JP7824619B2 - Reinforcement structure of existing embankments - Google Patents
Reinforcement structure of existing embankmentsInfo
- Publication number
- JP7824619B2 JP7824619B2 JP2020144072A JP2020144072A JP7824619B2 JP 7824619 B2 JP7824619 B2 JP 7824619B2 JP 2020144072 A JP2020144072 A JP 2020144072A JP 2020144072 A JP2020144072 A JP 2020144072A JP 7824619 B2 JP7824619 B2 JP 7824619B2
- Authority
- JP
- Japan
- Prior art keywords
- embankment
- levee
- support
- piles
- existing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/11—Hard structures, e.g. dams, dykes or breakwaters
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/30—Adapting or protecting infrastructure or their operation in transportation, e.g. on roads, waterways or railways
Landscapes
- Revetment (AREA)
Description
本発明は、既存堤防の補強構造に関する。 The present invention relates to a reinforcement structure for existing embankments.
河川における堤防や貯水を目的とした溜池や貯水池の堤や土手は、主に土質系材料を構築材料として用いていることで、止水(遮水)を目的としている「土構造物」である。以下、河川堤防を例に掲げて説明する。 River levees and the banks of reservoirs and reservoirs used for water storage are primarily constructed using soil-based materials and are therefore "earth structures" whose purpose is to stop water (water impermeability). The following explanation will use river levees as an example.
従来、図15で示すような河川303の堤防301が知られている。堤防301では、河川303を流れる水位の最大値(常態における最大値)として計画高水位が設定されている。しかしながら、気候変動による台風等の大雨によって非常態となり河川303を流れる水の量が増え堤防301を越水(越流)する水位になると、越水によって洪水が発生する(矢印A11~A13参照)。河川303の水が越流すると、越流した水が堤防301の裏法311を洗堀し、裏法311が崩れ、河川裏側の堤防301の部位が崩壊する。なお、図15に参照符号305で示すものは家屋である。 A levee 301 of a river 303, as shown in Figure 15, is known. The levee 301 has a planned high water level set as the maximum water level (maximum under normal conditions) flowing through the river 303. However, if an emergency occurs due to heavy rain such as a typhoon caused by climate change, and the amount of water flowing through the river 303 increases to a level that causes the levee 301 to overflow, flooding occurs due to the overflow (see arrows A11 to A13). When the water in the river 303 overflows, the overflowing water scours the back slope 311 of the levee 301, causing the back slope 311 to collapse and the portion of the levee 301 on the back side of the river to collapse. Note that the reference numeral 305 in Figure 15 denotes a house.
また、非常態となり河川303を流れる水の量が増えると、堤防301への水の浸透によって堤防301の浸透破壊が生じ洪水が発生したり(矢印A14~A17参照)、地盤307を流れる水の流れによる洗堀によって堤防301の洗堀破壊が生じ洪水が発生する(矢印A18~A23参照)。すなわち、水の流れで堤防301の浸食・洗堀が進行し、堤防301が崩壊する。また、堤防301内の水位が上がると、河川303の水が堤防301内に浸透し、パイピング現象が生じ(図16の破線313を参照)堤防301の強度が低下して、堤防301が浸透崩壊する。 Furthermore, when an emergency occurs and the amount of water flowing through river 303 increases, water seeps into levee 301, causing seepage failure of levee 301 and resulting in flooding (see arrows A14 to A17), or scouring caused by the flow of water flowing through ground 307 causes scouring failure of levee 301 and resulting in flooding (see arrows A18 to A23). In other words, the flow of water causes erosion and scouring of levee 301, leading to its collapse. Furthermore, when the water level within levee 301 rises, water from river 303 seeps into levee 301, causing a piping phenomenon (see dashed line 313 in Figure 16), weakening the strength of levee 301 and resulting in its collapse through seepage.
また、非常態となり河川303を流れる水の量が増えると、水の流れ(矢印A24参照)により表法が浸食され堤防301が崩壊し洪水が発生する。すなわち、図15で示す破線309が次第に図15の左側から右側に移行し、堤防301が崩壊し洪水が発生する。なお、河川303における水の流れる方向は、図15の紙面に対して直交する方向であるので、矢印A24は、矢印の形状になっておらず円形で示されている。 Furthermore, if an emergency occurs and the amount of water flowing through river 303 increases, the water flow (see arrow A24) will erode the surface of the levee, causing levee 301 to collapse and flooding. That is, the dashed line 309 shown in Figure 15 will gradually move from the left side to the right side of Figure 15, causing levee 301 to collapse and flooding to occur. Note that the direction of water flow in river 303 is perpendicular to the plane of the paper in Figure 15, so arrow A24 is shown as a circle rather than an arrow.
ところで、気候変動が一因とみられる降雨の激甚化で、現状の降雨による洪水を河道内(いわゆる堤防301内)ので抑え込む対策は最善ではないという考え方から、計画的に水をあふれさせる流域治水という考え方がある。 By the way, with the increasing intensity of rainfall, which is thought to be partly due to climate change, it is thought that the current approach of containing floods caused by rainfall within the river channel (so-called levees 301) is not the best solution, and so there is an idea called river basin flood control, which involves allowing water to overflow in a planned manner.
流域治水の概念は次のようなものである。 The concept of river basin flood control is as follows:
遊水池の整備、霞堤の整備や活用、ダムの洪水調整機能の強化等をすることによって、遊水、貯留機能を向上させる。土地利用の制限、家屋の移転、住宅の嵩上げ等をすることによって、土地利用・住まい方の工夫をする。 Improve flood retention and storage functions by developing flood control basins, constructing and utilizing levee dikes, and strengthening the flood control functions of dams. Improve land use and living arrangements by restricting land use, relocating houses, and raising housing levels.
流域治水での、対象地域の移転や水を計画的にあふれさせる方針は、移転に対する住民感情や費用や事業期間に大きな問題が伴うとともに、計画的にあふれさせる事で、事後の復旧、復興に多大な費用と工期が必要になると思われる。 In river basin flood control, policies such as relocating target areas or deliberately allowing water to overflow can pose significant problems, including residents' feelings about relocation, costs, and the duration of the project. Furthermore, deliberate overflowing is likely to require significant costs and construction time for subsequent recovery and reconstruction.
また、従来の堤防301を高規格堤防とすることが考えられる。 It is also possible to upgrade the conventional levee 301 to a high-standard levee.
高規格堤防では、堤防の幅を広くし越水しても堤防上に緩やかに水を流して堤防の決壊を防ぐようにしている。また、高規格堤防では、堤防の幅を広くし水が浸透しても堤防内部の浸食による決壊を防ぎやすくしている。また、高規格堤防では、コアとなる構造体(コンクリートや鋼材製や粘土製)を設け、越水時における堤防の崩壊を防ぎ堤防の形状を保持するようにしている。 High-standard levees are made wider so that even if they overflow, water flows gently over the levee, preventing them from collapsing. High-standard levees are also made wider so that even if water seeps in, they are more likely to prevent erosion inside the levee, leading to collapse. High-standard levees also have a core structure (made of concrete, steel, or clay) that prevents the levee from collapsing in the event of overflow and maintains its shape.
ここで、従来の技術に関する文献として特許文献1を掲げる。 Here, Patent Document 1 is cited as a document related to conventional technology.
しかし、高規格堤防を設置するとなると、堤防の作り直しもしくは大幅は改造が必要となり、工期が長くなり、コスト増になってしまう。 However, installing a high-standard levee would require rebuilding or extensive modification of the levee, which would extend the construction period and increase costs.
本発明は、既存の堤防(堤体)や溜池や貯水池の堤や土手をほぼそのままそのまま活用することで費用の低減と工期の短縮とをはかることができるとともに、計画高水位を越える流下水量となった場合であっても、浸食、洗堀、浸透、越水、地震による破壊から堤防や溜池や貯水池の堤や土手を護り、洪水の発生を防止することができる既存堤防や溜池や貯水池の堤や土手の補強構造を提供することを目的とする。 The present invention aims to provide a reinforcement structure for existing levees (embankments) and reservoir embankments and banks, which can reduce costs and shorten construction periods by utilizing existing levees (embankments) and reservoir embankments and banks almost as they are, and which can protect the levees, reservoir embankments and banks from erosion, scouring, seepage, overflowing and destruction due to earthquakes, thereby preventing flooding, even when the flow rate exceeds the planned high water level.
請求項1に記載の発明は、上側の部位が露出し下側の部位が堤防に入り込み、前記堤防に沿って設置されているキイと、上側の部位と中間の部位とが露出し下側の部位が前記堤防の外側で前記堤防の下側の地盤に入り込み、前記堤防に沿い所定の間隔をあけて設置されている複数本の支持杭と、前記堤防の幅方向では、前記キイと前記支持杭との間に設けられ、前記堤防の長手方向では、前記堤防に沿って長く延びており、上下方向では、前記キイの上側の部位と前記支持杭の上側の部位とで、前記キイと前記支持杭とに設置されており、水平方向もしくは水平方向に近似した方向に展開している床版と、前記堤防に沿って前記複数の支持杭の間に設置されており、前記複数の支持杭の間を閉じている仕切り壁とを有する既存堤防の補強構造である。 The invention described in claim 1 is a reinforcement structure for an existing levee, comprising: a key installed along the levee, with its upper portion exposed and its lower portion recessed into the levee; a plurality of support piles installed at predetermined intervals along the levee, with its upper and middle portions exposed and its lower portion recessed into the ground below the levee outside the levee; a deck slab installed between the key and the support piles in the width direction of the levee, extending long along the levee in the longitudinal direction of the levee and installed between the key and the support piles in the up-down direction at the upper portion of the key and the upper portion of the support pile; and a partition wall installed between the support piles along the levee and closing the space between the support piles.
請求項2に記載の発明は、上側の部位が露出し中間の部位が堤防に入り込み下側の部位が前記堤防の下側の地盤に入り込み、前記堤防に沿って設置されている支持体と、上側の部位と中間の部位とが露出し下側の部位が前記堤防の外側の前記地盤に入り込み、前記堤防に沿い所定の間隔をあけて設置されている複数本の支持杭と、前記堤防の幅方向では、前記支持体と前記支持杭との間に設けられ、前記堤防の長手方向では、前記堤防に沿って長く延びており、上下方向では、前記支持体の上側の部位と前記支持杭の上側の部位とで、前記支持体と前記支持杭とに設置されており、水平方向もしくは水平方向に近似した方向に展開している床版と、前記堤防に沿って前記複数の支持杭の間に設置されており、前記複数の支持杭の間を閉じている仕切り壁とを有する既存堤防の補強構造である。 The invention described in claim 2 is a reinforcement structure for an existing levee, comprising: a support body installed along the levee, with its upper portion exposed, its middle portion recessed into the levee, and its lower portion recessed into the ground below the levee; a plurality of support piles installed at predetermined intervals along the levee, with its upper and middle portions exposed and its lower portion recessed into the ground outside the levee; a deck slab installed between the support body and the support piles in the width direction of the levee, extending long along the length of the levee in the longitudinal direction of the levee and installed between the support body and the support piles in the up-down direction at the upper portion of the support body and the upper portion of the support pile; and a partition wall installed between the plurality of support piles along the levee, closing the space between the plurality of support piles.
請求項3に記載の発明は、上側の部位が露出し、中間の部位が堤防に入り込み、下側の部位が前記堤防の下側の地盤に入り込み、前記堤防の長手方向で連続して設けられている支持体と、上側の部位と中間の部位とが露出し下側の部位が前記堤防の外側の前記地盤に入り込み、前記堤防に沿い所定の間隔をあけて設置されている複数本の支持杭と、前記堤防の幅方向では、前記支持体と前記支持杭との間に設けられ、前記堤防の長手方向では、前記堤防に沿って長く延びており、上下方向では、前記支持体の上側の部位と前記支持杭の上側の部位とで、前記支持体と前記支持杭とに設置されており、水平方向もしくは水平方向に近似した方向に展開している床版とを有する既存堤防の補強構造である。 The invention described in claim 3 is a reinforcement structure for an existing embankment, comprising: a support body that is continuously arranged in the longitudinal direction of the embankment, with an upper portion exposed, an intermediate portion recessed into the embankment, and a lower portion recessed into the ground below the embankment; a plurality of support piles that are installed at predetermined intervals along the embankment, with their upper and intermediate portions exposed and their lower portions recessed into the ground outside the embankment; and a deck slab that is installed between the support body and the support piles in the width direction of the embankment, extends long along the longitudinal direction of the embankment, and is installed between the support body and the support piles in the up-down direction at the upper portion of the support body and the upper portion of the support pile, and extends horizontally or in a direction approximately horizontal.
本発明によれば、既存の堤防(堤体)や溜池や貯水池の堤や土手をほぼそのままそのまま活用することで費用の低減と工期の短縮とをはかることができるとともに、計画高水位を越える流下水量となった場合であっても、浸食、洗堀、浸透、越水、地震による破壊から堤防や溜池や貯水池の堤や土手を護り、洪水の発生を防止することができる既存堤防や溜池や貯水池の堤や土手の補強構造を提供することができるという効果を奏する。 This invention has the advantage of being able to reduce costs and shorten construction times by utilizing existing levees (embankments) and the banks and banks of reservoirs and reservoirs almost as they are, while also providing a reinforcement structure for existing levees, banks and banks of reservoirs and reservoirs that protects them from erosion, scouring, seepage, overflowing, and destruction due to earthquakes, thereby preventing the occurrence of floods, even when the flow rate exceeds the planned high water level.
〔第1の実施形態〕
本発明の第1の実施形態に係る既存堤防の補強構造1は、たとえば河川3の治水構造物である堤防(既存堤防;既存の構築構造の堤防)5を補強するものであり、図1~図4で示すように、第1の支持杭7と第2の支持杭9と床版(人工床版)11と仕切り壁13とを備えて構成されている。
First Embodiment
The reinforcement structure 1 for an existing levee according to the first embodiment of the present invention is intended to reinforce, for example, an levee (existing levee; an levee of an existing constructed structure) 5, which is a flood control structure for a river 3, and is configured to include a first support pile 7, a second support pile 9, a deck (artificial deck) 11, and a partition wall 13, as shown in Figures 1 to 4.
ここで、説明のために上下方向(鉛直方向;高さ方向)に対して直交する所定の一方向を幅方向とし、上下方向と幅方向とに対して直交する所定の一方向を上下流方向とする。幅方向の内側で河川3の水14が上下流方向の上流側から下流側に流れているものとする。 For the sake of explanation, a specific direction perpendicular to the up-down direction (vertical direction; height direction) is referred to as the width direction, and a specific direction perpendicular to both the up-down and width directions is referred to as the upstream-downstream direction. Water 14 of the river 3 is assumed to flow from the upstream side to the downstream side within the width direction.
なお、図1~図4では、1つの堤防(堤体)しか示されていないが、河川3を挟んだ反対側にも同様なもう1つ堤防が設けられていることがあり、この反対側の堤防にも、既存堤防の補強構造1が適用されることがある。また、堤防5やこれを補強している既存堤防の補強構造1が、上下流方向で必ずしも直線状になって延びていることはなく、湾曲しもしくは屈曲して延びている場合もある。 Note that Figures 1 to 4 only show one levee (levee body), but there may be another similar levee on the opposite side of the river 3, and the existing levee reinforcement structure 1 may also be applied to this opposite levee. Furthermore, the levee 5 and the existing levee reinforcement structure 1 that reinforces it do not necessarily extend in a straight line in the upstream and downstream directions, but may extend in a curved or bent manner.
第1の支持杭7は、細長い棒状に形成されている。第1の支持杭7の長手方向は概ね上下方向になっている。第1の支持杭7は、堤防5の幅方向では、堤防5の天端(堤防5の頂部)6のところに位置している。 The first support pile 7 is formed in the shape of a long, thin rod. The longitudinal direction of the first support pile 7 is generally in the vertical direction. In the width direction of the embankment 5, the first support pile 7 is located at the top end 6 of the embankment 5 (the peak of the embankment 5).
第1の支持杭7は、上側の部位が堤防5から露出している。また、第1の支持杭7は、中間の部位が打設されたことで堤防5に入り込み下側の部位が堤防5の下側の地盤15に打設されたことで堤防5と地盤15とに入り込んでいる。 The upper portion of the first support pile 7 is exposed from the embankment 5. Furthermore, the middle portion of the first support pile 7 is driven into the embankment 5, and the lower portion is driven into the ground 15 below the embankment 5, so it penetrates both the embankment 5 and the ground 15.
第1の支持杭7は、複数本設けられている。複数本の第1の支持杭7は、堤防5に沿い堤防5の長手方向(上下流方向)で所定の間隔をあけて堤防5と地盤15とに設置されている。 A plurality of first support piles 7 are provided. The first support piles 7 are installed along the embankment 5 at predetermined intervals in the longitudinal direction of the embankment 5 (upstream and downstream directions) between the embankment 5 and the ground 15.
第2の支持杭9も、第1の支持杭7と同様に、細長い棒状に形成されている。第2の支持杭9の長手方向も概ね上下方向になっている。 Like the first support pile 7, the second support pile 9 is also formed in the shape of a long, thin rod. The longitudinal direction of the second support pile 9 is also roughly vertical.
既存堤防の補強構造1を設けたことによる堤防5の幅寸法(堤防敷の寸法)が大きくなることを極力防ぎ堤防5の裏法の上側に床版11を設けるために、第2の支持杭9は、堤防5の幅方向では、堤防5の裏法(堤防5の上から見て陸側の堤防斜面)17の裏法尻(堤防斜面の下部)19のところ、もしくは、図2等で示すように、堤防5の裏法17の裏法尻19の近傍に位置している。 In order to minimize the increase in the width dimension (dimensions of the embankment floor) of the embankment 5 due to the installation of the existing embankment reinforcement structure 1 and to provide a deck slab 11 above the back slope of the embankment 5, the second support pile 9 is located in the width direction of the embankment 5 at the back slope toe (lower part of the embankment slope) 19 of the back slope (the landward embankment slope as viewed from above the embankment 5) 17 of the embankment 5, or near the back slope toe 19 of the back slope 17 of the embankment 5, as shown in Figure 2, etc.
第2の支持杭9が、堤防5の幅方向で、堤防5の裏法17のところに位置していてもよいし、堤防5の裏法17の裏法尻19から堤防5の外側に所定の距離だけ離れたところ(たとえば側帯21のところ)に位置していてもよい。なお、側帯21が、いわゆるゼロメートル地帯(地表の標高が満潮時の平均海水面以下の土地)になっていることもある。 The second support pile 9 may be located at the rear slope 17 of the embankment 5 in the width direction of the embankment 5, or may be located a predetermined distance outside the embankment 5 from the rear slope toe 19 of the rear slope 17 of the embankment 5 (for example, at the side belt 21). Note that the side belt 21 may be in a so-called zero-meter zone (land where the ground surface elevation is below mean sea level at high tide).
第2の支持杭9は、たとえば、上側の部位と中間の部位とが露出し下側の部位が堤防5の外側の地盤15に打設されたことで地盤15に入り込んでいる。第2の支持杭9も第1の支持杭7と同様に複数本設けられている。複数本の第2の支持杭9は、堤防5に沿い堤防5の長手方向(上下流方向)で所定の間隔をあけて地盤15に設置されている。 The second support piles 9 are, for example, exposed at their upper and middle sections and driven into the ground 15 at their lower sections outside the levee 5, so that they are embedded in the ground 15. Like the first support piles 7, multiple second support piles 9 are provided. The multiple second support piles 9 are installed in the ground 15 at predetermined intervals along the levee 5 in the longitudinal direction of the levee 5 (upstream and downstream directions).
床版11は、堤防5の幅方向では、第1の支持杭7と第2の支持杭9との間に設けられている。すなわち、床版11は、堤防5の幅方向では、少なくとも第1の支持杭7から第2の支持杭9にわたって延びている。 The deck 11 is located between the first support pile 7 and the second support pile 9 in the width direction of the embankment 5. In other words, the deck 11 extends from at least the first support pile 7 to the second support pile 9 in the width direction of the embankment 5.
床版11は、堤防5の長手方向では、堤防5に沿って長く延びている。また、床版11は、上下方向では、堤防5の上側で第1の支持杭7の上側の部位(たとえば上端面)と第2の支持杭9の上側の部位(たとえば上端面)とのところで、第1の支持杭7と第2の支持杭9とに一体的に設置されている。 The deck slab 11 extends longitudinally along the embankment 5. Furthermore, in the vertical direction, the deck slab 11 is installed integrally with the first support pile 7 and the second support pile 9 at the upper portion (e.g., the upper end surface) of the first support pile 7 and the upper portion (e.g., the upper end surface) of the second support pile 9 on the upper side of the embankment 5.
床版11の厚さ方向は概ね上下方向になっており、床版11は、水平方向もしくは水平方向に近似した方向に展開している。床版11の下面の一部(幅方向の内側の部位)は、緩衝工(図示せず)を介して堤防5の天端6に設置されているか、もしくは、堤防5の天端6に直接接している。また、床版11の表法55側上面には、係船柱(図示せず)が設置されている。 The thickness direction of the deck slab 11 is roughly vertical, and the deck slab 11 extends horizontally or in a direction close to horizontal. A portion of the underside of the deck slab 11 (the inner portion in the width direction) is attached to the top edge 6 of the embankment 5 via a hood (not shown), or is in direct contact with the top edge 6 of the embankment 5. In addition, a mooring bollard (not shown) is installed on the top surface of the deck slab 11 on the top face 55 side.
仕切り壁13は、堤防5に沿って(堤防5の長手方向で)複数の第1の支持杭7の間に設置されており、さらに、堤防5に沿って複数の第2の支持杭9の間にも設置されている。そして、仕切り壁13によって、複数の第1の支持杭7の間が閉じられており、複数の第2の支持杭9の間も閉じられている。 Partition walls 13 are installed between the first support piles 7 along the embankment 5 (in the longitudinal direction of the embankment 5), and are also installed between the second support piles 9 along the embankment 5. The partition walls 13 close off the spaces between the first support piles 7, and also close off the spaces between the second support piles 9.
なお、仕切り壁13が、堤防5に沿って複数の第1の支持杭7の間、複数の第2の支持杭9の間の少なくともいずれかに設置されており、複数の第1の支持杭7の間、複数の第2の支持杭9の間の少なくともいずれかを閉じている構成になっていてもよい。 In addition, partition walls 13 may be installed along the embankment 5 between at least one of the first support piles 7 and the second support piles 9, closing off at least one of the spaces between the first support piles 7 and the second support piles 9.
仕切り壁13の厚さ方向は概ね幅方向になっている。仕切り壁13は、複数の支持杭7、9に沿って概ね上下方向に展開しているとともに、堤防5の長手方向にも展開している。 The thickness direction of the partition wall 13 is roughly the same as the width direction. The partition wall 13 extends roughly in the vertical direction along the multiple support piles 7, 9, and also in the longitudinal direction of the embankment 5.
仕切り壁13が設けられていることで、堤防5の堤体内側を流れる水14の止水壁が形成されている。すなわち、複数の第1の支持杭7の間に仕切り壁13が設けられていることで、第1の支持杭7と仕切り壁13とで、堤防5の堤体内側を流れる水の止水壁(ハイブリッド鉛直止水壁)23が形成されている。また、複数の第2の支持杭9の間に仕切り壁13が設けられていることで、第2の支持杭9と仕切り壁13とで、堤防5の堤体内側を流れる水の止水壁(ハイブリッド鉛直止水壁)25が形成されている。 The provision of the partition walls 13 forms a water cut-off wall for water 14 flowing inside the body of the embankment 5. In other words, the provision of the partition walls 13 between the multiple first support piles 7 forms a water cut-off wall (hybrid vertical water cut-off wall) 23 for water flowing inside the body of the embankment 5, together with the first support piles 7 and the partition walls 13. Furthermore, the provision of the partition walls 13 between the multiple second support piles 9 forms a water cut-off wall (hybrid vertical water cut-off wall) 25 for water flowing inside the body of the embankment 5, together with the second support piles 9 and the partition walls 13.
なお、仕切り壁13が複数の第1の支持杭7の間と第2の支持杭9の間と両方に設けられている態様では、止水壁が二重に設けられたフェイルセーフ構造(フォルトトレランスシステム)が形成される。 In addition, when partition walls 13 are provided both between the first support piles 7 and between the second support piles 9, a fail-safe structure (fault-tolerant system) with double water-stopping walls is formed.
第1の支持杭7や堤防5や第2の支持杭9が設けられている部位では、地盤15が、硬い地盤(たとえば不透水層)27と硬い地盤の上側の柔らかい地盤(たとえば透水層)29とから成っている。 In the areas where the first support pile 7, embankment 5, and second support pile 9 are installed, the ground 15 consists of hard ground (e.g., an impermeable layer) 27 and soft ground (e.g., a permeable layer) 29 above the hard ground.
第1の支持杭7の下側の部位のうちの上部は柔らかい地盤29を貫通しており、第1の支持杭7の下側の部位のうちの下部は、硬い地盤27内に入り込んでいる。第2の支持杭9の下側の部位のうちの上部も柔らかい地盤29を貫通しており、第2の支持杭9の下側の部位のうちの下部も硬い地盤27内に入り込んでいる。 The upper part of the lower portion of the first support pile 7 penetrates the soft ground 29, and the lower part of the lower portion of the first support pile 7 penetrates into the hard ground 27. The upper part of the lower portion of the second support pile 9 also penetrates into the soft ground 29, and the lower part of the lower portion of the second support pile 9 also penetrates into the hard ground 27.
また、既存堤防の補強構造1には、パラペット31が設けられている。パラペット31は、床版11の上面から上方に所定の高さ突出しているとともに、堤防5に沿って(堤防の長手方向で)連続して長く延びている。また、パラペット31は、幅方向で床版11の外側(河川3とは反対側)の端部に位置している。さらに、パラペット31は、図7で示すように、床版11からの突出高さの値を変えることができるように構成されている。 The existing embankment reinforcement structure 1 also has a parapet 31. The parapet 31 protrudes a predetermined height above the top surface of the deck slab 11 and extends continuously along the embankment 5 (in the longitudinal direction of the embankment). The parapet 31 is also located at the outer end of the deck slab 11 in the width direction (the side opposite the river 3). Furthermore, as shown in Figure 7, the parapet 31 is configured so that the protruding height from the deck slab 11 can be changed.
ここで、堤防5および既存堤防の補強構造1についてさらに詳しく説明する。 Here, we will explain the embankment 5 and the existing embankment reinforcement structure 1 in more detail.
堤防5は、堤体本体33とこの堤体本体33を覆っている捨石35とを備えて構成されている。堤防5の断面(上下流方向に対して直交する平面による断面)は、たとえば等脚台形状に形成されている。 The levee 5 is composed of a levee body 33 and rubble 35 covering the levee body 33. The cross section of the levee 5 (a cross section taken along a plane perpendicular to the upstream and downstream directions) is formed, for example, in the shape of an isosceles trapezoid.
第1の支持杭7と第2の支持杭9とは、たとえば、鋼管で構成されており、お互いが同形状になっている。第1の支持杭7の上端面が堤防5の天端6で堤防5から露出している。そして、上下方向では、第1の支持杭7の上端面と堤防5の天端6との位置がお互いにほぼ一致している。上下方向では、第1の支持杭7と第2の支持杭9との位置がお互いにほぼ一致している。 The first support pile 7 and the second support pile 9 are made, for example, of steel pipes and have the same shape. The upper end surface of the first support pile 7 is exposed from the embankment 5 at the top 6 of the embankment 5. In the vertical direction, the positions of the upper end surface of the first support pile 7 and the top 6 of the embankment 5 are approximately aligned. In the vertical direction, the positions of the first support pile 7 and the second support pile 9 are approximately aligned.
仕切り壁13は、たとえば、図5(a)で示すように、矢板等の鋼材で構成されており、上下流方向では、お互いが隣接している第1の支持杭7(第2の支持杭9)の間に延びて設けられている。また、仕切り壁13は、上下方向では、床版11から地盤15の内部まで延びている。なお、図5(b)で示すように、仕切り壁13が、支持杭7、9と同様な鋼管で構成されていてもよい。 As shown in Figure 5(a), the partition wall 13 is made of steel material such as sheet piles, and extends between adjacent first support piles 7 (second support piles 9) in the upstream and downstream directions. Furthermore, the partition wall 13 extends from the deck slab 11 to the interior of the ground 15 in the vertical direction. As shown in Figure 5(b), the partition wall 13 may also be made of steel pipes similar to the support piles 7 and 9.
また、図6(a)で示すように、仕切り壁13の下端は、硬い地盤27の上面のところに位置している。なお、図6(b)で示すように、仕切り壁13の下端が、硬い地盤27内に位置してもよいし、図6(c)で示すように、仕切り壁13の下端が、硬い地盤27の上面よりも上側で柔らかい地盤29内に位置してもよい。 As shown in Figure 6(a), the lower end of the partition wall 13 is located on the upper surface of the hard ground 27. As shown in Figure 6(b), the lower end of the partition wall 13 may be located within the hard ground 27, or as shown in Figure 6(c), the lower end of the partition wall 13 may be located above the upper surface of the hard ground 27 and in soft ground 29.
床版11は、たとえば矢板やデッキプレート等の鋼材とか、プレキャストコンクリートスラブとか、プレキャストコンクリートスラブに代わり現所打コンクリートスラブ等で構成されており、床版11の下面が第1の支持杭7の上端面と第2の支持杭9の上端面とが接合されている。 The deck slab 11 is constructed from, for example, steel materials such as sheet piles or deck plates, precast concrete slabs, or cast-in-place concrete slabs instead of precast concrete slabs, and the underside of the deck slab 11 is joined to the upper end surfaces of the first support piles 7 and the second support piles 9.
ここで、パラペット31の床版11からの突出高さの値を変えることができるように構成について図7を参照しつつ説明する。 Here, we will explain, with reference to Figure 7, the configuration that allows the protruding height of the parapet 31 from the deck slab 11 to be changed.
図7(c)で示す構成では、パラペット31が、パラペット本体37とパラペット嵩上げ体39とを備えて構成されている。パラペット嵩上げ体39は、ヒンジ部41を介してパラペット本体37に設置されており、パラペット本体37に対して回動するようになっている。 In the configuration shown in Figure 7(c), the parapet 31 is composed of a parapet main body 37 and a parapet raising body 39. The parapet raising body 39 is attached to the parapet main body 37 via a hinge portion 41 and is capable of rotating relative to the parapet main body 37.
そして、水位が堤防を越水する水位以下である場合に、実線で示すように、パラペット嵩上げ体39がパラペット本体37に被さっている。一方、水位が堤防を越水する水位をさらに越えそうな場合には、二点鎖線で示すように、パラペット嵩上げ体39がパラペット本体37に対してたとえば180°回動し、パラペット31の嵩上げがされるようになっている。 When the water level is below the level at which the water would overflow the levee, the parapet raising body 39 covers the parapet main body 37, as shown by the solid line. On the other hand, when the water level is likely to exceed the level at which the water would overflow the levee, the parapet raising body 39 rotates, for example, 180 degrees relative to the parapet main body 37, as shown by the two-dot chain line, to raise the height of the parapet 31.
なお、ヒンジ部41のところでは、許容できる程度の若干の水漏れがあるが、この水漏れを防止するために、ヒンジ部41のところにシール材やパッキンを設けてもよい。 Note that there is a small amount of water leakage at the hinge portion 41, which is tolerable, but to prevent this leakage, a sealant or packing may be provided at the hinge portion 41.
図7(a)で示す構成では、第2の支持杭9(第1の支持杭7)が上側部材43と下側部材45とで構成されている。上側部材43は下側部材45に対して上下方向に移動位置決め自在になっている。そして、図7(a)で示す状態から上側部材43を上方に移動して図7(b)で示す状態にすることで、パラペット31の嵩上げがされるようになっている。 In the configuration shown in Figure 7(a), the second support pile 9 (first support pile 7) is composed of an upper member 43 and a lower member 45. The upper member 43 can be freely moved and positioned in the vertical direction relative to the lower member 45. The parapet 31 can be raised by moving the upper member 43 upward from the state shown in Figure 7(a) to the state shown in Figure 7(b).
なお、図7(a)(b)では示していないが、仕切り壁13も、支持杭7、9と同様に上側部材と下側部材とで構成されている。仕切り壁13の上側部材は、支持杭7、9の上側部材43に一体的に設置されており、仕切り壁13の下側部材は、支持杭7、9の下側部材45に一体的に設置されている。そして、図7(a)(b)で示すように、パラペット31の高さ位置を変えても、仕切り壁13の上側部材と仕切り壁13の下側部材とがお互いに滑り対偶をなしていることで、ハイブリッド鉛直止水壁23、25での止水がほぼされるようになっている。 Although not shown in Figures 7(a) and 7(b), the partition wall 13 is also composed of an upper member and a lower member, just like the support piles 7 and 9. The upper member of the partition wall 13 is installed integrally with the upper member 43 of the support piles 7 and 9, and the lower member of the partition wall 13 is installed integrally with the lower member 45 of the support piles 7 and 9. As shown in Figures 7(a) and 7(b), even if the height position of the parapet 31 is changed, the upper member of the partition wall 13 and the lower member of the partition wall 13 form a sliding pair with each other, so that the hybrid vertical water cut-off walls 23 and 25 can almost completely stop water flow.
次に、既存堤防の補強構造1による補強がされた堤防5における河川3の水14の流れについて説明する。 Next, we will explain the flow of water 14 from the river 3 on the levee 5 reinforced by the existing levee reinforcement structure 1.
常態では、図2等で示すように、計画高水位以下の水位で水14が河川3を流れる。一方、大雨等によって河川3が増水すると、計画高水位以上の水位で水14が河川3を流れるようになる。しかし、河川3の増水があっても、堤防を越水する水位以下の水位であれば、パラペット31によって越水が防止される(矢印A1参照)。なお、計画高水位とは、堤防整備で基準となる水位であり、堤防5の高さは、計画高水位の高さに余裕高を加えて決定される。 Under normal circumstances, as shown in Figure 2, water 14 flows through river 3 at a level below the planned high water level. On the other hand, when river 3 rises due to heavy rain or other reasons, water 14 flows through river 3 at a level above the planned high water level. However, even if river 3 rises, if the water level is below the level that would cause the levee to overflow, the parapet 31 prevents overflow (see arrow A1). The planned high water level is the water level that serves as the reference for levee construction, and the height of levee 5 is determined by adding a freeboard to the planned high water level.
また、河川3の増水があっても、ハイブリッド鉛直止水壁23によって、堤防5に浸透した水や地盤15(柔らかい地盤29)を流れる水が遮断される(矢印A2、A3、A4参照)。さらに、河川3の増水による水の流れ(矢印A5参照)によって堤防5の内側も部位が洗堀(図2に示す破線30を参照)されても、この洗堀は、ハイブリッド鉛直止水壁23のところで止まる。 Even if the river 3 floods, the hybrid vertical water cut-off wall 23 blocks water that has seeped into the levee 5 and water that flows through the ground 15 (soft ground 29) (see arrows A2, A3, and A4). Furthermore, even if the water flow caused by the flooding of the river 3 (see arrow A5) scours parts of the inside of the levee 5 (see dashed line 30 in Figure 2), this scouring stops at the hybrid vertical water cut-off wall 23.
既存堤防の補強構造1は、中間の部位が堤防5に入り込み下側の部位が堤防5の下側の地盤15に入り込み堤防5に沿い所定の間隔をあけて設置されている複数本の第1の支持杭7と、下側の部位が堤防5の外側の地盤15に入り込み堤防5に沿い所定の間隔をあけて設置されている複数本の第2の支持杭9とを備えて構成されている。 The reinforcement structure 1 for the existing embankment is composed of a plurality of first support piles 7, whose middle sections penetrate into the embankment 5 and whose lower sections penetrate into the ground 15 below the embankment 5, and which are installed at predetermined intervals along the embankment 5, and a plurality of second support piles 9, whose lower sections penetrate into the ground 15 outside the embankment 5, and which are installed at predetermined intervals along the embankment 5.
また、既存堤防の補強構造1には、床版11が設けられている。床版11は、堤防5の幅方向では第1の支持杭7と第2の支持杭9との間に設けられ、堤防5の長手方向では堤防5に沿って長く延びており、上下方向では第1の支持杭7の上側の部位と第2の支持杭9の上側の部位とで第1の支持杭7と第2の支持杭9とに設置されており、水平方向もしくは水平方向に近似した方向に展開している。 The existing embankment reinforcement structure 1 also includes a deck 11. The deck 11 is located between the first support pile 7 and the second support pile 9 in the width direction of the embankment 5, extends longitudinally along the embankment 5, and is installed on the first support pile 7 and the second support pile 9 at the upper portions of the first support pile 7 and the second support pile 9 in the vertical direction, and extends horizontally or in a direction close to horizontal.
さらに、既存堤防の補強構造1には、堤防5に沿って第1の支持杭7の間、第2の支持杭9の間に設置されて複数の支持杭7、9の間を閉じている仕切り壁13が設けられている。 Furthermore, the existing levee reinforcement structure 1 is provided with partition walls 13 installed between the first support piles 7 and the second support piles 9 along the levee 5, enclosing the spaces between the multiple support piles 7 and 9.
既存堤防の補強構造1がこのように構成されているので、既存の堤防(堤体)5をほぼそのままそのまま活用することができ、費用の低減と工期の短縮とをはかることができる。すなわち、堤防5内に第1の支持杭7をたとえば打設して設置することで、既存の堤防5に大きな改造を加えることなく、既存の堤防5をほぼそのままそのまま活用することができる。 Because the existing levee reinforcement structure 1 is configured in this way, the existing levee (levee body) 5 can be used almost as is, reducing costs and shortening the construction period. In other words, by installing the first support piles 7, for example, by driving them into the levee 5, the existing levee 5 can be used almost as is without requiring any major modifications.
また、既存堤防の補強構造1が上述したように構成されていることで、水量が増えた場合であっても、浸食、洗堀、浸透、越水、地震による破壊から堤防5を護ることができる。すなわち、床版11と支持杭7、9と仕切り壁13とが設けられているので、増えた水による浸食、洗堀、浸透を支持杭7、9と仕切り壁13で抑えることができ、また、越水による堤防5の破壊を床版11等で防ぐことができる。 Furthermore, because the existing levee reinforcement structure 1 is configured as described above, the levee 5 can be protected from erosion, scouring, seepage, overflow, and destruction due to earthquakes, even if the water volume increases. In other words, because the deck 11, support piles 7, 9, and partition wall 13 are provided, erosion, scouring, and seepage caused by increased water can be suppressed by the support piles 7, 9 and partition wall 13, and the deck 11, etc. can prevent destruction of the levee 5 due to overflow.
また、既存堤防の補強構造1によれば、床版11が第1の支持杭7と第2の支持杭9との間に設けられており、第2の支持杭9が堤防5の裏法17の裏法尻19のところに設けられているので、堤防5を補強した場合においても、幅方向で堤防5が河川3とは反対側に広がることが防止される。すなわち、堤防5の幅寸法(堤防敷の寸法)の値が大きくなることを極力防ぐことができる。 Furthermore, according to the existing levee reinforcement structure 1, the deck 11 is installed between the first support pile 7 and the second support pile 9, and the second support pile 9 is installed at the toe 19 of the back slope 17 of the levee 5. Therefore, even when the levee 5 is reinforced, the levee 5 is prevented from expanding in the width direction on the opposite side of the river 3. In other words, it is possible to minimize the increase in the width dimension (dimension of the levee base) of the levee 5.
また、既存堤防の補強構造1によれば、床版11が第1の支持杭7の上端面と第2の支持杭9の上端面とで、第1の支持杭7と第2の支持杭9とに設置されており、しかも、床版11の厚さ方向が上下方向になっているので、上下方向で堤防5の天端6よりも僅かに上側に床版11が位置しており、床版11の上面によって、堤防5の天端6が幅方向の外側に延長された態様になっている。これにより、床版11を堤防5の天端6よりも幅の広い遊歩道等として活用することができる。 Furthermore, according to the existing embankment reinforcement structure 1, the deck 11 is installed on the first support pile 7 and the second support pile 9, at the upper end surfaces of the first support pile 7 and the second support pile 9. Furthermore, since the thickness direction of the deck 11 is vertical, the deck 11 is positioned slightly above the top edge 6 of the embankment 5 in the vertical direction, and the top surface of the deck 11 extends the top edge 6 of the embankment 5 outward in the width direction. This allows the deck 11 to be used as a promenade or the like that is wider than the top edge 6 of the embankment 5.
また、既存堤防の補強構造1によれば、床版11の下面の一部が天端6に接合されているので、堤防5の天端6と床版11との間に水が流れにくくなり、堤防5の崩壊を防ぐことができるとともに、支持杭7、9の長さ寸法の値を小さくすることができる。 In addition, with the existing levee reinforcement structure 1, a portion of the underside of the deck slab 11 is joined to the top 6, making it difficult for water to flow between the top 6 of the levee 5 and the deck slab 11, preventing the levee 5 from collapsing and allowing the length dimensions of the support piles 7 and 9 to be reduced.
また、既存堤防の補強構造1によれば、床版11の上面から上方に所定の高さ突出しているとともに堤防5に沿って連続して長く延びているパラペット31が設けられているので、これによる越水対策がされている。すなわち、越水防止のため堤防の嵩上げがはかられており、越水防止のため河川3の幅の拡充をはかることができており、洪水に対する流下能力が向上している。 In addition, the existing levee reinforcement structure 1 has a parapet 31 that protrudes a predetermined height above the top surface of the deck slab 11 and extends continuously along the levee 5, providing a measure against overflow. In other words, the levee is raised to prevent overflow, and the width of the river 3 is widened to prevent overflow, improving the river's ability to flow down floodwaters.
また、既存堤防の補強構造1によれば、パラペット31が幅方向で床版11の外側に位置しているので、平面視において床版11における水が流れる部位の面積が広くなり、河川3の流量が増えてもパラペット31で水をせき止めることができ、越水をさらに一層防止することができる。 Furthermore, with the existing levee reinforcement structure 1, the parapet 31 is located on the outside of the deck slab 11 in the width direction, which increases the area of the deck slab 11 through which water flows in plan view. This allows the parapet 31 to hold back water even if the flow rate of the river 3 increases, further preventing overflow.
また、既存堤防の補強構造1によれば、パラペット31が突出高さの値を変えることができるように構成されているので、水量に応じた越水対策を講じることができる。すなわち、既存堤防の補強構造1によれば、既存の堤防5を利用し、越水対策を施し、浸食、洗堀、浸透防止工を加え、さらに地震に強い強靭な堤防に改善することができる。 Furthermore, with the existing levee reinforcement structure 1, the parapet 31 is configured so that the protruding height can be adjusted, making it possible to take measures against overflow according to the water volume. In other words, with the existing levee reinforcement structure 1, the existing levee 5 can be utilized to implement overflow prevention measures, add erosion, scouring, and seepage prevention works, and further improve the levee into a strong levee that is resistant to earthquakes.
また、堤防5よりも上部に構築されている床版11は、堤防5の天端6よりも圧倒的に広い面積を有する。これにより、従来の機能(たとえば、人道や車道)の他、また、土嚢や防災用具の保管ヤードの他、異常時には救護ヤードとして、異常事態発生後には、大量の災害ゴミの集収分別ヤードや一時保管ヤードとして、復旧・復興ヤードとして活用できる。 Furthermore, the deck slab 11, which is constructed above the levee 5, has an area that is overwhelmingly larger than the top 6 of the levee 5. This allows it to be used not only for its traditional functions (for example, as a footpath or roadway), but also as a storage yard for sandbags and disaster prevention equipment, as a first aid yard in the event of an emergency, and after an emergency situation occurs, as a collection and sorting yard for large amounts of disaster debris, as a temporary storage yard, and as a recovery and reconstruction yard.
次に、図9を参照しつつ、支持杭7、9と仕切り壁13との、幅方向での設置位置の変更について説明する。 Next, referring to Figure 9, we will explain how to change the installation positions of the support piles 7, 9 and the partition wall 13 in the width direction.
図1~図4等で示した既存堤防の補強構造1では、図9に二点鎖線47で示すところに第1の支持杭7と仕切り壁13(ハイブリッド鉛直止水壁23)を配置しており、図9に二点鎖線49で示すところに第2の支持杭9と仕切り壁13(ハイブリッド鉛直止水壁25)を配置している。 In the reinforcement structure 1 for the existing levee shown in Figures 1 to 4, etc., the first support pile 7 and partition wall 13 (hybrid vertical water cut-off wall 23) are placed where indicated by the two-dot chain line 47 in Figure 9, and the second support pile 9 and partition wall 13 (hybrid vertical water cut-off wall 25) are placed where indicated by the two-dot chain line 49 in Figure 9.
しかし、幅方向におけるハイブリッド鉛直止水壁23やハイブリッド鉛直止水壁25の位置は、図1~図4等で示すものに限定されるわけではない。 However, the positions of the hybrid vertical water blocking walls 23 and 25 in the width direction are not limited to those shown in Figures 1 to 4, etc.
すなわち、ハイブリッド鉛直止水壁23を、二点鎖線51で示すところ(堤防5の表法(堤防5の上から見て河川側の堤防斜面)55の表法尻(堤防斜面の下部)57のところもしくはこの近傍)に配置してもよいし、二点鎖線47と二点鎖線51との間の任意の位置に配置してもよい。なお、表法尻57と裏法尻17とをつないでいる部位(地盤15の上面の部位)は、堤防敷と呼ばれている。 That is, the hybrid vertical water cut-off wall 23 may be placed where indicated by the two-dot chain line 51 (at or near the toe 57 (lower part of the embankment slope) of the front slope (the slope of the embankment facing the river when viewed from above the embankment 5) 55 of the embankment 5), or at any position between the two-dot chain line 47 and the two-dot chain line 51. The area connecting the toe 57 of the front slope and the toe 17 of the back slope (the area on the top surface of the ground 15) is called the embankment base.
また、ハイブリッド鉛直止水壁25を、二点鎖線53で示すところ(堤防5の天端6のところ)に配置してもよいし、二点鎖線49と二点鎖線53との間の任意の位置に配置してもよい。 The hybrid vertical water cutoff wall 25 may also be placed where indicated by the two-dot chain line 53 (at the top 6 of the levee 5), or at any position between the two-dot chain line 49 and the two-dot chain line 53.
ハイブリッド鉛直止水壁23を二点鎖線51のところに配置している構成では、床版11も幅方向の内側に延長されている。また、この場合、ハイブリッド鉛直止水壁23や床版11の内側の端には、フェンダー59が設置されている。フェンダー59の詳細については後述する。 In a configuration in which the hybrid vertical water cutoff wall 23 is positioned at the two-dot chain line 51, the deck slab 11 also extends inward in the width direction. In this case, fenders 59 are installed at the inner edges of the hybrid vertical water cutoff wall 23 and the deck slab 11. Details of the fenders 59 will be described later.
ここで、既存堤防の補強構造1についてさらに説明する。この説明は、上記記載等と重複している場もある。また、既存堤防5は、溜池や貯水池の堤(既存の堤)や土手(既存の土手)を含むものとする。 Here, we will further explain the reinforcement structure 1 for existing levees. This explanation may overlap with the above description. Furthermore, existing levees 5 include embankments (existing embankments) and banks (existing banks) of reservoirs and ponds.
支持杭7、9は、床版11に作用する全荷重(床版11、上昇水位、作業重機、地震力など)を支持できる層(硬い地盤)27まで建込まれている(打設されている)。 The support piles 7 and 9 are erected (driven) down to a layer (hard ground) 27 that can support all loads acting on the deck slab 11 (deck slab 11, rising water level, heavy work equipment, seismic force, etc.).
支持杭7、9と連結されている仕切り壁(鉛直止水壁)13は、図6等で示すように、堤防崩壊作用要素(浸食、洗堀、浸透、越水、地震)に対応した任意の深さまで建込まれている。 The partition wall (vertical water cut-off wall) 13 connected to the support piles 7 and 9 is erected to an arbitrary depth corresponding to the factors that may cause the levee to collapse (erosion, scouring, seepage, overflow, earthquake), as shown in Figure 6, etc.
床版11と堤防5の天端部6との間に僅かな隙間が形成され、この隙間が水道となることを防止するために、堤防5の天端部6に床版11を直接設置するのではなく、堤防5の天端部6と床版11との間に、上述した緩衝工を設けることが望ましい。緩衝工として、アスファルトマット、アスファルトマスチック、コンクリート等の層を用いるものとする。また、緩衝工は、床版11を築造する前に築造しておいてもよい。 To prevent a small gap from forming between the deck slab 11 and the top 6 of the embankment 5 and becoming a waterway, it is desirable to install the above-mentioned buffer hood between the top 6 of the embankment 5 and the deck slab 11, rather than installing the deck slab 11 directly on the top 6 of the embankment 5. Layers of asphalt mat, asphalt mastic, concrete, etc. should be used as buffer hoods. The buffer hoods may also be constructed before the deck slab 11 is constructed.
支持杭7、9と仕切り壁13(鉛直止水壁23、25)とは、施工上、鋼製(鋼管杭、鋼矢板)がよいが、コンクリート製や他のもので構成されていてもよい。 For construction purposes, the support piles 7, 9 and partition wall 13 (vertical water-stopping walls 23, 25) are preferably made of steel (steel pipe piles, steel sheet piles), but they may also be made of concrete or other materials.
たとえば、鋼製鉛直止水壁23、25として、鋼矢板、鋼管矢板、組み合わせ鋼矢板、箱形矢板、H鋼矢板、鋼板、場所打ちコンクリート系矢板等が採用される。支持杭7、9として、鋼材系杭、コンクリート系杭、場所打杭等が採用されてもよい。 For example, steel sheet piles, steel pipe sheet piles, combined steel sheet piles, box sheet piles, H-shaped steel sheet piles, steel plates, cast-in-place concrete sheet piles, etc. may be used for the steel vertical water cut-off walls 23, 25. Steel piles, concrete piles, cast-in-place piles, etc. may also be used for the support piles 7, 9.
ところで、気候変動による降雨量の増加(たとえば、2016年のパリ協定など)に基づき、世界の平均気温が2℃上昇すると想定したとする。この想定により、降雨量が従来の1.1倍、洪水発生頻度が2倍に増加することが想定される。この場合の水害対策として堤防強化と言った従来のハード整備に加え、ソフト対策を強化することとする技術基準の見直しや堤防の嵩上げなどに着手するとの報道がされている。 Let's say that, based on increased rainfall due to climate change (for example, the 2016 Paris Agreement), it is assumed that the average global temperature will rise by 2°C. Based on this assumption, rainfall will increase by 1.1 times and the frequency of floods will double. In this case, in addition to conventional hard measures such as strengthening levees as flood prevention measures, it has been reported that efforts will be made to strengthen soft measures, such as reviewing technical standards and raising levees.
そもそも、いくら降水量が増加しても堤防5の決壊(崩壊)や堤防5からの越水がなければ洪水はおこりえない。一方、堤防5のない区画から水が溢れること(溢水)による被害もある。 In the first place, no matter how much precipitation increases, flooding will not occur unless levee 5 breaks (collapses) or water overflows from levee 5. On the other hand, there will also be damage caused by water overflowing (overflowing) from areas without levee 5.
ここで、堤防5の被害と主因と結果について説明する。 Here, we will explain the damage to Levee 5, its main causes, and the consequences.
被害を招く主因が想定外の地震である場合には、結果として堤防5が崩壊し不健全な状態になる。そして、計画高水位や計画高水流量に達していなくても洪水が発生する。 If the main cause of damage is an unexpected earthquake, the result will be that levee 5 will collapse and become unsound. Flooding will occur even if the planned high water level and planned high water flow rate have not been reached.
被害を招く主因が地震による地盤の液状化である場合も、結果として堤防5が崩壊し不健全な状態になる。そして、計画高水位や計画高水流量に達していなくても洪水が発生する。 If the main cause of damage is ground liquefaction due to an earthquake, the result will be the collapse of levee 5, leaving it in an unsound state. Flooding will then occur even if the planned high water level and planned high water flow rate have not been reached.
被害を招く主因が堤防5の圧密沈下である場合には、結果として堤防5の天端6の高さが不足し不健全な状態になる。そして、氾濫危険水位や計画高水位以下でも洪水が発生する。 If the main cause of damage is consolidation settlement of the levee 5, the resulting height of the top 6 of the levee 5 will be insufficient, leaving it in an unsound state. Flooding will then occur even below the flood danger level or the planned high water level.
被害を招く主因が想定外の降雨による越水である場合には、堤防5の決壊は起こらず堤防5は健全な状態を維持するが、水が堤防5を乗り越えることによって洪水が発生する。 If the main cause of damage is overflow due to unexpected rainfall, levee 5 will not collapse and will remain intact, but water will overflow levee 5, causing a flood.
被害を招く主因が水による堤防5の浸食である場合、水による堤防5の洗堀である場合、および、水の堤防5への浸透である場合には、結果として堤防5が崩壊し不健全な状態になる。そして、計画高水位や計画高水流量に達していなくても洪水が発生する。 If the main cause of damage is the erosion of levee 5 by water, the scouring of levee 5 by water, or the infiltration of water into levee 5, the result will be the collapse of levee 5 and its unsound state. Flooding will then occur even if the planned high water level or planned high water flow rate has not been reached.
しかし、既存堤防の補強構造1が採用された堤防5によれば、上述した堤防5の被害を防止することができる。すなわち、上述した堤防5の被害を招いた主因を総てクリアにした健全な堤防を提供することができる。 However, with levee 5, which employs existing levee reinforcement structure 1, the damage to levee 5 described above can be prevented. In other words, it is possible to provide a healthy levee that has resolved all of the main causes of the damage to levee 5 described above.
既存堤防の補強構造1では、現堤防5が健全な状態になっているが、不健全な状態になっているかを問わず、現在の堤防5を活用する。また、既存堤防の補強構造1では、現堤防5の前後の行政敷地内を活用する。すなわち、既存堤防の補強構造1が採用されたからと言って、堤防5の幅方向における寸法(堤防敷の寸法)がむやみに大きくならない(広がらないように)なっている。 Existing levee reinforcement structure 1 utilizes the current levee 5, even if it is in a sound state, regardless of whether it is in an unsound state. Furthermore, existing levee reinforcement structure 1 utilizes the administrative grounds in front of and behind the current levee 5. In other words, the adoption of existing levee reinforcement structure 1 does not unnecessarily increase (spread) the width dimension of levee 5 (dimensions of the levee base).
既存堤防の補強構造1では、気候変動による異常時高水位に対応した、水14の流下能力向上のために、堤防5の天端6高さ(より精確には、天端6高さに相当する既存堤防の補強構造1の上端の高さ)を、パラペット(cooping;parapet;かさ石)31により高めている。 In the reinforcement structure 1 of the existing levee, the height of the top 6 of the levee 5 (more precisely, the height of the top of the reinforcement structure 1 of the existing levee, which corresponds to the height of the top 6) is raised by a parapet 31 in order to improve the flow capacity of water 14 in response to abnormal high water levels caused by climate change.
また、既存堤防の補強構造1では、気候変動による異常時高水流量に対応した、水14の流下能力向上のための床版11やパラペット31を設けている。 In addition, the existing levee reinforcement structure 1 is equipped with a deck 11 and parapet 31 to improve the flow capacity of water 14 in response to abnormal high water flow rates caused by climate change.
現堤防5の崩壊の要因(想定外の地震、地震時の液状化、圧密沈下、越水、浸食、洗堀、浸透)により堤防5が崩壊状態になっても、既存堤防の補強構造1の工事がされていれば、堤防5の崩壊の要因となる作用外力に抗して洪水の危機から担保される。 Even if current levee 5 collapses due to factors that could cause its collapse (unforeseen earthquake, liquefaction during an earthquake, consolidation settlement, overflow, erosion, scouring, seepage), if reinforcement structure 1 for the existing levee has been constructed, it will be protected from the risk of flooding by resisting the external forces that could cause levee 5 to collapse.
床版11および上載荷重および作用外力から伝達される各荷重を支持層(硬い地盤)27に伝達する支持杭7、9と、床版11との取合部(結合部;図8参照)、および、堤防5の被害を招く主因となる要因に抗する鉛直止水壁23、25と床版11との取合部(結合部;図8参照)は、一般的には、支承部(support;bearing;shoe)といわれている。支承部の主な役割は、上部構造物(床版11)の荷重を、下部構造物(支持杭7、9)に伝達するための機能を持っている。 The joints (connections; see Figure 8) between the deck slab 11 and the support piles 7, 9, which transmit the loads transmitted from the superimposed load and external forces to the bearing layer (hard ground) 27, and the deck slab 11, as well as the joints (connections; see Figure 8) between the deck slab 11 and the vertical cut-off walls 23, 25, which resist the main factors that cause damage to the embankment 5, are generally referred to as supports (bearings). The main role of the supports is to transmit the load of the upper structure (deck slab 11) to the lower structure (support piles 7, 9).
また、既存堤防の補強構造1では、ハイブリッド鉛直止水壁23、25の頭部(上端部)が、たとえば、図8(a)(b)で示すように、床版11に止水を目的とした埋め込みがされている。つまり、ハイブリッド鉛直止水壁23、25の界面と床版11のハイブリッド鉛直止水壁23、25が埋め込まれている界面が、止水が必要とされる長さ埋め込まれている。 In addition, in the existing embankment reinforcement structure 1, the heads (upper ends) of the hybrid vertical water cut-off walls 23, 25 are embedded in the deck slab 11 for the purpose of water blocking, as shown in Figures 8(a) and 8(b), for example. In other words, the interface between the hybrid vertical water cut-off walls 23, 25 and the interface of the deck slab 11 where the hybrid vertical water cut-off walls 23, 25 are embedded is embedded for the length required for water blocking.
なお、図8で示す構成では、ハイブリッド鉛直止水壁23、25の上端部が、図8で示すように、床版11の下面に形成されている溝部に埋め込まれているが、床版11の下面に溝部を設けることなく。ハイブリッド鉛直止水壁23、25の上端が、床版11の下面に接合されている構成であってもよい。 In the configuration shown in Figure 8, the upper ends of the hybrid vertical water cutoff walls 23, 25 are embedded in grooves formed in the underside of the deck slab 11, as shown in Figure 8, but a configuration in which no grooves are provided on the underside of the deck slab 11 and the upper ends of the hybrid vertical water cutoff walls 23, 25 are joined to the underside of the deck slab 11 may also be used.
また、ゴムパッキン等の止水を目的とした介在物(図示せず)により、ハイブリッド鉛直止水壁23、25(埋め込まれている範囲)の界面と床版11の界面とに、水道が発生しない工夫がされていてもよい。 In addition, measures may be taken to prevent water leaks from occurring at the interface between the hybrid vertical water-stopping walls 23, 25 (embedded areas) and the deck slab 11 by using water-stopping inclusions (not shown) such as rubber gaskets.
また、ハイブリッド鉛直止水壁23、25を構成する部材(たとえば、鉄板類、矢板類)同士の鉛直継手(上下方向に延びている接合部)および支持杭との鉛直継手に、止水工(たとえば、膨潤性止水材等の塗布がされていること)が施されていれば、より安定な構造体となる。 Furthermore, if water-stopping works (for example, the application of a swelling water-stopping material, etc.) are applied to the vertical joints (joints extending in the vertical direction) between the components (for example, steel plates, sheet piles) that make up the hybrid vertical water-stopping walls 23, 25 and to the vertical joints with the support piles, the structure will be more stable.
また、床版11の上面は水平なレベルになっているが、床版11の上面(表面)に勾配がついていてもよい。たとえば、床版11の上面が、排水を考慮し河川3側に傾斜していてもよい。すなわち、幅方向において、床版11の上面に、河川3側で低く河川3側とは反対側で高くなるような勾配がついていてもよい。 In addition, although the top surface of the deck 11 is horizontal, the top surface (surface) of the deck 11 may be sloped. For example, the top surface of the deck 11 may be sloped toward the river 3 to allow for drainage. In other words, the top surface of the deck 11 may be sloped in the width direction so that it is lower on the river 3 side and higher on the opposite side of the river 3.
床版11からのパラペット31の天端の高さ(突出高さ)は、一定である必要は無い。陸地側(堤防5の外側;河川3とは反対側)に貯水池や洪水が発生しても問題の無い荒れ野原等がある場合には、当該地域(貯水池等)への排水を容易にして河口に向かう流下流量を削減し洪水災害の発生を防止し抑制するために、上下方向でのパラペット31の天端位置(パラペット31の高さ寸法の値)を堤防5の長手方向で適宜変えてもよい。すなわち、パラペット31の一部を切り下げたり、パラペット31の形状を櫛形にしたり、パラペット31に穴を穿ったりした構造にしてもよい。つまり、パラペット31に断面欠損部を予め構築してあってもよい。 The height (protruding height) of the parapet 31's top from the deck slab 11 does not need to be constant. If there is a reservoir or wasteland on the land side (outside the levee 5; opposite the river 3) where flooding will not cause any problems, the top position of the parapet 31 in the vertical direction (the height dimension value of the parapet 31) may be changed appropriately along the length of the levee 5 to facilitate drainage to the area (reservoir, etc.), reduce the amount of flow toward the river mouth, and prevent or mitigate flood disasters. That is, the parapet 31 may be partially cut down, shaped like a comb, or have holes drilled into it. In other words, a cross-sectional defect may be pre-constructed in the parapet 31.
また、仕切り壁13を支持杭として用いてもよい。この場合、ハイブリッド鉛直止水壁23、25を構成している支持杭は不要になる。 The partition wall 13 may also be used as a support pile. In this case, the support piles that make up the hybrid vertical water cut-off walls 23, 25 are not necessary.
総てのハイブリッド鉛直止水壁23、25(支持杭7、9や仕切り壁13)は鉛直方向に延びているが、作用外力に対し、最も効果的(有効的)な反力が期待できる角度としてもよい(斜杭)。ただし、総てを斜杭(斜めに延びている杭)とする必要はなく、鉛直杭と組み合わせた複合杭としてもよい。さらに、斜杭の傾きの方向を支持杭毎に適宜変えてあってもよい。 All hybrid vertical water cutoff walls 23, 25 (support piles 7, 9 and partition wall 13) extend vertically, but they may be angled to provide the most effective (efficient) reaction force against external forces (inclined piles). However, not all piles need to be inclined piles (piles extending at an angle); they may be composite piles combined with vertical piles. Furthermore, the inclination direction of the inclined piles may be changed as appropriate for each support pile.
ハイブリッド鉛直止水壁23、25(支持杭7、9や仕切り壁13)に供することができる材料としては、杭、矢板で代表されるが、鋼材、杭、地下連続壁で代表されるプレキャスト系(工場で予め製造)および現所打系(現場で設けるコンクリート系)であってもよい。 Materials that can be used for the hybrid vertical water cut-off walls 23, 25 (support piles 7, 9 and partition wall 13) are typically piles and sheet piles, but they can also be precast (prefabricated in a factory) and cast-in-place (concrete installed on-site) materials such as steel piles and underground continuous walls.
既存堤防の補強構造1は、既存の堤防5の天端6を常時活用(歩道、車道等)している場合の応用補強構造であり、脆弱堤防5でも強靭堤防であっても、既存堤防の補強構造1を採用することができる。 The existing levee reinforcement structure 1 is an applied reinforcement structure when the top 6 of the existing levee 5 is in constant use (for sidewalks, roadways, etc.), and the existing levee reinforcement structure 1 can be used for both weak and strong levee 5.
ハイブリッド鉛直止水壁23、25の設置位置は、堤防5内でも堤防5外でもよいが、河川3側に設置すれば、従来通りの堤防5の天端6の活用が可能になる。 The hybrid vertical water cut-off walls 23, 25 may be installed either inside or outside the levee 5, but if they are installed on the river 3 side, the top 6 of the levee 5 can be utilized as usual.
図9で示されているフェンダー59に加えてタラップを設置してもよい。フェンダー59やタラップは、救助・救援活動等に活躍する船舶の接岸設備である。フェンダー59やタラップを設けることで、防災準備、復旧、復興の一躍を担うことができる。また、床版11の内側(表法55側)上部に係船柱(図示せず)を設けることで、船舶の接岸がより効果的となる。 A ladder may be installed in addition to the fender 59 shown in Figure 9. The fender 59 and ladder are berthing equipment for ships used in rescue and relief operations. Installing the fender 59 and ladder can play an important role in disaster prevention preparation, recovery, and reconstruction. Furthermore, installing a mooring bollard (not shown) on the top inside of the deck slab 11 (on the side of the top deck 55) will make ship docking more effective.
〔第2の実施形態〕
図10で示す第2の実施形態に係る既存堤防の補強構造1aは、床版11が堤防5から上側に離れている点が、本発明の第1の実施形態に係る既存堤防の補強構造1と異なり、その他の点は、既存堤防の補強構造1と同様に構成されており、既存堤防の補強構造1と同様に変更を加えることができるようになっている。
Second Embodiment
The reinforcement structure 1a for an existing embankment according to the second embodiment shown in Figure 10 differs from the reinforcement structure 1 for an existing embankment according to the first embodiment of the present invention in that the deck slab 11 is spaced upward from the embankment 5, but in other respects it is configured in the same way as the reinforcement structure 1 for an existing embankment, and can be modified in the same way as the reinforcement structure 1 for an existing embankment.
既存堤防の補強構造1aでは、床版11の厚さ方向が概ね上下方向になっており、床版11が堤防5の上側で堤防5から離れている。また、支持杭7、9や仕切り壁13も、上側に延長されている。 In the existing embankment reinforcement structure 1a, the thickness direction of the deck slab 11 is roughly vertical, and the deck slab 11 is separated from the embankment 5 above it. In addition, the support piles 7, 9 and the partition wall 13 are also extended upward.
既存堤防の補強構造1aによれば、床版11が堤防5の上側で堤防5から離れているので、ハイブリッド鉛直止水壁23、25が堤防5よりも上側に突出していることになり、河川3の水14の流量が増えてもハイブリッド鉛直止水壁23、25によって水14をせき止めることができ、越水を一層防止することができる。また、堤防5の天端6や床版11の上面を、人や車の通り道等として有効活用することができる。 According to the existing levee reinforcement structure 1a, the deck 11 is located above the levee 5 and away from the levee 5, so the hybrid vertical water cut-off walls 23, 25 protrude above the levee 5. Even if the flow rate of water 14 in the river 3 increases, the hybrid vertical water cut-off walls 23, 25 can hold back the water 14, further preventing overflow. Furthermore, the top 6 of the levee 5 and the upper surface of the deck slab 11 can be effectively used as paths for pedestrians and vehicles.
〔第3の実施形態〕
図11で示す第3の実施形態に係る既存堤防の補強構造1bは、強靭な堤防5に採用されるものである。既存堤防の補強構造1bは、第1の支持杭7の代わりに止水キイ(キイ)61が用いられている等の点が、本発明の第1の実施形態に係る既存堤防の補強構造1と異なり、その他の点は、既存堤防の補強構造1と同様に構成されており、既存堤防の補強構造1とほぼ同様な変更を加えることができるようになっている。
Third Embodiment
The reinforcing structure 1b for an existing levee according to the third embodiment shown in Figure 11 is adopted for a strong levee 5. The reinforcing structure 1b for an existing levee according to the first embodiment of the present invention differs from the reinforcing structure 1 for an existing levee according to the first embodiment of the present invention in that a water-stop key (key) 61 is used instead of the first support pile 7, but in other respects it is configured in the same way as the reinforcing structure 1 for an existing levee, and it is possible to make almost the same modifications as those to the reinforcing structure 1 for an existing levee.
第3の実施形態に係る既存堤防の補強構造1bは、キイ61と支持杭(第2の支持杭)9と床版11とパラペット31とを備えて構成されている。 The reinforcing structure 1b for an existing embankment according to the third embodiment is composed of a key 61, support piles (second support piles) 9, a deck slab 11, and a parapet 31.
キイ61は、上側の部位が堤防5から露出し下側の部位が堤防5(堤防5の上側の部位のみ)に入り込んでいる。また、キイ61は、堤防5に沿って(堤防の長手方向で)堤防5に設置されている。キイ61は、堤防5が想定外の河川の水量に対しても十分な強度を備えており崩壊等のおそれが無い場合に、第1の支持杭7の代わりに設置されている。キイ61は、堤防5の中央の上部に設置されており、逆等脚台形状になっている。 The upper part of the key 61 is exposed from the levee 5, and the lower part is recessed into the levee 5 (only the upper part of the levee 5). The key 61 is also installed along the levee 5 (in the longitudinal direction of the levee). The key 61 is installed in place of the first support pile 7 when the levee 5 has sufficient strength to withstand unexpected river water volumes and there is no risk of collapse. The key 61 is installed at the top center of the levee 5 and has an inverted isosceles trapezoidal shape.
支持杭9は、複数本設けられている。支持杭9は、上側の部位と中間の部位とが露出し下側の部位が堤防5の外側の地盤15に打設されたことで入り込んでいる。複数本の支持杭9は、堤防5に沿い、堤防5の長手方向で所定の間隔をあけて地盤15に設置されている。 Multiple support piles 9 are installed. The upper and middle sections of the support piles 9 are exposed, while the lower sections are driven into the ground 15 outside the embankment 5, thereby embedding the piles. The multiple support piles 9 are installed in the ground 15 at predetermined intervals along the length of the embankment 5.
床版11は、堤防5の幅方向ではキイ61と支持杭9との間に設けられており、堤防5の長手方向では堤防5に沿って長く延びており、上下方向では、堤防5の上側でキイ61の上側の部位(たとえば上端面)と支持杭9の上側の部位(たとえば上端面)とで、キイ61と支持杭9とに一体的に設置されている。床版11は、水平方向もしくは水平方向に近似した方向に展開しており、床版11の厚さ方向は概ね上下方向になっている。 The deck 11 is located between the key 61 and the support pile 9 in the width direction of the embankment 5, extends longitudinally along the embankment 5, and is installed integrally with the key 61 and the support pile 9 at the upper part (e.g., the upper end surface) of the key 61 and the upper part (e.g., the upper end surface) of the support pile 9 above the embankment 5. The deck 11 extends horizontally or in a direction close to horizontal, and the thickness direction of the deck 11 is generally vertical.
また、既存堤防の補強構造1bには、仕切り壁13が設けられている。仕切り壁13は、堤防5に沿って(堤防の長手方向)で)複数の支持杭9の間に設置されており、複数の支持杭9の間を閉じている。仕切り壁13の厚さ方向は概ね幅方向になっている。なお、仕切り壁13が削除されていてもよい。 In addition, the existing levee reinforcement structure 1b is provided with partition walls 13. The partition walls 13 are installed between multiple support piles 9 along the levee 5 (in the longitudinal direction of the levee), enclosing the spaces between the multiple support piles 9. The thickness direction of the partition walls 13 is roughly the same as the width direction. Note that the partition walls 13 may be omitted.
既存堤防の補強構造1bでは、キイ61が、堤防5にのみ入り込み堤防5に沿って設置されているので、第1の支持杭7を用いる場合よりもキイ61の設置が容易になっている。すなわち、ハイブリッド鉛直止水壁23の代わりにキイ61(たとえばコンクリート製)を用いることで施工がしやすくなる。 In the existing levee reinforcement structure 1b, the keys 61 penetrate only into the levee 5 and are installed along the levee 5, making installation of the keys 61 easier than when using the first support piles 7. In other words, using keys 61 (made of concrete, for example) instead of the hybrid vertical water cut-off wall 23 makes construction easier.
なお、キイ61にせん断抵抗力を持たせたせん断キイとし、床版11の水平移動を抑制してもよい。 In addition, the key 61 may be a shear key that has shear resistance to suppress horizontal movement of the deck slab 11.
堤防5が強靭で被害を招いた主因の総てに抗する場合には、河川3を流下する流量(水の容積)を増大させるためにのみ、堤防5に既存堤防の補強構造1bを適用することにする。 If levee 5 is strong enough to withstand all of the main causes of the damage, existing levee reinforcement structure 1b will be applied to levee 5 only to increase the flow rate (volume of water) flowing down river 3.
堤防5が強靭なものである場合には、上述したようにハイブリッド鉛直止水壁25(支持杭9の仕切り壁13)が不要になる。また、既存堤防の補強構造1bでは、床版11から伝わる荷重に、堤防5の地盤反力と支持杭9の反力で抗する構造になっている。 If the levee 5 is strong, the hybrid vertical water cut-off wall 25 (partition wall 13 of the support piles 9) will not be necessary, as described above. Furthermore, the reinforcement structure 1b for the existing levee is designed to resist the load transmitted from the deck slab 11 with the ground reaction force of the levee 5 and the reaction force of the support piles 9.
堤防5が強靭で被害を招く主因の総てに抗することができる強靭堤防である場合には、河川3を流下する流量のポケット(容積)の増大をはかり、壊れることのない強靭堤防を越水(オーバーフロー)し洪水を引き起こすことを防止する目的で、床版11やパラペット31が構築されている。 If the levee 5 is strong and can withstand all of the main causes of damage, a deck 11 and parapet 31 are constructed to increase the pocket (volume) of flow that flows down the river 3 and prevent water from overflowing the unbreakable levee and causing a flood.
床版11と堤防5の天端6の間には、隙間を埋めるための緩衝材(たとえば、アスファルトマット、アスファルトマスチックとかのクッション材;図示せず)を介在させる場合がある。なお、フェイルセーフの構造として最も信頼に足るキイ61を構築してもよい。このキイ61は、現所打ちコンクリート造でも、各種プレキャスト材でも、矢板系の錠剤であってもよい。 A cushioning material (such as asphalt mat or asphalt mastic; not shown) may be placed between the deck slab 11 and the top 6 of the embankment 5 to fill the gap. Furthermore, a key 61 may be constructed as the most reliable fail-safe structure. This key 61 may be made of cast-in-place concrete, various precast materials, or sheet pile-type tablets.
〔第4の実施形態〕
図12で示す第4の実施形態に係る既存堤防の補強構造1cは、第1の支持杭7の代わりに支持体63が用いられている等の点が、本発明の第1の実施形態に係る既存堤防の補強構造1と異なり、その他の点は、既存堤防の補強構造1と同様に構成されており、既存堤防の補強構造1とほぼ同様な変更を加えることができるようになっている。
Fourth Embodiment
The reinforcement structure 1c for an existing levee according to the fourth embodiment shown in Figure 12 differs from the reinforcement structure 1 for an existing levee according to the first embodiment of the present invention in that a support 63 is used instead of the first support pile 7, but in other respects it is configured in the same way as the reinforcement structure 1 for an existing levee, and it is possible to make modifications that are almost the same as those to the reinforcement structure 1 for an existing levee.
第4の実施形態に係る既存堤防の補強構造1cは、支持体63と支持杭9と床版11と仕切り壁13とパラペット31とを備えて構成されている。 The reinforcement structure 1c for an existing embankment according to the fourth embodiment is composed of a support body 63, support piles 9, a deck slab 11, a partition wall 13, and a parapet 31.
支持体63は、上側の部位が堤防5から露出し中間の部位が堤防5に入り込み下側の部位が堤防5の下側の地盤15に入り込み、堤防5に沿って(堤防の長手方向で)堤防5に設置されている。支持体63の下端は、硬い地盤27の上面に当接しているが、破線で示すように、支持体63の下端部が、硬い地盤27内に入り込んでいてもよい。また、支持体63がキイ61と同様にコンクリート等で構成されていることが望ましい。 The support 63 is installed along the embankment 5 (in the longitudinal direction of the embankment), with its upper section exposed from the embankment 5, its middle section recessed into the embankment 5, and its lower section recessed into the ground 15 below the embankment 5. The lower end of the support 63 abuts against the upper surface of the hard ground 27, but as shown by the dashed line, the lower end of the support 63 may also recess into the hard ground 27. It is also desirable that the support 63 be made of concrete or the like, like the key 61.
支持杭9は、複数本設けられている。支持杭9は、上側の部位と中間の部位とが露出し下側の部位が堤防5の外側の地盤15に打設されたことで入り込んでいる。複数本の支持杭9は、堤防5に沿い、堤防5の長手方向で所定の間隔をあけて地盤15に設置されている。 Multiple support piles 9 are installed. The upper and middle sections of the support piles 9 are exposed, while the lower sections are driven into the ground 15 outside the embankment 5, thereby embedding the piles. The multiple support piles 9 are installed in the ground 15 at predetermined intervals along the length of the embankment 5.
床版11は、堤防5の幅方向では支持体63と支持杭9との間に設けられており、堤防5の長手方向では堤防5に沿って長く延びており、上下方向では、堤防5の上側で支持体63の上側の部位(たとえば上端面)と支持杭9の上側の部位(たとえば上端面)とで、支持体63と支持杭9とに一体的に設置されている。床版11は、水平方向もしくは水平方向に近似した方向に展開しており、床版11の厚さ方向は概ね上下方向になっている。 The deck 11 is located between the supports 63 and the support piles 9 in the width direction of the embankment 5, extends longitudinally along the embankment 5, and is installed integrally with the supports 63 and the support piles 9 at the upper part (e.g., the upper end surface) of the supports 63 and the upper part (e.g., the upper end surface) of the support piles 9 above the embankment 5. The deck 11 extends horizontally or in a direction close to horizontal, and the thickness direction of the deck 11 is generally vertical.
また、既存堤防の補強構造1cには、仕切り壁13が設けられている。仕切り壁13は、堤防5に沿って(堤防の長手方向)で)複数の支持杭9の間に設置されており、複数の支持杭9の間を閉じている。 In addition, the existing levee reinforcement structure 1c is provided with partition walls 13. The partition walls 13 are installed between multiple support piles 9 along the levee 5 (in the longitudinal direction of the levee) and close the spaces between the multiple support piles 9.
なお、既存堤防の補強構造1cにおいて、支持杭9の間に設けられている仕切り壁13を削除してもよい。この場合、支持体63に止水壁としての機能を持たせることが望ましい。すなわち、支持体63を堤防5の長手方向で連続して堤防5に設け、止水壁としての機能を持たせることが望ましい。 In addition, in the reinforcement structure 1c for an existing levee, the partition walls 13 provided between the support piles 9 may be eliminated. In this case, it is desirable for the support bodies 63 to function as water-stopping walls. In other words, it is desirable for the support bodies 63 to be provided continuously along the length of the levee 5, allowing them to function as water-stopping walls.
〔第5の実施形態〕
図13で示す第5の実施形態に係る既存堤防の補強構造1dは、設置対称である既存の堤防5が堀込み構造の堤防になっている等の点が、本発明の第1の実施形態に係る既存堤防の補強構造1と異なり、その他の点は、既存堤防の補強構造1と同様に構成されており、既存堤防の補強構造1とほぼ同様な変更を加えることができるようになっている。
Fifth Embodiment
The reinforcement structure 1d for an existing levee according to the fifth embodiment shown in Figure 13 differs from the reinforcement structure 1 for an existing levee according to the first embodiment of the present invention in that the existing levee 5 on which it is to be installed is an excavated levee, but in other respects it is configured in the same way as the reinforcement structure 1 for an existing levee, and it is possible to make modifications that are almost the same as those to the reinforcement structure 1 for an existing levee.
第5の実施形態に係る既存堤防の補強構造1dは、第1の支持杭7と第2の支持杭9と床版11と仕切り壁13とパラペット31とを備えて構成されている。 The fifth embodiment of the reinforcement structure 1d for an existing embankment is composed of first support piles 7, second support piles 9, a deck slab 11, a partition wall 13, and a parapet 31.
第1の支持杭7は、上側の部位が堤防(堀込み構造の堤防)5から露出し中間の部位が堤防5に入り込み下側の部位が堤防5の下側の地盤15に入り込んでいる。第2の支持杭9も、上側の部位が堤防5から露出し中間の部位が堤防5に入り込み下側の部位が堤防5の下側の地盤15に入り込んでいる。 The upper part of the first support pile 7 is exposed from the embankment (a trenched embankment) 5, the middle part is recessed into the embankment 5, and the lower part is recessed into the ground 15 below the embankment 5. The upper part of the second support pile 9 is also exposed from the embankment 5, the middle part is recessed into the embankment 5, and the lower part is recessed into the ground 15 below the embankment 5.
床版11は、堤防5の幅方向では、第1の支持杭7と第2の支持杭9との間に設けられており、堤防5の長手方向では、堤防5に沿って長く延びており、上下方向では、堤防5の上側で第1の支持杭7の上側の部位(たとえば上端面)と第2の支持杭9の上側の部位(たとえば上端面)とで、第1の支持杭7と第2の支持杭9とに一体的に設置されており、水平方向もしくは水平方向に近似した方向に展開している。 The deck slab 11 is located between the first support pile 7 and the second support pile 9 in the width direction of the embankment 5, extends longitudinally along the embankment 5, and is installed integrally with the first support pile 7 and the second support pile 9 at the upper part (e.g., the upper end surface) of the first support pile 7 and the upper part (e.g., the upper end surface) of the second support pile 9 on the upper side of the embankment 5, and extends horizontally or in a direction close to the horizontal.
仕切り壁13は、堤防5に沿って複数の第1の支持杭7の間、複数の第2の支持杭9の間の少なくともいずれかに設置されており、複数の支持杭7、9の間を閉じている。なお、仕切り壁13が削除されていてもよい。 The partition wall 13 is installed along the embankment 5 between at least one of the first support piles 7 and the second support piles 9, enclosing the space between the support piles 7, 9. The partition wall 13 may also be omitted.
また、既存堤防の補強構造1dでは、床版11の下面が緩衝工(図示せず)を介して堤防5の天端6に接合されているか、もしくは、堤防5の天端6に直接接合されている。 In addition, in the reinforcement structure 1d for the existing embankment, the underside of the deck slab 11 is either joined to the top 6 of the embankment 5 via a hood (not shown) or joined directly to the top 6 of the embankment 5.
〔第6の実施形態〕
図14で示す第6の実施形態に係る既存堤防の補強構造1eは、床版11が堤防5の上側で堤防5から離れている点が、本発明の第5の実施形態に係る既存堤防の補強構造1dと異なり、その他の点は、既存堤防の補強構造1dと同様に構成されており、既存堤防の補強構造1dとほぼ同様な変更を加えることができるようになっている。
Sixth Embodiment
The reinforcement structure 1e for an existing embankment according to the sixth embodiment shown in Figure 14 differs from the reinforcement structure 1d for an existing embankment according to the fifth embodiment of the present invention in that the deck slab 11 is located above the embankment 5 and separated from the embankment 5, but in other respects it is configured in the same way as the reinforcement structure 1d for an existing embankment, and it is possible to make modifications that are almost the same as those to the reinforcement structure 1d for an existing embankment.
ここで、上述した既存堤防の補強構造1~1e等についてさらに説明する。 Here, we will further explain the above-mentioned existing levee reinforcement structures 1 to 1e, etc.
河川3における堤防5や洪水時に一時的に水を貯留する遊水池の堤や土手、貯水を目的とした溜池や貯水池の堤や土手は、主に止水(遮水)を目的とした「土壌構造物」である。 Levees 5 on rivers 3, banks and embankments of flood control basins that temporarily store water during floods, and banks and embankments of reservoirs and reservoirs used for water storage are "soil structures" whose primary purpose is to stop water (water barrier).
築堤(Embankment)を伴う河川堤防や、貯水池、遊水池、堰堤等の構造物は、土壌を主構築材料とした「止水(遮水)を目的とした土壌構造物」である。 Structures such as river levees with embankments, reservoirs, retarding basins, and dams are "soil structures intended to stop water (water impermeability)" that use soil as their primary construction material.
河川堤防の水理的な特徴は、高水が長期的なものでなく一時的なものであって、高水が短時間(短期間)のうちに減水していくことになる。このために、堤体内への水の浸透は、「非定常(非定常浸透流)」になる。 The hydraulic characteristics of river levees are that high water levels are temporary, not long-term, and they subside over a short period of time. As a result, water infiltration into the levee body is "unsteady (unsteady seepage flow)."
貯水を目的とした溜池や貯水池や遊水池等の水理的な特徴は、長時間(長期間)にわたり水位を一定水位に近いレベルで保持することになる。これにより、堤体内への水の浸透は「定常(定常浸透流)」になる。 The hydraulic characteristics of reservoirs, reservoirs, and flood control basins designed for water storage are such that the water level is maintained at a near-constant level for a long period of time. This results in water infiltration into the embankment being "steady state (steady infiltration flow)."
溜池や貯水池は農林水産省の管轄であり、その堤の破壊モードについて3つに大別される。すなわち、図15に参照符号313で示すパイピングによる浸透破壊、降水の浸透や貯水の浸透による滑り破壊、越流や越流浸食による越流破壊(図15の破線315を参照)とに大別される。上述した既存堤防の補強構造1~1eによれば、上述した破壊を免れることができる。 Reservoirs and reservoirs are under the jurisdiction of the Ministry of Agriculture, Forestry and Fisheries, and the failure modes of their embankments can be broadly divided into three categories: seepage failure due to piping, as shown by reference number 313 in Figure 15; sliding failure due to the seepage of precipitation or stored water; and overflow failure due to overflow or overflow erosion (see dashed line 315 in Figure 15). The reinforcement structures 1 to 1e for existing embankments described above can prevent the above-mentioned failures.
既存堤防の補強構造1~1eにおいて、支持杭7、9は人口床版11の荷重および上積載荷重および作用外力から伝達され各種荷重を、支持層27に伝えるための本数が必要になる。 In the reinforcement structures 1-1e of existing levees, the number of support piles 7, 9 is required to transmit the various loads transmitted from the load of the artificial deck 11, the load on top, and external forces acting to the support layer 27.
また、ハイブリッド鉛直止水壁23(25)を、1列のみとしてもよいし、複数列としてもよい。しかし、ハイブリッド鉛直止水壁23(25)は、管理型廃棄物埋立処分場に供される遮水工とは相違し、「遮水(水を遮る)」ではなく止水(水を止める)」ことを目的としている。ハイブリッド鉛直止水壁23(25)には、管理型廃棄物処分場のような漏水に関する性能規定は存在しない。これにより、ハイブリッド鉛直止水壁23(25)の構造は、浸透水ある程度止める構造であればよい。 The hybrid vertical water cut-off walls 23 (25) may be arranged in a single row or in multiple rows. However, unlike the impermeable structures used in controlled waste landfills, the hybrid vertical water cut-off walls 23 (25) are intended to "stop water" rather than "water impermeable (block water)." There are no performance regulations for water leakage for hybrid vertical water cut-off walls 23 (25), as there are for controlled waste landfills. As a result, the structure of the hybrid vertical water cut-off walls 23 (25) only needs to be able to stop seepage water to a certain extent.
したがって、ハイブリッド鉛直止水壁23(25)に供する材料が、シート類でも木板類でも矢板類であっても、粘土類でも、鉄板類であっても、コンクリート類であっても、その性能を、十分に果たすことができる。 Therefore, the hybrid vertical water cut-off wall 23 (25) can fully perform its functions regardless of the material used, such as sheets, wooden boards, sheet piles, clay, steel plates, or concrete.
堤防5に供する「土壌材料」は長大な堤防を安価にかつ、短工期で築造しなければならないから、品質の良い土壌材料を遠隔地からもとめることは、目的に合致せず、一般的に言っても不可能であるといわざるを得ない。 The "soil material" used for Levee 5 must be able to be used to construct a long levee inexpensively and in a short period of time, so sourcing high-quality soil material from a remote location would not meet the objectives and would generally be considered impossible.
したがって、ほとんどが、河川が搬送したその地点近傍の堤外地の土砂を用いることになるので、河川堤防5に供する土壌材料は、透水性材料が主体となる。このことが、河川堤防5の構造的弱点となってしまうといった宿命となる。しかし、上述した既存堤防の補強構造1~1eによれば、河川堤防5に供する土壌材料であっても、上述した破壊を免れることができる。 As a result, most of the soil used for river levee 5 is from the area outside the levee near the point where it was transported by the river, and the soil material used for river levee 5 is primarily permeable material. This inevitably creates a structural weakness for river levee 5. However, with the reinforcement structures 1-1e for existing levees described above, even soil material used for river levee 5 can be prevented from being destroyed as described above.
堤防5内に補強構造1として新たに構築される杭群(支持7、9杭、ハイブリッド鉛直止水壁23、25)には、地震時の液状化防止とか、堤防5の強度増加等による耐震効果も期待される。 The pile group (support piles 7 and 9, hybrid vertical water-stop walls 23 and 25) newly constructed as reinforcing structure 1 within levee 5 is expected to have seismic resistance effects, such as preventing liquefaction during earthquakes and increasing the strength of levee 5.
なお、上述した既存堤防の補強構造1、1a、1b、1c、1d、1eは、次に示す既存堤防の補強構造の例である。 Note that the above-mentioned existing levee reinforcement structures 1, 1a, 1b, 1c, 1d, and 1e are examples of the following existing levee reinforcement structures:
すなわち、上側の部位が露出し中間の部位が堤防に入り込み下側の部位が前記堤防の下側の地盤に入り込むようにして前記堤防沿い設置されているか、もしくは、上側の部位と中間の部位とが露出し下側の部位が前記堤防の内側の地盤に入り込むようにして前記堤防に沿い設置されている第1の支持体と、上側の部位が露出し中間の部位が堤防に入り込み下側の部位が前記堤防の下側の地盤に入り込むようにして前記堤防沿い設置されているか、もしくは、上側の部位と下側の部位とが露出し下側の部位が前記堤防の外側の地盤に入り込むようにして、第1の支持体の外側で前記堤防に沿い設置されている第2の支持体と、前記堤防の幅方向では、前記第1の支持体と前記第2の支持体との間に設けられ、前記堤防の長手方向では、前記堤防に沿って長く延びており、上下方向では、前記第1の支持体の上側の部位と前記第2の支持体の上側の部位とで前記第1の支持体と前記第2の支持体とに設置されており、水平方向もしくは水平方向に近似した方向に展開している床版とを有し、前記第1の支持体、前記第2の支持体のうちいずれかが、または、いずれもが(前記第1の支持体、前記第2の支持体のうちの少なくともいずれかが、)前記堤防の内側を流れる水の止水壁になっている既存堤防の補強構造の例である。 That is, the first support is installed along the embankment with its upper section exposed, its middle section recessed into the embankment, and its lower section recessed into the ground below the embankment, or with its upper and middle sections exposed and its lower section recessed into the ground inside the embankment, and the second support is installed along the embankment outside the first support with its upper section exposed, its middle section recessed into the embankment, and its lower section recessed into the ground below the embankment, or with its upper and lower sections exposed and its lower section recessed into the ground outside the embankment. This is an example of a reinforcement structure for an existing levee, in which either or both of the first and second supports (at least one of the first and second supports) function as a water cut-off wall to block water flowing inside the levee.
1a、1b、1c、1d、1e 既存堤防の補強構造
5 堤防(堤体)
6 天端
7 第1の支持杭
9 第2の支持杭
11 床版
13 仕切り壁
15 地盤
31 パラペット
61 キイ
63 支持体
1a, 1b, 1c, 1d, 1e Reinforcement structure of existing levee 5 Levee (embankment body)
6 Top edge 7 First support pile 9 Second support pile 11 Deck slab 13 Partition wall 15 Ground 31 Parapet 61 Key 63 Support
Claims (3)
上側の部位と中間の部位とが露出し下側の部位が前記堤防の外側で前記堤防の下側の地盤に入り込み、前記堤防に沿い所定の間隔をあけて設置されている複数本の支持杭と、
前記堤防の幅方向では、前記キイと前記支持杭との間に設けられ、前記堤防の長手方向では、前記堤防に沿って長く延びており、上下方向では、前記キイの上側の部位と前記支持杭の上側の部位とで、前記キイと前記支持杭とに設置されており、水平方向もしくは水平方向に近似した方向に展開している床版と、
前記堤防に沿って前記複数の支持杭の間に設置されており、前記複数の支持杭の間を閉じている仕切り壁と、
を有することを特徴とする既存堤防の補強構造。 a key having an exposed upper portion and a recessed lower portion along the bank;
a plurality of support piles installed at predetermined intervals along the embankment, with upper and middle sections exposed and lower sections embedded in the ground below the embankment outside the embankment;
a deck slab that is provided between the key and the support pile in the width direction of the embankment, extends long along the embankment in the longitudinal direction of the embankment, and is installed between the key and the support pile at the upper part of the key and the upper part of the support pile in the up-down direction, and extends horizontally or in a direction close to the horizontal direction;
a partition wall installed between the plurality of support piles along the embankment and enclosing the gap between the plurality of support piles;
A reinforcement structure for an existing embankment, characterized by having:
上側の部位と中間の部位とが露出し下側の部位が前記堤防の外側の前記地盤に入り込み、前記堤防に沿い所定の間隔をあけて設置されている複数本の支持杭と、
前記堤防の幅方向では、前記支持体と前記支持杭との間に設けられ、前記堤防の長手方向では、前記堤防に沿って長く延びており、上下方向では、前記支持体の上側の部位と前記支持杭の上側の部位とで、前記支持体と前記支持杭とに設置されており、水平方向もしくは水平方向に近似した方向に展開している床版と、
前記堤防に沿って前記複数の支持杭の間に設置されており、前記複数の支持杭の間を閉じている仕切り壁と、
を有することを特徴とする既存堤防の補強構造。 a support installed along the embankment, with an upper portion exposed, a middle portion recessed into the embankment, and a lower portion recessed into the ground below the embankment;
a plurality of support piles installed at predetermined intervals along the embankment, with upper and middle portions exposed and lower portions embedded in the ground outside the embankment;
a deck slab that is provided between the support body and the support pile in the width direction of the embankment, extends long along the embankment in the longitudinal direction of the embankment, and is installed between the support body and the support pile at the upper part of the support body and the upper part of the support pile in the vertical direction, and extends horizontally or in a direction close to the horizontal direction;
a partition wall installed between the plurality of support piles along the embankment and enclosing the gap between the plurality of support piles;
A reinforcement structure for an existing embankment, characterized by having:
上側の部位と中間の部位とが露出し下側の部位が前記堤防の外側の前記地盤に入り込み、前記堤防に沿い所定の間隔をあけて設置されている複数本の支持杭と、
前記堤防の幅方向では、前記支持体と前記支持杭との間に設けられ、前記堤防の長手方向では、前記堤防に沿って長く延びており、上下方向では、前記支持体の上側の部位と前記支持杭の上側の部位とで、前記支持体と前記支持杭とに設置されており、水平方向もしくは水平方向に近似した方向に展開している床版と、
を有することを特徴とする既存堤防の補強構造。 a support member having an upper portion exposed, a middle portion recessed into the embankment, and a lower portion recessed into the ground below the embankment, the support member being provided continuously in the longitudinal direction of the embankment;
a plurality of support piles installed at predetermined intervals along the embankment, with upper and middle portions exposed and lower portions embedded in the ground outside the embankment;
a deck slab that is provided between the support body and the support pile in the width direction of the embankment, extends long along the embankment in the longitudinal direction of the embankment, and is installed between the support body and the support pile at the upper part of the support body and the upper part of the support pile in the vertical direction, and extends horizontally or in a direction close to the horizontal direction;
A reinforcement structure for an existing embankment, characterized by having:
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2020144072A JP7824619B2 (en) | 2020-08-28 | 2020-08-28 | Reinforcement structure of existing embankments |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2020144072A JP7824619B2 (en) | 2020-08-28 | 2020-08-28 | Reinforcement structure of existing embankments |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2022039178A JP2022039178A (en) | 2022-03-10 |
| JP7824619B2 true JP7824619B2 (en) | 2026-03-05 |
Family
ID=80498292
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2020144072A Active JP7824619B2 (en) | 2020-08-28 | 2020-08-28 | Reinforcement structure of existing embankments |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP7824619B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP7817542B2 (en) * | 2022-03-28 | 2026-02-19 | 日本製鉄株式会社 | embankment |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2013112982A (en) | 2011-11-28 | 2013-06-10 | Nippon Steel & Sumitomo Metal | Wall body structure |
| JP5939622B2 (en) | 2012-03-23 | 2016-06-22 | 株式会社技研製作所 | Retaining wall |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0231161B2 (en) * | 1985-03-20 | 1990-07-11 | Kensetsu Kiso Eng | DOROKAKUFUKUKOHO |
| JPH0630881Y2 (en) * | 1989-07-12 | 1994-08-22 | 建設省関東地方建設局長 | Equipment for passing vehicles on the embankment |
| JP2003013451A (en) * | 2001-07-02 | 2003-01-15 | Sumitomo Metal Ind Ltd | Embankment reinforcement structure |
| JP4479005B2 (en) * | 2004-12-20 | 2010-06-09 | 日本サミコン株式会社 | Road expansion structure and road expansion method |
| JP6760760B2 (en) * | 2016-05-18 | 2020-09-23 | 大成建設株式会社 | Embankment structure |
| JP2020100942A (en) * | 2018-12-19 | 2020-07-02 | 株式会社Ihi建材工業 | Seawall |
-
2020
- 2020-08-28 JP JP2020144072A patent/JP7824619B2/en active Active
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2013112982A (en) | 2011-11-28 | 2013-06-10 | Nippon Steel & Sumitomo Metal | Wall body structure |
| JP5939622B2 (en) | 2012-03-23 | 2016-06-22 | 株式会社技研製作所 | Retaining wall |
Non-Patent Citations (1)
| Title |
|---|
| 南海トラフ巨大地震に備える インプラント堤防 |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2022039178A (en) | 2022-03-10 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US10138616B2 (en) | Inverse construction method for deep, large and long pit assembling structure of suspension-type envelope enclosure | |
| CN111608139B (en) | Super-large-scale flood and gravel flow prevention methods | |
| Etcheverry | Irrigation Practice and Engineering... | |
| JP7824619B2 (en) | Reinforcement structure of existing embankments | |
| RU2770187C1 (en) | Method for structure construction in the under-runner space of rivers and canals in urban development | |
| CN119021251A (en) | Construction method of bridge main piers suitable for complex embankment areas in tidal rivers | |
| Bauduin | Roertunnel: tunnel elements constructed in building pit for in situ part of tunnel | |
| JP5669192B2 (en) | Quay structure or revetment structure | |
| CN114032846A (en) | A diversion structure for a large-diameter buried pipe passing through a gully | |
| RU2765209C1 (en) | Buoyant dam | |
| CN221167687U (en) | Wall-penetrating roof pipe culvert gate structure | |
| JP7817542B2 (en) | embankment | |
| Poppema et al. | International Good Practices of Embankment Upgrading with Limited Footprint Increase | |
| Hawkswood et al. | Impermeable Toe Protection To Caisson Breakwaters Using In-Situ Concrete Mattress | |
| Naeem et al. | Optimization of Seawall Design at Alameda Marina | |
| CN113481932B (en) | High pile cap type seawall | |
| Hunter et al. | Cardiff Bay Barrage: planning and design | |
| Seinuk | Foundation and Flood Protection Design in Flood Zones | |
| WO2024171665A1 (en) | Dike reinforcing structure, and dike | |
| Chen | Sluices and barrages | |
| Takuma et al. | Aseismic and Anti-Tsunami seawalls and port structures | |
| Morán et al. | Overtopping Protection of Embankment Dams: Technical Monograph | |
| Bisio | Honey, I shrunk the piano key weir: A case study of Burton Pond Dam | |
| Julien et al. | Alternative designs of pier-scour protection for the Gupo and Subway Bridge on the Lower Nakdong River | |
| JP2025122924A (en) | Reinforcement methods for existing levees and levees |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20230525 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20240116 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20240123 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20240228 |
|
| A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20240528 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20240607 |
|
| A911 | Transfer to examiner for re-examination before appeal (zenchi) |
Free format text: JAPANESE INTERMEDIATE CODE: A911 Effective date: 20240613 |
|
| A912 | Re-examination (zenchi) completed and case transferred to appeal board |
Free format text: JAPANESE INTERMEDIATE CODE: A912 Effective date: 20240802 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20251006 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20260213 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 7824619 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |