Transformer and method for determining partial discharge

Info

Publication number
JP7852126B2
JP7852126B2 JP2025101218A JP2025101218A JP7852126B2 JP 7852126 B2 JP7852126 B2 JP 7852126B2 JP 2025101218 A JP2025101218 A JP 2025101218A JP 2025101218 A JP2025101218 A JP 2025101218A JP 7852126 B2 JP7852126 B2 JP 7852126B2
Authority
JP
Japan
Prior art keywords
sensor
housing
coil
coil device
transformer according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2025101218A
Other languages
Japanese (ja)
Other versions
JP2025120480A (en
Inventor
雅之 城条
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP2025101218A priority Critical patent/JP7852126B2/en
Publication of JP2025120480A publication Critical patent/JP2025120480A/en
Application granted granted Critical
Publication of JP7852126B2 publication Critical patent/JP7852126B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Transformer Cooling (AREA)
  • Housings And Mounting Of Transformers (AREA)
  • Testing Relating To Insulation (AREA)
  • Testing Electric Properties And Detecting Electric Faults (AREA)

Description

本発明の実施態様は、変圧器及び部分放電判定方法に関する。 Embodiments of the present invention relate to a transformer and a method for determining partial discharge.

電力機器の絶縁破壊の前触れとして、電力機器から部分放電が発生することがある。このような特性を利用し、部分放電によって変化する物理量をセンサを用いて計測することによって、電力機器の絶縁破壊を予測する技術が知られている。 Partial discharge can occur in power equipment as a precursor to dielectric breakdown. A technique is known that utilizes this characteristic to predict dielectric breakdown by measuring the physical quantities that change due to partial discharge using sensors.

特許第6588781号公報Patent No. 6588781

電力機器の一具体例として、コイルを、絶縁性を有するガスを密閉するタンクに格納することで、巻線とタンクとの絶縁を確保した変圧器がある。このような変圧器について、部分放電の検出を行うことが望まれる。
本発明が解決しようとする課題は、部分放電を検出するための物理量を適切に計測することができる変圧器及び部分放電判定方法を提供することである。
One specific example of power equipment is a transformer in which the coil is housed in a tank sealed with an insulating gas, thereby ensuring insulation between the winding and the tank. For such transformers, it is desirable to detect partial discharge.
The problem that this invention aims to solve is to provide a transformer and a method for determining partial discharge that can appropriately measure the physical quantities necessary for detecting partial discharge.

実施形態の変圧器は、絶縁性を有するガスを密閉する筐体と、コイル装置と、冷却部と、ファンと、センサとを持つ。コイル装置は、筐体内に位置する。冷却部は、筐体に位置し、ガスから熱を奪う。ファンは、コイル装置と冷却部との間に位置し、ガスを圧送する。センサは、筐体のうちファンが位置する箇所と異なる箇所に位置し、コイル装置から生じる部分放電に関する物理量を測定する。 The transformer of this embodiment comprises a housing that seals an insulating gas, a coil device, a cooling unit, a fan, and a sensor. The coil device is located within the housing. The cooling unit is located within the housing and removes heat from the gas. The fan is located between the coil device and the cooling unit and pumps the gas. The sensor is located within the housing at a location different from where the fan is situated and measures physical quantities related to the partial discharge generated by the coil device.

第1の実施形態に係る変圧器の構成を示す斜視図である。This is a perspective view showing the configuration of a transformer according to the first embodiment. 第1の実施形態に係る変圧器の断面図である。This is a cross-sectional view of a transformer according to the first embodiment. 第1の実施形態に係る検査装置の構成を示す概略ブロック図である。This is a schematic block diagram showing the configuration of the inspection apparatus according to the first embodiment. 第2の実施形態に係る変圧器の構成を示す斜視図である。This is a perspective view showing the configuration of a transformer according to the second embodiment. 第3の実施形態に係る変圧器の構成を示す斜視図である。This is a perspective view showing the configuration of a transformer according to the third embodiment. 第3の実施形態に係る検査装置の構成を示す概略ブロック図である。This is a schematic block diagram showing the configuration of the inspection device according to the third embodiment. 第3の実施形態に係る検査装置による部分放電の判定方法を示すフローチャートである。This is a flowchart showing a method for determining partial discharge using an inspection device according to the third embodiment. 第4の実施形態に係る変圧器の構成を示す斜視図である。This is a perspective view showing the configuration of a transformer according to the fourth embodiment. 第5の実施形態に係る変圧器の構成を示す斜視図である。This is a perspective view showing the configuration of a transformer according to the fifth embodiment. 第6の実施形態に係る変圧器の構成を示す斜視図である。This is a perspective view showing the configuration of a transformer according to the sixth embodiment. 第7の実施形態に係る変圧器の構成を示す斜視図である。This is a perspective view showing the configuration of a transformer according to the seventh embodiment. 第8の実施形態に係る変圧器の構成を示す斜視図である。This is a perspective view showing the configuration of a transformer according to the eighth embodiment.

以下、実施形態の変圧器及び部分放電判定方法を、図面を参照して説明する。
〈第1の実施形態〉
《変圧器10の構成》
以下、図面を参照しながら実施形態について詳しく説明する。
図1は、第1の実施形態に係る変圧器10の構成を示す斜視図である。図2は、第1の実施形態に係る変圧器10の断面図である。第1の実施形態に係る変圧器10は、三相三巻線変圧器である。
変圧器10は、図1に示すように、3つのコイル装置11、コイルタンク13、熱交換器15、接続管17、センサ19を備える。
The transformer and partial discharge determination method of the embodiment will be described below with reference to the drawings.
<First Embodiment>
Configuration of transformer 10
The embodiments will be described in detail below with reference to the drawings.
Figure 1 is a perspective view showing the configuration of the transformer 10 according to the first embodiment. Figure 2 is a cross-sectional view of the transformer 10 according to the first embodiment. The transformer 10 according to the first embodiment is a three-phase three-winding transformer.
As shown in Figure 1, the transformer 10 comprises three coil devices 11, a coil tank 13, a heat exchanger 15, connecting pipes 17, and a sensor 19.

3つのコイル装置11は、コイルタンク13内に収容される。コイルタンク13は、加圧空気を密閉する。加圧空気は、少なくとも1気圧以上で加圧される。コイルタンク13は、例えば鋼板により構成される。熱交換器15は、コイルタンク13に充填される加圧空気から熱を奪い、大気中に放出する。接続管17は、コイルタンク13と熱交換器15とを接続し、加圧空気を流通させる。センサ19は、コイルタンク13のTEV(Transient Earth Voltage、過渡接地電圧)を計測する。具体的には、センサ19は、コイル装置11との間で形成される浮遊容量を介して検出されるコイルタンク13の表面電位を検出する。コイル装置11の部分放電が生じると、コイルタンク13の接地電圧が過渡的に変化する。そのため、センサ19によりTEVを計測することで、部分放電の検出を行うことができる。つまり、TEVは、部分放電に関する物理量の一例である。 The three coil devices 11 are housed within the coil tank 13. The coil tank 13 seals in pressurized air. The pressurized air is pressurized to at least 1 atmosphere. The coil tank 13 is constructed, for example, from steel plate. The heat exchanger 15 removes heat from the pressurized air filling the coil tank 13 and releases it into the atmosphere. The connecting pipe 17 connects the coil tank 13 and the heat exchanger 15, allowing the pressurized air to circulate. The sensor 19 measures the TEV (Transient Earth Voltage) of the coil tank 13. Specifically, the sensor 19 detects the surface potential of the coil tank 13, which is detected via the stray capacitance formed between it and the coil devices 11. When a partial discharge occurs in the coil devices 11, the ground voltage of the coil tank 13 changes transiently. Therefore, by measuring the TEV with the sensor 19, partial discharge can be detected. In other words, TEV is an example of a physical quantity related to partial discharge.

加圧空気は、コイルタンク13、熱交換器15、及び接続管17によって密封される。つまり、コイルタンク13、熱交換器15、及び接続管17は、変圧器10の筐体を構成する。 The pressurized air is sealed by the coil tank 13, the heat exchanger 15, and the connecting pipe 17. In other words, the coil tank 13, the heat exchanger 15, and the connecting pipe 17 constitute the housing of the transformer 10.

《コイル装置11の構成》
3つのコイル装置11は、図1に示すように、それぞれコイルタンク13内に、一列に並べて設置される。すなわち、コイルタンク13は、コイル装置11を収容する第1筐体の一例である。3つのコイル装置11は、それぞれU相、V相、及びW相に対応する。各コイル装置11は、図2に示すように、鉄心111とコイル112と口出し線113とを備える。
Configuration of the coil device 11
As shown in Figure 1, the three coil devices 11 are installed in a row within the coil tank 13. That is, the coil tank 13 is an example of a first housing that accommodates the coil devices 11. The three coil devices 11 correspond to the U phase, V phase, and W phase, respectively. As shown in Figure 2, each coil device 11 comprises an iron core 111, a coil 112, and lead wires 113.

コイル112は、高圧側巻線112a、低圧側巻線112b、空隙部112c、及び被覆部112dを有する。
高圧側巻線112a及び低圧側巻線112bは、鉄心111に巻回されて構成される。高圧側巻線112aは、変圧器10を電力系統に適用する際に高圧電力が入力される一次側の巻線として機能する。低圧側巻線112bは、変圧器を電力系統に適用する際に低圧電力を出力する二次側の巻線として機能する。高圧側巻線112aは、低圧側巻線112bの外側に設けられる。
空隙部112cは、高圧側巻線112aと低圧側巻線112bとの間に形成される。 被覆部112dは、エポキシ樹脂などの絶縁性の高い絶縁部材で形成される。高圧側巻線112a及び低圧側巻線112bを被覆する。被覆部112dは、例えば高圧側巻線112a及び低圧側巻線112bを絶縁部材に浸漬させ、当該絶縁部材を硬化させることで形成される。
口出し線113は、高圧側巻線112aから引き出される高圧側口出し線113a及び低圧側巻線112bから引き出される低圧側口出し線113bを備える。
The coil 112 has a high-voltage side winding 112a, a low-voltage side winding 112b, an air gap 112c, and a covering portion 112d.
The high-voltage side winding 112a and the low-voltage side winding 112b are formed by winding them around the iron core 111. The high-voltage side winding 112a functions as the primary side winding to which high-voltage power is input when the transformer 10 is applied to a power system. The low-voltage side winding 112b functions as the secondary side winding to which low-voltage power is output when the transformer is applied to a power system. The high-voltage side winding 112a is provided on the outside of the low-voltage side winding 112b.
The gap 112c is formed between the high-voltage side winding 112a and the low-voltage side winding 112b. The covering portion 112d is made of a highly insulating material such as epoxy resin. It covers the high-voltage side winding 112a and the low-voltage side winding 112b. The covering portion 112d is formed, for example, by immersing the high-voltage side winding 112a and the low-voltage side winding 112b in the insulating material and curing the insulating material.
The lead wire 113 includes a high-voltage side lead wire 113a drawn from the high-voltage side winding 112a and a low-voltage side lead wire 113b drawn from the low-voltage side winding 112b.

《コイルタンク13の構成》
コイルタンク13は、脚部131、底板132、側壁133、蓋板134、高圧側端子135、低圧側端子136、上部クランプ137、下部クランプ138、接地極139を備える。
Configuration of the coil tank 13
The coil tank 13 includes legs 131, a bottom plate 132, side walls 133, a lid plate 134, a high-voltage terminal 135, a low-voltage terminal 136, an upper clamp 137, a lower clamp 138, and a grounding electrode 139.

脚部131は、コイルタンク13を下方から支持する。
底板132は、脚部131の上に設けられる。底板132の上にはコイル装置11が設置される。側壁133は、底板132の端縁から上方に立ち上がるように設けられる。蓋板134は、側壁133の上部を覆うように設けられる。底板132、側壁133及び蓋板134は、鋼板によって構成される。
The leg portion 131 supports the coil tank 13 from below.
The base plate 132 is provided on the legs 131. The coil device 11 is installed on the base plate 132. The side walls 133 are provided so as to rise upward from the edge of the base plate 132. The cover plate 134 is provided so as to cover the upper part of the side walls 133. The base plate 132, side walls 133 and cover plate 134 are made of steel plates.

側壁133には、コイルタンク13の周方向にコイルタンク13を補強するための複数の補強部133aが設けられる。補強部133aは、側壁133から外方向に突出する水平方向に伸びる部分である。つまり、側壁133の外面は、補強部133aによって一方向に伸びる凹部と凸部が形成される。
補強部133aは、例えば鋼板を折り曲げて形成された断面C字状のチャンネル部材(リップ溝形鋼)や角形鋼管であってよい。この場合、補強部133aのリップが側壁133に接着又は溶接される。また、補強部133aは、例えば側壁133が波型に折り曲げて形成されることで生じる凸部であってもよい。
The side wall 133 is provided with a plurality of reinforcing portions 133a in the circumferential direction of the coil tank 13 to reinforce the coil tank 13. The reinforcing portions 133a are horizontally extending portions that protrude outward from the side wall 133. In other words, the outer surface of the side wall 133 is formed by the reinforcing portions 133a, creating recesses and protrusions that extend in one direction.
The reinforcing portion 133a may be, for example, a channel member with a C-shaped cross-section (lip channel steel) formed by bending a steel plate, or a rectangular steel pipe. In this case, the lip of the reinforcing portion 133a is bonded or welded to the side wall 133. Alternatively, the reinforcing portion 133a may be a protrusion created by bending the side wall 133 into a corrugated shape.

高圧側端子135及び低圧側端子136は、蓋板134を上下方向に貫通して設けられる。高圧側端子135及び低圧側端子136は、例えばT型ブッシングやダイレクトモールドブッシングによって構成される。高圧側端子135のコイルタンク13内側の端は、高圧側口出し線113aを介して高圧側巻線112aに接続される。低圧側端子136のコイルタンク13内側の端は、低圧側口出し線113bを介して低圧側巻線112bに接続される。高圧側端子135及び低圧側端子136は、コイル装置11と電気的に接続された取出端子である。 The high-voltage terminal 135 and low-voltage terminal 136 are provided, penetrating the cover plate 134 in the vertical direction. The high-voltage terminal 135 and low-voltage terminal 136 are constructed, for example, by T-type bushings or direct-molded bushings. The inner end of the high-voltage terminal 135 in the coil tank 13 is connected to the high-voltage winding 112a via the high-voltage lead wire 113a. The inner end of the low-voltage terminal 136 in the coil tank 13 is connected to the low-voltage winding 112b via the low-voltage lead wire 113b. The high-voltage terminal 135 and low-voltage terminal 136 are output terminals electrically connected to the coil device 11.

上部クランプ137は、3つのコイル装置11に亘って設けられ、各コイル装置11の鉄心111の上端部を挟み込んだ状態で固定される。
下部クランプ138は、3つのコイル装置11に亘って設けられ、各コイル装置11の鉄心111の下端部を挟み込んだ状態で固定される。下部クランプ138は、底板132に固定される。
上部クランプ137及び下部クランプ138は、例えば鋼板を折り曲げて形成されるチャンネル部材(溝形鋼)やアングル部材(山形鋼)によって構成されてよい。
接地極139は、大地に埋設され、接地線を介してコイルタンク13の外壁(例えば、側壁133)に接続される。これにより、コイルタンク13の底板132、側壁133及び蓋板134、並びにコイルタンク13に接続される接続管17及び熱交換器15が接地される。
The upper clamp 137 is provided across the three coil devices 11 and is fixed in place by clamping the upper end of the iron core 111 of each coil device 11.
The lower clamp 138 is provided across the three coil devices 11 and is fixed in place by clamping the lower end of the iron core 111 of each coil device 11. The lower clamp 138 is fixed to the bottom plate 132.
The upper clamp 137 and the lower clamp 138 may be made of, for example, channel members (channel steel) or angle members (angle steel) formed by bending steel plates.
The grounding electrode 139 is buried in the ground and connected to the outer wall (for example, the side wall 133) of the coil tank 13 via a grounding wire. This grounds the bottom plate 132, side walls 133 and lid plate 134 of the coil tank 13, as well as the connecting pipe 17 and heat exchanger 15 connected to the coil tank 13.

《熱交換器15の構成》
熱交換器15は、コイルタンク13に対してコイル装置11の並び方向に交差する方向に設けられる。例えば、コイル装置11の並び方向をコイルタンク13の左右方向と定義すると、熱交換器15は、コイルタンク13の後方に設けられる。熱交換器15は、例えば加圧空気が通る複数のチューブと大気との表面積を稼ぐフィンとからなる熱交換部を有する。すなわち、熱交換器15は、冷却部(熱交換部)を有する第2筐体の一例である。 接続管17は、熱交換器15の上部とコイルタンク13の上部とを接続する上部接続管171と、熱交換器15の下部とコイルタンク13の下部とを接続する下部接続管172とを有する。上部接続管171は、コイル装置11により熱せられた加圧空気を熱交換器15に流通させる。下部接続管172は、熱交換器15により冷却された加圧空気をコイルタンク13に流通させる。下部接続管172には、熱交換器15からコイルタンク13へ加圧空気を圧送するファン172aが設けられる。ファン172aは、必ずしも送風機でなくてよく、圧力比の高いブロワ等であってもよい。また、他の実施形態では、上部接続管171に、コイルタンク13から熱交換器15へ加圧空気を圧送するファンが設けられてもよい。
Configuration of the heat exchanger 15
The heat exchanger 15 is installed in a direction that intersects the direction in which the coil devices 11 are arranged relative to the coil tank 13. For example, if the direction in which the coil devices 11 are arranged is defined as the left-right direction of the coil tank 13, the heat exchanger 15 is installed behind the coil tank 13. The heat exchanger 15 has a heat exchange section consisting of, for example, a plurality of tubes through which pressurized air passes and fins that increase the surface area with the atmosphere. That is, the heat exchanger 15 is an example of a second housing having a cooling section (heat exchange section). The connecting pipe 17 has an upper connecting pipe 171 that connects the upper part of the heat exchanger 15 to the upper part of the coil tank 13, and a lower connecting pipe 172 that connects the lower part of the heat exchanger 15 to the lower part of the coil tank 13. The upper connecting pipe 171 allows pressurized air heated by the coil devices 11 to flow through to the heat exchanger 15. The lower connecting pipe 172 allows pressurized air cooled by the heat exchanger 15 to flow through to the coil tank 13. A fan 172a is provided in the lower connecting pipe 172 to pump pressurized air from the heat exchanger 15 to the coil tank 13. The fan 172a does not necessarily have to be a blower; it may be a blower with a high pressure ratio or the like. In another embodiment, a fan for pumping pressurized air from the coil tank 13 to the heat exchanger 15 may be provided in the upper connecting pipe 171.

《センサ19の配置》
センサ19は、コイルタンク13の側壁133の外面に取り付けられる。
具体的には、センサ19は、側壁133のうち、熱交換器15と対向する面の反対側の面であって、並んで設けられた3つのコイル装置11のうち中央のコイル装置11に対向する位置に取り付けられる。すなわち、センサ19は、コイルタンク13の前面に設けられる。また、センサ19は、側壁133の補強部133aを避けて、補強部133aのない凹部平面に取り付けられる。なお、第1の実施形態において、側壁133のうち3つのコイル装置11のうち中央のコイル装置11に対向する位置は、コイル装置11の外周面との距離が最も短い箇所である。
Arrangement of sensor 19
The sensor 19 is attached to the outer surface of the side wall 133 of the coil tank 13.
Specifically, the sensor 19 is mounted on the side wall 133 on the side opposite to the side facing the heat exchanger 15, and at a position facing the central coil device 11 of the three coil devices 11 arranged side by side. In other words, the sensor 19 is mounted on the front surface of the coil tank 13. Furthermore, the sensor 19 is mounted on a recessed surface without the reinforcing portion 133a of the side wall 133, avoiding the reinforcing portion 133a. In the first embodiment, the position on the side wall 133 facing the central coil device 11 of the three coil devices 11 is the point with the shortest distance from the outer surface of the coil device 11.

つまり、第1の実施形態に係るセンサ19は、ファン172aが設けられた下部接続管172と異なる位置に取り付けられる。これにより、センサ19の計測値に、ファン172aの駆動によって生じるノイズが混入することを防ぐことができる。
また、センサ19が補強部133a、高圧側端子135及び低圧側端子136を避けて取り付けられる。これにより、センサ19とコイル装置11との距離を短くすることができる。センサ19とコイル装置11との距離が短いほど、センサ19はコイル装置11から発せられるTEVを感度よく検出することができる。
In other words, the sensor 19 according to the first embodiment is mounted at a different position from the lower connecting pipe 172 on which the fan 172a is provided. This prevents noise generated by the operation of the fan 172a from being mixed into the measurement values of the sensor 19.
Furthermore, the sensor 19 is mounted so as to avoid the reinforcing portion 133a, the high-voltage terminal 135, and the low-voltage terminal 136. This allows the distance between the sensor 19 and the coil device 11 to be shortened. The shorter the distance between the sensor 19 and the coil device 11, the more sensitively the sensor 19 can detect the TEV emitted from the coil device 11.

《変圧器10の部分放電の検知方法》
第1の実施形態に係る変圧器10の部分放電の有無は、変圧器10の外部に設けられた検査装置30によって判定される。検査装置30は、PC(Personal Computer)などのコンピュータである。検査装置30は、演算装置31とディスプレイ32とを備える。
Method for detecting partial discharge of transformer 10
The presence or absence of partial discharge in the transformer 10 according to the first embodiment is determined by an inspection device 30 provided outside the transformer 10. The inspection device 30 is a computer such as a PC (Personal Computer). The inspection device 30 comprises an arithmetic unit 31 and a display 32.

図3は、第1の実施形態に係る検査装置30の構成を示す概略ブロック図である。
検査装置30は、取得部311、判定部312、及び出力部313を備える。
取得部311は、センサ19から計測値を取得する。
判定部312は、取得部311が取得した計測値に基づいて部分放電の発生の有無を判定する。
出力部313は、判定部312による判定結果をディスプレイ32に出力する。
Figure 3 is a schematic block diagram showing the configuration of the inspection device 30 according to the first embodiment.
The inspection device 30 includes an acquisition unit 311, a determination unit 312, and an output unit 313.
The acquisition unit 311 acquires measured values from the sensor 19.
The determination unit 312 determines whether or not a partial discharge has occurred based on the measured values acquired by the acquisition unit 311.
The output unit 313 outputs the determination result from the determination unit 312 to the display 32.

判定部312は、例えば以下の方法で部分放電を検知する。
判定部312は、取得部311がセンサ19から取得した計測値から、所定の中心周波数に係る電圧波形を抽出する。中心周波数は、実験等によりコイル装置11のTEVに係る周波数を計測しておくことなどで定められる。判定部312は、抽出した波形を観測し、部分放電の発生の有無を判定する。部分放電の発生の有無は、例えば、電圧波形の大きさが所定の閾値を超えた状態の継続時間、電圧が閾値を超える頻度等によって判定される。閾値は、実験等により3つのコイル装置11のうちセンサ19から最も遠いもののTEVの値を計測しておくことなどで定められる。部分放電は、間欠放電となって現れることが多いことから、判定部312は、例えば電圧が所定の閾値を超える回数が所定回数を超えたときに、部分放電が発生していると判定する。
The determination unit 312 detects partial discharge, for example, by the following method.
The determination unit 312 extracts a voltage waveform related to a predetermined center frequency from the measurement values acquired by the acquisition unit 311 from the sensor 19. The center frequency is determined by measuring the frequency related to the TEV of the coil device 11 through experiments, etc. The determination unit 312 observes the extracted waveform and determines whether or not a partial discharge has occurred. Whether or not a partial discharge has occurred is determined, for example, by the duration of the state in which the magnitude of the voltage waveform exceeds a predetermined threshold, the frequency with which the voltage exceeds the threshold, etc. The threshold is determined by measuring the TEV value of the coil device 11 furthest from the sensor 19 through experiments, etc. Since partial discharge often appears as intermittent discharge, the determination unit 312 determines that a partial discharge has occurred, for example, when the number of times the voltage exceeds a predetermined threshold exceeds a predetermined number of times.

なお、判定部312は、例えば以下の方法で部分放電を検知してもよい。取得部311は、接地極139に接続された図示しないセンサによる計測値をさらに取得し、判定部312は、接地極139に係る計測値と、センサ19の計測値の差分を算出する。判定部312は、当該差分に係る電流波形を観測し、パルス電流の発生の有無を判定する。センサによる計測値に重畳されるノイズが強い場合、判定部312は、部分放電の可能性がある箇所の計測値と部分放電がない箇所の計測値の差分を取ることで、ノイズを打ち消すことができる。 Furthermore, the determination unit 312 may detect partial discharge using, for example, the following method. The acquisition unit 311 further acquires measurement values from a sensor (not shown) connected to the grounding electrode 139, and the determination unit 312 calculates the difference between the measurement value related to the grounding electrode 139 and the measurement value from the sensor 19. The determination unit 312 observes the current waveform related to this difference and determines whether or not a pulse current is generated. If the noise superimposed on the sensor measurement value is strong, the determination unit 312 can cancel out the noise by taking the difference between the measurement value at a location where partial discharge is possible and the measurement value at a location where partial discharge is not present.

すなわち、変圧器10の部分放電の検査を行う検査者は、コイルタンク13の側壁133のうち、熱交換器15と対向する面の反対側の面であって、並んで設けられた3つのコイル装置11のうち中央のコイル装置11に対向する位置にセンサ19を取り付ける。そして、センサ19と検査装置30とを接続し、検査装置30に部分放電検査プログラムを実行させる。これにより、検査装置30は、センサ19の計測値に基づいてコイル装置11の部分放電の有無を判定する。検査装置30は、判定結果をディスプレイ32に出力する。 Specifically, the inspector performing the partial discharge test on the transformer 10 attaches the sensor 19 to the side wall 133 of the coil tank 13, on the side opposite to the side facing the heat exchanger 15, and at a position facing the central coil device 11 of the three coil devices 11 arranged side by side. The sensor 19 is then connected to the inspection device 30, and the inspection device 30 is instructed to run the partial discharge test program. Based on the measurement value from the sensor 19, the inspection device 30 determines whether or not there is a partial discharge in the coil device 11. The inspection device 30 outputs the determination result to the display 32.

《作用・効果》
このように、第1の実施形態に係る変圧器10のセンサ19は、コイルタンク13のうちファン172aが配置された位置と異なる位置に取り付けられる。これにより、変圧器10は、センサ19の計測値に、ファン172aの駆動によるノイズが重畳することを防ぐことができる。したがって、第1の実施形態に係る検査装置30は、センサ19の計測値に基づいて精度よく部分放電の有無を判定することができる。
Action/Effect
Thus, in the first embodiment, the sensor 19 of the transformer 10 is mounted in a position different from the position where the fan 172a is located in the coil tank 13. This prevents noise from the fan 172a from superimposing on the measurement value of the sensor 19. Therefore, the inspection device 30 according to the first embodiment can accurately determine the presence or absence of partial discharge based on the measurement value of the sensor 19.

また、第1の実施形態に係る変圧器10のセンサ19は、コイルタンク13のうち熱交換器15に対向しない面に取り付けられる。熱交換器15とコイルタンク13との間は狭いため、センサ19は、コイルタンク13のうち熱交換器15に対向しない面に取り付けられることで、検査者は、センサ19に容易にアクセスすることができる。 Furthermore, in the first embodiment, the sensor 19 of the transformer 10 is mounted on the side of the coil tank 13 that does not face the heat exchanger 15. Because the space between the heat exchanger 15 and the coil tank 13 is narrow, mounting the sensor 19 on the side of the coil tank 13 that does not face the heat exchanger 15 allows inspectors to easily access the sensor 19.

また、第1の実施形態に係るセンサ19は、3つのコイル装置11のうち中央のコイル装置11に対向する位置に取り付けられる。これにより、1つのセンサ19によって3つのコイル装置11のTEVを検出することができる。なお、他の実施形態において、コイル装置11が偶数個である場合には、センサ19は、中央の2つのコイル装置11の間に対応する箇所に取り付けられてもよい。 Furthermore, in the first embodiment, the sensor 19 is mounted at a position opposite the central coil device 11 among the three coil devices 11. This allows one sensor 19 to detect the TEV of all three coil devices 11. In other embodiments, if there is an even number of coil devices 11, the sensor 19 may be mounted at a corresponding location between the two central coil devices 11.

〈第2の実施形態〉
図4は、第2の実施形態に係る変圧器10の構成を示す斜視図である。
第1の実施形態に係るセンサ19は、コイルタンク13の前面に取り付けられる。これに対し、第2の実施形態に係るセンサ19は、コイルタンク13の蓋板134に取り付けられる。
<Second Embodiment>
Figure 4 is a perspective view showing the configuration of the transformer 10 according to the second embodiment.
In the first embodiment, the sensor 19 is mounted on the front of the coil tank 13. In contrast, in the second embodiment, the sensor 19 is mounted on the lid plate 134 of the coil tank 13.

《センサ19の配置》
第2の実施形態に係る変圧器10の構成は、第1の実施形態とセンサ19の取り付け位置のみが異なる。
第2の実施形態に係るセンサ19は、コイルタンク13の蓋板134のうち、並んで設けられた3つのコイル装置11のうち中央のコイル装置11に対向する位置に取り付けられる。また、センサ19は、蓋板134の高圧側端子135及び低圧側端子136を避けて、端子のない平面に取り付けられる。これにより、センサ19とコイル装置11との距離が短くなり、センサ19は、コイル装置11のTEVを感度よく計測することができる。
Arrangement of sensor 19
The configuration of the transformer 10 according to the second embodiment differs from that of the first embodiment only in the mounting position of the sensor 19.
In the second embodiment, the sensor 19 is mounted on the lid plate 134 of the coil tank 13, at a position facing the central coil device 11 of the three coil devices 11 arranged side by side. Furthermore, the sensor 19 is mounted on a flat surface without terminals, avoiding the high-voltage side terminals 135 and low-voltage side terminals 136 of the lid plate 134. This shortens the distance between the sensor 19 and the coil device 11, allowing the sensor 19 to measure the TEV of the coil device 11 with high sensitivity.

〈第3の実施形態〉
図5は、第3の実施形態に係る変圧器10の構成を示す斜視図である。
第1の実施形態に係る変圧器10は、1つのセンサ19によって、3つのコイル装置11の何れかから発生されるTEVを検出する。これに対し、第2の実施形態に係る変圧器10は、2つのセンサ19によってTEVを検出することで、検査装置30がいずれのコイル装置11に部分放電が生じているかを特定する。
<Third Embodiment>
Figure 5 is a perspective view showing the configuration of the transformer 10 according to the third embodiment.
In the first embodiment, the transformer 10 detects the TEV generated from any of the three coil devices 11 using one sensor 19. In contrast, in the second embodiment, the transformer 10 detects the TEV using two sensors 19, allowing the inspection device 30 to identify which coil device 11 is experiencing partial discharge.

《センサ19の配置》
第3の実施形態に係る変圧器10は、センサ19に代えて、第1センサ19a及び第2センサ19bを備える。
第1センサ19aは、側壁133のうち、熱交換器15と対向する面と反対の面であって、並んで設けられた3つのコイル装置11のうち、並び方向の第1側の端に位置するコイル装置11に対向する位置に取り付けられる。例えば、第1センサ19aは、最も左側に位置するコイル装置11に対向する位置に取り付けられる。
第2センサ19bは、側壁133のうち、熱交換器15と対向する面と反対の面であって、並んで設けられた3つのコイル装置11のうち、並び方向の第2側の端に位置するコイル装置11に対向する位置に取り付けられる。例えば、第2センサ19bは、最も右側に位置するコイル装置11に対向する位置に取り付けられる。
第1センサ19a及び第2センサ19bは、側壁133の補強部133aを避けて、補強部133aのない凹部平面に取り付けられる。
Arrangement of sensor 19
The transformer 10 according to the third embodiment is equipped with a first sensor 19a and a second sensor 19b instead of the sensor 19.
The first sensor 19a is mounted on the side wall 133, on the side opposite to the side facing the heat exchanger 15, and in a position opposite the coil device 11 located at the first end in the direction of alignment of the three coil devices 11 that are arranged side by side. For example, the first sensor 19a is mounted in a position opposite the leftmost coil device 11.
The second sensor 19b is mounted on the side wall 133 opposite to the side facing the heat exchanger 15, and is positioned opposite the coil device 11 located at the second end in the direction of alignment of the three coil devices 11 that are arranged side by side. For example, the second sensor 19b is mounted opposite the coil device 11 located on the far right.
The first sensor 19a and the second sensor 19b are mounted on a recessed surface without the reinforcing portion 133a of the side wall 133, avoiding the reinforcing portion 133a.

《検査装置30の構成》
図6は、第3の実施形態に係る検査装置30の構成を示す概略ブロック図である。
第3の実施形態に係る検査装置30は、第1の実施形態の構成に加え、さらに特定部314を備える。
取得部311は、第1センサ19a及び第2センサ19bと有線又は無線で接続され、第1センサ19a及び第2センサ19bそれぞれから計測値を取得する。
判定部312は、第1センサ19a及び第2センサ19bそれぞれの計測値に基づいて、部分放電の有無を判定する。
特定部314は、第1センサ19a及び第2センサ19bそれぞれの計測値に基づいて、3つのコイル装置11の何れに部分放電が発生しているかを特定する。
出力部313は、判定部312及び特定部314による判定結果をディスプレイ32に出力する。
Configuration of the inspection device 30
Figure 6 is a schematic block diagram showing the configuration of the inspection device 30 according to the third embodiment.
The inspection device 30 according to the third embodiment further includes a specific unit 314 in addition to the configuration of the first embodiment.
The acquisition unit 311 is connected to the first sensor 19a and the second sensor 19b by wire or wireless connection, and acquires measured values from the first sensor 19a and the second sensor 19b, respectively.
The determination unit 312 determines whether or not there is a partial discharge based on the measured values of the first sensor 19a and the second sensor 19b.
The identification unit 314 identifies which of the three coil devices 11 is experiencing partial discharge based on the measured values of the first sensor 19a and the second sensor 19b.
The output unit 313 outputs the determination results from the determination unit 312 and the identification unit 314 to the display 32.

《変圧器10の部分放電の検知方法》
第3の実施形態に係る検査装置30は、例えば以下の方法で部分放電を検知する。
図7は、第3の実施形態に係る検査装置30による部分放電の判定方法を示すフローチャートである。
検査装置30の判定部312は、第1センサ19a及び第2センサ19bそれぞれについて、第1の実施形態と同様の方法により、部分放電の有無を判定する(ステップS1)。判定部312が第1センサ19a及び第2センサ19bの両方の計測値について、部分放電が発生していないと判定した場合(ステップS1:NO)、出力部313は、変圧器10に部分放電が発生していないことを示す判定結果を出力する(ステップS2)。
Method for detecting partial discharge of transformer 10
In the third embodiment, the inspection device 30 detects partial discharge by, for example, the following method.
Figure 7 is a flowchart showing the method for determining partial discharge using the inspection device 30 according to the third embodiment.
The determination unit 312 of the inspection device 30 determines whether or not partial discharge occurs for each of the first sensor 19a and the second sensor 19b in the same manner as in the first embodiment (step S1). If the determination unit 312 determines that no partial discharge has occurred for the measured values of both the first sensor 19a and the second sensor 19b (step S1: NO), the output unit 313 outputs a determination result indicating that no partial discharge has occurred in the transformer 10 (step S2).

他方、判定部312が第1センサ19a及び第2センサ19bの少なくとも一方の計測値について、部分放電が発生していると判定した場合(ステップS1:YES)、特定部314は、第1センサ19aが計測したTEVと第2センサ19bが計測したTEVの差が所定値以上であるか否かを判定する(ステップS3)。第1センサ19aが計測したTEVと第2センサ19bが計測したTEVの差が所定値未満である場合(ステップS3:NO)、出力部313は、3つのコイル装置11のうち中央に設置されたものに、部分放電が生じていることを示す判定結果を出力する(ステップS4)。 On the other hand, if the determination unit 312 determines that partial discharge is occurring in at least one of the measured values of the first sensor 19a and the second sensor 19b (Step S1: YES), the identification unit 314 determines whether the difference between the TEV measured by the first sensor 19a and the TEV measured by the second sensor 19b is greater than or equal to a predetermined value (Step S3). If the difference between the TEV measured by the first sensor 19a and the TEV measured by the second sensor 19b is less than the predetermined value (Step S3: NO), the output unit 313 outputs a determination result indicating that partial discharge is occurring in the centrally located of the three coil devices 11 (Step S4).

第1センサ19aが計測したTEVと第2センサ19bが計測したTEVの差が所定値以上である場合(ステップS3:NO)、特定部314は、第1センサ19aが計測したTEVが第2センサ19bが計測したTEVより大きいか否かを判定する(ステップS5)。第1センサ19aが計測したTEVが第2センサ19bが計測したTEVより大きい場合(ステップS5:YES)、出力部313は、3つのコイル装置11のうち第1センサ19aに対向するもの、すなわち最も左側に位置するコイル装置11に、部分放電が生じていることを示す判定結果を出力する(ステップS6)。
他方、第1センサ19aが計測したTEVが第2センサ19bが計測したTEVより小さい場合(ステップS5:NO)、出力部313は、3つのコイル装置11のうち第2センサ19bに対向するもの、すなわち最も右側に位置するコイル装置11に、部分放電が生じていることを示す判定結果を出力する(ステップS7)。
If the difference between the TEV measured by the first sensor 19a and the TEV measured by the second sensor 19b is greater than or equal to a predetermined value (Step S3: NO), the identification unit 314 determines whether the TEV measured by the first sensor 19a is greater than the TEV measured by the second sensor 19b (Step S5). If the TEV measured by the first sensor 19a is greater than the TEV measured by the second sensor 19b (Step S5: YES), the output unit 313 outputs a determination result indicating that a partial discharge is occurring in the coil device 11 that is opposite the first sensor 19a among the three coil devices 11, i.e., the leftmost coil device 11 (Step S6).
On the other hand, if the TEV measured by the first sensor 19a is smaller than the TEV measured by the second sensor 19b (step S5: NO), the output unit 313 outputs a determination result indicating that partial discharge is occurring in the coil device 11 that is opposite the second sensor 19b, i.e., the rightmost coil device 11 (step S7).

このように、第3の実施形態によれば、検査装置30は、第1センサ19a及び第2センサ19bによって、3つのコイル装置11の何れに部分放電が発生しているかを特定することができる。 Thus, according to the third embodiment, the inspection device 30 can identify which of the three coil devices 11 is experiencing partial discharge using the first sensor 19a and the second sensor 19b.

〈第4の実施形態〉
図8は、第4の実施形態に係る変圧器10の構成を示す斜視図である。
第3の実施形態に係る第1センサ19a及び第2センサ19bは、コイルタンク13の前面に取り付けられる。これに対し、第4の実施形態に係る第1センサ19a及び第2センサ19bは、コイルタンク13の側面に取り付けられる。
<Fourth Embodiment>
Figure 8 is a perspective view showing the configuration of the transformer 10 according to the fourth embodiment.
In the third embodiment, the first sensor 19a and the second sensor 19b are mounted on the front of the coil tank 13. In contrast, in the fourth embodiment, the first sensor 19a and the second sensor 19b are mounted on the side of the coil tank 13.

《センサ19の配置》
第4の実施形態に係る変圧器10の構成は、第3の実施形態と第1センサ19a及び第2センサ19bの取り付け位置のみが異なる。
第4の実施形態に係る第1センサ19aは、コイル装置11の並び方向の第1側の側壁133のうち、並び方向の第1側の端に位置するコイル装置11に対向する位置に取り付けられる。例えば、第1センサ19aは、コイルタンク13の左側面のうち、最も左側に位置するコイル装置11に対向する位置に取り付けられる。
第4の実施形態に係る第2センサ19bは、コイル装置11の並び方向の第2側の側壁133のうち、並び方向の第2側の端に位置するコイル装置11に対向する位置に取り付けられる。例えば、第1センサ19aは、コイルタンク13の右側面のうち、最も右側に位置するコイル装置11に対向する位置に取り付けられる。
第1センサ19a及び第2センサ19bは、側壁133の補強部133aを避けて、補強部133aのない凹部平面に取り付けられる。
Arrangement of sensor 19
The configuration of the transformer 10 according to the fourth embodiment differs from that of the third embodiment only in the mounting positions of the first sensor 19a and the second sensor 19b.
In the fourth embodiment, the first sensor 19a is mounted on the first side wall 133 of the coil device 11 in the direction of alignment, at a position facing the coil device 11 located at the first end in the direction of alignment. For example, the first sensor 19a is mounted on the left side surface of the coil tank 13, at a position facing the leftmost coil device 11.
In the fourth embodiment, the second sensor 19b is mounted on the second side wall 133 of the coil device 11 in the direction of alignment, at a position facing the coil device 11 located at the second end in the direction of alignment. For example, the first sensor 19a is mounted on the right side of the coil tank 13, at a position facing the coil device 11 located on the far right.
The first sensor 19a and the second sensor 19b are mounted on a recessed surface without the reinforcing portion 133a of the side wall 133, avoiding the reinforcing portion 133a.

〈第5の実施形態〉
図9は、第5の実施形態に係る変圧器10の構成を示す斜視図である。
第3の実施形態に係る第1センサ19a及び第2センサ19bは、コイルタンク13の前面に取り付けられる。これに対し、第5の実施形態に係る第1センサ19a及び第2センサ19bは、コイルタンク13の背面に取り付けられる。
<Fifth Embodiment>
Figure 9 is a perspective view showing the configuration of the transformer 10 according to the fifth embodiment.
In the third embodiment, the first sensor 19a and the second sensor 19b are mounted on the front of the coil tank 13. In contrast, in the fifth embodiment, the first sensor 19a and the second sensor 19b are mounted on the rear of the coil tank 13.

《センサ19の配置》
第5の実施形態に係る変圧器10の構成は、第3の実施形態と第1センサ19a及び第2センサ19bの取り付け位置のみが異なる。
第5の実施形態に係る第1センサ19aは、側壁133のうち、熱交換器15と対向する面であって、並んで設けられた3つのコイル装置11のうち、並び方向の第1側の端に位置するコイル装置11に対向する位置に取り付けられる。例えば、第1センサ19aは、最も左側に位置するコイル装置11に対向する位置に取り付けられる。
第5の実施形態に係る第2センサ19bは、側壁133のうち、熱交換器15と対向する面であって、並んで設けられた3つのコイル装置11のうち、並び方向の第2側の端に位置するコイル装置11に対向する位置に取り付けられる。例えば、第2センサ19bは、最も右側に位置するコイル装置11に対向する位置に取り付けられる。
第1センサ19a及び第2センサ19bは、側壁133の補強部133aを避けて、補強部133aのない凹部平面に取り付けられる。また、第1センサ19a及び第2センサ19bは、ファン172aを有する下部接続管172が配置された位置と異なる位置に取り付けられる。これにより、センサ19の計測値に、ファン172aの駆動によって生じるノイズが混入することを防ぐことができる。
Arrangement of sensor 19
The configuration of the transformer 10 according to the fifth embodiment differs from that of the third embodiment only in the mounting positions of the first sensor 19a and the second sensor 19b.
In the fifth embodiment, the first sensor 19a is mounted on the side wall 133 facing the heat exchanger 15, and is positioned opposite the coil device 11 located at the first end in the direction of alignment of the three coil devices 11 that are arranged side by side. For example, the first sensor 19a is mounted opposite the leftmost coil device 11.
In the fifth embodiment, the second sensor 19b is mounted on the side wall 133 facing the heat exchanger 15, and is positioned opposite the coil device 11 located at the second end in the direction of alignment of the three coil devices 11 arranged side by side. For example, the second sensor 19b is mounted opposite the coil device 11 located on the far right.
The first sensor 19a and the second sensor 19b are mounted on a recessed surface without the reinforcing portion 133a of the side wall 133, avoiding the reinforcing portion 133a. Furthermore, the first sensor 19a and the second sensor 19b are mounted at a position different from the position where the lower connecting pipe 172 having the fan 172a is located. This prevents noise generated by the operation of the fan 172a from being mixed into the measurement values of the sensor 19.

〈第6の実施形態〉
図10は、第6の実施形態に係る変圧器10の構成を示す斜視図である。
第3の実施形態に係る第1センサ19a及び第2センサ19bは、コイルタンク13の前面に取り付けられる。これに対し、第6の実施形態に係る第1センサ19a及び第2センサ19bは、コイルタンク13の底面に取り付けられる。
<Sixth Embodiment>
Figure 10 is a perspective view showing the configuration of the transformer 10 according to the sixth embodiment.
In the third embodiment, the first sensor 19a and the second sensor 19b are mounted on the front of the coil tank 13. In contrast, in the sixth embodiment, the first sensor 19a and the second sensor 19b are mounted on the bottom of the coil tank 13.

《センサ19の配置》
第6の実施形態に係る変圧器10の構成は、第3の実施形態と第1センサ19a及び第2センサ19bの取り付け位置のみが異なる。
第6の実施形態に係る第1センサ19aは、側壁133のうち、並び方向の第1側の端に位置するコイル装置11に対向する位置よりも外側に取り付けられる。例えば、第1センサ19aは、最も左側に位置するコイル装置11に対向する位置よりさらに左側に取り付けられる。
第6の実施形態に係る第2センサ19bは、側壁133のうち、並び方向の第2側の端に位置するコイル装置11に対向する位置よりも外側に取り付けられる。例えば、第2センサ19bは、最も右側に位置するコイル装置11に対向する位置よりさらに右側に取り付けられる。
Arrangement of sensor 19
The configuration of the transformer 10 according to the sixth embodiment differs from that of the third embodiment only in the mounting positions of the first sensor 19a and the second sensor 19b.
In the sixth embodiment, the first sensor 19a is mounted on the side wall 133 at a position further outward than the position facing the coil device 11 located at the first end in the alignment direction. For example, the first sensor 19a is mounted to the left of the position facing the leftmost coil device 11.
In the sixth embodiment, the second sensor 19b is mounted on the side wall 133 at a position further outward than the position facing the coil device 11 located at the second end in the alignment direction. For example, the second sensor 19b is mounted to the right of the position facing the rightmost coil device 11.

第6の実施形態に係る変圧器10の第1センサ19a及び第2センサ19bは、コイルタンク13の底面に取り付けられる。コイルタンク13の底面の高さは低いため、第1センサ19a及び第2センサ19bが、コイルタンク13のうち熱交換器15に対向しない面に取り付けられることで、検査者は、第1センサ19a及び第2センサ19bに容易にアクセスすることができる。 In the sixth embodiment, the first sensor 19a and the second sensor 19b of the transformer 10 are mounted on the bottom surface of the coil tank 13. Because the bottom surface of the coil tank 13 is low, the first sensor 19a and the second sensor 19b are mounted on the side of the coil tank 13 that does not face the heat exchanger 15, allowing inspectors to easily access the first sensor 19a and the second sensor 19b.

〈第7の実施形態〉
図11は、第7の実施形態に係る変圧器10の構成を示す斜視図である。
第1の実施形態に係る熱交換器15は、コイルタンク13の後方に設けられる。これに対し、第7の実施形態に係る熱交換器15は、コイルタンク13の上に設けられる。すなわち、第7の実施形態において、熱交換器15とコイル装置11とは互いに高さが異なる位置に設けられる。
<Seventh Embodiment>
Figure 11 is a perspective view showing the configuration of the transformer 10 according to the seventh embodiment.
In the first embodiment, the heat exchanger 15 is located behind the coil tank 13. In contrast, in the seventh embodiment, the heat exchanger 15 is located above the coil tank 13. That is, in the seventh embodiment, the heat exchanger 15 and the coil device 11 are located at different heights from each other.

《センサ19の配置》
センサ19は、側壁133のうち、熱交換器15と対向する面の反対側の面であって、並んで設けられた3つのコイル装置11のうち中央のコイル装置11に対向する位置に取り付けられる。また、センサ19は、側壁133の補強部133aを避けて、補強部133aのない凹部平面に取り付けられる。
Arrangement of sensor 19
The sensor 19 is mounted on the side wall 133, on the side opposite to the side facing the heat exchanger 15, and in a position facing the central coil device 11 of the three coil devices 11 arranged side by side. Furthermore, the sensor 19 is mounted on a recessed surface of the side wall 133 that does not have a reinforcing portion 133a, avoiding the reinforcing portion 133a.

〈第8の実施形態〉
図12は、第8の実施形態に係る変圧器10の構成を示す斜視図である。
第1の実施形態に係る検査装置30は、変圧器10と別個に設けられる。これに対し、第8の実施形態に係る変圧器10は、変圧器10に備えられる制御装置21が検査装置として機能する。
<Eighth Embodiment>
Figure 12 is a perspective view showing the configuration of the transformer 10 according to the eighth embodiment.
In the first embodiment, the inspection device 30 is provided separately from the transformer 10. In contrast, in the eighth embodiment, the transformer 10 has a control device 21 that functions as the inspection device.

例えば、図12に示す例では、制御装置21は、変圧器10の蓋板134の上に設けられる。制御装置21は、変圧器10の挙動を制御しながら、定期的にセンサ19の計測値に基づいて部分放電の検出を行う。 For example, in the example shown in Figure 12, the control device 21 is mounted on the cover plate 134 of the transformer 10. The control device 21 controls the behavior of the transformer 10 and periodically detects partial discharge based on the measurements of the sensor 19.

〈他の実施形態〉
以上、図面を参照していくつかの実施形態について詳しく説明してきたが、具体的な構成は上述のものに限られることはなく、様々な設計変更等をすることが可能である。すなわち、他の実施形態においては、上述の処理の順序が適宜変更されてもよい。また、一部の処理が並列に実行されてもよい。
上述した実施形態に係る検査装置30は、単独のコンピュータによって構成されるものであってもよいし、検査装置30の構成を複数のコンピュータに分けて配置し、複数のコンピュータが互いに協働することで検査装置30として機能するものであってもよい。このとき、検査装置30を構成する一部のコンピュータが変圧器10に搭載され、他のコンピュータが変圧器10の外部に設けられてもよい。
<Other Embodiments>
Although several embodiments have been described in detail above with reference to the drawings, the specific configuration is not limited to those described above, and various design changes are possible. In other embodiments, the order of the processes described above may be changed as appropriate. Also, some processes may be executed in parallel.
The inspection device 30 according to the above embodiment may be composed of a single computer, or the configuration of the inspection device 30 may be divided among multiple computers, and the multiple computers may cooperate with each other to function as the inspection device 30. In this case, some of the computers constituting the inspection device 30 may be mounted on the transformer 10, and the other computers may be provided outside the transformer 10.

上述した実施形態に係るセンサ19は、コイル装置11のTEVを計測するが、これに限られない。例えば、他の実施形態に係るセンサ19は、コイル装置11の部分放電に由来する電流、電磁波、音波又は振動を測定できるセンサであればどのようなセンサであってもよい。 The sensor 19 according to the above embodiment measures the TEV of the coil device 11, but is not limited to this. For example, the sensor 19 according to another embodiment may be any sensor capable of measuring current, electromagnetic waves, sound waves, or vibrations originating from the partial discharge of the coil device 11.

上述した実施形態に係る変圧器10は、3つのコイル装置11を備えるが、これに限られない。例えば、他の実施形態に係る変圧器10は、2つ以下のコイル装置11を備えるものであってもよいし、4つ以上のコイル装置11を備えるものであってもよい。 The transformer 10 according to the above embodiment comprises three coil devices 11, but is not limited to this. For example, the transformer 10 according to other embodiments may comprise two or fewer coil devices 11, or four or more coil devices 11.

上述した実施形態では、冷却部としてラジエータによる熱交換器15を備えるが、これに限られない。例えば、他の実施形態に係る冷却部は、ヒートポンプによって加圧空気を冷却するものであってもよい。 In the above-described embodiment, a heat exchanger 15 using a radiator is provided as the cooling unit, but the system is not limited to this. For example, the cooling unit in other embodiments may cool pressurized air using a heat pump.

上述した実施形態では、変圧器10が加圧空気を密閉するが、これに限られない。例えば、他の実施形態では、変圧器10がSF6ガスなどの他の絶縁性を有するガスを密閉してもよい。また、他の実施形態では、コイル112は必ずしもモールドされなくてよい。 In the embodiment described above, the transformer 10 seals in pressurized air, but this is not limited to this. For example, in another embodiment, the transformer 10 may seal in another insulating gas, such as SF6 gas. Also, in another embodiment, the coil 112 does not necessarily have to be molded.

上述した実施形態では、変圧器10の筐体がコイルタンク13と熱交換器15と接続管17で構成されるが、これに限られない。例えば、他の実施形態に係る変圧器10は、コイルタンク13と熱交換器15とが一体となった筐体を有していてもよい。 In the embodiment described above, the housing of the transformer 10 is composed of a coil tank 13, a heat exchanger 15, and connecting pipes 17, but it is not limited to this. For example, the transformer 10 in another embodiment may have a housing in which the coil tank 13 and the heat exchanger 15 are integrated.

〈コンピュータ構成〉
検査装置30及び制御装置21は、バスで接続されたプロセッサ、メモリ、補助記憶装置などを備え、部分放電検出プログラムを実行することによって、取得部311、判定部312、及び出力部313を備える装置として機能する。プロセッサの例としては、CPU(Central Processing Unit)、GPU(Graphic Processing Unit)、マイクロプロセッサなどが挙げられる。
部分放電検出プログラムは、コンピュータ読み取り可能な記録媒体に記録されてもよい。コンピュータ読み取り可能な記録媒体とは、例えば磁気ディスク、光磁気ディスク、光ディスク、半導体メモリ等の記憶装置である。部分放電検出プログラムは、電気通信回線を介して送信されてもよい。
なお、検査装置30又は制御装置21の各機能の全て又は一部は、ASIC(Application Specific Integrated Circuit)やPLD(Programmable Logic Device)等のカスタムLSI(Large Scale Integrated Circuit)を用いて実現されてもよい。PLDの例としては、PAL(Programmable Array Logic)、GAL(Generic Array Logic)、CPLD(Complex Programmable Logic Device)、FPGA(Field Programmable Gate Array)が挙げられる。このような集積回路も、プロセッサの一例に含まれる。
<Computer Configuration>
The inspection device 30 and control device 21 are equipped with a processor, memory, auxiliary storage device, etc., connected by a bus, and function as a device comprising an acquisition unit 311, a determination unit 312, and an output unit 313 by executing a partial discharge detection program. Examples of processors include CPUs (Central Processing Units), GPUs (Graphics Processing Units), and microprocessors.
The partial discharge detection program may be recorded on a computer-readable recording medium. Computer-readable recording media include, for example, magnetic disks, magneto-optical disks, optical disks, and semiconductor memory. The partial discharge detection program may also be transmitted via a telecommunications line.
Furthermore, all or part of the functions of the inspection device 30 or the control device 21 may be implemented using custom LSIs (Large Scale Integrated Circuits) such as ASICs (Application Specific Integrated Circuits) or PLDs (Programmable Logic Devices). Examples of PLDs include PALs (Programmable Array Logic), GALs (Generic Array Logic), CPLDs (Complex Programmable Logic Devices), and FPGAs (Field Programmable Gate Arrays). Such integrated circuits are also included as examples of processors.

以上説明した少なくともひとつの実施形態によれば、変圧器10が、筐体のうちファン172aが配置された箇所と異なる箇所に、部分放電に関する物理量を測定するセンサを持つことにより、部分放電を検出するための物理量を適切に計測することができる。
本発明のいくつかの実施形態を説明したが、これらの実施形態は、例として提示したものであり、発明の範囲を限定することは意図していない。これら実施形態は、その他の様々な形態で実施されることが可能であり、発明の要旨を逸脱しない範囲で、種々の省略、置き換え、変更を行うことができる。これら実施形態やその変形は、発明の範囲や要旨に含まれると同様に、特許請求の範囲に記載された発明とその均等の範囲に含まれるものである。
According to at least one embodiment described above, the transformer 10 has a sensor for measuring physical quantities related to partial discharge located in a different location within the housing from where the fan 172a is positioned, thereby enabling the appropriate measurement of physical quantities for detecting partial discharge.
While several embodiments of the present invention have been described, these embodiments are presented as examples only and are not intended to limit the scope of the invention. These embodiments can be carried out in a variety of other forms, and various omissions, substitutions, and modifications can be made without departing from the spirit of the invention. These embodiments and their variations are included in the scope and spirit of the invention, as well as in the claims and their equivalents.

10…変圧器、11…コイル装置、13…コイルタンク、15…熱交換器、17…接続管、171…上部接続管、172…下部接続管、172a…ファン、19…センサ、30…検査装置、311…取得部、312…判定部、313…出力部、314…特定部 10... Transformer, 11... Coil device, 13... Coil tank, 15... Heat exchanger, 17... Connecting pipe, 171... Upper connecting pipe, 172... Lower connecting pipe, 172a... Fan, 19... Sensor, 30... Inspection device, 311... Acquisition unit, 312... Judgment unit, 313... Output unit, 314... Identification unit

Claims (17)

絶縁性を有する流体を密閉する筐体と、
前記筐体内に位置するコイル装置と、
前記筐体に位置し、前記流体から熱を奪う冷却部と、
前記流体を圧送し、前記コイル装置と前記冷却部との間で前記流体を流通させる圧送装置と、
前記筐体のうち前記圧送装置が位置する箇所と異なる箇所に取り付けられ、前記筐体の過渡接地電圧を測定するセンサと
を備える変圧器。
A housing that seals an insulating fluid,
A coil device located inside the aforementioned housing,
A cooling unit located in the aforementioned housing, which removes heat from the fluid,
A pumping device that pumps the fluid and circulates the fluid between the coil device and the cooling unit,
A transformer equipped with a sensor for measuring the transient ground voltage of the housing, which is mounted on a location in the housing different from the location where the pressure feeding device is located.
前記筐体は、前記コイル装置を収容する第1筐体と、前記冷却部を有する第2筐体と、前記第1筐体と前記第2筐体とを接続する接続管とを備え、
前記圧送装置は前記接続管内に位置し、
前記センサは前記第1筐体に取り付けられる
請求項1に記載の変圧器。
The housing comprises a first housing for housing the coil device, a second housing having the cooling section, and a connecting pipe connecting the first housing and the second housing.
The pumping device is located inside the connecting pipe,
The transformer according to claim 1, wherein the sensor is mounted on the first housing.
前記センサは、前記第1筐体のうち前記第2筐体に対向しない面に取り付けられる
請求項2に記載の変圧器。
The transformer according to claim 2, wherein the sensor is mounted on the side of the first housing that does not face the second housing.
前記センサは、前記第1筐体のうち前記第2筐体に対向する面であって、前記接続管が配置された箇所と異なる箇所に取り付けられる
請求項2に記載の変圧器。
The transformer according to claim 2, wherein the sensor is mounted on the surface of the first housing facing the second housing, at a location different from the location where the connecting pipe is arranged.
前記冷却部と前記コイル装置とが互いに高さが異なる箇所に位置し、
前記センサは、前記筐体のうち前記コイル装置に対向する面に取り付けられる
請求項1から請求項4の何れか1項に記載の変圧器。
The cooling unit and the coil device are located at different heights from each other.
The transformer according to any one of claims 1 to 4, wherein the sensor is mounted on the surface of the housing facing the coil device.
前記コイル装置を含む、前記筐体内に一方向に並んだ複数のコイル装置を備え、
前記センサは、前記筐体のうち前記複数のコイル装置の中央部分に対向する面に取り付けられる
請求項1から請求項5の何れか1項に記載の変圧器。
The housing includes a plurality of coil devices arranged in one direction, including the aforementioned coil device.
The transformer according to any one of claims 1 to 5, wherein the sensor is mounted on a surface of the housing facing the central portion of the plurality of coil devices.
前記コイル装置を含む、前記筐体内に一方向に並んだ複数のコイル装置を備え、
前記センサは、前記過渡接地電圧を測定する第1センサ及び第2センサとを備え、
前記第1センサは、前記筐体のうち前記複数のコイル装置のうち前記一方向の第1端に設けられたものに対向する面に取り付けられ、
前記第2センサは、前記筐体のうち前記複数のコイル装置のうち前記一方向の第2端に設けられたものに対向する面に取り付けられる
請求項1から請求項5の何れか1項に記載の変圧器。
The housing includes a plurality of coil devices arranged in one direction, including the aforementioned coil device.
The sensor comprises a first sensor and a second sensor for measuring the transient ground voltage.
The first sensor is mounted on the surface of the housing facing the coil device provided at the first end in one direction among the plurality of coil devices.
The transformer according to any one of claims 1 to 5, wherein the second sensor is mounted on the surface of the housing facing the coil device provided at the second end in one direction of the plurality of coil devices.
前記第1センサは、前記筐体の前記第1端側の面に取り付けられ、
前記第2センサは、前記筐体の前記第2端側の面に取り付けられる
請求項7に記載の変圧器。
The first sensor is mounted on the first end surface of the housing.
The transformer according to claim 7, wherein the second sensor is attached to the second end surface of the housing.
前記センサは、前記筐体の面のうち前記コイル装置の外周面との距離が最も短い箇所に取り付けられる
請求項1から請求項8の何れか1項に記載の変圧器。
The transformer according to any one of claims 1 to 8, wherein the sensor is mounted on the surface of the housing at the location where it is closest to the outer surface of the coil device.
前記筐体の外面は、一方向に伸びる凹部と凸部とを有し、
前記センサは前記凹部に取り付けられる
請求項1から請求項9の何れか1項に記載の変圧器。
The outer surface of the housing has a recess and a protrusion extending in one direction.
The transformer according to any one of claims 1 to 9, wherein the sensor is mounted in the recess.
前記筐体の外面に、前記コイル装置と電気的に接続された取出端子が位置し、
前記センサは、前記取出端子が配置された箇所と異なる箇所に取り付けられる
請求項1から請求項10の何れか1項に記載の変圧器。
On the outer surface of the housing, there is an outlet terminal that is electrically connected to the coil device.
The transformer according to any one of claims 1 to 10, wherein the sensor is mounted at a location different from the location where the output terminal is located.
前記センサは、前記筐体の下面であって、前記コイル装置に対向しない箇所に取り付けられる
請求項1または請求項2に記載の変圧器。
The transformer according to claim 1 or 2, wherein the sensor is mounted on the lower surface of the housing at a location not facing the coil device.
前記筐体は1気圧以上の前記流体を密閉し、
前記コイル装置の表面は、絶縁部材で覆われている
請求項1から請求項12の何れか1項に記載の変圧器。
The housing seals the fluid at 1 atmosphere or more.
The transformer according to any one of claims 1 to 12, wherein the surface of the coil device is covered with an insulating material.
前記センサは、前記筐体の外面に取り付けられる
請求項1から請求項13の何れか1項に記載の変圧器。
The transformer according to any one of claims 1 to 13, wherein the sensor is attached to the outer surface of the housing.
前記センサの計測値に基づいて、前記コイル装置の部分放電の有無を判定する判定部を備える
請求項1から請求項14の何れか1項に記載の変圧器。
A transformer according to any one of claims 1 to 14, further comprising a determination unit that determines whether or not there is a partial discharge in the coil device based on the measured value of the sensor.
前記第1センサの計測値と前記第2センサの計測値とに基づいて、前記複数のコイル装置のうち部分放電を生じているコイル装置を特定する特定部を備える
請求項7または請求項8に記載の変圧器。
The transformer according to claim 7 or claim 8, further comprising a identifying unit that identifies a coil device among the plurality of coil devices that is causing partial discharge, based on the measured value of the first sensor and the measured value of the second sensor.
絶縁性を有する流体を密閉する筐体と、前記筐体内に位置するコイル装置と、前記筐体に位置し、前記流体から熱を奪う冷却部と、前記流体を圧送し、前記コイル装置と前記冷却部との間で前記流体を流通させる圧送装置と、を備える変圧器の前記筐体のうち、前記圧送装置が位置する箇所と異なる箇所に、前記筐体の過渡接地電圧を測定するセンサを取り付けるステップと、
前記センサの計測値に基づいて、前記コイル装置の部分放電の有無を判定するステップと
を有する部分放電判定方法。
A transformer comprising a housing for sealing an insulating fluid, a coil device located inside the housing, a cooling unit located inside the housing for removing heat from the fluid, and a pumping device for pumping the fluid and circulating the fluid between the coil device and the cooling unit, wherein a sensor for measuring the transient ground voltage of the housing is attached to a location in the housing different from the location where the pumping device is located.
A method for determining partial discharge, comprising the step of determining whether or not there is a partial discharge in the coil device based on the measured value of the sensor.
JP2025101218A 2020-08-11 2025-06-17 Transformer and method for determining partial discharge Active JP7852126B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2025101218A JP7852126B2 (en) 2020-08-11 2025-06-17 Transformer and method for determining partial discharge

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2020135989A JP7508307B2 (en) 2020-08-11 2020-08-11 Transformers and partial discharge detection method
JP2024098365A JP7702213B2 (en) 2020-08-11 2024-06-18 Transformers and partial discharge detection method
JP2025101218A JP7852126B2 (en) 2020-08-11 2025-06-17 Transformer and method for determining partial discharge

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP2024098365A Division JP7702213B2 (en) 2020-08-11 2024-06-18 Transformers and partial discharge detection method

Publications (2)

Publication Number Publication Date
JP2025120480A JP2025120480A (en) 2025-08-15
JP7852126B2 true JP7852126B2 (en) 2026-04-27

Family

ID=80349844

Family Applications (3)

Application Number Title Priority Date Filing Date
JP2020135989A Active JP7508307B2 (en) 2020-08-11 2020-08-11 Transformers and partial discharge detection method
JP2024098365A Active JP7702213B2 (en) 2020-08-11 2024-06-18 Transformers and partial discharge detection method
JP2025101218A Active JP7852126B2 (en) 2020-08-11 2025-06-17 Transformer and method for determining partial discharge

Family Applications Before (2)

Application Number Title Priority Date Filing Date
JP2020135989A Active JP7508307B2 (en) 2020-08-11 2020-08-11 Transformers and partial discharge detection method
JP2024098365A Active JP7702213B2 (en) 2020-08-11 2024-06-18 Transformers and partial discharge detection method

Country Status (1)

Country Link
JP (3) JP7508307B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7853827B2 (en) * 2022-04-28 2026-04-30 株式会社日立産機システム Partial discharge detection device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002131366A (en) 2000-10-20 2002-05-09 Toshiba Corp Internal partial discharge monitoring device for high voltage equipment
US20150091598A1 (en) 2013-09-30 2015-04-02 Korea Electric Power Corporation Transformer fault detection apparatus and method
US20150109017A1 (en) 2013-10-18 2015-04-23 Abb Technology Ag Test system for high-voltage components
US20190138371A1 (en) 2017-11-07 2019-05-09 The Regents Of The University Of California Methods, systems, and devices for accurate signal timing of power component events

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58193731U (en) * 1982-06-10 1983-12-23 三菱電機株式会社 gas insulated electrical equipment
JP2557417B2 (en) * 1987-10-22 1996-11-27 株式会社東芝 Abnormality monitoring method for gas filled electrical equipment
JP3058977B2 (en) * 1991-03-01 2000-07-04 株式会社東芝 Partial discharge detection method for electrical equipment
KR100689226B1 (en) * 2005-06-22 2007-03-02 주식회사 애니게이트 Apparatus for observation load of voltage transformer
KR101311364B1 (en) 2013-03-29 2013-09-25 (주)서광기전 The apparatus for surveillance of electronic power distribution and electronic power distribution controlling system and method using the same

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002131366A (en) 2000-10-20 2002-05-09 Toshiba Corp Internal partial discharge monitoring device for high voltage equipment
US20150091598A1 (en) 2013-09-30 2015-04-02 Korea Electric Power Corporation Transformer fault detection apparatus and method
US20150109017A1 (en) 2013-10-18 2015-04-23 Abb Technology Ag Test system for high-voltage components
US20190138371A1 (en) 2017-11-07 2019-05-09 The Regents Of The University Of California Methods, systems, and devices for accurate signal timing of power component events

Also Published As

Publication number Publication date
JP7508307B2 (en) 2024-07-01
JP2022032335A (en) 2022-02-25
JP7702213B2 (en) 2025-07-03
JP2024114737A (en) 2024-08-23
JP2025120480A (en) 2025-08-15

Similar Documents

Publication Publication Date Title
JP7852126B2 (en) Transformer and method for determining partial discharge
JP5196692B2 (en) Apparatus and method for detecting the state of fluid-filled electrical equipment
CN107422200B (en) Transformer fault simulation system
EP1118088A1 (en) Fluid filled electrical device with diagnostic sensor located in fluid circulation flow path
KR101686133B1 (en) Apparatus of partial diacharge position multiple detecting with 3-D for oil filled power transformer
KR101290294B1 (en) Partial discharge diagnostic system of power apparatus using contactless phase measurement sensor
KR20170114214A (en) Apparatus for detecting abnormality of mold transformer
CN103683996A (en) Inverter
KR20140038261A (en) Apparatus for diagnosing a transformer and method for the same
KR100815877B1 (en) Absorption Test Apparatus and Method for Generator Stator Winding Insulation Using Cross Capacitance
JP5739675B2 (en) Static induction appliance and partial discharge measurement method
CN219589619U (en) LVDT sensor
KR20090009602A (en) High Power X-Ray Generator
KR102530020B1 (en) Solar power generation system equipped with safety management device based on salinity and humidity measurement
JP7510370B2 (en) Method and system for monitoring operation of stationary electromagnetic devices
CN213517491U (en) Leakage current detection device for electromagnetic stirrer coil
KR102406425B1 (en) Diagnosis device for isolation deterioration of electric apparatus and diagnosis method thereof
JPH01177845A (en) Water cooler for stator winding of rotary electric machine
KR101651176B1 (en) Apparatus and method for estimating location of insulation defects of cast resin transformers on live line
CN119936580A (en) Pressure sensor, test method, test system and computer equipment for transformer bushing arc test
JP2002017010A (en) Gas leak monitoring device for gas insulated electrical equipment
JP2023100407A (en) Oil-filled electrical equipment
US20230266378A1 (en) Fault gas detection system for a liquid filled high voltage transformer
JPH04112510A (en) Stationary induction apparatus
CN206710907U (en) A kind of Rectification Power Factor water-cooling system pressure tester

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20250617

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20260317

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20260415

R150 Certificate of patent or registration of utility model

Ref document number: 7852126

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150