JPS606413B2 - Sand pile construction method - Google Patents
Sand pile construction methodInfo
- Publication number
- JPS606413B2 JPS606413B2 JP8559081A JP8559081A JPS606413B2 JP S606413 B2 JPS606413 B2 JP S606413B2 JP 8559081 A JP8559081 A JP 8559081A JP 8559081 A JP8559081 A JP 8559081A JP S606413 B2 JPS606413 B2 JP S606413B2
- Authority
- JP
- Japan
- Prior art keywords
- sand
- tube
- hollow
- hydrated
- hollow tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/02—Improving by compacting
- E02D3/10—Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
- E02D3/106—Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains by forming sand drains containing only loose aggregates
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Structural Engineering (AREA)
- Agronomy & Crop Science (AREA)
- Environmental & Geological Engineering (AREA)
- Soil Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Description
【発明の詳細な説明】
本発明は軟弱地盤改良工事に用いられる砂杭造成工法に
関するものである。DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a sand pile construction method used for soft ground improvement work.
軟弱地盤中に砂杭造成用の中空管を用いて中空管の径よ
り径が拡大した砂杭を造成するには、従来、中空管を軟
弱地盤の所定深さに貫入し、ついでこの中空管内に砂を
供給して中空管を適当長上方に引抜き管下方に生ずる空
隙に管内の砂を排出し、ついで中空管を再貫入して上記
の排出した砂を締固めると共に周囲地盤中に膨大させる
操作サイクルを順次上方に繰返えす工法いわゆるコンポ
ーザー工法が多く用いられているほか、軟弱地盤中の所
定深さに貫入した中空管内に砂を供給し中空管を上方に
引抜くと共に中空管内に設けた振動体、スクリュー、上
下作動押出し機構等によって管下端より管内の砂を軟弱
地盤中に強制排出する工法も用いられている。In order to construct sand piles with a diameter larger than the diameter of the hollow pipe using a hollow pipe for sand pile construction in soft ground, conventionally, the hollow pipe is penetrated to a predetermined depth in the soft ground, and then Sand is supplied into this hollow tube, the hollow tube is pulled upward by a suitable length, the sand inside the tube is discharged into the gap created below the tube, and then the hollow tube is re-penetrated to compact the discharged sand and surround it. In addition to the so-called composer method, which is a construction method in which the operation cycle of expanding the volume into the ground is repeated sequentially upward, sand is supplied into a hollow pipe that penetrates to a predetermined depth in the soft ground, and the hollow pipe is pulled upward. A construction method is also used in which the sand inside the tube is forcibly discharged from the lower end of the tube into the soft ground using a vibrating body, a screw, a vertically operating extrusion mechanism, etc. installed inside the hollow tube.
上記した従来工法においては、特に径の大きい中空管を
用いて中空管の径より相当大きく径の拡大した砂杭の造
成には、中空管の作動エネルギーを多く要するものであ
る。又、中空管に供給する砂には、管下端よりの排出を
スムーズにするため、できるだけ含水比のすくないドラ
イ砂を用いるのが一般であった。上記した従来工法にお
ける中空管の作動エネルギーを節約し、又ドライ砂を使
用するために要する経費が嵩む不利を除くため、中空管
の上方への引抜き工程において「中空管に供給する砂に
、飽和附近の含水比とした加水砂を用い「 この加水砂
を中空管内において振動等によって流動状態に保持し、
中空管内の加水砂の管下端における圧力を管下端におけ
る軟弱地盤の受働圧力より大きくなるよう制御して中空
管内の加水砂を管下端より排出させて中空管径より径が
拡大した砂杭を造成する新らしい技術的発想の砂杭造成
工法を開発して、本出願人は特磯昭52−39543号
(特開昭53−125309号)「砂杭造成工法」とし
て出溌した。この工法の実施において「従釆工法に比し
、比較的単純な構造の中空管を用いて、軟弱地盤中に中
空管径より径の拡大した砂杭の造成に要する作動エネル
ギーの節約と施工時間の短縮及び使用砂の経費の低減を
図ることができた。本発明の工法は、上記の加水砂を用
いる新らしい砂杭造成の実施経験から、中空管の軟弱地
盤の所定深さに貫入する工程においても中空管内に加水
砂を供給してこれを管下端から排出することに着想した
もので、中空管径より径の拡大した砂杭、特に径の大き
く拡大した砂杭の造成においてL中空管の作動エネルギ
ーと施工時間の一層の節約を可能とするものである。In the above-mentioned conventional construction method, a large amount of energy is required to operate the hollow pipe, especially in order to construct a sand pile whose diameter is considerably larger than the diameter of the hollow pipe using a large-diameter hollow pipe. Additionally, dry sand with as low a water content as possible was generally used as the sand supplied to the hollow tube in order to ensure smooth discharge from the bottom end of the tube. In order to save the operating energy of the hollow tube in the above-mentioned conventional construction method and to eliminate the disadvantage of increasing costs required for using dry sand, "sand to be supplied to the hollow tube" is used in the upward drawing process of the hollow tube. Using hydrated sand with a water content near saturation, this hydrated sand is kept in a fluid state by vibration etc. in a hollow tube.
The pressure of the hydrated sand in the hollow tube at the lower end of the tube is controlled to be greater than the passive pressure of the soft ground at the lower end of the tube, and the hydrated sand in the hollow tube is discharged from the lower end of the tube to create a sand pile with a diameter larger than the diameter of the hollow tube. The present applicant developed a sand pile construction method based on a new technical idea, and published it as ``Sand Pile Construction Method'' in Special Iso No. 52-39543 (Japanese Patent Application Laid-open No. 53-125309). In implementing this construction method, ``Compared to the conventional construction method, a hollow pipe with a relatively simple structure is used to save the operating energy required to construct sand piles with a diameter larger than the diameter of the hollow pipe in soft ground. It was possible to shorten the time and reduce the cost of sand used. Based on the experience of constructing new sand piles using the above-mentioned water-added sand, the construction method of the present invention is based on the experience of constructing sand piles using the above-mentioned water-added sand. The idea was to supply hydrated sand into the hollow pipe during the penetrating process and discharge it from the bottom end of the pipe, making it ideal for creating sand piles with a diameter larger than the hollow pipe diameter, especially sand piles with a large diameter. This makes it possible to further save operating energy and construction time for L hollow tubes.
すなわち「本発明の第1発明の砂杭造成工法は、砂杭造
成用の中空管を用いて地盤中に多数の砂杭を造成する軟
弱地盤改良工法において〜第量図に示すように「中空管
1を軟弱地盤2の所定深さもこ貫入中、中空管翼内に飽
和附近の含水比とした加水砂3を供給しかつその加水砂
3を中空管1内において振動等によって流動状態に保持
すると共に、中空管1内の加水砂3の管下端における圧
力を管下端における軟弱地盤2の受働土庄より大きくな
るよう制御し、中空管1内の加水砂3を管下端から制御
された童排出させ、貫入した中空管の外周に加水砂層4
を造成し、ついで該中空管1の上方への引抜き中、中空
管1内に供給された上記の加水砂3を管下方に残置させ
ることによって、中空管1径より径が拡大した砂杭を軟
弱地盤中に造成することを特徴とするものである。In other words, "The sand pile construction method of the first invention of the present invention is a soft ground improvement method in which a large number of sand piles are constructed in the ground using a hollow pipe for sand pile construction. While the hollow tube 1 is penetrating the soft ground 2 to a predetermined depth, hydrated sand 3 with a water content near saturation is supplied into the hollow tube blade, and the hydrated sand 3 is caused to vibrate inside the hollow tube 1. While maintaining the fluidized state, the pressure of the hydrated sand 3 in the hollow tube 1 at the lower end of the tube is controlled to be greater than the pressure of the passive soil of the soft ground 2 at the lower end of the tube, and the hydrated sand 3 in the hollow tube 1 is controlled at the lower end of the tube. A layer of hydrated sand 4 is formed around the outer periphery of the penetrated hollow tube.
was created, and then, while the hollow tube 1 was being drawn upward, the above-mentioned hydrated sand 3 supplied into the hollow tube 1 was left below the tube, so that the diameter was expanded from the diameter of the hollow tube 1. This method is characterized by constructing sand piles in soft ground.
つぎに、本発明の第2発明の砂杭造成工法は、砂杭造成
用の中空管を用いて地盤中に多数の砂杭を造成する軟弱
地盤改良工法において、第2図に示すように、中空管1
を軟弱地盤2の所定深丸こ貫入中、中空管1内に飽和附
近の含水比とした加水砂3を供V給しかつその加水砂3
を中空管1内において振動等によって流動状態に保持す
ると共に、中空管1内の加水砂3の管下端における圧力
を管下端における軟弱地盤2の受働土庄より大きくなる
よう制御し、中空管亀内の加水砂3を管下端から制御さ
れた童排出させ、貫入した中空管1の外周に加水砂層4
を造成し「ついで該中空管1の上方への引抜き中、中空
管1内に上記の佳水砂3を供給しかつその加水砂3を前
記同様に流動状態を保持すると共に、中空管1内の加水
砂3の管下端における圧力を管下端における加水砂層4
を介して受ける軟弱地盤2の受働土庄より大きくなるよ
う制御し、中空管1内の加水砂3を管下端から制御され
た量排出させることによって、中空管1経より径が大き
く拡大した砂杭5′を軟弱地盤中に造成することを特徴
とするものである。以下に本発明について詳記する。先
づ第1図に塞き〜第1発明について説明する。Next, the sand pile construction method of the second invention of the present invention is a soft ground improvement method in which a large number of sand piles are constructed in the ground using a hollow pipe for sand pile construction, as shown in FIG. , hollow tube 1
While penetrating into the soft ground 2 at a predetermined depth, hydrated sand 3 with a moisture content near saturation is supplied into the hollow tube 1, and the hydrated sand 3 is
is maintained in a fluid state within the hollow tube 1 by vibration or the like, and the pressure of the hydrated sand 3 at the lower end of the tube is controlled to be greater than the passive soil pressure of the soft ground 2 at the lower end of the tube. The hydrated sand 3 inside the tube is discharged from the lower end of the tube in a controlled manner, and a hydrated sand layer 4 is formed around the outer periphery of the hollow tube 1 that has penetrated.
``Then, while the hollow tube 1 is being drawn upward, the above-mentioned water-hydrated sand 3 is supplied into the hollow tube 1, and the water-added sand 3 is maintained in a fluid state in the same manner as described above, and the hollow tube 1 is The pressure at the lower end of the hydrated sand 3 in the tube 1 is changed to the hydrated sand layer 4 at the lower end of the tube.
By controlling the diameter to be larger than the passive soil strength of the soft ground 2 received through the pipe and discharging the hydrated sand 3 in the hollow pipe 1 in a controlled amount from the lower end of the pipe, the diameter was expanded to a greater extent than the diameter of the hollow pipe 1. This method is characterized by constructing sand piles 5' in soft ground. The present invention will be described in detail below. First, the first invention will be explained with reference to FIG.
第葺図の図a〜図dに示すように、砂杭造成用の中空管
1を管頂に装着した振動杭打機6によって軟弱地盤2の
設計による所定深さに貫入中、中空管1内に管上部の供
給口7から飽和附近の含水比とした加水砂3を供給する
と、管内の上記の加水砂3は、振動によって流動状態に
置かれるので、恰も流体のように挙動する。従って管内
の加水砂3の管下端における圧力を管下端における軟弱
地盤2の受働士圧より大きくなるよう制御して管内に中
空管1の貫入に従って加水砂3を供V給すると、管内の
加水砂3は管下端から連続的に軟弱地盤2中に排出し、
貫入した中空管1の外周に加水砂層4が造成される。す
なわち、第1図の図dに示されるように、中空管1を軟
弱地盤2の所定深さまで貫入すると、中空管1径より蓬
の拡大した砂杭中に中空管1を挿入したような状態にな
る。As shown in Figures a to d of the first floor plan, while a vibrating pile driver 6 with a hollow pipe 1 for sand pile construction attached to the top of the pipe is penetrating soft ground 2 to a predetermined depth according to the design, the hollow When hydrated sand 3 with a water content near saturation is supplied into the pipe 1 from the supply port 7 at the top of the pipe, the hydrated sand 3 in the pipe is placed in a fluid state by vibration, so it behaves like a fluid. . Therefore, if the pressure of the hydrated sand 3 at the lower end of the pipe is controlled to be greater than the worker pressure of the soft ground 2 at the lower end of the pipe, and the hydrated sand 3 is supplied into the pipe as the hollow pipe 1 penetrates, the hydrated sand 3 inside the pipe is The sand 3 is continuously discharged from the lower end of the pipe into the soft ground 2,
A hydrated sand layer 4 is created around the outer periphery of the hollow tube 1 that has penetrated. That is, as shown in Fig. d of Fig. 1, when the hollow pipe 1 is penetrated to a predetermined depth in the soft ground 2, the hollow pipe 1 is inserted into the sand pile whose diameter has expanded from the diameter of the hollow pipe 1. It will be like this.
しかして、上記における管下端の加水砂3と周囲の軟弱
地盤2の受働土庄との条件の制御は、予め調査によって
知り得る施工地区の軟弱地盤2の各深度における受働土
庄に対応して中空管1内に順次供給する加水砂3の砂長
を制御することによって可能である。又、必要によって
は、図面に示す管上部の空気圧入口8から管内に圧縮空
気を送入して空気圧によって管下端の加水砂3の圧力を
補助することもできる。つぎに、第1図の図dの状態に
ついて、図e〜図gに示すように、中空管1を振動杭打
機6を動かしながら上方へ引抜くと、中空管1内の加水
砂3は管下方に残層され、中空管1の貫入において中空
管1の外周に造成された加水砂層4と一体となって中空
管1径より径が拡大した砂杭5が造成される。Therefore, in the above-mentioned control of the conditions of the hydrated sand 3 at the lower end of the pipe and the passive soil ridge of the surrounding soft ground 2, hollow soil is This is possible by controlling the length of the hydrated sand 3 that is sequentially supplied into the tube 1. Furthermore, if necessary, compressed air can be fed into the tube from the pneumatic inlet 8 at the top of the tube as shown in the drawings, and the pressure of the hydrated sand 3 at the lower end of the tube can be assisted by the air pressure. Next, regarding the state shown in Fig. d of Fig. 1, when the hollow pipe 1 is pulled upward while moving the vibrating pile driver 6, as shown in Figs. 3 is left below the pipe, and when the hollow pipe 1 penetrates, it is integrated with the hydrated sand layer 4 created on the outer periphery of the hollow pipe 1 to create a sand pile 5 whose diameter is larger than the diameter of the hollow pipe 1. Ru.
なお、第1図の図dの状態すなわち、中空管1を軟弱地
盤2の所定深さに貫入した状態においては、図示される
ように、中空管1内の加水砂3の砂長は普通中空管1の
貫入長さまで供給された状態となるものであるが、砂長
が管の貫入長より低い場合は、該中空管1の引抜き前に
加水砂3を管の貫入長まで補てんするものである。又、
中空管1の貫入において管外周に砂成される加水砂層4
の所望の厚さは、造成される砂杭5の径の拡大に関係す
るものであり、この厚さの制御は、供給加水砂3の流量
と中空管1の貫入速度とを適当に制御することによって
可能である。つぎに、砂杭造成用の中空管1に加水砂3
の供給は、第6図に例示するように「中空管1の上部に
設けた供給口7に蓬らなるホツバー9に砂をバケット1
0から供給すると共に、上記ホツパー9に水給供管11
によって適量の水を送入する手段によってもよく、又第
7図に例示するように、供給口7に砂と水との混合機(
図示省略)から加水砂3を圧送する放水砂供給管12を
連結する手段によってもよい。In addition, in the state shown in FIG. d of FIG. 1, that is, in the state where the hollow pipe 1 has penetrated the soft ground 2 to a predetermined depth, the sand length of the hydrated sand 3 in the hollow pipe 1 is as shown in the figure. Normally, the sand is supplied up to the penetration length of the hollow tube 1, but if the sand length is lower than the penetration length of the tube, the hydrated sand 3 is supplied up to the penetration length of the tube before pulling out the hollow tube 1. It is meant to compensate. or,
A hydrated sand layer 4 formed on the outer periphery of the hollow tube 1 when it penetrates.
The desired thickness is related to the expansion of the diameter of the sand pile 5 to be constructed, and the thickness is controlled by appropriately controlling the flow rate of the supplied hydrated sand 3 and the penetration speed of the hollow pipe 1. It is possible by doing. Next, hydrated sand 3 is added to the hollow pipe 1 for sand pile construction.
As illustrated in FIG.
In addition to supplying water from 0, a water supply pipe 11 is also connected to the hopper 9.
Alternatively, as illustrated in FIG. 7, a sand and water mixer (
It may also be possible to connect a water discharge sand supply pipe 12 that pressure-feeds the water-added sand 3 from a source (not shown).
なお、上記第6図及び第7図において13は脱気阻止弁
板を示している。本発明の第1発明の砂杭造成工法は、
上記のようにして行なわれるもので、中空管1径より径
の拡大した砂杭5の造成において、砂を管下端から軟弱
地盤2中に排出すると共にこの砂を更に横方向に拡大さ
せるのは、中空管1内に供給する加水砂3の管下端の圧
力を管下端の軟弱地盤2の受働土庄より大きくなるよう
に制御することによるもので、従来工法における中空管
1の引抜きと再貫入のサイクルを繰返えす中空管1の作
動エネルギーあるいは中空管内に設けた振動体、スクリ
ュー、上下作動押出し機構等の作動エネルギーを必要と
しないから、従来工法に比し、よりすくない作動エネル
ギーによって径の拡大した砂杭の造成ができる。In addition, in FIGS. 6 and 7 above, 13 indicates a degassing prevention valve plate. The sand pile construction method of the first invention of the present invention is as follows:
This is carried out as described above, and when constructing the sand pile 5 whose diameter is larger than the diameter of the hollow pipe 1, the sand is discharged from the lower end of the pipe into the soft ground 2 and this sand is further expanded laterally. This is done by controlling the pressure of the hydrated sand 3 supplied into the hollow pipe 1 at the lower end of the pipe to be greater than the passive soil pressure of the soft ground 2 at the lower end of the pipe, and it is different from the drawing of the hollow pipe 1 in the conventional construction method. Since it does not require the operating energy of the hollow tube 1 that repeats the cycle of re-penetration, or the operating energy of the vibrating body, screw, vertical movement extrusion mechanism, etc. installed in the hollow tube, the operating energy is lower than that of conventional construction methods. It is possible to create sand piles with an enlarged diameter.
又、単純な構造の中空管1の所定深さに貫入と上方への
引抜きによる簡単な作動によるもので、造成の施工時間
を節約することができる上に、加水砂3を用いるのでド
ライ砂を用るより経費が嵩まない利点がある。上記する
本発明の作用効果は、本願出願人の開発した加水砂を用
いる前記した特脇昭52−39鬼3号「砂杭造成工法」
のそれと基本的には同じであるが、この工法においては
、中空管1の軟弱地盤2中の所定深さに貫入中は、管下
端から管内に土壌の逆入を阻止するにとどまり、管下端
から加水砂3を排出するものではない。In addition, it is easy to operate by penetrating the hollow tube 1 of a simple structure to a predetermined depth and pulling it upward, which saves construction time. It has the advantage of being less expensive than using . The effects of the present invention described above are based on the above-mentioned Tokuwaki 52-39 Oni No. 3 "Sand pile construction method" using hydrated sand developed by the applicant.
However, in this construction method, while the hollow pipe 1 is penetrating the soft ground 2 to a predetermined depth, it only prevents soil from entering the pipe from the lower end of the pipe, and the pipe The hydrated sand 3 is not discharged from the lower end.
これに対して本発明は、中空管1の軟弱地盤2の所定深
さに貫入する工程において、中空管1内に加水砂3を供
聯合してこれを管下端から排出して、貫入した中空管1
の外周に、中空管1径より径の拡大した部に相当する加
水砂層4が先行して造成されるものであり、中空管1の
引抜き工程は単に中空管1を上方に引抜く操作のみでよ
く、中空管1内の操作はより簡単かつ容易で施工能率が
更に向上できるものである。つぎに、第2図に塞き本発
明の第2発明について説明する。In contrast, the present invention, in the process of penetrating the soft ground 2 of the hollow tube 1 to a predetermined depth, combines hydrated sand 3 into the hollow tube 1 and discharges it from the lower end of the tube. hollow tube 1
A hydrated sand layer 4 corresponding to the part whose diameter is larger than the diameter of the hollow tube 1 is created in advance on the outer periphery of the hollow tube 1, and the process of pulling out the hollow tube 1 is simply pulling out the hollow tube 1 upward. Only the operation is required, and the operation inside the hollow tube 1 is simpler and easier, and the construction efficiency can be further improved. Next, referring to FIG. 2, a second aspect of the present invention will be explained.
この第2発明工法における第2図の図a〜図dに示すよ
うに、中空管1を軟弱地盤2の所定深さに貫入する工程
は前記した第1発明と同じである。しかして、第2発明
の工法は、第2図の図e〜図gに示すように、中空管1
の上方への引抜き工程において更に貫入工程と同様に、
中空管1に加水砂3を供給してこれを管下端より排出し
、さきに中空管1の貫入中談管外周に造成された加水砂
層4を横方向に押し出して中空管1径より径が大きく拡
大した砂杭5′を造成するものである。なお、中空管1
の引抜き中における上記の加水砂層4を更に拡大する径
の制御は、前記同様に供給加水砂3の流量と中空管1の
引抜き速度とを適当に制御することによって可能である
。本発明の第2発明の砂杭造成工法は上記のようにして
行なわれるもので、第1発明の工法に比して、より径の
大きく拡大した砂杭5′の造成を容易にするものである
。すなわち、第2発明では、中空管1の軟弱地盤の所定
深さに貫入工程及び上方への引抜き工程の両工程におい
て、管下端より加水砂3を軟弱地盤2中に排出するもの
であるから、多量の加水砂3を中空管1の貫入と引抜き
の操作時間において供給すれ‘まよく、加水砂3を無理
なく供給できると共に、所要の径の極めて大きい砂杭5
′を確実かつ能率的に造成できるものである。更に「第
2発明は、第3図に例示するように〜中空管竃の貫入に
おいて造成された管外周の加水砂層41こ厚さの小さい
個所が生じた場合、中空管亀の引抜き中上記の個所にお
いてのみ管下機からの加水砂3の適量を排出させ、この
部を補修するのに用いることもできる。As shown in Figures a to d in Figure 2 in this second invention construction method, the step of penetrating the hollow tube 1 to a predetermined depth into the soft ground 2 is the same as in the first invention described above. Therefore, in the construction method of the second invention, as shown in FIG.
In the upward drawing process, as well as the penetrating process,
The hydrated sand 3 is supplied to the hollow tube 1 and discharged from the lower end of the tube, and the hydrated sand layer 4 formed on the outer periphery of the hollow tube 1 is pushed out laterally to reduce the diameter of the hollow tube 1. This is to create a sand pile 5' with a larger diameter. In addition, hollow tube 1
The diameter of the hydrated sand layer 4 can be further enlarged during drawing by appropriately controlling the flow rate of the supplied hydrated sand 3 and the drawing speed of the hollow tube 1, as described above. The method for constructing sand piles according to the second aspect of the present invention is carried out as described above, and makes it easier to construct sand piles 5' having a larger diameter than the method according to the first aspect. be. That is, in the second invention, the hydrated sand 3 is discharged into the soft ground 2 from the lower end of the pipe in both the process of penetrating the hollow pipe 1 to a predetermined depth in the soft ground and the process of pulling it upward. , a large amount of hydrated sand 3 can be supplied during the operation time of penetrating and withdrawing the hollow tube 1, and the hydrated sand 3 can be supplied without difficulty, and the sand pile 5 with an extremely large required diameter can be supplied.
′ can be created reliably and efficiently. Furthermore, as illustrated in FIG. It is also possible to discharge an appropriate amount of the water-added sand 3 from the pipe submachine only at the above-mentioned location and use it to repair this section.
又「第2発明は〜第4図に例示するように、加水砂層亀
1こ厚さの不揃が生じた場合「中空管】の引抜き中、管
下端から加水砂3を排出して径の大きく拡大した砂杭5
′の造成において、上記不揃の個所で排出させる加水砂
3の量を特に適量増減して図gに示すような径の均一な
径の大きく拡大した砂杭5′として造成することも可能
であり「又第5図に例示するように、砂杭5′の径を所
要の個所で特に大きく造成することも可能である。上記
した砂杭径の調整制御は、中空管1内に供給する加水砂
3の砂長を制御することによってもできるが、中空管亀
内に送入する圧縮空気による管下端の加水砂の圧力を補
助する空気圧の増減によって制御するのが容易かつ迅速
である。上述したように、本発明の砂杭造成工法は、比
較的簡単な構造の中空管を用いて、軟弱地盤中に中空管
径より径の拡大した砂杭を、従来工法に比して「すくな
い作動エネルギーによって容易、迅速かつ経済的に造成
できると共に「砂杭の径も容易に制御することのできる
優れた利点を有するものである。In addition, as illustrated in Fig. 4, in the second invention, when an irregularity in the thickness of the hydrated sand layer 3 occurs, the hydrated sand 3 is discharged from the lower end of the tube while the ``hollow tube'' is being pulled out to correct the diameter. greatly expanded sand pile 5
′, it is also possible to increase or decrease the amount of hydrated sand 3 discharged at the irregular locations by an appropriate amount to create a sand pile 5′ with a uniform diameter and a greatly enlarged diameter as shown in Figure g. Also, as illustrated in FIG. This can also be done by controlling the sand length of the hydrated sand 3, but it is easier and faster to control by increasing or decreasing the air pressure that assists the pressure of the hydrated sand at the lower end of the tube by compressed air fed into the hollow tube. As mentioned above, the sand pile construction method of the present invention uses a hollow pipe with a relatively simple structure to construct a sand pile with a diameter larger than that of the hollow pipe in soft ground compared to the conventional method. It has the excellent advantage that it can be constructed easily, quickly and economically with little operating energy, and that the diameter of the sand pile can be easily controlled.
添附の図面は本発明を実施例をもって説明するもので〜
第1図は本発明の第1発明の工法を順次的に示す説明図
、第2図は本発明の第2発明の工法を順次的に示す説明
図である。
つぎに第3図乃至第5図は、第2発明による砂杭径の調
整例を示す説明図である。つぎに第6図及び第7図は本
発明に用いる砂杭造成用の中空管の要部の実施例をそれ
ぞれ示す断面図である。貴……中空管、2・・…・軟弱
地盤、3・・…・放水砂、4・・・・・・加水砂層、5
…・・・径の拡大した砂杭、5′・…・・径の大きく拡
大した砂杭、6……振動杭打機も ?…・・・供聯合口
、8……空気圧入口「 9・…・・ホツパー、10……
バケット、11……水給供管、12……加水砂供給管も
13・…“脱気阻止弁板。
第1図
第2図
第3図
第4図
第5図
第6図
第7図The attached drawings illustrate the present invention with examples.
FIG. 1 is an explanatory diagram sequentially showing the construction method of the first invention of the present invention, and FIG. 2 is an explanatory diagram sequentially showing the construction method of the second invention of the invention. Next, FIGS. 3 to 5 are explanatory views showing examples of adjusting the sand pile diameter according to the second invention. Next, FIGS. 6 and 7 are sectional views showing an embodiment of the main part of a hollow pipe for constructing sand piles used in the present invention. Noble...Hollow pipe, 2...Soft ground, 3...Drained sand, 4...Hydrated sand layer, 5
...Sand piles with enlarged diameters, 5'...Sand piles with greatly enlarged diameters, 6...Vibratory pile drivers too?・・・・・・Supplementary port, 8... Pneumatic inlet 9... Hopper, 10...
Bucket, 11...Water supply pipe, 12...Hydrated sand supply pipe also 13..."Degassing prevention valve plate. Figure 1 Figure 2 Figure 3 Figure 4 Figure 5 Figure 6 Figure 7
Claims (1)
造成する軟弱地盤改良工法において、中空管を軟弱地盤
の所定深さに貫入中、中空管内に飽和附近の含水比とし
た加水砂を供給しかつその加水砂を中空管内において振
動等によって流動状態に保持すると共に、中空管内の加
水砂の管下端における圧力を管下端における軟弱地盤の
受働土圧より大きくなるよう制御し、中空管内の加水砂
を管下端から制御された量排出させ、貫入した中空管の
外周に加水砂層を造成し、ついで該中空管の上方への引
抜き中、中空管内に供給された上記の加水砂を管下方に
残置させることによって、中空管径より径が拡大した砂
杭を軟弱地盤中に造成することを特徴とする砂杭造成工
法。 2 砂杭造成中の中空管を用いて地盤中に多数の砂杭を
造成する軟弱地盤改良工法において、中空管を軟弱地盤
の所定深さに貫入中、中空管内に飽和附近の含水比とし
た加水砂を供給しかつその加水砂を中空管内において振
動等によって流動状態に保持すると共に、中空管内の加
水砂の管下端における圧力を管下端における軟弱地盤の
受働土圧より大きくなるよう制御し、中空管内の加水砂
を管下端から制御された量排出させ、貫入した中空管の
外周に加水砂層を造成し、ついで該中空管の上方への引
抜き中、中空管内に上記の加水砂を供給しかつその加水
砂を前記同様に流動状態に保持すると共に、中空管内の
加水砂の管下端における圧力を管下端における加水砂層
を介して受ける軟弱地盤の受働土圧より大きくなるよう
制御し、中空管内の加水砂を管下端から制御された量排
出させることによって、中空管径より径が大きく拡大し
た砂杭を軟弱地盤中に造成することを特徴とする砂杭造
成工法。[Scope of Claims] 1. In a soft ground improvement method in which a large number of sand piles are constructed in the ground using hollow pipes for sand pile construction, while the hollow pipe is being penetrated to a predetermined depth in the soft ground, inside the hollow pipe The hydrated sand is supplied with a moisture content near saturation, and the hydrated sand is kept in a fluid state by vibration etc. in the hollow tube, and the pressure of the hydrated sand at the lower end of the hollow tube is reduced by the passive soil of the soft ground at the lower end of the tube. The hydrated sand in the hollow tube is discharged in a controlled amount from the lower end of the tube to create a hydrated sand layer around the outer periphery of the penetrated hollow tube, and then, while the hollow tube is being pulled upward, A sand pile construction method characterized in that a sand pile with a diameter larger than the diameter of the hollow pipe is created in soft ground by leaving the above-mentioned hydrated sand supplied into the hollow pipe below the pipe. 2. In a soft ground improvement method in which a large number of sand piles are constructed in the ground using hollow pipes during construction of sand piles, while the hollow pipes are being penetrated to a predetermined depth in the soft ground, the moisture content in the hollow pipes is close to saturation. In addition to supplying the hydrated sand and maintaining the hydrated sand in a fluid state in the hollow tube by vibration etc., the pressure of the hydrated sand in the hollow tube at the lower end of the tube is controlled to be greater than the passive earth pressure of the soft ground at the lower end of the tube. Then, the hydrated sand in the hollow tube is discharged in a controlled amount from the lower end of the tube to create a layer of hydrated sand around the outer periphery of the hollow tube that has penetrated, and then, while the hollow tube is being pulled upward, the above-mentioned hydrated sand is discharged into the hollow tube. Supplying sand and maintaining the hydrated sand in a fluid state as described above, and controlling the pressure of the hydrated sand in the hollow tube at the lower end of the tube to be greater than the passive earth pressure of the soft ground that is received via the hydrated sand layer at the lower end of the tube. A sand pile construction method characterized in that a sand pile with a diameter larger than the diameter of the hollow pipe is created in soft ground by discharging a controlled amount of hydrated sand inside the hollow pipe from the lower end of the pipe.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP8559081A JPS606413B2 (en) | 1981-06-05 | 1981-06-05 | Sand pile construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP8559081A JPS606413B2 (en) | 1981-06-05 | 1981-06-05 | Sand pile construction method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS57201417A JPS57201417A (en) | 1982-12-09 |
| JPS606413B2 true JPS606413B2 (en) | 1985-02-18 |
Family
ID=13863025
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP8559081A Expired JPS606413B2 (en) | 1981-06-05 | 1981-06-05 | Sand pile construction method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS606413B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105926578A (en) * | 2016-06-20 | 2016-09-07 | 李平 | Soft foundation dewatering excitation equipment and reinforcing method |
-
1981
- 1981-06-05 JP JP8559081A patent/JPS606413B2/en not_active Expired
Also Published As
| Publication number | Publication date |
|---|---|
| JPS57201417A (en) | 1982-12-09 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPH0791930B2 (en) | Underground drilling machine cement soil equipment | |
| EP1183426A1 (en) | Process and device for producing a pile in the earth | |
| JP6182804B1 (en) | Ground injection device and ground injection method | |
| JPS606413B2 (en) | Sand pile construction method | |
| JP3451382B2 (en) | Underground water discharge method and drainage device | |
| JPH0469251B2 (en) | ||
| CN1085981A (en) | Capsule sealing grouting and sealing device thereof | |
| JPH10114942A (en) | Downward placing method for concrete | |
| CN108894232B (en) | Post-grouting device for concrete precast pile and forming method and grouting process thereof | |
| CN206990551U (en) | Acoustic frequency vibration creeps into slip casting analogue experiment installation | |
| JPH04347206A (en) | Land improvement method | |
| CN116695765A (en) | Tubular pile foundation device for reinforcing soft foundation and construction method thereof | |
| JP3184456B2 (en) | How to receive shield machine into the arrival shaft | |
| JPS6131244B2 (en) | ||
| JP3534234B2 (en) | Underground penetration assist device for casing and underground penetration assist method | |
| JPS6124489B2 (en) | ||
| CN207063981U (en) | A kind of underground mould bag stake suspension device | |
| JP3047330U (en) | Sheet pile driving equipment | |
| JPS6095024A (en) | Method of forming cast-in-place concrete pile in soft ground zone | |
| JPH089862B2 (en) | Chemical injection method | |
| JP2596843B2 (en) | Vibration compaction method | |
| JPH09279565A (en) | Ground improvement construction method | |
| JP2864243B2 (en) | Shaft construction method | |
| EP4522809A1 (en) | Method of installation of a drill pile and the drill pill | |
| JPS5949968B2 (en) | Sand pile construction method |