Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7695901B2 - Shaft coupling diagnostic device and shaft coupling diagnostic method - Google Patents
[go: Go Back, main page]

JP7695901B2 - Shaft coupling diagnostic device and shaft coupling diagnostic method - Google Patents

Shaft coupling diagnostic device and shaft coupling diagnostic method Download PDF

Info

Publication number
JP7695901B2
JP7695901B2 JP2022008787A JP2022008787A JP7695901B2 JP 7695901 B2 JP7695901 B2 JP 7695901B2 JP 2022008787 A JP2022008787 A JP 2022008787A JP 2022008787 A JP2022008787 A JP 2022008787A JP 7695901 B2 JP7695901 B2 JP 7695901B2
Authority
JP
Japan
Prior art keywords
shaft coupling
wear
acquisition unit
operation sound
prime mover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2022008787A
Other languages
Japanese (ja)
Other versions
JP2023107537A (en
Inventor
ティエンチエン レ
尚 横山
聡志 猪瀬
昭吾 國岡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Construction Machinery Co Ltd
Original Assignee
Hitachi Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Construction Machinery Co Ltd filed Critical Hitachi Construction Machinery Co Ltd
Priority to JP2022008787A priority Critical patent/JP7695901B2/en
Publication of JP2023107537A publication Critical patent/JP2023107537A/en
Application granted granted Critical
Publication of JP7695901B2 publication Critical patent/JP7695901B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Component Parts Of Construction Machinery (AREA)

Description

本発明は、軸継手診断装置及び軸継手診断方法に関する。 The present invention relates to a shaft coupling diagnostic device and a shaft coupling diagnostic method.

建設機械には、原動機(例えばエンジン)の動力を出力する駆動軸(例えばエンジンの出力軸)と、当該動力が原動機の駆動軸から伝達されることにより駆動される従動機(例えば油圧ポンプ)の従動軸(例えば油圧ポンプの回転軸)とを連結する軸継手が搭載されている。 Construction machinery is equipped with a shaft coupling that connects a drive shaft (e.g., the output shaft of an engine) that outputs the power of a prime mover (e.g., an engine) to a driven shaft (e.g., the rotating shaft of a hydraulic pump) of a driven mover (e.g., a hydraulic pump) that is driven by the power transmitted from the drive shaft of the prime mover.

建設機械に搭載される軸継手としては、原動機の駆動軸から出力された動力を、弾性体を介して従動機の従動軸に伝達する軸継手(「弾性体軸継手」とも称する)が多い。この種の軸継手は、駆動軸の中心軸線と従動軸の中心軸線とのずれや、原動機のトルク変動等を、弾性体の弾性変形によって吸収することができるので、原動機と従動機との間で円滑なトルクの伝達が可能となる。 Many of the shaft couplings installed on construction machinery are shaft couplings that transmit the power output from the drive shaft of the prime mover to the driven shaft of the driven machine via an elastic body (also called "elastic shaft couplings"). This type of shaft coupling can absorb misalignment between the central axis of the drive shaft and the central axis of the driven shaft, as well as torque fluctuations in the prime mover, by elastic deformation of the elastic body, allowing for smooth torque transmission between the prime mover and the driven machine.

軸継手では、経年劣化、疲労による変形等に伴って、弾性体が摩耗する。弾性体が摩耗すると、原動機と従動機との間で円滑なトルクの伝達が難しくなったり、場合によっては軸折損等の故障が発生したりする可能性がある。よって、軸継手の摩耗状況を診断して、適切なタイミングで弾性体を交換することが望ましい。 In shaft couplings, the elastic body wears out due to aging and deformation caused by fatigue. When the elastic body wears out, it becomes difficult to transmit torque smoothly between the prime mover and the driven machine, and in some cases, failures such as shaft breakage may occur. Therefore, it is advisable to diagnose the wear condition of the shaft coupling and replace the elastic body at the appropriate time.

軸継手の摩耗状況の診断方法として、原動機と従動機との連結を解除して軸継手を分解し弾性体を診断する方法が考えられる。しかし、この診断方法は、原動機と従動機との連結を解除することに伴い、例えば、従動機に取り付けられた油圧配管等を取り外す作業、診断後に当該配管を取り付ける作業、及び、作動油の処理作業等の、煩雑な作業を行う必要がある。加えて、この診断方法は、従動機を吊り上げるクレーン設備を準備する必要があると共に、作業場所も制限される。よって、この診断方法は、軸継手の摩耗状況を精確に診断できるとしても、作業性及びコスト等の観点から改善の余地がある。 One possible method for diagnosing the wear condition of a shaft coupling is to disconnect the prime mover from the driven machine, disassemble the shaft coupling, and diagnose the elastic body. However, this diagnostic method requires the disconnection of the prime mover from the driven machine, which requires cumbersome work, such as removing hydraulic piping attached to the driven machine, reattaching the piping after diagnosis, and disposing of hydraulic oil. In addition, this diagnostic method requires the preparation of crane equipment to hoist the driven machine, and the work location is limited. Therefore, even if this diagnostic method can accurately diagnose the wear condition of the shaft coupling, there is room for improvement in terms of workability, cost, etc.

これに対し、特許文献1には、軸継手の弾性体の外周面に対して診断用の突起を設けて、弾性体の寿命を診断する方法が開示されている。特許文献1に開示の方法では、弾性体が摩耗すると、弾性体に係合された駆動軸側ブロックと従動軸側ブロックとが接近し当該突起を押圧することを利用して、当該突起が破断しているかを視認することによって、弾性体の交換が必要か否かを判定する。 In response to this, Patent Document 1 discloses a method of diagnosing the lifespan of an elastic body of a shaft coupling by providing a diagnostic protrusion on the outer circumferential surface of the elastic body. In the method disclosed in Patent Document 1, when the elastic body wears out, the drive shaft side block and the driven shaft side block engaged with the elastic body approach each other and press against the protrusion. By utilizing this, it is possible to visually check whether the protrusion has broken, thereby determining whether the elastic body needs to be replaced.

また、特許文献2には、設定温度以上になると所定形状に変形するように設計・製作された形状記憶合金製の回転片を軸継手に設けて、回転片の変形程度を測定することによって、軸継手の劣化を診断する方法が開示されている。特許文献2に開示の方法では、軸継手内の摺動部がシール等の劣化や給油不足により潤滑不良となり発熱する現象を利用することによって、当該摺動部が異常に温度上昇したかを検出する。 Patent Document 2 also discloses a method for diagnosing deterioration of a shaft coupling by providing the shaft coupling with a rotating piece made of a shape memory alloy designed and manufactured to deform into a specified shape when the temperature exceeds a set temperature, and measuring the degree of deformation of the rotating piece. The method disclosed in Patent Document 2 detects whether the sliding part in the shaft coupling has experienced an abnormal rise in temperature by utilizing the phenomenon in which the sliding part generates heat due to poor lubrication caused by deterioration of seals or insufficient oil supply.

特開2015-72032号公報JP 2015-72032 A 特開平8-284967号公報Japanese Patent Application Publication No. 8-284967

しかしながら、これらの特許文献に開示の方法では、何れも、軸継手の摩耗状況が深刻な段階に至った場合に限って、例えば、弾性体に係合された駆動軸側ブロックと従動軸側ブロックとが接近する程に深刻な段階に至った場合に限って、軸継手の摩耗状況を診断することができる。これらの特許文献に開示の方法では、軸継手の摩耗に対する対策を講じる前に、軸折損等の故障が発生する可能性がある。よって、軸継手の摩耗状況を容易且つ精細に診断する技術が求められている。 However, in all of the methods disclosed in these patent documents, the wear condition of the shaft coupling can be diagnosed only when the wear condition of the shaft coupling has reached a serious stage, for example, when the wear condition has reached a serious stage where the drive shaft side block and the driven shaft side block engaged with the elastic body have come close to each other. With the methods disclosed in these patent documents, there is a possibility that a failure such as shaft breakage will occur before measures can be taken to prevent wear of the shaft coupling. Therefore, there is a demand for technology that can easily and precisely diagnose the wear condition of the shaft coupling.

上記事情に鑑みて、本発明は、軸継手の摩耗状況を容易且つ精細に診断することを目的とする。 In view of the above, the present invention aims to easily and precisely diagnose the wear condition of shaft couplings.

上記課題を解決するために、本発明に係る軸継手診断装置は、原動機の動力を出力する駆動軸と、前記動力が前記駆動軸から伝達されることにより駆動される従動機の従動軸とを連結する軸継手の摩耗状況を診断する軸継手診断装置であって、前記原動機の回転数を変化させた場合の前記原動機の稼働音を取得する稼働音取得部と、前記稼働音取得部により取得された前記稼働音に含まれる異常音成分を特徴量として抽出する特徴量抽出部と、前記異常音成分と前記摩耗状況との関係を示す摩耗モデルを取得する摩耗モデル取得部と、前記特徴量抽出部により抽出された前記異常音成分と、前記摩耗モデル取得部により取得された前記摩耗モデルとに基づいて、前記摩耗状況を診断する摩耗状況診断部と、を備えることを特徴とする。 In order to solve the above problems, the shaft coupling diagnostic device according to the present invention is a shaft coupling diagnostic device that diagnoses the wear condition of a shaft coupling that connects a drive shaft that outputs the power of a prime mover and a driven shaft of a driven machine that is driven by the power transmitted from the drive shaft, and is characterized by having an operation sound acquisition unit that acquires the operation sound of the prime mover when the rotation speed of the prime mover is changed, a feature extraction unit that extracts abnormal sound components contained in the operation sound acquired by the operation sound acquisition unit as features, a wear model acquisition unit that acquires a wear model that shows the relationship between the abnormal sound components and the wear condition, and a wear condition diagnosis unit that diagnoses the wear condition based on the abnormal sound components extracted by the feature extraction unit and the wear model acquired by the wear model acquisition unit.

本発明に係る軸継手診断方法は、原動機の動力を出力する駆動軸と、前記動力が前記駆動軸から伝達されることにより駆動される従動機の従動軸とを連結する軸継手の摩耗状況を診断する軸継手診断方法であって、前記原動機の回転数を変化させた場合の前記原動機の稼働音を取得することと、取得された前記稼働音に含まれる異常音成分を特徴量として抽出することと、前記異常音成分と前記摩耗状況との関係を示す摩耗モデルと、前記特徴量として抽出された前記異常音成分とに基づいて、前記摩耗状況を診断することと、を含むことを特徴とする。 The shaft coupling diagnosis method according to the present invention is a shaft coupling diagnosis method for diagnosing the wear condition of a shaft coupling that connects a drive shaft that outputs the power of a prime mover and a driven shaft of a driven machine that is driven by the power transmitted from the drive shaft, and is characterized by including the steps of: acquiring the operating sound of the prime mover when the rotation speed of the prime mover is changed; extracting abnormal sound components contained in the acquired operating sound as features; and diagnosing the wear condition based on a wear model that shows the relationship between the abnormal sound components and the wear condition and the abnormal sound components extracted as the features.

本発明によれば、軸継手の摩耗状況を容易且つ精細に診断することができる。 The present invention makes it possible to easily and precisely diagnose the wear condition of a shaft coupling.

軸継手の構成を模式的に示す分解斜視図。FIG. 2 is an exploded perspective view showing a schematic configuration of a shaft coupling. 実施形態1の軸継手診断装置の機能的構成を示すブロック図。FIG. 2 is a block diagram showing a functional configuration of the shaft coupling diagnosis device according to the first embodiment. 図3(a)は軸継手の摩耗が進行前である場合の原動機の稼働音を示す図、図3(b)は軸継手の摩耗がある程度進行した場合の原動機の稼働音を示す図。FIG. 3( a ) is a diagram showing the operating noise of the prime mover when wear of the shaft coupling has not yet progressed, and FIG. 3( b ) is a diagram showing the operating noise of the prime mover when wear of the shaft coupling has progressed to a certain extent. 摩耗モデルを説明する図。FIG. 1 is a diagram illustrating a wear model. 図2に示す軸継手診断装置を用いた軸継手診断方法を示すフローチャート。3 is a flowchart showing a shaft coupling diagnostic method using the shaft coupling diagnostic device shown in FIG. 2 . 実施形態2の軸継手診断装置の機能的構成を示すブロック図。FIG. 6 is a block diagram showing a functional configuration of a shaft coupling diagnosis device according to a second embodiment. 実施形態3の軸継手診断装置の機能的構成を示すブロック図。FIG. 11 is a block diagram showing a functional configuration of a shaft coupling diagnosis device according to a third embodiment. 実施形態4の軸継手診断装置の機能的構成を示すブロック図。FIG. 13 is a block diagram showing a functional configuration of a shaft coupling diagnosis device according to a fourth embodiment.

以下、本発明の実施形態について図面を用いて説明する。各実施形態において同一の符号を付された構成については、特に言及しない限り、各実施形態において同様の機能を有し、その説明を省略する。 Embodiments of the present invention will be described below with reference to the drawings. Components with the same reference numerals in each embodiment have the same functions in each embodiment unless otherwise specified, and the description thereof will be omitted.

[実施形態1]
図1~図5を用いて実施形態1の軸継手診断装置1について説明する。
[Embodiment 1]
A shaft coupling diagnosis device 1 according to a first embodiment will be described with reference to FIGS. 1 to 5. FIG.

図1は、軸継手80の構成を模式的に示す分解斜視図である。 Figure 1 is an exploded perspective view showing the configuration of the shaft coupling 80.

軸継手80は、原動機60(例えばエンジン)の動力を出力する駆動軸61(例えばエンジンの出力軸)と、当該動力が駆動軸61から伝達されることにより駆動される従動機70(例えば油圧ポンプ)の従動軸71(例えば油圧ポンプの回転軸)とを連結する軸継手である。 The shaft coupling 80 is a shaft coupling that connects a drive shaft 61 (e.g., the output shaft of an engine) that outputs the power of a prime mover 60 (e.g., an engine) to a driven shaft 71 (e.g., the rotating shaft of a hydraulic pump) of a driven machine 70 (e.g., a hydraulic pump) that is driven by the power transmitted from the drive shaft 61.

図1に示す軸継手80は、原動機60の駆動軸61から出力された動力を、弾性体85を介して従動機70の従動軸71に伝達する弾性体軸継手である。軸継手80は、駆動軸61の中心軸線と従動軸71の中心軸線とのずれや、原動機60のトルク変動等を、弾性体85の弾性変形によって吸収する。軸継手80は、油圧ショベル等の建設機械に搭載された弾性体軸継手である。 The shaft coupling 80 shown in FIG. 1 is an elastic shaft coupling that transmits the power output from the drive shaft 61 of the prime mover 60 to the driven shaft 71 of the driven machine 70 via an elastic body 85. The shaft coupling 80 absorbs the misalignment between the central axis of the drive shaft 61 and the central axis of the driven shaft 71, torque fluctuations of the prime mover 60, etc., by elastic deformation of the elastic body 85. The shaft coupling 80 is an elastic shaft coupling mounted on a construction machine such as a hydraulic excavator.

軸継手80は、駆動軸側ブロック81と、ハブ部材82と、従動軸側ブロック83と、弾性体85とを含む。 The shaft coupling 80 includes a drive shaft side block 81, a hub member 82, a driven shaft side block 83, and an elastic body 85.

駆動軸側ブロック81は、略扇形のブロック体として形成される。複数の駆動軸側ブロック81は、駆動軸61に設けられたフライホイール62に対して周方向に間隔をあけてねじ等により固定されている。駆動軸側ブロック81の外径側の周方向両側には、それぞれ周方向に延びる鍔部81aが設けられている。鍔部81aは、弾性体85の径方向の変位を規制する。 The drive shaft side block 81 is formed as a roughly sector-shaped block body. The multiple drive shaft side blocks 81 are fixed to the flywheel 62 provided on the drive shaft 61 at intervals in the circumferential direction by screws or the like. A flange portion 81a extending in the circumferential direction is provided on both circumferential sides of the outer diameter side of the drive shaft side block 81. The flange portion 81a regulates the radial displacement of the elastic body 85.

ハブ部材82は、厚肉の円筒体として形成される。ハブ部材82は、従動軸71の外周面に対してスプライン結合により固定されている。 The hub member 82 is formed as a thick-walled cylinder. The hub member 82 is fixed to the outer circumferential surface of the driven shaft 71 by a spline connection.

従動軸側ブロック83は、略扇形のブロック体として形成される。複数の従動軸側ブロック83は、ハブ部材82の外周面に対して、周方向に間隔をあけてねじ等により固定されている。従動軸側ブロック83は、ハブ部材82の外周面から径方向外側に突出するように設けられている。従動軸側ブロック83の外径側の周方向両側には、それぞれ周方向に延びる鍔部83aが設けられている。鍔部83aは、弾性体85の径方向の変位を規制する。 The driven shaft side block 83 is formed as a generally sector-shaped block body. The multiple driven shaft side blocks 83 are fixed to the outer circumferential surface of the hub member 82 at intervals in the circumferential direction by screws or the like. The driven shaft side blocks 83 are provided so as to protrude radially outward from the outer circumferential surface of the hub member 82. A flange portion 83a extending in the circumferential direction is provided on both circumferential sides of the outer diameter side of the driven shaft side block 83. The flange portion 83a restricts the radial displacement of the elastic body 85.

弾性体85は、ゴム等により厚肉の円筒体として形成される。弾性体85の内周面は、ハブ部材82を収容する収容部86を画定する。弾性体85の外周面には、駆動軸側ブロック81と係合する駆動軸側係合部87と、従動軸側ブロック83と係合する従動軸側係合部88とが、周方向に間隔をあけて交互に形成されている。駆動軸側係合部87及び従動軸側係合部88は、弾性体85の外周面から径方向内側に向かって窪む溝状に形成されている。駆動軸側係合部87と従動軸側係合部88との間の部分は、駆動軸側ブロック81と従動軸側ブロック83とによって周方向に圧縮される圧縮部89である。 The elastic body 85 is formed as a thick cylindrical body made of rubber or the like. The inner peripheral surface of the elastic body 85 defines a housing portion 86 that houses the hub member 82. On the outer peripheral surface of the elastic body 85, a drive shaft side engaging portion 87 that engages with the drive shaft side block 81 and a driven shaft side engaging portion 88 that engages with the driven shaft side block 83 are formed alternately at intervals in the circumferential direction. The drive shaft side engaging portion 87 and the driven shaft side engaging portion 88 are formed as grooves recessed radially inward from the outer peripheral surface of the elastic body 85. The portion between the drive shaft side engaging portion 87 and the driven shaft side engaging portion 88 is a compression portion 89 that is compressed in the circumferential direction by the drive shaft side block 81 and the driven shaft side block 83.

弾性体85の圧縮部89は、経年劣化、疲労による変形等に伴って摩耗し、周方向の厚さが減少する。すると、駆動軸側ブロック81の鍔部81aと従動軸側ブロック83の鍔部83aとが接近する。弾性体85の圧縮部89は、更に摩耗し、周方向の厚さが減少する。このように弾性体85の摩耗が進行していくと、やがて鍔部81aと鍔部83aとが接触してしまい、軸折損等の故障が発生してしまう。よって、軸継手80の摩耗状況を診断することは重要であり、適切なタイミングで弾性体85を交換することが望ましい。 The compression portion 89 of the elastic body 85 wears due to aging, deformation due to fatigue, etc., and the thickness in the circumferential direction decreases. Then, the flange portion 81a of the drive shaft side block 81 and the flange portion 83a of the driven shaft side block 83 approach each other. The compression portion 89 of the elastic body 85 wears further and the thickness in the circumferential direction decreases. If the wear of the elastic body 85 progresses in this way, the flange portion 81a and the flange portion 83a will eventually come into contact with each other, causing a failure such as shaft breakage. Therefore, it is important to diagnose the wear condition of the shaft coupling 80, and it is desirable to replace the elastic body 85 at the appropriate time.

図2は、実施形態1の軸継手診断装置1の機能的構成を示すブロック図である。 Figure 2 is a block diagram showing the functional configuration of the shaft coupling diagnosis device 1 of embodiment 1.

軸継手診断装置1は、軸継手80の摩耗状況を診断する装置である。具体的には、軸継手診断装置1は、軸継手80に連結された原動機60の稼働音から、軸継手80に含まれる弾性体85の摩耗状況を診断する装置である。 The shaft coupling diagnostic device 1 is a device that diagnoses the wear condition of the shaft coupling 80. Specifically, the shaft coupling diagnostic device 1 is a device that diagnoses the wear condition of the elastic body 85 included in the shaft coupling 80 from the operating sound of the prime mover 60 connected to the shaft coupling 80.

軸継手診断装置1は、スマートフォン、タブレット端末、携帯電話、PDA(Personal Data Assistant)等の携帯端末10に設けられている。携帯端末10は、演算処理を行うCPU(Central processing unit)と、演算処理手順を記述したプログラムを記憶する二次記憶装置としてのROM(Read only memory)と、演算経過や一時的な制御変数を記憶する一次記憶装置としてのRAM(Random access memory)とを備える。軸継手診断装置1は、携帯端末10に備えられた上記のCPU等によって構成され、CPUがプログラムを実行することによって、軸継手診断装置1の各種機能を実現する。 The shaft coupling diagnostic device 1 is provided in a mobile terminal 10 such as a smartphone, tablet terminal, mobile phone, or PDA (Personal Data Assistant). The mobile terminal 10 includes a CPU (Central Processing Unit) that performs arithmetic processing, a ROM (Read Only Memory) as a secondary storage device that stores a program describing the arithmetic processing procedure, and a RAM (Random Access Memory) as a primary storage device that stores the calculation process and temporary control variables. The shaft coupling diagnostic device 1 is configured by the above-mentioned CPU and other components provided in the mobile terminal 10, and the various functions of the shaft coupling diagnostic device 1 are realized by the CPU executing the program.

軸継手診断装置1は、機械情報取得部11と、稼働音取得部12と、特徴量抽出部13と、摩耗モデル取得部14と、摩耗状況診断部15と、診断結果出力部16とを備える。 The shaft coupling diagnostic device 1 includes a machine information acquisition unit 11, an operating sound acquisition unit 12, a feature extraction unit 13, a wear model acquisition unit 14, a wear condition diagnosis unit 15, and a diagnosis result output unit 16.

機械情報取得部11は、診断対象の軸継手80の情報を取得する。具体的には、機械情報取得部11は、軸継手80の構造に応じて定められた軸継手80の機種を特定する情報を取得する。機械情報取得部11は、携帯端末10の画面からユーザが軸継手80又は建設機械の機種を入力することによって、軸継手80の機種を特定する情報を取得することができる。 The machine information acquisition unit 11 acquires information on the shaft coupling 80 to be diagnosed. Specifically, the machine information acquisition unit 11 acquires information that identifies the model of the shaft coupling 80, which is determined according to the structure of the shaft coupling 80. The machine information acquisition unit 11 can acquire information that identifies the model of the shaft coupling 80 by the user inputting the model of the shaft coupling 80 or the construction machine from the screen of the mobile terminal 10.

稼働音取得部12は、携帯端末10に内蔵されたマイクによって構成される。稼働音取得部12は、原動機60の稼働音を取得(録音)する。稼働音取得部12は、取得された稼働音を特徴量抽出部13に出力する。原動機60の稼働音を取得する位置は、特に限定されないが、軸継手80が搭載された建設機械の近い位置であることが好ましい。 The operation sound acquisition unit 12 is composed of a microphone built into the mobile terminal 10. The operation sound acquisition unit 12 acquires (records) the operation sound of the prime mover 60. The operation sound acquisition unit 12 outputs the acquired operation sound to the feature extraction unit 13. The position from which the operation sound of the prime mover 60 is acquired is not particularly limited, but it is preferable that it is a position close to the construction machine on which the shaft coupling 80 is mounted.

稼働音取得部12は、原動機60の回転数を変化させた場合の原動機60の稼働音を取得する。具体的には、稼働音取得部12は、原動機60が最低回転数にて稼働中(ローアイドル中)の建設機械をキーオフした場合の稼働音を取得する。原動機60が最低回転数にて稼働中の建設機械をキーオフした場合には、原動機60の回転数は最低回転数から0に変化する。この場合、原動機60の稼働音の振幅は、軸継手80の摩耗状況に応じて異なる波形を示す。原動機60の稼働音の詳細については、図3(a)及び図3(b)を用いて後述する。 The operation sound acquisition unit 12 acquires the operation sound of the prime mover 60 when the rotation speed of the prime mover 60 is changed. Specifically, the operation sound acquisition unit 12 acquires the operation sound when the key is turned off on a construction machine in which the prime mover 60 is operating at the minimum rotation speed (low idling). When the key is turned off on a construction machine in which the prime mover 60 is operating at the minimum rotation speed, the rotation speed of the prime mover 60 changes from the minimum rotation speed to 0. In this case, the amplitude of the operation sound of the prime mover 60 shows a waveform that differs depending on the wear condition of the shaft coupling 80. Details of the operation sound of the prime mover 60 will be described later using Figures 3(a) and 3(b).

特徴量抽出部13は、稼働音取得部12により取得された稼働音に含まれる異常音成分を、軸継手80の摩耗状況を特定するための特徴量として抽出する。異常音成分は、軸継手80が摩耗している状況において原動機60の回転数を変化させたことによって発生し得る。具体的には、特徴量抽出部13は、建設機械をキーオフしてから原動機60の稼働音の振幅が収束するまでの期間において所定の閾値を超えた稼働音の振幅を、異常音成分として抽出する。異常音成分を含む稼働音は、建設機械をキーオフしてから原動機60の稼働音の振幅が収束するまでの期間において「カタカタ」と聞こえる音である。特徴量抽出部13は、抽出された異常音成分を摩耗状況診断部15に出力する。異常音成分の詳細については、図3(a)及び図3(b)を用いて後述する。 The feature extraction unit 13 extracts abnormal sound components contained in the operation sound acquired by the operation sound acquisition unit 12 as features for identifying the wear state of the shaft coupling 80. The abnormal sound components may be generated by changing the rotation speed of the prime mover 60 when the shaft coupling 80 is worn. Specifically, the feature extraction unit 13 extracts the amplitude of the operation sound that exceeds a predetermined threshold value during the period from when the construction machine is keyed off until the amplitude of the operation sound of the prime mover 60 converges as the abnormal sound component. The operation sound that includes the abnormal sound component is a sound that sounds like "clack" during the period from when the construction machine is keyed off until the amplitude of the operation sound of the prime mover 60 converges. The feature extraction unit 13 outputs the extracted abnormal sound components to the wear state diagnosis unit 15. Details of the abnormal sound components will be described later with reference to Figures 3(a) and 3(b).

摩耗モデル取得部14は、原動機60の稼働音の異常音成分と軸継手80の摩耗状況との関係を示す摩耗モデルを取得する。具体的には、摩耗モデル取得部14は、軸継手80に含まれる弾性体85の摩耗量と当該異常音成分の発生間隔(時間間隔)との関係を示す摩耗モデルを取得する。摩耗モデルは、弾性体85の摩耗量と異常音成分の発生間隔との関係を記述する数理モデルであってもよい。摩耗モデル取得部14は、機械情報取得部11により取得された軸継手80の情報に基づいて、当該情報によって特定される軸継手80の機種に応じた摩耗モデルを取得する。摩耗モデル取得部14は、予めデータベース等に登録された摩耗モデルを読み込むことによって摩耗モデルを取得してもよい。摩耗モデル取得部14は、予め記憶された実験データ等から摩耗モデルを生成することによって摩耗モデルを取得してもよい。摩耗モデル取得部14は、取得された摩耗モデルを摩耗状況診断部15に出力する。摩耗モデルの詳細については、図4を用いて後述する。 The wear model acquisition unit 14 acquires a wear model that indicates the relationship between the abnormal sound components of the operating sound of the prime mover 60 and the wear state of the shaft coupling 80. Specifically, the wear model acquisition unit 14 acquires a wear model that indicates the relationship between the amount of wear of the elastic body 85 included in the shaft coupling 80 and the occurrence interval (time interval) of the abnormal sound component. The wear model may be a mathematical model that describes the relationship between the amount of wear of the elastic body 85 and the occurrence interval of the abnormal sound component. Based on the information of the shaft coupling 80 acquired by the machine information acquisition unit 11, the wear model acquisition unit 14 acquires a wear model corresponding to the model of the shaft coupling 80 specified by the information. The wear model acquisition unit 14 may acquire the wear model by reading a wear model registered in advance in a database or the like. The wear model acquisition unit 14 may acquire the wear model by generating a wear model from experimental data or the like stored in advance. The wear model acquisition unit 14 outputs the acquired wear model to the wear state diagnosis unit 15. Details of the wear model will be described later with reference to FIG. 4.

摩耗状況診断部15は、特徴量抽出部13により抽出された異常音成分と、摩耗モデル取得部14により取得された摩耗モデルとに基づいて、軸継手80の摩耗状況を診断する。具体的には、摩耗状況診断部15は、特徴量抽出部13により抽出された異常音成分の発生間隔を、摩耗モデル取得部14により取得された摩耗モデルに適用することによって、弾性体85の摩耗量を推定する。摩耗状況診断部15は、推定された摩耗量に応じて、軸継手80の危険度を判定してもよい。摩耗状況診断部15は、摩耗量の推定結果や危険度の判定結果を含む摩耗状況の診断結果を、診断結果出力部16に出力する。摩耗状況の診断結果の出力方式は、摩耗量の値を示す数字を出力する方式であってもよいし、横軸(X軸)に時間を表し縦軸(Y軸)に摩耗量の指標を表すグラフを出力する方式であってもよい。グラフを出力する方式の場合、グラフの表示形式は、特に限定されず、例えば折れ線グラフや棒グラフ等の形式であってもよい。グラフを出力する方式の場合、時間の経過に応じた摩耗の進行を予測し易くすることができる。通常は時間の経過に伴い摩耗に起因する故障リスクが高まるので、例えば、経過時間の近い順から「交換推奨時期」、「交換必須」、「要点検」といったテキストメッセージの通知をすることが考えられる。あるいはテキストメッセージに限られず、故障リスクの進行に応じて行燈表示(青・黄・赤)のアイコンでの通知であってもよい。通知のタイミングは任意に設定され得る。 The wear condition diagnosis unit 15 diagnoses the wear condition of the shaft coupling 80 based on the abnormal sound components extracted by the feature extraction unit 13 and the wear model acquired by the wear model acquisition unit 14. Specifically, the wear condition diagnosis unit 15 estimates the wear amount of the elastic body 85 by applying the occurrence interval of the abnormal sound components extracted by the feature extraction unit 13 to the wear model acquired by the wear model acquisition unit 14. The wear condition diagnosis unit 15 may determine the risk of the shaft coupling 80 according to the estimated wear amount. The wear condition diagnosis unit 15 outputs the diagnosis result of the wear condition, including the estimation result of the wear amount and the judgment result of the risk level, to the diagnosis result output unit 16. The output method of the diagnosis result of the wear condition may be a method of outputting a number indicating the value of the wear amount, or a method of outputting a graph showing time on the horizontal axis (X axis) and an index of the wear amount on the vertical axis (Y axis). In the case of the method of outputting a graph, the display format of the graph is not particularly limited and may be, for example, a line graph, a bar graph, or the like. In the case of a method that outputs a graph, it is easy to predict the progress of wear over time. Since the risk of failure due to wear usually increases over time, it is possible to notify the user with text messages such as "Replacement recommended", "Replacement required", and "Inspection required" in order of the most recent elapsed time. Alternatively, the notification is not limited to text messages, and may be an icon display (blue, yellow, red) according to the progression of the risk of failure. The timing of the notification can be set as desired.

診断結果出力部16は、摩耗状況診断部15により出力された診断結果を出力する。例えば、診断結果出力部16は、当該診断結果を携帯端末10の画面に出力し、当該診断結果を携帯端末10の画面に表示することにより、当該診断結果をユーザに報知する。また、診断結果出力部16は、携帯端末10と通信可能に接続されたサーバ装置30に送信してもよい。 The diagnostic result output unit 16 outputs the diagnostic result output by the wear condition diagnosis unit 15. For example, the diagnostic result output unit 16 outputs the diagnostic result to the screen of the mobile terminal 10 and notifies the user of the diagnostic result by displaying the diagnostic result on the screen of the mobile terminal 10. The diagnostic result output unit 16 may also transmit the diagnostic result to a server device 30 that is communicably connected to the mobile terminal 10.

図3(a)は、軸継手80の摩耗が進行前である場合の原動機60の稼働音を示す図である。図3(b)は、軸継手80の摩耗がある程度進行した場合の原動機60の稼働音を示す図である。図3(a)及び図3(b)の各縦軸は、原動機60の稼働音の振幅を示す。図3(a)及び図3(b)の各横軸は、時間を示す。 Figure 3(a) is a diagram showing the operating noise of the prime mover 60 when wear of the shaft coupling 80 has not yet progressed. Figure 3(b) is a diagram showing the operating noise of the prime mover 60 when wear of the shaft coupling 80 has progressed to a certain extent. The vertical axis of each of Figures 3(a) and 3(b) indicates the amplitude of the operating noise of the prime mover 60. The horizontal axis of each of Figures 3(a) and 3(b) indicates time.

軸継手80の摩耗が進行前である場合、図3(a)に示すように、建設機械のキーオフの時点T1よりも前の期間において、原動機60の稼働音の振幅は、ノイズ等による変動を除けば概ね一定である。キーオフの時点T1以降、原動機60の稼働音の振幅は、徐々に低下していき、時点T2において収束する。時点T2以降、原動機60の稼働音の振幅は、収束したままで概ね一定である。原動機60の稼働音の振幅が収束した時点T2は、当該稼働音が消音した時点を示している。 When wear of the shaft coupling 80 has not yet progressed, as shown in FIG. 3(a), in the period prior to time T1 when the construction machine is keyed off, the amplitude of the operation sound of the prime mover 60 is generally constant, except for fluctuations due to noise, etc. After time T1 when the key is turned off, the amplitude of the operation sound of the prime mover 60 gradually decreases and converges at time T2. After time T2, the amplitude of the operation sound of the prime mover 60 remains converged and generally constant. Time T2 when the amplitude of the operation sound of the prime mover 60 converges indicates the time when the operation sound is silenced.

稼働音取得部12は、建設機械をキーオフした時点T1から、原動機60の稼働音の振幅が収束する時点T2以後に所定時間経過した時点T3までの期間Teを含む期間に亘って、原動機60の稼働音を取得する。 The operation sound acquisition unit 12 acquires the operation sound of the prime mover 60 over a period Te including a time period T1 from the time when the construction machine is keyed off to a time period T3 that is a predetermined time after a time period T2 at which the amplitude of the operation sound of the prime mover 60 converges.

軸継手80の摩耗がある程度進行した場合、図3(b)に示すように、建設機械のキーオフの時点T1よりも前の期間において、原動機60の稼働音の振幅は、図3(a)の場合と同様に概ね一定である。時点T2以降、原動機60の稼働音の振幅は、図3(a)の場合と同様に、概ね一定である。一方、キーオフの時点T1から稼働音の振幅が収束する時点T2までの期間Tcにおいて、原動機60の稼働音の振幅は、異常音成分を示すピークP1~P6が発生する。ピークP1~P6は、所定の閾値を超えた稼働音の振幅である。この閾値は、実験等によって予め算出することが可能である。 When wear of the shaft coupling 80 has progressed to a certain extent, as shown in FIG. 3(b), in the period before time T1 when the construction machine is keyed off, the amplitude of the operation sound of the prime mover 60 is roughly constant, as in the case of FIG. 3(a). After time T2, the amplitude of the operation sound of the prime mover 60 is roughly constant, as in the case of FIG. 3(a). On the other hand, in the period Tc from time T1 when the key is turned off to time T2 when the amplitude of the operation sound converges, the amplitude of the operation sound of the prime mover 60 produces peaks P1 to P6 that indicate abnormal sound components. Peaks P1 to P6 are the amplitude of the operation sound that exceeds a predetermined threshold. This threshold can be calculated in advance by experiment, etc.

特徴量抽出部13は、建設機械をキーオフした時点T1から、原動機60の稼働音の振幅が収束する時点T2以後に所定時間経過した時点T3までの期間Teにおける当該稼働音を、稼働音取得部12により取得された当該稼働音から切り取る。そして、特徴量抽出部13は、建設機械をキーオフした時点T1から、原動機60の稼働音の振幅が収束するまでの期間Tcにおいて所定の閾値を超えた当該稼働音の振幅(ピークP1~P6)を、異常音成分として抽出する。なお、特徴量抽出部13は、期間Tcにおいて所定の閾値以下の当該稼働音の振幅を、正常音成分として抽出し、摩耗状況診断部15に出力してもよい。 The feature extraction unit 13 cuts out the operation sound from the operation sound acquired by the operation sound acquisition unit 12 during a period Te from time T1 when the construction machine is keyed off to time T3, a predetermined time after time T2 when the amplitude of the operation sound of the prime mover 60 converges. The feature extraction unit 13 then extracts the amplitude of the operation sound (peaks P1 to P6) that exceeds a predetermined threshold during the period Tc from time T1 when the construction machine is keyed off to when the amplitude of the operation sound of the prime mover 60 converges as an abnormal sound component. Note that the feature extraction unit 13 may also extract the amplitude of the operation sound that is equal to or less than the predetermined threshold during the period Tc as a normal sound component, and output it to the wear condition diagnosis unit 15.

図4は、摩耗モデルを説明する図である。図4の縦軸は、異常音成分の発生間隔の平均値を示す。図4の横軸は、軸継手80に含まれる弾性体85の摩耗量を示す。 Figure 4 is a diagram explaining the wear model. The vertical axis of Figure 4 shows the average occurrence interval of abnormal sound components. The horizontal axis of Figure 4 shows the amount of wear of the elastic body 85 included in the shaft coupling 80.

図4に示すように、弾性体85の摩耗量が増加すると、異常音成分の発生間隔(時間間隔)が大きくなることが分かる。摩耗モデルは、弾性体85の摩耗量と異常音成分の発生間隔との関係を示す図4に示すようなグラフの近似式として記述され得る。摩耗モデル取得部14は、軸継手80の機種に応じて、図4に示すような摩耗モデルを取得する。摩耗状況診断部15は、特徴量抽出部13により抽出された異常音成分の発生間隔を、図4に示すようなグラフの近似式に代入することによって、軸継手80に含まれる弾性体85の摩耗量を推定することができる。 As shown in FIG. 4, it can be seen that as the amount of wear of the elastic body 85 increases, the occurrence interval (time interval) of the abnormal sound components increases. The wear model can be described as an approximation equation of a graph as shown in FIG. 4, which shows the relationship between the amount of wear of the elastic body 85 and the occurrence interval of the abnormal sound components. The wear model acquisition unit 14 acquires a wear model as shown in FIG. 4 according to the model of the shaft coupling 80. The wear status diagnosis unit 15 can estimate the amount of wear of the elastic body 85 included in the shaft coupling 80 by substituting the occurrence interval of the abnormal sound components extracted by the feature extraction unit 13 into the approximation equation of the graph as shown in FIG. 4.

図5は、図2に示す軸継手診断装置1を用いた軸継手診断方法を示すフローチャートである。 Figure 5 is a flowchart showing a method for diagnosing a shaft coupling using the shaft coupling diagnosis device 1 shown in Figure 2.

まず、ユーザは、携帯端末10にインストールされた軸継手診断装置1のアプリケーションソフトを起動する。軸継手診断装置1は、原動機60が最低回転数にて稼働するよう建設機械の準備を促す診断手順を、携帯端末10の画面に表示させる。軸継手診断装置1は、診断対象の軸継手80又は建設機械の機種を入力するフォームを、携帯端末10の画面に表示させる。ユーザは、建設機械の準備を行うと共に、携帯端末10の画面から軸継手80又は建設機械の機種を入力する。 First, the user starts the application software of the shaft coupling diagnostic device 1 installed on the mobile terminal 10. The shaft coupling diagnostic device 1 displays on the screen of the mobile terminal 10 a diagnostic procedure that prompts the user to prepare the construction machine so that the prime mover 60 operates at the minimum rotation speed. The shaft coupling diagnostic device 1 displays on the screen of the mobile terminal 10 a form for inputting the model of the shaft coupling 80 or construction machine to be diagnosed. The user prepares the construction machine and inputs the shaft coupling 80 or construction machine model from the screen of the mobile terminal 10.

ステップS101において、軸継手診断装置1は、携帯端末10の画面からユーザが軸継手80又は建設機械の機種を入力することによって、軸継手80の機種を特定する情報を取得する。軸継手診断装置1は、原動機60の稼働音を取得するのに最適な位置において当該稼働音を取得することを促す診断手順を、携帯端末10の画面に表示させる。ユーザは、携帯端末10の画面に表示された診断手順に従って、携帯端末10を移動させる。 In step S101, the shaft coupling diagnostic device 1 acquires information for identifying the model of the shaft coupling 80 by the user inputting the model of the shaft coupling 80 or the construction machine from the screen of the mobile terminal 10. The shaft coupling diagnostic device 1 displays, on the screen of the mobile terminal 10, a diagnostic procedure that prompts the user to acquire the operating sound of the prime mover 60 at the optimal position for acquiring the operating sound. The user moves the mobile terminal 10 according to the diagnostic procedure displayed on the screen of the mobile terminal 10.

ステップS102において、軸継手診断装置1は、取得された軸継手80の機種を特定する情報に基づいて、当該情報によって特定される軸継手80の機種に応じた摩耗モデルを取得する。 In step S102, the shaft coupling diagnosis device 1 acquires a wear model corresponding to the type of shaft coupling 80 identified by the acquired information identifying the type of shaft coupling 80.

ステップS103において、軸継手診断装置1は、原動機60が最低回転数にて稼働中の建設機械をキーオフした場合の稼働音を取得する。軸継手診断装置1は、期間Teを含む期間に亘って原動機60の稼働音を取得することを促す診断手順を、携帯端末10の画面に表示させる。ユーザは、携帯端末10の画面に表示された診断手順に従って、建設機械をキーオフすると共に、稼働音を取得する。 In step S103, the shaft coupling diagnostic device 1 acquires the operating sound when the prime mover 60 is turned off while the construction machine is operating at the minimum rotation speed. The shaft coupling diagnostic device 1 displays on the screen of the mobile terminal 10 a diagnostic procedure that prompts the user to acquire the operating sound of the prime mover 60 over a period including the period Te. The user follows the diagnostic procedure displayed on the screen of the mobile terminal 10 to turn off the key of the construction machine and acquire the operating sound.

ステップS104において、軸継手診断装置1は、取得された稼働音から、期間Teにおける稼働音を切り取る。そして、軸継手診断装置1は、切り取られた稼働音のうち、期間Tcにおいて所定の閾値を超えた当該稼働音の振幅を、異常音成分として抽出する。 In step S104, the shaft coupling diagnostic device 1 extracts the operation sounds during the period Te from the acquired operation sounds. Then, the shaft coupling diagnostic device 1 extracts, from the extracted operation sounds, the amplitude of the operation sounds that exceeds a predetermined threshold during the period Tc as an abnormal sound component.

ステップS105において、軸継手診断装置1は、抽出された異常音成分と、取得された摩耗モデルとに基づいて、軸継手80の摩耗状況を診断する。具体的には、軸継手診断装置1は、抽出された異常音成分の発生間隔を演算する。軸継手診断装置1は、演算された異常音成分の発生間隔を、取得された摩耗モデルに適用することによって、軸継手80に含まれる弾性体85の摩耗量を推定する。 In step S105, the shaft coupling diagnostic device 1 diagnoses the wear condition of the shaft coupling 80 based on the extracted abnormal sound components and the acquired wear model. Specifically, the shaft coupling diagnostic device 1 calculates the occurrence interval of the extracted abnormal sound components. The shaft coupling diagnostic device 1 estimates the amount of wear of the elastic body 85 included in the shaft coupling 80 by applying the calculated occurrence interval of the abnormal sound components to the acquired wear model.

ステップS106において、軸継手診断装置1は、診断結果を携帯端末10の画面に出力して、ユーザに報知する。図5に示す軸継手診断方法が終了する。 In step S106, the shaft coupling diagnosis device 1 outputs the diagnosis result to the screen of the mobile terminal 10 and notifies the user. The shaft coupling diagnosis method shown in FIG. 5 ends.

なお、軸継手診断装置1は、ステップS101とステップS105との間であれば、ステップS102を行う順番を変更してもよい。 The shaft coupling diagnosis device 1 may change the order in which step S102 is performed as long as it is between step S101 and step S105.

以上のように、実施形態1の軸継手診断装置1は、原動機60の動力を出力する駆動軸61と、動力が駆動軸61から伝達されることにより駆動される従動機70の従動軸71とを連結する軸継手80の摩耗状況を診断する装置である。軸継手診断装置1は、原動機60の回転数を変化させた場合の原動機60の稼働音を取得する稼働音取得部12を備える。軸継手診断装置1は、稼働音取得部12により取得された稼働音に含まれる異常音成分を特徴量として抽出する特徴量抽出部13を備える。軸継手診断装置1は、異常音成分と摩耗状況との関係を示す摩耗モデルを取得する摩耗モデル取得部14を備える。軸継手診断装置1は、特徴量抽出部13により抽出された異常音成分と、摩耗モデル取得部14により取得された摩耗モデルとに基づいて、軸継手80の摩耗状況を診断する摩耗状況診断部15を備える。 As described above, the shaft coupling diagnostic device 1 of the first embodiment is a device for diagnosing the wear condition of the shaft coupling 80 that connects the drive shaft 61 that outputs the power of the prime mover 60 and the driven shaft 71 of the driven machine 70 that is driven by the power transmitted from the drive shaft 61. The shaft coupling diagnostic device 1 includes an operation sound acquisition unit 12 that acquires the operation sound of the prime mover 60 when the rotation speed of the prime mover 60 is changed. The shaft coupling diagnostic device 1 includes a feature extraction unit 13 that extracts, as a feature, an abnormal sound component contained in the operation sound acquired by the operation sound acquisition unit 12. The shaft coupling diagnostic device 1 includes a wear model acquisition unit 14 that acquires a wear model that indicates the relationship between the abnormal sound component and the wear condition. The shaft coupling diagnostic device 1 includes a wear condition diagnosis unit 15 that diagnoses the wear condition of the shaft coupling 80 based on the abnormal sound component extracted by the feature extraction unit 13 and the wear model acquired by the wear model acquisition unit 14.

この構成により、軸継手診断装置1は、原動機60と従動機70との連結を解除し軸継手80を分解しなくても、軸継手80の摩耗状況を診断することができる。更に、軸継手診断装置1は、軸継手80の摩耗状況が深刻な段階に至る前であっても、原動機60の稼働音に異常音成分が発生することを利用して、軸継手80の摩耗が軽微な段階から摩耗状況を診断することができる。よって、軸継手診断装置1は、軸継手の摩耗状況を容易且つ精細に診断することができる。 With this configuration, the shaft coupling diagnostic device 1 can diagnose the wear condition of the shaft coupling 80 without disconnecting the prime mover 60 and the driven machine 70 and disassembling the shaft coupling 80. Furthermore, the shaft coupling diagnostic device 1 can diagnose the wear condition of the shaft coupling 80 from a stage where the wear is minor, even before the wear condition of the shaft coupling 80 reaches a serious stage, by utilizing the occurrence of abnormal sound components in the operating sound of the prime mover 60. Therefore, the shaft coupling diagnostic device 1 can easily and precisely diagnose the wear condition of the shaft coupling.

更に、軸継手診断装置1では、軸継手80が建設機械に搭載された弾性体軸継手であってもよい。稼働音取得部12は、原動機60が最低回転数にて稼働中の建設機械をキーオフした場合の稼働音を取得する。特徴量抽出部13は、建設機械をキーオフしてから稼働音の振幅が収束するまでの期間Tcにおいて所定の閾値を超えた稼働音の振幅を異常音成分として抽出する。 Furthermore, in the shaft coupling diagnostic device 1, the shaft coupling 80 may be an elastic shaft coupling mounted on a construction machine. The operation sound acquisition unit 12 acquires operation sounds when the construction machine is keyed off while the prime mover 60 is operating at the minimum rotation speed. The feature extraction unit 13 extracts, as an abnormal sound component, the amplitude of the operation sound that exceeds a predetermined threshold during the period Tc from when the construction machine is keyed off until the amplitude of the operation sound converges.

これにより、軸継手診断装置1は、軸継手80を診断する際の原動機60、従動機70及び軸継手80の状態を常に同じ条件として、原動機60の稼働音を安定的に取得することができる。加えて、軸継手診断装置1は、原動機60の稼働音に、軸継手80の摩耗に起因する異常音成分が含まれているか否かを明確に区別することができ、当該異常音成分だけを正確に抽出することができる。よって、軸継手診断装置1は、軸継手80の摩耗状況を容易且つ精細に診断することができるだけでなく、正確且つ安定的に診断することができる。 As a result, the shaft coupling diagnostic device 1 can stably acquire the operating sound of the prime mover 60 by always maintaining the same conditions for the states of the prime mover 60, the driven machine 70, and the shaft coupling 80 when diagnosing the shaft coupling 80. In addition, the shaft coupling diagnostic device 1 can clearly distinguish whether or not the operating sound of the prime mover 60 contains abnormal sound components caused by wear of the shaft coupling 80, and can accurately extract only those abnormal sound components. Therefore, the shaft coupling diagnostic device 1 can not only easily and precisely diagnose the wear condition of the shaft coupling 80, but also diagnose it accurately and stably.

更に、摩耗モデル取得部14は、軸継手80に含まれる弾性体85の摩耗量と異常音成分の発生間隔との関係を示す摩耗モデルを取得する。摩耗状況診断部15は、特徴量抽出部13により抽出された異常音成分の発生間隔を、摩耗モデル取得部14により取得された摩耗モデルに適用することによって、弾性体85の摩耗量を推定する。 Furthermore, the wear model acquisition unit 14 acquires a wear model that indicates the relationship between the amount of wear of the elastic body 85 included in the shaft coupling 80 and the occurrence interval of the abnormal sound component. The wear status diagnosis unit 15 estimates the amount of wear of the elastic body 85 by applying the occurrence interval of the abnormal sound component extracted by the feature extraction unit 13 to the wear model acquired by the wear model acquisition unit 14.

これにより、軸継手診断装置1は、比較的簡単な手法によって、弾性体85の摩耗がどの程度進行しているかを定量的に表すことができるので、軸継手80に異常が発生する予兆を検知することができる。よって、軸継手診断装置1は、軸継手80の摩耗状況を更に精細に診断することができるだけでなく、弾性体85の交換タイミング等の軸継手80の保守計画の最適化を図ることができる。軸継手診断装置1は、建設機械のダウンタイムを大幅に短縮することができ、建設機械の生産性を向上させることができる。 As a result, the shaft coupling diagnostic device 1 can quantitatively indicate the extent to which wear of the elastic body 85 has progressed using a relatively simple method, making it possible to detect signs of an abnormality occurring in the shaft coupling 80. As a result, the shaft coupling diagnostic device 1 can not only diagnose the wear condition of the shaft coupling 80 more precisely, but also optimize the maintenance plan for the shaft coupling 80, such as the timing of replacing the elastic body 85. The shaft coupling diagnostic device 1 can significantly reduce the downtime of construction machinery, thereby improving the productivity of the construction machinery.

更に、稼働音取得部12、特徴量抽出部13、摩耗モデル取得部14及び摩耗状況診断部15は、携帯端末10に設けられていてもよい。 Furthermore, the operation sound acquisition unit 12, the feature extraction unit 13, the wear model acquisition unit 14, and the wear condition diagnosis unit 15 may be provided in the mobile terminal 10.

これにより、軸継手診断装置1は、作業現場において誰でも気軽に、軸継手80の摩耗状況を診断することができる。よって、軸継手診断装置1は、軸継手80の摩耗状況を更に容易に診断することができる。 As a result, the shaft coupling diagnostic device 1 allows anyone at the work site to easily diagnose the wear condition of the shaft coupling 80. Therefore, the shaft coupling diagnostic device 1 can diagnose the wear condition of the shaft coupling 80 even more easily.

また、実施形態1の軸継手診断方法は、原動機60の動力を出力する駆動軸61と、動力が駆動軸61から伝達されることにより駆動される従動機70の従動軸71とを連結する軸継手80の摩耗状況を診断する軸継手診断方法である。軸継手診断方法は、原動機60の回転数を変化させた場合の原動機60の稼働音を取得すること(ステップS103)を含む。軸継手診断方法は、取得された稼働音に含まれる異常音成分を特徴量として抽出すること(ステップS104)を含む。軸継手診断方法は、異常音成分と摩耗状況との関係を示す摩耗モデルと、特徴量として抽出された異常音成分とに基づいて、軸継手80の摩耗状況を診断すること(ステップS105)を含む。 The shaft coupling diagnosis method of the first embodiment is a shaft coupling diagnosis method for diagnosing the wear condition of the shaft coupling 80 that connects the drive shaft 61 that outputs the power of the prime mover 60 and the driven shaft 71 of the driven machine 70 that is driven by the power transmitted from the drive shaft 61. The shaft coupling diagnosis method includes acquiring the operation sound of the prime mover 60 when the rotation speed of the prime mover 60 is changed (step S103). The shaft coupling diagnosis method includes extracting an abnormal sound component contained in the acquired operation sound as a feature (step S104). The shaft coupling diagnosis method includes diagnosing the wear condition of the shaft coupling 80 based on a wear model that shows the relationship between the abnormal sound component and the wear condition and the abnormal sound component extracted as the feature (step S105).

これにより、軸継手診断方法は、原動機60と従動機70との連結を解除し軸継手80を分解しなくても、軸継手80の摩耗状況を診断することができる。更に、軸継手診断方法は、軸継手80の摩耗状況が深刻な段階に至る前であっても、原動機60の稼働音に異常音成分が発生することを利用して、軸継手80の摩耗が軽微な段階から摩耗状況を診断することができる。よって、軸継手診断方法は、軸継手の摩耗状況を容易且つ精細に診断することができる。 As a result, the shaft coupling diagnosis method can diagnose the wear condition of the shaft coupling 80 without disconnecting the prime mover 60 and the driven machine 70 and disassembling the shaft coupling 80. Furthermore, the shaft coupling diagnosis method can diagnose the wear condition of the shaft coupling 80 from a stage where the wear is minor, even before the wear condition of the shaft coupling 80 reaches a serious stage, by utilizing the occurrence of abnormal sound components in the operating sound of the prime mover 60. Therefore, the shaft coupling diagnosis method can easily and precisely diagnose the wear condition of the shaft coupling.

更に、軸継手80が建設機械に搭載された弾性体軸継手であってもよい。稼働音を取得することは、原動機60が最低回転数にて稼働中の建設機械をキーオフした場合の稼働音を取得することである。異常音成分を抽出することは、建設機械をキーオフしてから稼働音の振幅が収束するまでの期間Tcにおいて所定の閾値を超えた稼働音の振幅を異常音成分として抽出することである。 Furthermore, the shaft coupling 80 may be an elastic shaft coupling mounted on the construction machine. Acquiring the operation sound means acquiring the operation sound when the construction machine operating with the prime mover 60 at the minimum rotation speed is keyed off. Extracting the abnormal sound component means extracting the amplitude of the operation sound that exceeds a predetermined threshold value during the period Tc from when the construction machine is keyed off until the amplitude of the operation sound converges as the abnormal sound component.

これにより、軸継手診断方法は、軸継手80を診断する際の原動機60、従動機70及び軸継手80の状態を常に同じ条件として、原動機60の稼働音を安定的に取得することができる。加えて、軸継手診断方法は、原動機60の稼働音に、軸継手80の摩耗に起因する異常音成分が含まれているか否かを明確に区別することができ、当該異常音成分だけを正確に抽出することができる。よって、軸継手診断方法は、軸継手80の摩耗状況を容易且つ精細に診断することができるだけでなく、正確且つ安定的に診断することができる。 As a result, the shaft coupling diagnosis method can stably obtain the operating sound of the prime mover 60 by always maintaining the same conditions for the prime mover 60, the driven machine 70, and the shaft coupling 80 when diagnosing the shaft coupling 80. In addition, the shaft coupling diagnosis method can clearly distinguish whether or not the operating sound of the prime mover 60 contains abnormal sound components caused by wear of the shaft coupling 80, and can accurately extract only the abnormal sound components. Therefore, the shaft coupling diagnosis method can not only easily and precisely diagnose the wear condition of the shaft coupling 80, but also diagnose it accurately and stably.

[実施形態2]
図6を用いて実施形態2の軸継手診断装置1について説明する。実施形態2の軸継手診断装置1において、実施形態1と同様の構成及び動作については、説明を省略する。
[Embodiment 2]
A shaft coupling diagnosis device 1 of the second embodiment will be described with reference to Fig. 6. In the shaft coupling diagnosis device 1 of the second embodiment, the description of the same configuration and operation as those of the first embodiment will be omitted.

図6は、実施形態2の軸継手診断装置1の機能的構成を示すブロック図である。 Figure 6 is a block diagram showing the functional configuration of the shaft coupling diagnosis device 1 of embodiment 2.

実施形態2の軸継手診断装置1では、機械情報取得部11及び稼働音取得部12が、携帯端末10に設けられている。実施形態2の軸継手診断装置1では、特徴量抽出部13、摩耗モデル取得部14、摩耗状況診断部15及び診断結果出力部16が、携帯端末10と通信可能なサーバ装置30に設けられている。 In the shaft coupling diagnostic device 1 of the second embodiment, the machine information acquisition unit 11 and the operating sound acquisition unit 12 are provided in the mobile terminal 10. In the shaft coupling diagnostic device 1 of the second embodiment, the feature extraction unit 13, the wear model acquisition unit 14, the wear condition diagnosis unit 15, and the diagnosis result output unit 16 are provided in a server device 30 that can communicate with the mobile terminal 10.

サーバ装置30は、CPU、ROM及びRAMを備え、建設機械の管理センサ等に設置されている。実施形態3の軸継手診断装置1は、サーバ装置30に備えられた上記のCPU等によって構成され、CPUがプログラムを実行することによって、軸継手診断装置1の各種機能を実現する。 The server device 30 is equipped with a CPU, ROM, and RAM, and is installed in a management sensor of a construction machine, etc. The shaft coupling diagnosis device 1 of the third embodiment is configured by the above-mentioned CPU, etc. provided in the server device 30, and the CPU executes a program to realize various functions of the shaft coupling diagnosis device 1.

実施形態2の機械情報取得部11は、取得された軸継手80の情報を、サーバ装置30に設けられた摩耗モデル取得部14に送信する。実施形態2の稼働音取得部12は、取得された原動機60の稼働音を、サーバ装置30に設けられた特徴量抽出部13に送信する。実施形態2の診断結果出力部16は、診断結果を携帯端末10に送信して携帯端末10の画面に表示させたり、診断結果を建設機械に送信して建設機械に設けられた表示装置に表示させたりする。この際、緊急の対応が必要な場合、携帯端末10には事象のみを上記行燈表示機能で簡易的に表示させる一方、診断結果等の詳細な情報は建設機械の表示装置に表示させる等、診断結果の通知先は異ならせてもよい。 The machine information acquisition unit 11 of the second embodiment transmits the acquired information of the shaft coupling 80 to the wear model acquisition unit 14 provided in the server device 30. The operating sound acquisition unit 12 of the second embodiment transmits the acquired operating sound of the prime mover 60 to the feature extraction unit 13 provided in the server device 30. The diagnosis result output unit 16 of the second embodiment transmits the diagnosis result to the mobile terminal 10 to display it on the screen of the mobile terminal 10, or transmits the diagnosis result to the construction machine to display it on a display device provided in the construction machine. In this case, if an emergency response is required, the mobile terminal 10 may simply display only the event using the above-mentioned lantern display function, while detailed information such as the diagnosis result may be displayed on the display device of the construction machine, and the notification destination of the diagnosis result may be different.

このように、実施形態2の軸継手診断装置1は、特徴量抽出部13、摩耗モデル取得部14及び摩耗状況診断部15がサーバ装置30に設けられているので、実施形態1よりも、これらの機能に係る処理を高速化することができる。よって、実施形態2の軸継手診断装置1は、実施形態1よりも、軸継手80の摩耗状況を迅速に診断することができる。更に、軸継手診断装置1は、サーバ装置30を利用することにより、軸継手80の摩耗状況の推移や詳細な摩耗原因を分析したり、他の建設機械の軸継手80の診断結果等を収集して軸継手80の摩耗状況を一元管理したりすることが容易となる。 In this way, in the shaft coupling diagnostic device 1 of embodiment 2, the feature extraction unit 13, the wear model acquisition unit 14, and the wear condition diagnosis unit 15 are provided in the server device 30, so that the processing related to these functions can be made faster than in embodiment 1. Therefore, the shaft coupling diagnostic device 1 of embodiment 2 can diagnose the wear condition of the shaft coupling 80 more quickly than in embodiment 1. Furthermore, by using the server device 30, the shaft coupling diagnostic device 1 can easily analyze the progress of the wear condition of the shaft coupling 80 and the detailed causes of wear, and collect the diagnosis results of the shaft couplings 80 of other construction machines and centrally manage the wear condition of the shaft coupling 80.

[実施形態3]
図7を用いて実施形態3の軸継手診断装置1について説明する。実施形態3の軸継手診断装置1において、実施形態1と同様の構成及び動作については、説明を省略する。
[Embodiment 3]
A shaft coupling diagnosis device 1 of the third embodiment will be described with reference to Fig. 7. In the shaft coupling diagnosis device 1 of the third embodiment, the description of the same configuration and operation as those of the first embodiment will be omitted.

図7は、実施形態3の軸継手診断装置1の機能的構成を示すブロック図である。 Figure 7 is a block diagram showing the functional configuration of the shaft coupling diagnosis device 1 of embodiment 3.

実施形態3の軸継手診断装置1では、機械情報取得部11、稼働音取得部12、特徴量抽出部13、摩耗モデル取得部14、摩耗状況診断部15及び診断結果出力部16が、建設機械の制御装置20に設けられている。 In the shaft coupling diagnostic device 1 of the third embodiment, a machine information acquisition unit 11, an operating sound acquisition unit 12, a feature extraction unit 13, a wear model acquisition unit 14, a wear condition diagnosis unit 15, and a diagnosis result output unit 16 are provided in the control device 20 of the construction machine.

制御装置20は、CPU、ROM及びRAMを組み合わせてなるマイクロコンピュータにより構成されている。実施形態3の軸継手診断装置1は、制御装置20に備えられた上記のCPU等によって構成され、CPUがプログラムを実行することによって、原動機60の回転数を変化させたり、建設機械に設けられたマイクを用いて原動機60の稼働音を取得したりすることができる。 The control device 20 is configured with a microcomputer that combines a CPU, a ROM, and a RAM. The shaft coupling diagnostic device 1 of embodiment 3 is configured with the above-mentioned CPU and other components provided in the control device 20, and the CPU executes a program to change the rotation speed of the prime mover 60 and obtain the operating sound of the prime mover 60 using a microphone installed on the construction machine.

実施形態3の機械情報取得部11は、診断開始時に、軸継手80の情報を制御装置20から直接的に取得する。実施形態3の稼働音取得部12は、制御装置20からの指令に基づいて、原動機60の稼働音の取得を開始する。例えば、制御装置20において建設機械のキーオフの発生を示すイベント情報が予め定義されており、制御装置20は、建設機械がキーオフされると、当該イベント情報を稼働音取得部12に出力する。稼働音取得部12は、当該イベント情報が入力されると、当該稼働音の取得を開始する。また、実施形態3の診断結果出力部16は、診断結果を、建設機械に設けられた表示装置に表示させたり、アラームとして出力したり、サーバ装置30に送信したりする。なお、診断結果の通知内容及び通知先は、任意に設定され得る。すなわち、緊急の対応が必要な場合、携帯端末10には事象のみを上記行燈表示機能で簡易的に表示させる一方、診断結果等の詳細な情報は建設機械の表示装置に表示させてもよい。また、故障リスクの進行に応じて診断結果の通知先は任意に設定してもよい。例えば、作業現場の点検員が早急に対応することで解決する可能性がある場合、点検員の保有する携帯端末10に通知した方が迅速に対応できることもある。このため、故障リスクの緊急度を判定して、緊急度が高い場合は携帯端末10とサーバ装置30の両者に送信するなどしてもよく、通知先は必ずしも1つに限られない。 The machine information acquisition unit 11 of the third embodiment acquires information on the shaft coupling 80 directly from the control device 20 at the start of diagnosis. The operation sound acquisition unit 12 of the third embodiment starts acquiring the operation sound of the prime mover 60 based on a command from the control device 20. For example, event information indicating the occurrence of key-off of the construction machine is predefined in the control device 20, and when the construction machine is keyed off, the control device 20 outputs the event information to the operation sound acquisition unit 12. When the event information is input, the operation sound acquisition unit 12 starts acquiring the operation sound. In addition, the diagnosis result output unit 16 of the third embodiment displays the diagnosis result on a display device provided on the construction machine, outputs it as an alarm, or transmits it to the server device 30. The notification content and notification destination of the diagnosis result can be set arbitrarily. That is, when an emergency response is required, the mobile terminal 10 may simply display only the event using the above-mentioned lantern display function, while detailed information such as the diagnosis result may be displayed on the display device of the construction machine. In addition, the notification destination of the diagnosis result may be set arbitrarily according to the progression of the failure risk. For example, if the problem can be solved by an inspector at the work site taking immediate action, it may be possible to respond more quickly by notifying the mobile terminal 10 held by the inspector. For this reason, the urgency of the risk of failure may be determined, and if the urgency is high, the notification may be sent to both the mobile terminal 10 and the server device 30, and the number of notification destinations is not necessarily limited to one.

このように、実施形態3の軸継手診断装置1は、機械情報取得部11、稼働音取得部12、特徴量抽出部13、摩耗モデル取得部14、摩耗状況診断部15及び診断結果出力部16が建設機械の制御装置20に設けられているので、作業現場に行かなくても建設機械側で軸継手80の摩耗状況を診断することができる。更に、建設機械の制御装置20が、診断結果を建設機械の稼働情報と併せてサーバ装置30等に送信することによって、サーバ装置30は、軸継手80の摩耗状況の推移や詳細な摩耗原因を分析したり、他の建設機械の軸継手80の診断結果を収集して軸継手80の摩耗状況を一元管理したりすることが容易となる。 In this way, in the shaft coupling diagnosis device 1 of embodiment 3, the machine information acquisition unit 11, the operating sound acquisition unit 12, the feature extraction unit 13, the wear model acquisition unit 14, the wear condition diagnosis unit 15, and the diagnosis result output unit 16 are provided in the control device 20 of the construction machine, so that the wear condition of the shaft coupling 80 can be diagnosed on the construction machine side without going to the work site. Furthermore, by the control device 20 of the construction machine transmitting the diagnosis result together with the operation information of the construction machine to the server device 30, etc., the server device 30 can easily analyze the progress of the wear condition of the shaft coupling 80 and the detailed cause of wear, and collect the diagnosis results of the shaft couplings 80 of other construction machines to centrally manage the wear condition of the shaft coupling 80.

[実施形態4]
図8を用いて実施形態4の軸継手診断装置1について説明する。実施形態4の軸継手診断装置1において、実施形態3と同様の構成及び動作については、説明を省略する。
[Embodiment 4]
A shaft coupling diagnosis device 1 of the fourth embodiment will be described with reference to Fig. 8. In the shaft coupling diagnosis device 1 of the fourth embodiment, the description of the same configuration and operation as those of the third embodiment will be omitted.

図8は、実施形態4の軸継手診断装置1の機能的構成を示すブロック図である。 Figure 8 is a block diagram showing the functional configuration of the shaft coupling diagnosis device 1 of embodiment 4.

実施形態4の軸継手診断装置1では、機械情報取得部11及び稼働音取得部12が、建設機械の制御装置20に設けられている。実施形態4の軸継手診断装置1では、特徴量抽出部13、摩耗モデル取得部14、摩耗状況診断部15及び診断結果出力部16が、建設機械と通信可能なサーバ装置30に設けられている。 In the shaft coupling diagnostic device 1 of the fourth embodiment, the machine information acquisition unit 11 and the operating sound acquisition unit 12 are provided in the control device 20 of the construction machine. In the shaft coupling diagnostic device 1 of the fourth embodiment, the feature extraction unit 13, the wear model acquisition unit 14, the wear condition diagnosis unit 15, and the diagnosis result output unit 16 are provided in a server device 30 that can communicate with the construction machine.

実施形態4の機械情報取得部11は、取得された軸継手80の情報を、サーバ装置30に送信する。実施形態4の稼働音取得部12は、取得された原動機60の稼働音を、サーバ装置30に送信する。実施形態4の診断結果出力部16は、診断結果を、建設機械に送信して建設機械に設けられた表示装置に表示させたり、携帯端末10に送信して携帯端末10の画面に表示させたりする。 The machine information acquisition unit 11 of the fourth embodiment transmits the acquired information of the shaft coupling 80 to the server device 30. The operation sound acquisition unit 12 of the fourth embodiment transmits the acquired operation sound of the prime mover 60 to the server device 30. The diagnosis result output unit 16 of the fourth embodiment transmits the diagnosis result to the construction machine to be displayed on a display device provided on the construction machine, or transmits the diagnosis result to the mobile terminal 10 to be displayed on the screen of the mobile terminal 10.

このように、実施形態4の軸継手診断装置1は、特徴量抽出部13、摩耗モデル取得部14及び摩耗状況診断部15がサーバ装置30に設けられているので、実施形態3よりも、これらの機能に係る処理を高速化することができる。よって、実施形態4の軸継手診断装置1は、実施形態3よりも、軸継手80の摩耗状況を迅速に診断することができる。 In this way, in the shaft coupling diagnosis device 1 of embodiment 4, the feature extraction unit 13, the wear model acquisition unit 14, and the wear condition diagnosis unit 15 are provided in the server device 30, so that the processing related to these functions can be made faster than in embodiment 3. Therefore, the shaft coupling diagnosis device 1 of embodiment 4 can diagnose the wear condition of the shaft coupling 80 more quickly than in embodiment 3.

以上、本発明の実施形態について詳述したが、本発明は、上記の実施形態に限定されるものではなく、特許請求の範囲に記載された本発明の精神を逸脱しない範囲で、種々の変更を行うことができる。本発明は、或る実施形態の構成を他の実施形態の構成に追加したり、或る実施形態の構成を他の実施形態と置換したり、或る実施形態の構成の一部を削除したりすることができる。 Although the embodiments of the present invention have been described in detail above, the present invention is not limited to the above embodiments, and various modifications can be made without departing from the spirit of the present invention described in the claims. The present invention allows the configuration of one embodiment to be added to the configuration of another embodiment, the configuration of one embodiment to be replaced with another embodiment, or part of the configuration of one embodiment to be deleted.

1…軸継手診断装置、10…携帯端末、11…機械情報取得部、12…稼働音取得部、13…特徴量抽出部、14…摩耗モデル取得部、15…摩耗状況診断部、20…制御装置、30…サーバ装置、60…原動機、61…駆動軸、70…従動機、71…従動軸、80…軸継手、85…弾性体 1...shaft coupling diagnostic device, 10...mobile terminal, 11...machine information acquisition unit, 12...operating sound acquisition unit, 13...feature extraction unit, 14...wear model acquisition unit, 15...wear status diagnosis unit, 20...control device, 30...server device, 60...prime mover, 61...drive shaft, 70...driven machine, 71...driven shaft, 80...shaft coupling, 85...elastic body

Claims (9)

原動機の動力を出力する駆動軸と、前記動力が前記駆動軸から伝達されることにより駆動される従動機の従動軸とを連結する軸継手の摩耗状況を診断する軸継手診断装置であって、
前記原動機の回転数を変化させた場合の前記原動機の稼働音を取得する稼働音取得部と、
前記稼働音取得部により取得された前記稼働音に含まれる異常音成分を特徴量として抽出する特徴量抽出部と、
前記異常音成分と前記摩耗状況との関係を示す摩耗モデルを取得する摩耗モデル取得部と、
前記特徴量抽出部により抽出された前記異常音成分と、前記摩耗モデル取得部により取得された前記摩耗モデルとに基づいて、前記摩耗状況を診断する摩耗状況診断部と、を備える
ことを特徴とする軸継手診断装置。
A shaft coupling diagnostic device for diagnosing a wear condition of a shaft coupling connecting a drive shaft that outputs power of a prime mover and a driven shaft of a driven machine that is driven by the power transmitted from the drive shaft, comprising:
an operation sound acquisition unit that acquires an operation sound of the prime mover when a rotation speed of the prime mover is changed;
a feature extraction unit that extracts, as a feature, an abnormal sound component contained in the operation sound acquired by the operation sound acquisition unit;
a wear model acquisition unit that acquires a wear model indicating a relationship between the abnormal sound component and the wear state;
a wear condition diagnosis unit that diagnoses the wear condition based on the abnormal sound component extracted by the feature extraction unit and the wear model acquired by the wear model acquisition unit.
前記軸継手は、建設機械に搭載された弾性体軸継手であり、
前記稼働音取得部は、前記原動機が最低回転数にて稼働中の前記建設機械をキーオフした場合の前記稼働音を取得し、
前記特徴量抽出部は、前記建設機械をキーオフしてから前記稼働音の振幅が収束するまでの期間において所定の閾値を超えた前記稼働音の振幅を前記異常音成分として抽出する
ことを特徴とする請求項1に記載の軸継手診断装置。
The shaft coupling is an elastic shaft coupling mounted on a construction machine,
the operation sound acquisition unit acquires the operation sound when the key is turned off on the construction machine while the prime mover is operating at a minimum rotation speed,
The shaft coupling diagnosis device according to claim 1, characterized in that the feature extraction unit extracts, as the abnormal sound component, an amplitude of the operation sound that exceeds a predetermined threshold during a period from when the construction machine is keyed off to when the amplitude of the operation sound converges.
前記摩耗モデル取得部は、前記軸継手に含まれる弾性体の摩耗量と前記異常音成分の発生間隔との関係を示す前記摩耗モデルを取得し、
前記摩耗状況診断部は、前記特徴量抽出部により抽出された前記異常音成分の発生間隔を、前記摩耗モデル取得部により取得された前記摩耗モデルに適用することによって、前記弾性体の前記摩耗量を推定する
ことを特徴とする請求項2に記載の軸継手診断装置。
the wear model acquisition unit acquires the wear model indicating a relationship between an amount of wear of an elastic body included in the shaft coupling and an occurrence interval of the abnormal sound component,
3. The shaft coupling diagnosis device according to claim 2, wherein the wear condition diagnosis unit estimates the amount of wear of the elastic body by applying an occurrence interval of the abnormal sound component extracted by the feature extraction unit to the wear model acquired by the wear model acquisition unit.
前記稼働音取得部、前記特徴量抽出部、前記摩耗モデル取得部及び前記摩耗状況診断部は、携帯端末に設けられている
ことを特徴とする請求項1に記載の軸継手診断装置。
The shaft coupling diagnosis device according to claim 1 , wherein the operation sound acquisition unit, the feature amount extraction unit, the wear model acquisition unit, and the wear condition diagnosis unit are provided in a mobile terminal.
前記稼働音取得部は、携帯端末に設けられており、
前記特徴量抽出部、前記摩耗モデル取得部及び前記摩耗状況診断部は、前記携帯端末と通信可能なサーバ装置に設けられている
ことを特徴とする請求項1に記載の軸継手診断装置。
The operation sound acquisition unit is provided in a mobile terminal,
The shaft coupling diagnosis device according to claim 1 , wherein the feature amount extraction unit, the wear model acquisition unit, and the wear condition diagnosis unit are provided in a server device capable of communicating with the mobile terminal.
前記軸継手は、建設機械に搭載されており、
前記稼働音取得部、前記特徴量抽出部、前記摩耗モデル取得部及び前記摩耗状況診断部は、前記建設機械に設けられている
ことを特徴とする請求項1に記載の軸継手診断装置。
The shaft coupling is mounted on a construction machine,
The shaft coupling diagnosis device according to claim 1 , wherein the operation sound acquisition unit, the feature amount extraction unit, the wear model acquisition unit and the wear condition diagnosis unit are provided in the construction machine.
前記軸継手は、建設機械に搭載されており、
前記稼働音取得部は、前記建設機械に設けられており、
前記特徴量抽出部、前記摩耗モデル取得部及び前記摩耗状況診断部は、前記建設機械と通信可能なサーバ装置に設けられている
ことを特徴とする請求項1に記載の軸継手診断装置。
The shaft coupling is mounted on a construction machine,
The operation sound acquisition unit is provided in the construction machine,
The shaft coupling diagnosis device according to claim 1, wherein the feature amount extraction unit, the wear model acquisition unit, and the wear condition diagnosis unit are provided in a server device capable of communicating with the construction machine.
原動機の動力を出力する駆動軸と、前記動力が前記駆動軸から伝達されることにより駆動される従動機の従動軸とを連結する軸継手の摩耗状況を診断する軸継手診断方法であって、
前記原動機の回転数を変化させた場合の前記原動機の稼働音を取得することと、
取得された前記稼働音に含まれる異常音成分を特徴量として抽出することと、
前記異常音成分と前記摩耗状況との関係を示す摩耗モデルと、前記特徴量として抽出された前記異常音成分とに基づいて、前記摩耗状況を診断することと、を含む
ことを特徴とする軸継手診断方法。
1. A shaft coupling diagnosis method for diagnosing a wear state of a shaft coupling that connects a drive shaft that outputs power of a prime mover to a driven shaft of a driven machine that is driven by the power transmitted from the drive shaft, comprising:
Acquiring an operation sound of the prime mover when a rotation speed of the prime mover is changed;
Extracting an abnormal sound component contained in the acquired operation sound as a feature amount;
diagnosing the wear state based on a wear model indicating a relationship between the abnormal sound component and the wear state, and on the abnormal sound component extracted as the feature amount.
前記軸継手は、建設機械に搭載された弾性体軸継手であり、
前記稼働音を取得することは、前記原動機が最低回転数にて稼働中の前記建設機械をキーオフした場合の前記稼働音を取得することであり、
前記異常音成分を抽出することは、前記建設機械をキーオフしてから前記稼働音の振幅が収束するまでの期間において所定の閾値を超えた前記稼働音の振幅を前記異常音成分として抽出することである、
ことを特徴とする請求項8に記載の軸継手診断方法。
The shaft coupling is an elastic shaft coupling mounted on a construction machine,
The acquisition of the operation sound is acquisition of the operation sound when the key of the construction machine is turned off while the prime mover is operating at a minimum rotation speed,
The extraction of the abnormal sound component is to extract, as the abnormal sound component, the amplitude of the operation sound that exceeds a predetermined threshold during a period from when the construction machine is keyed off to when the amplitude of the operation sound converges.
9. The shaft coupling diagnosis method according to claim 8.
JP2022008787A 2022-01-24 2022-01-24 Shaft coupling diagnostic device and shaft coupling diagnostic method Active JP7695901B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2022008787A JP7695901B2 (en) 2022-01-24 2022-01-24 Shaft coupling diagnostic device and shaft coupling diagnostic method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022008787A JP7695901B2 (en) 2022-01-24 2022-01-24 Shaft coupling diagnostic device and shaft coupling diagnostic method

Publications (2)

Publication Number Publication Date
JP2023107537A JP2023107537A (en) 2023-08-03
JP7695901B2 true JP7695901B2 (en) 2025-06-19

Family

ID=87474757

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022008787A Active JP7695901B2 (en) 2022-01-24 2022-01-24 Shaft coupling diagnostic device and shaft coupling diagnostic method

Country Status (1)

Country Link
JP (1) JP7695901B2 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015072032A (en) 2013-10-02 2015-04-16 日立建機株式会社 Construction machine
US20190033171A1 (en) 2017-07-26 2019-01-31 Caterpillar Inc. System and method for detecting wear or failure of genset power system coupling
JP2020180605A (en) 2019-04-26 2020-11-05 日立建機株式会社 Injector diagnosis device and injector diagnosis method
JP2021056880A (en) 2019-09-30 2021-04-08 ファナック株式会社 Diagnostic device and diagnostic method
JP2021067614A (en) 2019-10-25 2021-04-30 日立建機株式会社 Device and method for diagnosing failures

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08284967A (en) * 1995-04-18 1996-11-01 Nippon Steel Corp Shaft coupling deterioration diagnosis method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015072032A (en) 2013-10-02 2015-04-16 日立建機株式会社 Construction machine
US20190033171A1 (en) 2017-07-26 2019-01-31 Caterpillar Inc. System and method for detecting wear or failure of genset power system coupling
JP2020180605A (en) 2019-04-26 2020-11-05 日立建機株式会社 Injector diagnosis device and injector diagnosis method
JP2021056880A (en) 2019-09-30 2021-04-08 ファナック株式会社 Diagnostic device and diagnostic method
JP2021067614A (en) 2019-10-25 2021-04-30 日立建機株式会社 Device and method for diagnosing failures

Also Published As

Publication number Publication date
JP2023107537A (en) 2023-08-03

Similar Documents

Publication Publication Date Title
JP7441881B2 (en) System and method for predictive diagnosis of mechanical systems
JP6944580B2 (en) Abnormality diagnosis system
RU2068553C1 (en) Method of evaluation of technical condition of centrifugal pumping set by vibration of body
JP6234359B2 (en) Oil quality diagnosis system for work machines
JP2015517111A (en) Bearing monitoring method and system
KR102539547B1 (en) Injector diagnosis device and injector diagnosis method
JP2019178625A (en) Abnormality diagnosis system of pump equipment and abnormality diagnosis method of pump equipment
JP7695901B2 (en) Shaft coupling diagnostic device and shaft coupling diagnostic method
JP4101714B2 (en) Rotating equipment state diagnosis support apparatus and program thereof, recording medium storing the program, and state diagnosis support method
EP3260838A1 (en) Abnormality diagnosis system
JP2009115090A (en) Automatic detection and notification of turbine internal component degradation
KR101671634B1 (en) Method for determining the amount of wear quantity for shaft parts of power transmission system
JPWO2014045922A1 (en) Equipment abnormality monitoring system and equipment abnormality monitoring method
KR101989559B1 (en) Intelligent control decelerating device and control method thereof
CN112824857A (en) Fault monitoring method for rotary engineering machinery
CN119027102A (en) Coal mining machine equipment health management method and device
JP5644666B2 (en) Electric motor preventive maintenance equipment
JP2021124427A (en) Contact testing device for performing test by reproducing abnormal contact state in rotational shaft of rotation apparatus
JP7759287B2 (en) Shaft coupling wear amount diagnosis device and shaft coupling wear amount diagnosis method
JP3834228B2 (en) Abnormality diagnosis system for rotating machinery
CN214952153U (en) Bearing test equipment
JP2002099320A (en) Method and system for diagnosing rotary machine
CA3015495C (en) Systems and methods for predictive diagnostics for mechanical systems
CN115875276A (en) Method for intelligently controlling centrifugal pump
CN119267196A (en) A device and method for monitoring oil pump coupling of auxiliary machine oil station

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240909

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20250416

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20250527

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250609

R150 Certificate of patent or registration of utility model

Ref document number: 7695901

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150