JPS6119788B2 - - Google Patents
[go: Go Back, main page]

JPS6119788B2 - - Google Patents

Info

Publication number
JPS6119788B2
JPS6119788B2 JP57003623A JP362382A JPS6119788B2 JP S6119788 B2 JPS6119788 B2 JP S6119788B2 JP 57003623 A JP57003623 A JP 57003623A JP 362382 A JP362382 A JP 362382A JP S6119788 B2 JPS6119788 B2 JP S6119788B2
Authority
JP
Japan
Prior art keywords
stage
barrel
jib crane
leading
tier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP57003623A
Other languages
Japanese (ja)
Other versions
JPS58120963A (en
Inventor
Takayoshi Kawate
Katsushi Saito
Yasuhiro Yamashita
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kanadevia Corp
Original Assignee
Hitachi Zosen Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Zosen Corp filed Critical Hitachi Zosen Corp
Priority to JP362382A priority Critical patent/JPS58120963A/en
Publication of JPS58120963A publication Critical patent/JPS58120963A/en
Publication of JPS6119788B2 publication Critical patent/JPS6119788B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

【発明の詳細な説明】 本発明は、鉄塔支持形煙突の架設方法に関す
る。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method for constructing a tower-supported chimney.

従来、鉄塔支持形煙突の架設方法には、ポール
式デリツキとジヤツキアツプの組合せによる方
法、ジンポールとジヤツキアツプの組合せによる
方法などがあつたが、いずれの方法もクレーン解
体時における高所作業が多いこと、架設時のクレ
ーンの安定性が悪いことなどにより、その安定性
に問題があり、クレーンの吊場能力にも制限があ
り大ブロツクの部材を吊揚げできないことから、
建設現場での作業量が多いため作業能率が悪く、
工期が長いなどの問題があり、その解決が望まれ
ていた。
Conventionally, there have been methods for constructing tower-supported chimneys, such as a combination of a pole-type deli-tsuki and a jack-up, and a combination of a gin-pole and a jack-up. There were problems with the stability of the crane during erection, and the lifting capacity of the crane was also limited, making it impossible to lift large block members.
Work efficiency is poor due to the large amount of work at the construction site.
There were problems such as the long construction period, and it was hoped that these would be resolved.

そこで本発明はかかる問題点を解消した鉄塔支
持形煙突の架設方法を提案するものであつて、そ
の特徴とするところは、所定場所に鉄塔の脚部を
組立てると共に、脚部内の先行筒身設置位置に合
せて押上装置を設置し、この脚部内の押上装置上
に先行筒身の第1段から所定段数までを配置する
と共に、脚部内に隣接筒身最下段から所定段数ま
でを積み上げて配置し、上記先行筒身の第1段に
ジブクレーンを配置し、このジブクレーンは、ブ
ームを取付けたポストを第1段内に吊り上げ支持
すると共に、固定装置により第1段に固定し、押
上装置により先行筒身を所定高さ押し上げ、その
下に次の下段を挿入し、上記ジブクレーンにより
隣接筒身の次の上段を吊り上げてその積み上げ済
み段上に積み上げ、ジブクレーンにより鉄塔から
第2段を吊り上げてその脚部上に組立て、以上の
作用をくり返すことにより先行筒身の最下段を除
いて両筒身を所定どおり積み上げと共に鉄塔を組
立て、ジブクレーンによりノズル部を吊り上げ、
その各ノズル部をそれぞれ両筒身の頂部に配設
し、ジブクレーンを先行筒身内を通つて引き下げ
ると共に最下部の空間を介して先行筒身の外へ取
出し、その空間内に最下段を挿入することにあ
り、この構成によれば、先行筒身にクレーンを設
置することによつてこのクレーンの安定性を増
し、前記問題点を解決し、安全性、作業性にすぐ
れ、低コストで建設することのできる方法を提供
するものである。
Therefore, the present invention proposes a method for constructing a tower-supported chimney that solves these problems, and its features include assembling the legs of the steel tower at predetermined locations, and installing the leading cylinder inside the legs. A push-up device is installed in accordance with the position, and the first to a predetermined number of stages of the preceding barrel are arranged on the push-up device in this leg, and the adjacent barrels are stacked and arranged from the lowest step to a predetermined number of steps in the leg. A jib crane is placed in the first stage of the leading barrel, and this jib crane lifts and supports the post to which the boom is attached within the first stage, fixes it to the first stage with a fixing device, and lifts the post with the boom into the first stage. Push up the barrel to a specified height, insert the next lower tier under it, use the jib crane to lift the next upper tier of the adjacent barrel and stack it on top of the stacked tier, and then use the jib crane to lift the second tier from the steel tower. Assemble on the legs, repeat the above steps, stack both barrels as specified except for the bottom of the leading barrel, assemble the steel tower, lift the nozzle part with a jib crane,
Each nozzle part is arranged at the top of both barrels, and the jib crane is lowered through the leading barrel, taken out of the leading barrel through the space at the bottom, and the lowermost stage is inserted into that space. In particular, according to this configuration, the stability of the crane is increased by installing the crane on the leading barrel, the above-mentioned problems are solved, and the construction is excellent in safety and workability, and at low cost. This provides a method by which this can be done.

以下、本発明の一実施例を図に基づいて説明す
る。第1図および第2図イ,ロにおいて、21は
先行筒身、2は該筒身21の第1段21の内周
面の上部に固着された複数の吊金具、3は各吊金
具2に支持された滑車、5は第1段21の内周
面の下部に固着された複数のワイヤー止め金具、
1はジブクレーンであつて、第1段21内に挿
入された3つに分解可能なポスト7と、該ポスト
7の上部に外嵌固定されたリング状粱8と、ポス
ト7の下部に摺動自在に外嵌するリング状粱11
と、本体が該各粱8,11の外周面に複数個(こ
の実施例では4個づつ)固着されると共に先端が
第1段21の内周面に圧接するジヤツキ9,1
2と、上記ポスト7上に配設された旋回台13
と、該旋回台13上に配設された前部支持材1
5、後部支持材16および起状自在なブーム14
とから構成されている。6はポスト7の下端に固
着された複数の吊りピース、4は一端が該吊りピ
ース6に連結されると共に他端が滑車3を介して
ワイヤー止め金具5に連結されたワイヤーロープ
であつて、ジブクレーンを吊り上げて支持してい
る。10は両リング状粱8,11間に巻回されて
下部のリング状粱11を吊り上げ支持するワイヤ
ーロープである。17は先行筒身21の各段21
oを押し上げるための押上装置、19は鉄
塔、22は隣接筒身であつて積み上げられた各段
22oによつて構成されている。18はトラ
ツククレーンである。なお起伏装置の操作により
ブーム14を立て、前部支持材15に係着する
と、後部支持材16を外してもブーム14は安定
して立つた状態を保つことができる。また、ブー
ム14は短いビーム片を継ぎ合せて形成してい
る。押上装置17は、筒身基部において先行筒身
21を押し上げる装置で、例えば、特許第792671
号に示す煙突・塔等の建設装置である。
Hereinafter, one embodiment of the present invention will be described based on the drawings. In FIGS. 1 and 2 A and B, 21 is the leading barrel, 2 is a plurality of hanging fittings fixed to the upper part of the inner peripheral surface of the first stage 211 of the barrel 21 , and 3 is each hanging fitting. A pulley supported by 2, 5 a plurality of wire fasteners fixed to the lower part of the inner peripheral surface of the first stage 211 ,
Reference numeral 1 is a jib crane, which includes a post 7 inserted into the first stage 21 1 that can be disassembled into three parts, a ring-shaped ring 8 externally fitted and fixed on the upper part of the post 7, and a sliding part 8 on the lower part of the post 7. Ring-shaped cap 11 that is movably fitted on the outside
and a plurality of jacks 9, 1 whose main bodies are fixed to the outer circumferential surface of each of the shells 8, 11 (four pieces each in this embodiment) and whose tips are pressed against the inner circumferential surface of the first stage 211 .
2, and a swivel base 13 disposed on the post 7.
and a front support member 1 disposed on the swivel base 13.
5. Rear support member 16 and boom 14 that can be raised freely
It is composed of. 6 is a plurality of hanging pieces fixed to the lower end of the post 7; 4 is a wire rope whose one end is connected to the hanging piece 6 and the other end is connected to the wire stopper 5 via the pulley 3; The jib crane is lifted and supported. Reference numeral 10 denotes a wire rope that is wound between both the ring-shaped ropes 8 and 11 to lift and support the lower ring-shaped rope 11. 17 indicates each stage 21 of the leading barrel 21
A lifting device for pushing up 1 to 22 o , 19 is a steel tower, 22 is an adjacent cylinder, and is composed of stacked stages 22 1 to 22 o . 18 is a truck crane. Note that when the boom 14 is erected by operating the undulating device and engaged with the front support member 15, the boom 14 can be stably maintained in an upright state even if the rear support member 16 is removed. Moreover, the boom 14 is formed by joining together short beam pieces. The push-up device 17 is a device that pushes up the leading barrel 21 at the barrel base, and is disclosed in, for example, Japanese Patent No. 792671.
This is construction equipment for chimneys, towers, etc. as shown in No.

上記構成に基づいて鉄塔支持形煙突の架設方法
について説明する。
A method for constructing a tower-supported chimney will be explained based on the above configuration.

(A) トラツククレーン18によつて、鉄塔19の
脚部19oを組立てる。
(A) Assemble the legs 19o of the steel tower 19 using the truck crane 18.

(B) 押上装置17を設置する。先行筒身21の第
1段21から第4段21を設置する (C) 先行筒身21の第1段21に、トラツクク
レーン18を用いて、第3図に示すようにジブ
クレーン1をを設置する。
(B) Install the push-up device 17. Installing the first stage 211 to the fourth stage 214 of the leading barrel 21 (C) Using the truck crane 18, install the jib crane 1 on the first stage 211 of the leading barrel 21 as shown in FIG. Set up.

(D) 先行筒身21は鉄塔19の脚部19oによつ
て第4図に示すように安定よく保持されてい
る。
(D) The leading barrel 21 is stably held by the legs 19 o of the steel tower 19 as shown in FIG. 4.

(E) 先行筒身21を押上装置17により押上げ、
下部にできた空間へ第5段21を挿入して先
行筒身に取付け、さらに押上げたのち第5図に
示すように、台車25上の第6段21を挿入
し、先行筒身21に取付ける。
(E) The leading barrel 21 is pushed up by the pushing up device 17,
Insert the fifth stage 215 into the space created at the bottom and attach it to the leading barrel, push it up further, and then insert the sixth stage 216 on the trolley 25 as shown in FIG. Install it on 21.

(F) ジブクレーン1により、隣接筒身22の下部
22o〜22oを基礎部から適当な高さにま
で積み上げ、架設する。
(F) Using the jib crane 1, the lower parts 22o to 22o - 4 of the adjacent cylinders 22 are piled up to an appropriate height from the foundation and erected.

(G) ジブクレーン1を用いて、第6図及び第7図
に示すように、隣接筒身22に下から6段22
o及び鉄塔19を積上げ、架設を進行す
る。
(G) Using the jib crane 1, as shown in Fig. 6 and Fig.
o - 5 and steel tower 19 will be stacked up and construction will proceed.

(H) 更に先行筒身21を押し上げ、第8図に示す
ように先行筒身21の下部空間へ第8段21
を挿入し、先行筒身21の架設を進める。
(H) Further push up the leading barrel 21 and move the eighth stage 21 8 into the space below the leading barrel 21 as shown in FIG.
is inserted, and the construction of the leading barrel 21 is proceeded.

(I) 以上のごとく、先行筒身21の押上げ架設、
隣接筒身22及び鉄塔19の架設を繰り返し行
い、第9図に示すように、隣接筒身22にノズ
ル部24を載置し、鉄塔19の架設を先に完了
する。
(I) As described above, the pushing up construction of the leading barrel 21,
The construction of the adjacent barrel 22 and the steel tower 19 is repeated, and as shown in FIG. 9, the nozzle portion 24 is placed on the adjacent barrel 22, and the construction of the steel tower 19 is completed first.

(J) 先行筒身21の頂部へ、ノズル部23を数分
割にして吊り上げ、架設することにより、先行
筒身21も、最下段21o以外は架設を完了す
る。
(J) By hoisting the nozzle part 23 in several parts to the top of the leading cylinder body 21 and erecting it, the construction of the leading cylinder body 21 is also completed except for the lowest stage 21o .

(K) ジブクレーン1のブーム14を第10図に示
すごとく立て、前部支持材15に係着し、後部
支持材16を取り外す。
(K) Raise the boom 14 of the jib crane 1 as shown in Fig. 10, attach it to the front support member 15, and remove the rear support member 16.

(L) ワイヤー止め金具5に係着していた懸吊ワイ
ヤーロープ4を、例えば4箇所の内2箇所を、
地上で操作するウインチ(図示せず)に継ぎ、
その後、残り2箇所の懸吊ワイヤーロープ4を
外す。
(L) For example, remove the hanging wire rope 4 that was attached to the wire stopper 5 at two of the four locations.
Connected to a ground-operated winch (not shown),
After that, the remaining two hanging wire ropes 4 are removed.

(M) ジヤツキ9及び12をちぢめ、先行筒身
に圧着していた固定状態を解除する。
(M) Shrink jacks 9 and 12 to release the fixed state that was crimped onto the leading barrel.

(N) ウインチ操作により、ジブクレーン1
を、第11図に示すように先行筒身21の基部
へおろす。
(N) By operating the winch, jib crane 1
is lowered to the base of the leading barrel 21 as shown in FIG.

(O) 第11図に示すように、トラツククレー
ン18を用いてジブクレーン1を下部から遂次
解体し取出す。この場合懸吊ワイヤーロープ4
の係着位置を適宜移転する。
(O) As shown in FIG. 11, using the truck crane 18, the jib crane 1 is successively dismantled and taken out from the bottom. In this case, the hanging wire rope 4
Relocate the anchoring position as appropriate.

(P) ジブクレーン1の取出し後、先行筒身2
1の最下段21oを挿入し、第12図に示すよ
うに架設を終る。
(P) After removing the jib crane 1, the leading barrel 2
1, and the construction is completed as shown in FIG. 12 .

(Q) 押上装置17を撤去する。(Q) Remove the push-up device 17.

以上述べたごとく本発明の鉄塔支持形煙突の架
設方法によれば、筒身は鉄塔に支持され、クレー
ンは先行筒身の中心に確保され、極めて安定して
いる。そのため、クレーン自体は軽量できるが、
その割に大重量の物を吊ることができるので大型
のブロツクにした建設部材の運搬が可能であり、
従来の方式にくらべ能率的である。また、一人で
クレーン操作ができ、隣接筒身と鉄塔との架設作
業を並行して行うことができる。即ち、本発明の
方法によると、極めて安全で、しかも能率的に架
設することができる。
As described above, according to the method for constructing a tower-supported chimney of the present invention, the barrel is supported by the tower, the crane is secured at the center of the leading barrel, and the chimney is extremely stable. Therefore, although the crane itself can be lightweight,
Because it can hang relatively heavy objects, it is possible to transport construction materials in large blocks.
It is more efficient than conventional methods. In addition, one person can operate the crane and perform erection work on the adjacent barrel and steel tower in parallel. That is, according to the method of the present invention, construction can be carried out extremely safely and efficiently.

【図面の簡単な説明】[Brief explanation of the drawing]

図は本発明の一実施例を示し、第1図はクレー
ンの正面図、第2図イ及びロは第1図のイ−イ、
ロ−ロの各断面図、第3図及び第5図〜第12図
は工程説明図、第4図は第3図状態の平面図であ
る。 1……ジブクレーン、7……ポスト、9……ジ
ヤツキ、13……旋回台、14……ブーム、17
……押上装置、19……鉄塔、19o……鉄塔の
脚部、21……先行筒身、21o……先行筒
身の各段、22……隣接筒身、22o……隣
接筒身の各段、23……ノズル部、24……ノズ
ル部。
The drawings show one embodiment of the present invention, in which Fig. 1 is a front view of the crane, Fig. 2 A and B are Fig. 1 A-I,
Each sectional view of the roller, FIGS. 3 and 5 to 12 are process explanatory views, and FIG. 4 is a plan view of the state shown in FIG. 3. 1...Jib crane, 7...Post, 9...Jacket, 13...Swivel base, 14...Boom, 17
... Push-up device, 19 ... Steel tower, 19 o ... Legs of steel tower, 21 ... Leading cylinder body, 21 1 ~ o ... Each stage of leading cylinder body, 22 ... Adjacent cylinder body, 22 1 ~ o ...Each stage of adjacent cylinder body, 23... Nozzle part, 24... Nozzle part.

Claims (1)

【特許請求の範囲】[Claims] 1 所定場所に鉄塔の脚部を組立てると共に、脚
部内の先行筒身設置位置に合せて押上装置を設置
し、この脚部内の押上装置上に先行筒身の第1段
から所定段数までを配置すると共に、脚部内に隣
接筒身の最下段から所定段数までを積み上げて配
置し、上記先行筒身の第1段にジブクレーンを配
設し、このジブクレーンは、ブームを取付けたポ
ストを第1段内に吊り上げ支持すると共に、固定
装置により第1段に固定し、押上装置により先行
筒身を所定高さ押し上げ、その下に次の下段を挿
入し、上記ジブクレーンにより隣接筒身の次の上
段を吊り上げてその積み上げ済み段上に積み上
げ、ジブクレーンにより鉄塔の下から第2段を吊
り上げてその脚部上に組立て、以上の作用をくり
返すことにより先行筒身の最下段を除いて両筒身
を所定どおり積み上げると共に鉄塔を組立て、ジ
ブクレーンによりノズル部を吊り上げ、その各ノ
ズル部をそれぞれ両筒身の頂部に配設し、ジブク
レーンを先行筒身内を通つて引き下げると共に最
下部の空間を介して先行筒身の外へ取出し、その
空間内に最下段を挿入することを特徴とする鉄塔
支持形煙突の架設方法。
1. Assemble the legs of the steel tower at a specified location, install a lifting device in line with the installation position of the leading barrel in the leg, and arrange the leading barrel from the first stage to a predetermined number of stages on the pushing device in this leg. At the same time, adjacent barrels are stacked up to a predetermined number of stages from the lowest stage in the leg, and a jib crane is installed in the first stage of the preceding barrel, and this jib crane moves the post to which the boom is attached to the first stage. At the same time, it is lifted and supported in the first stage by a fixing device, the pushing device pushes up the preceding barrel to a predetermined height, the next lower stage is inserted under it, and the next upper stage of the adjacent barrel is lifted by the above-mentioned jib crane. Lift it up and stack it on top of the stacked tier, lift the second tier from the bottom of the steel tower using a jib crane, and assemble it on its legs.By repeating the above steps, both barrels are separated except for the bottom tier of the leading barrel. They are stacked as specified and the tower is assembled, the nozzle parts are hoisted up by a jib crane, each nozzle part is placed at the top of both cylinders, and the jib crane is lowered through the inside of the leading cylinder, and the leading cylinder is removed through the space at the bottom. A method for constructing a tower-supported chimney, which is characterized by taking it out of the body and inserting the lowest tier into the space.
JP362382A 1982-01-12 1982-01-12 Construction of iron tower supporting type chimney Granted JPS58120963A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP362382A JPS58120963A (en) 1982-01-12 1982-01-12 Construction of iron tower supporting type chimney

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP362382A JPS58120963A (en) 1982-01-12 1982-01-12 Construction of iron tower supporting type chimney

Publications (2)

Publication Number Publication Date
JPS58120963A JPS58120963A (en) 1983-07-19
JPS6119788B2 true JPS6119788B2 (en) 1986-05-19

Family

ID=11562621

Family Applications (1)

Application Number Title Priority Date Filing Date
JP362382A Granted JPS58120963A (en) 1982-01-12 1982-01-12 Construction of iron tower supporting type chimney

Country Status (1)

Country Link
JP (1) JPS58120963A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61238728A (en) * 1985-04-16 1986-10-24 Mitsui Norin Kk Complex substance of extract of tea leaf and active aluminum hydroxide

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4423138Y1 (en) * 1964-12-30 1969-09-30
JPS5512694B2 (en) * 1972-08-24 1980-04-03
JPS505865A (en) * 1973-05-21 1975-01-22
JPS5014463A (en) * 1973-06-12 1975-02-15
JPS537939A (en) * 1976-07-09 1978-01-24 Mitsubishi Heavy Ind Ltd Process for errecting upper end final unit of structure

Also Published As

Publication number Publication date
JPS58120963A (en) 1983-07-19

Similar Documents

Publication Publication Date Title
EP2478171B1 (en) Tubular building structure with hingedly connected platform segment
JP2007071097A (en) Construction method of wind power generation tower
JP2009073599A (en) Tower crane support structure and climbing method
CN110589690B (en) Climbing method of internal climbing tower crane in narrow space
CN109812117B (en) Mobile intelligent lifting radar tower and installation method thereof
JPS6119788B2 (en)
JP3379014B2 (en) Push-up method and its device
JP3708060B2 (en) Construction method of roof structure
JPH09177070A (en) Method and apparatus for constructing rebar cage for deep foundation
JP4354046B2 (en) Climbing crane floor climbing method
KR100978214B1 (en) Column for supporting beam structure of high-rise building and steel structure construction method using same
JPH07197696A (en) Construction method of connection type columnar body
JPH06101348A (en) How to build a tower
JP3073371B2 (en) Tower-like structure erection method and equipment
JPH062434A (en) How to build a steel frame roof
JPH0718743A (en) Construction method for large span domelike roof
Martinez-Calzon Two Special Construction Procedures For The Erection Of The Big Communication Towers Of Collserola And Valencia
JP3021199B2 (en) Construction method of chimney inner cylinder and pull jack up device for the construction
JPS5822991A (en) Installation method of reactor containment vessel
JPS6035512B2 (en) Erection equipment for tower-like structures
JP6355801B2 (en) Construction method of dome-like roof structure
JP2796448B2 (en) Building construction method and building construction equipment used for the construction method
JPH07172767A (en) Tower crane mast removal device
JP2687000B2 (en) Jib crane assembly equipment
JPH0321777A (en) How to build a steel column