JPS5945072B2 - Concrete placement method for vertical underground penstock - Google Patents
Concrete placement method for vertical underground penstockInfo
- Publication number
- JPS5945072B2 JPS5945072B2 JP56190429A JP19042981A JPS5945072B2 JP S5945072 B2 JPS5945072 B2 JP S5945072B2 JP 56190429 A JP56190429 A JP 56190429A JP 19042981 A JP19042981 A JP 19042981A JP S5945072 B2 JPS5945072 B2 JP S5945072B2
- Authority
- JP
- Japan
- Prior art keywords
- concrete
- penstock
- chute
- chute pipe
- discharge port
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 239000004567 concrete Substances 0.000 title claims description 53
- 238000000034 method Methods 0.000 title claims description 10
- 238000007599 discharging Methods 0.000 claims 1
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 12
- 229910052742 iron Inorganic materials 0.000 description 6
- 239000011382 roller-compacted concrete Substances 0.000 description 5
- 238000010276 construction Methods 0.000 description 3
- 239000003721 gunpowder Substances 0.000 description 3
- 238000009434 installation Methods 0.000 description 2
- 238000000926 separation method Methods 0.000 description 2
- 238000005266 casting Methods 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 238000007429 general method Methods 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Underground Or Underwater Handling Of Building Materials (AREA)
Description
【発明の詳細な説明】
本発明は立坑式埋設水圧鉄管のコンクIJ −ト打設法
に関するものである。DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a concrete IJ-casting method for a vertical underground penstock.
例えば第1図に示すように、地山1内に設けた地下発電
所2に水圧鉄管3を配設し、この水圧鉄管3と地山1と
の間に巻立コンクリート4を打設することにより立坑式
埋設水圧鉄管としている。For example, as shown in FIG. 1, a penstock 3 is installed in an underground power station 2 installed in a ground 1, and rolled concrete 4 is placed between the penstock 3 and the ground 1. Therefore, it is a vertical underground penstock.
この場合に巻立コンクリート4は従来よりパケットやシ
ュート工法で施工されている。In this case, the rolled concrete 4 has conventionally been constructed using a packet or shoot method.
ところで、第2図aに示すようにクレーン装置5により
水圧鉄管3を吊り降して第2図すに示すように積上げ、
そして積上げた水圧鉄管3と地山1との間に第2図Cに
示すようにパケット6を介して巻立コンクリート4を打
設するというような、鉄管据付とコンクリート打設とが
成るサイクルで繰返されるような工法では、前述の打設
法で可能である。By the way, as shown in FIG. 2A, the penstocks 3 are suspended by the crane device 5 and stacked as shown in FIG.
Then, in a cycle consisting of iron pipe installation and concrete pouring, rolled concrete 4 is placed between the piled up penstock 3 and the ground 1 via a packet 6 as shown in Fig. 2C. For construction methods that are repeated, the above-mentioned pouring method can be used.
しかし第3図に示すように、鉄管支持架台7などを介し
て水圧鉄管3の全てが先に据付けられており、後でコン
クリ−1・を打設する工法の場合には次のような問題が
ある。However, as shown in Fig. 3, all of the penstocks 3 are first installed via the iron pipe support frame 7, etc., and if the construction method involves pouring concrete 1 later, the following problems arise. There is.
A パケット方式の場合には、水圧鉄管3と地山1との
クリアランスが狭い(一般に600u+以下)ため、パ
ケット容量が小さくなり、打設能力が低下する。A In the case of the packet method, the clearance between the penstock 3 and the ground 1 is narrow (generally 600u+ or less), so the packet capacity becomes small and the laying capacity decreases.
B シュート工法の場合、コンクリート打設面の上昇と
ともにコンクリ−1へ吐出口を上昇させる必要があるた
め、シュート設備全体の移動を行なうか、吐出口付近の
シュートを取り外す作業が生ずる。B In the case of the chute method, it is necessary to raise the discharge port to the concrete 1 as the concrete placement surface rises, so it is necessary to move the entire chute equipment or remove the chute near the discharge port.
本発明は、地山に形成した立坑内に予め水圧鉄管を据付
けると共に、下端にシール板を配設し、前記水圧鉄管と
地山との間にシュート管を配設し、このシュート管は上
下方向所定間隔置きにコンクリート吐出口を有すると共
に、各コンクリート吐出口は蓋体により閉塞しておき、
この状態で、前記シュート管内に所定量のコンクリート
を投入することと、露出しているコンクリート吐出口群
のうちの最下位のコンクリ−ト吐出口の蓋体を開動して
シュート管内のコンクリートを吐出すこと、とを繰り返
すことを特徴とする立坑式埋設水圧鉄管のコンクリート
打設法を提供するものであり、かかる方法によると、シ
ュート工法であることから打設能力を向上し得、さらに
打設状態に応じてコンクリート吐出口による吐出位置を
変えることによって、コンクリート打設面の上昇ごとに
設備の移動や打設位置での作業員の作業を不要にし得、
しかもコンクリートの落下距離が大きくても、密封され
たシュート管内をコンクリートが落下するので分離が少
ないことになる。In the present invention, a penstock is installed in advance in a shaft formed in the ground, a seal plate is provided at the lower end, a chute pipe is arranged between the penstock and the ground, and the chute pipe is Concrete discharge ports are provided at predetermined intervals in the vertical direction, and each concrete discharge port is closed by a lid body.
In this state, a predetermined amount of concrete is poured into the chute pipe, and the lid of the lowest concrete discharge port of the exposed concrete discharge port group is opened to discharge the concrete in the chute pipe. The present invention provides a method for placing concrete for a vertical shaft-type underground penstock, which is characterized by repeating the following steps: By changing the discharge position of the concrete discharge port according to the concrete discharge position, it is possible to eliminate the need for moving equipment or the work of workers at the concrete pouring position each time the concrete pouring surface rises.
Furthermore, even if the concrete falls over a long distance, the concrete falls within the sealed chute pipe, resulting in less separation.
以下、本発明の一実施例を第4図〜第9図に基づいて説
明する。Hereinafter, one embodiment of the present invention will be described based on FIGS. 4 to 9.
第4図において10は地山11に形成した立坑で、その
内には鉄管支持台12などを介して予め水圧鉄管13な
どが据付けられている。In FIG. 4, reference numeral 10 denotes a vertical shaft formed in the ground 11, into which a penstock 13 and the like are installed in advance via an iron pipe support 12 and the like.
前記鉄管支持架台12上にはシール板14が配設され、
以って立坑10の下端は閉塞されている。A seal plate 14 is arranged on the iron pipe support frame 12,
Therefore, the lower end of the shaft 10 is closed.
前記立坑10内で、水圧鉄管13と地山11との間には
上下方向全長に亘ってシュート管15が配設され、この
シュート管15の上端はシャッター16を介してホッパ
ー17に連通している。In the shaft 10, a chute pipe 15 is disposed between the penstock 13 and the ground 11 over the entire length in the vertical direction, and the upper end of the chute pipe 15 communicates with a hopper 17 via a shutter 16. There is.
第4図〜6図に示すように、前記シュート管15は上下
方向所定間隔置きにコンクリート吐出口18を有すると
共に、これらコンクリート吐出口18は夫々蓋体19に
より閉塞されている。As shown in FIGS. 4 to 6, the chute pipe 15 has concrete discharge ports 18 at predetermined intervals in the vertical direction, and each of these concrete discharge ports 18 is closed by a lid 19.
すなわち蓋体19の下端はヒンジ20を介してシュート
管15側に支持されており、また上端はシュート管15
側からの押え金物21により押えられている。That is, the lower end of the lid body 19 is supported on the chute tube 15 side via the hinge 20, and the upper end is supported on the chute tube 15 side.
It is held down by a presser foot 21 from the side.
前記蓋体19とシュート管15との間には、コンクリー
ト吐出口18を囲むようにバッキング22が設けられ、
また蓋体19と押え金物21との間には火薬23が設け
られる。A backing 22 is provided between the lid body 19 and the chute pipe 15 so as to surround the concrete discharge port 18,
Further, gunpowder 23 is provided between the lid body 19 and the presser foot 21.
24は点火線を示す。24 indicates an ignition line.
第4図に示すように、先ず水圧鉄管13の据付けに並行
してシュート管15を設備する。As shown in FIG. 4, first, a chute pipe 15 is installed in parallel with the installation of the penstock 13.
このとき全ての蓋体19は、第5図、第6図に示すよう
にコンクリート吐出口18を閉塞している。At this time, all the lids 19 close the concrete discharge ports 18 as shown in FIGS. 5 and 6.
かかル状態でコンクリート25は先ずホッパー17に投
入され、そして一組のシャッター16で形成されている
ロック室を通って、一塊づつ密閉状態のシュート管15
内を落下する。Concrete 25 is first put into the hopper 17 in a closed state, and then passes through a lock chamber formed by a set of shutters 16 and is transferred one block at a time to the chute tube 15 in a sealed state.
Fall inside.
そしてシュート管15には、第7図に示すように巻立コ
ンクリート量■1に相当するコンクリート量■2を投入
しておく。As shown in FIG. 7, an amount of concrete ■2 corresponding to the rolled concrete amount ■1 is charged into the chute pipe 15.
このようにシュート管15内に所定量のコンクリート2
5を投入した後、露出している蓋体(すなわちコンクリ
ート吐出口)群のうち最下位の蓋体19を押えている押
え金物21を、火薬23を利用して破壊する。In this way, a predetermined amount of concrete 2 is placed inside the chute pipe 15.
5, the presser foot 21 holding down the lowest lid 19 of the exposed lids (i.e., concrete discharge ports) group is destroyed using gunpowder 23.
この火薬23の点火は、点火線24を上部投入部付近ま
で配線しておき、そこから行なうものとする。The gunpowder 23 is ignited from an ignition line 24 that is routed up to the vicinity of the upper charging section.
押え金物21が破壊されれば、蓋体19はシュート管1
5内部のコンクリート25の圧力で開かれ、コンクリー
ト25が排出される。If the presser foot 21 is destroyed, the lid body 19 will be removed from the chute tube 1.
5 is opened by the pressure of the concrete 25 inside, and the concrete 25 is discharged.
これにより第8図に示すように、コンクリート25が水
圧鉄管13の外面に流出して打設される。As a result, as shown in FIG. 8, the concrete 25 flows out onto the outer surface of the penstock 13 and is poured.
次いで、シュート管15内の所定のコンクリート25が
流出し、開放したコンクリート吐出口18がコンクリー
ト25中に埋設したかどうかを超音波利用の打設高計測
器26にて判定する。Next, a predetermined amount of concrete 25 in the chute pipe 15 has flowed out, and it is determined whether or not the opened concrete discharge port 18 is buried in the concrete 25 using a placement height measuring device 26 using ultrasonic waves.
そして第9図に示すように、前サイクルと同様に、巻立
コンクリート量■1に相当するコンクリート■2をシュ
ート管15内に投入する。Then, as shown in FIG. 9, similarly to the previous cycle, concrete ■2 corresponding to the rolled concrete amount ■1 is poured into the chute pipe 15.
このとき、前サイクルで開放されたコンクリート吐出口
18はコンクリート25中にあるので、シュート管15
は密閉状態にある。At this time, since the concrete discharge port 18 opened in the previous cycle is in the concrete 25, the chute pipe 15
is in a sealed state.
その後に下から二段目のコンクリート吐出口18を開放
し、コンクリート25を打設する。After that, the concrete discharge port 18 in the second stage from the bottom is opened, and concrete 25 is poured.
上述した本発明方法によると、シュート工法であること
から打設能力を向上できる。According to the above-mentioned method of the present invention, since it is a chute method, the placing ability can be improved.
さらに打設状態に応じてコンクリート吐出口による吐出
位置を変え得ることから、コンクリート打設面の上昇ご
とに設備の移動や打設位置での作業員の作業を不要にで
きる。Furthermore, since the discharge position of the concrete discharge port can be changed depending on the pouring condition, it is not necessary to move the equipment each time the concrete pouring surface is raised or to perform work by a worker at the pouring position.
しかもコンクリートの落下距離が大きくても、密封され
たシュート管内をコンクリートが落下するので分離が少
ないことになる。Furthermore, even if the concrete falls over a long distance, the concrete falls within the sealed chute pipe, resulting in less separation.
第1図はコンクリート打設後を示す縦断正面図、第2図
a−cは一般的な鉄管据付工法を示す縦断正面図、第3
図は鉄管を先に据付ける工法を示す縦断正面図、第4図
〜第9図は本発明の一実施例を示し、第4図はコンクリ
ート打設前における縦断正面図、第5図は要部の正面図
、第6図は同縦断側面図、第7図〜第9図は作業状態を
示す縦断正面図である。
10・・・・・・立坑、11・・・・・・地山、13・
・・・・・水圧鉄管、14・・・・・・シール板、15
・・・・・・シュート管、11・・・・・・ホッパー、
18・・・・・・コンクリート吐出口、19・・・・・
・蓋体、25・・・・・・コンクリート。Figure 1 is a longitudinal front view showing the state after concrete pouring, Figures 2 a-c are longitudinal front views showing the general method of installing iron pipes, and Figure 3
The figure is a vertical front view showing a construction method in which iron pipes are installed first, Figures 4 to 9 show an embodiment of the present invention, Figure 4 is a vertical front view before concrete placement, and Figure 5 is a main view. FIG. 6 is a longitudinal sectional side view of the unit, and FIGS. 7 to 9 are longitudinal sectional front views showing working conditions. 10... vertical shaft, 11... ground, 13.
... Penstock, 14 ... Seal plate, 15
... Chute tube, 11 ... Hopper,
18... Concrete discharge port, 19...
- Lid body, 25... concrete.
Claims (1)
と共に、下端にシール板を配設し、前記水圧鉄管と地山
との間にシュート管を配設し、このシュート管は上下方
向所定間隔置きにコンクリート吐出を有すると共に、各
コンクリート吐出口は蓋体により閉塞しておき、この状
態で、前記シュート管に所定量のコンクリートを投入す
ることと、露出しているコンクリート吐出口群のうちの
最下位のコンクリート吐出口の蓋体を開動してシュート
管内のコンクリートを吐出すこと、とを繰り返すことを
特徴とする立坑式埋設水圧鉄管のコンクリート打設法。1. A penstock is installed in advance in a shaft formed in the ground, a seal plate is provided at the lower end, and a chute pipe is arranged between the penstock and the ground, and this chute pipe is vertically Concrete is discharged at predetermined intervals, and each concrete discharge port is closed with a lid, and in this state, a predetermined amount of concrete is poured into the chute pipe, and the exposed concrete discharge port group is A method for placing concrete in a vertical underground penstock, which is characterized by repeatedly opening the lid of the lowest concrete outlet and discharging concrete from the chute pipe.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP56190429A JPS5945072B2 (en) | 1981-11-26 | 1981-11-26 | Concrete placement method for vertical underground penstock |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP56190429A JPS5945072B2 (en) | 1981-11-26 | 1981-11-26 | Concrete placement method for vertical underground penstock |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS5891293A JPS5891293A (en) | 1983-05-31 |
| JPS5945072B2 true JPS5945072B2 (en) | 1984-11-02 |
Family
ID=16257975
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP56190429A Expired JPS5945072B2 (en) | 1981-11-26 | 1981-11-26 | Concrete placement method for vertical underground penstock |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS5945072B2 (en) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS62153489A (en) * | 1985-12-24 | 1987-07-08 | 株式会社竹中工務店 | Construction of underground vertical cylindrical structure |
| JPS62153488A (en) * | 1985-12-24 | 1987-07-08 | 株式会社竹中工務店 | Construction of underground vertical cylindrical structure |
| US4833360A (en) * | 1987-05-15 | 1989-05-23 | Board Of Regents The University Of Texas System | Sonar system using acoustically transparent continuous aperture transducers for multiple beam beamformation |
| CN105648992B (en) * | 2016-01-19 | 2017-08-25 | 中国水利水电第五工程局有限公司 | A kind of vertical shaft upper curved section concrete construction method |
-
1981
- 1981-11-26 JP JP56190429A patent/JPS5945072B2/en not_active Expired
Also Published As
| Publication number | Publication date |
|---|---|
| JPS5891293A (en) | 1983-05-31 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104929143B (en) | A kind of bottom of foundation ditch dewatering well shut-in well method | |
| JPS5945072B2 (en) | Concrete placement method for vertical underground penstock | |
| FR2695148A1 (en) | Method and device in the context of the mechanized laying of underground electrical conduits or any other pipe of equivalent flexibility including mechanical protection by mortar or sand for example. | |
| CN214423335U (en) | Combined rammer with adjustable ramming energy level | |
| CN214614483U (en) | Pipe trench well lid and town road integral structure | |
| CN210947416U (en) | A kind of steel pipe column soil layer pre-buried bottom support device | |
| CN108818895A (en) | The clout processing unit and its processing method of fine concrete | |
| CN204060584U (en) | A kind of tool-type gravity slurry mud separator | |
| JP2018076650A (en) | Pile head processing method | |
| CN209654048U (en) | A pre-embedded structure of shield tunnel door in drainage tunnel | |
| US2272236A (en) | Method of and apparatus for building sea walls | |
| JP2662119B2 (en) | Installation method of underground tank storage device | |
| JP2632840B2 (en) | New Math Caisson | |
| CN114892640B (en) | A detection device for an underground diaphragm wall guide wall that doubles as a connecting wall at the top of a foundation pit | |
| CN220486766U (en) | Prefabricated apron of basement outer wall subsides post-cast strip | |
| JPH07104336B2 (en) | Ground model loading test device | |
| JPH06331125A (en) | Clinker hopper for coal burning furnace and opening method thereof | |
| JP3230113B2 (en) | Method and apparatus for supplying mud solidified slurry into excavation trench | |
| CN220364997U (en) | A kind of cast-in-place pile super-grouted concrete collection hopper | |
| JP6773065B2 (en) | How to disassemble the burner | |
| SU806817A1 (en) | Device for levelling-out a structure | |
| JPS55119812A (en) | Filling method of precast embankment | |
| CN109252545A (en) | The construction method of concrete structure staple shaft | |
| JPS6141686Y2 (en) | ||
| JPH07259054A (en) | Method for constructing water intake facility in existing dam |