JP7752666B2 - Display device, display method, and program - Google Patents
Display device, display method, and programInfo
- Publication number
- JP7752666B2 JP7752666B2 JP2023172907A JP2023172907A JP7752666B2 JP 7752666 B2 JP7752666 B2 JP 7752666B2 JP 2023172907 A JP2023172907 A JP 2023172907A JP 2023172907 A JP2023172907 A JP 2023172907A JP 7752666 B2 JP7752666 B2 JP 7752666B2
- Authority
- JP
- Japan
- Prior art keywords
- operating
- plant
- operating conditions
- conditions
- introduction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Economics (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Health & Medical Sciences (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Automation & Control Theory (AREA)
- Marketing (AREA)
- Primary Health Care (AREA)
- Public Health (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Testing And Monitoring For Control Systems (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Executing Machine-Instructions (AREA)
- Debugging And Monitoring (AREA)
- Selective Calling Equipment (AREA)
Description
本発明は、表示装置、表示方法およびプログラムに関する。 The present invention relates to a display device, a display method, and a program.
プラントの設計や開発においては、各設備の特性を示す特性関数などからなる計算機モデルを用いてプラントの挙動を推定するアプリケーション(プログラム)が用いられている(例えば、特許文献1を参照)。特許文献1に記載されているエネルギー変動費推定プログラムによれば、施設属性に依らず、他の様々な施設のデータを用いずに、対象施設の特性が変化したときも、対象施設のデータを使用して省エネ対策後の期間に省エネ対策を実施しなかった場合のエネルギー変動費を推定することができる。
なお、特許文献1に記載されているエネルギー変動費推定プログラムでは、例えば、プラントが時間的に後先する2つの期間で稼動されたとき、後の期間において先の期間の稼動条件でプラントを稼動すると仮定するときのエネルギー変動費が推定される。
In the design and development of plants, applications (programs) are used that estimate the behavior of the plant using a computer model consisting of characteristic functions that indicate the characteristics of each piece of equipment, etc. (See, for example, Patent Document 1.) The variable energy cost estimation program described in Patent Document 1 makes it possible to estimate the variable energy costs that would be incurred if no energy-saving measures were implemented in a period after the implementation of the energy-saving measures, using data on the target facility, regardless of facility attributes and without using data on various other facilities, even when the characteristics of the target facility have changed.
In addition, the variable energy cost estimation program described in Patent Document 1 estimates the variable energy costs, for example, when a plant is operated in two periods, one after the other, assuming that the plant is operated in the latter period under the operating conditions of the former period.
上述したように、特許文献1に記載されているエネルギー変動費推定プログラムでは、後の期間において先の期間の稼動条件でプラントを稼動すると仮定するときのエネルギー変動費が推定される。そのため、プラントの稼動条件(運転条件)を変化させた前後で、コスト削減などの効果を適切に比較することができない場合があるという課題があった。 As mentioned above, the variable energy cost estimation program described in Patent Document 1 estimates variable energy costs in a later period assuming that the plant will be operated under the operating conditions of the earlier period. This poses a problem in that it may not be possible to properly compare the effects of cost reductions and the like before and after changing the plant's operating conditions (operating conditions).
本発明は、上記の事情に鑑みてなされたものであり、プラントの運転条件を変化させた場合の効果を定量的に比較することができる運転比較装置、運転比較方法およびプログラムを提供することを目的とする。 The present invention was made in consideration of the above circumstances, and aims to provide an operation comparison device, an operation comparison method, and a program that can quantitatively compare the effects of changing plant operating conditions.
本発明の第1の態様によれば、運転比較装置は、プラントに係る複数の運転条件のうち満たすべき条件である要求条件の入力を受け付ける条件入力部と、複数のアルゴリズムに基づいて、前記要求条件を満たす複数の運転条件を算出する運転条件算出部と、前記複数の運転条件を提示する提示部とを備える。 According to a first aspect of the present invention, the operation comparison device includes a condition input unit that accepts input of required conditions, which are conditions that must be satisfied among multiple operating conditions related to the plant; an operating condition calculation unit that calculates multiple operating conditions that satisfy the required conditions based on multiple algorithms; and a presentation unit that presents the multiple operating conditions.
本発明の第2の態様によれば、第1の態様に係る運転比較装置において、前記複数のアルゴリズムは、前記プラントの挙動を模擬するプラントモデルに基づくシミュレーションによって前記運転条件を算出するアルゴリズムと、前記プラントの過去の運転に基づいて前記運転条件を算出するアルゴリズムとを含むものであってよい。 According to a second aspect of the present invention, in the operation comparison device according to the first aspect, the plurality of algorithms may include an algorithm that calculates the operating conditions by simulation based on a plant model that simulates the behavior of the plant, and an algorithm that calculates the operating conditions based on past operation of the plant.
本発明の第3の態様によれば、第1または第2の態様に係る運転比較装置において、前記複数のアルゴリズムは、前記プラントの挙動を模擬するプラントモデルに基づくシミュレーションによって前記運転条件を算出する運転条件提案プログラムの導入前の前記プラントの過去の運転に基づいて前記運転条件を算出するアルゴリズムと、前記運転条件提案プログラムの導入後の前記プラントの過去の運転に基づいて前記運転条件を算出するアルゴリズムとを含むものであってよい。 According to a third aspect of the present invention, in the operation comparison device according to the first or second aspect, the plurality of algorithms may include an algorithm that calculates the operating conditions based on past operation of the plant before the introduction of an operating condition proposal program that calculates the operating conditions through a simulation based on a plant model that simulates the behavior of the plant, and an algorithm that calculates the operating conditions based on past operation of the plant after the introduction of the operating condition proposal program.
本発明の第4の態様によれば、第2または第3の態様に係る運転比較装置において、前記プラントの過去の運転に基づいて前記運転条件を算出するアルゴリズムは、前記プラントの過去の運転に係る運転条件を学習用データセットとして学習された学習モデルを用いるアルゴリズムであるものであってよい。 According to a fourth aspect of the present invention, in the operation comparison device according to the second or third aspect, the algorithm for calculating the operating conditions based on the past operation of the plant may be an algorithm that uses a learning model trained using the operating conditions related to the past operation of the plant as a learning data set.
本発明の第5の態様によれば、プログラムは、プラントに係る複数の運転条件のうち満たすべき条件である要求条件の入力を受け付けるステップと、複数のアルゴリズムに基づいて、前記要求条件を満たす複数の運転条件を算出するステップと、前記複数の運転条件を提示するステップとをコンピュータに実行させる。 According to a fifth aspect of the present invention, the program causes a computer to execute the steps of accepting input of required conditions, which are conditions that must be satisfied among a plurality of operating conditions related to a plant; calculating a plurality of operating conditions that satisfy the required conditions based on a plurality of algorithms; and presenting the plurality of operating conditions.
本発明の第6の態様によれば、表示装置は、プラントに係る複数の運転条件のうち満たすべき条件である要求条件の入力を受け付ける条件入力部と、前記プラントの挙動を模擬するプラントモデルに基づくシミュレーションによって前記運転条件を算出する運転条件提案プログラムの導入前の前記プラントの過去の運転に基づいて算出した前記運転条件と、前記運転条件提案プログラムの導入後の前記プラントの過去の運転に基づいて算出した前記運転条件とを提示する提示部と、を備える。 According to a sixth aspect of the present invention, the display device includes a condition input unit that accepts input of required conditions, which are conditions that must be satisfied among a plurality of operating conditions related to the plant, and a presentation unit that presents the operating conditions calculated based on past operation of the plant before the introduction of an operating condition proposal program that calculates the operating conditions through a simulation based on a plant model that simulates the behavior of the plant, and the operating conditions calculated based on past operation of the plant after the introduction of the operating condition proposal program.
本発明の第7の態様によれば、表示方法は、プラントに係る複数の運転条件のうち満たすべき条件である要求条件の入力を受け付けるステップと、前記プラントの挙動を模擬するプラントモデルに基づくシミュレーションによって前記運転条件を算出する運転条件提案プログラムの導入前の前記プラントの過去の運転に基づいて算出した前記運転条件と、前記運転条件提案プログラムの導入後の前記プラントの過去の運転に基づいて算出した前記運転条件とを提示するステップとを含む。 According to a seventh aspect of the present invention, a display method includes a step of accepting input of required conditions, which are conditions that must be satisfied from among a plurality of operating conditions related to a plant, and a step of presenting the operating conditions calculated based on past operation of the plant before the introduction of an operating condition proposal program that calculates the operating conditions by simulation based on a plant model that simulates the behavior of the plant, and the operating conditions calculated based on past operation of the plant after the introduction of the operating condition proposal program.
本発明の第8の態様によれば、プログラムは、プラントに係る複数の運転条件のうち満たすべき条件である要求条件の入力を受け付けるステップと、前記プラントの挙動を模擬するプラントモデルに基づくシミュレーションによって前記運転条件を算出する運転条件提案プログラムの導入前の前記プラントの過去の運転に基づいて算出した前記運転条件と、前記運転条件提案プログラムの導入後の前記プラントの過去の運転に基づいて算出した前記運転条件とを提示するステップと、をコンピュータに実行させる。 According to an eighth aspect of the present invention, the program causes a computer to execute the following steps: accepting input of required conditions, which are conditions that must be satisfied among a plurality of operating conditions related to a plant; and presenting the operating conditions calculated based on past operation of the plant before the introduction of an operating condition proposal program that calculates the operating conditions through a simulation based on a plant model that simulates the behavior of the plant, and the operating conditions calculated based on past operation of the plant after the introduction of the operating condition proposal program.
本発明のいずれか1つの態様によれば、プラントの運転条件(要求条件)を変化させた場合の効果を定量的に比較することができる。 According to any one aspect of the present invention, it is possible to quantitatively compare the effects of changing the plant's operating conditions (required conditions).
〈第1の実施形態〉
図1は、第1の実施形態に係る運転比較装置の構成例を示すブロック図である。図2は、第1の実施形態に係るコジェネレーションシステムの構成例を示す模式図である。本実施形態に係るコジェネレーションシステム2のオペレーティングには、運転要求を満たす各プラントの運転条件を提案する運転条件提案プログラムが導入されている。運転条件の例としては、コジェネレーションシステム2における蒸気発生設備の負荷や発電設備の負荷、外部から受電する受電電力量などが挙げられる。操作者は、運転条件提案プログラムによって計算された運転条件を参考にして、各プラントの操作を行う。
First Embodiment
FIG. 1 is a block diagram showing an example of the configuration of an operation comparison device according to the first embodiment. FIG. 2 is a schematic diagram showing an example of the configuration of a cogeneration system according to the first embodiment. An operating condition proposal program that proposes operating conditions for each plant that satisfy operating requirements is installed in the operation of the cogeneration system 2 according to this embodiment. Examples of operating conditions include the load on the steam generation equipment and the load on the power generation equipment in the cogeneration system 2, and the amount of power received from outside. The operator operates each plant with reference to the operating conditions calculated by the operating condition proposal program.
図1に示す運転比較装置1は、運転条件提案プログラムによって提案されるコジェネレーションシステム2の運転条件を、運転条件提案プログラムの導入前の運転方針に従った運転条件と比較する装置であって、サーバー、パーソナルコンピュータなどのコンピュータを用いて構成される。すなわち、コジェネレーションシステム2の操作者は、運転比較装置1が提示する情報を参照することで、運転条件提案プログラムが提案する運転条件の妥当性を定量的に認識することができる。 The operation comparison device 1 shown in Figure 1 is a device that compares the operating conditions of the cogeneration system 2 proposed by the operating condition proposal program with the operating conditions in accordance with the operating policy before the operating condition proposal program was introduced, and is configured using a computer such as a server or personal computer. In other words, by referring to the information presented by the operation comparison device 1, the operator of the cogeneration system 2 can quantitatively recognize the validity of the operating conditions proposed by the operating condition proposal program.
《コジェネレーションシステムの構成》
まず、図2に示すコジェネレーションシステム2の構成例について説明する。図2は、2つのプラント20とプラント30に設置されている蒸気や電力を発生する各設備などをコジェネレーションシステム2として示す。プラント20とプラント30へは燃料41が配管42を介して供給される。プラント20は、第1ボイラー24および第2ボイラー25と、ガスタービンGT(以下、単にGTともいう)と、背圧タービンBT(以下、単にBTともいう)を備える。プラント20では、第1ボイラー24と、第2ボイラー25と、背圧タービンBTと、ガスタービンGTとを用いて発生したHP(高圧)プロセス蒸気51と、MP(中圧)プロセス蒸気52と、LP(低圧)プロセス蒸気53と、電力(送電54)を、プラント20あるいはプラント30内の図示していない他の設備などへ供給する。また、プラント30は、2つの第3ボイラー31および第4ボイラー32と、2つの復水タービンCT1(以下、単にCT1ともいう)および復水タービンCT2(以下、単にCT2ともいう)を備える。プラント30では、第3ボイラー31と、第4ボイラー32と、復水タービンCT1と、復水タービンCT2とを用いて発生したHPプロセス蒸気51と電力(送電54)を、プラント30あるいはプラント20内の図示していない他の設備などへ供給する。なお、プラント20およびプラント30は、電力会社などの外部から供給された電力も受電55することができる。なお、復水タービンCT1およびCT2の少なくとも一方の抽気が、MPプロセス蒸気52やLPプロセス蒸気53に供給されてもよい。
<<Configuration of a cogeneration system>>
First, an example configuration of a cogeneration system 2 shown in Fig. 2 will be described. Fig. 2 illustrates the cogeneration system 2 as each of the facilities for generating steam and electricity installed in two plants 20 and 30. Fuel 41 is supplied to the plants 20 and 30 via piping 42. The plant 20 includes a first boiler 24, a second boiler 25, a gas turbine GT (hereinafter simply referred to as GT), and a back-pressure turbine BT (hereinafter simply referred to as BT). In the plant 20, HP (high-pressure) process steam 51, MP (medium-pressure) process steam 52, LP (low-pressure) process steam 53, and electricity (power transmission 54) generated using the first boiler 24, the second boiler 25, the back-pressure turbine BT, and the gas turbine GT are supplied to other facilities, not shown, within the plant 20 or the plant 30. The plant 30 also includes two boilers, a third boiler 31 and a fourth boiler 32, and two condensing turbines CT1 (hereinafter simply referred to as CT1) and CT2 (hereinafter simply referred to as CT2). In the plant 30, HP process steam 51 and electric power (electric power transmission 54) generated using the third boiler 31, the fourth boiler 32, the condensing turbine CT1, and the condensing turbine CT2 are supplied to the plant 30 or other facilities (not shown) within the plant 20. The plants 20 and 30 can also receive electric power 55 supplied from an external source, such as an electric power company. Steam extracted from at least one of the condensing turbines CT1 and CT2 may be supplied as MP process steam 52 or LP process steam 53.
なお、運転比較装置1は、図2に示すようなコジェネレーションシステムに限らず、発電設備または発電設備と蓄電設備などから構成される発電システムなどを計算対象とすることができる。また、スチームタービン(以下、STともいう)による発電設備や、太陽光発電設備、風力発電設備、水力発電設備などを計算対象とすることができる。 The operation comparison device 1 is not limited to cogeneration systems such as those shown in Figure 2, and can also be used to calculate power generation systems consisting of power generation equipment or power generation equipment and storage equipment. It can also be used to calculate power generation equipment using steam turbines (hereinafter also referred to as STs), solar power generation equipment, wind power generation equipment, hydroelectric power generation equipment, etc.
《運転比較装置の構成》
図1において、運転比較装置1は、運転比較装置1を構成するコンピュータが有するハードウェアとプログラム、データなどのソフトウェアとの組み合わせから構成される機能的要素として、条件入力部11と、提案運転条件算出部12と、過去運転条件算出部13と、提示部14と、記憶部19とを備える。記憶部19は、プラントモデル16と、運転再現モデル17と、学習用データセット18とを記憶する。運転再現モデル17は、プラントの過去の実際の運転条件の値を学習用データセット18として学習した学習済みモデルであって、導入前モデル171と、導入後モデル172を含む。
<Configuration of operation comparison device>
1 , the operation comparison device 1 includes a condition input unit 11, a proposed operating condition calculation unit 12, a past operating condition calculation unit 13, a presentation unit 14, and a storage unit 19 as functional elements configured from a combination of hardware and software such as programs and data possessed by a computer constituting the operation comparison device 1. The storage unit 19 stores a plant model 16, an operation reproduction model 17, and a learning dataset 18. The operation reproduction model 17 is a trained model that has trained values of past actual operating conditions of the plant as the training dataset 18, and includes a pre-introduction model 171 and a post-introduction model 172.
条件入力部11は、計算対象のプラントの要求条件15の入力を受け付ける。プラントの要求条件15は、図2に示すプラント20およびプラント30のような計算対象とするプラントの要求条件(デマンド(需要)条件や各設備の制約条件など)を示すデータであり、例えば、電力デマンド(図2の送電54に対応する)の値、蒸気デマンド(図2のHPプロセス蒸気51、MPプロセス蒸気52およびLPプロセス蒸気53に対応する)の値、受電電力(図2の受電55に対応する)の値や、BT、ST、CTなどの運用制限値、送電や受電の運用制限値、気象条件、燃料や電力の単価などを含む。すなわち、要求条件15は、プラントの運転条件のうち、制約として与えられるものである。 The condition input unit 11 accepts input of the required conditions 15 for the plant being calculated. The required conditions 15 for the plant are data indicating the required conditions (such as demand conditions and constraints for each piece of equipment) for the plant being calculated, such as plant 20 and plant 30 shown in FIG. 2. For example, the required conditions 15 include the value of power demand (corresponding to power transmission 54 in FIG. 2), the value of steam demand (corresponding to HP process steam 51, MP process steam 52, and LP process steam 53 in FIG. 2), the value of received power (corresponding to power reception 55 in FIG. 2), operational limit values for BT, ST, CT, etc., operational limit values for power transmission and reception, weather conditions, and unit prices of fuel and electricity. In other words, the required conditions 15 are given as constraints on the plant's operating conditions.
提案運転条件算出部12は、運転条件提案プログラムによって要求条件15を満たす運転条件を計算する。具体的には、提案運転条件算出部12は、プラントの挙動を模擬するプラントモデル16に基づくシミュレーションによって、要求条件15を満たすプラントの運転条件を算出する。なお、プラントモデル16は、プラントの挙動を模擬するモデル(シミュレーションモデル)である。 The proposed operating condition calculation unit 12 calculates operating conditions that satisfy the required conditions 15 using an operating condition proposal program. Specifically, the proposed operating condition calculation unit 12 calculates plant operating conditions that satisfy the required conditions 15 through a simulation based on a plant model 16 that simulates the behavior of the plant. The plant model 16 is a model (simulation model) that simulates the behavior of the plant.
過去運転条件算出部13は、運転再現モデル17に、評価しようとする要求条件を入力することで、プラントの過去の運転方針に基づく運転条件を算出する。運転再現モデル17は過去の運転方針を再現する学習モデルであり、運転再現モデル17を用いることで、評価しようとする要求条件において、過去の運転方針ではどのようにプラントの運転条件が設定されていたのかを推定することができる。 The past operating condition calculation unit 13 calculates operating conditions based on the plant's past operating policies by inputting the required conditions to be evaluated into the operation reproduction model 17. The operation reproduction model 17 is a learning model that reproduces past operating policies, and by using the operation reproduction model 17, it is possible to estimate how the plant's operating conditions would have been set under past operating policies for the required conditions to be evaluated.
なお、運転再現モデル17が含む導入前モデル171は、運転条件提案プログラムを導入する前の過去の運転条件の値を学習用データセット18として学習された学習済みモデルである。また、導入後モデル172は、運転条件提案プログラムを導入した後の過去の運転条件を学習用データセット18として学習された学習済みモデルである。例えば、導入前モデル171は、運転条件提案プログラムが導入されるより前の過去の運転実績に基づく学習モデルであり、導入後モデル172は、例えば運転条件提案プログラムが導入された後から現在までの過去の運転実績に基づく学習モデルである。 The pre-introduction model 171 included in the driving reproduction model 17 is a trained model trained using the values of past driving conditions before the driving condition proposal program was introduced as the training dataset 18. The post-introduction model 172 is a trained model trained using the values of past driving conditions after the driving condition proposal program was introduced as the training dataset 18. For example, the pre-introduction model 171 is a trained model based on past driving performance before the driving condition proposal program was introduced, and the post-introduction model 172 is a trained model based on past driving performance from the time the driving condition proposal program was introduced to the present.
すなわち、過去運転条件算出部13は、導入前モデル171に要求条件を入力することで、導入前運転条件を算出するとともに、導入後モデル172に要求条件を入力することで導入後運転条件を算出する。導入前モデル171を用いることで、評価しようとする要求条件において、例えば運転条件提案プログラムが導入されるより前の過去の運転方針ではどのように運転条件が設定されていたのかを推定することができる。また、導入後モデル172を用いることで、評価しようとする要求条件において、運転条件提案プログラムが導入された後の運転方針では、どのように運転条件が設定されていたのかを推定することができる。すなわち、利用者は、導入前運転条件と導入後運転条件とを比較することで、運転条件提案プログラムの導入によってプラントの運転がどのように変化したかを認識することができる。 That is, the past operating condition calculation unit 13 calculates pre-introduction operating conditions by inputting required conditions into the pre-introduction model 171, and calculates post-introduction operating conditions by inputting required conditions into the post-introduction model 172. By using the pre-introduction model 171, it is possible to estimate how operating conditions were set under past operating policies, for example, before the operation condition proposal program was introduced, for the required conditions to be evaluated. Furthermore, by using the post-introduction model 172, it is possible to estimate how operating conditions were set under operating policies after the operation condition proposal program was introduced, for the required conditions to be evaluated. In other words, by comparing the pre-introduction operating conditions with the post-introduction operating conditions, the user can recognize how plant operation has changed due to the introduction of the operation condition proposal program.
提示部14は、提案運転条件算出部12が算出した(運転条件提案プログラムによって提案された)運転条件、ならびに過去運転条件算出部13が算出した導入前運転条件および導入後運転条件とに基づく情報を提示する。利用者は、運転条件提案プログラムによって提案された運転条件と導入前運転条件とを比較することで、運転条件提案プログラムの妥当性を定量的に評価することができる。また利用者は、導入前運転条件と導入後運転条件とを比較することで、運転条件提案プログラムを導入する前と後でプラントの運転がどのように変化したかを定量的に評価することができる。また利用者は、運転条件提案プログラムによって提案された運転条件と導入後運転条件とを比較することで、運転条件提案プログラムの導入後のプラントの運転方針の妥当性を定量的に評価することができる。なお、操作者は、運転条件提案プログラムによって提示された運転条件を参照するが、提示された運転条件と異なる条件で操作してもよい。そのため、提案運転条件算出部12によって算出された運転条件と、導入後モデル172に基づいて過去運転条件算出部13が算出する過去運転条件とは異なる可能性がある。 The presentation unit 14 presents information based on the operating conditions calculated by the proposed operating condition calculation unit 12 (proposed by the operating condition proposal program) and the pre-introduction operating conditions and post-introduction operating conditions calculated by the past operating condition calculation unit 13. By comparing the operating conditions proposed by the operating condition proposal program with the pre-introduction operating conditions, the user can quantitatively evaluate the validity of the operating condition proposal program. By comparing the pre-introduction operating conditions with the post-introduction operating conditions, the user can quantitatively evaluate how the plant's operation has changed before and after the introduction of the operating condition proposal program. By comparing the operating conditions proposed by the operating condition proposal program with the post-introduction operating conditions, the user can quantitatively evaluate the validity of the plant's operating policy after the introduction of the operating condition proposal program. Note that while the operator references the operating conditions presented by the operating condition proposal program, the operator may operate under conditions different from the presented operating conditions. Therefore, the operating conditions calculated by the proposed operating condition calculation unit 12 may differ from the past operating conditions calculated by the past operating condition calculation unit 13 based on the post-introduction model 172.
図3は、第1の実施形態における運転比較装置1のデータの入出力関係の例を示す模式図である。運転比較装置1は、インプット110として、要求条件15および学習用データセット18の入力を受け付ける。図3に示す例では、運転比較装置1は、要求条件15として、電力デマンド111、蒸気デマンド(HP/MP/LP)112、受電/送電電力113、BT/ST/GT等の運用制限114、送電・受電の運用制限115の入力を受け付ける。なお、要求条件15のうち受電/送電電力113は任意条件である。また運転比較装置1は、学習用データセット18として、過去の運転条件117の入力を受け付ける。
また、運転比較装置1は、アウトプット120として、運転条件120aおよび過去運転条件120bを出力する。運転条件120aおよび過去運転条件120bは、ボイラー負荷121、GT負荷122、BT負荷123、CT負荷124、受電/送電電力125、燃料費等126を含む。なお、受電/送電電力125は、要求条件15として受電/送電電力113が設定されない場合に計算される。
FIG. 3 is a schematic diagram showing an example of the input/output relationship of data of the operation comparison device 1 in the first embodiment. The operation comparison device 1 accepts input of required conditions 15 and a learning dataset 18 as input 110. In the example shown in FIG. 3, the operation comparison device 1 accepts input of power demand 111, steam demand (HP/MP/LP) 112, receiving/transmitting power 113, operation restrictions 114 such as BT/ST/GT, and operation restrictions 115 for transmitting and receiving power as required conditions 15. Note that, of the required conditions 15, the receiving/transmitting power 113 is an optional condition. The operation comparison device 1 also accepts input of past operating conditions 117 as the learning dataset 18.
The operation comparison device 1 also outputs operating conditions 120a and past operating conditions 120b as output 120. The operating conditions 120a and past operating conditions 120b include a boiler load 121, a GT load 122, a BT load 123, a CT load 124, received/transmitted power 125, and fuel costs, etc. 126. The received/transmitted power 125 is calculated when the received/transmitted power 113 is not set as the required condition 15.
提案運転条件算出部12は、運転条件提案プログラムPに従って、電力デマンド111、蒸気デマンド(HP/MP/LP)112、受電/送電電力113、BT/ST/GT等の運用制限114、送電・受電の運用制限115を満たすボイラー負荷121、GT負荷122、BT負荷123、CT負荷124、受電/送電電力125、燃料費等126を算出する。
また、過去運転条件算出部13は、運転再現モデル17に、電力デマンド111、蒸気デマンド(HP/MP/LP)112、受電/送電電力113、BT/ST/GT等の運用制限114、送電・受電の運用制限115を入力することで、ボイラー負荷121、GT負荷122、BT負荷123、CT負荷124、受電/送電電力125、燃料費等126を算出する。
The proposed operating conditions calculation unit 12 calculates, in accordance with the operating conditions proposal program P, a power demand 111, a steam demand (HP/MP/LP) 112, a received/transmitted power 113, a boiler load 121, a GT load 122, a BT load 123, a CT load 124, a received/transmitted power 125, and fuel costs, etc. 126 that satisfy an operational limit 114 of BT/ST/GT, etc., and an operational limit 115 of power transmission and receiving.
In addition, the past operating condition calculation unit 13 inputs power demand 111, steam demand (HP/MP/LP) 112, receiving/transmitting power 113, operational restrictions 114 of BT/ST/GT, etc., and operational restrictions 115 of transmitting and receiving power into the operation reproduction model 17, thereby calculating a boiler load 121, a GT load 122, a BT load 123, a CT load 124, receiving/transmitting power 125, and fuel costs, etc. 126.
《運転比較装置の動作》
次に、図1に示す運転比較装置1の動作例について説明する。図4は、第1の実施形態に係る運転比較装置1の動作例を示すフローチャートである。
運転比較装置1の条件入力部11は、利用者から要求条件の入力を受け付ける(ステップS101)。利用者は、複数の運転条件の中から任意の項目を要求条件として入力する。
要求条件が入力されると、提案運転条件算出部12は、受け付けた要求条件に基づいて、運転条件提案プログラムに従って運転条件を計算する(ステップS102)。
<<Operation of the Operation Comparison Device>>
Next, an example of the operation of the operation comparison device 1 shown in Fig. 1 will be described. Fig. 4 is a flowchart showing an example of the operation of the operation comparison device 1 according to the first embodiment.
The condition input unit 11 of the operation comparison device 1 receives input of required conditions from a user (step S101). The user inputs any item from among a plurality of operating conditions as the required condition.
When the required conditions are input, the proposed operating conditions calculation unit 12 calculates the operating conditions based on the received required conditions in accordance with the operating conditions proposal program (step S102).
他方、過去運転条件算出部13は、ステップS101で入力を受け付けた要求条件に基づいて、導入前モデル171を構築する(ステップS103)。すなわち、過去運転条件算出部13は、運転条件提案プログラムを導入する前のプラントの過去の運転条件の値のうち、ステップS101で要求条件として指定されたものを入力サンプルとし、他の運転条件を出力サンプルとする学習用データセット18を用いて、導入前モデル171を学習させる。過去運転条件算出部13は、ステップS101で入力された要求条件を、導入前モデル171に入力することで、導入前運転条件を計算する(ステップS104)。 On the other hand, the past operating condition calculation unit 13 constructs a pre-introduction model 171 based on the required conditions input in step S101 (step S103). That is, the past operating condition calculation unit 13 trains the pre-introduction model 171 using a learning dataset 18 in which, among the values of the plant's past operating conditions before the introduction of the operating condition proposal program, those specified as required conditions in step S101 are used as input samples, and other operating conditions are used as output samples. The past operating condition calculation unit 13 calculates the pre-introduction operating conditions by inputting the required conditions input in step S101 into the pre-introduction model 171 (step S104).
過去運転条件算出部13は、ステップS101で入力を受け付けた要求条件に基づいて、導入後モデル172を構築する(ステップS105)。すなわち、過去運転条件算出部13は、運転条件提案プログラムを導入した後のプラントの過去の運転条件の値のうち、ステップS101で要求条件として指定されたものを入力サンプルとし、他の運転条件を出力サンプルとする学習用データセット18を用いて、導入後モデル172を学習させる。過去運転条件算出部13は、ステップS101で入力された要求条件を、導入後モデル172に入力することで、導入後運転条件を計算する(ステップS106)。 The past operating condition calculation unit 13 constructs the post-introduction model 172 based on the required conditions input in step S101 (step S105). That is, the past operating condition calculation unit 13 trains the post-introduction model 172 using a learning dataset 18 in which, among the values of the plant's past operating conditions after the introduction of the operating condition proposal program, those specified as required conditions in step S101 are used as input samples, and other operating conditions are used as output samples. The past operating condition calculation unit 13 calculates the post-introduction operating conditions by inputting the required conditions input in step S101 into the post-introduction model 172 (step S106).
提示部14は、ステップS102、ステップS104、およびステップS106の計算結果を比較できる形態で提示する(ステップS107)。 The presentation unit 14 presents the calculation results of steps S102, S104, and S106 in a form that allows comparison (step S107).
《提示例》
ここで、図5と図6を参照して、提示部14による情報の提示例について説明する。図5は、第1の実施形態に係る条件入力部と提示部の動作例を説明するための模式図である。図5は、表示装置の表示画面や印刷装置による印刷紙面における提示部14による出力例である。図6は、第1の実施形態に係る提示部の動作例を説明するための模式図である。
<<Example of presentation>>
Here, an example of information presentation by the presentation unit 14 will be described with reference to Fig. 5 and Fig. 6. Fig. 5 is a schematic diagram for explaining an example of the operation of the condition input unit and the presentation unit according to the first embodiment. Fig. 5 shows an example of output by the presentation unit 14 on a display screen of a display device or on a printed page by a printing device. Fig. 6 is a schematic diagram for explaining an example of the operation of the presentation unit according to the first embodiment.
図5に示す例においては、ステップS1の入力により、要求条件の一例として、電力デマンド85MW、SH送気デマンド125(t/h)、SM送気デマンド100(t/h)、SL送気デマンド25(t/h)、ボイラ運転負荷上限100(%)、BT運転負荷上限100(%)、GT運転負荷上限100(%)、CT1運転負荷上限100(%)、CT2運転負荷上限100(%)、大気温度25(℃)、および降水量0(mm)が設定されている。すなわち、図5において、項番「1」~「4」の行における「要求条件」の列の値が、条件入力部11が受け付けたプラントの運転条件15に対応する。
これに対し、図5において、運転条件提案プログラムによって計算された要求条件を満足する提示運転条件(例えば、推奨運転点)の一例として、受電電力8(MW)、第1ボイラー負荷25(t/h)、第2ボイラー負荷 0(t/h)、第3ボイラー負荷 305(t/h)、第4ボイラー負荷 305(t/h)、BT負荷 3(MW)、GT負荷 17.5(MW)、CT1負荷 21(MW)、CT2負荷 35(MW)、燃料費が17%低減したことが表示される。
5, the following are set as examples of required conditions through the input in step S1: power demand 85 MW, SH air supply demand 125 (t/h), SM air supply demand 100 (t/h), SL air supply demand 25 (t/h), boiler operating load upper limit 100 (%), BT operating load upper limit 100 (%), GT operating load upper limit 100 (%), CT1 operating load upper limit 100 (%), CT2 operating load upper limit 100 (%), atmospheric temperature 25 (°C), and precipitation amount 0 (mm). That is, in FIG. 5, the values in the "required conditions" column in the rows with item numbers "1" to "4" correspond to the plant operating conditions 15 received by the condition input unit 11.
In contrast to this, in FIG. 5, examples of proposed operating conditions (for example, recommended operating points) that satisfy the required conditions calculated by the operating condition proposal program are displayed as follows: received power 8 (MW), first boiler load 25 (t/h), second boiler load 0 (t/h), third boiler load 305 (t/h), fourth boiler load 305 (t/h), BT load 3 (MW), GT load 17.5 (MW), CT1 load 21 (MW), CT2 load 35 (MW), and a 17% reduction in fuel costs.
また、図5において、「導入前運転条件」の列には、運転条件提案プログラム導入前の過去運転条件のデータが表示される。また、「導入後運転条件」の列には、運転条件提案プログラム導入後の過去運転条件のデータが表示される。 In addition, in Figure 5, the "Operating conditions before installation" column displays data on past operating conditions before the installation of the operating condition proposal program. In addition, the "Operating conditions after installation" column displays data on past operating conditions after the installation of the operating condition proposal program.
一方、図6に示す例では、提示部14は、図2を参照して説明したコジェネレーションシステム2の構成を示す画像に対して、例えば吹き出しG11~G17として、現状運転条件(例えば、推奨運転点)に基づく情報を提示する。 On the other hand, in the example shown in Figure 6, the presentation unit 14 presents information based on the current operating conditions (e.g., recommended operating points) as speech bubbles G11 to G17, for example, on an image showing the configuration of the cogeneration system 2 described with reference to Figure 2.
《作用・効果》
以上のように、本実施形態によれば、提示部14が、2つ以上の異なる運転方針に基づく運転条件を計算し、これらを提示する。これにより、運転比較装置1は、プラントの要求条件を変化させた場合における運転方針による運転条件の違いをリアルタイムかつ定量的に比較することができる。
<Actions and Effects>
As described above, according to this embodiment, the presentation unit 14 calculates and presents operating conditions based on two or more different operating policies, allowing the operation comparison device 1 to quantitatively compare differences in operating conditions between operating policies in real time when the required conditions of the plant are changed.
本実施形態によれば、提示部14は、運転条件提案プログラムによって提案された提案運転条件と導入前運転条件とを提示する。これにより利用者は、提案運転条件と導入前運転条件とを比較することで、運転条件提案プログラムの妥当性を定量的に評価することができる。
また本実施形態によれば、提示部14は、導入前運転条件と導入後運転条件とを提示する。これにより利用者は、運転条件提案プログラムを導入する前と後でプラントの運転がどのように変化したかを定量的に評価することができる。
また本実施形態によれば、提示部14は、運転条件提案プログラムによって提案された提案運転条件と導入後運転条件とを提示する。これにより利用者は、運転条件提案プログラムの導入後のプラントの運転方針の妥当性を定量的に評価することができる。
According to this embodiment, the presentation unit 14 presents the proposed operating conditions proposed by the operating condition proposal program and the pre-introduction operating conditions, thereby enabling the user to quantitatively evaluate the validity of the operating condition proposal program by comparing the proposed operating conditions with the pre-introduction operating conditions.
According to the present embodiment, the presentation unit 14 presents the pre-installation operating conditions and the post-installation operating conditions, thereby enabling the user to quantitatively evaluate how the plant operation has changed before and after the installation of the operating condition proposal program.
According to the present embodiment, the presentation unit 14 presents the proposed operating conditions proposed by the operating condition proposal program and the post-installation operating conditions, thereby enabling the user to quantitatively evaluate the validity of the plant operation policy after the installation of the operating condition proposal program.
以上、この発明の実施形態について図面を参照して説明してきたが、具体的な構成は上記実施形態に限られるものではなく、この発明の要旨を逸脱しない範囲の設計変更等も含まれる。 The above describes an embodiment of the present invention with reference to the drawings, but the specific configuration is not limited to the above embodiment and includes design modifications and the like that do not deviate from the gist of the present invention.
〈コンピュータ構成〉
図7は、少なくとも1つの実施形態に係るコンピュータの構成を示す概略ブロック図である。
コンピュータ90は、プロセッサ91、メインメモリ92、ストレージ93、インタフェース94を備える。
上述の運転比較装置1は、コンピュータ90に実装される。そして、上述した各処理部の動作は、プログラムの形式でストレージ93に記憶されている。プロセッサ91は、プログラムをストレージ93から読み出してメインメモリ92に展開し、当該プログラムに従って上記処理を実行する。また、プロセッサ91は、プログラムに従って、上述した各記憶部に対応する記憶領域をメインメモリ92に確保する。
<Computer Configuration>
FIG. 7 is a schematic block diagram illustrating the configuration of a computer according to at least one embodiment.
The computer 90 includes a processor 91 , a main memory 92 , a storage 93 , and an interface 94 .
The above-described operation comparison device 1 is implemented in a computer 90. The operations of the above-described processing units are stored in the form of a program in a storage 93. A processor 91 reads the program from the storage 93, loads it into a main memory 92, and executes the above-described processing in accordance with the program. The processor 91 also allocates storage areas in the main memory 92 corresponding to the above-described storage units in accordance with the program.
プログラムは、コンピュータ90に発揮させる機能の一部を実現するためのものであってもよい。例えば、プログラムは、ストレージに既に記憶されている他のプログラムとの組み合わせ、または他の装置に実装された他のプログラムとの組み合わせによって機能を発揮させるものであってもよい。なお、他の実施形態においては、コンピュータは、上記構成に加えて、または上記構成に代えてPLD(Programmable Logic Device)などのカスタムLSI(Large Scale Integrated Circuit)を備えてもよい。PLDの例としては、PAL(Programmable Array Logic)、GAL(Generic Array Logic)、CPLD(Complex Programmable Logic Device)、FPGA(Field Programmable Gate Array)が挙げられる。この場合、プロセッサによって実現される機能の一部または全部が当該集積回路によって実現されてよい。 The program may be for realizing some of the functions to be performed by the computer 90. For example, the program may be combined with other programs already stored in storage or implemented in other devices to achieve the functions. In other embodiments, the computer may include a custom LSI (Large Scale Integrated Circuit) such as a PLD (Programmable Logic Device) in addition to or instead of the above configuration. Examples of PLDs include PAL (Programmable Array Logic), GAL (Generic Array Logic), CPLD (Complex Programmable Logic Device), and FPGA (Field Programmable Gate Array). In this case, some or all of the functions realized by the processor may be realized by the integrated circuit.
ストレージ93の例としては、HDD(Hard Disk Drive)、SSD(Solid State Drive)、磁気ディスク、光磁気ディスク、CD-ROM(Compact Disc Read Only Memory)、DVD-ROM(Digital Versatile Disc Read Only Memory)、半導体メモリ等が挙げられる。ストレージ93は、コンピュータ90のバスに直接接続された内部メディアであってもよいし、インタフェース94または通信回線を介してコンピュータ90に接続される外部メディアであってもよい。また、このプログラムが通信回線によってコンピュータ90に配信される場合、配信を受けたコンピュータ90が当該プログラムをメインメモリ92に展開し、上記処理を実行してもよい。少なくとも1つの実施形態において、ストレージ93は、一時的でない有形の記憶媒体である。 Examples of storage 93 include HDD (Hard Disk Drive), SSD (Solid State Drive), magnetic disk, magneto-optical disk, CD-ROM (Compact Disc Read Only Memory), DVD-ROM (Digital Versatile Disc Read Only Memory), semiconductor memory, etc. Storage 93 may be internal media directly connected to the bus of computer 90, or external media connected to computer 90 via interface 94 or a communication line. Furthermore, if this program is distributed to computer 90 via a communication line, the computer 90 that receives the program may expand the program into main memory 92 and execute the above-mentioned processing. In at least one embodiment, storage 93 is a non-transitory, tangible storage medium.
1 運転比較装置
2 コジェネレーションシステム
11 条件入力部
12 提案運転条件算出部
13 過去運転条件算出部
14 提示部
15 プラントの要求条件
16 プラントモデル
17 運転再現モデル
18 学習用データセット
19 記憶部
20、30 プラント
171 導入前モデル
172 導入後モデル
1 Operation comparison device 2 Cogeneration system 11 Condition input unit 12 Proposed operating condition calculation unit 13 Past operating condition calculation unit 14 Presentation unit 15 Plant required conditions 16 Plant model 17 Operation reproduction model 18 Learning data set 19 Storage unit 20, 30 Plant 171 Pre-introduction model 172 Post-introduction model
Claims (3)
前記プラントの挙動を模擬するプラントモデルに基づくシミュレーションによって前記運転条件を算出する運転条件提案プログラムの導入前の前記プラントの過去の運転実績に基づき前記要求条件と前記運転条件との関係が学習された学習モデルを用いて算出した前記運転条件と、前記運転条件提案プログラムの導入後の前記プラントの過去の運転実績に基づき前記要求条件と前記運転条件との関係が学習された学習モデルを用いて算出した前記運転条件とを提示する提示部と、
を備える表示装置。 a condition input unit that receives input of required conditions that specify constraints for each item of a plurality of operating conditions related to the plant ;
a presentation unit that presents the operating conditions calculated using a learning model that has learned the relationship between the required conditions and the operating conditions based on past operating records of the plant before the introduction of an operating condition proposal program that calculates the operating conditions by simulation based on a plant model that simulates the behavior of the plant, and the operating conditions calculated using a learning model that has learned the relationship between the required conditions and the operating conditions based on past operating records of the plant after the introduction of the operating condition proposal program;
A display device comprising:
前記プラントの挙動を模擬するプラントモデルに基づくシミュレーションによって前記運転条件を算出する運転条件提案プログラムの導入前の前記プラントの過去の運転実績に基づき前記要求条件と前記運転条件との関係が学習された学習モデルを用いて算出した前記運転条件と、前記運転条件提案プログラムの導入後の前記プラントの過去の運転実績に基づき前記要求条件と前記運転条件との関係が学習された学習モデルを用いて算出した前記運転条件とを提示するステップと、
を含む表示方法。 receiving an input of required conditions that specify constraints for each of a plurality of operating conditions related to the plant ;
presenting the operating conditions calculated using a learning model that has learned the relationship between the required conditions and the operating conditions based on past operating records of the plant before the introduction of an operating condition proposal program that calculates the operating conditions by simulation based on a plant model that simulates the behavior of the plant, and the operating conditions calculated using a learning model that has learned the relationship between the required conditions and the operating conditions based on past operating records of the plant after the introduction of the operating condition proposal program;
Display methods including.
前記プラントの挙動を模擬するプラントモデルに基づくシミュレーションによって前記運転条件を算出する運転条件提案プログラムの導入前の前記プラントの過去の運転実績に基づき前記要求条件と前記運転条件との関係が学習された学習モデルを用いて算出した前記運転条件と、前記運転条件提案プログラムの導入後の前記プラントの過去の運転実績に基づき前記要求条件と前記運転条件との関係が学習された学習モデルを用いて算出した前記運転条件とを提示するステップと、
をコンピュータに実行させるためのプログラム。 receiving an input of required conditions that specify constraints for each of a plurality of operating conditions related to the plant ;
presenting the operating conditions calculated using a learning model that has learned the relationship between the required conditions and the operating conditions based on past operating records of the plant before the introduction of an operating condition proposal program that calculates the operating conditions by simulation based on a plant model that simulates the behavior of the plant, and the operating conditions calculated using a learning model that has learned the relationship between the required conditions and the operating conditions based on past operating records of the plant after the introduction of the operating condition proposal program;
A program that causes a computer to execute the following.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2023172907A JP7752666B2 (en) | 2019-07-19 | 2023-10-04 | Display device, display method, and program |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2019133828A JP7364382B2 (en) | 2019-07-19 | 2019-07-19 | Driving comparison device, driving comparison method and program |
| JP2023172907A JP7752666B2 (en) | 2019-07-19 | 2023-10-04 | Display device, display method, and program |
Related Parent Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2019133828A Division JP7364382B2 (en) | 2019-07-19 | 2019-07-19 | Driving comparison device, driving comparison method and program |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2023168555A JP2023168555A (en) | 2023-11-24 |
| JP7752666B2 true JP7752666B2 (en) | 2025-10-10 |
Family
ID=74193655
Family Applications (2)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2019133828A Active JP7364382B2 (en) | 2019-07-19 | 2019-07-19 | Driving comparison device, driving comparison method and program |
| JP2023172907A Active JP7752666B2 (en) | 2019-07-19 | 2023-10-04 | Display device, display method, and program |
Family Applications Before (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2019133828A Active JP7364382B2 (en) | 2019-07-19 | 2019-07-19 | Driving comparison device, driving comparison method and program |
Country Status (4)
| Country | Link |
|---|---|
| JP (2) | JP7364382B2 (en) |
| KR (1) | KR20220011163A (en) |
| TW (2) | TWI760791B (en) |
| WO (1) | WO2021015176A1 (en) |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2011248529A (en) | 2010-05-25 | 2011-12-08 | Panasonic Electric Works Co Ltd | Energy saving diagnosis system |
Family Cites Families (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4016307B2 (en) * | 1998-12-08 | 2007-12-05 | 株式会社安川電機 | Sewage treatment process simulator |
| JP4283978B2 (en) | 2000-08-18 | 2009-06-24 | 株式会社東芝 | Plant operation control apparatus, plant operation control method, and storage medium storing plant operation control program |
| JP4579137B2 (en) | 2005-11-09 | 2010-11-10 | 三菱電機株式会社 | Energy variable cost estimation device and energy variable cost estimation program |
| JP5751045B2 (en) * | 2010-08-31 | 2015-07-22 | 富士電機株式会社 | Plant operating condition optimization system, plant operating condition optimization method, plant operating condition optimization program |
| JP2019113883A (en) * | 2016-03-25 | 2019-07-11 | 株式会社日立製作所 | Utilization assisting apparatus and wind power generation system |
| JP6773012B2 (en) | 2017-11-27 | 2020-10-21 | 横河電機株式会社 | Operation improvement effect calculation device, operation improvement effect calculation method, operation improvement effect calculation program, and recording medium |
| DE112018006086T5 (en) | 2017-11-29 | 2020-09-03 | Mitsubishi Hitachi Power Systems, Ltd. | Operating condition evaluation device, operating condition evaluation method and control system for power plant |
-
2019
- 2019-07-19 JP JP2019133828A patent/JP7364382B2/en active Active
-
2020
- 2020-07-20 TW TW109124460A patent/TWI760791B/en not_active IP Right Cessation
- 2020-07-20 TW TW111106153A patent/TWI802281B/en active
- 2020-07-20 WO PCT/JP2020/028135 patent/WO2021015176A1/en not_active Ceased
- 2020-07-20 KR KR1020217041686A patent/KR20220011163A/en not_active Ceased
-
2023
- 2023-10-04 JP JP2023172907A patent/JP7752666B2/en active Active
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2011248529A (en) | 2010-05-25 | 2011-12-08 | Panasonic Electric Works Co Ltd | Energy saving diagnosis system |
Also Published As
| Publication number | Publication date |
|---|---|
| TWI802281B (en) | 2023-05-11 |
| TW202223718A (en) | 2022-06-16 |
| KR20220011163A (en) | 2022-01-27 |
| JP2023168555A (en) | 2023-11-24 |
| TW202111589A (en) | 2021-03-16 |
| WO2021015176A1 (en) | 2021-01-28 |
| JP2021018602A (en) | 2021-02-15 |
| JP7364382B2 (en) | 2023-10-18 |
| TWI760791B (en) | 2022-04-11 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Yang et al. | Effect of natural gas flow dynamics in robust generation scheduling under wind uncertainty | |
| Ding et al. | Short-term and medium-term reliability evaluation for power systems with high penetration of wind power | |
| Yao et al. | Stochastic day-ahead scheduling of integrated energy distribution network with identifying redundant gas network constraints | |
| Padhi et al. | Solving dynamic economic emission dispatch problem with uncertainty of wind and load using whale optimization algorithm | |
| Millstein et al. | The potential to improve the value of US geothermal electricity generation through flexible operations | |
| US20200265361A1 (en) | Plant evaluation system, plant evaluation method, and program | |
| Tsatsaronis et al. | Understanding the formation of costs and environmental impacts using exergy-based methods | |
| Saghafifar et al. | Comparative analysis of power augmentation in air bottoming cycles | |
| Rachmatullah et al. | Scenario planning for the electricity generation in Indonesia | |
| JP7359535B2 (en) | Computing devices, systems, computing methods and programs | |
| JP7752666B2 (en) | Display device, display method, and program | |
| Correia et al. | Sizing of a pumped storage power plant in S. Miguel, Azores, using stochastic optimization | |
| CN120218646A (en) | Data analysis method, device, equipment and medium for time-space energy block of power system | |
| US10628776B2 (en) | System and method for calculating a productivity of an industrial installation | |
| KR102881311B1 (en) | Computing devices, plants, computing methods and programs | |
| CN115640692A (en) | Working condition verification method and device, storage medium and electronic equipment | |
| Knizley et al. | Potential emissions reductions from the use of dual-combined heat and power systems in different climate conditions | |
| KR20240050832A (en) | Virtual environment framework apparatus and method for collecting industrial datasets | |
| Cummings | Cryptocurrency Mining and Grid Stabilization in Texas: ERCOT's Opportunity for Redemption | |
| Mathews et al. | Integrated simulation of coal-fired power stations | |
| JPWO2009093360A1 (en) | Circuit simulator and circuit simulation method | |
| KR20250157753A (en) | Method for calculating probabilistic future potential of renewable energy | |
| Glista et al. | Capacity Expansion Planning for Puerto Rico's Electric Power System | |
| Fojcik et al. | Wind turbine inflow estimation using blade loads and scada: steps towards real-world viability | |
| Wei et al. | Tractable Modeling of Decision-dependent Customer Interruption Cost and Cold Load Pickup for Optimizing Power Distribution System Restoration |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20231004 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20250107 |
|
| A601 | Written request for extension of time |
Free format text: JAPANESE INTERMEDIATE CODE: A601 Effective date: 20250310 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20250508 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20250902 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20250930 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 7752666 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |