JPS5919225B2 - Construction method of underground membrane tank - Google Patents
Construction method of underground membrane tankInfo
- Publication number
- JPS5919225B2 JPS5919225B2 JP12738780A JP12738780A JPS5919225B2 JP S5919225 B2 JPS5919225 B2 JP S5919225B2 JP 12738780 A JP12738780 A JP 12738780A JP 12738780 A JP12738780 A JP 12738780A JP S5919225 B2 JPS5919225 B2 JP S5919225B2
- Authority
- JP
- Japan
- Prior art keywords
- roof
- scaffolding
- bones
- column
- tank
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 239000012528 membrane Substances 0.000 title claims description 20
- 238000010276 construction Methods 0.000 title claims description 19
- 210000000988 bone and bone Anatomy 0.000 claims description 9
- 230000003014 reinforcing effect Effects 0.000 claims description 7
- 239000012774 insulation material Substances 0.000 claims description 4
- 238000003466 welding Methods 0.000 claims description 4
- 238000000034 method Methods 0.000 claims description 3
- 238000001816 cooling Methods 0.000 claims 1
- 239000012212 insulator Substances 0.000 claims 1
- 239000000463 material Substances 0.000 claims 1
- 239000011810 insulating material Substances 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
Landscapes
- Movable Scaffolding (AREA)
Description
【発明の詳細な説明】 本発明は地下式メンブレンタンクの建設工法に関する。[Detailed description of the invention] The present invention relates to a construction method for an underground membrane tank.
従来、たとえば地下式メンブレンタンクの建設工法の一
例として第1図のイル二に示す工法がある。Conventionally, as an example of a construction method for an underground membrane tank, there is a method shown in Fig. 1.
すなわち、まず同図イに示すごとく地盤G中に上面開放
のコンクリート躯体1を建設し、該躯体1の上部に外槽
側板2を固着しておく。That is, first, a concrete frame 1 with an open top is constructed in the ground G as shown in FIG.
次に躯体1の底面上において屋根3を組立て、その保冷
材4付き屋根3をウィンチ(ジヤツキでもよい)により
ワイヤロープ5を介して吊り上げ、同図口に示すごとく
屋根3の外周縁を前記外槽側板2の上端縁に固着し、次
に同図ハに示すごとく躯体1の底面上に該躯体1の内側
面に沿って足場6を仮設し、この足場6を利用して保冷
材7を躯体1の内側面に配設し、さらに同図二に示すご
とくメンブレン8を配設し、各メンブレン8の継ぎ目を
溶接し、次に上記足場6を分解してタンク外へ搬出する
ものである。Next, the roof 3 is assembled on the bottom surface of the frame 1, and the roof 3 with the cold insulating material 4 is lifted up via the wire rope 5 using a winch (or a jack), and the outer periphery of the roof 3 is attached to the outside as shown in the opening of the figure. It is fixed to the upper edge of the tank side plate 2, and then, as shown in FIG. It is arranged on the inner surface of the frame 1, and further a membrane 8 is arranged as shown in Figure 2, the seams of each membrane 8 are welded, and then the scaffold 6 is disassembled and carried out of the tank. .
また従来のタンク建設工法の他の例として第2図に示す
工法がある。Another example of the conventional tank construction method is the construction method shown in FIG.
すなわち、まず躯体1の底面中央にセンタコラム10を
立設し、躯体1の底面中央を除く該底面上に全面足場1
1を仮設し、上記センタコラム10の頂点にセンタリン
グ12を配設し、足場11を利用して保冷材7およびメ
ンブレン8を配設し、屋根骨13をクレーン車14によ
り吊り上げて、この屋根骨13の端部をセンタリング1
2と外槽側板2とに連結し、屋根板(図示せず)を配設
し、上記足場11およびセンタコラム10を分解してタ
ンク外へ搬出するものである。That is, first, the center column 10 is erected at the center of the bottom surface of the structure 1, and the entire scaffold 1 is placed on the bottom surface of the structure 1 except for the center of the bottom surface.
1 is temporarily installed, a centering 12 is placed at the apex of the center column 10, a cold insulation material 7 and a membrane 8 are placed using a scaffold 11, and a roof frame 13 is lifted by a crane truck 14. Centering the end of 13 1
2 and the outer tank side plate 2, a roof plate (not shown) is provided, and the scaffold 11 and center column 10 are disassembled and carried out of the tank.
上記両従来工法では、躯体1の底面外周縁の全周または
底面の全面にわたって足場6,11を仮設し、またその
足場6,11を分解しなくてはならず、しかも作業によ
っては倒回もその仮設と分解とをくり返さなくてはなら
ないので、作業日数が長くなり経済性や安全性、作業性
において問題があり、その改善が望まれている。In both of the conventional construction methods described above, scaffolds 6 and 11 must be temporarily installed around the entire outer periphery of the bottom surface of the frame 1, and the scaffolds 6 and 11 must be disassembled, and depending on the work, they may fall over. Since the temporary construction and disassembly have to be repeated, the number of working days becomes longer and there are problems in terms of economy, safety, and workability, and improvements are desired.
そこで本発明はかかる要望にこたえてなされたものであ
る。Therefore, the present invention has been made in response to such a demand.
以下、本発明の一実施例を第3図〜第5図に基づいて説
明する。Hereinafter, one embodiment of the present invention will be described based on FIGS. 3 to 5.
すなわちこの実施例は地下式メンブレンタンクの建設工
法に関し、第5図に示すものはその工法に用いられる足
場装置20である。That is, this embodiment relates to a construction method for an underground membrane tank, and what is shown in FIG. 5 is a scaffolding device 20 used in that construction method.
この足場装置20について説明すると、21は躯体1の
底面中央に固定される支持台、22は該支持台21上に
回転自在に配設されたセンタコラム、23は躯体1の内
側面に沿って配設された側部足場であって、横桁24と
、該横桁24上に互いに適当間隔をおいて複数本立設さ
れた縦桁25と、該各縦桁25間に上下方向適当間隔ご
とに配設された複数の受棚26と、該各受棚26から躯
体1の内側面に向けて水平方向へ張り出された作業足場
27と、階段28とを有する。To explain this scaffolding device 20, 21 is a support base fixed to the center of the bottom surface of the frame body 1, 22 is a center column rotatably disposed on the support base 21, and 23 is a support base fixed to the center of the bottom surface of the frame body 1. The side scaffolding is provided with a cross beam 24, a plurality of vertical beams 25 erected on the horizontal beam 24 at appropriate intervals, and vertically appropriate intervals between each vertical beam 25. The work platform 27 has a plurality of receiving shelves 26 disposed in the space, a work scaffold 27 extending horizontally from each receiving shelf 26 toward the inner surface of the frame 1, and a staircase 28.
29は前記横桁24の下部両端に配設された自走式走行
装置である。29 is a self-propelled traveling device arranged at both ends of the lower part of the cross beam 24.
30は横桁24の両端をセンタコラム22の下部に連結
する一対の継ぎ梁、31は補強梁、32は側部足場23
の上端からセンタコラム22の上端にかけて配設された
階段式の上部作業床であって、タンク屋根に沿うように
設計されている。30 is a pair of joint beams connecting both ends of the cross beam 24 to the lower part of the center column 22, 31 is a reinforcing beam, and 32 is a side scaffolding 23.
It is a stair-type upper working floor arranged from the upper end to the upper end of the center column 22, and is designed to follow the tank roof.
33は手摺り、34は側部足場23から上部作業床32
に通じる出入口である。33 is a handrail, 34 is from the side scaffolding 23 to the upper work floor 32
It is an entrance that leads to.
なおこの足場装置20は適当な大きさに分解できるよう
設計されている。Note that this scaffolding device 20 is designed so that it can be disassembled into an appropriate size.
次にタンクの建設工法について説明する。Next, the tank construction method will be explained.
まず予め建設された躯体1内に分解した足場装置20の
部品を入れ、支持台21を躯体1の底面中央に固定し、
センタコラム22を上記支持台2.1上に回転自在に配
設するなどして第3図イに示すごとく足場装置20を躯
体1内に組み立てる。First, the disassembled parts of the scaffolding device 20 are placed inside the pre-constructed frame 1, and the support base 21 is fixed at the center of the bottom of the frame 1.
The center column 22 is rotatably disposed on the support base 2.1, and the scaffolding device 20 is assembled within the frame 1 as shown in FIG. 3A.
次に同図口に示すごとく足場装置20の側部足場23を
利用してこの側部足場23に対向する躯体1の内側面の
箇所に保冷材7を配設する。Next, as shown in the opening of the same figure, by using the side scaffolding 23 of the scaffolding device 20, the cold insulating material 7 is arranged at a location on the inner surface of the frame 1 facing the side scaffolding 23.
またこれと同時にセンタコラム22の頂部にアジャスタ
ー35を配設し、該アジャスター35上にセンタリング
12を配設する。At the same time, an adjuster 35 is placed on the top of the center column 22, and the centering 12 is placed on the adjuster 35.
次にクレーン車14により吊り上げた屋根骨13の両端
を上記センタリング12と外槽側板2の上端縁に上部作
業床32を利用して固着し、また屋根骨13に補強骨(
図示せず)を固着する。Next, both ends of the roof frame 13 lifted by the crane truck 14 are fixed to the centering 12 and the upper edge of the outer tank side plate 2 using the upper work floor 32, and the roof frame 13 is attached to the reinforcing bone (
(not shown).
次に上記屋根骨13および補強骨上に屋根板(図示せず
)を固定し、屋根骨13および補強骨の下に保冷材4を
配設する。Next, a roof plate (not shown) is fixed on the roof ribs 13 and reinforcing bones, and a cold insulating material 4 is placed under the roof ribs 13 and reinforcing bones.
またこれと同時に前記躯体1の内側面に配設した保冷材
7の上に短冊状のメンブレン8を上下方向に沿って配設
する。At the same time, a strip-shaped membrane 8 is disposed along the vertical direction on the cold insulating material 7 disposed on the inner surface of the frame 1.
次に足場装置20の走行装置29を作動させてこの足場
装置20を一方向へ適当角度回転させて停止させ、上記
した作業をくり返し、屋根板どうしを継ぎ合せ、またメ
ンブレン8どうしを継ぎ合わせる。Next, the traveling device 29 of the scaffolding device 20 is activated to rotate the scaffolding device 20 by an appropriate angle in one direction and then stopped, and the above-described operations are repeated to join the roof panels together and also join the membranes 8 together.
次に同図ハに示すごとく側部足場23の側面に設けたメ
ンブレン用溶接架台36に支持されている自動溶接装置
(図示せず)を上下移動させて各メンブレン8の継ぎ目
を溶接する。Next, as shown in Figure C, an automatic welding device (not shown) supported by a membrane welding frame 36 provided on the side surface of the side scaffold 23 is moved up and down to weld the seams of each membrane 8.
以上の作業をくり返して、足場装置20が360°回転
すると、地下式メンブレンタンクが建設されることにな
る。By repeating the above operations and rotating the scaffolding device 20 through 360 degrees, an underground membrane tank will be constructed.
次に足場装置20を上から順番に分解し、その分解した
部品を同図二に示すごとく屋根板の工事穴37を介して
クレーン車により吊り上げて排出し、工事穴37を塞げ
ばよい。Next, the scaffold device 20 is disassembled in order from the top, and the disassembled parts are lifted and discharged by a crane vehicle through the construction hole 37 in the roof board, as shown in FIG. 2, and the construction hole 37 is closed.
上記実施例では一台の足場装置20だけを用いたが、こ
れに限定されるわけではなく、たとえば第6図および第
7図に示すごとく上記足場装置20とほぼ同一構造の補
助足場装置38を設けてもよい。Although only one scaffolding device 20 was used in the above embodiment, the present invention is not limited to this. For example, as shown in FIGS. It may be provided.
そしてたとえば足場装置20によって躯体1の内側面に
保冷材7を配設し、その後、補助足場装置38によって
メンブレン8を配設すると共に溶接するようにしてもよ
い。For example, the cold insulation material 7 may be disposed on the inner surface of the frame 1 using the scaffolding device 20, and then the membrane 8 may be disposed and welded using the auxiliary scaffolding device 38.
以上述べたごとく本発明の地下式メンブレンタンクの建
設工法によれば、久ンク側壁とタンク屋根とを同時に形
成することができるものであるから、作業能率が高く、
工事期間を短縮でき、コストダウンを図ることができる
ものである。As described above, according to the construction method of the underground membrane tank of the present invention, the tank side wall and the tank roof can be formed at the same time, so the work efficiency is high.
This can shorten the construction period and reduce costs.
第1図および第2図はそれぞれ従来のタンク建設工法を
示す概略説明図である。
第3図から第5図は本発明の一実施例を示し、第3図イ
ル二は作業手順を示す概略説明図、第4図は第3図イの
■−■矢視図、第5図は足場装置の斜視図である。
第6図および第7図は本発明の他の実施例を示し、第6
図は概略説明図、第7図は第6図の■−■矢視図である
。
1・・・・・・躯体、2・・・・・・外槽側板、4,7
・・・・・・保冷材、8・−・・・・メンブレン、12
・・−・・・センタリング、13・・・・・−屋根骨、
20・・・・・・足場装置、21・・・・・・支持台、
22・・・・・・センタコラム、23・・・・・・側部
足場、29・・・・・・走行装置、32・・・・・・上
部作業床、35・・−・・・アジャスター、36・・・
・・・メンブレン用溶接架台、37・・・・・・工事穴
、38・・・・・・補助足場装置。FIGS. 1 and 2 are schematic explanatory diagrams showing conventional tank construction methods, respectively. 3 to 5 show one embodiment of the present invention, FIG. 3 is a schematic explanatory diagram showing the work procedure, FIG. 4 is a view taken from the ■-■ arrow in FIG. is a perspective view of the scaffolding device. 6 and 7 show other embodiments of the present invention, and FIG.
The figure is a schematic explanatory diagram, and FIG. 7 is a view taken along the ■-■ arrow in FIG. 6. 1...Structure, 2...Outer tank side plate, 4, 7
...Cold insulation material, 8...Membrane, 12
・・・-・・・Centering, 13・・・・・・-Roof frame,
20...Scaffolding device, 21...Support stand,
22...Center column, 23...Side scaffolding, 29...Traveling device, 32...Upper working floor, 35...Adjuster , 36...
...Membrane welding frame, 37...Construction hole, 38...Auxiliary scaffolding device.
Claims (1)
自在に配設されたセンタコラムと、該コラムから適鮨間
隔離れた適所に配設された水平方向走行自在な側部足場
と、該側部足場を上記コラムに連結する連結体と、側部
足場の上部からコラムの上部にかけて配設された上部作
業床とを有する足場装置を分解した状態で挿入し、次に
支持台を躯体の底面中央に固定し、センタコラムを支持
台上に回転自在に配設するなどして足場装置を躯体内に
組み立て、次に足場装置の側部足場を利用してこの側部
足場に対向する躯体の内側面の箇所に保冷材を配設し、
またこれと同時にセンタコラムの頂部にアジャスターを
配設し、該アジャスター上にセンタリングを配設し、次
に躯体外より吊り上げた屋根骨の両端を上記センタリン
グと躯体上部の外槽側板の上端縁に上部作業床を利用し
て固着し、屋根骨に補強骨を固着し、次に上記屋根骨お
よび補強骨上に屋根板を固定し、屋根骨および補強骨の
下に保冷材を配設し、またこれと同時に躯体の内側面に
配設した保冷材の上に短冊状のメンブレンを上下方向に
沿って配設し、次に足場装置を一方向へ適当角度回転さ
せて停止させ、上記した作業をくり返し、屋根板どうし
を継ぎ合せ、またメンブレンどうしを継ぎ合わせ、次に
側部足場に支持されている自動溶接装置を上下移動させ
て各メンブレンの継ぎ目を溶接し、以上の作業をくり返
して地下式メンブレンタンクが建設されたならば、足場
装置を上から順番に分解し、その分解した部品を屋根板
の工事穴を介して吊り上げて排出し、工事穴を塞ぐこと
を特徴とする地下式メンブレンタンクの建設工法。1 Inside the frame with an open top, there is a support stand, a center column rotatably placed on the support stand, and side scaffolding that can move horizontally and placed at an appropriate location at an appropriate distance from the column. , a connecting body that connects the side scaffold to the column, and an upper working platform disposed from the top of the side scaffold to the top of the column, and then inserted in a disassembled state. Assemble the scaffolding device inside the structure by fixing it to the center of the bottom of the structure and rotatably arranging the center column on a support base, then use the side scaffolding of the scaffolding device to Cooling material is placed on the inner side of the opposing building blocks,
At the same time, an adjuster is installed on the top of the center column, a centering is placed on the adjuster, and then both ends of the roof frame lifted from outside the structure are connected to the centering and the upper edge of the outer tank side plate at the top of the structure. fixing using the upper working floor, fixing reinforcing bones to the roof bones, then fixing roof plates on the roof bones and reinforcing bones, placing a cold insulator under the roof bones and reinforcing bones, At the same time, a strip-shaped membrane is placed vertically on top of the cold insulation material placed on the inner surface of the structure, and then the scaffolding device is rotated in one direction at an appropriate angle and stopped, and the above-mentioned work is carried out. Repeat this process to join the roof panels together and then the membranes together, then move the automatic welding equipment supported by the side scaffolding up and down to weld the seams of each membrane. Once the type membrane tank is constructed, the scaffolding device is disassembled in order from the top, and the disassembled parts are lifted up and discharged through the construction hole in the roof plate, and the construction hole is closed. Tank construction method.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP12738780A JPS5919225B2 (en) | 1980-09-12 | 1980-09-12 | Construction method of underground membrane tank |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP12738780A JPS5919225B2 (en) | 1980-09-12 | 1980-09-12 | Construction method of underground membrane tank |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS5751370A JPS5751370A (en) | 1982-03-26 |
| JPS5919225B2 true JPS5919225B2 (en) | 1984-05-04 |
Family
ID=14958727
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP12738780A Expired JPS5919225B2 (en) | 1980-09-12 | 1980-09-12 | Construction method of underground membrane tank |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS5919225B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH042790U (en) * | 1990-04-21 | 1992-01-10 |
-
1980
- 1980-09-12 JP JP12738780A patent/JPS5919225B2/en not_active Expired
Also Published As
| Publication number | Publication date |
|---|---|
| JPS5751370A (en) | 1982-03-26 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN115467534A (en) | Method for constructing steel beams and floor slabs at positions of all-steel ultra-high-rise structure across post-cast strip in advance | |
| JPH05502073A (en) | Steel useful structure and its assembly method | |
| JPS5919225B2 (en) | Construction method of underground membrane tank | |
| CN214942741U (en) | Roof supports bed-jig | |
| JP3568167B2 (en) | Temporary hanging stairs | |
| CN211201305U (en) | Protection rack of submarine cable terminal preparation | |
| JP3671061B2 (en) | Suspension staircase and its temporary method | |
| CN209907898U (en) | Internal frame type workbench for erecting elevator shaft shear wall pouring template | |
| JPH09317185A (en) | Construction method of housing | |
| JP3234442B2 (en) | Building and scrap type building method | |
| US4679374A (en) | Building construction method | |
| JP2690822B2 (en) | Steel construction method for low-rise buildings | |
| JP2919827B1 (en) | All-weather temporary scaffolding device and method of using all-weather temporary scaffolding device | |
| CN118622004B (en) | Detachable overturning formwork supporting device for lower hanging side beam and construction method | |
| JP3100574B2 (en) | Suspended scaffold and its erection method | |
| JP2718188B2 (en) | Building exterior wall mounting method | |
| JPH0217091Y2 (en) | ||
| JP2661302B2 (en) | Grating floor construction method | |
| JPS62244941A (en) | Push-up system construction method | |
| JP2946372B2 (en) | Construction method of structure | |
| JP2590671B2 (en) | Construction method of steel frame using overhead crane frame | |
| JP3106270B2 (en) | Pillars for lifting and joining structures and methods for lifting structures | |
| SU1726702A1 (en) | Method of construction skeleton of a building | |
| JPH0420471B2 (en) | ||
| CN1326397A (en) | Device for producing wall elements |