JP7686546B2 - Wide-area supply and demand adjustment device, wide-area supply and demand adjustment system, computer program for wide-area supply and demand adjustment device, and wide-area supply and demand adjustment method - Google Patents
[go: Go Back, main page]

JP7686546B2 - Wide-area supply and demand adjustment device, wide-area supply and demand adjustment system, computer program for wide-area supply and demand adjustment device, and wide-area supply and demand adjustment method - Google Patents

Wide-area supply and demand adjustment device, wide-area supply and demand adjustment system, computer program for wide-area supply and demand adjustment device, and wide-area supply and demand adjustment method Download PDF

Info

Publication number
JP7686546B2
JP7686546B2 JP2021198294A JP2021198294A JP7686546B2 JP 7686546 B2 JP7686546 B2 JP 7686546B2 JP 2021198294 A JP2021198294 A JP 2021198294A JP 2021198294 A JP2021198294 A JP 2021198294A JP 7686546 B2 JP7686546 B2 JP 7686546B2
Authority
JP
Japan
Prior art keywords
areas
control
power
area
control share
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021198294A
Other languages
Japanese (ja)
Other versions
JP2023084240A (en
Inventor
勝利 廣政
正和 東野
好樹 村上
量一 市川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Toshiba Energy Systems and Solutions Corp
Original Assignee
Toshiba Corp
Toshiba Energy Systems and Solutions Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp, Toshiba Energy Systems and Solutions Corp filed Critical Toshiba Corp
Priority to JP2021198294A priority Critical patent/JP7686546B2/en
Publication of JP2023084240A publication Critical patent/JP2023084240A/en
Application granted granted Critical
Publication of JP7686546B2 publication Critical patent/JP7686546B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Description

本実施形態は、電力系統の需給制御を行う広域需給調整装置、広域需給調整システム、広域需給調整装置用コンピュータプログラムおよび広域需給調整方法に関する。 This embodiment relates to a wide-area supply and demand adjustment device that controls supply and demand in a power grid, a wide-area supply and demand adjustment system, a computer program for the wide-area supply and demand adjustment device, and a wide-area supply and demand adjustment method.

電力を安定供給するためには電力系統の需給制御を行うことが必要とされる。この種の電力系統の需給制御システムとしては、負荷周波数制御(LFC)および経済負荷配分制御(EDC)を用いて需給制御を行う電力需給調整システムが知られている。 To ensure a stable supply of electricity, it is necessary to control supply and demand in the power system. A known example of this type of power system supply and demand control system is an electric power supply and demand adjustment system that uses load frequency control (LFC) and economic load dispatch control (EDC) to control supply and demand.

特開2001-238355号公報JP 2001-238355 A 特開2007-306770号公報JP 2007-306770 A 特開2017-060325号公報JP 2017-060325 A

昨今の電力自由化により、新規電力事業者が電力事業に参入し、従来に比べ複雑な電力供給および電力消費がなされるようになった。このため、電力需要量と供給量の調整(以降「電力需給調整」と総称する)は、効率よく行うことが必要とされる。効率よく電力需給調整を行うために、広域のエリアにわたり電力需給調整を行うことが必要とされる。また、電力需給調整にかかる調整力が、一定のエリアに偏在化することを避けることが好ましい。 Due to the recent liberalization of the electricity market, new electricity suppliers have entered the electricity business, and electricity supply and consumption have become more complicated than before. For this reason, it is necessary to efficiently adjust the amount of electricity demand and supply (hereinafter referred to as "electricity supply and demand adjustment"). In order to efficiently adjust electricity supply and demand, it is necessary to adjust electricity supply and demand over a wide area. It is also preferable to avoid the adjustment power for electricity supply and demand adjustment being concentrated in a certain area.

一般送配電事業者の法的分離に伴い、2021年4月から、一般送配電事業者が調整力を調達するための需給調整市場の運用が開始された。需給調整市場は、市場運営の中立性と価格の透明性が確保されること、市場メカニズムを活用した効率的な需給調整が実現されること、必要な調整力が安定的に調達されること、が必要とされる。これらを実現するために、需給調整市場価格の公開、メリットオーダーでの発電、従来の一般電気事業者以外の電源やデマンドレスポンスの活用、調整の柔軟性が高い電源(周波数調整用の電源)の評価を行う方法等の検討が推進されている。需給調整市場が円滑に導入されるためにも、調整力の調達と運用における公平性と透明性が確保される必要がある。 Following the legal unbundling of general electricity transmission and distribution businesses, a supply and demand adjustment market for general electricity transmission and distribution businesses to procure adjustment capacity began operation in April 2021. The supply and demand adjustment market is required to ensure the neutrality of market operations and price transparency, to realize efficient supply and demand adjustment using market mechanisms, and to stably procure the necessary adjustment capacity. To achieve these, consideration is being given to methods such as disclosing supply and demand adjustment market prices, generating electricity on a merit order basis, utilizing power sources and demand response other than traditional general electricity businesses, and evaluating power sources with high adjustment flexibility (power sources for frequency adjustment). In order for the supply and demand adjustment market to be introduced smoothly, fairness and transparency must be ensured in the procurement and operation of adjustment capacity.

昨今の電力システム改革に伴い、現状の電力会社における発電、送配電、小売事業は、法的に分離され、送配電と発電、小売事業に分けられる。既存の電力会社は、需給、周波数調整を行う場合、自社内にて必要となる需給調整力を確保していた。しかしながら、昨今の発電事業と送配電事業の分離により、電力事業者は、需給調整市場により需給調整力を確保する場合もある。 Due to the recent electricity system reform, the current power generation, transmission and distribution, and retail businesses of electric power companies will be legally separated and divided into transmission and distribution and power generation and retail businesses. Existing electric power companies secured the necessary supply and demand adjustment capacity in-house when adjusting supply and demand and frequency. However, with the recent separation of power generation and transmission and distribution businesses, electric power companies may also secure supply and demand adjustment capacity through the supply and demand adjustment market.

電力事業者は、市場参加者として、また系統運用者として中立の立場にて、メリットオーダーによる需給、周波数調整を行う。電力事業者は、需給調整市場における商品を購入または販売して、需給、周波数調整を行う。 As market participants and grid operators, power companies adjust supply and demand and frequency based on merit order in a neutral position. Power companies adjust supply and demand and frequency by purchasing or selling products in the supply and demand adjustment market.

需給調整市場における商品メニューとして、調整速度の異なる制御に対応した複数の商品が準備されている。一例として、需給調整市場における商品メニューは、制御区分ごと「一次調整力」「二次調整力」「三次調整力」(上げ、下げ別)に対応した10区分として計画されている。 The product menu for the supply and demand adjustment market will include multiple products that correspond to control with different adjustment speeds. As an example, the product menu for the supply and demand adjustment market is planned to be divided into 10 categories corresponding to each control category: "primary adjustment power," "secondary adjustment power," and "tertiary adjustment power" (both increasing and decreasing).

従来、各エリアの電力系統において、エリアごとの電力需給制御装置により、自エリアの地域要求電力(AR)に基づき、需給調整力の制御および運用が行われていた。今後、需給調整市場により電力の広域調達、広域運用が開始される。今後、各エリアの電力系統における地域要求電力(AR)がネッティングされ、ネッティング後の地域要求電力(AR)が制御量として各エリアの電力系統に指示される。しかしながら複数のエリアに対し制御量にかかる指令が行われるため、一定のエリアに調整力が偏在化し、制御性能が確保されにくいとの問題点があった。 Conventionally, in each area's power system, supply and demand adjustment capacity was controlled and operated based on the area's local power requirement (AR) by the area's power supply and demand control device. In the future, wide-area procurement and operation of electricity will begin through the supply and demand adjustment market. In the future, the local power requirement (AR) in each area's power system will be netted, and the local power requirement (AR) after netting will be instructed to each area's power system as the control amount. However, because commands regarding the control amount are issued to multiple areas, adjustment capacity will be unevenly concentrated in certain areas, making it difficult to ensure control performance.

2020年8月に電力広域的運営推進機関(OCCTO)により、二次調整力に関する広域運用の検討方法が公開されたが、広域LFCとの連携方法による伝送時間や、演算時間を考慮した調整力の決定方法は考えられていない。このため、広域負荷周波数制御(LFC)機能による個別メリットオーダーリストに伴う制御量分担により、エリア間で調整力の余力が偏在化する可能性があり、制御性の悪化に繋がるとの問題点があった。また、メリットオーダーに伴う制御量の分担を行うことで調整コストに応じた配分となるため、経済性と制御性のトレードオフの関係となり、制御性の悪化に繋がるとの問題点があった。 In August 2020, the Organization for Cross-regional Coordination of Transmission Operators (OCCTO) published a method for examining the wide-area operation of secondary control reserve, but no consideration was given to a method for determining control reserve that takes into account transmission time through coordination with wide-area LFC or calculation time. This has led to the problem that the sharing of control volume due to individual merit order lists using the wide-area load frequency control (LFC) function could lead to uneven distribution of spare control reserve between areas, which could lead to a deterioration in controllability. In addition, sharing of control volume due to merit order results in allocation according to adjustment costs, which creates a trade-off between economy and controllability, which could lead to a deterioration in controllability.

本実施形態は、一定のエリアに調整力が偏在化することを抑制し、広域のエリアにわたり効率よく電力需給調整を行うことができる広域需給調整装置、広域需給調整システム、広域需給調整装置用コンピュータプログラムおよび広域需給調整方法を提供することを目的とする。 The present embodiment aims to provide a wide-area supply and demand adjustment device, a wide-area supply and demand adjustment system, a computer program for the wide-area supply and demand adjustment device, and a wide-area supply and demand adjustment method that can suppress uneven concentration of adjustment power in a certain area and efficiently adjust power supply and demand over a wide area.

本実施形態の広域需給調整装置は、以下の構成を有することを特徴とする。
(1)制御対象となる複数のエリアのそれぞれに要求された電力(AR値)に基づき、複数の前記エリア全体の調整量の総量を算出するネッティング部。
(2)前記ネッティング部により算出された複数の前記エリア全体の調整量の総量を、複数の前記エリアのそれぞれに分配して、複数の前記エリアのそれぞれの制御分担量、複数の前記エリアの発電機ごとの制御分担量のうち少なくとも一方を算出する制御分担量算出部。
(3)前記制御分担量算出部により算出された複数の前記エリアのそれぞれの制御分担量、複数の前記エリアの発電機ごとの制御分担量のうち少なくとも一方に基づき、複数の前記エリアのそれぞれに対する指令値を作成する各電源指令作成部。
The wide-area supply and demand adjustment device of this embodiment is characterized by having the following configuration.
(1) A netting unit that calculates the total amount of adjustment for all of a plurality of areas to be controlled based on the power (AR value) required for each of the plurality of areas.
(2) A control share calculation unit that distributes the total amount of adjustment for the entire plurality of areas calculated by the netting unit to each of the plurality of areas, and calculates at least one of the control share of each of the plurality of areas and the control share of each generator in the plurality of areas.
(3) Each power supply command creation unit creates a command value for each of the multiple areas based on at least one of the control burden amount for each of the multiple areas calculated by the control burden amount calculation unit and the control burden amount for each generator in the multiple areas.

第1実施形態にかかる広域需給調整システムを示す図FIG. 1 is a diagram showing a wide-area supply and demand adjustment system according to a first embodiment. 第1実施形態にかかる広域需給調整システムにおける広域需給調整装置と各エリアの接続関係を説明する図FIG. 1 is a diagram for explaining the connection relationship between a wide-area supply and demand adjustment device and each area in a wide-area supply and demand adjustment system according to a first embodiment. 第1実施形態にかかる電力需給制御装置の動作フローを示す図FIG. 2 is a diagram showing an operation flow of the power supply and demand control device according to the first embodiment. 第1実施形態にかかる広域需給調整装置の動作フローを示す図FIG. 1 is a diagram showing an operation flow of a wide-area supply and demand adjusting device according to a first embodiment. 従来技術によるAR配分方式の一般的な制御ロジックを示す図FIG. 1 shows a typical control logic of a conventional AR allocation method. 第1実施形態にかかる広域需給調整システムの制御ロジックを示す図FIG. 1 is a diagram showing a control logic of a wide-area supply and demand adjustment system according to a first embodiment. 第1実施形態にかかる広域需給調整システムにおける発電機毎の個別メリットオーダーを示す図FIG. 1 is a diagram showing individual merit orders for each generator in the wide-area supply and demand adjustment system according to the first embodiment. 第1実施形態にかかる広域需給調整装置と各エリアの関係を説明する図FIG. 1 is a diagram for explaining the relationship between a wide-area supply and demand adjusting device and each area according to a first embodiment. 第1実施形態にかかる広域需給調整システムにおける各エリアの調整力を説明する図FIG. 1 is a diagram for explaining the adjustment capacity of each area in a wide-area supply and demand adjustment system according to a first embodiment. 第1実施形態にかかる広域需給調整システムにおける各発電機の調整力を説明する図FIG. 1 is a diagram for explaining the adjustment power of each power generator in a wide-area supply and demand adjustment system according to a first embodiment. 第1実施形態にかかる広域需給調整システムにおける時系列的な調整力の余力を説明する図FIG. 1 is a diagram for explaining the time-series spare capacity of adjustment capacity in the wide-area supply and demand adjustment system according to the first embodiment. 第2実施形態にかかる広域需給調整システムにおけるメリットオーダーに従ったLFCモデルを示す図FIG. 13 is a diagram showing an LFC model according to a merit order in a wide-area supply and demand adjustment system according to a second embodiment. 第2実施形態にかかる広域需給調整システムにおける価格差をベースにした配分方法を説明する図FIG. 13 is a diagram for explaining an allocation method based on a price difference in the wide-area supply and demand adjustment system according to the second embodiment. 第2実施形態にかかる広域需給調整システムにおける各発電機の上げ調整価格および下げ調整価格示す図FIG. 13 is a diagram showing the upward adjustment price and the downward adjustment price of each power generator in the wide-area supply and demand adjustment system according to the second embodiment. 商品区分を説明する図Diagram explaining product categories

[第1実施形態]
[1-1.構成]
図1、図2を参照して本実施形態の一例として、広域需給調整システムについて説明する。なお、本実施形態において、同一構成の装置や部材が複数ある場合にはそれらについて同一の番号を付して説明を行い、また、同一構成の個々の装置や部材についてそれぞれを説明する場合に、共通する番号にアルファベットの添え字を付けることで区別する。
[First embodiment]
[1-1. Configuration]
As an example of this embodiment, a wide-area supply and demand adjustment system will be described with reference to Figures 1 and 2. In this embodiment, when there are multiple devices or components with the same configuration, they will be described with the same number, and when describing each individual device or component with the same configuration, they will be distinguished by adding an alphabetical suffix to the common number.

(1)システムの全体構成
図1に、本実施形態にかかる広域需給調整システム1を示す。広域需給調整システム1は、電力需給制御装置2、広域需給調整装置5を有する。一般に、広域需給調整装置5に相当するものを広域需給調整システムと呼ぶが、本実施形態では、広域需給調整装置5および電力需給制御装置2を含むものを広域需給調整システム1と呼ぶ。1台の電力需給制御装置2により需給調整の制御が行われる制御対象となる領域を、1つのエリアと呼ぶ。また、2つ以上のエリアを広域と呼ぶ。図2に示すように広域需給調整装置5は、複数のエリアの電力需給制御装置2に接続される。電力系統9は、複数の発電機91、自然エネルギー発電設備92、検出装置93を備える。電力需給制御装置2は、複数の発電機91、自然エネルギー発電設備92、検出装置93に接続される。電力系統9aは、連系線を介し他の電力系統9bに接続される。また、各発電機91は、検出用の信号線97および制御用の信号線98により電力需給制御装置2に接続される。
(1) Overall configuration of the system FIG. 1 shows a wide-area supply and demand adjustment system 1 according to this embodiment. The wide-area supply and demand adjustment system 1 has an electric power supply and demand control device 2 and a wide-area supply and demand adjustment device 5. In general, the equivalent of the wide-area supply and demand adjustment device 5 is called a wide-area supply and demand adjustment system, but in this embodiment, the wide-area supply and demand adjustment system 1 includes the wide-area supply and demand adjustment device 5 and the electric power supply and demand control device 2. An area that is the subject of control in which supply and demand adjustment is performed by one electric power supply and demand control device 2 is called one area. In addition, two or more areas are called a wide area. As shown in FIG. 2, the wide-area supply and demand adjustment device 5 is connected to the electric power supply and demand control devices 2 of multiple areas. The electric power system 9 includes multiple generators 91, natural energy power generation facilities 92, and a detection device 93. The electric power supply and demand control device 2 is connected to the multiple generators 91, natural energy power generation facilities 92, and a detection device 93. The electric power system 9a is connected to another electric power system 9b via an interconnection line. Further, each generator 91 is connected to the power supply and demand control device 2 by a detection signal line 97 and a control signal line 98 .

本実施形態にかかる広域需給調整システム1において、以下のデータが、入力、出力、送受信または記憶される。また、以降、「地域要求電力」を「AR」、「負荷周波数制御」を「LFC(LFC:Load Frequency Control)」、「経済負荷配分制御」を「EDC(ELD;Economic load Dispatch Control)」と呼ぶ場合がある。「需要実績値」とは、実際に供給した電力ではなく、実際に発電された電力の値(発電端電力値)をいう。
データa1(発電機発電電力値)
データb1(自然エネルギー発電電力値)
データc1(周波数変化量ΔF)
データc2(潮流電力変化量ΔPT)
データc3(融通電力P0)
データd1(発電目標値)
データf1(AR値)
データf2(平滑後AR値)
データf3(AR配分値)
データg1(リアルタイムEDC値)
データg2(個別メリットオーダーリスト)
データg3(既LFC動作量)
データh1(ネッティング後AR値)
データh2(制御分担量)
データh3(LFC制御出力指令)
In the wide-area supply and demand adjustment system 1 according to this embodiment, the following data is input, output, transmitted/received, or stored. In addition, hereinafter, "regional required power" may be referred to as "AR,""load frequency control" as "LFC (Load Frequency Control)," and "economic load dispatch control" as "EDC (Economic load Dispatch Control).""Demand performance value" refers to the value of actually generated power (generating end power value), not the power actually supplied.
Data a1 (generator generated power value)
Data b1 (renewable energy generation power value)
Data c1 (frequency change amount ΔF)
Data c2 (change in tidal flow power ΔPT)
Data c3 (interchangeable power P0)
Data d1 (power generation target value)
Data f1 (AR value)
Data f2 (smoothed AR value)
Data f3 (AR allocation value)
Data g1 (real-time EDC value)
Data g2 (individual merit order list)
Data g3 (already LFC operation amount)
Data h1 (AR value after netting)
Data h2 (control share)
Data h3 (LFC control output command)

(2)発電機91
発電機91は、電力系統9aに供給する電力を発電する電力供給設備である。一例として、本実施形態の広域需給調整システム1は、発電機91a~91nを有する。例えば、発電機91aは、出力変化速度の速い、水力機等の高速機により構成される。例えば、発電機91bは、出力変化速度のやや遅い、石油火力機等の中速機により構成される。例えば、発電機91nは、出力変化速度の極めて遅い、石炭火力機等の低速機により構成される。発電機91は任意の発電速度を有する発電機により構成されるものであってよい。
(2) Generator 91
The generator 91 is a power supply facility that generates power to be supplied to the power grid 9a. As an example, the wide-area supply and demand adjustment system 1 of this embodiment has generators 91a to 91n. For example, the generator 91a is configured from a high-speed machine such as a hydraulic machine with a fast output change rate. For example, the generator 91b is configured from a medium-speed machine such as an oil-fired power machine with a slightly slow output change rate. For example, the generator 91n is configured from a low-speed machine such as a coal-fired power machine with an extremely slow output change rate. The generator 91 may be configured from a generator having any power generation speed.

発電機91は、電力需給制御装置2に接続される。発電機91は、検出用の信号線97を介し電力需給制御装置2に対して、データa1(発電機発電電力値)を送信する。また、発電機91は、制御用の信号線98を介し電力需給制御装置2からデータd1(発電目標値)を受信し、データd1(発電目標値)に基づき発電電力の制御を行う。なお、発電機91a~91nは、任意の台数であってよい。 The generator 91 is connected to the power supply and demand control device 2. The generator 91 transmits data a1 (generator power generation value) to the power supply and demand control device 2 via a detection signal line 97. The generator 91 also receives data d1 (power generation target value) from the power supply and demand control device 2 via a control signal line 98, and controls the power generation based on the data d1 (power generation target value). Note that there may be any number of generators 91a to 91n.

(3)自然エネルギー発電設備92
自然エネルギー発電設備92は、太陽光、風力等の自然エネルギーにより電力を発電し、発電した電力を電力系統9aに供給する電力供給設備である。一例として、本実施形態の広域需給調整システム1は、自然エネルギー発電設備92a~92nを有する。自然エネルギー発電設備92は、電力需給制御装置2にデータb1(自然エネルギー発電電力値)を送信する。なお、自然エネルギー発電設備92a~92nは、任意の台数であってよい。
(3) 92 natural energy power generation facilities
The natural energy power generation facility 92 is a power supply facility that generates power using natural energy such as solar power and wind power, and supplies the generated power to the power grid 9a. As an example, the wide-area supply and demand adjustment system 1 of this embodiment has natural energy power generation facilities 92a to 92n. The natural energy power generation facility 92 transmits data b1 (natural energy generation power value) to the power supply and demand control device 2. Note that the number of natural energy power generation facilities 92a to 92n may be any number.

(4)検出装置93
検出装置93は、電力系統9aの電気量を検出する測定装置である。検出装置93は、電力系統9aに配置される。検出装置93は、連系線における電力系統9aに関するデータc1(周波数変化量ΔF)、データc2(潮流電力変化量ΔPT)、データc3(融通電力P0)の各項目を検出し電力需給制御装置2に送信する。
(4) Detection device 93
The detection device 93 is a measuring device that detects the amount of electricity in the power system 9a. The detection device 93 is disposed in the power system 9a. The detection device 93 detects each item of data c1 (frequency change amount ΔF), data c2 (tidal flow power change amount ΔPT), and data c3 (interchangeable power P0) related to the power system 9a in the interconnection line, and transmits the data to the power supply and demand control device 2.

(5)電力需給制御装置2
電力需給制御装置2は、コンピュータ等により構成される。電力需給制御装置2は、電力の監視制御を行う制御室等に配置される。電力需給制御装置2は、発電機91から送信されるデータa1(発電機発電電力値)、自然エネルギー発電設備92から送信されるデータb1(自然エネルギー発電電力値)、検出装置93から送信される連系線における電力系統9aに関するデータc1(周波数変化量ΔF)、データc2(潮流電力変化量ΔPT)、データc3(融通電力P0)が、入力される。電力需給制御装置2は、発電機91に対し、データd1(発電目標値)を送信する。
(5) Electricity supply and demand control device 2
The power supply and demand control device 2 is composed of a computer or the like. The power supply and demand control device 2 is placed in a control room or the like that monitors and controls power. The power supply and demand control device 2 receives data a1 (generator-generated power value) transmitted from the generator 91, data b1 (renewable energy-generated power value) transmitted from the natural energy power generation facility 92, and data c1 (frequency change amount ΔF), data c2 (tidal flow power change amount ΔPT), and data c3 (interchangeable power P0) related to the power system 9a in the interconnection line transmitted from the detection device 93. The power supply and demand control device 2 transmits data d1 (power generation target value) to the generator 91.

電力需給制御装置2は、入力部21、出力部22、目標値作成部23、AR算出部24、AR平滑部25、AR配分部26、リアルタイムEDC算出部27、AR送信部31、情報送信部32、LFC制御出力指令受信部33、切替部34を有する。 The power supply and demand control device 2 has an input unit 21, an output unit 22, a target value creation unit 23, an AR calculation unit 24, an AR smoothing unit 25, an AR allocation unit 26, a real-time EDC calculation unit 27, an AR transmission unit 31, an information transmission unit 32, an LFC control output command receiving unit 33, and a switching unit 34.

電力需給制御装置2の入力部21、出力部22、AR送信部31、情報送信部32、LFC制御出力指令受信部33は、ハードウェアにより構成される。目標値作成部23、AR算出部24、AR平滑部25、AR配分部26、リアルタイムEDC算出部27、切替部34は、機能ブロックとしてソフトウェアモジュールにより構成される。 The input unit 21, output unit 22, AR transmission unit 31, information transmission unit 32, and LFC control output command reception unit 33 of the power supply and demand control device 2 are configured with hardware. The target value creation unit 23, AR calculation unit 24, AR smoothing unit 25, AR allocation unit 26, real-time EDC calculation unit 27, and switching unit 34 are configured with software modules as functional blocks.

入力部21は、受信回路により構成される。入力部21は、入力側が信号線97を介し発電機91に、出力側が目標値作成部23に接続される。入力部21は、発電機91から送信されたデータa1(発電機発電電力値)を受信する。入力部21は、データa1(発電機発電電力値)を目標値作成部23に送信する。 The input unit 21 is composed of a receiving circuit. The input side of the input unit 21 is connected to the generator 91 via a signal line 97, and the output side is connected to the target value creation unit 23. The input unit 21 receives data a1 (generator generation power value) transmitted from the generator 91. The input unit 21 transmits data a1 (generator generation power value) to the target value creation unit 23.

出力部22は、送信回路により構成される。出力部22は、入力側が目標値作成部23に、出力側が信号線98を介し発電機91に接続される。出力部22は、目標値作成部23から入力されたデータd1(発電目標値)を、発電機91に送信する。 The output unit 22 is configured with a transmission circuit. The input side of the output unit 22 is connected to the target value creation unit 23, and the output side is connected to the generator 91 via a signal line 98. The output unit 22 transmits data d1 (power generation target value) input from the target value creation unit 23 to the generator 91.

目標値作成部23は、入力側が入力部21、切替部34およびリアルタイムEDC算出部27に接続され、出力側が出力部22に接続される。目標値作成部23は、入力部21から発電機91のデータa1(発電機発電電力値)を、切替部34からデータf3(AR配分値)またはデータh3(LFC制御出力指令)の一方を受信する。目標値作成部23は、リアルタイムEDC算出部27からデータg1(リアルタイムEDC値)を受信する。 The input side of the target value creation unit 23 is connected to the input unit 21, the switching unit 34, and the real-time EDC calculation unit 27, and the output side is connected to the output unit 22. The target value creation unit 23 receives data a1 (generator power generation value) of the generator 91 from the input unit 21, and either data f3 (AR allocation value) or data h3 (LFC control output command) from the switching unit 34. The target value creation unit 23 receives data g1 (real-time EDC value) from the real-time EDC calculation unit 27.

目標値作成部23は、データa1(発電機発電電力値)、データg1(リアルタイムEDC値)、切替部34により選択されたデータf3(AR配分値)またはデータh3(LFC制御出力指令)の一方に基づき、データd1(発電目標値)を作成し出力部22に送信する。 The target value creation unit 23 creates data d1 (power generation target value) based on data a1 (generator power generation value), data g1 (real-time EDC value), and one of data f3 (AR allocation value) or data h3 (LFC control output command) selected by the switching unit 34, and transmits the data d1 to the output unit 22.

AR算出部24は、入力側が自然エネルギー発電設備92および検出装置93に接続され、出力側がAR平滑部25、AR送信部31に接続される。AR算出部24は、自然エネルギー発電設備92からデータb1(自然エネルギー発電電力値)を、検出装置93からデータc1(周波数変化量ΔF)、データc2(潮流電力変化量ΔPT)、データc3(融通電力P0)を受信する。 The input side of the AR calculation unit 24 is connected to the natural energy power generation facility 92 and the detection device 93, and the output side is connected to the AR smoothing unit 25 and the AR transmission unit 31. The AR calculation unit 24 receives data b1 (natural energy power generation power value) from the natural energy power generation facility 92, and data c1 (frequency change amount ΔF), data c2 (tidal flow power change amount ΔPT), and data c3 (transfer power P0) from the detection device 93.

AR算出部24は、データb1(自然エネルギー発電電力値)、データc1(周波数変化量ΔF)、データc2(潮流電力変化量ΔPT)、データc3(融通電力P0)に基づき、AR値を算出し、AR平滑部25およびAR送信部31にデータf1(AR値)を送信する。 The AR calculation unit 24 calculates the AR value based on data b1 (renewable energy generation power value), data c1 (frequency change amount ΔF), data c2 (tidal flow power change amount ΔPT), and data c3 (transfer power P0), and transmits data f1 (AR value) to the AR smoothing unit 25 and the AR transmission unit 31.

AR平滑部25は、入力側がAR算出部24に、出力側がAR配分部26に接続される。AR平滑部25は、AR算出部24からデータf1(AR値)をを受信する。AR平滑部25は、データf1(AR値)に基づき、周波数分解を行いAR配分部26にデータf2(平滑後AR値)を送信する。 The input side of the AR smoothing unit 25 is connected to the AR calculation unit 24, and the output side is connected to the AR distribution unit 26. The AR smoothing unit 25 receives data f1 (AR value) from the AR calculation unit 24. The AR smoothing unit 25 performs frequency decomposition based on the data f1 (AR value) and transmits data f2 (smoothed AR value) to the AR distribution unit 26.

AR配分部26は、入力側がAR平滑部25に接続され、出力側が切替部34に接続される。AR配分部26は、AR平滑部25からデータf2(平滑後AR値)を受信する。AR配分部26は、データf2(平滑後AR値)に基づき、発電機91ごとの発電配分を算出し、切替部34にデータf3(AR配分値)を送信する。データf3(AR配分値)は、各発電機91へ配分された調整量であって、発電機91のメリットオーダーに基づいて算出される。 The input side of the AR allocation unit 26 is connected to the AR smoothing unit 25, and the output side is connected to the switching unit 34. The AR allocation unit 26 receives data f2 (smoothed AR value) from the AR smoothing unit 25. The AR allocation unit 26 calculates the power generation allocation for each generator 91 based on the data f2 (smoothed AR value), and transmits data f3 (AR allocation value) to the switching unit 34. The data f3 (AR allocation value) is the adjustment amount allocated to each generator 91, and is calculated based on the merit order of the generator 91.

また、AR配分部26は、データf3(AR配分値)を発電機91の運転能力に応じて配分する。運転能力は、例えば発電機91の発動までの応動時間である。AR配分部26は、各目標値作成部23に対するデータf3(AR配分値)を切替部34に送信する。 The AR allocation unit 26 also allocates data f3 (AR allocation value) according to the operating capacity of the generator 91. The operating capacity is, for example, the response time until the generator 91 is activated. The AR allocation unit 26 transmits data f3 (AR allocation value) for each target value creation unit 23 to the switching unit 34.

AR送信部31は、送信回路により構成される。AR送信部31は、AR算出部24により算出されたデータf1(AR値)を広域需給調整装置5に送信する。 The AR transmission unit 31 is composed of a transmission circuit. The AR transmission unit 31 transmits the data f1 (AR value) calculated by the AR calculation unit 24 to the wide-area supply and demand adjustment device 5.

情報送信部32は、送信回路および記憶装置により構成される。情報送信部32は、あらかじめ設定され記憶しているデータg2(個別メリットオーダーリスト)、データg3(既LFC動作量)にかかる情報を広域需給調整装置5に送信する。 The information transmission unit 32 is composed of a transmission circuit and a storage device. The information transmission unit 32 transmits information related to data g2 (individual merit order list) and data g3 (existing LFC operation volume) that are set and stored in advance to the wide-area supply and demand adjustment device 5.

LFC制御出力指令受信部33は、受信回路により構成される。LFC制御出力指令受信部33は、広域需給調整装置5から後述するデータh3(LFC制御出力指令)を受信し、切替部34に送信する。 The LFC control output command receiving unit 33 is composed of a receiving circuit. The LFC control output command receiving unit 33 receives data h3 (LFC control output command) described later from the wide-area supply and demand adjusting device 5, and transmits it to the switching unit 34.

切替部34は、AR配分部26から送信されたデータf3(AR配分値)、またはLFC制御出力指令受信部33から送信されたデータh3(LFC制御出力指令)のいずれか一方を選択し、目標値作成部23a~23nの各々に送信する。 The switching unit 34 selects either the data f3 (AR distribution value) transmitted from the AR distribution unit 26 or the data h3 (LFC control output command) transmitted from the LFC control output command receiving unit 33, and transmits it to each of the target value creation units 23a to 23n.

リアルタイムEDC算出部27は、入力側がAR平滑部25に接続され、出力側が各目標値作成部23に接続される。リアルタイムEDC算出部27は、AR平滑部25からデータf2(平滑後AR値)を受信する。なお、AR平滑部25は広域需給調整装置5内に有ってもよいこととする。 The input side of the real-time EDC calculation unit 27 is connected to the AR smoothing unit 25, and the output side is connected to each target value creation unit 23. The real-time EDC calculation unit 27 receives data f2 (smoothed AR value) from the AR smoothing unit 25. Note that the AR smoothing unit 25 may be located within the wide-area supply and demand adjustment device 5.

リアルタイムEDC算出部27は、データf2(平滑後AR値)に基づいて経済負荷配分を行い、発電機91のメリットオーダーによって、経済負荷配分の計算結果としてデータg1(リアルタイムEDC値)を発電機91ごとに算出する。 The real-time EDC calculation unit 27 performs economic load allocation based on data f2 (smoothed AR value) and calculates data g1 (real-time EDC value) for each generator 91 as the calculation result of economic load allocation based on the merit order of the generator 91.

データg1(リアルタイムEDC値)とは、広域需給調整システム1全体として経済的になるよう発電機91ごとにスケジュール配分された発電電力値である。 Data g1 (real-time EDC value) is the generated power value scheduled and allocated to each generator 91 so as to be economical for the wide-area supply and demand adjustment system 1 as a whole.

また、リアルタイムEDC算出部27は、発電機91のメリットオーダーによって自エリアにおけるEDC対象のエリアインバランス量を配分する。リアルタイムEDC算出部27は、EDC周期に合わせてエリアインバランス量を配分する。 The real-time EDC calculation unit 27 also allocates the area imbalance amount of the EDC target in its own area according to the merit order of the generator 91. The real-time EDC calculation unit 27 allocates the area imbalance amount according to the EDC period.

エリアインバランス量とは、あるエリアの未来の時間帯において、手当されている電力量と、要求された電力量との差分である。要求された電力量が、手当されている電力量よりも大(つまりAR値が正)であれば、エリアインバランス量の不足=調達すべき電力量の不足を意味する。反対に、要求された電力量が手当されている電力量よりも小(つまりAR値が負)であれば、エリアインバランス量の過多=調達すべき電力量の過多を意味する。 The area imbalance amount is the difference between the amount of electricity provided and the amount of electricity requested in a future time period for a certain area. If the amount of electricity requested is greater than the amount of electricity provided (i.e. the AR value is positive), then it means that there is a shortage of the area imbalance amount = a shortage of the amount of electricity to be procured. Conversely, if the amount of electricity requested is less than the amount of electricity provided (i.e. the AR value is negative), then it means that there is an excess of the area imbalance amount = an excess of the amount of electricity to be procured.

リアルタイムEDC算出部27により算出され配分されたデータg1(リアルタイムEDC値)は、目標値作成部23に送信される。目標値作成部23は、データa1(発電機発電電力値)、データg1(リアルタイムEDC値)、切替部34により選択されたデータf3(AR配分値)またはデータh3(LFC制御出力指令)の一方に基づき、データd1(発電目標値)を作成し出力部22に送信する。 The data g1 (real-time EDC value) calculated and allocated by the real-time EDC calculation unit 27 is transmitted to the target value creation unit 23. The target value creation unit 23 creates data d1 (power generation target value) based on data a1 (generator power generation value), data g1 (real-time EDC value), and one of data f3 (AR allocation value) or data h3 (LFC control output command) selected by the switching unit 34, and transmits the data d1 to the output unit 22.

(6)広域需給調整装置5
広域需給調整装置5は、コンピュータ装置により構成される。広域需給調整装置5は、各電力系統9に設置された電力需給制御装置2に対し、指令制御量の指示を行う上位の制御装置である。広域需給調整装置5は、各電力系統9の監視制御を行う制御室等に配置される。
(6) Wide-area supply and demand adjustment device 5
The wide-area supply and demand adjustment device 5 is composed of a computer device. The wide-area supply and demand adjustment device 5 is a higher-level control device that issues a command control amount to the power supply and demand control devices 2 installed in each power system 9. The wide-area supply and demand adjustment device 5 is placed in a control room or the like that monitors and controls each power system 9.

広域需給調整装置5は、ネッティング部51、制御分担量算出部52、各電源指令作成部53を有する。 The wide-area supply and demand adjustment device 5 has a netting unit 51, a control share calculation unit 52, and each power supply command creation unit 53.

ネッティング部51は、電力需給制御装置2からデータf1(AR値)を受信する。ネッティング部51は、各エリアのデータf1(AR値)に基づき、エリア全体に対する調整量を算出するために、AR値のネッティングを行う。制御量を決定する動作がネッティングと呼ばれる。ネッティング部51は、ネッティングしたAR値をデータh1(ネッティング後AR値)として制御分担量算出部52に送信する。 The netting unit 51 receives data f1 (AR value) from the power supply and demand control device 2. Based on the data f1 (AR value) for each area, the netting unit 51 performs netting of the AR values to calculate the adjustment amount for the entire area. The operation of determining the control amount is called netting. The netting unit 51 transmits the netted AR value as data h1 (AR value after netting) to the control share calculation unit 52.

制御分担量算出部52は、ネッティング部51からデータh1(ネッティング後AR値)を受信する。また、制御分担量算出部52は、電力需給制御装置2からデータg2(個別メリットオーダーリスト)、データg3(既LFC動作量)を受信する。制御分担量算出部52は、データh1(ネッティング後AR値)、データg2(個別メリットオーダーリスト)、データg3(既LFC動作量)に基づいて、各エリアの発電機に対する制御分担量を算出する。制御分担量算出部52は、算出した制御分担量をデータh2(制御分担量)として各電源指令作成部53に送信する。 The control share calculation unit 52 receives data h1 (AR value after netting) from the netting unit 51. The control share calculation unit 52 also receives data g2 (individual merit order list) and data g3 (existing LFC operation amount) from the power supply and demand control device 2. The control share calculation unit 52 calculates the control share for the generators in each area based on data h1 (AR value after netting), data g2 (individual merit order list), and data g3 (existing LFC operation amount). The control share calculation unit 52 transmits the calculated control share to each power source command creation unit 53 as data h2 (control share).

各電源指令作成部53は、制御分担量算出部52からデータh2(制御分担量)を受信する。各電源指令作成部53は、データh2(制御分担量)に基づき各エリアの発電機に対する指令値を算出する。各電源指令作成部53は、算出した各エリアの発電機に対する指令値をデータh3(LFC制御出力指令)として各エリアの電力需給制御装置2のLFC制御出力指令受信部33に送信する。 Each power supply command creation unit 53 receives data h2 (control share amount) from the control share calculation unit 52. Each power supply command creation unit 53 calculates a command value for the generator in each area based on data h2 (control share amount). Each power supply command creation unit 53 transmits the calculated command value for the generator in each area as data h3 (LFC control output command) to the LFC control output command receiving unit 33 of the power supply and demand control device 2 in each area.

以上が、広域需給調整システム1の構成である。 The above is the configuration of the wide-area supply and demand adjustment system 1.

[1-2.作用]
最初に現在行われている一般的な電力需給制御について説明する。
[1-2. Effect]
First, a general power supply and demand control currently being carried out will be described.

[一般的な電力需給制御]
電力系統の負荷は、季節や時刻に応じ変動している。電力系統の負荷変動は、以下の(イ)(ロ)(ハ)の3つに区分して考えることができる。
(イ)サイクリック分:数秒から数分周期までの微小周期の負荷変動をサイクリック分と呼ぶ。変動幅の小さい種々の振動周期を持った脈動成分や、不規則な変動成分が重畳したものと考えられる。
(ロ)フリンジ分:数分から10数分程度までの短周期の負荷変動をフリンジ分と呼ぶ。
(ハ)サステンド分:10数分以上の長周期の負荷変動をサステンド分と呼ぶ。
[General power supply and demand control]
The load on the power grid fluctuates depending on the season and time of day. Load fluctuations on the power grid can be classified into the following three categories: (a) (b) (c).
(a) Cyclic component: Load fluctuations with a very short period, from a few seconds to a few minutes, are called cyclic components. They can be thought of as a superposition of pulsating components with various vibration periods with small fluctuation ranges and irregular fluctuation components.
(b) Fringe component: A short-cycle load fluctuation lasting from a few minutes to about 10 minutes is called a fringe component.
(c) Sustained component: Load fluctuations with a long period of 10 minutes or more are called sustained components.

微小周期の負荷変動であるサイクリック分のうち、極めて短周期の負荷変動は、系統の負荷特性より調整される。サイクリック分のうち、前述の周期以上の数分程度の周期を有する負荷変動は、ガバナフリー運転されている発電所の調速機により調整される。サイクリック分のうち、さらに前述の周期以上の負荷変動は、電力会社の中央給電指令所に設置された電力需給制御装置により制御され調整される。 Of the cyclic load fluctuations, which are minute periodic load fluctuations, extremely short-period load fluctuations are adjusted based on the load characteristics of the system. Of the cyclic load fluctuations, load fluctuations with periods of several minutes or more than the aforementioned period are adjusted by the governor of a power plant operating in governor-free mode. Of the cyclic load fluctuations, load fluctuations with periods even longer than the aforementioned period are controlled and adjusted by a power supply and demand control device installed in the power company's central load dispatching center.

短周期の負荷変動であるフリンジ分の負荷変動は、サイクリック分に比べ変動量が大きいためガバナフリーだけでは調整することができない。フリンジ分の負荷変動は、負荷周波数制御(LFC:Load Frequency Control)により、検出された周波数偏差、電力変動量に基づき発電機の出力が制御され調整される。 Fringe load fluctuations, which are short-period load fluctuations, are larger than cyclic load fluctuations and cannot be adjusted by governor-free alone. Fringe load fluctuations are adjusted by load frequency control (LFC), which controls the generator output based on the detected frequency deviation and power fluctuation.

長周期の負荷変動であるサステンド分の負荷変動は、負荷変動における変動量が大きく、1日の負荷曲線における負荷変動の一部と考えることができる。サステンド分の負荷変動は、負荷周波数制御では、発電機の発電能力が不足しており、所望の発電量に調整することができない。サステンド分の負荷変動は、発電所の経済運用である経済負荷配分制御(EDC:Economic Load Dispatch)により調整される。 The sustained load fluctuation, which is a long-period load fluctuation, has a large amount of fluctuation in the load fluctuation and can be considered as part of the load fluctuation in the daily load curve. The sustained load fluctuation cannot be adjusted to the desired power generation amount by load frequency control because the generator's power generation capacity is insufficient. The sustained load fluctuation is adjusted by economic load dispatch (EDC), which is the economic operation of the power plant.

負荷周波数制御および経済負荷配分制御は、電力会社の中央給電指令所に設置された電力需給制御装置の重要機能である。負荷周波数制御(LFC)は、連系線潮流、系統周波数を一定に維持することを目的とする。経済負荷配分制御(EDC)は、最経済となる電力運用を行うことを目的とする。以下、負荷周波数制御(LFC)と経済負荷配分制御(EDC)を合わせて需給制御と呼ぶ。 Load frequency control and economic load dispatch control are important functions of power supply and demand control devices installed in the central load dispatching center of electric power companies. Load frequency control (LFC) aims to maintain constant interconnection line power flow and system frequency. Economic load dispatch control (EDC) aims to operate electricity in the most economical way. Hereinafter, load frequency control (LFC) and economic load dispatch control (EDC) will be collectively referred to as supply and demand control.

負荷周波数制御(LFC)は、系統の周波数および他系統との連系線における潮流電力に応じた各発電機の出力調整により行われる。負荷周波数制御(LFC)の出力調整は、全ての発電機に対して行われるのではなく、比較的速い出力変動に対応することができる水力機のような高速機や石油火力機のような中速機に対して行われる。 Load frequency control (LFC) is performed by adjusting the output of each generator according to the system frequency and the tidal power in the interconnection lines with other systems. Load frequency control (LFC) output adjustment is not performed for all generators, but rather for high-speed machines such as hydroelectric machines that can handle relatively fast output fluctuations, and medium-speed machines such as oil-fired machines.

石炭火力機のような低速機や原子力ユニットまたは運用上出力変動を避けたい発電機に対して、負荷周波数制御(LFC)の出力調整は、一般的には行われない。負荷周波数制御(LFC)は、各電力会社の中央給電指令所の電力需給制御装置から各発電機に対し、行われるものであり、出力が所望の値に変動するまでに、数十秒程度の遅れが発生する。 Load frequency control (LFC) output adjustments are not generally performed on low-speed machines such as coal-fired power plants, nuclear units, or generators where output fluctuations should be avoided for operational reasons. Load frequency control (LFC) is performed on each generator by the power supply and demand control device at each power company's central load dispatching center, and there is a delay of several tens of seconds before the output changes to the desired value.

負荷周波数制御(LFC)は、以下の3方式に区分される。
(a)定周波数制御(FFC):周波数変化量(ΔF)を検出して、ΔFを少なくするように発電機の出力を調整し、系統の周波数のみを規定値に保つように制御する制御方式。
(b)定連系電力制御(FTC):連系線における潮流電力の変化量(ΔPT)を検出して、ΔPTを少なくするように発電機の出力を調整し、連系線における潮流電力のみを規定値に保つように制御する制御方式。
(c)周波数バイアス連系線電力制御(TBC):周波数変化量(ΔF)と連系線における潮流電力の変化量(ΔPT)とを検出し、地域要求電力(AR)を算出し、地域要求電力(AR)に応じて発電機の出力を制御する制御方式。
Load frequency control (LFC) is classified into the following three methods.
(a) Constant Frequency Control (FFC): A control method that detects the amount of frequency change (ΔF) and adjusts the generator output to reduce ΔF, thereby controlling only the system frequency to remain at a specified value.
(b) Constant Tie Power Control (FTC): A control method that detects the amount of change (ΔPT) in the tidal flow power in the interconnection line and adjusts the generator output to reduce ΔPT, thereby controlling only the tidal flow power in the interconnection line to a specified value.
(c) Frequency bias tie-line power control (TBC): A control method in which the amount of change in frequency (ΔF) and the amount of change in tidal flow power (ΔPT) in the tie-line are detected, the area required power (AR) is calculated, and the generator output is controlled in accordance with the area required power (AR).

現在、周波数バイアス連系線電力制御(TBC)が、我が国において広く採用されている。周波数バイアス連系線電力制御(TBC)は、各電力会社の中央給電指令所に設置された電力需給制御装置から各発電機に対し行われる。周波数バイアス連系線電力制御(TBC)にかかる制御は、以下の手順により行われる。 Currently, frequency bias tie-line power control (TBC) is widely adopted in Japan. Frequency bias tie-line power control (TBC) is performed on each generator by a power supply and demand control device installed in the central load dispatching center of each power company. Frequency bias tie-line power control (TBC) is performed according to the following procedure.

(手順a1:地域要求電力(AR)の算出)
周波数変化量(ΔF)と連系線潮流変化量(ΔPT)に基づき地域要求電力(AR)の算出を行う。
AR=-K・ΔF+ΔPT
・・・・・(式1)
AR:地域要求電力[MW]
K:系統定数[MW/Hz]
ΔF:周波数偏差[Hz]
ΔPT:連系線潮流変化量[MW]
連系線潮流変化量(ΔPT)とは、連系線における潮流電力の変化量である。上記(式1)では、自系統に流入する電力の潮流方向を正の値としている。地域要求電力(AR)の値が正であれば、系統全体として発電ユニットの出力を上げる。地域要求電力(AR)が負の値であれば、系統全体として発電ユニットの出力を下げる。
(Step a1: Calculation of area required power (AR))
The regional power requirement (AR) is calculated based on the frequency change (ΔF) and the interconnection line power flow change (ΔPT).
AR=-K・ΔF+ΔPT
...(Formula 1)
AR: Regional required power [MW]
K: System constant [MW/Hz]
ΔF: Frequency deviation [Hz]
ΔPT: Amount of change in interconnection line power flow [MW]
The interconnection line power flow change (ΔPT) is the amount of change in the power flow in the interconnection line. In the above (Equation 1), the power flow direction of the power flowing into the local system is a positive value. If the value of the area required power (AR) is positive, the output of the power generation units is increased for the entire system. If the value of the area required power (AR) is negative, the output of the power generation units is decreased for the entire system.

(手順a2:地域要求電力(AR)のフィルタリング)
過去の地域要求電力(AR)に基づき指数平滑等によるフィルタリングを行い、地域要求電力(AR)を低速機、高速機へ配分する調整量を算出する。出力変化速度の遅い、例えば火力発電機が低速機に相当する。出力変化速度の速い、例えば水力発電機が高速機に相当する。地域要求電力(AR)を周波数分解し、変動周期の短い電力を高速機に、変動周期の長い電力を低速機に配分するように調整量を算出してもよい。
(Step a2: Filtering of area required power (AR))
Filtering by exponential smoothing or the like is performed based on the past regional power requirement (AR), and an adjustment amount for allocating the regional power requirement (AR) to low-speed and high-speed units is calculated. A thermal power generator, for example, with a slow output change rate corresponds to a low-speed unit. A hydroelectric generator, for example, with a fast output change rate corresponds to a high-speed unit. The regional power requirement (AR) may be frequency-decomposed, and an adjustment amount is calculated so that power with a short fluctuation period is allocated to high-speed units and power with a long fluctuation period is allocated to low-speed units.

(手順a3:発電機への配分)
地域要求電力(AR)をフィルタリング、または周波数分解し、算出した調整量を各発電機に配分する。配分は、需給調整が行われている全ての発電機に対して、低速機、高速機別に発電機の出力変化速度、または出力余裕度等に基づき行われる。
(Step a3: Allocation to generators)
The regional power requirement (AR) is filtered or frequency-resolved, and the calculated adjustment amount is allocated to each generator. The allocation is performed for all generators for which supply and demand adjustment is performed, based on the output change rate of the generators, output margin, etc., for low-speed and high-speed machines.

(手順a4:目標指令値の算出)
各発電機の目標指令値の算出を行う。各発電機の目標指令値は、配分された地域要求電力(AR)と、経済負荷配分制御(EDC)にて算出されたリアルタイムEDCまたは現在出力とが加算され算出される。目標指令値は、一定の基準値を逸脱しないように設けられた上下限値内に設定されるようにしてもよい。
(Step a4: Calculation of target command value)
A target command value for each generator is calculated. The target command value for each generator is calculated by adding the distributed area required power (AR) and the real-time EDC or current output calculated by the economic load dispatch control (EDC). The target command value may be set within upper and lower limits so as not to deviate from a certain reference value.

(手順a5:発電機の出力が変動する)
目標指令値を受信し、各発電機は、出力を変動させる。その結果、系統周波数、並びに連系線潮流が変化する。その後、手順a1に戻り上記手順を繰り返す。
(Step a5: The generator output fluctuates)
Upon receiving the target command value, each generator varies its output. As a result, the system frequency and the interconnection line power flow change. After that, the process returns to step a1 and the above steps are repeated.

[一般的な経済負荷配分制御(EDC)]
経済負荷配分制御(EDC)は、1日の負荷曲線に見られる、低速の電力負荷変動に対して行われる。低速の電力負荷変動は、過去のデータの基づき高精度で予測することができる。予測された電力負荷変動に対して、燃料費であるコストが少なくなるように、経済負荷配分制御(EDC)にかかる各発電機の制御量が算出される。経済負荷配分制御(EDC)にかかる各発電機の制御量の算出に、等増分燃料費則(等λ法)が用いられる場合が多い。
[General Economic Dispatch Control (EDC)]
Economic load dispatch control (EDC) is performed for slow power load fluctuations seen in a daily load curve. Slow power load fluctuations can be predicted with high accuracy based on past data. The control amount of each generator for economic load dispatch control (EDC) is calculated so that the fuel cost is reduced for the predicted power load fluctuation. The equal increment fuel cost law (equal λ method) is often used to calculate the control amount of each generator for economic load dispatch control (EDC).

以下に、日本の電力会社にて多用されている等増分燃料費則(等λ法)の一例について説明する。経済負荷配分制御(EDC)は、各電力会社の中央給電指令所に設置された電力需給制御装置から各発電機に対し行われる。経済負荷配分制御(EDC)にかかる制御は、以下の手順により行われる。 Below, we explain an example of the equal incremental fuel cost law (equal lambda method), which is widely used by Japanese electric power companies. Economic load dispatch control (EDC) is performed on each generator by an electric power supply and demand control device installed in the central load dispatching center of each electric power company. Economic load dispatch control (EDC) is performed according to the following procedure.

(手順b1:λの初期値の設定)
最初に、増分となる燃料にかかる燃料費に相当するλの初期値を設定する。
(Step b1: Setting the initial value of λ)
First, an initial value of λ, which corresponds to the fuel cost for the incremental fuel, is set.

(手順b2:各発電機の制御量の算出)
次に、増分となる燃料にかかる燃料費に相当するλに等しくなる各発電機の制御量の算出を行う。制御量は、最小出力値を下回っている場合、最小出力値に、最大出力値を上回っている場合、最大出力値に設定される。
(Step b2: Calculation of control amount of each generator)
Next, a control variable for each generator is calculated that is equal to λ, which corresponds to the fuel cost for the incremental fuel. If the control variable is below the minimum output value, it is set to the minimum output value, and if the control variable is above the maximum output value, it is set to the maximum output value.

(手順b3:出力電力の総和の算出)
次に、各発電機から出力される出力電力の総和を算出する。
(Step b3: Calculation of the sum of output power)
Next, the sum of the output powers output from the generators is calculated.

(手順b4:λの再設定)
手順b3で算出された出力電力の総和が負荷未満である場合、λを大きくし、出力の総和が負荷を超える場合、λを小さくし、λの再設定を行う。以降、出力電力の総和と負荷との差分が一定値以内になるまで手順b2~手順b4を繰り返す。
(Step b4: Resetting λ)
If the sum of the output powers calculated in step b3 is less than the load, λ is increased, and if the sum of the output powers exceeds the load, λ is decreased and λ is reset. After that, steps b2 to b4 are repeated until the difference between the sum of the output powers and the load falls within a certain value.

昨今の電力システム改革に伴い、現状の電力会社における発電、送配電、小売事業は、法的に分離され、送配電と発電、小売事業に分けられる。従来において、電力需給、周波数調整を行う場合、電力会社は自社内にて必要となる需給調整力を確保していた。電力システム改革により、電力会社は需給調整市場により需給調整力を確保することとなる。需給調整市場における商品メニューは、一例として図15に示すように制御区分ごと「一次調整力」「二次調整力」「三次調整力」(上げ、下げ別)に対応した10区分として計画されている。 Due to the recent electricity system reform, the current power generation, transmission and distribution, and retail businesses of electric power companies will be legally separated and divided into transmission and distribution and power generation and retail businesses. Previously, when adjusting power supply and demand and frequency, electric power companies secured the necessary supply and demand adjustment capacity in-house. With the electricity system reform, electric power companies will secure supply and demand adjustment capacity through the supply and demand adjustment market. As an example, the product menu in the supply and demand adjustment market is planned to be divided into 10 categories corresponding to each control category of "primary adjustment capacity," "secondary adjustment capacity," and "tertiary adjustment capacity" (increase or decrease), as shown in Figure 15.

アンシラリーサービスは、系統全体の周波数維持等の高品質な電力供給を確保する業務である。従来において、アンシラリーサービスは、自社の発電機を用い一般電気事業者により行われていた。需給調整市場に基づく新たなライセンス制により、今後のアンシラリーサービスは、一般送配電事業者により行われる。 Ancillary services are the work of ensuring a high-quality power supply, such as maintaining the frequency of the entire system. Traditionally, ancillary services were provided by general electric utilities using their own generators. With the new licensing system based on the supply and demand adjustment market, ancillary services will be provided by general electricity transmission and distribution utilities in the future.

今後のアンシラリーサービスにおいて、電力品質確保に必要な電源等は、調整力として一般送配電事業者により発電事業者等から調達され、調整力の確保に必要なコストは託送料金として、一般送配電事業者により回収される仕組みとなった。この仕組みにより、多様な発電事業者等の参画および競争が進み、調整力として調達可能な電力の増大、電力品質の向上、効率的な調整力の活用等が期待される。この仕組みは、調整力の調達の公平性、透明性が確保された上で、一般送配電事業者により行われることを前提としている。手続の具体的な内容は、各一般送配電事業者に委ねられている。 In the future, in ancillary services, power sources necessary for ensuring power quality will be procured by general electricity transmission and distribution operators from power generation companies, etc. as adjustment capacity, and the costs required for securing adjustment capacity will be recovered by the general electricity transmission and distribution operators as wheeling charges. This system is expected to encourage participation and competition among a variety of power generation companies, etc., and to increase the amount of electricity that can be procured as adjustment capacity, improve power quality, and utilize adjustment capacity efficiently. The system is premised on the general electricity transmission and distribution operators ensuring the fairness and transparency of the procurement of adjustment capacity. The specific details of the procedure are left to each general electricity transmission and distribution operator.

今後、系統全体における高品質な電力供給を確保することが、一般送配電事業者に要求される。需給調整市場により需給調整力の確保が行われるため、一般送配電事業者は、メリットオーダーによる需給、周波数調整を行う。 In the future, general electricity transmission and distribution operators will be required to ensure a high-quality power supply throughout the entire system. Since the supply and demand adjustment market will ensure supply and demand adjustment capacity, general electricity transmission and distribution operators will adjust supply and demand and frequency based on merit order.

従来、各エリアの電力系統において、エリアごとの電力需給制御装置により、自エリアの地域要求電力(AR)に基づき、需給調整力の制御および運用が行われていた。今後、需給調整市場により電力の広域調達、広域運用が開始される。今後、各エリアの電力系統における地域要求電力(AR)がネッティングされ、ネッティング後の地域要求電力(AR)が図6、図7に示すように負荷周波数制御(LFC)にかかる制御量として各エリアの電力系統に指示される。 Conventionally, in each area's power grid, supply and demand adjustment capacity was controlled and operated based on the area's local power requirement (AR) by the area's power supply and demand control device. In the future, wide-area procurement and operation of electricity will begin through the supply and demand adjustment market. In the future, the area requirements (AR) in each area's power grid will be netted, and the area requirements (AR) after netting will be instructed to each area's power grid as the control amount for load frequency control (LFC), as shown in Figures 6 and 7.

しかしながら複数のエリアに対し負荷周波数制御(LFC)にかかる制御量の指令が行われるため、一定のエリアに調整力が偏在化し、制御性能が確保されにくいとの問題点があった。 However, because load frequency control (LFC) commands are sent to multiple areas, there is a problem that the adjustment power is concentrated in certain areas, making it difficult to ensure control performance.

電力系統9の制御性能を確保するために、一定のエリアに調整力が偏在化しない負荷周波数制御(LFC)にかかる制御量の指令が行われることが望ましい。 To ensure the control performance of the power grid 9, it is desirable to issue commands for the control amount related to load frequency control (LFC) that do not unevenly distribute the adjustment power in a certain area.

また、需給調整市場においても、調整力の細分化(10の商品区分)のみではなく、調整力の広域調達を行うことが想定されている。現在、調整力はエリア内のみで調達されている。今後、調整力の広域調達を行うために、複数のエリアにリアルタイムで制御信号を送る仕組みが設けられることが望ましい。 In addition, in the supply and demand adjustment market, it is expected that adjustment capacity will not only be subdivided (10 product categories), but will also be procured over a wide area. Currently, adjustment capacity is procured only within an area. In the future, it is desirable to establish a mechanism for sending control signals to multiple areas in real time in order to procure adjustment capacity over a wide area.

[広域需給調整システム1の動作]
次に、本実施形態の広域需給調整システム1の動作を図1~図4に基づき説明する。本実施形態の広域需給調整システム1において、複数のエリアにおける電力需給制御装置2が、図2に示すように広域需給調整装置5により連携して制御される。本実施形態において2つ以上のエリアを広域と呼ぶ。本実施形態における需給調整方式は、図15におけるLFC機能にかかる二次調整力の商品区分を主に対象とする。需給調整のための調整電源である発電機91は、火力、水力機のみならず、蓄電池やDR等を含む。
[Operation of wide-area supply and demand adjustment system 1]
Next, the operation of the wide-area supply and demand adjustment system 1 of this embodiment will be described with reference to Figs. 1 to 4. In the wide-area supply and demand adjustment system 1 of this embodiment, power supply and demand control devices 2 in multiple areas are controlled in cooperation with a wide-area supply and demand adjustment device 5 as shown in Fig. 2. In this embodiment, two or more areas are called a wide area. The supply and demand adjustment method in this embodiment mainly targets the product category of secondary control capacity related to the LFC function in Fig. 15. The generator 91, which is an adjustment power source for supply and demand adjustment, includes not only thermal and hydroelectric machines but also storage batteries, DR, etc.

(電力需給制御装置2の動作)
図3に、電力需給制御装置2の動作にかかるフローを示す。図3に示すプログラムは、電力需給制御装置2に内蔵される。本実施形態の複数のエリアに配置された電力需給制御装置2は、広域需給調整装置5からデータh3(LFC制御出力指令)を指示される。電力需給制御装置2は、下記の手順にて動作および演算を行う。
(Operation of power supply and demand control device 2)
Fig. 3 shows a flow of operations of the power supply and demand control device 2. The program shown in Fig. 3 is built into the power supply and demand control device 2. The power supply and demand control devices 2 arranged in multiple areas in this embodiment receive data h3 (LFC control output command) from the wide-area supply and demand adjustment device 5. The power supply and demand control devices 2 operate and perform calculations in the following procedure.

(ステップS20:データf1(AR値)の算出)
検出装置93は、連系線における電力系統9aに関するデータc1(周波数変化量ΔF)、データc2(潮流電力変化量ΔPT)、データc3(融通電力P0)の各項目を検出し、電力需給制御装置2に送信する。自然エネルギー発電設備92は、電力需給制御装置2にデータb1(自然エネルギー発電電力値)を送信する。
(Step S20: Calculation of data f1 (AR value))
The detection device 93 detects each item of data c1 (frequency change amount ΔF), data c2 (tidal flow power change amount ΔPT), and data c3 (interchangeable power P0) related to the power system 9a in the interconnection line, and transmits them to the power supply and demand control device 2. The natural energy power generation facility 92 transmits data b1 (natural energy generated power value) to the power supply and demand control device 2.

電力需給制御装置2のAR算出部24は、以下の信号を受信する。
検出装置3から送信された以下の信号
データc1(周波数変化量ΔF)
データc2(潮流電力変化量ΔPT)
データc3(融通電力P0)
自然エネルギー発電設備92から送信された以下の信号
データb1(自然エネルギー発電電力値)
The AR calculation unit 24 of the power supply and demand control device 2 receives the following signals.
The following signal data c1 (frequency change amount ΔF) transmitted from the detection device 3
Data c2 (change in forward flow power ΔPT)
Data c3 (interchangeable power P0)
The following signal data b1 (renewable energy power generation power value) transmitted from the natural energy power generation facility 92

AR算出部24は、データc1(周波数変化量ΔF)、データc2(潮流電力変化量ΔPT)、データc3(融通電力P0)、データb1(自然エネルギー発電電力値)に基づき、データf1(AR値)の算出を(式1)により行う。(式1)を再掲する。(式1)におけるARが、データf1(AR値)である。
AR=-K・ΔF+ΔPT
・・・・・(式1)
AR:地域要求電力[MW]
K:系統定数[MW/Hz]
ΔF:周波数偏差[Hz]
ΔPT:連系線潮流変化量[MW]
上記(式1)では、自系統に流入する電力の潮流方向を正の値としている。
The AR calculation unit 24 calculates data f1 (AR value) using (Equation 1) based on data c1 (frequency change amount ΔF), data c2 (tidal flow power change amount ΔPT), data c3 (interchangeable power P0), and data b1 (renewable energy power generation power value). (Equation 1) is shown again. AR in (Equation 1) is data f1 (AR value).
AR=-K・ΔF+ΔPT
...(Formula 1)
AR: Regional required power [MW]
K: System constant [MW/Hz]
ΔF: Frequency deviation [Hz]
ΔPT: Amount of change in interconnection line power flow [MW]
In the above (Equation 1), the flow direction of power flowing into the own system is set to a positive value.

(ステップS30:データf1(AR値)の送信)
AR送信部31は、ステップS20で算出されたデータf1(AR値)を広域需給調整装置5に送信する。
(Step S30: Transmission of data f1 (AR value))
The AR transmitter 31 transmits the data f1 (AR value) calculated in step S20 to the wide-area supply and demand adjustment device 5.

広域需給調整装置5は、各エリアの電力需給制御装置2からデータf1(AR値)を受信する。また、広域需給調整装置5は、各エリアの電力需給制御装置2からデータg2(個別メリットオーダーリスト)、データg3(既LFC動作量)を受信する。広域需給調整装置5は、データf1(AR値)、データg2(個別メリットオーダーリスト)、データg3(既LFC動作量)に基づき各エリアの調整量または各エリアの発電機ごとの調整量を算出し、データh3(LFC制御出力指令)として各エリアの電力需給制御装置2に対し送信する。 The wide-area supply and demand adjustment device 5 receives data f1 (AR value) from the power supply and demand control device 2 in each area. The wide-area supply and demand adjustment device 5 also receives data g2 (individual merit order list) and data g3 (existing LFC operation amount) from the power supply and demand control device 2 in each area. The wide-area supply and demand adjustment device 5 calculates the adjustment amount for each area or the adjustment amount for each generator in each area based on data f1 (AR value), data g2 (individual merit order list), and data g3 (existing LFC operation amount), and transmits it to the power supply and demand control device 2 in each area as data h3 (LFC control output command).

(ステップS31:データh3(LFC制御出力指令)の受信)
LFC制御出力指令受信部33は、広域需給調整装置5からデータh3(LFC制御出力指令)を受信し切替部34に送信する。
(Step S31: Reception of data h3 (LFC control output command))
The LFC control output command receiving unit 33 receives data h3 (LFC control output command) from the wide-area supply and demand adjusting device 5 and transmits it to the switching unit 34.

(ステップS21:データf2(平滑後AR値)の算出)
AR平滑部25は、ステップS20で算出されたデータf1(AR値)に基づき、データf2(平滑後AR値)を算出する。データf2(平滑後AR値)は、フーリエ展開によりデータf1(AR値)が周波数分解され算出される。
(Step S21: Calculation of data f2 (smoothed AR value))
The AR smoothing unit 25 calculates data f2 (smoothed AR value) based on the data f1 (AR value) calculated in step S20. The data f2 (smoothed AR value) is calculated by subjecting the data f1 (AR value) to frequency decomposition through Fourier expansion.

(ステップS22:データf3(AR配分値)の算出)
AR配分部26は、ステップS21で周波数分解されたデータf2(平滑後AR値)に基づき、データf3(AR配分値)を算出する。データf3(AR配分値)は、各発電機91a、91b、91nの調整量であり、発電機91の出力応答速度または出力余裕度に応じ算出される。
(Step S22: Calculation of data f3 (AR distribution value))
The AR allocation unit 26 calculates data f3 (AR allocation value) based on the data f2 (smoothed AR value) frequency-resolved in step S21. The data f3 (AR allocation value) is an adjustment amount for each of the generators 91a, 91b, 91n, and is calculated according to the output response speed or output margin of the generator 91.

(ステップS32:データf3(AR配分値)またはデータh3(LFC制御出力指令)の選択)
切替部34は、ステップS22で算出されたデータf3(AR配分値)またはデータh3(LFC制御出力指令)を選択して出力する。例えば、他のエリアにおける電力需給制御装置2または電力系統9に事故が発生した場合、切替部34によりデータf3(AR配分値)が選択される。他のエリアにおける電力需給制御装置2または電力系統9に異常がない場合、切替部34によりデータh3(LFC制御出力指令)が選択される。切替部34は、切替えることによりデータf3(AR配分値)またはデータh3(LFC制御出力指令)の選択を行う。
(Step S32: Selection of data f3 (AR distribution value) or data h3 (LFC control output command))
The switching unit 34 selects and outputs data f3 (AR allocation value) or data h3 (LFC control output command) calculated in step S22. For example, if an accident occurs in the power supply and demand control device 2 or the power system 9 in another area, the switching unit 34 selects data f3 (AR allocation value). If there is no abnormality in the power supply and demand control device 2 or the power system 9 in another area, the switching unit 34 selects data h3 (LFC control output command). The switching unit 34 selects data f3 (AR allocation value) or data h3 (LFC control output command) by switching.

(ステップS204:データg1(リアルタイムEDC値)の算出)
リアルタイムEDC算出部27は、上記のステップS20~S22に並行して、ステップS204を実行する。リアルタイムEDC算出部27は、ステップS21で算出されたデータf2(平滑後AR値)に基づき、データg1(リアルタイムEDC値)を算出する。データg1(リアルタイムEDC値)は、発電機91a、91b,91nのメリットオーダーに応じ、各発電機91a、91b,91nに対する経済負荷配分が行われ、算出される。
(Step S204: Calculation of data g1 (real-time EDC value))
The real-time EDC calculation unit 27 executes step S204 in parallel with the above steps S20 to S22. The real-time EDC calculation unit 27 calculates data g1 (real-time EDC value) based on data f2 (smoothed AR value) calculated in step S21. The data g1 (real-time EDC value) is calculated by economical load allocation to each of the generators 91a, 91b, and 91n according to the merit order of the generators 91a, 91b, and 91n.

(ステップS23:データd1(発電目標値)の算出)
目標値作成部23は、ステップS22で算出されたデータf3(AR配分値)、ステップS204でリアルタイムEDC算出部27により算出されたデータg1(リアルタイムEDC値)に基づき、データd1(発電目標値)を算出する。目標値作成部23a、23b、23nごとに、各発電機91a、91b、91bnごとのデータd1(発電目標値)が算出される。
(Step S23: Calculation of data d1 (power generation target value))
The target value creation unit 23 calculates data d1 (power generation target value) based on the data f3 (AR allocation value) calculated in step S22 and the data g1 (real-time EDC value) calculated in step S204 by the real-time EDC calculation unit 27. For each of the target value creation units 23a, 23b, and 23n, data d1 (power generation target value) is calculated for each of the generators 91a, 91b, and 91bn.

(ステップS24:データd1(発電目標値)の送信)
目標値作成部23は、ステップS23で算出したデータd1(発電目標値)を、出力部22に送信する。データd1(発電目標値)は、出力部22a、22b、22nのそれぞれに送信される。
(Step S24: Transmission of data d1 (power generation target value))
The target value creation unit 23 transmits the data d1 (power generation target value) calculated in step S23 to the output unit 22. The data d1 (power generation target value) is transmitted to each of the output units 22a, 22b, and 22n.

(ステップS25:データd1(発電目標値)の指令送出)
出力部22は、ステップS24で受信したデータd1(発電目標値)を、発電機91に送信する。データd1(発電目標値)は、各発電機91a、91b、91nに対し、それぞれ出力部22a、22b、22nから送信される。これにより、各発電機91a、91b、91nは、データd1(発電目標値)にかかる電力を出力する。
(Step S25: Sending command for data d1 (power generation target value))
The output unit 22 transmits the data d1 (power generation target value) received in step S24 to the generator 91. The data d1 (power generation target value) is transmitted from the output units 22a, 22b, and 22n to the generators 91a, 91b, and 91n, respectively. As a result, the generators 91a, 91b, and 91n output power corresponding to the data d1 (power generation target value).

図5に、出力変化速度比にて処理を行う場合のAR配分部26における一般的な制御ロジックを示す。出力変化速度比にて処理を行う場合の一般的なAR配分は以下の手順にて行われる。最初にAR計算により周波数偏差と系統容量の積が算出される。次に係数Kが乗算された周波数偏差と系統容量の積と、連系点の潮流偏差との差分が周波数分解され、平滑化される。平滑化された差分は、さらに不感帯を除きPI制御され、各発電機91に対する指令値に配分される。 Figure 5 shows a typical control logic in the AR allocation unit 26 when processing is performed using the output change speed ratio. Typical AR allocation when processing is performed using the output change speed ratio is performed as follows. First, the product of the frequency deviation and the system capacity is calculated using AR calculation. Next, the difference between the product of the frequency deviation and the system capacity multiplied by the coefficient K and the power flow deviation at the interconnection point is frequency resolved and smoothed. The smoothed difference is further PI controlled except for the dead band, and is allocated to the command value for each generator 91.

(広域需給調整装置5の動作)
ネッティング部51は、データf1(AR値)に基づき、制御の対象となるエリア全体の調整量データh1(ネッティング後AR値)の総量を算出する。データf1(AR値)は、制御の対象となるエリアのそれぞれに要求された電力であり、各エリアの電力需給制御装置2により算出される。
(Operation of the wide-area supply and demand adjustment device 5)
The netting unit 51 calculates the total amount of adjustment amount data h1 (AR value after netting) for the entire area to be controlled based on the data f1 (AR value). The data f1 (AR value) is the power requested for each area to be controlled, and is calculated by the power supply and demand control device 2 of each area.

制御分担量算出部52は、ネッティング部51により算出されたエリア全体の調整量であるデータh1(ネッティング後AR値)の総量を、制御の対象となるエリアのそれぞれに分配して、データh2(制御分担量)を算出する。データh2(制御分担量)は、それぞれのエリアの制御分担量として算出されてもよいし、それぞれのエリアの発電機ごとの制御分担量として算出されてもよい。 The control share calculation unit 52 distributes the total amount of data h1 (AR value after netting), which is the adjustment amount for the entire area calculated by the netting unit 51, to each of the areas to be controlled, and calculates data h2 (control share). Data h2 (control share) may be calculated as the control share for each area, or may be calculated as the control share for each generator in each area.

制御分担量算出部52は、エリアにおける発電機が発電することができる余力である調整力に基づき、現在供給されている電力と要求された電力との差分であるインバランスを分配してエリアのそれぞれの制御分担量、エリアのそれぞれの発電機ごとの制御分担量のうち少なくとも一方をデータh2(制御分担量)として算出する。 The control share calculation unit 52 distributes the imbalance, which is the difference between the currently supplied power and the requested power, based on the adjustment capacity, which is the surplus power that the generators in the area can generate, and calculates at least one of the control share for each area and the control share for each generator in the area as data h2 (control share).

各電源指令作成部53は、制御分担量算出部52により算出されたデータh2(制御分担量)に基づき、エリアのそれぞれに対する指令値データh3(LFC制御出力指令)を作成する。データh2(制御分担量)は、制御分担量算出部52によりそれぞれのエリアの制御分担量、それぞれのエリアの発電機ごとの制御分担量として算出される。 Each power supply command creation unit 53 creates command value data h3 (LFC control output command) for each area based on data h2 (control share amount) calculated by the control share amount calculation unit 52. Data h2 (control share amount) is calculated by the control share amount calculation unit 52 as the control share amount for each area and the control share amount for each generator in each area.

従来技術におけるAR配分部26は、インバランスを発電機91に配分する場合、各エリア単位で、データf2(平滑後AR値)を各発電機91に配分していた。今後、需給調整市場が開設されるため、調整量はメリットオーダー方式による調整コストを含め算出される。広域需給調整装置5は、メリットオーダー方式による調整コストを含め算出した調整量を、各発電機91に配分する。 In the prior art, when the AR allocation unit 26 allocated the imbalance to the generators 91, it allocated data f2 (smoothed AR value) to each generator 91 on an area basis. In the future, as a supply and demand adjustment market will be established, the adjustment amount will be calculated including the adjustment cost using the merit order method. The wide-area supply and demand adjustment device 5 allocates the adjustment amount calculated including the adjustment cost using the merit order method to each generator 91.

AR配分部26は、各エリアにおける各発電機91に対する調整量を算出する。一方、広域需給調整装置5は、各エリアを統合した広域におけるインバランスに基づき、各エリアに対する調整量を算出する。広域需給調整装置5による各エリアに対するメリットオーダー方式による調整コストを用いた配分は、図7に示す手順に基づき行われる。 The AR allocation unit 26 calculates the adjustment amount for each generator 91 in each area. On the other hand, the wide-area supply and demand adjustment device 5 calculates the adjustment amount for each area based on the imbalance in the wide area that integrates each area. The allocation by the wide-area supply and demand adjustment device 5 using the adjustment cost by the merit order method for each area is performed based on the procedure shown in Figure 7.

つまり、従来技術における広域需給調整装置5は、発電機91の出力を上げる場合(上げ調整力)、単価の安い順にエリアごとの発電機91を抽出し配分する。広域需給調整装置5は、発電機91の出力を下げる場合(下げ調整力)、単価の高い順にエリアごとの発電機91を抽出し配分する。 In other words, when the wide-area supply and demand adjustment device 5 in the conventional technology increases the output of the generators 91 (upward adjustment capability), it extracts and allocates the generators 91 from each area in the order of lowest unit price. When the wide-area supply and demand adjustment device 5 decreases the output of the generators 91 (downward adjustment capability), it extracts and allocates the generators 91 from each area in the order of highest unit price.

例えば、図8に示すように、4つのエリアがあり、エリアAには調整コストの安い発電機91が多く、エリアDには調整コストの高い発電機91が多いと仮定する。従来技術における広域需給調整装置5は、エリアAに出力増加の配分を多く行うこととなる。このためエリアAにおける上げ調整力が不足する場合があり、制御性が悪化する可能性があった。また、従来技術における広域需給調整装置5は、エリアDに出力減少の配分を多く行うこととなる。このためエリアDにおける下げ調整力が不足する場合があり、制御性が悪化する可能性があった。 For example, as shown in Figure 8, assume that there are four areas, with many generators 91 with low adjustment costs in area A and many generators 91 with high adjustment costs in area D. A wide-area supply and demand adjustment device 5 in the conventional technology would allocate more increased output to area A. This could result in a lack of upward adjustment power in area A, and controllability could deteriorate. Also, a wide-area supply and demand adjustment device 5 in the conventional technology would allocate more decreased output to area D. This could result in a lack of downward adjustment power in area D, and controllability could deteriorate.

本実施形態にかかる広域需給調整装置5は、一定のエリアに調整力が偏在化することを抑制するために、各エリアの調整力の大きさに応じて調整量を算出する。 The wide-area supply and demand adjustment device 5 in this embodiment calculates the adjustment amount according to the magnitude of the adjustment capacity of each area in order to prevent the adjustment capacity from being unevenly concentrated in a certain area.

ネッティング部51は、電力需給制御装置2からデータf1(AR値)を受信する。ネッティング部51は、各エリアのデータf1(AR値)に基づき、エリア全体に対する調整量を算出するために、AR値のネッティングを行う。制御量を決定する動作がネッティングと呼ばれる。ネッティング部51は、ネッティングしたAR値をデータh1(ネッティング後AR値)として制御分担量算出部52に送信する。 The netting unit 51 receives data f1 (AR value) from the power supply and demand control device 2. Based on the data f1 (AR value) for each area, the netting unit 51 performs netting of the AR values to calculate the adjustment amount for the entire area. The operation of determining the control amount is called netting. The netting unit 51 transmits the netted AR value as data h1 (AR value after netting) to the control share calculation unit 52.

制御分担量算出部52は、ネッティング部51からデータh1(ネッティング後AR値)を受信する。また、制御分担量算出部52は、電力需給制御装置2からデータg2(個別メリットオーダーリスト)、データg3(既LFC動作量)を受信する。制御分担量算出部52は、データh1(ネッティング後AR値)、データg2(個別メリットオーダーリスト)、データg3(既LFC動作量)に基づいて、各エリアの発電機に対する制御分担量を算出する。各エリアの発電機に対するデータh2(制御分担量)は以下の手順により算出される。 The control share calculation unit 52 receives data h1 (AR value after netting) from the netting unit 51. The control share calculation unit 52 also receives data g2 (individual merit order list) and data g3 (existing LFC operation amount) from the power supply and demand control device 2. The control share calculation unit 52 calculates the control share for the generators in each area based on data h1 (AR value after netting), data g2 (individual merit order list), and data g3 (existing LFC operation amount). Data h2 (control share) for the generators in each area is calculated by the following procedure.

例えば、図9に示すように、エリアA、エリアB、エリアC、エリアDごとに、それぞれ、100MW、50MW、30MW、80MWの調整力がある場合、各エリアに分担される調整量は(式2)のようになる。調整力は、発電することができる余力にかかる電力である。エリアA、エリアB、エリアC、エリアDごとの100MW、50MW、30MW、80MWの調整力は、予め定められたた調整力、または予め入札により確保されている発電機91の調整力にかかる電力(ΔkW)の総和である。

Figure 0007686546000001
・・・・・(式2) For example, as shown in Fig. 9, when area A, area B, area C, and area D have adjustment capacities of 100 MW, 50 MW, 30 MW, and 80 MW, respectively, the adjustment amount allocated to each area is as shown in (Formula 2). Adjustment capacities are power required for surplus power that can be generated. The adjustment capacities of 100 MW, 50 MW, 30 MW, and 80 MW for area A, area B, area C, and area D are the sum of power (ΔkW) required for the adjustment capacities of generators 91 that have been determined in advance or secured in advance through bidding.
Figure 0007686546000001
...(Formula 2)

(式2)がデータh2(制御分担量)とされる。制御分担量算出部52は、算出したデータh2(制御分担量)を各電源指令作成部53に送信する。 (Equation 2) is set as data h2 (control share). The control share calculation unit 52 transmits the calculated data h2 (control share) to each power command creation unit 53.

上記によれば、制御分担量算出部52によるデータh2(制御分担量)にかかる各エリアの調整量は、予め定められた各エリアの調整力または予め入札により確保されている個々の発電機91の調整力にかかる電力(ΔkW)に基づき、(式2)により算出されるものとした。しかしながら調整量の算出は、上記に限られない。 According to the above, the adjustment amount for each area for data h2 (control share amount) by the control share calculation unit 52 is calculated by (Formula 2) based on the power (ΔkW) for the adjustment capacity of each area that has been determined in advance or the adjustment capacity of each individual generator 91 that has been secured in advance through bidding. However, the calculation of the adjustment amount is not limited to the above.

広域需給調整装置5は、図11に示すように、時々刻々変化する発電機91の現在出力値に基づき、当該時刻の上げ調整力の余力、下げ調整力の余力の比に基づきインバランスを配分して調整量の算出するようにしてもよい。上げ調整力の余力は(式5)により、下げ調整力の余力は(式6)により算出される。 As shown in FIG. 11, the wide-area supply and demand adjustment device 5 may allocate the imbalance based on the current output value of the generator 91, which changes from moment to moment, and calculate the adjustment amount based on the ratio of the upward adjustment capacity margin to the downward adjustment capacity margin at the relevant time. The upward adjustment capacity margin is calculated by (Equation 5), and the downward adjustment capacity margin is calculated by (Equation 6).

上げ調整力=
min[(上げ調整力確保量),(BG計画値+上げ調整力確保量-現在出力)]
・・・・・(式5)
下げ調整力=
max[(下げ調整力確保量),(現在出力-BG計画値+下げ調整力確保量)]
・・・・・(式6)
(式5)による上げ調整力、(式6)による下げ調整力は、(式2)の各式における調整力に代替される。
Lift adjustment power =
min [(guaranteed upward control capacity), (BG planned value + guaranteed upward control capacity - current output)]
...(Formula 5)
Lowering adjustment power =
max [(reserved downward adjustment capacity), (current output - BG planned value + reserved downward adjustment capacity)]
...(Formula 6)
The upward adjustment force according to (Equation 5) and the downward adjustment force according to (Equation 6) are substituted for the adjustment forces in each of (Equation 2).

各電源指令作成部53は、制御分担量算出部52からデータh2(制御分担量)を受信する。各電源指令作成部53は、データh2(制御分担量)に基づき各エリアの発電機に対する指令値を算出する。 Each power supply command creation unit 53 receives data h2 (control share) from the control share calculation unit 52. Each power supply command creation unit 53 calculates a command value for the generator in each area based on data h2 (control share).

各電源指令作成部53は、制御分担量算出部52によるデータh2(制御分担量)にかかる各エリアの調整量の算出後、メリットオーダー方式や既存の出力変化速度比に基づき配分を行い、各発電機91の調整量を算出する。また、例えば図10に示すように、各エリア内の個々の発電機91の調整力の情報に基づき、直接、個々の発電機91の調整量を求めてもよい。例えば、エリアAの一つの発電機91の調整量GA-1は(式3)、エリアDの一つの発電機91の調整量GA-4は(式4)に示すとおりとなる。

Figure 0007686546000002
・・・・・(式3)
Figure 0007686546000003
・・・・・(式4) After the control share calculation unit 52 calculates the adjustment amount for each area based on the data h2 (control share), each power supply command creation unit 53 performs allocation based on the merit order method or an existing output change speed ratio, and calculates the adjustment amount for each generator 91. Alternatively, as shown in Fig. 10, for example, the adjustment amount for each generator 91 may be calculated directly based on information on the adjustment capacity of each generator 91 in each area. For example, the adjustment amount GA-1 of one generator 91 in area A is as shown in (Equation 3), and the adjustment amount GA-4 of one generator 91 in area D is as shown in (Equation 4).
Figure 0007686546000002
...(Formula 3)
Figure 0007686546000003
...(Formula 4)

各電源指令作成部53は、(式3)、(式4)により算出した各エリアの発電機に対する指令値をデータh3(LFC制御出力指令)として各エリアの電力需給制御装置2のLFC制御出力指令受信部33に送信する。 Each power supply command creation unit 53 transmits the command value for the generator in each area calculated using (Equation 3) and (Equation 4) as data h3 (LFC control output command) to the LFC control output command receiving unit 33 of the power supply and demand control device 2 in each area.

本実施形態によれば、広域需給調整システム1は、インバランスが調整力に応じて配分された調整量を算出するので、一定のエリアに調整力が偏在化することを抑制し、広域のエリアにわたり効率よく電力需給調整を行うことができる広域需給調整システムを提供することができる。 According to this embodiment, the wide-area supply and demand adjustment system 1 calculates an adjustment amount in which the imbalance is allocated according to the adjustment power, and therefore it is possible to provide a wide-area supply and demand adjustment system that can suppress uneven distribution of adjustment power in a certain area and efficiently adjust power supply and demand over a wide area.

[1-3.効果]
(1)本実施形態によれば、広域需給調整装置5は、制御対象となる複数のエリアのそれぞれに要求された電力(AR値)に基づき、複数のエリア全体の調整量であるデータh1(ネッティング後AR値)の総量を算出するネッティング部51と、ネッティング部51により算出された複数のエリア全体の調整量であるデータh1(ネッティング後AR値)の総量を、複数のエリアのそれぞれに分配して、複数のエリアのそれぞれの制御分担量、複数のエリアの発電機91ごとの制御分担量のうち少なくとも一方をデータh2(制御分担量)として算出する制御分担量算出部52と、制御分担量算出部52により算出された複数のエリアのそれぞれの制御分担量、複数のエリアの発電機91ごとの制御分担量にかかるデータh2(制御分担量)のうち少なくとも一方に基づき、複数のエリアのそれぞれに対する指令値であるデータh3(LFC制御出力指令)を作成する各電源指令作成部53と、を有するので、一定のエリアに調整力が偏在化することを抑制し、広域のエリアにわたり効率よく電力需給調整を行うことができる広域需給調整装置5を提供することができる。
[1-3. Effects]
(1) According to this embodiment, the wide-area supply and demand adjustment device 5 includes a netting unit 51 that calculates a total amount of data h1 (netted AR value) that is an adjustment amount for the entire plurality of areas based on the power (AR value) requested for each of the plurality of areas to be controlled, and a netting unit 52 that distributes the total amount of data h1 (netted AR value) that is the adjustment amount for the entire plurality of areas calculated by the netting unit 51 to each of the plurality of areas, and calculates at least one of the control allocation amount for each of the plurality of areas and the control allocation amount for each generator 91 in the plurality of areas as data h2 (control allocation and each power source command creation unit 53 that creates data h3 (LFC control output command) that is a command value for each of the multiple areas based on at least one of the control share of each of the multiple areas calculated by the control share calculation unit 52 and data h2 (control share) related to the control share of each generator 91 in the multiple areas. Therefore, it is possible to provide a wide-area supply and demand adjustment device 5 that can suppress the concentration of adjustment power in a certain area and efficiently adjust power supply and demand over a wide area.

(2)本実施形態によれば、制御分担量算出部52は、エリアにおける発電機が発電することができる余力である調整力に基づき、現在供給されている電力と要求された電力との差分であるインバランスを分配してエリアのそれぞれの制御分担量、およびエリアの発電機ごとの制御分担量のうち少なくとも一方をデータh2(制御分担量)算出するので、データh2(制御分担量)は、インバランスが調整力に応じて配分され、一定のエリアに調整力が偏在化することを抑制し、広域のエリアにわたり効率よく電力需給調整を行うことができる。 (2) According to this embodiment, the control share calculation unit 52 distributes the imbalance, which is the difference between the currently supplied power and the requested power, based on the adjustment capacity, which is the surplus power that can be generated by the generators in the area, to calculate at least one of the control share for each area and the control share for each generator in the area as data h2 (control share). Therefore, data h2 (control share) distributes the imbalance according to the adjustment capacity, suppresses the concentration of adjustment capacity in certain areas, and enables efficient adjustment of power supply and demand over a wide area.

(3)本実施形態によれば、広域需給調整システム1の電力需給制御装置2は、制御の対象となる発電機91により構成されたエリアに要求された要求電力(AR値)を算出するAR算出部24と、AR算出部24により算出された要求電力(AR値)に基づき、発電機91ごとの配分値であるデータf3(AR配分値)を算出するAR配分部26と、AR配分部26により算出されたデータf3(AR配分値)と、各電源指令作成部53により作成された指令値であるデータh3(LFC制御出力指令)と、を切替えて目標値作成部23に送信する切替部34と、を有し、目標値作成部23は、切替部34からデータf3(AR配分値)が出力された場合、各電源指令作成部53により作成された指令値データh3(LFC制御出力指令)に代替してデータf3(AR配分値)に基づき、制御の対象となる発電機91に対する発電目標値データd1(発電目標値)を作成するので、他のエリアにおける電力需給制御装置2、または電力系統9に事故が発生した場合であっても、エリアの電力需給制御装置2により発電機91に対し電力需給調整を行うことができる。 (3) According to this embodiment, the power supply and demand control device 2 of the wide-area supply and demand adjustment system 1 includes an AR calculation unit 24 that calculates the required power (AR value) requested for the area constituted by the generators 91 to be controlled, an AR allocation unit 26 that calculates data f3 (AR allocation value) which is an allocation value for each generator 91 based on the required power (AR value) calculated by the AR calculation unit 24, and a target value creation unit 53 that switches between the data f3 (AR allocation value) calculated by the AR allocation unit 26 and data h3 (LFC control output command) which is a command value created by each power source command creation unit 53. 23, and when data f3 (AR allocation value) is output from the switching unit 34, the target value creation unit 23 creates power generation target value data d1 (power generation target value) for the generator 91 to be controlled based on the data f3 (AR allocation value) instead of the command value data h3 (LFC control output command) created by each power command creation unit 53. Therefore, even if an accident occurs in the power supply and demand control device 2 or the power system 9 in another area, the power supply and demand control device 2 in the area can adjust the power supply and demand for the generator 91.

[2.第2実施形態]
[2-1.構成および作用]
第2実施形態にかかる広域需給調整システム1について説明する。第2実施形態にかかる広域需給調整システム1は、広域需給調整装置5の制御分担量算出部52による演算が、第1実施形態にかかる広域需給調整システム1と相違する。第2実施形態にかかる広域需給調整システム1の構成は、第1実施形態にかかる広域需給調整システム1の構成と同じである。
[2. Second embodiment]
[2-1. Configuration and Action]
A wide-area supply and demand adjustment system 1 according to the second embodiment will be described. The wide-area supply and demand adjustment system 1 according to the second embodiment differs from the wide-area supply and demand adjustment system 1 according to the first embodiment in the calculation by the control share calculation unit 52 of the wide-area supply and demand adjustment device 5. The configuration of the wide-area supply and demand adjustment system 1 according to the second embodiment is the same as the configuration of the wide-area supply and demand adjustment system 1 according to the first embodiment.

以下の説明において、第1実施形態にかかる広域需給調整システム1と異なる動作について説明する。第1実施形態にかかる広域需給調整システム1と同様の動作について、説明を省略する。 In the following explanation, operations that differ from the wide-area supply and demand adjustment system 1 according to the first embodiment will be explained. Explanations of operations that are similar to those of the wide-area supply and demand adjustment system 1 according to the first embodiment will be omitted.

第1実施形態にかかる広域需給調整システム1は、各エリアの調整力に応じてインバランスをエリアごとの発電機91に配分してエリア間の偏在化を抑制することにより、制御性を優先した配分を行うものとした。 The wide-area supply and demand adjustment system 1 according to the first embodiment allocates the imbalance to the generators 91 in each area according to the adjustment capacity of each area, suppressing uneven distribution between areas, thereby prioritizing controllability in the allocation.

第2実施形態にかかる広域需給調整システム1は、発電機91の出力変化速度とメリットオーダーの重み付けを行い、両者を組合わせインバランスをエリアごとの発電機91に配分することにより、種々の系統状態に柔軟に対応することができる経済性と制御性を含めた配分を行う。 The wide-area supply and demand adjustment system 1 according to the second embodiment weights the output change rate of the generators 91 and the merit order, and by combining the two and allocating the imbalance to the generators 91 in each area, performs allocation that is both economical and controllable and can flexibly respond to various system conditions.

第2実施形態にかかる広域需給調整装置5の制御分担量算出部52は、エリアにおける制御性にかかる演算、経済性にかかる演算の、それぞれの寄与度が重み付けにより設定された演算により、エリアのそれぞれの制御分担量、エリアのそれぞれの発電機91ごとの制御分担量のうち少なくとも一方をデータh2(制御分担量)として算出する。 The control share calculation unit 52 of the wide-area supply and demand adjustment device 5 in the second embodiment calculates at least one of the control share for each area and the control share for each generator 91 in the area as data h2 (control share) by performing a calculation in which the contribution of each of the calculations related to controllability and economy in the area is set by weighting.

第2実施形態にかかる広域需給調整装置5は、以下の演算を行う。 The wide-area supply and demand adjustment device 5 in the second embodiment performs the following calculations:

第2実施形態にかかる広域需給調整装置5は、各エリアの電力需給制御装置2からデータf1(AR値)を受信し、データf1(AR値)に基づき、各エリアを統合した広域におけるネッティング後のインバランスをエリアごとの発電機91に配分し、データh3(LFC制御出力指令)として各エリアの電力需給制御装置2に送信する。第2実施形態にかかる広域需給調整装置5の制御分担量算出部52は、ネッティング後のインバランスをメリットオーダーに従って各発電機91に配分する。 The wide-area supply and demand adjustment device 5 according to the second embodiment receives data f1 (AR value) from the power supply and demand control devices 2 of each area, and allocates the imbalance after netting in the wide area integrating each area to the generators 91 of each area based on the data f1 (AR value), and transmits it as data h3 (LFC control output command) to the power supply and demand control devices 2 of each area. The control share calculation unit 52 of the wide-area supply and demand adjustment device 5 according to the second embodiment allocates the imbalance after netting to each generator 91 according to merit order.

ネッティング後のインバランス(AR)は、計画値または現在出力、もしくは計画値と現在出力の両者に基づき配分される。図12に、広域需給調整装置5の制御分担量算出部52における演算を模式化したブロック図を示す。LFCの対象となる発電機91をLFC発電機と呼ぶ場合がある。LFC配分量(ΔP)から制御周期間の変化量制約を考慮した後の値(ΔP’)が各LFC発電機の計画値(PPLAN)または現在出力(PNOW)に配分されて、各電源指令作成部53によりデータh3(LFC制御出力指令)にかかる指令値が算出される。各電源指令作成部53は、各エリアの発電機に対する指令値をデータh3(LFC制御出力指令)として各エリアの電力需給制御装置2のLFC制御出力指令受信部33に送信する。 The imbalance (AR) after netting is allocated based on the planned value or the current output, or both the planned value and the current output. FIG. 12 shows a block diagram that shows a schematic of the calculation in the control share calculation unit 52 of the wide-area supply and demand adjustment device 5. The generator 91 that is the subject of LFC may be called an LFC generator. The value (ΔP′) obtained by considering the change amount constraint between control periods from the LFC allocation amount (ΔP) is allocated to the planned value (P PLAN ) or current output (P NOW ) of each LFC generator, and each power supply command creation unit 53 calculates a command value related to data h3 (LFC control output command). Each power supply command creation unit 53 transmits the command value for the generator in each area as data h3 (LFC control output command) to the LFC control output command receiving unit 33 of the power supply and demand control device 2 in each area.

インバランス(AR)が大きい場合、各LFC発電機に配分されたLFC配分量(ΔP)は各LFC発電機の出力変化可能量より大きい場合もある。この場合、各発電機は現在出力から出力を変動させることが可能な範囲で応答する。 When the imbalance (AR) is large, the LFC allocation amount (ΔP) allocated to each LFC generator may be larger than the amount of output change possible for each LFC generator. In this case, each generator responds within the range in which it is possible to change the output from the current output.

単に価格順にLFC配分量(ΔP)から制御周期間の変化量制約を考慮した後の値(ΔP’)を各LFC発電機の計画値(PPLAN)または現在出力(PNOW)に配分した場合、上げ指令では価格の安い(下げ指令では高い)順に配分されるが、稼働する発電機の台数が減って制御性が低下する可能性がある。 If the value (ΔP') obtained by simply taking into account the constraint on the amount of change between control periods from the LFC allocation amount (ΔP) in order of price is allocated to the planned value (P PLAN ) or current output (P NOW ) of each LFC generator, the allocation will be in order of lowest price for an increase command (highest price for a decrease command), but the number of operating generators may decrease, resulting in a decrease in controllability.

以下に、出力変化速度とメリットオーダーを組合わせた重み付けにより、ネッティング後のインバランスをメリットオーダーに従って各発電機に配分する、種々の電力系統9の系統状態に対応した演算手順を説明する。制御分担量算出部52は、複数のエリアの調整力に応じてインバランスを複数のエリアに配分する制御性にかかる演算、およびインバランスをメリットオーダーに従って複数のエリアに配分する経済性にかかる演算の、重み付係数Wiによりそれぞれの寄与度が設定された演算により、複数のエリアのそれぞれの制御分担量、複数のエリアの発電機ごとの制御分担量のうち一方または両者を算出する。 Below, a calculation procedure corresponding to various system states of the power system 9 is described, in which the imbalance after netting is allocated to each generator according to merit order by weighting that combines the output change rate and merit order. The control share calculation unit 52 calculates one or both of the control share of each of the multiple areas and the control share of each generator in the multiple areas by calculations related to controllability that allocates the imbalance to multiple areas according to the adjustment capabilities of the multiple areas, and calculations related to economy that allocate the imbalance to multiple areas according to the merit order, with the contribution levels of each set by the weighting coefficient Wi.

広域需給調整装置5の制御分担量算出部52は、以下の演算手順によりネッティング後のインバランスをメリットオーダーに従って各発電機に配分する。制御分担量算出部52は、(式7)による重み付係数Wiによりネッティング後のインバランスを各発電機に配分する。

Figure 0007686546000004
・・・・・(式7)
(式7)は、重み付係数Wiの一例である。 The control share calculation unit 52 of the wide-area supply and demand adjusting device 5 allocates the imbalance after netting to each generator according to the merit order by the following calculation procedure. The control share calculation unit 52 allocates the imbalance after netting to each generator by the weighting coefficient Wi according to (Equation 7).
Figure 0007686546000004
...(Formula 7)
Equation 7 is an example of the weighting coefficient Wi.

(式7)において、VCiは各LFC発電機の価格の関数である。RiはLFC発電機の出力変化速度である。重み付係数Wiは、δ=1の場合、価格のみにより決定され、δ=0の場合、出力変化速度に比例して決定される。また、指数mによって価格差の重みを変えることができる。各LFC発電機への調整量は、(式8)により算出される。
各LFC発電機への調整量=インバランス(AR)×Wi
・・・・・(式8)
現在出力(現在値)または計画出力(BG計画値)に加えてデータh3(LFC制御出力指令)が作成される。
In (Equation 7), VCi is a function of the price of each LFC generator. Ri is the output change rate of the LFC generator. The weighting coefficient Wi is determined only by the price when δ=1, and is determined in proportion to the output change rate when δ=0. The weight of the price difference can be changed by the index m. The adjustment amount to each LFC generator is calculated by (Equation 8).
Adjustment amount for each LFC generator = Imbalance (AR) x Wi
...(Formula 8)
In addition to the current output (current value) or the planned output (BG planned value), data h3 (LFC control output command) is created.

価格の関数VCiは、上げ指令時には価格が安いほど大きく、下げ指令時には価格が高いほど大きくなるように決定される。一例として、価格の関数VCiは、価格差をベースとした(式9)、(式10)にかかる関数により表される。

Figure 0007686546000005
・・・・・(式9)

Figure 0007686546000006
・・・・・(式10) The price function VCi is determined so that it is larger the lower the price is when an increase command is issued, and is larger the higher the price is when a decrease command is issued. As an example, the price function VCi is expressed by a function according to (Equation 9) or (Equation 10) based on the price difference.
Figure 0007686546000005
...(Formula 9)

Figure 0007686546000006
...(Formula 10)

(式9)(式10)においてNは使用するLFC発電機の台数、VMAXは各LFC発電機の現在値(現在出力)に対応する価格の最大値、VMINは価格の最小値である。(式9)(式10)により、上げ指令時に価格が最小の発電機の重み付係数Wiが最大になり、下げ指令時に価格が最大の発電機の重み付係数Wiが最大になる。図13に、上げ指令時、下げ指令時の価格差の例を示す。 In (Equation 9) and (Equation 10), N is the number of LFC generators to be used, VMAX is the maximum price corresponding to the current value (current output) of each LFC generator, and VMIN is the minimum price. According to (Equation 9) and (Equation 10), the weighting coefficient Wi of the generator with the lowest price becomes maximum when an increase command is issued, and the weighting coefficient Wi of the generator with the highest price becomes maximum when a decrease command is issued. Fig. 13 shows an example of the price difference when an increase command is issued and when a decrease command is issued.

図14に、メリットオーダー方式にて用いられる調整コストの例を示す。図14に示すように、調整コストは、発電機の出力に対して離散的に、階段状に設定される。また、調整コストは、出力に対して上げ調整(V1)価格、下げ調整(V2)価格の2つの価格が存在する。 Figure 14 shows an example of adjustment costs used in the merit order method. As shown in Figure 14, the adjustment costs are set discretely and in steps with respect to the generator's output. In addition, there are two adjustment costs with respect to output: an upward adjustment (V1) price and a downward adjustment (V2) price.

上記では、各エリアを統合した広域におけるインバランスに基づき、個々の発電機に対して、一括でLFC発電機への調整量を算出するものとしたが、第1実施形態と同様、各エリアに対する調整力を配分した後、個々の発電機に対する配分を行う2段階の演算によりLFC発電機への調整量を算出するものであってもよい。 In the above, the adjustment amount to the LFC generator is calculated for each generator at once based on the imbalance in a wide area integrating each area, but as in the first embodiment, the adjustment amount to the LFC generator may be calculated by a two-stage calculation in which the adjustment power to each area is first allocated, and then allocated to each generator.

本実施形態によれば、出力変化速度とメリットオーダーを組合わせた重み付係数Wiにより、種々の系統状態に対応した柔軟な演算により、インバランスを各発電機に配分することができる。 According to this embodiment, the weighting coefficient Wi, which combines the output change rate and the merit order, allows for flexible calculations that correspond to various system conditions to allocate the imbalance to each generator.

[2-2.効果]
(1)本実施形態によれば、広域需給調整装置5の制御分担量算出部52は、エリアにおける制御性にかかる演算、および経済性にかかる演算の、それぞれの寄与度が設定された演算により、エリアのそれぞれの制御分担量、エリアの発電機91ごとの制御分担量のうち少なくとも一方をデータh2(制御分担量)として算出するので、種々の系統状態に対応した制御性、経済性を含む柔軟な演算により、インバランスを各発電機91に配分することができる。
[2-2. Effects]
(1) According to this embodiment, the control share calculation unit 52 of the wide-area supply and demand adjustment device 5 calculates at least one of the control share for each area and the control share for each generator 91 in the area as data h2 (control share amount) through a calculation in which the contribution rates of the calculation related to controllability in the area and the calculation related to economy are set. Therefore, the imbalance can be allocated to each generator 91 through a flexible calculation that includes controllability and economy that correspond to various system conditions.

(2)本実施形態によれば、広域需給調整装置5の制御分担量算出部52は、エリアにおける発電機91の出力変化速度、およびコストメリットに基づく要求であるメリットオーダーの、それぞれの寄与度が設定された演算により、エリアのそれぞれの制御分担量、エリアのそれぞれの発電機91ごとの制御分担量のうち少なくとも一方をデータh2(制御分担量)として算出するので、出力変化速度とメリットオーダーを組合わせた重み付け係数を用いた、種々の系統状態に対応した柔軟な演算により、インバランスを各発電機に配分することができる。 (2) According to this embodiment, the control share calculation unit 52 of the wide-area supply and demand adjustment device 5 calculates at least one of the control share of each area and the control share of each generator 91 in the area as data h2 (control share) by a calculation in which the contribution rates of the output change rate of the generators 91 in the area and the merit order, which is a requirement based on cost merit, are set. Therefore, the imbalance can be allocated to each generator by a flexible calculation that corresponds to various system conditions using a weighting coefficient that combines the output change rate and the merit order.

[3.第3実施形態]
[3-1.構成および作用]
第3実施形態にかかる広域需給調整システム1について説明する。第3実施形態にかかる広域需給調整システム1は、広域需給調整装置5の制御分担量算出部52による演算が、第1実施形態、第2実施形態にかかる広域需給調整システム1と相違する。第3実施形態にかかる広域需給調整システム1の構成は、第1実施形態、第2実施形態にかかる広域需給調整システム1の構成と同じである。
[3. Third embodiment]
[3-1. Configuration and Action]
A wide-area supply and demand adjustment system 1 according to the third embodiment will be described. The wide-area supply and demand adjustment system 1 according to the third embodiment differs from the wide-area supply and demand adjustment system 1 according to the first and second embodiments in the calculation by the control share calculation unit 52 of the wide-area supply and demand adjustment device 5. The configuration of the wide-area supply and demand adjustment system 1 according to the third embodiment is the same as the configuration of the wide-area supply and demand adjustment system 1 according to the first and second embodiments.

以下の説明において、第1実施形態、第2実施形態にかかる広域需給調整システム1と異なる動作について説明する。第1実施形態、第2実施形態にかかる広域需給調整システム1と同様の動作について、説明を省略する。 In the following explanation, operations that differ from those of the wide-area supply and demand adjustment system 1 according to the first and second embodiments will be explained. Explanations of operations that are similar to those of the wide-area supply and demand adjustment system 1 according to the first and second embodiments will be omitted.

第1実施形態にかかる広域需給調整システム1は、各エリアの調整力に応じてインバランスをエリアごとの発電機91に配分してエリア間の偏在化を抑制することにより、制御性を優先した配分を行うものとした。 The wide-area supply and demand adjustment system 1 according to the first embodiment allocates the imbalance to the generators 91 in each area according to the adjustment capacity of each area, suppressing uneven distribution between areas, thereby prioritizing controllability in the allocation.

第2実施形態にかかる広域需給調整システム1は、発電機91の出力変化速度とメリットオーダーの重み付けを行い、両者を組合わせインバランスをエリアごとの発電機91に配分することにより、種々の系統状態に柔軟に対応することができる経済性と制御性を含めた配分を行うものとした。 The wide-area supply and demand adjustment system 1 according to the second embodiment weights the output change rate of the generators 91 and the merit order, and by combining the two and distributing the imbalance to the generators 91 in each area, performs an allocation that takes into account both economy and controllability and can flexibly respond to various system conditions.

第3実施形態にかかる広域需給調整システム1は、第1実施形態にかかる各エリアの調整力に応じてインバランスをエリアごとの発電機91に配分する制御性を優先した配分と、第2実施形態にかかる発電機91の出力変化速度とメリットオーダーの重み付けを行い、両者を組合わせインバランスをエリアごとの発電機91に配分する、経済性と制御性の両者を含めた演算を行う。 The wide-area supply and demand adjustment system 1 according to the third embodiment performs a calculation that takes into account both economy and controllability, by combining the first embodiment in which imbalances are allocated to the generators 91 of each area according to the adjustment capacity of each area, weighting the output change rate and merit order of the generators 91 according to the second embodiment, and combining the two to allocate imbalances to the generators 91 of each area.

第3実施形態にかかる広域需給調整装置5の制御分担量算出部52は、下記の第一の演算、第二の演算の寄与度が重み付けにより設定された演算により、エリアのそれぞれの制御分担量、エリアのそれぞれの発電機ごとの制御分担量のうち少なくとも一方をデータh2(制御分担量)として算出する。 The control share calculation unit 52 of the wide-area supply and demand adjustment device 5 in the third embodiment calculates at least one of the control share of each area and the control share of each generator in the area as data h2 (control share) by performing a calculation in which the contributions of the first calculation and the second calculation below are set by weighting.

第一の演算は、エリアにおける発電機91が発電することができる余力である調整力に基づき、現在供給されている電力と要求された電力との差分であるインバランスを分配して、エリアのそれぞれの制御分担量、エリアのそれぞれの発電機91ごとの制御分担量のうち少なくとも一方をデータh2(制御分担量)として算出する演算である。 The first calculation is a calculation that distributes the imbalance, which is the difference between the currently supplied power and the requested power, based on the adjustment capacity, which is the surplus power that the generators 91 in the area can generate, and calculates at least one of the control share of each area and the control share of each generator 91 in the area as data h2 (control share).

第二の演算は、電力系統9における現在の電力品質を示すパラメータに基づき、エリアにおける制御性にかかる演算、経済性にかかる演算の、それぞれの寄与度が重み付けにより設定された演算により、エリアのそれぞれの制御分担量、エリアのそれぞれの発電機91ごとの制御分担量のうち少なくとも一方をデータh2(制御分担量)として算出する演算である。 The second calculation is a calculation in which the contribution of each of the controllability calculations and the economy calculations in the area is weighted based on a parameter indicating the current power quality in the power system 9, and at least one of the control share of each area and the control share of each generator 91 in the area is calculated as data h2 (control share).

第3実施形態にかかる広域需給調整システム1の広域需給調整装置5は、以下の演算を行う。 The wide-area supply and demand adjustment device 5 of the wide-area supply and demand adjustment system 1 according to the third embodiment performs the following calculations:

第3実施形態にかかる広域需給調整システム1の広域需給調整装置5の制御分担量算出部52は、経済性と制御性を両立させた以下の(a)(b)2通りの演算を組合わせた配分を行う。
(a)第1実施形態と第2実施形態の重み付けによる調整力の配分
(b)制御の仕上がり状況に応じた調整方法の切り替えによる調整力の配分
上記の(a)の演算において第1実施形態にかかる調整力の配分、第2実施形態にかかる調整力の配分は、制御分担量算出部52により行われる。上記の(b)の演算において制御性を優先した調整力の配分、経済性を優先した調整力の配分は、制御分担量算出部52により行われる。
The control share calculation unit 52 of the wide-area supply and demand adjustment device 5 of the wide-area supply and demand adjustment system 1 in the third embodiment performs allocation by combining the following two calculations (a) and (b) that achieve both economical and controllable performance.
(a) Allocation of adjustment capability by weighting of the first and second embodiments (b) Allocation of adjustment capability by switching adjustment methods according to the completion status of control In the calculation of (a) above, the allocation of adjustment capability according to the first embodiment and the allocation of adjustment capability according to the second embodiment are performed by the control share calculation unit 52. In the calculation of (b) above, the allocation of adjustment capability giving priority to controllability and the allocation of adjustment capability giving priority to economy are performed by the control share calculation unit 52.

(a)による演算では、第1実施形態にかかる調整力の大きさに応じた配分と、第2実施形態にかかる出力変化速度とメリットオーダーを重み付けにより組合わせた配分を、(式11)に示すように、さらに重み係数Yiにより比率を決定し、調整力の配分を行う。

Figure 0007686546000007
・・・・・(式11) In the calculation according to (a), the adjustment power is allocated by combining the allocation according to the magnitude of the adjustment power in the first embodiment and the allocation obtained by weighting the output change rate and merit order in the second embodiment, and further determining the ratio using the weighting coefficient Yi as shown in (Equation 11).
Figure 0007686546000007
...(Formula 11)

ここで、Xiは第1実施形態にかかる広域需給調整装置5の制御分担量算出部52により算出された関数であり、Wiは第2実施形態にかかる広域需給調整装置5の制御分担量算出部52により算出された関数である。γ=1の場合、制御性を優先した配分となり、γ=0の場合、経済性を優先した配分となる。各LFC発電機への調整量は、(式12)により算出される。
各LFC発電機への調整量=インバランス(AR)×Yi
・・・・・(式12)
Here, Xi is a function calculated by the control share calculation unit 52 of the wide-area supply and demand adjustment device 5 according to the first embodiment, and Wi is a function calculated by the control share calculation unit 52 of the wide-area supply and demand adjustment device 5 according to the second embodiment. When γ=1, the allocation prioritizes controllability, and when γ=0, the allocation prioritizes economy. The adjustment amount to each LFC generator is calculated by (Equation 12).
Adjustment amount for each LFC generator = Imbalance (AR) x Yi
...(Formula 12)

(b)による演算では、時々刻々変化する系統周波数偏差(Δf)やインバランス(AR)の大きさ等の制御の仕上がり状況に応じて調整方法を切り替え調整力の配分を行う。 In the calculation according to (b), the adjustment method is switched according to the control completion status such as the system frequency deviation (Δf) and the magnitude of the imbalance (AR), which change from moment to moment, and the adjustment power is allocated.

一例として、仕上がり規定値が時々刻々変化する周波数の基準値との差分であるΔfの瞬時値である場合について説明する。制御の仕上がり状況としての仕上がり規定値であるΔfが±0.1Hzを超えている場合、緊急時とみなし、制御分担量算出部52は制御性を優先させた調整力の配分を行う。Δfが±0.1Hz以下である場合、平常時とみなし、制御分担量算出部52は、第1実施形態にかかる関数Xiと第2実施形態にかかる関数Wiを切替え経済性を優先させた調整力の配分を行う。 As an example, we will explain the case where the specified finish value is the instantaneous value of Δf, which is the difference from the reference value of the frequency that changes from moment to moment. When Δf, which is the specified finish value as the control finish status, exceeds ±0.1 Hz, it is considered to be an emergency, and the control share calculation unit 52 allocates adjustment power with priority given to controllability. When Δf is ±0.1 Hz or less, it is considered to be a normal state, and the control share calculation unit 52 switches between the function Xi according to the first embodiment and the function Wi according to the second embodiment to allocate adjustment power with priority given to economy.

仕上がり規定値は、時々刻々変化する周波数の基準値との差分であるΔfの瞬時値であってもよいし、インバランス(AR)の瞬時値であってもよい。もしくは、仕上がり規定値は、過去から現在に至る一定期間の周波数の基準値との差分であるΔfまたはインバランス(AR)の平均値や標準偏差であってもよい。 The specified finish value may be the instantaneous value of Δf, which is the difference from the reference value of the frequency that changes from moment to moment, or the instantaneous value of the imbalance (AR). Alternatively, the specified finish value may be the average value or standard deviation of Δf, which is the difference from the reference value of the frequency over a certain period from the past to the present, or the imbalance (AR).

広域需給調整装置5の制御分担量算出部52は、各エリアの調整力に応じてインバランスをエリアごとの発電機91に配分してエリア間の偏在化を抑制することにより、制御性を優先した配分を行う。 The control share calculation unit 52 of the wide-area supply and demand adjustment device 5 allocates the imbalance to the generators 91 in each area according to the adjustment capacity of each area, thereby suppressing uneven distribution between areas, thereby prioritizing controllability in the allocation.

広域需給調整装置5の制御分担量算出部52は、発電機91の出力変化速度とメリットオーダーの重み付けを行い、両者を組合わせインバランスをエリアごとの発電機91に、経済性と制御性を含めた配分を行う。 The control share calculation unit 52 of the wide-area supply and demand adjustment device 5 weights the output change rate of the generators 91 and the merit order, and by combining the two, allocates the imbalance to the generators 91 in each area, taking into account both economy and controllability.

Xiは各エリアの調整力に応じた配分にかかる関数であり、Wiは発電機91の出力変化速度とメリットオーダーの重み付けによる配分にかかる関数である。 Xi is a function that affects the distribution according to the adjustment capacity of each area, and Wi is a function that affects the distribution based on the output change rate of the generator 91 and merit order weighting.

広域需給調整装置5の制御分担量算出部52は、関数Xi、関数Wiをγにより重み付けし発電機91に配分し調整量を算出する。または、広域需給調整装置5の制御分担量算出部52は、仕上がり規定値に基づき関数Xi、関数Wiを切替え発電機91に配分し調整量を算出する。広域需給調整装置5の各電源指令作成部53は、算出した調整量をデータh3(LFC制御出力指令)として各エリアの電力需給制御装置2のLFC制御出力指令受信部33に送信する。 The control share calculation unit 52 of the wide-area supply and demand adjustment device 5 weights the functions Xi and Wi by γ and allocates them to the generators 91 to calculate the adjustment amount. Alternatively, the control share calculation unit 52 of the wide-area supply and demand adjustment device 5 switches the functions Xi and Wi based on the specified finish value and allocates them to the generators 91 to calculate the adjustment amount. Each power supply command creation unit 53 of the wide-area supply and demand adjustment device 5 transmits the calculated adjustment amount as data h3 (LFC control output command) to the LFC control output command receiving unit 33 of the power supply and demand control device 2 in each area.

本実施形態によれば、インバランスに対して、制御性と経済性を組合わせた調整力の配分、時々刻々の制御の仕上がり状況に応じた調整力の配分を行うので、種々の系統状態に柔軟に対応した調整力の配分を行うことができる。 According to this embodiment, the adjustment power is allocated to deal with imbalances by combining controllability and economy, and the adjustment power is allocated according to the moment-to-moment control completion status, so that the adjustment power can be allocated in a way that flexibly responds to various system conditions.

[3-2.効果]
(1)本実施形態によれば、広域需給調整装置5の制御分担量算出部52は、エリアにおける発電機91が発電することができる余力である調整力に基づき、現在供給されている電力と要求された電力との差分であるインバランスを分配して、エリアのそれぞれの制御分担量、エリアのそれぞれの発電機91ごとの制御分担量のうち少なくとも一方をデータh2(制御分担量)として算出する第一の演算と、電力系統9における現在の電力品質を示すパラメータに基づき、複数のエリアの調整力に応じてインバランスを複数のエリアに配分する制御性にかかる演算、およびインバランスをメリットオーダーに従って複数のエリアに配分する経済性にかかる演算の、それぞれの寄与度が設定された演算により、エリアのそれぞれの制御分担量、エリアのそれぞれの発電機91ごとの制御分担量のうち少なくとも一方をデータh2(制御分担量)として算出する第二の演算の、それぞれの演算の寄与度が設定された演算により、エリアのそれぞれの制御分担量、エリアの発電機91ごとの制御分担量のうち少なくとも一方をデータh2(制御分担量)として算出するので、インバランスに対して、制御性と経済性を組合わせた調整力の配分、時々刻々の制御の仕上がり状況に応じた調整力の配分により、種々の系統状態に柔軟に対応した調整力の配分を行うことができる。
[3-2. Effects]
(1) According to this embodiment, the control share calculation unit 52 of the wide-area supply and demand adjustment device 5 performs a first calculation to distribute an imbalance, which is a difference between currently supplied power and requested power, based on adjustment capacity, which is the surplus capacity that the power generators 91 in the area can generate, and calculate at least one of the control share of each area and the control share of each power generator 91 in the area as data h2 (control share amount); a controllability calculation to distribute the imbalance to a plurality of areas in accordance with the adjustment capacity of the plurality of areas based on a parameter indicating the current power quality in the power system 9; and a calculation to distribute the imbalance to the plurality of areas according to the merit order. The first calculation calculates at least one of the control shares for each area and the control shares for each generator 91 in the area as data h2 (control shares) by a calculation in which the contribution degree of each of the calculations related to the economy is set.Since this allows for the allocation of adjustment power that combines controllability and economy to deal with imbalances, and the allocation of adjustment power according to the moment-to-moment control completion status, it is possible to allocate adjustment power that flexibly responds to various system conditions.

[4.他の実施形態]
変形例を含めた実施形態を説明したが、これらの実施形態は例として提示したものであって、発明の範囲を限定することを意図していない。これらの実施形態は、その他の様々な形態で実施されることが可能であり、発明の要旨を逸脱しない範囲で、種々の省略や置き換え、変更を行うことができる。これらの実施形態やその変形は、発明の範囲や要旨に含まれると同様に、特許請求の範囲に記載された発明とその均等の範囲に含まれるものである。以下は、その一例である。
4. Other embodiments
Although the embodiments including the modified examples have been described, these embodiments are presented as examples and are not intended to limit the scope of the invention. These embodiments can be implemented in various other forms, and various omissions, substitutions, and modifications can be made without departing from the gist of the invention. These embodiments and their modifications are included in the scope of the invention and its equivalents as well as in the scope and gist of the invention. The following is an example.

(1)上記実施形態では、リアルタイムEDC算出部27によりデータg1(リアルタイムEDC値)が算出され、目標値作成部23に送信されるものとした。広域需給調整装置5により経済配分が行われる場合は、リアルタイムEDC算出部27によりデータg1(リアルタイムEDC値)が算出されないものとしてもよい。また、広域需給調整装置5により経済配分が行われる場合であっても、リアルタイムEDC算出部27によエリア固有のデータg1(リアルタイムEDC値)が算出されるようにしてもよい。 (1) In the above embodiment, data g1 (real-time EDC value) is calculated by the real-time EDC calculation unit 27 and transmitted to the target value creation unit 23. When economic allocation is performed by the wide-area supply and demand adjustment device 5, data g1 (real-time EDC value) may not be calculated by the real-time EDC calculation unit 27. Furthermore, even when economic allocation is performed by the wide-area supply and demand adjustment device 5, area-specific data g1 (real-time EDC value) may be calculated by the real-time EDC calculation unit 27.

(2)上記実施形態では、出力変化速度とメリットオーダーを組合わせた演算によりインバランスがエリアごとの発電機91に配分された調整量は、広域需給調整装置5の制御分担量算出部52により算出されるものとした。しかしながら、出力変化速度とメリットオーダーを組合わせた演算によりインバランスがエリアごとの発電機91に配分された調整量は、広域需給調整装置5の制御分担量算出部52に代替して、または重複して電力需給制御装置2の目標値作成部23により算出されるようにしてもよい。 (2) In the above embodiment, the adjustment amount in which the imbalance is allocated to the generators 91 for each area by a calculation combining the output change rate and the merit order is calculated by the control share calculation unit 52 of the wide-area supply and demand adjustment device 5. However, the adjustment amount in which the imbalance is allocated to the generators 91 for each area by a calculation combining the output change rate and the merit order may be calculated by the target value creation unit 23 of the power supply and demand control device 2 instead of or in addition to the control share calculation unit 52 of the wide-area supply and demand adjustment device 5.

(3)上記実施形態では、発電機91は、火力、水力等の発電機であるものとした。しかしながら発電機91は、これに限られない。発電機91は、蓄電池やDR等であってもよい。 (3) In the above embodiment, the generator 91 is a thermal, hydroelectric, or other generator. However, the generator 91 is not limited to this. The generator 91 may be a storage battery, a DR, or the like.

(4)上記実施形態における、自然エネルギー発電設備92は、太陽光発電装置、風力発電装置、海流発電装置、地熱発電装置であってもよい。 (4) In the above embodiment, the natural energy power generation facility 92 may be a solar power generation device, a wind power generation device, an ocean current power generation device, or a geothermal power generation device.

(5)上記実施形態では、入力部21は、受信回路としたがこれに限られない。入力部21は、メモリポートやキーボードによる入力装置でもよい。 (5) In the above embodiment, the input unit 21 is a receiving circuit, but is not limited to this. The input unit 21 may be an input device such as a memory port or a keyboard.

1・・・広域需給調整システム
2・・・電力需給制御装置
21,21a,21b,21n・・・入力部
22,22a,22b,22n・・・出力部
23,23a,23b,23n・・・目標値作成部
24・・・AR算出部
25・・・AR平滑部
26・・・AR配分部
27・・・リアルタイムEDC算出部
31・・・AR送信部
32・・・情報送信部
33・・・LFC制御出力指令受信部
34・・・切替部
5・・・広域需給調整装置
51・・・ネッティング部
52・・・制御分担量算出部
53・・・各電源指令作成部
91,91a,91b,91n・・・発電機
92,92a,92b,92n・・・自然エネルギー発電設備
93・・・検出装置
97,97a,97b,97n・・・信号線
98,98a,98b,98n・・・信号線

Reference Signs List 1: Wide-area supply and demand adjustment system 2: Power supply and demand control device 21, 21a, 21b, 21n: Input unit 22, 22a, 22b, 22n: Output unit 23, 23a, 23b, 23n: Target value creation unit 24: AR calculation unit 25: AR smoothing unit 26: AR allocation unit 27: Real-time EDC calculation unit 31: AR transmission unit 32: Information transmission unit 33: LFC control output command reception unit 34: Switching unit 5: Wide-area supply and demand adjustment device 51: Netting unit 52: Control share calculation unit 53: Each power supply command creation unit 91, 91a, 91b, 91n: Generator 92, 92a, 92b, 92n: Natural energy power generation equipment 93: Detection device 97, 97a, 97b, 97n: Signal line 98, 98a, 98b, 98n: Signal line

Claims (13)

制御対象となる複数のエリアのそれぞれに要求された電力(AR値)に基づき、複数の前記エリア全体の調整量の総量を算出するネッティング部と、
前記ネッティング部により算出された複数の前記エリア全体の調整量の総量を、複数の前記エリアのそれぞれに分配して、複数の前記エリアのそれぞれの制御分担量、複数の前記エリアの発電機ごとの制御分担量のうち少なくとも一方を算出する制御分担量算出部と、
前記制御分担量算出部により算出された複数の前記エリアのそれぞれの制御分担量、複数の前記エリアの発電機ごとの制御分担量のうち少なくとも一方に基づき、複数の前記エリアのそれぞれに対する指令値を作成する各電源指令作成部と、
を有し、
前記制御分担量算出部は、前記エリアにおける発電機が発電することができる余力である調整力に基づき、現在供給されている電力と要求された電力との差分であるインバランスを分配して前記エリアのそれぞれの制御分担量、および前記エリアの発電機ごとの制御分担量のうち少なくとも一方を算出する、広域需給調整装置。
a netting unit that calculates a total amount of adjustment for a plurality of areas based on the power (AR value) required for each of the plurality of areas to be controlled;
a control share calculation unit that distributes the total amount of adjustments for the entire plurality of areas calculated by the netting unit to each of the plurality of areas, and calculates at least one of a control share of each of the plurality of areas and a control share of each generator of the plurality of areas;
a power supply command creation unit that creates a command value for each of the plurality of areas based on at least one of the control share of each of the plurality of areas calculated by the control share calculation unit and the control share of each generator in the plurality of areas;
having
The control share calculation unit is a wide-area supply and demand adjustment device that distributes an imbalance, which is the difference between the currently supplied power and the requested power, based on adjustment capacity, which is the surplus power that can be generated by generators in the area, and calculates at least one of the control share for each area and the control share for each generator in the area.
制御対象となる複数のエリアのそれぞれに要求された電力(AR値)に基づき、複数の前記エリア全体の調整量の総量を算出するネッティング部と、
前記ネッティング部により算出された複数の前記エリア全体の調整量の総量を、複数の前記エリアのそれぞれに分配して、複数の前記エリアのそれぞれの制御分担量、複数の前記エリアの発電機ごとの制御分担量のうち少なくとも一方を算出する制御分担量算出部と、
前記制御分担量算出部により算出された複数の前記エリアのそれぞれの制御分担量、複数の前記エリアの発電機ごとの制御分担量のうち少なくとも一方に基づき、複数の前記エリアのそれぞれに対する指令値を作成する各電源指令作成部と、
を有し、
前記制御分担量算出部は、複数の前記エリアの調整力に応じてインバランスを複数の前記エリアに配分する制御性にかかる演算、およびインバランスをメリットオーダーに従って複数の前記エリアに配分する経済性にかかる演算の、それぞれの寄与度が設定された演算により、複数の前記エリアのそれぞれの制御分担量、複数の前記エリアの発電機ごとの制御分担量のうち少なくとも一方を算出する、広域需給調整装置。
a netting unit that calculates a total amount of adjustment for a plurality of areas based on the power (AR value) required for each of the plurality of areas to be controlled;
a control share calculation unit that distributes the total amount of adjustments for the entire plurality of areas calculated by the netting unit to each of the plurality of areas, and calculates at least one of a control share of each of the plurality of areas and a control share of each generator of the plurality of areas;
a power supply command creation unit that creates a command value for each of the plurality of areas based on at least one of the control share of each of the plurality of areas calculated by the control share calculation unit and the control share of each generator in the plurality of areas;
having
The control share calculation unit calculates at least one of the control share of each of the plurality of areas and the control share of each generator in the plurality of areas by a calculation related to controllability, which allocates the imbalance to the plurality of areas in accordance with the adjustment capacity of the plurality of areas, and a calculation related to economy, which allocates the imbalance to the plurality of areas according to a merit order, in which the contribution levels of each are set.
制御対象となる複数のエリアのそれぞれに要求された電力(AR値)に基づき、複数の前記エリア全体の調整量の総量を算出するネッティング部と、
前記ネッティング部により算出された複数の前記エリア全体の調整量の総量を、複数の前記エリアのそれぞれに分配して、複数の前記エリアのそれぞれの制御分担量、複数の前記エリアの発電機ごとの制御分担量のうち少なくとも一方を算出する制御分担量算出部と、
前記制御分担量算出部により算出された複数の前記エリアのそれぞれの制御分担量、複数の前記エリアの発電機ごとの制御分担量のうち少なくとも一方に基づき、複数の前記エリアのそれぞれに対する指令値を作成する各電源指令作成部と、
を有し、
前記制御分担量算出部は、前記エリアにおける前記発電機の出力変化速度、およびコストメリットに基づく要求であるメリットオーダーの、それぞれの寄与度が設定された演算により、前記エリアのそれぞれの制御分担量、前記エリアのそれぞれの発電機ごとの制御分担量のうち少なくとも一方を算出する、広域需給調整装置。
a netting unit that calculates a total amount of adjustment for a plurality of areas based on the power (AR value) required for each of the plurality of areas to be controlled;
a control share calculation unit that distributes the total amount of adjustments for the entire plurality of areas calculated by the netting unit to each of the plurality of areas, and calculates at least one of a control share of each of the plurality of areas and a control share of each generator of the plurality of areas;
a power supply command creation unit that creates a command value for each of the plurality of areas based on at least one of the control share of each of the plurality of areas calculated by the control share calculation unit and the control share of each generator in the plurality of areas;
having
The control share calculation unit calculates at least one of the control share for each of the areas and the control share for each of the generators in the area by calculation in which the contribution rates of the output change rate of the generators in the area and the merit order, which is a requirement based on cost merit, are set. This is a wide-area supply and demand adjustment device.
制御対象となる複数のエリアのそれぞれに要求された電力(AR値)に基づき、複数の前記エリア全体の調整量の総量を算出するネッティング部と、
前記ネッティング部により算出された複数の前記エリア全体の調整量の総量を、複数の前記エリアのそれぞれに分配して、複数の前記エリアのそれぞれの制御分担量、複数の前記エリアの発電機ごとの制御分担量のうち少なくとも一方を算出する制御分担量算出部と、
前記制御分担量算出部により算出された複数の前記エリアのそれぞれの制御分担量、複数の前記エリアの発電機ごとの制御分担量のうち少なくとも一方に基づき、複数の前記エリアのそれぞれに対する指令値を作成する各電源指令作成部と、
を有し、
前記制御分担量算出部は、
前記エリアにおける前記発電機が発電することができる余力である調整力に基づき、現在供給されている電力と要求された電力との差分であるインバランスを分配して、前記エリアのそれぞれの制御分担量、前記エリアのそれぞれの発電機ごとの制御分担量のうち少なくとも一方を算出する第一の演算と、
電力系統における現在の電力品質を示すパラメータに基づき、複数の前記エリアの調整力に応じてインバランスを複数の前記エリアに配分する制御性にかかる演算、およびインバランスをメリットオーダーに従って複数の前記エリアに配分する経済性にかかる演算の、それぞれの寄与度が設定された演算により、前記エリアのそれぞれの制御分担量、前記エリアの発電機ごとの制御分担量のうち少なくとも一方を算出する第二の演算の、
それぞれの演算の寄与度が設定された演算により、前記エリアのそれぞれの制御分担量、前記エリアの発電機ごとの制御分担量のうち少なくとも一方を算出する、広域需給調整装置。
a netting unit that calculates a total amount of adjustment for a plurality of areas based on the power (AR value) required for each of the plurality of areas to be controlled;
a control share calculation unit that distributes the total amount of adjustments for the entire plurality of areas calculated by the netting unit to each of the plurality of areas, and calculates at least one of a control share of each of the plurality of areas and a control share of each generator of the plurality of areas;
a power supply command creation unit that creates a command value for each of the plurality of areas based on at least one of the control share of each of the plurality of areas calculated by the control share calculation unit and the control share of each generator in the plurality of areas;
having
The control allocation calculation unit
a first calculation for distributing an imbalance, which is a difference between currently supplied power and requested power, based on an adjustment capability, which is a surplus power that the power generators in the area can generate, to calculate at least one of a control allocation amount for each of the areas and a control allocation amount for each of the power generators in the area;
a second calculation for calculating at least one of a control allocation amount for each of the areas and a control allocation amount for each generator in the area by a calculation in which the contribution degree of each of a controllability calculation for allocating the imbalance to a plurality of the areas in accordance with the adjustment capabilities of the plurality of the areas based on a parameter indicating the current power quality in the power system and an economy calculation for allocating the imbalance to the plurality of the areas in accordance with a merit order is set;
A wide-area supply and demand adjusting device that calculates at least one of the control share of each of the areas and the control share of each generator in the area by calculations in which the contribution degree of each calculation is set.
制御対象となる複数のエリアのそれぞれに要求された電力(AR値)に基づき、複数の前記エリア全体の調整量の総量を算出するネッティング部と、a netting unit that calculates a total amount of adjustment for a plurality of areas based on the power (AR value) required for each of the plurality of areas to be controlled;
前記ネッティング部により算出された複数の前記エリア全体の調整量の総量を、複数の前記エリアのそれぞれに分配して、複数の前記エリアのそれぞれの制御分担量、複数の前記エリアの発電機ごとの制御分担量のうち少なくとも一方を算出する制御分担量算出部と、a control share calculation unit that distributes the total amount of adjustments for the entire plurality of areas calculated by the netting unit to each of the plurality of areas, and calculates at least one of a control share of each of the plurality of areas and a control share of each generator of the plurality of areas;
を有し、having
前記制御分担量算出部は、前記エリアにおける発電機が発電することができる余力である調整力に基づき、現在供給されている電力と要求された電力との差分であるインバランスを分配して前記エリアのそれぞれの制御分担量、および前記エリアの発電機ごとの制御分担量のうち少なくとも一方を算出する、広域需給調整装置。The control share calculation unit is a wide-area supply and demand adjustment device that distributes an imbalance, which is the difference between the currently supplied power and the requested power, based on adjustment capacity, which is the surplus power that can be generated by generators in the area, and calculates at least one of the control share for each area and the control share for each generator in the area.
制御対象となる複数のエリアのそれぞれに要求された電力(AR値)に基づき、複数の前記エリア全体の調整量の総量を算出するネッティング部と、a netting unit that calculates a total amount of adjustment for a plurality of areas based on the power (AR value) required for each of the plurality of areas to be controlled;
前記ネッティング部により算出された複数の前記エリア全体の調整量の総量を、複数の前記エリアのそれぞれに分配して、複数の前記エリアのそれぞれの制御分担量、複数の前記エリアの発電機ごとの制御分担量のうち少なくとも一方を算出する制御分担量算出部と、a control share calculation unit that distributes the total amount of adjustments for the entire plurality of areas calculated by the netting unit to each of the plurality of areas, and calculates at least one of a control share of each of the plurality of areas and a control share of each generator of the plurality of areas;
を有し、having
前記制御分担量算出部は、複数の前記エリアの調整力に応じてインバランスを複数の前記エリアに配分する制御性にかかる演算、およびインバランスをメリットオーダーに従って複数の前記エリアに配分する経済性にかかる演算の、それぞれの寄与度が設定された演算により、複数の前記エリアのそれぞれの制御分担量、複数の前記エリアの発電機ごとの制御分担量のうち少なくとも一方を算出する、広域需給調整装置。The control share calculation unit calculates at least one of the control share of each of the plurality of areas and the control share of each generator in the plurality of areas by a calculation related to controllability, which allocates the imbalance to the plurality of areas in accordance with the adjustment capacity of the plurality of areas, and a calculation related to economy, which allocates the imbalance to the plurality of areas according to a merit order, in which the contribution levels of each are set.
制御対象となる複数のエリアのそれぞれに要求された電力(AR値)に基づき、複数の前記エリア全体の調整量の総量を算出するネッティング部と、a netting unit that calculates a total amount of adjustment for a plurality of areas based on the power (AR value) required for each of the plurality of areas to be controlled;
前記ネッティング部により算出された複数の前記エリア全体の調整量の総量を、複数の前記エリアのそれぞれに分配して、複数の前記エリアのそれぞれの制御分担量、複数の前記エリアの発電機ごとの制御分担量のうち少なくとも一方を算出する制御分担量算出部と、a control share calculation unit that distributes the total amount of adjustments for the entire plurality of areas calculated by the netting unit to each of the plurality of areas, and calculates at least one of a control share of each of the plurality of areas and a control share of each generator of the plurality of areas;
を有し、having
前記制御分担量算出部は、前記エリアにおける前記発電機の出力変化速度、およびコストメリットに基づく要求であるメリットオーダーの、それぞれの寄与度が設定された演算により、前記エリアのそれぞれの制御分担量、前記エリアのそれぞれの発電機ごとの制御分担量のうち少なくとも一方を算出する、広域需給調整装置。The control share calculation unit calculates at least one of the control share for each of the areas and the control share for each of the generators in the area by calculation in which the contribution rates of the output change rate of the generators in the area and the merit order, which is a requirement based on cost merit, are set. This is a wide-area supply and demand adjustment device.
制御対象となる複数のエリアのそれぞれに要求された電力(AR値)に基づき、複数の前記エリア全体の調整量の総量を算出するネッティング部と、a netting unit that calculates a total amount of adjustment for a plurality of areas based on the power (AR value) required for each of the plurality of areas to be controlled;
前記ネッティング部により算出された複数の前記エリア全体の調整量の総量を、複数の前記エリアのそれぞれに分配して、複数の前記エリアのそれぞれの制御分担量、複数の前記エリアの発電機ごとの制御分担量のうち少なくとも一方を算出する制御分担量算出部と、a control share calculation unit that distributes the total amount of adjustments for the entire plurality of areas calculated by the netting unit to each of the plurality of areas, and calculates at least one of a control share of each of the plurality of areas and a control share of each generator of the plurality of areas;
を有し、having
前記制御分担量算出部は、The control allocation amount calculation unit
前記エリアにおける前記発電機が発電することができる余力である調整力に基づき、現在供給されている電力と要求された電力との差分であるインバランスを分配して、前記エリアのそれぞれの制御分担量、前記エリアのそれぞれの発電機ごとの制御分担量のうち少なくとも一方を算出する第一の演算と、a first calculation for distributing an imbalance, which is a difference between currently supplied power and requested power, based on an adjustment capability, which is a surplus power that the power generators in the area can generate, to calculate at least one of a control allocation amount for each of the areas and a control allocation amount for each of the power generators in the area;
電力系統における現在の電力品質を示すパラメータに基づき、複数の前記エリアの調整力に応じてインバランスを複数の前記エリアに配分する制御性にかかる演算、およびインバランスをメリットオーダーに従って複数の前記エリアに配分する経済性にかかる演算の、それぞれの寄与度が設定された演算により、前記エリアのそれぞれの制御分担量、前記エリアの発電機ごとの制御分担量のうち少なくとも一方を算出する第二の演算の、a second calculation for calculating at least one of a control allocation amount for each of the areas and a control allocation amount for each generator in the area by a calculation in which the contribution degree of each of a controllability calculation for allocating the imbalance to a plurality of the areas in accordance with the adjustment capabilities of the plurality of the areas based on a parameter indicating the current power quality in the power system and an economy calculation for allocating the imbalance to the plurality of the areas in accordance with a merit order is set;
それぞれの演算の寄与度が設定された演算により、前記エリアのそれぞれの制御分担量、前記エリアの発電機ごとの制御分担量のうち少なくとも一方を算出する、広域需給調整装置。A wide-area supply and demand adjusting device that calculates at least one of the control share of each of the areas and the control share of each generator in the area by calculations in which the contribution degree of each calculation is set.
制御対象となる複数のエリアのそれぞれに要求された電力(AR値)に基づき、複数の前記エリア全体の調整量を算出するネッティング部と、
前記ネッティング部により算出された複数の前記エリア全体の調整量を、複数の前記エリアのそれぞれに分配して、複数の前記エリアのそれぞれの制御分担量、複数の前記エリアの発電機ごとの制御分担量のうち少なくとも一方を算出する制御分担量算出部と、
前記制御分担量算出部により算出された複数の前記エリアのそれぞれの制御分担量、複数の前記エリアの発電機ごとの制御分担量のうち少なくとも一方に基づき、前記エリアのそれぞれに対する指令値を作成する各電源指令作成部と、
を有する広域需給調整装置と、
前記各電源指令作成部により作成された前記指令値に基づき、制御の対象となる前記発電機に対する発電目標値を作成する目標値作成部を有し、前記発電機に対し発電目標値を発電設備に送信する、
複数の電力需給制御装置と、
を有し、
前記電力需給制御装置は、
制御の対象となる前記発電機により構成されたエリアに要求された要求電力(AR値)を算出するAR算出部と、
前記AR算出部により算出された要求電力(AR値)に基づき、発電設備ごとの配分値を算出するAR配分部と、
前記AR配分部により算出された前記配分値と、各電源指令作成部により作成された前記指令値と、を切替えて前記目標値作成部に送信する切替部と、を有し、
前記目標値作成部は、前記切替部から前記配分値が出力された場合、前記各電源指令作成部により作成された前記指令値に代替して前記配分値に基づき、制御の対象となる前記発電機に対する発電目標値を作成する、広域需給調整システム。
a netting unit that calculates an adjustment amount for all of a plurality of areas to be controlled based on the power (AR value) required for each of the plurality of areas;
a control share calculation unit that distributes the adjustment amount for the entirety of the plurality of areas calculated by the netting unit to each of the plurality of areas, and calculates at least one of a control share amount for each of the plurality of areas and a control share amount for each generator in the plurality of areas;
each power supply command creation unit that creates a command value for each of the areas based on at least one of the control share of each of the areas calculated by the control share calculation unit and the control share of each generator in the plurality of areas;
A wide-area supply and demand adjustment device having the
a target value creation unit that creates a power generation target value for the generator to be controlled based on the command value created by each of the power supply command creation units, and transmits the power generation target value to a power generation facility for the generator;
A plurality of power supply and demand control devices;
having
The power supply and demand control device comprises:
an AR calculation unit that calculates a required power (AR value) required for an area constituted by the generator to be controlled;
an AR allocation unit that calculates an allocation value for each power generation facility based on the required power (AR value) calculated by the AR calculation unit;
a switching unit that switches between the allocation value calculated by the AR allocation unit and the command value created by each power command creation unit and transmits the selected command value to the target value creation unit,
When the allocation value is output from the switching unit, the target value creation unit creates a power generation target value for the generator to be controlled based on the allocation value, instead of the command value created by each power supply command creation unit .
コンピュータに、
制御対象となる複数のエリアのそれぞれに要求された電力(AR値)に基づき、複数の前記エリア全体の調整量を算出させるネッティングステップと、
前記ネッティングステップにより算出された複数の前記エリア全体の調整量を、複数の前記エリアのそれぞれに分配して、複数の前記エリアのそれぞれの制御分担量、複数の前記エリアごとの制御分担量のうち少なくとも一方を算出させる制御分担量算出ステップと、
前記制御分担量算出ステップにより算出された複数の前記エリアのそれぞれの制御分担量、複数の前記エリアの発電機ごとの制御分担量のうち少なくとも一方に基づき、複数の前記エリアのそれぞれに対する指令値を作成させる各電源指令作成ステップと、
を実行させ
前記制御分担量算出ステップでは、前記エリアにおける発電機が発電することができる余力である調整力に基づき、現在供給されている電力と要求された電力との差分であるインバランスを分配して前記エリアのそれぞれの制御分担量、および前記エリアの発電機ごとの制御分担量のうち少なくとも一方を算出することをコンピュータに実行させる、広域需給調整装置用コンピュータプログラム。
On the computer,
a netting step of calculating an adjustment amount for all of a plurality of areas based on the power (AR value) required for each of the plurality of areas to be controlled;
a control share calculation step of distributing the adjustment amounts of the entirety of the plurality of areas calculated by the netting step to each of the plurality of areas, and calculating at least one of a control share amount of each of the plurality of areas and a control share amount for each of the plurality of areas;
a power supply command creating step of creating a command value for each of the plurality of areas based on at least one of the control share of each of the plurality of areas calculated in the control share calculating step and the control share of each generator in the plurality of areas;
Run the command ,
The computer program for a wide-area supply and demand adjustment device causes a computer to execute the following in the control share calculation step: distribute the imbalance, which is the difference between the currently supplied power and the requested power, based on the adjustment capacity, which is the surplus power that can be generated by generators in the area, to calculate at least one of the control share for each of the areas and the control share for each generator in the area .
コンピュータに、On the computer,
制御対象となる複数のエリアのそれぞれに要求された電力(AR値)に基づき、複数の前記エリア全体の調整量を算出させるネッティングステップと、a netting step of calculating an adjustment amount for all of a plurality of areas based on the power (AR value) required for each of the plurality of areas to be controlled;
前記ネッティングステップにより算出された複数の前記エリア全体の調整量を、複数の前記エリアのそれぞれに分配して、複数の前記エリアのそれぞれの制御分担量、複数の前記エリアごとの制御分担量のうち少なくとも一方を算出させる制御分担量算出ステップと、a control share calculation step of distributing the adjustment amounts of the entirety of the plurality of areas calculated by the netting step to each of the plurality of areas, and calculating at least one of a control share amount of each of the plurality of areas and a control share amount for each of the plurality of areas;
を実行させ、Run the command,
前記制御分担量算出ステップでは、前記エリアにおける発電機が発電することができる余力である調整力に基づき、現在供給されている電力と要求された電力との差分であるインバランスを分配して前記エリアのそれぞれの制御分担量、および前記エリアの発電機ごとの制御分担量のうち少なくとも一方を算出することをコンピュータに実行させる、広域需給調整装置用コンピュータプログラム。The computer program for a wide-area supply and demand adjustment device causes a computer to execute the following in the control share calculation step: distribute the imbalance, which is the difference between the currently supplied power and the requested power, based on the adjustment capacity, which is the surplus power that can be generated by generators in the area, to calculate at least one of the control share for each of the areas and the control share for each generator in the area.
制御対象となる複数のエリアのそれぞれに要求された電力(AR値)に基づき、複数の前記エリア全体の調整量を算出するネッティング手順と、
前記ネッティング手順により算出された複数の前記エリア全体の調整量を、複数の前記エリアのそれぞれに分配して、複数の前記エリアのそれぞれの制御分担量、複数の前記エリアの発電機ごとの制御分担量のうち少なくとも一方を算出する制御分担量算出手順と、
前記制御分担量算出手順により算出された複数の前記エリアのそれぞれの制御分担量、複数の前記エリアの発電機ごとの制御分担量のうち少なくとも一方に基づき、複数の前記エリアのそれぞれに対する指令値を作成する各電源指令作成手順と、
を有し、
前記制御分担量算出手順では、前記エリアにおける発電機が発電することができる余力である調整力に基づき、現在供給されている電力と要求された電力との差分であるインバランスを分配して前記エリアのそれぞれの制御分担量、および前記エリアの発電機ごとの制御分担量のうち少なくとも一方を算出する、広域需給調整方法。
a netting step for calculating an adjustment amount for all of a plurality of areas to be controlled based on the power (AR value) required for each of the plurality of areas;
a control share calculation step of distributing the adjustment amount for the entire plurality of areas calculated by the netting step to each of the plurality of areas to calculate at least one of a control share amount for each of the plurality of areas and a control share amount for each generator in the plurality of areas;
a power supply command creation step of creating a command value for each of the plurality of areas based on at least one of the control burden amounts for each of the plurality of areas calculated by the control burden calculation step and the control burden amounts for each generator in the plurality of areas;
having
The control share calculation step is a wide-area supply and demand adjustment method in which an imbalance, which is the difference between the currently supplied power and the requested power, is distributed based on adjustment capacity, which is the surplus power that can be generated by generators in the area, to calculate at least one of the control share for each of the areas and the control share for each generator in the area.
制御対象となる複数のエリアのそれぞれに要求された電力(AR値)に基づき、複数の前記エリア全体の調整量を算出するネッティング手順と、a netting step for calculating an adjustment amount for all of a plurality of areas to be controlled based on the power (AR value) required for each of the plurality of areas;
前記ネッティング手順により算出された複数の前記エリア全体の調整量を、複数の前記エリアのそれぞれに分配して、複数の前記エリアのそれぞれの制御分担量、複数の前記エリアの発電機ごとの制御分担量のうち少なくとも一方を算出する制御分担量算出手順と、a control share calculation step of distributing the adjustment amount for the entire plurality of areas calculated by the netting step to each of the plurality of areas to calculate at least one of a control share amount for each of the plurality of areas and a control share amount for each generator in the plurality of areas;
を有し、having
前記制御分担量算出手順では、前記エリアにおける発電機が発電することができる余力である調整力に基づき、現在供給されている電力と要求された電力との差分であるインバランスを分配して前記エリアのそれぞれの制御分担量、および前記エリアの発電機ごとの制御分担量のうち少なくとも一方を算出する、広域需給調整方法。The control share calculation step is a wide-area supply and demand adjustment method in which an imbalance, which is the difference between the currently supplied power and the requested power, is distributed based on adjustment capacity, which is the surplus power that can be generated by generators in the area, to calculate at least one of the control share for each of the areas and the control share for each generator in the area.
JP2021198294A 2021-12-07 2021-12-07 Wide-area supply and demand adjustment device, wide-area supply and demand adjustment system, computer program for wide-area supply and demand adjustment device, and wide-area supply and demand adjustment method Active JP7686546B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021198294A JP7686546B2 (en) 2021-12-07 2021-12-07 Wide-area supply and demand adjustment device, wide-area supply and demand adjustment system, computer program for wide-area supply and demand adjustment device, and wide-area supply and demand adjustment method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021198294A JP7686546B2 (en) 2021-12-07 2021-12-07 Wide-area supply and demand adjustment device, wide-area supply and demand adjustment system, computer program for wide-area supply and demand adjustment device, and wide-area supply and demand adjustment method

Publications (2)

Publication Number Publication Date
JP2023084240A JP2023084240A (en) 2023-06-19
JP7686546B2 true JP7686546B2 (en) 2025-06-02

Family

ID=86771780

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021198294A Active JP7686546B2 (en) 2021-12-07 2021-12-07 Wide-area supply and demand adjustment device, wide-area supply and demand adjustment system, computer program for wide-area supply and demand adjustment device, and wide-area supply and demand adjustment method

Country Status (1)

Country Link
JP (1) JP7686546B2 (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2021097424A (en) 2019-12-13 2021-06-24 株式会社東芝 Power supply/demand controller

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2021097424A (en) 2019-12-13 2021-06-24 株式会社東芝 Power supply/demand controller

Also Published As

Publication number Publication date
JP2023084240A (en) 2023-06-19

Similar Documents

Publication Publication Date Title
AU2019397506B2 (en) Hybrid power plant
CA2908965C (en) Multi-farm wind power generation system
JP7143105B2 (en) Power supply and demand control system, power supply and demand control program, and power supply and demand control method
CN105046395B (en) An intraday rolling plan formulation method for power system with multiple types of new energy
JP6892349B2 (en) Power supply and demand control device, power supply and demand control system, computer program for power supply and demand control, and power supply and demand control method
JP7781538B2 (en) Power supply and demand adjustment system, power supply and demand adjustment method, power supply and demand adjustment program and recording medium thereof
CN113904385A (en) New energy power generation side virtual power plant shared energy storage method and system and storage medium
CN104538990A (en) Automatic generation control method for small power grid isolated network operation
JP7242466B2 (en) Power supply and demand control device, power supply and demand control program, and power supply and demand control method
JP6075116B2 (en) Supply and demand control device
CN115714425A (en) Distributed renewable energy cluster scheduling method and device
Silvente et al. Improved time representation model for the simultaneous energy supply and demand management in microgrids
JP7286566B2 (en) Power supply and demand controller
Zhu et al. Hierarchical cluster coordination control strategy for large-scale wind power based on model predictive control and improved multi-time-scale active power dispatching
CN107292515A (en) A kind of power network multi-agent system dispatching method based on Demand-side scheduling capacity reporting policy game
CN107147105A (en) A Hybrid Optimization and Distributed Coordinated Hybrid Control Method for Multi-Space-Temporal Scales
JP7285053B2 (en) Power supply and demand control device, power supply and demand control system, and power supply and demand control method
CN104239966B (en) Active power distribution network operating method based on electricity cost differentiation
CN103187730B (en) Advanced control method related to automatic generation control
Jin et al. An overview of virtual power plant development from the perspective of market participation
JP2020022320A (en) Power supply-demand control device, power supply-demand control system, computer program for power supply-demand control, and power supply-demand control method
JP7366727B2 (en) Electricity supply and demand control device
JP7686546B2 (en) Wide-area supply and demand adjustment device, wide-area supply and demand adjustment system, computer program for wide-area supply and demand adjustment device, and wide-area supply and demand adjustment method
CN115935619A (en) Day-ahead low-carbon scheduling method and device for active distribution network based on demand response
JP7785657B2 (en) Wide-area supply and demand adjustment device, wide-area supply and demand adjustment system, computer program for wide-area supply and demand adjustment device, and wide-area supply and demand adjustment method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240312

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20250127

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20250204

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20250404

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20250422

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61