Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7702828B2 - POWER SUPPRESSION DISTRIBUTION AMOUNT CALCULATION DEVICE AND POWER SUPPRESSION DISTRIBUTION AMOUNT CALCULATION METHOD - Google Patents
[go: Go Back, main page]

JP7702828B2 - POWER SUPPRESSION DISTRIBUTION AMOUNT CALCULATION DEVICE AND POWER SUPPRESSION DISTRIBUTION AMOUNT CALCULATION METHOD - Google Patents

POWER SUPPRESSION DISTRIBUTION AMOUNT CALCULATION DEVICE AND POWER SUPPRESSION DISTRIBUTION AMOUNT CALCULATION METHOD Download PDF

Info

Publication number
JP7702828B2
JP7702828B2 JP2021116448A JP2021116448A JP7702828B2 JP 7702828 B2 JP7702828 B2 JP 7702828B2 JP 2021116448 A JP2021116448 A JP 2021116448A JP 2021116448 A JP2021116448 A JP 2021116448A JP 7702828 B2 JP7702828 B2 JP 7702828B2
Authority
JP
Japan
Prior art keywords
distribution amount
amount
time period
suppression
distribution
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021116448A
Other languages
Japanese (ja)
Other versions
JP2023012775A (en
Inventor
満文 後藤
尚希 西川
義樹 加藤
慎一郎 浅海
裕 小林
英明 片野
敏昭 田邉
弘芳 薮▲崎▼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Heavy Industries Ltd
Original Assignee
Mitsubishi Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Heavy Industries Ltd filed Critical Mitsubishi Heavy Industries Ltd
Priority to JP2021116448A priority Critical patent/JP7702828B2/en
Publication of JP2023012775A publication Critical patent/JP2023012775A/en
Application granted granted Critical
Publication of JP7702828B2 publication Critical patent/JP7702828B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Description

本開示は、電力抑制分配量算出装置、及び電力抑制分配量算出方法に関する。 This disclosure relates to a power suppression distribution amount calculation device and a power suppression distribution amount calculation method.

電力の需要と供給のバランスを取るための手段として、需要家に電力需要(消費電力)の調整を働きかけるデマンドレスポンス(以下、DRとする)がある。DRでは、一般送配電事業者などが複数の需要家からなるコミュニティを管理する管理者(アグリゲータ)にDR時間帯における電力の抑制を要請することがある。アグリゲータは、電力の抑制量を複数の需要家ごとに分配する。例えば、特許文献1には、需要家の過去の電力需要に基づいて電力抑制の分配量が決められ、DR開始直前の需要家の状況に基づいてこの電力抑制の分配量を修正することが開示されている。 One method for balancing the supply and demand of electricity is demand response (hereinafter referred to as DR), which encourages consumers to adjust their electricity demand (power consumption). In DR, general electricity transmission and distribution companies may request an administrator (aggregator) that manages a community of multiple consumers to curtail power during DR time periods. The aggregator distributes the amount of power curtailment to each of the multiple consumers. For example, Patent Document 1 discloses that the amount of power curtailment distributed is determined based on the consumer's past power demand, and that this amount of power curtailment is revised based on the consumer's situation immediately before the start of DR.

特開2016-135040号公報JP 2016-135040 A

しかしながら、特許文献1に記載の技術では、DR時間帯における需要家の状況の変化については考慮されていない。このため、DR時間帯における電力の抑制量が適切に需要家に分配されず、アグリゲータや需要家は一般送配電事業者などから要請された電力の抑制を達成することが難しい場合がある。 However, the technology described in Patent Document 1 does not take into account changes in the circumstances of consumers during DR hours. As a result, the amount of power reduction during DR hours is not appropriately distributed to consumers, and it may be difficult for aggregators and consumers to achieve the power reduction requested by general electricity transmission and distribution companies, etc.

本開示は、上述の課題に鑑みてなされたものであって、少なくとも1つの時間帯における電力の抑制量を適切に需要家に分配することができる電力抑制分配量算出装置、及び電力抑制分配量算出方法を提供することを目的とする。 The present disclosure has been made in consideration of the above-mentioned problems, and aims to provide a power suppression distribution amount calculation device and a power suppression distribution amount calculation method that can appropriately distribute the amount of power suppression to consumers in at least one time period.

上記目的を達成するため、電力抑制分配量算出装置は、少なくとも1つの時間帯における複数の需要家の集合体であるコミュニティ全体に対する電力の抑制量を算出する抑制量算出部と、前記少なくとも1つの時間帯よりも前に、前記抑制量に対する前記複数の需要家ごとの分配量を算出する分配量算出部と、前記複数の需要家ごとの電力機器の状態に関する機器状態情報をリアルタイムに収集可能な機器状態収集部と、前記少なくとも1つの時間帯において、前記機器状態収集部がリアルタイムに収集する前記機器状態情報に基づいて、前記分配量を修正するか否かを判定する判定部と、前記判定部が前記分配量を修正すると判定した場合に前記分配量を修正する分配量修正部と、を備える。 To achieve the above object, the power suppression and distribution amount calculation device includes a suppression amount calculation unit that calculates a power suppression amount for an entire community, which is a collection of multiple consumers, during at least one time period; a distribution amount calculation unit that calculates a distribution amount for each of the multiple consumers for the suppression amount prior to the at least one time period; an equipment status collection unit that can collect equipment status information related to the state of power equipment for each of the multiple consumers in real time; a determination unit that determines whether or not to modify the distribution amount based on the equipment status information collected in real time by the equipment status collection unit during the at least one time period; and a distribution amount correction unit that corrects the distribution amount when the determination unit determines that the distribution amount should be corrected.

上記目的を達成するため、電力抑制分配量算出方法は、少なくとも1つの時間帯における複数の需要家の集合体であるコミュニティ全体に対する電力の抑制量を算出するステップと、前記少なくとも1つの時間帯よりも前に、前記抑制量に対する前記複数の需要家ごとの分配量を算出するステップと、前記少なくとも1つの時間帯において、前記複数の需要家ごとの電力機器の状態に関する機器状態情報をリアルタイムに収集するステップと、前記少なくとも1つの時間帯において、リアルタイムに収集された前記機器状態情報に基づいて、前記分配量を修正するか否かを判定するステップと、前記分配量を修正すると判定した場合に前記分配量を修正するステップと、を備える。 To achieve the above object, the method for calculating the amount of power suppression and distribution includes the steps of: calculating an amount of power suppression for an entire community, which is a collection of multiple consumers, during at least one time period; calculating a distribution amount for each of the multiple consumers for the suppression amount prior to the at least one time period; collecting device status information on the state of power devices for each of the multiple consumers in real time during the at least one time period; determining whether or not to modify the distribution amount based on the device status information collected in real time during the at least one time period; and modifying the distribution amount when it is determined that the distribution amount should be modified.

本開示の電力抑制分配量算出装置及び電力抑制分配量算出方法によれば、少なくとも1つの時間帯における電力の抑制量を適切に需要家に分配することができる。 The power suppression/distribution amount calculation device and power suppression/distribution amount calculation method disclosed herein can appropriately distribute the amount of power suppression to consumers in at least one time period.

一実施形態に係るデマンドレスポンスシステムの構成を示す概略構成図である。FIG. 1 is a schematic diagram showing a configuration of a demand response system according to an embodiment. 第1実施形態に係る電力抑制分配量算出装置の概略的な機能ブロック図である。1 is a schematic functional block diagram of a power suppression and distribution amount calculation device according to a first embodiment. FIG. 幾つかの実施形態に係る電力機器の機器状態情報を説明するための図である。FIG. 2 is a diagram for explaining device status information of electric power devices according to some embodiments. 幾つかの実施形態に係る判定部の状態を示す図である。11A-11C are diagrams illustrating states of a determination unit according to some embodiments. 第2実施形態に係る電力抑制分配量算出装置の概略的な機能ブロック図である。FIG. 11 is a schematic functional block diagram of a power suppression and distribution amount calculation device according to a second embodiment. 一実施形態に係る電力抑制分配量算出方法のフローチャートである。4 is a flowchart of a power restraint distribution amount calculation method according to an embodiment.

以下、本開示の実施の形態による電力抑制分配量算出装置及び電力抑制分配量算出方法について、図面に基づいて説明する。かかる実施の形態は、本開示の一態様を示すものであり、この開示を限定するものではなく、本開示の技術的思想の範囲内で任意に変更可能である。 The power suppression/distribution amount calculation device and power suppression/distribution amount calculation method according to the embodiment of the present disclosure will be described below with reference to the drawings. This embodiment shows one aspect of the present disclosure, does not limit the disclosure, and can be modified as desired within the scope of the technical concept of the present disclosure.

図1は、一実施形態に係るデマンドレスポンスシステム100の構成を示す概略構成図である。デマンドレスポンスシステム100は、将来の特定の期間において特定の大きさの電力を抑制する計画を策定するものである。 Figure 1 is a schematic diagram showing the configuration of a demand response system 100 according to one embodiment. The demand response system 100 develops a plan to suppress a specific amount of power in a specific future period.

図1に示すように、デマンドレスポンスシステム100は、一般送配電事業者102と、アグリゲータ104と、複数の需要家108の集合体であるコミュニティ106と、を含む。 As shown in FIG. 1, the demand response system 100 includes a general electricity transmission and distribution company 102, an aggregator 104, and a community 106 which is a collection of multiple consumers 108.

一般送配電事業者102は、電力需給が逼迫すると予測される時間帯(以下、DR時間帯)が到来する前に、アグリゲータ104に対してDR時間帯における電力の抑制を要請する。DR時間帯は1つの時間帯または連続した複数の時間帯で構成されている。一般送配電事業者102は、1つの時間帯ごとに電力の要請が達成されたか否かを判定する。アグリゲータ104は、一般送配電事業者102のDR要請を受けると、このDR要請を達成するために抑制する電力量を複数の需要家108ごとに分配する。需要家108は、例えば、工場、商業施設、住宅などである。 Before the arrival of a time period when electricity supply and demand is predicted to be tight (hereinafter, DR time period), the general electricity transmission and distribution company 102 requests the aggregator 104 to suppress electricity during the DR time period. The DR time period consists of one time period or multiple consecutive time periods. The general electricity transmission and distribution company 102 determines whether the electricity request has been fulfilled for each time period. When the aggregator 104 receives a DR request from the general electricity transmission and distribution company 102, it distributes the amount of electricity to be suppressed in order to fulfill the DR request to each of multiple consumers 108. The consumers 108 are, for example, factories, commercial facilities, homes, etc.

図1に例示する形態では、アグリゲータ104には、DR時間帯における電力の抑制量に対する複数の需要家108ごとの分配量を算出する電力抑制分配量算出装置1が設置されている。電力抑制分配量算出装置1は、クラウド環境に設けられたクラウドサーバであって、図示しないCPUやGPUといったプロセッサ、ROMやRAMといったメモリなどを備える。電力抑制分配量算出装置1は、メモリにロードされたプログラムの命令に従ってプロセッサが動作(演算等)することで、電力抑制分配量算出装置1が備える各機能部を実現する。以下、電力抑制分配量算出装置1の各機能部について説明する。尚、電力抑制分配量算出装置1は、クラウドサーバに限定されず、例えば、アグリゲータ104の施設内に配置されるコンピュータであってもよい。 In the embodiment illustrated in FIG. 1, the aggregator 104 is provided with a power suppression/distribution amount calculation device 1 that calculates the distribution amount for each of multiple consumers 108 for the suppression amount of power during the DR period. The power suppression/distribution amount calculation device 1 is a cloud server provided in a cloud environment, and includes a processor such as a CPU or GPU, not shown, and memory such as a ROM or RAM. The power suppression/distribution amount calculation device 1 realizes each of the functional units of the power suppression/distribution amount calculation device 1 by the processor operating (calculating, etc.) according to the instructions of a program loaded into the memory. Each functional unit of the power suppression/distribution amount calculation device 1 will be described below. Note that the power suppression/distribution amount calculation device 1 is not limited to a cloud server, and may be, for example, a computer located within the facility of the aggregator 104.

<第1実施形態>
(構成)
図2は、第1実施形態に係る電力抑制分配量算出装置1の概略的な機能ブロック図である。第1実施形態では、DR時間帯は第1時間帯を含んでおり、第1時間帯の開始時刻はDR時間帯の開始時刻と同じ時刻である。一般送配電事業者102は、第1時間帯が到来する前に、アグリゲータ104に対して第1時間帯における電力の抑制を要請している。尚、第1実施形態では、第1時間帯の開始時刻はDR時間帯の開始時刻と同じ時刻であるが、本開示はこの形態に限定されない。
First Embodiment
(composition)
2 is a schematic functional block diagram of the power suppression/distribution amount calculation device 1 according to the first embodiment. In the first embodiment, the DR time period includes a first time period, and the start time of the first time period is the same as the start time of the DR time period. The general electricity transmission and distribution company 102 requests the aggregator 104 to suppress power during the first time period before the first time period arrives. Note that, in the first embodiment, the start time of the first time period is the same as the start time of the DR time period, but the present disclosure is not limited to this form.

図2に示すように、電力抑制分配量算出装置1は、抑制量算出部2、分配量算出部4と、機器状態収集部6と、判定部8と、分配量修正部10と、を備える。 As shown in FIG. 2, the power suppression/distribution amount calculation device 1 includes a suppression amount calculation unit 2, a distribution amount calculation unit 4, an equipment status collection unit 6, a determination unit 8, and a distribution amount correction unit 10.

抑制量算出部2は、一般送配電事業者102のDR要請を受けると、第1時間帯におけるコミュニティ106全体に対する電力の抑制量を算出する。この抑制量は、一般送配電事業者102のDR要請を達成可能な電力量以上であることが望ましいが、一般送配電事業者102のDR要請を達成可能な電力量より少なくてもよい。 When the suppression amount calculation unit 2 receives a DR request from the general electricity transmission and distribution company 102, it calculates the amount of suppression of power for the entire community 106 in the first time period. This suppression amount is preferably equal to or greater than the amount of power that can achieve the DR request of the general electricity transmission and distribution company 102, but may be less than the amount of power that can achieve the DR request of the general electricity transmission and distribution company 102.

分配量算出部4は、第1時間帯よりも前に、抑制量に対する複数の需要家108ごとの分配量を算出する。言い換えると、分配量算出部4は、第1時間帯が到来するよりも前に、第1時間帯における電力の抑制を達成するための分配計画Pを策定する。分配量算出部4による第1時間帯の分配計画Pの策定方法は特に限定されない。例えば、分配量算出部4は、第1時間帯より以前のDR要請に対する需要家108の電力の抑制量の実績に基づいて、この需要家108に要請する分配量を算出する。幾つかの実施形態では、分配量算出部4は、後述する機器状態収集部6が収集する需要家108の電力機器110の機器状態情報Xを加味して、分配量を算出する。 The distribution amount calculation unit 4 calculates the distribution amount for each of the multiple consumers 108 in relation to the suppression amount before the first time slot. In other words, the distribution amount calculation unit 4 formulates a distribution plan P for achieving power suppression in the first time slot before the arrival of the first time slot. The method of formulating the distribution plan P for the first time slot by the distribution amount calculation unit 4 is not particularly limited. For example, the distribution amount calculation unit 4 calculates the distribution amount to be requested to the consumer 108 based on the actual amount of power suppression of the consumer 108 in response to the DR request before the first time slot. In some embodiments, the distribution amount calculation unit 4 calculates the distribution amount by taking into account the equipment status information X of the power equipment 110 of the consumer 108 collected by the equipment status collection unit 6 described later.

機器状態収集部6は、複数の需要家108ごとの電力機器110の状態に関する機器状態情報Xをリアルタイムに収集可能に構成されている。例えば、電力抑制分配量算出装置1は複数の需要家108ごとの電力機器110と電気的に接続されており、電力抑制分配量算出装置1の機器状態収集部6は、電力機器110から送信される電気信号を受信することで、機器状態情報Xをリアルタイムに収集する。尚、電力抑制分配量算出装置1は、電力機器110と無線接続されていてもよいし、専用線や電力線によって有線接続されていてもよい。 The equipment status collection unit 6 is configured to be able to collect equipment status information X relating to the status of the power equipment 110 for each of the multiple consumers 108 in real time. For example, the power suppression/distribution amount calculation device 1 is electrically connected to the power equipment 110 for each of the multiple consumers 108, and the equipment status collection unit 6 of the power suppression/distribution amount calculation device 1 collects the equipment status information X in real time by receiving an electrical signal transmitted from the power equipment 110. The power suppression/distribution amount calculation device 1 may be wirelessly connected to the power equipment 110, or may be wired by a dedicated line or power line.

電力機器110の機器状態情報Xについて具体的に説明する。図3は、幾つかの実施形態に係る電力機器110の機器状態情報Xを説明するための図である。電力機器110は、電力消費機器112と、発電機器114と、を含む。電力消費機器112は、一般送配電事業者102から送配電される電力を消費する機器であり、例えば、工場に設けられる冷凍機やボイラー、商業施設・住宅に設けられる照明装置や空調装置などである。発電機器114は、自身で電力を発電する機器であり、例えば、都市ガス、LNG、軽油、又は重油等を燃料として駆動する発電機や蓄電池などである。 The device status information X of the electric power device 110 will be specifically described. FIG. 3 is a diagram for explaining the device status information X of the electric power device 110 according to some embodiments. The electric power device 110 includes a power consumption device 112 and a power generation device 114. The power consumption device 112 is a device that consumes electric power transmitted and distributed from the general power transmission and distribution company 102, such as a refrigerator or boiler installed in a factory, or a lighting device or air conditioning device installed in a commercial facility or a house. The power generation device 114 is a device that generates electric power by itself, such as a generator or a storage battery that runs on city gas, LNG, light oil, heavy oil, or the like as fuel.

図3に例示する形態では、電力機器110は、電力消費機器112と発電機器114の両方を有する。機器状態情報Xは、電力機器110の電力消費機器112が受電する受電電力量X1と、電力機器110の発電機器114が発電する発電電力量X2と、を含んでいる。受電電力量X1は、例えば、一般送配電事業者102から電力消費機器112に送配電される電力Wを電力計116によって計測した値である。電力計116は、例えば、インターネットを介して、機器状態収集部6に受電電力量X1を送信するように構成されている。発電電力量X2は、例えば、発電量算出装置118によって発電機器114の稼働情報Y(台数や稼働率など)から算出される値である。発電量算出装置118は、例えば、インターネットを介して、機器状態収集部6に発電電力量X2を送信するように構成されている。図3に例示する形態によれば、機器状態収集部6は、電力計116から受電電力量X1を収集し、発電量算出装置118から発電電力量X2を収集するので、需要家108の電力の過不足状態を速やかに収集することができる。 In the embodiment illustrated in FIG. 3, the power equipment 110 has both the power consumption equipment 112 and the power generation equipment 114. The equipment status information X includes the amount of received power X1 received by the power consumption equipment 112 of the power equipment 110 and the amount of generated power X2 generated by the power generation equipment 114 of the power equipment 110. The amount of received power X1 is, for example, a value measured by the power meter 116 of the power W transmitted and distributed from the general power transmission and distribution company 102 to the power consumption equipment 112. The power meter 116 is configured to transmit the amount of received power X1 to the equipment status collection unit 6, for example, via the Internet. The amount of generated power X2 is, for example, a value calculated by the power generation amount calculation device 118 from the operation information Y (such as the number of units and the operation rate) of the power generation equipment 114. The power generation amount calculation device 118 is configured to transmit the amount of generated power X2 to the equipment status collection unit 6, for example, via the Internet. According to the embodiment illustrated in FIG. 3, the device status collection unit 6 collects the amount of received power X1 from the power meter 116 and collects the amount of generated power X2 from the power generation calculation device 118, so that the power surplus or shortage status of the consumer 108 can be promptly collected.

尚、別の実施形態では、電力機器110は電力消費機器112を有するが、発電機器114を有さず、機器状態情報Xは受電電力量X1だけを含む。別の実施形態では、電力機器110は電力消費機器112と発電機器114の両方を有するが、機器状態情報Xは、発電電力量X2だけを含む。 In another embodiment, the power equipment 110 has a power consumption equipment 112 but does not have a power generation equipment 114, and the equipment status information X includes only the amount of received power X1. In another embodiment, the power equipment 110 has both a power consumption equipment 112 and a power generation equipment 114, and the equipment status information X includes only the amount of generated power X2.

図2に戻って、判定部8及び分配量修正部10について説明する。判定部8は、第1時間帯において、機器状態収集部6がリアルタイムに収集する機器状態情報Xに基づいて、分配量算出部4が算出した複数の需要家108ごとの分配量を修正するか否かを判定する。言い換えると、判定部8は、第1時間帯において、機器状態収集部6がリアルタイムに収集する機器状態情報Xに基づいて、分配量算出部4が策定した第1時間帯の分配計画Pを修正するか否かを判定する。 Returning to FIG. 2, the determination unit 8 and the distribution amount correction unit 10 will be described. The determination unit 8 determines whether or not to correct the distribution amount for each of the multiple consumers 108 calculated by the distribution amount calculation unit 4 during the first time period, based on the equipment status information X collected in real time by the equipment status collection unit 6. In other words, the determination unit 8 determines whether or not to correct the distribution plan P for the first time period, formulated by the distribution amount calculation unit 4, during the first time period, based on the equipment status information X collected in real time by the equipment status collection unit 6 during the first time period.

ここで、判定部8による判定方法の一例について説明する。まず、判定部8は、第1時間帯にコミュニティ106が単位時間当たり(例えば、1分当たり)に受電する平均受電量を算出する。具体的には、判定部8は、第1時間帯の開始時刻から経過時間が経過するまでに収集された機器状態情報Xに基づいて、第1時間帯の開始時刻から経過時間が経過するまでにコミュニティ106全体が受電した電力量を算出する。そして、判定部8は、この電力量を経過時間で割ることで平均受電量を算出する。少なくとも1つの需要家108が発電機器114を有する場合には、第1時間帯の開始時刻から経過時間が経過するまでにコミュニティ106全体が受電した電力量から発電した電力量を差し引いた値を経過時間で割ることで平均受電量を算出する。尚、第1時間帯の開始時刻から経過時間が経過した時刻は、第1時間帯の終了時刻を超えない。 Here, an example of the determination method by the determination unit 8 will be described. First, the determination unit 8 calculates the average amount of power received by the community 106 per unit time (e.g., per minute) during the first time period. Specifically, the determination unit 8 calculates the amount of power received by the entire community 106 from the start time of the first time period until the elapse of the elapsed time based on the device status information X collected from the start time of the first time period until the elapse of the elapsed time. Then, the determination unit 8 calculates the average amount of power received by dividing this amount of power by the elapsed time. When at least one consumer 108 has a power generation device 114, the average amount of power received is calculated by subtracting the amount of power generated from the amount of power received by the entire community 106 from the start time of the first time period until the elapse of the elapsed time by the elapsed time. Note that the time elapsed from the start time of the first time period does not exceed the end time of the first time period.

幾つかの実施形態では、第1時間帯の開始時刻から経過時間が経過した時刻を経過時刻とすると、平均受電量は、経過時刻の直前から経過時刻までにコミュニティ106全体が受電した電力量の単位時間当たりの平均値である。経過時刻の直前とは、経過時刻から予め設定された時間だけ過去のことであり、例えば、経過時刻の2分前である。このような構成によれば、判定部8は、需要家108の電力機器110の最新状態に近い状態だけを考慮して、第1時間帯の分配計画Pを修正するか否かを判定することができる。 In some embodiments, if the elapsed time is the time that has elapsed since the start time of the first time slot, the average power received is the average value per unit time of the amount of power received by the entire community 106 from just before the elapsed time to the elapsed time. Just before the elapsed time refers to a preset time in the past from the elapsed time, for example, two minutes before the elapsed time. With this configuration, the determination unit 8 can determine whether or not to modify the distribution plan P for the first time slot, taking into account only the state close to the latest state of the power equipment 110 of the consumer 108.

次に、判定部8は、第1時間帯にコミュニティ106に単位時間当たりに供給される電力の平均目標受電電力量を算出する。具体的には、判定部8は、DR要請が無かった場合の第1時間帯に消費する電力の予測値(ベースライン)から抑制量を差し引いた値を、第1時間帯の長さで割ることで平均目標受電電力量を算出する。そして、判定部8は、平均目標受電電力量<平均受電量であるならば、第1時間帯の分配計画Pを修正すると判定する。一方で、判定部8は、平均目標受電電力量>平均受電量であるならば、第1時間帯の分配計画Pを修正しないと判定する。幾つかの実施形態では、判定部8は、平均目標受電電力量<平均受電量×α(αは1未満の数値)であるならば、第1時間帯の分配計画Pを修正すると判定する。αは、例えば、0.8以上の数値である。尚、第1時間帯の長さは、第1時間帯の開始時刻から終了時刻までに経過する時間であって、例えば、30分である。 Next, the determination unit 8 calculates the average target amount of received power of power supplied per unit time to the community 106 during the first time slot. Specifically, the determination unit 8 calculates the average target amount of received power by dividing the value obtained by subtracting the suppression amount from the predicted value (baseline) of power consumed during the first time slot when there is no DR request by the length of the first time slot. Then, the determination unit 8 determines that the distribution plan P for the first time slot is to be revised if the average target amount of received power is less than the average amount of received power. On the other hand, the determination unit 8 determines that the distribution plan P for the first time slot is not to be revised if the average target amount of received power is greater than the average amount of received power. In some embodiments, the determination unit 8 determines that the distribution plan P for the first time slot is to be revised if the average target amount of received power is less than the average amount of received power x α (α is a numerical value less than 1). α is, for example, a numerical value equal to or greater than 0.8. The length of the first time slot is the time elapsed from the start time to the end time of the first time slot, and is, for example, 30 minutes.

分配量修正部10は、判定部8が複数の需要家108ごとの分配量を修正すると判定した場合には、複数の需要家108ごとの分配量を修正する。言い換えると、分配量修正部10は、判定部8が第1時間帯の分配計画Pを修正すると判定した場合には、第1時間帯の分配計画Pを修正する。そして、修正された複数の需要家108ごとの分配量は、電力抑制分配量算出装置1の外部に出力され、この分配量に対応する需要家108に通知されるようになっている。判定部8が第1時間帯の分配計画Pを修正しないと判定した場合には、第1時間帯の分配計画Pは、分配量修正部10によって修正されずに電力抑制分配量算出装置1の外部に出力される。 When the determination unit 8 determines that the distribution amount for each of the multiple consumers 108 should be corrected, the distribution amount correction unit 10 corrects the distribution amount for each of the multiple consumers 108. In other words, when the determination unit 8 determines that the distribution plan P for the first time slot should be corrected, the distribution amount correction unit 10 corrects the distribution plan P for the first time slot. The corrected distribution amount for each of the multiple consumers 108 is output to the outside of the power suppression and distribution amount calculation device 1, and is notified to the consumer 108 corresponding to this distribution amount. When the determination unit 8 determines that the distribution plan P for the first time slot should not be corrected, the distribution plan P for the first time slot is output to the outside of the power suppression and distribution amount calculation device 1 without being corrected by the distribution amount correction unit 10.

ここで、分配量修正部10による修正方法の一例について説明する。分配量修正部10は、機器状態収集部6がリアルタイムに収集する機器状態情報Xに基づいて、複数の需要家108のうち予め通知した分配量を満たす電力の抑制が困難と予測される第1の需要家108Aと、第1の需要家108Aを除く第2の需要家108Bと、を選出する。そして、分配量修正部10は、第1の需要家108Aに再分配する分配量を減少し、この減少した分配量を第2の需要家108Bに分配する分配量に増加する。 Here, an example of a correction method by the distribution amount correction unit 10 will be described. Based on the equipment status information X collected in real time by the equipment status collection unit 6, the distribution amount correction unit 10 selects, from among the multiple consumers 108, a first consumer 108A for which it is predicted that it will be difficult to suppress power to satisfy the distribution amount notified in advance, and a second consumer 108B excluding the first consumer 108A. Then, the distribution amount correction unit 10 reduces the distribution amount to be redistributed to the first consumer 108A, and increases this reduced distribution amount to the distribution amount to be distributed to the second consumer 108B.

尚、分配量修正部10は、第1時間帯において、分配量修正部10が修正した分配量を再修正するように構成されてもよい。幾つかの実施形態では、判定部8は、第1時間帯において、機器状態収集部6がリアルタイムに収集する機器状態情報Xに基づいて、分配量修正部10が修正した複数の需要家108ごとの分配量を再修正するか否かを判定する。分配量修正部10は、判定部8が再修正すると判定した場合には、複数の需要家108ごとの分配量を再修正する。 The distribution amount correction unit 10 may be configured to re-correct the distribution amount corrected by the distribution amount correction unit 10 during the first time period. In some embodiments, the determination unit 8 determines whether or not to re-correct the distribution amount corrected by the distribution amount correction unit 10 for each of the multiple consumers 108 during the first time period, based on the equipment status information X collected in real time by the equipment status collection unit 6. When the determination unit 8 determines that the distribution amount should be re-corrected, the distribution amount correction unit 10 re-corrects the distribution amount for each of the multiple consumers 108.

(作用・効果)
第1実施形態によれば、第1時間帯の分配計画Pは、第1時間帯にリアルタイムに収集される機器状態情報Xに基づいて、修正の要否が判定される。つまり、第1時間帯の分配計画Pに対する修正の要否判定は、第1時間帯における電力機器110の状態が考慮されるようになっている。そして、分配量修正部10は、判定部8が第1時間帯の分配計画Pを修正すると判定した場合に第1時間帯の分配計画Pを修正する。このため、第1時間帯の分配計画Pの精度を高め、DR要請を達成する可能性を高めることができる。
(Action and Effects)
According to the first embodiment, the need for modification of the distribution plan P for the first time slot is determined based on the equipment status information X collected in real time during the first time slot. That is, the need for modification of the distribution plan P for the first time slot is determined taking into account the state of the electric equipment 110 in the first time slot. Then, the distribution amount modification unit 10 modifies the distribution plan P for the first time slot when the determination unit 8 determines that the distribution plan P for the first time slot should be modified. This can improve the accuracy of the distribution plan P for the first time slot and increase the possibility of achieving a DR request.

幾つかの実施形態に係る判定部8について説明する。図4は、幾つかの実施形態に係る判定部8の状態を示す図である。図4において、第1時刻t1は、第1時間帯の開始時刻である。第2時刻t2は、第1時刻t1から第1時間Δ1が経過した時刻である。第3時刻t3は、分配量修正部10が分配量を修正した時刻(第1時間帯の分配計画Pを修正した時刻)である。第4時刻t4は、第3時刻t3から第2時間Δ2が経過した時刻である。第5時刻t5は、第1時間帯の終了時刻である。 The determination unit 8 according to some embodiments will be described. FIG. 4 is a diagram showing the state of the determination unit 8 according to some embodiments. In FIG. 4, the first time t1 is the start time of the first time slot. The second time t2 is the time when the first time Δ1 has elapsed since the first time t1. The third time t3 is the time when the distribution amount correction unit 10 corrects the distribution amount (the time when the distribution plan P for the first time slot is corrected). The fourth time t4 is the time when the second time Δ2 has elapsed since the third time t3. The fifth time t5 is the end time of the first time slot.

判定部8の状態は、第1時間帯において、リアルタイムに収集される機器状態情報Xに基づいて、第1時間帯の分配計画Pを修正するか否かを判定する第1状態s1と、リアルタイムに収集される機器状態情報Xに関係なく第1時間帯の分配計画Pを修正しないと判定する第2状態s2と、を含む。第1時間Δ1は、判定部8の判定の正確性を一定以上にするために必要となる機器状態情報Xを蓄積する時間であって、予め定められている。第2時間Δ2は、需要家108が修正された第1時間帯の分配計画Pに応動するまでにかかる時間であって、予め定められている。第2時間Δ2は、例えば、需要家108に分配量が通知されてから、需要家108の発電機器114によって発電される発電量が目標値(DR要請を達成可能な発電量)に到達するまでにかかる時間である。 The states of the determination unit 8 include a first state s1 in which it is determined whether or not to modify the distribution plan P for the first time slot based on the equipment status information X collected in real time during the first time slot, and a second state s2 in which it is determined not to modify the distribution plan P for the first time slot regardless of the equipment status information X collected in real time. The first time Δ1 is a time for accumulating the equipment status information X required to make the determination by the determination unit 8 more accurate than a certain level, and is determined in advance. The second time Δ2 is a time required for the consumer 108 to respond to the modified distribution plan P for the first time slot, and is determined in advance. The second time Δ2 is, for example, a time required for the amount of power generated by the power generation equipment 114 of the consumer 108 to reach a target value (the amount of power generation that can achieve the DR request) after the distribution amount is notified to the consumer 108.

図4に示すように、幾つかの実施形態では、判定部8の状態は、第1時刻t1から第2時刻t2まで第2状態s2となっている。つまり、判定部8は、第1時間帯の開始時刻から第1時間Δ1が経過するまでは分配量(第1時間帯の分配計画P)を修正しないと判定する。 As shown in FIG. 4, in some embodiments, the state of the determination unit 8 is the second state s2 from the first time t1 to the second time t2. In other words, the determination unit 8 determines that the distribution amount (distribution plan P for the first time slot) will not be revised until the first time Δ1 has elapsed from the start time of the first time slot.

第1時間帯の開始時刻から第1時間Δ1が経過するまでは、機器状態収集部6によって収集される機器状態情報Xが十分ではないので、判定部8の判定の正確性は低く、第1時間帯の分配計画Pの修正は不要である。図4に例示する構成によれば、機器状態情報Xが十分に収集され、判定部8の判定の正確性が高くなるまで、第1時間帯の分配計画Pの修正を抑止することができる。 Before the first time Δ1 has elapsed from the start time of the first time slot, the equipment status information X collected by the equipment status collection unit 6 is insufficient, so the accuracy of the judgment by the judgment unit 8 is low and there is no need to modify the distribution plan P for the first time slot. According to the configuration illustrated in FIG. 4, it is possible to prevent modification of the distribution plan P for the first time slot until sufficient equipment status information X is collected and the accuracy of the judgment by the judgment unit 8 becomes high.

図4に示すように、幾つかの実施形態では、判定部8の状態は、第3時刻t3から第4時刻t4まで第2状態となっている。つまり、判定部8は、第1時間帯において、分配量修正部10が分配量(第1時間帯の分配計画P)を修正した場合には、分配量修正部10が分配量を修正した時間から第2時間Δ2が経過するまでは分配量を修正しないと判定する。 As shown in FIG. 4, in some embodiments, the state of the determination unit 8 is the second state from the third time t3 to the fourth time t4. In other words, when the distribution amount correction unit 10 corrects the distribution amount (distribution plan P for the first time period) in the first time period, the determination unit 8 determines that the distribution amount will not be corrected until the second time Δ2 has elapsed since the time when the distribution amount correction unit 10 corrected the distribution amount.

需要家108が修正された第1時間帯の分配計画Pに応動するまでには幾らかの時間がかかる。このため、第1時間帯の分配計画Pを修正した時刻から幾らかの時間が経過するまでは、機器状態収集部6によって収集される機器状態情報Xが十分ではないので、判定部8の判定の正確性は低く、第1時間帯の分配計画Pの修正は不要である。図4に例示する構成によれば、修正された第1時間帯の分配計画Pに対して需要家108が応動した後の機器状態情報Xを十分に収集し、判定部8の判定の正確性が高くなるまで、第1時間帯の分配計画Pの修正を抑止することができる。 It takes some time for the consumer 108 to respond to the revised distribution plan P for the first time slot. For this reason, until some time has passed since the time when the distribution plan P for the first time slot is revised, the equipment status information X collected by the equipment status collection unit 6 is insufficient, so the accuracy of the judgment by the judgment unit 8 is low and revision of the distribution plan P for the first time slot is unnecessary. According to the configuration illustrated in FIG. 4, it is possible to collect sufficient equipment status information X after the consumer 108 responds to the revised distribution plan P for the first time slot, and to prevent revision of the distribution plan P for the first time slot until the accuracy of the judgment by the judgment unit 8 becomes high.

図4に例示する形態では、第1時間帯のうち第1時刻t1から第2時刻t2、及び第3時刻t3から第4時刻t4を除いた時間帯において、判定部8の状態は、第1状態s1となっている。言い換えると、判定部8の状態は、第2時刻t2から第3時刻t3、及び第4時刻t4から第5時刻t5までの両方で第1状態s1となっている。このような構成によれば、判定部8の状態が第1状態s1である時間を増やし、第1時間帯において意図せぬイベントが発生したとしても、速やかに、この意図せぬイベントを考慮した第1時間帯の分配計画Pを策定することができる。 In the embodiment illustrated in FIG. 4, the state of the determination unit 8 is the first state s1 during the first time slot excluding the first time t1 to the second time t2 and the third time t3 to the fourth time t4. In other words, the state of the determination unit 8 is the first state s1 both from the second time t2 to the third time t3 and from the fourth time t4 to the fifth time t5. With this configuration, the time during which the state of the determination unit 8 is the first state s1 is increased, and even if an unintended event occurs during the first time slot, a distribution plan P for the first time slot can be quickly formulated that takes the unintended event into account.

<第2実施形態>
本開示の第2実施形態に係る電力抑制分配量算出装置1について説明する。第2実施形態は、抑制量算出部2、分配量算出部4、及び分配量修正部10の機能を追加したものである。第2実施形態において、第1実施形態の構成要件と同じものは同じ参照符号を付し、その詳細な説明は省略する。
Second Embodiment
A power suppression and distribution amount calculation device 1 according to a second embodiment of the present disclosure will be described. The second embodiment adds functions of a suppression amount calculation unit 2, a distribution amount calculation unit 4, and a distribution amount correction unit 10. In the second embodiment, the same components as those in the first embodiment are given the same reference numerals, and detailed descriptions thereof will be omitted.

(構成)
図5は、第2実施形態に係る電力抑制分配量算出装置1の概略的な機能ブロック図である。第2実施形態では、DR時間帯は、第1時間帯と、第1時間帯より後に第1時間帯と連続する第2時間帯と、を含んでいる。一般送配電事業者102は、第1時間帯が到来する前に、アグリゲータ104に対して第1時間帯における電力の抑制と第2時間帯における電力の抑制を要請している。つまり、第2実施形態に係るDR要請は、第1時間帯における電力の抑制と第2時間帯における電力の抑制の両方を含む。図2に示すように、電力抑制分配量算出装置1は、第1時間帯の分配計画Pに加え、第2時間帯における電力の抑制量に対する複数の需要家108ごとの分配量である第2時間帯の第2分配計画P2も算出する。
(composition)
FIG. 5 is a schematic functional block diagram of the power suppression/distribution amount calculation device 1 according to the second embodiment. In the second embodiment, the DR time period includes a first time period and a second time period that is subsequent to the first time period and is continuous with the first time period. Before the first time period arrives, the general power transmission and distribution company 102 requests the aggregator 104 to suppress power in the first time period and suppress power in the second time period. That is, the DR request according to the second embodiment includes both the suppression of power in the first time period and the suppression of power in the second time period. As shown in FIG. 2, the power suppression/distribution amount calculation device 1 calculates, in addition to the distribution plan P for the first time period, a second distribution plan P2 for the second time period, which is a distribution amount for each of the multiple consumers 108 with respect to the amount of power suppression in the second time period.

抑制量算出部2は、DR要請を受けると、第1時間帯におけるコミュニティ106全体に対する電力の抑制量(第1抑制量)、及び第2時間帯におけるコミュニティ106全体に対する電力の抑制量(第2抑制量)を算出する。第1抑制量と第2抑制量とは、互いに異なる値であってもよいし、互いに等しい値であってもよい。 When the suppression amount calculation unit 2 receives a DR request, it calculates the power suppression amount for the entire community 106 in the first time period (first suppression amount) and the power suppression amount for the entire community 106 in the second time period (second suppression amount). The first suppression amount and the second suppression amount may be different values or may be equal values.

分配量算出部4は、第1時間帯よりも前に、第1抑制量に対する複数の需要家108ごとの分配量(第1分配量)、及び第2抑制量に対する複数の需要家108ごとの分配量(第2分配量)を算出する。第1分配量は上述した第1時間帯の分配計画Pに相当し、第2分配量は上述した第2時間帯の第2分配計画P2に相当する。 The distribution amount calculation unit 4 calculates, prior to the first time slot, a distribution amount (first distribution amount) for each of the multiple consumers 108 for the first suppression amount, and a distribution amount (second distribution amount) for each of the multiple consumers 108 for the second suppression amount. The first distribution amount corresponds to the distribution plan P for the first time slot described above, and the second distribution amount corresponds to the second distribution plan P2 for the second time slot described above.

分配量修正部10は、第1時間帯において、判定部8が第1分配量を修正すると判定した場合には、第2時間帯よりも前に第2分配量を修正する。そして、修正された第2分配量は、電力抑制分配量算出装置1の外部に出力され、第2時間帯よりも前に、この第2分配量に対応する需要家108に通知されるようになっている。第1時間帯において、判定部8が第1分配量を修正しないと判定した場合には、第2分配量は、分配量修正部10によって修正されずに電力抑制分配量算出装置1の外部に出力される。 If the determination unit 8 determines that the first distribution amount should be modified during the first time period, the distribution amount modification unit 10 modifies the second distribution amount before the second time period. The modified second distribution amount is then output to the outside of the power suppression and distribution amount calculation device 1, and is notified to the consumer 108 corresponding to this second distribution amount before the second time period. If the determination unit 8 determines that the first distribution amount should not be modified during the first time period, the second distribution amount is output to the outside of the power suppression and distribution amount calculation device 1 without being modified by the distribution amount modification unit 10.

(作用・効果)
第1時間帯において、判定部8が第1分配量を修正すると判定した場合には、第2分配量も修正が必要となる可能性が高い。これは、例えば、第1時間帯に需要家108の電力機器110に意図せぬイベント(例えば、故障)が発生した際に、第2時間帯における需要家108の電力の抑制に影響を与える可能性が高いからである。
(Action and Effects)
When the determining unit 8 determines that the first distribution amount should be modified in the first time slot, it is highly likely that the second distribution amount also needs to be modified. This is because, for example, when an unintended event (e.g., a failure) occurs in the electric power device 110 of the consumer 108 in the first time slot, it is highly likely that this will affect the suppression of power of the consumer 108 in the second time slot.

第2実施形態によれば、分配量修正部10は、第1時間帯において、判定部8が第1分配量を修正すると判定した場合に第2分配量を修正する。このため、第2時間帯よりも前に、第2分配量の精度を高め、DR要請を達成する可能性を高めることができる。 According to the second embodiment, the distribution amount correction unit 10 corrects the second distribution amount when the determination unit 8 determines that the first distribution amount should be corrected during the first time period. This makes it possible to improve the accuracy of the second distribution amount before the second time period and increase the possibility of achieving the DR request.

<電力抑制分配量算出方法>
図6は、一実施形態に係る電力抑制分配量算出方法のフローチャートである。図6に示すように、電力抑制分配量算出方法は、抑制量算出ステップS2と、分配量算出ステップS4と、分配量通知ステップS6と、収集ステップS8と、判定ステップS10と、修正ステップS12と、を含む。
<Power control distribution amount calculation method>
6 is a flowchart of a power suppression and distribution amount calculation method according to an embodiment. As shown in FIG. 6, the power suppression and distribution amount calculation method includes a suppression amount calculation step S2, a distribution amount calculation step S4, a distribution amount notification step S6, a collection step S8, a determination step S10, and a correction step S12.

抑制量算出ステップS2では、第1時間帯におけるコミュニティ106全体に対する電力の抑制量を算出する。 In the reduction amount calculation step S2, the amount of power reduction for the entire community 106 during the first time period is calculated.

分配量算出ステップS4では、第1時間帯よりも前に、抑制量算出ステップS2で算出された抑制量に対する複数の需要家108ごとの分配量を算出する。つまり、分配量算出ステップS4では、第1時間帯の分配計画Pが策定される。 In the distribution amount calculation step S4, the distribution amount for each of the multiple consumers 108 is calculated for the suppression amount calculated in the suppression amount calculation step S2 before the first time slot. That is, in the distribution amount calculation step S4, a distribution plan P for the first time slot is formulated.

分配量通知ステップS6では、分配量算出ステップS4で算出された複数の需要家108ごとの分配量を、第1時間帯よりも前に、該分配量に対応する需要家108に通知する。 In the distribution amount notification step S6, the distribution amount for each of the multiple consumers 108 calculated in the distribution amount calculation step S4 is notified to the consumer 108 corresponding to the distribution amount before the first time period.

収集ステップS8では、第1時間帯において、複数の需要家108ごとの電力機器110の状態に関する機器状態情報Xをリアルタイムに収集する。 In the collection step S8, equipment status information X regarding the status of the power equipment 110 for each of the multiple consumers 108 is collected in real time during the first time period.

判定ステップS10では、第1時間帯において、収集ステップS8でリアルタイムに収集された機器状態情報Xに基づいて、第1時間帯の分配計画Pを修正するか否かを判定する。第1時間帯の分配計画Pを修正すると判定すると(S10:Yes)、修正ステップS12に進む。第1時間帯の分配計画Pを修正しないと判定すると(S10:No)、収集ステップS8に戻る。 In the determination step S10, it is determined whether or not to modify the distribution plan P for the first time slot based on the device status information X collected in real time in the collection step S8 during the first time slot. If it is determined that the distribution plan P for the first time slot is to be modified (S10: Yes), the process proceeds to the modification step S12. If it is determined that the distribution plan P for the first time slot is not to be modified (S10: No), the process returns to the collection step S8.

修正ステップS12では、判定ステップS10で第1時間帯の分配計画Pを修正すると判定した場合に第1時間帯の分配計画Pを修正する。そして、第1時間帯の分配計画Pの修正が完了すると、修正ステップS12から分配量通知ステップS6に戻る。分配量通知ステップS6では、第1時間帯において、修正ステップS12で修正された第1時間帯の分配計画Pを需要家108に通知する。 In the correction step S12, if it is determined in the determination step S10 that the distribution plan P for the first time slot should be corrected, the distribution plan P for the first time slot is corrected. Then, when the correction of the distribution plan P for the first time slot is completed, the process returns from the correction step S12 to the distribution amount notification step S6. In the distribution amount notification step S6, the distribution plan P for the first time slot corrected in the correction step S12 is notified to the consumer 108 in the first time slot.

このような電力抑制分配量算出方法によれば、第1時間帯の分配計画Pに対する修正の要否判定は、第1時間帯における電力機器110の状態が考慮されるようになっている。そして、第1時間帯の分配計画Pを修正すると判定した場合には、修正された第1時間帯の分配計画Pが需要家108に通知される。このため、第1時間帯の分配計画Pの精度を高め、DR要請を達成する可能性を高めることができる。 According to this method for calculating the amount of power suppression and distribution, the state of the power devices 110 in the first time slot is taken into consideration when determining whether or not the distribution plan P for the first time slot needs to be revised. Then, if it is determined that the distribution plan P for the first time slot needs to be revised, the revised distribution plan P for the first time slot is notified to the consumer 108. This makes it possible to improve the accuracy of the distribution plan P for the first time slot and increase the possibility of achieving the DR request.

幾つかの実施形態では、抑制量算出ステップS2は、第1時間帯におけるコミュニティ106全体に対する電力の抑制量(第1抑制量)、及び、第2時間帯におけるコミュニティ106全体に対する電力の抑制量(第2抑制量)を算出する。分配量算出ステップS4は、第1時間帯よりも前に、第1抑制量に対する複数の需要家108ごとの分配量(第1分配量)、及び第2抑制量に対する複数の需要家108ごとの分配量(第2分配量)を算出する。修正ステップS12は、第1時間帯において、第1分配量を修正すると判定した場合には、第2時間帯よりも前に第2分配量を修正する。そして、分配量通知ステップS6は、第1時間帯において、修正ステップS12で修正された第2分配量を需要家108に通知する。 In some embodiments, the suppression amount calculation step S2 calculates the power suppression amount (first suppression amount) for the entire community 106 in the first time period, and the power suppression amount (second suppression amount) for the entire community 106 in the second time period. The distribution amount calculation step S4 calculates the distribution amount (first distribution amount) for each of the multiple consumers 108 for the first suppression amount and the distribution amount (second distribution amount) for each of the multiple consumers 108 for the second suppression amount before the first time period. If it is determined that the first distribution amount is to be corrected in the first time period, the correction step S12 corrects the second distribution amount before the second time period. Then, the distribution amount notification step S6 notifies the consumers 108 of the second distribution amount corrected in the correction step S12 in the first time period.

このような電力抑制分配量算出方法によれば、第1時間帯において、第1分配量を修正すると判定すると、第2分配量が修正され、この修正された第2分配量が需要家108に通知される。このため、第2時間帯よりも前に、第2分配量の精度を高め、DR要請を達成する可能性を高めることができる。 According to this method of calculating the power suppression distribution amount, if it is determined that the first distribution amount should be revised in the first time period, the second distribution amount is revised, and this revised second distribution amount is notified to the consumer 108. Therefore, it is possible to improve the accuracy of the second distribution amount before the second time period, and increase the possibility of fulfilling the DR request.

上記各実施形態に記載の内容は、例えば以下のように把握される。 The contents described in each of the above embodiments can be understood, for example, as follows:

[1]本開示に係る電力抑制分配量算出装置(1)は、
少なくとも1つの時間帯における複数の需要家(108)の集合体であるコミュニティ(106)全体に対する電力の抑制量を算出する抑制量算出部(2)と、
前記少なくとも1つの時間帯よりも前に、前記抑制量に対する前記複数の需要家ごとの分配量を算出する分配量算出部(4)と、
前記複数の需要家ごとの電力機器(110)の状態に関する機器状態情報をリアルタイムに収集可能な機器状態収集部(6)と、
前記少なくとも1つの時間帯において、前記機器状態収集部がリアルタイムに収集する前記機器状態情報に基づいて、前記分配量を修正するか否かを判定する判定部(8)と、
前記判定部が前記分配量を修正すると判定した場合に前記分配量を修正する分配量修正部(10)と、を備える。
[1] A power suppression and distribution amount calculation device (1) according to the present disclosure,
a power suppression amount calculation unit (2) that calculates a power suppression amount for an entire community (106) that is a collection of a plurality of consumers (108) in at least one time period;
a distribution amount calculation unit (4) that calculates a distribution amount for each of the plurality of consumers with respect to the suppression amount before the at least one time period;
An equipment status collection unit (6) capable of collecting equipment status information relating to the status of the electric power equipment (110) for each of the plurality of consumers in real time;
a determination unit (8) that determines whether or not to modify the distribution amount based on the device status information collected in real time by the device status collection unit during the at least one time period;
and a distribution amount correction unit (10) that corrects the distribution amount when the determination unit determines that the distribution amount should be corrected.

上記[1]に記載の構成によれば、少なくとも1つの時間帯におけるコミュニティ全体に対する電力の抑制量に対する複数の需要家ごとの分配量は、少なくとも1つの時間帯よりも前に算出される。そして、この算出された分配量は、少なくとも1つの時間帯にリアルタイムに収集される機器状態情報に基づいて、修正の要否が判定される。つまり、分配量の修正の要否判定は、少なくとも1つの時間帯における電力機器の状態が考慮されるようになっている。そして、分配量修正部は、判定部が分配量を修正すると判定した場合に分配量を修正する。このため、少なくとも1つの時間帯における電力の抑制量を適切に複数の需要家ごとに分配することができる。 According to the configuration described in [1] above, the distribution amount for each of the multiple consumers with respect to the amount of power suppression for the entire community in at least one time period is calculated at least before one time period. Then, the calculated distribution amount is determined whether or not it needs to be revised based on equipment status information collected in real time during at least one time period. In other words, the determination of whether or not the distribution amount needs to be revised takes into account the state of the power equipment in at least one time period. Then, the distribution amount revision unit revisions the distribution amount when the determination unit determines that the distribution amount should be revised. Therefore, the amount of power suppression in at least one time period can be appropriately distributed to each of the multiple consumers.

[2]幾つかの実施形態では、上記[1]に記載の構成において、
前記判定部は、前記少なくとも1つの時間帯の開始時刻から予め定められた第1時間が経過するまでは前記分配量を修正しないと判定する。
[2] In some embodiments, in the configuration described in [1] above,
The determination unit determines that the distribution amount should not be modified until a predetermined first time has elapsed from a start time of the at least one time slot.

少なくとも1つの時間帯の開始時刻から第1時間が経過するまでは、機器状態収集部によって収集される機器状態情報が十分ではないので、判定部の判定の正確性は低く、分配量の修正は不要である。上記[2]に記載の構成によれば、機器状態情報が十分に収集され、判定部の判定の正確性が高くなるまで、分配量の修正を抑止することができる。 Until the first hour has elapsed from the start time of at least one time period, the device status information collected by the device status collection unit is insufficient, so the accuracy of the judgment by the judgment unit is low and correction of the distribution amount is not necessary. According to the configuration described in [2] above, correction of the distribution amount can be suppressed until sufficient device status information is collected and the accuracy of the judgment by the judgment unit becomes high.

[3]幾つかの実施形態では、上記[1]又は[2]に記載の構成において、
前記判定部は、前記少なくとも1つの時間帯において、前記分配量修正部が前記分配量を修正した場合には、前記分配量修正部が前記分配量を修正した時刻から予め定められた第2時間が経過するまでは前記分配量を修正しないと判定する。
[3] In some embodiments, in the configuration described in [1] or [2] above,
When the distribution amount correction unit corrects the distribution amount during the at least one time period, the judgment unit determines that the distribution amount will not be corrected until a predetermined second time has elapsed from the time when the distribution amount correction unit corrected the distribution amount.

需要家が分配量修正部によって修正された分配量に応動するまでには幾らかの時間がかかる。このため、分配量を修正した時刻から幾らかの時間が経過するまでは、機器状態収集部によって収集される機器状態情報が十分ではないので、判定部の判定の正確性は低く、分配量の修正は不要である。上記[4]に記載の構成によれば、修正した分配量が複数の需要家のそれぞれに反映された機器状態情報が十分に収集され、判定部の判定の正確性が高くなるまで、分配量の修正を抑止することができる。 It takes some time for the consumer to respond to the distribution amount corrected by the distribution amount correction unit. For this reason, until some time has passed since the time the distribution amount was corrected, the equipment status information collected by the equipment status collection unit is insufficient, so the accuracy of the judgment by the judgment unit is low and correction of the distribution amount is not necessary. According to the configuration described in [4] above, it is possible to suppress correction of the distribution amount until sufficient equipment status information reflecting the corrected distribution amount for each of the multiple consumers is collected and the judgment by the judgment unit becomes highly accurate.

[4]幾つかの実施形態では、上記[1]から[3]の何れか1つに記載の構成において、
前記少なくとも1つの時間帯は、第1時間帯と、前記第1時間帯より後に前記第1時間帯と連続する第2時間帯と、を含み、
前記抑制量算出部は、前記第1時間帯における前記コミュニティ全体に対する電力の第1抑制量、及び前記第2時間帯における前記コミュニティ全体に対する電力の第2抑制量を算出するように構成され、
前記分配量算出部は、前記第1時間帯よりも前に、前記第1抑制量に対する前記複数の需要家ごとの第1分配量、及び前記第2抑制量に対する前記複数の需要家ごとの第2分配量を算出するように構成され、
前記分配量修正部は、前記第1時間帯において、前記判定部が前記第1分配量を修正すると判定した場合には、前記第2時間帯よりも前に前記第2分配量を修正するように構成される。
[4] In some embodiments, in the configuration according to any one of [1] to [3] above,
the at least one time period includes a first time period and a second time period subsequent to the first time period and consecutive to the first time period;
the suppression amount calculation unit is configured to calculate a first suppression amount of power for the entire community in the first time period and a second suppression amount of power for the entire community in the second time period;
the distribution amount calculation unit is configured to calculate, prior to the first time slot, a first distribution amount for each of the plurality of consumers with respect to the first suppression amount and a second distribution amount for each of the plurality of consumers with respect to the second suppression amount;
The distribution amount correction unit is configured to correct the second distribution amount before the second time period when the determination unit determines in the first time period that the first distribution amount should be corrected.

第1時間帯において、判定部が第1分配量を修正すると判定した場合には、第2時間帯における第2分配量も修正が必要となる可能性が高い。上記[4]に記載の構成によれば、第1時間帯において、第1分配量を修正すると判定した場合には、第2時間帯よりも前に第2分配量を修正する。このため、第2時間帯よりも前に、第2時間帯における電力の抑制量を適切に複数の需要家ごとに分配することができる。 If the determination unit determines that the first distribution amount should be modified in the first time slot, it is highly likely that the second distribution amount in the second time slot will also need to be modified. According to the configuration described in [4] above, if the determination unit determines that the first distribution amount should be modified in the first time slot, the second distribution amount is modified before the second time slot. Therefore, the amount of power suppression in the second time slot can be appropriately distributed to each of the multiple consumers before the second time slot.

[5]幾つかの実施形態では、上記[1]から[4]の何れか1つに記載の構成において、
前記電力機器は、電力を消費する電力消費機器(112)と、電力を発電する発電機器(114)と、を含み、
前記機器状態情報は、前記電力消費機器が受電する受電電力量、及び前記発電機器が発電する発電電力量のうちの少なくとも1つを含む。
[5] In some embodiments, in the configuration according to any one of [1] to [4] above,
The electric power equipment includes an electric power consumption equipment (112) that consumes electric power and a power generation equipment (114) that generates electric power;
The device status information includes at least one of an amount of power received by the power consuming device and an amount of power generated by the power generating device.

上記[5]に記載の構成によれば、機器状態収集部は、電力機器から電力の過不足状態を速やかに収集することができる。 According to the configuration described in [5] above, the equipment status collection unit can quickly collect information on the power surplus or shortage status from the power equipment.

[6]本開示に係る電力抑制分配量算出方法は、
少なくとも1つの時間帯における複数の需要家の集合体であるコミュニティ全体に対する電力の抑制量を算出するステップ(S2)と、
前記少なくとも1つの時間帯よりも前に、前記抑制量に対する前記複数の需要家ごとの分配量を算出するステップ(S4)と、
前記少なくとも1つの時間帯において、前記複数の需要家ごとの電力機器の状態に関する機器状態情報をリアルタイムに収集するステップ(S8)と、
前記少なくとも1つの時間帯において、リアルタイムに収集された前記機器状態情報に基づいて、前記分配量を修正するか否かを判定するステップ(S10)と、
前記分配量を修正すると判定した場合に前記分配量を修正するステップ(S12)と、を備える。
[6] The power suppression and distribution amount calculation method according to the present disclosure includes:
A step (S2) of calculating an amount of power suppression for an entire community, which is a collection of a plurality of consumers, in at least one time period;
A step (S4) of calculating a distribution amount for each of the plurality of consumers with respect to the suppression amount before the at least one time period;
A step (S8) of collecting equipment status information regarding a status of an electric power device for each of the plurality of consumers in real time during the at least one time period;
A step (S10) of determining whether or not to modify the distribution amount based on the device status information collected in real time during the at least one time period;
and a step (S12) of correcting the distribution amount when it is determined that the distribution amount should be corrected.

上記[6]に記載の方法によれば、複数の需要家ごとの分配量の修正の要否判定は、少なくとも1つの時間帯における電力機器の状態が考慮されるようになっている。そして、分配量を修正すると判定した場合に分配量が修正される。このため、少なくとも1つの時間帯における電力の抑制量を適切に複数の需要家ごとに分配することができる。 According to the method described in [6] above, the state of the electric power equipment in at least one time period is taken into consideration when determining whether or not the distribution amount needs to be revised for each of the multiple consumers. Then, if it is determined that the distribution amount needs to be revised, the distribution amount is revised. Therefore, the amount of power suppression in at least one time period can be appropriately distributed to each of the multiple consumers.

[7]幾つかの実施形態では、上記[6]に記載の方法において、
前記少なくとも1つの時間帯は、第1時間帯と、前記第1時間帯より後に前記第1時間帯と連続する第2時間帯と、を含み、
前記抑制量を算出するステップは、前記第1時間帯における前記コミュニティ全体に対する電力の第1抑制量、及び前記第2時間帯における前記コミュニティ全体に対する電力の第2抑制量を算出し、
前記分配量を算出するステップは、前記第1時間帯よりも前に、前記第1抑制量に対する前記複数の需要家ごとの第1分配量、及び前記第2抑制量に対する前記複数の需要家ごとの第2分配量を算出し、
前記分配量を修正するステップは、前記第1時間帯において、前記第1分配量を修正すると判定した場合には、前記第2時間帯よりも前に前記第2分配量を修正する。
[7] In some embodiments, in the method according to [6] above,
the at least one time period includes a first time period and a second time period subsequent to the first time period and consecutive to the first time period;
the step of calculating a power suppression amount includes calculating a first power suppression amount for the entire community in the first time period and a second power suppression amount for the entire community in the second time period;
The step of calculating the distribution amount includes calculating, before the first time slot, a first distribution amount for each of the plurality of consumers with respect to the first suppression amount and a second distribution amount for each of the plurality of consumers with respect to the second suppression amount;
In the step of correcting the distribution amount, when it is determined that the first distribution amount is to be corrected in the first time period, the second distribution amount is corrected before the second time period.

上記[7]に記載の方法によれば、第1時間帯において、第1分配量を修正すると判定した場合には、第2時間帯よりも前に第2分配量を修正する。このため、第2時間帯よりも前に、第2時間帯における電力の抑制量を適切に複数の需要家ごとに分配することができる。 According to the method described in [7] above, if it is determined that the first distribution amount is to be revised in the first time slot, the second distribution amount is revised before the second time slot. Therefore, the amount of power suppression in the second time slot can be appropriately distributed to each of the multiple consumers before the second time slot.

1 電力抑制分配量算出装置
2 抑制量算出部
4 分配量算出部
6 機器状態収集部
8 判定部
10 分配量修正部
106 コミュニティ
108 需要家
110 電力機器

S2 抑制量算出ステップ
S4 分配量算出ステップ
S8 収集ステップ
S10 判定ステップ
S12 修正ステップ

REFERENCE SIGNS LIST 1 Power suppression and distribution amount calculation device 2 Suppression amount calculation unit 4 Distribution amount calculation unit 6 Equipment state collection unit 8 Determination unit 10 Distribution amount correction unit 106 Community 108 Customer 110 Power equipment

S2: Suppression amount calculation step S4: Distribution amount calculation step S8: Collection step S10: Judgment step S12: Correction step

Claims (7)

少なくとも1つの時間帯における複数の需要家の集合体であるコミュニティ全体に対する電力の抑制量を算出する抑制量算出部と、
前記少なくとも1つの時間帯よりも前に、前記抑制量に対する前記複数の需要家ごとの分配量を算出する分配量算出部と、
前記複数の需要家ごとの電力機器の状態に関する機器状態情報をリアルタイムに収集可能な機器状態収集部と、
前記少なくとも1つの時間帯において、前記機器状態収集部がリアルタイムに収集する前記機器状態情報に基づいて、前記分配量を修正するか否かを判定する判定部と、
前記判定部が前記分配量を修正すると判定した場合に前記分配量を前記少なくとも1つの時間帯の途中で修正する分配量修正部と、を備える、
電力抑制分配量算出装置。
a suppression amount calculation unit that calculates an amount of power suppression for an entire community, which is a collection of a plurality of consumers, in at least one time period;
a distribution amount calculation unit that calculates a distribution amount for each of the plurality of consumers with respect to the suppression amount before the at least one time period;
an equipment status collection unit capable of collecting equipment status information relating to a status of an electric power equipment of each of the plurality of consumers in real time;
a determination unit that determines whether or not to modify the distribution amount based on the device status information collected in real time by the device status collecting unit during the at least one time period;
and a distribution amount correction unit that corrects the distribution amount during the at least one time period when the determination unit determines that the distribution amount should be corrected.
Power suppression distribution amount calculation device.
少なくとも1つの時間帯における複数の需要家の集合体であるコミュニティ全体に対する電力の抑制量を算出する抑制量算出部と、
前記少なくとも1つの時間帯よりも前に、前記抑制量に対する前記複数の需要家ごとの分配量を算出する分配量算出部と、
前記複数の需要家ごとの電力機器の状態に関する機器状態情報をリアルタイムに収集可能な機器状態収集部と、
前記少なくとも1つの時間帯において、前記機器状態収集部がリアルタイムに収集する前記機器状態情報に基づいて、前記分配量を修正するか否かを判定する判定部と、
前記判定部が前記分配量を修正すると判定した場合に前記分配量を修正する分配量修正部と、を備え、
前記判定部は、前記少なくとも1つの時間帯の開始時刻から予め定められた第1時間が経過するまでは前記分配量を修正しないと判定する、
力抑制分配量算出装置。
a suppression amount calculation unit that calculates an amount of power suppression for an entire community, which is a collection of a plurality of consumers, in at least one time period;
a distribution amount calculation unit that calculates a distribution amount for each of the plurality of consumers with respect to the suppression amount before the at least one time period;
an equipment status collection unit capable of collecting equipment status information relating to a status of an electric power equipment of each of the plurality of consumers in real time;
a determination unit that determines whether or not to modify the distribution amount based on the device status information collected in real time by the device status collecting unit during the at least one time period;
a distribution amount correction unit that corrects the distribution amount when the determination unit determines that the distribution amount should be corrected,
The determination unit determines that the distribution amount should not be corrected until a predetermined first time has elapsed from a start time of the at least one time period.
Power suppression distribution amount calculation device.
少なくとも1つの時間帯における複数の需要家の集合体であるコミュニティ全体に対する電力の抑制量を算出する抑制量算出部と、
前記少なくとも1つの時間帯よりも前に、前記抑制量に対する前記複数の需要家ごとの分配量を算出する分配量算出部と、
前記複数の需要家ごとの電力機器の状態に関する機器状態情報をリアルタイムに収集可能な機器状態収集部と、
前記少なくとも1つの時間帯において、前記機器状態収集部がリアルタイムに収集する前記機器状態情報に基づいて、前記分配量を修正するか否かを判定する判定部と、
前記判定部が前記分配量を修正すると判定した場合に前記分配量を修正する分配量修正部と、を備え、
前記判定部は、前記少なくとも1つの時間帯において、前記分配量修正部が前記分配量を修正した場合には、前記分配量修正部が前記分配量を修正した時刻から予め定められた第2時間が経過するまでは前記分配量を修正しないと判定する
力抑制分配量算出装置。
a suppression amount calculation unit that calculates an amount of power suppression for an entire community, which is a collection of a plurality of consumers, in at least one time period;
a distribution amount calculation unit that calculates a distribution amount for each of the plurality of consumers with respect to the suppression amount before the at least one time period;
an equipment status collection unit capable of collecting equipment status information relating to a status of an electric power equipment of each of the plurality of consumers in real time;
a determination unit that determines whether or not to modify the distribution amount based on the device status information collected in real time by the device status collecting unit during the at least one time period;
a distribution amount correction unit that corrects the distribution amount when the determination unit determines that the distribution amount should be corrected,
When the distribution amount correction unit corrects the distribution amount during the at least one time period, the determination unit determines that the distribution amount will not be corrected until a predetermined second time has elapsed from the time when the distribution amount correction unit corrected the distribution amount .
Power suppression distribution amount calculation device.
少なくとも1つの時間帯における複数の需要家の集合体であるコミュニティ全体に対する電力の抑制量を算出する抑制量算出部と、
前記少なくとも1つの時間帯よりも前に、前記抑制量に対する前記複数の需要家ごとの分配量を算出する分配量算出部と、
前記複数の需要家ごとの電力機器の状態に関する機器状態情報をリアルタイムに収集可能な機器状態収集部と、
前記少なくとも1つの時間帯において、前記機器状態収集部がリアルタイムに収集する前記機器状態情報に基づいて、前記分配量を修正するか否かを判定する判定部と、
前記判定部が前記分配量を修正すると判定した場合に前記分配量を修正する分配量修正部と、を備え、
前記少なくとも1つの時間帯は、第1時間帯と、前記第1時間帯より後に前記第1時間帯と連続する第2時間帯と、を含み、
前記抑制量算出部は、前記第1時間帯における前記コミュニティ全体に対する電力の第1抑制量、及び前記第2時間帯における前記コミュニティ全体に対する電力の第2抑制量を算出するように構成され、
前記分配量算出部は、前記第1時間帯よりも前に、前記第1抑制量に対する前記複数の需要家ごとの第1分配量、及び前記第2抑制量に対する前記複数の需要家ごとの第2分配量を算出するように構成され、
前記分配量修正部は、前記第1時間帯において、前記判定部が前記第1分配量を修正すると判定した場合には、前記第2時間帯よりも前に前記第2分配量を修正するように構成される
力抑制分配量算出装置。
a suppression amount calculation unit that calculates an amount of power suppression for an entire community, which is a collection of a plurality of consumers, in at least one time period;
a distribution amount calculation unit that calculates a distribution amount for each of the plurality of consumers with respect to the suppression amount before the at least one time period;
an equipment status collection unit capable of collecting equipment status information relating to a status of an electric power equipment of each of the plurality of consumers in real time;
a determination unit that determines whether or not to modify the distribution amount based on the device status information collected in real time by the device status collecting unit during the at least one time period;
a distribution amount correction unit that corrects the distribution amount when the determination unit determines that the distribution amount should be corrected,
the at least one time period includes a first time period and a second time period subsequent to the first time period and consecutive to the first time period;
the suppression amount calculation unit is configured to calculate a first suppression amount of power for the entire community in the first time period and a second suppression amount of power for the entire community in the second time period;
the distribution amount calculation unit is configured to calculate, prior to the first time slot, a first distribution amount for each of the plurality of consumers with respect to the first suppression amount and a second distribution amount for each of the plurality of consumers with respect to the second suppression amount;
the distribution amount correction unit is configured to correct the second distribution amount before the second time period when the determination unit determines, in the first time period, that the first distribution amount is to be corrected .
Power suppression distribution amount calculation device.
前記電力機器は、電力を消費する電力消費機器と、電力を発電する発電機器と、を含み、
前記機器状態情報は、前記電力消費機器が受電する受電電力量、及び前記発電機器が発電する発電電力量のうちの少なくとも1つを含む、
請求項1から4の何れか一項に記載の電力抑制分配量算出装置。
The electric power equipment includes an electric power consumption equipment that consumes electric power and an electric power generation equipment that generates electric power,
The device status information includes at least one of an amount of power received by the power consumption device and an amount of power generated by the power generation device.
The power suppression and distribution amount calculation device according to claim 1 .
少なくとも1つの時間帯における複数の需要家の集合体であるコミュニティ全体に対する電力の抑制量を算出するステップと、
前記少なくとも1つの時間帯よりも前に、前記抑制量に対する前記複数の需要家ごとの分配量を算出するステップと、
前記少なくとも1つの時間帯において、前記複数の需要家ごとの電力機器の状態に関する機器状態情報をリアルタイムに収集するステップと、
前記少なくとも1つの時間帯において、リアルタイムに収集された前記機器状態情報に基づいて、前記分配量を修正するか否かを判定するステップと、
前記分配量を修正すると判定した場合に前記分配量を前記少なくとも1つの時間帯の途中で修正するステップと、を備える、
電力抑制分配量算出方法。
A step of calculating an amount of power suppression for an entire community, which is a collection of a plurality of consumers, in at least one time period;
calculating a distribution amount for each of the plurality of consumers with respect to the suppression amount before the at least one time period;
collecting equipment status information regarding a status of an electric power device for each of the plurality of consumers in real time during the at least one time period;
determining whether to modify the distribution amount based on the device status information collected in real time during the at least one time period;
and correcting the distribution amount during the at least one time period when it is determined that the distribution amount should be corrected.
Method for calculating power suppression distribution amount.
少なくとも1つの時間帯における複数の需要家の集合体であるコミュニティ全体に対する電力の抑制量を算出するステップと、
前記少なくとも1つの時間帯よりも前に、前記抑制量に対する前記複数の需要家ごとの分配量を算出するステップと、
前記少なくとも1つの時間帯において、前記複数の需要家ごとの電力機器の状態に関する機器状態情報をリアルタイムに収集するステップと、
前記少なくとも1つの時間帯において、リアルタイムに収集された前記機器状態情報に基づいて、前記分配量を修正するか否かを判定するステップと、
前記分配量を修正すると判定した場合に前記分配量を修正するステップと、を備え、
前記少なくとも1つの時間帯は、第1時間帯と、前記第1時間帯より後に前記第1時間帯と連続する第2時間帯と、を含み、
前記抑制量を算出するステップは、前記第1時間帯における前記コミュニティ全体に対する電力の第1抑制量、及び前記第2時間帯における前記コミュニティ全体に対する電力の第2抑制量を算出し、
前記分配量を算出するステップは、前記第1時間帯よりも前に、前記第1抑制量に対する前記複数の需要家ごとの第1分配量、及び前記第2抑制量に対する前記複数の需要家ごとの第2分配量を算出し、
前記分配量を修正するステップは、前記第1時間帯において、前記第1分配量を修正すると判定した場合には、前記第2時間帯よりも前に前記第2分配量を修正する、
力抑制分配量算出方法。
A step of calculating an amount of power suppression for an entire community, which is a collection of a plurality of consumers, in at least one time period;
calculating a distribution amount for each of the plurality of consumers with respect to the suppression amount before the at least one time period;
collecting equipment status information regarding a status of an electric power device for each of the plurality of consumers in real time during the at least one time period;
determining whether to modify the distribution amount based on the device status information collected in real time during the at least one time period;
and correcting the distribution amount when it is determined that the distribution amount should be corrected.
the at least one time period includes a first time period and a second time period subsequent to the first time period and consecutive to the first time period;
the step of calculating a power suppression amount includes calculating a first power suppression amount for the entire community in the first time period and a second power suppression amount for the entire community in the second time period;
The step of calculating the distribution amount includes calculating, before the first time slot, a first distribution amount for each of the plurality of consumers with respect to the first suppression amount and a second distribution amount for each of the plurality of consumers with respect to the second suppression amount;
When it is determined that the first distribution amount is to be modified in the first time period, the step of modifying the distribution amount modifies the second distribution amount before the second time period.
Method for calculating power suppression distribution amount.
JP2021116448A 2021-07-14 2021-07-14 POWER SUPPRESSION DISTRIBUTION AMOUNT CALCULATION DEVICE AND POWER SUPPRESSION DISTRIBUTION AMOUNT CALCULATION METHOD Active JP7702828B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021116448A JP7702828B2 (en) 2021-07-14 2021-07-14 POWER SUPPRESSION DISTRIBUTION AMOUNT CALCULATION DEVICE AND POWER SUPPRESSION DISTRIBUTION AMOUNT CALCULATION METHOD

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021116448A JP7702828B2 (en) 2021-07-14 2021-07-14 POWER SUPPRESSION DISTRIBUTION AMOUNT CALCULATION DEVICE AND POWER SUPPRESSION DISTRIBUTION AMOUNT CALCULATION METHOD

Publications (2)

Publication Number Publication Date
JP2023012775A JP2023012775A (en) 2023-01-26
JP7702828B2 true JP7702828B2 (en) 2025-07-04

Family

ID=85129564

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021116448A Active JP7702828B2 (en) 2021-07-14 2021-07-14 POWER SUPPRESSION DISTRIBUTION AMOUNT CALCULATION DEVICE AND POWER SUPPRESSION DISTRIBUTION AMOUNT CALCULATION METHOD

Country Status (1)

Country Link
JP (1) JP7702828B2 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016135040A (en) 2015-01-21 2016-07-25 三菱電機株式会社 Electricity supply and demand adjustment request amount determination apparatus and method
JP2016217599A (en) 2015-05-19 2016-12-22 ダイキン工業株式会社 Management device for plural air conditioners

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016135040A (en) 2015-01-21 2016-07-25 三菱電機株式会社 Electricity supply and demand adjustment request amount determination apparatus and method
JP2016217599A (en) 2015-05-19 2016-12-22 ダイキン工業株式会社 Management device for plural air conditioners

Also Published As

Publication number Publication date
JP2023012775A (en) 2023-01-26

Similar Documents

Publication Publication Date Title
KR101872557B1 (en) Energy consumption management
JP5416735B2 (en) Power monitoring control device and power monitoring control system
JP5372724B2 (en) Power generation system using natural energy
JP5635005B2 (en) Energy saving
US20170207629A1 (en) Industrial demand response enabling system, industrial demand response enabling method, and program
US10855080B2 (en) Systems and methods for generating power generation suppression control information by a control device
JP2017017779A (en) Power supply system and power supply method
US20170017215A1 (en) Demand prediction system and program
US10380706B2 (en) Equipment management apparatus
US20190052096A1 (en) Control device
WO2017203664A1 (en) Control device, storage battery control device, control system, battery unit control device, control method, storage battery control method, battery unit control device operating method, and program
JP6701965B2 (en) Processing device, processing method, and program
AU2017253053B2 (en) Demand monitoring device, demand monitoring method, and demand monitoring program
WO2017170018A1 (en) Power control device, power control method, and program
JP7702828B2 (en) POWER SUPPRESSION DISTRIBUTION AMOUNT CALCULATION DEVICE AND POWER SUPPRESSION DISTRIBUTION AMOUNT CALCULATION METHOD
JP2017118715A (en) Power management apparatus, power management system, and power management method
JP5886400B1 (en) Power market pricing system and method
JP6922570B2 (en) Processing equipment, processing methods and programs
JP2018133867A (en) Power control system and power control method
WO2013179809A1 (en) Device, system, and method for managing power
JP2014174769A (en) Energy controller, control method and control program
JP2017195752A (en) Power control system and power control method
JP6203144B2 (en) Air conditioning management device, air conditioning management method, and program
WO2017163934A1 (en) Power control system, control device, control method, and computer program
JP6106052B2 (en) Energy management system and method, and program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240419

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20250210

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20250218

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20250402

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20250603

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250624

R150 Certificate of patent or registration of utility model

Ref document number: 7702828

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150