Distribution system operating device

Info

Publication number
JP2645003B2
JP2645003B2 JP62034471A JP3447187A JP2645003B2 JP 2645003 B2 JP2645003 B2 JP 2645003B2 JP 62034471 A JP62034471 A JP 62034471A JP 3447187 A JP3447187 A JP 3447187A JP 2645003 B2 JP2645003 B2 JP 2645003B2
Authority
JP
Japan
Prior art keywords
procedure
section
accommodation
switch
distribution
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP62034471A
Other languages
Japanese (ja)
Other versions
JPS63206119A (en
Inventor
敏昭 吉浦
誠二 東
昭 高橋
博 鈴木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP62034471A priority Critical patent/JP2645003B2/en
Publication of JPS63206119A publication Critical patent/JPS63206119A/en
Application granted granted Critical
Publication of JP2645003B2 publication Critical patent/JP2645003B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Description

【発明の詳細な説明】 [発明の目的] (産業上の利用分野) 本発明は配電系統にある配電線の作業停電及び復電に
伴なう電力融通に必要な開閉器の切替え操作を行なう配
電系統の操作装置に関するものである。
DETAILED DESCRIPTION OF THE INVENTION [Purpose of the Invention] (Industrial application field) The present invention performs a switching operation of a switch required for power interchange accompanying a power outage and power restoration of a distribution line in a distribution system. The present invention relates to an operation device for a distribution system.

(従来の技術) 従来技術を第3図、第4図、第5図を用いての説明す
る。
(Prior Art) The prior art will be described with reference to FIGS. 3, 4, and 5. FIG.

第3図において、SSは配電変電所であり、通常、変圧
器TRを備え、母線BUSからフィーダしゃ断器CBを介して
配電線Fを導出している。この配電線Fは複数の区分開
閉器SWにより、夫々配電区間K1、K2、K3…に区分される
と共に、他の配電線にも連系されるように構成されてい
る。
In FIG. 3, SS is a distribution substation, which usually includes a transformer TR, and leads out a distribution line F from a bus BUS via a feeder breaker CB. The distribution line F is divided into distribution sections K 1 , K 2 , K 3 ... By a plurality of division switches SW, and is configured to be connected to other distribution lines.

一方、CTはフィーダ電流(配電線導出部の電流)を検
出するための変流器、CMはフィーダ電流測定器である。
これらの電流測定器の出力信号及びフィーダしゃ断器CB
や区分開閉器SW等のオン・オフ状態信号は、信号伝送装
置を構成する遠方監視制御装置(以下、テレコンと称
す)の子局TC1、TC2、TC3…及びテレコン親局TC0を介し
て制御所内の監視盤KB及び配電系統の操作装置(以下操
作装置と称す)CPUに入力される。監視盤KBは、配電系
統の現在時点の開閉器状態、フィーダ電流等を表示し、
操作装置CPUは、そのメモリ部に前記信号伝送装置から
得られるオンライン情報を記憶する他、各配電区間、例
えばK1、K2、K3…毎に予定された区間負荷電流値を記憶
している。
On the other hand, CT is a current transformer for detecting the feeder current (current of the distribution line lead-out section), and CM is a feeder current measuring device.
Output signals of these current measuring devices and feeder breaker CB
And on-off state signal section switch SW or the like, remote monitor control device constituting the signal transmission device (hereinafter, referred to as tele) the slave station TC 1, TC 2, TC 3 ... and Tele master station TC 0 of It is input to the monitoring panel KB and the operation device (hereinafter referred to as operation device) CPU of the power distribution system in the control center via the control center. The monitoring panel KB displays the current switch state and feeder current of the distribution system,
The operating device CPU stores online information obtained from the signal transmission device in its memory unit, and also stores a section load current value scheduled for each distribution section, for example, K 1 , K 2 , K 3 ,. I have.

一方、操作卓OPは操作装置CPUに対して、特定開閉器
の操作指令や作業停電操作指令等を指示するマンマシン
インターフェイス装置である。
On the other hand, the console OP is a man-machine interface device for instructing the operation device CPU to issue an operation command for a specific switch, a work power failure operation command, and the like.

ここで開閉器SWには、配電線事故時の事故区分の検出
を容易にするために、無電圧開放形の自動開閉器が用い
られており、又、開閉器毎に時限順送装置を設けて時限
順送装置の機能により、停電復電時の復旧操作を行なっ
ている。時限順送装置の機能とは、電源側に電圧が有
り、負荷側が停電している条件で一定時間(X時間)後
に開閉器を「入」制御し、その後更に一定時間(Y時
間)以内に停電すればロックする。そして、再び電源側
に電圧有、負荷側停電の条件が成立しても再度、開閉器
の「入」制御をしないようになっているものである。
Here, the switch SW uses a no-voltage open type automatic switch to facilitate detection of the fault category at the time of distribution line fault, and a time-sequential feeding device is provided for each switch. With the function of the time-sequential forwarding device, a recovery operation at the time of power failure and power recovery is performed. The function of the time-sequential feeding device is that the switch is turned on after a certain time (X hours) under the condition that there is a voltage on the power supply side and a power failure on the load side, and then within a certain time (Y time) Locks out if power fails. Then, even if the conditions of the voltage on the power supply side and the power failure on the load side are satisfied again, the "ON" control of the switch is not performed again.

上記した時限順送装置による復旧操作に加えて、操作
装置CPUからはテレコン親局TC0経由で各テレコン子局TC
2、TC3を順次選択制御する遠方制御機能により、停電復
電時の復旧操作が可能であり、一般には時限順送機能と
遠方制御機能を併用することにより、配電系統運用シス
テム全体の信頼性を向上させている。
In addition to the recovery operation by the timed progressive device described above, each of the tele conversion slave stations TC via telecontrol master station TC 0 from the operating device CPU
2, the distal control function for sequentially selecting control TC 3, are possible recovery operations at the time of power failure power recovery by the general be used together timed progressive function and far control function, the overall power distribution system management system reliability Has been improved.

次に、第4図、第5図を用いて配電線事故発生時の負
荷側健全区間に対する融通操作手順、或いは作業停電実
施時の作業停電区間より負荷側に存在する区間に対する
融通操作手順(事前切替手順)を求めるための融通計算
について説明する。
Next, referring to FIG. 4 and FIG. 5, a switching operation procedure for a healthy section on the load side when a distribution line accident occurs, or a switching operation procedure for a section existing on the load side from the work blackout section when a work blackout is performed (beforehand). The switching calculation for obtaining the switching procedure will be described.

ここで融通計算とは、与えられた制約条件で、ある一
つ以上の停電区間と配線系統の状態(区分開閉器と区間
の繋りを示す情報、即ち、配電区間の両端に接続されて
いる区分開閉器のどちらが始端でどちらが終端であるか
という情報や、開閉器の開閉状態信号、更には変圧器や
配電線の電流、各配電区間の負荷電流)を基にして、健
全な配電線から当該融通送電の対象となっている停電区
間群に対し、融通送電するために、目的関数に合致した
最適な開閉器操作手順(最適解)を求める計算を言う。
Here, the interchange calculation refers to a state of one or more blackout sections and a wiring system (information indicating connection between a section switch and a section, that is, connected to both ends of a power distribution section under given constraints. Based on the information on which of the segmented switches is the starting end and which is the end, the switching status signal of the switch, the current of the transformer and the distribution line, and the load current of each distribution section) This refers to the calculation for finding the optimal switch operation procedure (optimum solution) that matches the objective function in order to perform power transmission and transmission for the group of power interruption sections that are the target of the power transmission and transmission.

なお、前記目的関数とは、例えば供給支障を最小化す
ることや、融通送電後の各配電線の予備力が平均化する
こと等をいう。
Note that the objective function refers to, for example, minimizing a supply hindrance, averaging the reserve capacity of each distribution line after the interchange and transmission.

これを、配電系統図を参照しながら説明する。第4図
は健全時の状態を示し、K1、K2、K3が後に停電区間群と
なる注目すべき配電区間群である。SS1、SS2、SS3…SSX
は配電変電所であり、フィーダしゃ断器CB1、CB2、CB3
…CBXを介して配電線F1、F2、F3…FXを導出している。
注目すべき配電区間群K1、K2、K3は全て配電線FXから送
電されており、これら配電区間群に隣接する配電線F1
F2、F3の予備力は夫々F1:50[A],F2:60[A],F3:10
[A]であると仮定する。
This will be described with reference to a distribution system diagram. FIG. 4 shows a state in a healthy state, in which K 1 , K 2 , and K 3 are notable power distribution sections that will later become power failure sections. SS 1 , SS 2 , SS 3 … SS X
A power distribution substation, feeder breakers CB 1, CB 2, CB 3
The distribution lines F 1 , F 2 , F 3 ... F X are derived via CB X.
Distribution leg group note K 1, K 2, K 3 are transmission from all distribution lines F X, the distribution line F 1 adjacent thereto distribution leg group,
The reserves of F 2 and F 3 are F 1 : 50 [A], F 2 : 60 [A], and F 3 : 10, respectively.
Assume [A].

なお、図中開閉器のシンボルを黒丸で示したものはオ
ン状態、白丸で示したものはオフ状態を示す。
In the figure, a switch symbol shown in a black circle indicates an ON state, and a switch symbol shown in a white circle indicates an OFF state.

この第4図の状態において、配電線FXの配電区間KX
作業のために停電するとして、SWX、CBXをオフした場
合、第5図に示すように配電区間K1〜K3まで停電となっ
てしまう。この作業停電以外の停電区間群(以下、停電
区間と称する)K1〜K3の区間負荷の大きさ(K1:30
[A],K2:20[A],K3:10[A])、これらの配電区間
群に隣接する配電線の予備力(F1:50[A],F2:60
[A],F3:10[A])、開閉器SW1〜SW2、SW4〜SW6の状
態信号を基に融通計算を行なう。
In the state of this FIG. 4, the distribution leg K X of the distribution line F X as power failure for work, SW X, if you turn off the CB X, distribution leg K 1 ~K 3 as shown in Figure 5 Until the blackout. This task blackout other blackout section group (hereinafter, referred to as blackout interval) K 1 ~K 3 sections load magnitude (K 1: 30
[A], K 2 : 20 [A], K 3 : 10 [A]), and reserve capacity (F 1 : 50 [A], F 2 : 60) of distribution lines adjacent to these distribution section groups.
[A], F 3: 10 [A]), performing switch SW 1 ~SW 2, SW 4 ~SW flexibility calculated based on the state signals of the 6.

以下、この融通計算について表を用いて説明する。 Hereinafter, this accommodation calculation will be described using a table.

先ず、停電区間K1〜K3への融通計算を開始するに当
り、停電区間群K1〜K3に直接接続され得る開閉器SW1〜S
W6を仮想的に全てオフ状態にしておく。
First, hit the start the interchange calculation to blackout interval K 1 ~K 3, switch SW 1 to S which may be connected directly to the power failure section group K 1 ~K 3
W 6 is virtually all turned off.

次に、停電区間群K1〜K3を区間負荷の小さい順に並べ
る(表1)。
Next, arrange the power failure section group K 1 ~K 3 in ascending order of segment loading (Table 1).

そして、配電線F1〜F3が実際の配電区間相互の接続状
態を無視して区間負荷の大きさのみを判断要素として停
電区間群K1〜K3に送電したと仮定した場合、夫々の配電
線F1〜F3が幾つの区間数まで送電できるかについて判断
する。この判断結果を表2に示す。
Then, assuming that the distribution lines F 1 to F 3 have transmitted power to the blackout section groups K 1 to K 3 using only the magnitude of the section load as a determining factor ignoring the actual connection state of the distribution sections, distribution line F 1 to F 3 determines whether it transmission until the number of number of sections. Table 2 shows the result of this determination.

そして、与えられた停電区間数をα(この場合α=
3)とし、式α≧a1+a2+a3=Σaiを用いて、各配電線
の送電区間数aiの組合わせを求め、これを表3とする。
Then, the given number of blackout sections is α (in this case, α =
3), and using the equation α ≧ a 1 + a 2 + a 3 = Σai, a combination of the number of power transmission sections ai of each distribution line is obtained.

但し、0≦a1≦a1 max 0≦a2≦a2 max 0≦a3≦a3 max 表3からa1、a2、a3夫々の組合わせのケースについ
て、系統の繋り上の制約条件及び融通すべき区間の負荷
合計が、融通側配電線F1〜F3の予備力を越えない範囲で
融通区間を決定する。この決定された融通区間の組合わ
せをパターン化して示す(表4)。
Where 0 ≦ a 1 ≦ a 1 max 0 ≦ a 2 ≦ a 2 max 0 ≦ a 3 ≦ a 3 max From Table 3, for each combination of a 1 , a 2 , and a 3 , the constraints on the connection of the system and the total load of the section to be interchanged indicate the reserve capacity of the interchange-side distribution lines F 1 to F 3. The interchange section is determined within the range not exceeding. The combination of the determined accommodation sections is shown in a pattern (Table 4).

なお、表4のうち、パターン、、及びの如
く、一つの区間K1〜K3が同時に2つの配電線から融通送
電される場合は実用解ではないので、*印を付けて以後
の計算にはこれを除外する。
Of the Table 4, the pattern ,, and as, is not a practical solution if one section K 1 ~K 3 is to be flexible transmission simultaneously from two distribution lines, the calculation subsequent marked * Excludes this.

次に、各パターンが目的関数(例えば供給支障の最小
化、融通後の各配電線の予備力の均平度KPの最適化)に
合致するか否かの評価を行なう。評価のための指標は表
5に示す通りである。
Then, each pattern (minimization of example supply trouble, optimization Hitoshitaira degree K P of reserve capacity of each distribution line after interchange) the objective function to evaluate the whether they meet the. Indices for evaluation are as shown in Table 5.

なお、前記均平度KPは次の式から求める。Incidentally, the Hitoshitaira degree K P is determined from the following equation.

ここで、FiYBは配電線iの融通送電後の予備力、Nは
融通配電線数である。KPは1で完全に平均化する。
Here, Fi YB is the reserve capacity of the distribution line i after the flexible transmission, and N is the number of the flexible distribution lines. K P is completely averaged at 1.

この表5からわかるように、2つの目的関数のうち供
給支障最小を第1優先の目的関数とし、均平度KPを第2
位の目的関数とした時、パターンが最適解となる。
As can be seen from Table 5, the supply hindrance minimum of two objective functions the objective function of the first priority, the Hitoshitairado K P second
When the objective function of the order is used, the pattern becomes the optimal solution.

以上の結果として、融通操作手順後の予備力は夫々
F1:20[A],F2:30[A],F3:10[A]となる。
As a result, the reserve after the interchange operation procedure
F 1 : 20 [A], F 2 : 30 [A], F 3 : 10 [A].

なお、第5図の例は極めて単純な配電系統でありなが
ら、上述の如く評価すべきパターン数が17もある。実系
統で最適解を求めようとした場合、複雑な配電系統のた
め、数十万〜数百万のパターンを評価する必要があり、
この評価をオペレータが行なうことは不可能であり、
又、上記数十万〜数百万のパターンを全てメモリに記憶
させることは、メモリ容量が増大化するので実用的でな
く、現実にはパターンを生成する都度、前回求めた解と
比較し、小さい方の均平度のパターンを残すようにして
いる。
Although the example of FIG. 5 is an extremely simple distribution system, there are 17 patterns to be evaluated as described above. When trying to find the optimal solution in a real system, it is necessary to evaluate hundreds of thousands to millions of patterns due to the complicated distribution system,
It is impossible for an operator to make this assessment,
Also, storing all of the above several hundred thousand to several million patterns in the memory is not practical because the memory capacity increases, and in actuality, each time a pattern is generated, it is compared with the solution obtained last time, Try to keep the smaller flatness pattern.

(発明が解決しようとする問題点) しかしながら、従来の操作装置CPUが作業停電時の事
前切替操作手順を前記融通計算を使用して求めた場合
に、求めた融通手順では以下の問題がある。
(Problems to be Solved by the Invention) However, when the conventional operating device CPU obtains the pre-switching operation procedure at the time of a work power failure using the above-mentioned accommodation calculation, the obtained accommodation procedure has the following problems.

融通手順をテレコンを使用して実施している最中に、
例えばテレコン故障が発生し、遠方制御機能が機能しな
くなるか、又は操作装置CPUが停止した場合、時限順送
機能が機能してしまい、ループ状態が生じたり過負荷状
態になってしまう等配電系統運用に支障をきたすことと
なる。
While implementing the interchange procedure using a teleconverter,
For example, when a telecon fault occurs and the remote control function stops functioning or the operating device CPU stops, the timed sequential transfer function functions and a loop state occurs or an overload state occurs. Operation will be hindered.

本発明は上記問題点を解決するためになされたもので
あり、万が一融通手順を実施中にテレコン故障の発生
や、操作装置CPUが停止した場合であっても、時限順送
機能が機能しないような操作手順を自動的に計算して操
作するようにした配電系統の操作装置を提供することを
目的としている。
The present invention has been made in order to solve the above-mentioned problem, and in the event that a telecon fault occurs during the execution of the interchange procedure or the operation device CPU stops, the timed sequential forwarding function does not function. It is an object of the present invention to provide a distribution system operation device that automatically calculates and operates a simple operation procedure.

[発明の構成] (問題点を解決するための手段) 第1図によって説明すると、本発明は作業区間が設定
されていることにより、負荷側区間の融通操作手順を求
める融通演算手段11と、この融通操作手順を基にして融
通後の仮系統状態を作成し、かつ実操作用の融通操作手
順を作成する操作手順再演算手段12と、この融通操作手
順を実行させるために制御信号を出力する操作手順実行
手段13とから構成した。
[Structure of the Invention] (Means for Solving the Problems) Explained with reference to FIG. 1, according to the present invention, since a work section is set, a flexibility calculation means 11 for determining a flexibility operation procedure of a load-side section; An operation procedure recalculating means 12 for creating a provisional system state after the accommodation based on the accommodation operation procedure and creating an accommodation operation procedure for actual operation, and outputting a control signal for executing the accommodation operation procedure And an operation procedure executing means 13 for performing the operation.

(作用) 先ず、操作卓OPにて作業停電区間を設定する。これを
受けた融通演算手段11は、作業停電区間より負荷側の区
間を融通対象として融通計算を実行し、融通手順を求め
る。この融通手順に基づいて操作手順再演算手段12は、
融通後の仮系統を作成し、かつ、融通ルート単位にグル
ープ分けし、又、グループ分けした融通ルート毎に操作
手順を作成すると共に、時限順送機能防止用のロック手
順を追加し、更に前記操作手順を逆送送電となるように
並び替えて出力する。
(Operation) First, a work blackout section is set on the console OP. Receiving this, the accommodation calculating means 11 executes accommodation calculation with the section on the load side from the work power interruption section as the object of accommodation, and obtains an accommodation procedure. Based on this accommodation procedure, the operation procedure recalculation means 12
Create a provisional system after the interchange, and group it into units of the interchange route, create an operation procedure for each of the grouped interchange routes, and add a lock procedure to prevent the timed sequential forwarding function. The operation procedure is rearranged so as to be reverse power transmission and output.

(実施例) 以下、図面を参照して実施例を説明する。(Example) Hereinafter, an example is described with reference to drawings.

第1図は本発明による配電系統の操作装置CPUの一実
施例の機能ブロック構成図である。
FIG. 1 is a functional block diagram of an embodiment of an operation device CPU of a distribution system according to the present invention.

第1図において、配電系統の操作装置CPUは、操作卓O
Pによって作業停電区間を設定された時、オンライン情
報及び予め記憶されている情報を基に電力融通のための
計算を行なう融通演算手段11と、操作手順再演算手段12
と、この操作手順再演算手段12にて作成した操作手順を
実行させるべく制御信号を前記テレコン親局TC0へ送出
する操作手順実行手段13とから構成している。
In FIG. 1, the operation device CPU of the distribution system is an operation console O.
When a work blackout section is set by P, a flexibility calculation means 11 for performing calculations for power flexibility based on online information and information stored in advance, and an operation procedure recalculation means 12
If, it constitutes a control signal in order to perform the operating procedure created from the operating procedure execution unit 13 for sending to the telecontrol master station TC 0 at this operating procedure recalculation unit 12.

なお、前記操作手順再演算手段12はこの融通演算手段
11による融通計算の結果に基づいて、融通後の仮系統を
作成すると共に、仮系統に基づいて融通ルート単位にグ
ループ分けし、そのグループ分けした融通ルート毎に操
作手順を作成して、その操作手順に時限順送機能防止用
のロック手順を追加し、かつ、この操作手順を逆送送電
となるように並び替える。
The operation procedure re-calculating means 12 is provided by the flexible calculating means.
Based on the result of the accommodating calculation by step 11, create a provisional system after the accommodating operation, divide the group into units of accommodating routes based on the tentative system, create an operating procedure for each of the accommodating accommodating routes, and perform the operation. A lock procedure for preventing a timed sequential transmission function is added to the procedure, and the operation procedure is rearranged so as to be reverse power transmission.

以上のように構成した配電系統の操作装置の作用につ
いて、以下に説明する。
The operation of the power distribution system operating device configured as described above will be described below.

操作卓OPより作業停電区間を設定することにより、操
作装置CPUは従来技術と同様に、融通演算手段11にて作
業停電区間より負荷側の区間を融通対象として融通計算
を実行し、融通手順を求める。
By setting the work blackout section from the console OP, the operating device CPU executes the interchange calculation with the interchange calculation means 11 for the section on the load side from the work blackout section as the object of interchange, as in the prior art, and executes the interchange procedure. Ask.

操作装置CPUは、前記融通演算手段11により求めた融
通手順を基にして融通手順実行後の仮系統を作成し、こ
の仮系統において融通ルート毎にグループ分けする。但
し、グループ分けした結果、融通される区間同士が標準
系統の時属する配電線が異なる場合は、更にグループ分
けする。
The operating device CPU creates a provisional system after the execution of the accommodation procedure based on the accommodation procedure obtained by the accommodation calculation means 11, and divides the temporary system into groups for each accommodation route. However, as a result of grouping, if the distribution sections belong to different distribution lines belonging to the standard system, the groups are further grouped.

ここで標準系統とは、通常の配電系統の運用形態であ
り、系統切戻し作業(事故復旧後又は作業停電終了後の
作業)時の目的系統である。
Here, the standard system is an operation mode of a normal distribution system, and is a target system at the time of system switchback work (work after restoration from an accident or work after a power failure).

融通ルート毎にグループ分けした例を第2図を用いて
説明する。
An example of grouping for each accommodation route will be described with reference to FIG.

第2図は融通操作を実行したと仮定した仮系統図であ
り、融通操作を実行する前の系統状態は、配電線F2から
電力を供給している区間C1、C2、C3、C4、C5、C6と、配
電線F3から電力供給している区間C7、C8、C9、C10、C11
とが停電状態である。
FIG. 2 is a tentative system diagram assuming that the accommodating operation has been performed, and the system state before executing the accommodating operation is a section C 1 , C 2 , C 3 , which is supplying power from the distribution line F 2 . Sections C 7 , C 8 , C 9 , C 10 , C 11 where power is supplied from C 4 , C 5 , C 6 and distribution line F 3
Are in a power outage state.

即ち、開閉器SW1、SW2、SW3、SW4、SW5、SW6、SW7、S
W8、SW9、SW10、SW11、SW12、SW13、SW14及び配電線
F2、F3のCBの状態はオフ状態である。
That is, the switch SW 1, SW 2, SW 3 , SW 4, SW 5, SW 6, SW 7, S
W 8, SW 9, SW 10 , SW 11, SW 12, SW 13, SW 14 and power distribution lines
The state of the CB of F 2 and F 3 is off.

ここで、被融通区間はC1〜C11であり、連系開閉器SW
10、SW11、SW12、SW13、SW14により融通されている。配
電線F1からは、開閉器SW10のルート区間C3、C4、C5
C1、C2を、更に開閉器SW12のルートではC7、C8を融通
し、開閉機SW11のルートでは区間C6を融通している。
Here, the flexible section is C 1 -C 11, interconnection switch SW
Are flexible by 10, SW 11, SW 12, SW 13, SW 14. From the distribution line F 1 is the root segment C 3 of the switch SW 10, C 4, C 5 ,
C 1 and C 2 are further provided, and C 7 and C 8 are provided in the route of the switch SW 12 , and a section C 6 is provided in the route of the switch SW 11 .

ここで、区間C1〜C5、C7、C8は標準系統の時属する配
電線が、配電線F2と配電線F4とで異なるために再度グル
ープ分けする。全融通ルートについてグループ分けする
と、表6が得られる。
Here, the section C 1 ~C 5, C 7, C 8 when belonging distribution curve of standard strains, again grouped to different between distribution line F 2 and distribution lines F 4. Table 6 is obtained by grouping all the accommodation routes.

このグループ分けした融通ルートグループ単位に、以
下のようにして手順を作成する。先ず、融通点となる開
閉器の「入」制御手順を初めに作成する。これは送電側
区間と被融通区間(連系点区間)を繋ぐ開閉器「入」制
御手順を作成することである。
A procedure is created in the following manner for each group of accommodation route groups. First, an "on" control procedure for a switch serving as an interchange point is created first. This is to create a switch “on” control procedure that connects the power transmission side section and the section to be interchanged (interconnection point section).

次に、融通点以外の開閉器の「入」制御手順は連係点
区間から、標準系統の時負荷側に属する被融通区間を融
通する開閉器の「入」制御手順を作成し、この後、連係
点区間から標準系統の時、電源側に属する区間を融通す
る開閉器の「入」制御手順を作成するようにする。
Next, the "on" control procedure of the switch other than the interchange point, from the link point section, create an "on" control procedure of the switch that accommodates the accommodated section belonging to the time load side of the standard system, In the case of the standard system from the link point section, a switch ON control procedure for accommodating a section belonging to the power supply side is created.

前記融通ルートグループ1の手順は、表7の如くとな
る。
Table 7 shows the procedure of the accommodating route group 1.

更に時限順送機能を考慮して時限順送機能による自動
投入を防ぐことを目的とし、開閉器のロック手順を追加
する。これは標準系統の時、自動開閉器を挟んで被融通
区間同士が別々の融通ルートグループに分割された場合
に行なうものであり、これにより電源側区間が充電され
ても時限順送機能により、自動投入されることがないた
めに、ループ状態となることはない。この開閉器ロック
手順追加の必要な融通ルートグループは、グループ2、
グループ4、グループ5であり、このグループ毎の手順
を表8−1、表8−2、表8−3に示す。
Further, in order to prevent the automatic closing by the timed sequential forwarding function in consideration of the timed sequential forwarding function, a lock procedure of the switch is added. This is performed in the case of the standard system, when the sections to be interchanged are divided into different interchange route groups with the automatic switch interposed therebetween. There is no loop state because there is no automatic input. The interchange route groups that require this additional switch lock procedure are Group 2,
They are Group 4 and Group 5, and the procedures for each group are shown in Tables 8-1, 8-2 and 8-3.

以上融通ルートグループ単位に作成した手順を標準系
統の時、下位に属するグループ順に並び替えを行なう。
この並び替えにより融通ルートグループ単位の手順作成
時に追加した開閉器ロック手順が、標準系統の時上位に
属する区間への充電手順より先行することとなり、時限
順送機能による開閉器の自動投入を確実に防ぐことが可
能である。
In the case of the standard system, the procedure created for each accommodation route group is rearranged in the order of the group belonging to the lower order.
By this rearrangement, the switch lock procedure added when creating a procedure for each accommodation route group will precede the charging procedure for the higher-ranking section of the standard system, ensuring that the switch is automatically turned on by the time-sequential forwarding function. It is possible to prevent.

このようにして得られる融通操作手順を表9に示す。 The accommodating procedure thus obtained is shown in Table 9.

*注*通常の区分開閉器では、切(オフ)状態の開閉器
に対し、切操作を行なうと、時限順送機能がロックされ
る。
* Note * In a normal section switch, if the switch is turned off for the switch in the off (off) state, the timed sequential forwarding function is locked.

ここで、操作装置CPUは、前記融通操作手順表9を融
通操作手順再演算手段12により求め、この融通操作手順
に従い、伝送装置を介して順次開閉器に制御信号を送出
する。
Here, the operating device CPU obtains the accommodating operation procedure table 9 by the accommodating operation procedure re-calculating means 12, and sequentially sends a control signal to the switch via the transmission device according to the accommodating operation procedure.

[発明の効果] 以上説明したように本発明によれば、時限順送機能を
考慮した融通操作手順を自動的に計算し、操作すること
が出来るため、融通操作手順を実行途中に万が一の遠方
制御機能の不良に際しても、信頼性及び安定性の高い配
電系統の操作装置を提供することが出来る。
[Effects of the Invention] As described above, according to the present invention, it is possible to automatically calculate and operate a flexible operation procedure in consideration of the timed sequential forwarding function. Even when the control function is defective, it is possible to provide a distribution system operation device with high reliability and stability.

【図面の簡単な説明】[Brief description of the drawings]

第1図は本発明による配電系統の操作装置の一実施例の
構成図、第2図は同実施例における配電系統の操作装置
CPUの詳細を示す機能ブロック図、第3図は従来装置の
機能ブロック構成図、第4図は従来装置の動作状態を示
す図、第5図は配電系統において、停電時の構成図であ
る。 1……配電系統の操作装置、11……融通演算手段 12……操作手順再演算手段 13……操作手順実行手段
FIG. 1 is a block diagram of an embodiment of a distribution system operating device according to the present invention, and FIG. 2 is a distribution system operating device in the embodiment.
FIG. 3 is a functional block diagram of the conventional device, FIG. 4 is a diagram showing an operation state of the conventional device, and FIG. 5 is a configuration diagram at the time of a power failure in the power distribution system. DESCRIPTION OF SYMBOLS 1 ... Operation device of distribution system, 11 ... Accuracy calculation means 12 ... Operation procedure recalculation means 13 ... Operation procedure execution means

フロントページの続き (72)発明者 高橋 昭 東京都府中市東芝町1 株式会社東芝府 中工場内 (72)発明者 鈴木 博 東京都府中市東芝町1 株式会社東芝府 中工場内 (56)参考文献 特開 昭54−129445(JP,A) 特開 昭61−258629(JP,A) 特開 昭58−63030(JP,A) 特開 昭56−53544(JP,A)Continuing on the front page (72) Inventor Akira Takahashi 1 Toshiba-cho, Fuchu-shi, Tokyo Inside the Toshiba Fuchu factory (72) Inventor Hiroshi Suzuki 1 Toshiba-cho, Fuchu-shi, Tokyo 1 Inside Toshiba Fuchu factory (56) Reference Document JP-A-54-129445 (JP, A) JP-A-61-258629 (JP, A) JP-A-58-63030 (JP, A) JP-A-56-53544 (JP, A)

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】配電系統のフィーダしゃ断器の開閉状態信
号、配電線を複数区間に区分し、かつ配電線相互を連系
する区分開閉器の開閉状態信号、各配電線の負荷電流信
号、予め設定されているか或いは遠方監視制御装置を用
いてオンラインで取込んだ区間負荷電流信号、配電区間
相互がどのように接続されているかを示す繋り情報等の
信号を用いて配電系統の運用を行う配電系統の操作装置
において、 作業停電区間が設定されることによりオンライン情報及
び予め記憶されている情報を基に前記作業停電区間より
負荷側の区間を融通対象として融通計算を実行し、融通
操作手順を求める融通演算手段11と、 この融通演算手段11により求めた融通手順を基にして融
通手順実行後の仮系統を作成すると共に、この仮系統に
おいて融通ルート単位にグループ分けし、そのグループ
分けした融通ルート毎に、送電側区間と被融通区間(連
係点区間)とを繋ぐ融通点開閉器の「入」操作手順と、
前記融通点開閉器以外の開閉器の「入」操作手順と、異
なる融通ルート間にある開閉器が時限順送機能による自
動投入を防止する時限順送機能ロック手順とを作成し、
更にこのように作成した操作手順を逆送送電となるよう
に並び替える操作手順再演算手段12と、 この操作手順再演算手段12にて作成した操作手順を実行
させるために制御信号を出力する操作手順実行手段13と
からなることを特徴とする配電系統の操作装置。
An open / closed state signal of a feeder breaker of a power distribution system, a open / closed state signal of a divided switch for dividing a distribution line into a plurality of sections and interconnecting distribution lines, a load current signal of each distribution line, Operate the power distribution system using signals such as load current signals that are set or taken online using the remote monitoring and control device, and connection information that indicates how the distribution sections are connected to each other. In the operation device of the power distribution system, a work interruption section is set, and based on the online information and the information stored in advance, a section on the load side from the work interruption section is subjected to the accommodation calculation, and the accommodation operation procedure is performed. And a provisional system after the execution of the accommodation procedure is created based on the accommodation procedure obtained by the accommodation operation means 11. Loop divided, the flexibility every route that the grouping, the procedure "ON" operation flexibility point switch for connecting the transmission-side section and the flexible section (linked point interval)
Create an `` on '' operation procedure of switches other than the interchange point switch, and a timed sequential function lock procedure for preventing a switch located between different interchange routes from being automatically turned on by a timed sequential function,
Further, an operation procedure re-computing means 12 for rearranging the operation procedure created in this way so as to be reverse power transmission, and an operation of outputting a control signal to execute the operation procedure created by the operation procedure re-computation means 12 An operation device for a distribution system, comprising: a procedure execution unit 13.
JP62034471A 1987-02-19 1987-02-19 Distribution system operating device Expired - Lifetime JP2645003B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP62034471A JP2645003B2 (en) 1987-02-19 1987-02-19 Distribution system operating device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP62034471A JP2645003B2 (en) 1987-02-19 1987-02-19 Distribution system operating device

Publications (2)

Publication Number Publication Date
JPS63206119A JPS63206119A (en) 1988-08-25
JP2645003B2 true JP2645003B2 (en) 1997-08-25

Family

ID=12415165

Family Applications (1)

Application Number Title Priority Date Filing Date
JP62034471A Expired - Lifetime JP2645003B2 (en) 1987-02-19 1987-02-19 Distribution system operating device

Country Status (1)

Country Link
JP (1) JP2645003B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7732292B2 (en) * 2021-09-09 2025-09-02 中国電力株式会社 Power distribution and transfer load support system and power distribution and transfer load support program

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6028223B2 (en) * 1978-03-31 1985-07-03 株式会社東芝 Distribution line operating device
JPS61258629A (en) * 1985-05-07 1986-11-17 株式会社東芝 Misoperation preventor for distribution wire switch

Also Published As

Publication number Publication date
JPS63206119A (en) 1988-08-25

Similar Documents

Publication Publication Date Title
US11904918B2 (en) Computer interlocking system and switching control method for the same, device, and storage medium
CN106160187A (en) Middle pressure power transmission and distribution automatic switching control system and control method
JPS6022576B2 (en) voltage detector
CN107846015A (en) Intelligent distribution network load transfer optimal route selection method based on peer-to-peer communication
JP2645003B2 (en) Distribution system operating device
CN115158396A (en) An electrical fault handling system for rail transit turnouts
JP4969340B2 (en) Supervisory control system
RU2215355C1 (en) No-break power installation for railway automatic-control systems
JP6612990B2 (en) Power converter
JP2971186B2 (en) Automatic check system for switch of distribution system
CN106602529B (en) A kind of low-voltage circuit guard method in groups
CN216086256U (en) Automatic power switching system
CN119675225B (en) Automatic switching control method and system for standby power supply based on voltage double criteria
JPH061945B2 (en) Distribution system operating device
JP2557374B2 (en) Power system operating device
JPH0923583A (en) Distribution system operation device
RU2703266C1 (en) SYSTEM AND METHOD OF AUTOMATIC CONTROL OF MUNICIPAL DISTRIBUTION ELECTRIC NETWORK 6-10 kV
JP3211289B2 (en) Protection relay with switching function for instrument transformer
JPH061946B2 (en) Work power failure operation device
US20220337051A1 (en) Restoration Of Fault Insulated Feeder
CN114221430A (en) Main transformer section switching method and device for transformer substation
SU1457060A1 (en) High-voltage switchgear
JPS60128830A (en) Load selection breaking unit
JPS602854B2 (en) Distribution line power interchange processing equipment
JPH0246217Y2 (en)

Legal Events

Date Code Title Description
S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313115

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

EXPY Cancellation because of completion of term