JP7807630B2 - Traffic management system - Google Patents
[go: Go Back, main page]

JP7807630B2 - Traffic management system - Google Patents

Traffic management system

Info

Publication number
JP7807630B2
JP7807630B2 JP2021090537A JP2021090537A JP7807630B2 JP 7807630 B2 JP7807630 B2 JP 7807630B2 JP 2021090537 A JP2021090537 A JP 2021090537A JP 2021090537 A JP2021090537 A JP 2021090537A JP 7807630 B2 JP7807630 B2 JP 7807630B2
Authority
JP
Japan
Prior art keywords
work
simulation
schedule
gse
ground support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021090537A
Other languages
Japanese (ja)
Other versions
JP2022182803A (en
Inventor
いずみ 伊藤
友哉 水谷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinfonia Technology Co Ltd
Original Assignee
Sinfonia Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinfonia Technology Co Ltd filed Critical Sinfonia Technology Co Ltd
Priority to JP2021090537A priority Critical patent/JP7807630B2/en
Publication of JP2022182803A publication Critical patent/JP2022182803A/en
Application granted granted Critical
Publication of JP7807630B2 publication Critical patent/JP7807630B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、空港に配備されている複数の地上支援装置の運行を管理する運行管理システムに関する。 The present invention relates to an operation control system that manages the operation of multiple ground support devices deployed at an airport.

従来より、空港には種々の地上支援作業を行うための複数の地上支援装置が配備されている。このような地上支援装置は一般的にGSE(Ground Support Equipment)と呼ばれており、GSEにはハイリフトローダ、ベルトローダ、トーイングトラクタ、パッセンジャーステップ等の様々な種類がある。例えば、特許文献1には、GSEの一例として、電動式のベルトローダが開示されている。現状、各GSEをいつ、どこで使うかといった作業スケジュールは人手によって組まれている。 Traditionally, airports have deployed multiple pieces of ground support equipment to perform various ground support tasks. Such ground support equipment is generally called GSE (Ground Support Equipment), and there are various types of GSE, including high-lift loaders, belt loaders, towing tractors, and passenger steps. For example, Patent Document 1 discloses an electric belt loader as an example of a GSE. Currently, work schedules, such as when and where to use each GSE, are created manually.

特開2012-240812号公報JP 2012-240812 A

GSEによる地上支援作業に遅れが生じた場合や、フライトスケジュールに変更が生じた場合等は、再度作業スケジュールを組み直す必要がある。また、作業スケジュールにそもそも不備があれば、作業スケジュール通りに作業を行っていても、作業に支障が生じることがある。これらの場合に、作業スケジュールを人手によって組み直すのは非常に手間であり、時間もかかるため、GSEによる地上支援作業にさらなる遅れや混乱をもたらすことが問題となっていた。 If there is a delay in the ground support work performed by the GSE or if there is a change in the flight schedule, the work schedule must be rescheduled. Furthermore, if there are any deficiencies in the work schedule to begin with, disruptions to the work may occur even if the work is being carried out according to schedule. In these cases, manually rescheduling the work schedule is extremely time-consuming and cumbersome, which causes further delays and confusion in the ground support work performed by the GSE, creating a problem.

本発明は、上述の課題を鑑みてなされたものであり、地上支援装置による作業を円滑に遂行できるようにすることを目的とする。 The present invention was made in consideration of the above-mentioned problems, and aims to enable work to be carried out smoothly using ground support equipment.

本発明は、空港に配備されている複数の地上支援装置の運行を管理する運行管理システムであって、前記空港のフライトスケジュールに基づいて、前記複数の地上支援装置による作業スケジュールを作成するスケジュール作成部と、前記作業スケジュールに基づいて、前記各地上支援装置の作業位置までの走行経路を設定する走行経路設定部と、前記作業スケジュール及び前記走行経路に従って前記複数の地上支援装置を稼働させた場合のシミュレーションを実行するシミュレーション部と、を備えることを特徴とする。 The present invention is an operation management system that manages the operation of multiple ground support equipment deployed at an airport, and is characterized by comprising: a schedule creation unit that creates a work schedule for the multiple ground support equipment based on the airport's flight schedule; a travel route setting unit that sets a travel route to a work position for each of the ground support equipment based on the work schedule; and a simulation unit that runs a simulation of what would happen if the multiple ground support equipment were operated in accordance with the work schedule and the travel route.

本発明に係る運行管理システムは、スケジュール作成部によって作成された作業スケジュール、及び、走行経路設定部によって設定された各地上支援装置の走行経路に基づいてシミュレーションを実行するシミュレーション部を備えている。シミュレーションを実行することによって、作業スケジュール及び走行経路の問題点を事前に発見することができる。したがって、作業スケジュール及び走行経路の見直しを早期に行うことができ、地上支援装置による作業を円滑に遂行できるようになる。 The operation management system of the present invention includes a simulation unit that runs a simulation based on the work schedule created by the schedule creation unit and the travel routes of each ground support device set by the travel route setting unit. By running a simulation, problems with the work schedule and travel routes can be discovered in advance. This allows for early revision of the work schedule and travel routes, enabling work by the ground support devices to be carried out smoothly.

本発明において、前記シミュレーションの一種として、前記複数の地上支援装置による作業を開始する前に、前記作業スケジュール及び前記走行経路に問題があるか否かを確認する事前シミュレーションを実行可能であり、前記事前シミュレーションによって問題が見つかると、前記スケジュール作成部が前記作業スケジュールを再作成するとともに、前記走行経路設定部が前記走行経路を再設定することが好ましい。 In the present invention, as one type of simulation, a preliminary simulation can be performed before work by the multiple ground support devices is started to check whether there are any problems with the work schedule and the travel route, and if a problem is found in the preliminary simulation, it is preferable that the schedule creation unit re-create the work schedule and the travel route setting unit re-set the travel route.

事前シミュレーションを実行することによって、作業スケジュール及び走行経路にそもそも不備がある場合でも、各地上支援装置の稼働前に作業スケジュール及び走行経路の見直しを行うことができる。 By performing a preliminary simulation, even if there are deficiencies in the work schedule and driving route to begin with, the work schedule and driving route can be revised before each ground support device is put into operation.

本発明において、前記シミュレーション部は、前記複数の地上支援装置の現在位置に関する情報、及び、前記複数の地上支援装置による作業進捗に関する情報のうち少なくとも何れかの情報を受け取ると、前記シミュレーションの一種として、前記少なくとも何れかの情報に基づいて遅延が見込まれる作業があるか否かを確認する進捗シミュレーションを実行可能であることが好ましい。 In the present invention, it is preferable that, upon receiving at least one of information regarding the current positions of the plurality of ground support devices and information regarding the progress of work performed by the plurality of ground support devices, the simulation unit is capable of executing, as one type of simulation, a progress simulation that checks whether any work is expected to be delayed based on at least one of the information.

このように、現在の作業の進捗状況を考慮したうえで、遅延が見込まれる作業を見つけ出すことによって、作業スケジュールの見直しが早期に可能となり、地上支援装置による作業を継続的に円滑に行うことができる。 In this way, by taking into account the progress of current work and identifying work that is likely to be delayed, work schedules can be revised early, allowing ground support equipment work to be carried out smoothly and continuously.

本発明において、前記シミュレーション部は、前記進捗シミュレーションによって遅延が見込まれる作業が見つかると、当該作業を応援可能な作業者及び/又は当該作業の応援に利用できる前記地上支援装置を探索することが好ましい。 In the present invention, when the progress simulation identifies a task that is expected to be delayed, the simulation unit preferably searches for workers who can assist with the task and/or the ground support equipment that can be used to assist with the task.

このような構成によれば、進捗シミュレーションによって今後遅れそうな作業が見つかった場合でも、応援可能な作業者や地上支援装置に応援を要請すれば、作業の遅れを抑制することができる。 With this configuration, even if the progress simulation identifies work that is likely to be delayed, delays in the work can be reduced by requesting assistance from available workers or ground support equipment.

本発明において、前記シミュレーション部は、前記シミュレーションの一種として、前記フライトスケジュールに変更が発生した場合に、前記作業スケジュールのうち前記フライトスケジュールの変更の影響が及ぶ範囲を特定する影響シミュレーションを実行可能であり、前記シミュレーション部は、前記影響シミュレーションによって特定された前記範囲に関する情報を前記スケジュール作成部に送信し、前記スケジュール作成部は、前記範囲において前記作業スケジュールを再作成することが好ましい。 In the present invention, the simulation unit is capable of executing, as one type of simulation, an impact simulation that identifies the range of the work schedule that will be affected by a change to the flight schedule when a change to the flight schedule occurs, and the simulation unit preferably transmits information about the range identified by the impact simulation to the schedule creation unit, and the schedule creation unit recreates the work schedule within that range.

このように、フライトスケジュールの変更の影響が及ぶ範囲を特定することで、作業スケジュールを再作成すべき範囲を限定することができ、迅速に作業スケジュールを再作成することができる。 In this way, by identifying the scope of impact of flight schedule changes, the scope of work schedules that need to be re-created can be limited, allowing work schedules to be re-created quickly.

地上支援作業の作業スケジュール及び地上支援装置の走行経路の見直しを早期に行うことができ、地上支援装置による作業を円滑に遂行できるようになる。 This will enable early revision of ground support work schedules and ground support equipment routes, ensuring smooth work by ground support equipment.

空港の設備を簡易的に示す平面図である。FIG. 1 is a simplified plan view of airport facilities. 本実施形態の空港システムを示すブロック図である。1 is a block diagram showing an airport system according to an embodiment of the present invention; (a)フライトスケジュールに含まれる情報の一例を示す表、及び、(b)積載物のリストの一例を示す表である。1A is a table showing an example of information included in a flight schedule; and FIG. 1B is a table showing an example of a cargo list. (a)作業者関連情報の一例を示す表、及び、(b)GSE関連情報の一例を示す表である。1A is a table showing an example of worker-related information; FIG. 1B is a table showing an example of GSE-related information; 作業スケジュールに含まれる情報の一例を示す表である。10 is a table showing an example of information included in a work schedule. 作業者端末に送信される情報の一例を示す表である。10 is a table showing an example of information transmitted to a worker terminal. GSEに送信される情報の一例を示す表である。10 is a table showing an example of information transmitted to a GSE. 作業エリアに設定した平面グリッドを示す平面図である。FIG. 10 is a plan view showing a plane grid set in a work area. GSEの作業位置の一例を示す平面図である。FIG. 10 is a plan view showing an example of a working position of a GSE. GSEの走行経路の一例を示す平面図である。FIG. 2 is a plan view showing an example of a travel path of a GSE. GSEの予約領域の一例を示す平面図である。FIG. 10 is a plan view showing an example of a reserved area of a GSE. 事前シミュレーションを含む一連の処理を示すフローチャートである。1 is a flowchart showing a series of processes including a pre-simulation. 進捗シミュレーションを含む一連の処理を示すフローチャートである。10 is a flowchart showing a series of processes including a progress simulation. 影響シミュレーションを含む一連の処理を示すフローチャートである。10 is a flowchart showing a series of processes including an influence simulation.

以下、本発明に係る運行管理システムの実施形態について、図面を参照しつつ説明する。 An embodiment of the traffic management system according to the present invention will be described below with reference to the drawings.

図1は、空港1の設備を簡易的に示す平面図である。図1に示すように、空港1にはターミナルビル2が設けられている。ターミナルビル2には、複数のゲート3が設けられており、着陸した航空機100は所定のゲート3まで移動して停止する。複数のゲート3には、ボーディングブリッジ4が接続されている。ボーディングブリッジ4は、ゲート3から航空機100に乗客及び乗員を乗降させるための設備である。ボーディングブリッジ4が利用できない場合には、後述のパッセンジャーステップ13eを利用することもある。空港1において航空機100が駐機している間、乗客及び乗員の乗降、貨物及び手荷物の搬出入、燃料の補充、機内外の清掃、機体設備の点検、除氷作業、電源の供給等、各種作業(地上支援作業)が行われる。そして、地上支援作業が完了して準備が整うと、航空機100は空港1に設けられた滑走路(不図示)から離陸する。 Figure 1 is a simplified plan view of the facilities at airport 1. As shown in Figure 1, airport 1 has a terminal building 2. Terminal building 2 has multiple gates 3, and a landing aircraft 100 moves to a designated gate 3 and stops there. Passenger bridges 4 are connected to the multiple gates 3. Passenger bridges 4 are facilities for boarding and disembarking passengers and crew from gate 3 to aircraft 100. If passenger bridges 4 are unavailable, passenger step 13e, described below, may be used. While aircraft 100 is parked at airport 1, various operations (ground support operations) are performed, such as boarding and disembarking passengers and crew, loading and unloading cargo and baggage, refueling, cleaning the interior and exterior of the aircraft, inspecting aircraft equipment, deicing, and supplying power. Once ground support operations are completed and preparations are complete, aircraft 100 takes off from a runway (not shown) at airport 1.

地上支援作業では、複数のGSE13が使用される。GSEとは、Ground Support Equipmentの略であり、地上支援装置を意味する。GSE13には様々な種類があるが、一例を挙げると、航空機100に給油するための給油車13a、乗客の手荷物を機内に搬出入するベルトローダ13b、航空機100を牽引するトーイングトラクタ13c、貨物を機内に搬出入するハイリフトローダ13d、乗員及び乗客を機内に直接乗降させるためのパッセンジャーステップ13e等がある。給油車13a、ベルトローダ13b、トーイングトラクタ13c、ハイリフトローダ13d、パッセンジャーステップ13eは、空港1内を走行する作業車両である。なお、図1に示すように、空港1内において、複数のGSE13によって地上支援作業が行われるエリアを作業エリア102と呼ぶ。 Multiple GSEs 13 are used for ground support operations. GSE stands for Ground Support Equipment. There are various types of GSEs 13, including a fuel truck 13a for refueling the aircraft 100, a belt loader 13b for loading and unloading passenger baggage onto and off the aircraft, a towing tractor 13c for towing the aircraft 100, a high-lift loader 13d for loading and unloading cargo onto and off the aircraft, and a passenger step 13e for directly loading and unloading crew and passengers onto and off the aircraft. The fuel truck 13a, belt loader 13b, towing tractor 13c, high-lift loader 13d, and passenger step 13e are work vehicles that travel within the airport 1. As shown in Figure 1, the area within the airport 1 where ground support operations are performed by multiple GSEs 13 is called the work area 102.

現状、GSE13による作業スケジュールは人手によって組まれている。GSE13による地上支援作業に遅れが生じた場合や、フライトスケジュールに変更が生じた場合等は、再度作業スケジュールを組み直す必要がある。また、作業スケジュールにそもそも不備があれば、作業スケジュール通りに作業を行っていても、作業に支障が生じることがある。これらの場合に、作業スケジュールを人手によって組み直すのは非常に手間であり、時間もかかるため、GSE13による地上支援作業にさらなる遅れや混乱をもたらすことが問題となっていた。そこで、本願発明者らは、これらの課題を解決すべく、空港1におけるGSE13の運行管理システムを考案した。以下、この運行管理システムについて詳細に説明する。 Currently, work schedules for GSE 13 are created manually. If there is a delay in ground support work by GSE 13 or if there is a change in the flight schedule, the work schedule must be rescheduled. Furthermore, if there is an error in the work schedule to begin with, work may be disrupted even if it is being carried out according to the schedule. In these cases, manually rescheduling the work schedule is extremely time-consuming and cumbersome, which causes further delays and confusion in ground support work by GSE 13, posing a problem. To address these issues, the inventors of the present application have devised an operation management system for GSE 13 at airport 1. This operation management system is described in detail below.

(空港システム)
図2は、本実施形態の空港システム10を示すブロック図である。本実施形態の空港システム10は、航空管制21と、GSE管制22(本発明の運行管理システムに相当)と、複数のGSE13と、複数の作業者端末15とを含む。
(Airport System)
2 is a block diagram showing the airport system 10 of this embodiment. The airport system 10 of this embodiment includes an air traffic control system 21, a GSE control system 22 (corresponding to the traffic management system of the present invention), a plurality of GSEs 13, and a plurality of operator terminals 15.

(GSE)
各GSE13は、通信部41、位置情報取得部42、走行制御部43、ID取得部44を有する。GSE13は、通信部41を介して、GSE管制22と通信可能であり、GSE管制22との間で情報の送受信が可能に構成されている。また、GSE13は、通信部41を介して、他のGSE13や作業者端末15と通信可能に構成されてもよい。位置情報取得部42は、例えば、GPS(Global Positioning System:全地球測位システム)信号を受信して自車の位置情報を取得する。自車の位置情報は、GPS以外の測位方式を用いて取得してもよい。位置情報取得部42で取得された位置情報は、GSE13の現在位置に関する情報として、通信部41を介してGSE管制22に送信される。
(GSE)
Each GSE 13 has a communication unit 41, a location information acquisition unit 42, a driving control unit 43, and an ID acquisition unit 44. The GSE 13 is capable of communicating with the GSE control 22 via the communication unit 41 and is configured to be able to transmit and receive information to and from the GSE control 22. The GSE 13 may also be configured to be able to communicate with other GSEs 13 and the operator terminal 15 via the communication unit 41. The location information acquisition unit 42 receives, for example, a GPS (Global Positioning System) signal to acquire location information of the vehicle. The location information of the vehicle may also be acquired using a positioning method other than GPS. The location information acquired by the location information acquisition unit 42 is transmitted to the GSE control 22 via the communication unit 41 as information regarding the current location of the GSE 13.

走行制御部43は、GSE管制22から送信される後述の作業スケジュール及び各GSE13の走行経路、位置情報取得部42によって取得した自車の位置情報等に基づいて、自車の走行制御を行う。つまり、GSE13は自動運転可能に構成されている。ID取得部44は、作業者端末15に表示される作業者IDや作業者が有するIDカードに付与されている作業者IDを読み取ることができるように構成されている。作業者IDはバーコードやICタグでもよいし、その他の構成でもよい。なお、作業者がID取得部44に作業者IDを手入力するようにしてもよい。 The driving control unit 43 controls the driving of the vehicle based on the work schedule (described below) transmitted from the GSE control 22, the driving route of each GSE 13, and the vehicle's location information acquired by the location information acquisition unit 42. In other words, the GSE 13 is configured to be capable of autonomous driving. The ID acquisition unit 44 is configured to be able to read the worker ID displayed on the worker terminal 15 or the worker ID attached to the ID card held by the worker. The worker ID may be a barcode, an IC tag, or some other configuration. The worker may manually input the worker ID into the ID acquisition unit 44.

GSE13のエンジンのON/OFF(電動式のGSE13の場合は電源のON/OFF)に関する情報や、GSE13が有する荷役装置やアウトリガー等の動作状況に関する情報は、作業進捗に関する情報として、通信部41を介してGSE管制22に送信される。また、例えば、ハイリフトローダやベルトローダ、貨物搬送用のトーイングトラクタやドーリー等の貨物を取り扱うGSE13には、貨物に付与された貨物IDを読み取る不図示の貨物ID読取装置が設けられていてもよい。この場合、貨物ID読取装置によって読み取られた貨物IDは、作業進捗に関する情報として、GSE管制22に送信される。貨物IDはバーコードやICタグでもよいし、その他の構成でもよい。さらに、GSE13が電動式の場合は、GSE13のバッテリー残量に関する情報が作業進捗に関する情報として、GSE管制22に送信されてもよい。 Information regarding the ON/OFF status of the GSE 13's engine (or the ON/OFF status of the power supply in the case of an electrically powered GSE 13) and information regarding the operating status of the GSE 13's cargo handling equipment, outriggers, etc., are transmitted to the GSE control 22 via the communication unit 41 as information regarding work progress. Furthermore, a GSE 13 that handles cargo, such as a high-lift loader, belt loader, or a towing tractor or dolly for transporting cargo, may be provided with a cargo ID reader (not shown) that reads the cargo ID assigned to the cargo. In this case, the cargo ID read by the cargo ID reader is transmitted to the GSE control 22 as information regarding work progress. The cargo ID may be a barcode, an IC tag, or some other configuration. Furthermore, if the GSE 13 is electrically powered, information regarding the remaining battery charge of the GSE 13 may be transmitted to the GSE control 22 as information regarding work progress.

(作業者端末)
作業者端末15は、GSE13を用いて地上支援作業を行う作業者が携帯する端末である。例えば、作業者端末15は、GPSで現在地を特定可能であり、GSE管制22と通信可能なスマートフォンである。ただし、作業者端末15は、作業者の現在地が確認可能であり、GSE管制22と通信可能であれば、どのような端末を用いてもよい(ガラパゴス携帯と称される携帯電話機、無線通信機、タブレット端末、スマートグラス又はスマートウォッチ等のウェアラブル端末等)。作業者端末15で取得された位置情報は、作業者の現在位置に関する情報としてGSE管制22に送信される。また、作業者端末15は、GSE13や他の作業者端末15と通信可能に構成されてもよい。作業者端末15には、作業者が作業の進捗状況(作業の開始、完了、問題発生等)を入力することができ、入力された進捗状況は作業進捗に関する情報としてGSE管制22に送信される。
(Worker terminal)
The worker terminal 15 is a terminal carried by a worker performing ground support work using the GSE 13. For example, the worker terminal 15 is a smartphone capable of identifying the current location using GPS and communicating with the GSE control 22. However, the worker terminal 15 may be any terminal (e.g., a mobile phone known as a Galapagos mobile phone, a wireless communication device, a tablet terminal, a wearable terminal such as smart glasses or a smart watch) that can confirm the worker's current location and communicate with the GSE control 22. The location information acquired by the worker terminal 15 is transmitted to the GSE control 22 as information regarding the worker's current location. The worker terminal 15 may also be configured to be able to communicate with the GSE 13 and other worker terminals 15. The worker can input the progress of the work (e.g., start, completion, occurrence of problems, etc.) into the worker terminal 15, and the input progress information is transmitted to the GSE control 22 as information regarding the work progress.

(GSE管制)
GSE管制22は、通信部31、スケジュール作成部32、走行経路設定部33、シミュレーション部34を有する。GSE管制22は、通信部31を介して、航空管制21、複数のGSE13、及び、複数の作業者端末15と通信可能である。例えば、GSE管制22は、通信部31を介して、航空管制21から空港1のフライトスケジュールを受信したり、各GSE13の現在位置及び作業進捗に関する情報を受信したり、各作業者端末15(作業者)の現在位置及び作業進捗に関する情報を受信したりすることが可能である。なお、フライトスケジュールに関しては、飛行機を運行するエアライン各社から受信するようにしてもよい。
(GSE control)
The GSE control 22 has a communication unit 31, a schedule creation unit 32, a travel route setting unit 33, and a simulation unit 34. The GSE control 22 is capable of communicating with the air traffic control 21, a plurality of GSEs 13, and a plurality of worker terminals 15 via the communication unit 31. For example, the GSE control 22 is capable of receiving the flight schedule of the airport 1 from the air traffic control 21 via the communication unit 31, receiving information on the current position and work progress of each GSE 13, and receiving information on the current position and work progress of each worker terminal 15 (worker). Note that the flight schedule may be received from each airline operating the aircraft.

GSE管制22は、地上支援作業を行う作業者に関する情報(作業者関連情報)、GSE13に関する情報(GSE関連情報)、空港1の地図情報、航空機100の機種情報等を有している。GSE管制22が有する各種情報は、スケジュール作成部32、走行経路設定部33及びシミュレーション部34によって適宜利用される。 GSE control 22 stores information about workers performing ground support work (worker-related information), information about GSE 13 (GSE-related information), map information about airport 1, and model information about aircraft 100. The various information stored in GSE control 22 is used as appropriate by the schedule creation unit 32, flight route setting unit 33, and simulation unit 34.

(スケジュール作成部)
スケジュール作成部32は、空港1のフライトスケジュールと、作業者関連情報と、GSE関連情報とに基づいて、複数のGSE13による作業スケジュールを作成する。
(Schedule Creation Department)
The schedule creation unit 32 creates a work schedule for a plurality of GSEs 13 based on the flight schedule of the airport 1, worker-related information, and GSE-related information.

GSE管制22は、通信部31を介して、フライトスケジュールを航空管制21から受信する。受信したフライトスケジュールには、例えば、図3(a)に示すような各種情報が含まれている。また、フライトスケジュールには、図3(b)のような積載物リストが添付されていることが望ましい。積載物リストは、図3(a)のフライト番号ごとに生成され、それぞれの航空機100に積載されている貨物の情報が含まれている。 GSE control 22 receives flight schedules from air traffic control 21 via communication unit 31. The received flight schedule includes various information, for example, as shown in Figure 3(a). It is also desirable that the flight schedule be accompanied by a cargo list, as shown in Figure 3(b). The cargo list is generated for each flight number in Figure 3(a) and includes information on the cargo being loaded on each aircraft 100.

図4(a)に作業者関連情報の一例を示す。作業者関連情報には、作業者が担当可能な作業内容、運転・使用が可能なGSE13の種類、その日の勤務状況(出勤状況)等が含まれる。また、各作業者には個別に作業者IDが割り振られている。図4(b)にGSE関連情報の一例を示す。GSE関連情報には、それぞれのGSE13に割り振られたGSE ID、GSE13の種類(車種や機種等)、対応可能な航空機100の機種、GSE13に付属の補助器具、稼働状況(正常稼働中、メンテナンス中、異常発生中、有人運転中・無人運転中等の情報)、待機場所(稼働中の場合は作業中のゲート番号等)が含まれている。 Figure 4(a) shows an example of worker-related information. Worker-related information includes the tasks that a worker can handle, the type of GSE 13 that they can operate and use, their work status (attendance status) for that day, etc. Each worker is also assigned an individual worker ID. Figure 4(b) shows an example of GSE-related information. The GSE-related information includes the GSE ID assigned to each GSE 13, the type of GSE 13 (such as vehicle type and model), the aircraft 100 models that it is compatible with, auxiliary equipment attached to the GSE 13, operating status (such as information on normal operation, under maintenance, abnormality, manned operation, unmanned operation, etc.), and waiting location (such as the gate number being worked on if in operation).

スケジュール作成部32は、上述したようなフライトスケジュール、作業者関連情報及びGSE関連情報に基づいて、作業スケジュールを作成する。その際、スケジュール作成部32は、GSE13及び作業者の現在位置も考慮して、作業スケジュールを作成するのが好ましい。スケジュール作成部32によって作成された作業スケジュールは、GSE管制22の通信部31を介して各GSE13及び各作業者の有する作業者端末15に送信される。 The schedule creation unit 32 creates a work schedule based on the flight schedule, worker-related information, and GSE-related information described above. In doing so, the schedule creation unit 32 preferably creates the work schedule taking into consideration the current locations of the GSE 13 and workers. The work schedule created by the schedule creation unit 32 is transmitted to each GSE 13 and the worker terminal 15 held by each worker via the communication unit 31 of the GSE control 22.

図5に、スケジュール作成部32によって作成される作業スケジュールの一例を示す。作業スケジュールには、航空機100の離発着時刻、離発着時の滑走路、地上支援作業を行うゲート番号、航空機100の機種、作業内容ごとの担当作業者、使用するGSE13のID等が含まれる。例えば、フライト番号1に関しては、作業者IDが001の作業者が、GSE IDがHL-01のハイリフトローダを使って、貨物搬出の作業を担当することを示している。なお、図5において、PSはパッセンジャーステップ、TTはトーイングトラクタ、BLはベルトローダを示す。GSE管制22が作成する作業スケジュールに含まれる情報の種類は、図5に示したものに限定されず適宜変更が可能である。 Figure 5 shows an example of a work schedule created by the schedule creation unit 32. The work schedule includes information such as the takeoff and landing times of the aircraft 100, the runways for takeoff and landing, the gate number for ground support operations, the aircraft 100 model, the operators responsible for each operation, and the ID of the GSE 13 to be used. For example, for flight number 1, the operator with operator ID 001 will be in charge of cargo removal using a high-lift loader with GSE ID HL-01. In Figure 5, PS stands for passenger step, TT stands for towing tractor, and BL stands for belt loader. The types of information included in the work schedule created by the GSE control 22 are not limited to those shown in Figure 5 and can be changed as appropriate.

スケジュール作成部32によって作成された作業スケジュールは、通信部31を介して、各GSE13及び各作業者端末15に送信される。作業者端末15へ送信される作業スケジュールの一例を図6に示す。本実施形態では、それぞれの作業者が有する作業者端末15へ送信される作業スケジュールの内容は、その作業者が担当する作業に関する情報のみである。図6は、作業者IDが001の作業者が有する作業者端末15に送信される内容である。図5及び図6には記載していないが、各作業の開始時刻及び終了予定時刻を決めておくとより円滑に作業を進めることが可能である。 The work schedule created by the schedule creation unit 32 is transmitted to each GSE 13 and each worker terminal 15 via the communication unit 31. An example of a work schedule transmitted to a worker terminal 15 is shown in Figure 6. In this embodiment, the content of the work schedule transmitted to the worker terminal 15 owned by each worker contains only information related to the work that the worker is responsible for. Figure 6 shows the content transmitted to the worker terminal 15 owned by the worker with worker ID 001. Although not shown in Figures 5 and 6, determining the start time and planned end time of each task will enable work to proceed more smoothly.

GSE13へ送信される作業スケジュールの一例を図7に示す。本実施形態では、それぞれのGSE13へ送信される作業スケジュールの内容は、そのGSE13が担当する作業に関する情報のみである。図7は、GSE IDがHL-01のハイリフトローダに送信される内容である。図7の作業スケジュールには作業者IDが含まれているため、GSE13のID取得部44に、乗車した作業者が作業者IDを入力することで、スケジュール通りの作業者が乗車しているかを確認することが可能である。GSE13の作業スケジュールに関しても、各作業の開始時刻及び終了予定時刻を決めておくとより円滑に作業を進めることが可能である。 An example of a work schedule sent to a GSE 13 is shown in Figure 7. In this embodiment, the content of the work schedule sent to each GSE 13 contains only information about the work that that GSE 13 is responsible for. Figure 7 shows the content sent to a high-lift loader with a GSE ID of HL-01. The work schedule in Figure 7 includes the worker ID, so by having the worker on board enter their worker ID into the ID acquisition unit 44 of the GSE 13, it is possible to confirm that the worker on board is according to schedule. Setting the start and end times for each task in the GSE 13 work schedule will also allow work to proceed more smoothly.

(走行経路設定部)
走行経路設定部33は、スケジュール作成部32によって作成された作業スケジュールで使用されることになっている各GSE13について、各GSE13の現在位置及び作業位置に基づいて、各GSE13の現在位置から作業位置までの走行経路を設定する。
(Travel route setting unit)
The travel route setting unit 33 sets a travel route from the current position of each GSE 13 to the work position for each GSE 13 to be used in the work schedule created by the schedule creation unit 32, based on the current position and work position of each GSE 13.

走行経路設定部33は、航空機100の停止位置及び機種情報等に基づいて、作業エリア102内における各GSE13の作業位置を決定する。作業エリア102には、予め図8のような平面グリッドGが割り当てられている。航空機100の停止位置は、平面グリッドG上にて、GSE管制22が有する空港1の地図情報や機種情報等から決められる。平面グリッドGの大きさやマスの細かさは、航空機100の大きさに応じて変更するようにしてもよい。また、平面グリッドGは予め固定的に設定されていてもよい。 The flight path setting unit 33 determines the working position of each GSE 13 within the working area 102 based on the stopping position of the aircraft 100, aircraft model information, etc. A planar grid G as shown in Figure 8 is assigned to the working area 102 in advance. The stopping position of the aircraft 100 is determined on the planar grid G based on map information of the airport 1 and aircraft model information held by the GSE control 22. The size and fineness of the grid G may be changed depending on the size of the aircraft 100. Alternatively, the planar grid G may be set to a fixed value in advance.

走行経路設定部33は、まず、各GSE13の作業位置を決定する。図9には、作業位置の一例として、給油車13aの作業位置P1及びハイリフトローダ13dの作業位置P2を図示している。作業位置P1、P2は、航空機100の停止位置及び機種情報等に基づいて、平面グリッドGのマス単位で設定される。また、走行経路設定部33は、GSE管制22が有している各GSE13の現在位置に関する情報を取得する。 The travel path setting unit 33 first determines the work position of each GSE 13. Figure 9 illustrates, as examples of work positions, work position P1 of the tanker truck 13a and work position P2 of the high-lift loader 13d. Work positions P1 and P2 are set in units of squares on the planar grid G based on the stopping position of the aircraft 100, model information, etc. The travel path setting unit 33 also acquires information related to the current position of each GSE 13 held by the GSE control 22.

次に、走行経路設定部33は、地上支援作業を行う各GSE13の現在位置から作業位置までの走行経路を設定する。図10には、走行経路の一例として、給油車13aの走行経路R1及びハイリフトローダ13dの走行経路R2を図示している。走行経路R1、R2は、平面グリッドGの設定エリアの外側においては、基本的に、作業エリア102の周りに設定されている通行路103を通るように設定される。また、平面グリッドGの設定エリア内では、走行経路R1、R2はマス単位(図10のハッチング参照)で設定される。 Next, the travel route setting unit 33 sets a travel route from the current position of each GSE 13 performing ground support work to the work position. Figure 10 illustrates, as examples of travel routes, travel route R1 for the fuel tanker 13a and travel route R2 for the high-lift loader 13d. Outside the set area of the planar grid G, travel routes R1 and R2 are basically set to pass through the access route 103 set around the work area 102. Furthermore, within the set area of the planar grid G, travel routes R1 and R2 are set in units of squares (see hatching in Figure 10).

走行経路設定部33によって設定された走行経路は、GSE管制22の通信部31を介して各GSE13に送信される。各GSE13の走行制御部43は、受信した走行経路に従って現在位置から作業位置までの走行制御を行う。このとき、一斉に各GSE13が移動を開始すると、GSE13同士が干渉することがあるので、走行経路設定部33は、各GSE13の走行経路の設定時に各GSE13を移動させる順番も決定するのが好ましい。例えば、最初に給油車13aを移動させ、給油車13aが平面グリッドG内に進入したタイミングで、ハイリフトローダ13dの移動を開始させるようにすれば、給油車13aとハイリフトローダ13dの干渉を防止できる。 The travel route set by the travel route setting unit 33 is transmitted to each GSE 13 via the communication unit 31 of the GSE control 22. The travel control unit 43 of each GSE 13 controls travel from the current position to the work position according to the received travel route. If all GSEs 13 start moving at the same time, the GSEs 13 may interfere with each other. Therefore, it is preferable that the travel route setting unit 33 also determine the order in which each GSE 13 will move when setting the travel route for each GSE 13. For example, if the fuel truck 13a is moved first and the high-lift loader 13d is allowed to start moving when the fuel truck 13a enters the planar grid G, interference between the fuel truck 13a and the high-lift loader 13d can be prevented.

各GSE13の走行制御部43は、通行路103を走行している間は、走行レーンを示す白線等を認識することによって、一般的な手法で自動運転を実現することができる。しかしながら、作業エリア102には走行レーンを示す白線やマーカーはないし、航空機100の停止位置や機種によって走行経路は毎回変わるため、一般的な自動運転の手法を採用することは難しい。そこで、各GSE13は作業エリア102内、すなわち、平面グリッドGの設定エリア内に入ると、次のようにして自動運転を行う。 While traveling on the route 103, the travel control unit 43 of each GSE 13 can achieve automated driving using conventional methods by recognizing white lines and other markings that indicate the driving lane. However, since there are no white lines or markers indicating the driving lane in the work area 102, and the driving route changes each time depending on the aircraft 100's stopping position and model, it is difficult to adopt conventional automated driving methods. Therefore, when each GSE 13 enters the work area 102, i.e., the set area of the planar grid G, it performs automated driving as follows.

各GSE13は、GSE管制22から走行経路に関する情報を受け取る際に、平面グリッドGの座標情報も一緒に受け取る。各GSE13の走行制御部43は、平面グリッドGの設定エリア内を走行する際には、随時、自車の現在位置を取得し、平面グリッドGのどのマスにいるかを把握する。そして、次に進むべきマスを確認しながら走行経路に沿った走行を行う。 When each GSE 13 receives information about the driving route from the GSE control 22, it also receives coordinate information of the planar grid G. When driving within the set area of the planar grid G, the driving control unit 43 of each GSE 13 acquires the current position of the vehicle at any time and determines which square of the planar grid G it is located in. It then drives along the driving route while checking the next square to proceed to.

平面グリッドGの設定エリア内でのGSE13同士の衝突を避けるため、走行経路設定部33は、各GSE13の少なくとも進行方向前方に他のGSE13が進入できない予約領域をマス単位で設定する。設定された予約領域は、GSE管制22の通信部31を介して、全てのGSE13に送信される。図11には、予約領域の一例として、給油車13aの予約領域S1及びハイリフトローダ13dの予約領域S2をハッチングで図示している。予約領域S1、S2は、進行方向の側方及び後方にも設定されているが、予約領域は少なくとも各GSE13の進行方向の前方に設定されていればよい。走行経路設定部33は、各GSE13の走行に応じて予約領域を随時更新する。更新された予約領域は、その都度、通信部31を介して、全てのGSE13に送信される。 To avoid collisions between GSEs 13 within the set area of the planar grid G, the travel path setting unit 33 sets a reservation area in square units, at least ahead of each GSE 13 in the direction of travel, into which other GSEs 13 cannot enter. The set reservation area is transmitted to all GSEs 13 via the communication unit 31 of the GSE control 22. In Figure 11, the reservation area S1 for the fuel tanker 13a and the reservation area S2 for the high-lift loader 13d are illustrated with hatching as examples of reservation areas. Reservation areas S1 and S2 are also set to the sides and rear in the direction of travel, but it is sufficient that the reservation area is set at least ahead in the direction of travel of each GSE 13. The travel path setting unit 33 updates the reservation area as each GSE 13 travels. The updated reservation area is transmitted to all GSEs 13 via the communication unit 31 each time.

各GSE13の走行制御部43は、平面グリッドGの設定エリア内の走行時に、自車の予約領域が他のGSE13の予約領域と重複していないかを確認する。予約領域が重複していない場合は、走行経路に沿って走行を継続する。一方、予約領域が重複している場合は、一時停止し、他のGSE13との予約領域の重複が解消されるまで待機する。ここで、予約領域が重複した場合にどちらのGSE13を優先的に走行させるかは事前に決めておくことが好ましい。例えば、予め優先順位を決めておくようにしてもよいし、走行速度が速いほうを先に走行させるようにしてもよい。なお、予約領域が重複した場合に、一時停止するのではなく、走行経路設定部33が走行経路を再設定するようにしてもよい。各GSE13が作業位置に到着したら、走行を停止して地上支援作業を開始する。地上支援作業は、各GSE13が自動で行ってもよいし、作業者が各GSE13を操作して行ってもよい。なお、地上支援作業を行うために停止しているGSE13に対して、その周囲に予約領域を設定するようにしてもよい。 When driving within the set area of the planar grid G, the driving control unit 43 of each GSE 13 checks whether the vehicle's reservation area overlaps with the reservation areas of other GSEs 13. If the reservation areas do not overlap, the vehicle continues driving along the driving route. On the other hand, if the reservation areas overlap, the vehicle pauses and waits until the overlap with the reservation areas of other GSEs 13 is resolved. It is preferable to determine in advance which GSE 13 will be given priority when the reservation areas overlap. For example, priorities may be determined in advance, or the vehicle with the faster driving speed may be allowed to drive first. Note that, instead of pausing when the reservation areas overlap, the driving route setting unit 33 may re-set the driving route. When each GSE 13 arrives at the work position, it stops driving and begins ground support work. Ground support work may be performed automatically by each GSE 13, or by an operator operating each GSE 13. Note that a reservation area may be set around a GSE 13 that is stopped to perform ground support work.

各GSE13の優先順位について補足説明する。走行経路設定部33は、各GSE13に優先順位をつけることで、各GSE13を作業位置に移動させる順番を決定してもよい。例えば、次の作業エリア102まですぐに移動する必要があるGSE13の優先順位を高く設定してもよい。あるいは、道幅、車両の大きさ、他のGSE13の配置、作業手順の関係等から、先に作業位置へ向かう必要があるGSE13の優先順位を高く設定してもよい。また、複数種類のGSE13による共同作業(例えばハイリフトローダやコンテナローダと、貨物ドーリーを牽引しているトーイングトラクタとを用いた、航空機への貨物搬出入等)を行う場合は、先にどちらか一方のGSE13が作業位置に到着していたとしても、共同で作業を行うGSE13が到着しない限り、作業を開始できない場合がある。そのため、共同で作業を行うGSE13は優先順位を高く設定しておくことが好ましい。 Additionally, the priority of each GSE 13 will be explained. The travel path setting unit 33 may determine the order in which each GSE 13 is moved to the work position by assigning a priority to each GSE 13. For example, a high priority may be set for a GSE 13 that needs to move immediately to the next work area 102. Alternatively, a high priority may be set for a GSE 13 that needs to reach the work position first, based on road width, vehicle size, the location of other GSEs 13, work procedures, etc. Furthermore, when multiple types of GSE 13 are performing collaborative work (for example, loading and unloading cargo into and from an aircraft using a high-lift loader or container loader and a towing tractor towing a cargo dolly), even if one GSE 13 arrives at the work position first, work may not begin until the GSE 13 performing the collaborative work arrives. Therefore, it is preferable to set a high priority for GSEs 13 performing collaborative work.

さらに、先に作業位置で作業していたGSE13が作業位置から退場しない限り、次に作業予定のGSE13が作業位置に到着できない場合(例えば、次に作業予定のパッセンジャーステップが、コンテナローダが作業位置から退場しないと航空機の乗客乗降口に接近できない場合)、先に作業位置にいたGSE13の優先順位を高く設定し、速やかに退場できるようにしておくとよい。この他にも、次の作業エリア102までの移動距離が長いGSE13の優先順位を高く設定しておいてもよい。また、GSE13に乗車する予定の作業者または乗車中の作業者に応じて、優先順位を設定してもよい。例えば、航空機への貨物の積み込み等の監督を行う作業者のように、その作業者が作業位置にいないと作業が始められない人物が乗車中のGSE13は、優先順位を高く設定してもよい。 Furthermore, if the next GSE 13 scheduled to work cannot arrive at the work position unless the GSE 13 that was previously working at the work position leaves the work position (for example, if the next passenger step scheduled to work cannot approach the aircraft passenger entrance/exit door unless the container loader leaves the work position), it is advisable to set a high priority for the GSE 13 that was previously at the work position so that it can leave quickly. Alternatively, a high priority may be set for a GSE 13 that has a long travel distance to the next work area 102. Priorities may also be set according to the worker who is scheduled to board or currently on board the GSE 13. For example, a high priority may be set for a GSE 13 that is carrying a person on board who cannot begin work unless that person is at the work position, such as a worker supervising the loading of cargo onto an aircraft.

なお、ここでは、各GSE13を現在位置から作業位置まで移動させる場合について説明した。しかしながら、各GSE13が地上支援作業を終了した後、作業位置から所定の位置へ戻るまでの走行経路を設定することも可能である。 Note that the above description has been given of the case where each GSE 13 is moved from its current position to a work position. However, it is also possible to set a travel route for each GSE 13 to return from its work position to a specified position after completing ground support work.

また、本実施形態では、航空機100の周囲の作業エリア102に平面グリッドGを設定し、各GSE13の走行経路をマス単位で管理するものとした。しかしながら、平面グリッドGを利用することは必須ではなく、例えば、マス単位ではなく、平面座標系を作業エリア102に設定し、ダイクストラ法や行列式を用いたグラフ理論を利用して走行経路を設定するようにしてもよい。 In addition, in this embodiment, a planar grid G is set in the working area 102 around the aircraft 100, and the travel path of each GSE 13 is managed on a square-by-square basis. However, the use of a planar grid G is not essential; for example, instead of a square-by-square basis, a planar coordinate system may be set in the working area 102, and travel paths may be set using graph theory using Dijkstra's algorithm or determinants.

また、平面グリッドG内でエリアごとにGSE13の速度制限を決めておくようにしてもよい。こうすれば、航空機100からの距離に応じてGSE13に速度制限を設けている安全規格、例えばIATA(国際航空運送協会)が定めるISAGO(IATA's Safety Audit for Ground Operations)などに容易に対応することができる。 It is also possible to set a speed limit for GSE 13 for each area within the planar grid G. This makes it easy to comply with safety standards that impose speed limits on GSE 13 depending on the distance from the aircraft 100, such as ISAGO (IATA's Safety Audit for Ground Operations) established by IATA (International Air Transport Association).

また、走行経路設定部33がGSE13の現在地と走行経路を監視し、GSE13の現在地が走行経路を逸脱した場合は、その旨をGSE管制22がGSE13や作業者端末15に報知するようにしてもよい。 In addition, the driving route setting unit 33 may monitor the current location and driving route of the GSE 13, and if the current location of the GSE 13 deviates from the driving route, the GSE control 22 may notify the GSE 13 and the operator terminal 15 of this.

(シミュレーション部)
シミュレーション部34は、スケジュール作成部32によって作成された作業スケジュール、及び、走行経路設定部33によって設定された走行経路に従って、複数のGSE13を稼働させた場合のシミュレーションを行う。シミュレーションでは、作業スケジュール及び走行経路に基づいたGSE13及び作業者の動きが再現される。このため、一見、作業スケジュール上では問題なさそうでも、あるGSE13又は作業者が非効率的な移動を強いられている場合に、それを発見することができる。また、シミュレーションで複数のGSE13の移動を同時に再現することで、GSE13が集中して混雑する場所及び時間の特定が可能となる。
(Simulation Department)
The simulation unit 34 performs a simulation of the operation of multiple GSEs 13 according to the work schedule created by the schedule creation unit 32 and the travel route set by the travel route setting unit 33. The simulation reproduces the movements of the GSEs 13 and workers based on the work schedule and travel route. Therefore, even if there appears to be no problem with the work schedule at first glance, it is possible to discover if a certain GSE 13 or worker is being forced to move inefficiently. Furthermore, by simultaneously reproducing the movements of multiple GSEs 13 in the simulation, it is possible to identify locations and times where GSEs 13 are concentrated and congested.

また、シミュレーション部34は、作業者の作業負荷を演算するようにしてもよい。例えば、作業者の性別、外気温や天候、地上支援作業で予測される運動量等を考慮してシミュレーションを行い、作業負荷が過剰な作業者を抽出するようにしてもよい。また、GSE13が電動式の場合、外気温やGSE13の稼働状況等を考慮して、バッテリーの発熱量をシミュレーションすることで、バッテリー残量を予測するようにしてもよい。以下では、シミュレーション部34で行われるシミュレーションの一例として、事前シミュレーション、進捗シミュレーション、及び、影響シミュレーションの3種類のシミュレーションについて図12~図14のフローチャートを参照しつつ説明する。 The simulation unit 34 may also calculate the workload of workers. For example, a simulation may be performed taking into account the worker's gender, outside temperature and weather, the amount of exercise predicted for ground support work, and the like, to extract workers with excessive workloads. Furthermore, if the GSE 13 is electrically powered, the remaining battery charge may be predicted by simulating the amount of heat generated by the battery, taking into account the outside temperature and the operating status of the GSE 13, and the like. Below, three types of simulations - advance simulation, progress simulation, and impact simulation - will be described as examples of simulations performed by the simulation unit 34, with reference to the flowcharts in Figures 12 to 14.

(事前シミュレーション)
図12を参照しつつ事前シミュレーションについて説明する。事前シミュレーションは、各GSE13による地上支援作業を開始する前に、スケジュール作成部32によって作成された作業スケジュール、及び、走行経路設定部33によって設定された走行経路に問題があるか否かを確認するためのシミュレーションである。
(Preliminary simulation)
The pre-simulation will be described with reference to Fig. 12. The pre-simulation is a simulation performed before each GSE 13 starts ground support work to check whether there are any problems with the work schedule created by the schedule creation unit 32 and the travel route set by the travel route setting unit 33.

GSE管制22が、通信部31を介して航空管制21からフライトスケジュールを受信すると(ステップS101)、スケジュール作成部32にフライトスケジュールが送信される。スケジュール作成部32は、受信したフライトスケジュールと、上述した作業者関連情報及びGSE関連情報とに基づいて、複数のGSE13による作業スケジュールを作成する(ステップS102)。スケジュール作成部32は、作業スケジュールを作成し終えると、作業スケジュールを走行経路設定部33に送信する(ステップS103)。 When the GSE control 22 receives a flight schedule from the air traffic control 21 via the communication unit 31 (step S101), the flight schedule is transmitted to the schedule creation unit 32. The schedule creation unit 32 creates a work schedule for multiple GSEs 13 based on the received flight schedule and the worker-related information and GSE-related information described above (step S102). After completing the creation of the work schedule, the schedule creation unit 32 transmits the work schedule to the driving route setting unit 33 (step S103).

走行経路設定部33は、作業スケジュールを受信すると、作業スケジュールで使用されることになっている各GSE13について走行経路を設定する(ステップS104)。このとき、既述のように、各GSE13を走行させる順番や優先順位についても設定しておくことが好ましい。走行経路設定部33は、各GSE13の走行経路を設定し終えると、作業スケジュール及び走行経路をシミュレーション部34に送信する(ステップS105)。なお、作業スケジュールについては、スケジュール作成部32がシミュレーション部34に送信してもよい。 When the driving route setting unit 33 receives the work schedule, it sets driving routes for each GSE 13 to be used in the work schedule (step S104). At this time, as described above, it is preferable to also set the order and priority of the driving of each GSE 13. After setting the driving routes for each GSE 13, the driving route setting unit 33 transmits the work schedule and driving routes to the simulation unit 34 (step S105). Note that the schedule creation unit 32 may transmit the work schedule to the simulation unit 34.

シミュレーション部34は、作業スケジュール及び走行経路を受信すると、その作業スケジュール及び走行経路に従って複数のGSE13を稼働させた場合の事前シミュレーションを行う(ステップS106)。事前シミュレーションでは、複数のGSE13による地上支援作業を開始する前に、作業スケジュール及び走行経路に問題があるか否かを確認する。 When the simulation unit 34 receives the work schedule and travel route, it performs a pre-simulation of what would happen if multiple GSEs 13 were to be operated in accordance with the work schedule and travel route (step S106). In the pre-simulation, it checks whether there are any problems with the work schedule and travel route before starting ground support work using multiple GSEs 13.

事前シミュレーションによって問題が見つかれば(ステップS107でYES)、その問題点に関する情報をスケジュール作成部32に送信する。そして、その問題点を解消すべく、ステップS102~S107が繰り返される。すなわち、スケジュール作成部32は、事前シミュレーションによって見つかった問題点を解消すべく作業スケジュールを再作成し(ステップS102)、再作成した作業スケジュールを走行経路設定部33に送信する(ステップS103)。走行経路設定部33は、再作成された作業スケジュールに基づいて、各GSE13の走行経路を再設定し(ステップS104)、再設定された走行経路を作業スケジュールとともにシミュレーション部34に送信する(ステップS105)。そして、シミュレーション部34は、再作成された作業スケジュール及び再設定された走行経路に基づいて、事前シミュレーションを再度実行する(ステップS106)。なお、各GSE13の走行経路の再設定のみで問題点を解消できる場合は、ステップS102及びS103を省略してもよい。 If a problem is found in the preliminary simulation (YES in step S107), information about the problem is sent to the schedule creation unit 32. Steps S102 to S107 are then repeated to resolve the problem. That is, the schedule creation unit 32 recreates the work schedule to resolve the problem found in the preliminary simulation (step S102) and transmits the recreated work schedule to the travel route setting unit 33 (step S103). The travel route setting unit 33 resets the travel routes of each GSE 13 based on the recreated work schedule (step S104) and transmits the reset travel routes together with the work schedule to the simulation unit 34 (step S105). The simulation unit 34 then performs a preliminary simulation again based on the recreated work schedule and the reset travel routes (step S106). Note that if the problem can be resolved simply by resetting the travel routes of each GSE 13, steps S102 and S103 may be omitted.

なお、事前シミュレーションによって抽出される問題点の一例としては、GSE13同士の干渉、GSE13の混雑、作業者の過剰な作業負荷、電動式のGSE13のバッテリー切れ等が挙げられる。GSE13同士の干渉やGSE13の混雑が予測される場合は、例えば走行経路を設定し直すことで問題点を解消できる。また、作業者の過剰な作業負荷が問題となる場合や、作業の途中でGSE13のバッテリー切れが予測される場合は、例えば作業スケジュールを見直すことで問題点を解消できる。ただし、事前シミュレーションによって何を問題点として抽出するか、及び、どのようにしてその問題点を解消するかは、適宜変更が可能である。 Examples of problems that can be extracted through pre-simulation include interference between GSEs 13, congestion of GSEs 13, excessive workload on workers, and running out of batteries on electric GSEs 13. If interference between GSEs 13 or congestion of GSEs 13 is predicted, the problem can be resolved by, for example, reconfiguring the travel route. Also, if excessive workload on workers is a problem or if it is predicted that the GSEs 13 will run out of battery power during work, the problem can be resolved by, for example, revising the work schedule. However, the issues extracted through pre-simulation and how to resolve them can be changed as appropriate.

事前シミュレーションによって問題が発見されなければ(ステップS107でNO)、GSE管制22は通信部31を介して、問題がなかった作業スケジュール及び走行経路を各GSE13及び各作業者が有する作業者端末15に送信する(ステップS108)。そして、各GSE13及び各作業者は、受信した作業スケジュール及び走行経路に従って、地上支援作業を開始する。 If no problems are found in the preliminary simulation (NO in step S107), the GSE control 22 transmits the problem-free work schedule and travel route via the communication unit 31 to each GSE 13 and the worker terminal 15 of each worker (step S108). Then, each GSE 13 and each worker begins ground support work in accordance with the received work schedule and travel route.

(進捗シミュレーション)
図13を参照しつつ進捗シミュレーションについて説明する。進捗シミュレーションは、各GSE13の現在位置に関する情報、及び、各GSE13による作業進捗に関する情報のうち少なくとも何れかの情報を受け取ると、その情報に基づいて遅延が見込まれる作業があるか否かを確認するためのシミュレーションである。
(Progress simulation)
The progress simulation will be described with reference to Fig. 13. The progress simulation is a simulation that, upon receiving at least one of information regarding the current location of each GSE 13 and information regarding the progress of work by each GSE 13, checks whether there is any work that is expected to be delayed based on that information.

GSE管制22が、通信部31を介して、各GSE13から各GSE13の現在位置及び作業進捗に関する情報を受信するとともに、各作業者が有する作業者端末15から作業者の現在位置及び作業進捗に関する情報を受信すると(ステップS201)、シミュレーション部34にそれらの情報が送信される。なお、GSE管制22は、これらの情報を常時受信可能である。 When the GSE control 22 receives information about the current location and work progress of each GSE 13 from each GSE 13 via the communication unit 31, and also receives information about the current location and work progress of each worker from the worker terminal 15 held by each worker (step S201), this information is transmitted to the simulation unit 34. Note that the GSE control 22 can receive this information at all times.

シミュレーション部34は、各GSE13の現在位置及び作業進捗に関する情報、及び、作業者の現在位置及び作業進捗に関する情報を受信すると、それらの情報を考慮した進捗シミュレーションを行う(ステップS202)。進捗シミュレーションは、予め決められた所定時間間隔で実行するようにしてもよいし、最新の現在位置又は作業進捗を受け取った時点で随時実行するようにしてもよい。進捗シミュレーションを実行することで、現状の作業スケジュール及び走行経路に従って作業を続けた場合に、各作業が作業スケジュール通りに完了しそうか、作業スケジュールよりも早く完了しそうか、それとも、作業スケジュールよりも遅れそうかが予測できる。 When the simulation unit 34 receives information about the current location and work progress of each GSE 13, and information about the current location and work progress of the worker, it performs a progress simulation that takes this information into consideration (step S202). The progress simulation may be performed at predetermined time intervals, or may be performed whenever the latest current location or work progress information is received. By performing a progress simulation, it is possible to predict whether each task is likely to be completed according to the work schedule, ahead of the work schedule, or behind the work schedule if work continues according to the current work schedule and travel route.

進捗シミュレーションによって、遅延が見込まれる作業が見つかると(ステップS203でYES)、シミュレーション部34は、その遅延が見込まれる作業の応援が可能な作業者及び/又は応援に利用できるGSE13を探索する(ステップS204)。そして、GSE管制22は、通信部31を介して、応援可能な作業者が有する作業者端末15や応援に利用可能なGSE13に応援要請を送信する(ステップS205)。応援要請を受けた作業者やGSE13が、遅延が見込まれる作業の応援に回ることで、作業の遅れを抑制することができる。進捗シミュレーションによって、遅延が見込まれる作業が見つからなかった場合(ステップS203でNO)、進捗シミュレーションを終了し、次の進捗シミュレーション実行時まで待機する。 When the progress simulation finds a task that is expected to be delayed (YES in step S203), the simulation unit 34 searches for workers who can support the task and/or GSEs 13 that can be used for support (step S204). The GSE control unit 22 then sends a support request via the communication unit 31 to the worker terminals 15 of the workers who can support and to the GSEs 13 that can provide support (step S205). The workers and GSEs 13 that receive the support request can then support the task that is expected to be delayed, thereby preventing work delays. If the progress simulation does not find a task that is expected to be delayed (NO in step S203), the progress simulation ends and the system waits until the next progress simulation is executed.

(影響シミュレーション)
図14を参照しつつ影響シミュレーションについて説明する。影響シミュレーションは、地上支援作業の遂行中にフライトスケジュールに遅れ等の変更が発生した場合に、スケジュール作成部32によって作成された作業スケジュールのうちフライトスケジュールの変更の影響が及ぶ範囲を特定するためのシミュレーションである。なお、フライトスケジュールに限らず、上記で説明した進捗シミュレーションで把握しきれず、突発的に遅れやトラブルが発生した場合に、影響シミュレーションを実施してもよい。
(Impact simulation)
The impact simulation will be described with reference to Figure 14. The impact simulation is a simulation for identifying the extent to which a change in the flight schedule, such as a delay, will affect the work schedule created by the schedule creation unit 32 when a change occurs in the flight schedule during the execution of ground support work. Note that impact simulation may also be performed when a sudden delay or trouble occurs that cannot be fully grasped by the progress simulation described above, and is not limited to flight schedules.

GSE管制22が、通信部31を介して航空管制21からフライトスケジュールの変更に関する情報を受信すると(ステップS301)、シミュレーション部34に変更後のフライトスケジュールが送信される。シミュレーション部34は、変更後のフライトスケジュールを受信すると、現状の作業スケジュールのうちフライトスケジュールの変更の影響が及ぶ範囲を特定すべく影響シミュレーションを行う(ステップS302)。 When GSE control 22 receives information regarding a change to the flight schedule from air traffic control 21 via communication unit 31 (step S301), the changed flight schedule is transmitted to simulation unit 34. Upon receiving the changed flight schedule, simulation unit 34 performs an impact simulation to identify the extent to which the change to the flight schedule will affect the current work schedule (step S302).

影響シミュレーションによってフライトスケジュールの変更の影響が及ぶ範囲が見つかれば(ステップS303でYES)、その範囲に関する情報をスケジュール作成部32に送信する。スケジュール作成部32は、上記範囲において作業スケジュールを再作成し(ステップS304)、再作成した作業スケジュールを走行経路設定部33に送信する(ステップS305)。走行経路設定部33は、再作成された作業スケジュールに基づいて、各GSE13の走行経路を再設定し(ステップS306)、再設定された走行経路を作業スケジュールとともにシミュレーション部34に送信する(ステップS307)。そして、シミュレーション部34は、再作成された作業スケジュール及び再設定された走行経路に基づいて、事前シミュレーションを実行する(ステップS308)。事前シミュレーションについては、すでに説明したとおりであるので、ここでの説明は省略する。 If the impact simulation identifies an area affected by the flight schedule change (YES in step S303), information about that area is sent to the schedule creation unit 32. The schedule creation unit 32 recreates the work schedule for that area (step S304) and sends the recreated work schedule to the travel route setting unit 33 (step S305). The travel route setting unit 33 resets the travel routes for each GSE 13 based on the recreated work schedule (step S306) and sends the reset travel routes together with the work schedule to the simulation unit 34 (step S307). The simulation unit 34 then performs a pre-simulation based on the recreated work schedule and the reset travel routes (step S308). The pre-simulation has already been described, so a detailed description will be omitted here.

事前シミュレーションによって問題が発見されれば(ステップS309でYES)、その問題点に関する情報をスケジュール作成部32に送信する。そして、その問題点を解消すべく、ステップS304~S309が繰り返される。すなわち、スケジュール作成部32は、事前シミュレーションによって見つかった問題点を解消すべく作業スケジュールを再作成し(ステップS304)、再作成した作業スケジュールを走行経路設定部33に送信する(ステップS305)。走行経路設定部33は、再作成された作業スケジュールに基づいて、各GSE13の走行経路を再設定し(ステップS306)、再設定された走行経路を作業スケジュールとともにシミュレーション部34に送信する(ステップS307)。そして、シミュレーション部34は、事前シミュレーションを再度実行する(ステップS308)。 If a problem is discovered through the pre-simulation (YES in step S309), information about the problem is sent to the schedule creation unit 32. Steps S304 to S309 are then repeated to resolve the problem. That is, the schedule creation unit 32 recreates the work schedule to resolve the problem discovered through the pre-simulation (step S304) and transmits the recreated work schedule to the travel route setting unit 33 (step S305). The travel route setting unit 33 reconfigures the travel routes of each GSE 13 based on the recreated work schedule (step S306) and transmits the reconfigured travel routes together with the work schedule to the simulation unit 34 (step S307). The simulation unit 34 then performs the pre-simulation again (step S308).

事前シミュレーションによって問題が発見されなければ(ステップS309でNO)、GSE管制22は通信部31を介して、問題がなかった作業スケジュール及び走行経路を各GSE13及び各作業者が有する作業者端末15に送信する(ステップS310)。そして、各GSE13及び各作業者は、受信した作業スケジュール及び走行経路に従って、地上支援作業を開始する。 If no problems are found in the preliminary simulation (NO in step S309), the GSE control 22 transmits the problem-free work schedule and travel route via the communication unit 31 to each GSE 13 and the worker terminal 15 of each worker (step S310). Then, each GSE 13 and each worker begins ground support work in accordance with the received work schedule and travel route.

(効果)
本実施形態に係るGSE管制22(運行管理システム)は、スケジュール作成部32によって作成された作業スケジュール、及び、走行経路設定部33によって設定された各GSE13の走行経路に基づいてシミュレーションを実行するシミュレーション部34を備えている。シミュレーションを実行することによって、作業スケジュール及び走行経路の問題点を事前に発見することができる。したがって、作業スケジュール及び走行経路の見直しを早期に行うことができ、GSE13による作業を円滑に遂行できるようになる。
(effect)
The GSE control 22 (traffic management system) according to this embodiment includes a simulation unit 34 that executes a simulation based on the work schedule created by the schedule creation unit 32 and the travel route of each GSE 13 set by the travel route setting unit 33. By executing a simulation, problems with the work schedule and travel routes can be discovered in advance. Therefore, the work schedule and travel routes can be revised early, allowing the GSE 13 to carry out work smoothly.

本実施形態では、シミュレーション部34は、上記シミュレーションの一種として、複数のGSE13による作業を開始する前に、作業スケジュール及び走行経路に問題があるか否かを確認する事前シミュレーションを実行可能であり、事前シミュレーションによって問題が見つかると、スケジュール作成部32が作業スケジュールを再作成するとともに、走行経路設定部33が走行経路を再設定する。事前シミュレーションを実行することによって、作業スケジュール及び走行経路にそもそも不備がある場合でも、各GSE13の稼働前に作業スケジュール及び走行経路の見直しを行うことができる。 In this embodiment, the simulation unit 34 can perform a pre-simulation, as one type of the above-mentioned simulation, to check whether there are any problems with the work schedule and driving routes before work by multiple GSEs 13 begins. If a problem is found through the pre-simulation, the schedule creation unit 32 recreates the work schedule, and the driving route setting unit 33 re-sets the driving route. By performing a pre-simulation, even if there are deficiencies in the work schedule and driving route to begin with, the work schedule and driving route can be revised before each GSE 13 is put into operation.

本実施形態では、シミュレーション部34は、複数のGSE13の現在位置に関する情報、及び、複数のGSE13による作業進捗に関する情報のうち少なくとも何れかの情報を受け取ると、上記シミュレーションの一種として、少なくとも何れかの情報に基づいて遅延が見込まれる作業があるか否かを確認する進捗シミュレーションを実行可能である。このように、現在の作業の進捗状況を考慮したうえで、遅延が見込まれる作業を見つけ出すことによって、作業スケジュールの見直しが早期に可能となり、地上支援装置による作業を継続的に円滑に行うことができる。 In this embodiment, when the simulation unit 34 receives at least one of information related to the current locations of multiple GSEs 13 and information related to the progress of work performed by multiple GSEs 13, it can perform a progress simulation, as a type of the above simulation, to confirm whether there is any work that is expected to be delayed based on at least one of the information. In this way, by taking into account the progress of current work and identifying work that is expected to be delayed, it becomes possible to review the work schedule early, allowing work by ground support equipment to be carried out continuously and smoothly.

本実施形態では、シミュレーション部34は、進捗シミュレーションによって遅延が見込まれる作業が見つかると、当該作業を応援可能な作業者及び/又は当該作業の応援に利用できるGSE13を探索する。このような構成によれば、進捗シミュレーションによって今後遅れそうな作業が見つかった場合でも、応援可能な作業者やGSE13に応援を要請すれば、作業の遅れを抑制することができる。 In this embodiment, when the progress simulation identifies work that is likely to be delayed, the simulation unit 34 searches for workers who can assist with the work and/or GSE 13 that can be used to support the work. With this configuration, even if the progress simulation identifies work that is likely to be delayed in the future, delays in the work can be reduced by requesting assistance from workers or GSE 13 who can help.

本実施形態では、シミュレーション部34は、上記シミュレーションの一種として、フライトスケジュールに変更が発生した場合に、作業スケジュールのうちフライトスケジュールの変更の影響が及ぶ範囲を特定する影響シミュレーションを実行可能であり、シミュレーション部34は、影響シミュレーションによって特定された上記範囲に関する情報をスケジュール作成部32に送信し、スケジュール作成部32は、当該範囲において作業スケジュールを再作成する。このように、フライトスケジュールの変更の影響が及ぶ範囲を特定することで、作業スケジュールを再作成すべき範囲を限定することができ、迅速に作業スケジュールを再作成することができる。 In this embodiment, the simulation unit 34 is capable of executing an impact simulation, as one type of the above simulation, which identifies the range of the work schedule that will be affected by a change to the flight schedule when a change to the flight schedule occurs. The simulation unit 34 transmits information regarding the range identified by the impact simulation to the schedule creation unit 32, and the schedule creation unit 32 recreates the work schedule within that range. In this way, by identifying the range that will be affected by a change to the flight schedule, it is possible to limit the range of the work schedule that needs to be recreated, and the work schedule can be recreated quickly.

(他の実施形態)
上記実施形態に種々の変更を加えた変形例について説明する。
(Other embodiments)
A description will be given of modifications of the above embodiment, in which various changes have been made.

上記実施形態では、GSE管制22がスケジュール作成部32、走行経路設定部33及びシミュレーション部34を有しており、GSE管制22が本発明の運行管理システムに相当するものとした。しかしながら、スケジュール作成部32、走行経路設定部33及びシミュレーション部34が物理的にどこに設けられているかについて制限はなく、各部32~34の一部又は全部がGSE管制22以外に設けられていてもよい。 In the above embodiment, the GSE control 22 has a schedule creation unit 32, a driving route setting unit 33, and a simulation unit 34, and the GSE control 22 corresponds to the traffic management system of the present invention. However, there are no restrictions on where the schedule creation unit 32, the driving route setting unit 33, and the simulation unit 34 are physically located, and some or all of the units 32 to 34 may be located outside the GSE control 22.

上記実施形態では、GSE13が自動運転可能に構成されているものとしたが、GSE13が自動運転可能であることは必須ではない。作業者がGSE13を運転する場合には、走行経路設定部33が設定した走行経路に基づいて、GSE13に設けられた不図示のナビゲーション装置が作業者にナビゲーションを行うようにすればよい。あるいは、走行経路設定部33が設定した走行経路を作業者端末15へ送信し、作業者端末15をナビゲーション装置として活用してもよい。 In the above embodiment, the GSE 13 is configured to be capable of automatic driving, but it is not essential that the GSE 13 be capable of automatic driving. When an operator drives the GSE 13, a navigation device (not shown) provided in the GSE 13 can provide navigation to the operator based on the driving route set by the driving route setting unit 33. Alternatively, the driving route set by the driving route setting unit 33 can be transmitted to the operator terminal 15, and the operator terminal 15 can be used as a navigation device.

上記実施形態では、GSE管制22は、航空管制21、GSE13及び作業者端末15と通信可能であるものとしたが、これに加えて空港1の他の設備と通信可能に構成されてもよい。例えば、GSE管制22が、チェックインゲートや搭乗ゲートの端末から乗客に関する情報を受信できるように構成し、作業スケジュールの作成に反映するようにしてもよい。あるいは、GSE管制22が、キャビンアテンダントが有する携帯端末から乗客の異常(例えば急病人の発生)に関する情報等を受信できるようにしてもよい。また、GSE管制22と接続可能な端末やGSE13については、GSE管制22を介してソフトウェアのバージョン等の管理を行うことも可能である。 In the above embodiment, GSE control 22 is capable of communicating with air traffic control 21, GSE 13, and worker terminal 15, but it may also be configured to be able to communicate with other facilities at airport 1. For example, GSE control 22 may be configured to receive information about passengers from terminals at check-in gates and boarding gates, and this information may be reflected in the creation of work schedules. Alternatively, GSE control 22 may be configured to receive information about passenger abnormalities (e.g., sudden illness) from mobile terminals carried by cabin attendants. Furthermore, for terminals connectable to GSE control 22 and GSE 13, it is also possible to manage software versions, etc. via GSE control 22.

上記実施形態において、GSE管制22はGSE関連情報に含まれる付属器具や作業者関連情報を活用してもよい。例えば、作業者のニーズに合わせてパワースーツを配備したり、荷物の搬送を補助する機構が付属器具として搭載されたGSE13を配備したりしてもよい。 In the above embodiment, GSE control 22 may utilize accessory equipment and worker-related information included in the GSE-related information. For example, a power suit may be deployed to meet the needs of the worker, or a GSE 13 equipped with an accessory mechanism to assist in the transportation of luggage may be deployed.

上記実施形態において、空港内に複数のグランドハンドリング会社が設置されている場合、複数のグランドハンドリング会社が持つそれぞれのGSE管制22が連携して作業を行ってもよい。例えば、グランドハンドリング会社Aの作業中、トラブルが発生し、GSE13の台数が不足してしまった場合や作業者の欠員で作業が困難になった場合、グランドハンドリング会社AのGSE管制22Aが、別のグランドハンドリング会社BのGSE管制22BにGSE13の不足や作業者補填の要請を送信してもよい。この場合、GSE管制22Bは現在作業を行っていないGSE13や作業者をグランドハンドリング会社Aへ応援として配備することも可能である。また、GSE管制22は、近くの空港の別のGSE管制にGSEや作業者の応援を要請してもよい。あるいは、1つのGSE管制22が複数のグランドハンドリング会社の運行管理を一括して行うようにしてもよい。 In the above embodiment, if multiple ground handling companies are installed within an airport, the GSE control 22 of each of the multiple ground handling companies may work together. For example, if a problem occurs during work by ground handling company A, resulting in a shortage of GSEs 13 or a shortage of workers, making work difficult, ground handling company A's GSE control 22A may send a request to another ground handling company B's GSE control 22B to inform them of the shortage of GSEs 13 or to request additional workers. In this case, GSE control 22B can deploy GSEs 13 or workers that are not currently working to ground handling company A as backup. GSE control 22 may also request backup GSEs or workers from another GSE control at a nearby airport. Alternatively, one GSE control 22 may manage the operations of multiple ground handling companies collectively.

上記実施形態において、シミュレーション部33に機械学習やディープラーニング等の学習手段を用いてもよい。例えば、作業進捗の遅れを予測するために、学習手段に複数のGSE13の現在位置に関する情報、及び、複数のGSE13による作業進捗に関する情報のうち少なくとも何れかの情報を入力し、学習済みの過去の作業進捗状況と遅れの関係性とを比較及び検討することで、作業の遅れにつながる前兆を発見することができる。 In the above embodiment, the simulation unit 33 may use learning means such as machine learning or deep learning. For example, in order to predict delays in work progress, at least one of information related to the current locations of multiple GSEs 13 and information related to the work progress by multiple GSEs 13 is input to the learning means, and by comparing and examining the relationship between the learned past work progress status and delays, signs that could lead to work delays can be discovered.

1:空港
13:GSE(地上支援装置)
22:GSE管制(運行管理システム)
32:スケジュール作成部
33:走行経路設定部
33:シミュレーション部
1: Airport 13: GSE (Ground Support Equipment)
22: GSE Control (Traffic Management System)
32: Schedule creation unit 33: Travel route setting unit 33: Simulation unit

Claims (3)

空港に配備されている複数の地上支援装置の運行を管理する運行管理システムであって、
前記空港のフライトスケジュールに基づいて、前記複数の地上支援装置による作業スケジュールを作成するスケジュール作成部と、
前記作業スケジュールに基づいて、前記各地上支援装置の作業位置までの走行経路を設定する走行経路設定部と、
前記作業スケジュール及び前記走行経路に従って前記複数の地上支援装置を稼働させた場合のシミュレーションを実行するシミュレーション部と、
を備え、
前記シミュレーション部は、前記複数の地上支援装置の現在位置に関する情報、及び、前記複数の地上支援装置による作業進捗に関する情報のうち少なくとも何れかの情報を受け取ると、前記シミュレーションの一種として、前記少なくとも何れかの情報に基づいて遅延が見込まれる作業があるか否かを確認する進捗シミュレーションを実行可能であり、
前記シミュレーション部は、前記進捗シミュレーションによって遅延が見込まれる作業が見つかると、当該作業を応援可能な作業者及び/又は当該作業の応援に利用できる前記地上支援装置を探索することを特徴とする運行管理システム。
An operation management system that manages the operation of a plurality of ground support devices deployed at an airport,
a schedule creation unit that creates a work schedule for the plurality of ground support devices based on a flight schedule of the airport;
a travel route setting unit that sets a travel route to a work position of each of the ground support devices based on the work schedule;
a simulation unit that executes a simulation in which the plurality of ground support equipment are operated in accordance with the work schedule and the travel route;
Equipped with
the simulation unit is capable of executing, as one type of the simulation, a progress simulation to confirm whether or not there is any work that is expected to be delayed based on at least one of information related to the current positions of the plurality of ground support devices and information related to the progress of work by the plurality of ground support devices, when receiving at least one of the information related to the current positions of the plurality of ground support devices and information related to the progress of work by the plurality of ground support devices;
An operation management system characterized in that when the progress simulation finds work that is expected to be delayed, the simulation unit searches for workers who can assist with the work and/or the ground support equipment that can be used to support the work.
空港に配備されている複数の地上支援装置の運行を管理する運行管理システムであって、
前記空港のフライトスケジュールに基づいて、前記複数の地上支援装置による作業スケジュールを作成するスケジュール作成部と、
前記作業スケジュールに基づいて、前記各地上支援装置の作業位置までの走行経路を設定する走行経路設定部と、
前記作業スケジュール及び前記走行経路に従って前記複数の地上支援装置を稼働させた場合のシミュレーションを実行するシミュレーション部と、
を備え、
前記シミュレーション部は、前記シミュレーションの一種として、前記フライトスケジュールに変更が発生した場合に、前記作業スケジュールのうち前記フライトスケジュールの変更の影響が及ぶ範囲を特定する影響シミュレーションを実行可能であり、
前記シミュレーション部は、前記影響シミュレーションによって特定された前記範囲に関する情報を前記スケジュール作成部に送信し、
前記スケジュール作成部は、前記範囲において前記作業スケジュールを再作成することを特徴とする運行管理システム。
An operation management system that manages the operation of a plurality of ground support devices deployed at an airport,
a schedule creation unit that creates a work schedule for the plurality of ground support devices based on a flight schedule for the airport;
a travel route setting unit that sets a travel route to a work position of each of the ground support devices based on the work schedule;
a simulation unit that executes a simulation in which the plurality of ground support equipment are operated in accordance with the work schedule and the travel route;
Equipped with
the simulation unit is capable of executing, as one type of the simulation, an impact simulation that, when a change occurs in the flight schedule, identifies an extent of the work schedule that is affected by the change in the flight schedule;
the simulation unit transmits information about the range identified by the influence simulation to the schedule creation unit;
The operation management system is characterized in that the schedule creation unit recreates the work schedule within the range.
空港に配備されている複数の地上支援装置の運行を管理する運行管理システムであって、
前記空港のフライトスケジュールに基づいて、前記複数の地上支援装置による作業スケジュールを作成するスケジュール作成部と、
前記作業スケジュールに基づいて、前記各地上支援装置の作業位置までの走行経路を設定する走行経路設定部と、
前記作業スケジュール及び前記走行経路の問題点を発見できるように、前記作業スケジュール及び前記走行経路に従って前記複数の地上支援装置を稼働させた場合の前記複数の地上支援装置及び作業者の動きを再現させるシミュレーションを実行するシミュレーション部と、
を備え
前記シミュレーションによって、作業者の作業負荷、または、前記地上支援装置が電動式の場合はバッテリー残量を予測し、前記地上支援装置同士の干渉、前記地上支援装置の混雑、作業者の過剰な作業負荷、および、前記電動式の地上支援装置のバッテリー切れのうち、いずれかの問題が見つかれば、前記作業スケジュールの再作成または前記走行経路の再設定を行い、前記シミュレーションを再度実行することを特徴とする運行管理システム。
An operation management system that manages the operation of a plurality of ground support devices deployed at an airport,
a schedule creation unit that creates a work schedule for the plurality of ground support devices based on a flight schedule for the airport;
a travel route setting unit that sets a travel route to a work position of each of the ground support devices based on the work schedule;
a simulation unit that executes a simulation to reproduce the movements of the plurality of ground support equipment and workers when the plurality of ground support equipment are operated in accordance with the work schedule and the travel route so that problems with the work schedule and the travel route can be found;
Equipped with
The operation management system is characterized in that the simulation predicts the workload of workers or, if the ground support equipment is electrically powered, the remaining battery charge, and if any of the following problems are found: interference between the ground support equipment, congestion on the ground support equipment, excessive workload on workers, or a dead battery in the electrically powered ground support equipment, the system recreates the work schedule or resets the travel route and runs the simulation again .
JP2021090537A 2021-05-28 2021-05-28 Traffic management system Active JP7807630B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021090537A JP7807630B2 (en) 2021-05-28 2021-05-28 Traffic management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021090537A JP7807630B2 (en) 2021-05-28 2021-05-28 Traffic management system

Publications (2)

Publication Number Publication Date
JP2022182803A JP2022182803A (en) 2022-12-08
JP7807630B2 true JP7807630B2 (en) 2026-01-28

Family

ID=84328415

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021090537A Active JP7807630B2 (en) 2021-05-28 2021-05-28 Traffic management system

Country Status (1)

Country Link
JP (1) JP7807630B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2024203475A1 (en) * 2023-03-31 2024-10-03 日本電気株式会社 Charging plan creating system, information processing device, information processing method, and recording medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002074437A (en) 2000-08-30 2002-03-15 Hitachi Ltd Aircraft spot management system
JP2002230246A (en) 2001-02-07 2002-08-16 Hitachi Ltd Resource allocation management system
JP2003122879A (en) 2001-10-11 2003-04-25 Hitachi Ltd Comprehensive information system
JP2003317200A (en) 2002-04-24 2003-11-07 Toshiba Corp Airport control support system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SG10201911549WA (en) * 2018-12-06 2020-07-29 Borealis Tech Ltd Airport ramp surface movement monitoring system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002074437A (en) 2000-08-30 2002-03-15 Hitachi Ltd Aircraft spot management system
JP2002230246A (en) 2001-02-07 2002-08-16 Hitachi Ltd Resource allocation management system
JP2003122879A (en) 2001-10-11 2003-04-25 Hitachi Ltd Comprehensive information system
JP2003317200A (en) 2002-04-24 2003-11-07 Toshiba Corp Airport control support system

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
令和元年度 GSEの軌跡分析・ 現況再現シミュレーション実施調査業務,2020年03月,[令和7年6月18日検索], 取得先<https://www.mlit.go.jp/common/001335404.pdf>
大山 洋志,航空イノベーションの取組とGSE(空港業務支援車両)自動化推進に向けての研究,[online],2018年12月04日,[令和7年6月18日検索], 取得先<https://www.nilim.go.jp/lab/bbg/kouenkai/kouenkai2018/pdf/181204_04.pdf>
長谷川 浩,空港地上支援機材の交通シミュレーションプログラムの作成,国土技術政策総合研究所資料,No.54,2002年12月,ISSN 1346-7328

Also Published As

Publication number Publication date
JP2022182803A (en) 2022-12-08

Similar Documents

Publication Publication Date Title
US11355021B1 (en) Nodal network infrastructure for unmanned aerial vehicle operations at scale
JP7594175B2 (en) Approach route setting system and approach route setting method
US20250115371A1 (en) Systems and Methods for Transferring Aircraft
CN106828264A (en) Unmanned plane Vehicular system and its management method
JP7828008B2 (en) Traffic management system
JP6862511B2 (en) Shipping method and delivery system
EP3625741B1 (en) System and apparatus for resource management
CN109625039B (en) Autonomous dispatching system and method for transportation of mine transport locomotive
Morris et al. Self-Driving Aircraft Towing Vehicles: A Preliminary Report.
CN106926767A (en) Unmanned plane Vehicular system and its management method
CN115963820A (en) Wisdom mine system
CN112700071A (en) Control method and system for automatically driving passenger ferry vehicle in airport
JP7453537B2 (en) Driving route setting system and driving route setting method
JP7807630B2 (en) Traffic management system
CN120319073A (en) A method and system for detecting and preventing collisions between aircraft and vehicles at civil aviation airport aprons
JP6970237B2 (en) Management system, management program and management method
Nneji et al. Functional requirements for remotely managing fleets of on-demand passenger aircraft
JP2001307300A (en) Spot management system
JP7691614B2 (en) Approach Route Planning System and Ground Support Equipment
Kurzweil et al. Shifting readiness of Prague Airport for safe operations of autonomous tow tractors
JP7691617B2 (en) Location Management System
Alonso Tabares et al. Intelligent and fuzzy applications in aircraft handling services with Aviation 4.0
US20260017584A1 (en) Fleet management system for an airport
Cousy et al. AEON: Toward a concept of operation and tools for supporting engine-off navigation for ground operations
KR20230005659A (en) Method for providing multimodal transport service based on air vehicle and apparatus for the same

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240521

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20250212

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20250212

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20250410

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20250624

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20250822

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20250909

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20251118

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20251216

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20251229

R150 Certificate of patent or registration of utility model

Ref document number: 7807630

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150