JP7715219B2 - Planning device, planning method, and program - Google Patents
[go: Go Back, main page]

JP7715219B2 - Planning device, planning method, and program - Google Patents

Planning device, planning method, and program

Info

Publication number
JP7715219B2
JP7715219B2 JP2023579913A JP2023579913A JP7715219B2 JP 7715219 B2 JP7715219 B2 JP 7715219B2 JP 2023579913 A JP2023579913 A JP 2023579913A JP 2023579913 A JP2023579913 A JP 2023579913A JP 7715219 B2 JP7715219 B2 JP 7715219B2
Authority
JP
Japan
Prior art keywords
consumer
adjustment
adjustment power
planning
control device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2023579913A
Other languages
Japanese (ja)
Other versions
JPWO2023152820A5 (en
JPWO2023152820A1 (en
Inventor
眞 杉村
耕治 工藤
博 倉金
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NEC Corp
Original Assignee
NEC Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NEC Corp filed Critical NEC Corp
Publication of JPWO2023152820A1 publication Critical patent/JPWO2023152820A1/ja
Publication of JPWO2023152820A5 publication Critical patent/JPWO2023152820A5/en
Application granted granted Critical
Publication of JP7715219B2 publication Critical patent/JP7715219B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/28Arrangements for balancing of the load in networks by storage of energy
    • H02J3/32Arrangements for balancing of the load in networks by storage of energy using batteries or super capacitors with converting means
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Description

本発明は、計画装置、計画方法およびプログラムに関する。 The present invention relates to a planning device, a planning method, and a program .

電力需要家が備える蓄電池を用いて、電力系統安定化のための調整力を提供するアンシラリー(Ancillary)サービスが知られている(例えば、特許文献1参照)。 Ancillary services are known that use storage batteries installed at electricity consumers to provide adjustment power for stabilizing the power grid (see, for example, Patent Document 1).

日本国特開2020-137368号公報Japanese Patent Application Publication No. 2020-137368

調整力提供サービス(アンシラリーサービス)の約定状況に応じて計画の対象を選択する必要なしに、調整力提供サービスの計画を立案できることが好ましい。 It would be desirable to be able to plan adjustment capacity provision services (ancillary services) without having to select the target of the plan depending on the contract status of the adjustment capacity provision services.

この開示の目的の一例は、上述した課題を解決することのできる計画装置、計画方法およびプログラムを提供することである。 An example of a purpose of this disclosure is to provide a planning device, a planning method, and a program that can solve the above-mentioned problems.

本発明の第一の態様によれば、計画装置は、電力系統安定化のための調整力の提供者たり得る少なくとも1つの需要家を対象として、各需要家について、調整力提供サービスの少なくとも1つの約定単位期間におけるその需要家による前記調整力提供サービスの提供の有無にかかわらず、その約定単位期間を含む計画期間における前記需要家のシステムによる前記調整力提供サービスの運用計画を立案するための最適化問題における制約条件として、前記計画期間に含まれる約定単位期間と、複数の前記需要家を含み前記約定単位期間毎の前記調整力提供サービスの約定の単位となる需要家グループのうち、その約定単位期間に前記調整力提供サービスの提供がない需要家グループに含まれる需要家との組み合わせについて、前記調整力の確保量を0にするための数式を含む制約条件を、前記需要家グループ毎に設定する制約条件設定手段と、前記制約条件を用いた最適化問題を解くことで、前記計画期間における前記調整力提供サービスの運用計画を立案する運用計画立案手段と、を備える。 According to a first aspect of the present invention, the planning device targets at least one consumer that can be a provider of adjustment power for stabilizing a power system, and includes: a constraint condition setting means that sets, for each consumer group, a constraint condition including a contract unit period included in the planning period and a mathematical formula for setting the secured amount of adjustment power to zero for a combination of a contract unit period included in the planning period and a consumer group that is a unit of contract for the adjustment power provision service for each contract unit period, the contract unit period including a plurality of the consumers, and a consumer that is included in a consumer group that is not provided with the adjustment power provision service in the contract unit period; and an operation plan creation means that creates an operation plan for the adjustment power provision service for the planning period by solving the optimization problem using the constraint condition .

本発明の第二の態様によれば、計画方法は、コンピュータが、電力系統安定化のための調整力の提供者たり得る少なくとも1つの需要家を対象として、各需要家について、調整力提供サービスの少なくとも1つの約定単位期間におけるその需要家による前記調整力提供サービスの提供の有無にかかわらず、その約定単位期間を含む計画期間における前記需要家のシステムによる前記調整力提供サービスの運用計画を立案するための最適化問題における制約条件として、前記計画期間に含まれる約定単位期間と、複数の前記需要家を含み前記約定単位期間毎の前記調整力提供サービスの約定の単位となる需要家グループのうち、その約定単位期間に前記調整力提供サービスの提供がない需要家グループに含まれる需要家との組み合わせについて、前記調整力の確保量を0にするための数式を含む制約条件を、前記需要家グループ毎に設定し、前記制約条件を用いた最適化問題を解くことで、前記計画期間における前記調整力提供サービスの運用計画を立案する、ことを含む。 According to a second aspect of the present invention, a planning method includes a computer setting, as constraints in an optimization problem for at least one consumer that can be a provider of adjustment power for stabilizing a power system, a constraint including a contract unit period included in the planning period and a mathematical expression for setting the secured amount of adjustment power to zero for a combination of a contract unit period included in the planning period and a consumer group that is a unit of contract for the adjustment power provision service for each contract unit period and that includes a plurality of the consumers and that is not provided with the adjustment power provision service in that contract unit period, and solving the optimization problem using the constraints to create an operation plan for the adjustment power provision service for the planning period .

本発明の第三の態様によれば、プログラムは、コンピュータに、電力系統安定化のための調整力の提供者たり得る少なくとも1つの需要家を対象として、各需要家について、調整力提供サービスの少なくとも1つの約定単位期間におけるその需要家による前記調整力提供サービスの提供の有無にかかわらず、その約定単位期間を含む計画期間における前記需要家のシステムによる前記調整力提供サービスの運用計画を立案するための最適化問題における制約条件として、前記計画期間に含まれる約定単位期間と、複数の前記需要家を含み前記約定単位期間毎の前記調整力提供サービスの約定の単位となる需要家グループのうち、その約定単位期間に前記調整力提供サービスの提供がない需要家グループに含まれる需要家との組み合わせについて、前記調整力の確保量を0にするための数式を含む制約条件を、前記需要家グループ毎に設定することと、前記制約条件を用いた最適化問題を解くことで、前記計画期間における前記調整力提供サービスの運用計画を立案することと、ことを実行させるためのプログラムである。
According to a third aspect of the present invention, a program causes a computer to execute the following steps: for at least one consumer that can be a provider of adjustment power for stabilizing a power system, regardless of whether the adjustment power provision service is provided by the consumer in at least one contract unit period of the adjustment power provision service, the program sets, for each consumer group , a constraint including a contract unit period included in the planning period and a formula for setting the amount of guaranteed adjustment power to zero for a combination of a consumer group that includes a plurality of the consumers and serves as a unit for contracting the adjustment power provision service for each contract unit period, and a consumer that is included in a consumer group that is not provided with the adjustment power provision service in that contract unit period; and to formulate an operation plan for the adjustment power provision service for the planning period by solving the optimization problem using the constraint ;

本発明によれば、調整力提供サービスの約定状況に応じて計画の対象を選択する必要なしに、調整力提供サービスの計画を立案できる。 According to the present invention, it is possible to plan adjustment capacity provision services without having to select the target of the plan based on the contract status of the adjustment capacity provision service.

第一実施形態に係る電力システムの構成の例を示す図である。1 is a diagram illustrating an example of the configuration of a power system according to a first embodiment. 第一実施形態に係る上位制御装置の構成の例を示す図である。FIG. 2 is a diagram illustrating an example of the configuration of a higher-level control device according to the first embodiment. 第一実施形態に係る上位制御装置が需要家への調整力確保量の割当の計画を行うタイミングの例を示す図である。FIG. 4 is a diagram illustrating an example of timing at which the upper control device according to the first embodiment plans allocation of the amount of guaranteed adjustment capacity to consumers. 第一実施形態に係る上位制御装置における処理の手順の例を示す図である。FIG. 4 is a diagram illustrating an example of a processing procedure in a higher-level control device according to the first embodiment. 第二実施形態における最適化問題での、調整力提供サービスの約定状況の設定の例を示す図である。FIG. 11 is a diagram illustrating an example of setting the contract status of the adjustment power providing service in the optimization problem according to the second embodiment. 第二実施形態に係る上位制御装置が調整力提供サービスを行う処理手順の例を示す図である。FIG. 11 is a diagram illustrating an example of a processing procedure in which a higher-level control device according to the second embodiment performs an adjustment power providing service. 第三実施形態における最適化問題での、調整力提供サービスの約定状況の設定の例を示す図である。FIG. 11 is a diagram illustrating an example of setting the contract status of the adjustment power providing service in the optimization problem according to the third embodiment. 第三実施形態に係る上位制御装置が調整力提供サービスを行う処理手順の例を示す図である。FIG. 11 is a diagram illustrating an example of a processing procedure in which a higher-level control device according to the third embodiment performs an adjustment power providing service. 第四実施形態に係る制御装置の構成の例を示す図である。FIG. 10 is a diagram illustrating an example of the configuration of a control device according to a fourth embodiment. 第五実施形態に係る計画方法における処理の手順の例を示す図である。FIG. 13 is a diagram illustrating an example of a processing procedure in a planning method according to the fifth embodiment. 少なくとも1つの実施形態に係るコンピュータの構成を示す概略ブロック図である。FIG. 1 is a schematic block diagram illustrating the configuration of a computer according to at least one embodiment.

以下、本発明の実施形態を説明するが、以下の実施形態は請求の範囲にかかる発明を限定するものではない。また、実施形態の中で説明されている特徴の組み合わせの全てが発明の解決手段に必須であるとは限らない。 The following describes embodiments of the present invention, but the following embodiments do not limit the scope of the invention as claimed. Furthermore, not all combinations of features described in the embodiments are necessarily essential to the solution of the invention.

<第一実施形態>
図1は、第一実施形態に係る電力システムの構成の例を示す図である。図1に示す構成で、電力システム1は、中央給電指令システム11と、アグリゲーション事業者システム12と、上位側第一ゲートウェイ装置21と、上位制御装置22と、上位側第二ゲートウェイ装置23と、電力系統30と、需要家設置システム50と、大型蓄電システム70とを備える。
First Embodiment
Fig. 1 is a diagram showing an example of the configuration of a power system according to the first embodiment. In the configuration shown in Fig. 1, the power system 1 includes a central load control system 11, an aggregation operator system 12, a first upper gateway device 21, a higher-level control device 22, a second upper gateway device 23, a power grid 30, a customer-installed system 50, and a large-scale power storage system 70.

需要家設置システム50は、分電盤51と、電力負荷52と、太陽光発電(Photovoltaic;PV)システム53と、蓄電システム60とを備える。蓄電システム60は、下位側ゲートウェイ装置61と、下位制御装置62と、パワーコンディショニングシステム(Power Conditioning Subsystem;PCS)63と、蓄電池64とを備える。
大型蓄電システム70は、下位制御装置71とパワーコンディショニングシステム72と、大型蓄電池73とを備える。
また、図1では、通信経路を破線で示し、電力経路を実線で示している。図1において、下位側ゲートウェイ装置61および下位制御装置62も電力を消費しているが、蓄電システム60のAC側(分電盤51側)出力の擾乱にならない構成で受電されている。
The consumer-installed system 50 includes a distribution board 51, a power load 52, a photovoltaic (PV) system 53, and a power storage system 60. The power storage system 60 includes a lower-level gateway device 61, a lower-level control device 62, a power conditioning subsystem (PCS) 63, and a storage battery 64.
The large-scale power storage system 70 includes a lower-level control device 71 , a power conditioning system 72 , and a large-scale storage battery 73 .
In addition, communication paths are indicated by dashed lines and power paths are indicated by solid lines in Fig. 1. In Fig. 1, the lower-level gateway device 61 and the lower-level control device 62 also consume power, but the power is received in a manner that does not disturb the AC side (distribution board 51 side) output of the power storage system 60.

中央給電指令システム11は、送配電事業者の中央給電指令所に設けられ、電力系統30における電力の需給バランスを制御する。また、中央給電指令システム11は、電力需要家等が備える蓄電池の放電または充電によって電力系統30の安定化を図るアンシラリーサービスの提供を上位制御装置に要求する。図1の例では、蓄電池64および大型蓄電池73が、アンシラリーサービスに用いられる蓄電池の例に該当する。 The central load control system 11 is installed in the central load control center of the power transmission and distribution company and controls the balance of power supply and demand in the power grid 30. The central load control system 11 also requests the upper control device to provide ancillary services that stabilize the power grid 30 by discharging or charging storage batteries provided by power consumers, etc. In the example of Figure 1, storage battery 64 and large storage battery 73 are examples of storage batteries used for ancillary services.

電力需要家を単に需要家とも称する。需要家の数を数える際、1件、2件、・・・とも表記する、あるいは、1つ、2つ、・・・とも表記する。
電力系統30は、送配電事業者の監視制御のもと、商用電力の送配電に用いられる。
An electricity consumer is also simply called a consumer. When counting the number of consumers, it is written as one, two, etc., or one, two, etc.
The power system 30 is used for transmitting and distributing commercial power under the monitoring and control of a power transmission and distribution company.

アグリゲーション事業者システム12は、アグリゲータ(Aggregator)の設備に設けられ、エネルギーリソースアグリゲーション(Energy Resource Aggregation)に関する情報を上位制御装置22に通知する。なお、以下では装置間で自動的に情報伝達が行われる場合を例に説明するが、情報伝達の一部または全部が、担当者によるメールまたはFAXの送信など人間によって行われていてもよい。
ここでいうエネルギーリソースアグリゲーションは、複数の需要家等が備える蓄電池の充放電を取りまとめて送配電事業者にアンシラリーサービスを提供することである。エネルギーリソースアグリゲーションを、単にリソースアグリゲーションとも称する。
ここでいうアグリゲータは、リソースアグリゲーションを行う事業者である。
The aggregation provider system 12 is installed in the equipment of an aggregator, and notifies information related to energy resource aggregation to a higher-level control device 22. Note that, although the following description will be given taking as an example a case where information is transmitted automatically between devices, some or all of the information transmission may be performed manually by a person in charge, such as by sending an email or a fax.
Energy resource aggregation here refers to providing ancillary services to electricity transmission and distribution companies by aggregating the charging and discharging of storage batteries provided by multiple consumers, etc. Energy resource aggregation is also simply referred to as resource aggregation.
The aggregator here refers to a business operator that performs resource aggregation.

アグリゲータが、リソースアグリゲータ(Resource Aggregator;RA)と、アグリゲーションコーディネータ(Aggregation Coordinator;AC)とによって構成されるなど、アグリゲータが階層的に構成されていてもよい。リソースアグリゲータは、複数の需要家等が備える蓄電池の充放電を取りまとめる。アグリゲーションコーディネータは、リソースアグリゲータが複数の需要家等について取り纏めた充放電電力提供サービスを、複数のリソースアグリゲータについてさらに取り纏めて送配電事業者にサービス提供する。
この場合、階層化されたアグリゲーションサービス事業者の各々がアグリゲーション事業者システム12を備えることで、アグリゲーション事業者システム12が階層的に設けられていてもよい。
The aggregator may be configured hierarchically, for example, by including a resource aggregator (RA) and an aggregation coordinator (AC). The resource aggregator coordinates the charging and discharging of storage batteries provided by multiple consumers, etc. The aggregation coordinator further aggregates the charging and discharging power providing services aggregated by the resource aggregator for multiple consumers, etc., for multiple resource aggregators and provides the services to an electricity transmission and distribution company.
In this case, each of the hierarchical aggregation service providers may be provided with an aggregation provider system 12, so that the aggregation provider systems 12 are provided in a hierarchical structure.

上位側第一ゲートウェイ装置21は、中央給電指令システム11と上位制御装置22との通信を仲介する。
上位制御装置22は、中央給電指令システム11からの要求に応じて、需要家等が備える蓄電池に充放電を行わせる。上位制御装置22は、複数の需要家等が備える蓄電池の充放電を取りまとめることで、比較的大容量の調整力を提供することができる。
The upper-level first gateway device 21 mediates communication between the central power supply command system 11 and the upper-level control device 22 .
The upper level control device 22 charges and discharges the storage batteries provided by the consumers, etc. in response to a request from the central load control system 11. The upper level control device 22 can provide a relatively large capacity of adjustment power by coordinating the charging and discharging of the storage batteries provided by multiple consumers, etc.

上位側第二ゲートウェイ装置23は、上位制御装置22と需要家等に設置されている制御装置との通信を仲介する。図1の例では、下位制御装置62および下位制御装置71が、需要家等に設置されている制御装置の例に該当する。下位制御装置62は、パワーコンディショニングシステム63と協働して蓄電池64の充放電を制御する。あるいは、下位側ゲートウェイ装置61が、パワーコンディショニングシステム63と協働して蓄電池64を制御する機能、あるいはその一部を有していてもよい。この場合、下位側ゲートウェイ装置61も、需要家等に設置されている制御装置の例に該当する。下位制御装置71は、パワーコンディショニングシステム72と協働して大型蓄電池73の充放電を制御する。 The upper-side second gateway device 23 mediates communication between the upper-side control device 22 and control devices installed in consumers' homes, etc. In the example of Figure 1, the lower-side control device 62 and the lower-side control device 71 are examples of control devices installed in consumers' homes, etc. The lower-side control device 62 controls the charging and discharging of the storage battery 64 in cooperation with the power conditioning system 63. Alternatively, the lower-side gateway device 61 may have a function, or part of a function, to control the storage battery 64 in cooperation with the power conditioning system 63. In this case, the lower-side gateway device 61 also is an example of a control device installed in a consumer's home, etc. The lower-side control device 71 controls the charging and discharging of the large storage battery 73 in cooperation with the power conditioning system 72.

上位側第一ゲートウェイ装置21と、上位制御装置22と、上位側第二ゲートウェイ装置23とは、SaaS(Software As A Service、または、System As A Service)事業者の設備に設けられている。
ここでは、SaaS事業者は、リソースアグリゲーションを実行するサービスを提供する。アグリゲータは、アグリゲーション事業者システム12を用いてリソースアグリゲーションに関する情報を上位制御装置22に通知し、上位制御装置22にリソースアグリゲーションを実行させる。
アグリゲータが上位制御装置を有していてもよい。例えば、アグリゲーション事業者システム12と、上位制御装置22とが組み合わさって1つのシステムとして構成されていてもよい。
The upper-level first gateway device 21, the upper-level control device 22, and the upper-level second gateway device 23 are provided in the facilities of a SaaS (Software as a Service or System as a Service) provider.
In this example, a SaaS provider provides a service that executes resource aggregation. The aggregator uses an aggregation provider system 12 to notify a host control device 22 of information related to resource aggregation, and causes the host control device 22 to execute the resource aggregation.
The aggregator may have a higher-level control device. For example, the aggregation provider system 12 and the higher-level control device 22 may be combined to form a single system.

需要家設置システム50は、1つの需要家に設けられている電力設備および電力負荷と、それら電力設備および電力負荷を制御する制御装置との組み合わせによるシステムである。
需要家設置システム50は、需要家のシステムの例に該当する。
The customer-installed system 50 is a system that combines power facilities and power loads installed in one customer, and a control device that controls the power facilities and power loads.
The customer-installed system 50 corresponds to an example of a customer system.

分電盤51は、電力系統30と需要家設置システム50との連系点の需要家設置システム50側に設けられ、電力系統30と、需要家設置システム50の各機器との間の電気のやり取りを仲介する。例えば、分電盤51における順潮流時には、分電盤51は、電力系統30から供給される電気(商用電力)を、需要家設置システム50の各機器に分配する。 The distribution board 51 is provided on the consumer installation system 50 side of the interconnection point between the power grid 30 and the consumer installation system 50, and mediates the exchange of electricity between the power grid 30 and each device in the consumer installation system 50. For example, when the distribution board 51 is in forward power flow, the distribution board 51 distributes electricity (commercial power) supplied from the power grid 30 to each device in the consumer installation system 50.

電力負荷52は、電力を消費する機器の総称である。電力負荷52を構成する機器の個数は、特定の個数に限定されない。また、電力負荷52を構成する機器の種類も、特定のものに限定されない。
太陽光発電システム53は、太陽光を受けて発電し、交流電力を出力する。
蓄電システム60は、蓄電池64と、蓄電池64の充放電を制御する構成との組み合わせによるシステムである。
The power load 52 is a general term for devices that consume power. The number of devices that make up the power load 52 is not limited to a specific number. Furthermore, the types of devices that make up the power load 52 are not limited to a specific type.
The solar power generation system 53 receives sunlight, generates electricity, and outputs AC power.
The power storage system 60 is a system that combines a storage battery 64 with a configuration that controls charging and discharging of the storage battery 64 .

下位側ゲートウェイ装置61は、上位制御装置22と下位制御装置62との通信を仲介する。上述したように、下位側ゲートウェイ装置61が、パワーコンディショニングシステム63と協働して蓄電池64の充放電を制御する機能、またはその一部を有していてもよい。
下位制御装置62は、パワーコンディショニングシステム63と協働して蓄電池64の充放電を制御する。例えば、下位制御装置62が、蓄電池64の充電、放電、または充放電停止をパワーコンディショニングシステム63に指示し、パワーコンディショニングシステム63が、下位制御装置62の指示に従って、蓄電池64に充放電を行わせ、または、蓄電池64の充放電を停止させる。
下位制御装置62は、特に、上位制御装置22からの指示または要求に応じて、蓄電池64の充放電を制御する。
The lower-level gateway device 61 mediates communication between the upper level control device 22 and the lower level control device 62. As described above, the lower-level gateway device 61 may have a function, or a part of a function, of controlling the charging and discharging of the storage battery 64 in cooperation with the power conditioning system 63.
The lower-level control device 62 cooperates with the power conditioning system 63 to control the charging and discharging of the storage battery 64. For example, the lower-level control device 62 instructs the power conditioning system 63 to charge, discharge, or stop charging and discharging of the storage battery 64, and the power conditioning system 63 causes the storage battery 64 to charge or discharge, or stops charging and discharging of the storage battery 64, in accordance with the instruction from the lower-level control device 62.
The lower-level control device 62 controls the charging and discharging of the storage battery 64 in response to instructions or requests from the upper-level control device 22 .

パワーコンディショニングシステム63は、交流電力と直流電力との変換を行う。蓄電池64の充電時には、パワーコンディショニングシステム63は、分電盤51側からの交流電力を直流電力に変換して蓄電池64に供給する。蓄電池64の放電時には、パワーコンディショニングシステム63は、蓄電池64からの直流電力を交流電力に変換し、分電盤51側に供給する。 The power conditioning system 63 converts AC power to DC power. When charging the storage battery 64, the power conditioning system 63 converts AC power from the distribution board 51 side into DC power and supplies it to the storage battery 64. When discharging the storage battery 64, the power conditioning system 63 converts DC power from the storage battery 64 into AC power and supplies it to the distribution board 51 side.

また、パワーコンディショニングシステム63は、上記のように、下位制御装置62と協働して蓄電池64の充放電を制御する。
下位側ゲートウェイ装置61、下位制御装置62、および、パワーコンディショニングシステム63のうち何れか2つ、またはこれら3つが組み合わさって1つの装置として構成されていてもよい。
Furthermore, the power conditioning system 63 cooperates with the lower-level control device 62 to control the charging and discharging of the storage battery 64 as described above.
Any two of the lower-level gateway device 61, the lower-level control device 62, and the power conditioning system 63, or all three of these may be combined to form a single device.

需要家設置システム50の構成は、図1に示す構成に限定されず、蓄電池およびその蓄電池の充放電を制御する機構を備えるいろいろな構成とすることができる。たとえば、需要家設置システム50が太陽光発電システム53を備えていなくてもよい。
また、需要家によって需要家設置システム50の構成が異なっていてもよい。例えば、蓄電池64および太陽光発電システム53の何れもパワーコンディショニングシステム63に接続されるなど、パワーコンディショニングシステム63が、マルチ入力型のパワーコンディショニングシステム(ハイブリッドPCS)として構成されていてもよい。
The configuration of the customer-installed system 50 is not limited to the configuration shown in Fig. 1, and various configurations including a storage battery and a mechanism for controlling the charging and discharging of the storage battery are possible. For example, the customer-installed system 50 does not have to include the photovoltaic power generation system 53.
Furthermore, the configuration of the consumer-installed system 50 may differ depending on the consumer. For example, the power conditioning system 63 may be configured as a multi-input power conditioning system (hybrid PCS), such as by connecting both the storage battery 64 and the solar power generation system 53 to the power conditioning system 63.

大型蓄電システム70は、電力系統30の安定化のための充放電機能を提供する。大型蓄電システム70では、下位制御装置71が、上位制御装置22からの指示または要求に応じて、パワーコンディショニングシステム72と協働して大型蓄電池73の充放電を制御する。また、下位制御装置71とパワーコンディショニングシステム72とが組み合わさって1つの装置として構成されていてもよい。その場合、下位制御装置71は、電力系統30と大型蓄電池73との間の、直流電力と交流電力との変換を行う。 The large-scale energy storage system 70 provides a charging and discharging function for stabilizing the power grid 30. In the large-scale energy storage system 70, the lower-level control device 71 controls the charging and discharging of the large-scale storage battery 73 in cooperation with the power conditioning system 72 in response to instructions or requests from the upper-level control device 22. The lower-level control device 71 and the power conditioning system 72 may also be combined into a single device. In this case, the lower-level control device 71 converts DC power to AC power between the power grid 30 and the large-scale storage battery 73.

図2は、上位制御装置22の構成の例を示す図である。図2に示す構成で、上位制御装置22は、基準値決定部110と、制御情報算出部120とを備える。基準値決定部110は、制約条件設定部111と、運用計画立案部112と、基準値出力部113とを備える。 Figure 2 is a diagram showing an example of the configuration of the upper control device 22. In the configuration shown in Figure 2, the upper control device 22 comprises a reference value determination unit 110 and a control information calculation unit 120. The reference value determination unit 110 comprises a constraint condition setting unit 111, an operation plan formulation unit 112, and a reference value output unit 113.

上位制御装置22は、上記のようにリソースアグリゲーションを実行する。上位制御装置22がリソースアグリゲーションの対象とするアンシラリーサービスを調整力提供サービスとも称する。調整力提供サービスの落札は、調整力提供サービスの約定単位期間である商品ブロック、および、需要家をグループに纏めた需要家リストパターンを単位として行われるものとする。すなわち、商品ブロック毎に、複数の需要家リストパターンのうち何れかについて、調整力提供サービスが落札されるものとする。 The upper control device 22 performs resource aggregation as described above. The ancillary services that the upper control device 22 targets for resource aggregation are also referred to as adjustment capacity provision services. Bidding for adjustment capacity provision services is conducted in units of product blocks, which are the contract unit periods for adjustment capacity provision services, and customer list patterns, which group together customers. In other words, for each product block, an adjustment capacity provision service is awarded for one of multiple customer list patterns.

需要家リストパターンは、複数の需要家を含み約定単位期間(商品ブロック)毎の調整力提供サービスの約定の単位となる需要家グループの例に該当する。需要家が需要家リストパターンに登録されていることは、その需要家が需要家グループに含まれることの例に該当する。需要家が需要家リストパターンに登録されていることを、その需要家が需要家リストパターン含まれるとも称する。 A consumer list pattern is an example of a consumer group that includes multiple consumers and serves as the unit of contract for adjustment power provision services for each contract unit period (product block). When a consumer is registered in a consumer list pattern, this is an example of the consumer being included in a consumer group. When a consumer is registered in a consumer list pattern, this is also referred to as the consumer being included in the consumer list pattern.

需要家は、調整力の提供者の例に該当する。また、需要家は、調整力提供サービスの約定がある場合に調整力の提供を行う点で、調整力の提供者たり得る者の例に該当する。 Consumers are an example of a provider of adjustment capacity. Consumers also qualify as an example of a party that could become a provider of adjustment capacity, in that they provide adjustment capacity when there is an agreement for adjustment capacity provision services.

上位制御装置22は、調整力提供サービスの落札結果情報をアグリゲーション事業者システム12から取得し、落札結果情報に示される調整力約定量を確保できるように、需要家への調整力確保量の割当を計画する。
また、調整力提供サービス開始より所定時間以上前に、アグリゲータが需給調整市場に対して基準値(ベースライン)を申告するように要求されるものとする。基準値は、電力値(例えば、キロワット(kW))で表される。調整力は、その電力値と基準値との差で計算される。
The upper control device 22 acquires bidding result information for the adjustment capacity provision service from the aggregation operator system 12, and plans the allocation of the adjustment capacity guarantee amount to the consumer so that the adjustment capacity contract amount indicated in the bidding result information can be secured.
Furthermore, the aggregator is required to declare a baseline to the supply and demand balancing market at least a predetermined time before the start of the balancing reserve service. The baseline is expressed in power value (e.g., kilowatts (kW)). The balancing reserve is calculated as the difference between the power value and the baseline.

上記の基準値申告の要求に対し、上位制御装置22は、基準値の申告期限よりも前に、需要家への調整力確保量の割当を計画し、計画において、需要家毎に基準値を決定する。上位制御装置22は、決定した需要家毎の基準値をアグリゲーション事業者システム12に送信し、アグリゲーション事業者システム12は、需要家毎の基準値に基づいて需要家リストパターン単位での基準値を算出し、需給調整市場に申告する。需要家リストパターン単位での基準値は、上位制御装置22がリソースアグリゲーションで纏められた調整力の基準値、といえる。 In response to the above-mentioned request for reporting of reference values, the upper control device 22 plans the allocation of the amount of adjustment capacity to be secured to the consumer prior to the deadline for reporting the reference values, and determines a reference value for each consumer in the plan. The upper control device 22 transmits the determined reference value for each consumer to the aggregation operator system 12, which then calculates a reference value for each consumer list pattern based on the reference value for each consumer and reports it to the supply and demand adjustment market. The reference value for each consumer list pattern can be said to be the reference value for adjustment capacity that the upper control device 22 has aggregated through resource aggregation.

図3は、上位制御装置22が需要家への調整力確保量の割当の計画を行うタイミングの例を示す図である。
図3の例で、30分毎のコマ時間と、コマ時間毎の指令量積算値の例とが示されている。
FIG. 3 is a diagram showing an example of the timing at which the upper level control device 22 plans allocation of the adjustment reserve capacity to the consumers.
In the example of FIG. 3, an example of a frame time of 30 minutes and an example of an integrated value of the command amount for each frame time is shown.

また、図3では、0時から3時、3時から6時、6時から9時のように6つのコマ時間を合わせた3時間毎の商品ブロックが示されている。各商品ブロックの開始1時間前に、発電・小売電気事業者の計画提出期限であるゲートクローズ(Gate Close;GC)が設定されており、ゲートクローズよりも30分以上前に、需要家リストパターン単位での基準値を提出することが要求される。したがって、アグリゲーション事業者システム12は、各商品ブロックの開始1時間半前までに、その商品ブロックについての基準値として、需要家リストパターン単位での基準値を申告する。 Figure 3 also shows product blocks of three hours each, consisting of six time slots, such as midnight to 3:00, 3:00 to 6:00, and 6:00 to 9:00. One hour before the start of each product block, a gate close (GC), which is the deadline for power generation and retail electricity companies to submit their plans, is set, and reference values for each consumer list pattern are required to be submitted at least 30 minutes before the gate close. Therefore, the aggregation operator system 12 declares the reference values for each consumer list pattern as the reference values for each product block at least one and a half hours before the start of each product block.

上位制御装置22は、アグリゲーション事業者システム12が需要家リストパターン単位での基準値を申告するのに先立って、需要家への調整力確保量の割当を計画し、計画において決定する需要家毎の基準値をアグリゲーション事業者システム12に連絡する。
ただし、図3に示す時間幅およびタイミングは例であり、これらに限定されない。
Before the aggregation operator system 12 declares the reference value for each consumer list pattern, the upper control device 22 plans the allocation of adjustment capacity reserves to consumers and communicates the reference value for each consumer determined in the plan to the aggregation operator system 12.
However, the time widths and timings shown in FIG. 3 are examples and are not limited to these.

また、上位制御装置22は、需要家設置システム50に対してエネルギーマネージメントサービスを提供する。エネルギーマネージメントサービスでは、上位制御装置22は、例えば電力利用の効率化など所定の目的に基づいて、需要家設置システム50における電力需給を調整する。
特に、上位制御装置22は、エネルギーマネージメントサービスとアンシラリーサービスとを同時に実行する同時マルチユースに基づいて、需要家設置システム50の蓄電池64の充放電を計画する。
Furthermore, the upper level control device 22 provides an energy management service to the consumer-installed system 50. In the energy management service, the upper level control device 22 adjusts the supply and demand of power in the consumer-installed system 50 based on a predetermined purpose, such as improving the efficiency of power use.
In particular, the upper control device 22 plans charging and discharging of the storage battery 64 of the customer-installed system 50 based on simultaneous multi-use in which the energy management service and the ancillary service are executed simultaneously.

上位制御装置22が、アンシラリーサービスの対象となる需要家のうち一部の需要家についてエネルギーマネージメントサービスを提供するようにしてもよい。例えば、アンシラリーサービスは実施するがエネルギーマネージメントは実施しない需要家設置システム50があってもよい。 The upper control device 22 may provide energy management services to some of the consumers who are the target of ancillary services. For example, there may be a consumer installation system 50 that provides ancillary services but does not provide energy management.

また、一部の需要家では、蓄電システム60がエネルギーマネージメントサービスの計画を行うようにしてもよい。この場合、下位制御装置62が上位制御装置22にエネルギーマネージメントサービスの計画を通知するようにしてもよい。そして、上位制御装置22が、下位制御装置62から通知されたエネルギーマネージメントサービスの計画を考慮してアンシラリーサービスの計画を行うようにしてもよい。 In addition, for some consumers, the storage system 60 may plan the energy management service. In this case, the lower-level control device 62 may notify the upper-level control device 22 of the energy management service plan. The upper-level control device 22 may then plan the ancillary service taking into account the energy management service plan notified by the lower-level control device 62.

図4は、電力システム1における処理の手順の例を示す図である。
図4の処理で、アグリゲーション事業者システム12は、予め、契約関連情報を上位制御装置22に通知する(ステップS101)。契約関連情報には、アグリゲータと各需要家との間の、調整力の提供についての契約に関する情報が含まれる。例えば、契約関連情報には、需要家リストパターンと、需要家リストパターンに登録されている需要家毎の、調整力提供の契約内容、および、需要家設置システム50の仕様等の情報が含まれていてもよい。
FIG. 4 is a diagram illustrating an example of a processing procedure in the power system 1.
4 , the aggregation operator system 12 notifies the upper control device 22 of contract-related information in advance (step S101). The contract-related information includes information on the contract for the provision of adjustment capacity between the aggregator and each consumer. For example, the contract-related information may include information such as a consumer list pattern, the contract details for the provision of adjustment capacity for each consumer registered in the consumer list pattern, and the specifications of the consumer-installed system 50.

また、アグリゲータと需要家との間でエネルギーマネージメントサービスが締結されている場合、需要家毎の、エネルギーマネージメントサービスの種類およびそのサービスの内容など、エネルギーマネージメントサービスに関する情報が契約関連情報に含まれていてもよい。 In addition, if an energy management service is concluded between an aggregator and a consumer, the contract-related information may include information regarding the energy management service, such as the type of energy management service and the content of that service, for each consumer.

また、アグリゲーション事業者システム12は、調整力提供サービスの落札時に、落札結果(約定結果)を上位制御装置22に連絡する(ステップS102)。例えば、落札は、土曜日から次の金曜日までの1週間分纏めて行われる。アグリゲーション事業者システム12は、落札された1週間分の商品ブロック毎、かつ、調整力提供サービスの種類が複数ある場合はサービスの種類毎に、落札された需要家リストパターン、調整力約定量(約定された調整力確保量)、および、約定価格などの情報を上位制御装置22に連絡する。 Furthermore, when a bid for a regulation power provision service is won, the aggregation operator system 12 notifies the upper control device 22 of the winning bid result (contract result) (step S102). For example, the winning bid is made for one week from Saturday to the following Friday. For each product block for one week that has been won, and for each type of service if there are multiple types of regulation power provision services, the aggregation operator system 12 notifies the upper control device 22 of information such as the won consumer list pattern, the regulation power contract amount (the contracted amount of regulation power secured), and the contract price.

また、上位制御装置22は、商品ブロック毎に、その商品ブロックで落札された需要家リストパターンに登録されている需要家毎(需要家設置システム50毎)の基準値を決定し、アグリゲーション事業者システム12に連絡する(ステップS103)。上記のように、上位制御装置22は、商品ブロック毎に、その商品ブロックの開始90分前よりも前に、基準値の決定のための運用計画を行い、運用計画で決定した基準値をアグリゲーション事業者システム12に連絡する。 Furthermore, for each product block, the upper control device 22 determines a reference value for each consumer (each consumer installation system 50) registered in the consumer list pattern that has been successful in bidding for that product block, and notifies the aggregation provider system 12 of this (step S103). As described above, for each product block, the upper control device 22 makes an operational plan for determining the reference value at least 90 minutes before the start of that product block, and notifies the aggregation provider system 12 of the reference value determined in the operational plan.

基準値の決定のための運用計画では、上位制御装置22は、ステップS102でアグリゲーション事業者システム12から通知される、約定された調整力確保量を、落札された需要家リストパターンに登録されている需要家に割り振るように、計画を立てる(立案する)。
上位制御装置22は、各需要家について、エネルギーマネージメントサービスでの蓄電池64の充放電量も計画し、計画した充放電量を含むように基準値を決定する。
In the operational plan for determining the reference value, the upper control device 22 makes (drafts) a plan to allocate the agreed adjustment capacity reserve amount notified by the aggregation operator system 12 in step S102 to the consumers registered in the successful bidder list pattern.
The upper level control device 22 also plans the amount of charge and discharge of the storage battery 64 in the energy management service for each consumer, and determines the reference value so as to include the planned amount of charge and discharge.

アグリゲーション事業者システム12は、落札された需要家リストパターンに登録されている需要家毎の基準値に基づいて、需要家リストパターン単位での基準値を算出し、需給調整市場システム13に申告する(ステップS104)。需給調整市場システム13は、調整力取引の市場である需給調整市場を提供するシステムである。 The aggregation operator system 12 calculates the reference value for each consumer list pattern based on the reference value for each consumer registered in the successful consumer list pattern, and reports it to the supply and demand adjustment market system 13 (step S104). The supply and demand adjustment market system 13 is a system that provides a supply and demand adjustment market, which is a market for adjustment power trading.

調整力サービスの実施期間(商品ブロックの期間到来時)においては、上位制御装置22は、例えば15分毎など所定期間毎に、調整力提供サービス実施のための運用計画を行い、運用計画に基づいて各需要家設置システム50を制御する。
具体的には、上位制御装置22は、15分毎など所定期間毎に、各需要家設置システム50の下位制御装置62から、その需要家設置システム50の状態情報の連絡を受け(ステップS105)、また、中央給電指令システム11から制御指令の通知を受ける(ステップS106)。中央給電指令システム11から制御指令では、約定された調整力確保量の範囲内で、調整力の要求量が通知される。
During the period in which the adjustment power service is implemented (when the product block period arrives), the upper control device 22 makes an operational plan for implementing the adjustment power provision service at predetermined intervals, such as every 15 minutes, and controls each consumer installation system 50 based on the operational plan.
Specifically, the upper control device 22 receives status information of each customer installed system 50 from the lower control device 62 of that customer installed system 50 at predetermined intervals, such as every 15 minutes (step S105), and also receives a control command from the central load control system 11 (step S106). The control command from the central load control system 11 notifies the required amount of adjustment capacity within the agreed range of the amount of adjustment capacity to be secured.

次に、上位制御装置22は、通知された調整力の要求量に基づいて、例えば30分のコマ時間毎に各需要家の蓄電池64の充放電量を決定し、下位制御装置62に蓄電池64の充放電制御を指示する(ステップS107)。
上位制御装置22は、要求される調整力を、落札された需要家リストパターンに登録されている需要家に、ステップS103で決定した需要家毎の調整力確保量の範囲内で割り振る。
Next, the upper control device 22 determines the charge/discharge amount of each consumer's storage battery 64 for each 30-minute frame time, for example, based on the notified required amount of adjustment power, and instructs the lower control device 62 to control the charge/discharge of the storage battery 64 (step S107).
The upper level control device 22 allocates the requested regulation capacity to the consumers registered in the successful bidder consumer list pattern within the range of the regulation capacity to be secured for each consumer determined in step S103.

上位制御装置22は、各需要家に割り振った調整力提供のための充放電量と、ステップS103で計画したエネルギーマネージメントサービスのための充放電量とを合計する。そして、上位制御装置22は、算出した充放電量を示す制御指令情報を下位制御装置62に通知する。これにより、上位制御装置22は、示される充放電量で蓄電池64に充放電を行わせるように、下位制御装置62に指示する。
落札された需要家リストパターンに登録されている需要家の需要家設置システム50は、調整力を提供しない場合でも、基準値を維持することが要求される。
The upper control device 22 sums up the charge/discharge amount for providing adjustment capability allocated to each consumer and the charge/discharge amount for the energy management service planned in step S103. Then, the upper control device 22 notifies the lower control device 62 of control command information indicating the calculated charge/discharge amount. In response, the upper control device 22 instructs the lower control device 62 to charge/discharge the storage battery 64 at the indicated charge/discharge amount.
The customer installed systems 50 of the customers registered in the successful customer list pattern are required to maintain the reference value even when they do not provide adjustment capacity.

上記のステップS103での、上位制御装置22による基準値の決定について、さらに説明する。
上位制御装置22は、例えば以下の情報を用いて基準値の決定のための運用計画を行う。
The determination of the reference value by the upper control device 22 in step S103 will be further described.
The upper level control device 22 makes an operation plan for determining the reference value using, for example, the following information.

1.上位制御装置22が、アグリゲーション事業者システム12から取得する情報
1-1.各需要家設置システム50の仕様の情報
・蓄電池64で許容される、蓄電残量の上限値(AC充電可能量)[kWh]、下限値(AC放電可能量)[kWh]
・蓄電池64のDC(直流)最大充放電電力値(充電電力上限値[kW]、放電電力上限値[kW])
・パワーコンディショニングシステム63のAC(交流)最大充放電電力値(充電電力上限値[kW]、放電電力上限値[kW])
・パワーコンディショニングシステム63のAC/DC変換効率、DC/AC変換効率
・パワーコンディショニングシステム63のタイプ(ハイブリッドPCS、セパレートPCSなど)
・太陽光発電システム53の発電最大電力値[kW]
・系統連系状態(周波数調整による逆潮流を許可するか否か、など)
・系統買電最大電力値、系統売電最大電力値(系統と売買する電力の上限値)[kW]
これらの情報は、例えば、ステップS101でアグリゲーション事業者システム12から取得する契約関連情報に含まれる。
1. Information acquired by the upper control device 22 from the aggregation provider system 12 1-1. Information on the specifications of each customer-installed system 50 Upper limit value (AC chargeable amount) [kWh] and lower limit value (AC dischargeable amount) [kWh] of the remaining power storage capacity allowed for the storage battery 64
DC (direct current) maximum charge/discharge power value of the storage battery 64 (charge power upper limit value [kW], discharge power upper limit value [kW])
AC (alternating current) maximum charge/discharge power value of the power conditioning system 63 (charge power upper limit value [kW], discharge power upper limit value [kW])
AC/DC conversion efficiency and DC/AC conversion efficiency of the power conditioning system 63. Type of the power conditioning system 63 (hybrid PCS, separate PCS, etc.).
Maximum power generation value [kW] of the solar power generation system 53
・Grid connection status (whether reverse power flow due to frequency adjustment is permitted, etc.)
・Maximum power purchase value from the grid, maximum power sale value from the grid (upper limit of power sold to and purchased from the grid) [kW]
This information is included in the contract-related information acquired from the aggregation operator system 12 in step S101, for example.

1-2.エネルギーマネージメントサービス関連情報
・エネルギーマネージメントサービス状態(ピークカット、ピークシフト、太陽光発電の自家消費など、エネルギーマネージメントサービスのモード(種類))
・ピークカット閾値[kW]
・売電料金単価[円/kWh]、時間帯別の買電料金単価[円/kWh]
・エネルギーマネージメントサービスの計画(時間帯毎の蓄電池の充放電の計画値)
これらの情報は、例えば、ステップS101でアグリゲーション事業者システム12から取得する契約関連情報に含まれる。
1-2. Energy management service related information ・Energy management service status (peak cut, peak shift, solar power self-consumption, etc., energy management service mode (type))
- Peak cut threshold [kW]
- Power selling price [yen/kWh], power purchasing price by time period [yen/kWh]
- Energy management service plan (planned charging and discharging values for storage batteries for each time period)
This information is included in the contract-related information acquired from the aggregation operator system 12 in step S101, for example.

1-3.各商品ブロックにおける、サービス毎(一次調整力、二次調整力(1)、二次調整力(2)など)の、落札された需要家リストパターンおよび調整力約定量
この情報は、例えば、ステップS102でアグリゲーション事業者システム12から取得する落札結果情報に含まれる。
1-3. Successful bidder list patterns and contracted amounts of adjustment capacity for each service (primary adjustment capacity, secondary adjustment capacity (1), secondary adjustment capacity (2), etc.) in each product block. This information is included in the successful bid result information acquired from the aggregation operator system 12 in step S102, for example.

2.上位制御装置22が、下位制御装置62から取得する情報
2-1.各需要家設置システム50(各リソース)の電力需給情報
・需要家負荷電力量累積値
・発電電力量累積値
・系統買電量累積値
・系統売電量累積値
これらの情報は、例えば、ステップS105で下位制御装置62から取得する状態情報に含まれる。
2. Information acquired by the upper control device 22 from the lower control device 62 2-1. Power supply and demand information of each consumer installed system 50 (each resource), cumulative consumer load power amount, cumulative generated power amount, cumulative grid purchase amount, and cumulative grid sale amount. This information is included in the status information acquired from the lower control device 62 in step S105, for example.

2-2.最新の蓄電池の情報
・AC(交流)充放電可能電力値(蓄電池64の充電上限値[kW]、放電上限値[kW])
・蓄電残量(SOC(State Of Charge))
2-2. Latest battery information: AC (alternating current) chargeable/dischargeable power value (charge upper limit [kW], discharge upper limit [kW] of battery 64)
・Remaining storage capacity (SOC (State Of Charge))

これらの情報は、例えば、ステップS105で下位制御装置62から取得する状態情報に含まれる。上位制御装置22が、ある商品ブロックにおけるサービス実施のための運用計画(ステップS107)のために取得する状態情報を、次の商品ブロックにおける基準値の決定のための運用計画(ステップS103)に用いるようにしてもよい。 This information is included, for example, in the status information acquired from the lower-level control device 62 in step S105. The status information acquired by the upper-level control device 22 for the operational plan (step S107) for implementing a service in a certain product block may be used in the operational plan (step S103) for determining the reference value in the next product block.

上位制御装置22は、これらの情報を用いて、全需要家(何れかの需要家リストパターンに登録されている全ての需要家)について、現在時刻の次のコマ時間から24時間分、コマ時間毎(30分単位)に、各需要家設置システム50の基準値、および、調整力の提供可能量を算出する。
その際、後述するように、上位制御装置22は、各商品ブロックについて、その商品ブロックで調整力の提供が約定されていない需要家の需要家設置システム50については、調整力の提供量が0になるように計算を行う。
Using this information, the upper control device 22 calculates the reference value and the available adjustment capacity of each consumer installation system 50 for all consumers (all consumers registered in any consumer list pattern) for each frame hour (in 30-minute increments) for 24 hours starting from the next frame hour from the current time.
In this case, as described below, the upper control device 22 performs calculations for each product block so that the amount of adjustment capacity provided for the customer installation systems 50 of customers for which the provision of adjustment capacity has not been agreed upon in that product block is zero.

ここで、エネルギーマネージメントサービスについて、1日分など比較的長時間の計画を立案することが好ましい場合がある。例えば、ピークシフトについて有効な計画を立案するためには、電気料金が安い時間帯と、電気料金が高い時間帯とが計画に含まれている必要がある。そこで、上位制御装置22は、上記のように24時間の計画を立案する。
ただし、上位制御装置22が計画の対象とする期間は、24時間に限定されず、複数の商品ブロックを含むいろいろな期間とすることができる。
Here, it may be preferable to create a plan for a relatively long period, such as one day, for the energy management service. For example, to create an effective plan for peak shifting, the plan must include time periods when electricity rates are low and time periods when electricity rates are high. Therefore, the upper-level control device 22 creates a 24-hour plan as described above.
However, the period that the upper control device 22 plans is not limited to 24 hours, but can be any period that includes multiple product blocks.

上位制御装置22は、各商品ブロックについて、落札された需要家リストパターンに登録されている需要家による調整力の提供可能量の総和が、ステップS102でアグリゲーション事業者システム12から通知される、調整力約定量に一致するように計画を立案する。 The upper control device 22 prepares a plan for each product block so that the sum of the available adjustment capacity provided by the consumers registered in the successful consumer list pattern matches the adjustment capacity contract amount notified by the aggregation operator system 12 in step S102.

上位制御装置22は、例えば、以下のような手順で、基準値の決定のための計画の立案を行う。
(A)需要予測
上位制御装置22は、下位制御装置62から、各需要家設置システム50(リソース)の電力需給情報(需要家負荷電力量累積値、発電電力量累積値など)を収集し、所定期間の各需要家設置システム50の負荷需要予測を行う。
The upper level control device 22 formulates a plan for determining the reference value, for example, in the following procedure.
(A) Demand forecast The upper control device 22 collects power supply and demand information (cumulative consumer load power amount, cumulative generated power amount, etc.) of each consumer installation system 50 (resource) from the lower control device 62, and performs load demand forecast for each consumer installation system 50 for a specified period.

(B)エネルギーマネージメントの判定
上位制御装置22は、アグリゲーション事業者システム12、または、下位制御装置62から、エネルギーマネージメント関連情報(エネルギーマネージメントの状態、ピークカット閾値、売電料金単価、時間帯別の買電料金単価など)を入手し、各需要家が実施しているエネルギーマネージメントを判定する。
(B) Determination of energy management The upper control device 22 obtains energy management-related information (energy management status, peak cut threshold, electricity selling price, electricity purchasing price by time period, etc.) from the aggregation operator system 12 or the lower control device 62, and determines the energy management being implemented by each consumer.

具体的には、上位制御装置22は、ピークシフトまたはピークカットなどエネルギーマネージメントサービスのモード(種類)、および、ピークカットの場合の閾値、および、ピークシフトの場合の時間帯別の電気料金などの条件を把握する。需要家のエネルギーマネージメントが計画されている場合、あるいは、上位制御装置22が需要家のエネルギーマネージメントの計画を立案する場合、上位制御装置22は、その計画を考慮して調整力提供サービスの計画を立案する。 Specifically, the upper control device 22 grasps conditions such as the mode (type) of energy management service, such as peak shift or peak cut, the threshold for peak cut, and the electricity rates by time period for peak shift. When energy management for a consumer is planned, or when the upper control device 22 prepares a plan for energy management for a consumer, the upper control device 22 prepares a plan for the adjustment power provision service taking that plan into account.

(C)最新の蓄電池の状況の収集
上位制御装置22は、下位制御装置62から、各需要家の蓄電池64の最新の情報(蓄電池64の充電上限値・放電上限値、SOCなど)を収集する。
(C) Collection of Latest Battery Status The upper control device 22 collects the latest information (such as the upper charge limit and upper discharge limit, SOC, etc. of the storage battery 64) of each consumer from the lower control device 62.

(D)需要家の静的な情報の入手
上位制御装置22は、アグリゲーション事業者システム12から、各需要家設置システム50の状態情報、および、蓄電システム60の仕様情報(蓄電池64の充電上限値・放電上限値、蓄電残量の上限値・下限値、パワーコンディショニングシステム63のAC/DC変換効率・DC/AC変換効率、パワーコンディショニングシステム63のタイプ(ハイブリッドPCS、セパレートPCS)、系統連系状態など)を入手する。
(D) Obtaining static information of consumers The upper control device 22 obtains status information of each consumer-installed system 50 and specification information of the power storage system 60 (such as the upper charge and discharge limits of the storage battery 64, the upper and lower limits of the remaining power storage capacity, the AC/DC conversion efficiency and DC/AC conversion efficiency of the power conditioning system 63, the type of the power conditioning system 63 (hybrid PCS, separate PCS), and the grid connection status) from the aggregation operator system 12.

(E)調整力約定量の入手
上位制御装置22は、アグリゲーション事業者システム12から、各商品ブロックにおける、サービス毎(一次調整力、二次調整力(1)、二次調整力(2)など)の、落札された需要家リストパターンおよび調整力約定量を入手する。
(E) Obtaining adjustment capacity contract amount The upper control device 22 obtains the successful bidder list patterns and adjustment capacity contract amounts for each service (primary adjustment capacity, secondary adjustment capacity (1), secondary adjustment capacity (2), etc.) in each product block from the aggregation operator system 12.

(F)計画の立案
上位制御装置22は、これらの情報を用いて最適化問題を生成し、得られた最適化問題を解くことで計画を立案する。例えば、上位制御装置22は、物理的に満たさなければならない制限または変化を表す式を制約条件とする。
(F) Planning The upper-level control device 22 uses this information to generate an optimization problem and then solves the resulting optimization problem to create a plan. For example, the upper-level control device 22 sets as constraints equations that represent physical limitations or changes that must be satisfied.

また、上位制御装置22は、調整力提供による需要家の金銭的利得、および、エネルギーマネージメント実施による需要家の金銭的利得の全需要家についての合計が大きいほど評価が高くなる目的関数を用いる。需要家の買電電力については、電気料金の全需要家についての合計が小さいほど評価が高くなる目的関数とする。 In addition, the upper control device 22 uses an objective function that evaluates more highly the greater the total for all consumers of the financial gains of consumers from the provision of adjustment power and the financial gains of consumers from the implementation of energy management. For the electricity purchased by consumers, the objective function evaluates more highly highly the smaller the total for all consumers of electricity charges.

上位制御装置22は、得られた制約条件の下で、目的関数が示す評価がなるべく高くなる解を探索する最適化問題を解くことで、各需要家の調整力提供用の運用およびエネルギーマネージメント用の運用を計画する。例えば、上位制御装置22は、需要家毎、かつ、30分のコマ時間毎に、エネルギーマネージメントによる蓄電池64の充放電量と、基準値(調整力の基準値)と、調整力確保量とを算出する。The upper control device 22 plans operations for providing adjustment capacity and operations for energy management for each consumer by solving an optimization problem that searches for a solution that maximizes the evaluation indicated by the objective function under the obtained constraints. For example, the upper control device 22 calculates, for each consumer and for each 30-minute frame, the amount of charge and discharge of the storage battery 64 through energy management, the reference value (reference value for adjustment capacity), and the amount of adjustment capacity to be secured.

その際、上位制御装置22は、エネルギーマネージメントによる蓄電池64の充放電量が基準値に反映されるようにする。このことは、例えば、エネルギーマネージメントによる蓄電池64の充放電量と基準値との関係を示す式を制約条件に含めることで行うことができる。
また、後述するように、上位制御装置22は、各商品ブロックについて、その商品ブロックで調整力の提供が約定されていない需要家の需要家設置システム50については、調整力の提供量が0になるように計算を行う。
At this time, the upper control device 22 causes the reference value to reflect the charge/discharge amount of the storage battery 64 due to energy management. This can be done, for example, by including in the constraints an equation that indicates the relationship between the charge/discharge amount of the storage battery 64 due to energy management and the reference value.
Furthermore, as will be described later, for each product block, the upper control device 22 performs calculations so that the amount of adjustment capacity provided is zero for the customer installation systems 50 of customers for which the provision of adjustment capacity has not been agreed upon in that product block.

図2に示す構成で、基準値決定部110は、上述した需要家毎の基準値(調整力の基準値)を決定するための各種処理を行う。例えば、基準値決定部110は、図4のステップS101からS104までの処理を行う。 In the configuration shown in Figure 2, the reference value determination unit 110 performs various processes to determine the reference value (reference value of adjustment capacity) for each consumer described above. For example, the reference value determination unit 110 performs the processes from steps S101 to S104 in Figure 4.

制約条件設定部111は、需要家毎の基準値を決定するための最適化問題の制約条件を設定する。特に、制約条件設定部111は、計画期間に含まれる商品ブロックと需要家との組み合わせのうち、調整力提供サービスの約定が無い、商品ブロックと需要家との組み合わせについて、調整力の確保量を0にするための数式を含む制約条件を設定する。The constraint condition setting unit 111 sets constraint conditions for the optimization problem to determine the reference value for each consumer. In particular, the constraint condition setting unit 111 sets constraint conditions including a mathematical formula for setting the amount of guaranteed adjustment capacity to 0 for combinations of product blocks and consumers included in the planning period that do not have a contract for adjustment capacity provision services.

すなわち、制約条件設定部111は、上述した24時間の計画期間に含まれる商品ブロック毎に、その商品ブロックで落札された需要家リストパターンに登録されていない需要家について、その商品ブロックとその需要家との組み合わせにおける調整力の確保量を0にするための数式を含む制約条件を設定する。
制約条件設定部111は、制約条件設定手段の例に該当する。
That is, for each product block included in the above-mentioned 24-hour planning period, the constraint condition setting unit 111 sets a constraint condition including a mathematical formula for setting the amount of adjustment capacity secured for the combination of that product block and that consumer to zero for consumers who are not registered in the consumer list pattern that has won a bid for that product block.
The constraint condition setting unit 111 is an example of a constraint condition setting means.

ここで、上記のように計画期間を24時間に設定する場合など、計画期間に複数の商品ブロックが含まれる場合、落札された需要家リストパターンが商品ブロック毎に異なることが考えられる。この場合、最適化問題の対象となる需要家設置システム50が商品ブロック毎に異なる。 Here, if the planning period includes multiple product blocks, such as when the planning period is set to 24 hours as described above, it is possible that the winning customer list pattern will differ for each product block. In this case, the customer installation system 50 that is the target of the optimization problem will differ for each product block.

このように、最適化問題の対象となる需要家設置システム50が商品ブロック毎に異なる場合、エネルギーマネージメントに係る需要家設置システム50の運用と、調整力の提供に係る需要家設置システム50の運用とで最適化問題を別々に生成することも考えられる。
例えば、エネルギーマネージメントに係る需要家設置システム50の運用については、24時間等の計画期間について最適化問題を生成することが考えられる。また、調整力の提供に係る需要家設置システム50の運用については、商品ブロック毎に、その商品ブロックで落札された需要家リストパターンに登録されている需要家を対象として最適化問題を生成することが考えられる。
In this way, if the consumer installation system 50 that is the target of the optimization problem differs for each product block, it is also possible to generate separate optimization problems for the operation of the consumer installation system 50 related to energy management and the operation of the consumer installation system 50 related to the provision of adjustment power.
For example, for the operation of the consumer installed system 50 related to energy management, it is conceivable to generate an optimization problem for a planning period such as 24 hours. Also, for the operation of the consumer installed system 50 related to the provision of adjustment capacity, it is conceivable to generate an optimization problem for each product block, targeting the consumers registered in the consumer list pattern that has been successful in bidding for that product block.

しかしながら、この方法では、エネルギーマネージメントのための需要家設置システム50の運用と、調整力の提供のための需要家設置システム50の運用との関係を計画に十分反映することができない。この点で、計画の精度が低くなってしまうと考えられる。 However, this method does not adequately reflect in the plan the relationship between the operation of the customer installation system 50 for energy management and the operation of the customer installation system 50 for providing adjustment power. In this respect, it is thought that the accuracy of the plan will be low.

例えば、蓄電池64の充放電量(充放電電力、および、充放電電力量のいずれも)について、エネルギーマネージメントでの使用可能分と、調整力のための確保の分とは、トレードオフの関係にある。これに対し、エネルギーマネージメントに係る需要家設置システム50の運用と、調整力の提供に係る需要家設置システム50の運用とで最適化問題を別々に生成する場合、エネルギーマネージメントでの使用可能分、または、調整力のための確保の分の何れかを先に決定することになる。このため、エネルギーマネージメントでの使用可能分と、調整力のための確保の分との適切な配分を見いだせないことが考えられる。 For example, with regard to the charge/discharge amount of the storage battery 64 (both the charge/discharge power and the charge/discharge power amount), there is a trade-off between the amount usable for energy management and the amount reserved for adjustment capacity. In contrast, if optimization problems are generated separately for the operation of the consumer installed system 50 related to energy management and the operation of the consumer installed system 50 related to the provision of adjustment capacity, either the amount usable for energy management or the amount reserved for adjustment capacity will be determined first. For this reason, it is conceivable that an appropriate allocation between the amount usable for energy management and the amount reserved for adjustment capacity cannot be found.

また、上位制御装置22は、需要家毎の基準値の決定を、3時間毎(商品ブロック毎)に繰り返し行う必要がある。また、1つの需要家リストパターンに最大9999件の需要家を登録可能であるなど、計画の対象となる需要家が多いことが考えられる。このことから、上位制御装置22が需要家毎の基準値を算出する際、時間上の制限および計算資源上の制限がある。例えば、需要家設置システム50の運用のシミュレーションを繰り返し実行して評価の高い運用を探索するといった方法は、採用できないと考えられる。 In addition, the upper control device 22 must repeatedly determine the reference value for each consumer every three hours (for each product block). Furthermore, it is conceivable that there will be a large number of consumers that are the subject of the plan, as a maximum of 9,999 consumers can be registered in one consumer list pattern. For this reason, there are time and computational resource limitations when the upper control device 22 calculates the reference value for each consumer. For example, it is considered that a method such as repeatedly running simulations of the operation of the consumer-installed system 50 to search for highly rated operations cannot be adopted.

そこで、制約条件設定部111は、上記のように、計画期間に含まれる商品ブロックと需要家との組み合わせのうち、調整力提供サービスの約定が無い、商品ブロックと需要家との組み合わせについて、調整力の確保量を0にするための数式を含む制約条件を設定する。 Therefore, as described above, the constraint condition setting unit 111 sets constraint conditions including a mathematical formula for setting the amount of adjustment capacity to zero for combinations of product blocks and consumers included in the planning period for which no adjustment capacity provision service agreement has been made.

制約条件設定部111は、制約条件の設定により、各需要家について、調整力提供サービスの約定がない商品ブロックでの調整力確保量が0となるようにすることができる。この点で、制約条件設定部111が設定する制約条件では、各需要家が、あたかも計画期間中ずっと調整力提供サービスに参加しているかのように扱うことができ、かつ、実際には約定がない商品ブロックでは調整力確保量を0とすることで、最適化問題を解いて得られる計画の妥当性を確保できる。 The constraint condition setting unit 111 can set constraint conditions so that, for each consumer, the amount of guaranteed adjustment capacity in product blocks where there is no contract for the adjustment capacity provision service is 0. In this regard, the constraint conditions set by the constraint condition setting unit 111 allow each consumer to be treated as if they were participating in the adjustment capacity provision service throughout the planning period, and by setting the amount of guaranteed adjustment capacity to 0 in product blocks where there is no actual contract, the validity of the plan obtained by solving the optimization problem can be ensured.

基準値決定部110は、制約条件設定部111が設定する制約条件を用いて、エネルギーマネージメントにおける需要家設置システム50の運用と、商品ブロック毎の調整力の確保における需要家設置システム50の運用とを纏めて表す最適化問題を設定することができる。この点で、基準値決定部110が設定する最適化問題では、エネルギーマネージメントのための需要家設置システム50の運用と、調整力の提供のための需要家設置システム50の運用との関係が十分に反映されることが期待される。基準値決定部110がこの最適化問題を解いて得られる計画では、エネルギーマネージメントでの使用可能分と、調整力のための確保の分とが適切に配分されていることが期待される。
また、基準値決定部110は、調整力提供サービスの計画を、商品ブロックよりも長い期間について立案することができる。
The reference value determination unit 110 can set an optimization problem that collectively represents the operation of the consumer installed system 50 for energy management and the operation of the consumer installed system 50 for securing adjustment capacity for each product block, using the constraint conditions set by the constraint condition setting unit 111. In this regard, the optimization problem set by the reference value determination unit 110 is expected to fully reflect the relationship between the operation of the consumer installed system 50 for energy management and the operation of the consumer installed system 50 for providing adjustment capacity. The plan obtained by the reference value determination unit 110 solving this optimization problem is expected to appropriately allocate the amount available for energy management and the amount secured for adjustment capacity.
Furthermore, the reference value determination unit 110 can create a plan for the adjustment power providing service for a period longer than the product block.

また、調整力提供サービスの約定の有無が条件分岐ではなく数式で表されていることで、基準値決定部110がこの最適化問題を解く際、調整力提供サービスの約定の有無を区別して処理を変える必要がない。
また上記のように、基準値決定部110がこの最適化問題を解いて得られる計画では、各需要家について、調整力提供サービスの約定が無い商品ブロックでは調整力の確保量が0になっている点で、調整力提供サービスの落札状況に整合している。
Furthermore, because the presence or absence of a contract for the adjustment capacity provision service is expressed by a mathematical formula rather than by a conditional branch, when the reference value determination unit 110 solves this optimization problem, there is no need to distinguish between the presence or absence of a contract for the adjustment capacity provision service and change the processing accordingly.
Furthermore, as described above, in the plan obtained by the reference value determination unit 110 solving this optimization problem, for each consumer, the amount of adjustment capacity secured is 0 for product blocks that do not have a contract for adjustment capacity provision services, which is consistent with the bidding situation for adjustment capacity provision services.

制約条件設定部111が、調整力提供サービスの約定がない商品ブロックと需要家との組み合わせについて、調整力の確保量を0に設定する数式を含む制約条件を設定するようにしてもよい。例えば、制約条件設定部111が、調整力提供サービスの約定がない商品ブロックと需要家との組み合わせにおける調整力の確保量を示す変数に0を代入する等式を含む制約条件を設定するようにしてもよい。
これにより、基準値決定部110が最適化問題を解いて得られる計画でも、調整力提供サービスの約定がない商品ブロックと需要家との組み合わせについて、調整力の確保量が0になると期待される。
The constraint condition setting unit 111 may set a constraint condition including a mathematical expression that sets the amount of secured adjustment capacity to 0 for a combination of a product block and a consumer for which no agreement for an adjustment capacity provision service has been made. For example, the constraint condition setting unit 111 may set a constraint condition including an equation that substitutes 0 for a variable that indicates the amount of secured adjustment capacity for a combination of a product block and a consumer for which no agreement for an adjustment capacity provision service has been made.
As a result, even in the plan obtained by the reference value determination unit 110 solving the optimization problem, it is expected that the amount of adjustment capacity secured will be zero for combinations of product blocks and consumers for which no adjustment capacity provision service is agreed upon.

制約条件設定部111が、調整力提供サービスの約定がない商品ブロックと需要家リストパターンとの組み合わせについて、調整力の確保量を0に設定する数式を含む制約条件を設定するようにしてもよい。例えば、制約条件設定部111が、調整力提供サービスの約定がない商品ブロックと需要家リスパターンとの組み合わせにおける調整力の確保量を示す変数に0を代入する等式を含む制約条件を設定するようにしてもよい。 The constraint condition setting unit 111 may set a constraint condition including a mathematical formula that sets the amount of adjustment capacity to be secured to 0 for a combination of a product block and a consumer list pattern for which no adjustment capacity provision service agreement has been made. For example, the constraint condition setting unit 111 may set a constraint condition including an equation that assigns 0 to a variable indicating the amount of adjustment capacity to be secured for a combination of a product block and a consumer list pattern for which no adjustment capacity provision service agreement has been made.

この場合、需要家リストパターンにおける調整力の確保量が、その需要家リストパターンに含まれる全需要家における調整力の確保量の合計であることを示す式が、最適化問題の制約条件に含まれていてもよい。あるいは、制約条件設定部111または運用計画立案部112が、商品ブロックと需要家リストパターンとの組み合わせについて、調整力の確保量を0に設定する数式を、商品ブロックと需要家リストパターンに含まれる各需要家との組み合わせについて、調整力の確保量を0に設定する数式に展開するようにしてもよい。
これにより、基準値決定部110が最適化問題を解いて得られる計画で、調整力提供サービスの約定がない商品ブロックと需要家との組み合わせについて、調整力の確保量が0になると期待される。
In this case, the constraints of the optimization problem may include an equation indicating that the amount of secured adjustment capacity in a consumer list pattern is the sum of the amounts of secured adjustment capacity for all consumers included in the consumer list pattern. Alternatively, the constraint condition setting unit 111 or the operation plan planning unit 112 may expand the equation that sets the amount of secured adjustment capacity to 0 for a combination of a product block and a consumer list pattern into an equation that sets the amount of secured adjustment capacity to 0 for a combination of a product block and each consumer included in the consumer list pattern.
As a result, in the plan obtained by the reference value determination unit 110 solving the optimization problem, it is expected that the amount of adjustment capacity secured will be 0 for combinations of product blocks and consumers for which no adjustment capacity provision service is agreed upon.

制約条件設定部111が、調整力提供サービスの約定がない商品ブロックと需要家との組み合わせについて、調整力の確保量を0に設定する数式を設けることに加えて、調整力提供サービスの約定がない商品ブロックと需要家リストパターンとの組み合わせについて、調整力の確保量を0に設定する数式を設けるようにしてもよい。 In addition to the constraint condition setting unit 111 establishing a formula that sets the amount of adjustment capacity to be secured to 0 for combinations of product blocks and consumers for which no adjustment capacity provision service agreement has been made, the constraint condition setting unit 111 may also establish a formula that sets the amount of adjustment capacity to be secured to 0 for combinations of product blocks and consumer list patterns for which no adjustment capacity provision service agreement has been made.

あるいは、制約条件設定部111が、調整力提供サービスの約定がない商品ブロックと需要家との組み合わせについて、調整力の確保量を0に設定する数式を設けることに代えて、調整力提供サービスの約定がない商品ブロックと需要家リストパターンとの組み合わせについて、調整力の確保量を0に設定する数式を設けるようにしてもよい。 Alternatively, instead of the constraint condition setting unit 111 establishing a formula that sets the amount of adjustment capacity to be secured to 0 for combinations of product blocks and consumers for which no adjustment capacity provision service agreement has been made, the constraint condition setting unit 111 may establish a formula that sets the amount of adjustment capacity to be secured to 0 for combinations of product blocks and consumer list patterns for which no adjustment capacity provision service agreement has been made.

制約条件設定部111が、調整力提供サービスの約定がない商品ブロックと需要家との組み合わせについて、調整力提供サービスの報酬単価を0またはそれ以下とする数式を含む制約条件を設定するようにしてもよい。この場合、最適化問題における評価関数として、最適化問題の対象の全需要家の金銭的利得の合計が大きいほど高い評価を示す評価関数を用いることができる。 The constraint condition setting unit 111 may set constraint conditions including a mathematical formula that sets the remuneration unit price for the adjustment power provision service at 0 or less for combinations of product blocks and consumers for which no adjustment power provision service agreement has been made. In this case, an evaluation function that indicates a higher evaluation the greater the total monetary gain of all consumers that are the subject of the optimization problem can be used as the evaluation function for the optimization problem.

報酬単価が0またはそれ以下の場合、報酬単価に調整力提供量を乗算して算出される報酬(金銭的利得)も0またはそれ以下になる。このことから基準値決定部110が、上記の評価関数に基づいて、報酬単価が0またはマイナスになっている商品ブロックかつ需要家について、調整力の確保量を0と算出することが期待される。 If the remuneration unit price is 0 or less, the remuneration (monetary gain) calculated by multiplying the remuneration unit price by the amount of adjustment capacity provided will also be 0 or less. Therefore, it is expected that the reference value determination unit 110 will calculate the amount of adjustment capacity to be secured as 0 for product blocks and consumers for which the remuneration unit price is 0 or negative, based on the above evaluation function.

運用計画立案部112は、上位制御装置22が対象とする全ての需要家のそれぞれについて、個々の商品ブロックにおける調整力提供サービスの約定の有無にかかわらず、複数の商品ブロックを含む計画期間を通しての需要家設置システム50における電力需給の状況に基づいて、調整力提供サービスの運用計画を立案する。 The operational planning unit 112 prepares an operational plan for the adjustment power provision service for each of all consumers targeted by the upper control device 22, based on the electricity supply and demand situation in the consumer installation system 50 throughout the planning period including multiple product blocks, regardless of whether an adjustment power provision service has been agreed upon in each individual product block.

例えば、制約条件設定部111が設定した制約条件を用いた最適化問題を解くことで、計画期間における調整力提供サービスおよびエネルギーマネージメントの運用計画を立案する。特に、運用計画立案部112は、運用計画の立案において需要家毎の基準値を決定する。運用計画立案部112は、運用計画立案手段の例に該当する。 For example, the operation plan for the adjustment power provision service and energy management for the planning period is formulated by solving an optimization problem using the constraint conditions set by the constraint condition setting unit 111. In particular, the operation plan formulation unit 112 determines reference values for each consumer when formulating the operation plan. The operation plan formulation unit 112 is an example of an operation plan formulation means.

制約条件設定部111が、最適化問題の制約条件に、需要家設置システム50における電力需給の状況に基づく制約条件を含めるようにしてもよい。この場合、運用計画立案部112が最適化問題を解くことは、需要家設置システム50における電力需給の状況に基づいて調整力提供サービスの運用計画を立案することの例に該当する。 The constraint condition setting unit 111 may include, in the constraint conditions of the optimization problem, constraint conditions based on the power supply and demand situation in the consumer installation system 50. In this case, solving the optimization problem by the operation plan formulation unit 112 corresponds to an example of formulating an operation plan for the adjustment power provision service based on the power supply and demand situation in the consumer installation system 50.

ここでいう、需要家設置システム50における電力需給の状況は、需要家設置システム50における電力の需給に関連するいろいろな状況とすることができる。例えば、制約条件設定部111が、上述したような、アグリゲーション事業者システム12からの情報、および、下位制御装置62からの情報(仕様情報などの静的情報、および、状態情報などの動的情報)に基づいて、最適化問題の制約条件を設定するようにしてもよい。 The electricity supply and demand situation in the consumer-installed system 50 referred to here can be various situations related to the electricity supply and demand in the consumer-installed system 50. For example, the constraint setting unit 111 may set constraints for the optimization problem based on information from the aggregation operator system 12 and information from the lower-level control device 62 (static information such as specification information, and dynamic information such as status information), as described above.

上記のように、制約条件設定部111が、調整力提供サービスの約定がない約定単位期間と需要家との組み合わせについて、調整力提供サービスの報酬単価を0またはそれ以下とする数式を含む制約条件を設定するようにしてもよい。この場合、運用計画立案部112は、最適化問題の対象の全需要家の金銭的利得の合計が大きいほど高い評価を示す評価関数を用いた最適化問題を解くようにしてもよい。
基準値出力部113は、運用計画立案部112が決定した需要家毎の基準値をアグリゲーション事業者システム12に連絡する。
As described above, the constraint condition setting unit 111 may set a constraint condition including a mathematical expression that sets the remuneration unit price of the adjustment power provision service to 0 or less for a combination of a contract unit period and a consumer for which no contract for the adjustment power provision service has been made. In this case, the operation plan formulation unit 112 may solve the optimization problem using an evaluation function that indicates a higher evaluation the greater the total monetary gain of all consumers that are targets of the optimization problem.
The reference value output unit 113 notifies the aggregation operator system 12 of the reference value for each consumer determined by the operation plan formulation unit 112 .

制御情報算出部120は、上述した、各需要家の蓄電池64の充放電量を決定し、下位制御装置62に充放電制御を指示するための各種処理を行う。例えば、制御情報算出部120は、図4のステップS105からS107までの処理を行う。The control information calculation unit 120 performs various processes to determine the charge/discharge amount of each consumer's storage battery 64 and to instruct the lower-level control device 62 to control charge/discharge. For example, the control information calculation unit 120 performs the processes from step S105 to S107 in Figure 4.

以上のように、運用計画立案部112は、電力系統安定化のための調整力の提供者たり得る少なくとも1つの需要家を対象として、各需要家について、少なくとも1つの商品ブロックにおける調整力提供サービスの約定の有無にかかわらず、その商品ブロックを含む計画期間におけるその需要家の需要家設置システム50による調整力提供サービスの運用計画を立案する。 As described above, the operational planning unit 112 targets at least one consumer that can be a provider of adjustment power for stabilizing the power system, and for each consumer, regardless of whether or not an adjustment power provision service has been agreed upon in at least one product block, prepares an operational plan for the adjustment power provision service provided by that consumer's customer installation system 50 during the planning period including that product block.

運用計画立案部112は、上記のように、需要家と、調整力提供サービスの約定単位期間との組み合わせにおける調整力提供サービスの約定の有無にかかわらず、調整力提供サービスの運用計画を立案する。上位制御装置22によれば、この点で、調整力提供サービスの約定状況に応じて計画の対象を選択する必要なしに、調整力提供サービスの計画を立案できる。As described above, the operation planning unit 112 creates an operation plan for the adjustment capacity provision service regardless of whether or not a contract for the adjustment capacity provision service has been concluded for the combination of the consumer and the contract unit period for the adjustment capacity provision service. In this respect, the upper control device 22 can create a plan for the adjustment capacity provision service without having to select the target of the plan depending on the contract status of the adjustment capacity provision service.

また、運用計画立案部112によれば、調整力提供サービスの約定の無い、需要家と約定単位期間との組み合わせも、計画の対象に含めることができる。これにより、運用計画立案部112では、調整力提供サービスと、例えばピークシフトなど複数の商品ブロックを含む計画期間を設けることが好ましいサービス(「他のサービス」と称する)との同時実施の際に、個々の商品ブロックにおける調整力提供サービスの計画を、その商品ブロックにおける他のサービスの実施の影響だけでなく、計画期間全体における他のサービスの実施の影響を反映して立案することができる。運用計画立案部112によれば、この点で、他のサービスの影響を比較的高精度に反映して調整力提供サービスの計画を立案することができる。 Furthermore, the operational planning unit 112 can also include combinations of consumers and contract unit periods for which there is no contract for the adjustment capacity provision service in the planning. As a result, when the adjustment capacity provision service is implemented simultaneously with a service (referred to as "other services") for which it is preferable to set a planning period including multiple product blocks, such as peak shifting, the operational planning unit 112 can plan the adjustment capacity provision service for each product block by reflecting not only the impact of the implementation of the other services in that product block, but also the impact of the implementation of the other services over the entire planning period. In this respect, the operational planning unit 112 can plan the adjustment capacity provision service by reflecting the impact of other services with a relatively high degree of accuracy.

また、運用計画立案部112は、需要家設置システム50における電力需給の状況に基づいて調整力提供サービスの運用計画を立案する。
これにより、運用計画立案部112が、調整力提供サービスの運用計画を高精度に立案できることが期待される。
In addition, the operation plan formulation unit 112 formulates an operation plan for the adjustment power providing service based on the state of power supply and demand in the consumer installed system 50 .
This is expected to enable the operation plan formulation unit 112 to formulate an operation plan for the adjustment power providing service with high accuracy.

また、制約条件設定部111は、調整力提供サービスの約定が無い商品ブロックと需要家との組み合わせについて、調整力提供サービスの確保量を0にするための数式を含む制約条件を設定する。運用計画立案部112は、制約条件設定部111が設定した制約条件を用いた最適化問題を解くことで、計画期間における調整力提供サービスの運用計画を立案する。 In addition, the constraint condition setting unit 111 sets constraint conditions including a mathematical formula for setting the amount of adjustment power provision service secured to 0 for combinations of product blocks and consumers for which no adjustment power provision service agreement has been made. The operation plan formulation unit 112 formulates an operation plan for the adjustment power provision service for the planning period by solving an optimization problem using the constraint conditions set by the constraint condition setting unit 111.

制約条件設定部111は、制約条件の設定により、各需要家について、調整力提供サービスの約定がない商品ブロックでの調整力確保量が0となるようにすることができる。この点で、制約条件設定部111が設定する制約条件では、各需要家が、あたかも計画期間中ずっと調整力提供サービスに参加しているかのように扱うことができ、かつ、実際には約定がない商品ブロックでは調整力確保量を0とすることで、最適化問題を解いて得られる計画の妥当性を確保できる。 The constraint condition setting unit 111 can set constraint conditions so that, for each consumer, the amount of guaranteed adjustment capacity in product blocks where there is no contract for the adjustment capacity provision service is 0. In this regard, the constraint conditions set by the constraint condition setting unit 111 allow each consumer to be treated as if they were participating in the adjustment capacity provision service throughout the planning period, and by setting the amount of guaranteed adjustment capacity to 0 in product blocks where there is no actual contract, the validity of the plan obtained by solving the optimization problem can be ensured.

基準値決定部110は、制約条件設定部111が設定する制約条件を用いて、エネルギーマネージメントにおける需要家設置システム50の運用と、商品ブロック毎の調整力の確保における需要家設置システム50の運用とを纏めて表す最適化問題を設定することができる。この点で、基準値決定部110が設定する最適化問題では、エネルギーマネージメントのための需要家設置システム50の運用と、調整力の提供のための需要家設置システム50の運用との関係が十分に反映されることが期待される。基準値決定部110がこの最適化問題を解いて得られる計画では、エネルギーマネージメントでの使用可能分と、調整力のための確保の分とが適切に配分されていることが期待される。
また、基準値決定部110は、調整力提供サービスの計画を、商品ブロックよりも長い期間について立案することができる。
The reference value determination unit 110 can set an optimization problem that collectively represents the operation of the consumer installed system 50 for energy management and the operation of the consumer installed system 50 for securing adjustment capacity for each product block, using the constraint conditions set by the constraint condition setting unit 111. In this regard, the optimization problem set by the reference value determination unit 110 is expected to fully reflect the relationship between the operation of the consumer installed system 50 for energy management and the operation of the consumer installed system 50 for providing adjustment capacity. The plan obtained by the reference value determination unit 110 solving this optimization problem is expected to appropriately allocate the amount available for energy management and the amount secured for adjustment capacity.
Furthermore, the reference value determination unit 110 can create a plan for the adjustment power providing service for a period longer than the product block.

また、調整力提供サービスの約定の有無が条件分岐ではなく数式で表されていることで、基準値決定部110がこの最適化問題を解く際、調整力提供サービスの約定の有無を区別して処理を変える必要がない。
また上記のように、基準値決定部110がこの最適化問題を解いて得られる計画では、各需要家について、調整力提供サービスの約定が無い商品ブロックでは調整力の確保量が0になっている点で、調整力提供サービスの落札状況に整合している。
Furthermore, because the presence or absence of a contract for the adjustment capacity provision service is expressed by a mathematical formula rather than by a conditional branch, when the reference value determination unit 110 solves this optimization problem, there is no need to distinguish between the presence or absence of a contract for the adjustment capacity provision service and change the processing accordingly.
Furthermore, as described above, in the plan obtained by the reference value determination unit 110 solving this optimization problem, for each consumer, the amount of adjustment capacity secured is 0 for product blocks that do not have a contract for adjustment capacity provision services, which is consistent with the bidding situation for adjustment capacity provision services.

また、制約条件設定部111は、調整力提供サービスの約定がない商品ブロックと需要家との組み合わせについて、調整力の確保量を0に設定する数式を含む制約条件を設定する。
これにより、基準値決定部110が最適化問題を解いて得られる計画でも、調整力提供サービスの約定がない商品ブロックと需要家との組み合わせについて、調整力の確保量が0になると期待される。
Furthermore, the constraint condition setting unit 111 sets a constraint condition including a mathematical formula that sets the amount of guaranteed adjustment capacity to 0 for a combination of a product block and a consumer for which no adjustment capacity providing service is agreed upon.
As a result, even in the plan obtained by the reference value determination unit 110 solving the optimization problem, it is expected that the amount of adjustment capacity secured will be zero for combinations of product blocks and consumers for which no adjustment capacity provision service is agreed upon.

また、制約条件設定部111は、前記調整力提供サービスの約定がない商品ブロックと需要家リストパターンとの組み合わせについて、調整力の確保量を0に設定する数式を含む制約条件を設定する。
ここで、需要家リストパターンにおける調整力の確保量は、その需要家リストパターンに含まれる需要家における調整力の確保量の合計である。
Furthermore, the constraint condition setting unit 111 sets a constraint condition including a mathematical expression that sets the amount of guaranteed adjustment capacity to 0 for a combination of a product block and a consumer list pattern for which no agreement for the adjustment capacity providing service is made.
Here, the secured amount of adjustment capability in a customer list pattern is the total secured amount of adjustment capability of the customers included in that customer list pattern.

これにより、基準値決定部110が最適化問題を解いて得られる計画でも、調整力提供サービスの約定がない商品ブロックと需要家リストパターンとの組み合わせについて、その商品ブロックと、その需要家リストパターンに含まれる各需要家との組み合わせにおける調整力の確保量が0になると期待される。 As a result, even in the plan obtained by the reference value determination unit 110 solving the optimization problem, for combinations of product blocks and customer list patterns for which no contract for adjustment capacity provision services is made, it is expected that the amount of adjustment capacity secured for the combination of that product block and each customer included in that customer list pattern will be zero.

また、制約条件設定部111は、調整力提供サービスの約定がない商品ブロックと需要家との組み合わせについて、調整力提供サービスの報酬単価を0またはそれ以下とする数式を含む制約条件を設定する。運用計画立案部112は、最適化問題の対象の全需要家の金銭的利得の合計が大きいほど高い評価を示す評価関数を用いた最適化問題を解く。 The constraint condition setting unit 111 also sets constraint conditions including a mathematical formula that sets the remuneration unit price for the adjustment power provision service at 0 or less for combinations of product blocks and consumers for which no agreement for adjustment power provision services has been made. The operation plan formulation unit 112 solves the optimization problem using an evaluation function that indicates a higher evaluation the greater the total monetary gain of all consumers that are the subject of the optimization problem.

報酬単価が0またはそれ以下の場合、報酬単価に調整力提供量を乗算して算出される報酬(金銭的利得)も0またはそれ以下になる。このことから基準値決定部110が、上記の評価関数に基づいて、報酬単価が0またはマイナスになっている商品ブロックかつ需要家について、調整力の確保量を0と算出することが期待される。 If the remuneration unit price is 0 or less, the remuneration (monetary gain) calculated by multiplying the remuneration unit price by the amount of adjustment capacity provided will also be 0 or less. Therefore, it is expected that the reference value determination unit 110 will calculate the amount of adjustment capacity to be secured as 0 for product blocks and consumers for which the remuneration unit price is 0 or negative, based on the above evaluation function.

<第二実施形態>
第二実施形態および第三実施形態では、第一実施形態の更に具体的な例について説明する。第二実施形態および第三実施形態でも、電力システムおよびその各部の個構成は、第一実施形態で説明したのと同様である。第二実施形態および第三実施形態でも、図1および図2に示す構成を用いて説明する。
第二実施形態では、上位制御装置22が、需要家リストパターン毎に最適化問題を設定する場合の例について説明する。
Second Embodiment
In the second and third embodiments, more specific examples of the first embodiment will be described. In the second and third embodiments, the power system and the individual configurations of its components are the same as those described in the first embodiment. The second and third embodiments will also be described using the configurations shown in FIGS. 1 and 2.
In the second embodiment, an example will be described in which the upper control device 22 sets an optimization problem for each consumer list pattern.

図5は、第二実施形態における最適化問題での、調整力提供サービスの約定状況の設定の例を示す図である。
図5の例では、#1から#9までの、連続する9個の商品ブロックが示されている。これら9個のうち8個の連続する商品ブロックの時間長である24時間が、上位制御装置22が運用計画を立案する時間長であるものとする。
FIG. 5 is a diagram illustrating an example of setting the contract status of the adjustment power providing service in the optimization problem according to the second embodiment.
5 shows nine consecutive product blocks numbered #1 to #9. The duration of eight consecutive product blocks out of these nine blocks, 24 hours, is assumed to be the duration for which the upper control device 22 formulates an operation plan.

また、図5では、9個の商品ブロックのそれぞれについて、落札された需要家リストパターンが示されている。図5では、需要家リストパターンC1、C2、C3、C4およびC8の5個の需要家リストパターンが示されている。
これらの需要家リストパターンのうち、需要家リストパターンC1、C3には、それぞれ以下の需要家が登録されているものとする。
需要家リストパターンC1:A1-A40
需要家リストパターンC3:A1-A20、B1-B20
5 also shows the customer list patterns for which bids were made for each of the nine product blocks. Five customer list patterns, C1, C2, C3, C4, and C8, are shown in FIG.
Of these customer list patterns, the customer list patterns C1 and C3 each have the following customers registered therein.
Customer list pattern C1: A1-A40
Customer list pattern C3: A1-A20, B1-B20

このように、需要家リストパターンC1には、需要家A1からA40まで40件の需要家が登録されている。また、需要家リストパターンC3には、需要家A1からA20まで、および、需要家B1からB20までの40件の需要家が登録されている。
また、需要家A1からA20は、需要家リストパターンC1、C3の両方に登録されている。需要家リストパターンC2、C4およびC5には、需要家リストパターンC1、C3の何れとも重複して登録されている需要家はないものとする。
In this way, 40 customers, A1 to A40, are registered in customer list pattern C1. Also, 40 customers, A1 to A20 and B1 to B20, are registered in customer list pattern C3.
In addition, consumers A1 to A20 are registered in both consumer list patterns C1 and C3. It is assumed that consumer list patterns C2, C4, and C5 do not have any consumers that are registered in either consumer list pattern C1 or C3.

第二実施形態では、基準値決定部110は、個々の需要家リストパターンを対象として最適化問題を設定する。具体的には、基準値決定部110は、基準値の決定対象の商品ブロックで落札されている需要家リストパターンに登録されている需要家A1からA40を対象として、最適化問題を設定する。
以下では、基準値の決定対象の商品ブロックを、対象商品ブロックと称する。また、対象商品ブロックで落札されている需要家リストパターンを、対象需要家リストパターンと称する。
In the second embodiment, the reference value determination unit 110 sets an optimization problem for each customer list pattern. Specifically, the reference value determination unit 110 sets an optimization problem for the customers A1 to A40 registered in the customer list pattern that have won bids for the product block for which the reference value is to be determined.
Hereinafter, the product block for which the reference value is determined will be referred to as the “target product block.” Also, the customer list pattern for which a successful bid has been made in the target product block will be referred to as the “target customer list pattern.”

また、基準値決定部110(制約条件設定部111)は、対象需要家リストパターンが落札されている商品ブロックについては、落札結果に基づく数式を、対象需要家リストパターンに登録されている需要家毎に生成して制約条件に含める。一方、制約条件設定部111は、対象需要家リストパターンが落札されていない商品ブロックについては、調整力の確保量を0にするための数式を、対象需要家リストパターンに登録されている需要家毎に生成して制約条件に含める。具体的には、制約条件設定部111は、対象需要家リストパターンに登録されている各需要家の需要家設置システム50における調整力の確保量が0になるような数式を制約条件に含める。 In addition, for product blocks for which the target consumer list pattern has been successfully bid, the reference value determination unit 110 (constraint condition setting unit 111) generates a formula based on the bidding results for each consumer registered in the target consumer list pattern and includes it in the constraint conditions. On the other hand, for product blocks for which the target consumer list pattern has not been successfully bid, the constraint condition setting unit 111 generates a formula for setting the amount of adjustment capacity secured to zero for each consumer registered in the target consumer list pattern and includes it in the constraint conditions. Specifically, the constraint condition setting unit 111 includes in the constraint conditions a formula that sets the amount of adjustment capacity secured in the consumer installation system 50 of each consumer registered in the target consumer list pattern to zero.

上記のように、制約条件設定部111が、調整力の確保量を0に設定する数式を制約条件に含めるようにしてもよい。あるいは、制約条件設定部111が、調整力提供サービスの報酬単価を0またはそれ以下とする数式を制約条件に含めるようにしてもよい。As described above, the constraint condition setting unit 111 may include in the constraint conditions a mathematical formula that sets the amount of adjustment capacity to be secured to 0. Alternatively, the constraint condition setting unit 111 may include in the constraint conditions a mathematical formula that sets the remuneration unit price for the adjustment capacity provision service to 0 or less.

例えば、商品ブロック#1では、需要家リストパターンC1が落札されている。そこで、基準値決定部110は、需要家リストパターンC1に登録されている需要家の需要家設置システム50の運用計画を24時間分立案して、商品ブロック#1における需要家毎の基準値を決定する。 For example, in product block #1, customer list pattern C1 has been awarded. Therefore, the reference value determination unit 110 creates a 24-hour operation plan for the customer installation system 50 of the customers registered in customer list pattern C1 and determines the reference value for each customer in product block #1.

その際、制約条件設定部111は、需要家リストパターンC1が落札されている商品ブロック#1および#5については、需要家リストパターンC1に登録されている各需要家について、落札結果に基づく数式を制約条件に含める。一方、制約条件設定部111は、需要家リストパターンC1が落札されていない商品ブロック#2、#3、#4、#6、#7および#8については、需要家リストパターンC1に登録されている各需要家について、調整力の確保量が0になるような数式を制約条件に含める。In this case, for product blocks #1 and #5 for which customer list pattern C1 has been awarded, the constraint condition setting unit 111 includes in the constraint conditions a formula based on the bidding results for each customer registered in customer list pattern C1. On the other hand, for product blocks #2, #3, #4, #6, #7 and #8 for which customer list pattern C1 has not been awarded, the constraint condition setting unit 111 includes in the constraint conditions a formula that causes the amount of adjustment capacity to be secured to be 0 for each customer registered in customer list pattern C1.

また、商品ブロック#2では、需要家リストパターンC3が落札されている。そこで、基準値決定部110は、需要家リストパターンC3に登録されている需要家の需要家設置システム50の運用計画を24時間分立案して、商品ブロック#2における需要家毎の基準値を決定する。 Furthermore, in product block #2, customer list pattern C3 has been sold. Therefore, the reference value determination unit 110 creates a 24-hour operation plan for the customer installation system 50 of the customers registered in customer list pattern C3 and determines the reference value for each customer in product block #2.

その際、制約条件設定部111は、需要家リストパターンC3が落札されている商品ブロック#2、#3および#8については、需要家リストパターンC3に登録されている各需要家について、落札結果に基づく数式を制約条件に含める。一方、制約条件設定部111は、需要家リストパターンC3が落札されていない商品ブロック#4、#5、#6、#7および#8については、需要家リストパターンC3に登録されている各需要家について、調整力の確保量が0になるような数式を制約条件に含める。 In this case, for product blocks #2, #3, and #8 for which customer list pattern C3 has been successfully bid, the constraint condition setting unit 111 includes in the constraint conditions a formula based on the bidding results for each customer registered in customer list pattern C3. On the other hand, for product blocks #4, #5, #6, #7, and #8 for which customer list pattern C3 has not been successfully bid, the constraint condition setting unit 111 includes in the constraint conditions a formula that causes the amount of adjustment capacity to be secured to be 0 for each customer registered in customer list pattern C3.

このように、制約条件設定部111は、計画期間に含まれる商品ブロックと、需要家リストパターンのうち、その商品ブロックに調整力提供サービスの約定がない需要家リストパターンに登録されている需要家との組み合わせについて、調整力の確保量を0にするための数式を含む制約条件を、需要家リストパターン毎に設定する。
運用計画立案部112は、需要家リストパターン毎の制約条件を用いた需要家リストパターン毎の最適化問題を解く。
In this way, the constraint condition setting unit 111 sets, for each consumer list pattern, a constraint condition including a formula for setting the amount of adjustment capacity to zero for a combination of a product block included in the planning period and a consumer registered in a consumer list pattern that does not have a contract for adjustment capacity provision services in that product block.
The operation plan formulation unit 112 solves an optimization problem for each customer list pattern using constraints for each customer list pattern.

これにより、運用計画立案部112は、対象需要家リストパターンが落札されている商品ブロックについては調整力提供サービスと、エネルギーマネージメントサービスの計画との両方に基づく計画を立案する。
一方、運用計画立案部112は、対象需要家リストパターンが落札されていない商品ブロックについては、実質的には調整力提供サービスの計画を行わず、エネルギーマネージメントサービスのみに基づく計画を立案する。
As a result, the operation plan formulation unit 112 formulates a plan based on both the adjustment power providing service plan and the energy management service plan for the product block for which the target consumer list pattern has been successfully bid.
On the other hand, for product blocks for which the target consumer list pattern has not been sold, the operation plan creation unit 112 does not actually plan the adjustment power providing service, but creates a plan based only on the energy management service.

図6は、第二実施形態に係る上位制御装置22が調整力提供サービスを行う処理手順の例を示す図である。上位制御装置22は、商品ブロック毎に、アグリゲーション事業者システム12が需給調整市場システム13に基準値を申告するよりも前に、図6の処理を行う。 Figure 6 is a diagram showing an example of the processing procedure by which the upper control device 22 in the second embodiment performs the adjustment power provision service. The upper control device 22 performs the processing of Figure 6 for each product block before the aggregation operator system 12 declares the reference value to the supply and demand adjustment market system 13.

図6の処理で、上位制御装置22は、需要家リストパターン毎に処理を行うループL1を開始する(ステップS201)。
次に、基準値決定部110は、ループL1で処理対象になっている需要家リストパターンについて運用計画を立案する(ステップS202)。上記のように、基準値決定部110は、ループL1で処理対象になっている需要家リストパターンについて最適化問題を設定して解くことで、運用計画を立案する。
In the process of FIG. 6, the upper control device 22 starts a loop L1 for performing processing for each customer list pattern (step S201).
Next, the reference value determination unit 110 formulates an operation plan for the customer list pattern being processed in the loop L1 (step S202). As described above, the reference value determination unit 110 formulates an operation plan by setting and solving an optimization problem for the customer list pattern being processed in the loop L1.

基準値決定部110は、基準値決定の対象となる需要家リストパターン(次の商品ブロックで落札されている需要家リストパターン)に登録されている需要家の需要家設置システム50については、調整力の確保量の決定、基準値の決定、および、エネルギーマネージメントのための需要家設置システム50の機器の制御を決定する。それ以外の需要家設置システム50については、基準値決定部110は、エネルギーマネージメントのための需要家設置システム50の機器の制御を決定する。 For the consumer installation systems 50 of consumers registered in the consumer list pattern for which the reference value is to be determined (the consumer list pattern for which a bid has been made in the next product block), the reference value determination unit 110 determines the amount of adjustment capacity to be secured, the reference value, and the control of the equipment in the consumer installation systems 50 for energy management. For other consumer installation systems 50, the reference value determination unit 110 determines the control of the equipment in the consumer installation systems 50 for energy management.

次に、基準値出力部113は、ループL1で処理対象になっている需要家リストパターンが、次の商品ブロック(次に時間が到来する商品ブロック)で落札された需要家リストパターンか否かを判定する(ステップS203)。 Next, the reference value output unit 113 determines whether the customer list pattern being processed in loop L1 is a customer list pattern that has been won in the next product block (the product block whose time has come next) (step S203).

次の商品ブロックで落札された需要家リストパターンであると判定した場合(ステップS203:YES)、基準値出力部113は、その需要家リストパターンに登録されている各需要家の基準値をアグリゲーション事業者システム12へ送信する(ステップS204)。 If it is determined that the customer list pattern is a successful bidder in the next product block (step S203: YES), the reference value output unit 113 transmits the reference values of each customer registered in that customer list pattern to the aggregation operator system 12 (step S204).

次に、上位制御装置22は、ループL1の終端処理を行う(ステップS205)。具体的には、上位制御装置22は、全ての需要家リストパターンについてループL1の処理を行ったか否かを判定する。未処理の需要家リストパターンがあると上位制御装置22が判定した場合、処理がステップS201へ戻り、上位制御装置22は、未処理の需要家リストパターンについて引き続きループL1の処理を行う。一方、全ての需要家リストパターンについてループL1の処理を行ったと判定した場合、上位制御装置22は、ループL1を終了する。 Next, the upper control device 22 performs termination processing of loop L1 (step S205). Specifically, the upper control device 22 determines whether or not loop L1 processing has been performed for all customer list patterns. If the upper control device 22 determines that there are unprocessed customer list patterns, processing returns to step S201, and the upper control device 22 continues processing loop L1 for the unprocessed customer list patterns. On the other hand, if it determines that loop L1 processing has been performed for all customer list patterns, the upper control device 22 terminates loop L1.

ステップS205で、上位制御装置22がループL1を終了した場合、制御情報算出部120は、ステップS204で基準値出力部113が基準値を送付した商品ブロックの時刻の到来を待って、需要家設置システム50の制御を行う(ステップS206)。制御情報算出部120は、下位制御装置62に制御指令情報を通知して、需要家設置システム50の各部に対する制御を行うよう指示する。 If the upper control device 22 ends loop L1 in step S205, the control information calculation unit 120 waits for the arrival of the time of the product block for which the reference value output unit 113 sent the reference value in step S204, and controls the consumer-installed system 50 (step S206). The control information calculation unit 120 notifies the lower control device 62 of control command information and instructs it to control each part of the consumer-installed system 50.

制御情報算出部120は、その商品ブロックで落札された需要家リストパターンに登録されている需要家の需要家設置システム50については、調整力提供のための制御とエネルギーマネージメントのための制御とを行う。それ以外の需要家設置システム50については、制御情報算出部120は、エネルギーマネージメントのための制御を行う。 The control information calculation unit 120 performs control for providing adjustment capacity and control for energy management for the customer-installed systems 50 of customers registered in the customer list pattern that was successfully bid on for that product block. For other customer-installed systems 50, the control information calculation unit 120 performs control for energy management.

ステップS206の後、上位制御装置22は、図6の処理を終了する。
一方、ステップS203で、次の商品ブロックで落札された需要家リストパターンではないと、基準値出力部113が判定した場合(ステップS203:NO)、処理がステップS205へ進む。
After step S206, the upper level control device 22 ends the process of FIG.
On the other hand, if the reference value output unit 113 determines in step S203 that the customer list pattern is not a customer list pattern that has been successfully bid on in the next product block (step S203: NO), the process proceeds to step S205.

以上のように、制約条件設定部111は、計画期間に含まれる商品ブロックと、需要家リストパターンのうち、その商品ブロックに調整力提供サービスの約定がない需要家リストパターンに登録されている需要家との組み合わせについて、調整力の確保量を0にするための数式を含む制約条件を、需要家リストパターン毎に設定する。運用計画立案部112は、需要家リストパターン毎の制約条件を用いた需要家リストパターン毎の最適化問題を解く。 As described above, the constraint condition setting unit 111 sets, for each consumer list pattern, constraint conditions including a formula for setting the amount of adjustment capacity to zero for combinations of product blocks included in the planning period and consumers registered in a consumer list pattern that does not have an agreement for adjustment capacity provision services in that product block. The operation plan creation unit 112 solves the optimization problem for each consumer list pattern using the constraint conditions for each consumer list pattern.

第二実施形態に係る上位制御装置22によれば、1つの需要家リストパターンを対象として最適化問題を生成する点で、最適化問題の規模が比較的小さい。第二実施形態に係る上位制御装置22によれば、この点で、最適化問題について比較的短時間で評価の高い解を得られると期待される。 The upper control device 22 according to the second embodiment generates an optimization problem for a single customer list pattern, so the size of the optimization problem is relatively small. In this respect, the upper control device 22 according to the second embodiment is expected to be able to obtain a highly evaluated solution to the optimization problem in a relatively short time.

また、第二実施形態に係る上位制御装置22では、需要家リストパターン毎の最適化問題を解く際に、他の需要家リストパターンの影響を考慮する必要が無い。したがって、第二実施形態に係る上位制御装置22では、各最適化問題を並列処理で解くことができ、計算時間が比較的短いことが期待される。 Furthermore, in the upper control device 22 according to the second embodiment, when solving the optimization problem for each customer list pattern, there is no need to consider the influence of other customer list patterns. Therefore, in the upper control device 22 according to the second embodiment, each optimization problem can be solved by parallel processing, and it is expected that the calculation time will be relatively short.

<第三実施形態>
第三実施形態では、上位制御装置22が、全需要家について1つの最適化問題を設定する場合の例について説明する。
図7は、第三実施形態における最適化問題での、調整力提供サービスの約定状況の設定の例を示す図である。
Third Embodiment
In the third embodiment, an example will be described in which the upper control device 22 sets one optimization problem for all consumers.
FIG. 7 is a diagram illustrating an example of setting the contract status of the adjustment power providing service in the optimization problem according to the third embodiment.

図5の場合と同じく図7でも、#1から#9までの、連続する9個の商品ブロックが示されており、それぞれの商品ブロックで落札された需要家リストパターンも図5の場合と同じである。
各需要家リストパターンに登録されている需要家も、図5の場合と同じものとする。特に、需要家リストパターンC1には、需要家A1からA40まで40件の需要家が登録され、需要家リストパターンC3には、需要家A1からA20まで、および、需要家B1からB20までの40件の需要家が登録されているものとする。このように需要家A1からA20は、需要家リストパターンC1、C3の両方に登録されている一方、需要家リストパターンC2、C4およびC5には、需要家リストパターンC1、C3の何れとも重複して登録されている需要家はないものとする。
また、上位制御装置22が運用計画を立案する時間長も、図5の場合と同じく24時間であるものとする。
As in the case of FIG. 5, in FIG. 7, nine consecutive product blocks #1 to #9 are shown, and the list patterns of customers who have made successful bids for each product block are the same as in the case of FIG.
The consumers registered in each consumer list pattern are also assumed to be the same as those in Figure 5. In particular, consumer list pattern C1 has 40 consumers registered, consumers A1 to A40, and consumer list pattern C3 has 40 consumers registered, consumers A1 to A20 and consumers B1 to B20. In this way, consumers A1 to A20 are registered in both consumer list patterns C1 and C3, while consumer list patterns C2, C4, and C5 do not have any consumers that are registered in either consumer list pattern C1 or C3.
The length of time for which the upper level control device 22 formulates an operation plan is also assumed to be 24 hours, the same as in the case of FIG.

第三実施形態では、基準値決定部110は、全需要家(少なくとも何れか1つの需要家リストパターンに登録されている需要家全て)を対象として最適化問題を設定する。
これにより、第三実施形態では、特に、複数の需要家リストパターンに登録されている需要家の扱いが、第二実施形態の場合と異なる。第三実施形態では、基準値決定部110は、複数の需要家リストパターンに登録されている需要家について、それぞれの需要家リストパターンの落札による約定が反映された最適化問題を生成する。
In the third embodiment, the reference value determination unit 110 sets an optimization problem targeting all consumers (all consumers registered in at least one consumer list pattern).
As a result, in the third embodiment, the handling of consumers registered in multiple consumer list patterns is particularly different from that in the second embodiment. In the third embodiment, the reference value determination unit 110 generates an optimization problem for consumers registered in multiple consumer list patterns, in which the contracts resulting from successful bids for each consumer list pattern are reflected.

例えば、基準値決定部110が商品ブロック#1における基準値を決定する際、落札されている需要家リストパターンC1に登録されている需要家のうち、需要家A1からA20までは、需要家リストパターンC3にも登録されている。これにより、需要家A1からA20までは、は、需要家リストパターンC1が落札された商品ブロック#1および#5だけでなく、需要家リストパターンC3が落札された商品ブロック#2、#3および#8でも約定されている。 For example, when the reference value determination unit 110 determines the reference value for product block #1, among the consumers registered in customer list pattern C1 who have won bids, consumers A1 to A20 are also registered in customer list pattern C3. As a result, consumers A1 to A20 are contracted not only in product blocks #1 and #5 for which customer list pattern C1 has been won, but also in product blocks #2, #3, and #8 for which customer list pattern C3 has been won.

第三実施形態では、基準値決定部110が全需要家を対象とする最適化問題を設定することで、制約条件設定部111は、全ての需要家リストパターンの落札を反映した制約条件を設定する。
したがって、制約条件設定部111は、商品ブロック#1における運用計画のための最適化問題で、需要家A1からA20について、商品ブロック#1、#2、#3、#5、#8の何れの約定も反映した制約条件を設定する。
また、制約条件設定部111は、商品ブロック#1における運用計画のための最適化問題で、需要家A1からA20について、商品ブロック#2、#3、#5、#8の何れの約定も反映した制約条件を設定する。
In the third embodiment, the reference value determination unit 110 sets an optimization problem targeting all consumers, and the constraint condition setting unit 111 sets constraint conditions that reflect successful bids for all consumer list patterns.
Therefore, the constraint setting unit 111 sets constraints that reflect the agreements of any of product blocks #1, #2, #3, #5, and #8 for consumers A1 to A20 in the optimization problem for the operational plan in product block #1.
In addition, the constraint setting unit 111 sets constraints for consumers A1 to A20 in the optimization problem for the operation plan in product block #1 that reflect the agreements of any of product blocks #2, #3, #5, and #8.

図8は、第三実施形態に係る上位制御装置22が調整力提供サービスを行う処理手順の例を示す図である。上位制御装置22は、商品ブロック毎に、アグリゲーション事業者システム12が需給調整市場システム13に基準値を申告するよりも前に、図8の処理を行う。 Figure 8 is a diagram showing an example of the processing procedure by which the upper control device 22 in the third embodiment performs the adjustment power provision service. The upper control device 22 performs the processing of Figure 8 for each product block before the aggregation operator system 12 declares the reference value to the supply and demand adjustment market system 13.

図8の処理で、基準値決定部110は、全ての需要家を対象に運用計画を立案する(ステップS301)。上記のように、基準値決定部110は、全需要家を対象として最適化問題を設定して解くことで、運用計画を立案する。
基準値決定部110は、基準値決定の対象となる需要家設置システム50(次の商品ブロックで落札されている需要家リストパターンに登録されている需要家の需要家設置システム50)については、調整力の確保量の決定、基準値の決定、および、エネルギーマネージメントのための需要家設置システム50の機器の制御を決定する。それ以外の需要家設置システム50については、基準値決定部110は、エネルギーマネージメントのための需要家設置システム50の機器の制御を決定する。
8, the reference value determination unit 110 formulates an operation plan for all consumers (step S301). As described above, the reference value determination unit 110 formulates an operation plan by setting and solving an optimization problem for all consumers.
For the customer installed systems 50 for which the reference value is to be determined (customer installed systems 50 of customers registered in the customer list pattern for which a bid has been made in the next product block), the reference value determination unit 110 determines the amount of adjustment capacity to be secured, the reference value, and the energy management control of the devices in the customer installed systems 50. For other customer installed systems 50, the reference value determination unit 110 determines the energy management control of the devices in the customer installed systems 50.

次に、上位制御装置22は、需要家リストパターン毎に処理を行うループL2を開始する(ステップS302)。
次に、基準値出力部113は、ループL2で処理対象になっている需要家リストパターンが、次の商品ブロック(次に時間が到来する商品ブロック)で落札された需要家リストパターンか否かを判定する(ステップS303)。
Next, the upper level control device 22 starts a loop L2 for performing processing for each customer list pattern (step S302).
Next, the reference value output unit 113 determines whether the customer list pattern being processed in loop L2 is a customer list pattern that has been won in the next product block (the product block whose time has come next) (step S303).

次の商品ブロックで落札された需要家リストパターンであると判定した場合(ステップS303:YES)、基準値出力部113は、その需要家リストパターンに登録されている各需要家の基準値をアグリゲーション事業者システム12へ送信する(ステップS304)。 If it is determined that the customer list pattern is a successful bidder in the next product block (step S303: YES), the reference value output unit 113 transmits the reference values of each customer registered in that customer list pattern to the aggregation operator system 12 (step S304).

次に、上位制御装置22は、ループL2の終端処理を行う(ステップS305)。具体的には、上位制御装置22は、全ての需要家リストパターンについてループL2の処理を行ったか否かを判定する。未処理の需要家リストパターンがあると上位制御装置22が判定した場合、処理がステップS302へ戻り、上位制御装置22は、未処理の需要家リストパターンについて引き続きループL2の処理を行う。一方、全ての需要家リストパターンについてループL2の処理を行ったと判定した場合、上位制御装置22は、ループL2を終了する。 Next, the upper control device 22 performs termination processing of loop L2 (step S305). Specifically, the upper control device 22 determines whether or not loop L2 processing has been performed for all customer list patterns. If the upper control device 22 determines that there are unprocessed customer list patterns, processing returns to step S302, and the upper control device 22 continues processing loop L2 for the unprocessed customer list patterns. On the other hand, if it determines that loop L2 processing has been performed for all customer list patterns, the upper control device 22 ends loop L2.

ステップS305で、上位制御装置22がループL2を終了した場合、制御情報算出部120は、ステップS304で基準値出力部113が基準値を送付した商品ブロックの時刻の到来を待って、需要家設置システム50の制御を行う(ステップS306)。制御情報算出部120は、下位制御装置62に制御指令情報を通知して、需要家設置システム50の各部に対する制御を行うよう指示する。 If the upper control device 22 ends loop L2 in step S305, the control information calculation unit 120 waits for the arrival of the time of the product block for which the reference value output unit 113 sent the reference value in step S304, and controls the consumer-installed system 50 (step S306). The control information calculation unit 120 notifies the lower control device 62 of control command information and instructs it to control each part of the consumer-installed system 50.

制御情報算出部120は、その商品ブロックで落札された需要家リストパターンに登録されている需要家の需要家設置システム50については、調整力提供のための制御とエネルギーマネージメントのための制御とを行う。それ以外の需要家設置システム50については、制御情報算出部120は、エネルギーマネージメントのための制御を行う。 The control information calculation unit 120 performs control for providing adjustment capacity and control for energy management for the customer-installed systems 50 of customers registered in the customer list pattern that was successfully bid on for that product block. For other customer-installed systems 50, the control information calculation unit 120 performs control for energy management.

ステップS306の後、上位制御装置22は、図8の処理を終了する。
一方、ステップS303で、次の商品ブロックで落札された需要家リストパターンではないと、基準値出力部113が判定した場合(ステップS303:NO)、処理がステップS305へ進む。
After step S306, the upper level control device 22 ends the process of FIG.
On the other hand, if the reference value output unit 113 determines in step S303 that the customer list pattern is not a customer list pattern that has been successfully bid on in the next product block (step S303: NO), the process proceeds to step S305.

以上のように、制約条件設定部111は、計画期間に含まれる商品ブロックと、複数の需要家リストパターンの少なくとも何れか1つに含まれる需要家との組み合わせのうち、調整力提供サービスの約定が無い商品ブロックと需要家との組み合わせについて、調整力の確保量を0にするための数式を含む制約条件、かつ、複数の需要家リストパターンの少なくとも何れか1つに含まれる需要家全体についての最適化問題の制約条件を設定する。
運用計画立案部112は、複数の需要家リストパターンの少なくとも何れか1つに含まれる需要家全体についての最適化問題を解く。
As described above, the constraint condition setting unit 111 sets constraint conditions including a formula for setting the amount of adjustment capacity to zero for combinations of product blocks and consumers that do not have a contract for adjustment capacity provision services, among combinations of product blocks included in the planning period and consumers that are included in at least one of the multiple consumer list patterns, and sets constraint conditions for the optimization problem for all consumers that are included in at least one of the multiple consumer list patterns.
The operation plan formulation unit 112 solves an optimization problem for all of the consumers included in at least one of the plurality of consumer list patterns.

第三実施形態に係る上位制御装置22によれば、各需要家について、その需要家が登録されている全ての需要家リストパターンの落札による約定を反映させて最適化問題を生成し、計画を立案することができる。第三実施形態に係る上位制御装置22によれば、この点で、計画を高精度に立案できること期待される。 The host control device 22 according to the third embodiment can generate an optimization problem for each consumer by reflecting the agreements resulting from successful bids for all consumer list patterns in which the consumer is registered, and can create a plan. In this respect, the host control device 22 according to the third embodiment is expected to be able to create plans with high accuracy.

また、第三実施形態に係る上位制御装置22では、複数の需要家リストパターンに登録されている需要家が需要家リストパターン毎に繰り返し最適化問題の対象となることがない点で、全体での問題の規模が比較的小さいと評価できる。
また、第三実施形態に係る上位制御装置22では、全需要家を対象として1つの最適化問題を生成するので、解くべき最適化問題の個数が少なくて済む。
Furthermore, in the upper control device 22 of the third embodiment, the overall scale of the problem can be evaluated as being relatively small in that consumers registered in multiple consumer list patterns are not repeatedly subject to the optimization problem for each consumer list pattern.
Furthermore, in the upper control device 22 according to the third embodiment, one optimization problem is generated for all consumers, so the number of optimization problems to be solved can be reduced.

なお、第三実施形態に係る上位制御装置22が、対象を全需要家ではなく、計画対象の所定期間において、約定された複数の需要家リストパターンに属する全需要家のみとするようにしてもよい。
これにより、計算コストを下げることができる。
In addition, the upper control device 22 in the third embodiment may target not all consumers, but only all consumers that belong to multiple contracted consumer list patterns during the specified period of the planned target.
This reduces the calculation cost.

また、上位制御装置22の処理を、最適化計算の実行環境を仮受けて行うことを考えた場合、第三実施形態では、並列処理が不要である点で、最適化計算実行環境の利用コストが比較的安価であることが期待される。 Furthermore, when considering that the processing of the upper control device 22 is performed by temporarily receiving an optimization calculation execution environment, in the third embodiment, since parallel processing is not required, it is expected that the cost of using the optimization calculation execution environment will be relatively low.

<第四実施形態>
図9は、第四実施形態に係る制御装置の構成の例を示す図である。図9に示す構成で、計画装置610は、運用計画立案部611を備える。
<Fourth embodiment>
9 is a diagram illustrating an example of the configuration of a control device according to the fourth embodiment. In the configuration illustrated in FIG. 9, a planning device 610 includes an operation plan formulation unit 611.

かかる構成で、運用計画立案部611は、電力系統安定化のための調整力の提供者たり得る少なくとも1つの需要家を対象として、各需要家について、調整力提供サービスの少なくとも1つの約定単位期間における前記調整力提供サービスの約定の有無にかかわらず、その約定単位期間を含む計画期間における前記需要家のシステムによる前記調整力提供サービスの運用計画を立案する。
運用計画立案部611は、運用計画立案手段の例に該当する。
With this configuration, the operation planning unit 611 targets at least one consumer that can be a provider of adjustment power for stabilizing the power system, and for each consumer, regardless of whether or not an agreement for the adjustment power provision service has been made for at least one agreement unit period of the adjustment power provision service, creates an operation plan for the adjustment power provision service by the consumer's system for a planning period that includes that agreement unit period.
The operation planning unit 611 is an example of an operation planning means.

運用計画立案部611は、上記のように、需要家と、調整力提供サービスの約定単位期間との組み合わせにおける調整力提供サービスの約定の有無にかかわらず、調整力提供サービスの運用計画を立案する。計画装置610によれば、この点で、調整力提供サービスの約定状況に応じて計画の対象を選択する必要なしに、調整力提供サービスの計画を立案できる。As described above, the operation planning unit 611 creates an operation plan for the adjustment power provision service regardless of whether or not an adjustment power provision service contract exists for the combination of the consumer and the contract unit period for the adjustment power provision service. In this respect, the planning device 610 can create a plan for the adjustment power provision service without having to select the target of the plan depending on the contract status of the adjustment power provision service.

また、運用計画立案部611によれば、調整力提供サービスの約定の無い、需要家と約定単位期間との組み合わせも、計画の対象に含めることができる。これにより、運用計画立案部611では、調整力提供サービスと、例えばピークシフトなど複数の約定単位期間を含む計画期間を設けることが好ましいサービス(「他のサービス」と称する)との同時実施の際に、個々の約定単位期間における調整力提供サービスの計画を、その約定単位期間における他のサービスの実施の影響だけでなく、計画期間全体における他のサービスの実施の影響を反映して立案することができる。計画装置610によれば、この点で、他のサービスの影響を比較的高精度に反映して調整力提供サービスの計画を立案することができる。 Furthermore, the operational planning unit 611 can also include combinations of consumers and contract unit periods for which there is no contract for the adjustment reserve provision service in the planning. As a result, when the adjustment reserve provision service is implemented simultaneously with a service (referred to as "other services") for which it is preferable to set a planning period including multiple contract unit periods, such as peak shifting, the operational planning unit 611 can plan the adjustment reserve provision service for each contract unit period, reflecting not only the impact of the implementation of the other service in that contract unit period, but also the impact of the implementation of the other service over the entire planning period. In this respect, the planning device 610 can plan the adjustment reserve provision service while reflecting the impact of other services with a relatively high degree of accuracy.

<第五実施形態>
図10は、第五実施形態に係る計画方法における処理の手順の例を示す図である。図10に示す計画方法は、運用計画を立案すること(ステップS611)を含む。
Fifth Embodiment
Fig. 10 is a diagram showing an example of a processing procedure in a planning method according to the fifth embodiment. The planning method shown in Fig. 10 includes formulating an operation plan (step S611).

運用計画を立案すること(ステップS611)では、コンピュータが、制約条件を用いた最適化問題を解くことで、計画期間における調整力提供サービスの運用計画を立案する。 In formulating an operational plan (step S611), the computer formulates an operational plan for the adjustment power provision service for the planning period by solving an optimization problem using constraints.

図10に示す計画方法では、上記のように、需要家と、調整力提供サービスの約定単位期間との組み合わせにおける調整力提供サービスの約定の有無にかかわらず、調整力提供サービスの運用計画を立案する。図10に示す計画方法によれば、この点で、調整力提供サービスの約定状況に応じて計画の対象を選択する必要なしに、調整力提供サービスの計画を立案できる。 In the planning method shown in Figure 10, as described above, an operation plan for the adjustment power provision service is created regardless of whether or not an adjustment power provision service contract exists for the combination of the consumer and the contract unit period of the adjustment power provision service. In this respect, the planning method shown in Figure 10 allows the adjustment power provision service to be planned without having to select the target of the plan depending on the contract status of the adjustment power provision service.

また、図10に示す計画方法によれば、調整力提供サービスの約定の無い、需要家と約定単位期間との組み合わせも、計画の対象に含めることができる。これにより、図10に示す計画方法では、調整力提供サービスと、例えばピークシフトなど複数の約定単位期間を含む計画期間を設けることが好ましいサービス(「他のサービス」と称する)との同時実施の際に、個々の約定単位期間における調整力提供サービスの計画を、その約定単位期間における他のサービスの実施の影響だけでなく、計画期間全体における他のサービスの実施の影響を反映して立案することができる。図10に示す計画方法によれば、この点で、他のサービスの影響を比較的高精度に反映して調整力提供サービスの計画を立案することができる。 Furthermore, according to the planning method shown in Figure 10, combinations of consumers and contract unit periods for which there is no contract for the adjustment reserve provision service can also be included in the planning. As a result, with the planning method shown in Figure 10, when the adjustment reserve provision service is implemented simultaneously with a service (referred to as "other service") for which it is preferable to set a planning period including multiple contract unit periods, such as peak shifting, the adjustment reserve provision service plan for each contract unit period can be prepared by reflecting not only the impact of the implementation of the other service in that contract unit period, but also the impact of the implementation of the other service over the entire planning period. In this respect, the planning method shown in Figure 10 allows the adjustment reserve provision service plan to be prepared by reflecting the impact of other services with a relatively high degree of accuracy.

図11は、少なくとも1つの実施形態に係るコンピュータの構成を示す概略ブロック図である。
図11に示す構成で、コンピュータ700は、CPU710と、主記憶装置720と、補助記憶装置730と、インタフェース740と、不揮発性記録媒体750とを備える。
FIG. 11 is a schematic block diagram illustrating the configuration of a computer according to at least one embodiment.
In the configuration shown in FIG. 11, a computer 700 includes a CPU 710 , a main memory device 720 , an auxiliary memory device 730 , an interface 740 , and a non-volatile recording medium 750 .

上記の上位制御装置22、および、計画装置610のうち何れか1つ以上またはその一部が、コンピュータ700に実装されてもよい。その場合、上述した各処理部の動作は、プログラムの形式で補助記憶装置730に記憶されている。CPU710は、プログラムを補助記憶装置730から読み出して主記憶装置720に展開し、当該プログラムに従って上記処理を実行する。また、CPU710は、プログラムに従って、上述した各記憶部に対応する記憶領域を主記憶装置720に確保する。各装置と他の装置との通信は、インタフェース740が通信機能を有し、CPU710の制御に従って通信を行うことで実行される。また、インタフェース740は、不揮発性記録媒体750用のポートを有し、不揮発性記録媒体750からの情報の読出、および、不揮発性記録媒体750への情報の書込を行う。 One or more of the above-mentioned upper control device 22 and planning device 610, or a portion thereof, may be implemented in the computer 700. In this case, the operation of each of the above-mentioned processing units is stored in the auxiliary storage device 730 in the form of a program. The CPU 710 reads the program from the auxiliary storage device 730, expands it in the main storage device 720, and executes the above-mentioned processing in accordance with the program. The CPU 710 also allocates memory areas in the main storage device 720 corresponding to each of the above-mentioned memory units in accordance with the program. Communication between each device and other devices is carried out by the interface 740, which has communication functions and performs communication under the control of the CPU 710. The interface 740 also has a port for the non-volatile recording medium 750, and reads information from the non-volatile recording medium 750 and writes information to the non-volatile recording medium 750.

上位制御装置22がコンピュータ700に実装される場合、その各部の動作は、プログラムの形式で補助記憶装置730に記憶されている。CPU710は、プログラムを補助記憶装置730から読み出して主記憶装置720に展開し、当該プログラムに従って上記処理を実行する。 When the upper control device 22 is implemented in the computer 700, the operation of each part is stored in the auxiliary storage device 730 in the form of a program. The CPU 710 reads the program from the auxiliary storage device 730, expands it into the main storage device 720, and executes the above-mentioned processing in accordance with the program.

また、CPU710は、プログラムに従って、上位制御装置22が処理を行うための記憶領域を主記憶装置720に確保する。
上位制御装置22と他の装置との通信は、インタフェース740が通信機能を有し、CPU710の制御に従って動作することで実行される。
上位制御装置22とユーザとのインタラクションは、インタフェース740が入力デバイスおよび出力デバイスを有し、CPU710の制御に従って出力デバイスにて情報をユーザに提示し、入力デバイスにてユーザ操作を受け付けることで実行される。
Furthermore, the CPU 710 reserves a storage area in the main storage device 720 for the host control device 22 to perform processing in accordance with the program.
Communication between the upper level control device 22 and other devices is performed by the interface 740 having a communication function and operating under the control of the CPU 710 .
Interaction between the host control device 22 and the user is carried out by the interface 740 having an input device and an output device, presenting information to the user via the output device under the control of the CPU 710, and accepting user operations via the input device.

計画装置610がコンピュータ700に実装される場合、その各部の動作は、プログラムの形式で補助記憶装置730に記憶されている。CPU710は、プログラムを補助記憶装置730から読み出して主記憶装置720に展開し、当該プログラムに従って上記処理を実行する。When the planning device 610 is implemented in the computer 700, the operation of each part is stored in the auxiliary storage device 730 in the form of a program. The CPU 710 reads the program from the auxiliary storage device 730, expands it into the main storage device 720, and executes the above processing in accordance with the program.

また、CPU710は、プログラムに従って、計画装置610が処理を行うための記憶領域を主記憶装置720に確保する。
計画装置610と他の装置との通信は、インタフェース740が通信機能を有し、CPU710の制御に従って動作することで実行される。
計画装置610とユーザとのインタラクションは、インタフェース740が入力デバイスおよび出力デバイスを有し、CPU710の制御に従って出力デバイスにて情報をユーザに提示し、入力デバイスにてユーザ操作を受け付けることで実行される。
Furthermore, the CPU 710 allocates a storage area in the main storage device 720 for the planning device 610 to perform processing in accordance with the program.
Communication between the planning device 610 and other devices is performed by the interface 740 having a communication function and operating under the control of the CPU 710 .
Interaction between the planning device 610 and the user is performed by the interface 740 having an input device and an output device, presenting information to the user via the output device under the control of the CPU 710, and accepting user operations via the input device.

上述したプログラムのうち何れか1つ以上が不揮発性記録媒体750に記録されていてもよい。この場合、インタフェース740が不揮発性記録媒体750からプログラムを読み出すようにしてもよい。そして、CPU710が、インタフェース740が読み出したプログラムを直接実行するか、あるいは、主記憶装置720または補助記憶装置730に一旦保存して実行するようにしてもよい。 One or more of the above-mentioned programs may be recorded on non-volatile recording medium 750. In this case, interface 740 may read the program from non-volatile recording medium 750. Then, CPU 710 may directly execute the program read by interface 740, or may temporarily store the program in main memory device 720 or auxiliary memory device 730 and then execute it.

なお、上位制御装置22、および、計画装置610が行う処理の全部または一部を実行するためのプログラムをコンピュータ読み取り可能な記録媒体に記録して、この記録媒体に記録されたプログラムをコンピュータシステムに読み込ませ、実行することにより各部の処理を行ってもよい。なお、ここでいう「コンピュータシステム」とは、OSや周辺機器等のハードウェアを含むものとする。
また、「コンピュータ読み取り可能な記録媒体」とは、フレキシブルディスク、光磁気ディスク、ROM(Read Only Memory)、CD-ROM(Compact Disc Read Only Memory)等の可搬媒体、コンピュータシステムに内蔵されるハードディスク等の記憶装置のことをいう。また上記プログラムは、前述した機能の一部を実現するためのものであってもよく、さらに前述した機能をコンピュータシステムにすでに記録されているプログラムとの組み合わせで実現できるものであってもよい。
Note that the programs for executing all or part of the processing performed by the upper control device 22 and the planning device 610 may be recorded on a computer-readable recording medium, and the programs recorded on this recording medium may be read into a computer system and executed to perform the processing of each part. Note that the term "computer system" here includes hardware such as an OS and peripheral devices.
Furthermore, "computer-readable recording medium" refers to portable media such as flexible disks, optical magnetic disks, ROMs (Read Only Memory), and CD-ROMs (Compact Disc Read Only Memory), as well as storage devices such as hard disks built into computer systems. The program may be one that realizes part of the functions described above, or may be one that can realize the functions described above in combination with a program already recorded in the computer system.

以上、この発明の実施形態について図面を参照して詳述してきたが、具体的な構成はこの実施形態に限られるものではなく、この発明の要旨を逸脱しない範囲の設計等も含まれる。 The above describes in detail an embodiment of the present invention with reference to the drawings, but the specific configuration is not limited to this embodiment and also includes designs that do not deviate from the gist of the present invention.

本発明は、計画装置、計画方法および記録媒体に適用してもよい。 The present invention may be applied to a planning device, a planning method, and a recording medium.

22 上位制御装置
110 基準値決定部
111 制約条件設定部
112、611 運用計画立案部
113 基準値出力部
120 制御情報算出部
610 計画装置
22 Upper level control device 110 Reference value determination unit 111 Constraint condition setting unit 112, 611 Operation plan formulation unit 113 Reference value output unit 120 Control information calculation unit 610 Planning device

Claims (7)

電力系統安定化のための調整力の提供者たり得る少なくとも1つの需要家を対象として、各需要家について、調整力提供サービスの少なくとも1つの約定単位期間におけるその需要家による前記調整力提供サービスの提供の有無にかかわらず、その約定単位期間を含む計画期間における前記需要家のシステムによる前記調整力提供サービスの運用計画を立案するための最適化問題における制約条件として、前記計画期間に含まれる約定単位期間と、複数の前記需要家を含み前記約定単位期間毎の前記調整力提供サービスの約定の単位となる需要家グループのうち、その約定単位期間に前記調整力提供サービスの提供がない需要家グループに含まれる需要家との組み合わせについて、前記調整力の確保量を0にするための数式を含む制約条件を、前記需要家グループ毎に設定する制約条件設定手段と、
前記制約条件を用いた最適化問題を解くことで、前記計画期間における前記調整力提供サービスの運用計画を立案する運用計画立案手段と、
を備える計画装置。
a constraint condition setting means for setting, for each consumer group, a constraint condition including a contract unit period included in the planning period and a consumer group that includes a plurality of consumers and serves as a contract unit for the adjustment power provision service for each contract unit period, a constraint condition including a mathematical formula for setting the secured amount of adjustment power to zero for a combination of a contract unit period included in the planning period and a consumer group that does not receive the adjustment power provision service in the contract unit period, the combination being a contract unit period for at least one consumer that can be a provider of adjustment power for stabilizing the power system, regardless of whether the adjustment power provision service is provided by the consumer in at least one contract unit period of the adjustment power provision service;
an operation planning means for creating an operation plan for the adjustment power providing service during the planning period by solving an optimization problem using the constraint conditions ;
A planning device comprising:
前記運用計画立案手段は、前記需要家のシステムにおける電力需給の状況に基づいて前記調整力提供サービスの運用計画を立案する、
請求項1に記載の計画装置。
The operation plan formulation means formulates an operation plan for the adjustment power providing service based on a state of power supply and demand in the customer's system.
The planning device of claim 1 .
前記制約条件設定手段は、前記調整力提供サービスの提供がない、前記約定単位期間と前記需要家との組み合わせについて、前記調整力の確保量を0に設定する数式を含む前記制約条件を設定する、
請求項1または請求項2に記載の計画装置。
the constraint condition setting means sets the constraint condition including a mathematical formula that sets the secured amount of adjustment capacity to 0 for a combination of the contract unit period and the consumer for which the adjustment capacity providing service is not provided.
The planning device according to claim 1 or 2 .
前記制約条件設定手段は、前記調整力提供サービスの提供がない、前記約定単位期間と、複数の前記需要家を含み前記約定単位期間毎の前記調整力提供サービスの約定の単位となる需要家グループとの組み合わせについて、前記調整力の確保量を0に設定する数式を含む前記制約条件を設定する、
請求項からの何れか一項に記載の計画装置。
the constraint condition setting means sets the constraint condition including a mathematical formula that sets the secured amount of adjustment power to 0 for a combination of the contract unit period in which the adjustment power provision service is not provided and a consumer group that includes a plurality of the consumers and is a contract unit for the adjustment power provision service for each contract unit period.
A planning device according to any one of claims 1 to 3 .
前記制約条件設定手段は、前記調整力提供サービスの提供がない、前記約定単位期間と前記需要家との組み合わせについて、前記調整力提供サービスの報酬単価を0またはそれ以下とする数式を含む前記制約条件を設定し、
前記運用計画立案手段は、前記最適化問題の対象の全需要家の金銭的利得の合計が大きいほど高い評価を示す評価関数を用いた前記最適化問題を解く、
請求項からの何れか一項に記載の計画装置。
the constraint condition setting means sets the constraint condition including a mathematical formula that sets a remuneration unit price of the adjustment power provision service to 0 or less for a combination of the contract unit period and the consumer in which the adjustment power provision service is not provided,
the operation plan formulation means solves the optimization problem using an evaluation function that indicates a higher evaluation as the total monetary gain of all consumers that are targets of the optimization problem increases;
A planning device according to any one of claims 1 to 4 .
コンピュータが、
電力系統安定化のための調整力の提供者たり得る少なくとも1つの需要家を対象として、各需要家について、調整力提供サービスの少なくとも1つの約定単位期間におけるその需要家による前記調整力提供サービスの提供の有無にかかわらず、その約定単位期間を含む計画期間における前記需要家のシステムによる前記調整力提供サービスの運用計画を立案するための最適化問題における制約条件として、前記計画期間に含まれる約定単位期間と、複数の前記需要家を含み前記約定単位期間毎の前記調整力提供サービスの約定の単位となる需要家グループのうち、その約定単位期間に前記調整力提供サービスの提供がない需要家グループに含まれる需要家との組み合わせについて、前記調整力の確保量を0にするための数式を含む制約条件を、前記需要家グループ毎に設定し、
前記制約条件を用いた最適化問題を解くことで、前記計画期間における前記調整力提供サービスの運用計画を立案する、
ことを含む計画方法。
The computer
For at least one consumer that can be a provider of adjustment power for stabilizing the power system, regardless of whether the adjustment power provision service is provided by the consumer in at least one contract unit period of the adjustment power provision service, a constraint condition is set for each consumer group as a constraint condition in an optimization problem for formulating an operation plan for the adjustment power provision service by the consumer's system in a planning period including the contract unit period, the constraint condition including a mathematical formula for setting the secured amount of adjustment power to zero for a contract unit period included in the planning period and a consumer group that includes a plurality of the consumers and serves as a contract unit for the adjustment power provision service for each contract unit period, and that is not provided with the adjustment power provision service in that contract unit period;
creating an operation plan for the adjustment reserve providing service during the planning period by solving an optimization problem using the constraint conditions;
A planning method that includes:
コンピュータに、
電力系統安定化のための調整力の提供者たり得る少なくとも1つの需要家を対象として、各需要家について、調整力提供サービスの少なくとも1つの約定単位期間におけるその需要家による前記調整力提供サービスの提供の有無にかかわらず、その約定単位期間を含む計画期間における前記需要家のシステムによる前記調整力提供サービスの運用計画を立案するための最適化問題における制約条件として、前記計画期間に含まれる約定単位期間と、複数の前記需要家を含み前記約定単位期間毎の前記調整力提供サービスの約定の単位となる需要家グループのうち、その約定単位期間に前記調整力提供サービスの提供がない需要家グループに含まれる需要家との組み合わせについて、前記調整力の確保量を0にするための数式を含む制約条件を、前記需要家グループ毎に設定することと、
前記制約条件を用いた最適化問題を解くことで、前記計画期間における前記調整力提供サービスの運用計画を立案することと、
を実行させるためのプログラム。
On the computer,
For at least one consumer that can be a provider of adjustment power for stabilizing the power system, regardless of whether the adjustment power provision service is provided by the consumer in at least one contract unit period of the adjustment power provision service, as a constraint in an optimization problem for each consumer to create an operation plan for the adjustment power provision service by the consumer's system in a planning period including the contract unit period, the constraint including a mathematical formula for setting the secured amount of adjustment power to zero for a contract unit period included in the planning period and a consumer group that includes a plurality of the consumers and serves as a contract unit for the adjustment power provision service for each contract unit period, and that is not provided with the adjustment power provision service in that contract unit period;
creating an operation plan for the adjustment reserve providing service during the planning period by solving an optimization problem using the constraint conditions; and
A program to execute.
JP2023579913A 2022-02-09 2022-02-09 Planning device, planning method, and program Active JP7715219B2 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2022/005092 WO2023152820A1 (en) 2022-02-09 2022-02-09 Planning device, planning method, and recording medium

Publications (3)

Publication Number Publication Date
JPWO2023152820A1 JPWO2023152820A1 (en) 2023-08-17
JPWO2023152820A5 JPWO2023152820A5 (en) 2024-10-09
JP7715219B2 true JP7715219B2 (en) 2025-07-30

Family

ID=87563817

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2023579913A Active JP7715219B2 (en) 2022-02-09 2022-02-09 Planning device, planning method, and program

Country Status (2)

Country Link
JP (1) JP7715219B2 (en)
WO (1) WO2023152820A1 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015045084A1 (en) 2013-09-27 2015-04-02 株式会社日立製作所 Electric power system control device, electric power system, and electric power system control method
WO2017203664A1 (en) 2016-05-26 2017-11-30 日本電気株式会社 Control device, storage battery control device, control system, battery unit control device, control method, storage battery control method, battery unit control device operating method, and program
JP2019134522A (en) 2018-01-29 2019-08-08 株式会社東芝 Storage battery management device, storage battery management method and storage battery management program
JP2019213364A (en) 2018-06-06 2019-12-12 株式会社東芝 Storage battery management device, storage battery management method and storage battery management program
JP2020137368A (en) 2019-02-25 2020-08-31 日本電気株式会社 Upper-level device, control device, terminal device, charge/discharge control system, storage battery group supervision control system, control method and program
JP2021184682A (en) 2020-05-22 2021-12-02 株式会社東芝 Storage battery management device, storage battery management method, and storage battery management program

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015045084A1 (en) 2013-09-27 2015-04-02 株式会社日立製作所 Electric power system control device, electric power system, and electric power system control method
WO2017203664A1 (en) 2016-05-26 2017-11-30 日本電気株式会社 Control device, storage battery control device, control system, battery unit control device, control method, storage battery control method, battery unit control device operating method, and program
JP2019134522A (en) 2018-01-29 2019-08-08 株式会社東芝 Storage battery management device, storage battery management method and storage battery management program
JP2019213364A (en) 2018-06-06 2019-12-12 株式会社東芝 Storage battery management device, storage battery management method and storage battery management program
JP2020137368A (en) 2019-02-25 2020-08-31 日本電気株式会社 Upper-level device, control device, terminal device, charge/discharge control system, storage battery group supervision control system, control method and program
JP2021184682A (en) 2020-05-22 2021-12-02 株式会社東芝 Storage battery management device, storage battery management method, and storage battery management program

Also Published As

Publication number Publication date
JPWO2023152820A1 (en) 2023-08-17
WO2023152820A1 (en) 2023-08-17

Similar Documents

Publication Publication Date Title
Alam et al. An optimal P2P energy trading model for smart homes in the smart grid
JP2022130284A (en) Risk restriction optimization of virtual power plant in pool and futures market
KR101975175B1 (en) Appartus for scheduling of power demand-supply operation and method thereof
JP2011503713A (en) Resource allocation forecasting and management according to service level agreements
JP7403264B2 (en) Energy management system, integrated management device and energy management method
JP7435628B2 (en) Control devices, power conditioning systems, distributed power systems, power control systems, control methods and programs
JP7345331B2 (en) Bidding plan determining device and bidding plan determining method
WO2017170018A1 (en) Power control device, power control method, and program
Yao et al. Cutting your cloud computing cost for deadline-constrained batch jobs
JP2023054543A (en) power trading device
JP7377392B1 (en) Apparatus, method and program
US12176712B2 (en) Power management system, power demand-supply management apparatus, and power demand-supply management method
JP7724447B2 (en) Power procurement profit and loss estimation device and power procurement profit and loss estimation method
JP7715219B2 (en) Planning device, planning method, and program
JP7630299B2 (en) SUPPLY AND DEMAND MANAGEMENT DEVICE, TRADING SUPPORT DEVICE, SUPPLY AND DEMAND MANAGEMENT METHOD, AND SUPPLY AND DEMAND MANAGEMENT PROGRAM
JP7363924B2 (en) Service management equipment, power conditioning systems, distributed power systems, power control systems and programs
WO2021132580A1 (en) Electric power management system, and electric power management method
KR102840407B1 (en) System for Transacting P2P Energy to Minimize Uncertainty Cost and Energy Cost
KR20210071583A (en) A system and method for determining optimum development bid amount using cluster
US20230216298A1 (en) Transactive energy system and method
JP7591213B1 (en) Electricity bidding support device, electricity bidding support method, and electricity bidding support program
JP7848600B2 (en) Control device, control method, and program
JP7166242B2 (en) Power transaction contract calculation device and power transaction contract calculation method
JP7486653B1 (en) Apparatus, method and program
JP7806744B2 (en) power management device

Legal Events

Date Code Title Description
A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240730

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240730

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20250325

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20250523

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20250617

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250630

R150 Certificate of patent or registration of utility model

Ref document number: 7715219

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150