JPS5845557B2 - How to install a through pipe in a shield segment - Google Patents
How to install a through pipe in a shield segmentInfo
- Publication number
- JPS5845557B2 JPS5845557B2 JP54026745A JP2674579A JPS5845557B2 JP S5845557 B2 JPS5845557 B2 JP S5845557B2 JP 54026745 A JP54026745 A JP 54026745A JP 2674579 A JP2674579 A JP 2674579A JP S5845557 B2 JPS5845557 B2 JP S5845557B2
- Authority
- JP
- Japan
- Prior art keywords
- pipe
- segment
- seal case
- guide tube
- guide
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Description
【発明の詳細な説明】
本発明はシールドトンネルを構成するセグメントに貫通
管を設置する方法に関するものである。DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method of installing a through pipe in a segment forming a shield tunnel.
シールドトンネルを施工する場合、作業の安全性、確実
性を期するために、シールドトンネルに、曲がりのチェ
ックするための観測用の管や、地上部との通信、給排水
、排気等を容易にするための連絡管、二次巻コンクリー
トを打設するためのコンクリート注入管、或はトンネル
底部の地盤を凍結工法により改良するための凍結管を貫
通設置する必要のある場合が多いが、上記管を設置する
にはセグメントに穿孔しなければならず、その穿孔に際
しては、シールドトンネル内にその外周の水や土砂が浸
入しないように施工しなければならない。When constructing a shield tunnel, in order to ensure work safety and reliability, the shield tunnel should be equipped with observation pipes to check for bends, communication with the above ground, water supply, drainage, exhaust, etc. In many cases, it is necessary to install a connecting pipe for concrete, a concrete injection pipe for pouring secondary concrete, or a freezing pipe for improving the ground at the bottom of the tunnel using freezing methods. To install the shield tunnel, a hole must be drilled into the segment, and the hole must be constructed in such a way that water and earth and sand from the outer periphery of the shield tunnel do not enter into the shield tunnel.
従来、シールドトンネルのセグメントに貫通管を設置す
る場合は、該セグメントの穿孔すべき部分の外周の地盤
に薬液を注入して該地盤を硬化させ、水や土砂の浸入を
防護していたが、この薬液の注入だけでは、水や土砂の
浸入を防いで施工することは困難である。Conventionally, when installing a through pipe in a segment of a shield tunnel, a chemical solution was injected into the ground around the area where the segment was to be drilled to harden the ground and protect it from infiltration of water and earth. It is difficult to prevent the infiltration of water and earth and sand by simply injecting this chemical solution.
本発明は上記のような事情に鑑み、シールドトンネルを
構成するシールドセグメントに安全且つ確実に貫通管を
設置できる方法を提供することを目的としてなされたも
ので、その構成は、シールドトンネルを構成するシール
ドセグメントに貫通管を設置するに際し、ポーリング機
により地表等から内径が前1己貫通管の外径より大径の
管を案内管として前記セグメントの表面まで穿孔し、前
記セグメントの前記穿孔部に対する個所の内@1面に前
記案内管の径より大きい直状のシールケースを密着固定
した後、前記案内管により前記セグメントに穿孔してか
ら前記シールケースに止水材を注入してp’riRL、
前記案内管に所要の管を挿入して鉄管により前記シール
ケースを穿孔すると共に鉄管の適宜の個所を前記シール
ケースに密着固定することを特徴とするものである。In view of the above-mentioned circumstances, the present invention has been made for the purpose of providing a method for safely and reliably installing a through pipe in a shield segment that constitutes a shield tunnel. When installing a penetration pipe in a shield segment, a hole is drilled from the ground surface etc. using a poling machine to the surface of the segment, using a pipe whose inner diameter is larger than the outer diameter of the previous penetration pipe as a guide pipe. After closely fixing a straight seal case larger than the diameter of the guide tube to the inner surface of the segment, the guide tube perforates the segment, and then a water stop material is injected into the seal case to p'riRL. ,
The present invention is characterized in that a required tube is inserted into the guide tube, the iron tube is used to pierce the seal case, and appropriate locations of the iron tube are closely fixed to the seal case.
次に本発明の実施の一例を図に拠り説明する。Next, an example of implementation of the present invention will be explained with reference to the drawings.
1はシールドトンネルを構成するシールドセグメント、
2は該セグメン)IK貫通設置すべき管の外径より大き
い内径の案内管で、先端部にビットbを設け、ポーリン
グ機により地表からセグメント10表面に達するところ
1で穿孔する。1 is a shield segment that constitutes a shield tunnel,
Reference numeral 2 denotes a guide tube having an inner diameter larger than the outer diameter of the tube to be installed through the segment (IK).A bit B is provided at the tip of the guide tube, and a hole is bored at the point 1 where it reaches the surface of the segment 10 from the ground surface using a poling machine.
3はセグメント1における前記案内管2の達した部分の
内駒に密着させたシールケースで、案内管1の径より大
きい金属製の直状をなし、セグメント1が鉄製の場合は
溶接により、オたセグメント1がコンクリート製の場合
はアンカーボルトにより、セグメント1に密着固定する
。Reference numeral 3 denotes a seal case that is tightly attached to the inner piece of the portion of the segment 1 that the guide tube 2 reaches, and is made of metal and has a straight shape that is larger in diameter than the guide tube 1. If the segment 1 is made of iron, the seal case is made of metal by welding. If segment 1 is made of concrete, it is tightly fixed to segment 1 using anchor bolts.
4はシールケース3に設けた弁、5は同じく注入用補助
弁、6は、前記案内管2によりセグメント1を貫通して
孔7を設けた後、案内管2及び前記弁からシールケース
3に注入したモルタル等による止水材で、該止水材6は
シールケース3、案内管2の下部に充填されると共に案
内管2と前記孔7との隙間から鉄管の外周の地盤に進入
する。4 is a valve provided in the seal case 3; 5 is an auxiliary injection valve; and 6 is a valve provided in the seal case 3 from the guide pipe 2 and the valve after a hole 7 is provided through the segment 1 through the guide pipe 2. The water stop material 6 is made of injected mortar or the like, and the water stop material 6 fills the seal case 3 and the lower part of the guide pipe 2, and enters the ground around the outer periphery of the iron pipe through the gap between the guide pipe 2 and the hole 7.
8はセグメント1に貫通設置すべき管で、地上から案内
管2に挿入し案内管2下部内及びシールケース3内の止
水材6をポーリングし、更にシールケース3の底板[穿
孔して該ケース3から突出させ、所要長突出したところ
で、溶接によりシールケース3に密に定着するのである
。8 is a pipe to be installed through the segment 1, which is inserted into the guide pipe 2 from the ground, polls the water stop material 6 inside the lower part of the guide pipe 2 and inside the seal case 3, and furthermore, the bottom plate of the seal case 3 [pierces and It is made to protrude from the case 3, and when it protrudes to a required length, it is tightly fixed to the seal case 3 by welding.
即ち、本発明は、渣ず、シールドセグメント1に貫通設
置すべき管8の外径よりその内径が大きく且つ先端にピ
ッ)bを設けた管を案内管2として、第1図に示すよう
に、ポーリング機により地表からセグメント10表面に
達するところ1で穿孔し、前記セグメント1の前記穿孔
部に対する個所の内側面に、第2図に示すように、前記
案内管2外径より大きい隆状をなす鉄製のシールケース
3を密着固定した後、再びポーリング機により、第3図
に示すように、案内管2の先端でセグメント1を貫通し
て孔7を設け、次いで案内管2及びシールケース3の弁
から、第4図に示すように、モルタル等の止水材6をケ
ース3に注入して、ケース3内及び案内管2下部とその
周辺を止水材6による止水層に形成した後、管8を案内
管2に挿入してポーリング機により案内管2の下部及び
シールケース3内の止水材6をポーリングし、更に第5
図に示すように、シールケース3の底板に穿孔して管8
の下端を該ケース3から突出させ、所要長突出させたと
ころで、管8を溶接により該ケース3の底板に密着固定
することにより、管8をシールドセグメント1に貫通設
置する方法であって、管8の設置後、案内管2はこれを
抜去するか又はその11埋殺しにするものとする。That is, in the present invention, as shown in FIG. , a hole is drilled at a point 1 reaching the surface of the segment 10 from the ground surface using a poling machine, and a ridge larger than the outer diameter of the guide tube 2 is formed on the inner surface of the segment 1 at a location corresponding to the hole, as shown in FIG. After the seal case 3 made of eggplant iron is tightly fixed, a hole 7 is formed by penetrating the segment 1 at the tip of the guide tube 2 using a poling machine again, as shown in FIG. As shown in FIG. 4, a water-stopping material 6 such as mortar was injected into the case 3 through the valve, and a water-stopping layer of the water-stopping material 6 was formed inside the case 3 and the lower part of the guide pipe 2 and its surroundings. After that, the tube 8 is inserted into the guide tube 2, and the lower part of the guide tube 2 and the water stop material 6 in the seal case 3 are polled using a polling machine.
As shown in the figure, a hole is drilled in the bottom plate of the seal case 3 and the tube 8
This is a method of installing the tube 8 through the shield segment 1 by making the lower end protrude from the case 3 and, when the tube 8 protrudes for a required length, tightly fixing the tube 8 to the bottom plate of the case 3 by welding. After installing the guide tube 8, the guide tube 2 shall be removed or the guide tube 11 shall be buried.
伺、上記実施例にかいては、シールドトンネルを構成す
る上部のシールドセグメントに上から貫通管を設置する
例について述べたが、本発明はこれに限られるものでは
ない。Although, in the above embodiment, a through pipe is installed from above in the upper shield segment constituting the shield tunnel, the present invention is not limited to this.
即ち、測部のシールドセグメントに貫通管を設置する場
合に適用できること勿論であり、オた、シールドトンネ
ルの底部の地盤を改良するために凍結管を貫通させて埋
設するような場合にも適用できる。In other words, it can of course be applied when installing a penetration pipe in the shield segment of a survey section, and it can also be applied when a frozen pipe is penetrated and buried to improve the ground at the bottom of a shield tunnel. .
本発明は上述の通りであって、シールドトンネルを構成
するシールドセグメントに貫通管を設置するに際し、案
内管とシールケース及び止水材により前記セグメントの
貫通管を設置すべき部分を完全に止水した状態で作業を
行なうようにしたから、安全且つ確実に貫通管を設置で
き、従って、シールドトンネル(てその曲がりをチェッ
クするための観測用の管や、地上との連落管、コンクリ
ート注入管、或は凍結管を貫通設置する際に適用して極
めて有用である。The present invention is as described above, and when installing a through pipe in a shield segment constituting a shield tunnel, the part of the segment where the through pipe is to be installed is completely watertight using a guide pipe, a seal case, and a water stop material. Since the work was carried out in the condition that the through pipe was installed safely and reliably, it was possible to install the through pipe safely and reliably. , or when a freezing tube is installed through the pipe.
図は本発明方法の実施の一例を示す工程の略図で、第1
図は案内管を案内としてシールドセグメント表面まで穿
孔した状態を示す図、第2図はシールドセグメントの内
側面にシールケースを密着固定した状態を示す図、第3
図は案内管でシールドセグメントに穿孔した状態を示す
図、第4図は王水材をシールケースに注入した状態を示
す図、第5図は貫通設置すべき管を案内管に挿入しシー
ルケースを穿孔して溶接により該ケースに密着固定した
状態を示す図、第6図は案内管を抜去した状態を示す図
である。
1・・・シールドセグメント、2・・・案内管、3・・
・シルトケース、6・・・止水材、8・・・管。The figure is a schematic diagram of a process showing an example of implementing the method of the present invention.
The figure shows the state in which the hole has been drilled to the surface of the shield segment using the guide tube as a guide, Figure 2 shows the state in which the seal case is tightly fixed to the inner surface of the shield segment, and Figure 3 shows the state in which the seal case is tightly fixed to the inner surface of the shield segment.
The figure shows the state in which the shield segment is perforated with the guide tube, Figure 4 shows the state in which aqua regia material is injected into the seal case, and Figure 5 shows the state in which the pipe to be penetrated is inserted into the guide tube and the seal case is perforated. FIG. 6 is a diagram showing a state in which the guide tube is tightly fixed to the case by welding, and FIG. 6 is a diagram showing a state in which the guide tube is removed. 1... Shield segment, 2... Guide tube, 3...
- Silt case, 6...Water stop material, 8...Pipe.
Claims (1)
に貫通管を設置するに際し、ポーリング機により地表等
から内径が前記貫通管の外径より大径の管を案内管とし
て前記セグメントの表面1で穿孔し、前記セグメントの
前記穿孔部に対する個所の内債1面に前記案内管の径よ
り大きい直状のシールケースを密着固定した後、前記案
内管により前記セグメントに穿孔してから前記シールケ
ースに止水材を注入して止水し、前記案内管に所要の管
を挿入して鉄管により前記シールケースを穿孔すると共
に鉄管の適宜の個所を前記シールケースに密着固定する
ことを特徴とするシールセグメントに貫通管を設置する
方法。1 When installing a through pipe in a shield segment constituting a shield tunnel, a hole is drilled from the ground surface etc. using a poling machine on the surface 1 of the segment using a pipe whose inner diameter is larger than the outside diameter of the said through pipe as a guide pipe. , After tightly fixing a straight seal case larger than the diameter of the guide tube to one surface of the internal bond at the location corresponding to the perforation part of the segment, and after piercing the segment with the guide tube, the seal case is watertight. A seal segment characterized by injecting a material to stop water, inserting a required pipe into the guide pipe, perforating the seal case with the iron pipe, and closely fixing an appropriate part of the iron pipe to the seal case. How to install a through pipe.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP54026745A JPS5845557B2 (en) | 1979-03-09 | 1979-03-09 | How to install a through pipe in a shield segment |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP54026745A JPS5845557B2 (en) | 1979-03-09 | 1979-03-09 | How to install a through pipe in a shield segment |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS55119891A JPS55119891A (en) | 1980-09-13 |
| JPS5845557B2 true JPS5845557B2 (en) | 1983-10-11 |
Family
ID=12201829
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP54026745A Expired JPS5845557B2 (en) | 1979-03-09 | 1979-03-09 | How to install a through pipe in a shield segment |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS5845557B2 (en) |
-
1979
- 1979-03-09 JP JP54026745A patent/JPS5845557B2/en not_active Expired
Also Published As
| Publication number | Publication date |
|---|---|
| JPS55119891A (en) | 1980-09-13 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2008522058A (en) | Pre-support tunnel construction method and equipment adapted to it | |
| JP6360818B2 (en) | Steel pipe concrete composite pile, its manufacturing method and pile head treatment method | |
| JPS5845557B2 (en) | How to install a through pipe in a shield segment | |
| JPH08311864A (en) | Earth retaining wall and construction method | |
| JPH11152986A (en) | Protection method for shielding excavation in section covered with thin soil layer | |
| JPH03132592A (en) | Foundation improvement for driving tunnel | |
| JP6935640B2 (en) | Construction method of underground widening part | |
| JP2000297428A (en) | Method for carrying out work connected with ground through partition wall | |
| JPS5942795B2 (en) | How to install a through pipe in a ductile shield segment | |
| JP3843175B2 (en) | Pile formation method that penetrates existing underground structures | |
| JPH0893395A (en) | How to stop the check boring for shield work | |
| JP2010112128A (en) | Reinforcement method of ground, reinforced ground | |
| JP2000328561A (en) | Groundwater permeation method for soil cement column retaining wall | |
| CN116498334B (en) | Shield tunnel safety reinforcement structure and construction method for passing through buildings | |
| JPH06105030B2 (en) | Shielding method for front face work of shield machine | |
| JP2881501B2 (en) | Construction method for high strength cast-in-place concrete piles | |
| JPH0414522A (en) | Method for constructing water stopping layer | |
| JPH0390705A (en) | Joining method for steel pipe pile | |
| JPS5876700A (en) | Method of installing penetrating pipe to shield segment under compressed air | |
| JPH108873A (en) | Water stop method at the time of inserting pipe into ground | |
| JPH0133607B2 (en) | ||
| JP2709332B2 (en) | Exit packing device for excavation of roads and its method | |
| JP2001355232A (en) | Water stop method for joint section on steel pipe sheet pile | |
| JPH0711636A (en) | Pile construction method using existing piles | |
| JPS6043520B2 (en) | Upward lock bolt construction method |