Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPS5944857B2 - Demand power monitoring device - Google Patents
[go: Go Back, main page]

JPS5944857B2 - Demand power monitoring device - Google Patents

Demand power monitoring device

Info

Publication number
JPS5944857B2
JPS5944857B2 JP54000481A JP48179A JPS5944857B2 JP S5944857 B2 JPS5944857 B2 JP S5944857B2 JP 54000481 A JP54000481 A JP 54000481A JP 48179 A JP48179 A JP 48179A JP S5944857 B2 JPS5944857 B2 JP S5944857B2
Authority
JP
Japan
Prior art keywords
power demand
demand
time
power
predicted
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP54000481A
Other languages
Japanese (ja)
Other versions
JPS5592539A (en
Inventor
汪 石川
功 阿久津
博久 水原
祥三 北村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Tokyo Electric Power Co Holdings Inc
Original Assignee
Tokyo Electric Power Co Inc
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyo Electric Power Co Inc, Mitsubishi Electric Corp filed Critical Tokyo Electric Power Co Inc
Priority to JP54000481A priority Critical patent/JPS5944857B2/en
Publication of JPS5592539A publication Critical patent/JPS5592539A/en
Publication of JPS5944857B2 publication Critical patent/JPS5944857B2/en
Expired legal-status Critical Current

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Description

【発明の詳細な説明】 本発明は電力需要家において需要電力を監視するために
各種の演算表示を行う需要電力監視装置に関するもので
ある。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a power demand monitoring device that performs various calculations and displays in order to monitor power demand at a power consumer.

従来の需要電力監視装置としては、例れば発信装置付電
力量計の発信パルスを計数し、この計数値をもとに需要
時限経過時の需要電力を予測演算して表示し、又この値
をもとにして警報信号を発生する装置があつた。
Conventional power demand monitoring devices, for example, count the transmitted pulses of a power meter with a transmitting device, calculate and display a predicted power demand when the demand time limit has elapsed based on this counted value, and display this value. There was a device that generated an alarm signal based on the

このような装置の動作原理を第1図により説明する。第
ス図において横軸は需要時限の経過時間で、需要時限を
Tとする。
The operating principle of such a device will be explained with reference to FIG. In the diagram, the horizontal axis is the elapsed time of the demand time limit, and T is the demand time limit.

また、縦軸は需要電力である。1は需要電力の増加を示
す曲線で、需要経過時限をの時点における現在需要電力
をpとし、この時点からある短い時間間隔△をさかのぼ
つた時間における需要電力の増分を△pとすれば、需要
時限Tにおける需要電力すなわち予測需要電力Rは次式
(1)△p R二P+−×(T−を)・・・・・・・・(1)△をで
あられされる。
Also, the vertical axis is the power demand. 1 is a curve showing the increase in power demand.If the current power demand at the time when the demand has elapsed is p, and the increment in power demand from this point back by a certain short time interval △ is △p, then the demand Demand power in time period T, that is, predicted power demand R is given by the following formula (1) Δp R2 P+−×(T−) (1) Δ.

なお、需要時限Tは30分、△をは1分をとるのが通常
行なわれている。そして、上記(1)式による予測需要
電力は△を時間間隔で行われる。しかしながら、従来の
時間△をは比較的小さい値(例えば1分)に限定されて
いたため、例えば鉄鋼の圧延設備などの負荷を有する需
要家では負荷変動が激しいため予測需要電力Rが大きく
ふらつく欠点があつた。そこで、このような欠点を除去
するために需要電力の増分△pを計量する時間間隔△を
を大きくしてそれにより負荷変動の影響を低減する装置
が提案された。この装置の動作原理を第2図により説明
する。第2図において、需要時限の経過時間tl、を2
、を3において各々時間間隔△Tをとりこの時間におけ
る需要電力の増分を△P1、△P2、△P3とし、△T
は第1図の△をよりも大きくて例えば△をの整数倍にと
る。
Note that the demand time limit T is usually 30 minutes, and Δ is 1 minute. The predicted power demand according to the above equation (1) is calculated at Δ time intervals. However, in the past, the time △ was limited to a relatively small value (for example, 1 minute), so for example, in a customer with a load such as a steel rolling facility, the predicted power demand R fluctuates greatly due to severe load fluctuations. It was hot. Therefore, in order to eliminate such drawbacks, a device has been proposed in which the time interval Δ for measuring the increment Δp in the power demand is increased, thereby reducing the influence of load fluctuations. The operating principle of this device will be explained with reference to FIG. In Figure 2, the elapsed time tl of the demand time limit is 2
, take a time interval △T, and let the increment of power demand in this time be △P1, △P2, △P3, and △T
is larger than △ in FIG. 1, for example, △ is taken as an integer multiple of △.

すなわち、任意の自然数をnとすれば次式匂ΔT=n×
Δt (nは2以上) ・・・・・{2) の関係を満足するようにする。
In other words, if n is any natural number, then the following formula ΔT=n×
Δt (n is 2 or more) ...{2) The following relationship should be satisfied.

この関係から予測需要電力Rは次式(3)で表わすこと
ができる。
From this relationship, the predicted power demand R can be expressed by the following equation (3).

ここで、第2図をみてもわかるとおりΔTを△tよりも
大きくとれば第1図の場合よりもΔPl,ΔP2,△P
3の値は平均化され、負荷変動の影響を低減しうる。こ
のように第2図の動炸原理による装置は負荷変動による
予測需要電力のふらつきは少なくなつたが、その反面次
のような欠点を生じた。すなわち、上記特徴の裏返しと
もいえる負荷変動に対する追随性あるいは感度の鈍さの
問題である。この欠点を第3図により説明する。
Here, as can be seen from Fig. 2, if ΔT is larger than △t, ΔPl, ΔP2, △P
The values of 3 are averaged and can reduce the effects of load fluctuations. As described above, although the device based on the pulse principle shown in FIG. 2 reduces fluctuations in predicted power demand due to load fluctuations, it has the following drawbacks. In other words, the problem is the inability to follow load fluctuations or the insensitivity, which is the opposite of the above-mentioned characteristics. This drawback will be explained with reference to FIG.

第3図において需要時限の経過時間Tl,t2,t3に
おける予測需要電力を各々Rl,R2,R3とし、管理
したい目標需要電力をQとする。ここで、仮りに需要電
力がt1の時点から急激に増加した場合Tl,t2にお
ける予測需要電力Rl,R2は目標需要電力Qを超過し
てしまう。この場合に、従来装置としては警報を発生し
たりあるいは負荷遮断を行う機能を有するものがあり、
例えばこの警報によりT2の時点で負荷遮断をしたと考
える。そうすると、需要電力の増加は第3図のT3にお
ける如くゆるくなる。しかしながら、T3における予測
需要電力R3は依然として目標需要電力Qを超過するた
めさらに負荷遮断を行い、結果的には負荷を切りすぎる
欠点が生じる。負荷遮断を行つた場合負荷遮断の効果を
みるために予測需要電力Rの演算において需要電力の増
分ΔPの計量は負荷遮断を行つた時点から行うのが妥当
である。すなわへT,の時点においてはΔTのかわりに
Δtをとり需要電力の増分はΔ4を用いて予測需要電力
Rを演算するのが好ましい。このようにすれζ二予測需
要電力はRΔとなり目標需要電力Qを下廻つて負荷遮断
の効果が顕著にわかる。本発明は、上記のような従来の
欠点を除去すべくなされたもので、予測需要電力の演算
において通常は需要電力の増分を計量する時間間隔を長
くし、予測需要電力力泪標値を超過する場合は上記需要
電力の増分を計量する時間間隔を短くすることにより、
需要電力の状態を克明に監視できる需要電力監視装置を
提供しようとするものである。
In FIG. 3, the predicted power demands at the elapsed times Tl, t2, and t3 of the demand time limit are Rl, R2, and R3, respectively, and the target power demand to be managed is Q. Here, if the power demand increases rapidly from the time point t1, the predicted power demand R1, R2 at T1, t2 will exceed the target power demand Q. In this case, some conventional devices have the function of generating an alarm or shedding the load.
For example, assume that this alarm causes load shedding at time T2. Then, the increase in power demand becomes slower as shown at T3 in FIG. However, since the predicted power demand R3 at T3 still exceeds the target power demand Q, load shedding is further performed, resulting in the drawback that the load is cut too much. When load shedding is performed, in order to see the effect of load shedding, it is appropriate to measure the increment ΔP in power demand in calculating the predicted power demand R from the time when load shedding is performed. In other words, at the time T, it is preferable to calculate the predicted power demand R by taking Δt instead of ΔT and using Δ4 as the increment of the power demand. In this way, the predicted power demand of ζ2 becomes RΔ, which falls below the target power demand Q, and the effect of load shedding is clearly seen. The present invention has been made in order to eliminate the above-mentioned drawbacks of the conventional technology, and in calculating predicted power demand, the time interval for measuring increments in power demand is usually lengthened, so that the predicted power demand is exceeded. In this case, by shortening the time interval for measuring the increment of the above-mentioned power demand,
The present invention aims to provide a power demand monitoring device that can clearly monitor the state of power demand.

以下、本発明の一実施例を図に従つて説明する。第4図
において、1は回路の電力量をPT,CTを介して計量
し、使用電力量に比例したパルスを発信する電力量計で
ある。2はこのパルスを計数する需要電力カウンタ、3
,4は各々一定時間間隔における需要電力の増分を計量
するカウンタで、(2)式においてn=2としたとき、
ΔT=2・Δtなる関係の場合の構成例である。
An embodiment of the present invention will be described below with reference to the drawings. In FIG. 4, reference numeral 1 denotes a power meter that measures the amount of power in the circuit via PT and CT and emits a pulse proportional to the amount of power used. 2 is a demand power counter that counts these pulses; 3
, 4 are counters that measure the increment in power demand at fixed time intervals, and when n=2 in equation (2),
This is a configuration example in the case of the relationship ΔT=2·Δt.

すなわち第3図で説明するならば増分カウンタ3はTl
,t,・・・・・・の需要電力の増分ΔPl,ΔP,・
・・・・・△P2l−1を計数し、増分カウンタ4はT
2,t4・・・・・・の需要電力の増分ΔP2,ΔP4
・・・・・・ΔP2lを計数するカウンタである。5は
時計部で、需要時限Tを計測し、需要時限T間隔毎に需
要電力カウンタ2の計数値を零戻しする。
In other words, if we explain using FIG. 3, the incremental counter 3 is Tl.
, t, ...... Increase in power demand ΔPl, ΔP, ・
...Count △P2l-1, and the increment counter 4 is T
2, t4...Increments in power demand ΔP2, ΔP4
. . . A counter that counts ΔP2l. Reference numeral 5 denotes a clock unit that measures the demand time limit T and resets the count value of the demand power counter 2 to zero at every demand time limit T interval.

また、時間間隔ΔTまたはΔt毎に、需要電力の増分カ
ウンタ3および4を時間差△tでもつて交互に零戻しす
る。さらにまた、同時に需要時限の残り時間(T−t)
も計測する。時間間隔ΔTとΔtは切換回路12により
切換るものである。6はゲート回路で、前記需要電力の
増分カウンタ3および4の計数値を時計部5の信号によ
り△t毎に交互に切りかえて演算回路7に入力する。
Further, the demand power increment counters 3 and 4 are returned to zero alternately with a time difference Δt at every time interval ΔT or Δt. Furthermore, at the same time, the remaining time of the demand time limit (T-t)
Also measured. The time intervals ΔT and Δt are switched by the switching circuit 12. Reference numeral 6 denotes a gate circuit, which alternately switches the counted values of the power demand increment counters 3 and 4 every Δt according to a signal from the clock section 5 and inputs them to the arithmetic circuit 7.

7は需要電力カウンタ2、ゲート回路6、および時計部
5の需要時限の残り時間T−tの計測値をもとに(3)
式により予測需要電力を時間間隔△t毎に演算する回路
であつて、演算結果は表示回路8により表示される。
7 is based on the measured values of the remaining time Tt of the demand time limit of the demand power counter 2, the gate circuit 6, and the clock section 5 (3)
This is a circuit that calculates predicted power demand at each time interval Δt using a formula, and the calculation results are displayed on a display circuit 8.

9は目標需要電力設定器で、前記予測需要電力に対して
その目標値を設定する。
Reference numeral 9 denotes a target power demand setting device, which sets a target value for the predicted power demand.

10は比較回路で、前記予測需要電力と目標需要電力を
比較し、前者が後者を超過すると警報信号を発生する。
A comparison circuit 10 compares the predicted power demand with the target power demand, and generates an alarm signal when the former exceeds the latter.

11は警報回路で、前記警報信号により動作し、外部に
ランプやブザーあるいは接点信号などで需要電力が目標
需要電力を超過するおそれのあることを知らせ、管理者
の注意を喚起するものである。
Reference numeral 11 denotes an alarm circuit, which is activated by the above-mentioned alarm signal and uses a lamp, a buzzer, or a contact signal to inform the outside that the power demand may exceed the target power demand, thereby calling the administrator's attention.

さて、比較回路10から警報信号が発生するとこの信号
により切換回路12は需要電力増分カウンタの零戻し信
号の間隔をΔTからΔtに切換丸その時点からΔPの計
数をあらたに開始する。同時に演算回路は前記警報信号
が出力している間は(1)式の演算式により予測需要電
力を演算するよう演算回路の構成が切り換えられるもの
である。なお、本発明の一実施例としては以上のような
構成であるが、需要電力増分カウンタ3,4は2回路に
何ら限定されるものでなく、3回路でも4回路でもつけ
ることができる。また、切換スイツチにより例えば5回
路装備していてもそのうち3回路だけ使用するよう構成
することもできる。また、回路数を増やした場合に回路
が複雑になることを考慮すれば例えばマイクロコンピユ
ータを使用して演算回路やゲート回路、需要電力カウン
タ、比較回路などを構成する方が利点のある場合もある
。また、本発明の説明では予測需要電力の演算について
説明したが、負荷の調整量である調整電力の演算などに
本発明の原理を応用することも可能である。以上のよう
に、本発明によれば需要電力の増分を計量する時間間隔
を予測需要電力が目標値を超過する場合に超過しない場
合よりも短くしうることにより負荷の変化の状態や負荷
遮断の効果が直ちに判別できることになり、負荷の切り
すぎなどのトラブルがなく適切な需要電力の監視が行え
、その効果ははなはだ大なるものである。
Now, when an alarm signal is generated from the comparator circuit 10, this signal causes the switching circuit 12 to switch the interval of the zero return signal of the demand power increment counter from ΔT to Δt, and from that point on, starts counting ΔP anew. At the same time, the configuration of the arithmetic circuit is switched so that the predicted power demand is calculated by the arithmetic expression (1) while the alarm signal is being output. Although the embodiment of the present invention has the above-described configuration, the power demand increment counters 3 and 4 are not limited to two circuits at all, and can be provided with three or four circuits. Further, by using a changeover switch, for example, even if five circuits are provided, only three of them can be used. Also, considering that the circuit becomes more complex when the number of circuits is increased, it may be advantageous to use a microcomputer to configure arithmetic circuits, gate circuits, power demand counters, comparison circuits, etc. . Further, in the description of the present invention, the calculation of predicted power demand has been explained, but it is also possible to apply the principle of the present invention to calculation of adjusted power, which is the amount of adjustment of load. As described above, according to the present invention, the time interval for measuring the increment in power demand can be made shorter when the predicted power demand exceeds the target value than when it does not exceed the target value. The effect can be immediately determined, and the power demand can be appropriately monitored without problems such as excessive load cutting, and the effect is extremely large.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は従来装置の一実施例の動作原理を示すタイムチ
ヤート、第2図は従来の装置の他の一実施例の動作原理
を示すタイムチヤート、第3図は本発明による装置の一
実施例の動作原理を示すタイムチヤート、第4図は本発
明による装置の一実施例のプロツク図である。 図において、1は発信装置付電力量計、2は需要電力カ
ウンタ、3,4は需要電力増分カウンタ、5は時計部、
6はゲート回路、7は演算回路、8は表示器、9は目標
需要電力設定器、10は比較回路、11は警報回路、1
2は切換回路である。
FIG. 1 is a time chart showing the operating principle of one embodiment of the conventional device, FIG. 2 is a time chart showing the operating principle of another embodiment of the conventional device, and FIG. 3 is an embodiment of the device according to the present invention. FIG. 4 is a time chart illustrating the principle of operation of an example; and FIG. 4 is a block diagram of an embodiment of the apparatus according to the invention. In the figure, 1 is a power meter with a transmitter, 2 is a demand power counter, 3 and 4 are demand power increment counters, 5 is a clock unit,
6 is a gate circuit, 7 is an arithmetic circuit, 8 is a display, 9 is a target power demand setting device, 10 is a comparison circuit, 11 is an alarm circuit, 1
2 is a switching circuit.

Claims (1)

【特許請求の範囲】[Claims] 1 発信装置付電力量計の発信パルスを計数する計数手
段と、ある設定時間内における該計数値の増加量を求め
て同時間内の増加量と需要時限の残り時間との積に前記
計数値を加えることにより予測需要電力を演算する手段
と、該予測需要電力を目標需要電力と比較する手段とを
備えた需要電力監視装置において、前記予測需要電力が
前記目標需要電力を超過することを条件に、前記設定時
間を所定値に短縮する手段とを備えた需要電力監視装置
1. A counting means for counting the transmitted pulses of a power consumption meter with a transmitting device, and determining the amount of increase in the counted value within a certain set time, and calculating the said counted value as the product of the amount of increase within the same time and the remaining time of the demand time limit. In a power demand monitoring device comprising means for calculating predicted power demand by adding , and means for comparing the predicted power demand with a target power demand, the condition is that the predicted power demand exceeds the target power demand. and means for shortening the set time to a predetermined value.
JP54000481A 1979-01-05 1979-01-05 Demand power monitoring device Expired JPS5944857B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP54000481A JPS5944857B2 (en) 1979-01-05 1979-01-05 Demand power monitoring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP54000481A JPS5944857B2 (en) 1979-01-05 1979-01-05 Demand power monitoring device

Publications (2)

Publication Number Publication Date
JPS5592539A JPS5592539A (en) 1980-07-14
JPS5944857B2 true JPS5944857B2 (en) 1984-11-01

Family

ID=11474960

Family Applications (1)

Application Number Title Priority Date Filing Date
JP54000481A Expired JPS5944857B2 (en) 1979-01-05 1979-01-05 Demand power monitoring device

Country Status (1)

Country Link
JP (1) JPS5944857B2 (en)

Also Published As

Publication number Publication date
JPS5592539A (en) 1980-07-14

Similar Documents

Publication Publication Date Title
US4059747A (en) Demand controller
US4179611A (en) Efficiency monitoring device
JPS5944857B2 (en) Demand power monitoring device
JPH01260369A (en) Life forcasting circuit for power supply apparatus
RU2233482C1 (en) Device for determining optimal period for maintenance of product
GB1512407A (en) Apparatus for monitoring the consumption of electricity
JPH10240360A (en) Method and device for monitoring demand
JPH11206015A (en) Demand power monitoring method and device
KR830000688Y1 (en) Demand controller
JPH0458114A (en) Intermittently driven integration type flowmeter
JPS609412B2 (en) Demand power monitoring device
JPS5944856B2 (en) Demand power monitoring device
JPS5944855B2 (en) Demand power control device
JPH0627660B2 (en) Flow rate display method of flow rate display device
JP3816582B2 (en) Demand monitoring device
SU894758A1 (en) Device for monitoring and registering press working strokes
JPS60125123A (en) Demand power monitor
JPS6016131A (en) Demand power monitor controller
SU964682A1 (en) Device for monitoring equipment capacity
SU980111A1 (en) Machine operation monitoring device
SU437985A1 (en) Device for threshold period control
JPS5836198Y2 (en) Demand power monitoring device
JPH0365023A (en) Demand controller
GB1593438A (en) Monitoring equipment
JPS6016291B2 (en) Rolling reduction measuring device