Distribution line operating device

Info

Publication number
JPS6028223B2
JPS6028223B2 JP53037777A JP3777778A JPS6028223B2 JP S6028223 B2 JPS6028223 B2 JP S6028223B2 JP 53037777 A JP53037777 A JP 53037777A JP 3777778 A JP3777778 A JP 3777778A JP S6028223 B2 JPS6028223 B2 JP S6028223B2
Authority
JP
Japan
Prior art keywords
section
power
distribution line
feeder
switch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP53037777A
Other languages
Japanese (ja)
Other versions
JPS54129445A (en
Inventor
清 藤渡
興太郎 川村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP53037777A priority Critical patent/JPS6028223B2/en
Publication of JPS54129445A publication Critical patent/JPS54129445A/en
Publication of JPS6028223B2 publication Critical patent/JPS6028223B2/en
Expired legal-status Critical Current

Links

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Description

【発明の詳細な説明】 本発明は配電線操作装置に関し、特に配電線の作業停電
に伴う電力融通に非要な区分開閉器の操作を行なうもの
である。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a power distribution line operating device, and particularly to a power distribution line operating device that operates unnecessary sectional switches for power interchange due to work power outages on power distribution lines.

例えば第1図に示す如き配電系統について配電線操作を
するにつき、従来第2図に示す如き構成の配電線操作装
置が用いられていた。
For example, in order to operate a distribution line in a power distribution system as shown in FIG. 1, a power distribution line operating device having a configuration as shown in FIG. 2 has conventionally been used.

第1図において、1は母線で、配電用変電所変圧器2次
側に設置され、変圧器と各配電線とを結合し、一般的に
複数の配電線が接続される。
In FIG. 1, reference numeral 1 denotes a busbar, which is installed on the secondary side of a distribution substation transformer, connects the transformer and each distribution line, and generally connects a plurality of distribution lines.

また2(2一1〜2一4)は母線1と配電線とを結合す
る配電線用しや断器(以下FCBと呼ぶ)で、これを開
閉することにより区間を停電させる目的に使われ、遠方
監視制御装置子局5(第2図)からの開閉信号で動作す
る。3(3一1〜3一16)は区間で、需要家の集合体
で構成され、配電線用しや断器2または区分開閉器4を
通じて電力の供孫溝を受ける。
In addition, 2 (2-1 to 2-4) are distribution line circuit breakers (hereinafter referred to as FCB) that connect bus 1 and distribution lines, and are used for the purpose of causing power outages in sections by opening and closing them. , operates by opening/closing signals from the remote monitoring and control device slave station 5 (FIG. 2). 3 (3-1 to 3-16) is a section, which is composed of a collection of consumers, and receives power from the supply line through the distribution line break switch 2 or the section switch 4.

4(4−1〜4−16)は区分開閉器(以下PSWと呼
ぶ)で、区間3に対する樟送電または区間3の接続、切
り離しの目的に使われ、遠方監視制御装置子局5からの
開閉信号で動作する。
4 (4-1 to 4-16) are section switches (hereinafter referred to as PSWs), which are used for the purpose of transmitting camphor power to section 3 or connecting and disconnecting section 3. Works with signals.

また、線路が無電圧になると自動開勝する機能を持く)
。母線1の電力は、フイーダ10一1〜10一4により
分岐され、配電線用しや断器FCB2一1,2一2,2
一3,2一4を介して区間3一1,3一6,3−11,
3−14に供給される。
Also, it has a function that automatically opens when the line becomes non-voltage)
. The power of bus 1 is branched by feeders 10-1 to 10-4, and distribution line breakers FCB2-1, 2-2, 2
3-1, 3-6, 3-11 through 1-3, 2-4,
3-14.

この場合区間3−1,3−6,3一11,3一14に供
給された電力は区分開閉器塔W4によって相互に結合さ
れた末端側の多数の区間3に順次連鎖的に供給されて行
く。例えば区間3−1の電力はPSW4一1を介して区
間3−2に供給され、さらにPSW4−2を介して区間
3−3に供給され、さらに的W4−3を介して区間3−
4に供給され、さらにPSW4−4を介して最末端の区
間3−5に供孫合される。しかるにこの場合区間3一3
及び3一5は、フイーダ10一2つまり遮断器2−2か
ら電力を供給される他の系統の区間3一8及び3−10
に、それぞれPSW4−5及び4−6を介して結合され
る。なお第1図、第3図において[コは閉略しているし
や断器FCBを示し、夏劉ま開路しているしや断器FC
Bを示し、0は閉路している区分開閉器PSWを示し、
■は開路している区分開閉器PSWを示し、こコは区間
を示す。
In this case, the power supplied to the sections 3-1, 3-6, 3-11, and 3-14 is sequentially supplied to a large number of sections 3 on the terminal side interconnected by the section switch tower W4 in a chain manner. go. For example, power in section 3-1 is supplied to section 3-2 via PSW4-1, further supplied to section 3-3 via PSW4-2, and then further supplied to section 3-3 via target W4-3.
4, and further fed to the endmost section 3-5 via PSW 4-4. However, in this case, the interval 3-3
and 3-5 are sections 3-8 and 3-10 of other systems supplied with power from the feeder 10-2, that is, the circuit breaker 2-2.
are coupled via PSWs 4-5 and 4-6, respectively. Note that in Figures 1 and 3, ``C'' indicates a closed circuit breaker FCB, and ``Xia'' indicates an open circuit breaker FC.
B, 0 indicates a closed section switch PSW,
■ indicates the section switch PSW that is open, and here indicates the section.

第2図の配電系統に対して、従来の配電線操作装置は次
のように動作する。
For the power distribution system shown in FIG. 2, the conventional power distribution line operating device operates as follows.

PSW4一1〜4一16の開閉状態およびPCB2(2
−1〜2一4)の開閉状態は、遠方監視制御装置子局(
以下TC子局と呼ぶ)5(5一1,5−2・・・)から
遠方監視制御装置親局6(以下TC親局と呼ぶ)へ伝送
される。
Open/close status of PSW4-1 to 4-16 and PCB2 (2
-1 to 2-4) are open/closed.
5 (5-1, 5-2, . . . ) (hereinafter referred to as a TC slave station) to a remote monitoring and control device master station 6 (hereinafter referred to as a TC master station).

TC親局6は、TC子局5から伝送された情報を系統監
視盤7へ伝送する。系統監視盤7は伝送されたPSW4
およびFCB2の開閉状態を表示する。また、フィーダ
10の負荷電流(以下フィーダ電流と呼ぶ)は、TC子
局5−1からTC親局6へ伝送され、さらにTC親局6
より系統監視盤7へ送られ、系統監視盤7に表示される
。このように遠方監視制御装置子局(TC子局)5は、
遠方監視制御装置親局6からの開閉信号を受信すること
により、区分開閉器4および配電線用しや断器2を開閉
路させる。
The TC master station 6 transmits the information transmitted from the TC slave station 5 to the system monitoring panel 7. The system monitoring panel 7 uses the transmitted PSW4
and displays the open/closed status of FCB2. Further, the load current of the feeder 10 (hereinafter referred to as feeder current) is transmitted from the TC slave station 5-1 to the TC master station 6, and further transmitted to the TC master station 6.
The information is then sent to the system monitoring panel 7 and displayed on the system monitoring panel 7. In this way, the remote monitoring and control device slave station (TC slave station) 5
By receiving the switching signal from the remote monitoring and control device master station 6, the section switch 4 and the distribution line sheath breaker 2 are opened and closed.

また、区分開閉器4および配電線用しや断器2の開閉状
態、および配電線の負荷の大きさを遠方監視制御装置親
局6に伝送する機能を持つ。また遠方監視制御装置親局
(TC親局)6は、遠方監視制御装置子局5から伝送さ
れた区分開閉器4および配電線用しや断器2の開閉状態
、および配電線の負荷の大きさを系統監視盤7に伝送す
る。
It also has a function of transmitting the open/closed states of the sectional switch 4 and the distribution line sheath breaker 2 and the magnitude of the load on the distribution line to the remote monitoring and control device master station 6. In addition, the remote monitoring and control equipment master station (TC master station) 6 receives information about the open/closed states of the sectional switch 4 and distribution line breakers 2, and the magnitude of the load on the distribution line, which are transmitted from the remote monitoring and control equipment slave station 5. The information is transmitted to the system monitoring panel 7.

さらに系統監視盤7は、遠方監視制御装置親局6から伝
送された区分開閉器4および配電線用しや断器2の開閉
状態、および配電線の負荷を表示する機能を持つ。
Furthermore, the system monitoring panel 7 has a function of displaying the open/closed states of the section switches 4 and the distribution line breakers 2, and the load on the distribution lines, which are transmitted from the remote monitoring and control device master station 6.

これに加えて操作卓8が設けられる。In addition to this, an operation console 8 is provided.

操作卓8は区分開閉器4または配電用しや断器2の開閉
路を指示するスイッチが設けられ、指示されたスイッチ
の信号を遠方監視制御装置子親局6へ伝送する。しかる
に操作卓8上に設けたスイッチを操作することにより、
操作すべき俺W4またはFCB2と関路または閉路の操
作方向を指示すると、その操作信号はTC親局6を通じ
てTC子局5へ伝送され、TC子局5は指令された操作
信号に従って斑W4またはFCB2を動作させる。
The operation console 8 is provided with a switch for instructing the opening and closing of the sectional switch 4 or the power distribution sheath breaker 2, and transmits the signal of the instructed switch to the remote monitoring and control device sub-master station 6. However, by operating the switch provided on the console 8,
When you instruct W4 or FCB2 to be operated and the direction of operation of the barrier or closed path, the operation signal is transmitted to the TC slave station 5 through the TC master station 6, and the TC slave station 5 operates the spot W4 or FCB2 according to the commanded operation signal. Operate FCB2.

操作後のPSW4またはFCB2の開閉状態は前述の如
くTC子局5、TC親局6を通じて系統監視盤7に表示
される。操作後のFCB2でのフイーダ電流も前述した
如く、TC子息5−1、TC親局6を通じて系統監視盤
7に表示される。第2図の従来の配電線操作装置におい
て、作業のための停電に伴う電力融通を行うにつき鴎W
4は次のように操作される。
The open/close status of the PSW 4 or FCB 2 after the operation is displayed on the system monitoring panel 7 through the TC slave station 5 and the TC master station 6 as described above. As described above, the feeder current in the FCB 2 after the operation is also displayed on the system monitoring panel 7 through the TC son 5-1 and the TC master station 6. In the conventional power distribution line operation device shown in Figure 2, the gull W
4 is operated as follows.

すなわち第1図の配電系統において、区間3−6,3−
7,3一8,3一9および3−10がFCB2一2より
電力供給されている時に、区間3−7を作業停電する(
これを作業区間と呼ぶ)場合に、単に区間3一7を停電
させるとこの区間3一7より末端側の区間3−8,3一
9および3一10(これらを逆送区間と呼ぶ)も一緒に
停電してしまう。
In other words, in the distribution system shown in Figure 1, sections 3-6, 3-
When 7, 3-8, 3-9, and 3-10 are being supplied with power from FCB2-2, there is a work power outage in section 3-7 (
(This is called the work section), if you simply turn off section 3-7, sections 3-8, 3-9, and 3-10 (these are called the reverse section) on the distal side of section 3-7 will also be affected. The power goes out together.

これを回避するためには他のフイ−ダから電力の融通を
しなければならない。その融通方法としては第3図に示
すようにすることが考えられる。
In order to avoid this, power must be exchanged from other feeders. A conceivable way to accommodate this is as shown in FIG. 3.

なお2割ま作業区間を示し、また函劇ま逆送区間を示す
。どのフィーダより電力の融通をするかを決定するには
、逆送区間の負荷の大きさおよび全てのMW4の開閉状
態が必要であり、更に各フイーダ10の供給予備力を把
握していることが必要である。
In addition, 20% indicates the work section, and also indicates the box drop or reverse transport section. In order to determine which feeder to use for power interchange, it is necessary to know the magnitude of the load in the reverse feed section and the open/closed status of all MW4, and also to know the supply reserve capacity of each feeder 10. is necessary.

また、PSW4およびFCB2は、それを開賂または閉
路することにより区間3を相互に接続するものであるが
、この接続の状態は固定的なものではなく、その時の区
間3の負荷電流の大きさ等により適宜接続替えが行なわ
れている。ところでこのようにすると、電力融通のため
の操作をする際に、制御所運転員は作業停電に備えて、
常にPSW4およびFCB2の開閉状態、および区間3
の負荷電流の大きさを監視記憶していなければならない
面倒な手間がかかる。
In addition, PSW4 and FCB2 connect section 3 to each other by opening or closing them, but the state of this connection is not fixed, and depends on the magnitude of the load current in section 3 at that time. Connections are changed as appropriate. By the way, by doing this, when performing operations for power interchange, control center operators can prepare for work power outages.
PSW4 and FCB2 are always open/closed, and section 3
It takes a lot of time and effort to monitor and remember the magnitude of the load current.

PSW4の数が多量で、かつ複雑な構成であるため作業
停電に伴う電力の融通をするための凶W4およびFCB
2を開閉操作するとき誤爆作により、停電させなくとも
よい区間3を停電させてしまうことも稀ではない。以上
の点を考慮して本発明においては、作業停電および作業
停電に伴う電力の融通のための配電線操作(PSW4お
よびFCB2の開閉路の変更)を自動的に行なうことに
より従来の配電線操作装置の不都合を解決しようとする
もので、操作すべきPSW4およびFCB2を自動的に
検知し、謀操作を防ぎ、できるだけ不要な停電区間を作
らないようにするものである。
Because the number of PSW4 is large and the configuration is complicated, it is necessary to use PSW4 and FCB for power interchange due to work power outages.
It is not uncommon for power to be cut off in section 3, which does not require a power outage, due to an erroneous detonation when opening and closing section 2. In consideration of the above points, the present invention automatically performs distribution line operations (changes in switching paths of PSW 4 and FCB 2) for work power outages and power interchange due to work power outages, compared to conventional distribution line operations. This is an attempt to solve the inconveniences of the device, by automatically detecting the PSW 4 and FCB 2 to be operated, preventing deliberate operations, and preventing the creation of unnecessary power outage sections as much as possible.

以下図面について本発明に係る配電線操作装置の一例を
詳述するに、本発明においては第2図との対応部分には
同一符号を附して第4図に示す如く、操作卓8とTC親
局6との間に例えばマイクロコンピュータ又はミニコン
ピュータ構成の配電線操作処理装置9を設ける。
An example of the distribution line operating device according to the present invention will be described below in detail with reference to the drawings. In the present invention, the same reference numerals are given to corresponding parts as in FIG. 2, and as shown in FIG. 4, the operating console 8 and the TC A distribution line operation processing device 9 having a microcomputer or minicomputer configuration, for example, is provided between the master station 6 and the power distribution line operation processing device 9 .

しかるにTC親局6は従来の場合と同様に系統監視盤7
へPSW4およびFCB2の開閉状態およびフィーダ1
0の負荷電流の情報を送り出すと共に、配電線操作処理
装置9(以下操作処理装置と呼ぶ)へも送り出すように
する。
However, the TC master station 6 is connected to the grid monitoring board 7 as in the conventional case.
Open/close status of PSW4 and FCB2 and feeder 1
The information on the load current of 0 is sent out, and is also sent to the distribution line operation processing device 9 (hereinafter referred to as the operation processing device).

従って操作処理装置9には常にPSW4およびFCB2
の開閉状態、およびフィーダ10の負荷電流が伝送され
ていることになる。また、操作卓8はスイッチ操作によ
り、作業停電すべき区間3を操作処理装置9に対して指
示する。
Therefore, the operation processing device 9 always includes PSW4 and FCB2.
The open/close state of the feeder 10 and the load current of the feeder 10 are transmitted. In addition, the operation console 8 instructs the operation processing device 9 as to the section 3 in which a work power outage is to be performed by operating a switch.

ここで操作処理装置9は、常に各FCB2の開閉状態、
フィーダ電流、およびそれらに接続されているPSW4
の開閉状態を記憶しておき、操作卓8上のスイッチ操作
による作業停電指令を受信したとき逆送区間を検出する
とともに、その逆送区間に対し、他のフィーダ10から
電力の融通をし、その後作業区間を停電させる。このよ
うに本発明の場合TC親局6は、配電線操作装置9へも
同一情報を伝送する。
Here, the operation processing device 9 always controls the open/closed state of each FCB 2,
feeder currents and PSW4 connected to them
The opening/closing state of the feeder is memorized, and when a work power outage command is received by operating a switch on the operation console 8, a reverse feed section is detected, and power is accommodated from other feeders 10 for the reverse feed section. The work area will then be cut off from power. In this way, in the case of the present invention, the TC master station 6 also transmits the same information to the distribution line operating device 9.

操作卓上のスイッチ操作(従来方式の場合)または、配
電線操作処理装置(本発明による場合)からの区分開閉
器4および配電線用しや断器2の開閉信号を遠方監視制
御装置子局5へ伝送する機能を持つ。また本発明の場合
操作卓8には、作業区間を指示するスイッチが設けられ
、指示されたスイッチの信号を配電線操作処理装置9へ
伝送する機能を持つ。しかるに配電線操作処理装置9は
、遠方監視制御装置親局6から、区分開閉器4および配
電線用しや断器2の開閉状態、および配電線の負荷の大
きさが伝送される。
Remote monitoring and control device slave station 5 receives open/close signals for sectional switch 4 and distribution line sheath breaker 2 from switch operation on the operation desk (in the case of the conventional method) or from the distribution line operation processing device (in the case according to the present invention). It has the function of transmitting to. Further, in the case of the present invention, the operation console 8 is provided with a switch for instructing the work section, and has a function of transmitting the signal of the instructed switch to the distribution line operation processing device 9. However, the distribution line operation processing device 9 receives the open/close states of the section switch 4 and the distribution line sheath breaker 2 and the magnitude of the load on the distribution line from the remote monitoring and control device master station 6.

操作卓8上のスイッチ操作により作業区間が指示された
時、その作業区間を停電すべく、逆送区間に対し予備フ
ィーダの検出および予備フィーダへの接続替えを行なっ
た後、区分開閉器4および配電線用しや断器2の開閉信
号を遠方監視制御装置親局6に伝送して作業区間を停電
させる。
When a work zone is designated by operating a switch on the console 8, in order to shut off the power in that work zone, after detecting the backup feeder and changing the connection to the backup feeder for the reverse feed zone, the section switch 4 and The opening/closing signal of the distribution line cutter 2 is transmitted to the remote monitoring and control device master station 6 to shut off the power in the work section.

第4図の構成の本発明に依る配電線操作装置は、作業停
電および作業停電に伴う電力の融通のために、FCB2
又はPSW4を次のように操作する。なお以下の動作説
明においては先ず動作の概要を説明した後に、次に詳細
な動作を説明する。本発明装置は概略次のような検出お
よび操作を行う。‘11 各FCB2(つまり各フィー
ダ)により送電されている区間3及び偽W4を予定の順
序で検出する。
The distribution line operating device according to the present invention having the configuration shown in FIG.
Or operate PSW4 as follows. In the following explanation of the operation, an overview of the operation will first be explained, and then a detailed explanation will be given. The device of the present invention generally performs the following detection and operation. '11 Detect the section 3 and false W4 in which power is being transmitted by each FCB 2 (that is, each feeder) in the scheduled order.

{21 各区間3の負荷電流を求める。{21 Find the load current in each section 3.

【3’逆送区間内の末端区間の検出。[3' Detection of end section within reverse feed section.

作業停電を実施しようとしている区間を経由して送電さ
れている区間3の集合体すなわち逆送区間のうち、作業
区間より一番末端の区間3、すなわち他の区間3に対し
て送電していない区間3を検出する。
Among the collection of sections 3 that are transmitting power through the section where a work power outage is to be implemented, that is, the reverse transmission section, power is not being transmitted to the section 3 that is furthest from the work section, that is, to other sections 3. Detect section 3.

これを以下末端区間と呼ふ;。‘41 電力の融通を行
なうフィーダ(予備フィーダ)の検出‘3}で検出され
た末端区間に送電しているフィーダ10以外のもので、
当該末端区間に電力の融通ができるフィーダ10を検出
する。
This will be referred to as the terminal section below. '41 Detection of a feeder that accommodates power (backup feeder) '3}
A feeder 10 that can accommodate power in the end section is detected.

(5ー PSW4の操作 側で検出されたフィーダ10の供給余裕電流(予備力)
と当該末端区間の負荷電流の大きさにより次の操作をす
る。
(5- Supply surplus current (reserve power) of feeder 10 detected on the operating side of PSW4
Perform the following operation depending on the magnitude of the load current in the end section.

‘a} 予備力の方が大きいときは、当該末端区間を‘
4}で検出されたフィーダ10に接続変更をする。
'a} If the reserve capacity is larger, the end section is '
4}, the connection is changed to the feeder 10 detected.

【bー 予備力の方が小さいときは、当該末端区間を停
電させる。
[b- If the reserve capacity is smaller, the relevant end section will be cut off.

【6} 末端区間に対する操作の繰り返し上記【1}〜
■を逆送区間のすべての区間3について操作が終了する
まで繰り返す。
[6} Repeat the operation for the terminal section [1} ~
Repeat step (3) until the operation is completed for all sections 3 of the reverse feed section.

‘7)作業区間の停電 最後に作業区間を停電させる。‘7) Power outage in the work area Finally, power is cut off in the work area.

以上の操作によって作業停電に伴う電力の融通操作およ
び作業停電操作が完了する。
With the above operations, the power interchange operation and the work power outage operation accompanying the work power outage are completed.

以上が操作の概要であるが、次に第2図の系統において
、区間3−7を作業区間とする場合の操作方法を例とし
て、以下に詳細に説明する。
The above is an overview of the operation. Next, in the system shown in FIG. 2, the operation method when the section 3-7 is used as the work section will be explained in detail below.

〔1〕 各フィーダにより送電されているPSW4およ
び区間3の検出FCB2およびPSW4に接続され得る
区間3は、配電線の建設または、増設時に自づと決定さ
れる。
[1] Detection of the PSW4 and section 3 to which power is transmitted by each feeder The section 3 that can be connected to the FCB2 and PSW4 is automatically determined at the time of construction or expansion of the distribution line.

その接続関係を第1表の如く予測してあらかじめ操作装
置9のメモリに記憶しておおく。
The connection relationship is predicted as shown in Table 1 and stored in advance in the memory of the operating device 9.

第1表は、図一1の配電線における接続関係および、F
CB2およびPSW4の開閉状態を例示したものであり
、FCB2およびPSW4により送電され得る区間3を
表わしている。俺W4に接続され得る区間3は「始端側
区間」および「終端側区間」の2区間あるが、始端また
は終端側区間の区分は単なる便宜的区分であり、何ら特
別の意味はない。TC親局6から伝送されるFCB2お
よびPSW4の開閉状態は、それが伝送されるたびに第
1表のメモリに記憶する。従って第1表は現時点におけ
るFCB2およびPSW4の開閉状態を表わしているこ
とになる。なお第1表において、「0」は開路状態、「
1」は閉路状態をそれぞれ示す。第1表 このようにして操作装置9のメモリに記憶されている第
1表の内容に基づいて操作装置9は、各フィ−ダに接続
されているFCB2,PSW4および区間3を以下に述
べるが如くして検出し、第2表のデータを作成する。
Table 1 shows the connection relationships in the distribution line in Figure 11 and the F
This is an example of the open/closed states of CB2 and PSW4, and represents section 3 in which power can be transmitted by FCB2 and PSW4. There are two sections 3 that can be connected to the W4, a "starting end section" and a "terminating end section," but the division into the starting end section or the terminal end section is merely a convenient division and has no special meaning. The open/close states of the FCB 2 and PSW 4 transmitted from the TC master station 6 are stored in the memory shown in Table 1 each time they are transmitted. Therefore, Table 1 represents the current open/close states of FCB2 and PSW4. In Table 1, "0" indicates an open circuit state, and "0" indicates an open circuit state.
1'' indicates a closed circuit state. Table 1 Based on the contents of Table 1 thus stored in the memory of the operating device 9, the operating device 9 determines the FCB 2, PSW 4 and section 3 connected to each feeder as described below. Detection is performed in this way, and the data in Table 2 is created.

第2は、各FCB2,PSW4とその両端の区間3の関
係を表わしており、FCB2またはPSW4からみて露
流々入側区間を受電区間とし、亀流々出側区間を送電区
間としている。
The second represents the relationship between each FCB 2 and PSW 4 and the sections 3 at both ends thereof, and the section on the inflow side of the dew flow is the power receiving section when viewed from the FCB 2 or PSW 4, and the section on the outflow side of the tortoise flow is the power transmission section.

第2表フイータ−10−1 フイーダ10−2 フイータ−10−3 フイータ110−4 次に例えば第1図におけるフィーダ10−2を例にとっ
て第2表の作成方法を説明する。
Second Table Feeder 10-1 Feeder 10-2 Feeter 10-3 Feeter 110-4 Next, a method for creating the second table will be explained by taking the feeder 10-2 in FIG. 1 as an example.

第3表から第6表は第2表のフィーダ10−2に関する
部分ができるまでの途中経過を表わしている。FCB2
−2が第1表で閉路丈態を示していれば、その終端側区
間3一6はFCB2一2より送電されている状態である
。(FCB2が関路状態であれば、それに接続されてい
る区間3は皆無である。)この閉略しているFCB2一
2と送電区間3−6を第2表のメモIJIこ登録する。
かくしてFCB2−2および送電区間3一6が登録され
た後の状態は第3表のようになる。第3表 ここで、FCB2には受電区間3はないので「受電区間
」欄は無意味である。
Tables 3 to 6 show the progress until the part related to feeder 10-2 in Table 2 is completed. FCB2
If -2 indicates a closed circuit state in Table 1, the terminal side section 3-6 is in a state where power is being transmitted from the FCB 2-2. (If FCB 2 is in the barrier state, there is no section 3 connected to it.) Register the closed FCB 2-2 and power transmission section 3-6 in the memo IJI of Table 2.
In this way, the state after FCB 2-2 and power transmission section 3-6 are registered is as shown in Table 3. Table 3 Here, since there is no power receiving section 3 in FCB2, the "power receiving section" column is meaningless.

次に第2表に登録された送電区間(本例では3−6であ
る)に接続し得るFCB2またはPSW4を第1表より
検出する。
Next, the FCB 2 or PSW 4 that can be connected to the power transmission section (3-6 in this example) registered in Table 2 is detected from Table 1.

これは、前記送電区間を第1表の「始様側区間」および
「終端側区間一樹より見つけ出せば、その「FCBまた
は俺WJ欄に登録されている。
This means that if you find the power transmission section from the ``Starting side section'' and ``Terminal side section Kazuki'' in Table 1, it will be registered in the ``FCB or OreWJ'' column.

FCB2またはPSW4が、その送電区間に後続してい
るFCB2または俺W4ということになる(本例では2
一2および4一7である)。このようにして見つけ出し
たFCB2またはMW4のうち、開閉状態が「閉路」と
なっていて、かつ、第2表の「送電FCBまたはPSW
」欄に未登録のPSW4は当該送電区間と下位区間(F
CB2からみて電気的に遠い方の区間)とを結ぶ鴎W4
ということになる(本例では4一7である)。
FCB2 or PSW4 is the FCB2 or IW4 that follows the power transmission section (in this example, 2
12 and 4-7). Among the FCB2 or MW4 found in this way, if the opening/closing state is "closed" and the "power transmission FCB or PSW" in Table 2 is
PSW4 that is not registered in the " column is registered in the relevant power transmission section and lower section (F
Ushi W4 that connects the electrically farthest section from CB2)
(In this example, it is 4-7).

この検出したPSW4を第2表の「送電FCBまたはP
SW」欄に登録するとともに、前記送電区間(本例では
3一6である。)は送電FCBまたは笛W(本例では4
‐7である)に対しては受電区間となるので、前記送電
区間を「受電区間一樹に登録する。かくして登録された
後の状態は第4表のようになる。第4表 続いて、第2表に新たに登録したPSW4(本例では4
一7である)に接続している区間3でかつ、第2表に禾
登録の区間3を第1表−1および第2表より検出する(
本例では3一7である)。
This detected PSW4 is connected to the “power transmission FCB or
At the same time, the power transmission section (in this example, 3-6) is registered in the power transmission FCB or whistle W (in this example, 4-6).
-7) is the power receiving section, so the power transmission section is registered in the "power receiving section Kazuki."The state after being registered is as shown in Table 4. PSW4 newly registered in Table 2 (in this example, 4
From Table 1-1 and Table 2, detect section 3 that is connected to Section 3 (1-7) and registered in Table 2 as section 3 (
In this example, it is 3-7).

これにより検出される区間3(本例では3一7である)
は、前記PSW4(本例では4−7である)から送電さ
れていることを表わしており、この区間3を表−2の「
送電区間」欄に登録する。かくして登録された後の状態
は第5表のようになる。第5表 このようにPSW4と区間3の接続関係のチェックを第
2表の「送電FCBまたは偽W」欄に登録すべきPSW
4がなくなるまで順次繰り返す。
Section 3 detected by this (3-7 in this example)
indicates that power is being transmitted from PSW 4 (in this example, it is 4-7), and this section 3 is defined as "" in Table 2.
Register in the "Power transmission section" column. The status after registration is as shown in Table 5. Table 5: Check the connection relationship between PSW 4 and Section 3 as shown in Table 2.
Repeat in sequence until 4 is gone.

これによりフィーダ10一2に接続されているFCB2
,PSW4および区間3をすべて検出することができ、
その終了後の状態は第6表のようになる。第6表 前記PSW4と区間3の接続関係のチェックの過程で分
岐線路があった場合、第2表の「送電FCBまたはPS
W」欄に登録すべき塔W4が複数個表われることがある
As a result, FCB2 connected to feeder 10-2
, PSW4 and section 3 can all be detected,
The status after completion is as shown in Table 6. Table 6 If there is a branch line during the process of checking the connection relationship between PSW 4 and Section 3, please refer to Table 2.
A plurality of towers W4 to be registered in the "W" column may appear.

このようなときは、1つのPSW4のみ「送電FCBま
たはPSW」欄に登録し、残りのPSW4は第7表のメ
モリに登録しておき、前者のPSW4の接続関係をすべ
てチェックした後後者のPSW4の接続関係のチェック
をする。後者については、第7表に登録されている分岐
したPSW4を取り出し、そのPSW4を始点として偽
W4と区間3の接続関係を同様にチェックすればよい。
第7表 なお前述の第2表はすべてのフィーダ10について作成
され、FCB2または掩W4の開閉状態が変化するつど
更新されるものである。
In such a case, register only one PSW4 in the "Power transmission FCB or PSW" field, and register the remaining PSW4 in the memory in Table 7. After checking all the connections of the former PSW4, the latter PSW4 Check the connections. Regarding the latter, it is sufficient to take out the branched PSW4 registered in Table 7 and check the connection relationship between the false W4 and section 3 using that PSW4 as the starting point.
Table 7 The above-mentioned Table 2 is created for all the feeders 10, and is updated every time the open/closed state of the FCB 2 or the cover W4 changes.

〔2〕 各区間3の負荷電流の検出 操作袋簿9は各フィーダ電流(TC子局5およびTC親
局6を通じて本装置に伝送される)および、当該フィー
ダ10に接続されている区間3の設備容量を用い、次式
により各区間3の負荷電流を推定する。
[2] The detection operation list 9 for the load current of each section 3 records each feeder current (transmitted to this device through the TC slave station 5 and the TC master station 6) and the load current of the section 3 connected to the feeder 10. Using the installed capacity, estimate the load current in each section 3 using the following formula.

ここで、FLは区間3−iが接続されているフィーダ電
流、NLは区間3−iの負荷電流、NCiは区間3−i
の設備容量(電流)、ZNCiは区間3−iが接続され
ているフィーダ10‘こ接続されている区間3の設備容
量合計である。
Here, FL is the feeder current to which section 3-i is connected, NL is the load current of section 3-i, and NCi is the feeder current to which section 3-i is connected.
The installed capacity (current) of ZNCi is the total installed capacity of the section 3 connected to the feeder 10' to which the section 3-i is connected.

なお、この設備容量は、配電線の建設または増設時に自
づと決定されるものであり、常時変化するものではない
。このようにして求められた区間3の負荷電流を操作処
理装置9が第8表としてメモリに記憶しておく。
Note that this installed capacity is automatically determined at the time of construction or expansion of the distribution line, and does not constantly change. The operation processing device 9 stores the thus obtained load current in section 3 in the memory as Table 8.

第8表 〔3〕 逆送区間内の検出 第2表は区間3と区間3の接続関係を送受軍の方向を含
めて表わしているから、作業停電を実施しようとしてい
る区間3を経由して送電されている逆送区間内の末端区
間は第2表を用いて容易に検出することができる。
Table 8 [3] Detection within Reverse Transmission Section Table 2 shows the connection relationship between Section 3 and Section 3, including the direction of the sending and receiving forces. The terminal section within the reverse section where power is being transmitted can be easily detected using Table 2.

まず、操作卓8によって指示された作業区間が区間3−
7である場合、1つのPSW4を経由して区間3−7よ
り直接受電している区間3を検出するため、第2表の「
受電区間」欄を検索すると、フィーダ10−2の表の第
3行に区間3−7が発見される。
First, the work section specified by the console 8 is section 3-
7, in order to detect section 3 which is receiving power directly from section 3-7 via one PSW 4, "
When searching the "power receiving section" column, section 3-7 is found in the third row of the table for feeder 10-2.

そのとき同じ行の「送電区間」欄に示される区間3一8
は、区間3−7よりPSW4一8を経由して受電してい
ることを表わしている。次に同様にして区間3−8より
受電している区間3を検索すれば区間3−9が検出され
る。
At that time, sections 3-8 shown in the "Transmission Section" column on the same line
indicates that power is being received from section 3-7 via PSW4-8. Next, if the section 3 receiving power from the section 3-8 is searched in the same way, the section 3-9 will be detected.

これを「受電区間」欄を検索しても該当区間が発見され
ない区間3−10が検出されるまで繰り返し行なう。こ
の区間3一10が「受電区間」欄に検出されないことは
、区間3一10には送電区間が接続されていないこと、
すなわち末端区間であることを示している。〔4〕予備
フィーダの検出 上記〔3〕のステップで検出した逆送区間内の末端区間
に対し、電力の融通を行なうための予備フィーダの検出
を行う。
This process is repeated until a section 3-10 is detected in which no corresponding section is found even if the "power receiving section" column is searched. The fact that this section 3-10 is not detected in the "power receiving section" column means that no power transmission section is connected to section 3-10.
In other words, this indicates that it is the terminal section. [4] Detection of backup feeder A backup feeder for power interchange is detected for the end section of the reverse feed section detected in step [3] above.

まず、末端区間(本例では3−10である)末端区間が
現在接続されているフイーダとは異なるフィーダに接続
するための掩W4を検出する。
First, a cover W4 for connecting the end section (3-10 in this example) to a feeder different from the feeder to which the end section is currently connected is detected.

これは、第1表の「始端側区間」および「終端側区間一
樹から末端区間3−10に後続し得るPSW4(本例で
は4−6,4−10および4‐14である)を取り出し
、この的W4のうちで現在関路となっている斑W4(本
例では4一6および4−14である)を取り出せばよい
。次に上記により検出した末端区間3一10を他のフィ
ーダ10‘こ接続するPSW4(本例では4一6および
4−14である)の他のフイーダ10側区間(本例では
3一5および3一15)を第1表より検出し、その区間
3がどのフィーダから電力の供給をされているかを第2
表のどのフイーダにその区間3が登録されているかによ
って検出する。
This extracts PSW4 (in this example, 4-6, 4-10, and 4-14) that can follow the terminal section 3-10 from the "Starting section" and "Terminal section Kazuki" in Table 1, and All you have to do is take out the spots W4 (4-6 and 4-14 in this example) that are currently the checkpoints from this target W4. Detect the other sections on the feeder 10 side (3-5 and 3-15 in this example) of the connected PSW 4 (4-6 and 4-14 in this example) from Table 1, and find that the section 3 is The second step is to determine which feeder is supplying power.
Detection is performed based on which feeder in the table the section 3 is registered.

他のフイーダ側区間がどの第2表のフイーダ1川こも登
録されていない場合は、その区間3は停電中であること
を表わしているので電力の融通のための対象フイーダか
ら除外する。以上により予備フィーダを検出するが、予
備フィーダが複数となる場合は、予備力(フイーダの設
備容量(電流)と現在フィーダに流れている電流との差
)が最大となるフィーダを予備フイーダとする(本例で
はフイーダ10一4とする)。
If other feeder-side sections are not registered in any of the feeders 1 and 1 in Table 2, that section 3 is excluded from the target feeders for power interchange, since it indicates that there is a power outage. The backup feeder is detected as described above, but if there are multiple backup feeders, the feeder with the maximum reserve power (the difference between the feeder's installed capacity (current) and the current flowing through the feeder) is selected as the backup feeder. (In this example, it is assumed to be feeder 10-4).

〔5〕 PSW4の操作 上記〔4〕のステップで検出した末端区間(本例では3
一10である)と予備フイーダ(本例では10一4)と
を接続するPSW4(本例では4−14である)を閉略
し、その後当該末端区間を第2表の「送電区間」欄を検
索するとフィーダ10−2の表の第5行に発見されるの
で、その行の「FCBおよび鴨W」欄のPSW4(本例
では4−10である)を関路操作する。
[5] Operation of PSW4 The terminal section detected in step [4] above (in this example, 3
PSW4 (in this example, 4-14) connecting the backup feeder (10-10 in this example) and the backup feeder (in this example, 4-14) is closed, and then the terminal section is connected to the "power transmission section" column of Table 2. When searched, it is found in the fifth row of the table for feeder 10-2, so PSW4 (4-10 in this example) in the "FCB and duck W" column of that row is operated.

〔6〕 末端区間に対する操作の繰り返し前述の概要で
述べた通りの繰返し動作を実行する。
[6] Repeating the operation for the end section Execute the repeating operation as described in the above outline.

〔7〕 作業区間の停電 上記操作完了によって電力の融通操作が完了しているの
で、作業区間(本例では3−7であるについて)第2表
の「送電区間」欄を検索すると、フィーダ10−2の表
の第2行に発見されるので、その行の「FCBおよびP
SW」欄の笛W4(本例では4‐7である)を開勝操作
することにより当該作業区間を停電させる。
[7] Power outage in the work section Since the power interchange operation has been completed by completing the above operation, searching the "Power transmission section" column in Table 2 for the work section (3-7 in this example) will show that the feeder 10 -2 in the second row of the table, so the "FCB and P
By operating the whistle W4 (in this example, 4-7) in the "SW" column, the power is cut off for the work section.

上述のように本発明によれば、操作卓8上のスイッチ操
作で作業区間を指示するだけで、運転員の助勢なしで、
電力融通を伴う作業停電のための俺W4の開閉操作を速
かに行なうことができる。従って制御所の運転員が作業
停電ごとにPSW4及びFCB2の開閉状態や区間3の
負荷電流の大きさを監視記憶しておかねばならない面倒
な手間を不必要にし得ると共に、謀操作による停電の発
生を未然に防止できる。また作業区間より末端側の逆送
区間のそれぞれについて、電力融通が可能なフィーダを
検出して当該逆送区間の停電の要、不要を決めるように
したことにより、作業区間以外の停電区間の範囲をでき
るだけ狭くできる。
As described above, according to the present invention, by simply instructing the work zone by operating the switch on the operation console 8, the work can be carried out without the assistance of an operator.
I can quickly open and close my W4 for work power outages that involve power interchange. This eliminates the need for control center operators to monitor and memorize the open/close status of PSW 4 and FCB 2 and the magnitude of the load current in section 3 for each power outage. can be prevented from occurring. In addition, for each reverse feed section on the terminal side of the work section, feeders that are capable of power interchange are detected and it is determined whether a power outage is necessary or unnecessary for that reverse feed section. can be made as narrow as possible.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明を適用し得る配電線系統を示す単線結線
図、第2図は従来の配電線操作装置を示す系統図、第3
図は作業区間を指定した場合の逆送区間への蟹力融通の
説明に供する単線結線図、第4図は本発明に依る配電礎
泉操作装置の一例を示す系統図である。 1・・・・・・母線、2(2−1,2−2・・・)・・
・・・・配電線用しや断器、3(3一1,3−2・・・
)・・・・・・区間、4(4−1,4−2・・・)・・
・・・・区分開閉器、5(5一1,5−2・・・)・・
・・・・遠方監視制御装置子局(TC子局)、6・・・
・・・遠方監視制御装置親局(TC親局)、・7・・・
・・・系統監視盤、8・・・・・・操作卓、9・・・・
・・配電線操作処理装置。 多1図 多3図 多2図 多4図
Fig. 1 is a single line diagram showing a distribution line system to which the present invention can be applied, Fig. 2 is a system diagram showing a conventional distribution line operating device, and Fig. 3 is a system diagram showing a conventional distribution line operating device.
The figure is a single line diagram for explaining the accommodation of power to the reverse feed section when a work section is specified, and FIG. 4 is a system diagram showing an example of the power distribution foundation spring operating device according to the present invention. 1... Bus line, 2 (2-1, 2-2...)...
...Distribution line disconnector, 3 (3-1, 3-2...
)......section, 4 (4-1, 4-2...)...
...Division switch, 5 (5-1, 5-2...)...
...Distant monitoring and control device slave station (TC slave station), 6...
... Remote monitoring and control device master station (TC master station), 7...
...System monitoring panel, 8...Operation console, 9...
...Distribution line operation processing equipment. Multi 1 drawing Multi 3 drawing Multi 2 drawing Multi 4 drawing

Claims (1)

【特許請求の範囲】 1 配電系統の区分開閉器及び配電線用しや断器の開閉
状態、並びに各配電線の負荷を系統監視盤に遠方監視表
示すると共に、当該表示を監視しながら上記区分開閉器
又は配電用しや断器を開閉操作し得る操作卓とを有する
配電線操作装置において、上記操作卓と、上記区分開閉
器及び配電用しや断器との間の信号系に配電線操作処理
装置を設け、 この配電線操作処理装置は上記操作卓の
スイツチ操作により作業区間が指定されたときその作業
円間を停電させるべく、(ア) 各配電線用しや断器を
介してフイーダにより送電されている区間及び区分開閉
器を予定の順序で検出手段(イ) 各区間の負荷電流を
求める手段 (ウ) 逆送区間内の送電していない末端区間を検出す
る手段(エ) 電力の融通を行なう予備のフイーダを検
出する手段(オ) 検出された予備のフイーダの供給余
裕電流とその末端区間の負荷電流の大きさを比較し、
供給余裕電流の方が大きいときはその末端区間を検出さ
れた予備のフイーダに接続変更し、 供給余裕電流の方
が小さいときはその末端区間を停電させる手段(カ)
末端区間に対し(ア)〜(エ)の操作が終了するまで繰
り返す手段をそれぞれ実行し、 予備フイーダへの接続替えを行つた後に、上記区分開
閉器及び上記配電線用しや断器に対する開閉信号を送出
することを特徴とする配電線操作装置。
[Scope of Claims] 1. The opening/closing status of the distribution system's sectional switches and distribution line breakers, as well as the load on each distribution line, is remotely monitored and displayed on a system monitoring panel, and the above-mentioned classification is monitored while monitoring the display. In a distribution line operating device having an operation console capable of opening and closing a switch or a distribution sheath breaker, a distribution line is provided in a signal system between the operation console and the sectional switch or distribution sheath breaker. An operation processing device is provided, and this distribution line operation processing device performs the following functions in order to cause a power outage in the work area when a work area is specified by operating a switch on the operation console. Means for detecting the sections and sectional switches where power is being transmitted by the feeder in the scheduled order (a) Means for determining the load current in each section (c) Means for detecting the end section where power is not being transmitted within the reverse feed section (d) Means for detecting a spare feeder for power interchange (e) Compares the supply margin current of the detected spare feeder with the magnitude of the load current in its end section,
When the supply margin current is larger, the terminal section is connected to the detected spare feeder, and when the supply margin current is smaller, the terminal section is powered off.
Repeat the steps (a) to (d) for the end section until they are completed, and after changing the connection to the backup feeder, open/close the sectional switch and the distribution line breaker. A power distribution line operating device characterized by transmitting a signal.
JP53037777A 1978-03-31 1978-03-31 Distribution line operating device Expired JPS6028223B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP53037777A JPS6028223B2 (en) 1978-03-31 1978-03-31 Distribution line operating device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP53037777A JPS6028223B2 (en) 1978-03-31 1978-03-31 Distribution line operating device

Publications (2)

Publication Number Publication Date
JPS54129445A JPS54129445A (en) 1979-10-06
JPS6028223B2 true JPS6028223B2 (en) 1985-07-03

Family

ID=12506906

Family Applications (1)

Application Number Title Priority Date Filing Date
JP53037777A Expired JPS6028223B2 (en) 1978-03-31 1978-03-31 Distribution line operating device

Country Status (1)

Country Link
JP (1) JPS6028223B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2645003B2 (en) * 1987-02-19 1997-08-25 九州電力株式会社 Distribution system operating device

Also Published As

Publication number Publication date
JPS54129445A (en) 1979-10-06

Similar Documents

Publication Publication Date Title
US6882888B2 (en) Configuration of a control system for an electrical switchgear assembly
CN108899900B (en) Substation protection and measurement and control on-site secondary equipment voltage parallel and switching method
JP2009225534A (en) Distribution system operation device
JPS6028223B2 (en) Distribution line operating device
CN207663532U (en) Based on the anti-error behaviour's speech prompting system of switchgear
JPS6353774B2 (en)
JPH0783564B2 (en) Ground fault point recognition device for distribution lines
JP3141806B2 (en) Automatic distribution line switchgear
JP2723410B2 (en) Distribution system operating device
JPH01136528A (en) Remote control of distribution line
KR19980020450A (en) Expert guide for recovery of electrostatic system and its recovery guide
JPH0284014A (en) Distribution line monitoring system
JPS6053528B2 (en) Power system monitoring device
JPH0771374B2 (en) Ground fault point recognition device for distribution lines
JPH0341010B2 (en)
JPS60174034A (en) Power distribution line system state monitor
JP2793669B2 (en) Switching control device for indoor high-voltage distribution
JPH03198623A (en) Distribution system monitoring controller
JPH0748930B2 (en) Distribution line loop switching device
JP2003284262A (en) Distribution line monitoring and control equipment
JPH09285040A (en) Distribution line automation system
JPH03190529A (en) Direction/distance relaying device
JPS61266028A (en) Distribution wire system state monitor
Van Bavel et al. Remote control and diagnosis of the 36 kV substations in the Brussels area
JPH0433523A (en) Distribution system controller