Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPS5944855B2 - Demand power control device - Google Patents
[go: Go Back, main page]

JPS5944855B2 - Demand power control device - Google Patents

Demand power control device

Info

Publication number
JPS5944855B2
JPS5944855B2 JP54000479A JP47979A JPS5944855B2 JP S5944855 B2 JPS5944855 B2 JP S5944855B2 JP 54000479 A JP54000479 A JP 54000479A JP 47979 A JP47979 A JP 47979A JP S5944855 B2 JPS5944855 B2 JP S5944855B2
Authority
JP
Japan
Prior art keywords
power
demand
time
time limit
division circuit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP54000479A
Other languages
Japanese (ja)
Other versions
JPS5592537A (en
Inventor
汪 石川
功 阿久津
博久 水原
祥三 北村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Tokyo Electric Power Co Holdings Inc
Original Assignee
Tokyo Electric Power Co Inc
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from JP479A external-priority patent/JPS54109295A/en
Application filed by Tokyo Electric Power Co Inc, Mitsubishi Electric Corp filed Critical Tokyo Electric Power Co Inc
Publication of JPS5592537A publication Critical patent/JPS5592537A/en
Publication of JPS5944855B2 publication Critical patent/JPS5944855B2/en
Expired legal-status Critical Current

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Description

【発明の詳細な説明】 本発明は電力管理において需要電力が目標需要電力、例
えば契約電力を超過しないようにするために、超過のお
それがある場合は負荷制御を行う信号を出力し、負荷制
御用スイツチを制御する需要電力制御装置に関するもの
である・一般に、需要電力が契約電力を超過すると、そ
の超過分に対して割高な違約金を支払わなければならな
いために需要電力が契約亀力を超過するおそれがある場
合、未然にそれを知り超過を防止しなければならない。
DETAILED DESCRIPTION OF THE INVENTION In order to prevent power demand from exceeding a target power demand, for example, contract power in power management, the present invention outputs a signal to perform load control when there is a risk of exceeding the target power demand, and performs load control. This relates to a power demand control device that controls power switches. Generally speaking, if the power demand exceeds the contract power, you will have to pay a relatively high penalty fee for the excess amount, so the power demand will exceed the contract power. If there is a risk of excess, it is necessary to know this in advance and prevent it from exceeding.

従来このような目的のために需要電力があらかじめ設定
した値に達すると警報を発生し、それにより負荷遮断を
行う警報接点付需要電力計があつた。
Conventionally, for this purpose, there has been a power demand meter with an alarm contact that generates an alarm when the demand power reaches a preset value, and thereby performs load shedding.

しかしながらこの装置では需要時限の経過時間に無関係
に警報を発生するため需要時限の経過時間が大きいとき
は多くの負荷を切らねばならない。逆に経過時間が小さ
い場合はまた負荷を切らなくても良い場合があり、要す
るに最適の負荷制御量がわからない欠点があつた。この
ような欠点を除去するために一定時間の需要電力の増分
を求め、この値に需要時限の残り時間を乗算し、この値
に現時点の需要電力値を加算して予測需要電力を算出し
、この値と目標需要電力の差を求め、これを需要時限と
需要時限の残り時間の比で除算して調整電力を算出し、
この値をもとに負荷制御を行う装置が提供された。すな
わちいくらの負荷を制御すれば良いかという値である調
整電力を求め、この値に対して警報値を設定し、前者が
この値を超過した場合に回路の負荷を一段階づつ遮断す
るものであつた。しかしながら、この装置では急激な負
荷増加により需要電力が急増した場合、負荷制御の方が
追いつかず、結果的に需要電力が目標需要電力を超過し
てしまう欠点があつた。本発明はかかる点に鑑みてなさ
れたもので、算出された調整電力に対し警報値を設定し
、調整電力が設定値を超過した場合、その倍数に相当す
る回路数の負荷を制御することにより、需要電力が急増
する場合においても需要覗力を目標電力内におさめるこ
とができる需要電力制御装置を提供することを目的とす
る。
However, since this device generates an alarm regardless of the elapsed time of the demand time limit, many loads must be cut off when the elapsed time of the demand time limit is long. On the other hand, if the elapsed time is short, there are cases where it is not necessary to turn off the load again, which has the disadvantage that the optimum load control amount cannot be determined. In order to eliminate such drawbacks, the increment of power demand for a certain period of time is calculated, this value is multiplied by the remaining time of the demand period, and the current power demand value is added to this value to calculate the predicted power demand. Calculate the difference between this value and the target power demand, divide this by the ratio of the demand time period and the remaining time of the demand time period to calculate the adjusted power,
A device has been provided that performs load control based on this value. In other words, the system calculates the regulated power, which is a value that indicates how much load should be controlled, sets an alarm value for this value, and shuts off the circuit load one step at a time when the former exceeds this value. It was hot. However, this device has a drawback that when the power demand increases rapidly due to a sudden increase in load, the load control cannot keep up with the demand, and as a result, the power demand exceeds the target power demand. The present invention has been made in view of this point, and by setting an alarm value for the calculated regulated power, and when the regulated power exceeds the set value, the load of the number of circuits corresponding to the multiple of the set value is controlled. An object of the present invention is to provide a power demand control device that can keep demand monitoring power within a target power range even when power demand increases rapidly.

以下本発明の一実施例を図面にもとづき説明する。An embodiment of the present invention will be described below based on the drawings.

第1図において、1は発信装置付電力量計で回路の電力
量を計器用変圧器PT,変流器CTを介して計量し、使
用電力量に比例したパルス信号を発信する。2はこのパ
ルスを計数するカウンタで、この計数値をPとする。
In FIG. 1, reference numeral 1 denotes a power meter with a transmitting device that measures the amount of power in a circuit via a voltage transformer PT and a current transformer CT, and transmits a pulse signal proportional to the amount of power used. 2 is a counter that counts these pulses, and this count value is designated as P.

この値は時計部3から需要時限T例えば30分毎に発信
される時限終了信号により零戻しされるものである。4
は需要時限の増分Δpを計数するカウンタで、時計部3
からの信号により一定時間Δt毎に零戻しされるもので
ある。
This value is reset to zero by a time limit end signal transmitted from the clock section 3 at the demand time limit T, for example, every 30 minutes. 4
is a counter that counts the increment Δp of the demand time limit, and the clock section 3
The signal is returned to zero at regular intervals Δt.

5は時計部3からの基準パルスを計数することにより需
要時限Tと需要時限の超過時間TO)差である残り時間
T−tを計数する減算カウンタである。
Reference numeral 5 denotes a subtraction counter that counts the reference pulse from the clock section 3 to count the remaining time T-t, which is the difference between the demand time limit T and the demand time limit excess time TO.

6は目標需要電力Qを設定する設定部である。6 is a setting unit that sets the target power demand Q.

7は上記の計数値や設定値をもとに調整電力を算出する
演算回路であつて、具体的には、次式の計算を行なうも
のである。
7 is an arithmetic circuit that calculates the adjusted power based on the above-mentioned count value and setting value, and specifically, it calculates the following equation.

すなわち調整醒力をUとおけばとして求めることができ
る。
In other words, it can be obtained by letting U be the adjusted awakening force.

ここで、Q;目標需要亀力、P;需要時限tのときの需
要電力、Δp;需要電力の時間Δtにおける増分、T−
t:需要時限の残り時間、T;需要時限(例えば30分
)である。8は上記(a)式により算出された調整電力
Uを表示する表示部である。
Here, Q: Target demand power, P: Demand power at demand time t, Δp: Increment of demand power at time Δt, T-
t: Remaining time of demand time limit, T: Demand time limit (for example, 30 minutes). 8 is a display unit that displays the adjusted power U calculated by the above equation (a).

9は調整電力Uの極性の表示器で、上簀αa)式より調
整電力Uが正のとき需要電力は目標需要電力Qを超過す
るおそれのないことを示し、調整電力Uが負のとき需要
電力は目標需要電力Qを超過するおそれのあることを示
す。
9 is an indicator of the polarity of the regulated power U. According to the above equation αa), when the regulated power U is positive, the demand power is unlikely to exceed the target power demand Q, and when the regulated power U is negative, the demand is This indicates that the power is likely to exceed the target power demand Q.

従つて調整電力Uが負の場合は負荷を遮断する必要があ
り、調整電力Uが正の場合は負荷を投入する余裕のある
ことを示す。しかしながら、単純に負荷制御を行なつた
のでは負荷の切りすぎや入れすぎあるいは制御回数が頻
繁になつて負荷開閉器の寿命を縮めるおそれがある。し
かして10は調整電力Uに対して警報値Vを設定する設
定器である。これは極囲が負であつても調整電力Uの絶
対値がある値を越さないと負荷制御をしないよう一定の
不感帯を設けるもので、この設定値は負荷制御を行う一
回分の負荷容量を設定すれば良い。すなわち調整電力U
がこの値を越えたとき負荷制御を行なうわけである。1
4は第1の除算回路であつて、前記調整電力Uの値をあ
る自然数、例えば2で除算するものである。
Therefore, when the regulated power U is negative, it is necessary to cut off the load, and when the regulated power U is positive, it indicates that there is room to turn on the load. However, if the load is simply controlled, the load may be turned off or turned on too much, or the load may be controlled too frequently, which may shorten the life of the load switch. 10 is a setting device for setting an alarm value V for the regulated power U. This is to provide a certain dead zone so that load control will not be performed unless the absolute value of the adjusted power U exceeds a certain value even if the polar range is negative, and this set value is the load capacity for one load control. All you have to do is set . That is, the regulated power U
When exceeds this value, load control is performed. 1
4 is a first division circuit that divides the value of the adjusted power U by a certain natural number, for example, 2.

15はゲート回路であつて、調整電力Uの極囲が正のと
き第1の除算回路14の出力を通過させ、極lが負のと
きは演算回路7の出力すなわち調整電力Uの値を通過さ
せる切換動作をするものである。
Reference numeral 15 denotes a gate circuit, which allows the output of the first division circuit 14 to pass when the polar range of the regulated power U is positive, and passes the output of the arithmetic circuit 7, that is, the value of the regulated power U, when the pole l is negative. This is the switching operation that allows the

11は第2の除算回路であつて、前記ゲート回路15を
通過した値を、警報値Vで除算し、この商を求め、商の
整数部を出力する。
A second division circuit 11 divides the value passed through the gate circuit 15 by the alarm value V, obtains the quotient, and outputs the integer part of the quotient.

そしてこの商の数の負荷を制御する。12は負荷制御回
路で、例えば商が2であれば2回制御し、商が3であれ
ば3回制御する。
Then, the load of this quotient number is controlled. Reference numeral 12 denotes a load control circuit, which controls the load twice if the quotient is 2, and controls it three times if the quotient is 3, for example.

例えばリレー回路で構成される。な右負荷制御回路13
にはそれぞれ警報値Vの値に等しい負荷が各端子に接続
されている。次に調整電力Uの極曲と第1の除算回路1
4およびゲート回路15の動作について詳細に説明する
For example, it is composed of a relay circuit. Right load control circuit 13
A load equal to the value of the alarm value V is connected to each terminal. Next, the polar bend of the regulated power U and the first division circuit 1
4 and the operations of gate circuit 15 will be explained in detail.

極囲表示器9の表示値が負の場合は需要電力が目標需要
賦力Qを超過するおそれ有とみなし負荷遮断を行う必要
がある。ゲート回路15はこの極囲の信号により演算回
路7の出力を通過させ第2の除算回路11に入力し、調
整電力U÷警報値Vの除算を行ない、商の整数部の数に
等しい負荷を遮断し、使用電力を低減せしめる。次に極
囲表示器9の表示値が正の場合は需要電力が目標需要電
力Qを超過するおそれがなく、使用電力は余裕があるこ
とを示す。従つて目標需要亀力ぎりぎりで効率的な電気
の使用を行ないたい場合は負荷を投入し使用電力を増加
させてもかまわない。しかしながら、負荷遮断と同様に
して負荷を投入したのでは負荷変動によつて負荷をすぐ
遮断しなければならない事態を生じるおそれがある。こ
うしたことは負荷開閉器の寿命を縮めるので好ましくな
い。従つて前記極ヒが正の場合、ゲート回路5は第一の
除算回路14で調整電力U÷任意の自然数nで除算した
結果を通過させ、前記と同様に第二の除算回路11に入
力し、除算を行い商の整数部の数に等しい負荷を投入し
、使用電力を増加せしめる。投入される負荷の量は、遮
断する負荷の量より少なくなるので、再遮断を行なわね
ばならない事態が減少し、しかも効率の良い電気の使用
ができることになる。本発明の一実施例は以上のような
構成であるが第一の除算回路14の除数nは任意に設定
可能なプリセツト手段を有するよう構成すれば、需要電
力に余裕がある場合の負荷投入の頻度を使用者が任意に
設定できるのでその効果はきわめて大きい。
If the display value of the extreme area indicator 9 is negative, it is assumed that the demand power is likely to exceed the target demand force Q, and it is necessary to perform load shedding. The gate circuit 15 passes the output of the arithmetic circuit 7 based on this extreme signal, inputs it to the second division circuit 11, divides the adjusted power U÷the alarm value V, and divides the load equal to the number of integer parts of the quotient. shut off and reduce power consumption. Next, when the display value of the extreme area indicator 9 is positive, it indicates that there is no fear that the power demand will exceed the target power demand Q, and that there is a margin for the power consumption. Therefore, if you want to use electricity efficiently at the very limit of the target demand power, you can increase the power usage by adding a load. However, if a load is applied in the same manner as load shedding, there is a risk that the load may have to be immediately shelved due to load fluctuations. This is undesirable because it shortens the life of the load switch. Therefore, when the polarity is positive, the gate circuit 5 passes the result of dividing the adjusted power U by any natural number n in the first division circuit 14, and inputs it to the second division circuit 11 in the same manner as above. , and a load equal to the integer part of the quotient is applied to increase the power consumption. Since the amount of load that is applied is less than the amount of load that is cut off, the number of times that the load has to be cut off again is reduced, and moreover, electricity can be used more efficiently. Although one embodiment of the present invention has the above-mentioned configuration, if the divisor n of the first division circuit 14 is configured to have a preset means that can be set arbitrarily, load application when there is a margin in the demand power is possible. Since the frequency can be set arbitrarily by the user, the effect is extremely large.

また需要時限が終了した時点で負荷を全点投入し以下前
記説明のような負荷制御動作を行うよう構成することも
できる。また演算式で分子を△p {P+−(T−t)}−Qとして演算し、極△t囲表示
器9の表示の「+」と「−」の意味を逆にしてもさしつ
かえない。
Further, it is also possible to configure the system so that the load is applied at all points when the demand time period ends, and the load control operation as described above is performed below. Alternatively, the numerator may be calculated as Δp {P+-(T-t)}-Q in the arithmetic expression, and the meanings of "+" and "-" displayed on the polar Δt area display 9 may be reversed.

また調整電力の表示8の△pほかに予測需要電力が相当
するP+一(T−t)△tや需要時限tにおける需要電
力Pおよび残り時間(T−t)を表示する表示器を設け
ることも可能である。
In addition to △p of the adjusted power display 8, a display may be provided to display P+1(T-t)△t corresponding to the predicted power demand, the demand power P at the demand time limit t, and the remaining time (T-t). is also possible.

また演算回路7および第1,第2の除算回路14,11
は汎用Cを使用して構成しうるが、マイクロコンピユー
タのような演算素子を使用して構成することも可能であ
る。そして需要電力カウンタ2、需要電力の増分カウン
タ4、残り時間の減算カウンタ5をマイクロコンピユー
タのメモリで置きかえることも可能である。さらに、ま
た上記実施例においては、第2の除算回路11の前に第
1の除算回路14を配置するよう構成したが、第2図に
示すように第2の除算回路11の後に第1の除算回路を
配置し、極囲信号によりゲート回路15で切換えて、負
荷制御回路12に入力するよう構成することも可能であ
る。
In addition, the arithmetic circuit 7 and the first and second division circuits 14 and 11
can be constructed using general-purpose C, but it can also be constructed using an arithmetic element such as a microcomputer. It is also possible to replace the demand power counter 2, the demand power increment counter 4, and the remaining time subtraction counter 5 with the memory of the microcomputer. Furthermore, in the above embodiment, the first division circuit 14 is arranged before the second division circuit 11, but as shown in FIG. It is also possible to arrange a divider circuit, switch it in the gate circuit 15 according to the range signal, and input it to the load control circuit 12.

また調整電力を算出する演算式は、前記(a)式によら
ず、下記(b)式にても算出可能である。すなわち、こ
\で、Q;目標需要電力、P;需要時限tのときの需要
電力、Δp;需要電力の時間Δtにおける増分、T−t
;需要時限の残り時間、T;需要時限(例えば30分)
である。次に(b)式の物理的意味について説明すると
、まず第一項は目標需要電力Qと時限tにおける需要電
力Pの差を(Q−P)式で求め、これを需要時限の残り
時間(T−t)と需要時限Tの比で除算することにより
時限tにおいて使用してもかまわない電力、すなわち許
容電力が求められる。
Moreover, the calculation formula for calculating the adjusted power is not based on the above-mentioned formula (a), but can also be calculated using the following formula (b). That is, here, Q: target power demand, P: power demand at demand time limit t, Δp: increment of power demand at time Δt, T-t
;Remaining time of demand time limit, T;Demand time limit (for example, 30 minutes)
It is. Next, to explain the physical meaning of equation (b), the first term is to calculate the difference between the target power demand Q and the power demand P at time period t using the equation (Q-P), and calculate this for the remaining time of the demand time period ( The electric power that can be used in the time limit t, that is, the allowable electric power, is obtained by dividing the ratio of T-t) to the demand time limit T.

そして第二項は需要亀力の増分(△p)を(Δt/T)
で除算することにより時限tにおける瞬時平均電力が求
められる。そして調整電力は両者の差で求められるとい
う原理によるものである。他方(a)式は{P+仝上(
T−t)}式で表わされる予測需Δt要電力と目標需要
電力の差を残り時間(T−t)と需要時限Tの比で少算
することにより調整電力を求めるもので、結果的には同
じ式になるか、その考え方は全く異なるものであり、回
路的構成も当然異なつてくる。
And the second term is the increase in demand force (△p) (Δt/T)
By dividing by , the instantaneous average power in time period t is obtained. This is based on the principle that the adjusted power is determined by the difference between the two. On the other hand, equation (a) is {P+for(
The adjusted power is calculated by subtracting the difference between the predicted power demand Δt and the target power demand, expressed by the formula T-t), by the ratio of the remaining time (T-t) and the demand time limit T, and as a result, Will it be the same formula? The way of thinking is completely different, and the circuit configuration will naturally be different.

以上のように本発明によれば算出された調整電力に対し
、警報値を設定し、調整電力が設定値を超過した場合、
その倍数に相当する回路数の負荷を制御するように構成
したので、需要電力を目標亀力におさめるため必要な負
荷制御が的確に行なえて効率的な電力の使用が可能とな
る等効果があり、省エネルギー、省資源が叫ばれている
今日の状況において本発明の装置の果たす効果は、はな
はだ顕著である。
As described above, according to the present invention, an alarm value is set for the adjusted power calculated, and when the adjusted power exceeds the set value,
Since the configuration is configured to control the load of the number of circuits corresponding to a multiple of the number of circuits, it is possible to accurately perform the load control necessary to keep the power demand within the target power, which has the effect of enabling efficient power use. In today's situation where energy saving and resource saving are in demand, the effects of the device of the present invention are extremely remarkable.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明の一実施例を示すプロツク図、第2図は
本発明の他の実施例を示すプロツク図である。 図において、1は発信装置付電力量計、2,4はカウン
タ、3は時計部、4は減算カウンタ、6は設定部、7は
演算回路、8は表示部、9は表示器、10は設定器、1
4および11は第1および第2の除算回路、12は負荷
制御回路、15はゲート回路である。
FIG. 1 is a block diagram showing one embodiment of the present invention, and FIG. 2 is a block diagram showing another embodiment of the present invention. In the figure, 1 is a power consumption meter with a transmitter, 2 and 4 are counters, 3 is a clock section, 4 is a subtraction counter, 6 is a setting section, 7 is an arithmetic circuit, 8 is a display section, 9 is an indicator, and 10 is a Setting device, 1
4 and 11 are first and second division circuits, 12 is a load control circuit, and 15 is a gate circuit.

Claims (1)

【特許請求の範囲】 1 電力量に比例したパルスを発信する発信装置付電力
量計の発信パルスを計数し、この計数値と一定時間内に
おける上記計数値の増分と、需要時限とこの需要時限の
残り時間と、目標需要電力から調整電力を演算する第1
の手段と、この調整電力を表示する第2の手段と、上記
調整電力に対して警報値を設定する第3の手段と、上記
調整電力の演算符号が所定極性のとき上記調整電力を上
記警報値で除算し商の整数部を求め、上記演算符号が上
記所定極性と異なるとき上記調整電力を上記警報値の所
定倍数で除算し商の整数部を求める第4の手段と、上記
演算符号が上記所定極性のとき上記第4の手段の出力に
対応した数の負荷回路をしや断し、上記演算符号が上記
所定極性と異なるとき上記第4の手段の出力に対応した
数の負荷回路を投入制御する第5の手段とを備えた需要
電力制御装置。 2 第1の手段は U=(Q−{P+(△p/△t)(T−t)}/(T−
t)/T)こゝでU;調整電力、Q;目標需要電力、P
;需要時限tのときの需要電力、△p;需要電力の時間
△tにおける増分、T−t;需要時限の残り時間、T;
需要時限なる演算を行なうことを特徴とする特許請求の
範囲第1項記載の需要電力制御装置。 3 第1の手段は U={P+(△p/△t)(T−t)}−Q/(T−t
)/T)こゝで、U;調整電力、Q;目標需要電力、P
;需要時限tのときの需要電力、△p;需要電力の時間
△tにおける増分、T−t;需要時限の残り時間、T;
需要時限なる演算を行なうことを特徴とする特許請求の
範囲第1項記載の需要電力装置。 4 第1の手段は U=(Q−P/(T−t)/T)−(△p/△t/T)
こゝで、U;調整電力、Q;目標需要電力、P;需要時
限tのときの需要電力、△p;需要電力の時間△tにお
ける増分、T−t;需要時限の残り時間、T;需要時限
なる演算を行なうことを特徴とする特許請求の範囲第1
項記載の需要電力制御装置。 5 第4の手段は、調整電力を所定の自然数で除算する
第1の除算回路と、上記調整電力の演算符号が所定極性
のとき上記調整電力を有効とし、上記演算符号が上記所
定極性と異なるとき上記第1の除算回路の出力を有効と
するゲート回路と、このゲート回路の出力を警報値で除
算し、商の整数部を求める第2の除算回路から成ること
を特徴とする特許請求の範囲第2項から第4項の何れか
に記載の需要電力制御装置。 6 第4の手段は、調整電力を警報値で除算し、商の整
数部を求める第2の除算回路と、この第2の除算回路の
出力を所定の自然数で除算する第1の除算回路と、上記
調整電力の演算符号が所定極性のとき上記第2の除算回
路の出力を有効とし、上記演算符号が上記所定極性と異
なるとき上記第1の除算回路の出力を有効とするゲート
回路から成ることを特徴とする特許請求の範囲第2項か
ら第4項の何れかに記載の需要電力制御装置。
[Scope of Claims] 1. Count the pulses transmitted by a power meter with a transmitter that transmits pulses proportional to the amount of electric power, and calculate the counted value, the increment of the counted value within a certain period of time, the demand time period, and this demand time period. The first step is to calculate the adjusted power from the remaining time and the target power demand.
means for displaying the regulated power; third means for setting an alarm value for the regulated power; fourth means for dividing the regulated power by a predetermined multiple of the alarm value to obtain an integer part of the quotient when the arithmetic code is different from the predetermined polarity; When the polarity is the predetermined polarity, the number of load circuits corresponding to the output of the fourth means is cut off, and when the operational sign is different from the predetermined polarity, the number of load circuits corresponding to the output of the fourth means is cut off. A demand power control device comprising a fifth means for controlling input. 2 The first means is U=(Q-{P+(△p/△t)(T-t)}/(T-
t)/T) where U: Adjusted power, Q: Target demand power, P
; Demand power at demand time limit t, Δp; Increment of demand power at time Δt, T-t; Remaining time of demand time limit, T;
2. The power demand control device according to claim 1, wherein the power demand control device performs calculation of demand time limit. 3 The first means is U={P+(△p/△t)(T-t)}-Q/(T-t
)/T) Here, U: Adjusted power, Q: Target power demand, P
; Demand power at demand time limit t, Δp; Increment of demand power at time Δt, T-t; Remaining time of demand time limit, T;
2. The power demand device according to claim 1, wherein the power demand device calculates a demand time limit. 4 The first means is U = (Q-P/(T-t)/T)-(△p/△t/T)
Here, U: Adjusted power, Q: Target power demand, P: Demand power at demand time limit t, Δp: Increment of demand power at time Δt, T-t: Remaining time of demand time limit, T; Claim 1, characterized in that a calculation of demand time limit is performed.
Demand power control device as described in section. 5. A fourth means includes a first division circuit that divides the regulated power by a predetermined natural number, and makes the regulated power valid when the arithmetic sign of the regulated power has a predetermined polarity, and the regulated power is different from the predetermined polarity. A gate circuit that validates the output of the first division circuit, and a second division circuit that divides the output of the gate circuit by an alarm value and obtains the integer part of the quotient. The power demand control device according to any one of the ranges 2 to 4. 6. The fourth means includes a second division circuit that divides the adjusted power by the alarm value and obtains an integer part of the quotient, and a first division circuit that divides the output of the second division circuit by a predetermined natural number. , comprising a gate circuit that validates the output of the second division circuit when the operational sign of the adjusted power has a predetermined polarity, and validates the output of the first division circuit when the operational sign of the adjusted power differs from the predetermined polarity. A power demand control device according to any one of claims 2 to 4, characterized in that:
JP54000479A 1979-01-04 1979-01-05 Demand power control device Expired JPS5944855B2 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP479A JPS54109295A (en) 1978-01-03 1979-01-04 Tooth filler

Publications (2)

Publication Number Publication Date
JPS5592537A JPS5592537A (en) 1980-07-14
JPS5944855B2 true JPS5944855B2 (en) 1984-11-01

Family

ID=11462328

Family Applications (1)

Application Number Title Priority Date Filing Date
JP54000479A Expired JPS5944855B2 (en) 1979-01-04 1979-01-05 Demand power control device

Country Status (1)

Country Link
JP (1) JPS5944855B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6241872A (en) * 1985-08-13 1987-02-23 岡崎工業株式会社 Three-dimensional parking apparatus
JPH0268053U (en) * 1988-06-17 1990-05-23

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6241872A (en) * 1985-08-13 1987-02-23 岡崎工業株式会社 Three-dimensional parking apparatus
JPH0268053U (en) * 1988-06-17 1990-05-23

Also Published As

Publication number Publication date
JPS5592537A (en) 1980-07-14

Similar Documents

Publication Publication Date Title
US4059747A (en) Demand controller
EP0028625B1 (en) Bidirectional integrator
JPS5944855B2 (en) Demand power control device
JP3430890B2 (en) Power management device
JPH01260369A (en) Life forcasting circuit for power supply apparatus
US4670713A (en) Tieline control
JP4778211B2 (en) Annual power consumption management system
GB1512407A (en) Apparatus for monitoring the consumption of electricity
JP6063366B2 (en) Elevator monitoring device
JPS6118770B2 (en)
KR830000688Y1 (en) Demand controller
JPS609412B2 (en) Demand power monitoring device
KR830000139Y1 (en) Demand controller
JPS5944857B2 (en) Demand power monitoring device
JPH0427876A (en) Watthour meter
JP4040150B2 (en) Electronic energy meter
JPS5944856B2 (en) Demand power monitoring device
JPH0365023A (en) Demand controller
JPS63273752A (en) Integrating watt meter for airconditioner
JPS6156528B2 (en)
JPS5832465Y2 (en) Demand control device
KR830000159B1 (en) Demand controller
KR830000687Y1 (en) Demand control device
JP2007271281A (en) Electric power monitoring system
JPS6016131A (en) Demand power monitor controller