Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7708613B2 - Apparatus and method for recovering surveying targets - Google Patents
[go: Go Back, main page]

JP7708613B2 - Apparatus and method for recovering surveying targets - Google Patents

Apparatus and method for recovering surveying targets

Info

Publication number
JP7708613B2
JP7708613B2 JP2021134984A JP2021134984A JP7708613B2 JP 7708613 B2 JP7708613 B2 JP 7708613B2 JP 2021134984 A JP2021134984 A JP 2021134984A JP 2021134984 A JP2021134984 A JP 2021134984A JP 7708613 B2 JP7708613 B2 JP 7708613B2
Authority
JP
Japan
Prior art keywords
survey target
steel support
survey
target
flange surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021134984A
Other languages
Japanese (ja)
Other versions
JP2023028970A (en
Inventor
和彦 水谷
亮太 逵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maeda Corp
Original Assignee
Maeda Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maeda Corp filed Critical Maeda Corp
Priority to JP2021134984A priority Critical patent/JP7708613B2/en
Publication of JP2023028970A publication Critical patent/JP2023028970A/en
Application granted granted Critical
Publication of JP7708613B2 publication Critical patent/JP7708613B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

特許法第30条第2項適用 ウェブサイトの掲載日 令和3年8月2日 ウェブサイトのアドレス https://confit.atlas.jp/guide/event/jsce2021/participant_login?lang=jaArticle 30, paragraph 2 of the Patent Act applies. Date of publication on the website: August 2, 2021. Website address: https://confit.atlas.jp/guide/event/jsce2021/participant_login?lang=ja

本発明は、測量用ターゲットの回収装置および回収方法に関する。 The present invention relates to a device and method for recovering survey targets.

トンネルを構築する工法として、NATM工法(New Austrian Tunneling Method)が知
られている。NATM工法においては、切羽の近傍に吹付け機をセットして、切羽にコンクリートを一次吹き付けし、次いで、切羽近傍に支保工を建て込むエレクタを備えた作業車を配置し、エレクタによりアーチ状の鋼製支保工を切羽近傍のトンネル坑壁に建て込み、これが完了すると切羽に吹付け機を再び配置し、建て込まれたトンネル支保工を埋め込むようにしてコンクリートの二次吹付けを行う。
The New Austrian Tunneling Method (NATM) is a known method for constructing tunnels. In the NATM method, a sprayer is set up near the tunnel face to spray concrete onto the face as a first step, then a work vehicle equipped with an erector for erecting shoring is placed near the face, and arch-shaped steel shoring is erected on the tunnel wall near the face using the erector. Once this is complete, the sprayer is placed back at the face, and the erected tunnel shoring is embedded and the second spraying of concrete is performed.

鋼製支保工の建て込みに際しては、鋼製支保工に取り付けた測量用ターゲット(ミラー、プリズム等)を測量機器によって視準し、鋼製支保工の移動をリアルタイムで監視しながら鋼製支保工を所定の建て込み位置に建て込むことが行われている。測量用ターゲット等の施工補助具は、使用後に回収する必要がある。 When erecting steel supports, surveying targets (mirrors, prisms, etc.) attached to the steel supports are sighted with surveying equipment, and the movement of the steel supports is monitored in real time while the steel supports are erected in the designated erection position. Construction aids such as surveying targets must be collected after use.

鋼製支保工に対する測量用ターゲットの着脱を容易にする技術として、例えば、プリズムを備える本体部と、この本体部に一体化されて支保工に対し固定可能な磁石とを備え、磁石部に磁力の励磁・消磁を操作する操作ハンドルを設けた測量用ターゲットが知られている(例えば、特許文献1を参照)。この種の測量用ターゲットにおいては、支保工に対する着脱を容易にして取付・撤去作業を改善することができる。 As a technology for easily attaching and detaching a surveying target to a steel support, for example, a surveying target is known that has a main body with a prism, a magnet that is integrated with the main body and can be fixed to the support, and an operating handle on the magnet for controlling magnetization and demagnetization (see, for example, Patent Document 1). This type of surveying target can be easily attached and detached from the support, improving installation and removal work.

特開2018-178455号公報JP 2018-178455 A

近年では、トンネル施工に関し、切羽における人手作業を回避し、施工の安全性および作業性を向上するための技術が益々強く望まれている。しかしながら、従来においては、鋼製支保工に取り付けた測量用ターゲットの撤去は、手作業で行う必要があった。 In recent years, there has been an increasing demand for technology to avoid manual work at the tunnel face and improve the safety and ease of construction. However, in the past, the removal of survey targets attached to steel supports had to be done manually.

本発明は、上記のような問題点に鑑みてなされたものであって、その目的は、鋼製支保工に取り付けた測量用ターゲットを人手作業によらず回収することの可能な技術を提供することにある。 The present invention was made in consideration of the above problems, and its purpose is to provide a technology that makes it possible to retrieve survey targets attached to steel supports without manual labor.

本発明は、鋼製支保工のフランジ面に磁力で吸着された測量用ターゲットを回収する回収装置であって、前記鋼製支保工を建て込むエレクタ装置のハンドに搭載され、前記測量用ターゲットの所定部位に係留させた牽引ロープを巻き取り可能な巻き取り装置を備え、前記測量用ターゲットの回収時に、前記巻き取り装置によって前記牽引ロープを巻き取ることを特徴とする。また、前記測量用ターゲットの回収時に、前記巻き取り装置によって前記牽引ロープを巻き取ることによって前記測量用ターゲットに前記フランジ面上を滑動させてもよい。 The present invention is a recovery device that recovers a survey target that is magnetically attracted to the flange surface of a steel support, and is equipped with a winding device that is mounted on the hand of an erector device that erects the steel support and is capable of winding up a towing rope that is moored to a predetermined portion of the survey target, and is characterized in that when the survey target is recovered, the winding device winds up the towing rope. Also, when the survey target is recovered, the winding device may wind up the towing rope to cause the survey target to slide over the flange surface.

また、本発明は、鋼製支保工の建て込み施工に用いる測量用ターゲットを回収する回収方法であって、前記鋼製支保工を建て込むエレクタ装置のハンドに搭載された巻き取り装
置に巻回された牽引ロープを、前記鋼製支保工のフランジ面に磁力で吸着された前記測量用ターゲットの所定部位に係留させる工程と、前記巻き取り装置によって前記牽引ロープを巻き取ることによって前記測量用ターゲットを回収する工程と、を含むことを特徴とする。また、前記測量用ターゲットを回収する工程において、前記測量用ターゲットに前記フランジ面上を滑動させて前記測量用ターゲットを回収してもよい。
The present invention is also a method for recovering a survey target used in erecting a steel support, comprising the steps of: mooring a towing rope wound around a winding device mounted on a hand of an erector device for erecting the steel support to a predetermined portion of the survey target magnetically attracted to a flange surface of the steel support; and recovering the survey target by winding up the towing rope with the winding device. In addition, in the step of recovering the survey target, the survey target may be slid on the flange surface to recover the survey target.

本発明によれば、鋼製支保工に取り付けた測量用ターゲットを人手作業によらず回収することの可能な技術を提供できる。 The present invention provides a technology that makes it possible to retrieve survey targets attached to steel supports without manual labor.

図1は、実施形態1に係るトンネル支保工の側面図である。FIG. 1 is a side view of a tunnel support according to the first embodiment. 図2は、実施形態1に係る作業車の上面図である。FIG. 2 is a top view of the work vehicle according to the first embodiment. 図3は、実施形態1に係る作業車の側面図である。FIG. 3 is a side view of the work vehicle according to the first embodiment. 図4は、実施形態1に係るエレクタ装置におけるハンドの上面図である。FIG. 4 is a top view of a hand in the erector device of embodiment 1. 図5は、実施形態1に係るトンネル支保工の建て込みシステムSの概略構成図である。FIG. 5 is a schematic diagram of a tunnel support erection system S according to the first embodiment. 図6は、実施形態1に係るターゲットを示す図である。FIG. 6 is a diagram showing a target according to the first embodiment. 図7は、実施形態1に係るトンネル支保工へのターゲットの取付け態様を示す図である。FIG. 7 is a diagram showing a manner in which a target is attached to a tunnel support in accordance with the first embodiment. 図8は、実施形態1に係る回収装置の外観斜視図である。FIG. 8 is an external perspective view of the recovery device according to the first embodiment. 図9は、実施形態1に係る回収装置のカバーを取り外した状態を説明する図である。FIG. 9 is a diagram illustrating the recovery device according to the first embodiment with the cover removed. 図10は、回収装置におけるリモコンの一例を示す図である。FIG. 10 is a diagram showing an example of a remote control in the collection device. 図11は、回収装置を用いて各測量用ターゲットを回収する直前の状態を示す図である。FIG. 11 is a diagram showing a state immediately before each survey target is collected by the collection device. 図12は、左側第1回収装置20(L1)によって第1測量用ターゲット9aを回収している途中の状況を示す図である。FIG. 12 is a diagram showing a state in which the first survey target 9a is being collected by the left first collection device 20 (L1). 図13は、左側第2回収装置20(L2)によって第2測量用ターゲット9bを回収している途中の状況を示す図である。FIG. 13 is a diagram showing a state in which the second survey target 9b is being collected by the left-side second collection device 20 (L2). 図14は、全ての測量用ターゲットについて自動回収が完了した状態を示す図である。FIG. 14 is a diagram showing a state in which automatic collection of all the survey targets has been completed. 図15は、測量用ターゲットを斜め下方牽引パターンで回収する際に測量用ターゲットに作用する力を説明する図である。FIG. 15 is a diagram illustrating the forces acting on the survey target when the survey target is retrieved in a diagonal downward towing pattern. 図16は、測量用ターゲットを斜め上方牽引パターンで回収する際に測量用ターゲットに作用する力を説明する図である。FIG. 16 is a diagram illustrating the forces acting on the survey target when the survey target is retrieved in a diagonal upward towing pattern.

以下、本発明の実施形態について、図面を参照しながら説明する。 The following describes an embodiment of the present invention with reference to the drawings.

<実施形態1>
図1は、実施形態1に係るトンネル支保工10の側面図である。トンネル支保工10は、NATM工法(New Austrian Tunneling Method)に適用され、トンネル掘削に伴い露出
する地山の崩落防止のために掘削直後の坑壁に沿って建て込まれるアーチ状の鋼製支保工である。トンネル支保工10は、トンネル軸方向に沿って一定間隔毎に設置される。トンネル支保工10は、H形断面を有するH形鋼によって形成されている。より詳しくは、トンネル支保工10は、一対の円弧状の鋼製支保工10L,10Rの天端部(上端部)同士を一体に連結することでアーチ状に形成されている。以下、鋼製支保工10Lを「左側鋼製支保工」と呼び、鋼製支保工10Rを「右側鋼製支保工」と呼ぶ。
<Embodiment 1>
FIG. 1 is a side view of a tunnel support 10 according to the first embodiment. The tunnel support 10 is applied to the New Austrian Tunneling Method (NATM) and is an arch-shaped steel support erected along the tunnel wall immediately after excavation to prevent the collapse of the ground exposed during tunnel excavation. The tunnel support 10 is installed at regular intervals along the tunnel axis direction. The tunnel support 10 is formed of H-shaped steel having an H-shaped cross section. More specifically, the tunnel support 10 is formed in an arch shape by integrally connecting the top ends (upper ends) of a pair of arc-shaped steel supports 10L and 10R. Hereinafter, the steel support 10L is referred to as the "left side steel support" and the steel support 10R is referred to as the "right side steel support".

左側鋼製支保工10Lは、第1本体部111、第1天端継手板121、第1底板131を有する。第1本体部111は、ウェブ111a、当該ウェブ111aに直交する一対の上フランジ111bおよび下フランジ111cから構成されるH形鋼である。また、第1本体部111における一端には第1天端継手板121が溶接され、他端には第1底板131が溶接されている。第1天端継手板121および第1底板131は四角形の鋼製平板であり、第1本体部111のH形断面に対して直交方向に延在している。右側鋼製支保工10Rについても同様に、第2本体部112、第2天端継手板122、第2底板132を有する。第2本体部112は、ウェブ112a、当該ウェブ112aに直交する一対の上フランジ112bおよび下フランジ112cから構成されるH形鋼である。左側鋼製支保工10Lの第1本体部111および右側鋼製支保工10Rの第2本体部112は左右対称な円弧形状の長手を有している。また、第2本体部112における一端には第2天端継手板122が溶接され、他端には第2底板132が溶接されている。第2天端継手板122、第2底板132は四角形の鋼製平板であり、第2本体部112のH形断面に対して直交方向に延在している。本実施形態では、第1天端継手板121および第2天端継手板122は合同の正方形平面を有している。図1に示すように、左側鋼製支保工10Lおよび右側鋼製支保工10Rは、第1天端継手板121および第2天端継手板122が互いに突き合わされた状態で連結されている。左側鋼製支保工10Lおよび右側鋼製支保工10Rの連結構造は、例えば、本出願人が出願した特許文献1(特開2018-178455号)に開示されているように、第1天端継手板121および第2天端継手板122をワンタッチで締結可能な構造であってもよい。 The left-side steel support 10L has a first main body 111, a first top joint plate 121, and a first bottom plate 131. The first main body 111 is an H-shaped steel consisting of a web 111a and a pair of upper flanges 111b and lower flanges 111c perpendicular to the web 111a. The first top joint plate 121 is welded to one end of the first main body 111, and the first bottom plate 131 is welded to the other end. The first top joint plate 121 and the first bottom plate 131 are rectangular flat steel plates that extend perpendicular to the H-shaped cross section of the first main body 111. Similarly, the right-side steel support 10R has a second main body 112, a second top joint plate 122, and a second bottom plate 132. The second main body 112 is an H-shaped steel consisting of a web 112a and a pair of upper flanges 112b and lower flanges 112c perpendicular to the web 112a. The first main body 111 of the left steel support 10L and the second main body 112 of the right steel support 10R have a symmetrical arc-shaped longitudinal direction. In addition, a second top joint plate 122 is welded to one end of the second main body 112, and a second bottom plate 132 is welded to the other end. The second top joint plate 122 and the second bottom plate 132 are rectangular steel flat plates and extend perpendicular to the H-shaped cross section of the second main body 112. In this embodiment, the first top joint plate 121 and the second top joint plate 122 have a congruent square plane. As shown in FIG. 1, the left-side steel support 10L and the right-side steel support 10R are connected with the first top joint plate 121 and the second top joint plate 122 butted against each other. The connection structure of the left-side steel support 10L and the right-side steel support 10R may be a structure in which the first top joint plate 121 and the second top joint plate 122 can be fastened with one touch, as disclosed in Patent Document 1 (JP Patent Publication 2018-178455) filed by the present applicant, for example.

上述したトンネル支保工10は、図2および図3に示される施工用重機である作業車200に搭載されたエレクタ装置100によって建て込むことができる。図2は、実施形態1に係る作業車200の上面図である。図3は、実施形態1に係る作業車200の側面図である。作業車200は、エレクタ装置100および吹付け装置600を備えている。エレクタ装置100は、同一構成の一対のブーム17L,17Rを備えている。一対のブーム17L,17Rは、これらに付設される駆動機構の作動によって伸縮動作、傾動動作、揺動動作、回動動作が自在である。また、各ブーム17L,17Rの先端には、同一構成の一対のハンド18L,18Rが連結されている。一対のハンド18L,18Rは、これらに付設される駆動機構の作動によって回転動作および揺動動作が自在であり、左側鋼製支保工10Lおよび右側鋼製支保工10Rをそれぞれ着脱自在に挟圧把持(保持)することができる。 The tunnel support 10 described above can be erected by an erector device 100 mounted on a work vehicle 200, which is a heavy construction machine shown in Figures 2 and 3. Figure 2 is a top view of the work vehicle 200 according to the first embodiment. Figure 3 is a side view of the work vehicle 200 according to the first embodiment. The work vehicle 200 is equipped with an erector device 100 and a spraying device 600. The erector device 100 is equipped with a pair of booms 17L, 17R of the same configuration. The pair of booms 17L, 17R can freely extend, tilt, swing, and rotate by the operation of a drive mechanism attached to them. In addition, a pair of hands 18L, 18R of the same configuration are connected to the tip of each boom 17L, 17R. The pair of hands 18L, 18R can rotate and swing freely by operating the drive mechanism attached to them, and can detachably clamp and hold (hold) the left steel support 10L and the right steel support 10R, respectively.

以下では、符号17Lで示すブームを「左側ブーム」と呼び、符号17Rで示すブームを「右側ブーム」と呼ぶ。また、符号18Lで示すハンドを「左側ハンド」と呼び、符号18Rで示すハンドを「右側ハンド」と呼ぶ。但し、左側ブームおよび右側ブームを特に区別する必要が無い場合には、単にブーム17と記載する場合がある。同様に、左側ハンドおよび右側ハンドを特に区別する必要が無い場合には、単にハンド18と記載する場合がある。 In the following, the boom indicated by reference symbol 17L will be referred to as the "left boom", and the boom indicated by reference symbol 17R will be referred to as the "right boom". Additionally, the hand indicated by reference symbol 18L will be referred to as the "left hand", and the hand indicated by reference symbol 18R will be referred to as the "right hand". However, when there is no need to particularly distinguish between the left boom and the right boom, it may simply be referred to as boom 17. Similarly, when there is no need to particularly distinguish between the left hand and the right hand, it may simply be referred to as hand 18.

エレクタ装置100は、左側ハンド18Lに左側鋼製支保工10Lを着脱自在に把持し、右側ハンド18Rに右側鋼製支保工10Rを着脱自在に把持することができる。本実施形態において、左側鋼製支保工10Lおよび右側鋼製支保工10Rは、アーチ状のトンネル支保工10が2分割された一対の支保材であり、トンネル切羽の近傍に誘導された後、これらを切羽で組み立ててアーチ状のトンネル支保工10を形成する。 The erector device 100 can detachably hold the left steel support 10L with the left hand 18L, and detachably hold the right steel support 10R with the right hand 18R. In this embodiment, the left steel support 10L and the right steel support 10R are a pair of supports formed by dividing the arch-shaped tunnel support 10 into two parts, and after being guided near the tunnel face, they are assembled at the face to form the arch-shaped tunnel support 10.

図4は、エレクタ装置100におけるハンド18の上面図である。図4においては左側ハンド18Lを図示しているが、右側ハンド18Rも左側ハンド18Lと実質的に等価な構造である。各ハンド18には一対の把持部18Aが設けられており、鋼製支保工10R,10Lを把持することができる。また、各ハンド18における両端には、回収装置20
が設けられている。回収装置20は、トンネル支保工10(左側鋼製支保工10Lおよび右側鋼製支保工10R)のフランジ面に磁力で吸着された測量用ターゲットを回収するための装置であり、この回収装置20を用いて測量用ターゲットを自動回収するための装置であるが、その詳細については後述する。ハンド18における一対の把持部18Aには、鋼製支保工10L,10Rにおける下フランジ111cを載置した状態で把持することができる。
Fig. 4 is a top view of the hand 18 in the erector device 100. Fig. 4 shows the left hand 18L, but the right hand 18R has a substantially equivalent structure to the left hand 18L. Each hand 18 is provided with a pair of gripping parts 18A, and can grip the steel supports 10R and 10L. In addition, a recovery device 20 is provided at both ends of each hand 18.
The recovery device 20 is a device for recovering the surveying target that is magnetically attracted to the flange surface of the tunnel support 10 (left steel support 10L and right steel support 10R), and the recovery device 20 is used to automatically recover the surveying target, the details of which will be described later. The pair of gripping parts 18A of the hand 18 can grip the lower flanges 111c of the steel supports 10L and 10R with the lower flanges 111c placed on them.

図5は、実施形態1に係るトンネル支保工10の建て込みシステムSの概略構成図である。図中、符号100はトンネル支保工10の建て込みを行うエレクタ装置、符号200はエレクタ装置100を搭載すると共に自走可能な作業車(重機)である。符号300はレーザ光による測距・測角儀(測量機)である自動追尾型トータルステーション、符号400はトータルステーション300を制御するトータルステーションコントローラ、符号500はトータルステーションコントローラ400と無線による送受信を可能とするトータルステーション側アンテナである。エレクタ装置100は、操縦席に搭載されたディスプレイ装置であるモニタ101、エレクタコントローラ102、エレクタ側アンテナ103、操作盤104、キーボード105、ポンティングデバイス106等を有する。勿論、これらの具体的な構成は建て込みシステムSの一例である。 Figure 5 is a schematic diagram of the tunnel support 10 erection system S according to the first embodiment. In the figure, reference numeral 100 denotes an erector device that erects the tunnel support 10, and reference numeral 200 denotes a self-propelled work vehicle (heavy machinery) that is equipped with the erector device 100. Reference numeral 300 denotes an automatic tracking total station that is a distance and angle measuring instrument (surveying instrument) using laser light, reference numeral 400 denotes a total station controller that controls the total station 300, and reference numeral 500 denotes a total station antenna that enables wireless transmission and reception with the total station controller 400. The erector device 100 has a monitor 101 that is a display device mounted on the cockpit, an erector controller 102, an erector antenna 103, an operation panel 104, a keyboard 105, a pointing device 106, and the like. Of course, these specific configurations are examples of the erection system S.

トータルステーション300は、レーザ光を照射してプリズム等を含む測量用ターゲット9を自動追尾し、その測距・測角を行うことで、測量用ターゲット9の位置を測定(測量)する測量機であり、トンネル内において座標が既知の地点(座標既知地点)に設置される。本実施形態では、トンネル切羽に建て込むトンネル支保工10(左側鋼製支保工10Lおよび右側鋼製支保工10R)に測量用ターゲット9を取り付け、トンネル支保工10(左側鋼製支保工10Lおよび右側鋼製支保工10R)の移動に伴い測量用ターゲット9を自動追尾することから、そのようなターゲットの自動追尾、および視準に障害が無いところを選んで設置するとよい。例えば、トンネル床面に設置しても良いし、天井部に架台を架設して、トータルステーション300を架台上に設置してもよい。 The total station 300 is a surveying instrument that uses laser light to automatically track a surveying target 9, which includes a prism, and measures the position of the target 9 by measuring the distance and angle. The total station 300 is installed at a point in the tunnel whose coordinates are known (point with known coordinates). In this embodiment, the surveying target 9 is attached to the tunnel support 10 (left steel support 10L and right steel support 10R) that is erected at the tunnel face, and the surveying target 9 is automatically tracked as the tunnel support 10 (left steel support 10L and right steel support 10R) moves. Therefore, it is preferable to install the total station 300 at a place where there are no obstacles to the automatic tracking and aiming of such targets. For example, the total station 300 may be installed on the tunnel floor, or a stand may be erected on the ceiling and the total station 300 may be installed on the stand.

トータルステーションコントローラ400は、例えば携帯可能なコンピュータを含んで構成されている。トータルステーションコントローラ400は、コンピュータに組み込まれたソフトウェアによってトータルステーション300の各種の機構を自動制御すると共に、トータルステーション300の測量データを処理する。更に、トータルステーションコントローラ400は、エレクタコントローラ102側との無線通信によりデータの送受信が可能であり、且つ、エレクタコントローラ102側からの指令によりトータルステーション300の各種の機構を無線遠隔操作することが可能である。 The total station controller 400 is configured to include, for example, a portable computer. The total station controller 400 automatically controls various mechanisms of the total station 300 using software built into the computer, and processes the survey data of the total station 300. Furthermore, the total station controller 400 can transmit and receive data via wireless communication with the erector controller 102, and can wirelessly remotely operate various mechanisms of the total station 300 in response to commands from the erector controller 102.

図6は、実施形態1に係るターゲット9を示す図である。ターゲット9は、ホルダ91に設けられた磁石92と、ホルダ91の先端側に取付けられたプリズム93を有する。ホルダ91は概略円柱体形状を有し、その底面91A側に磁石92が埋設されていてもよい。左側鋼製支保工10L及び右側鋼製支保工10Rは鋼製であるため、ホルダ91に設けられた磁石92の磁力によって左側鋼製支保工10L及び右側鋼製支保工10Rに対してターゲット9を着脱自在に取り付けることができる。図6に示すように、ホルダ91には、後述する牽引ロープ26の先端を係留するための取付部94が設けられている。 Figure 6 is a diagram showing the target 9 according to the first embodiment. The target 9 has a magnet 92 provided on a holder 91 and a prism 93 attached to the tip side of the holder 91. The holder 91 has a roughly cylindrical shape, and the magnet 92 may be embedded on the bottom surface 91A side. Since the left steel support 10L and the right steel support 10R are made of steel, the target 9 can be detachably attached to the left steel support 10L and the right steel support 10R by the magnetic force of the magnet 92 provided on the holder 91. As shown in Figure 6, the holder 91 is provided with an attachment portion 94 for mooring the tip of the towing rope 26 described later.

図7は、実施形態1に係るトンネル支保工へのターゲットの取付け態様を示す図である。図7に示すように、左側鋼製支保工10Lおよび右側鋼製支保工10Rは左右対称な円弧状である。ここで、左側鋼製支保工10Lは、その上端部と下端部にそれぞれ第1測量用ターゲット9aと第2測量用ターゲット9bが取り付けられる。また、右側鋼製支保工10Rは、その上端部と下端部にそれぞれ第3測量用ターゲット9cと第4測量用ターゲット9dが取り付けられる。ここで、第1測量用ターゲット9a~第4測量用ターゲット
9dを「測量用ターゲット9」と総称する。なお、左側鋼製支保工10Lおよび右側鋼製支保工10Rに対する「測量用ターゲット9」の取付位置、数などについては特に限定されず、図7に示される態様は一例である。
FIG. 7 is a diagram showing a manner in which targets are attached to the tunnel support according to the first embodiment. As shown in FIG. 7, the left steel support 10L and the right steel support 10R are symmetrical arc shapes. Here, the left steel support 10L has a first survey target 9a and a second survey target 9b attached to its upper end and lower end, respectively. The right steel support 10R has a third survey target 9c and a fourth survey target 9d attached to its upper end and lower end, respectively. Here, the first survey target 9a to the fourth survey target 9d are collectively referred to as "survey targets 9". Note that there are no particular limitations on the attachment positions and numbers of the "survey targets 9" to the left steel support 10L and the right steel support 10R, and the manner shown in FIG. 7 is one example.

次に、左側鋼製支保工10Lおよび右側鋼製支保工10Rの連結および建て込みを行う際のエレクタ装置100の動作について説明する。左側鋼製支保工10Lおよび右側鋼製支保工10Rの連結および建て込みに際して、エレクタ装置100は、左側ブーム17Lおよび右側ブーム17Rを伸長および傾動させると共に、左側ハンド18Lおよび右側ハンド18Rを回転させることで、左側鋼製支保工10Lおよび右側鋼製支保工10Rをトンネル軸と直交するように移動させる。なお、エレクタ装置100における各ブーム17L,17Rおよび各ハンド18L,18Rの駆動は、操作盤104の操作によって行うことができる。 Next, the operation of the erector device 100 when connecting and erecting the left steel support 10L and the right steel support 10R will be described. When connecting and erecting the left steel support 10L and the right steel support 10R, the erector device 100 extends and tilts the left boom 17L and the right boom 17R, and rotates the left hand 18L and the right hand 18R, thereby moving the left steel support 10L and the right steel support 10R perpendicular to the tunnel axis. The operation of each boom 17L, 17R and each hand 18L, 18R in the erector device 100 can be performed by operating the operation panel 104.

エレクタ装置100における各ブーム17L,17Rおよび各ハンド18L,18Rの操作は、トータルステーション300を用いてリアルタイムに取得する各測量用ターゲット9の3次元位置座標に基づいて行うことができる。例えば、エレクタコントローラ102は、トータルステーションコントローラ400を介してトータルステーション300を無線遠隔操作し、各測量用ターゲット9(第1ターゲット9a~第4ターゲット9d)を自動追尾して、各測量用ターゲット9の座標を順次自動測量する。トータルステーション300は、座標既知地点に設置されている。このように座標既知地点に設置されたトータルステーション300からレーザ光を照射して各測量用ターゲット9を視準して測距・測角を行うことで、第1測量用ターゲット9a~第4測量用ターゲット9dの3次元位置座標を求めることができる。エレクタコントローラ102は、トータルステーション300から取得した各測量用ターゲット9の測量データに基づいて、ハンド18L,18Rを相対移動させるためのそれぞれの駆動量を設定し、図7に示すように左側鋼製支保工10Lの第1天端継手板121および右側鋼製支保工10Rの第2天端継手板122を相互に突き合せた状態で連結することによってアーチ状のトンネル支保工10を形成する。 The operation of each boom 17L, 17R and each hand 18L, 18R in the erector device 100 can be performed based on the three-dimensional position coordinates of each survey target 9 obtained in real time using the total station 300. For example, the erector controller 102 wirelessly remotely controls the total station 300 via the total station controller 400, automatically tracks each survey target 9 (first target 9a to fourth target 9d), and automatically surveys the coordinates of each survey target 9 in sequence. The total station 300 is installed at a point with known coordinates. In this way, the three-dimensional position coordinates of the first survey target 9a to the fourth survey target 9d can be obtained by irradiating a laser beam from the total station 300 installed at a point with known coordinates to collimate each survey target 9 and measure the distance and angle. The erector controller 102 sets the drive amount for moving the hands 18L and 18R relative to each other based on the survey data of each survey target 9 obtained from the total station 300, and forms an arch-shaped tunnel support 10 by connecting the first top joint plate 121 of the left steel support 10L and the second top joint plate 122 of the right steel support 10R in a butted state as shown in Figure 7.

各測量用ターゲット9(第1ターゲット9a~第4ターゲット9d)の座標を順次自動測量しながら左側鋼製支保工10Lおよび右側鋼製支保工10Rを相互連結する制御の詳細については、本出願人が出願した特許文献1(特開2018-178455号)に開示されているため、これ以上の詳細な説明は省略する。また、左側鋼製支保工10Lおよび右側鋼製支保工10Rの連結構造を、上記特許文献1(特開2018-178455号)の図9に開示されているワンタッチ継手構造とすることで、エレクタ装置100のハンド操作によって左側鋼製支保工10Lおよび右側鋼製支保工10Rをワンタッチで連結することができる。なお、ここでいうハンド操作には、ハンド18L,18Rの駆動機構を作動させてハンド18L,18Rを直接的に操作することの他、ハンド18L,18Rが取り付けられているブーム17L,17Rを駆動することによってハンド18L,18Rを間接的に操作することも含まれる。 The details of the control for interconnecting the left-side steel support 10L and the right-side steel support 10R while automatically surveying the coordinates of each survey target 9 (first target 9a to fourth target 9d) in sequence are disclosed in Patent Document 1 (JP 2018-178455 A) filed by the applicant, and therefore will not be described in further detail here. In addition, by making the connection structure of the left-side steel support 10L and the right-side steel support 10R a one-touch joint structure as disclosed in FIG. 9 of Patent Document 1 (JP 2018-178455 A), the left-side steel support 10L and the right-side steel support 10R can be connected in one touch by hand operation of the erector device 100. In addition, the hand operation referred to here includes not only directly operating the hands 18L, 18R by operating the drive mechanism of the hands 18L, 18R, but also indirectly operating the hands 18L, 18R by driving the booms 17L, 17R to which the hands 18L, 18R are attached.

上記のようにトンネル支保工10をアーチ状に組み上げた後、エレクタ装置100は、ハンド18L,18Rを駆動することで、トンネル支保工10をトンネル切羽近傍における所定の建て込み位置に配置する。例えば、エレクタコントローラ102は、トータルステーション300から取得した各測量用ターゲット9(第1測量用ターゲット9a~第4測量用ターゲット9d)の座標位置を含む測量データに基づいて、第1測量用ターゲット9a~第4測量用ターゲット9dのそれぞれの位置をモニタ101に表示させても良い。また、モニタ101には、第1測量用ターゲット9a~第4測量用ターゲット9dのそれぞれの位置に加えて、第1測量用ターゲット9a~第4測量用ターゲット9dの目標位置を併せて表示させても良い。エレクタ装置100を操作するオペレータは、モニタ101を見ながら、ブーム17L,17Rやハンド18L,18Rを駆動させることで、トンネ
ル支保工10を正規の建て込み位置に配置することができる。
After assembling the tunnel support 10 in an arch shape as described above, the erector device 100 drives the hands 18L and 18R to place the tunnel support 10 at a predetermined erection position near the tunnel face. For example, the erector controller 102 may display the positions of the first survey target 9a to the fourth survey target 9d on the monitor 101 based on survey data including the coordinate positions of each survey target 9 (the first survey target 9a to the fourth survey target 9d) acquired from the total station 300. In addition to the positions of the first survey target 9a to the fourth survey target 9d, the monitor 101 may also display the target positions of the first survey target 9a to the fourth survey target 9d. The operator who operates the erector device 100 can place the tunnel support 10 at the regular erection position by driving the booms 17L and 17R and the hands 18L and 18R while watching the monitor 101.

本実施形態においては、適宜のタイミング、例えば、所定の建て込み位置へのトンネル支保工10(左側鋼製支保工10Lおよび右側鋼製支保工10R)の建て込みが完了した時点で、トンネル支保工10(左側鋼製支保工10Lおよび右側鋼製支保工10R)から各測量用ターゲット9を回収する。本実施形態に係るエレクタ装置100の各ハンド18L,18Rには、トンネル支保工10(左側鋼製支保工10Lおよび右側鋼製支保工10R)のフランジ面に磁力で吸着された各測量用ターゲット9を回収する回収装置20が搭載されており、この回収装置20を用いて各測量用ターゲット9を人手に頼らず自動回収することができる。以下、測量用ターゲットの回収装置およびその回収方法の詳細について説明する。 In this embodiment, at an appropriate timing, for example, when the erection of the tunnel support 10 (left steel support 10L and right steel support 10R) to a specified erection position is completed, each survey target 9 is retrieved from the tunnel support 10 (left steel support 10L and right steel support 10R). Each hand 18L, 18R of the erector device 100 according to this embodiment is equipped with a retrieval device 20 that retrieves each survey target 9 that is magnetically attracted to the flange surface of the tunnel support 10 (left steel support 10L and right steel support 10R), and this retrieval device 20 can be used to automatically retrieve each survey target 9 without relying on human labor. Details of the survey target retrieval device and the retrieval method are described below.

図8および図9を参照して、各ハンド18L,18Rに搭載される回収装置20を説明する。図8は、実施形態1に係る回収装置20の外観斜視図である。図9は、実施形態1に係る回収装置20のカバーを取り外した状態を説明する図である。回収装置20は、各ハンド18L,18Rの端部に取付けられるベース板21、ベース板21上にそれぞれ設置されるウィンチ22(巻き取り装置)、バッテリー23(電源)、制御ボックス24、および、カバー25を含んで構成されている。ベース板21には、ウィンチ22、バッテリー23、制御ボックス24を直接、或いは、ブラケット等を介して取り付けるためのビス孔が設けられており、ビスやブラケット等を用いてベース板21の所定位置にウィンチ22、バッテリー23、制御ボックス24が固定されている。 The recovery device 20 mounted on each hand 18L, 18R will be described with reference to Figures 8 and 9. Figure 8 is an external perspective view of the recovery device 20 according to the first embodiment. Figure 9 is a view illustrating the recovery device 20 according to the first embodiment with the cover removed. The recovery device 20 includes a base plate 21 attached to the end of each hand 18L, 18R, a winch 22 (winding device), a battery 23 (power source), a control box 24, and a cover 25, which are installed on the base plate 21. The base plate 21 has screw holes for mounting the winch 22, battery 23, and control box 24 directly or via a bracket, etc., and the winch 22, battery 23, and control box 24 are fixed to a predetermined position on the base plate 21 using screws, brackets, etc.

ウィンチ22は、例えば電動ウィンチであり、正逆方向に回転駆動されるドラム部22Aに牽引ロープ26が巻き回されている。ウィンチ22は、バッテリー23からの電力供給を受けて駆動され、その駆動は制御ボックス24に格納された制御基板等を含む制御部によって制御される。例えば、ウィンチ22のドラム部22Aが正方向に回転駆動されることで牽引ロープ26が引き出され、ドラム部22Aが逆方向に回転駆動されることで牽引ロープ26が巻き取られる。回収装置20は、ウィンチ22の駆動をリモート操作するためのリモートコントローラ(リモコン)を含んでいてもよい。図10は、回収装置20におけるリモコンの一例を示す図である。リモコン30は、例えば引き出しボタン31、巻き取りボタン32有している。リモコン30は、制御ボックス24内の制御部と通信可能であり、作業員がリモコン30を操作することでウィンチ22を駆動することができる。例えば、作業員がリモコン30の引き出しボタン31を押し続けている間、ウィンチ22のドラム部22Aが正方向に回転駆動されることで牽引ロープ26が定速で引き出され、巻き取りボタン32を押し続けている間、ウィンチ22のドラム部22Aが逆方向に回転駆動されることで牽引ロープ26が定速で巻き取られるように構成されていてもよい。その他、リモコン30はオン-オフボタンを有していてもよい。 The winch 22 is, for example, an electric winch, and the towing rope 26 is wound around the drum part 22A that is rotated in the forward and reverse directions. The winch 22 is driven by receiving power from the battery 23, and the drive is controlled by a control unit including a control board and the like stored in the control box 24. For example, the drum part 22A of the winch 22 is rotated in the forward direction to pull out the towing rope 26, and the drum part 22A is rotated in the reverse direction to wind up the towing rope 26. The recovery device 20 may include a remote controller (remote control) for remotely operating the drive of the winch 22. FIG. 10 is a diagram showing an example of a remote control in the recovery device 20. The remote control 30 has, for example, a pull-out button 31 and a wind-up button 32. The remote control 30 can communicate with the control unit in the control box 24, and the winch 22 can be driven by an operator operating the remote control 30. For example, while the worker continues to press the pull button 31 on the remote control 30, the drum portion 22A of the winch 22 is rotated in the forward direction to pull out the towing rope 26 at a constant speed, and while the worker continues to press the winding button 32, the drum portion 22A of the winch 22 is rotated in the reverse direction to wind up the towing rope 26 at a constant speed. Additionally, the remote control 30 may have an on-off button.

また、回収装置20のベース板21には、牽引ロープ26の引き出し、巻き取りをガイドするガイド部材27が設けられており、ガイド部材27のガイド穴27Aに牽引ロープ26が通されている。牽引ロープ26の先端には、カラビナ等の取付金具28を取り付けるための輪っか26Aが形成されている。牽引ロープ26の輪っか26Aにカラビナ等の取付金具28を取付け、この取付金具28を介して測量用ターゲット9のホルダ91に設けられた取付部94に牽引ロープ26の輪っか26Aを係留することができる。なお、回収装置20のカバー25には、ガイド部材27を外部に露出させるための切欠き部25Aが設けられており、ベース板21にカバー25を取り付けた状態においてもガイド部材27のガイド穴27Aがカバー25によって覆われないように構成されている。 The base plate 21 of the recovery device 20 is provided with a guide member 27 for guiding the pulling out and winding of the towing rope 26, and the towing rope 26 is passed through a guide hole 27A of the guide member 27. A loop 26A for attaching a mounting bracket 28 such as a carabiner is formed at the end of the towing rope 26. A mounting bracket 28 such as a carabiner is attached to the loop 26A of the towing rope 26, and the loop 26A of the towing rope 26 can be moored to a mounting part 94 provided on the holder 91 of the survey target 9 via the mounting bracket 28. The cover 25 of the recovery device 20 is provided with a cutout portion 25A for exposing the guide member 27 to the outside, and is configured so that the guide hole 27A of the guide member 27 is not covered by the cover 25 even when the cover 25 is attached to the base plate 21.

本実施形態において、牽引ロープ26は、例えばワイヤー製ロープによって形成されているが、測量用ターゲット9の回収時に測量用ターゲット9をフランジ面に沿って牽引す
ることができれば素材について特に限定されない。例えば、牽引ロープ26は、ナイロン、ポリエステル、ポリプロピレン、ポリエチレン、ビニロン等の合成繊維によって形成されていてもよいし、麻や綿等の天然繊維によって形成されていてもよい。
In this embodiment, the towing rope 26 is formed of, for example, a wire rope, but there is no particular limitation on the material as long as it can tow the survey target 9 along the flange surface when retrieving the survey target 9. For example, the towing rope 26 may be formed of synthetic fibers such as nylon, polyester, polypropylene, polyethylene, vinylon, etc., or may be formed of natural fibers such as hemp, cotton, etc.

次に、図11~図14を参照して回収装置20を用いた各測量用ターゲット9の自動回収方法について説明する。図11は、回収装置20を用いて各測量用ターゲット9を回収する直前の状態を示す図である。一例として、図11には、アーチ状に組み上げられたトンネル支保工10が所定の建て込み位置に設置された状態が示されている。図11には、左側鋼製支保工10Lを把持する左側ハンド18Lと、右側鋼製支保工10Rを把持する右側ハンド18Rを図示している。なお、便宜上、ブーム17L,17Rの図示は省略している。 Next, a method for automatically collecting each survey target 9 using the collection device 20 will be described with reference to Figures 11 to 14. Figure 11 is a diagram showing the state immediately before collecting each survey target 9 using the collection device 20. As an example, Figure 11 shows a state in which a tunnel support 10 assembled in an arch shape is installed in a specified erection position. Figure 11 shows a left hand 18L that grasps the left steel support 10L, and a right hand 18R that grasps the right steel support 10R. For convenience, the booms 17L and 17R are omitted from the illustration.

左側ハンド18Lに搭載された一組の回収装置20のうち、左側鋼製支保工10Lの天端部(上端部)側に設置されている第1測量用ターゲット9aを回収するための回収装置を「左側第1回収装置20(L1)」と呼び、左側鋼製支保工10Lの下端部側に設置されている第2測量用ターゲット9bを回収するための回収装置を「左側第2回収装置20(L2)」と呼ぶ。同様に、右側ハンド18Rに搭載された一組の回収装置20のうち、右側鋼製支保工10Rの天端部(上端部)側に設置されている第3測量用ターゲット9cを回収するための回収装置を「右側第1回収装置20(R1)」と呼び、右側鋼製支保工10Rの下端部側に設置されている第4測量用ターゲット9dを回収するための回収装置を「右側第2回収装置20(R2)」と呼ぶ。なお、上記回収装置20(L1)、20(L2)、20(R1)、20(R2)は、回収する対象となる測量用ターゲット9との関係で区別して示したものであり、その構造や機能自体は実質的に等価である。 Of the set of recovery devices 20 mounted on the left hand 18L, the recovery device for recovering the first survey target 9a installed on the top end (upper end) side of the left steel support 10L is called the "left first recovery device 20 (L1)," and the recovery device for recovering the second survey target 9b installed on the lower end side of the left steel support 10L is called the "left second recovery device 20 (L2)." Similarly, of the set of recovery devices 20 mounted on the right hand 18R, the recovery device for recovering the third survey target 9c installed on the top end (upper end) side of the right steel support 10R is called the "right first recovery device 20 (R1)," and the recovery device for recovering the fourth survey target 9d installed on the lower end side of the right steel support 10R is called the "right second recovery device 20 (R2)." Note that the above recovery devices 20 (L1), 20 (L2), 20 (R1), and 20 (R2) are shown to be distinct from one another in relation to the survey target 9 that they are to recover, but their structures and functions are essentially equivalent.

図11において、左側第1回収装置20(L1)の牽引ロープ26は、先端側の取付金具28を第1測量用ターゲット9aの取付部94に係留することで、第1測量用ターゲット9aに繋がれている。また、左側第2回収装置20(L2)の牽引ロープ26は、先端側の取付金具28を第2測量用ターゲット9bの取付部94に係留することで、第2測量用ターゲット9bに繋がれている。右側第1回収装置20(R1)の牽引ロープ26は、先端側の取付金具28を第3測量用ターゲット9cの取付部94に係留することで、第3測量用ターゲット9cに繋がれている。また、右側第2回収装置20(L2)の牽引ロープ26は、先端側の取付金具28を第4測量用ターゲット9dの取付部94に係留することで、第4測量用ターゲット9dに繋がれている。図11に示すように、各回収装置20の牽引ロープ26は、接続される測量用ターゲット9に対して大きな張力が掛からないように弛んだ状態となっている。なお、本実施形態において、左側鋼製支保工10Lの下フランジ112cには、第1測量用ターゲット9aおよび第2測量用ターゲット9bを取り付けるべき規定位置Ps1,Ps2に目印が予めペンキ等で標示されており、規定位置Ps1,Ps2にそれぞれ第1測量用ターゲット9aおよび第2測量用ターゲット9bが取り付けられるようになっている。同様に、右側鋼製支保工10Rの下フランジ112cには、第3測量用ターゲット9cおよび第4測量用ターゲット9dを取り付けるべき規定位置Ps3,Ps4に目印が予めペンキ等で標示されており、規定位置Ps3,Ps4にそれぞれ第3測量用ターゲット9cおよび第4測量用ターゲット9dが取り付けられるようになっている。 In FIG. 11, the towing rope 26 of the first left recovery device 20 (L1) is connected to the first survey target 9a by mooring the tip side mounting bracket 28 to the mounting part 94 of the first survey target 9a. The towing rope 26 of the second left recovery device 20 (L2) is connected to the second survey target 9b by mooring the tip side mounting bracket 28 to the mounting part 94 of the second survey target 9b. The towing rope 26 of the first right recovery device 20 (R1) is connected to the third survey target 9c by mooring the tip side mounting bracket 28 to the mounting part 94 of the third survey target 9c. The towing rope 26 of the second right recovery device 20 (L2) is connected to the fourth survey target 9d by mooring the tip side mounting bracket 28 to the mounting part 94 of the fourth survey target 9d. As shown in FIG. 11, the towing rope 26 of each recovery device 20 is in a slack state so that a large tension is not applied to the connected survey target 9. In this embodiment, the lower flange 112c of the left steel support 10L has marks in advance with paint or the like at the specified positions Ps1 and Ps2 where the first survey target 9a and the second survey target 9b should be attached, so that the first survey target 9a and the second survey target 9b are attached to the specified positions Ps1 and Ps2, respectively. Similarly, the lower flange 112c of the right steel support 10R has marks in advance with paint or the like at the specified positions Ps3 and Ps4 where the third survey target 9c and the fourth survey target 9d should be attached, so that the third survey target 9c and the fourth survey target 9d are attached to the specified positions Ps3 and Ps4, respectively.

ここで、左側鋼製支保工10Lおよび右側鋼製支保工10Rの連結および建て込みを行う前に、各回収装置20から牽引ロープ26を必要十分に引き出し、各測量用ターゲット9の取付部94(所定部位)に対して弛んだ状態で繋いでおいてもよい。そのようにすることで、牽引ロープ26の先端を各測量用ターゲット9の取付部94に係留させる作業をトンネル切羽近傍で行う必要がなく、より一層作業の安全性を向上させることができる。 Here, before connecting and erecting the left-side steel support 10L and the right-side steel support 10R, the towing rope 26 may be pulled out sufficiently from each recovery device 20 and connected in a slack state to the mounting part 94 (predetermined part) of each survey target 9. By doing so, there is no need to moor the tip of the towing rope 26 to the mounting part 94 of each survey target 9 near the tunnel face, which further improves the safety of the work.

ここで、図10に示したリモコン30は、回収装置20毎に用意されていてもよい。各測量用ターゲット9の回収は、回収装置20毎に対応するリモコン30の巻き取りボタン32を操作し、各回収装置20のウィンチ22によって牽引ロープ26を巻き取ることによって回収する。その際、各測量用ターゲット9に下フランジ112c,122cのフランジ面上を滑動させることによって各測量用ターゲット9を回収してもよい。 The remote control 30 shown in FIG. 10 may be provided for each recovery device 20. Each survey target 9 is recovered by operating the winding button 32 on the remote control 30 corresponding to each recovery device 20 and winding the towing rope 26 with the winch 22 of each recovery device 20. At that time, each survey target 9 may be recovered by sliding it on the flange surface of the lower flanges 112c, 122c.

図12は、一例として、左側第1回収装置20(L1)によって第1測量用ターゲット9aを回収している途中の状況を示している。図13は、一例として、左側第2回収装置20(L2)によって第2測量用ターゲット9bを回収している途中の状況を示している。図13において、左側第1回収装置20(L1)による第1測量用ターゲット9aの回収は完了している。右側第1回収装置20(R1)、右側第2回収装置20(R2)を用いた第3測量用ターゲット9c、第4測量用ターゲット9dの自動回収についても、第1測量用ターゲット9a、第2測量用ターゲット9bと同様、右側鋼製支保工10Rにおける下フランジ112cのフランジ面上を滑動させることによって行うことができる。図14は、全ての測量用ターゲット9について自動回収が完了した状態を示している。 Figure 12 shows, as an example, a situation in which the first survey target 9a is being collected by the left first collection device 20 (L1). Figure 13 shows, as an example, a situation in which the second survey target 9b is being collected by the left second collection device 20 (L2). In Figure 13, the collection of the first survey target 9a by the left first collection device 20 (L1) is complete. The automatic collection of the third survey target 9c and the fourth survey target 9d using the right first collection device 20 (R1) and the right second collection device 20 (R2) can also be performed by sliding them on the flange surface of the lower flange 112c of the right steel support 10R, as with the first survey target 9a and the second survey target 9b. Figure 14 shows a state in which automatic collection of all survey targets 9 has been completed.

以上のように、本実施形態における測量用ターゲット9の回収装置20およびこれを用いた回収方法によれば、測量用ターゲット9を自動で回収することができる。そのため、各測量用ターゲット9の回収作業をエレクタ装置100のマンケージ等を利用した人手によって行う必要がない。その結果、従来よりもトンネルの施工の効率性や安全性を向上させることができる。 As described above, according to the survey target 9 recovery device 20 and the recovery method using the same in this embodiment, the survey target 9 can be recovered automatically. Therefore, it is not necessary to recover each survey target 9 manually using the man cage of the erector device 100, etc. As a result, it is possible to improve the efficiency and safety of tunnel construction compared to the conventional method.

なお、各測量用ターゲット9の回収作業が完了した後の工程は特に限定されないが、例えば、エレクタ装置100の各ハンド18L,18Rにトンネル支保工10(左側鋼製支保工10Lおよび右側鋼製支保工10R)を把持した状態で吹付け装置600から二次吹付けコンクリートを吹付け、トンネル支保工10をトンネル坑壁面に仮固定してもよい。その際、まずは、左側鋼製支保工10Lおよび右側鋼製支保工10Rの脚部およびその周囲のトンネル坑壁面(一次吹付けコンクリートの表面)に対して二次吹付けコンクリートを吹付けることで、トンネル支保工10をトンネル坑壁面に仮固定した後、エレクタ装置100のハンド18L,18Rによるトンネル支保工10の把持を解除してもよい。そして、次いで、トンネルの軸方向に隣接する新設のトンネル支保工10および既設のトンネル支保工10の間(新設区間)に二次吹付けコンクリートを吹付けて、新設のトンネル支保工10の長手方向全域を二次吹付けコンクリートに埋め込むことで、新設のトンネル支保工10をトンネル坑壁面(一次吹付けコンクリートの表面)に固定してもよい。 The process after the recovery work of each survey target 9 is completed is not particularly limited, but for example, the tunnel support 10 (left steel support 10L and right steel support 10R) may be held by each hand 18L, 18R of the erector device 100, and secondary shotcrete may be sprayed from the spraying device 600 to temporarily fix the tunnel support 10 to the tunnel wall surface. In this case, the tunnel support 10 may be temporarily fixed to the tunnel wall surface by spraying secondary shotcrete against the legs of the left steel support 10L and right steel support 10R and the surrounding tunnel wall surface (surface of the primary shotcrete), and then the grip of the tunnel support 10 by the hands 18L, 18R of the erector device 100 may be released. Next, secondary shotcrete may be sprayed between the new tunnel support 10 and the existing tunnel support 10 that are adjacent in the axial direction of the tunnel (new section), and the entire longitudinal area of the new tunnel support 10 may be embedded in the secondary shotcrete, thereby fixing the new tunnel support 10 to the tunnel wall surface (surface of the primary shotcrete).

<ターゲット回収時に測量用ターゲットが落下せずに滑動する条件>
次に、回収装置20による牽引ロープ26によって測量用ターゲット9を牽引する際に、測量用ターゲット9が左側鋼製支保工10Lおよび右側鋼製支保工10Rの下フランジ112c,122cから落下せずに下フランジ112c,122cに沿って測量用ターゲット9を滑動させるための条件を検討する。
<Conditions for survey targets to slide without falling when retrieving them>
Next, when the survey target 9 is towed by the towing rope 26 of the recovery device 20, the conditions for sliding the survey target 9 along the lower flanges 112c, 122c of the left-side steel support 10L and the right-side steel support 10R without the survey target 9 falling from the lower flanges 112c, 122c will be considered.

以下では、測量用ターゲット9より低位置に配置された回収装置20の牽引ロープ26によって斜め下方に測量用ターゲット9を牽引するパターン(以下、「斜め下方牽引パターン」という)と、測量用ターゲット9より高位置に配置された回収装置20の牽引ロープ26によって斜め上方に測量用ターゲット9を牽引するパターン(以下、「斜め上方牽引パターン」という)とに分けて、それぞれ説明する。上述した左側第1回収装置20(L1)や右側第1回収装置20(R1)によって第1測量用ターゲット9aおよび第3測量用ターゲット9cをそれぞれ回収するときの態様が斜め下方牽引パターンに該当する。一方、上述した左側第2回収装置20(L2)や右側第2回収装置20(R2)によって第2測量用ターゲット9bおよび第4測量用ターゲット9dをそれぞれ回収するときの態
様が斜め下方牽引パターンに該当する。
In the following, a pattern in which the survey target 9 is pulled diagonally downward by the towing rope 26 of the recovery device 20 arranged at a lower position than the survey target 9 (hereinafter referred to as the "diagonally downward towing pattern") and a pattern in which the survey target 9 is pulled diagonally upward by the towing rope 26 of the recovery device 20 arranged at a higher position than the survey target 9 (hereinafter referred to as the "diagonally upward towing pattern") will be described separately. The mode in which the first survey target 9a and the third survey target 9c are respectively recovered by the above-mentioned first left recovery device 20 (L1) and first right recovery device 20 (R1) corresponds to the diagonally downward towing pattern. On the other hand, the mode in which the second survey target 9b and the fourth survey target 9d are respectively recovered by the above-mentioned second left recovery device 20 (L2) and second right recovery device 20 (R2) corresponds to the diagonally downward towing pattern.

図15は、測量用ターゲット9を斜め下方牽引パターンで回収する際に測量用ターゲット9に作用する力を説明する図である。すなわち、図15は、左側鋼製支保工10L(第1本体部111)の下フランジ112cにおけるフランジ面F1に吸着している第1測量用ターゲット9aを左側第1回収装置20(L1)によって回収する際、或いは、右側鋼製支保工10R(第1本体部121)の下フランジ112cにおけるフランジ面F1に吸着している第3測量用ターゲット9cを右側第1回収装置20(R1)によって回収する際に、測量用ターゲット9a,9cに作用する力を示している。従って、図15の説明における測量用ターゲット9とは、具体的には測量用ターゲット9a,9cを指す。 Figure 15 is a diagram explaining the forces acting on the survey target 9 when the survey target 9 is retrieved in a diagonally downward towing pattern. That is, Figure 15 shows the forces acting on the survey targets 9a and 9c when the first survey target 9a adsorbed to the flange surface F1 of the lower flange 112c of the left steel support 10L (first main body part 111) is retrieved by the left first retrieval device 20 (L1), or when the third survey target 9c adsorbed to the flange surface F1 of the lower flange 112c of the right steel support 10R (first main body part 121) is retrieved by the right first retrieval device 20 (R1). Therefore, the survey target 9 in the explanation of Figure 15 specifically refers to the survey targets 9a and 9c.

ここで、測量用ターゲット9が下フランジ112c,122cのフランジ面F1に接する位置における、フランジ面F1の接線方向をx方向とし、当該x方向と鉛直方向とを含む平面上であって且つx方向に直交する方向をy方向とする。x方向は、測量用ターゲット9から、当該測量用ターゲット9を回収する回収装置20(20(L1),20(R1))に向かう方向を正の方向とする。y方向は、下フランジ112c,122cのフランジ面F1から測量用ターゲット9へ向かう方向を正の方向とする。また、測量用ターゲット9のうち、フランジ面F1に接する部分のx方向の寸法を長さaとする。また、測量用ターゲット9における取付部94からフランジ面F1までのy方向に沿った距離を長さbとする。測量用ターゲット9の底面91Aはフランジ面F1に吸着されているため、長さbは、測量用ターゲット9における取付部94から底面91Aまでの高さ寸法と実質的に等しい。また、測量用ターゲット9の重心からフランジ面F1までのy方向に沿った距離を長さcとする。また、測量用ターゲット9の質量をm、重力加速度をgとする。また、測量用ターゲット9がフランジ面F1から受ける垂直抗力をNとする。また、測量用ターゲット9とフランジ面F1との間に作用する磁力をSとする。また、測量用ターゲット9の取り付け部94に接続される牽引ロープ26にかかる張力をTとする。また、水平方向とx方向とのなす角をα、水平方向と牽引ロープ26の方向とのなす角をθとする。なお、角度α、θは、水平方向から反時計回りの方向を正とする。 Here, the tangent direction of the flange surface F1 at the position where the survey target 9 is in contact with the flange surface F1 of the lower flanges 112c, 122c is defined as the x direction, and the direction on a plane including the x direction and the vertical direction and perpendicular to the x direction is defined as the y direction. The positive direction of the x direction is the direction from the survey target 9 toward the recovery device 20 (20(L1), 20(R1)) that recovers the survey target 9. The positive direction of the y direction is the direction from the flange surface F1 of the lower flanges 112c, 122c toward the survey target 9. The dimension of the part of the survey target 9 in the x direction that is in contact with the flange surface F1 is defined as length a. The distance in the y direction from the mounting portion 94 of the survey target 9 to the flange surface F1 is defined as length b. Since the bottom surface 91A of the survey target 9 is attached to the flange surface F1, the length b is substantially equal to the height dimension from the mounting portion 94 to the bottom surface 91A of the survey target 9. The distance in the y direction from the center of gravity of the survey target 9 to the flange surface F1 is defined as the length c. The mass of the survey target 9 is defined as m, and the gravitational acceleration is defined as g. The normal force that the survey target 9 receives from the flange surface F1 is defined as N. The magnetic force acting between the survey target 9 and the flange surface F1 is defined as S. The tension applied to the towing rope 26 connected to the mounting portion 94 of the survey target 9 is defined as T. The angle between the horizontal direction and the x direction is defined as α, and the angle between the horizontal direction and the direction of the towing rope 26 is defined as θ. The angles α and θ are positive in the counterclockwise direction from the horizontal direction.

ここで、測量用ターゲット9は、垂直抗力Nの大きさが正であれば、フランジ面F1への吸着状態が維持され、落下することがない。フランジ面F1に吸着した状態の測量用ターゲット9はy方向に動かないため、測量用ターゲット9のy方向における力のつり合い方程式としては、下記式1、およびこれを変換した式2となる。
S=mgcosα+Tsin(θ-α)+N・・・(式1)
N=S-mgcosα-Tsin(θ-α)・・・(式2)
ここで、上記のように、垂直抗力Nが正の値であれば測量用ターゲット9の吸着状態が維持される。そのため、測量用ターゲット9が落下しないための条件式Aが下記のように得られる。
S>mgcosα+Tsin(θ-α)・・・(条件式A)
Here, if the magnitude of the normal force N is positive, the survey target 9 maintains its adherence to the flange surface F1 and does not fall. Since the survey target 9 adhered to the flange surface F1 does not move in the y direction, the force balance equation in the y direction of the survey target 9 is given by the following formula 1 and its converted formula 2.
S=mgcosα+Tsin(θ-α)+N...(Formula 1)
N=S-mgcosα-Tsin(θ-α)...(Formula 2)
Here, as described above, if the normal force N is a positive value, the attracted state of the survey target 9 is maintained. Therefore, the conditional formula A for preventing the survey target 9 from falling is obtained as follows.
S>mgcosα+Tsin(θ-α)...(Conditional expression A)

次に、測量用ターゲット9は、x方向に作用する合力が最大静止摩擦力よりも大きくなった場合にフランジ面F1を滑り始める。よって、静止状態の測量用ターゲット9がフランジ面F1に沿って滑り出す条件は式3-1で表すことができる。そして、式3-1を変換した式3-2を更に変換することで条件式Bが導出される。
μN<mgsinα+Tcos(θ-α)・・・(式3-1)
μ(S-mgcosα-Tsin(θ-α))<mgsinα+Tcos(θ-α)・・・(式3-2)
S<(mgsinα+Tcos(θ-α))/μ+mgcosα+Tsin(θ-α)・・・(条件式B)
ここで、μは、フランジ面F1と測量用ターゲット9(9a,9c)との間の最大静止
摩擦係数である。
Next, the survey target 9 starts to slide on the flange surface F1 when the resultant force acting in the x direction becomes greater than the maximum static friction force. Therefore, the condition under which the stationary survey target 9 starts to slide along the flange surface F1 can be expressed by Equation 3-1. Conditional Equation B is derived by further transforming Equation 3-2, which is a transformation of Equation 3-1.
μN<mgsinα+Tcos(θ-α)...(Formula 3-1)
μ(S-mgcosα-Tsin(θ-α))<mgsinα+Tcos(θ-α)...(Formula 3-2)
S<(mgsinα+Tcos(θ-α))/μ+mgcosα+Tsin(θ-α) (conditional expression B)
Here, μ is the maximum static friction coefficient between the flange surface F1 and the survey target 9 (9a, 9c).

次に、静止状態の測量用ターゲット9がフランジ面F1に沿って滑動し続ける条件は、x方向の合力が動摩擦力よりも大きいことによって満たされる。従って、測量用ターゲット9がフランジ面F1に沿って滑動し続ける条件は下記式4-1で表すことができる。そして、式4-1を変換した式4-2を更に変換することで条件式Cが導出される。
μ′N<mgsinα+Tcos(θ-α)・・・(式4-1)
μ′(S-mgcosα-Tsin(θ-α))<mgsinα+Tcos(θ-α)・・・(式4-1)
S<(mgsinα+Tcos(θ-α))/μ′+mgcosα+Tsin(θ-α)・・・(条件式C)
ここで、μ′は、フランジ面F1と測量用ターゲット9との間の動摩擦係数である。なお、μ′は、μより小さいので、条件式Bが満たされる場合には、条件式Cも同時に満たされることとなる。
Next, the condition for the stationary survey target 9 to continue to slide along the flange surface F1 is satisfied when the resultant force in the x direction is greater than the kinetic friction force. Therefore, the condition for the survey target 9 to continue to slide along the flange surface F1 can be expressed by the following formula 4-1. Conditional formula C is derived by further transforming formula 4-2, which is a transformation of formula 4-1.
μ′N<mgsinα+Tcos(θ−α)...(Formula 4-1)
μ'(S-mgcosα-Tsin(θ-α))<mgsinα+Tcos(θ-α)...(Formula 4-1)
S<(mgsinα+Tcos(θ-α))/μ′+mgcosα+Tsin(θ-α)...(Conditional expression C)
Here, μ′ is the dynamic friction coefficient between the flange surface F1 and the survey target 9. Since μ′ is smaller than μ, when conditional formula B is satisfied, conditional formula C is also satisfied at the same time.

更に、測量用ターゲット9の牽引時において、測量用ターゲット9に作用する時計回りのモーメントが反時計回りのモーメントよりも小さい場合には、測量用ターゲット9が転倒することがない。そして、測量用ターゲット9に作用する時計回りのモーメントは、式5で表される。
cmgcosα+(a/2)mgsinα+aTsin(θ-α)・・・(式5)
一方、測量用ターゲット9に作用する反時計回りのモーメントは、下記式6-1で表される。
(a/2)×S+bTcos(θ-α)・・・(式6-1)
以上より、牽引時に測量用ターゲット9が転倒しない条件は下記式6-2を満たすときに成立し、式6-2を変換することで条件式Dが導出される。
cmgcosα+(a/2)mgsinα+aTsin(θ-α)<(a/2)×S+bTcos(θ-α)・・・(式6-2)
S<mg((2c/a)cosα+sinα)+T(2sin(θ-α)-(2b/a)cos(θ-α))・・・(条件式D)
Furthermore, when the clockwise moment acting on the survey target 9 is smaller than the counterclockwise moment when the survey target 9 is towed, the survey target 9 will not fall over. The clockwise moment acting on the survey target 9 is expressed by Equation 5.
cmgcosα+(a/2)mgsinα+aTsin(θ-α)...(Formula 5)
On the other hand, the counterclockwise moment acting on the survey target 9 is expressed by the following formula 6-1.
(a/2)×S+bTcos(θ-α)...(Formula 6-1)
From the above, the condition for the survey target 9 not toppling over when towed is met when the following formula 6-2 is satisfied, and conditional formula D is derived by converting formula 6-2.
cmgcosα+(a/2)mgsinα+aTsin(θ-α)<(a/2)×S+bTcos(θ-α)...(Formula 6-2)
S<mg((2c/a)cosα+sinα)+T(2sin(θ-α)-(2b/a)cos(θ-α))...(Conditional expression D)

次に、「斜め上方牽引パターンについて説明する。図16は、測量用ターゲット9を斜め上方牽引パターンで回収する際に測量用ターゲット9に作用する力を説明する図である。すなわち、図16は、左側鋼製支保工10L(第1本体部111)の下フランジ112cにおけるフランジ面F1に吸着している第2測量用ターゲット9bを左側第2回収装置20(L2)によって回収する際、或いは、右側鋼製支保工10R(第1本体部121)の下フランジ112cにおけるフランジ面F1に吸着している第4測量用ターゲット9cを右側第2回収装置20(R2)によって回収する際に、測量用ターゲット9b,9dに作用する力を示している。従って、図16の説明における測量用ターゲット9とは、具体的には測量用ターゲット9b,9dを指す。 Next, the "diagonal upward towing pattern" will be explained. FIG. 16 is a diagram for explaining the forces acting on the survey target 9 when the survey target 9 is retrieved using the diagonal upward towing pattern. That is, FIG. 16 shows the forces acting on the survey targets 9b and 9d when the second survey target 9b adsorbed to the flange surface F1 of the lower flange 112c of the left steel support 10L (first main body 111) is retrieved by the left second retrieval device 20 (L2), or when the fourth survey target 9c adsorbed to the flange surface F1 of the lower flange 112c of the right steel support 10R (first main body 121) is retrieved by the right second retrieval device 20 (R2). Therefore, the survey target 9 in the explanation of FIG. 16 specifically refers to the survey targets 9b and 9d.

図16において、x方向、y方向等の基準軸方向やその正負の方向、垂直抗力N、質量m、重力加速度g、磁力Sなどについては、図15に説明したものと同様である。図15で説明したように角度α、θは、水平方向から反時計回りの方向を正として設定されるため、図16に示す「斜め上方牽引パターンでは、主として角度α,θは負の値をとることになるが、角度α、θの正負は特に問わない。 In FIG. 16, the reference axis directions such as the x direction and y direction, their positive and negative directions, normal force N, mass m, gravitational acceleration g, magnetic force S, etc. are the same as those explained in FIG. 15. As explained in FIG. 15, the angles α and θ are set with the counterclockwise direction from the horizontal direction being positive, so in the "diagonal upward traction pattern" shown in FIG. 16, the angles α and θ will mainly take negative values, but it does not matter whether the angles α and θ are positive or negative.

図16に示す斜め上方牽引パターンについても、垂直抗力Nの大きさが正であればフランジ面F1への測量用ターゲット9の吸着状態が維持され、落下することがない。従って、斜め上方牽引パターンについても、上述した斜め下方牽引パターンの場合と同様、条件式1を満たすときにフランジ面F1への測量用ターゲット9の吸着状態が維持され、落下
することが抑制される。
16, if the normal force N is positive, the survey target 9 is maintained in an attracted state to the flange surface F1 and does not fall. Therefore, in the case of the diagonal upward pulling pattern, similarly to the case of the diagonal downward pulling pattern described above, when the conditional expression 1 is satisfied, the survey target 9 is maintained in an attracted state to the flange surface F1 and is prevented from falling.

また、斜め上方牽引パターンについても、静止状態の測量用ターゲット9がフランジ面F1に沿って滑り出す条件、測量用ターゲット9がフランジ面F1に沿って滑動し続ける各条件として、斜め下方牽引パターンと同様の条件式(2)、条件式(3)によって表すことができる。また、斜め上方牽引パターンについても、牽引時に測量用ターゲット9が転倒しない条件は、斜め下方牽引パターンと同様の条件式(4)によって表すことができる。 For the diagonal upward towing pattern, the conditions under which the stationary survey target 9 starts to slide along the flange surface F1 and the conditions under which the survey target 9 continues to slide along the flange surface F1 can be expressed by conditional formula (2) and conditional formula (3) similar to those for the diagonal downward towing pattern. For the diagonal upward towing pattern, the conditions under which the survey target 9 does not tip over when towed can be expressed by conditional formula (4) similar to those for the diagonal downward towing pattern.

以上のように、斜め下方牽引パターンと斜め上方牽引パターンの何れにおいても、条件式1、条件式2、条件式4を満たすことによって、回収装置20によって測量用ターゲット9を回収する際に、測量用ターゲット9を転倒および落下させることなくフランジ面F1に沿って滑動させ続けることができる。これにより、フランジ面F1に沿って測量用ターゲット9を円滑に牽引し、回収することができる。 As described above, in both the diagonally downward pulling pattern and the diagonally upward pulling pattern, by satisfying conditional expressions 1, 2, and 4, when the survey target 9 is retrieved by the retrieval device 20, the survey target 9 can continue to slide along the flange surface F1 without tipping over or falling. This allows the survey target 9 to be smoothly pulled and retrieved along the flange surface F1.

以上、測量用ターゲットを回収する回収装置および回収方法の実施形態について説明したが、実施形態における各構成及びそれらの組み合わせ等は、一例であって、本発明の主旨から逸脱しない範囲内で、適宜、構成の付加、省略、置換、及びその他の変更が可能である。また、本明細書に開示された各々の態様は、本明細書に開示された他のいかなる特徴とも組み合わせることができる。 The above describes an embodiment of a recovery device and a recovery method for recovering survey targets, but each configuration and combination thereof in the embodiment is merely an example, and addition, omission, substitution, and other modifications of configurations are possible as appropriate without departing from the spirit of the present invention. Furthermore, each aspect disclosed in this specification can be combined with any other feature disclosed in this specification.

9・・・測量用ターゲット
10・・・トンネル支保工
18・・・ハンド
18A・・・把持部
20・・・回収装置
22・・・ウィンチ
26・・・牽引ロープ
27・・・ガイド部材
91・・・ホルダ
92・・・磁石
93・・・プリズム
94・・・取付部
100・・・エレクタ装置
9: Survey target 10: Tunnel support 18: Hand 18A: Grip 20: Recovery device 22: Winch 26: Towing rope 27: Guide member 91: Holder 92: Magnet 93: Prism 94: Mounting part 100: Erector device

Claims (2)

鋼製支保工のフランジ面に対し、ホルダに設けられた磁石の磁力で吸着された測量用ターゲットを回収する回収装置であって、
前記鋼製支保工を建て込むエレクタ装置のハンドに搭載され、前記測量用ターゲットの所定部位に係留させた牽引ロープを巻き取り可能な巻き取り装置を備え、
前記測量用ターゲットの回収時に、前記巻き取り装置によって前記牽引ロープを巻き取ることによって、前記測量用ターゲットにおける前記ホルダの底面を前記フランジ面に吸着させた状態で当該フランジ面上を滑動させることが可能である、
測量用ターゲットの回収装置。
A recovery device for recovering a survey target that is attracted to a flange surface of a steel support by the magnetic force of a magnet provided in a holder ,
A winding device is provided which is mounted on the hand of the erector device for erecting the steel support and can wind up the towing rope moored at a predetermined portion of the survey target,
When the survey target is retrieved, the towing rope is wound up by the winding device , so that the bottom surface of the holder in the survey target can be slid on the flange surface while being adhered to the flange surface.
A survey target recovery device.
鋼製支保工の建て込み施工に用いる測量用ターゲットを回収する回収方法であって、
前記鋼製支保工を建て込むエレクタ装置のハンドに搭載された巻き取り装置に巻回された牽引ロープを、前記鋼製支保工のフランジ面に対し、ホルダに設けられた磁石の磁力で吸着された前記測量用ターゲットの所定部位に係留させる工程と、
前記巻き取り装置によって前記牽引ロープを巻き取ることによって前記測量用ターゲットを回収する工程と、
を含み、
前記測量用ターゲットを回収する工程においては、前記測量用ターゲットにおける前記ホルダの底面を前記フランジ面に吸着させた状態で前記フランジ面上を滑動させることが可能である、
測量用ターゲットの回収方法。
A method for recovering a survey target used in erecting a steel support structure, comprising:
A process of mooring a towing rope wound around a winding device mounted on a hand of an erector device that erects the steel support to a predetermined portion of the survey target that is attracted to the flange surface of the steel support by the magnetic force of a magnet provided in a holder ;
Retrieving the survey target by winding up the tow rope with the winding device;
Including,
In the step of recovering the survey target, the bottom surface of the holder of the survey target can be slid on the flange surface while being adhered to the flange surface.
How to recover survey targets.
JP2021134984A 2021-08-20 2021-08-20 Apparatus and method for recovering surveying targets Active JP7708613B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021134984A JP7708613B2 (en) 2021-08-20 2021-08-20 Apparatus and method for recovering surveying targets

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021134984A JP7708613B2 (en) 2021-08-20 2021-08-20 Apparatus and method for recovering surveying targets

Publications (2)

Publication Number Publication Date
JP2023028970A JP2023028970A (en) 2023-03-03
JP7708613B2 true JP7708613B2 (en) 2025-07-15

Family

ID=85331121

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021134984A Active JP7708613B2 (en) 2021-08-20 2021-08-20 Apparatus and method for recovering surveying targets

Country Status (1)

Country Link
JP (1) JP7708613B2 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201262546Y (en) 2008-04-14 2009-06-24 中铁西南科学研究院有限公司 TBM tunnel clearance displacement monitoring system
CN103471569A (en) 2012-06-07 2013-12-25 北京申江工程技术咨询有限公司 Automatic guide measuring target and measuring system for shield machine
JP2019027274A (en) 2017-07-28 2019-02-21 前田建設工業株式会社 Construction method using construction auxiliary tool, recovery device of construction auxiliary tool, and recovery method of construction auxiliary tool

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60199196A (en) * 1984-03-22 1985-10-08 東急建設株式会社 Measurement of propelling accuracy in propelling construction method
JPS6230107U (en) * 1985-03-27 1987-02-23

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201262546Y (en) 2008-04-14 2009-06-24 中铁西南科学研究院有限公司 TBM tunnel clearance displacement monitoring system
CN103471569A (en) 2012-06-07 2013-12-25 北京申江工程技术咨询有限公司 Automatic guide measuring target and measuring system for shield machine
JP2019027274A (en) 2017-07-28 2019-02-21 前田建設工業株式会社 Construction method using construction auxiliary tool, recovery device of construction auxiliary tool, and recovery method of construction auxiliary tool

Also Published As

Publication number Publication date
JP2023028970A (en) 2023-03-03

Similar Documents

Publication Publication Date Title
JP7102653B2 (en) Construction method using surveying target, surveying target recovery device, and surveying target recovery method
JP6420231B2 (en) Tunnel support construction method and system
JP2004301665A (en) Wall inspection robot system and wall inspection method
JP6466669B2 (en) Work robot system and control method of work robot system
Fukuda et al. Remote vertical exploration by Active Scope Camera into collapsed buildings
JP2015031026A (en) Wiring method to crossing pipe in fluid pipeline, and wiring method of communication line for work with work body attached to portion thereof, as well as device for use in the method
JP7091931B2 (en) Automatic operation device and automatic operation method for indoor cranes
JP7708613B2 (en) Apparatus and method for recovering surveying targets
JP7328659B2 (en) Shoring erection device and shoring erection method using the same
JP5849901B2 (en) Moving vehicle
KR102234797B1 (en) Self propelled reel type hydraulic puller
JP5704391B2 (en) Method and apparatus for moving and escaping moving objects
US6478171B2 (en) Vinyl lifting crane and method
JPH07197461A (en) Pile driver, transferable base frame of pile driver and preventive device of diffusion of turbid water resulting from the pile drive and piling method thereof
JP2020158254A (en) crane
JP6666976B2 (en) Tunnel shoring method and system
CN107476757A (en) Climb equipment hanger
JP2019143316A (en) Unmanned spraying system
JP6738779B2 (en) Pile driver and method of changing the posture of the pile driver
JP4934556B2 (en) How to run or rotate heavy objects
KR101926553B1 (en) Underground structure verticality management system through GPS real-time dynamic observation
JP2011255490A (en) Method and apparatus for casting robot body
JP4560728B2 (en) Pile chuck control device
JP7506874B2 (en) Slope inspection device
CN111267116B (en) A surveying and mapping robot

Legal Events

Date Code Title Description
A80 Written request to apply exceptions to lack of novelty of invention

Free format text: JAPANESE INTERMEDIATE CODE: A80

Effective date: 20210916

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240610

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20250124

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20250204

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20250318

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20250624

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250703

R150 Certificate of patent or registration of utility model

Ref document number: 7708613

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150