Optical power supply system management device

Info

Publication number
JP7779407B2
JP7779407B2 JP2024559820A JP2024559820A JP7779407B2 JP 7779407 B2 JP7779407 B2 JP 7779407B2 JP 2024559820 A JP2024559820 A JP 2024559820A JP 2024559820 A JP2024559820 A JP 2024559820A JP 7779407 B2 JP7779407 B2 JP 7779407B2
Authority
JP
Japan
Prior art keywords
optical
optical node
nodes
node
management device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2024559820A
Other languages
Japanese (ja)
Other versions
JPWO2024111112A1 (en
Inventor
紗希 野添
ひろし 渡邉
良 小山
友裕 川野
和典 片山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NTT Inc
NTT Inc USA
Original Assignee
Nippon Telegraph and Telephone Corp
NTT Inc USA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Telegraph and Telephone Corp, NTT Inc USA filed Critical Nippon Telegraph and Telephone Corp
Publication of JPWO2024111112A1 publication Critical patent/JPWO2024111112A1/ja
Application granted granted Critical
Publication of JP7779407B2 publication Critical patent/JP7779407B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B10/00Transmission systems employing electromagnetic waves other than radio-waves, e.g. infrared, visible or ultraviolet light, or employing corpuscular radiation, e.g. quantum communication
    • H04B10/80Optical aspects relating to the use of optical transmission for specific applications, not provided for in groups H04B10/03 - H04B10/70, e.g. optical power feeding or optical transmission through water

Landscapes

  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Optical Communication System (AREA)

Description

本開示は、通信局と通信局外に設置される複数の光ノードで構成される光通信網において、通信局内に設置され、複数の光ノードに対する光給電を管理する光ノード制御装置(以下、管理装置)、その管理方法、及びコンピュータにその管理方法を実行させるためのプログラムに関する。 This disclosure relates to an optical node control device (hereinafter referred to as a management device) that is installed within a communication station and manages optical power supply to multiple optical nodes in an optical communication network consisting of a communication station and multiple optical nodes installed outside the communication station, a management method for the same, and a program for causing a computer to execute the management method.

アクセスネットワークでは、心線切り替え作業は現地に赴いて工事担当者の手動で実施される。例えば、非特許文献1では、所内等の電源環境に設置された給電制御光源と、遠隔に配置された単数あるいは複数の遠隔光路切替ノード(光ノード)から構成されるシステムにおいて、単一のレーザで光給電および光ノードに内包される複数の光スイッチの制御の機能を同時に実現できる方式が提案されている。この光ノードは、光ファイバ網内に設置され、光ファイバの心線単位で心線相互の接続や切替を行うことができるメリットを有する。 In access networks, fiber switching work is typically performed manually by on-site technicians. For example, Non-Patent Document 1 proposes a method in which a single laser can simultaneously perform optical power supply and control the multiple optical switches contained in an optical node in a system consisting of a power supply control light source installed in a power supply environment such as an on-site power source and one or more remotely located remote optical path switching nodes (optical nodes). This optical node is installed within an optical fiber network and has the advantage of being able to interconnect and switch optical fiber cores individually.

図1(A)に示すように、通信局10のビル内等の遠隔にある給電制御光源から出た光給電光は、光ファイバ52で複数の光ノード20に順次接続される。「順次」とは、チャネルセレクタ12によりルートを変更することで、例えば光ノード20#1につないだ後、経路を変えて次の光ノード20#2につなぐことを意味する。図1(A)では簡単のため、光ノードは2台であるが、台数はこれに限定するものではない。なお、図1(A)の光給電システムでは、光ファイバ52は給電用であり、通信用及び主信号用の光ファイバ51とは別に設けられている。また、通信局10は、光ノード20に光給電を行い、チャネルセレクタ12の切り替えを制御し、且つ光ノード20との通信を行う管理装置11を備えている。管理装置11が光給電用の給電制御光源を有する。図1(A)では、光ノード#1と光ファイバ52が接続、また光ノード#2と光ファイバ52が別の光ファイバで接続されているが、この接続構成に限らない。例えば、図1(B)のように、光ノード20自身がチャネルセレクタを有することで、1本の給電用の光ファイバ52を共用する構成でもよい。この場合、各光ノード20は自身が持つチャネルセレクタを切り替えることで、自らに給電を行うか、他の光ノードへ給電を行うかを切り替えることでルートを変更できる。As shown in Figure 1(A), optical power supply light emitted from a power supply control light source located remotely, such as within the building of the communication station 10, is sequentially connected to multiple optical nodes 20 via optical fiber 52. "Sequential" means that the channel selector 12 changes the route, for example, connecting to optical node 20#1, then changing the path to connect to the next optical node 20#2. For simplicity, Figure 1(A) shows two optical nodes, but the number of nodes is not limited to this. In the optical power supply system of Figure 1(A), optical fiber 52 is used for power supply and is provided separately from optical fiber 51 for communication and main signals. The communication station 10 also includes a management device 11 that optically supplies power to the optical nodes 20, controls the switching of the channel selector 12, and communicates with the optical nodes 20. The management device 11 has a power supply control light source for optical power supply. In Figure 1(A), optical node #1 is connected to optical fiber 52, and optical node #2 is connected to optical fiber 52 via a separate optical fiber, but this connection configuration is not limited to this. 1B, the optical nodes 20 may each have a channel selector, allowing them to share a single power supply optical fiber 52. In this case, each optical node 20 can change the route by switching its own channel selector to switch between supplying power to itself or to another optical node.

光ノードは、給電制御光に重畳した制御信号を受信し、光ノード内のデバイスを制御することができる。また、光電変換素子で光給電光を電気に変換し、デバイス用及び制御部用のコンデンサ等の蓄電部に蓄電する。この蓄電された電力により、光ノードの制御部や各デバイスに供給され、制御・駆動する。 Optical nodes can receive control signals superimposed on the power supply control light and control devices within the optical node. In addition, photoelectric conversion elements convert the optical power supply light into electricity, which is then stored in storage units such as capacitors for the devices and control unit. This stored electricity is supplied to the optical node's control unit and each device, controlling and driving them.

制御部やデバイスは、駆動可能な電圧値以下になると制御や駆動ができなくなる。複数の光ノードに対して、光給電を行うことで、各々の蓄電部に常に一定量の蓄電がなされて、制御部が駆動可能な電圧値に保つことが必要である。この電圧値を確認する方法として管理装置から光ノードに現在の蓄電量を問合せし、光ノードが管理装置へ蓄電量を応答する機能を持つことが必要である。このような機能を持たせることで、一定以上の蓄電量を確保することができる。さらに光ノードが駆動可能な電圧値以上の値を保ったうえで、光ノードのコマンドを動作させることが必要不可欠となる。また、上記の構成をとるため、管理装置から同時には1台の光ノードにしか光給電できない。 Control units and devices cannot be controlled or operated if the voltage drops below a value that allows them to operate. By optically supplying power to multiple optical nodes, it is necessary to ensure that a certain amount of power is always stored in each storage unit, maintaining a voltage value that allows the control unit to operate. To confirm this voltage value, the management device must be able to inquire about the current amount of stored power to the optical node, and the optical node must have the function to respond to the management device with the amount of stored power. By providing this function, it is possible to ensure that a certain amount of stored power is maintained. Furthermore, it is essential that optical node commands are executed while maintaining a voltage value above the voltage that allows the optical node to operate. Furthermore, with the above configuration, the management device can only supply optical power to one optical node at a time.

光ノードは、遠隔光路切替ノードであり、管理装置からの指示で動作を実行する。非特許文献2では、動作とは、光ノードに内包される光クロスコネクト機能の光スイッチによる心線切替、ポート監視機能による光強度測定データ取得及び管理装置へのデータ送信がある。光ノードを動作させるため、管理装置からの信号は光給電光に重畳している。 Optical nodes are remote optical path switching nodes that perform operations in response to instructions from a management device. According to Non-Patent Document 2, operations include fiber switching using an optical switch with an optical cross-connect function included in the optical node, acquiring optical intensity measurement data using a port monitoring function, and transmitting the data to the management device. To operate the optical node, signals from the management device are superimposed on the optical power supply light.

既存のネットワーク装置である光回線終端装置のOLT(Optical Line Terminal)やONU(Optical Network Unit)と比較すると、光ノードは、通信局側からの光給電によって蓄電すること(具体的には、電柱の電線から商用電源を受けないこと)、通信局と光ノードとの通信は数百bps程度のシリアル通信であることが制約条件である。 Compared to existing network devices such as optical line terminals (OLT) (Optical Line Terminal) and ONU (Optical Network Unit), optical nodes are constrained by the requirement that they store power through optical power supply from the communication station (specifically, they do not receive commercial power from the power lines on utility poles), and that communication between the communication station and the optical node is serial communication at around several hundred bps.

2021年 電子情報通信学会 総合大会 B-13-16「将来光アクセス網に向けた遠隔光路切替ノードの検討」2021 Institute of Electronics, Information and Communication Engineers General Conference B-13-16 "Study on remote optical path switching nodes for future optical access networks" 渡辺 他.多段ループ網における遠隔光路切替ノードと光クロスコネクト機能に関する検討,信学技報, vol. 121, no. 332, OFT2021-62, pp. 36-41, 2022年1月.Watanabe et al. Study on remote optical path switching node and optical cross-connect function in multistage loop networks, IEICE Technical Report, vol. 121, no. 332, OFT2021-62, pp. 36-41, January 2022.

光ノードは省電力駆動が前提であり、簡素な機能構成が望ましいため、同時に複数の動作コマンドを実行することはできない。想定以上の電力を消費するためである。そこで、電力消費を抑えるため、単一の動作コマンドのみ(各動作コマンドは基本的に排他動作)とする機構が必要である。 Optical nodes are designed to operate with low power consumption, and a simple functional configuration is desirable, so multiple operation commands cannot be executed simultaneously. This is because doing so would consume more power than expected. Therefore, in order to reduce power consumption, a mechanism is needed that allows only a single operation command (each operation command is essentially an exclusive operation).

管理装置から光ノードへ指示される動作として、前記の動作以外に管理・保守機能の動作が挙げられる。光ノードのネットワーク装置としての管理・保守機能の動作としては、給電、異常時等にMPU(Micro Processor Unit)の復旧を目的とした遠隔での再起動、不具合の改修及び新規機能追加を目的としたファームウェア更改、管理装置からの蓄電量問合せに対する応答や正常性確認のための疎通確認時の応答などが含まれる。以降、心線切替、ポート監視(データ取得)、ポート監視(データ転送)、再起動、ファームウェア更改、蓄電量問合せに対する応答、疎通確認時の応答などのこれらの動作を「動作x」とする。In addition to the operations mentioned above, operations instructed from the management device to the optical node also include management and maintenance function operations. The management and maintenance function operations of the optical node as a network device include power supply, remote restart to restore the MPU (Micro Processor Unit) in the event of an abnormality, firmware updates to repair malfunctions and add new functions, responses to stored power inquiries from the management device, and responses when confirming communication to verify normality. Hereinafter, these operations, such as fiber switching, port monitoring (data acquisition), port monitoring (data transfer), restart, firmware updates, responses to stored power inquiries, and responses when confirming communication, will be referred to as "operation x."

前述のように、光ノードの動作は種々あるが、各動作の実行時の消費電力を予め把握していなければ、実行途中に電力不足になる可能性がある。電力不足となる場合は2つある。As mentioned above, optical nodes perform a variety of operations, but if the power consumption during each operation is not known in advance, there is a risk of running out of power during the operation. There are two cases in which a power shortage can occur.

1つ目は、管理装置から光給電光が供給されている(チャネルセレクタで選択され、動作xをさせようとしている)光ノードが電力不足となる場合である。以下の説明において当該光ノードを「選択光ノード」と記載する。例えば、光給電によって選択光ノードに蓄電された蓄電量(例えば、電圧値)が、心線切替に必要な消費電力よりも小さい状態から動作を開始した場合、心線切替の途中に電力不足となり、心線切替が完了しないことから、正常な通信を行うことができず、動作の再実行となる可能性がある。 The first is when an optical node receiving optical power from a management device (selected by a channel selector and attempting to perform operation x) experiences a power shortage. In the following explanation, this optical node will be referred to as the "selected optical node." For example, if the selected optical node starts operation from a state in which the amount of power (e.g., voltage value) stored in the optically powered node is less than the power consumption required for fiber switching, a power shortage occurs during fiber switching, preventing the fiber switching from completing, preventing normal communication and potentially requiring the operation to be retried.

2つ目は、選択光ノード以外の光ノード(以下の説明において「他の光ノード」と記載する。)が電力不足となる場合である。例えば、光ノード20#1を選択光ノードとすると、光ノード20#2は他の光ノードであり、給電されておらず、自然放電によって蓄電量が低下する。光ノード20#1の動作xがファイル送信動作(例えば、ポート監視機能による管理装置への光強度測定データ送信や、ファームウェア更改のファイル転送)であり、尚且つファイル容量が大きい場合は、前述のように通信速度が限られることから、動作完了までに時間を要するときがある。このとき自然放電によって光ノード20#2の蓄電量が低下し、駆動電圧以下となる。光ノード20#1の動作が完了したときに、光ノード20#2に駆動電圧以上の蓄電量がなければ、管理装置と通信することができなくなる可能性がある。The second scenario occurs when optical nodes other than the selected optical node (hereinafter referred to as "other optical nodes") experience a power shortage. For example, if optical node 20#1 is the selected optical node, optical node 20#2 is another optical node that is not powered and whose stored power decreases due to natural discharge. If operation x of optical node 20#1 is a file transmission operation (e.g., sending optical intensity measurement data to a management device using a port monitoring function or transferring a file for firmware updates) and the file size is large, it may take some time to complete the operation due to the limited communication speed as mentioned above. In this case, the stored power of optical node 20#2 decreases due to natural discharge and falls below the drive voltage. If optical node 20#2 does not have stored power equal to or greater than the drive voltage when optical node 20#1 completes its operation, it may not be able to communicate with the management device.

また、1つ目の場合と2つ目の場合が両方起こることも考えられる。 It is also possible that both the first and second cases occur.

つまり、従来の光給電システムには、管理装置が常時複数の光ノードの蓄電量を監視できない構造であり、光ノードの蓄電量によっては所望の動作を完了することができず、当該動作の再実行が発生する可能性があるという課題があった。 In other words, conventional optical power supply systems were designed so that the management device could not constantly monitor the amount of power stored in multiple optical nodes, and there was a problem that depending on the amount of power stored in the optical node, the desired operation could not be completed, and the operation could have to be re-executed.

そこで、本発明は、上記課題を解決するために、光給電システムにおいて、管理装置と光ノードの通信途絶の回避やコマンドの再実行を回避できる管理装置、管理方法、及びプログラムを提供することを目的とする。 Therefore, in order to solve the above problems, the present invention aims to provide a management device, management method, and program that can avoid communication interruptions between the management device and optical nodes and avoid the need to re-execute commands in an optical power supply system.

上記目的を達成するために、本発明に係る管理装置は、光ノードの動作に要する消費電力と時間を考慮した上で当該動作を光ノードに実行させることとした。 In order to achieve the above objective, the management device of the present invention causes the optical node to perform operations while taking into account the power consumption and time required for the operation of the optical node.

具体的には、本発明に係る管理装置は、
セレクタを介して複数の光ノードと光ファイバで接続され、前記セレクタで選択された前記光ノードの1つである選択光ノードへ光給電を行う光源と、
前記光源の光に重畳した制御信号で前記選択光ノードとの通信を行う通信部と、
前記光ノードそれぞれについて、蓄電電圧値、前記蓄電電圧値を確認した時刻を保持するデータベースと、
前記選択光ノードに任意の動作をさせる前の確認時に、条件1と条件2を満たしている場合に前記選択光ノードに前記動作をさせるプログラムと、
を備える。
ただし、前記条件1は、
前記選択光ノードが、前記確認時に前記動作に必要なエネルギー及び自身を駆動させるエネルギーに相当する前記蓄電電圧を有していること、
前記条件2は、
前記光ノードのうち、前記選択光ノード以外の他の光ノード全てが、前記選択光ノードの前記動作の後であって順次光給電される給電サイクルの終了後に前記他の光ノードの駆動を可能とする駆動電圧より大きい電圧を有していること、
である。
Specifically, the management device according to the present invention comprises:
a light source connected to a plurality of optical nodes via a selector by an optical fiber, and optically feeding power to a selected optical node, which is one of the optical nodes selected by the selector;
a communication unit that communicates with the selected optical node using a control signal superimposed on the light from the light source;
a database that stores, for each of the optical nodes, a stored voltage value and a time when the stored voltage value was confirmed;
a program for causing the selected optical node to perform an arbitrary operation if conditions 1 and 2 are satisfied when checking before causing the selected optical node to perform the operation;
Equipped with.
However, the above condition 1 is
the selected optical node has the stored voltage equivalent to the energy required for the operation and the energy to drive itself at the time of the confirmation;
The condition 2 is
Among the optical nodes, all of the optical nodes other than the selected optical node have a drive voltage that is higher than a drive voltage that enables the other optical nodes to be driven after the operation of the selected optical node and after the end of a power supply cycle in which the optical nodes are sequentially optically powered;
is.

また、本発明に係る管理方法は、管理装置がセレクタを介して複数の光ノードと光ファイバで接続され、前記セレクタで選択された前記光ノードの1つである選択光ノードへ光給電及び通信の少なくとも一方を行う光給電システムの動作を管理する管理方法であって、
前記光ノードそれぞれについて、蓄電電圧値、前記蓄電電圧値を確認した時刻を保持すること、及び
前記選択光ノードに任意の動作をさせる前の確認時に、条件1と条件2を満たしている場合に前記選択光ノードに前記動作をさせること、
を行う。
A management method according to the present invention is a management method for managing an operation of an optical power supply system in which a management device is connected to a plurality of optical nodes via a selector by optical fibers, and performs at least one of optical power supply and communication with a selected optical node, which is one of the optical nodes selected by the selector, comprising:
storing a stored voltage value and a time when the stored voltage value was confirmed for each of the optical nodes; and causing the selected optical node to perform an arbitrary operation if conditions 1 and 2 are satisfied at the time of confirmation before causing the selected optical node to perform the operation.
Do the following.

さらに、本発明に係るプログラムは、 コンピュータに管理方法を実行させるためのプログラムであって、
前記管理方法は、管理装置がセレクタを介して複数の光ノードと光ファイバで接続され、前記セレクタで選択された前記光ノードの1つである選択光ノードへ光給電及び通信の少なくとも一方を行う光給電システムの動作を管理する方法であり、
前記光ノードそれぞれについて、蓄電電圧値、前記蓄電電圧値を確認した時刻を保持すること、及び
前記選択光ノードに任意の動作をさせる前の確認時に、条件1と条件2を満たしている場合に前記選択光ノードに前記動作をさせること、
である。
Furthermore, a program according to the present invention is a program for causing a computer to execute a management method,
The management method is a method for managing an operation of an optical power supply system in which a management device is connected to a plurality of optical nodes via a selector by optical fibers, and performs at least one of optical power supply and communication with a selected optical node, which is one of the optical nodes selected by the selector;
storing a stored voltage value and a time when the stored voltage value was confirmed for each of the optical nodes; and causing the selected optical node to perform an arbitrary operation if conditions 1 and 2 are satisfied at the time of confirmation before causing the selected optical node to perform the operation.
is.

本管理装置は、動作に要する消費電力と時間との関係を把握しておき、選択光ノードが動作を行う前に各光ノードの蓄電量の確認を行う。本管理装置は、この関係と確認に基づいて、光ノードの蓄電量が足りずに通信途絶することや選択光ノードがコマンドを再実行することがない、と判断した場合に、選択光ノードに動作を実行させる。
従って、本発明は、光給電システムにおいて、管理装置と光ノードの通信途絶の回避やコマンドの再実行を回避できる管理装置、管理方法、及びプログラムを提供することができる。
The management device grasps the relationship between the power consumption and time required for operation, and checks the amount of power stored in each optical node before the selected optical node performs an operation. Based on this relationship and confirmation, the management device causes the selected optical node to perform an operation if it determines that the optical node will not have enough power stored to cause a communication interruption or that the selected optical node will not re-execute a command.
Therefore, the present invention can provide a management device, a management method, and a program that can avoid communication interruptions between the management device and optical nodes and avoid re-execution of commands in an optical power supply system.

本発明に係る管理装置の前記プログラムは、前記動作が予め指定された指定動作である場合、前記選択光ノードへ光給電するエネルギーを前記指定動作で消費するエネルギーより大きくすることを特徴とする。
指定動作とは、動作時間が長いものや消費電力が大きいものである。指定動作を実行した場合、途中で蓄電量が不足する可能性が高い。そこで、指定動作を実行する場合には、供給する光給電のエネルギーも大きくすることで、蓄電量の不足を防止できる。
The program of the management device according to the present invention is characterized in that, when the operation is a designated operation designated in advance, the energy optically supplied to the selected optical node is made larger than the energy consumed in the designated operation.
The designated operation is one that takes a long time to operate or consumes a lot of power. When a designated operation is performed, there is a high possibility that the stored power will run out during the operation. Therefore, when a designated operation is performed, the optical power supply energy can be increased to prevent the stored power from running out.

本発明に係る管理装置の前記プログラムは、前記指定動作を行う時間が所定時間より長くなる場合、1回の動作を行う時間が前記所定時間より短くなるように前記指定動作を分割することを特徴とする。
動作時間が所定より長くなる場合、選択光ノードの蓄電量が不足すること、及び光給電されない時間が長くなるので他の光ノードも蓄電量が不足することがある。動作時間が所定より長くなると予測される場合は、指定動作を分割実行することで各光ノードの蓄電量が不足することを防止できる。
The program of the management device according to the present invention is characterized in that, if the time required to perform the specified action is longer than a predetermined time, the specified action is divided so that the time required to perform one action is shorter than the predetermined time.
If the operation time is longer than the predetermined time, the stored power amount of the selected optical node may become insufficient, and the time when optical power is not supplied may become long, so that the stored power amount of other optical nodes may also become insufficient. If the operation time is predicted to be longer than the predetermined time, the stored power amount of each optical node can be prevented from becoming insufficient by dividing and executing the specified operation.

本発明に係る管理装置の前記プログラムは、前記選択光ノードに前記動作をさせる前に、前記光ノードそれぞれに対して前記動作が実行中であるか否かを確認し、いずれかの前記光ノードが前記動作を実行中である場合、当該動作が完了するまで前記選択光ノードに前記動作をさせることを待機することを特徴とする。
システム内で動作する光ノードを1つに限定し、想定以上に蓄電量の減少を防止することができる。
The program of the management device of the present invention is characterized in that, before causing the selected optical node to perform the operation, it checks whether the operation is being executed for each of the optical nodes, and if any of the optical nodes is executing the operation, it waits before causing the selected optical node to perform the operation until the operation is completed.
By limiting the number of optical nodes operating within the system to one, it is possible to prevent the amount of stored power from decreasing more than expected.

なお、上記各発明は、可能な限り組み合わせることができる。
また、本発明のプログラムは、記録媒体に記録することも、ネットワークを通して管理装置へ提供することも可能である。
The above inventions can be combined as much as possible.
The program of the present invention can be recorded on a recording medium or provided to the management device via a network.

本発明は、光給電システムにおいて、管理装置と光ノードの通信途絶の回避やコマンドの再実行を回避できる管理装置、管理方法、及びプログラムを提供することができる。 The present invention provides a management device, management method, and program that can avoid communication interruptions between the management device and optical nodes and avoid the need to re-execute commands in an optical power supply system.

光給電システムを説明する図である。FIG. 1 is a diagram illustrating an optical power supply system. 本発明に係る管理装置を説明する図である。FIG. 1 is a diagram illustrating a management device according to the present invention. 本発明に係る管理方法を説明する図である。FIG. 1 is a diagram illustrating a management method according to the present invention. 光ノードが行う動作に必要な時間とエネルギーの関係を説明する図である。FIG. 1 is a diagram illustrating the relationship between the time and energy required for operations performed by an optical node. 本発明に係る管理方法を説明する図である。FIG. 1 is a diagram illustrating a management method according to the present invention. 本発明に係る管理方法を説明する図である。FIG. 1 is a diagram illustrating a management method according to the present invention. 本発明に係る管理方法を説明する図である。FIG. 1 is a diagram illustrating a management method according to the present invention. 本発明に係る管理装置を説明する図である。FIG. 1 is a diagram illustrating a management device according to the present invention.

添付の図面を参照して本発明の実施形態を説明する。以下に説明する実施形態は本発明の実施例であり、本発明は、以下の実施形態に制限されるものではない。なお、本明細書及び図面において符号が同じ構成要素は、相互に同一のものを示すものとする。 Embodiments of the present invention will be described with reference to the accompanying drawings. The embodiments described below are examples of the present invention, and the present invention is not limited to the following embodiments. Note that components with the same reference numerals in this specification and drawings are considered to be identical to each other.

(実施形態1)
図2は、本実施形態の管理装置11を説明する機能ブロック図である。管理装置11は、
セレクタ12を介して複数の光ノード20と光ファイバ52で接続され、セレクタ12で選択された光ノード20の1つである選択光ノード(本例では光ノード20#1とする。)へ光給電を行う光源11aと、
光源11aの光に重畳した制御信号で選択光ノード20#1との通信を行う通信部11bと、
光ノード20それぞれについて、蓄電電圧値、前記蓄電電圧値を確認した時刻を保持するデータベース11cと、
選択光ノード20#1に任意の動作をさせる前の確認時に、条件1と条件2を満たしている場合に選択光ノード20#1に前記動作をさせるプログラム11dと、
を備える。
ただし、条件1は、
選択光ノード20#1が、前記確認時に前記動作に必要なエネルギー及び自身を駆動させるエネルギーに相当する前記蓄電電圧を有していること、
条件2は、
光ノード20のうち、選択光ノード20#1以外の他の光ノード20#n(本例ではnは2以上N以下の整数)全てが、選択光ノード20#1の前記動作の後であって順次光給電される給電サイクルの終了後に他の光ノード20#nの駆動を可能とする駆動電圧より大きい電圧を有していること、
である。
(Embodiment 1)
FIG. 2 is a functional block diagram illustrating the management device 11 of this embodiment.
a light source 11a connected to a plurality of optical nodes 20 via a selector 12 by an optical fiber 52, and supplying optical power to a selected optical node (optical node 20#1 in this example) that is one of the optical nodes 20 selected by the selector 12;
a communication unit 11b that communicates with the selected optical node 20#1 using a control signal superimposed on the light of the light source 11a;
a database 11c for storing, for each optical node 20, a stored voltage value and a time when the stored voltage value was confirmed;
a program 11d for causing the selected optical node 20#1 to perform an arbitrary operation if conditions 1 and 2 are satisfied when checking before causing the selected optical node 20#1 to perform the operation;
Equipped with.
However, condition 1 is
The selected optical node 20#1 has the stored voltage equivalent to the energy required for the operation and the energy to drive itself at the time of the confirmation;
Condition 2 is:
Among the optical nodes 20, all of the other optical nodes 20#n (in this example, n is an integer between 2 and N) other than the selected optical node 20#1 have a voltage higher than the drive voltage that enables the other optical nodes 20#n to be driven after the operation of the selected optical node 20#1 and after the end of the power supply cycle in which optical power is supplied sequentially;
is.

管理装置11は、選択光ノード20#1に動作xを実行させる前に、上記2つの条件を満たすか否かを判断するプログラム11dを有する。管理装置11は、動作x実行前にプログラム11dが2つの条件を両方満たすと判断したとき、選択光ノード20#1に動作xを実行させる。管理装置11は、2つの条件の両方あるいは片方しか満たさないと判断したときは、両方の条件を満たすようになるまで、選択光ノード20#1に動作xの実行を待機させ、各光ノード20に対して光源11aから光給電を実施する。なお、全ての光ノード20へ光給電するのではなく、条件を満たしていない光ノード20のみに光給電を行ってもよい。 The management device 11 has a program 11d that determines whether the above two conditions are met before causing the selected optical node 20#1 to perform operation x. When program 11d determines that both conditions are met before executing operation x, the management device 11 causes the selected optical node 20#1 to perform operation x. When the management device 11 determines that both or only one of the two conditions is met, the management device 11 causes the selected optical node 20#1 to wait before executing operation x until both conditions are met, and optical power is supplied from the light source 11a to each optical node 20. Note that instead of optically supplying power to all optical nodes 20, optical power may be supplied only to optical nodes 20 that do not satisfy the conditions.

2つの条件について記述する。光給電システム内にはN台の光ノードがある。1台目の光ノード20#k(k=1;kは光ノードの識別番号であり、1からNまでの整数である。)に動作xを時刻t=tに実施することを考える。このとき、N台の光ノード20全てのコンデンサ電圧値(蓄電電圧値)が、光ノード自身が駆動できる駆動電圧V以上に保つための2つの条件を説明する。尚、パラメータは次の通りである。
(t):時刻tのコンデンサの電圧値(>V)[V]、
:コンデンサ静電容量[F]、
:動作xを実施時の光ノードのエネルギー消費量[J]、
:管理装置と光ノード間の制御信号及び制御データの転送データ量[byte]、
v:通信速度[bps]、
:転送(実行)時間[s]、
(t):給電時の単位時間当たりのエネルギー上昇量を[J/s]、
:非給電時のコンデンサ電圧下降量[V/s]。
Two conditions will be described. There are N optical nodes in an optical power supply system. Consider that operation x is performed on the first optical node 20#k (k=1; k is the identification number of the optical node and is an integer from 1 to N) at time t= t1 . Here, two conditions will be described for maintaining the capacitor voltage values (storage voltage values) of all N optical nodes 20 at or above the drive voltage V0 at which the optical nodes themselves can be driven. The parameters are as follows:
V k (t): voltage value of the capacitor at time t (>V 0 ) [V],
C k : Capacitor capacitance [F],
U x : Energy consumption of the optical node when performing operation x [J],
D x : Transfer data amount of control signals and control data between the management device and the optical node [bytes],
v: communication speed [bps],
T x : transfer (execution) time [s],
P k (t): Energy increase per unit time during power supply [J/s],
d k : Amount of capacitor voltage drop when power is not supplied [V/s].

(条件1)
選択光ノード20#1(本例ではk=1)で実施時(時刻t=t)に必要なエネルギーは,動作xに必要なエネルギーUと光ノードの駆動電圧V相当の蓄電エネルギーの合計値より大きい。
すなわち、条件1は選択光ノード20#1についての条件であり、選択光ノード20#1が動作xの実行時に駆動電圧Vを維持できる蓄電量を保持しているための条件である。
(条件2)
他の光ノード20#n(n=2~N)に蓄電するため、選択光ノード20#1の動作x実行後に各光ノード20に少なくとも時間T[s]ずつ順次光給電される(各光ノード20に一通り光給電される期間を「給電サイクル」とする。)。時刻t=t+N・Txまでの間(給電サイクル終了時点)で、全光ノード20の電圧値V(t)のうち最低値がVを上回る。なお、
[数1a]
=8D/v (1a)
である。
すなわち、条件2は他の光ノード20#nについての条件であり、自然放電を考慮し、給電サイクル終了後に駆動電圧Vを維持できる蓄電量を保持しているための条件である。
(Condition 1)
The energy required at the selected optical node 20#1 (k=1 in this example) when performed (time t= t1 ) is greater than the sum of the energy Ux required for operation x and the stored energy equivalent to the drive voltage V0 of the optical node.
That is, condition 1 is a condition for the selected optical node 20#1, and is a condition for the selected optical node 20#1 to have a stored amount of power that can maintain the drive voltage V0 when the operation x is being performed.
(Condition 2)
In order to store power in the other optical nodes 20#n (n=2 to N), after the selected optical node 20#1 executes operation x, optical power is sequentially supplied to each optical node 20 for at least time Tx [s] (the period during which optical power is supplied to each optical node 20 is referred to as a "power supply cycle"). Until time t= t1 +N·Tx (the end of the power supply cycle), the minimum value of the voltage values Vk (t) of all optical nodes 20 exceeds V0 . Note that,
[Equation 1a]
T x =8D x /v (1a)
is.
That is, condition 2 is a condition for the other optical node 20#n, and is a condition for maintaining a stored amount of electricity that can maintain the drive voltage V0 after the end of the power supply cycle, taking into account natural discharge.

図3は、管理装置11が行う管理方法を説明する図である。本管理方法は、
管理装置11がセレクタ12を介して複数の光ノード20#kと光ファイバ52で接続され、セレクタ12で選択された光ノードの1つである選択光ノード20#1へ光給電及び通信の少なくとも一方を行う光給電システムの動作を管理する管理方法であって、
光ノード20#kそれぞれについて、蓄電電圧値、前記蓄電電圧値を確認した時刻を保持すること(手順1)、及び
選択光ノード20#1に任意の動作をさせる前の確認時に、条件1と条件2を満たしている場合に選択光ノード20#1に前記動作をさせること(手順2)、
を行う。
FIG. 3 is a diagram illustrating a management method performed by the management device 11.
A management method for managing an operation of an optical power supply system in which a management device 11 is connected to a plurality of optical nodes 20#k via a selector 12 by an optical fiber 52, and performs at least one of optical power supply and communication with a selected optical node 20#1, which is one of the optical nodes selected by the selector 12, comprising:
For each optical node 20#k, a stored voltage value and the time when the stored voltage value was confirmed are stored (Step 1), and when checking before causing the selected optical node 20#1 to perform an arbitrary operation, if conditions 1 and 2 are satisfied, the selected optical node 20#1 is caused to perform the operation (Step 2).
Do the following.

本例では、説明容易化のためN=2とする。
[手順1]
まず、管理装置11の通信部11bが全光ノード20の電圧値を確認することから開始する。電圧値の確認方法の一例として、管理装置11が光チャンネルセレクタ12にて光ノード20#1を選択し、電圧値をリクエストする(ステップS1-11)と、光ノード20#1が、現在のコンデンサの出力電圧値をレスポンスする(ステップS1-12)。光ノード20#2についても同様の確認作業(ステップS1-21及びステップS1-22)を行うことで確認が可能である。
管理装置11は、光ノード20の番号k、確認時刻t、電圧値V(t)を、管理装置11内のDB11cに保存する。
In this example, N=2 for ease of explanation.
[Step 1]
First, the communication unit 11b of the management device 11 starts by checking the voltage values of all optical nodes 20. As an example of a method for checking the voltage values, the management device 11 selects optical node 20#1 with the optical channel selector 12 and requests the voltage value (step S1-11), and the optical node 20#1 responds with the current capacitor output voltage value (step S1-12). The same checking operation (steps S1-21 and S1-22) can also be performed for optical node 20#2 to check it.
The management device 11 stores the number k of the optical node 20, the confirmation time t, and the voltage value V k (t) in the DB 11 c within the management device 11.

[手順2]
次に、プログラム11dは、光ノード20#1が時刻tから時間Txの間で動作xを行うとき、現在の光ノード20の電圧値VとVの値が条件1と条件2の両方を満たすかを判断する(ステップS2-1)。満たさない場合は、該当光ノードの給電が完了するまで待機する(ステップS2-2)。条件1と条件2の両方を満たす場合は、チャンネルセレクタ12にて光ノード20#1を選択し、動作xのステップを送信する(ステップS2-3)。必要に応じて、光ノード20#1は動作xの完了ステップを管理装置11の通信部11bに送信し(ステップS2-4)、動作xを完了する(エンドS3)。
[Step 2]
Next, the program 11d determines whether the current voltage values V1 and Vk of the optical node 20 satisfy both conditions 1 and 2 when the optical node 20#1 performs operation x between time t1 and time Tx (step S2-1). If they do not, the program 11d waits until power supply to the optical node is completed (step S2-2). If both conditions 1 and 2 are satisfied, the program 11d selects the optical node 20#1 using the channel selector 12 and transmits a step for operation x (step S2-3). If necessary, the optical node 20#1 transmits a completion step for operation x to the communication unit 11b of the management device 11 (step S2-4) and completes operation x (end S3).

(実施形態2)
図4は、光ノードの動作x実行時に要する時間Tと光ノードの動作x実行時の消費エネルギーUの関係を説明する図である。
が大きい動作は、領域(i)のポート監視部(データ転送)とFW更改である。この動作の場合、条件2の判断において、光ノード20#k(k=1)の動作x中の光ノード20#k(k=2~N)の消費エネルギーの低下量が大きくなる。
一方、Tが小さい動作は、領域(ii)の心線切替及びポート監視(データ取得)と、領域(iii)の再起動、蓄電量問合せ、及びマイコンの疎通確認である。この動作の場合、条件2の判断において、光ノード20#k(k=2~N)の消費エネルギーの低下量が小さくなる。
(Embodiment 2)
FIG. 4 is a diagram illustrating the relationship between the time Tx required for an optical node to perform an operation x and the energy consumption Ux when the optical node performs the operation x.
The operations with large Tx are the port monitoring unit (data transfer) and FW update in area (i). In the case of these operations, the reduction in the energy consumption of the optical node 20#k (k=2 to N) during the operation x of the optical node 20#k (k=1) is large in the judgment of condition 2.
On the other hand, operations with small Tx are fiber switching and port monitoring (data acquisition) in area (ii), and restarting, power storage amount inquiry, and microcomputer connectivity check in area (iii). In the case of these operations, the reduction in energy consumption of optical node 20#k (k=2 to N) is small in the judgment of condition 2.

また、Uが大きい動作は、領域(i)のポート監視(データ転送)とFW更改のうち、ファイル容量が大きい場合と、領域(ii)の動作である。この動作の場合、条件1の判断において、動作x中の光ノード20#k(k=1)の消費エネルギーの低下量が大きくなる。
一方、Uが小さい動作は、領域(iii)の動作である。この動作の場合、条件1の判断において、光ノード20#k(k=1)の消費エネルギーの低下量が小さくなる。
Furthermore, operations with a large Ux are port monitoring (data transfer) and FW update in area (i) when the file capacity is large, and operations in area (ii). In the case of these operations, the reduction in the energy consumption of the optical node 20#k (k=1) during operation x is large in the judgment of condition 1.
On the other hand, an operation with a small Ux is an operation in region (iii). In this operation, the reduction in the energy consumption of the optical node 20#k (k=1) is small in the determination of condition 1.

以上のことから、領域(i)でファイル容量が大きい場合は、動作x中の光ノード20#k(k=1)及び光ノード20#k(k=2~N)の全ての光ノードで消費エネルギーの低下量が大きいことがわかる。これは、電圧不足により動作xを完了することができず、再実行が発生する可能性が最も高いことを示す。 From the above, we can see that when the file capacity in area (i) is large, the decrease in energy consumption is large for optical node 20#k (k = 1) and all optical nodes 20#k (k = 2 to N) during operation x. This indicates that operation x cannot be completed due to insufficient voltage, and there is a high possibility that it will have to be re-executed.

ここで、条件1に示すP(t)の値を調整する。具体的には、光源11aが出力する光強度を調整することでP(t)の値を調整できる。光ノード20#k(k=1)が動作xを実行することでUが消費され、電圧がVから降下する。このとき、光ノード20#k(k=1)のエネルギー収支から、動作xで消費されるU以上のエネルギーを光給電にて光ノード(k=1)へ供給すればよい。つまり、プログラム11dは、動作xが予め指定された指定動作(領域(i)に含まれる動作)である場合、選択光ノード20#1へ光給電するエネルギーを前記指定動作で消費するエネルギーUより大きくする。すなわち、動作xの実行中に、
のエネルギーを光ノード20#k(k=1)へ供給すれば,動作x実行中のエネルギーの低下を防ぐことが可能となる。
Here, the value of Pk (t) shown in condition 1 is adjusted. Specifically, the value of Pk (t) can be adjusted by adjusting the light intensity output by the light source 11a. When the optical node 20#k (k=1) executes operation x, Ux is consumed and the voltage drops from V1 . At this time, based on the energy balance of the optical node 20#k (k=1), energy equal to or greater than Ux consumed in operation x can be supplied to the optical node (k=1) by optical power feeding. In other words, when operation x is a designated operation (an operation included in area (i)) designated in advance, the program 11d makes the energy optically fed to the selected optical node 20#1 greater than the energy Ux consumed in the designated operation. In other words, during the execution of operation x,
If the energy of the optical node 20#k (k=1) is supplied to the optical node 20#k (k=1), it is possible to prevent a decrease in energy during the execution of the operation x.

以上のことから、図4に示す領域(i)に含まれる動作については、式(3)を満たすエネルギーを光ノード20#k(k=1)へ供給すれば、動作xの開始と同時に給電することが可能であり、電力不足となる可能性を低減することができる。 From the above, for operations included in area (i) shown in Figure 4, if energy that satisfies equation (3) is supplied to optical node 20#k (k = 1), power can be supplied simultaneously with the start of operation x, thereby reducing the possibility of power shortages.

図5は、これらの動作を踏まえた管理装置11が行う管理方法を説明する図である。本例も説明容易化のためN=2とする。まず、プログラム11dは、動作xが領域(i)~(iii)のいずれかであるかを確認する(ステップS4)。領域(ii)及び(iii)の場合は、図3で説明した方法で動作xを実行する。領域(i)の場合は、光ノード20#k(k=2~N)の電圧値V(t)を問合せ(ステップS5-1「チャンネルセレクタ12にて光ノード20#n(n=2~N)を選択し、電圧値をリクエスト」及びステップS5-2「現在のコンデンサの出力電圧値をレスポンス」)、それが時刻tから時間Txの間で条件2を満たすか確認する(ステップS6-1)。 FIG. 5 is a diagram illustrating a management method performed by the management device 11 based on these operations. For ease of explanation, N=2 in this example as well. First, the program 11d checks whether the operation x is in any of areas (i) to (iii) (step S4). If it is in areas (ii) and (iii), the program 11d executes the operation x using the method described in FIG. 3. If it is in area (i), the program 11d queries the voltage value V k (t) of the optical node 20#k (k=2 to N) (step S5-1 "select the optical node 20#n (n=2 to N) by the channel selector 12 and request the voltage value" and step S5-2 "respond with the current capacitor output voltage value") and checks whether this satisfies condition 2 between time t1 and time Tx (step S6-1).

条件2を満たさない場合は、当該ノードへ給電を行う(ステップS6-2)。条件2を満たす場合は、光ノード20#k(k=1)の電圧値V(t)を問合せ(ステップS7-1「チャンネルセレクタ12にて光ノード20#1を選択し、電圧値をリクエスト」及びステップS7-2「現在のコンデンサの出力電圧値をレスポンス」)、それが時刻tから時間Txの間で条件1を満たすか確認する(ステップS8-1)。 If condition 2 is not satisfied, power is supplied to the node (step S6-2). If condition 2 is satisfied, the voltage value V k (t) of the optical node 20#k (k=1) is queried (step S7-1 "select optical node 20#1 with the channel selector 12 and request a voltage value" and step S7-2 "respond with the current capacitor output voltage value"), and it is confirmed whether this satisfies condition 1 between time t1 and time Tx (step S8-1).

条件1を満たさない場合は、供給するエネルギーを式(3)を満たすように調整し(ステップS8-2)、光ノード20#k(k=1)への動作xの実行とエネルギー供給を同時に実行する(ステップS9-1「チャンネルセレクタにて光ノード20#1を選択し、動作xをリクエスト」)。
一方、条件1を満たす場合は、そのまま光ノード20#k(k=1)への動作xの実行とエネルギー供給を同時に実行する(ステップS9-1)。
最後に、必要に応じて、光ノード20#1は動作xの完了ステップを管理装置11の通信部11bに送信し(ステップS9-2)、動作xを完了する(エンドS3)。
If condition 1 is not satisfied, the supplied energy is adjusted to satisfy equation (3) (step S8-2), and the execution of operation x and the supply of energy to optical node 20#k (k=1) are simultaneously performed (step S9-1 "select optical node 20#1 with channel selector and request operation x").
On the other hand, if the condition 1 is satisfied, the operation x is executed and energy is supplied to the optical node 20#k (k=1) at the same time (step S9-1).
Finally, if necessary, the optical node 20#1 transmits a completion step of the operation x to the communication unit 11b of the management device 11 (step S9-2), and completes the operation x (end S3).

ここで、ステップS8-2を行わなければ、動作x実行前(ステップS9-1前)に光ノード20#k(k=1)へ光給電するステップが別途必要となる。本実施形態の場合、図5のようにステップS8-2を行うことで、光ノード20#k(k=1)への動作xの実行とエネルギー供給が同時に実行できるため、動作xの実行前に条件1を満たすか否かの確認が不要となる。電圧値V(t)の問合せを行うにも電力を消費するため、消費電力の観点、及び確認に要する時間の観点からも効率的な運用が可能となる。 Here, if step S8-2 is not performed, a separate step of optically supplying power to the optical node 20#k (k=1) is required before executing operation x (before step S9-1). In the case of this embodiment, by performing step S8-2 as shown in Fig. 5, the execution of operation x and the supply of energy to the optical node 20#k (k=1) can be performed simultaneously, so there is no need to check whether condition 1 is satisfied before executing operation x. Since power is consumed even when querying the voltage value Vk (t), efficient operation is possible in terms of power consumption and the time required for confirmation.

(実施形態3)
動作xが疎通確認などの場合、Dの値は一意に決まるため、U及びT、ひいてはV(t)の値も一意に決定することができる。しかしながら、実施形態2で説明したように、動作xがFW更改でありDの値が毎回変わる場合、式(1a)の関係より、vが一定であると、DによってTの値は変化する。
(Embodiment 3)
When operation x is a communication check or the like, the value of Dx is uniquely determined, and therefore the values of Ux and Tx , and therefore Vk (t), can also be uniquely determined. However, as described in the second embodiment, when operation x is a FW update and the value of Dx changes each time, according to the relationship in formula (1a), if v is constant, the value of Tx changes depending on Dx .

このとき、実施形態1で説明した方法で算出された条件1を満たすTx1と、条件2から算出されるTx2とでは値が異なる場合がある。つまり、光ノード20#k(k=1)のファイル容量が大きいため、条件1から転送時間が長時間必要であると算出された場合、その時間が光ノード(k=2~N)は全てVを下回る時間であるため、条件2を満たす時間が設定できなくなる等が考えられる。 In this case, the value of Tx1 that satisfies condition 1 calculated by the method described in embodiment 1 may differ from the value of Tx2 calculated from condition 2. In other words, if it is calculated from condition 1 that a long transfer time is required because the file capacity of optical node 20#k (k=1) is large, that time will be below V0 for all optical nodes (k=2 to N), and it may not be possible to set a time that satisfies condition 2.

このとき、小さい方の値を採用することが望ましい。具体的には、
(Tx1<Tx2の場合)
光ノード20#1の動作xの実行が完了した後でも、まだ光ノード20#n(n=2~N)の電圧値の最低値がVを上回る。このため、Tx1の値を採用することで、全ての光ノード20が駆動電圧以上に保たれる。
(Tx1>Tx2の場合)
x2の値を採用すれば、光ノード20#n(n=2~N)のいずれかの電圧値の最低値がVを下回る前に、光ノード(k=1)の動作を完了でき、光ノード20#n(n=2~N)の給電に移行することができる。
In this case, it is desirable to adopt the smaller value.
(When T x1 < T x2 )
Even after the execution of operation x of optical node 20#1 is completed, the minimum voltage value of optical node 20#n (n = 2 to N) still exceeds V 0. Therefore, by adopting the value of T x1 , all optical nodes 20 are kept at or above the driving voltage.
(When T x1 > T x2 )
By adopting the value of T x2 , the operation of the optical node (k=1) can be completed before the lowest voltage value of any of the optical nodes 20#n (n=2 to N) falls below V 0 , and power supply to the optical node 20#n (n=2 to N) can be switched on.

ここで、Tx1、Tx2のうち、小さい方の値をTxsとする。前述の式(1a)から、既知の値であるvより、適用したいFWファイルの容量Dと大小関係を比較する。
(Txs・v>8Dのとき)
FWファイルを一度の給電で送信することが可能である。
(Txs・v<8Dのとき)
FWファイルを一度の給電で送信することできない。この場合は、FWファイルの容量をTxs・v/8以下に分割し、給電をはさみながら複数回に分けてファイルを送信する。
Here, the smaller of T x1 and T x2 is defined as T xs . From the above-mentioned formula (1a), the known value v is compared with the capacity D x of the FW file to be applied to determine which is larger.
(When T xs ·v>8D x )
It is possible to transmit the FW file with one power supply.
(When T xs · v < 8D x )
The FW file cannot be sent in one power supply. In this case, the size of the FW file is divided into Txs ·v/8 or less, and the file is sent in multiple times with power supplies in between.

図6は、これらの動作を踏まえた管理装置11が行う管理方法を説明する図である。管理装置11のプログラム11dは、指定動作(領域(i)の動作)を行う時間が所定時間より長くなる場合、1回の動作を行う時間が前記所定時間より短くなるように前記指定動作を分割することを特徴とする。 Figure 6 is a diagram explaining the management method performed by the management device 11 based on these operations. The program 11d of the management device 11 is characterized in that, if the time required to perform a specified operation (operation in area (i)) is longer than a predetermined time, the program 11d divides the specified operation so that the time required to perform one operation is shorter than the predetermined time.

手順3(ステップS8-1及びステップS8-2まで)までは図7で説明した管理方法と同じである。本管理方法は、ステップS8-1又はステップS8-2の後、所定要件(Txs・v>8D)を満たすか否かを判断する(ステップS10-1)。
所定要件を満たす場合、図7で説明したステップS9-1を行う。
一方、所定要件を満たさない場合、
FWファイルの容量をTxs・v/8以下に分割すること(ステップS10-2)、
セレクタ12で光ノード20#1を選択し、分割したFWファイルの送信と光給電を行うこと(ステップS10-3)、
セレクタ12で他の光ノード20#n(n=2~N)を順次選択して光給電を行うこと(ステップS10-4)、及び
分割したFWファイルを全て送信完了したかを確認し、未完了であればステップS10-3とステップS10-4を繰り返すこと(ステップS10-5)
を行う。
最後に、必要に応じて、光ノード20#1は動作xの完了レスポンスを管理装置11の通信部11bに送信し(レスポンスS9-2)、動作xを完了する(エンドS3)。
The management method is the same as that described in Fig. 7 up to step 3 (steps S8-1 and S8-2). After step S8-1 or S8-2, this management method determines whether a predetermined requirement (T xs ·v>8D x ) is met (step S10-1).
If the predetermined requirements are met, step S9-1 described with reference to FIG. 7 is carried out.
On the other hand, if the specified requirements are not met,
Dividing the capacity of the FW file into T xs ·v/8 or less (step S10-2);
The selector 12 selects the optical node 20#1, and transmits the divided FW files and supplies optical power (step S10-3).
The selector 12 sequentially selects other optical nodes 20#n (n=2 to N) and optically supplies power to them (step S10-4), and checks whether all the divided FW files have been transmitted. If not, steps S10-3 and S10-4 are repeated (step S10-5).
Do the following.
Finally, if necessary, the optical node 20#1 transmits a completion response of the operation x to the communication unit 11b of the management device 11 (response S9-2), and completes the operation x (end S3).

本管理方法は、全ての光ノードを駆動電圧以上に保ちながら、FW更改を行うことが可能である。 This management method makes it possible to perform FW updates while keeping all optical nodes at or above their operating voltage.

(実施形態4)
図7は、本実施形態の管理装置11が行う管理方法を説明する図である。管理装置11のプログラム11dは、選択光ノード20#1に動作xをさせる前に、光ノード20#k(k=1~N)それぞれに対して動作が実行中であるか否かを確認し、いずれかの光ノードが動作を実行中である場合、当該動作が完了するまで選択光ノード20#1に動作xをさせることを待機する。
(Embodiment 4)
7 is a diagram illustrating a management method performed by the management device 11 of this embodiment. Before causing the selected optical node 20#1 to perform operation x, the program 11d of the management device 11 checks whether an operation is currently being executed for each of the optical nodes 20#k (k=1 to N), and if any optical node is currently executing an operation, waits until the operation is completed before causing the selected optical node 20#1 to perform operation x.

本実施形態の管理方法は、実施形態1から3で説明した手順1又は3の前に、管理装置11が各光ノード20に対して何らかの動作を実行中であるか否かを確認する(ステップS11-1)。各光ノード20で何らかの動作が実行されていなければ、手順1又は手順3を開始する。一方、いずれかの光ノード20で何らかの動作が実行中であればその動作が完了するまで、手順1又は3の実行を待機する(ステップS11-2)。 In the management method of this embodiment, before performing steps 1 or 3 described in embodiments 1 to 3, the management device 11 checks whether any operation is being performed on each optical node 20 (step S11-1). If no operation is being performed on any optical node 20, step 1 or 3 is initiated. On the other hand, if any operation is being performed on any optical node 20, the execution of step 1 or 3 is put on hold until that operation is completed (step S11-2).

本管理方法は、管理装置11から実行される動作が単一の動作コマンドのみで、排他動作を実現することができる。 This management method enables exclusive operation to be performed by the management device 11 with only a single operation command.

(実施形態5)
管理装置11はコンピュータとプログラムによっても実現でき、プログラムを記録媒体に記録することも、ネットワークを通して提供することも可能である。
図8は、システム100のブロック図を示している。システム100は、ネットワーク135へと接続されたコンピュータ105を含む。
(Embodiment 5)
The management device 11 can also be realized by a computer and a program, and the program can be recorded on a recording medium or provided via a network.
8 shows a block diagram of a system 100. The system 100 includes a computer 105 connected to a network 135.

ネットワーク135は、データ通信ネットワークである。ネットワーク135は、プライベートネットワーク又はパブリックネットワークであってよく、(a)例えば或る部屋をカバーするパーソナル・エリア・ネットワーク、(b)例えば或る建物をカバーするローカル・エリア・ネットワーク、(c)例えば或るキャンパスをカバーするキャンパス・エリア・ネットワーク、(d)例えば或る都市をカバーするメトロポリタン・エリア・ネットワーク、(e)例えば都市、地方、又は国家の境界をまたいでつながる領域をカバーするワイド・エリア・ネットワーク、又は(f)インターネット、のいずれか又はすべてを含むことができる。通信は、ネットワーク135を介して電子信号及び光信号によって行われる。Network 135 is a data communications network. Network 135 may be a private network or a public network, and may include any or all of the following: (a) a personal area network, e.g., covering a room; (b) a local area network, e.g., covering a building; (c) a campus area network, e.g., covering a campus; (d) a metropolitan area network, e.g., covering a city; (e) a wide area network, e.g., covering an area spanning city, region, or country boundaries; or (f) the Internet. Communications are conducted over network 135 by electronic and optical signals.

コンピュータ105は、プロセッサ110、及びプロセッサ110に接続されたメモリ115を含む。コンピュータ105が、本明細書においてはスタンドアロンのデバイスとして表されているが、そのように限定されるわけではなく、むしろ分散処理システムにおいて図示されていない他のデバイスへと接続されてよい。Computer 105 includes processor 110 and memory 115 connected to processor 110. Although computer 105 is depicted herein as a standalone device, it is not limited to such and may rather be connected to other devices not shown in a distributed processing system.

プロセッサ110は、命令に応答し且つ命令を実行する論理回路で構成される電子デバイスである。 Processor 110 is an electronic device consisting of logic circuits that respond to and execute instructions.

メモリ115は、コンピュータプログラムがエンコードされた有形のコンピュータにとって読み取り可能な記憶媒体である。この点に関し、メモリ115は、プロセッサ110の動作を制御するためにプロセッサ110によって読み取り可能及び実行可能なデータ及び命令、すなわちプログラムコードを記憶する。メモリ115を、ランダムアクセスメモリ(RAM)、ハードドライブ、読み出し専用メモリ(ROM)、又はこれらの組み合わせにて実現することができる。メモリ115の構成要素の1つは、プログラムモジュール120である。Memory 115 is a tangible, computer-readable storage medium on which a computer program is encoded. In this regard, memory 115 stores data and instructions, i.e., program code, that are readable and executable by processor 110 to control the operation of processor 110. Memory 115 may be implemented as random access memory (RAM), a hard drive, read-only memory (ROM), or a combination thereof. One component of memory 115 is program module 120.

プログラムモジュール120は、本明細書に記載のプロセスを実行するようにプロセッサ110を制御するための命令を含む。本明細書において、動作がコンピュータ105或いは方法又はプロセス若しくはその下位プロセスによって実行されると説明されるが、それらの動作は、実際にはプロセッサ110によって実行される。Program modules 120 include instructions for controlling processor 110 to perform the processes described herein. Although operations are described herein as being performed by computer 105 or a method or process or sub-process thereof, those operations are actually performed by processor 110.

用語「モジュール」は、本明細書において、スタンドアロンの構成要素又は複数の下位の構成要素からなる統合された構成のいずれかとして具現化され得る機能的動作を指して使用される。したがって、プログラムモジュール120は、単一のモジュールとして、或いは互いに協調して動作する複数のモジュールとして実現され得る。さらに、プログラムモジュール120は、本明細書において、メモリ115にインストールされ、したがってソフトウェアにて実現されるものとして説明されるが、ハードウェア(例えば、電子回路)、ファームウェア、ソフトウェア、又はこれらの組み合わせのいずれかにて実現することが可能である。The term "module" is used herein to refer to a functional operation that may be embodied as either a stand-alone component or an integrated configuration of multiple subcomponents. Thus, program module 120 may be implemented as a single module or as multiple modules operating in concert with one another. Furthermore, while program module 120 is described herein as being installed in memory 115 and thus implemented in software, it may be implemented in any of hardware (e.g., electronic circuitry), firmware, software, or a combination thereof.

プログラムモジュール120は、すでにメモリ115へとロードされているものとして示されているが、メモリ115へと後にロードされるように記憶装置140上に位置するように構成されてもよい。記憶装置140は、プログラムモジュール120を記憶する有形のコンピュータにとって読み取り可能な記憶媒体である。記憶装置140の例として、コンパクトディスク、磁気テープ、読み出し専用メモリ、光記憶媒体、ハードドライブ又は複数の並列なハードドライブで構成されるメモリユニット、並びにユニバーサル・シリアル・バス(USB)フラッシュドライブが挙げられる。あるいは、記憶装置140は、ランダムアクセスメモリ、或いは図示されていない遠隔のストレージシステムに位置し、且つネットワーク135を介してコンピュータ105へと接続される他の種類の電子記憶デバイスであってよい。While program module 120 is shown as already loaded into memory 115, it may be configured to reside on storage device 140 for later loading into memory 115. Storage device 140 is a tangible, computer-readable storage medium that stores program module 120. Examples of storage device 140 include compact discs, magnetic tape, read-only memory, optical storage media, a memory unit consisting of a hard drive or multiple parallel hard drives, and a universal serial bus (USB) flash drive. Alternatively, storage device 140 may be random access memory or another type of electronic storage device located in a remote storage system (not shown) and connected to computer 105 via network 135.

システム100は、本明細書においてまとめてデータソース150と称され、且つネットワーク135へと通信可能に接続されるデータソース150A及びデータソース150Bを更に含む。実際には、データソース150は、任意の数のデータソース、すなわち1つ以上のデータソースを含むことができる。データソース150は、体系化されていないデータを含み、ソーシャルメディアを含むことができる。System 100 further includes data source 150A and data source 150B, collectively referred to herein as data sources 150, and communicatively connected to network 135. In practice, data source 150 may include any number of data sources, i.e., one or more data sources. Data source 150 may include unstructured data and may include social media.

システム100は、ユーザ101によって操作され、且つネットワーク135を介してコンピュータ105へと接続されるユーザデバイス130を更に含む。ユーザデバイス130として、ユーザ101が情報及びコマンドの選択をプロセッサ110へと伝えることを可能にするためのキーボード又は音声認識サブシステムなどの入力デバイスが挙げられる。ユーザデバイス130は、表示装置又はプリンタ或いは音声合成装置などの出力デバイスを更に含む。マウス、トラックボール、又はタッチ感応式画面などのカーソル制御部が、さらなる情報及びコマンドの選択をプロセッサ110へと伝えるために表示装置上でカーソルを操作することをユーザ101にとって可能にする。The system 100 further includes a user device 130 operated by the user 101 and connected to the computer 105 via a network 135. The user device 130 includes an input device, such as a keyboard or a voice recognition subsystem, that allows the user 101 to communicate information and command selections to the processor 110. The user device 130 also includes an output device, such as a display device, a printer, or a voice synthesizer. A cursor control, such as a mouse, trackball, or touch-sensitive screen, allows the user 101 to manipulate a cursor on the display device to communicate further information and command selections to the processor 110.

プロセッサ110は、プログラムモジュール120の実行の結果122をユーザデバイス130へと出力する。あるいは、プロセッサ110は、出力を例えばデータベース又はメモリなどの記憶装置125へともたらすことができ、或いはネットワーク135を介して図示されていない遠隔のデバイスへともたらすことができる。The processor 110 outputs the results 122 of the execution of the program module 120 to the user device 130. Alternatively, the processor 110 may provide the output to a storage device 125, such as a database or memory, or via a network 135 to a remote device (not shown).

例えば、図3のフローチャートを行うプログラム11dをプログラム120としてもよい。システム100を管理装置11として動作させることができる。 For example, program 11d that executes the flowchart of Figure 3 may be program 120. The system 100 can be operated as the management device 11.

用語「・・・を備える」又は「・・・を備えている」は、そこで述べられている特徴、完全体、工程、又は構成要素が存在することを指定しているが、1つ以上の他の特徴、完全体、工程、又は構成要素、或いはそれらのグループの存在を排除してはいないと、解釈されるべきである。用語「a」及び「an」は、不定冠詞であり、したがって、それを複数有する実施形態を排除するものではない。The terms "comprises" or "comprising" should be interpreted as specifying the presence of the stated feature, integer, step, or component, but not excluding the presence of one or more other features, integers, steps, or components, or groups thereof. The terms "a" and "an" are indefinite articles and therefore do not exclude embodiments having a plurality thereof.

(他の実施形態)
なお、この発明は上記実施形態に限定されるものではなく、この発明の要旨を逸脱しない範囲で種々変形して実施可能である。要するにこの発明は、上位実施形態そのままに限定されるものではなく、実施段階ではその要旨を逸脱しない範囲で構成要素を変形して具体化できる。
(Other embodiments)
The present invention is not limited to the above-described embodiment, and various modifications can be made without departing from the spirit of the present invention. In short, the present invention is not limited to the above-described embodiment, and the components can be modified and embodied in the implementation stage without departing from the spirit of the present invention.

また、上記実施形態に開示されている複数の構成要素を適宜な組み合わせにより種々の発明を形成できる。例えば、実施形態に示される全構成要素から幾つかの構成要素を削除してもよい。さらに、異なる実施形態に亘る構成要素を適宜組み合わせてもよい。 In addition, various inventions can be formed by appropriately combining multiple components disclosed in the above embodiments. For example, some components may be deleted from all of the components shown in the embodiments. Furthermore, components from different embodiments may be appropriately combined.

[定義]
本明細書及び図面で使用される略語は次の通りである。
[Definition]
The abbreviations used in this specification and drawings are as follows:

DCN: Data Communication Network
CLI: クライアント(client)
IF: インターフェース
OSS:Open Source Software
OpS:Operation System
DCN: Data Communication Network
CLI: Client
IF: Interface OSS: Open Source Software
OpS: Operation System

10:通信局
11:管理装置
11a:光源
11b:通信部
11c:データベース
11d:プログラム
12:チャネルセレクタ
20、20#1、20#2、20#3:光ノード
51:主信号用光ファイバ
52:光ファイバ
100:システム
101:ユーザ
105:コンピュータ
110:プロセッサ
115:メモリ
120:プログラムモジュール
122:結果
125:記憶装置
130:ユーザデバイス
135:ネットワーク
140:記憶装置
150:データソース
10: Communication station 11: Management device 11a: Light source 11b: Communication unit 11c: Database 11d: Program 12: Channel selectors 20, 20#1, 20#2, 20#3: Optical node 51: Main signal optical fiber 52: Optical fiber 100: System 101: User 105: Computer 110: Processor 115: Memory 120: Program module 122: Result 125: Storage device 130: User device 135: Network 140: Storage device 150: Data source

Claims (6)

セレクタを介して複数の光ノードと光ファイバで接続され、前記セレクタで選択された前記光ノードの1つである選択光ノードへ光給電を行う光源と、
前記光源の光に重畳した制御信号で前記選択光ノードとの通信を行う通信部と、
前記光ノードそれぞれについて、蓄電電圧値、前記蓄電電圧値を確認した時刻を保持するデータベースと、
前記選択光ノードに任意の動作をさせる前の確認時に、条件1と条件2を満たしている場合に前記選択光ノードに前記動作をさせるプログラムと、
を備える管理装置。
ただし、前記条件1は、
前記選択光ノードが、前記確認時に前記動作に必要なエネルギー及び自身を駆動させるエネルギーに相当する前記蓄電電圧を有していること、
前記条件2は、
前記光ノードのうち、前記選択光ノード以外の他の光ノード全てが、前記選択光ノードの前記動作の後であって順次光給電される給電サイクルの終了後に前記他の光ノードの駆動を可能とする駆動電圧より大きい電圧を有していること、
である。
a light source connected to a plurality of optical nodes via a selector by an optical fiber, and optically feeding power to a selected optical node, which is one of the optical nodes selected by the selector;
a communication unit that communicates with the selected optical node using a control signal superimposed on the light from the light source;
a database that stores, for each of the optical nodes, a stored voltage value and a time when the stored voltage value was confirmed;
a program for causing the selected optical node to perform an arbitrary operation if conditions 1 and 2 are satisfied when checking before causing the selected optical node to perform the operation;
A management device comprising:
However, the above condition 1 is
the selected optical node has the stored voltage value corresponding to the energy required for the operation and the energy to drive itself at the time of the confirmation;
The condition 2 is
Among the optical nodes, all of the optical nodes other than the selected optical node have a drive voltage that is higher than a drive voltage that enables the other optical nodes to be driven after the operation of the selected optical node and after the end of a power supply cycle in which the optical nodes are sequentially optically powered;
is.
前記プログラムは、
前記動作が予め指定された指定動作である場合、前記選択光ノードへ光給電するエネルギーを前記指定動作で消費するエネルギーより大きくすること
を特徴とする請求項1に記載の管理装置。
The program
2. The management device according to claim 1, wherein, when the operation is a designated operation designated in advance, the energy optically supplied to the selected optical node is made larger than the energy consumed in the designated operation.
前記プログラムは、
前記指定動作を行う時間が所定時間より長くなる場合、1回の動作を行う時間が前記所定時間より短くなるように前記指定動作を分割すること
を特徴とする請求項2に記載の管理装置。
The program
3. The management device according to claim 2, wherein, when the time required to perform the specified action is longer than a predetermined time, the specified action is divided so that the time required to perform one action is shorter than the predetermined time.
前記プログラムは、
前記選択光ノードに前記動作をさせる前に、前記光ノードそれぞれに対して前記動作が実行中であるか否かを確認し、いずれかの前記光ノードが前記動作を実行中である場合、当該動作が完了するまで前記選択光ノードに前記動作をさせることを待機すること
を特徴とする請求項1から3のいずれかに記載の管理装置。
The program
A management device as described in any one of claims 1 to 3, characterized in that before causing the selected optical node to perform the operation, it checks whether the operation is being executed for each of the optical nodes, and if any of the optical nodes is executing the operation, it waits until the operation is completed before causing the selected optical node to perform the operation.
管理装置がセレクタを介して複数の光ノードと光ファイバで接続され、前記セレクタで選択された前記光ノードの1つである選択光ノードへ光給電及び通信の少なくとも一方を行う光給電システムの動作を管理する管理方法であって、
前記光ノードそれぞれについて、蓄電電圧値、前記蓄電電圧値を確認した時刻を保持すること、及び
前記選択光ノードに任意の動作をさせる前の確認時に、条件1と条件2を満たしている場合に前記選択光ノードに前記動作をさせること、
を行う管理方法。
ただし、前記条件1は、
前記選択光ノードが、前記確認時に前記動作に必要なエネルギー及び自身を駆動させるエネルギーに相当する前記蓄電電圧を有していること、
前記条件2は、
前記光ノードのうち、前記選択光ノード以外の他の光ノード全てが、前記選択光ノードの前記動作の後であって順次光給電される給電サイクルの終了後に前記他の光ノードの駆動を可能とする駆動電圧より大きい電圧を有していること、
である。
A management method for managing an operation of an optical power supply system in which a management device is connected to a plurality of optical nodes via a selector by optical fibers, and performs at least one of optical power supply and communication with a selected optical node, which is one of the optical nodes selected by the selector, comprising:
storing a stored voltage value and a time when the stored voltage value was confirmed for each of the optical nodes; and causing the selected optical node to perform an arbitrary operation if conditions 1 and 2 are satisfied at the time of confirmation before causing the selected optical node to perform the operation.
A management method for doing this.
However, the above condition 1 is
the selected optical node has the stored voltage value corresponding to the energy required for the operation and the energy to drive itself at the time of the confirmation;
The condition 2 is
Among the optical nodes, all of the optical nodes other than the selected optical node have a drive voltage that is higher than a drive voltage that enables the other optical nodes to be driven after the operation of the selected optical node and after the end of a power supply cycle in which the optical nodes are sequentially optically powered;
is.
コンピュータに管理方法を実行させるためのプログラムであって、
前記管理方法は、管理装置がセレクタを介して複数の光ノードと光ファイバで接続され、前記セレクタで選択された前記光ノードの1つである選択光ノードへ光給電及び通信の少なくとも一方を行う光給電システムの動作を管理する方法であり、
前記光ノードそれぞれについて、蓄電電圧値、前記蓄電電圧値を確認した時刻を保持すること、及び
前記選択光ノードに任意の動作をさせる前の確認時に、条件1と条件2を満たしている場合に前記選択光ノードに前記動作をさせること、
を行うプログラム。
ただし、前記条件1は、
前記選択光ノードが、前記確認時に前記動作に必要なエネルギー及び自身を駆動させるエネルギーに相当する前記蓄電電圧を有していること、
前記条件2は、
前記光ノードのうち、前記選択光ノード以外の他の光ノード全てが、前記選択光ノードの前記動作の後であって順次光給電される給電サイクルの終了後に前記他の光ノードの駆動を可能とする駆動電圧より大きい電圧を有していること、
である。
A program for causing a computer to execute a management method,
The management method is a method for managing an operation of an optical power supply system in which a management device is connected to a plurality of optical nodes via a selector by optical fibers, and performs at least one of optical power supply and communication with a selected optical node, which is one of the optical nodes selected by the selector;
storing a stored voltage value and a time when the stored voltage value was confirmed for each of the optical nodes; and causing the selected optical node to perform an arbitrary operation if conditions 1 and 2 are satisfied at the time of confirmation before causing the selected optical node to perform the operation.
A program that:
However, the above condition 1 is
the selected optical node has the stored voltage value corresponding to the energy required for the operation and the energy to drive itself at the time of the confirmation;
The condition 2 is
Among the optical nodes, all of the optical nodes other than the selected optical node have a drive voltage that is higher than a drive voltage that enables the other optical nodes to be driven after the operation of the selected optical node and after the end of a power supply cycle in which the optical nodes are sequentially optically powered;
is.
JP2024559820A 2022-11-25 2022-11-25 Optical power supply system management device Active JP7779407B2 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2022/043528 WO2024111112A1 (en) 2022-11-25 2022-11-25 Management device for optical power supply system

Publications (2)

Publication Number Publication Date
JPWO2024111112A1 JPWO2024111112A1 (en) 2024-05-30
JP7779407B2 true JP7779407B2 (en) 2025-12-03

Family

ID=91195842

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2024559820A Active JP7779407B2 (en) 2022-11-25 2022-11-25 Optical power supply system management device

Country Status (2)

Country Link
JP (1) JP7779407B2 (en)
WO (1) WO2024111112A1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014204612A (en) 2013-04-08 2014-10-27 キヤノン株式会社 Power feeding device, power feeding method and program
WO2021014841A1 (en) 2019-07-22 2021-01-28 京セラ株式会社 Light power supply system
JP2021175280A (en) 2020-04-24 2021-11-01 富士通クライアントコンピューティング株式会社 Information processing apparatus, control device, and program
WO2022130525A1 (en) 2020-12-16 2022-06-23 日本電信電話株式会社 Monitoring control device and optical power feeding system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014204612A (en) 2013-04-08 2014-10-27 キヤノン株式会社 Power feeding device, power feeding method and program
WO2021014841A1 (en) 2019-07-22 2021-01-28 京セラ株式会社 Light power supply system
JP2021175280A (en) 2020-04-24 2021-11-01 富士通クライアントコンピューティング株式会社 Information processing apparatus, control device, and program
WO2022130525A1 (en) 2020-12-16 2022-06-23 日本電信電話株式会社 Monitoring control device and optical power feeding system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
藤本 達也、他,遠隔光路切替ノード実現に向けた光給電効率の検討,電子情報通信学会2021年総合大会講演論文集 通信2,日本,電子情報通信学会,2021年03月,p.260

Also Published As

Publication number Publication date
JPWO2024111112A1 (en) 2024-05-30
WO2024111112A1 (en) 2024-05-30

Similar Documents

Publication Publication Date Title
US7409472B2 (en) Device controller and input/output system
CN104811339A (en) Intelligent networking method based on arbitration-free bus
CN103135731A (en) Method and device for intelligent power supply control for portable computer
JP5233477B2 (en) Control system for distributed power system
CN104954213A (en) Arbitration bus-free networking system applicable to intelligent capacitor
US20120278552A1 (en) Remote execution of raid in large topologies
JP7779407B2 (en) Optical power supply system management device
JP5396766B2 (en) Control system for distributed power system
CN103761131A (en) Multi-board-card automatic updating method and system based on internal storage sharing
CN106341180B (en) A kind of optical module and optical module control method, device
KR20240143232A (en) Photovoltaic power generation system, and apparatus and method for updating firmware of mlpe
CN101651558A (en) Power saving management method and system
US10978875B2 (en) On-site ESS management device
CN117040103A (en) Dual power supply circuit of energy storage system, energy storage system and power supply control method
KR20240146472A (en) Photovoltaic power generation system, apparatus and method for updating cumulative power generation data of mlpe
KR20110110938A (en) Solar power generation system with individual management function of solar cell module
CN106155954A (en) The system and method that a kind of module identification and COM1 distribute automatically
CN113658351A (en) Product production method and device, electronic equipment and storage medium
CN101374086B (en) Access method and apparatus for farend equipment of distributed communication system
CN112463045B (en) Redundant disk array diversity batch control method, device, equipment and product
JP7795139B2 (en) Determination device and determination method
JP2010193264A (en) Network system and transmission apparatus
WO2024236828A1 (en) Maintenance management system
JP7704306B2 (en) Optical power supply system management device and file transmission method
CN108663882B (en) Light source system and method for generating light combination beam with target brightness value

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20250311

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20250620

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20250623

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20250909

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20250926

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20251021

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20251103

R150 Certificate of patent or registration of utility model

Ref document number: 7779407

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150