートの幅方向に延伸する平板部を備えた隅角部材であり、当該隅角部材は一対の前記側壁部上にそれぞれ配置され、
第3列の前記プレキャスト部材は、前記ボックスカルバートの幅方向に延伸する平板部を備えた中間部材であり、第1列の前記プレキャスト部材と第2列の前記プレキャスト部材との間に設置され、
第1列の前記プレキャスト部材と第3列の前記プレキャスト部材との間、及び、第2列の前記プレキャスト部材と第3列の前記プレキャスト部材との間には、それぞれ前記梁部が設けられていることを特徴とする、請求項1又は2に記載のボックスカルバート。
The plurality of rows of precast members are comprised of three rows;
The precast members in the first and second rows are corner members having flat plate portions extending in the width direction of the box culvert, and the corner members are respectively disposed on a pair of the side wall portions;
The precast member in the third row is an intermediate member having a flat plate portion extending in the width direction of the box culvert, and is installed between the precast members in the first row and the precast members in the second row;
A box culvert as described in claim 1 or 2, characterized in that a beam portion is provided between the precast members in the first row and the precast members in the third row, and between the precast members in the second row and the precast members in the third row.
第3列の前記プレキャスト部材は、前記平板部から下方に延伸する脚部を更に備え、
前記脚部は前記ボックスカルバートの中間壁の高さ方向の一部又は全部を構成することを特徴とする、請求項3に記載のボックスカルバート。
The precast member of the third row further includes a leg portion extending downwardly from the plate portion;
The box culvert according to claim 3, wherein the leg portion constitutes a part or all of the intermediate wall of the box culvert in the height direction.
天井面を構成する頂版部と、側面を構成する側壁部と、を備えたボックスカルバートの構築方法であって、
一対の前記側壁部上に、前記ボックスカルバートの幅方向に延伸する平板部を備えたプレキャスト製の隅角部材を前記ボックスカルバートの長さ方向に連続して配置して隅角部を構築する隅角部構築工程と、
一対の前記側壁部上に構築された前記隅角部間に、前記ボックスカルバートの幅方向に延伸する平板部を備えたプレキャスト製の中間部材を前記ボックスカルバートの長さ方向に連続して配置し、頂版中央部を構築する頂版中央部構築工程と、
前記隅角部と前記頂版中央部との間に設けられた間隙部に沿って、前記ボックスカルバートの長さ方向に隣接する複数の前記中間部材に跨って延伸する梁部を構築する梁部構築工程と、を含み、
前記梁部構築工程では、前記間隙部において、前記隅角部材及び前記中間部材から互いに向かい合う方向に突出する鉄筋同士を連結させ、更に、前記ボックスカルバートの長さ方向に延伸する主鉄筋を前記ボックスカルバートの長さ方向に隣接する複数の前記中間部材に跨って配置した後に、当該間隙部に現場打ちコンクリートを打設して前記梁部を構築し、
前記隅角部、前記頂版中央部、及び前記梁部により前記頂版部を構成することを特徴とする、ボックスカルバートの構築方法。
A method for constructing a box culvert having a top plate portion constituting a ceiling surface and a side wall portion constituting a side surface, comprising:
a corner construction process for constructing a corner by continuously arranging precast corner members having flat plate portions extending in the width direction of the box culvert on the pair of side wall portions in the length direction of the box culvert;
a top plate central portion construction process for constructing a top plate central portion by continuously arranging precast intermediate members having flat plate portions extending in the width direction of the box culvert between the corner portions constructed on the pair of side wall portions in the length direction of the box culvert;
and a beam construction process for constructing a beam extending across a plurality of intermediate members adjacent in the longitudinal direction of the box culvert along a gap provided between the corner portion and the central portion of the top plate,
In the beam construction process, the reinforcing bars protruding from the corner members and the intermediate members in the directions facing each other are connected to each other in the gaps, and further, main reinforcing bars extending in the longitudinal direction of the box culvert are arranged across a plurality of the intermediate members adjacent in the longitudinal direction of the box culvert , and then the beams are constructed by pouring in-situ concrete into the gaps;
A method for constructing a box culvert, characterized in that the top plate portion is formed by the corner portion, the central portion of the top plate, and the beam portion.
天井面を構成する頂版部と、側面を構成する側壁部と、を備えたボックスカルバートの構築方法であって、
一対の前記側壁部上に、前記ボックスカルバートの幅方向に延伸する平板部を備えたプレキャスト製の隅角部材を前記ボックスカルバートの長さ方向に連続して配置して隅角部を構築する隅角部構築工程と、
一対の前記側壁部上に構成された前記隅角部間において、一対の隣り合う前記平板部の間設けられた間隙部に沿って、前記ボックスカルバートの長さ方向に隣接する複数の前記隅角部材に跨って延伸する梁部を構築する梁部構築工程と、を含み、
前記梁部構築工程では、前記間隙部において、一対の前記隅角部材から互いに向かい合う方向に突出する鉄筋同士を連結させ、更に、前記ボックスカルバートの長さ方向に延伸する主鉄筋を前記ボックスカルバートの長さ方向に隣接する複数の前記隅角部材に跨って配置した後に、当該間隙部に現場打ちコンクリートを打設して前記梁部を構築し、
前記隅角部、及び前記梁部により前記頂版部を構成することを特徴とする、ボックスカルバートの構築方法。
A method for constructing a box culvert having a top plate portion constituting a ceiling surface and a side wall portion constituting a side surface, comprising:
a corner construction process for constructing a corner by continuously arranging precast corner members having flat plate portions extending in the width direction of the box culvert on the pair of side wall portions in the length direction of the box culvert;
and a beam construction process for constructing a beam extending across a plurality of the corner members adjacent in the longitudinal direction of the box culvert along a gap provided between a pair of adjacent flat plate portions between the corner portions formed on a pair of the side wall portions,
In the beam construction process, reinforcing bars protruding from a pair of corner members in directions facing each other are connected to each other in the gap, and further, main reinforcing bars extending in the longitudinal direction of the box culvert are arranged across a plurality of adjacent corner members in the longitudinal direction of the box culvert , and then, cast-in-place concrete is poured into the gap to construct the beam,
A method for constructing a box culvert, characterized in that the top plate portion is formed by the corner portion and the beam portion.
JP2022125355A 2022-08-05 2022-08-05 Box culvert and its construction method Active JP7670979B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2022125355A JP7670979B2 (en) 2022-08-05 2022-08-05 Box culvert and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022125355A JP7670979B2 (en) 2022-08-05 2022-08-05 Box culvert and its construction method

Publications (2)

Publication Number Publication Date
JP2024022047A JP2024022047A (en) 2024-02-16
JP7670979B2 true JP7670979B2 (en) 2025-05-01

Family

ID=89855192

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022125355A Active JP7670979B2 (en) 2022-08-05 2022-08-05 Box culvert and its construction method

Country Status (1)

Country Link
JP (1) JP7670979B2 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002227130A (en) 2001-02-05 2002-08-14 Dps Bridge Works Co Ltd Connecting structure for concrete member
JP2015074886A (en) 2013-10-07 2015-04-20 清水建設株式会社 Box culvert and its construction method
JP2022034412A (en) 2020-08-18 2022-03-03 ランデス株式会社 Split rigid culvert

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002227130A (en) 2001-02-05 2002-08-14 Dps Bridge Works Co Ltd Connecting structure for concrete member
JP2015074886A (en) 2013-10-07 2015-04-20 清水建設株式会社 Box culvert and its construction method
JP2022034412A (en) 2020-08-18 2022-03-03 ランデス株式会社 Split rigid culvert

Also Published As

Publication number Publication date
JP2024022047A (en) 2024-02-16

Similar Documents

Publication Publication Date Title
US9797138B2 (en) Constructive system and method of construction thereof
KR102182536B1 (en) Combined structure of precast columns and beams for construction of warehouse, precast beams used for the same
KR20160150155A (en) Fcm construction method using divided pouring light weight concrete for segment
KR20160150154A (en) Fcm construction method using divided pouring of segment concrete
JP2017071964A (en) How to build a cable-stayed bridge
KR101582599B1 (en) Bridge construction method for forming continuous point part of pier using copping for connecting girder
KR20050055171A (en) Composite rigid-frame bridge installing prestressed compound beam to the contral point of the slab of rigid-frame bridge and connecting the beam to the steel member installed in the upper of pole, and construction method thereof
JP7334948B2 (en) Culvert structure and its construction method
CN114000408A (en) Prefabricated bridge deck structure and construction method thereof
KR101013235B1 (en) Manufacturing method of rainwater storage tank
JP7670979B2 (en) Box culvert and its construction method
JP4406879B2 (en) Bridge girder construction method
JP4299455B2 (en) Junction structure and joining method for large-section tunnel segments
CN115977233A (en) Fully assembled concrete building structure
JP7417087B2 (en) Half precast structural version
JP5074260B2 (en) Bridge erection method
JP7534623B2 (en) Steel bar connection structure between precast members, half-precast concrete slab equipped with said steel bar connection structure, and half-precast concrete wall equipped with said steel bar connection structure
JPH11158812A (en) Hollow slab bridge and method of construction
KR102270427B1 (en) Composite rahmen bridge and constructing method thereof
JP2004263501A (en) Beam-column joint structure
KR102431326B1 (en) Strut-tie connection structure and construction structure using the same
JP3569691B2 (en) Under-track structure construction method
JP7401765B2 (en) Half precast girder and its construction method
JP7213154B2 (en) Top slab construction method for shaft and top slab structure
JP7670981B2 (en) How to Build a Box Culvert

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20241030

A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20241030

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20241217

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20250214

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20250318

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250331

R150 Certificate of patent or registration of utility model

Ref document number: 7670979

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150