JPS5949968B2 - Sand pile construction method - Google Patents
Sand pile construction methodInfo
- Publication number
- JPS5949968B2 JPS5949968B2 JP3954377A JP3954377A JPS5949968B2 JP S5949968 B2 JPS5949968 B2 JP S5949968B2 JP 3954377 A JP3954377 A JP 3954377A JP 3954377 A JP3954377 A JP 3954377A JP S5949968 B2 JPS5949968 B2 JP S5949968B2
- Authority
- JP
- Japan
- Prior art keywords
- sand
- hollow pipe
- hydrated
- hollow tube
- hollow
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Description
【発明の詳細な説明】
本発明は軟弱地盤中に多数の砂杭を造成する軟弱地盤の
改良工事に用いられる砂杭造成工法に関するものである
。DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a sand pile construction method used in soft ground improvement work, which involves constructing a large number of sand piles in soft ground.
軟弱地盤中に砂杭、特に砂杭造成用の中空管の径より径
が拡大した砂杭を造成するには、従来、砂杭造成用の中
空管を軟弱地盤の所定の深さに貫入し、ついでこの中空
管内に砂を供給して中空管を適当長引抜き前下方に生ず
る空隙部に管内の砂[を排出し、ついで中空管を再貫入
して上記の排出した砂を締固めすると共に周囲地盤中に
膨大させる操作サイクルを順次上方に繰返えす工法いわ
ゆるコンポーザー工法が多く用いられているほか、軟弱
地盤の所定の深さに貫入した中空管内に砂を供給して中
空管を上方に引抜き、中空管に設けた装置による振動体
、スクリュー、上下作動押出し機構等によって管下端よ
り管内の砂を軟弱地盤中に強制排出、押出し、締固め等
する工法も行なわれている。In order to construct sand piles in soft ground, especially sand piles whose diameter is larger than the diameter of the hollow pipe for sand pile construction, conventionally, the hollow pipe for sand pile construction is placed at a predetermined depth in the soft ground. Then, sand is supplied into the hollow tube, and before the hollow tube is pulled out for an appropriate length, the sand inside the tube is discharged into the gap created below, and then the hollow tube is re-penetrated and the discharged sand is removed. In addition to the so-called composer method, which is a construction method in which the operation cycle of compacting and enlarging the surrounding ground is repeated in sequence upwards, sand is often used to fill soft soil with sand into a hollow pipe penetrated to a predetermined depth. Another method is to pull the hollow pipe upwards and forcibly discharge, extrude, and compact the sand inside the pipe from the lower end of the pipe into the soft ground using a vibrating body, a screw, a vertically moving extrusion mechanism, etc. using a device installed in the hollow pipe. ing.
上記した従来工法の砂杭造成の中空管の引抜き工程にお
いては、砂杭造成に駆動エネルギーを相当多(要するも
のであり、中空管の径より径の相当太き(拡大した砂杭
の造成1.軟弱地盤の相当深い所からの砂杭の造成及び
径の特に大きい中空管による砂杭の造成には駆動エネル
ギーを特に多く要するものである。In the process of drawing out the hollow pipe for sand pile creation using the conventional method described above, a considerable amount of driving energy is required to create the sand pile, and the diameter is considerably thicker than the diameter of the hollow pipe (the diameter of the enlarged sand pile). Creation 1. Creation of sand piles from considerable depths in soft ground and construction of sand piles using hollow pipes with a particularly large diameter require a particularly large amount of driving energy.
又、中空管下端面する砂については、管下端よりの排出
をスムーズにするためできるだけ含水のす(ない砂を用
いるよう配慮されて来た。Furthermore, with regard to the sand facing the bottom end of the hollow tube, consideration has been given to using sand that does not contain water as much as possible in order to ensure smooth discharge from the bottom end of the tube.
本発明は上記した従来の砂杭、特に中空管の径より径の
拡大した砂杭の造成工法における中空管の駆動エネルギ
ーを節約でき、又砂にドライの砂を使用するために要す
る経費等の不利を除き得る新らしい技術的発想に基(砂
杭造成工法を提供するものである。The present invention can save the driving energy of the hollow pipe in the construction method of the above-mentioned conventional sand pile, especially the sand pile whose diameter is larger than the diameter of the hollow pipe, and the cost required for using dry sand for the sand. This project provides a sand pile construction method based on a new technical idea that can eliminate the disadvantages of sand pile construction.
すなわち、本発明の砂杭造成工法は、第2図の説明図に
例示するように、軟弱地盤2の所定の深さに貫入した砂
杭造成用の中空管1を上方に引抜きする工程において、
中空管1内に供給の飽和附近の含水比とした加水砂3を
中空管1内において振動等によって流動状態に保持する
と共に、中空管1の引抜き中、中空管」内の加水砂3の
中空管1下端面における圧力を中空管1下端における軟
弱地盤2の受働土圧より大きくなるよう制御し、中空管
1内の加水砂3を中空管1下端より軟弱地盤2中に排出
せしめて中空管1径より径が拡大した砂杭3を造成する
ことを特徴とするものである。That is, the sand pile construction method of the present invention, as illustrated in the explanatory diagram of FIG. ,
Hydrated sand 3 with a water content near saturation is maintained in the hollow tube 1 in a fluid state by vibration, etc., and water is added inside the hollow tube while the hollow tube 1 is being pulled out. The pressure of the sand 3 at the lower end of the hollow tube 1 is controlled to be greater than the passive earth pressure of the soft ground 2 at the lower end of the hollow tube 1, and the hydrated sand 3 in the hollow tube 1 is applied to the soft ground from the lower end of the hollow tube 1. This method is characterized in that a sand pile 3 whose diameter is larger than the diameter of the hollow pipe 1 is created by discharging it into the sand pipe 2.
なお第2図において、砂杭造成用の中空管1は1実施例
を示したもので、4は中空管1の頂部に装着した振動式
杭打機、5は中空管1の上部に設けたホッパーである。In addition, in FIG. 2, the hollow pipe 1 for sand pile construction shows one embodiment, 4 is a vibrating pile driver attached to the top of the hollow pipe 1, and 5 is the top of the hollow pipe 1. This is a hopper installed in
以下更に本発明について詳記する。The present invention will be further described in detail below.
本発明の発明者による実験研究によれば、飽和附近の含
水比とした加水砂3は振動等によって流動状態となり、
中空管1内においてこのようにして流動状態に保持され
た加水砂3は恰も流体のように挙動する。According to experimental research by the inventor of the present invention, hydrated sand 3 with a water content near saturation becomes fluid due to vibration, etc.
The hydrated sand 3 thus maintained in a fluid state within the hollow tube 1 behaves like a fluid.
この性質を利用して、軟弱地盤2の所定の深さに貫入し
た中空管1を上方に引抜きする工程において、中空管1
内に供給の加水砂3の中空管1下端面における圧力を中
空管1下端における軟弱地盤2の受動土圧より太き(な
るよう制御して、中空管1内の加水砂3を中空管1下端
より軟弱地盤2中に排出せしめることが本発明の基本で
ある。Utilizing this property, in the process of pulling out the hollow tube 1 that has penetrated the soft ground 2 to a predetermined depth, the hollow tube 1
The pressure of the hydrated sand 3 at the lower end of the hollow tube 1 is controlled to be greater than the passive earth pressure of the soft ground 2 at the lower end of the hollow tube 1. The basis of the present invention is to discharge water from the lower end of the hollow pipe 1 into the soft ground 2.
つぎに先ず、中空管1下端面における管内の加水砂3の
圧力すなわち内圧と中空管1下端における軟弱地盤2の
圧力すなわち外圧との釣り合いについて述べる。Next, first, a description will be given of the balance between the pressure of the hydrated sand 3 in the tube at the lower end surface of the hollow tube 1, that is, the internal pressure, and the pressure of the soft ground 2 at the lower end of the hollow tube 1, that is, the external pressure.
第1図は、中空管1下端における土圧に相当する管内砂
3(流動状態に保持した飽和附近の含水比とした加水砂
)の砂長日を中空管1下端の深度2に対して表わしたも
ので、土圧が深度2に比例している場合の粘性土地盤で
の1例を示している。Figure 1 shows the sand length of sand 3 in the pipe (hydrated sand with a water content near saturation maintained in a fluid state) corresponding to the earth pressure at the bottom end of the hollow pipe 1, with respect to the depth 2 at the bottom end of the hollow pipe 1. This is an example of a case where the earth pressure is proportional to depth 2 in a cohesive ground.
今、深度2゜においては、本来静止土圧に相当する管内
砂長H8すなわち(HO120)点で内、外圧は釣り合
っている。Now, at a depth of 2 degrees, the internal and external pressures are balanced at the pipe sand length H8, that is, (HO120) point, which originally corresponds to static earth pressure.
又、管内にこれ以上の砂長分があって土圧を越えて管内
の砂(加水砂)が管下端から排出されることとなる管内
砂長はH2であり、図では(H2、Zo)点で示され、
このときの土圧は受働土圧と呼ばれる。In addition, if there is more sand in the pipe than this, the sand in the pipe exceeds the earth pressure and the sand (hydrated sand) in the pipe is discharged from the lower end of the pipe.The sand length in the pipe is H2, and in the figure (H2, Zo). indicated by a dot,
The earth pressure at this time is called passive earth pressure.
又、逆に管内に上記した砂長H8以下の砂長分であって
土圧を下まわって土壌の管内への逆流が起る管内砂長は
Hlであり、図では(Hl、Zo)点で示され、このと
きの土圧は主働土圧と呼ばれる。In addition, conversely, the sand length within the pipe that is less than the sand length H8 described above and which is below the earth pressure and causes the soil to flow back into the pipe is Hl, and in the figure, it is the point (Hl, Zo). The earth pressure at this time is called the active earth pressure.
なお図において■は静止土圧直線、■は受働土圧直線、
■は主働土圧直線である。In the figure, ■ is the static earth pressure line, ■ is the passive earth pressure line,
■ is the active earth pressure straight line.
上記の関係を釣り合い式で表わすと、ランキン土圧によ
れば、つぎの関係が成立する。When the above relationship is expressed as a balanced equation, the following relationship holds true according to Rankine earth pressure.
H−1”s=Z −rc !rJ:2C(L−1)ここ
に、Z−rc+2C:受働土圧、z、rc−2C:主働
土圧、C:地盤強度、H:管内砂長、2:管下端の深度
、rc:粘性土の比重量、rs:加水砂の比重量である
。H-1"s=Z-rc !rJ:2C(L-1) where, Z-rc+2C: passive earth pressure, z, rc-2C: active earth pressure, C: ground strength, H: sand length in pipe, 2: depth of the lower end of the pipe, rc: specific weight of clayey soil, rs: specific weight of hydrated sand.
しかして、地盤強度Cは; 一般の沖積粘土では深度Z
に比例するから、比例定数なαとしてC−α2と表わす
ことができ、上記した釣り合い式(1−1)はつぎのよ
うに表わすことができる。Therefore, the ground strength C is; In general alluvial clay, the depth Z
Since it is proportional to , it can be expressed as C-α2 with α being a proportionality constant, and the above balance equation (1-1) can be expressed as follows.
H−rs =Z (7”c±2α)(1−2)・ 本
発明は、上記の式(l−2)の釣り合い式を基本として
これを砂杭造成に適用するものである3すなわち第2図
に例示するように、軟弱地盤2の所定の深さZdに貫入
され加水砂3が供給された下端開放の中空管1(図a参
照)を振動式杭打機4を作動させて上方に引抜く、この
中空管1の引抜きに従って中空管1の上部のホッパー5
から中空管1内に加水砂3を順次供給し、この加水砂3
を振動式杭打機4等による振動によって中空管1内にお
いて流動状態に保持する一方、引抜き中の中空管1の下
端の各深度Zにおいて、管内の加水砂3の中空管1下端
面における圧力が、中空管1下端における軟弱地盤2の
受働土圧より大きくなるよう制御する(図す、c参照)
。H-rs = Z (7"c±2α) (1-2) The present invention is based on the above balanced equation (l-2) and applies it to sand pile construction. As illustrated in Fig. 2, a vibrating pile driver 4 is operated to drive a hollow pipe 1 with an open bottom end (see Fig. a) penetrated to a predetermined depth Zd in soft ground 2 and supplied with hydrated sand 3. As the hollow tube 1 is pulled upward, the hopper 5 at the top of the hollow tube 1
The hydrated sand 3 is sequentially supplied into the hollow tube 1 from
is maintained in a fluid state in the hollow tube 1 by vibrations by a vibrating pile driver 4, etc., while at each depth Z of the lower end of the hollow tube 1 being pulled out, the hydrated sand 3 in the tube is placed under the hollow tube 1. The pressure at the end face is controlled to be greater than the passive earth pressure of the soft ground 2 at the lower end of the hollow pipe 1 (see Figure c).
.
しかして、この制御は、釣り合い式(1−2)において
、rs、rc1αは一応定数とされるから深度2に応じ
て中空管1内に順次供給する加水砂3の砂長Hを制御す
ることによって可能であり、かくして中空管1の径より
径が拡大した砂杭3′が地表まで造成される(図d参照
)。Therefore, in the balance equation (1-2), rs and rc1α are assumed to be constants, so this control controls the sand length H of the hydrated sand 3 that is sequentially supplied into the hollow tube 1 according to the depth 2. In this way, a sand pile 3' whose diameter is larger than that of the hollow pipe 1 is constructed up to the ground surface (see Figure d).
つぎに、本発明の工法に用いる中空管について述べると
、第2図に示す1実施例では、中空管1の頂部には振動
式杭打機4が装着されており、この振動式杭打機4の作
動によって、中空管1の軟弱地盤中への貫入が行なわれ
ると共に中空管1の引抜きにおいて中空管1内に供給さ
れた加水砂3が振動を受けて流動状態に保持される。Next, regarding the hollow pipe used in the construction method of the present invention, in one embodiment shown in FIG. 2, a vibratory pile driver 4 is attached to the top of the hollow pipe 1, As the punching machine 4 operates, the hollow tube 1 penetrates into the soft ground, and when the hollow tube 1 is pulled out, the hydrated sand 3 supplied into the hollow tube 1 is vibrated and kept in a fluid state. be done.
しかし、中空管10貫入は、上記の振動式杭打機4に限
られるものでな(、他の適当な杭打機を用いることは自
由であり、又中空管1の引抜きにおいて、中空管1内の
加水砂3を良好な流動状態に保持するには、振動杭打機
4とは別に振動機構又は振動機を管に装着することも考
慮される。However, the penetration of the hollow pipe 10 is not limited to the above-mentioned vibrating pile driver 4 (you are free to use any other suitable pile driver, In order to maintain the hydrated sand 3 in the empty tube 1 in a good fluid state, it is also considered to attach a vibrating mechanism or a vibrator to the tube separately from the vibrating pile driver 4.
又、管内の加水砂3を流動状態に保持するには振動以外
の方法も可能と考えられる。Furthermore, methods other than vibration may be possible to maintain the hydrated sand 3 in the pipe in a fluid state.
つぎに加水砂3の管内への供給には、第2図のホンパー
5に代って加水砂3の圧送パイプ等も考慮される。Next, for supplying the water-added sand 3 into the pipe, a pressure-feeding pipe for the water-added sand 3 may be used in place of the pumper 5 shown in FIG. 2.
つぎに、中空管1の下端は、本発明の工法の特徴として
、第2図に示すように、最も簡単な切り放しとした開放
端とすることが出来るものであり、又この中空管1を軟
弱地盤2の所定の深さに貫入するのに、第3図図aに示
すように、本発明の特許出願人が昭和52年3月25日
に特許出願した砂杭造成工法である中空管の貫入中、中
空管1内の加水砂3の中空管1下端面における圧力を中
空管1下端における軟弱地盤2の土圧と釣り合う状態に
制御し、土壌が中空管1下端より管内に逆流するのを阻
止する工法を用いることが可能であると共に、この工法
を用いると中空管1の軟弱地盤2の所定の深さに貫入し
た状態は、第2図の図aの状態となるので極めて便利で
ある。Next, as a feature of the construction method of the present invention, the lower end of the hollow tube 1 can be made into the simplest cut-off open end, as shown in FIG. In order to penetrate the soft ground 2 to a predetermined depth, as shown in Fig. 3 a, the method for constructing sand piles was applied for a patent on March 25, 1976 by the applicant for the patent of the present invention. During the penetration of the hollow tube, the pressure of the hydrated sand 3 in the hollow tube 1 at the lower end surface of the hollow tube 1 is controlled to be in balance with the earth pressure of the soft ground 2 at the lower end of the hollow tube 1, so that the soil It is possible to use a construction method that prevents the flow from flowing backward into the pipe from the lower end, and when this construction method is used, the state in which the hollow pipe 1 penetrates the soft ground 2 to a predetermined depth is as shown in Figure 2 (a). This is extremely convenient.
なお本発明の中空管を上方に引抜(砂杭造成の工程に先
立つ貫入工程には、貫入後に管内に加水砂を供給する場
合は、管内への土壌の逆流を防止する必要があり;中空
管下端に離脱可能な密閉栓を設けるとか、中空管下端に
近い管内に細径部7を設けて砂のアーチアクションによ
る砂枠8を形成するとか(第3図図す参照)、中空管−
ト端に開閉沓又は開閉蓋を設ける等の手段が用いられる
。In addition, when the hollow pipe of the present invention is pulled upward (in the penetration process prior to the sand pile construction process, if hydrated sand is supplied into the pipe after penetration, it is necessary to prevent soil from flowing back into the pipe; A removable sealing plug may be provided at the lower end of the hollow tube, or a narrow diameter portion 7 may be provided within the tube near the lower end of the hollow tube to form a sand frame 8 by arch action of the sand (see Figure 3). Empty tube-
Means such as providing an opening/closing shoe or opening/closing lid at the top end is used.
以下更に本発明における中空管1の引抜き中、中空管1
内の加水砂3の中空管1の下端面における圧力を、中空
管1下端における軟弱地盤2の受動土圧より大きい状態
に制御することについて述べる。Further, during the drawing of the hollow tube 1 in the present invention, the hollow tube 1
Controlling the pressure at the lower end surface of the hollow tube 1 of the hydrated sand 3 to be greater than the passive earth pressure of the soft ground 2 at the lower end of the hollow tube 1 will be described.
すなわち、前記した制御は、H: 7’s=Z (rc
±2α)なる釣り合い式0式%)
態となるよう制御するものであるが、第4図に略示する
ように中空管内に圧縮空気を送入6し、この圧縮空気に
よる空気圧Pによって中空管下端面における加水砂3の
圧力を補助することができる。That is, the above control is H: 7's=Z (rc
The system is controlled so that the balanced equation 0 (%) is given by ±2α). As shown schematically in Figure 4, compressed air is fed into the hollow tube, and the air pressure P caused by this compressed air causes The pressure of the hydrated sand 3 on the lower end surface of the tube can be assisted.
この空気圧Pを用いる制御状態は以下の式で表わせる。The control state using this air pressure P can be expressed by the following equation.
H7’s+P > Z (rc+2α) (2−1
)従って管内に供給する加水砂3の砂量Hと、空気圧P
とを制御して、内、外圧の状態を上式の如く保持するこ
ととなる。H7's+P > Z (rc+2α) (2-1
) Therefore, the sand amount H of the hydrated sand 3 supplied into the pipe and the air pressure P
The internal and external pressure conditions are maintained as shown in the above equation.
しかして空気圧Pの制御は迅速かつ極めて容易であるの
で、本発明の実施においては、前記した加水砂3の砂量
Hのみによる場合に比し、空気圧Pでこれを補助する制
御の方がより容易確実となる。However, since the control of the air pressure P is quick and extremely easy, in the implementation of the present invention, it is better to use the air pressure P to assist in controlling this, compared to the case where the sand amount H of the water-added sand 3 is used alone. Easy and reliable.
更に以下に、本発明の実施において、中空管の引抜き中
、造成される砂杭の径を制御する方法として、中空管内
に追加供給する加水砂流量qと、□ 中空管の引抜き速
度Vとを制御する実施方法について述べる。Furthermore, in the implementation of the present invention, as a method of controlling the diameter of the sand pile created during drawing of the hollow tube, the flow rate q of hydrated sand additionally supplied into the hollow tube, and the drawing speed V of the hollow tube will be described below. This section describes an implementation method for controlling the
第5図は、本発明の工法の中空管の引抜き中の一部を略
示するもので、短時間△tKA→Bの引抜きがあり、こ
の間に△Vなる供給加水砂量が投入され、管内砂量はH
−4H1に変化するここでの釣り合い式は、A、Hにお
いて、
H−rs=Z (1”c+2ct ) (3−
1)H7−rs= (Z −ΔZ ) (rc+2α)
(3−i )となる。FIG. 5 schematically shows a part of the hollow tube being pulled out using the method of the present invention, in which there is a short period of pulling out of △tKA→B, during which time an amount of supplied hydrated sand of △V is added, The amount of sand in the pipe is H
The balance equation here that changes to -4H1 is, at A and H, H-rs=Z (1"c+2ct) (3-
1) H7-rs= (Z-ΔZ) (rc+2α)
(3-i).
又、短時間△l中に、管下端より排出された全体量は、
造成された砂杭量に等しいので、排出砂杭の断面積をA
s、管断面積をAPとすると、
△z−A8二(H−Hl)・AP十△v (3−2)と
なる。Also, the total amount discharged from the lower end of the tube during the short time △l is:
Since it is equal to the amount of sand pile created, the cross-sectional area of the discharged sand pile is A.
s and the cross-sectional area of the pipe is AP, then △z-A82(H-Hl)·AP10△v (3-2).
この式に式(:1l()、(3−1)’よりのHo、H
の値を代入してA8を算出すると、(rc+2α)
ムV
A8−−−=ね ・Ap+スフ−となる。In this formula, Ho, H from the formula (:1l(), (3-1)')
When A8 is calculated by substituting the value of (rc+2α)
M V A8---=ne ・Ap+Sufu-.
△V △2
今、 q=−1、■ニー であるから、上△t
△を
式を書き直すとつぎの式を得る。△V △2 Now, q=-1, ■knee, so upper △t
Rewriting the formula for △ yields the following formula.
この式(3−3)より明らかなように、供給投入の加水
砂流量qと引抜き速度Vとを適当に制御すi ることに
よって、中空管の引抜き中、加水砂の排出によって造成
される砂杭の径を所望の径に制御することができる。As is clear from this equation (3-3), by appropriately controlling the hydrated sand flow rate q and the drawing speed V, the hydrated sand can be created by discharging the hydrated sand during drawing of the hollow tube. The diameter of the sand pile can be controlled to a desired diameter.
しかして、上記の中空管の引抜き中における加水砂流量
qと中空管の引抜き速度Vの制御の実施において、中空
管の引抜き速度)■のコントロールには従来公知の手段
があり、又加水砂流量qすなわち、加水砂の中空管内へ
の供給量のコントロールも圧送パイプ等による供給によ
って実施し得る所である。Therefore, in carrying out the control of the hydrated sand flow rate q and the hollow tube drawing speed V during the hollow tube drawing described above, there are conventionally known means for controlling the hollow tube drawing speed). The flow rate q of hydrated sand, that is, the amount of hydrated sand supplied into the hollow tube can also be controlled by supplying the hydrated sand through a pressure pipe or the like.
つぎに、本発明において前記したように加水砂を飽和附
近の含水比とする点について説明すると、実験研究によ
れば、飽和の含水比を100係とすれば95係程度の含
水比としても振動等によってこれを流動状態とすること
は可能であり、又飽和以上の含水比とすれば含水比の犬
となる程流動状態とすることは容易となる。Next, to explain the point of setting the water content ratio of the hydrated sand near saturation as described above in the present invention, according to experimental research, if the water content ratio at saturation is 100 parts, even if the water content ratio is about 95 parts, vibrations will occur. It is possible to make this into a fluid state by such methods, and if the water content ratio is set to be higher than saturation, the higher the water content ratio, the easier it is to make it into a fluid state.
しかし管内の加水砂は砂杭の造成工程においては砂杭造
成として用いられるので、加水砂の含水比を特に大きく
することは砂杭造成に不都合が生ずるから、加水砂の含
水比は流動状態となし得るに足る程度すなわち飽和附近
の含水比としたものである。However, since the hydrated sand in the pipe is used as sand pile construction in the sand pile construction process, increasing the water content ratio of the hydrated sand in particular will cause problems in sand pile construction, so the water content ratio of the hydrated sand should be adjusted to match the fluid state. The water content ratio is set to a sufficient level that can be achieved, that is, close to saturation.
上述したように、本発明の砂杭造成工法は、比較的単純
な構造の中空管を用いて、軟弱地盤中に、中空管径より
径の拡大した砂杭を、従来の工法に比べて、よりすくな
いエネルギーによって、造成することができる利点があ
る。As mentioned above, the sand pile construction method of the present invention uses hollow pipes with a relatively simple structure to construct sand piles with a diameter larger than the hollow pipe diameter in soft ground compared to conventional construction methods. It has the advantage of being able to be constructed with less energy.
更に本発明の砂杭造成工法は、施工時間を節約できるこ
と、使用する砂に特に経費が嵩まないこと、砂杭の径を
容易に制御し得ること等極めてすぐれた利点を有するも
のである。Furthermore, the sand pile construction method of the present invention has extremely excellent advantages such as being able to save construction time, not requiring any particular cost for the sand used, and being able to easily control the diameter of the sand pile.
添附の図面は、本発明の工法の態様を実施例により説明
するもので、第1図は中空管下端における軟弱地盤の土
圧に相当する管内の加水砂の砂量を、中空管下端の深度
に対して表わしたグラフ図、第2図は本発明の工法にお
ける中空管の引抜き工程を順次的に例示した説明図、第
3図は中空管を軟弱地盤の所定の深さに貫入する工程の
実施例の説明図、第4図は、中空管の上部に圧縮空気を
送入して空気圧によって中空管内の加水砂の圧力を補助
する実施例の説明略図、第5図は、中空管内に追加供給
する加水砂流量と中空管の引抜き速度の制御によって中
空管下端より排出された砂によって造成される砂杭の径
との関係を説明する説明略図である。
1・・・中空管、2・・・軟弱地盤、3・・・加水砂、
31・・・砂杭、4・・・振動式杭打機、5・・・ホッ
パー、6・・・圧縮空気の送入、7・・・細径部、8・
・・砂枠、2・・・中空管下端の深度、H・・・中空管
内の加水砂の砂量、P・・・空気圧。The attached drawings are for explaining aspects of the construction method of the present invention using examples. Figure 1 shows the amount of hydrated sand in the pipe corresponding to the earth pressure of the soft ground at the bottom end of the hollow pipe. Figure 2 is an explanatory diagram illustrating the process of pulling out hollow pipes in sequence in the construction method of the present invention, and Figure 3 is a graph showing the process of pulling out hollow pipes at a predetermined depth in soft ground. Fig. 4 is an explanatory diagram of an embodiment of the penetrating step, and Fig. 4 is a schematic illustration of an embodiment in which compressed air is fed into the upper part of the hollow tube to assist the pressure of the hydrated sand in the hollow pipe with air pressure. , is an explanatory diagram illustrating the relationship between the flow rate of hydrated sand additionally supplied into the hollow tube and the diameter of the sand pile created by the sand discharged from the lower end of the hollow tube by controlling the drawing speed of the hollow tube. 1...Hollow tube, 2...Soft ground, 3...Hydrated sand,
31... Sand pile, 4... Vibratory pile driver, 5... Hopper, 6... Compressed air supply, 7... Small diameter part, 8...
...Sand frame, 2...Depth of the lower end of the hollow tube, H...Amount of hydrated sand in the hollow tube, P...Pneumatic pressure.
Claims (1)
管を上方に引抜きする工程において、中空管内に供給の
飽和附近の含水比とした加水砂を中空管内において振動
等によって流動状態に保持すると共に、中空管の引抜き
中、中空管内の加水砂の中空管下端面における圧力を中
空管下端における軟弱地盤の受働土圧上り太き(なるよ
う制御し、中空管内の加水砂を中空管下端より軟弱地盤
中に排出せしめて中空管径より径が拡大した砂杭を造成
することを特徴とする砂杭造成工法。 2 中空管の上部から中空管内に圧縮空気を送入し、こ
の圧縮空気による空気圧によって中空管下端面における
加水砂の圧力を補助することを特徴とする特許請求の範
囲IVc記載の砂杭造成工法。 3 中空管内に中空管の上方に引抜き中に追加供給され
る飽和附近の含水比とした加水砂の供給流量と中空管の
引抜き速度とを制御することによって、造成される砂杭
の径を制御することを特徴とする特許請求の範囲1に記
載の砂杭造成工法。[Scope of Claims] 1. In the process of pulling upward a hollow pipe for constructing sand piles that has penetrated to a predetermined depth in soft ground, hydrated sand with a moisture content near the saturation level of the supply is placed inside the hollow pipe. At the same time, while the hollow tube is being pulled out, the pressure of the hydrated sand on the lower end surface of the hollow tube is controlled so that the passive earth pressure of the soft ground at the lower end of the hollow tube increases. A sand pile construction method characterized in that the hydrated sand inside the hollow pipe is discharged into the soft ground from the lower end of the hollow pipe to create a sand pile whose diameter is larger than the diameter of the hollow pipe. 2. From the top of the hollow pipe. A sand pile construction method according to claim IVc, characterized in that compressed air is introduced into the hollow pipe, and the pressure of the hydrated sand on the lower end surface of the hollow pipe is assisted by the air pressure of the compressed air. 3. Inside the hollow pipe. The diameter of the sand pile to be created is controlled by controlling the supply flow rate of hydrated sand with a water content near saturation, which is additionally supplied above the hollow pipe during drawing, and the drawing speed of the hollow pipe. The sand pile construction method according to claim 1, characterized by:
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP3954377A JPS5949968B2 (en) | 1977-04-08 | 1977-04-08 | Sand pile construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP3954377A JPS5949968B2 (en) | 1977-04-08 | 1977-04-08 | Sand pile construction method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS53125309A JPS53125309A (en) | 1978-11-01 |
| JPS5949968B2 true JPS5949968B2 (en) | 1984-12-05 |
Family
ID=12555957
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP3954377A Expired JPS5949968B2 (en) | 1977-04-08 | 1977-04-08 | Sand pile construction method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS5949968B2 (en) |
-
1977
- 1977-04-08 JP JP3954377A patent/JPS5949968B2/en not_active Expired
Also Published As
| Publication number | Publication date |
|---|---|
| JPS53125309A (en) | 1978-11-01 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105908744A (en) | Pore pressure counterforce construction method, construction device and soil clearing device | |
| EP0539079B1 (en) | Apparatus and method for constructing compacted granular or stone columns in soil masses | |
| US3416322A (en) | Sonic method and apparatus for implanting underground concrete walls | |
| JPS5949968B2 (en) | Sand pile construction method | |
| US3646766A (en) | Installation of sand drains | |
| US4701078A (en) | Pile construction method for improving bearing power | |
| JP2584402B2 (en) | Construction method such as compacted sand pile | |
| JPS6225806B2 (en) | ||
| JP2891663B2 (en) | Ground improvement equipment | |
| JPS6115205B2 (en) | ||
| US3423944A (en) | Method for forming end bearing concrete piles | |
| JP2597833B2 (en) | Complex improvement method for soft ground | |
| JPH03271419A (en) | Chemical injection device | |
| JP2758129B2 (en) | Installation method of ground improvement pile | |
| JPH0330423Y2 (en) | ||
| JPS58101922A (en) | Control or air pressure in hollow pipe for sand pile construction | |
| JPS606413B2 (en) | Sand pile construction method | |
| JPH0517958A (en) | Execution method for steel pipe pile | |
| JPH0412327B2 (en) | ||
| JPS59130919A (en) | How to remove existing hollow piles | |
| JP4545340B2 (en) | Slime discharging method, cast-in-place pile method, and bags used for them | |
| JP2876293B2 (en) | Hopper equipment for sandy soil supply | |
| JPH08109633A (en) | Space filling method between earth retaining wall and wale and bag body used therefor | |
| JPS6160922A (en) | Method of enlarging pile hole diameter | |
| JPS606412B2 (en) | Sand pile construction method |