Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPS6033458B2 - Tea manufacturing method - Google Patents
[go: Go Back, main page]

JPS6033458B2 - Tea manufacturing method - Google Patents

Tea manufacturing method

Info

Publication number
JPS6033458B2
JPS6033458B2 JP14896882A JP14896882A JPS6033458B2 JP S6033458 B2 JPS6033458 B2 JP S6033458B2 JP 14896882 A JP14896882 A JP 14896882A JP 14896882 A JP14896882 A JP 14896882A JP S6033458 B2 JPS6033458 B2 JP S6033458B2
Authority
JP
Japan
Prior art keywords
tea
temperature
hot air
target
tea temperature
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP14896882A
Other languages
Japanese (ja)
Other versions
JPS5939247A (en
Inventor
文雄 富田
雄二 金子
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kawasaki Kiko Co Ltd
Original Assignee
Kawasaki Kiko Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kawasaki Kiko Co Ltd filed Critical Kawasaki Kiko Co Ltd
Priority to JP14896882A priority Critical patent/JPS6033458B2/en
Publication of JPS5939247A publication Critical patent/JPS5939247A/en
Publication of JPS6033458B2 publication Critical patent/JPS6033458B2/en
Expired legal-status Critical Current

Links

Landscapes

  • Drying Of Solid Materials (AREA)
  • Tea And Coffee (AREA)

Description

【発明の詳細な説明】 本発明は新規な製茶粗榛方法に関する。[Detailed description of the invention] The present invention relates to a novel tea processing method.

詳しくは、操乾室内に送られる熱風の温度を規定してい
る加熱機構の制御が茶温と茶温変化率の両者を指標とし
てなされるようにし、茶温をより一定に維持して上乾き
させることなく、できるだけ恒率的乾燥を行なわしめて
、色沢・香気・水色等の優れた荒茶を製造することがで
きるようにした新規な製茶粗榛方法を提供しようとする
ものである。操乾室内に送られる熱風の温度、熱風量、
綾手や後手が装着された主軸の回転数等、製茶粗操工程
における各制御要素をその工程の進行に従って順次推移
させながら1の粗榛工程を終了する製茶粗榛方法におい
て、従来、熱風温度を規定している加熱機構の制御は作
業者の経験と勘をたよりに熱風温度自体の目標値を数段
階設定してなされていたが、この方法では茶温の大きな
変動は避けようがなかった。このため、近時、茶温自体
を直接検出し、茶温を指標として加熱機構を制御する試
み、あるいはさらに進んで、操乾室内の絶対湿度と茶温
との相互の関係から加熱機構を制御しようとする発明(
特開昭55−162941号)等が成されてきている。
Specifically, the heating mechanism that regulates the temperature of the hot air sent into the drying room is controlled using both the tea temperature and the tea temperature change rate, so that the tea temperature can be maintained more constant and the top drying process can be improved. To provide a new tea manufacturing and roughening method which enables drying to be carried out as constant as possible without drying, and to produce rough tea with excellent color luster, aroma, light blue color, etc. The temperature and volume of hot air sent into the drying room,
In the tea processing method, in which each control element in the tea processing process, such as the rotational speed of the main shaft on which the twilling hand and rear hand are attached, is changed sequentially as the process progresses, the first roughening process is completed. The control of the heating mechanism that stipulates this was done by setting several target values for the hot air temperature itself based on the experience and intuition of the operator, but with this method, large fluctuations in tea temperature were unavoidable. . For this reason, recent attempts have been made to directly detect the tea temperature itself and control the heating mechanism using the tea temperature as an index, or to go further, to control the heating mechanism from the mutual relationship between the absolute humidity in the drying room and the tea temperature. An invention that attempts to
Japanese Unexamined Patent Publication No. 55-162941) etc. have been made.

しかし、これらの方法であっても、茶温で4℃前後の変
動は避けられないのが実情であった。これは、加熱機構
の制御に対して茶温の応答が遅れるのが原因であった。
本発明はこのような実情に鑑みてなされたもので、茶温
とともに、茶温変化率を加熱機構の制御の指標とするこ
とにより、前もって茶温の応答遅れを予想したさめ細か
な制御を行ない、茶温をより一定に維持して、上乾きさ
せることなく、できるだけ恒率的乾燥を行なわしめて、
色沢・香気・水色等の優れた荒茶を製造することができ
るようにしたものである。
However, even with these methods, fluctuations of around 4°C in tea temperature cannot be avoided. This was caused by a delay in the response of the tea temperature to the control of the heating mechanism.
The present invention has been made in view of the above circumstances, and by using the tea temperature change rate as well as the tea temperature change rate as an index for controlling the heating mechanism, it is possible to perform fine control by anticipating the tea temperature response delay in advance. , by keeping the tea temperature more constant and drying as constant as possible without over-drying.
This makes it possible to produce rough tea with excellent color, aroma, and light blue color.

以下に、本発明の詳細な説明をするが、はじめに、本発
明を実施するに適した製茶粗操機の一例について説明す
る。
The present invention will be described in detail below, but first, an example of a tea processing machine suitable for carrying out the present invention will be described.

第1図は製茶粗操機1の概略を示すものである。FIG. 1 schematically shows a tea processing machine 1. As shown in FIG.

2はこの製茶粗操機1に併設された熱風発生機である。2 is a hot air generator attached to this tea processing machine 1.

3は製茶粗操機のフレームであり、該フレーム3には榛
胴4と主軸駆動部5が戦暦されている。孫月同4は両端
が閉塞された樋状をなし、前面側下部に粗榛終了後の茶
葉を取り出すための開閉自在の取出扉6が形成されてい
る。榛月岡4内にはこれを軸方向に貫通して前記駆動部
5によって回転される主軸7が回転自在に設けられてお
り、該主軸7には多数の挨手8,8……と俊手9,9・
・・・・・とが取着されている。10は操胴4の上端に
蓮穀された櫨散室であり、前面には開閉自在の窓11が
設けられ、また、後面には熱風吹込ロー2が開設されて
いる。
Reference numeral 3 denotes a frame of a tea processing machine, and the frame 3 has a shaft 4 and a main shaft drive section 5 mounted thereon. The Sogetsu Do 4 has a gutter-like shape with both ends closed, and a take-out door 6 that can be opened and closed is formed at the lower part of the front side to take out the tea leaves after roasting. A main shaft 7 is rotatably provided in the Hainzukioka 4, passing through it in the axial direction and being rotated by the drive unit 5. 9,9・
... is attached. Reference numeral 10 denotes an oak scattering chamber made of lotus grains at the upper end of the steering drum 4, a window 11 that can be opened and closed is provided at the front, and a hot air blowing row 2 is provided at the rear.

13は擬散室10の上端排気口部に配置された蒸葉プー
ルで、この中には茶葉を所定重量になるまで投入し、下
側の扉(図示略)を開くと、プール13内の茶葉が操且
同4と蝿散室10とから構成される操乾室内に投入され
る。
Reference numeral 13 denotes a steamed leaf pool placed at the upper end exhaust port of the diffusion chamber 10. Tea leaves are put into this pool until it reaches a predetermined weight, and when the lower door (not shown) is opened, the contents of the pool 13 are Tea leaves are put into a drying chamber consisting of a drying chamber 4 and a fly scattering chamber 10.

尚、この蒸葉プール13には、通常、茶葉の重量計測装
置が付設されている。14は蝿散室10の上端排気口部
を覆う金網である。
Note that this steamed leaf pool 13 is usually equipped with a tea leaf weight measuring device. Reference numeral 14 denotes a wire mesh that covers the upper end exhaust port of the fly dispersal chamber 10.

15は榛且同4の底部に設けた茶温センサー、16は目
標茶温を設定するための茶温設定ダイヤル、17は後述
する制御をなす各種回路を内蔵した制御盤である。
15 is a tea temperature sensor provided at the bottom of the teacup 4; 16 is a tea temperature setting dial for setting a target tea temperature; and 17 is a control panel incorporating various circuits for control as described below.

18は縄散室10の後側に形成された熱風導でその一端
で熱風発生機2の熱風送出口19と運速されている。
Reference numeral 18 denotes a hot air guide formed on the rear side of the scattering room 10, and one end of which is connected to the hot air outlet 19 of the hot air generator 2.

熱風発生機2は熱交換部20と送気ファン21とから成
る。
The hot air generator 2 includes a heat exchange section 20 and an air supply fan 21.

熱交換部20は、ケーシング22の中に炉筒23とこれ
に連結された熱気路24,24・・・・・・とが配置さ
れて成り、炉筒23にはバーナー25が装着されていて
、バーナー25によって炉筒23内で発生した熱気がケ
ーシング22内に迷路状に配置された熱気路を通って煙
突26から排出される。バーナー25は、燃料を炉筒2
3内へ贋霧するための気流を発生させるファン27、火
花を発生させるための点火トランス28、燃料を加圧す
るオイルポンプ29とが付設されてなる。
The heat exchange section 20 includes a furnace cylinder 23 and hot air passages 24, 24, . The hot air generated in the furnace tube 23 by the burner 25 is discharged from the chimney 26 through hot air passages arranged in a labyrinth in the casing 22. The burner 25 supplies fuel to the furnace cylinder 2.
A fan 27 for generating airflow to atomize the fuel into the engine 3, an ignition transformer 28 for generating sparks, and an oil pump 29 for pressurizing the fuel are attached.

尚、バーナー25には図示していないが、発生熱量の異
なる2つのノズルが設けられ、また、それぞれのノズル
への配管途中には電磁弁30,31(図示略)が設けら
れており、この電磁弁を「開J「閉」し2つのノズルを
2つ点火、一方を点火、他方を点火、というように3つ
の態様で稼動させることによって、高燃焼・低燃焼の切
替が成し得るようになっている。エアーは送気ファン2
1によって外部から直接に又は適当なフィルターを経て
導入され、送気ファン21とケリシング22との間を蓮
通する送気口32からケーシング22内に入り、そして
熱風送出口19から風導18内に供給される。
Although not shown, the burner 25 is provided with two nozzles that generate different amounts of heat, and electromagnetic valves 30 and 31 (not shown) are provided in the middle of the piping to each nozzle. Switching between high combustion and low combustion can be achieved by operating the solenoid valve in three ways: opening and closing the two nozzles, igniting one, and igniting the other. It has become. Air is air supply fan 2
1 directly from the outside or through a suitable filter, enters the casing 22 through the air inlet 32 that passes between the air fan 21 and the kerating 22, and enters the air guide 18 through the hot air outlet 19. supplied to

そして、エアーはケーシング22内を通過する際に、高
温化された炉筒23や熱気路24,24・・・・・・の
表面と接触し加熱され熱風となる。そして、この熱風は
熱風導18を経て熱風吹込口12,12・・・・・・か
ら榛乾室内に供給される。尚、送気ファン21と送気□
32との間には、図示してないが、制御モータ33にに
よって開閉度が制御される熱風量調節用ダンパーが配置
されている。34は制御モータ33の回動位置により操
乾室内に送り込まれている熱風量を検出するポテンシオ
メ−夕である。
When the air passes through the casing 22, it comes into contact with the heated surfaces of the furnace tube 23 and the hot air passages 24, 24, . . . and is heated to become hot air. Then, this hot air is supplied into the drying chamber from the hot air blowing ports 12, 12, . . . through the hot air guide 18. In addition, the air supply fan 21 and the air supply □
Although not shown, a damper for adjusting the amount of hot air whose opening/closing degree is controlled by the control motor 33 is disposed between the hot air flow rate control member 32 and the control motor 33 . A potentiometer 34 detects the amount of hot air being sent into the drying chamber based on the rotational position of the control motor 33.

製茶粗操工程は以上のような製茶粗榛機によって、前工
程で蒸した茶葉をその含有残留水分が約50%になるま
で乾燥するのであるが、単に含有残留水分を約50%に
すれば良いというものではなく、茶葉の色沢・香気・水
色等の品質に劣化を与えないように行なわれなければな
らない。
In the tea manufacturing process, the tea leaves steamed in the previous process are dried using the tea processing machine as described above until the residual moisture content is reduced to approximately 50%. It does not mean that it is good, but it must be done in a way that does not deteriorate the quality of the tea leaves, such as their color, aroma, and light blue color.

そのためには、1の製茶粗操工程中操乾室内に送られる
熱風の温度、熱風量、主軸の回転数等の製茶粗榛工程に
おける各制御要素をその工程の進行に従って順次推移さ
せて行なわれる。たとえば、榛乾室内に送られる熱風の
量は、送気ファン21と熱交換部20の送気□32との
間に配置されたダンパーの開閉度を調整することによっ
て制御される。
To do this, each control element in the tea processing process, such as the temperature of the hot air sent into the drying chamber during the tea processing process 1, the amount of hot air, and the rotation speed of the main shaft, is changed sequentially as the process progresses. . For example, the amount of hot air sent into the drying chamber is controlled by adjusting the opening/closing degree of a damper disposed between the air blowing fan 21 and the air blowing □ 32 of the heat exchange section 20.

また、操乾室内に送られる熱風の温度はバーナー25の
燃焼度を調整することによって為される。
Further, the temperature of the hot air sent into the drying chamber is controlled by adjusting the burn-up of the burner 25.

この場合、熱風導18の適当な箇所に温度センサーを配
置し、工程初期はこれによって、榛乾室内に吹き込まれ
る熱風の温度を検出し、この値と当刻時における目標値
との差によってバーナーの燃焼度を制御し、工程途中よ
り茶溢センサー15によって操乾室内で現に裸み込まれ
ている茶葉の茶温を検出しこの値を目標茶温や目標茶温
変化率と比較してバーナーの燃焼度を制御する態様と、
工程当初から、茶温を検出し、この値を目標茶温や目標
茶温変化率と比較してバーナーの熱競度を制御する態様
等が考えられる。第2図は制御部のブロックダイヤグラ
ム、第3図は本発明を実施する際の手順を示すフローチ
ャートである。
In this case, a temperature sensor is placed at an appropriate location in the hot air guide 18, and at the beginning of the process, the temperature of the hot air blown into the drying chamber is detected. During the process, the tea overflow sensor 15 detects the tea temperature of the tea leaves that are currently soaked in the drying chamber, and compares this value with the target tea temperature and target tea temperature change rate. A mode of controlling the burnup of
A possible method is to detect the tea temperature from the beginning of the process and compare this value with the target tea temperature or target tea temperature change rate to control the heat competition of the burner. FIG. 2 is a block diagram of the control section, and FIG. 3 is a flowchart showing the procedure for implementing the present invention.

第2図においてCPUは中央処理装置であり、本発明方
法を実行するのに必要な各種の演算や処理を行なうもの
である。
In FIG. 2, the CPU is a central processing unit that performs various calculations and processes necessary to execute the method of the present invention.

EPROMはCPUもこ接続された消去書込可能謙取専
用メモリーで、CPUが行なう演算や各種処理の手順及
び各種制御要素の推移の指標となる既成パターンや目標
茶温変化率等が記憶されている。RAMはCPUに接続
されたランダムアクセスメモリーであり、CPUが演算
や処理を行なうのに必要なデータ、例えばダイヤル16
による目標茶温、茶温センサー15で検出した現在茶温
、現在熱風量等を一時的に記憶しておくものである。A
/Dはアナログ・デジタル変換器である。35はCPU
に接続された入出力ボートであり、36はゲート・ラツ
チ制御回路である。
EPROM is an erasable and writable dedicated memory that is connected to the CPU, and stores calculations performed by the CPU, various processing procedures, pre-existing patterns that serve as indicators of the transition of various control elements, target tea temperature change rate, etc. . RAM is a random access memory connected to the CPU that stores data necessary for the CPU to perform calculations and processing, such as dial 16.
The target tea temperature, the current tea temperature detected by the tea temperature sensor 15, the current amount of hot air, etc. are temporarily stored. A
/D is an analog-to-digital converter. 35 is CPU
36 is a gate/latch control circuit.

茶温センサー15、茶温設定ダイヤル16、ポテシオメ
ータ34は、アナログ・デジタル変換器を介し、さらに
ゲート・ラッチ制御回路36からの信号によって開閉さ
れるそれぞれのゲート回路37を介して入出力ボート3
5に接続されている。バーナー25のファン27をはじ
め、点火トランス28、オイルポンプ29、電磁弁30
電磁弁31はバーナー制御リレー38,39とゲート・
ラッチ制御回路36により制御されるラッチ回路40,
40を介して入出力ボート35と接続されている。尚、
熱風導18の適当な箇所に温度センサーを配置し、これ
によって、操乾室内に吹き込まれる熱風の温度を検出し
、この値と当該時における目標値との差によってバーナ
ーの燃焼度を制御する構成については、従来公知であり
、しかも、本発明の要部ではないので省略する。
The tea temperature sensor 15, the tea temperature setting dial 16, and the potentiometer 34 are connected to the input/output boat 3 via an analog/digital converter and through respective gate circuits 37 that are opened and closed by signals from a gate/latch control circuit 36.
5. Including fan 27 of burner 25, ignition transformer 28, oil pump 29, solenoid valve 30
The solenoid valve 31 is connected to the burner control relays 38, 39 and the gate.
a latch circuit 40 controlled by a latch control circuit 36;
It is connected to the input/output boat 35 via 40. still,
A configuration in which a temperature sensor is placed at an appropriate location in the hot air guide 18 to detect the temperature of the hot air blown into the drying chamber, and the burn-up of the burner is controlled based on the difference between this value and the target value at that time. Since this is conventionally known and is not an essential part of the present invention, it will be omitted.

しかして、上記のような製茶粗裸機を用いての本発明製
茶粗操方法は以下のようにしてなされるが、熱風量や主
軸の回転数等の制御要素の推移の制御は従来と変わると
ころがなく、また、本発明の要部でないので、ここでは
バーナー25の制御に関するフローについて詳細に説明
する。
Therefore, the tea processing method of the present invention using the tea processing machine as described above is performed as follows, but the control of changes in control elements such as the hot air volume and the rotation speed of the main shaft is different from the conventional method. However, since this is not an important part of the present invention, the flow related to the control of the burner 25 will be described in detail here.

の まず、熱風量調節用ダンパーの開閉度を制御する制
御モータ33に付設したポテンシオメータ34によって
現在裸乾室内に送り込まれている熱風量を間接的に読み
込む。
First, the amount of hot air currently being sent into the bare drying room is indirectly read by the potentiometer 34 attached to the control motor 33 that controls the opening/closing degree of the damper for adjusting the amount of hot air.

【ィ} 現在熱風量が第1表に示すいずれの風量城に該
当するか判断する。
[A] Determine which of the air volume levels shown in Table 1 the current hot air volume falls under.

第1表 この第1表は、製茶粗操機の容量や生茶葉の品種、摘孫
時期等により異なり経験的に得られたもので、これらの
値やその対応関係はすべてEPROM内に記憶されてい
る。
Table 1 This table 1 has been obtained empirically and varies depending on the capacity of the tea processing machine, the variety of raw tea leaves, the time of harvesting, etc. All of these values and their correspondence are stored in the EPROM. ing.

{ゥ)該当する風量域が前回読み込んだ風量城から変化
したか否かの判断を行ない、「イエス」つまり該当する
風量城が変化した場合は次へ進み、「ノー」の場合はの
へ進む。
{U) Determine whether or not the relevant air volume range has changed from the air volume castle read last time. If "yes", that is, the relevant air volume castle has changed, proceed to the next step; if "no", proceed to the next step. .

C} 当該風量城における加熱サイクルの基本パターン
(高燃焼×秒・低燃焼Y秒)を第1表より読み込む。
C} Read the basic pattern of the heating cycle (high combustion x seconds, low combustion Y seconds) for the air volume castle from Table 1.

例えば、何で読み込んだ熱風量が86の/minであれ
ば風量城はAであり(X=10,Y=30)がRAM内
に読み込まれる。
For example, if the hot air volume read is 86/min, the air volume is A and (X=10, Y=30) is read into the RAM.

則 榛胴4の底部に設けた茶温センサー15で現在擦り
込まれている茶葉の茶温を読み込む。
Rules The tea temperature of the tea leaves currently being rubbed is read by the tea temperature sensor 15 provided at the bottom of the teacup barrel 4.

(力)茶温設定ダイヤル16で設定した目標茶温を読み
込む。この目標茶温は通常34〜3800の範囲内で選
ばれる。(キ) 目標茶温から現在茶温を差し引いた値
がマイナスであるか否かを判断し、「ノー一であれば次
へ進み、「イエス」であれば(夕)へ進む。
(Power) Read the target tea temperature set with the tea temperature setting dial 16. This target tea temperature is usually selected within the range of 34 to 3800. (G) Determine whether the value obtained by subtracting the current tea temperature from the target tea temperature is negative, and if the answer is "no", proceed to the next step; if the answer is "yes", proceed to (evening).

(ク) 高燃焼×秒終了したか杏かを判断し、「ノー」
であれば次へ進み、「イエス」であれば(コ)へ進む。
(h) High combustion x seconds to judge whether it has finished or not, and answer “no”
If so, proceed to the next step, and if “yes” proceed to (c).

(ケ) バーナ−制御リレー38,39に高燃焼指令信
号を出力し、仇へ戻る。つまり、バーナー25のファン
27、点火トランス28、オイルポンプ2 9をすべて
○Nし、電磁弁30,31を共に「開一としてのへ戻る
(i) Output a high combustion command signal to burner control relays 38 and 39 and return to the enemy. In other words, turn on the fan 27 of the burner 25, the ignition transformer 28, and the oil pump 29, and return both the solenoid valves 30 and 31 to their original state.

(コ) 低燃焼Y秒終了したか否かを判断し、「ノー一
であれば次へ進み、「イエス」であれば(シ)へ進む。
(J) Determine whether Y seconds of low combustion have ended or not, and if "No", proceed to the next step; if "Yes", proceed to (C).

(サ) バーナー制御リレー38,39に低燃焼指令信
号を出力し、‘刀へ戻る。たとえば、電磁弁30を「開
一に31を「開一になるように出力した後、坊へ戻るの
である。つまり、これまでのフローは風量城が変わった
当初であって現在茶温が目標茶温を割っている場合には
、第1回目の加熱サイクルは第1表に示すように、風量
城Aでは高燃焼1の砂、低燃焼30秒、風量域Bでは高
燃焼8秒、低燃焼32秒、風量城Cでは高燃焼4秒、低
燃焼3競砂を基本パターンとし行なおうとするのである
(S) Outputs a low combustion command signal to burner control relays 38 and 39 and returns to the sword. For example, the solenoid valve 30 outputs "31" to "Kaiichi" and then returns to Bo. In other words, the flow up to now was when the air volume was changed, and the tea temperature is currently the target. If the tea temperature is lower than the tea temperature, the first heating cycle is as shown in Table 1. In air volume area A, sand with high combustion level 1, low combustion level is 30 seconds, and in air volume area B, high combustion rate is 8 seconds, low combustion level is 30 seconds. The basic pattern is 32 seconds of combustion, 4 seconds of high combustion, and 3 competitive sands for low combustion in airflow castle C.

(シ) 1加熱サイクル(X+Y)秒間における茶温の
変化率を算出する。
(C) Calculate the rate of change in tea temperature in 1 heating cycle (X+Y) seconds.

(ス) EPROM内に前もって記憶されている日標茶
温変化率の許容誤差範囲内に入っているか否かを判断し
、「ノー」であれば次へ進み、「イエス」であれば{刀
へ戻る。
(S) Determine whether or not it is within the allowable error range of the daily standard tea temperature change rate stored in advance in the EPROM. If "no", proceed to the next step; if "yes", proceed to the next step. return.

本実施例の場合、目標茶温変化率は0.15oo/4の
砂、許容誤差範囲は0.15土0.03℃/4の砂とし
てある。
In the case of this example, the target tea temperature change rate is 0.15°C/4 sand, and the allowable error range is 0.15°C/4 sand.

尚、この値も前述の第1表と同様に経験的に得られたも
のである。
It should be noted that this value was also obtained empirically as in Table 1 above.

(セ) (シ)で算出した茶溢変化率から目標茶温変化
率を差し引き誤差を算出する。
(C) Subtract the target tea temperature change rate from the tea overflow rate calculated in (C) to calculate the error.

(ソ) 誤差に対応する補正値(△×,△Y)を第2表
から読み出し、(×,Y)を補正し、高燃焼・低燃焼の
比率を変更してのへ戻る。
(S) Read the correction value (△×, △Y) corresponding to the error from Table 2, correct (×, Y), change the high combustion/low combustion ratio, and return to the previous step.

第2表 第2表も、第1表同様経験的に得られたもので、EPR
OM内に前もって記憶されている。
Table 2 Table 2, like Table 1, was obtained empirically, and the EPR
Pre-stored in OM.

例えば、高燃焼1の沙、低燃焼3硯砂の加熱サイクルを
行なったところ、その間の茶温変化率が−0.130o
/4硯砂・だつたとすると、目標茶温変化率との誤差は
(一0.1yo/4の砂)−(0.150o/4硯砂)
=−0.2800/40秒となり、第2表から(△X=
+9,△Y=−9)と読み出され、X=10十9、Y=
30−9と補正され、高燃焼19秒、低燃焼21秒のパ
ターンに変更される。これを第4図について説明すると
、区間41,42が補正前の加熱サイクルであり、区間
43,44が補正後の加熱サイクルで、高燃焼区間は4
1の1の砂から43の1現物こ、低熱焼区間は42の3
の砂から44の21秒にと、加熱サイクルのパターンが
変更されている。つまり、(シ)から(ソ)までのフロ
ーは、現在茶温が目標茶温を割っている場合、高燃焼と
低燃焼を交互に繰り返す加熱サイクルを1加熱サイクル
毎における茶温の変化率を監視しながらその次の加熱サ
イクルのパターンを変更していこうとするのである。
For example, when we performed a heating cycle of sand with high combustion level 1 and inkstone sand with low combustion level 3, the rate of change in tea temperature during that period was -0.130o.
/4 inkstone sand, the error from the target tea temperature change rate is (-0.1yo/4 sand) - (0.150o/4 inkstone sand)
= -0.2800/40 seconds, and from Table 2 (△X=
+9, △Y=-9), X=109, Y=
It is corrected to 30-9 and changed to a pattern of high combustion for 19 seconds and low combustion for 21 seconds. To explain this with reference to FIG. 4, sections 41 and 42 are the heating cycles before correction, sections 43 and 44 are the heating cycles after correction, and the high combustion section is 4.
1 of 1 sand to 43 of 1 spot, low heat firing section is 42 of 3
The heating cycle pattern has been changed from sand to 44 and 21 seconds. In other words, in the flow from (shi) to (so), if the current tea temperature is less than the target tea temperature, the rate of change in tea temperature in each heating cycle is calculated by repeating a heating cycle that alternately repeats high combustion and low combustion. It attempts to monitor and change the pattern of the next heating cycle.

(夕) 現在熱風量がいずれの風量城に該当するか判断
し、Aであれば次へ進みBかCであれば(ツ)へ進む。
(Evening) Determine which air volume level the current hot air volume corresponds to, and if it is A, proceed to the next step, and if it is B or C, proceed to (T).

(チ) バーナー制御リレー38,39に低燃焼指令信
号を出力し、何へ戻る。つまり、現在茶温が目標茶温を
越えたときには、バーナーは低燃焼をして茶温を降下さ
せる体制に入る。
(H) Output a low combustion command signal to burner control relays 38 and 39, and return to what. In other words, when the current tea temperature exceeds the target tea temperature, the burner enters a system in which low combustion is performed to lower the tea temperature.

そして、低燃焼は茶温が目標茶温を割るまで続けられる
こととなる。これを風量城Aにおける茶温とバーナーの
燃焼状態の関連を表わした第4図について説明すると、
区間45が上述の低燃焼が行なわれている時間に相当す
る。
The low combustion will continue until the tea temperature falls below the target tea temperature. To explain this with reference to Figure 4, which shows the relationship between the tea temperature and the burner combustion state at air volume castle A,
Section 45 corresponds to the time during which the above-mentioned low combustion is occurring.

尚、風量城Aに該当する熱風量が操乾室内に送り込まれ
ているときは、茶葉はまだ相当の水分を持っているため
、バーナー25を全く停止してしまうと茶温が急激に降
下してしまうため、低燃焼をさせて除々に降下させよう
とするのである。
Note that when the hot air volume corresponding to air flow rate A is being sent into the drying chamber, the tea leaves still have a considerable amount of moisture, so if the burner 25 is completely stopped, the tea temperature will drop rapidly. Therefore, they try to cause low combustion and gradually descend.

(ッ)10秒カウンターをセットし、セット時の茶温を
読み込む。
(t) Set the counter for 10 seconds and read the tea temperature at the time of setting.

尚、1の砂カウンターは一種のタイマーであり、本実施
例ではソフト的に構成したが詳細は省す。(テ)10秒
カウンターがカウントアップしたか否かを判断し、「ノ
ー」であれば次へ進み、「ィヱス」であれば(ナ)へ進
む。
Note that the sand counter 1 is a type of timer, and in this embodiment, it is configured as software, but the details will be omitted. (Te) Determine whether the 10 second counter has counted up or not. If "No", proceed to the next step; if "Yes", proceed to (Na).

(ト) バーナー制御リレー38,39にポストパージ
指令信号を出力し、何へ戻る。
(G) Output a post-purge command signal to burner control relays 38 and 39, and return to the next step.

つまり、バーナー26のファン27は回転させたまま、
電磁弁30,31を共に「閉」にして、炉筒23内の熱
気を強性的に排出し炉筒23を冷却して茶葉に与える熱
量を最4・限にし、茶温の上昇を防ごうとするのである
In other words, while the fan 27 of the burner 26 is kept rotating,
Both the solenoid valves 30 and 31 are "closed" to forcefully exhaust the hot air inside the furnace tube 23, cool the furnace tube 23, and limit the amount of heat given to the tea leaves to a maximum of 4.5 mm, thereby preventing a rise in tea temperature. I'm trying to do that.

(ナ)10秒カウンターがカウントアップした時の茶温
を読み込む。
(na) Read the tea temperature when the 10 second counter counts up.

(ニ) 10秒カウンターセット時の茶温からカウント
アップ時の茶温を差し引いた値が0かマイナスであるか
杏かを判断し、「ノー」であれば次へ進み、「イエス」
であれば(ネ)へ進む。
(d) Determine whether the value obtained by subtracting the tea temperature when counting up from the tea temperature when the counter is set for 10 seconds is 0, negative, or apricot, and if "No", proceed to the next step, and "Yes".
If so, proceed to (ne).

(ヌ)10秒カウンターをリセットし、仇へ戻る。(ネ
) バーナー制御リレー38,39に作動停止指令信号
を出力し、抗へ戻る。
(NU) Reset the counter for 10 seconds and return to the enemy. (N) Output an operation stop command signal to the burner control relays 38 and 39 and return to the control.

つまり、現在茶温が目標茶温を越えているときであって
操乾室内へ送り込まれている熱風量がBかCの風量域に
該当する場合には、(ッ)から(ネ)までのフローで、
茶温が降下し始めるまで1の砂毎のポストパージを繰り
返し行なって与える熱量を最4・限として茶温の上昇を
早期に押え、茶温が降下し始めたらポストパージをやめ
、今度は冷却された炉筒の余熱で熱められた熱風を送り
込んで茶溢の過剰な降下を防ごうとするのである。
In other words, when the current tea temperature exceeds the target tea temperature and the amount of hot air being sent into the drying room falls under the air volume range B or C, In the flow,
Repeat the post-purge for each sand until the tea temperature starts to drop, increasing the amount of heat given to a maximum of 4.5 cm to suppress the rise in tea temperature as soon as possible. When the tea temperature starts to drop, stop post-purging and then cool the tea. By sending in hot air heated by the residual heat of the furnace tube, the tea leaves are prevented from falling excessively.

これを風量域B,Cにおける茶温とバーナーの燃焼状態
の関連を表わした第5図について説明すると、区間46
が1硯砂毎のポストパージが繰り返し行なわれている時
間に相当し、区間47がバーナーの作動を完全に停止し
炉筒の余熱のみで加熱しようとする時間に相当する。
To explain this with reference to Fig. 5, which shows the relationship between tea temperature and burner combustion state in air volume ranges B and C, section 46
corresponds to the time during which post-purging is repeatedly performed for each inkstone sand, and period 47 corresponds to the time during which the operation of the burner is completely stopped and heating is attempted only by the residual heat of the furnace cylinder.

尚、風量城B又はCに該当する熱風量が榛乾室内に送り
込まれているときは、茶葉はもうかなりの水分を発散し
てしまっており、供給熱量に対して茶温が敏感に反応す
るので、低燃焼を続けたら茶溢はさらに上昇してしまう
し、いきなりバーナーの作動を停止させても熱い炉筒の
余熱でやはり上昇してしまう。
Furthermore, when the amount of hot air corresponding to air volume B or C is being sent into the drying chamber, the tea leaves have already released a considerable amount of moisture, and the tea temperature will respond sensitively to the amount of heat supplied. Therefore, if the combustion continues at a low level, the tea temperature will rise further, and even if you suddenly stop the burner operation, the residual heat from the hot furnace cylinder will still cause it to rise.

そこで、ポストパージをして炉筒を冷却して与える熱量
を最小限とするのであるが、茶温が目標茶温を割るまで
ポストパージを続けると今度は炉筒が冷え過ぎて茶温が
降下し過ぎるので、ポストパージは茶温を降下し始める
まで10秒毎の繰り返しとし、後はその冷却された炉筒
の余熱で熱められた熱風を送り込んで茶温の過剰な降下
を防ごうとしたのである。尚、第一発明においては加熱
機構への燃料の供給量を直接制御する他の実施例も考え
られるが、以上の説明で容易に類推ができるのでその詳
細は略す。
Therefore, a post-purge is performed to cool the furnace tube and minimize the amount of heat given, but if the post-purge is continued until the tea temperature falls below the target tea temperature, the furnace tube will become too cold and the tea temperature will drop. In order to prevent the tea temperature from dropping excessively, the post purge is repeated every 10 seconds until the tea temperature starts to drop, and then hot air heated by the residual heat of the cooled furnace tube is sent in to prevent the tea temperature from dropping excessively. That's what I did. In addition, in the first invention, other embodiments in which the amount of fuel supplied to the heating mechanism is directly controlled may also be considered, but since it can be easily inferred from the above explanation, the details thereof will be omitted.

上述の実施例では1つの目標茶温を加熱機構の制御の指
標としたが、次に上下2つの目標茶温を指標とする他の
実施例について説明する。
In the above embodiment, one target tea temperature was used as an index for controlling the heating mechanism, but next, another embodiment using two target tea temperatures, upper and lower, as indicators will be described.

まず、茶温設定ダイヤル16で1つの目標茶温を設定す
るとその値より低い値が自動的に設定されるようにする
が、2つの茶温設定ダイヤルで上下2つの目標茶温を設
定するかして、上方目標茶温と下方目標茶温がRAM内
に書き込まれるようにする。
First, when one target tea temperature is set using the tea temperature setting dial 16, a value lower than that value is automatically set. Then, the upper target tea temperature and the lower target tea temperature are written into the RAM.

そして、一番最初に測定した初期現在茶温が下方目標茶
温を割っているときはフラグを立て、それ以外のときは
フラグを立てないようにし、その後は、現在茶温が下方
目標茶溢を割った時点でフラグを立て上方目標茶温を越
えた時点でフラグを消すようにし、フラグが立っている
ときは下方目標茶温を指標とし、フラグが立っていない
ときは上方目標茶温を指標とするようにフローを構成す
る。
Then, when the initial current tea temperature measured at the beginning is less than the lower target tea temperature, a flag is set, otherwise the flag is not set, and thereafter, the current tea temperature is lower than the lower target tea temperature. A flag is set when the upper target tea temperature is exceeded, and the flag is turned off when the upper target tea temperature is exceeded.When the flag is set, the lower target tea temperature is used as the indicator, and when the flag is not set, the upper target tea temperature is Configure the flow to serve as an indicator.

これを第6図について説明すると、初期現在茶温がポイ
ント48であればフラグが立てられ下方目標茶温が加熱
機構の制御の指標となる。
To explain this with reference to FIG. 6, if the initial current tea temperature is point 48, a flag is set and the lower target tea temperature becomes an index for controlling the heating mechanism.

もし、初期現在茶温がポイント50や54であればフラ
グは立てられず上方目標茶溢がその指標となる。茶溢が
ポイント48でスタートすると現在茶温は目標茶温を割
っているので高燃焼・低燃焼を繰り返す加熱サイクルが
行なわれ、茶温はポイント49へ至る。ポイント49の
時点ではフラグが立つたままなので下方目標値を越える
と低燃焼あるいはポストパージ等の冷却サイクルが行な
われ、ポイント50を経由し上方目標値を越え・ずに茶
温は降下しポイント51へ至る。ポイント51の時点で
もフラグが立ったままなので下方目標茶温を割ると加熱
サイクルが再開される。その後、茶温が上昇しポイント
52で再び下方目標茶温を越し冷却サイクルが開始され
る。
If the initial current tea temperature is point 50 or 54, no flag is raised and the upper target tea overflow becomes the indicator. When the tea overflow starts at point 48, the current tea temperature is below the target tea temperature, so a heating cycle is performed in which high combustion and low combustion are repeated, and the tea temperature reaches point 49. At point 49, the flag remains on, so if the lower target value is exceeded, a cooling cycle such as low combustion or post-purge will be performed, and the tea temperature will drop through point 50 without exceeding the upper target value, and the tea temperature will drop to point 51. leading to. Since the flag remains set even at point 51, the heating cycle is restarted when the lower target tea temperature is exceeded. Thereafter, the tea temperature rises and exceeds the lower target tea temperature again at point 52, and the cooling cycle begins.

そして、その後も茶温が上昇しポイント53に至ると、
それまでずっと立つていたフラグが消される。しかし、
フラグが消されても冷却サイクルはそのまま続けられ、
茶温はポイント54を経由して降下し、ポイント55へ
至る。ポイント55の時点ではフラグが立っていないの
で上方目標茶温が制御の指標となっており、これより加
熱サイクルが再開されていくこととなる。そしてポイン
ト56で下方目標茶温を割るので再びフラグが立てられ
ることとなる。このように目標茶温を上方と下方に設け
、これを適宜切り替えるようにすれば、茶温の応答遅れ
をさらに前もって是正することができ、茶溢は一層一定
に維持することができる。
Then, when the tea temperature continues to rise and reaches point 53,
The flag that had been standing for a long time will be erased. but,
Even if the flag is cleared, the cooling cycle continues,
The tea temperature drops via point 54 and reaches point 55. Since the flag is not set at point 55, the upper target tea temperature is the control index, and the heating cycle is restarted from this point. Then, at point 56, the lower target tea temperature is lowered, so the flag is set again. By setting the target tea temperatures above and below and switching between them as appropriate, the delay in tea temperature response can be corrected in advance, and the tea overflow can be maintained even more constant.

以上、記載したところから明らかなように、本発明製茶
粗操方法によれば、加熱機構の制御が目標茶温と目標茶
温変化率の両者を指標としてなされるようにして茶温の
応答遅れを前もって是正できるようにしたので、茶温は
極めて一定に維持することができ、その変化も非常に滑
らかでありひいては、茶藁表面水分の蒸発速度と茶葉内
部水分の表面への移行速度を均衡化した恒率的乾燥がで
き、色沢、香気、水色等の優れた荒茶を製造することが
できる。
As is clear from the above description, according to the tea manufacturing and roughing method of the present invention, the heating mechanism is controlled using both the target tea temperature and the target tea temperature change rate as indicators, thereby delaying the response of the tea temperature. By making it possible to correct this in advance, the tea temperature can be maintained extremely constant, and its changes are also very smooth, which in turn balances the rate of evaporation of moisture on the surface of the tea straw with the rate of transfer of moisture inside the tea leaves to the surface. It is possible to dry the tea at a constant rate and produce rough tea with excellent color, aroma, light blue color, etc.

【図面の簡単な説明】[Brief explanation of drawings]

図面は本発明の実施の一例を示すもので、第1図は粗探
機の全体を示す一部切欠斜視図、第2図は主要制御部の
ブロックダイヤグラム、第3図はフローチャート、第4
図は大風量城における茶温とバーナーの燃焼状態の関連
を表わした図、第5図は小風量域における茶温とバーナ
ーの燃焼状態の関連を表わした図、第6図は目標茶温が
2つ設定された場合の指標の切り替えを説明するための
図である。 1・・・・・・製茶粗操機、2・・・・・・熱風発生機
、4・・・・・・裸胴、7・・・・・・主軸、8・・・
・・・操手、9・・・・・・汝手、10…・・・凝敵室
、15・・・・・・茶溢センサー、16・…・・茶温設
定ダイヤル、21・・・・・・送気ファン、23・・・
・・・炉筒、25・・・・・・バーナー、27・・・・
・・ファン、33…・・・制御モータ、34…・・・ポ
テンシオメータ、35……入出力ボート、36・・・・
・・ゲート・ラッチ制御回路、37・・・・・・ゲート
回路、38,39・・・・・・バーナ制御リレー、40
……ラッチ回路、RAM,EPROM・・・・・・メモ
リ、CPU・・…・中央処理装置。 第1図 第2図 第3図 第4図 第5図 第6図
The drawings show an example of the implementation of the present invention, and FIG. 1 is a partially cutaway perspective view showing the entire rough probe, FIG. 2 is a block diagram of the main control section, FIG. 3 is a flowchart, and FIG.
Figure 5 shows the relationship between tea temperature and burner combustion status in a large air volume area, Figure 5 shows the relationship between tea temperature and burner combustion status in a small air volume area, and Figure 6 shows the relationship between tea temperature and burner combustion status in a small air volume area. FIG. 6 is a diagram for explaining switching of indicators when two indicators are set. 1... Tea processing machine, 2... Hot air generator, 4... Bare body, 7... Main shaft, 8...
...Manipulator, 9...Your hand, 10...Concentration chamber, 15...Tea overflow sensor, 16...Tea temperature setting dial, 21... ...Air fan, 23...
...Furnace tube, 25...Burner, 27...
... Fan, 33 ... Control motor, 34 ... Potentiometer, 35 ... Input/output boat, 36 ...
...Gate latch control circuit, 37...Gate circuit, 38, 39...Burner control relay, 40
...Latch circuit, RAM, EPROM...Memory, CPU...Central processing unit. Figure 1 Figure 2 Figure 3 Figure 4 Figure 5 Figure 6

Claims (1)

【特許請求の範囲】 1 揉乾室内に送られる熱風の温度、熱風量、揉手や浚
手が装着された主軸の回転数等、製茶粗揉工程における
各制御要素をその工程の進行に従つて順次推移させなが
ら1の粗揉工程を終了する製茶粗揉方法において、熱風
温度を規定している加熱機構の制御は茶温と茶温変化率
の両者を指標としてなされるようにしたことを特徴とす
る製茶粗揉方法。 2 揉乾室内に送られる熱風の温度、熱風量、揉手や浚
手が装着された主軸の回転数等、製茶粗揉工程における
各制御要素をその工程の進行に従つて順次推移させなが
ら1の粗揉工程を終了する製茶粗揉方法において、マイ
クロプロセツサを中核とするいわゆるマイクロコンピユ
ータを用意してそれによつて熱風温度を規定している加
熱機構が、現在茶温が目標茶温を越えているときは冷却
サイクルを行ない、目標茶温を割つているときは高燃焼
と低燃焼を交互に繰り返す加熱サイクルを行なうととも
に1加熱サイクル毎における茶温の変化率と目標茶温変
化率との誤差に応じて高燃焼・低燃焼の比率を補正する
よう制御されることを特徴とする製茶粗揉方法。 3 冷却サイクルは低燃焼で行なうこととした、特許請
求の範囲第2項記載の製茶粗揉方法。 4 冷却サイクルはポストパージした後加熱機構を作動
停止して行なうこととした、特許請求の範囲第2項記載
の製茶粗揉方法。 5 揉乾室内に送られる熱風の温度、熱風量、揉手や浚
手が装着された主軸の回転数等、製茶粗揉工程における
各制御要素をその工程の進行に従つて順次推移させなが
ら1の粗揉工程を終了する製茶粗揉方法において、マイ
クロプロセツサを中核とするいわゆるマイクロコンピユ
ータを用意してそれによつて熱風温度を規定している加
熱機構が、現在茶温が目標茶温を越えているときであつ
て多風量の熱風が送り込まれている場合には低燃焼して
冷却サイクルを行ない、目標茶温を越えているときであ
つて少風量の熱風が送り込まれている場合にはポストパ
ージした後作動停止して冷却サイクルを行ない、目標茶
温を割つているときは高燃焼と低燃焼を交互に繰り返す
加熱サイクルを行なうとともに、1加熱サイクル毎にお
ける茶温の変化率と目標茶温変化率との誤差に応じて高
燃焼・低燃焼の比率を補正するよう制御されることを特
徴とする製茶粗揉方法。 6 上下2つの温度が適時切り替えられて目標茶温とな
るようにした、特許請求の範囲第1項乃至第5項記載の
製茶粗揉方法。
[Scope of Claims] 1. Each control element in the tea manufacturing process, such as the temperature of hot air sent into the rolling drying chamber, the amount of hot air, and the rotation speed of the main shaft on which the rolling hands and dredges are attached, is controlled according to the progress of the process. In the tea manufacturing method in which the first rough rolling step is completed by sequentially changing the temperature of the tea, the heating mechanism that regulates the hot air temperature is controlled using both the tea temperature and the tea temperature change rate as indicators. Characteristic tea manufacturing method. 2. While changing each control element in the tea roughing process sequentially as the process progresses, such as the temperature of the hot air sent into the rolling and drying room, the amount of hot air, and the rotation speed of the main shaft on which the rolling hands and dredges are attached, In the tea manufacturing method that finishes the rough rolling process, the heating mechanism uses a so-called microcomputer with a microprocessor at its core to regulate the hot air temperature. When the tea temperature is below the target tea temperature, a cooling cycle is performed, and when the target tea temperature is below, a heating cycle is performed that alternately repeats high combustion and low combustion. A tea processing method characterized in that the ratio of high combustion and low combustion is controlled to be corrected according to the error. 3. The tea manufacturing and roughening method according to claim 2, wherein the cooling cycle is performed with low combustion. 4. The tea manufacturing and roughening method according to claim 2, wherein the cooling cycle is performed by stopping the operation of the heating mechanism after post-purging. 5 While changing each control element in the tea roughing process sequentially as the process progresses, such as the temperature of the hot air sent into the rolling and drying room, the amount of hot air, and the rotation speed of the main shaft on which the rolling hands and dredges are attached, In the tea manufacturing method that finishes the rough rolling process, the heating mechanism uses a so-called microcomputer with a microprocessor at its core to regulate the hot air temperature. When the tea temperature is over the target tea temperature and a large amount of hot air is being sent, the cooling cycle is performed with low combustion, and when the target tea temperature is exceeded and a small amount of hot air is being sent. After post-purging, the operation is stopped and a cooling cycle is performed, and when the target tea temperature is below the target tea temperature, a heating cycle is performed in which high combustion and low combustion are repeated alternately, and the rate of change in tea temperature and target tea are calculated for each heating cycle. A tea processing method characterized in that the ratio of high combustion and low combustion is controlled to be corrected according to the error with the rate of temperature change. 6. The tea manufacturing and roughening method according to claims 1 to 5, wherein the upper and lower temperatures are switched at appropriate times to reach a target tea temperature.
JP14896882A 1982-08-26 1982-08-26 Tea manufacturing method Expired JPS6033458B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP14896882A JPS6033458B2 (en) 1982-08-26 1982-08-26 Tea manufacturing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP14896882A JPS6033458B2 (en) 1982-08-26 1982-08-26 Tea manufacturing method

Publications (2)

Publication Number Publication Date
JPS5939247A JPS5939247A (en) 1984-03-03
JPS6033458B2 true JPS6033458B2 (en) 1985-08-02

Family

ID=15464689

Family Applications (1)

Application Number Title Priority Date Filing Date
JP14896882A Expired JPS6033458B2 (en) 1982-08-26 1982-08-26 Tea manufacturing method

Country Status (1)

Country Link
JP (1) JPS6033458B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61149045A (en) * 1984-12-24 1986-07-07 Terada Seisakusho:Kk Coarse rolling method in tea processing

Also Published As

Publication number Publication date
JPS5939247A (en) 1984-03-03

Similar Documents

Publication Publication Date Title
KR950001890B1 (en) Distribution device of coffee bean
US7946220B2 (en) Method and steam cooking apparatus for regulating cooking processes in an oven
CA1312128C (en) Limit switch control method for a two-stage furnace
US4922624A (en) Method and apparatus for drying lumber
JPS6033458B2 (en) Tea manufacturing method
CN113933464B (en) Determination method and system for dehumidification rate of tobacco leaf curing houses
JP3142648B2 (en) Agricultural and seafood drying control
JPS6158158B2 (en)
JPH0153022B2 (en)
JPS618590A (en) Cereal drier
JPS6022894B2 (en) Stand-alone tea rolling machine and its control method
KR0170171B1 (en) Indoor installation type combustion device
JPS6361596B2 (en)
JPS61185172A (en) Humidity adjusting apparatus additionally attached to laver drying equipment
JPH0633936B2 (en) Grain dryer
JP2863879B2 (en) Dryer air supply heating control method and apparatus
US23748A (en) Stove
JP7403114B2 (en) gas dryer
JPH0229305B2 (en) SEICHASOJUHOHOOYOBISEICHAARAMOMIKI
JPS6122237Y2 (en)
US3054607A (en) Apparatus for drying charged storage battery cell elements
JPS63264A (en) Tea-making process and apparatus therefor
JPS61116281A (en) Cereal grain drier
JP2580040B2 (en) Control equipment for grain drying equipment
JPS59183651A (en) Method for coarse rolling of green tea leaf in manufacturing green tea leaf and apparatus therefor